3674NOTE:
With proper validation
this form constitutes an
encroachment permit
CITY OF LA QUINTA
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
S.-s-ao0z
Subdivision Improvement Permit — Class I I I
DATE: Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION HiraflopaooSanior Apartmente, Tract 28601-1
N/W cornor of Jefferson Street & Ave. 48
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION Streats & Storm •Drain Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION Stroet - Curb Otter See Attached COnditions
Storm Drain pipe -- Parking Lot
ink i
DIMENSION OF INSTALLATION OR REMOVAL 10661 x 2901
2801 x 550' PFMAY
0 7 2002
SIZE OF EXCAVATION, IF NEEDED ��jT1fOFLAQUINTA
"' FINANCEDEPT.
APPROXIMATE TIME WHEN WORK WILL BEGIN 5/6/02_'
APPROXIMATE TIME OF COMPLETION 7/2 02
ESTIMATED CONSTRUCTION COST $ 305,606.00
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements) fL.Aa70
� A�G�>��ii^ . "''/�'✓"'
In consideration .of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, authorized agents, officers re resentatives and"em to ees harmle f m n t ns; r^
Y 9 P p y ss ro and againstj8n ,and a�,�
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to person -r% pe (1
happening or occurring as a proximate result of any work undertaken under the permit granted�,pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance.of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all 'applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this work. ,
w
Signature,,of Applicant or Agent
Desert Cities Devolopment 46753 Adams :Streel 771-3345
Name of Applicant (please print) Business Address 'Telephone No.
Sfte As Abova
Name of Contractor and Job Foreman Business Address Telephone No.
768595 02108
Contractorrr'stLiicernnsee NNo.(,dor,=no COMOp� iitydBuusin�e� License No.
Illinois Union Ina. (Liability) CCL�147507/XCP142508
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class I II
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor. Improvement Permit — Class IV: See attached schedule
Inspection Fee $ 9,168.18
Permit Fee 100
Penalty
Cash Deposit -Surety Bond plancheck(4,500)credit
if required
TOTAL: $ 4,768.18
Receipt No.
Received by
Date
'�4
PERMIT VALIDATION
PERMIT NO. 3674 r '�
DATE APPROVED 5/6d02
EXPIRATION DATE 5/31/02
DATE,I�S/SUED /6 / A/6-:?By
Administrative Authority
Recorded by
Telephone: (760) 777-7075
SPECIAL CONDITIONS --PERMIT NO. 3674
--- Desert Cities Development ---
In addition to the standard permit conditions, the following shall apply:
Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For
Public Works Construction(SSPWC) and as directed by and to. the satisfaction of the City Engineer.
2. Desert Cities Development, hereinafter referred to as "Permittee", shall be responsible for providing
continuous dust and erosion control pursuant to the Fugitive Dust Control Plan.
3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and
more frequently if required.
4. - Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout
the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance
ofequipment within one-half mile of human occupancy shall be performed only during the following
time periods:
October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 am. to 5:00 p.m.
May 1 st to September 30: Monday -Friday 6:00 am to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
5. Work performed within 500 feet of a major and/or signalized intersection is restricted between the
hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 am. and removed before 3 p.m. The
Pemzittee"shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-
6894 if signal operation at the intersection is to be altered in any way.
6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private
street and for any damage to other City streets or facilities as a result of work performed under this
permit.
7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City
for review and approval one (1) week prior to starting any construction. It shall be the Permittee's
responsibility to appropriately detour and barricade all construction sites.
Special Conditions - Pem it No. 3674 Pagel of 3
SPECIAL CONDITIONS --PERMIT NO. 3674
--- Desert Cities Development ---
8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be permitted. A minimum of one travel lane of paved surface shall be
maintained with flagmen at all times.
9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422=
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
10. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost
to the City of La Quinta.
11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest
edition ofthe Standard Specifications For Public Works Construction (SSPWC), and as required by
the Public Works Department. Backfill shall be completed in lifts, not to exceed F, compacted to
90% minimum relative compaction. Native material may be used, provided the material is suitable for
use as backfill after construction operations. Controlled Density Fill (C.F.) may be used as an
alternative.
12. All excavations within City of La Quinta right-of-way shall be backf lied, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of
the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed
that which can not be backfilled in the same day. Excavated trenches shall not be allowed open
overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet
in length, open overnight at a point where construction will begin the next day, provided that this
length of trench is completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to
its original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
of the work. Permanent pavement shall be replaced as follows:
a) Sawcut and remove existing a.c. surfaces a distance of one foot (1) beyond all trench walls,
including any sloughing or cave in of adjacent sods. Undermined a.c. surfaceg shall be removed.
All a c. edges shall be straight, clean and vertical.
b) Provide an existing section (four -and -one-half inches [4%2"] minimum) of crushed aggregate
or miscellaneous base material, compacted to 95% minimum relative compaction.
Special Conditions - Permit No. 3674 Page 2 of 3
SPECIAL CONDITIONS —PERMIT NO. 3674
--- Desert Cities Development ---
c) Provide an existing section plus one inch (I") [four inches (4") minimum] of asphalt concrete
in two (2) or more 'lifts; the first lift(s) comprised of a base course a.c. material, of a City
approved mix design, meeting the requirements of Greenbook class B-AR-4000; the final 0.10'
lift comprised of a wearing course a.c. material, of a City approved mix design, meeting the
requirements of Greenbook class C2-AR-4000. All pavement edges shall be flush with adjacent
a.c. surfaces. Each lift of a c. material shall.be compacted to 95%' minimum relative
compaction.
d) For trenches greater than two feet (2') in width, the Permittee shall perform a grind and a.c.
overlay of 0.10' depth for three feet (3') in addition to the pavement replacement specified
above.
16. Permittee shall notify the City of La Quinta Public Works Department a minimum of 48 hours
prior to commencement of any construction at (760) 777-7075.
17. Permittee shall stabilize any soil that was disturbed (shoulder areas, etc.) as a result of. work
performed under this permit with an approved dust control treatment.
18. Pursuant to Chapter 12.56 of the La Quints Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a.delivery or pickup on the subject street, or if this permit specifically grants
permission to use the street to deliver street construction materials and/or equipment.
19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
20. This permit work allows for street improvements and storm drainage system of Mira Flores Senior
Apartments, per the approved plans dated May 7, 2002, Tract 28601-1. This permit work does not
include any off -site street improvements to be constructed under this permit.
Special Conditions - Pemiit No. 3674 Page 3 of 3
NOTE: MAY O
With proper validation 2 2Q02
this form constitutes an CITY OF LA QUINTA
encroachment permit Pusuc vvc)'
«
APPLICATION FOR PERMIT.
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
i�
For the construction of public or private curbs, driveways, pavements, sidewalks, parking Is, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVE Sand ROVED SUBDIVISIONS
DATE: 5 — )'0 2
LOCATION OF CONSTRUCTION COILtl.a- or- JEF—.SO4
ra.f lbre5 .. ►or
(Street address or Description of Location) /
PURPOSE OF CONSTRUCTION
DESCRIPTION OF CONSTRUCTION S'Cr .'TS — Gultq G
Sir %t Dat-eiu+5 - P4W" uc LCrr
DIMENSION OF INSTALLATION OR REMOVAL ►OCOW k 240�
Subdivision Improvement Permit — Class I I I
Minor Improvement Permit Class IV
48**1 i(Ur-T 2YGn 1 — I.
