Loading...
3674NOTE: With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS S.-s-ao0z Subdivision Improvement Permit — Class I I I DATE: Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION HiraflopaooSanior Apartmente, Tract 28601-1 N/W cornor of Jefferson Street & Ave. 48 (Street address or Description of Location) PURPOSE OF CONSTRUCTION Streats & Storm •Drain Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION Stroet - Curb Otter See Attached COnditions Storm Drain pipe -- Parking Lot ink i DIMENSION OF INSTALLATION OR REMOVAL 10661 x 2901 2801 x 550' PFMAY 0 7 2002 SIZE OF EXCAVATION, IF NEEDED ��jT1fOFLAQUINTA "' FINANCEDEPT. APPROXIMATE TIME WHEN WORK WILL BEGIN 5/6/02_' APPROXIMATE TIME OF COMPLETION 7/2 02 ESTIMATED CONSTRUCTION COST $ 305,606.00 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) fL.Aa70 � A�G�>��ii^ . "''/�'✓"' In consideration .of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, authorized agents, officers re resentatives and"em to ees harmle f m n t ns; r^ Y 9 P p y ss ro and againstj8n ,and a�,� penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to person -r% pe (1 happening or occurring as a proximate result of any work undertaken under the permit granted�,pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance.of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all 'applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. , w Signature,,of Applicant or Agent Desert Cities Devolopment 46753 Adams :Streel 771-3345 Name of Applicant (please print) Business Address 'Telephone No. Sfte As Abova Name of Contractor and Job Foreman Business Address Telephone No. 768595 02108 Contractorrr'stLiicernnsee NNo.(,dor,=no COMOp� iitydBuusin�e� License No. Illinois Union Ina. (Liability) CCL�147507/XCP142508 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class I II Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee $ 9,168.18 Permit Fee 100 Penalty Cash Deposit -Surety Bond plancheck(4,500)credit if required TOTAL: $ 4,768.18 Receipt No. Received by Date '�4 PERMIT VALIDATION PERMIT NO. 3674 r '� DATE APPROVED 5/6d02 EXPIRATION DATE 5/31/02 DATE,I�S/SUED /6 / A/6-:?By Administrative Authority Recorded by Telephone: (760) 777-7075 SPECIAL CONDITIONS --PERMIT NO. 3674 --- Desert Cities Development --- In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction(SSPWC) and as directed by and to. the satisfaction of the City Engineer. 2. Desert Cities Development, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control pursuant to the Fugitive Dust Control Plan. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. - Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance ofequipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 am. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 am to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. 5. Work performed within 500 feet of a major and/or signalized intersection is restricted between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 am. and removed before 3 p.m. The Pemzittee"shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275- 6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Pem it No. 3674 Pagel of 3 SPECIAL CONDITIONS --PERMIT NO. 3674 --- Desert Cities Development --- 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422= 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition ofthe Standard Specifications For Public Works Construction (SSPWC), and as required by the Public Works Department. Backfill shall be completed in lifts, not to exceed F, compacted to 90% minimum relative compaction. Native material may be used, provided the material is suitable for use as backfill after construction operations. Controlled Density Fill (C.F.) may be used as an alternative. 12. All excavations within City of La Quinta right-of-way shall be backf lied, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement shall be replaced as follows: a) Sawcut and remove existing a.c. surfaces a distance of one foot (1) beyond all trench walls, including any sloughing or cave in of adjacent sods. Undermined a.c. surfaceg shall be removed. All a c. edges shall be straight, clean and vertical. b) Provide an existing section (four -and -one-half inches [4%2"] minimum) of crushed aggregate or miscellaneous base material, compacted to 95% minimum relative compaction. Special Conditions - Permit No. 3674 Page 2 of 3 SPECIAL CONDITIONS —PERMIT NO. 3674 --- Desert Cities Development --- c) Provide an existing section plus one inch (I") [four inches (4") minimum] of asphalt concrete in two (2) or more 'lifts; the first lift(s) comprised of a base course a.c. material, of a City approved mix design, meeting the requirements of Greenbook class B-AR-4000; the final 0.10' lift comprised of a wearing course a.c. material, of a City approved mix design, meeting the requirements of Greenbook class C2-AR-4000. All pavement edges shall be flush with adjacent a.c. surfaces. Each lift of a c. material shall.be compacted to 95%' minimum relative compaction. d) For trenches greater than two feet (2') in width, the Permittee shall perform a grind and a.c. overlay of 0.10' depth for three feet (3') in addition to the pavement replacement specified above. 16. Permittee shall notify the City of La Quinta Public Works Department a minimum of 48 hours prior to commencement of any construction at (760) 777-7075. 