Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
3605
NOTE: With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS 1/11/02 Subdivision Improvement Permit —Class III DATE: Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION S1820/440/660 00110A FfA4iE10 AND C,,T,LE SMALOS (Street address or Description of Location) PURPOSE OF CONSTRUCTION IN.Oi 'ALLATION 00 130 ?PAT 0V Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION sta 4TTACHM SPECIAL CONDITIONS DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify,.defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. r Signature of Applicant or Agent SOU,, RN CALIVOINIA CAS CO PO WX 3003 REDLAN #Si CA 92323 909 335 7963 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class I I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule 000 Inspection Fee $` II � a sitar Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL Receipt No. Received by Date PERMIT VALIDATION PERMIT NO. 3605 DATE APPROVED 1/111.02 EXPIRATION DATE 04111/02 DATE ISSUED By / Administrative Authority Recorded by I Telephone: (760) 777-7075 SPECIAL CONDITIONS --PERMIT NO. 3605 --- SOUTHERN CALIFORNIA GAS CO. --- In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. SOUTHERN CALIFORNIA GAS CO., hereinafter referred to. as "Permittee", shall be responsible for providing continuous dust and erosion control. All areas shall be kept watered down daily including weekends. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant.to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and. Sundays. 5. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared m accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No. 3605 Pagel of 4 SPECIAL CONDITIONS --PERMIT NO. 3605 --- SOUTHERN CALIFORNIA GAS CO. --- 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. ' It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant" to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to' soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at an appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No. 3605 Page 2 of 4 SPECIAL CONDITIONS --PERMIT NO. 3605 --- SOUTHERN CALIFORNIA GAS CO. --- F. In subsequent lengths of trench, the frequency of compaction tests, shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. G. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. H. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. I. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the. satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping,. irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. Special Conditions - Permit No. 3605 Page 3 of SPECIAL CONDITIONS --PERMIT NO. 3605 --- SOUTHERN CALIFORNIA GAS CO. --- C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved '/2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench sawcut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold - milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: • For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. • For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of V max medium asphalt concrete shall be installed from saw - cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades.. 16. Pernuttee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 18. This permit allows for the installation of a gas main and service to addresses 51-820 Avenida Madero, 51-840 Avenida Madero, and 51-860 Avenida Madero. . 19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. Special Conditions - Permit No. 3605 Page'4 of r NOTE: ' With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS 1/11/02 Subdivision Improvement Permit —.Class 'III DATE: Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION 51820/840/860 AVENIDA MADERO AND CALLE SINAWI (Street address or Description of Location) PURPOSE OF CONSTRUCTION jV9TAT.s ATTnN OR 150 �P>RT Oil' Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION 'SEE ATTACHED SPECIAL CONDITIONS DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED . APPROXIMATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacin and/or -re 1--in im rovements) 1I In consideration of the granting of this permit, the •applicant hereby agrees to: Indemnify, defend• and save the City, its authorized