C f K,2,4
Sketch (attach construction plans if appropriate)
Zoo` V. S50�_ �I
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN W LL BEdI
APPROXIMATE T
ESTIMATED CON
(Including removal
paction and placin
In consideration o;
Indemnify, d
penalties, liat
happening or
O PIONn
I P $ coo 4 sT.
tr do teri I fftt,e
b ' k illi19
, con t r surf c I i mp cvementII�/tin f t is ppplicant he eby, grees to: PL , (14 kluw..L
jave OW City, its authorized agents, officer Vepresentatives and employees, harrriless from and against any and all
m oss resulting from claims or court action nd arising out of any accident, loss or damage to persons or property
as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this work.
Signature of Applican or Agent
%'ALGt}4E-L -.66 4u"]5& A 0 A M 5t' 171-3344'
Name of Applicant (please print) Business Address Telephone No.
rn S ST'. T71- 3344'
'Name of Contractor and Job Foreman Business Address Telephone No.
'1(o85q� o�1oB
Contractor's License No. City Business License No XCP 14�So fi
►L.\.IhLDIS �l1LW1l 1kIS, cl.►>,b11.aty IUS� GG}- 1429G'2%
S'tn-CE Fcs wfl (w>7n m4�ct co►nr� t Ca Ca I [� 2 oe 2
Applicant's Insurance Company, Policy Number
FEES: Subdivision Improvement Permit — Class III
Public:mprovements: 3% of estimated construction costs
Private °improvements: 3% of estimated construction costs
Minor. Imp lvement Permit — Class IV: See.attached schedule
Inspection Fee $
Permit Fee
Penalty
Cash Deposit -Surety Bond kp("k,,oL C4/S'o
if required
TOTAL:
Receipt No.
Received by
Recorded by
Date
PERMIT VALIDATION
PERMIT NO., G 7 y
DATE APPROVED _ 5—A U Z
EXPIRATION DATE S✓�3 / O 3
—T
DATE ISSUED
By
Ad nistrative Authority
Telephone: (760) 777-7.075
,1
1
•1
CONSTRUCTION ACTIVITY SUMMARY
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Rep
STREET IMPROVEMENTS
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/ReF
Material Certifications
AC Design Mix
WATERIMPROVEMENTS
MAINS
SERVICES
Compaction Testing/ReF
Material Certifications
SEWERIMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/Rep
Material Certifications
STORM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/Rep
Material Certifications
DRY UTILTIES
CONDUITS
STRUCTURES
MEDIAN -.....................................
PERIMETER
F730 04/02 c-..e o s
WEEKLY INSPECTION RE'. -RT
PROJECT NAME c?</
PERMIT NO.. PLAN SET NO.
DIN
INSPECTOR
JOURNAL OF NOTABLE ACTIVITY & ACTION
t
TIE
/�� CJ�
j�
1J i/C
C 7
/
J/ 1 % �� / f 7cv CUV�
1. '7 e
� 6 6,10 6 y tC 77s
NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
roan
Uy,UL Page 1 of 2
CONSTRION ACTIVITY SUMMAA
YR L5 2 MO % DATES: thru WORK BY SPECIAL
. PERMISSION
MONJ TUE WED THU FRI SAT SUN NITE
TEMPORARY TRAFFIC CONT
ROL
...........
DUST CONTROL
Onsite Measures
VEEKLY INSPECTION REP(
PROJECT NAME /;e7C-f -2 tR GQ /- i
PERMIT NO.PLAN SET NO.
DIN //�� r
INSPECTOR /&j 7 Y C fo-m &0
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
/ u�(/2
'I=
7-/0-6 2
1�4r79 C�2lC G2c� 7
s i n Srar t Ye s .0 ii cl "7 t G 7'77
7�1 ClSd 0 fgg 5' O 77C / 410 f
c� 5127 S S,5 0- Vel Y
777o G o
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
r i ,ju U41UZ Page 1 of 2
CONSTROTION ACTIVITY SUMMAW
YR O MO % DATES: IS thru % 9 WORK BY SPECIAL
PERMISSION
MON TUE WED THU FRI SAT SUN I NITE
TEMPORARY TRAFFIC CONT
ROL
OL ......... ......... .. ............................
'CONTROL
Onsite Measures
Non -conforming
Certifications
MEDIAN
I
P2no 'J of 7
MEEKLY INSPECTION REP,
PROJECT NAME Lrr7C /
PERMIT NO.. 3 PLAN SET NO.
DIN
INSPECTOR Z-Z L 7YG� ��79?I)%-)'1
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
713`02
�
2% u Y/ ed
) a-irli,
G o e s a r o 7-
v/ c* 1 11 9%
f
�o uXe� 22
S�'77 fa a �� 7a Cl �0 7 2e
G
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
UgiUt rage 1 of 2
CONSTR*TION ACTIVITY SUMMA10
YR _Q MO 9 DATES: __'_12_ thru _26 WORK BY SPECIAL
PERMISSION
MON TUE WED THU FRI SAT SUN NITE
TEMPORARY TRAFFIC CONTROL .
Conforming implementaton
Non -conforming implementation
DUST CONTROL
Onsite Measures
Conforming implementaton
Non -conforming implementation
Track -out Cleanup
Conforming implementaton
Non -conforming implementation
GRADING
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Report
STREET IMPROVEMENTS
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC - CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/Reports
Material Certifications
AC Design Mbc
WATER IMPROVEMENTS
MAINS
SERVICES
Compaction Testing/Reports
Material Certifications
SEWER IMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/Reports
Material Certifications
STORM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/Reports
Material Certifications
DRY UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/Reports
Material Certifications
. PERIMETER I
F130 04/02 0___
MEEKLY INSPECTION REP(
PROJECT NAME
PERMIT NO. `Jla�% y PLAN SET NO.
DIN
INSPECTOR 11ot,U2Yd C6-) n o T�
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
.723 0
02
�1-2S'o2
I
7 `-Oz
Ord 2,7d<� a�
If / .L` f 9d 9' C 07 7 P V c aY u Y
%Po u Y e C' a T 'yo L 7-t o / r- ?
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE 8 TYPE OF NOTICE ISSUED IN THIS SECTION)
r i ou u4iuz Page 1 of 2
CONSTTION ACTIVITY SUMMokY
Track -out C
_�--- ®�-
130 04/02 Page 2 of 2
WEEKLY INSPECTION RE1 IT
PROJECT NAME f Y�uG��
PERMIT NO. j 4 % ! PLAN SET NO.
DIN
INSPECTOR Q�LAs)9YiftJ La-r7712Is77
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
7-
7-36-02
j 1
-L- a
PO
CUY U e✓
C ur& a72 d
CULL 1 L) -i-f f r
CJ
9 2 GY 7 7 Cp U
-Po ci x
a g7d -Co?-zi7 ouzk d U l-e y-
NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE a TYPE OF NOTICE ISSUED IN THIS SECTION)
r l ou U4/UL vage i of z
CONSTIR ION ACTIVITY SUMMA10
YR MO B DATES: S thru 9 WORK BY SPECIAL
PERMISSION
MON TUE I WED I THU FRH SAT I SUN I NITE
....... ................................
TEMPORARY TRAFFIC CONTROL . , 1.,*-..-.'..-:,."*".,.*..-".-'.-.'.'-.'.�*'..-.-'-.-','...'-'.-.*.-.'*..-.'.*.--'..*.-".'...'-'.'.'.'-..-'.'--.'.'-�.'*.-�'.-'.-'.-.-".--'.'-.-,.'.-*,.,..".,.*..."..'*.:-.*-.,-.,.,-.,-,.-'. .................
........ . .
. . .................
Non -conforming implementation
DUST CONTROL
.........
.. ........... ...........
...... .......
Onsite Measures x
Conforming implementaton
Non -conforming implementation
Track -out Cleanup ..... ........ ............
