3574NOTE:
With proper validation
this form constitutes an
encroachment permit
CITY OF LA QUINTA
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit —Class I II
DATE: 11/15/01 Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION Washington @ 48th Avenue
CUE 2000-048 - La Quints. Arts Foundation
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION T #* 11 TTrk 1 4- Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION *end t f A
DIMENSION OF INSTALLATION OR REMOVAL
700 feet
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN
APPROXIMATE TIME OF COMPLETION 1 muck
ESTIMATED CONSTRUCTION COST $ 21 -000
(Including removal of all obstruction, materials, and debris, backfilling, com-
action and lacin ermanent resurfncin and/or re `acin im rovements)
P P 9 P 9 P9 P
In consideration of the granting of this permit, the applicant hereby agrees to:
See Attached Conditions
NOV 16 2001 L
Indemnify, defend• and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this work.
at ' d',
Signature of Applicantor Agent
T.a 0t),11xnta Arts Foundation 564-1244
Name of Applicant (please print) Business Address Telephone No.
Braudirk Electriacl
Name of Contractor and Job Foreman Business Address Telephone No.
4.R962'A
Contractor's License No.
City Business License No.
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit —Class III
Public improvements: 3% of estimated cons -ruction costs
Private improvements: 3% of estimated construction costs
Minor. Improvement Permit — Class IV: See attached schedule
Inspection Fee
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
Receipt No.
$ Alin
100
$ 730
Received by Date
Recorded by
3574
PERMIT VALIDATIO
PERMIT NO. 3547
DATE APPROVED 1 1 /1 /ni
EXPIRATION DATE 5/15/02
DATE ISSUED
L C Administrative Authority
Telephone: (760) 777-7075
It
NOT€':: '
With proper validation
this form constitutes an CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT).
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
DATE: 11/15/01
Subdivision Improvement Permit — Class I I
Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION Washington @ 48th Avenue
CUP 2000-048 — La Quinta Arts Foundation 5-yo Zeno D y�
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION Tom.^�^ �. �r�rn �_ �'* Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION-0.414A-4nn
See Attached Conditions
DIMENSION OF INSTALLATION OR REMOVAL
700 feet
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN
APPROXIMATE TIME OF COMPLETION i WAPA
ESTIMATED CONSTRUCTION COST $ n AQnn
(Including removal of all obstruction, materials, and debris, backfilling,
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to: i
Indemnify, defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this work.
n14
.AA4,t- A?, J4
Signature of Applicant/or Agent
x,R OuintA Arts Founiiat [on 564-1244
Name of Applicant (please print) Business Address Telephone No.
Braudirk Electriacl
Name of Contractor and Job Foreman Business Address Telephone No.
4i12�2�
Contractor's License No.
City Business License No.
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class 111
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor. Improvement Permit — Class IV: See attached schedule
Inspection Fee $
100
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL: $ 730
Receipt No. ~
Received by Date
Recorded by
3574
PERMIT VALIDATION
PERMIT NO. 3547
DATE APPROVED t 1 / 1 At /At
EXPIRATION DATE 5/15/02
DATE ISSUED
By
L Administrative Authority
Telephone: (760) 777-7075 - -
01
s
The following General and Special Provisions are attached to and made a part of Permit No.
GENERAL. PROVISIONS
The following shall always apply:
ENROACHP4ENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of
way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to
secure permission from abutting property owners. Such authorization must be jsecured by the permittee prior to starting work.
TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on
any paved surface unless fined with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to
protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing
pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred, City of Le Quints ,ball request
that these portions of road be resurfaced over thew entire width. Resurfacing shall consist of one coat of two inches (2) of A.C.
surfacing plus appropriate seal cost as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the
City Engineer or La Quints City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the
duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations.
CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and
concrete structures encountered during excavation which necessitate removal shall be replaced in hind. In the event it becomes
necessary to remove or cut existing drainage structures, City of La Quints sball be notified prior to commencement of this work.
Drainage structures and open drains shall be kept free of debris at all times for proper drainage.
RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations abaltbe removed from the right
of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and 'compaction
Existing gutter line and drainage ditches iball be replaced to their original standard or better. All excess material shall be -removed
prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shaU be used
immediately after backfill.
DE-WA7ER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quints roads, it shall
be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary..
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited
access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for
any length of time, permittee shall contact this office to obtain the necessary permission.
SPECIAL. PROVISIONS
The following shall apply when indicated:
R NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction.
R LTITI.ITY CL.EARANCE- (Substructures) Prior to making any excavation within the City of Le Quints right of way
authorized by permit, the perminee shall contact all concerned utility companies relative to the location of existing
substructures. Damage to existing substructures resulting from operations conducted under this permit shall be. the sole
responsibility of the permittee.
.110
LTI7I.ITY CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site.' The permittee shall notify all concerned utility companies of the proposed work.
R4 PAVENITM WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be suifsced
with inches of A.C. paving placed on inches of class aggregate subbase course having an W
value of not less than and in conformance with City of La Quints Road Improvement Standards and
Specifications, Ordinance 0461.
R'S PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a elope of
i/4 inch to one foot (1).
06 GRADE CBECICtT1G: City of Le Quints shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
R7 CURB REMOVAL. FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( _feet) shall be
removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of Ls Quints Standard 1207.
Its DRIVEWAYS: A.C. driveways shall be constructed asnot to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on (_� of claw aggregate base.
Driveway construction shall conform to attached drawing.
R9 SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times.
RIO SOIL STERn»-ER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply witb.the
manufacturer's specifications.
COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of
Ls Quints may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of Ls
Quints forces to preclude delay or interference with State of City of I:a Quints projects.
1 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be
replaced by a licensed civil engineer or surveyor at the expense of the perminee. A complete set of notes showing the ties to
these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified
�� upon completion or replacement of all survey monuments for proper project clearance.
it1 3 1PAVEMENT C II -MG: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method
of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating
equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to bat
facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
RH LBUT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the
traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No
excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction
material is actually on the work site.
1 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes .
of producing an adequately consolidated backfill. Any material which the City of Ls Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced
by an approved sand or gravel.
R16 BACKFU L SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than
three feet (37 and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case,
a relative compaction of 95 percent shall be ortained with the structural section of the roadway.
R17 BAC)CFILL PLACEMENT': Backfill shall be applied. in layers of not more than 50 percent of the total depth of the trench
before flooding or a maximum of five-foot OD lifts where trenches are of excessive depths. Care is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting
compaction shall be not leas than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction.
Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where
jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous.
RIB COMPACTION TESTS: If so required by the inspector, compaction testa shall be made at intervals of not more than 1000
feet and a minimum of one (1) test on each road: One (1) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications, Division of Highways, State of California, dated January 1973.
1.9 COMPACTION TESTS: if so required by the inspector, compaction tests shall be made for each clogging or service line.
One (1) copy of each test shall be 'forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Section 6.3.01. of the Standard Specifications, Division of Highways, State of
California, dated January 1973.
TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a
maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the
placement of the temporary pavement exceed a five (5) day limit.
PERMANENT. PAVEMENr REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2') of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a
i. inch class base shall be placed no later than days after completion of temporary road repair.
FOG SEAL: A fog Beal coat consisting of on application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
STREET RF.STRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
,t
completion of permanent repairs.
R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City -of Le Quints road right of way shall be
accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling
public. It shall be the responsibility of the perminee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The
entire width of the -tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump
bole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to
restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or
barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall
comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
2
SPECIAL CONDITIONS —PERMIT INTO. 3574
--- ]La QU' inta Arts Foundation ---
In addition to the standard permit conditions, the following shall apply:
]Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For
]Public Works Construction (SS PWC) and as directed by and to the satisfaction of the City Engineer.
]La Quinta Arts (Foundation, hereinafter referred to as "]Permittee", shall be responsible for providing
continuous dust and erosion control. All areas shall be kept watered down daily including weekends.
