3592NOTE:
With proper validation
this form constitutes an
encroachment permit
CITY OF LA QUINTA
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit — Class III
DATE: 12/14/2001 Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION SANTIAGO AT LA QUINTA DEL ORO TRACT 23971-1 VIA SEVILLA
(Street address or Description of Location)
INSTALL NEW SIDEWALK AND
PURPOSE OF CONSTRUCTION Sketch (attach construction plans if appropriate)
T1FAU'VS SMALL AOA Ole d—UX
DESCRIPTION OF CONSTRUCTION SEE ATTACHED SPECIAL CONDITIONS
1tMOVE 40 L.F. OF CURB AND GUTTER FOR DRIVEWAY
APPROACH
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED
DEC 14 2801
APPROXIMATE TIME WHEN WORK WILL BEGIN
APPROXIMATE TIME OF COMPLETION
ESTIMATED CONSTRUCTION COST $ 3,000.00
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this work.
z ,
Signature of Applicant or Agent
CENTURY AMERICAN 78-520 VIA SEVILLA LA QUINTA CA 92253 760 360 3303 `'4:0"
Name of Applicant (please print) Business Address Telephone No.
CENTURY AMERICAN 78-520 VIA SEVILLA LA QUINTA CA 92253 760 360 3303
Name of Contractor and Job Foreman Business Address Telephone No.
478689 CS
Contractor's License No. City Business License No.
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class 111
Public. improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV:'See attached schedule
Inspection Fee ' $ 225.00
100.00
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL: $ 325.00
Receipt No.
Received by Date
Recorded by
a3a3ia�
3592
PERMIT VALIDATION
PERMIT NO. iCQ
12/13/01
DATE APPROVED
EXPIRATION DATE 6/13/02
DATE ISSUED . C9
By 9,2 !/
y Administrative Authority
Telephone: (760) 777-7075
-----------------------------------------------------
i
1 NOTE:
jWith proper validation
this form constitutes an CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit —Class I I I
DATE: 12 ^ 1-2- Subdivision
I Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION SA^I T I A o @ L-A �ur••. �7✓L b�C m
VtA SEvi IAA-; -'r,-'e-+ 2,31-1l - 1
(Street address of Description of Location)
CONSTRUCTION
�L s sbwk
IPTI
.J t t Sr De"b'4 p - appropriate) etch (attach construction lens if a
SCue 9 —'c-' r—
o C- F Of SQ G
DIME,1qSION OF INJEILLATION OR R MOVAL
` o t_ t: �C d d— to O L. F e t fC. S r tb Imo.
SIZE OF EXCAVATION, IF NEEDED � O �
APPROXIMATE TIME WHEN WORK WILL BEGIN 1�" O
APPROXIMATE TIME OF COMPLETION — o
11,
ESTIMATED CONSTRUCTION COST $ EDO ' OU
(Including removal of all obstruction, materials, and debris, badtfilling, com-
acti n nd I arm
REV'.'/
DEC 1 2 2001
p o a p acing p anen resu sang an or rep acing Improvements►
In consideration of the granting of this permit, the. applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives end employees, harmless from and against any and all
penaltles, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any'work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at.least twenty-four 1241 hours In advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
i la Quinta and to pay for any additional replacement necessary as the result of this work.
Signature of Applicant or Agent
►�( -�uK�G� ZQ-S� V � s-ol Il.t �G 330 3
Name of Appli nt (please print) Business Address Telephone No.
Name of tontrector and Job Foreman Business Address Telephone No.
i Contractor's License No. City Business License No.
,f2►.k_rll��
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class III
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee $ ZZ��
Permit Fee 160
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
Receipt No.
Received by
Recorded by
Date
PERMIT VALIDATION
PERMIT NO. r 2
DATE APPROVED Z 3
EXPIRATION DATE (s /3 U 2
DATE UED
By
dministretive Authority
Telephone: (760) 777-7075
SPECIAL CONDITIONS --PERMIT NO. 3592
---Century American ---
In addition to the standard permit conditions, the following shall apply:
1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed, in accordance with the latest edition of the Standard Specifications For Public
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. Century American, hereinafter referred to as "Permittee", shall be responsible for providing continuous
dust and erosion control.
3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more
frequently if required.