........ ..... ......
Conforming implementaton I
Non -conforming implementation
.. ...............................
GRADING . ............
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Reports
..........................
STREET IMPROVEMENTS
... ......
.. . ..... ....
. .... ...... .
% ........ I ........ : .. :.::. .... ..... . .. ...
C&G I A x
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC - CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/Reports
Material Certifications
AC Design Mb(
WATER IMPROVEMENTS
.. .... . .....
... . ............
........... .... ..
MAINS
SERVICES
Compaction Testing/Reports
Material Certifications
. ............. .. . ........
SEWER IMPROVEMENTS
. . . . . . . . . . . . . .
MAINS
LATERALS zz-
STRUCTURES
Compaction Testing/Reports
Material Certifications
................
STORM DRAINS
..........
...........
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/Reports
Material Certifications
DRY UTILTIES
............................
CONDUITS
STRUCTURES
Compaction Testing/Reports
Material Certifications
..... .. ...............
. . ... . .....
LANDSCAPING
.. ....... ........ .....
MEDIAN
PERIMETER
ulwulz Page 2 of 2
VEEKLY INSPECTION REPC
PROJECT NAME 7 c�'03
PERMIT NO. 2LZ PLAN SET NO.
DIN
INSPECTOR l%i1c� 1Y� �U771 /JfU7?
DATE
JOURNAL OF NOTABLE ACTIVITY 8 ACTION .
v
Z sc- Lo c ! c g r /cz,, 77. 0 0
7.1 cJ c- cs
�17�Ci
x!- e a
e::7 e .
NOTICE SUMMARY FOR THIS WEEK
(INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F13U 04/U2 Page 1 of 2
CONSTROtION ACTIVITY SUMMA&
YR 02- MO _� DATES: • f R thru
WORK BY SPECIAL
PERMISSION
MON I TUE I WED I THU I FRI I SAT I SUN I NITE
PORARY TRAFFIC
..CONTROL
Onsite Measures
Track -out
implementation
Clearing & Grubbing
Earth Moving: Cut &
Fine Grading
Compaction Testing/F
STREET IMPROVEMENTS
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/F
Material Certifications
AC Design Mbc
WATER IMPROVEMENTS
MAINS
Compaction Testing/1
Material Certification:
:R IMPROVEMENTS
MAINS
LATERALS
Material Certifications
2M DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/F
UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/F
Material Certifications
PERIMETER
F130 nam
WEEKLY INSPECTION REP(
PROJECT NAME 7XP e 72 /_. ( (- DIN
PERMIT NO. 34 ZY PLAN SET NO. INSPECTOR
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
p e0 r
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 04/02 Page 1 of 2
CONSTROTION ACTIVITY SUMMAW
VEEKLY INSPECTION REP, '
PROJECT NAME DIN
PERMIT NO. PLAN SET NO. INSPECTOR /70WW i(::2L C 729t--7k77
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
g-2%v2
I
f Co - ttPY 27 2 -De 3 fr
S' P7 'r
y77 d r =F '✓" f� r rye �. =0Y?? 2�"� l7
jC 2 s 'it 7 7•
If '77-20ve a U r t e)- 0 V
/c09/ rr ye? t o v c/�
/V` c- e 7 5 c r a cle s L-v e e c .
[uva�cti b O.?1 Gl�7� cl o Ca7cA, 3'(r, ),
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 04/02 rage i or 2
CONSTROTION ACTIVITY SUMMAS
ONEEKLY INSPECTION REP(
PROJECT NAME
PERMIT NO. -�4 %y PLAN SET NO.
DIN
INSPECTOR Oc5777 ri7 r2E
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
2,-0
7` k r �a r 0 o r 4 T t2 G /c
o j f yf Yu LtJ �� / c9 V
St, lo 4'o r zv, 3 r j
d '4 a f-1-- v 7 7 dc-;-tv If i e ioJg « U"
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 u4/uL rage 1 vi 4
CONSTRION ACTIVITY SUMMA&
YR 49 MO DATES: A- thru WORK BY SPECIAL
PERMISSION
MON . TUE WED THU FRI SAT SUN NITE
TEMPORARY TRAFFIC CONT
ROL
ROL ...... .:................
DUST CONTROL
Onsite Measures
Track -out Cleanu
Conforming impl
Non -conforming
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Rer
:ET IMPROVEMENTS .
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC - CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
. _,V_ - _.
JEEKLY INSPECTION REPC&
PROJECT NAME
PERMIT NO. e 4 % �Z PLAN SET NO.
DIN
INSPECTOR /'/O ccl NYC �o77t�
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
7
%T v i rack 6 C) AJ
�-
f-- •�
/ aU- o
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 04/02 Page 1 of 2
CONSTRA�ION ACTIVITY SUMMA&
YR Ci MO 5 DATES: 3 thru 27 WORK BY SPECIAL
PERMISSION
MON I TUE I WED I THU I FRI SAT I SUN I NITE
TEMPORARY TRAFFIC O ............................._.._ ... ...................... ................
'CONTROL
Onsite Measures
UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/Reports
Material Certifications
PERIMETER I I
F130 04/02 an„e ... o
JEEKLY INSPECTION REP(
PROJECT NAME `I
PERMIT NO.� `O % J7 PLAN SET NO.'
DIN l
INSPECTOR A/d "J9rd L/01 lli-p-tD'77
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
7r i k o v 1 o-27
I
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
UtiiUZ rage 1 of z
CONSTRION ACTIVITY SUMMAIR
J
YRMO mil- �O DATES:_ thru WORK BY SPECIAL
PERMISSION
MON I TUE I WED THU FRI I SAT I SUN I NITE
UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/F
Material Certifications
� PERIMETER
F130 04102 .,
...yam .,
VEEKLY INSPECTION REP(
PROJECT NAME
PERMIT NO. 3 (o 7 L%' PLAN SET NO.
DIN
INSPECTOR /76 UJ V rd 0O'Tft/ &>77
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
3a"a
_2 777 /D ;?L e k o o f S') j
I
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF. NOTICE ISSUED IN THIS SECTION)
v4,Vc rage i of z
CONSTIRLOtION, ACTIVITY SUMMA0
YR SZ MO DATES: 7 th,11 WORK BY SPECIAL
PERMISSION
MON I TUE I WED I THU FRI SAT SUN NITE
TEMPORARY TRAFFIC CONTROL
DUST CONTROL
............ ... . .........
Onsite Measures Y,
Conforming implementaton
Non -conforming implementation
Track -out Cleanup
............
SEWER IMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/Reports
Material Certifications
STORM DRAINS
MAINS
—STRUCTURES
SANDFILTERS
Compaction Testing/Reports
Material Certifications
DRY UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/Reports
Material Certifications
LANDSCAPING
MEDIAN
PERIMETER
�4
Page 2 of 2
VEEKLY INSPECTION REP(
PROJECT NAME ��'c�C� ��f;� oJ- DIN
PERMIT NO. �� PLAN SET NO. INSPECTOR /-/Q/ LA )c7 i' G
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
id-� 02
ld-/a�rJ
`-
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
uyiue Page 1 of 2
CONSTACTION ACTIVITY SUMMAY
WEEKLY INSPECTION REI
PROJECT NAME fib' 6 CJ /- / DIN
PERMIT NO. 3 � 7:�/ PLAN SET NO.