Streets shall be kept clean. They shall be completely cleaned at the end of each working day and
more frequently if required.
4. IFumummnt to Section 6.08.050 oT the IL@ Quinta M[unnucupzl Cale ((Girdtnnance Is § R, 1982),
thi°ough out the woi k 56te, the IFei°mmnttee 5➢n&lh comply with City i°eganhated woi k hours.
Opei maho n and maintenance oT equipment within one-h-90 ° mule off human n occupancy sh .0 be
pelrffoirmmed on0y duu-inng the ToUowunng time periods.-
Ocaobeu- Rot to Aput 30. M onnday-IFir6day 7000 a.m. to 5030 p.m.
;Satui dmy @000 &mmo to 5000 P.M.
M,%y Rot to Septemmbei° 36o M oImlay-Yi day 6000 %.mm to 7a00 p.m.
Svuidmy @000 a.m. to 5.00 P.M.
Wei k slnahh be pi°®hnnlvnted on hegah hnoUd@ys and Sunndmy&
Woi k peKon°nnued within 500 Teet oT z sig nmpnzed inaei°secdo n is i°esti°ucted between the hour off
9 Somme - 3 pone 'Ti mflTnic conntn°®p slnmhh be set up aReu- 9 a.m. and i°emmoved beh°®i°e 3 p.m. The
Pennnuttee shag contact the Mvennde ECou nti°y 'Tmi ice Signah Maintenance IIDepwimme nt at (909)
275-6994 5T 5ugnn@0 opei°ation at the nnntemectionn is to be ahtei°ed in any way.
6.. ]Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
lPermittee shall assume responsibility for repair of pavement damage to any public or private street
and for damage to other City streets or facilities as a result of work performed under this permit.
7. ]Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Frans Standards or the Work Area'Traffic (Control Handbook (WATCH Manual). A traffic control
plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City
for review and approval one (1) week prior to starting any construction. It shall be the ]Permittee's
responsibility to appropriately detour and barricade all construction sites.
8. ]Pursuant to Section 14.16.290 of the ]La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be permitted. A minimum of one travel lane of paved surface. shall be
maintained with flagmen at all times. ,
Special Conditions - Permit No. 3574 Page I of 4
SPECIAL CONDITIONS --PERMIT NO. 3574
--- La Quinta Arts ]Foundation ---
9. Prior to excavating, if required, the Permitt6e shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the ]public Works (Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
10. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee as directed by and to the satisfaction of the City ]Engineer at no cost
to the City of ]La Quinta.
11. (Pursuant to Section 14.16.370 of -the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest
edition of the Standard Specifications For Public Works Construction (SSIFWC), except as otherwise
specified herein.
Native material may be used as backfill material provided that minimum compaction, achieved in
the manner prescribed herein, is achieved. backfill shall be performed by mechanical means; no
water densified compaction via jetting or flooding or other means shall be allowed. It shall be the
Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection,
onsite, at all times during backfill operations.
backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material,
such material shall be removed to the limits directed by the cGeotechnical Inspector and/or the
City Inspector and the resulting excavation backfilled with pipe bedding material.
B. backfill materials shall be brought to or maintained at an appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through progress testing on the stockpiles.
C. -The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the
depth of lift that can be compacted.
D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall
be taken within the flifis to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift
thickness to be compacted for the remainder of the project.
F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift
of backfill, per 300 linear feet of open trench, at randomly selected locations within the open
length of trench.
Special Conditions - Permit No. 3574 Page 2 of 4
r!
SPECIAL CONDITIONS —PERMIT NO. 3 574
--- La Quinta Arts ]Foundation ---
G. The depth of the randomly selected compaction tests shall also be randomly selected except
that where multiple tests are required in a given length of trench, the tests shall be no closer
than three feet (vertically) from each other. .
H. If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all
test results shall be furnished to the City Inspector.