17. Permittee shall stabilize any soil that was disturbed (shoulder areas, etc.) as a result of. work performed under this permit with an approved dust control treatment. 18. Pursuant to Chapter 12.56 of the La Quints Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a.delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 20. This permit work allows for street improvements and storm drainage system of Mira Flores Senior Apartments, per the approved plans dated May 7, 2002, Tract 28601-1. This permit work does not include any off -site street improvements to be constructed under this permit. Special Conditions - Pemiit No. 3674 Page 3 of 3 NOTE: MAY O With proper validation 2 2Q02 this form constitutes an CITY OF LA QUINTA encroachment permit Pusuc vvc)' « APPLICATION FOR PERMIT. PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) i� For the construction of public or private curbs, driveways, pavements, sidewalks, parking Is, sewers, water mains and other like public works improvements in connection with MINOR IMPROVE Sand ROVED SUBDIVISIONS DATE: 5 — )'0 2 LOCATION OF CONSTRUCTION COILtl.a- or- JEF—.SO4 ra.f lbre5 .. ►or (Street address or Description of Location) / PURPOSE OF CONSTRUCTION DESCRIPTION OF CONSTRUCTION S'Cr .'TS — Gultq G Sir %t Dat-eiu+5 - P4W" uc LCrr DIMENSION OF INSTALLATION OR REMOVAL ►OCOW k 240� Subdivision Improvement Permit — Class I I I Minor Improvement Permit Class IV 48**1 i(Ur-T 2YGn 1 — I. C f K,2,4 Sketch (attach construction plans if appropriate) Zoo` V. S50�_ �I SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN W LL BEdI APPROXIMATE T ESTIMATED CON (Including removal paction and placin In consideration o; Indemnify, d penalties, liat happening or O PIONn I P $ coo 4 sT. tr do teri I fftt,e b ' k illi19 , con t r surf c I i mp cvementII�/tin f t is ppplicant he eby, grees to: PL , (14 kluw..L jave OW City, its authorized agents, officer Vepresentatives and employees, harrriless from and against any and all m oss resulting from claims or court action nd arising out of any accident, loss or damage to persons or property as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applican or Agent %'ALGt}4E-L -.66 4u"]5& A 0 A M 5t' 171-3344' Name of Applicant (please print) Business Address Telephone No. rn S ST'. T71- 3344' 'Name of Contractor and Job Foreman Business Address Telephone No. '1(o85q� o�1oB Contractor's License No. City Business License No XCP 14�So fi ►L.\.IhLDIS �l1LW1l 1kIS, cl.►>,b11.aty IUS� GG}- 1429G'2% S'tn-CE Fcs wfl (w>7n m4�ct co►nr� t Ca Ca I [� 2 oe 2 Applicant's Insurance Company, Policy Number FEES: Subdivision Improvement Permit — Class III Public:mprovements: 3% of estimated construction costs Private °improvements: 3% of estimated construction costs Minor. Imp lvement Permit — Class IV: See.attached schedule Inspection Fee $ Permit Fee Penalty Cash Deposit -Surety Bond kp("k,,oL C4/S'o if required TOTAL: Receipt No. Received by Recorded by Date PERMIT VALIDATION PERMIT NO., G 7 y DATE APPROVED _ 5—A U Z EXPIRATION DATE S✓�3 / O 3 —T DATE ISSUED By Ad nistrative Authority Telephone: (760) 777-7.075 ,1 1 •1 CONSTRUCTION ACTIVITY SUMMARY Clearing & Grubbing Earth Moving: Cut & Fill Fine Grading Compaction Testing/Rep STREET IMPROVEMENTS C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC -CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/ReF Material Certifications AC Design Mix WATERIMPROVEMENTS MAINS SERVICES Compaction Testing/ReF Material Certifications SEWERIMPROVEMENTS MAINS LATERALS STRUCTURES Compaction Testing/Rep Material Certifications STORM DRAINS MAINS STRUCTURES SANDFILTERS Compaction Testing/Rep Material Certifications DRY UTILTIES CONDUITS STRUCTURES MEDIAN -..................................... PERIMETER F730 04/02 c-..e o s WEEKLY INSPECTION RE'. -RT PROJECT NAME c?</ PERMIT NO.. PLAN SET NO. DIN INSPECTOR JOURNAL OF NOTABLE ACTIVITY & ACTION t TIE /�� CJ� j� 1J i/C C 7 / J/ 1 % �� / f 7cv CUV� 1. '7 e � 6 6,10 6 y tC 77s NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) roan Uy,UL Page 1 of 2 CONSTRION ACTIVITY SUMMAA YR L5 2 MO % DATES: thru WORK BY SPECIAL . PERMISSION MONJ TUE WED THU FRI SAT SUN NITE TEMPORARY TRAFFIC CONT ROL ........... DUST CONTROL Onsite Measures VEEKLY INSPECTION REP( PROJECT NAME /;e7C-f -2 tR GQ /- i PERMIT NO.PLAN SET NO. DIN //�� r INSPECTOR /&j 7 Y C fo-m &0 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION / u�(/2 'I= 7-/0-6 2 1�4r79 C�2lC G2c� 7 s i n Srar t Ye s .0 ii cl "7 t G 7'77 7�1 ClSd 0 fgg 5' O 77C / 410 f c� 5127 S S,5 0- Vel Y 777o G o NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) r i ,ju U41UZ Page 1 of 2 CONSTROTION ACTIVITY SUMMAW YR O MO % DATES: IS thru % 9 WORK BY SPECIAL PERMISSION MON TUE WED THU FRI SAT SUN I NITE TEMPORARY TRAFFIC CONT ROL OL ......... ......... .. ............................ 