3655NOTE:
With proper validation
this form constitutes an CITY OF LA QUINTA
.encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, -pavements, sidewalks, parking lots, sewers, water -mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
April 16, 2002 Subdivision Improvement Permit — Class I I I
DATE: Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION DUNS PAI. N COMMERCUL HUILDIING/LA QUMU RBTAIZ PLAZA
47-120 DUMB PALMS -ROAD Lk QUINTA, CALLA 92253
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION NEW COMMMM WILYMP Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION DRIB APPROACH/ALLEY
iWAM AHD SIP= STRM TIE IN
DIMENSION OF INSTALLATION OR REMOVAL 23• Z 25'
SIZE OF EXCAVATION, IF NEEDED JR/A
APPROXIMATE TIME WHEN WORK WILL BEGIN 04/17/02
APPROXIMATE TIME OF COMPLETION 06/15/2002
ESTIMATED CONSTRUCTION COST'$ 100-0
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements) _
In consideration of 'the granting of this permit, the applicant hereby agrees to:
On ATTACHED COHDIT()FS)
�C 0NAQ8 V A E4
Indemnify, defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and against any,and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of•any work undertaken underth,e-permit granted, pursuant to this application.
Notify the Administrative Authority at least twenty-four (24,)-hours in advance,of the time when work will' -'be started.
r
Comply with all applicable City Ordinances, the ter nZ and conditions of the.permit and all applicable rules and regulations of the C'
La Quinta and to pay for any additional replacement necessary as the result of this work.`
"SI nature of A `"o+
• p•iicant or Agent
ORR SUILDERs '
77-570 SPBINOFIM 1 E mm On pAxar avQmm4 r;A f74ns aAn--Axaa
Name of Applicant (please print) u'siness Address Telephone No.
NRX0 ORR S M SAWR
Name of Contractor and Job Foreman Business Address Telephone No.
693077 01395
Contractor's License No. City Business License No.
NAVIT MRS 1HSUBAM CO.— GLI06761
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit —Class III
Public improvements: 3% of'estimated construction costs
Private improvements: 3% of estimated construction costs
`Minor, Improvement Permit - Class IV: See attached schedule
Inspection Fee $-- PERMIT VALIDATION
100.00 3655
Permit Fee Cg CR
PLAN PERMIT NO.
PLAN.. 04/16/02
Penalty TSfl.00 -=
Cash Deposit -Surety Bond -tDATE APPROVED
�_.
if required 11800..00 EXPIRATION DATE 06/15/02
4,150.00 04/16/02
TOTAL: $ .
Receipt No.
Received by Date
Recorded by
DATE ISSUED
r
By 14
P114,y ' �! �libgr(• r-c �'a 1 ��f ,r-�r� tw.a...
•� Administrative Authorit �`
,Telephone: (760) 777-7075
Z d SNIJOM OI38fld UlNIf10 U-1:3WUN SStiL-LLL-09L:-131 92:TT NOW 2002-ST-�Idd
..,
MOTE:
With proper validation
this form constitutes an CITY OF LA OUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT),
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
And other like public works improvements in connection with MINOR IMPROVI;MENTSand APPROVED SUBDIVISIONS
April 11, 2002 Subdivision Improvement Permit - Class I I I
DATE: Minot• Improvement Permit Class IV
LOCATION OF CONSTRUCTION Dutie Palms Commeroail Building / La Quin_ to Retail Plaza
47-120 Dune Palms RoAd - La Quint:a, CA 92253
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION New Commercial Building
DESCRIPTION OF CONSTRUCTION Drive Approach / Alley
Water.,and Sewer Street. Tie In
DIMENSION OF INSTALLATION OR REMOVAL 25 t X 25 r
SIZE OF EXCAVATION, IF NEEDED
Agri' 1-7_
APPROXIMATE TIME WHEN WORK WILL BEGIN • '• 2002
APPROXIMATE TIME OF COMPLETION June 15, 2002
ESTIMATED CONSTRUCTION COST $ / O o,.woa O
(including removal _of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements) _
In consideration of the granting of this permit, the applicant hereby agrees to:
Sketch (attach construction plans if appropriate)
1:V:!
APR 1 5 2002
PUBLIC WORKS
Indemnify, defend and save the City, its authOrized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when Wor will be started,
Comply wlth all applicable City Ordinances, the terms and conditions of the permit d a ppl' le rul s and regulations of the City of
Le nulnte and to pay for any additional replacement necessary as the result of this hark, n
Signature f Appl ant or Agent — '
Orr Builders 77-570 Springfield L - Suite D - Palm Desert, CA. 92211.
Name of Applicant (please print) Business Address Telephone No.
Arian Orr (760)360-66.32
Name of Contractor and Job Foremen Business Address Telephone No.
693077 01395
Contractor's License No. City Business LicenseZ.
Navugators Insurance Co. GL106761
Applicant's Insurance Company Policy Number
Z0/Z0 39Vd 300A GSL00PE09L bE:TT Z00Z/ST/b0
The following General. and Special Provisions are attached to and made a part of Permit No.
GENERAL PROVISIONS
The following shall always apply: '
ENROACHMENP ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of
way ONLY. Wbeoever concoction extends within private property, it is the responsibility of the permittee for his contractors to
secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on
any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes'to
protect the paving during excavations. Rubber4ired equipment only shall be used in backfill operations in paved sreaa. If the existing
pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quints shall request
that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2') of A.C.
surfacing Plus appropriate seal cost as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas sball. be properly lighted and barricaded as deemed necessary by the
City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the
duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations.
CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and.
concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes
necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work.
Drainage structures and open drains shall be kept free of debris at all times for proper drainage.
RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right
of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction.
Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be -removed
prior to paving. Water tanker shall be used, as required, -to sprinkle the job site to keep down dust conditions and'ahall be used
immediately after backfill.
DEWATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quintn roads, it shall
be the responsibility of the permittee (ctjntractor) to control this water and to provide off-street barricades when necessary..
CLOSING STREETS: No street shall be closed. A minimum of one has of traffic shall be maintained at all times to provide limited
access for the adjoining property owners and emergency vehicles.. In the event it is felt by the permittee that he must close a street for
any length of time, permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
>i NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction.
U11LITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quints right of way '
authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing
substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole
responsibility of the permince.
ITTII.ITY CLEARANCE- (Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with inches of A.C. paving placed on inches of class aggregate subbase course having an 'R'
value of not less than and in conformance with City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a dope of
1/4 inch to one foot (1').
R6 GRADE- CMECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete.curb and/or curb and gutter (_feet) shall be
removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shallbe constructed in conformance with City of La Quinta Standard I=.
Ra DRIVEWAYS: A.C. driveways shall be constructed w not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on (_, of class aggregate bane.
Driveway construction shall conform to attached drawing.
SIGEIT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. .
RIO SOII. S7ERUJUX The area to be surfaced shell be treated with &oil sterilizer. Rate of application shall commply with.the
manufacturer's specifications.
M
' COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of
La Quints may condpct in.this area during the period of this permit. Work shall be coordinated with the State or City of La
Quints forces to preclude delay or interference with State of city of Ls Quints projects.
,1 f SURVEY MONUMENTS: Prior to excavating or beginning of construction, all survey monuments which exist on the
J centerline of all streets or property lines when involved shall be completely tied out so they may readily and coffwdy be
replaced by a licensed civil engineer or surveyor at the expense of the permittee..A complete set of notes showing the ties to
these monuments. shall be furnished to the City Engineer prior to the removal of any monuments: This office shall be notified
upon completion or replacement of all survey monuments for proper project clearance.
PAVEMENT' CUTTING: Pavement will be mechanically saw cut to a straight to a atraight'edge prior to exeavatio:. Method
of pavement cutting shall be approved through the office of the City Engineer. (Under no.elkumst u!zes shall excavating
equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to beat
facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
LIMTT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trt r : before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends sa . 04idays for the protection of the
traveling public. The Public Works Inspector shall determine the'suitability of excavation barricading in each •case. No
excavation shall remain open for a period exceeding five (5) days:, No excavation shall be made unless the coar action
material is actually on the work site.
1 BACKFIll..:4ATERLU. Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes .
of producing an adequately consolidated backfill. Any material which the City of Ls Quints deems ummitable (spongy or
saturated. material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced
by as approved sand or gravel.1
.16 BACKFTLL SAND: Backfill shall be approved transit -mix sand or equivalent. and shall be'placed in lifts of not greater than
three feet (3) and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any 'case,
a relative compaction of 95 percent shall be attained with the structural section of the roadway.
.17 BACKALL PLACEMENT: Backfill shall be applied. in layers of not more than 50 percent of the total depth of the. trench
before flooding or a maximum of five-foot (57l lifts where trenches are of excessive depths. Cr.; :s to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material abali be placed an that the resulting
compaction shall be not lees than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction.
Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where
jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous.
18
13D
COMPACTION TESTS: If so required by the rnspector, compaction tests shall be made at intervals of not more than 1000
feet and a minimum of oae (1) teat on each road: One (1) copy of each teat shall be forwarded to the City Engineer for
approval and filed* prior to making permanent repairs. Compaction tests shall be made as outlined in Section 63.01 of the
Standard'Specifications, Division of High- r, s. State of California, dated January 1973;
COMPACTION TESTS: If so requiied•by the inspector, compaction tests shall be made for each crossing or.eervice line.
One (1) copy of each test sball be forwarded to.the City Engineer for approval sad filed prior to making permanent repairs.
Compaction testa shall be made as outlined in Section 6.3.01• of the Standard Specifications, Division of Mgbways, State of
California, dated.January 1973.
712V4PORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC400 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a
maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the
placement of the temporary pavement exceed a five (5) day limit.
PERMANENT-PAVEMENI' REPAIR: After backfill and compaction have been completed, a temporary patch consisting. Of.
two inches (2') of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a.
inch class base shall be placed no later than days after completion of temporary road repair.
FOG SEAT.: A fog Beal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.' .
STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
24 TREE RELOCATION OR REMOVAL: Tree relocation within the City -of La Quints road right of way shall be
accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling
public. It shall be th.e responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections which can be handled safely without interference or bazard to highway traffic. The
entire width of the -tree stump shall be removed and disposed of so that no debris remains in. view of the highway. The stump
hole shall be backfilled and thoroughly compacted as specified in the following paragraph'. Where is becomes necessary to
restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and oir '
barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall
comply with Section 6.3.01 of the Standard Specifications, Division of highways, State of California, dated January 1973.
.,
SPECIAL CONDITIONS --PERMIT NO. 3655
--- Orr Builders, Inc. ---
In addition to the standard permit conditions, the following shall apply:
1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For
Public Works Construction.(SSPWC) and as directed by and to the satisfaction of the City Engineer.
2
3
4.
Orr Builders, Inc., hereinafter referred to as "Permittee", . shall be responsible for providing
continuous dust and erosion control. All areas shall be kept watered down daily including weekends.
Streets shall be kept clean. They shall be completely cleaned at the end. of each working day and
more frequently if required.
Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance.18.§ 1; 1982),
throughout the work site, the Permittee shall comply with City regulated work hours. '
Operation and maintenance of equipment within one-half mile of human occupancy shall be
performed only during the following time periods:
October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 P.M.
