Loading...
3609NOTE: With proper validation this form'constitutes an encroachment permit CITY OF LA QUINTA . APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, 'pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: 1 / 18/02 Subdivision Improvement Permit — Class III Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION AVENUE 50 AT PALMILLA, NORTR STD9 OF AVMF .150 (Street address or Description of Location) INSTALLATION OF GAS MAIN PURPOSE OF CONSTRUCTION Sketch (attach construction plans if appropriate) SEw Hx 1ACIIED SPECIAL CONDITIONS DESCRIPTION OF CONSTRUCTION DIMENSION OF INSTALLATION OR REMOVAL "SIZE OF -EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN llii�t APPROXIMATE TIME OF COMPLETION 1114102 ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties,% liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or. property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will b�e.started. Comply with all applicable City Ordinances, the terms and conditions of the permit>.nd II applicable rules Ad regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of th s work. Signature of Applicant or Agent SOWMRN CALIFORNIA GAS CO 75095 MAYFAIR DRIVE PALM DESERT CA 92211 760 341 7378 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit - Class I I Public improvements:.3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee $ 0-00 Permit Fee 0.00 Penalty Cash Deposit -Surety Bond if required TOTAL: $ 0.00 Receipt No. Received by Date Recorded by bon N :!- 3609 PERMIT VALIDATION PERMIT NO. lenA DATE APPROVED 1/17/02 EXPIRATION DATE 04/17/02 DATE ISSUED BV Al^j, r %Administrative Authority Telephone: (760) 777-7075 I�.------------------------•--------------------------------------------- I , I NOTE: With proper validation this form constitutes an CITY OF LA QUINTA. U� encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) �- For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS ✓a 02 Subdivision Improvement Permit —Class I I I DATE: _ �j Minor Improvement Permit Class IV LOCA1/1OY OF CONSTRUCTION /y .5•/D.#6_ ' O,c' 41y'l- '5 0, (Street Address or Description of LocationnZ )i /� PURPO,S CONSTRUCTION ` / � �' Sketch (attach constru ion plans if appropriate) DESCRIPTION OF CONSTRUCTION �,� �� C.1/ ' " 1 1 U✓` S DIME 0F INSIP LLATq.N QRR EMOa/A RECe"E— SIZE OF EXCAVATION, IF NEEDED (o K — ���®i APPROXIMATE TIME WHEN WORK WILL BEGIN Z UQItl �!EC, f1 2002 APPROXIMATE TIME OF COMPLETION ./l5� Z V ESTIMATED CONSTRUCTION COST $ g ga� (Including removal of all obstruction, materials, and debris, backfilling, com. _ _ i9 U oa S paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the. applicant hereby agrees to: Indemnity, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any'work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the -terms and conditions of the permit and all applicable rules and regulations of the City of La Quinte and to pay for any additional replacement necessary as the result of this work. CB1l,Z�JGi�, Z nature of Ap I.cant or Agent Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ tlJ PERMIT VALIDATION Permit Fee U Penalty Cash Deposit -Surety Bond if required TOTAL: $ C/ Receipt No. Received by Date Recorded by PERMIT NO. 3 Ce D / DATE APPROVED 7 O Z EXPIRATION DATE f '7 U -Z DATE ISSUE ' sy Administrati Authority Telephone: (760) 777-7075 SPECIAL CONDITIONS --PERMIT NO. 3609 --- SOUTHERN CALIFORNIA GAS CO. --- In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. SOUTHERN CALIFORNIA GAS CO., hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. All areas shall be kept watered down daily including weekends. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. 5. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. - 3 p.m Traffic control shall be set up after 9 a.m. and removed before 3 p.m The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Tragic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No. 3609 Pagel of 4 SPECIAL CONDITIONS --PERMIT NO. 3609 --- SOUTHERN CALIFORNIA GAS CO. --- 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9.' Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of --way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought. to or maintained at an appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first, length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No. 3609 Page 2 of 4 SPECIAL CONDITIONS --PERMIT NO. 3609 --- SOUTHERN CALIFORNIA GAS CO. --- F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. G. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. H. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. I. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be fiarnished to the City Inspector. 12. All excavations within City of La Quinta right-of-way, shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. Verify with Leonard St. Sauver, Assistant Engineer I, Public Works Department exact structural section and asphalt concrete pavement requirements (rubberized asphalt concrete). Special Conditions - Permit No. 3609 Page 3 of 4 SPECIAL CONDITIONS --PERMIT NO. 3609 --- SOUTHERN CALIFORNIA GAS CO. --- C. Permanent pavement replacement shall be installed using a City approved 1/4"'max medium asphalt concrete as the base course lift and a City approved %2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench sawcut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface: The cold - milled area and }rase asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: • For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. • For transverse trenches across existing street: two feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 1/4" max medium asphalt concrete shall be installed from saw - cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 1.6. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil,stabilization shall be done immediately after completing the operation. 17 Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 18. This permit allows for the installation of approximately 285' of a 4" gas main. This permit work will tie-in into an existing 4" gas main to provide service to Palmilla, Tract 29858. This permit work is located on the north side of Ave. 50 west of Jefferson Street. Coordinate with CVWD for work currently under construction on Ave. 50, no delays shall be encumbered by CVWD. 19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. Special Conditions - Permit No. 3609 Page 4 of 4 The following General and Special Provisions are attached to and made a part of Permit No. GENERAL PROVISIONS The following shall always apply:' ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permince for his contractors to ' secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fined with smooth -faced street pads. All mechanical outriggers shall be fitted -with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is maned, City of L Quints shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one. coat of two inches (2) of A:C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shallbe placed and maintained for the duration of the project. The City shall be n06fied.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of 1.8 Quints shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall' be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfifl and'compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. Al excess material shall be -removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and ahall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quints roads, it shall be the responsibility of the perminee (contractor) to control this water and to provide off-street barricades when necessary.. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that. he 'must. close a street for any length of time, permittee shall contact this office to obtain the necessary permission.. SPECIAL PROVISIONS The following shall apply when indicated: tl NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. iTTI ITY CLEARANCE: (Substructures) Prior to making any excavation within the City of la Quinta right of way authorized by permit, the perminee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit.shall be.the.sole responsibility of the permittee. LrIII.TI'Y CLEARANCE: (Surface Structures) No work shall be done under this permit until 'nll utilities ate clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 ]PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course having an 'R' value of not less than and in conformance with City of La Quints Road Improvement Standards and Specifications, Ordinance 0461. (E5) PARKWAY GRADING: Area between the property Line and top of the proposed concrete. curb* shallbe graded to a elope of L/ 1/4 inch to one foot (I). R6 GRADE CHECKING: City of Is Quints shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and -gutter L_feet) shall be . removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of Is Quints Standard i207.... . RS DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the'property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed -on ( ) of class aggregate base. Driveway construction shall conform to attached drawing. R9 SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. R10 SOH: STERILIZER The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with.the manufacturer's specifications. :R 1 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quints may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quints forces to preclude delay or interference with State of City of La Quints projects. '162 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. 