'CONTROL Onsite Measures Non -conforming Certifications MEDIAN I P2no 'J of 7 MEEKLY INSPECTION REP, PROJECT NAME Lrr7C / PERMIT NO.. 3 PLAN SET NO. DIN INSPECTOR Z-Z L 7YG� ��79?I)%-)'1 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION 713`02 � 2% u Y/ ed ) a-irli, G o e s a r o 7- v/ c* 1 11 9% f �o uXe� 22 S�'77 fa a �� 7a Cl �0 7 2e G NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) UgiUt rage 1 of 2 CONSTR*TION ACTIVITY SUMMA10 YR _Q MO 9 DATES: __'_12_ thru _26 WORK BY SPECIAL PERMISSION MON TUE WED THU FRI SAT SUN NITE TEMPORARY TRAFFIC CONTROL . Conforming implementaton Non -conforming implementation DUST CONTROL Onsite Measures Conforming implementaton Non -conforming implementation Track -out Cleanup Conforming implementaton Non -conforming implementation GRADING Clearing & Grubbing Earth Moving: Cut & Fill Fine Grading Compaction Testing/Report STREET IMPROVEMENTS C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC - CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/Reports Material Certifications AC Design Mbc WATER IMPROVEMENTS MAINS SERVICES Compaction Testing/Reports Material Certifications SEWER IMPROVEMENTS MAINS LATERALS STRUCTURES Compaction Testing/Reports Material Certifications STORM DRAINS MAINS STRUCTURES SANDFILTERS Compaction Testing/Reports Material Certifications DRY UTILTIES CONDUITS STRUCTURES Compaction Testing/Reports Material Certifications . PERIMETER I F130 04/02 0___ MEEKLY INSPECTION REP( PROJECT NAME PERMIT NO. `Jla�% y PLAN SET NO. DIN INSPECTOR 11ot,U2Yd C6-) n o T� DATE JOURNAL OF NOTABLE ACTIVITY & ACTION .723 0 02 �1-2S'o2 I 7 `-Oz Ord 2,7d<� a� If / .L` f 9d 9' C 07 7 P V c aY u Y %Po u Y e C' a T 'yo L 7-t o / r- ? NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE 8 TYPE OF NOTICE ISSUED IN THIS SECTION) r i ou u4iuz Page 1 of 2 CONSTTION ACTIVITY SUMMokY Track -out C _�--- ®�- 130 04/02 Page 2 of 2 WEEKLY INSPECTION RE1 IT PROJECT NAME f Y�uG�� PERMIT NO. j 4 % ! PLAN SET NO. DIN INSPECTOR Q�LAs)9YiftJ La-r7712Is77 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION 7- 7-36-02 j 1 -L- a PO CUY U e✓ C ur& a72 d CULL 1 L) -i-f f r CJ 9 2 GY 7 7 Cp U -Po ci x a g7d -Co?-zi7 ouzk d U l-e y- NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE a TYPE OF NOTICE ISSUED IN THIS SECTION) r l ou U4/UL vage i of z CONSTIR ION ACTIVITY SUMMA10 YR MO B DATES: S thru 9 WORK BY SPECIAL PERMISSION MON TUE I WED I THU FRH SAT I SUN I NITE ....... ................................ TEMPORARY TRAFFIC CONTROL . , 1.,*-..-.'..-:,."*".,.*..-".-'.-.'.'-.'.�*'..-.-'-.-','...'-'.-.*.-.'*..-.'.*.--'..*.-".'...'-'.'.'.'-..-'.'--.'.'-�.'*.-�'.-'.-'.-.-".--'.'-.-,.'.-*,.,..".,.*..."..'*.:-.*-.,-.,.,-.,-,.-'. ................. ........ . . . . ................. Non -conforming implementation DUST CONTROL ......... .. ........... ........... ...... ....... Onsite Measures x Conforming implementaton Non -conforming implementation Track -out Cleanup ..... ........ ............ ........ ..... ...... Conforming implementaton I Non -conforming implementation .. ............................... GRADING . ............ Clearing & Grubbing Earth Moving: Cut & Fill Fine Grading Compaction Testing/Reports .......................... STREET IMPROVEMENTS ... ...... .. . ..... .... . .... ...... . % ........ I ........ : .. :.::. .... ..... . .. ... C&G I A x SUBGRADE AGGREGATE BASE AC - BASE LIFT AC - CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/Reports Material Certifications AC Design Mb( WATER IMPROVEMENTS .. .... . ..... ... . ............ ........... .... .. MAINS SERVICES Compaction Testing/Reports Material Certifications . ............. .. . ........ SEWER IMPROVEMENTS . . . . . . . . . . . . . . MAINS LATERALS zz- STRUCTURES Compaction Testing/Reports Material Certifications ................ STORM DRAINS .......... ........... MAINS STRUCTURES SANDFILTERS Compaction Testing/Reports Material Certifications DRY UTILTIES ............................ CONDUITS STRUCTURES Compaction Testing/Reports Material Certifications ..... .. ............... . . ... . ..... LANDSCAPING .. ....... ........ ..... MEDIAN PERIMETER ulwulz Page 2 of 2 VEEKLY INSPECTION REPC PROJECT NAME 7 c�'03 PERMIT NO. 2LZ PLAN SET NO. DIN INSPECTOR l%i1c� 1Y� �U771 /JfU7? DATE JOURNAL OF NOTABLE ACTIVITY 8 ACTION . v Z sc- Lo c ! c g r /cz,, 77. 0 0 7.1 cJ c- cs �17�Ci x!- e a e::7 e . NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F13U 04/U2 Page 1 of 2 CONSTROtION ACTIVITY SUMMA& YR 02- MO _� DATES: • f R thru WORK BY SPECIAL PERMISSION MON I TUE I WED I THU I FRI I SAT I SUN I NITE PORARY TRAFFIC ..CONTROL Onsite Measures Track -out implementation Clearing & Grubbing Earth Moving: Cut & Fine Grading Compaction Testing/F STREET IMPROVEMENTS C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC -CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/F Material Certifications AC Design Mbc WATER IMPROVEMENTS MAINS Compaction Testing/1 Material Certification: :R IMPROVEMENTS MAINS LATERALS Material Certifications 2M DRAINS MAINS STRUCTURES SANDFILTERS Compaction Testing/F UTILTIES CONDUITS STRUCTURES Compaction Testing/F Material Certifications PERIMETER F130 nam WEEKLY INSPECTION REP( PROJECT NAME 7XP e 72 /_. ( (- DIN PERMIT NO. 34 ZY PLAN SET NO. INSPECTOR DATE JOURNAL OF NOTABLE ACTIVITY & ACTION p e0 r NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 04/02 Page 1 of 2 CONSTROTION ACTIVITY SUMMAW VEEKLY INSPECTION REP, ' PROJECT NAME DIN PERMIT NO. PLAN SET NO. INSPECTOR /70WW i(::2L C 729t--7k77 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION g-2%v2 I f Co - ttPY 27 2 -De 3 fr S' P7 'r y77 d r =F '✓" f� r rye �. =0Y?? 2�"� l7 jC 2 s 'it 7 7• If '77-20ve a U r t e)- 0 V /c09/ rr ye? t o v c/� /V` c- e 7 5 c r a cle s L-v e e c . [uva�cti b O.?1 Gl�7� cl o Ca7cA, 3'(r, ), NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 04/02 rage i or 2 CONSTROTION ACTIVITY SUMMAS ONEEKLY INSPECTION REP( PROJECT NAME PERMIT NO. -�4 %y PLAN SET NO. DIN INSPECTOR Oc5777 ri7 r2E DATE JOURNAL OF NOTABLE ACTIVITY & ACTION 2,-0 7` k r �a r 0 o r 4 T t2 G /c o j f yf Yu LtJ �� / c9 V St, lo 4'o r zv, 3 r j d '4 a f-1-- v 7 7 dc-;-tv If i e ioJg « U" NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 u4/uL rage 1 vi 4 CONSTRION ACTIVITY SUMMA& YR 49 MO DATES: A- thru WORK BY SPECIAL PERMISSION MON . TUE WED THU FRI SAT SUN NITE TEMPORARY TRAFFIC CONT ROL ROL ...... .:................ DUST CONTROL Onsite Measures Track -out Cleanu Conforming impl Non -conforming Clearing & Grubbing Earth Moving: Cut & Fill Fine Grading Compaction Testing/Rer :ET IMPROVEMENTS . C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC - CAP STRIPING & SIGNS TRAFFIC SIGNAL . _,V_ - _. JEEKLY INSPECTION REPC& PROJECT NAME PERMIT NO. e 4 % �Z PLAN SET NO. DIN INSPECTOR /'/O ccl NYC �o77t� DATE JOURNAL OF NOTABLE ACTIVITY & ACTION 7 %T v i rack 6 C) AJ �- f-- •� / aU- o NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 04/02 Page 1 of 2 CONSTRA�ION ACTIVITY SUMMA& YR Ci MO 5 DATES: 3 thru 27 WORK BY SPECIAL PERMISSION MON I TUE I WED I THU I FRI SAT I SUN I NITE TEMPORARY TRAFFIC O ............................._.._ ... ...................... ................ 'CONTROL Onsite Measures UTILTIES CONDUITS STRUCTURES Compaction Testing/Reports Material Certifications PERIMETER I I F130 04/02 an„e ... o JEEKLY INSPECTION REP( PROJECT NAME `I PERMIT NO.� `O % J7 PLAN SET NO.' DIN l INSPECTOR A/d "J9rd L/01 lli-p-tD'77 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION 7r i k o v 1 o-27 I NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) UtiiUZ rage 1 of z CONSTRION ACTIVITY SUMMAIR J YRMO mil- �O DATES:_ thru WORK BY SPECIAL PERMISSION MON I TUE I WED THU FRI I SAT I SUN I NITE UTILTIES CONDUITS STRUCTURES Compaction Testing/F Material Certifications � PERIMETER F130 04102 ., ...yam ., VEEKLY INSPECTION REP( PROJECT NAME PERMIT NO. 3 (o 7 L%' PLAN SET NO. DIN INSPECTOR /76 UJ V rd 0O'Tft/ &>77 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION 3a"a _2 777 /D ;?L e k o o f S') j I NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF. NOTICE ISSUED IN THIS SECTION) v4,Vc rage i of z CONSTIRLOtION, ACTIVITY SUMMA0 YR SZ MO DATES: 7 th,11 WORK BY SPECIAL PERMISSION MON I TUE I WED I THU FRI SAT SUN NITE TEMPORARY TRAFFIC CONTROL DUST CONTROL ............ ... . ......... Onsite Measures Y, Conforming implementaton Non -conforming implementation Track -out Cleanup ............ SEWER IMPROVEMENTS MAINS LATERALS STRUCTURES Compaction Testing/Reports Material Certifications STORM DRAINS MAINS —STRUCTURES SANDFILTERS Compaction Testing/Reports Material Certifications DRY UTILTIES CONDUITS STRUCTURES Compaction Testing/Reports Material Certifications LANDSCAPING MEDIAN PERIMETER �4 Page 2 of 2 VEEKLY INSPECTION REP( PROJECT NAME ��'c�C� ��f;� oJ- DIN PERMIT NO. �� PLAN SET NO. INSPECTOR /-/Q/ LA )c7 i' G DATE JOURNAL OF NOTABLE ACTIVITY & ACTION id-� 02 ld-/a�rJ `- NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) uyiue Page 1 of 2 CONSTACTION ACTIVITY SUMMAY WEEKLY INSPECTION REI PROJECT NAME fib' 6 CJ /- / DIN PERMIT NO. 3 � 7:�/ PLAN SET NO. INSPECTOR A10i02," �!Oh 77 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION /b-N-U . c 1< _ k v v I- a» dc y S o 7 i NOTICE SUMMARY FOR THIS WEEK' (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 04/02 Page 1 of 2 CONSTACTION ACTIVITY SUMMgY YR 7 _ MO /O DATES: ?/ thru WORK BY SPECIAL PERMISSION MON TUE I WED I THU I FRI SAT I SUN I NITE DUST CONTROL Onsite Measures Track -out CONTROL implementation WEEKLY INSPECTION REI IT PROJECT. NAME ��C'T- PERMIT NO. Y,67L/ PLAN SET NO. ALI INSPECTOR 11.6W a Y C� Cd '7? "/ 72 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION. io� -23�v ' 777 AQ NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 04/02 Page 1 of 2 CONSTROTION ACTIVITY SUMMAW YR MO DATES: thru WORK BY SPECIAL PERMISSION MON I TUE WED THU FRI SAT i SUN I NITE O C N .................................................... CONTROL TEMPORARY TRAFFICL :::::>::>:::<<[:::::>::»::.... »::::>:>::>:: DUST CONTROL Onsite Measures Conforming imp Non -conforming Track -out Cleanu implementation Clearing & Grubbing Earth Moving: Cut & Fill Fine Grading Compaction Testing/Rep STREET IMPROVEMENTS C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC -CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/Rep Material Certifications AC Design Mix, WATER IMPROVEMENTS MAINS SERVICES Compaction Testing/Rep Material Certifications SEWER IMPROVEMENTS MAINS LATERALS STRUCTURES Compaction Testing/Rep Material Certifications STORM DRAINS MAINS STRUCTURES SANDFILTERS Compaction Testing/Rep Material Certifications DRY UTILTIES CONDUITS STRUCTURES Compaction Testing/Rep Material Certifications LANDSCAPING MEDIAN a_ js PERIMETER �. J F130 naing VEEKLY INSPECTION REP( PROJECT NAME PERMIT NO.. T % 7 PLAN SET NO. DIN / J INSPECTOR DATE JOURNAL OF NOTABLE ACTIVITY & ACTION M /-0 '� 'o )rCO' S e f 5gle I NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 04102 Page 1 of 2 CONSTF&TION ACTIVITY SUMMaY y. YR 0 2 MO f % DATES: q thru WORK BY SPECIAL PERMISSION MON I TUE WED THU I FRI SAT I SUN NITE IC CONTROL Onsite. Measures Track -out implementation WEEKLY INSPECTION REI IT PROJECT NAME fYr?(2 PERMIT NO. 3 6 7! PLAN SET NO.' DIN INSPECTOR AQU),�fYn C09'-n2/(Si7 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION. I NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 . 04/02 Page 1 of 2 CONSTRArION ACTIVITY SUMMA� YR (0;�?