Work shall be prohibited on legal holidays and Sundays.
5. Work performed_ within 500 feet of a signalized intersection is restricted between the hours of
9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The
Permittee shall contact the Riverside Country Traffic Signal Maintenance Department, at (909)
275-6894 if signal -operation at the intersection is to be altered in any way.
6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982);
Permittee shall assume responsibility for repair of pavement damage to any public or private street
and for damage to other City streets or facilities as a result of work performed under.this permit.
7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City
for review and approval one (1) week prior to starting any construction. It shall be the Permittee's
responsibility to appropriately detour and barricade all construction sites.
8. Pursuant to Section 14.16.290 of the La Quirita Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be permitted. A minimum of one travel lane of paved surface shall be
maintained with flagmen at all times.
Special Conditions - Permit No. 3655 Pagel of 4
SPECIAL CONDITIONS --PERMIT NO. 3655
--- Orr Builders, Inc. ---
Prior to'excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to. notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits; and storm drain facilities.
10. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost
to the City of La Quinta.
11. . Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest.
edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise
specified herein.
Native material may be used as backfill material provided that minimum compaction, achieved in the
manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water
densified compaction via jetting or flooding or other means shall be allowed. It shall be the
Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection,
onsite, at all times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A.' When a firm foundation is not encountered due to soft, spongy or other unsuitable material,
such material shall be removed to the limits directed by the Geotechnical Inspector and/or the
City Inspector and the resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be brought to or maintained at an appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through progress testing on the stockpiles.
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the
depth of lift that can be compacted.
D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall
be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish-- the maximum lift
thickness to be compacted for the remainder of the project.
F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift
of backfill, per 300 linear feet of open trench, at randomly selected locations within the open
length of trench.
Special Conditions - Permit No. 3655 Page 2 of 4
SPECIAL CONDITIONS --PERMIT NO. 3655
--- Orr -Builders, Inc. ---
G. The depth of the randomly selected compaction tests shall also be randomly selected except
that where multiple tests are required in a given length of trench, the tests shall be no closer
than three feet (vertically) from each other.
H. If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
I. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all
test results shall be furnished to the City Inspector.
12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of
the City Engineer for the protection of the public.' Lengths of open trench shall not greatly exceed
that which can not be backfilled in the same day. Excavated trenches shall not be allowed open
overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet
in length, open overnight at a point where construction will begin the next day, provided that this
length of trench is completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to
its original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
of the work. Permanent pavement replacement shall conform to the following conditions:
A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges
shall be straight and clean. .
B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than
existing of asphalt concrete over the same existing thickness of crushed aggregate base or
crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the
Standard Specifications for Public Works Construction. The replaced pavement and base
material shall be compacted to 95% relative compaction and respectively tested, for each 300
linear feet of trench. Verify exact structural replacement section thicknesses with the City prior
to installation.
C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium
asphalt concrete as the base course lift and a City approved t/2" max medium finish course lift
for capping. Asphalt concrete mix design shall be approved by the City prior to its placement.
Special Conditions - Permit No. 3655 Page 3 of 4
SPECIAL CONDITIONS --PERMIT NO.3655
--- Orr Builders, Inc. ---
D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during
the trenching operation located adjacent to the trench sawcut shall be cold -milled to a depth
of 0..10 feet with butt joint created next to the existing unmilled pavement surface. The cold -
milled area and base asphalt concrete in the trench area shall be overlaid with a City approved
C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: ,
For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut
removal lines.
For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut
removal lines, or to the lane line striping, whichever is greater.
For transverse trenches across existing street: two (2) feet outside the sawcut removal
lines.
E. If grinding and capping operations are not performed in the same day as base paving
operations, the base course lift of V max medium asphalt concrete shall be installed from saw -
cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving
shall not be left 0.10' low in anticipation of grinding and capping.
F. Any existing -lane striping affected by this resurfacing shall be replaced in kind by the Permittee,
as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall
be removed and replaced in kind. The finished pavement surface shall be smooth, consistent,
and shall conform to the surrounding grades.
16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization shall be done immediately
after completing the operation.
1.7. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants
permission to use the street to deliver street construction materials and/or equipment.
18. This permit allows for Precise Grading including but not limited to curb & gutter, fine grading, paving
and drainage per the approved plans for SDP 2001-709, dated April 16, 2002. This work is located
on the westside of Dune Palms Road south of Highway 111. All consideration should be taken into
account to construction vehicles and traffic operating near businesses currently open to the public.
19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
Special Conditions - Permit No. 3655 Page 4 of 4
w
WEEKLY INSPECTION RAW
PROJECT NAME �7eS 77-7/777 DIN
PERMIT NO. .� (o �PLAN SET NO. INSPECTOR AL097-Gd 0077712AD-77
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
/GlL/�
/o -
17 i ¢ a.
�-
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
wYrue rage i oT
CONSTACTION ACTIVITY SUMMaY
YR MO DATES: thru WORK BY SPECIAL
PERMISSION
MON TUE WED THU FRI SAT SUN NITE
WEEKLY INSPECTION REPCO.
PROJECT NAME 7` 12,0 -D v w r s ' T 1-77?
PERMIT NO. :�lo^.�S PLAN SET NO.
DIN
INSPECTOR AIQW3Y2 '` 0m-yJ/QV
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
I
A
�/
FrLiYbi k rt�.�� C
<
.