13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LU41T OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation 'shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work Bite. RI BACKFELL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes Of producing an adequately consolidated backfill. Any material which the City of Le Quints deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved Band or gravel. R16 BACKF LL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three feet (Y) and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFILL PLACEMENT: Backfill shall be applied, in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot W) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at interval$ of not more than 1000 feet and a minimum of one (1) teat on each road: One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. COMPACTION TESTS: If so required -by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways. State of California, dated January 1973. TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. PERMANENT. PAVEME?4T REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2') of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. STREET RF.STRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City -of La Quints road right of way shall be accomplished by $'licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the -tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS /18/02 Subdivision Improvement Permit — Class I II DATE: Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION AVMS 50 AT VA MILLA WMTH 'I IDR 07 AVMMA SLi (Street address or Description of Location) YI�STAL�.ATION OF GAS MAiti PURPOSE OF CONSTRUCTION Sketch (attach construction plans if appropriate) .�wK1R,Ci31v SPEV-14L CONS ITIOUS DESCRIPTION OF CONSTRUCTION DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN > —11Inoy APPROXIMATE TIME OF COMPLETION t�'�► ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of -'this work. Signature of Applicant or Agent SOMMEAN CALIVOILNIA (W CO 75095 h4YPAIR DRIV2 PALK DUERT CA 92211 760 341 7370 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. Received by $ 0.00 O.00 . 0.00 Date PERMIT VALIDATION PERMIT NO. 3609 1/17/02 DATE APPROVED EXPIRATION DATE DATE ISSUED 04/17/02 By Administrative Authority Recorded by 11 Telephone: (760) 777-7075 The following General and Special Provisions are attached to and made a part of Permit No. 3� a GENERAL PROVISIONS The following shall always apply: ENROACHMENI' ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of I.a Quints right of way ONLY. Whenever ctr onsuction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work.. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shallbe used in backfill operations in paved areas. U the existing pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quints shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (21 of A:C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly ligbted and barricaded as deemed necessary by the City Engineer or La Quints City Public Works inspectors. 'Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quints shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backftll. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quints roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he 'must close a street for any length of time, perminee shall contact this office to obtain the necessary permission. ' SPECIAL. PROVISIONS The following shall apply when indicated: tl NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. U7UJTY CLEARANCE- (Substructures) Prior to making any excavation within the City of Le Quints right of way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the.sole responsibility of the permittee. 