INSPECTOR A10i02," �!Oh 77
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
/b-N-U
. c 1< _ k v v I- a» dc y S o 7
i
NOTICE SUMMARY FOR THIS WEEK' (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 04/02 Page 1 of 2
CONSTACTION ACTIVITY SUMMgY
YR 7 _ MO /O DATES: ?/ thru WORK BY SPECIAL
PERMISSION
MON TUE I WED I THU I FRI SAT I SUN I NITE
DUST CONTROL
Onsite Measures
Track -out
CONTROL
implementation
WEEKLY INSPECTION REI IT
PROJECT. NAME ��C'T-
PERMIT NO. Y,67L/ PLAN SET NO.
ALI
INSPECTOR 11.6W a Y C� Cd '7? "/ 72
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION.
io� -23�v
' 777 AQ
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 04/02 Page 1 of 2
CONSTROTION ACTIVITY SUMMAW
YR MO DATES: thru WORK BY SPECIAL
PERMISSION
MON I TUE WED THU FRI SAT i SUN I NITE
O C N ....................................................
CONTROL
TEMPORARY TRAFFICL :::::>::>:::<<[:::::>::»::.... »::::>:>::>::
DUST CONTROL
Onsite Measures
Conforming imp
Non -conforming
Track -out Cleanu
implementation
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Rep
STREET IMPROVEMENTS
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/Rep
Material Certifications
AC Design Mix,
WATER IMPROVEMENTS
MAINS
SERVICES
Compaction Testing/Rep
Material Certifications
SEWER IMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/Rep
Material Certifications
STORM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/Rep
Material Certifications
DRY UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/Rep
Material Certifications
LANDSCAPING
MEDIAN
a_ js
PERIMETER �. J
F130 naing
VEEKLY INSPECTION REP(
PROJECT NAME
PERMIT NO.. T % 7 PLAN SET NO.
DIN / J
INSPECTOR
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
M /-0
'� 'o )rCO' S e f 5gle
I
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 04102 Page 1 of 2
CONSTF&TION ACTIVITY SUMMaY
y.
YR 0 2 MO f % DATES: q thru WORK BY SPECIAL
PERMISSION
MON I TUE WED THU I FRI SAT I SUN NITE
IC CONTROL
Onsite. Measures
Track -out
implementation
WEEKLY INSPECTION REI IT
PROJECT NAME fYr?(2
PERMIT NO. 3 6 7! PLAN SET NO.'
DIN
INSPECTOR AQU),�fYn C09'-n2/(Si7
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION.
I
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 .
04/02
Page 1 of 2
CONSTRArION ACTIVITY SUMMA�
YR (0;�?— MO _� DATES: thru WORK BY SPECIAL
PERMISSION
IMONI TUE IWEDFTHU I.FRI I SAT I SUN I NITE
TRAFFIC CONT
'CONTROL
Onsite Measures
I PERIMETER .1 1 1 1 1 1 1 1
F13n nd/n9 0— o -f e
JEEKLY INSPECTION REPO
PROJECT NAME
PERMIT NO.SPLAN SET NO.
DIN '
INSPECTOR //Q W 9 Yc4 00 "'10/0-71
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
IL
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130
04/02
Page 1 of 2
x
1p
WEEKLY INSPECTION REF tT
PROJECT NAME 14(r224 rloy,,
PERMIT NO. ?i�% 7 PLAN SET NO.
INSPECTOR m ✓
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
IZ
I
Tdlevcl�5 0�- �e, .I/ 2ec�e� g2�/«'//.'.c/ e/l�ria.✓ ,�.� ��u.�t�ec�
C2�c �. (.�,.c� ' �iaelGG; �:/:�✓ /� rrr /a� ,✓ 7122�v�hGS Chz�C�
NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE 8 TYPE OF NOTICE ISSUED IN THIS SECTION)
riov
vage 1 OT 1
y.
i.
r
WEEKLY INSPECTION REI U
PROJECT NAME / r277 �'d %��6 r e S DIN ® l
PERMIT NO. �J (n / '7� PLAN SET NO. INSPECTOR /&V tA4 07%74/677
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
a ?? ; 76 d i M sn 2 9 C i o Jul c!e 1
a d�C LAJO/t -* Yi' 117-f
Y % ,-4 Y Loa l ) 3 Cie- -D
For 7? s I q-d 1,c1 2 lk S 4 f V f I i i f l ?
Jn e Pr QA,-W
/0 9 vises 77 t7z ee
e.'30
ojr w-,ney v -De 5e,->� �' Ies
r �r
v
i e-4- g-e)le a.0if ty 01
6"f
NOTICE SUMMARY FOR THIS WEEK:
(INDICATE ONLY DATE 8 TYPE OF NOTICE ISSUED IN THIS SECTION)
r i ov U4lU1 Page 1 of 2
CONSTTION ACTIVITY SUM.Ay
WEEKLY INSPECTION RE tT
PROJECT NAME /!7/
PERMIT NO. z rG 1 PLAN SET NO.
DIN
INSPECTOR
DATE
�� JOURNAL OF NOTABLE ACTIVITY & ACTION
3
1- /L/ U
'/-)r /2 ins 1-12227 Cf r l s I L'url, s
NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE -OF NOTICE ISSUED IN THIS SECTION)
F130
;�L•fL�Ya
Page 1 of 2
WEEKLY INSPECTION REPCW
PROJECT NAME
PERMITNO. 7 PLAN SET NO.
DIN
INSPECTOR fldl rel�y� Oo7;Z -72
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
61-22'N9
t✓ �VC�
-Dv
- 5 f w . frcf7 77 . ,C i-�--e I
STE
C7? T7'C 6f C'?L S f /( 7 2c�1Z7 //7%f W 5' C'2
7- i T1 -t
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)'
04/02 Page 1 of 2
CONSTRI TION ACTIVITY SUMMA
YR MO DATES: thru WORK BY SPECIAL
PERMISSION
MON I TUE I WED I THU I FRI I SAT SUN I NITE
MPORARY TRAFFIC
(CONTROL
Onsite Measures
Material Certifications
SEWER IMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/F
Material Certifications
STORM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/F
Material Certifications
DRY UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/R
Material Certifications
l rtKl""t I tK I I I I 1 ■ 1 1 1
F130 n4/02 D... o ..# o
*NEEKLY INSPECTION REPCO
PROJECT NAME J 3��JL'� �,2,9/a U l - / DIN
PERMIT NO. , L T/PLAN SET NO. INSPECTOR f1OWaYC' 207:77/J-fa71
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
.4-/702
�' e> 1. /0aUY
ow i c1 e o r to ' I a Se ,re
Y dd -e -7 fe,
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
77
rage -I oT 1
CONSTRION ACTIVITY SUMMA
YR OP MO_ DATES: • / % thru WORK BY SPECIAL
PERMISSION .
MON TUE WED THU FRI SAT I SUN I NITE
ON C T
TEMPORARY CONTROL
................. _..
C ...........................................,............- ..
(CONTROL
Onsite Measures
Track -out Cleanup
Conforming implement.
Non -conforming impler
GRADING
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/ReF
STREET IMPROVEMENTS
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/Rep
Material Certifications
AC Design Mbc
WATERIMPROVEMENTS
MAINS
SERVICES
Compaction Testing/Rep
Material Certifications
SEWER IMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/Rep
Material Certifications
STORM DRAINS
MAINS
STRUCTURES.