— MO _� DATES: thru WORK BY SPECIAL PERMISSION IMONI TUE IWEDFTHU I.FRI I SAT I SUN I NITE TRAFFIC CONT 'CONTROL Onsite Measures I PERIMETER .1 1 1 1 1 1 1 1 F13n nd/n9 0— o -f e JEEKLY INSPECTION REPO PROJECT NAME PERMIT NO.SPLAN SET NO. DIN ' INSPECTOR //Q W 9 Yc4 00 "'10/0-71 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION IL NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 04/02 Page 1 of 2 x 1p WEEKLY INSPECTION REF tT PROJECT NAME 14(r224 rloy,, PERMIT NO. ?i�% 7 PLAN SET NO. INSPECTOR m ✓ DATE JOURNAL OF NOTABLE ACTIVITY & ACTION IZ I Tdlevcl�5 0�- �e, .I/ 2ec�e� g2�/«'//.'.c/ e/l�ria.✓ ,�.� ��u.�t�ec� C2�c �. (.�,.c� ' �iaelGG; �:/:�✓ /� rrr /a� ,✓ 7122�v�hGS Chz�C� NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE 8 TYPE OF NOTICE ISSUED IN THIS SECTION) riov vage 1 OT 1 y. i. r WEEKLY INSPECTION REI U PROJECT NAME / r277 �'d %��6 r e S DIN ® l PERMIT NO. �J (n / '7� PLAN SET NO. INSPECTOR /&V tA4 07%74/677 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION a ?? ; 76 d i M sn 2 9 C i o Jul c!e 1 a d�C LAJO/t -* Yi' 117-f Y % ,-4 Y Loa l ) 3 Cie- -D For 7? s I q-d 1,c1 2 lk S 4 f V f I i i f l ? Jn e Pr QA,-W /0 9 vises 77 t7z ee e.'30 ojr w-,ney v -De 5e,->� �' Ies r �r v i e-4- g-e)le a.0if ty 01 6"f NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE 8 TYPE OF NOTICE ISSUED IN THIS SECTION) r i ov U4lU1 Page 1 of 2 CONSTTION ACTIVITY SUM.Ay WEEKLY INSPECTION RE tT PROJECT NAME /!7/ PERMIT NO. z rG 1 PLAN SET NO. DIN INSPECTOR DATE �� JOURNAL OF NOTABLE ACTIVITY & ACTION 3 1- /L/ U '/-)r /2 ins 1-12227 Cf r l s I L'url, s NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE -OF NOTICE ISSUED IN THIS SECTION) F130 ;�L•fL�Ya Page 1 of 2 WEEKLY INSPECTION REPCW PROJECT NAME PERMITNO. 7 PLAN SET NO. DIN INSPECTOR fldl rel�y� Oo7;Z -72 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION 61-22'N9 t✓ �VC� -Dv - 5 f w . frcf7 77 . ,C i-�--e I STE C7? T7'C 6f C'?L S f /( 7 2c�1Z7 //7%f W 5' C'2 7- i T1 -t NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)' 04/02 Page 1 of 2 CONSTRI TION ACTIVITY SUMMA YR MO DATES: thru WORK BY SPECIAL PERMISSION MON I TUE I WED I THU I FRI I SAT SUN I NITE MPORARY TRAFFIC (CONTROL Onsite Measures Material Certifications SEWER IMPROVEMENTS MAINS LATERALS STRUCTURES Compaction Testing/F Material Certifications STORM DRAINS MAINS STRUCTURES SANDFILTERS Compaction Testing/F Material Certifications DRY UTILTIES CONDUITS STRUCTURES Compaction Testing/R Material Certifications l rtKl""t I tK I I I I 1 ■ 1 1 1 F130 n4/02 D... o ..# o *NEEKLY INSPECTION REPCO PROJECT NAME J 3��JL'� �,2,9/a U l - / DIN PERMIT NO. , L T/PLAN SET NO. INSPECTOR f1OWaYC' 207:77/J-fa71 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION .4-/702 �' e> 1. /0aUY ow i c1 e o r to ' I a Se ,re Y dd -e -7 fe, NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) 77 rage -I oT 1 CONSTRION ACTIVITY SUMMA YR OP MO_ DATES: • / % thru WORK BY SPECIAL PERMISSION . MON TUE WED THU FRI SAT I SUN I NITE ON C T TEMPORARY CONTROL ................. _.. C ...........................................,............- .. (CONTROL Onsite Measures Track -out Cleanup Conforming implement. Non -conforming impler GRADING Clearing & Grubbing Earth Moving: Cut & Fill Fine Grading Compaction Testing/ReF STREET IMPROVEMENTS C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC -CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/Rep Material Certifications AC Design Mbc WATERIMPROVEMENTS MAINS SERVICES Compaction Testing/Rep Material Certifications SEWER IMPROVEMENTS MAINS LATERALS STRUCTURES Compaction Testing/Rep Material Certifications STORM DRAINS MAINS STRUCTURES. SANDFILTERS Compaction Testing/Reps Material Certifications DRY UTILTIES CONDUITS STRUCTURES Compaction Testing/Repi Material Certifications I. PERIMETER I I I I I . F130 04/02 pn.. 9 .,f 13 WEEKLY INSPECTION REPO' PROJECT NAME lid C ���Of` / DIN PERMIT NO. ' / . PLAN SET NO. INSPECTOR/D faJ Y C o7?'(v1oz9 DATE S7&vl wa/77JOURNAL OF NOTABLE ACTIVITY & ACTION C?�/[ V 7T% 7-7h6 e / c z I -271 d �v off-s 0773, J arri9�t , �j7-791 �777cY s% 77h0JZL-. y CJ rI�a� _ l� �; �� �"%vim/.(5`/y Szu,c/i,` 6-7�77 rt-, ; �.�a� F 115:-'' : v a O�e 7 7 71 / %? v f F 5 53 F/ v s r� NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) rage -I or z CONSTROTION ACTIVITY SUMMAW YR MO DATES: thru WORK BY SPECIAL PERMISSION MON TUE WED THU I FRI SAT SUN NITE TEMPORARY TRAFFIC CONTROL ~ a.:. Conforming implementaton Non -conforming implementation U ON D ST CONTROL :::::::::.::::::. Onsite Measures ............ ...:.: ...............:::.,:•:::...:::::......... . Conforming implementaton Non -conforming implementation c ea T ra k-out Cleanup n P Conforming implementaton Non -conforming implementation GRADING Clearing & Grubbing Earth Moving: Cut & Fill Fine Grading Compaction Testing/Reports STREET IMPROVEMENTS C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC -CAP STRIPING 8 SIGNS TRAFFIC SIGNAL Compaction Testing/Reports Material Certifications AC Design Mbc I VEME NT WATER MPROS MAINS SERVICES Compaction Testing/Reports Material Certifications SEWERIMPROVEMENTS MAINS LATERALS STRUCTURES Compaction Testing/Reports Material Certifications STORM DRAINS .4f.:. MAINS STRUCTURES SANDFILTERS Compaction Testing/Reports Material Certifications DRY U ILTI S T E :•i:•ii:i}:{Y:i::'r::i;i:}}i:•:•i:•isii::iiiii::} ..........:.:.... ....... . iv.: w:.w::.,:w.A:iL.'•.'