1K J ITIII 1TY CLEARANCE: (Surface Structures) No work shall be done under this permit until'ell utilities are clear of the v proposed work site. The perminee shall notify all concerned utility companies of the proposed wont. R4 PAVEMENT WIDENIISG: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course having an'R' value of not less than and in conformance with City of La Quints Road Improvement Standards and �� Specifications, Ordinance #461. % l E5) PARKWAY GRADING: Area between the property line and top of the proposed concmte curb shall - be graded to a slope of L� 1/4 inch to one foot (1'). R6 GRADE CHECKING: City of La Quints shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quints Standard #207. R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on (_� of class aggregate base. Driveway construction shall conform to attached drawing. R9 SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. RIO SOIL STERILIZER The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with. the manufacturer's specifications. :1 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quints may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quints forces to preclude delay or interference with State of City of La Quints projects. '162 SURVEY MONIJM UM:. Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. ' 3 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. RI BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes . of producing an adequately consolidated backfill. Any material which the City of La Quints deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. I R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFiLL PLACEMENT: Backfill shall be applied, in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is Dot subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be Dot less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road: One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. COMPACTION 7ESI : If so required -by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC-900 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ]PERMANENT. PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2') of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. STREET RESTAIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City -of La Quints road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the -tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 19.73. SPECIAL CONDITIONS --PERMIT NO. 3609 --- SOUTHERN CALIFORNIA GAS CO. --- In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. SOUTHERN CALIFORNIA GAS CO., hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. All areas shall be kept watered down daily including weekends. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. 5. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair �of any pavement damage to any public or private street and for any damage to City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No. 3609 Pagel of4 SPECIAL CONDITIONS --PERMIT NO. 3609 --- SOUTHERN CALIFORNIA GAS CO. --- 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B.. Backfill materials shall be brought to or maintained at an appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No. 3609 Page 2 of 4 SPECIAL CONDITIONS --PERMIT NO. 3609 --- SOUTHERN CALIFORNIA GAS CO. --- F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. G. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. H. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. I. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can. not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. Verify with Leonard St. Sauver, Assistant Engineer I, Public Works Department exact structural -section and asphalt concrete pavement requirements (rubberized asphalt concrete). Special Conditions - Permit No. 3609 Page 3 of 4 e SPECIAL CONDITIONS --PERMIT NO. 3609 --- SOUTHERN CALIFORNIA GAS CO. --- C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved %" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench sawcut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold - milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as.follows: • For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. • For transverse trenches across existing street: two feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of %" max medium asphalt concrete shall be installed from saw - cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 18. This permit allows for the installation of approximately 285' of a 4" gas main. This permit work will tie-in into an existing 4" gas main to provide service to Palmilla, Tract 29858. This permit work is located on the north side of Ave. 50 west of Jefferson Street. Coordinate with CVWD for work currently under construction on Ave. 50, no delays shall be