SANDFILTERS
Compaction Testing/Reps
Material Certifications
DRY UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/Repi
Material Certifications
I. PERIMETER I I I I I .
F130 04/02 pn.. 9 .,f 13
WEEKLY INSPECTION REPO'
PROJECT NAME lid C ���Of` / DIN
PERMIT NO. ' / . PLAN SET NO. INSPECTOR/D faJ Y C o7?'(v1oz9
DATE
S7&vl wa/77JOURNAL OF NOTABLE ACTIVITY & ACTION
C?�/[ V
7T% 7-7h6 e / c z I
-271 d �v off-s
0773,
J arri9�t , �j7-791 �777cY s%
77h0JZL-.
y CJ rI�a� _ l� �;
�� �"%vim/.(5`/y Szu,c/i,`
6-7�77 rt-, ;
�.�a� F 115:-'' : v a
O�e 7 7 71 / %? v f F 5 53
F/ v s
r�
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
rage -I or z
CONSTROTION ACTIVITY SUMMAW
YR MO DATES: thru
WORK BY SPECIAL
PERMISSION
MON
TUE
WED
THU I
FRI
SAT
SUN
NITE
TEMPORARY TRAFFIC CONTROL
~ a.:.
Conforming implementaton
Non -conforming implementation
U ON D ST CONTROL
:::::::::.::::::.
Onsite Measures
............
...:.:
...............:::.,:•:::...:::::.........
.
Conforming implementaton
Non -conforming implementation
c ea T ra k-out Cleanup
n P
Conforming implementaton
Non -conforming implementation
GRADING
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Reports
STREET IMPROVEMENTS
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -CAP
STRIPING 8 SIGNS
TRAFFIC SIGNAL
Compaction Testing/Reports
Material Certifications
AC Design Mbc
I VEME NT WATER MPROS
MAINS
SERVICES
Compaction Testing/Reports
Material Certifications
SEWERIMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/Reports
Material Certifications
STORM DRAINS
.4f.:.
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/Reports
Material Certifications
DRY U ILTI S
T E
:•i:•ii:i}:{Y:i::'r::i;i:}}i:•:•i:•isii::iiiii::}
..........:.:....
....... .
iv.: w:.w::.,:w.A:iL.'•.'.
:�•4:.:::+r:
<. �•
,iry:•:M+.:..vi
CONDUITS
STRUCTURES
Compaction Testing/Reports
Material Certifications
LANDSCAPING
,..,.::,..,.a:..,...:
.;,:.;•::<:.,:;:.>.........................:::.
>.......
MEDIAN......
PERIMETER
' 1w uwuz Page 2 of 2
ONEEKLY INSPECTION REP"
PROJECT NAME
PERMIT NO. 7 PLAN SET NO.
DIN
INSPECTOR �'07?7RQIt7l
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
- ,j-0
�- -0
i77z 51z1-" -v 0 A4
�7 -c u n ri 7- / U c k uj
-9aeA
- TiI s form c ,, i7% �' o •P rrd U'7 Cf
G 0T}c7T7
�V,
'l2' dr` I -21 % P . 77 ! ci- /r` r C''?%
(asp
g C'��CI V ' .7-1
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 04/02 Page 1 of 2
CONSTR TION ACTIVITY SUMMAW
YR2,00?— MO DATES: thru WORK BY SPECIAL
PERMISSION
MON TUE WED THU FRI SAT SUN NITE
............
...........
....................... TEMPORARY TRAFFIC CONTROL ...... . .............. . . . . . . . . . . . ................
IDUST CONTROL
I Onsite Measures
Track -out Cleanup
-
..
....... ...... .
. ..............
----------------
.................
..............
... .. ..............
- --- ------- -
................. —
............. .
............. . ..
................
-
.. - .. . . . . ... .......
..
Conforming implementaton
Non -conforming implementation
GRADING
. .. . . ... ...... . .... . . .
.............
................... ..... ...................
....... ...........
... .... . ..............................................................
. .
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Reports
STREET IMPROVEMENTS
.. ....
.... . ..............
. .. .. . .. .
............ . .
.. .............. ...... . ...............
............
. ........
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/Reports
Material Certifications
AC Design Mbc
WATER IMPROVEMENTS
.................................
. . . . . . . . . . . . . . . . . .
. . . . . . . . . .
MAINS
SERVICES
Compaction Testing/Reports
Material Certifications
SEWERIMPRO S
....
....... .. ................
.. .. ...................
...... ... ..........
..................................................
. . . . . . . . :1..
MAINS
LATERALS
STRUCTURES
Compaction Testing/Reports
Material Certifications
STORM DRAINS
..... .....
...... ... . .. ..................
...................
. ............................
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . e
M .. ......
MAINS
x
I x
ly-
STRUCTURES
SANDFILTERS
Compaction Testing/Reports
Material Certifications
DRY UTILTIES
. . . . . . . . . . . . . . . . .
. . . . . . . . . . . . .
CONDUITS
STRUCTURES
Compaction Testing/Reports
Material Certifications
LANDSCAPING
...... .............
. ..
MEDIAN
I
I
I
I
I
PERIMETER
I
I
I
I
I
F130
04/02
Paoe 2 of 2
ONEEKLY INSPECTION REPO'
PROJECT NAME
PERMIT NO. -�3 ? PLAN SET NO.
DIN
INSPECTOR` 10wf y4 i 007')zn 10*71
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
1-7r . -/2- G' ` . a fi. s fa-)- 777 cIY81 7-1 ;v i 717 6 ,5? c
111'd-7 / i o� z
NOTICE SUMMARY FOR THIS WEEK
(INDICATE ONLY DATE s TYPE OF NOTICE ISSUED IN THIS SECTION)
F i Qu . 0402 Page 1 of 2
CONSTR TION ACTIVITY SUMMA
YR�?t) 0?— MO DATES:,a 9 thru WORK BY SPECIAL
PERMISSION
MON TUE WED THU FRI SAT SUN NITE
TEMPORARY TRAFFICCONT
ROL L
.......... ...............
T CONTROL
Onsite Measures
Track -out C
Non -conforming implen
GRADING
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Rep
STREET IMPROVEMENTS
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/Rep
Material Certifications
AC Design Mbc
WATER IMPROVEMENTS
MAINS
SERVICES
Compaction Testing/Rep
Material Certifications
SEWERIMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/Rep
Material Certifications
STORM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/Rept
Material Certifications
DRY UTILTIES
CONDUITS
STRUCTURES
Material Certifications
LANDSCAPING
:h••4
MEDIAN
PERIMETER
F130 04J02
WEEKLY INSPECTION RART
PROJECT NAME �Y�G7� L O/ ,
PERMIT NO. ��, `7� PLAN SET NO.
DIN
INSPECTOR f�6 u��7 rQ �6 W-1
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
J' = 2 3 -
Jam' y
2 Surf
7;
7c-
2 s 1 o y
�.�
c 14 _ r` 7 P
NOTICE SUMMARY FOR THIS WEEK:
(INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
��lwla rage 1 ot,2
CONSTRICTION ACTIVITY SUMARY
YR MO DATES: thru WORK BY SPECIAL
PERMISSION
MON I TUE I WED I THU 1 FRI I SAT I SUN I NITE
'CONTROL
Onsite Measures
Material Certifications
ER IMPROVEMENTS
MAINS
LATERALS
PROJECT NAME
PERMIT NO.
