Loading...
3577i NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE 11113/01 LOCATION OF CONSTRUCTION (Tract 30125-2) (Street address or Description of Location) Ave 50 & Eisenhower Subdivision Improvement Permit — Class III Minor Improvement Permit Class IV PURPOSE OF CONSTRUCTION Roush Gradinu Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION Routth Gradi.nR See Attached Conditions DIMENSION OF INSTALLATION OR REMOVAL CAP rZrAdina plAn SIZE OF EXCAVATION, IF NEEDED CAA G-AA4"g PIP" APPROXIMATE TIME WHEN WORK WILL BEGIN 11/14/01 APPROXIMATE TIME OF COMPLETION 2/15/02 ESTIMATED CONSTRUCTION COST i\ 911-011 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. 4-Signature of Applicant or Agent Sedona Homes, Inc. 77564 Country Club Drive 772-8224 Name of Applicant (please print) Business Address Telephone No. Sunrose Corp. Palm Desert, CA 92211 Name of Contractor and Job Foreman Business Address Telephone No. 533670 Contractor's License No. Lloyds of London 01137 City Business License No. Binder #4897 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee $ 2730.33 100.00 Permit Fee Penalty Cash Deposit -Surety Bond if required P1An shack (3.000) arAdt TOTAL: $ (169.67) Receipt No Received by Recorded by Date Fyl� 3577 PERMIT VALIDATION PERMIT NO. 3577 DATE APPROVED ? ? /1 A/ nl EXPIRATION DATE 11/16/02 DATE ISSUED v ` _ Administrative ministrative Authority Telephone: (760) 777-7075 r,f i ----------------------------------------------------------- NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT). For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: / ! Z / J / O 1 LOCATION OF CONSTRUCTION /g4V-le+ S0 Tit ACT - 601a 5 - a -- Subdivision Improvement Permit —Class III Minor Improvement Permit Class IV (Street address or Description of Location,)( C�7 PURPOSE OF CONSTRUCTION `yy� �A6//3gSketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION DIME SION OF I STA LATION OR13EMOVAL SIZ OF EXCAVATION IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN O APPROXIMATE TIME OF COMPLETION a� ESTIMATED CONSTRUCTION COSTS O /� (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend. and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any'work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quints and to pay for any additional replacement necessary as the refit of this work. Aignature of Applicant or Agent I J (o Q �Q�K�A �ZSYYJ�S��C • r%%��5%�t�J�Ti2y�L..cJ.6 .�' /Q . 77 `dt �r��`� Name of Applicant (please print) Business Address Telephone No. jiy 4 Q5 E �y ae. /o • , 6' EA_'T C/9- 9, Name of Contractor and Job Foreman Business Address Telephone No. �,5,33 4-70 O/ i3 7 Contractor's License No. / , D6 City Business License No.. �p o Applicant's fnsurance Company Policy Number FEES: Subdivision Improvement Permit — Class III Public improvements: 3%of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit —t Class IV: See attached schedule Inspection Fee $ �� ✓ V �%• 3 Permit Fee dy D Penalty Cash Deposit -Surety Bo714 if required G 3 Ll 6 Receipt No. Received by Date Recorded by 3567 PERMIT VALIDATION PERMIT NO. -;6 7-7 DATE APPROVED EXPIRATION DATE DATE D By Administra ' e 8thority Telephone: (760) 777-7075 A The following General and Special Provisions are attached to and made a part of Permit No. 9 ` GENERAL PROVISIONS The following shall always apply: EN'ROACE NEVI ON PRIVA7Z PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT. Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fined with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred, City of La Quints shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (27 of A.C. surfacing plus appropriate seal cost as specified above. PR07ECTTON OF TRAFFIC, All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or Le Quints City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The'City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE MUC7URES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quints shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material rciulting'from excavation and backfill operations shalt be removed from the'righl of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and'compaction. Existing gutter line and drainage ditches iball be replaced to their original standard or better. All excess material shall be -removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERA73ONS: If de -watering operations are required and pumps are forcing water on City of La Quints roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.. CLOSING STRFMS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the perminee that he'must close a street for any length of time, perminee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS following shall apply when indicated: M NOTIFICATION: Perminee shall notify the City at (619)777.7075 at least 48 hours in advance of starting construction. ®1TTILITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way authorized by permit, the perminee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. R3 LTI7I.TTY CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The perminee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course having an 'R' value of not less than and in conformance with City of La Quints Road Improvement Standards and Specifications, Ordinance 0461. R'S PARKWAY GRADING: Area between the property line and top of the proposed concrete curb sball U graded to a slope of 1/4 inch to one foot (1). R6 GRADE. CHECKING: City of Ls Quints shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB RJOYAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (`_feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach abed] be constructed in conformance with City of La Quints Standard #207. Rg DRIVEWAYS: A.C. driveways shell be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on (__, of clap aggregate base. Driveway construction shall conform to attached drawing. SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. R10 SOIL 911JRl1 I7.ER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall cotttmply with -the manufacturer's specifications. 1 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quints may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of IA Quints forces to preclude delay or interference with State of City of La Quints projects. (102 SURVEY MONUMUM: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the perminee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. 3 PAVEMENT C1TI7TNG: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. �Cl BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes . �.J of producing an adequately consolidated backfill. Any material which the City of Le Quints deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. ^R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three feet (31 and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BAC304LL PLACEMENT: Backfill shall be applied. in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (51 lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. RIB COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than low feet and a minimum of one (1) test on each road: One (1) copy of each test shall be forwarded to the City Engineer for approval Rod filed prior to making permanent repairs. Compaction tests shall be made u outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. COMPACTION TESTS: If so required -by the inspector, compaction tests shall be made for each crossing or service'litie. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction testa shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. TEMPORARY ]PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a Lnaximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no can shall the placement of the temporary pavement exceed a five (5) day limit. PERMANENT.pAVEMENi' REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2') of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class ban shall be placed no later than . days after completion of temporary road repair. FOG SEAL A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City -of La Quints road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in actions which can be handled safely without interference or bazard to highway traffic. The entire width of the -tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump bole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of Sib feet at any one Uwe. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not lees than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. SPECIAL CONDITIONS --PERMIT NO.3577 --- SEDONA HOMES --- In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. SEDONA HOMES, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control pursuant to the Fugitive Dust Control Plan. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. 5. Work performed within 500 feet of a major and/or signalized intersection is restricted between the hours of 9 a.m - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275- 6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No. 3577 Page I of 3 SPECIAL CONDITIONS --PERMIT NO. 3577 --- SEDONA HOMES --- 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Penn ittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), and as required by the Public Works Department. Backfill shall be completed in lifts, not to exceed 1', compacted to 90% minimum relative compaction. Native material may be used, provided the material is suitable for use as backfill after construction operations. Controlled Density Fill (C.F.) may be used as an alternative. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to thesatisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc.; shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. - Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement shall be replaced as follows: a) Sawcut and remove existing a.c. surfaces a distance of one foot (F) beyond all trench walls, including any sloughing or cave in of adjacent soils. Undermined a.c. surfaces shall be removed. All a.c. edges shall be straight, clean and vertical. b) Provide an existing section (four -and -one-half inches [4%" ] minimum) of crushed aggregate or miscellaneous base material, compacted to 95% minimum relative compaction. Special Conditions - Permit No. 3577 Page 2 of 3 rt SPECIAL CONDITIONS --PERMIT NO.3577 --- SEDONA HOMES --- c) Provide an existing section plus one inch (1") [four inches (4") minimum] of asphalt concrete in two (2) or more lifts; the first lift(s) comprised of a base course a.c. material, of a City approved mix design, meeting the requirements of Greenbook class B-AR-4000; the final 0.10' lift comprised of a wearing course a.c. material, of a City approved mix design, meeting the requirements of Greenbook class C2-AR-4000. All pavement edges shall be flush with adjacent a.c. surfaces. Each lift of a.c. material shall be compacted to 95% minimum relative compaction. d) For trenches greater than two feet (2') in width, the Permittee shall perform a grind and a.c. . overlay of 0.10' depth for three feet (3') in addition to the pavement replacement specified above. 16. Permittee shall notify the City of La Quinta Public Works Department a minimum of 48 hours prior to commencement of any construction at (760) 777-7075. 17. Permittee shall stabilize any soil that was disturbed (shoulder areas, etc.) as a result of work performed under this permit with an approved dust control treatment. 18. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 20. This permit authorizes for the Rough Grading of Tract 30125-2, per the approved plans dated November 13, 2001. This work is located at Ave. 50 and Eisenhower Drive. Special Conditions - Permit No. 3577 Page 3 of 3 NOV.13.2001 9:12RM NO.336 P.1 79.799 Old Avenue 52 La QuInta, CA 92253 VOICE: 760-7714013 FAX: 760.771 r1073 E-MAIL: mds1squintatMM0scOnsu1tinq.n4t sit0 vere0c. To: Guy Pegan Company: Berryman & Henigar Fax #: (714) 836-5906 From: George Prine. Subject: TR 30125-2 F A X Date: 11/13/01 Job ##: 517-00 Pages: 4, including cover cc: Raoul Martinez, via fax (760) 777-7155 MESSAGE: Attached is the cost estimate revised per your instructions_ Please note that the demolition items have been broken out separately. This was done so a demolition permit could be issued prior to the final approval of the Rough Grading, Drainage and Paving plans for this portion of the project. Thank you for your assistance on this project. NOV-13-2001 TIDE 09:12 TEL:760-777-7155 NRME:PUELIC WORKS P. 1 NOV.'13.2001 9:1'SAIl 0 S36 P 2 ,ti,,.W �..,..,�.TI,.