. :�•4:.:::+r: <. �• ,iry:•:M+.:..vi CONDUITS STRUCTURES Compaction Testing/Reports Material Certifications LANDSCAPING ,..,.::,..,.a:..,...: .;,:.;•::<:.,:;:.>.........................:::. >....... MEDIAN...... PERIMETER ' 1w uwuz Page 2 of 2 ONEEKLY INSPECTION REP" PROJECT NAME PERMIT NO. 7 PLAN SET NO. DIN INSPECTOR �'07?7RQIt7l DATE JOURNAL OF NOTABLE ACTIVITY & ACTION - ,j-0 �- -0 i77z 51z1-" -v 0 A4 �7 -c u n ri 7- / U c k uj -9aeA - TiI s form c ,, i7% �' o •P rrd U'7 Cf G 0T}c7T7 �V, 'l2' dr` I -21 % P . 77 ! ci- /r` r C''?% (asp g C'��CI V ' .7-1 NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 04/02 Page 1 of 2 CONSTR TION ACTIVITY SUMMAW YR2,00?— MO DATES: thru WORK BY SPECIAL PERMISSION MON TUE WED THU FRI SAT SUN NITE ............ ........... ....................... TEMPORARY TRAFFIC CONTROL ...... . .............. . . . . . . . . . . . ................ IDUST CONTROL I Onsite Measures Track -out Cleanup - .. ....... ...... . . .............. ---------------- ................. .............. ... .. .............. - --- ------- - ................. — ............. . ............. . .. ................ - .. - .. . . . . ... ....... .. Conforming implementaton Non -conforming implementation GRADING . .. . . ... ...... . .... . . . ............. ................... ..... ................... ....... ........... ... .... . .............................................................. . . Clearing & Grubbing Earth Moving: Cut & Fill Fine Grading Compaction Testing/Reports STREET IMPROVEMENTS .. .... .... . .............. . .. .. . .. . ............ . . .. .............. ...... . ............... ............ . ........ C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC -CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/Reports Material Certifications AC Design Mbc WATER IMPROVEMENTS ................................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . MAINS SERVICES Compaction Testing/Reports Material Certifications SEWERIMPRO S .... ....... .. ................ .. .. ................... ...... ... .......... .................................................. . . . . . . . . :1.. MAINS LATERALS STRUCTURES Compaction Testing/Reports Material Certifications STORM DRAINS ..... ..... ...... ... . .. .................. ................... . ............................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . e M .. ...... MAINS x I x ly- STRUCTURES SANDFILTERS Compaction Testing/Reports Material Certifications DRY UTILTIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CONDUITS STRUCTURES Compaction Testing/Reports Material Certifications LANDSCAPING ...... ............. . .. MEDIAN I I I I I PERIMETER I I I I I F130 04/02 Paoe 2 of 2 ONEEKLY INSPECTION REPO' PROJECT NAME PERMIT NO. -�3 ? PLAN SET NO. DIN INSPECTOR` 10wf y4 i 007')zn 10*71 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION 1-7r . -/2- G' ` . a fi. s fa-)- 777 cIY81 7-1 ;v i 717 6 ,5? c 111'd-7 / i o� z NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE s TYPE OF NOTICE ISSUED IN THIS SECTION) F i Qu . 0402 Page 1 of 2 CONSTR TION ACTIVITY SUMMA YR�?t) 0?— MO DATES:,a 9 thru WORK BY SPECIAL PERMISSION MON TUE WED THU FRI SAT SUN NITE TEMPORARY TRAFFICCONT ROL L .......... ............... T CONTROL Onsite Measures Track -out C Non -conforming implen GRADING Clearing & Grubbing Earth Moving: Cut & Fill Fine Grading Compaction Testing/Rep STREET IMPROVEMENTS C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC -CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/Rep Material Certifications AC Design Mbc WATER IMPROVEMENTS MAINS SERVICES Compaction Testing/Rep Material Certifications SEWERIMPROVEMENTS MAINS LATERALS STRUCTURES Compaction Testing/Rep Material Certifications STORM DRAINS MAINS STRUCTURES SANDFILTERS Compaction Testing/Rept Material Certifications DRY UTILTIES CONDUITS STRUCTURES Material Certifications LANDSCAPING :h••4 MEDIAN PERIMETER F130 04J02 WEEKLY INSPECTION RART PROJECT NAME �Y�G7� L O/ , PERMIT NO. ��, `7� PLAN SET NO. DIN INSPECTOR f�6 u��7 rQ �6 W-1 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION J' = 2 3 - Jam' y 2 Surf 7; 7c- 2 s 1 o y �.� c 14 _ r` 7 P NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) ��lwla rage 1 ot,2 CONSTRICTION ACTIVITY SUMARY YR MO DATES: thru WORK BY SPECIAL PERMISSION MON I TUE I WED I THU 1 FRI I SAT I SUN I NITE 'CONTROL Onsite Measures Material Certifications ER IMPROVEMENTS MAINS LATERALS PROJECT NAME PERMIT NO. WEEKLY INSPECTION REISRT DIN PLAN SET NO. INSPECTOR DATE I JOURNAL OF NOTABLE ACTIVITY & ACTION E SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) Paae CONSTACTION ACTIVITY SUMARY MEDIAN YR MO DATES: thru WORK BY SPECIAL PERMISSION MON I TUE WED I THU I FRI I SAT I SUN I NITE Deno 7 of 7 WEEKLY INSPECTION REORT PROJECT NAME DIN PERMIT NO. PLAN SET NO. INSPECTOR DATE JOURNAL OF NOTABLE ACTIVITY & ACTION (NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) Page 1 of 2 CONSTACTION ACTIVITY SUMMRRY YR MO DATES: thru WORK BY SPECIAL PERMISSION MON I TUE I WED THU FRI SAT I SUN I NITE 'CONTROL Onsite Measures Track -out Cleanup Conforming implementaton Non -conforming implementation Earth Moving: Cut & Fill Fine Grading Compaction Testing/Reports STREETIMPROVEMENTS EMENTS C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC - CAP STRIPING & SIGNS TRAFFIC SIGNAL AC Design Mix WATERIMPROVEMENTS MAINS SERVICES Compaction Testing/F Material Certifications