WEEKLY INSPECTION REISRT
DIN
PLAN SET NO. INSPECTOR
DATE I JOURNAL OF NOTABLE ACTIVITY & ACTION
E SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
Paae
CONSTACTION ACTIVITY SUMARY
MEDIAN
YR MO DATES: thru WORK BY SPECIAL
PERMISSION
MON I TUE WED I THU I FRI I SAT I SUN I NITE
Deno 7 of 7
WEEKLY INSPECTION REORT
PROJECT NAME DIN
PERMIT NO. PLAN SET NO. INSPECTOR
DATE JOURNAL OF NOTABLE ACTIVITY & ACTION
(NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
Page 1 of 2
CONSTACTION ACTIVITY SUMMRRY
YR MO DATES: thru WORK BY SPECIAL
PERMISSION
MON I TUE I WED THU FRI SAT I SUN I NITE
'CONTROL
Onsite Measures
Track -out Cleanup
Conforming implementaton
Non -conforming implementation
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Reports
STREETIMPROVEMENTS EMENTS
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC - CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
AC Design Mix
WATERIMPROVEMENTS
MAINS
SERVICES
Compaction Testing/F
Material Certifications
SEWERIMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/F
Material Certifications
STORM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/F
Material Certifications
DRY UTILTIES
CONDUITS
STRUCTURES
Compaction Testing/F
Material Certifications
LANDSCAPING
MEDIAN
PERIMETER
ov Uwuz Page 2 of 2
WEEKLY INSPECTION REART
PROJECT NAME DIN
PERMIT NO. PLAN SET NO. INSPECTOR
DATE JOURNAL OF NOTABLE ACTIVITY & ACTION
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 04/02 Page 1 of 2
CONSTkuCTION ACTIVITY SUMARY
WEEKLY INSPECTION REORT
PROJECT NAME f7"-&C f Flores
PERMIT NO. , !' PLAN SET NO.
DIN
INSPECTOR ,VO1J,;tYd L`62y 077
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
���d
,V-- 23 -U
`�- 2
v'
Cv�-� ���� ��� • f �cl
2, C,, , l / eo-7yz a c4 tjv d
2- 1, -1 F If .1-7-78 Cl- 4 • s d
NOTICE SUMMARY FOR THIS WEEK:
(INDICATE ONLY DATE'& TYPE OF NOTICE ISSUED IN THIS SECTION)
C�9l1
rage i of 2
CONSTkOCTION ACTIVITY SUMI imRY
YR MO DATES: thru WORK BY SPECIAL
PERMISSION
MON TUE WED THU FRI SAT SUN NITE
'CONTROL
Onsite Measures
WEEKLY INSPECTION RART
PROJECT NAME /4'"� �(i42 O L
PERMIT NO. -31PSV PLAN SET NO.
DIN 1710
,
INSPECTOR G CE0-771'p
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
j;2, 0?
3-0
10aCAq 0Q7-11-9,
✓
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 ,,.... ,
rage l OT Z
CONSTkuCTION ACTIVITY SUMNimRY
YR.206 MO V_ DATES: ,=02 thru(J) 3 WORK BY SPECIAL
PERMISSION.
MON I TUE I WED I THU I FRI I SAT I SUN I NITE
MPORARY TRAFFIC
Onsite Measures
Track -out C
GRADING
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading �+
Compaction Testing/ReF
STREET IMPROVEMENTS
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC - CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/ReF
Material Certifications
AC Design Mix
WATERIMPROVEMENTS
MAINS
SERVICES
Compaction Testing/ReF
Material Certifications
SEWER IMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/ReF
Material Certifications
STORM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/Rep
Material Certifications
DRY UTILTIES
CONDUITS
Material Certifications
LANDSC APING
MEDIAN
PERIMETER
F130 Haim
WEEKLY INSPECTION REART
PROJECT NAME
^'L DIN.
PERMIT NO. PLAN SET NO. INSPECTOR _/ ✓O wa•YJ L 0719Z ?
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
2
�...
NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130
rage 1 OT 2
CONSTkuCTION ACTIVITY SUMARY
YR2QD2
MO � DATES:
thru �C
WORK BY SPECIAL
PERMISSION
MON
I TUE I
WED
THU I
FRI
SAT
SUN I
NITE
'CONTROL
Onsite Measures
Track -out Cleanup ............. ................... .......... . ... . . -
.............. .. ..... ... ...... .
. ....... .......
. ...... ........ ... .
.... ........ ....... * ..... ......... .......... X.
............. ......
. ........ ........ ................. .......... ...
......... ........ .......... ... ... .. .... .......... X. ...... .
. ... ... ................. ......... ...... ........... ...... .
Conforming implementaton
Non -conforming implementation
..................
. ...... ................
... .......... ....
................... ...... x
GRADING .:
... ...... ........... ....... .... ....... ... . ......
......... .............. .. .... ...... .... ..... ......
. ................... .... ...... *.,. -.:,
X.: . .... ................ . ......... . ....
Clearing & Grubbing
Earth Movina: Cut& Fill I I I I
Fine Grading
Compaction Testing/R
:ET IMPROVEMENTS
C&G
SUBGRADE 1-171C
AGGREGATE BASE
AC - BASE LIFT
AC - CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/R
Material Certifications
AC Design Mix
ERIMPROVEMENTS
Material Certifications
PERIMETER I I I I I I - I
F130 04/09
WEEKLY INSPECTION RART
PROJECT NAME � C4 -1 (o6l —./
PERMIT NO. 3� ��l PLAN SET NO.
DIN . / ,
INSPECTOR A}' O iLi'arcw� 0137-), .
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
/302
- of d-en-
.......__.-...-
NOTICE SUMMARY FOR THIS WEEK:
(INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F1 qn
Page 1 of 2
CONSTACTION ACTIVITY SUMARY
Material Certifications
ERIMPROVEMENTS
MAINS
LATERALS
STRUCTURES
Compaction Testing/F
Material Certifications
tM DRAINS
MAINS
STRUCTURES
SANDFILTERS
Compaction Testing/F
Material Certifications
UTILTIES
CONDUITS
STRUCTURES
MEDIAN
PERIME'
ulwuz Page 2 of 2
WEEKLY INSPECTION RART
PROJECT NAM7Ey
/r�r,4
029
6D/--
PERMIT NO -AL-
a
PLAN SET NO.
DIN �d
INSPECTORS
DATE
JOURNAL OF NOTABLE ACTIVITY & ACTION
,b CJ
u zz 7r 0/
NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE 8 TYPE OF NOTICE ISSUED IN THIS SECTION)
Pi 'An ..,
rage l OT Y
CONSTRUCTION ACTIVITY SUMARY
YR MO DATES: thru WORK BY SPECIAL
PERMISSION
MON I TUE I WED THU FRI I SAT I SUN I NITE
TEMPORAR TRAFFIC CONTROL ..........................................................................................................
Y
DUST CONTROL
Onsite Measures
PERIMETER I I I I I I
F130 04/D9 P2ne 9 of 9
r1.�1�"`'�.`f +`�' 3K'�sK'Z-'%�,;�� GYP"-'i�'��'7� •' ��"�'F�-."`, °y�t�i,�-��re..-.,,-mac '4�.'�_s' 4'Fx��y������� i.. ,.�'*,.-....i^�-"t
(WSIadden Engineering
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date -b3
Job No. 111�
FIELD MEMO
Project Name', Ali Client:
Site Address AU{ V kel )e %lt•�
Job Phone
Work DoneeSSx )k
Test Summary / Footings Inspected
Test
No.
1
Location
Sir�Qw�/k geft')"en b%> - / ,� �k
Elev.
st
Dry
Density
It'6.v.
Moist
%
.-o
% Relative
Compaction
d
Ref. Max
pcf
11 L
Moist
%
bk6,
4)
x;r
Comments
w_7RN"1J=
Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
f.as..-'-':;.-,.,�••,•,•r_`•.•.,,,.,Gj,• .,�,,,Y,r. .,fit „�,t,r•ry;?-.i'C".'- ....r:� r.siiii.•�...«SryAi•+`,..'r.G.w:�:..�.-+sj+L�.-•�i,�:,,.,.r..•...;.w..�vk,,,,,,,,,,•..a.r.. �,.y{1'-•-•M•�=R-..i�,;�er�.,;�._.yw
Slcadden Engineering
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date /Z-ZO -OZ.
