Loading...
3659NOTE: ti With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: 03/11/02 Subdivision Improvement Permit— Class III Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION TRACT 24197-4 MONTICELLO (Street address or Description of Location) PURPOSE OF CONSTRUCTION TN'f'TtR.TOIR %tTR9RT2/CTTR1RQ 01f1'1" {'11 0 a RTTWPWAT.1( DESCRIPTION OF CONSTRUCTION cats». A4 ARnyy, DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN Sketch (attach construction plans if appropriate) SEE ATTACHED SPECIAL CONDITIONS APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ �%U;4#j9U$UVU*0y (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) _ In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Xl1' Signature of Applicant or Agent CENTURY CROWELL COMUNITIES ✓ 909 381 6607 Name of Applicant (please print) Business Address Telephone No. SMIE A8 ABOVE Name of Contractor and Job Foreman Business Address Telephone No. 714188 Contractor's License No. GOLDEN EAGLE INSURANCE CO Applicant's Insurance Company 02120 City Business License No. NWC 544068-00 FEES: Subdivision Improvement Permit — Class I II Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. $ 9071.70 100.00 (3,750,.00) cxadit $ 5�421.70 Received by Date Recorded by Policy Number ' i MAR 22 2ou PERMIT VALIDATION 3659 PERMIT NO. DATE APPROVED 03/15/02 EXPIRATION DATE f13/�IZ113 DATE ISSUED Administrative Authority sIephone. (760) 777--7075 NOTE: With proper validation 4.. this form constitutes an CITY OF LA QUINTA r encroachment permit s APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) or For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS s-11_,® 2 Subdivision Improvement Permit— Class III DATE:- JMinor I�mpp�ovemeent Permit Class IV LOCATION OF. CONSTRUCTION `Y �i�1� OZ 7�� / y i" /'[ D rL l ! G C [i (Street address or Description of Location) PURPOSE OF ON TR C O DESCRIPTION OF-C64STRUCTION DIMENSION OF INSTALLATION OR. REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN Sketch (attach construction plans if appropriate) i APPROXIMATE TIME OF COMPLETION MAR 1 12002 ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and de ris, backfilling, com• 3oZ1391 � paction and placing permanent resurfacing and/or replacing improvements) o Ant An Ihi r6RKS In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend• and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of Le Ouinta and to pay for any additional replacement necessary as the result of �this work. A n _ A A A /? Signature of Aolicant or Agent _ Name of Applica(please print) V 5dzn _ QA Lt Name of Contractor and Job Foreman " Con actor's icense No 'Applicant's Insurance Co ny FEES: Subdivision Improvement Permit —Class III Business Telephone No. Business Address Telephone No. aC20 City Business Licen No. NZ06 6 aZf �oa Policy Number Public improvements: 3%of'estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee $ / o / I Permit Fee / 66 - 00 Cash Deposit -Surety Bond if required TOTAL: $ 54 1 52 A/i Receipt No. Received by Date Recorded by 3527. PERMIT VALIDATION PERMIT NO. 3 6 I DATE APPROVED 3 /1, 1y 2 EXPIRATION DATE 3�3 � 2b Z DATE rIED By Adnj nistrative Authority Telephone: (760) 777-7075 FEB,21,2002 .3:59PM DUDEK AND ASSOC NO.5267 P, 2 Cost Estimate Monticello - Tract No- 24197-4 Item Description Quantity Unit Price Cost Rough Gradin 1 Clearing & Grubbing 14.3 Ac. $500.00 /Ac. $7,150 2 Street & Lot Grading 94,000 C.Y. $1.75 /C.Y. $164,500 .�-7 Interior Street Improvements 1 Paving (3" AC, 4Ys' AGG. Base & cross gutters 2 6" Curb & Gutter 3 Cross Gutters 4 4" Sidewalk 5 Street Signs. 6 Stop Sign & Painting Water Improvements 1 8" DIP Water Main (with fittings) 2 1" Service (with Meter) 3 6" Fire Hydrant Assembly Sanitary Sewer Improvements 1 8" VCP Sewer. Main (with fittings) 2 48" Dia. Manholes ` 3 4" VCP Laterals Subtotal $171,650 68,000 S.F. $1.40 /S.F. $95,200 3,700 L.F. $10.00 /L.F_ $37,000 900 S.F. $5.00 /S.F_ $4,500 20,000 S.F. $2.00 /S.F. $40,000 1 Ea. $250.00 /Ea. $250 3 Ea. $250.00 /Ea. $750 Subtotal $177,70 1,800 L.F. $30.00 /L.F. $54,000 54 Ea. $450.00 /Ea. $24,300 8 Ea. $2,500.00 /Ea. $20,000 Subtotal $98,300 1,000 L.F. $22.00 /L.F_ $22,000 5 Ea. $2,000.00 /Ea. $10,000 1,100 L.F. $10.00 /L.F. $11,000 Subtotal $43,000 �OFESS�O� r� ��,SONF� �! No. 24089 EXR 12-31-2001 n, 10.26-01 10/24/2001 Job No. 2512 Page 1 of 2 FEB. 21. 