Tc 777; V ris ro � `S� Vic_ � � l t{ - /a7Z
e r azz sjcd e wa 1A
i111�: 1 2 9-7 Ct cI(ri v e
e a Zve
wzlk
14 1,V w cQ 5 2
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
vyivc I'age 1 of 2
CONSTRI 'ION ACTIVITY SUMMA
YR MO DATES: 7 thru WORK BY SPECIAL
PERMISSION
MON I TUE I WED THU FRI I SAT I SUN I NITE
TRAFFIC
tT CONTROL
Onsite Measures
Conforming imp
Non -conforming
Track -out Cleanu
Conforming imp
Non -conforming
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Reports
ET OV STRE MPR ME NT S E
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/Reports
Material Certifications
AC Design Mix
R I OV S
WATE MPR EMENT
MAINS
SERVICES
Compaction Testing/Reports
Material Certifications
SEWER IMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/Reports
Material Certifications
STORM DRAINS
...::::v:::.::::::::::::::::::::w.�:::::::::::::::::::::::::::::.
�::::::::::::::
n.......
•.}:;�;.}}.:•:.}••,•:::..}>..
}..
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/Reports
Material Certifications
DRY UTILTIES
r:>::>::.>::`>:i`•:> z<•'?:r
zi::v:}....}:
c • • •:.
CONDUITS
STRUCTURES
Compactiiting/Reports
Material CtionsN
SCAP NG
LAD IMEDIANPERIMETE
F130 04/02
an„o l of 9
ISVEEKLY INSPECTION REPO
PROJECT NAME � 0 DU%lC' -AJ77i 1(,g auip7l f',
PERMIT NO. �0 5J�' PLAN SET NO. INSPECTOR70
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
.9-30-02
Zli r e u v 4 s e c cJ - a C% s.r IT G_ e lo-n �7cf
62
10-2-02
2 1 e c� /as
ll k cl
/2e
077 :56 1.ce 77
/0�F3-02
77CY C'/q s
' !1 a. e v C a
/aC'-e. /-7
cyvt�� tiJ�s arf 20� X2D� ��C,
alfe7-7 U pS;
NOTICE SUMMARY FOR THIS WEEK
(INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
�y��� rage 1 at 2
CONSTRI TION ACTIVITY SUMMA
YR MO DATES: thru WORKBY'SPECIAL
PERMISSION
MON I TUE WED THU I FRI SAT SUN NITE
CON::»>::::>:':<:»»:>;:>::�;#:::<::»�:>:>::>::s:>::::>::>::»::>::>:<:>::>::>::::»:<::<:»»>>::::>::::>:::::»»»:::: :> TEMPORARY TRAFFIC CONTROL ,,.,,...,....:.
DUST CONTROL
Onsite Measures
Track -out Cleanup
Conforming implement.
Non -conforming implen
GRADING
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Rer
STREET IMPROVEMENTS
C&G $%cl to
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/Rep
Material Certifications
AC Design Mbc
WATER IMPROVEMENTS
MAINS
SERVICES
Compaction Testing/Rep
Material Certifications
SEWER IMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/Rep
Material Certifications
STORM DRAINS
MAINS
STRUCTURES
SANDFILTERS
UTILTIES
CONDUITS
STRUCTURES
MEDIAN
I
WEEKLY INSPECTION REPCO
PROJECT NAME
PERMIT NO.—.1�6-6 PLAN SET NO. INSPECTOR a 14)d Y a �8�71
JOURNAL OF NOTABLE ACTIVITY & ACTION
�jDATE
27-D
I
s16 Y 77'Y.97 -n • .5'a u U i 1,d r 7-7
r777 o UY LL-
SUS% Yc?�� 771 VCf u /C4177
`OY777 97'e e - v U y
SvL- c
y
vre 1
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
r i w 04/02 Page 1 of 2
CONSTRI FION ACTIVITY SUMMA
YR Q ?-- MO DATES: thru - / WORK BY SPECIAL
PERMISSION
MON I TUE I WED I THU I FRI I SAT I SUN I NITE
MPORARY TRAFFIC
CONTROL
Onsite Measures
Track -out
Non -conforming implementation
GRADING
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Gradinq
STREET IMPROVEMENTS
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/Rel
Material Certifications
AC Design Ma
WATERIMPROVEMENTS
MAINS
SERVICES
Compaction Testing/Rel
Material Certifications
SEWER IMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/Rel
Material Certifications
STORM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/Rer
Material Certifications
DRY UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/ReF
Material Certifications
PERIMETER I I I I J
F130 04/02 pans 7 ni 9
WEEKLY INSPECTION REP*
PROJECT NAME 1/`J,/�C5 C/✓�L�S �8�?4/ )0 Oi l'-Xta /� /'ZJLDIN '
PERMIT NO. �� �� PLAN SET NO. INSPECTOR
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
9/
'71 'O 2-
!_ 2-
S7o -2-" ( (79
��C{79 QV /s, C'P677 e Y ,4 /? i ?� S %L /� c- e- u c-
z 7Cl Lc 77 7.42,2 e f"<4fiV f� f C' 07?7 /O7.7
GY z7q 7? U r r V r
NOTICE SUMMARY FOR THIS WEEK
(INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
rwnn-
-tfw,L rage i oT z
CONSTRI FION ACTIVITY SUMMA
YR MO DATES: l thru WORK BY SPECIAL
PERMISSION
MON, I TUE I WED I THU I FRI I SAT I SUN I NITE
(TEMPORARY TRAFFIC C
(CONTROL
Onsite Measures
Material Certifications
tM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/F
Material Certifications
UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/F
Material Certifications
MEDIAN
pane 9 nt 7
WEEKLY INSPECTION REPO*
PROJECT NAME. /:W 29Y22
PERMIT NO. —? 6 PLAN SET NO.