encumbered by CVWD. 19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. Special Conditions - Permit No. 3609 Page 4 of -iZT:ZO TO/tT/ZO PLAN FILE # BASE SKETCH CONSTR. SKEF"H COMPL. SKETCH JW.O. SHEET st BY: MPC 02-14-01 BY: BY: 01 OF 02 �� � s-� 1 � vvte � (� ►tea ram-- � S� I Sri, o a s-v RIM ,q—) ��09_p_ Wifti 01,1— dz>�T 9 `rc�s a.42pu/l�,P,/nar �000cP/ice Isolation Area Affected Yes ❑ No 0 Pressure District Affected Yes ❑ No Business District Affected Yes ❑ No p Supply Line Affected Yes ❑ No Gl P,egulator Station Affected Yes ❑ No Valves) Required Yes ❑ No ID �''�� Reviewed By: • C. P. Reviewed By: k �Nya0-- Ed ' PIPING LEAK TEST (MEDIUM) TESTED AT: P.S.I. ❑ A I R ❑ NITROGEN ❑ OTHER FOR: HRS. AND/OR_ MtN. (GAS STANDARD ss184.0150) uu 1� SIGN: DATE: PRINT NAME/TITLE: 1 = 80 ' GAS HANDLING WAS REVIEWED AND PERFORMED LA QU I NTA AS PLANNED PER GAS STANDARD #184.06 FEET + NO ❑ YES ❑ ?0 80 120 160 200 IF NO PLEASE GIVE EXPLANATION TO LEFT SIGN: DATE: PRINT NAME/TITLE: ANY CHANGES TO THE DESIGNED PIPE AND` COMPONENTS REQUIRES APPROVAL FROM TECHNICAL SERVICES PLANNING. IF CHANGES WERE MADE TO THE PLANS: ENGINEER CONTACTED: DATE: FPA / PA: DATE: UPDATED TO R.E.R.: SOIL TYPE GROUP RED YELLOW GREEN � (LA CITY ONLY) 1 2 3 BACKFILL TYPE: USED MECHANICAL COMPACTION Yes❑ No[] JOINT TRENCH (TYPICAL) Yes[] No[] o� M a$in -GAS_-�- � t—TEL GAS - - - ❑ Z< _� T - - LCATV ELECTRIC- ❑ TELEPHONE ❑ " - - ` —POWER T.V. CABLE ❑ OTHER-- _ ❑ STUB SUMMARY ALL STJBS ARE 2` UNLESS OTHERWISE POSTED SHC:RT SIDE STUBS LONG SIDE STUBS FT- INSIDE PROP. LINE FT:__INSIDE LOT LINE THOMAS GUIDE 5470-AG CITY OF LA OUINTA PRESS. DIST. NO. is DIST. PRESS./MAOP: SET/MOP: CLASS LOCATION 01 02 R3 [14 ISO MAP NO. 4W3. SUPPLY LINE NO. SUPPLY LINE PRESS. REGULATOR STATION I.D.sr VALVE (S) REQUIRED Yes ❑ Na ❑ PIPELINE MARKERS REQUIRED: Yes [I No IF YES SHOW LOCATION ENVIRONMENTAL REQUEST FORM: Yes ❑ NOD E.C.S. ISSUES: Yes NO[] C.P. AREA NO. C.P. CONTACT: PHONE NO. THIS BLDG. OR AREA QUALIFIES FOR ANNUAL LEAK SURVEY: YeS❑ Not] (POST LIMITS) A PRE -JOB MEETING WILL BE HELD WITH A GAS COMPANY REPRESENTATIVE PRIOR TO THE START OF ANY CONSTRUCTION. Yes[] NO[] REVIEWED BY PRINT NAME DATE REG. ENG. TECH. SUP. L.P.A. L.S.P.S. e, tJ/� P.A./F.P.A. O.O.M./P.M. F.O.S./F.S. Underground Service Alert O�FORE ro Coll Two Working Days cry �'o r BEFORE YOU DIG P 1-800-227-2600 sEav�Ti Cket # PROJ. # 27911 WR. # 1173931 EPOCH # RER.# PLANNING PRINT l TOTAL FEET INST'D INSTALL MAIN WITH AT LEAST COVER BELOW � zmk TOTAL FEET RETIRED DON MOVED OPEER.CDAOTE: DOFF MOVED COI�DaTE I�i COUNTY RIVEPSIDE RETIREMENT REASON: PERMIT ISSUED BY: PERMIT #: " The DISTRICT PALM DESERT Gas TRACT # 985n-/ 'I CREW FOREMAN Compa"r ATLAS # IND94.95 YEAR C.P. INSTALLECOMPANY TAX CODE # 20-999 D: PL�INED Y: STAKED.......... ❑ SOUTHERN CALIFORNIA GAS COMPANY FACILITY OX a Sempra Energy'o«wany PE: YES NO0 OPER. 20% OR OVER ❑S.M.Y.S. STAKING RE0UIRED ❑ INLAND EMPIRE REGION CATNODICALLY PROTECTED: YES ED NO C7 AT LESS THAN 20% RIS.M.Y.S. NO STAKES NEEDED PQ1 W. 0.# 54141-026 COST CENTER Q To t 50TH 1� 29 UG 30 h 33 35 Isolation Area Affected Yes ❑ No IZI Pressure District Affected Yes ❑ No m Business District Affected Yes ❑ No p Supply Line Affected Yes ❑ No Regulator Station Affected Yes ❑ No IO Valve(s) Required Yes ❑ No 0 Reviewed By: C. P. Reviewed By: 34 36 ,1 J AVE. 1 / ---fi ----b — -----—-—-—-—-—-—-— - — - — -— --—-—-—-—----—-—-—-—-—-—-— - — - — -- ------- -- -------------------- - a -`—I — --------- — - — - —- ;(J3741 (J cc 3 .� �. 1" = 80' 2s ` LA OU I NTA EE FEET DD , 40 0 40 80 0 1 12 � 0 ,\ `60 _200 X 16 17 4t �I / 27 \ \ 2 7 N ( 98 It / • �� ` � 9T 18 15 t1 5' I C1t 26 '-i i; ILL 76I , 96 14 95 0 25 24 23 22 1 42 37 39 41 40 PTA 38 3 N , Yi TOTAL FEET INST'D A INSTALL MAIN WITH AT LEAST COVER BELOW D % TOTAL FEET RETIRED The COUNTY R1VV[,RS[DE RETIREMENT REASON: PERMIT ISSUED BY: PERMIT st: Gas DISTRICT PALM DESERT Crtmparry- TRACT # 29`-8-It Z 9 —Z- ATLAS # iND')4.95 YEAR C.P. INSTALLED: PLAN D BY. A& Sempra Energy'comany TAX CODE # Z0-999 1 STAKED.......... C PF: YFS n Nn n nnrn nnw nn nvrn r-1 r u v r CTAK 1Mft 0rA111Drn [— I ,/ /i"� ; Isolation Area Affected Yes ❑ No Ill Pressure District Affected Yes ❑ No m Business District Affected Yes ❑ No Supply Line Affected Yes ❑ No Regulator Station Affected Yes ❑ No O Volve(s) Required Yes ❑ No 0 Reviewed By: C. P. Reviewed By: 7 7N 7 r/ INSTALL MAIN WITH AT LEAST ' The ........_.. _._._ -- -- Gas ,y Company. a & 5empra Energy'comany TOTAL FEET INST'D COVER BELOW CA-dilm CA-ITOTAL FEET RETIRED