� PLANNING, ENGINEERING, SURVEYING I�.;,.2.AQlf;: A, CA COST ESTIMATE FOR BOND PURPOSES TRACT NO, 30125-2 (23 LOTS) PREPARED: OCTOBER 16, 2001 REVISED: NOVEMBER 2, 2001 REVISED: NOVEMBER 12, 2001 ITEM QUANTITY UNIT COST COST CLEARING AND GRADING EXCAVATION & COMPACTION 16,606 CY 1.75 29,061 EXPORT 12 390 CY 500 61 950 ON -SITE STREET IMPROVEMENTS REMOVE EXISTING BARRICADE REMOVE EXISTING V CHAIN LINK FENCE CONSTRUCT 6" CONCRETE WEDGE CURB CONSTRUCT CURB TRANSITION PER RIV. CO. STD. NO.211 MODIFIED TO WEDGE CURB INSTALL 3" A.C. OVER 4.5" C.A.B. CONSTRUCT CROSS GUTTER PER RIV. CO. STD. NO, 209A- MODIFIED TO V WIDE ADJUST MANHOLE TO GRADE, 2ND LIFT ADJUST WATER VALVE BOXES TO GRADE, 2ND LIFT CONSTRUCT MASONRY RETAINING WALL CONSTRUCT 8' WIDE X 4" THICK CONCRETE CART PATH TO MATCH EXISTING CONSTRUCT W WIDE X 6" THICK CONCRETE CART PATH TO MATCH EXISTING 200 SF 4.00 TOTAL ESTIMATED ON -SITE STREET IMPROVEMENTS 10% CONTINGENCY TOTAL ESTIMATED ON -SITE STREET IMPROVEMENTS TOTAL ESTIMATED GRADING 10% CONTINGENCY TOTAL ESTIMATED GRADING 1 EA 500.00 2,500 LF 2.50 2,644 LF 8.00 91,011 9.101 $ 100,112 500 6,250 21,152 45 LF 10.00 450 41,876 SF 1.35 56,533 531 SF 4.00 2,124 12 EA 350.00 4,200 8 EA 150.00 1,200 528 LF 65.00 34,320 984 SF 3.00 2,952 800 130,481 13,048 $ 143,529 STORM DRAIN INSTALL 24" HDPE (N-12) STORM DRAIN PIPE 20 LF 50.00 1,000 CONSTRUCT MODIFIED CATCH BASIN PER RIV. CO. STD. 302 WITH STD. DWG. 305, DOUBLE (2) TYPE 24-18 GRATE 1 EA 18,000.00 16,000 CONSTRUCT GUTTER DEPRESSION 1 EA 200.00 200 CONSTRUCT BUBBLER 1 EA 2,000.00 2,OOD TOTAL ESTIMATED STORM DRAIN 21,200 10% CONTINGENCY 2,120 TOTAL ESTIMATED STORM DRAIN $ 23,320 SEWER SYSTEM 8" VCP SEWER 1,317 LF 30.00 39,510 4'-0" MANHOLES 8 EA 2,600.00 20,000 4" VCP LATERALS 23 EA 500.00 11,500 TOTAL ESTIMATED SEWER IMPROVEMENTS 71,010 10% CONTINGENCY 7,101 TOTAL ESTIMATED SEINER SYSTEM $ 78,111 PAGE 1 OF 2 SEDONA HOMES TRACT NO. 30125-2 FILE: G;15170010EST1-2I3OND.xls NOV-13-2001 TUE 09:12 TEL:760-777-7155 NAME:PUBLIC WORKS P. 2 N04'_ --.. 01_T 9� 13AM PLANNING, ENGINEERING, SURVEYING WATER SYSTEM 8" DIP WATER MAIN, POLYETHYLENE ENCASED 8" DUCTILE IRON GATE VALVE, EPDXY LINED AND COATED STANDARD (6"X4"X2-1/2") FIRE HYDRANT ASSEMBLY, WET BARREL (WB) WITH BLUE RETRO-REFLECTIVE PAVEMENT MARKERS 1" DOMESTIC SERVICES 1,370 LF 3 EA I�!�:.6�QI<P:3A, CA 35,00 47,950 600.00 1,800 5 EA 3,000.00 23 EA 750.00 TOTAL ESTIMATED ON -SITE WATER IMPROVEMENTS 10% CONTINGENCY 15,000 17,250 82,000 8,200 TOTAL ESTIMATED WATER SYSTEM $ 90,200 ELECTRICITY ELECTRIC UNDERGROUND 23 DU 2,500.00 57,500 TOTAL ESTIMATED BOND AMOUNT $ 492,771 UNIT PRICES USED HEREIN ARE DA3ED UPON EITHER CLIENT '° iNCLUOES CONDUIT, WIRE, TRENCH, TRANSFORMERS AND PROVIDED INFORMATION OR FROM BEST AVAILABLE INDUSTRY VAULTS. IID ESTIMATE OF $1,000 PER UNIT COVERS THEIR COST DATA AT THE TIME OF PREPRATION, CONSULTANT ASSUMES NO OF THE INSTALLATION OF WIRE TRANSFORMERS ETC„ AND IS INCLUDED RESPONSIBILITY FOR THE EXACTNESS OF SUCH UNIT PRICES IN IN THE $2.500 PER UNIT COST. EITHER EVENT, PREPARED UNDER THE SUPERVISION OF: STANCEY C. MOR: EXP. DATE 9/30/01 PAGE 2OF2 SEDONA HOMES TRACT NO, 30125-2 FILE: G:15170010EST1-2BOND.xIs NOV-13-2001 TUE 09:10" TEL:760-777-7155 NAME:PUBLIC WORKS P. 3 rlov,13.2801TI, 9:13Ar1 PLANNING, ENGINEERING, SURVEYING IIN9;.326.A OIF; 4-A, CA COST ESTIMATE FOR BOND PURPOSES TRACT NO. 30126-2 (23 LOTS) DEMOLITION - EXISTING PARKING LOT PREPARED: NOVEMBER 2, 2001 REVISED: NOVEMBER 12, 2001 ITEM QUANTITY UNIT COST COST ON -SITE STREET IMPROVEMENTS REMOVE EXISTING CONCRETE CURB & WALKS REMOVE EXISTING GATE & APPURTENANCES REMOVE EXISTING A.C. PAVEMENT SAWCUT EXISTING CONCRETE CART PATH REMOVE EXISTING CONCRETE CART PATH REMOVE EXISTING CONCRETE DOWNDRAINS REMOVE EXISTING 12" P,V.C. STORM DRAIN AND APPURTENANCES. REMOVE EXISTING LIGHTS, PEDESTALS, AND WIRING 41 EA 100.00 TOTAL ESTIMATED OWSITE STREET IMPROVEMENTS 10% CONTINGENCY TOTAL ESTIMATED ON -SITE STREET IMPROVEMENTS UNIT PRICES USED HEREIN ARE BASED UPON EITHER CLIENT PROVIDED INFORMATION OR FROM BEST AVAILABLE INDUSTRY OATH AT THE TIME OF PREPRATION. CONSULTANT ASSUMIFS NO RESPONSIBILITY FOR THE EXACTNESS OF SUCH UNIT PRICES IN EITHER EVENT. PREPARED UNDER THE SUPERVISION OF: STANLEY C. MOR; EXP. DATE 9/30/01 TOTAL ESTIMATED BOND AMOUNT 900 LF 4.00 3,600 1 EA 500.00 500 116,900 SF 0.60 70,140 16 LF 2.00 32 1,040 SF 3.00 3,120 1 �A 200.00 200 ' 1 EA 500.00 500 4,100 82,192 8,219 $ 90.411 $ 90,411 INCLUDES CONDUIT, WIRE, TRENCH, TRANSFORMERS AND VAULTS. IID ESTIMATE OF $1.000 PER UNIT COVERS THEIR COST OF THE INSTALLATION OF WIRE TRANSFORMERS ETC.. AND IS INCLUDED IN THE $2,500 PER UNIT COST. SEDONA HOMES NOV-13-2001 TUE 09:12 TRACT NO..30125-2 FILE: G:15170010EST1-2DEMO.xIs TEL:760-777-7155 NAr1E:PUBLIC WORKS P. 4