4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout
the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance
of equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
5. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. -
3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall
contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal
operation at the intersection is to be altered in any way.
6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private street
and for any damage to other City streets or facilities as a result of work performed under this permit.
7, Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans
Standards or the Work Area Traffic Control Handbook (WATCH Manual), A traffic control plan, if
required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review
and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility
to appropriately detour and barricade all construction sites.
8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street
closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with
flagmen at all times.
Special Conditions - Permit No.3592 Pagel of 4
SPECIAL CONDITIONS --PERMIT NO. 3592
---Century American---
9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
10. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be
performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the
City of La Quinta.
11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill
compaction within street rights -of -way shall conform with Section 306A .3 of the latest edition of the
Standard Specifications for Public Works Construction (SSPWC), except as otherwise specified.
Native material may be used as backfill material provided that minimum compaction, achieved in the
manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water
densified compaction via jetting or flooding or other means shall be allowed. It shallbe the Permittee's
responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times
during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such
material shall be removed to the limits directed by the Geotechnical Inspector and/or the City
Inspector and the resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be brought to or maintained at an appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through progress testing on the stockpiles.
C. The first length of trench backfilled shall. be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill
is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift
that can be compacted.
D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be
taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift thickness
to be compacted for the remainder of the project.
E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of
backfill, per 300 linear feet of open trench, at randomly selected locations within the open length
of trench.
Special Conditions - Permit No.3592 Page 2 of 4
1
a
{
If
If
SPECIAL CONDITIONS --PERMIT NO. 3592
---Century American---
F. The depth of the randomly selected compaction tests shall also be randomly selected except that
where multiple tests are required in a given length of trench, the tests shall be no closer than three
feet (vertically) from each other.
G. If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test
results shall be furnished to the City Inspector.
12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within
the existing travel way, at the end of every workday as directed by and to the satisfaction of the City
Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which
can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however,
Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open
overnight at a point where construction will begin the next day, provided that this length of trench is
completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its
original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. Pursuant to Section 14.16.375 of the La Quinta MunicipalCode (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
of the work. Permanent pavement replacement shall conform to the following conditions:
A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall
be straight and clean.
B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than
existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed
miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard
Specifications for Public Works Construction. The replaced pavement and base material shall be
compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench.
Verify exact structural replacement section thicknesses with the City prior to installation.
C. Permanent pavement replacement shall be installed using a City approved 1/4" max medium asphalt
concrete as the base course lift and a City approved %" max medium finish course lift for capping.
Asphalt concrete mix design shall be approved -by the City prior to its placement.
D.. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the
trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10
Special Conditions - Pemiit No.3592 Page 3 of 4
-.
,�.
'..
..
� - 1
.
•
�
f -
.�
-
1
- ..
s
_
1
� � �
�
�
_
n
•
'
�
r.
f
J
7
• �
� �
` �
-
1
..
.
.
r
•
e
-•
�
� ry .
j .
Y � ..
..
}
- _
•
-
• _.
-r
�
.
! i.
.
+
,
1
r
•'•
�
-
,
�
'
� •
j
•
�
r
SPECIAL CONDITIONS --PERMIT NO. 3592
---Century American ---
feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area
and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000
asphalt concrete mix. The width of the cold milling area shallbe as follows:
For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut removal
lines.
For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut removal
lines, or to the lane line striping, whichever is greater.
For transverse trenches across existing street: two (2) feet outside the sawcut removal lines.
E. If grinding and capping operations are not performed in the same day as base paving operations,
the base course lift of %" max medium asphalt concrete shall be installed from saw -cut edge to
saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left
0.10' low in anticipation of grinding and capping.
F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee,
as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be
removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and
shall conform to the surrounding grades.
16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work -performed
under this permit with an approved dust control treatment. Soil stabilization shall be done immediately
after completing the operation.
17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight -limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants
permission to use the street to deliver street construction materials and/or equipment.
18. Stock pile shall not exceed 3' in total height from the existing surrounding area.
19. This permit allows for the installation of approximately 640 L.F. of sidewalk and remove and replace
approximately 40 L.F. of sidewalk. This work is located in the Santiago Development, Tract 23971-1.
20. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
Special Conditions - Permit No.3592 Page 4 of 4
�
� r
L
i�� �
�� �