12. All excavations within City of La Quinta right-of-way shall be backfalled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of
the City (Engineer for the protection of the public. ]Lengths of open trench shall not greatly exceed
that which can not be backfil➢ed in the same day. (Excavated trenches shall not be allowed open
overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet
in length, open overnight at a point where construction will began the next day, provided that this
length of trench is completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to
its original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. (Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the
completion of the work. (Permanent pavement replacement shall conform to the following
conditions:
A: ]Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. ]Edges
shall be straight and clean.
B. (Permanent pavement replacement structural section, within all trenches, shall be 1" thicker
than existing of asphalt concrete over the same existing thickness of crushed aggregate base
or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of
the Standard Specifications for ]Public Works Construction. The replaced pavement and base
material shall be compacted to 95% relative compaction and respectively tested, for each 300
linear feet of trench. Verify exact structural replacement section thicknesses with the City
prior to installation.
C. Permanent *pavement replacement shall be installed using a City approved 3/4" max medium
asphalt concrete as the base course lift and a City approved '/z" max medium finish course lift
for capping. Asphalt concrete mix design shall be approved by the City prior to its placement.
Special Conditions - Permit No. 3574 Page 3 of 4
SPECIAL CONDITIONS —PERMIT NO. 3 574
--- La Quinta Arts ]Foundation ---
G. The depth of the randomly selected compaction tests shall also be randomly selected except
that where multiple tests are required in a given length of trench, the tests shall be no closer
than three feet (vertically) from each other. .
H. If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all
test results shall be furnished to the City Inspector.
12. All excavations within City of La Quinta right-of-way shall be backfalled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of
the City (Engineer for the protection of the public. ]Lengths of open trench shall not greatly exceed
that which can not be backfil➢ed in the same day. (Excavated trenches shall not be allowed open
overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet
in length, open overnight at a point where construction will began the next day, provided that this
length of trench is completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to
its original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. (Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the
completion of the work. (Permanent pavement replacement shall conform to the following
conditions:
A: ]Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. ]Edges
shall be straight and clean.
B. (Permanent pavement replacement structural section, within all trenches, shall be 1" thicker
than existing of asphalt concrete over the same existing thickness of crushed aggregate base
or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of
the Standard Specifications for ]Public Works Construction. The replaced pavement and base
material shall be compacted to 95% relative compaction and respectively tested, for each 300
linear feet of trench. Verify exact structural replacement section thicknesses with the City
prior to installation.
C. Permanent *pavement replacement shall be installed using a City approved 3/4" max medium
asphalt concrete as the base course lift and a City approved '/z" max medium finish course lift
for capping. Asphalt concrete mix design shall be approved by the City prior to its placement.
Special Conditions - Permit No. 3574 Page 3 of 4
SPECIAL CONDITIONS --PERMIT NO. 3574
--- La Quinta Arts ]Foundation ---
D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during
the trenching operation located adjacent to the trench sawcut shall be cold -grilled to a depth
of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold -
milled area and base asphalt concrete in the trench area shall be overlaid with a City approved
cC2-AEA-4000 asphalt concrete mix. The width of the cold milling area shall be as follows:
For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut
removal lines.
For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut
removal lines, or to the lane line striping, whichever is greater.
For transverse trenches across existing street: two (2) feet outside the sawcut removal
lines.
E. if grinding and capping operations are not performed in the same day as base paving
operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from
saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of
paving shall not be left 0.10' low in anticipation of grinding and capping.
F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the
permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal
loops shall be removed and replaced in kind. The finished pavement surface shall be smooth,
consistent, and shall conform to the surrounding grades.
16. permittee shall permanently stabilize any and all soil that was disturbed as a result of work
performed under this permit with an approved dust control treatment. Soil stabilization .shall be done
immediately after completing the operation.
17. pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck ]route network) is three (s) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically
grants .permission to use the street to deliver street construction materials and/or equipment.
18. This permit allows for the installation of imperial Irrigation Districts utilities along Washington
Street and Ave. 48, for CUP 2000-648, La Quinta Arts ]Foundation.
19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
Special Conditions - Permit No. 3574 Page 4 of 4