INSPECTOR A u.9r Ci L D777YJt077'
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
//
02
�°-1 - a
I
i= D Y ?? � aU Y
Ic� l S. cp. C Y o 5 S 4 v 6;rT
/' y7� 2 • •
• cJ Y L <1 ass s c.1�14 ei i
NOTICE SUMMARY FOR THIS WEEK
(INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
r»U 04/02 Page 1 of 2
CONSTRI PION ACTIVITY SUMMA
YR MO DATES: thru WORK BY SPECIAL
PERMISSION .
MON I TUE I WED I THU I FRI . SAT I SUN I NITE
PORARY TRAFF
DUST CONTROL
Onsite Measures
Track -out
implementation
GRADING
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/ReF
STREET IMPROVEMENTS
C&G y
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/ReF
Material Certifications
AC Design Mbc
WATERIMPROVEMENTS
MAINS
SERVICES
Compaction Testing/ReF
Material Certifications
SEWER IMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/ReF
Material Certifications
STORM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/ReF
Material Certifications
DRY UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/ReF
Material Certifications
LANDSCAPING
MEDIAN
IJ
Paae 2 of 2
WEEKLY INSPECTIONREPO
PROJECT NAME�U7> P T�ci �77-r S
PERMIT NO, � (a. � `7� PLAN SET NO.
DIN J %
INSPECTOR 1 %o tUg y L! �C-12:7 �o7�
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
-0 2
I
aa/e 4 0 o ;;lc� u
/=
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
u4iut Page 1 of 2
CONSTRI PION ACTIVITY SUMMA
YR D 2 MO _� DATES: ,�_ thru s, WORK BY SPECIAL
PERMISSION
MON I TUE I WED I THU FRI I SAT I SUN I NITE
ITEMPORARY TRAFFIC
.•::::..::::•::::......::::::.....:...::
UST CONTROL:::::::.:::::::: .>:::::.:::::::.:.:.::::::::::::::: •.:::•:::::::.:::
Onsite Measures %
ER IMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/Reports
Material Certifications
tM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/Reports
Material Certifications
UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/Reports
MEDIAN
PERIMETER
F130 04/02 pans 7 nt 7
WNEEKLY INSPECTION REPO
PROJECT NAME //7"/'-�2Q ��7p /��777�' -Roll
PERMIT NO. PLAN SET NO.
DIN > J `
INSPECTOR A/Dt,o 06771 -2;1
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION.
I
ou6u ; Id I izgi 47/o-1,7 - e�' �•
G s :
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
rage T of z
CONSTRION ACTIVITY SUMMAW
F130 04/02 Page 2 of 2
WEEKLY INSPECTION REPO
PROJECT NAME -ZZ 120
PERMIT NO. PLAN SET NO.
DIN
INSPECTOR
DATE
-
JOURNAL OF NOTABLE ACTIVITY & ACTION
/
G- 0 2
02
-FoL/77 d .. a 7771 g Zy _ ro f/J�779
a upfi for Orr �'a �� S f/c� S % i d '-s
G 'vur�! 9e' O .l 1.tJc-e /f n C//�7
7'4 A fa vwy^.
7-
0 ' P7 7a O C
_
e P V c,'r S ?
7c7-J 777,�r17 41e h,4d �'c-777a,vf 5c-,.te7- i le Y,' et<1 L -iTdi-
�' r f o �v• S
c� CYoS S C Y h � cl frernch
oc�f1 9 uYL /,
YcP ,7
el
s�aH1�l af�,`oa
a /b P6.r
% 2
�c7Y 7% u 7-
NOTICE SUMMARY FOR THIS WEEK
(INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
UgiUZ Page 1 of 2
CONSTRI TION ACTIVITY SUMMAS
YRYD62MO 4L DATES: thru -7_ WORK BY SPECIAL
PERMISSION
MON TUE WED THU FRI SAT I SUN i NITE
RAFFIC CONTROL
T CONTROL
Onsite Measures
conrormmg impiememaion
Non -conforming implementation
GRADI
NG
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Reports
STR EETIMP ROVEM EN T S
C&G dla 0T 7
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC - CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/Reports
Material Certifications
AC Design Mbc
c
WATER
IMPROVEMENTS
MAINS
SERVICES
Compaction Testing/Reports
Material Certifications
:.>::.
SEWER IMPROVEMENTS :;:.;::;•
�•:
MAINS, .:::......:..::....::...:.:::::...... .............
LATERALS
STRUCTURES
2M DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/Ri
UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/F
Material Certifications
)SCAPING
\IC r11 A\I
. PERIMETER I I 1
F130 04/02 P... ,) ..r
WEEKLY INSPECTION REORT
PROJECT NAME -'/ /—/2D U ?Jr 86 I7n S Rd,
PERMIT NO. -365`- PLAN SET NO.
DIN f �1
INSPECTOR /. �O LV�'Y (r CSrYY�%j %a7J
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
Flan
"''"'4 Page 1 of 2
CONSTRUCTION ACTIVITY SUMM^kY
YReOZ_ MO DATES: aZ thru WORK BY SPECIAL
PERMISSION
MON I TUE I WED -F TH7U FRI I SAT I SUN I NITE
IDUST CONTROL
I Onsite Measures
.......... ................. .. ........... .. ................. . ...........
Track -out Cleanup
Conforming implementaton
Non -conforming implementation
Clearing & Grubbing
Earth Moving: Cut& Fill
Fine Grading
STREET IMPROVEMENTS ............................... .........
. ............
. ........... .............
.. .............. . ....
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT,
AC - CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/Reports
Material Certifications
AC Design Mix
WATERIMPROVEMENTS
. ... . ...........
MAINS
SERVICES
Compaction Testing/Reports
Material Certifications
. .. .... ................................ .....
. . ...............
. . ...... . SEWER IMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/Reports
Material Certifications
STORM DRAINS ......