2002 4:OOPM DUDEK AND ASSOC NO. 5267 P. 3 Item Cost Estimate Monticello - Tentative Tract No. 24197-4- Description Quantity Unit Price Cost Dry Utilities & Improvements 1 Electric, Gas & Telephone 54 Ea. $1,800.00 /Ea. �OO 2 Perimeter Wall 850 L.F. $30.00 /L.F. $25,500 3 Permits and Fees 1 L.S. $9,000.00 /L.S. $9,000 4 Retaining Wall - 2" tall 470 L.F. $26.00./L_F. $12,220 5 Retaining Wall - 2'8" tall 560 L.F. $35.00 /L.F. $19,600 6 Retaining Wall - 3'4" tall 110 L.F. $44.00 /L.F. $4,840 7 Retaining Wall - 4' tall 170 L.F. $52.00 /L.F. $8,840 8 Retaining Wall - 4'8" tall 270 L.F. $61.00 /L.F. $16,470 9 Retaining Wall - 5'4" tall 200 L.F. $70.00 /L.F. $14,000 10 Retaining Wall - 6' tall 20 L.F. $78.00 /L.F. $1,560 11 Retaining Wall - 66" tall 30 L.F. $88.00 /L.F. $2,640 12 Monumentation 1 L.S. $10,000.00 /L.S. $10,000 Subtotal $221,870 ` Summary of Improvement Costs: Rough Grading $171,650 Street Improvements $177,700 Sanitary Sewer Improvements $43,000 Water Improvements $98,300 Dry Utilities $221,870 TOTAL COSTS $712,520 10% CONTINGENCY $71,252 TOTAL $783, 772 The above quantifies and costs are approximate and prepared for the city to determine the bond account. Unforeseen adjustments will likely occur during final design. Neither the Engineer nor the Developer guaranwe these quantities or costs. and financial decision should be made accordingly. C� t No. 240,39 IO�26-01 10/24/2001 Job No. 2512 Page 2 of 2 SPECIAL CONDITIONS --PERMIT NO. 3659 --- Century Crowell Communities --- In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. Century Crowell Communities, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control pursuant to the Fugitive Dust Control Plan. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Work performed within 500 feet of a major and/or signalized intersection is restricted between the hours of 9 am. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275- 6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage tol other City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance'warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No. 3659 Pagel of 3 SPECIAL CONDITIONS --PERMIT NO. 3659 --- Century Crowell Communities --- 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), and as required by the Public Works Department. Backfill shall be completed in lifts, not to exceed V, compacted to 90% minimum relative compaction. Native, material may be used, provided the material is suitable for use as backfill after construction operations. Controlled Density Fill (C.F.) may be used as an alternative. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the .satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement shall be replaced as follows: a) Sawcut and remove existing a.c. surfaces a distance of one foot (P) beyond all trench walls, including any sloughing or cave in of adjacent soils. Undermined a c. surfaces shall be removed. All a.c. edges shall be straight, clean and vertical. b) Provide an existing section (four -and -one-half inches [41/z"] minimum) of crushed aggregate or miscellaneous base material, compacted to 95% minimum relative compaction. Special Conditions - Permit No. 3659 Page 2 of 3 .SPECIAL CONDITIONS --PERMIT NO. 3659 --- Century Crowell Communities --- c) Provide an existing section plus one inch (1 ") [four inches (4") minimum] of asphalt concrete in two (2) or more lifts; the first lift(s) comprised of a base course a.c. material, of a City approved mix design, meeting the requirements of Greenbook class B-AR-4000; the final 0.10' lift comprised of a wearing course a.c. material, of a City approved mix design, meeting the requirements of Greenbook class C2-AR-4000. All pavement edges shall be flush with adjacent a.c. surfaces. Each lift of a.c. material shall be compacted to 95% minimum relative compaction. d) For trenches greater than two feet (2') in width, the Permittee shall perform a grind and a.c. overlay of 0.10' depth for three feet (3') in addition to the pavement replacement specified above. 16. Permittee shall notify the City of La Quinta Public Works Department a minimum of 48 hours prior to commencement of any construction at (760) 777-7075. 17. Permittee shall stabilize any soil that was disturbed (shoulder areas, etc.) as a result of work performed under this permit with an approved dust control treatment. 18. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 20. This permit authorizes work for street improvements, for Monticello, Tract 24197-4, per the approved plans dated March 13, 2002. Improvements include, but are not limited to paving, curb & gutter, signing & striping. Special Conditions - Pemtit No. 3659 Page 3 of 3