Job No. SZ Z -
4
FIELD MEMO
Project Name W t o r iore-S Client:
Site Address
Job Phone
Work Done (
ICS{ CCGtrc.t t -.C—
Test Summary / Footings Inspected
`"- a, pry v t [- lie(
. Test
No.
Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
i
l rd r i i=1 .mot cv�%
103 6
6.1
TO
Drw U
G.
6AS ir&lclk 114- Of
7. S
�a
Comments
- 1�f 1 >� � .� s s..� A 6t,,c So G
rField Tech. S -pe or Ag erii i1
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
` i''.v"F.da-`sms:^.,y+t•'+•l..la'.`E`-�t"`a�Y"r.��_•:4y�::�f`,.rf•`1'
Sladd�n Engineering -
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date 1 8- G 3
i
Job No. SZZ — 400 b
FIELD MEMO
Project Name Client:
Site Address
Job Phone
Work Done
Test Summary / Footings Inspected
1
Test
No.
Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
A6WA%
l
) a
«z . ., ,►p ,O /c%
77
ss.5
iU
/OG' Z
-7 I
/
7J-
/CX� •6
� . S
%/
CommerlIs
'
S 5. d
7•
S
/w <
s
S
�'� • i
S �
SU
C--)CK
24 hour notice requested to schedule Field Technician. Thank you for the
/Super. or Agent
to be of service.
z .' SIadden Engineering
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date Zy
r / Job No.
•� AFIELD. MEMO
f Project Name M Client:
Site Address
ell
Job Phone
Work Done
4—
Test Summary / Footings Inspected
1
Test
No.
Location
'
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf .
, Moist
0
/o
Rid
1
I1-5,5
3.0
e 5
!� �St' �l,%cC�'�"•c�f' r�Y f,�1�s154
S•G•
//Z•�
`�•S
�7
We44lc e4w L4� 1?6 fLA 11-41
.
J/3,d
S.Z
Comments
r
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
Sladden Engineering
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369
'39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date
Job No-i7Z t1113
FIELD MEMO
Project Name &Qt� �51'c t� Client:
Site Address � ,e " -�- .OkQQ
Job Phone
Work Done � �5�,,��,�� �„j„� O� Q�t• ,.
c,
lP=
Test Summary / Footings Inspected
Test
No.
Location
Elffev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
Z
log
-?.4
3
Ito
9.
-'
I
carte 5.c.E,---�r►�aA
i q
go
tp,n /o 6 a-(- io+ 30
IN
(0 8
Comments --r 1 / G
Field Tech. Super. or Agen
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
Sladden Engineering
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
c 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date
Job No. S ZZ - 11
FIELD MEMO'
Project Name �'GrLs Client:
Site Address {
wt ,Y
-Job Phone
Work Done
GS�``*• �- _ -
Test`Summa'ry L Footings Inspected
Test
No..
j Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
?+0 &/1/3 4205 /-� S 6
�. Gz
/G
7
3
AZ
8. /
75
I
►�+Gd I
I
��� L3
�•
/
Comments
C-
/Field Tech. —Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
`l1lti � •t�'�t'i"i •.: '.11 r ,,caii'P
Sladden Engineering --
6782 Stanton Ave., Suite E, "Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
.. 39-725 Garand Ln.,. Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date 7 O z
Job No.
FIELD MEMO
Project Name 14�`3 Client:
Site Address
Job Phone
Work Done
1
Test Summary / Footings Inspected
Test
No
Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
0
/o
/6
Comments /� �_ L t
411 T7 1� 'C 104 5 4-A rr=. Sn
iField Tech. Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
Sladden' Engineering
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date
Job No.
FIELD MEMO
Project Name l/�/" F�U✓� 5 Client:
Site Address
.x
Job Phone
Work Done
L 'N
Test Summary / Footings Inspected M
Test
No.
Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
3
//d .
F l,Cllrvd'o L�-t
Comments j
_ � u
''Field Tech. Super. or Agent
24 hour notice requested to schedule -Field Technician. Thank you for the opportunity to be of service.
gimw'�
Sladiddd "Eh gllih�ddrdhg
6782 Stanton Ave., Suite E, Buena Park, CA 90621 '(562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm` Des6rt, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date 7-
Job No.
FIELD MEMO
Project Name Client:
Site Address
Job Phone
Work Done
Test Summary / Footings Inspected
Test
No.
Location
El
Elev.
Dry
Density
Moist
%
7. 7
% Relative
Compaction
Ref..Max
pcf
Moist
%
-3
Comments
24 hour
Super. or Agent
>ezequested to schedule Field Technician. Thank you for the opportunity to be of service.
Sladddn- Engineering
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 ,
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
K
Date -7- & 30 - G Z
Job No.
FIELD MEMO r?'
Project Name .' /� Client:
4
Site Address
Job Phone
Work Done
Test Summary / Footings Inspected
Test
No..
Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
J/ (`C)
/ .
7s
I
16fso
TS
00 0-
166.7
77
Comments
Field,Tech. Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
,� ".� .*�.�-F'"�'�-"""`"''-�,. •- . • .. art """'.' ;
r
:i= SIaddin :Engineering
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 " (714) 523-0952 Fax (714) 523-1369 x,
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 -
Date 7` Z GZ
a1..
Job No. SZZ, 4/�/8
v� FIELD ME
MO
1'.
�t`r/� O�bS
Project Name Client: '
Site Address1
Y
J
Job Phone r
Work Done
�., ,. l � � � � Gov �__ b •
Test Summary / Footings Inspected
Test
No.
Location
Elev.
Dry.
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
. Moist
%
�. Z-4 75 Ci5-1 Gr suds- t
5 G
lex-1 8
/o. y
fs
,/a
Zy 4.ZS
_
/GS /
/7 /
5'z
z
I. . Z
Z Y40'�' i I
1
��y _7'
s1
z z d 7s \V
166
Commentsayo
(_,,Field Tech. Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
�,���eYr��`'+'�"°"*^r''fi-+.y►+r•C.i�++'-�s�6`++C�+#..7�'ar - - "i" - -.tL�:�..rt'w.�^•eR'�'�.�r7-..w.+wA'i°sc+tl�ryF:_ri;
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
a
Date 7, Z 5 - G Z
( Job No. A91
FIELD MEMO
Project Name' -lA Client:
Site Address '
Job Phone
Work Done
UtAl P
C, -� ('C —
Test Summary / Footings Inspected
Test Dry Moist % Relative Ref. Max Moist
No.
Location
Elev.
Density
%
Compaction
pcf
%
C'J'r6 moo' (,s wmej s,•, & cF 4-e r'xk
/v C;r,
-
S-S
//0
C,k -7 4M MoAO, Co
16
ss
r
-
.1�
/G5•�
l3.
SS
�
3 i lk,�, lo4s . a .� - ��
f 0 L4,9
�f
q5
L t �s����
lV
((�. V
9 ,
97
Comments
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
.. I+ ... .� Y.. - MI`
,x Sladddn -Engineering'..... . ......:. -, V
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 T
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 77273893 Fax (760) 772-3895
j6� -e'-3 FIELD MEMO
Project Name Client:
Site Address, t
Job Phone
Work Done
Test Summary / Footings Inspected
Date. 7— Z y—eZ
Job No.SZ
Test
No.
t Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
5 Z
RnA vto
I
5.
YU-
41f
Ale
S-
v�-! —S
/!> L
SS
Comments
Ad �6��� �o
U u -
i -
Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
Sladdw!-Etigif!6erin
� s
6782 Stanton Ave., Suite E, Buena Park, CA 90621
(562) 864-4121 (714) 523-0952 Fax (714) 523-1369
-'f
39-725 Garand Ln., Suite G, Palm Desert, CA
92211 .-(760) 772-3893 .