. . . . . .... . . . . .. .....
. . . . . . . . . . . . .
MAINS
STRUCTURES
SANDIFILTERS
Compaction Testing/Reports
Material Certifications
....... .....
DRY UT
ILTIES . .. ... .... . .. . .. .... . ... "
............. ... ....... ...
CONDUITS
STRUCTURES
Compaction Testing/Reports
Material Certifications I
MEDIAN
PERIMETER
F130
WEEKLY INSPECTION RECT
PROJECT NAME/ rZ 120 o-n , plyms
PERMIT NO. 3l 5S PLAN SET NO.
DIN
INSPECTOR
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
y 2 9 —0
y-36_0
o
Cv - ' 4 F! % l U ca C4 -L
/—/.79erail e AI.,;jlJj-7-?5E . gd .
NOTICE SUMMARY FOR THIS WEEK:. (INDICATE ONLY DATE 8 TYPE OF NOTICE ISSUED IN THIS SECTION)
���� rage 1 of 2
CONSTRUCTION ACTIVITY SUMMARY
YR MO DATES: thru WORK BY SPECIAL
PERMISSION
MON TUE WED THU FRI SAT SUN NITS
'CONTROL
Onsite Measures
Track -out Cleanup
Conforming impleme
Non -conforming imp
ADING
Clearing & Grubbing
Earth Moving: Cut & I
Fine Grading
Compaction Testing/F
ZEET IMPROVEMENTS
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/F
Material Certifications
AC Design Mbc
TERIMPROVEMENTS
MAINS
Material Certifications
°RIMPROVEMENTS
MAINS
LATERALS
Material Certifications
iM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/F
Material Certifications
UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/F
Material Certifications
MEDIAN
PERIMETER
F130 04/02
WEEKLY INSPECTION REPORT
PROJECT NAME
PERMIT NO. , 3 G� 'J _ PLAN SET NO.
DIN
INSPECTOR �70 UOSY,4
DATE,,JOURNAL
OF NOTABLE ACTIVITY & ACTION
yJ-�G
i'L'
7 7 f 7
U
4- U
h�
ar71.it 17
70 ) o Y 2 c. ' ?2
P'' e i e 1-7-7 6 LJ IV i 1 e / _ -.ter
-71 ri e• l 3 7'a A P 7
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
vwiuc Page 1 of 2
CONSTRUCTION ACTIVITY SUMARY
YR8MZ MO s DATES: thru _ WORK BY SPECIAL
PERMISSION
MON I TUE I WED THU FRI I SAT I SUN I NITE
TEMPORARY TRAFFIC CONT
ROL L
Conforming implementaton
Non -conforming implementation
DUST CONTROL
Onsite Measures `�t....• •___. �...__
Track -out
PROJECT NAME
PERMIT NO.
WEEKLY INSPECTION REORT
DIN
PLAN SET NO. INSPECTOR
DATE JOURNAL OF NOTABLE ACTIVITY & ACTION
NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 04/02 Page 1 of 2
CONSTRUCTION ACTIVITY SUMARY
f
YR MO DATES: thru WORK BY SPECIAL
PERMISSION
MON I TUE I WED I THU I FRI I SAT SUN NITE
TEMPORARY
(CONTROL
Onsite Measures
Track -out Cleanup
Conforming implementaton
Non -conforming implementation
)ING
Clearing & Grubbing
Earth Movina: Cut & Fill
WEEKLY INSPECTION RE&T
PROJECT NAME DIN
PERMIT NO. PLAN SET NO. INSPECTOR
DATE JOURNAL OF NOTABLE ACTIVITY & ACTION
(NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
Page 1 of 2
CONSTRUCTION ACTIVITY SUMM�RY
YR MO DATES: thru WORK BY SPECIAL
PERMISSION
MON I TUE I WED THU FRI I SATI SUN NITE
Onsite Measures
T J :3WUN :-131 Ec:ST INA 2002-LT-33a
• s Illlllil� a I
6.4 1....tl_. e r s
TE:
Contractors & Developers
77.570 Springfield Lane, Suite D, Palm Desert, California 92211
760-360-6632...,__..., Fax_ 760-360-5591
FAX TRANSMITTAL
FROM: VYI�w NtG�a S
J. PAUL INDUSTRIAL BUILDING — PHASE YI
Project No. 292-02
Jobsite Phone
Jobsite Fax��- a
N . OF PACES (INCLUDING COVER SHEET)
- A A - d ` .
Sent from fax number (760) JC &� - 6 d Z y_
If there are problems with this transmittal, please call our Jobsite Office at
(760)
G G,riGn
To J 629Z . z 091 Sa3G1Ina :AaO Wd oz:2:0 v0r=Z-2T-03Q -
2 d 34Jt1N :-131 62:SZ IdJ 2002-zZ-330
1r-
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12,
13.
14.
15.
16.
17.
18.
19,
20.
21.
22.
23.
24.
OFFICIAL PRELIMINARY PUNCHLIST
CONDITIONAL USE PERMIT 1996-028
Install-10-� . curb —near —drain. —on North-side,of building-.----
Repair irrigation sprinkler near rip -rap rock on north side of building.
Repair slop on retention basin (erosion), possible irrigation break (several locations).
Parking stalls at exit doors at rear of building shall be designated as No Parking.
Striping on Dune Palms Road to be striped to preconstruction condition.
Repair A.C. at driveway on Dune Palms Road.
Place handi p signs_in appropriate Iocation-relative to'handlcap-parking-stall—
f 1
- j
. 1
zo'd
AFF•1MartinezMects\Punch119te18OP2001-709.wpd Page 3 of 4
_'a3a1Ina d'=10 Wd TZ:cal ?OOZ-2T-3311
I
Test
No.