agents, officers, representatives and employees; harmless from and against any and. all penalties, liabilities or loss resulting from claims or court action and arising out -of any accident, loss•or damage to persons or property happening or. occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applicant or Agent SOUHTERN CALIFORNIA GAS CO'PO BOX 3003 REDLANDS CA 92323 909 335 7963 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company ! Policy Number FEES: Subdivision Improvement Permit — Class I I I Public improvements: 3% of estimated construction Private improvements: 3% of estimated construction Minor. Improvement Permit — Class IV: See attached s Inspection Fee $ 0,00 0.00 Permit Fee Penalty Cash Deposit -Surety Bond if required t, TOTAL: ' $ 0.00 Receipt No. Received by / Date Recorded by ule L > 3805 PERMIT VALIDATION PERMIT NO. 3605 DATE;APPROVED EXPIRATION DATE 04/11/02' DATE.I�ISS%fSSU-ED / %i Administrative Authority Telephone: (760) 777-7075 SPECIAL CONDITIONS --PERMIT NO. 3605 --- SOUTHERN CALIFORNIA GAS CO. --- In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. SOUTHERN CALIFORNIA GAS CO., hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. All areas shall be kept watered down daily including weekends. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Rork performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. - 3 p. m. Traffic control shall be set up after 9 a. m and removed before 3 p.m' The Permittee shall contact the Riverside Country'Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or 'facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No. 3605 Pagel of 4 SPECIAL CONDITIONS --PERMIT NO. 3605 --- SOUTHERN CALIFORNIA GAS CO. --- 8. Pursuant to Section 14.16.290 of the La Quinta Municipal- Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at an appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No. 3605 Page 2 of 4 SPECIAL CONDITIONS --PERMIT NO. 3605 --- SOUTHERN CALIFORNIA GAS CO. --- F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations. within the open length of trench. G. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. H. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. I. All costs incurred due to the conditions above shall be.borne by the Permittee. Copies of all test results shall be finnished to the City Inspector. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13: All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the. City prior to installation. Special Conditions - Permit No. 3605 Page 3 of 4 SPECIAL CONDITIONS --PERMIT NO. 3605 --- SOUTHERN CALIFORNIA GAS CO. --- C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved %2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench sawcut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold - milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: • For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. • For transverse. trenches across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from saw - cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants .permission to use the street to deliver street construction materials and/or equipment. 18. This permit allows for the installation of a gas main and service to addresses 51-820 Avenida Madero, 51-840 Avenida Madero, and 51-860 Avenida Madero. 19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. Special Conditions - Pemi t No. 3605 Page 4 of 4 f+u-ws fete) :3No►Id3131 MipW^v &A!3aM!Yi Af 31v0 31r0 N011vI NOM 03AOWddr 31v0 �sQ ON lI1Md3d NOI1vOI1vA 1NMY.Ild Aq pepxooa M0 Aq pwv" VN ldmmw *1viol (� puma., P PL f Mamma" 4WD A�Ruy I —Q MS :AI 060 — Wad wwuMoiftl jIIIM vw0 uolsxuouoo pISPAIP o $0 %C :quwuMo,du1, $NOW 1000 p4RUAm 06 SC MuwuMoud" 01" III UNO — >i!ufy I u0mumpam �fi3d �N Nllad At�dulo0 aY�waul b�!Idev 'eN mmn wMlwl f kq � SON wrald�M1 wolppr wwn�n f 0wwmd w put numaupo p "UmN MINI OLO*%P.L HOIVNIQH000 Z ,wld 0w 10) unsp e v 110 VAN . v . '4MMr!M M 1Pr 0Ip w Awa�w� Ir IM1w" Am 14 Me A pw mom Y't p All*+W p wp[MMiM+ M wp� "ON"* Ip pM "am" so p ri"N"mo M wowf so 1mwM0wp Ai!, """dio Iw ""M Mews 'paw 60w«p p w,w„p M a�1 f►LI ww1-Mwwt awl � AMwM�1► �M>0++!