SEWERIMPROVEMENTS MAINS LATERALS STRUCTURES Compaction Testing/F Material Certifications STORM DRAINS MAINS STRUCTURES SANDFILTERS Compaction Testing/F Material Certifications DRY UTILTIES CONDUITS STRUCTURES Compaction Testing/F Material Certifications LANDSCAPING MEDIAN PERIMETER ov Uwuz Page 2 of 2 WEEKLY INSPECTION REART PROJECT NAME DIN PERMIT NO. PLAN SET NO. INSPECTOR DATE JOURNAL OF NOTABLE ACTIVITY & ACTION NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 04/02 Page 1 of 2 CONSTkuCTION ACTIVITY SUMARY WEEKLY INSPECTION REORT PROJECT NAME f7"-&C f Flores PERMIT NO. , !' PLAN SET NO. DIN INSPECTOR ,VO1J,;tYd L`62y 077 DATE JOURNAL OF NOTABLE ACTIVITY & ACTION ���d ,V-- 23 -U `�- 2 v' Cv�-� ���� ��� • f �cl 2, C,, , l / eo-7yz a c4 tjv d 2- 1, -1 F If .1-7-78 Cl- 4 • s d NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE'& TYPE OF NOTICE ISSUED IN THIS SECTION) C�9l1 rage i of 2 CONSTkOCTION ACTIVITY SUMI imRY YR MO DATES: thru WORK BY SPECIAL PERMISSION MON TUE WED THU FRI SAT SUN NITE 'CONTROL Onsite Measures WEEKLY INSPECTION RART PROJECT NAME /4'"� �(i42 O L PERMIT NO. -31PSV PLAN SET NO. DIN 1710 , INSPECTOR G CE0-771'p DATE JOURNAL OF NOTABLE ACTIVITY & ACTION j;2, 0? 3-0 10aCAq 0Q7-11-9, ✓ NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 ,,.... , rage l OT Z CONSTkuCTION ACTIVITY SUMNimRY YR.206 MO V_ DATES: ,=02 thru(J) 3 WORK BY SPECIAL PERMISSION. MON I TUE I WED I THU I FRI I SAT I SUN I NITE MPORARY TRAFFIC Onsite Measures Track -out C GRADING Clearing & Grubbing Earth Moving: Cut & Fill Fine Grading �+ Compaction Testing/ReF STREET IMPROVEMENTS C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC - CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/ReF Material Certifications AC Design Mix WATERIMPROVEMENTS MAINS SERVICES Compaction Testing/ReF Material Certifications SEWER IMPROVEMENTS MAINS LATERALS STRUCTURES Compaction Testing/ReF Material Certifications STORM DRAINS MAINS STRUCTURES SANDFILTERS Compaction Testing/Rep Material Certifications DRY UTILTIES CONDUITS Material Certifications LANDSC APING MEDIAN PERIMETER F130 Haim WEEKLY INSPECTION REART PROJECT NAME ^'L DIN. PERMIT NO. PLAN SET NO. INSPECTOR _/ ✓O wa•YJ L 0719Z ? DATE JOURNAL OF NOTABLE ACTIVITY & ACTION 2 �... NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 rage 1 OT 2 CONSTkuCTION ACTIVITY SUMARY YR2QD2 MO � DATES: thru �C WORK BY SPECIAL PERMISSION MON I TUE I WED THU I FRI SAT SUN I NITE 'CONTROL Onsite Measures Track -out Cleanup ............. ................... .......... . ... . . - .............. .. ..... ... ...... . . ....... ....... . ...... ........ ... . .... ........ ....... * ..... ......... .......... X. ............. ...... . ........ ........ ................. .......... ... ......... ........ .......... ... ... .. .... .......... X. ...... . . ... ... ................. ......... ...... ........... ...... . Conforming implementaton Non -conforming implementation .................. . ...... ................ ... .......... .... ................... ...... x GRADING .: ... ...... ........... ....... .... ....... ... . ...... ......... .............. .. .... ...... .... ..... ...... . ................... .... ...... *.,. -.:, X.: . .... ................ . ......... . .... Clearing & Grubbing Earth Movina: Cut& Fill I I I I Fine Grading Compaction Testing/R :ET IMPROVEMENTS C&G SUBGRADE 1-171C AGGREGATE BASE AC - BASE LIFT AC - CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/R Material Certifications AC Design Mix ERIMPROVEMENTS Material Certifications PERIMETER I I I I I I - I F130 04/09 WEEKLY INSPECTION RART PROJECT NAME � C4 -1 (o6l —./ PERMIT NO. 3� ��l PLAN SET NO. DIN . / , INSPECTOR A}' O iLi'arcw� 0137-), . DATE JOURNAL OF NOTABLE ACTIVITY & ACTION /302 - of d-en- .......__.-...- NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F1 qn Page 1 of 2 CONSTACTION ACTIVITY SUMARY Material Certifications ERIMPROVEMENTS MAINS LATERALS STRUCTURES Compaction Testing/F Material Certifications tM DRAINS MAINS STRUCTURES SANDFILTERS Compaction Testing/F Material Certifications UTILTIES CONDUITS STRUCTURES MEDIAN PERIME' ulwuz Page 2 of 2 WEEKLY INSPECTION RART PROJECT NAM7Ey /r�r,4 029 6D/-- PERMIT NO -AL- a PLAN SET NO. DIN �d INSPECTORS DATE JOURNAL OF NOTABLE ACTIVITY & ACTION ,b CJ u zz 7r 0/ NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE 8 TYPE OF NOTICE ISSUED IN THIS SECTION) Pi 'An .., rage l OT Y CONSTRUCTION ACTIVITY SUMARY YR MO DATES: thru WORK BY SPECIAL PERMISSION MON I TUE I WED THU FRI I SAT I SUN I NITE TEMPORAR TRAFFIC CONTROL .......................................................................................................... Y DUST CONTROL Onsite Measures PERIMETER I I I I I I F130 04/D9 P2ne 9 of 9 r1.�1�"`'�.`f +`�' 3K'�sK'Z-'%�,;�� GYP"-'i�'��'7� •' ��"�'F�-."`, °y�t�i,�-��re..-.,,-mac '4�.'�_s' 4'Fx��y������� i.. ,.�'*,.-....i^�-"t (WSIadden Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date -b3 Job No. 111� FIELD MEMO Project Name', Ali Client: Site Address AU{ V kel )e %lt•� Job Phone Work DoneeSSx )k Test Summary / Footings Inspected Test No. 1 Location Sir�Qw�/k geft')"en b%> - / ,� �k Elev. st Dry Density It'6.v. Moist % .-o % Relative Compaction d Ref. Max pcf 11 L Moist % bk6, 4) x;r Comments w_7RN"1J= Super. or Agent 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. f.as..-'-':;.-,.,�••,•,•r_`•.•.,,,.,Gj,• .,�,,,Y,r. .,fit „�,t,r•ry;?-.i'C".'- ....r:� r.siiii.