Locationt i
Y,
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
6A
. � ..� 7
,� 1, .
�� �. 5'
�. �
� 5
11 �•
a
170
,
t 101 _
I
10?• 6—
c
a
^-"+°%+€ic.V.-`��c��I'��i: c3 e��s"k`•:w�::bsQ. r.,�_.-.a..�.i'.:r,y�+�.0 -,f =.:. e�.5=.i'� -�: ,a„�7 ;§ra-,,,�:,. .....�e;'P�F''�£i i^^ty'.^-k�'4':�''r'�=.t :.^.c...w-••�,.� I�
of
Sladden Engineering
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date
Job No. r'z2. -
FIELD MEMO
Project Name �•_ ; }%
Site Address
Job Phone
Work Done
Client: C.L.
RECE ED
00 1
W
IRR BUILDERS
Test Summary/ Footings Inspected X\0 L�
t.
.1
Comments
Tech.
24 hour, notice requested to schedule Field Technician. Thank you for the
:SuperAor Agent---
ity to be of service.
SSIadden Engineering
6782 Stanton Ave., Su * ite A, Buena Park, CA 90621 (714) 523-0952 Fax (714)*523-1369
39-725 Garand Ln;, Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760)772 -3895
Date
Job No.
FIELD MEMO
1
Project Name cl)vke? to 1q,4r-m PLC Client: R
Site Address
Job Phone
Work Done
...
Test Summary / Footings Inspected
orl Div Ine
Test
No.
RECEWdr-oMi8n
Elev.
Elev.
Dry
Density
Moist,
%
%Relative
Compaction
Ref. Max
"Ref. Max
pcf
pcf
Moist
%
OCT 0 ^A
1212
17. G
C115
J 2
ORA gi pill r% 'a)
a LO
ct q,.
)7
4qql
C
7,
;1
Comments
Field Tech.
Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
4�.
't�44�.i" �� . � ; a�-•� �a�... ���� y "fiY^.l,�n�y����. � 14 ';,�
��t.�llr.���. { 7xt`-.-CJ��. <y�.'., ^tiY.�}•,1-!Fa � :.!'4•iYta'r"M�
Slodden Engineering
6782 Stanton Ave., Suite A, Buena Park, CA 90621
(714) 523-0952
Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211
(760) 772-3893
Fax (760) 772-3895�
Date
2
Job No.
t. FIELD_
MEMO
-
Project Name �°i't� ^?� � tkl-t �j Client: O P R
Site Address x.
Job Phone
Work Done
Test Summary / Footings Inspected
Test
No.
.4
..; Location •
" Elev. .
D,ry! .:
Density
Moist
% "
% Relative
Compaction
Ref. Max
pcf
Moist
%
T V
)
Y.6
14,-6,�
) i�d. 6
S. ! �`
GIFT
(3
Ij.`� LI
ti
7
} .mil
r l
l
17Lq,r)
((j•61
! V
Comments_%.
Field Tech. t Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
Sladden En9in''eeHn*9'
6782 Stanton Ave., Suite A, Buena Park, CA 90621
39-725 Garand Ln., Suite G, Palm Desert, CA 92211
(714) 523-0952 Fax (714) 523-1369
(760) 772-3893 Fax (760) 772-3895
Date
Job KI
FIELD MEMO
Project Name 0)u 0 '0 Z-I' S Client: 0 rz
Site Address
Job Phone
Work Done
40
'
Test Summary / Footings Inspected
Test
No.
1-11 - % Location
14M A
Elev.
Dry
Density
Moist
%
%Relative
Compaction
Ref. Max
Pcf
Moist
%
5'C
/04,10
a
qG
0 7i;�
77
�/O.
I
IAJ�
9.7
04
I (I V. 3
4"'
cj
it) L-f Y.
1, 7
comments . I j1
A
0CLO 24AW
N
Field Tech.
Super.. or Agent
L 2
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
�.+rg•..yiw�
WSladden Engineering
6782 Stanton Ave., Suite A. Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1389
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date -,G
Job No. 5 7-2 �� 7
FIELD MEMO
Z
Project Name „-- e 16L Client: O P
Site Address
RECEIVED
Job Phone
Work Done • ` " Ule�ll 15 0 Ill 61 OP wok
Test Summary./ Footings Inspected
comments O
Field Tech. Super. or Agent
' I
24 hour notice reaueSted to Schedule Field Technician. Thank vrni fnr tha nnnnrtiinity to ha of carvir:a
(WSIddden Engineering
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln', Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Yr
Date
Job No. ZOZO,
FIELD MEMO
AProject Name V, Client: OR
Site Address
16bPhone
Work Done
67.
Test Summary Footings "Inspected A
Test
Location 4
Elev.
Elev.
Dry
Moist
%Relative
Ref. Max
Moist
No.
r
Density
%
Compaction
Pcf
%
15, 6h.
/D6125
q7-
I I �1
eI
t 1111A C
I
i
q
)64
X
C
omments
Field Tech. 4. Super. or Agent
24 hour notice requested to schedule, Field Technician. Thank you for the opportunity to be of service.
.12
V i
r Sladden Engineering
., 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln.; Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
a Date
Job No. .5 � � - �n f,
FIELD MEMO
Project Name ,- i < �A Vl--, ` � � Client:
Site Address
Job Phone
Work Done
o'
Test Suminary / Footings Inspected
Test
No
Location
El.*
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
1
1
Comments
Y
��..C� 4•V AC' 3 Sc a 4 F:.
y
Field Irech. Super. or Agent r;
24 hour notice requested to schedule Field'Technician. Thank you for the opportunity to be of service.