�r!Wv� wp Al!wN �llOe. $np w wwa�e P"U" Smu" wA wMR �MM W M AM p Wow N w"M p w OM�+�uee ra �M1we0�y AYteple ao p�otNO aemu" M UM *WPQW AM p we �w M go,= snag A UM P WOJi OR pw AM i�Y! pw Wa1 wMwy » M sMIN9ww+� tiWwk pul�M14 INaRPw� wol Io Mtl!A!1 'M*dit4 .As* wR sow M Mtw 'Nw+"ul :01 9ftJft Ag" 3ungddt Ap *SpW d SIlp p &"USA MA j0 uogfwpnuoo YI ( Iglwuw�OAd�Y, WI�Idai �o/pIw fwx;slw Iwp 11mid pug uonme lullp;w q lurpp put 4"Mm ew 'Wonvunqo p10 Is9w u+w a+lpnp" l) ! Am NOIlOf1I! 1SN00 031vIM11S3 r1,� ��y� `l �'/ M0113idIMOJ d0 31MI131vIMIXOIIddv NIl�3f 11NN 1IYOM N3" 3NIl 31yIMIXOVNV /i OS Q30 N dl NOLLWAVOXI d0 3ZIS WA003N WO NOI1v"v1tNl 110 N01Sp13N10 woum1d1SN00110 390dVrW Pml p wlwlwp in a."m moon NSA" ��� � g � �8 NotlarlfdlsNo� �o Nouvx, III Eno— >tluuy Id1111 / ® �;itvo MMIA1Gfn$ 03AOU&V Pw SMIRI3AOddIM1 VONI1M ql!m vopmuum ul ouwv.Aeudwl l" M alpnd o n � oY• "n'Y' """' 't"'""' 'qoI iY!Ila,d 'e1lltiwp,� 'auOuwA�d '�Awwu,p 'KM ftw,e ,0 a114r+d. Io uoaxutts m «A ,od (lN3MWJVOd0N3) NOILMUIMOO vXVOM 0119Ad " 1111d3d UOd NOIJL='Iddiv vVosu"s."peNHO and v1NIfCvidoA100 vwnnpw+w�ua'apu3 z00z0 Ndr® .°e aw"sru'"Mlt' 3338 �10111 �- Wd££:TO TO/6Z/TT Ilia w; Campaw A Sen Ppr ! Energjf company 60, 2 1 AVENIDA MADERO m 0 m. Isolation Area Affected Yes ❑ No 0 Pressure District Affected Yes ❑ No ❑ Business District Affected Yes ❑ No p Supply Line Affected Yes ❑ No El Regulator Station Affected Yes ❑ No Valve(s) Required Yes ❑ No ©I, Reviewed By:n C. P. Reviewed By: 12 am 0 TIED 53449-866 } 14 PLAN FILE # BASE SKETCH CONSTR. SKETCH I COMPL. SKETCH JW.O. SHEET # BY: JMJ 11 /29/01 BY: BY: 01 OF 01 LA OUINTA PIPING LEAK TEST (MEDIUM) TESTED AT: P.S.I. [:]AIR ❑ NITROGEN [:)OTHER FOR: _ HRS. AND/OR _ MIN. (GAS STANDARD #184.0150) SIGN: DATE: PRINT NAME/TITLE: GAS HANDLING WAS REVIEWED AND PERFORMED AS PLANNED PER GAS STANDARD #184.06 NO ❑ YES ❑ IF NO PLEASE GIVE EXPLANATION TO LEFT MAIN ' SIGN: DATE: CODDEE PRINT NAME/TITLE: TEXT INT I if ANY CHANGES 70 THE DES I GI ED FIFE ANC), COMPONENTS REQUIRES APPROVAL FROM TECHNICAL SERVICES PLANNING. EXIST: ❑ INST: ❑ ABAND: ❑ INT: IF CHANGES WERE MADE TO THE PLANS: CODE: ' - / LOT tt: ENGINEER CONTACTED: DATE: EXIST: ❑ INST: ❑ ABAND: ❑ INT: FPA / PA. CODE: P / LOT #: DATE: x 15 9 16 2' PDM 8 7 0' 6 5 UPDATED TO R.E.R.: c7 a r JOINT TRENCH (TYPICAL) r' Yes ❑ No ❑ m a o? 60, D cli - - - - - -- -- 4 GAS-;iD 3 2 I o,� - - - -- ( I�{ ' CURB ) a z LTEL LCATV GAS - - - - - - ❑ N ELECTRIC-- ❑ TELEPHONE ❑ - - - 0--FPOWER T.V. CABLE ❑ OTHER - - -- ❑ STUB SUMMARY p ALL STUBS ARE 2' UNLESS OTHERWISE POSTED EM _ - SHORT SIDE STUBS LONG SIDE STUBS 54146-137 2' PEM 5-96 / l TIED / FT. INSIDE PROP. LINE CURB ) rt I - FT. INSIDE LOT LINE _ 32'— THOMAS GUIDE 879.E-1 CITY OF LA QUINTA 21 22 p' 23 24 PRESS. DIST. NO. f / 0 2 (-j 60' SET/MOP: DIST. PRESS./MAOP: CLASS LOCATION ❑1 ❑2 U3 ❑4 ISO MAP NO. 7- SUPPLY LINE NO. SUPPLY LINE PRESS. REGULATOR STATION I.D.# / R.S.# VALVE(S) REQUIRED Yes ❑ No ❑ PIPELINE MARKERS REQUIRED: Yes ❑ No ❑ IF YES SHOW LOCATION O�--- ENVIRONMENTAL ' K• ---- REQUEST FORM: Yes ❑ No❑ E.C.S. ISSUES: Yes No[] C.P. AREA NO. /1 1 C.P. CONTACT: PHONE NO. THIS BLDG. OR AREA QUALIFIES FOR ANNUAL LEAK SURVEY: Yes ❑ No ❑ (POST LIMITS) A PRE -JOB MEETING WILL BE HELD WITH A GAS COMPANY REPRESENTATIVE PRIOR TO THE START OF ANY CONSTRUCTION. Yes ❑ No ❑ REVIEWED BY PRINT NAME DATE 1 i REG. ENG. p-_ TECH. SUP. f / -L.P.A. _ P.A./F.P.A. n??liiC ••� s''�. D.O.M./P. M. F.O. S. /F. S. LJ—�-- fFZ . 21Z. Underground Service Alert - FORE yo Call Two Working Days BEFORE YOU DIG 1 800-227-2600 9�UH0 SEV4 T i cket # PROJ. # 38000 WR. # 1244976 EPOCH # RER.# PLANNING PRINT TOTA FEET INST'D DATE MOVED NOTICE OF DATE MOVED COMPLETION INSTALL MAIN WITH AT LEAST �C/ COVE_R BE.LOw ! L���1, G;�',!1`OTAL FEET RETIRED ON JO6: OPER. DATE: OFF JOB: DATE: COUNTY RIVERSIDE RETIREMENT REASON: PERMIT ISSUED BY: PERMIT #: I DISTRICT PALM DESERT N/A FEET TRACT # CREW FOREMAN 15 0 15 30 60 90 ATLAS # IND 111 YEAR C.P. INSTALLED' PLANNED PY: COMPANY TAX CODE # 20-999 ,G'L / , STAKED.......... ❑ SOUTHERN CALIFORNIA GAS COMPANY FACILITY: X❑ PE: YES S NOF7 OPER. 20% OR OVER ❑S.M.Y.S. STAKING REQUIRED ❑ INLAND EMPIRE REGION CATHODICALLY PROTECTED: YES= NO® AT LESS: THAN 20% ®S.M.Y.S. NO STAKES NEEDED W-0.# 54141-644 COST CENTER OG