Fax.(760) 772-3895
Date `7- / 7- UZ
: ~.
Job No. sL7-
FIELD
MEMO
Project Name
Client:
Site Address
Job Phone
J�
f
Work Done
_s
r,
_ t Test Summary / Footings Inspeced
Test
No.
Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
/o / / Z
(n
/GS. �/
5'-T
5 7
Mr
7Z
le A .S
3 7
SS
/
-/Cr-7 c/
f
tip
U�
s
ss
Comments
Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
Sladden E'n` ineenn'-
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date 7—/—�Z
Job No. SZZ- /II
FIELD MEMO
Project Name ti!.'i�° Fjar�s. Client:
Site Address
Job Phone
Work Done
-;R � " � -
l' rZ'St,
Test Summary / Footings Inspected
Test
No.
Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
,v
/o1. 7
�. Z
77
I
/67 y
'Y:-s
y
1
6
I
1, 3
9
7
/6a .S
C 3
�%
Z2
I
/G s S'
s,
Commen
"s
/7
io?.0
3 - l
17
I I
j
/6
I
/0(- y
61
9z
I I
1 1S I
I lip
2-
S
�3
1 1 1
1
I
/�
o<< 4 t ►ac"U'r
1 I
1
IGs71y
s�
1 1"
�5
L;01
I
l-
VFielld Tech Super. or Agent s
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. ,
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln.,'Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date 7 0z,
4.
7� Job No. ZZI i3
FIELD MEMO
Project Name A Client:
4A
Site Address
Job Phone
Work Done
Test Summary / Footings Inspected
Test
No.
Location
El
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
Pcf
Moist
%
12.5
5 Z
d
Comments
V
Jt
iFlVeld Tech. Super. or Agent
24 hour notice requested to schedule- Field,.Technician. Thank you for the opportunity to be of service.
0
a
Sladden Engineering
6782 Stanton Ave.. Suite " Suens Park. CA 90821 (362) 864.4.21 ,714) 523-0952 Fax (714) 523.1359
34-725 GarRw X.. Sui.e G. Palm Desert, CA 92211 (760)'72-3e93 Fax i760 77c^-3895
Date
cTe&- 3C 7 4/ Job Na.
FIELD MEMO
Project Name tom--' Client:
Site Address —.
Job Phone
Work Done
Test Summary / Footings Inspected
Test
P,a.
LoC,ation
� Elev.
Dry i Moist % Relative i Ref. Max Moist -
� h, °� ICompact:on pct °
Density ° i a
/Z, 3
E.
!
i
I
1
i
Comments '•
Field Tech.
Super. or Agent
9a hnur notice requested to schedule Field Technician. Thank you for the oDoortu-iity to be of service.
'(*Sladden engineering
6782 Stanton Ave.. Suite E, Buera Park, CA 90621 (5e2) 864-4121 (714) 523.0952 Fax (7141, 523-1369
39-725 Garand Ln., Suite G, Pal-n Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date 7-z- O-z—
Job No.
FIELD MEMO
Project Name V"Y'o (4 r&- Client:
Site Address
Job Phone
Wwk Dom
Test Summary I Footings inspected
Test
No. Location
Elev.
Dry
Density
1410ist
%
% RelatKe
Compaction
Ref. Max
Pcf
10oist
%
15 J
fol.
5
76
L
Comments
Field Tech,
Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service,
Sladden Engineering
6782 Stanton Ave., Suite 5, 9Lena Park, CA M621 (562) 804-4121 (714) 523.0952 Fax (714) 523-1369
39-725 Garand Ln.. Suite G, Palm Desert, CA 92211 (7439) 772-3893 Fax (760) 772-3895
Date
Job No.,�
FIELD MEMO
Project Name _ T- lo,rif. '5 Client:
Site Address ___ __.____ V °�" r- —
1..G IYV:J`"Lc
Job Phone��+�►-.. �—
Work Done
vpQt Summary / Footlnas lnsoected
_
Test
No.�,
.._-
Location
Elev.
Density Moist
ty i "
T
i w Reletive
f Compaction
Ref. Max
p;.f
Moist
%
Joss
Field Te Super. or Age.
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
e80:80 ZO 60 T.nr
SlacJclen Enineerin9 9
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
,y
Date
Job No.
FIELD MEMO
Project Name Client:
Site Address
Job Phone
Work Done
60
5� J s
Test Summary / Footings Inspected
Test
No.
Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
Wet L A
;7
/ /.S
Y Y
Comments
Field Tech
Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service
FIELDDate
44
MEMO
SdeAddrmso
�
<JobPhona
.-
Work Done
Test Summary Footings Inspected
`
Test
Location
Elev.
Dry
Moist
%Relative
Re-f.Max
Moist
Af
Comments
'
-
.�'
�
PSuper. ^
______ uo�� _ . '~
�
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. �
�u-�-^w��C#�F`r+4.;.�'�'.+�'�-••{.;�,.r...:�-;,�_.,��—^�'�'�Y`t'a.••.-��+^-4.�-.�:a,x�7�L,.�.,��r-C�`'d'',,,,`�..�..sr�.-v.rc"'"�r"a�
Sladden Engineering.
-6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952, Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date S- o'o- O-L
Job No.
FIELD MEMO
Project Name 44�4 Fte'c S Client:
Site Address
Job Phone
Work Done
O -) F; Pi'49 `'j t'A d e ,
Test Summary / Footings Inspected
Test
No.
Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
0
o
_
3
u�6
S;
yZ /
4 11
1
iv,
°jq
36
t
ZG f
l i ?
01-7
-5.5
U
Sal
�
�+
1
10,3
Comments 3L
/aq,s
ti,t I0.�
33
I � 3 .v
S►v
�i �
Field Tiech. Super. or Agent
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.
3 r.
Sladden Engineering
- 6782 Stanton Ave., Suite E, Buena Park, CA 90621T (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
r -
.%.. Date y—e-5' - G Z
Job No.
FIELD MEMO
Project Name '_ `�'� A 't KEY ES . Client:
Site Address
Job Phone
Work Done
lri�c� CICI D mot- CA-- O b� �j / /`
Test Summary / Footings Inspected
Test
No.
Location
Elev.
Dry
Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
.1 �Z
I
y
/0/
95
3.5
i
10- 1
8.6
17
3c
/07s
/
13
ly
Comments
r �
(/i ield Tech. Super. or Agent
24 hour notice requested to schedule Field Technician.. Thank you for the opportunity to be of service.
.s'Lvih - :Fr.r�.-1-.,.xti's.1:•.,,�+'^..+t<o•.+.-.-.,•..+`.,+.�.••:...:'..._r.i..--+"`*1'.,._s�..+----'�vt-"n �i..
LAW—
S Iadd en Engineering _
i 6782 StantonAve., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
Date
°F Job No. 5 — // l
FIELD MEMO.
Project Name MI r��� y M y Client:
Site Address .. ._ . _ ._�_ • ... __ ..� __. �. _.�� __
z �
Job Phone
Work Done
V
Test Summary / Footings Inspected
Test
No.
Location
iElev.
Dry
„ Density
Moist
%
% Relative
Compaction
Ref. Max
pcf
Moist
%
__
• /��`..,-f7 �
Z %� S�
� 1. z.
f. �
S `7//
S
- - --
a S 64- SS
/ 7 7.
yf
/07.7
6
'
i
6.9-)
s s
I
3
1G�.
7 5
53
1 `l �
�
/G 3. 5
� • f
i'4
t
Comments
Vr ield T ch. Super. or Agent
1
24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.