Sladden Engineering 52 Fax (714) 523-1369
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (7 14) 623-09 (760) 772-3895
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax
Date
Job No
FIELD MEMO
Client:
Project Name
Site Address
Job Phone
Work Done
r -- /'- -�' Z-
Test burnmery
f rowil-wo I110F wUF-
Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
Pcf
Moist
%
Test
No.
Comments
4�1
Field Tech. Super. or Agent
0'%A rarm,*Qfarl tn Qnhwitile Field Technician. Thank you for the opportunity to be of service,
k�
SIodith Ch ineering
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
j 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 1
Project Name / �- / 14Z,4
Site Address
Job Phone
Work Done
Test Summary / Footings Inspected
Date lQ
Job No.
FIELD MEMO
Client:
RECEIVED
AN 0 6 2002
ORR RUIl pERS
Test
No.
Location
�"
Elev.
Dry
Density
tY
Moist
%
% Relative
Compaction
P
Ref. Max
P cf
Moist
%
Zia 14,141:1 C. /G / / X �'
,� �
0 L
7_74W11-7
`
,mil
4 7
�;71'
_WT
t
Comments
r,
Tech.
J�
n
Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service
Sladden Engineering
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) .523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date
Job No.
FIELD MEMO
Project Name ., 0 i, A Client: e P RECEs j/per_
Site Address
. n j----
Job Phone s�1lt=
Work Done
Test Summary / Footings Inspected
Test
No.
Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
3
li :
U- r,
L
c
110
wrnmen is
T
Fiel Tech. Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
va non -complying fill whic ong wi
site.
ntl,r .
Deprse s
ess
resulting from these removals should have debris and herein.
Dep filled with suitable fill soils compacted as recomm
= - -removed .and be.,_ underlying soil has been
ted. ,
No compa�c
= fill should. tie'.plaq unless the g
observed by Earth Systems Consultants
3. In
order to help minimize potential settlement problems associateld Ear h
structures supported on a non -uniform thickness of compact
ed -fil?ns
Systems Consultants should be consulted for site grading rec ere oo
relative to bacl�illing large and/or deep depressions
constting from ruction lion should be
under item one val
above. In general, all prop
supported by a uniform thickness of compacted soil.
original
4 • Building areaser. The
should be overexcavated to -of two feet below
e or_two feet below the bottom of_the footings-, whichever is_deepmois e
grad
exposed surface should be-scarified—to�a _depth— 1 inches,
rcent of um density.
conditioned and recompacted to=a a n layers at near optimum
The previously removed sods should placedty.
moisture content and compacted to at least 90 percent of maximum dfeei of soil
intent is to have building foundations supported by at least
threecompacted to at least 90 percent relative compaction.
5 grading ding recommendations apply to building areas and to areas at least five
feet beyond building limits.
6 Auxiliary structures including freestanding or retaining walls should have the
per item four above. The
existing soils beneath the structure
processed� eet beyond the footings. If plans for
grading recommendations apply provided for our review, these
auxiliary structures and walls are p
recommendations may be revised.
losses include shrinkage and subsidence along with clearing
7 . Potential graduig� g the investi ation
losses. Based_.upon- the information �b�ea e _o_s_ses on the order��
sum ariZed ink port, we would expect shrink ged
`25 er rcent for the upper five feet This is bas 3-)on compactive e 94 n
to ppercent
to produce an average degree of compaction of approximately Subsidenceu is estimated at
and will vary depending upon contractor methods.
two tenth (0.1) to three
tenths 0.3) of a foot.
B . Site Deve?opment - Qgngral
1. The following general recommendations listed in this section are in addition tD
those listed in the "Grading" section A above.
2. All rocks la
rger er than eight (S) inches in greatest dimension should be removed
from fill or backfill material.
Import soil used to raise site grades should be equal to or betTct` than on-site
lil
l not
. �npo •_�,�.t ► charac�� _ ;report soil
expansion, and itiA Ya ..:J�• _s -r .
etrPn nth _
;+a"'+n-+s�va--r'r++t'^.'i"'J+y.r.�.�-1`.w.,Fi-'* rr-�W�"`h�"`^"r•"'"--'^'i�.-7+.•...:-:-Frn-..�-.....----^--"��Y'.".^i"r,.F:-.kk .'�'i-�'-'� r
Sladden ` ngi.neering
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) .772-3895
Date '/ 2 3 Cr7__
Job No. 522 - ZCIZ6
FIELD MEMO
Project Name &AG Client:
Site Address
Job Phone
Work Done .
COUTCCA(-J�'C
Test Summary / Footings Inspected
Test
No
Location /�
Elev.
Dry
Density
Moist
- %
%Relative
Compaction
Ref. Max
pcf
. Moist
1
i
r h
Comments
e
Y
field Tech.
Super. or Agent
t.
24 hour. notice.requested to schedule Field Technician. Thank you for the opportunity to be of service.
`aj,"'',�w''-�.,�i--.s�3F.+r�-'a.?' .. _-w,.:trfis--;riG'w,.t•%F-,.�>.ww---�.
Sladden Engineering
t: 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (7.14) 523-0952 Fax (714) 523-1369
�. 397725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date ' 2S -GZ-
Job No. �Z Z - ZGLO
FIELD MEMO
Project Name �cJ►a.. P401 IA-5 . r+ ?.-on Client:
Site Address
Job Phone
Work Done
IN
Test Summary / Footings Inspected
Test
No.
Location l
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
.i)
/
'7
1 Z
--�1
z
7.57
11
3'
.0
S /
► s
1 G
, �` 66)f1
3',354
/Gl' z
7 • z
7
lil U V
VW
P `/. l
16 - 5
sS
A_1
Field Tech.
Super. or Agent
24 hour notice requested to schedule Field Technician:- Thank you for the opportunity to be of service.