•�...«SryAi•+`,..'r.G.w:�:..�.-+sj+L�.-•�i,�:,,.,.r..•...;.w..�vk,,,,,,,,,,•..a.r.. �,.y{1'-•-•M•�=R-..i�,;�er�.,;�._.yw Slcadden Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date /Z-ZO -OZ. Job No. SZ Z - 4 FIELD MEMO Project Name W t o r iore-S Client: Site Address Job Phone Work Done ( ICS{ CCGtrc.t t -.C— Test Summary / Footings Inspected `"- a, pry v t [- lie( . Test No. Location Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist % i l rd r i i=1 .mot cv�% 103 6 6.1 TO Drw U G. 6AS ir&lclk 114- Of 7. S �a Comments - 1�f 1 >� � .� s s..� A 6t,,c So G rField Tech. S -pe or Ag erii i1 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. ` i''.v"F.da-`sms:^.,y+t•'+•l..la'.`E`-�t"`a�Y"r.��_•:4y�::�f`,.rf•`1' Sladd�n Engineering - 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date 1 8- G 3 i Job No. SZZ — 400 b FIELD MEMO Project Name Client: Site Address Job Phone Work Done Test Summary / Footings Inspected 1 Test No. Location Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist % A6WA% l ) a «z . ., ,►p ,O /c% 77 ss.5 iU /OG' Z -7 I / 7J- /CX� •6 � . S %/ CommerlIs ' S 5. d 7• S /w < s S �'� • i S � SU C--)CK 24 hour notice requested to schedule Field Technician. Thank you for the /Super. or Agent to be of service. z .' SIadden Engineering 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date Zy r / Job No. •� AFIELD. MEMO f Project Name M Client: Site Address ell Job Phone Work Done 4— Test Summary / Footings Inspected 1 Test No. Location ' Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf . , Moist 0 /o Rid 1 I1-5,5 3.0 e 5 !� �St' �l,%cC�'�"•c�f' r�Y f,�1�s154 S•G• //Z•� `�•S �7 We44lc e4w L4� 1?6 fLA 11-41 . J/3,d S.Z Comments r 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. Sladden Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 '39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date Job No-i7Z t1113 FIELD MEMO Project Name &Qt� �51'c t� Client: Site Address � ,e " -�- .OkQQ Job Phone Work Done � �5�,,��,�� �„j„� O� Q�t• ,. c, lP= Test Summary / Footings Inspected Test No. Location Elffev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist % Z log -?.4 3 Ito 9. -' I carte 5.c.E,---�r►�aA i q go tp,n /o 6 a-(- io+ 30 IN (0 8 Comments --r 1 / G Field Tech. Super. or Agen 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. Sladden Engineering 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 c 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date Job No. S ZZ - 11 FIELD MEMO' Project Name �'GrLs Client: Site Address { wt ,Y -Job Phone Work Done GS�``*• �- _ - Test`Summa'ry L Footings Inspected Test No.. j Location Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist % ?+0 &/1/3 4205 /-� S 6 �. Gz /G 7 3 AZ 8. / 75 I ►�+Gd I I ��� L3 �• / Comments C- /Field Tech. —Super. or Agent 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. `l1lti � •t�'�t'i"i •.: '.11 r ,,caii'P Sladden Engineering -- 6782 Stanton Ave., Suite E, "Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 .. 39-725 Garand Ln.,. Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date 7 O z Job No. FIELD MEMO Project Name 14�`3 Client: Site Address Job Phone Work Done 1 Test Summary / Footings Inspected Test No Location Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist 0 /o /6 Comments /� �_ L t 411 T7 1� 'C 104 5 4-A rr=. Sn iField Tech. Super. or Agent 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. Sladden' Engineering 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date Job No. FIELD MEMO Project Name l/�/" F�U✓� 5 Client: Site Address .x Job Phone Work Done L 'N Test Summary / Footings Inspected M Test No. Location Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist % 3 //d . F l,Cllrvd'o L�-t Comments j _ � u ''Field Tech. Super. or Agent 24 hour notice requested to schedule -Field Technician. Thank you for the opportunity to be of service. gimw'� Sladiddd "Eh gllih�ddrdhg 6782 Stanton Ave., Suite E, Buena Park, CA 90621 '(562) 864-4121 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm` Des6rt, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date 7- Job No. FIELD MEMO Project Name Client: Site Address Job Phone Work Done Test Summary / Footings Inspected Test No. Location El Elev. Dry Density Moist % 7. 7 % Relative Compaction Ref..Max pcf Moist % -3 Comments 24 hour Super. or Agent >ezequested to schedule Field Technician. Thank you for the opportunity to be of service. Sladddn- Engineering 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 , 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 K Date -7- & 30 - G Z Job No. FIELD MEMO r?' Project Name .' /� Client: 4 Site Address Job Phone Work Done Test Summary / Footings Inspected Test No.. Location Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist % J/ (`C) / . 7s I 16fso TS 00 0- 166.7 77 Comments Field,Tech. Super. or Agent 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. ,� ".� .*�.�-F'"�'�-"""`"''-�,. •- . • .. art """'.' ; r :i= SIaddin :Engineering 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 " (714) 523-0952 Fax (714) 523-1369 x, 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 - Date 7` Z GZ a1.. Job No. SZZ, 4/�/8 v� FIELD ME MO 1'. �t`r/� O�bS Project Name Client: ' Site Address1 Y J Job Phone r Work Done �., ,. l � � � � Gov �__ b • Test Summary / Footings Inspected Test No. Location Elev. Dry. Density Moist % % Relative Compaction Ref. Max pcf . Moist % �. Z-4 75 Ci5-1 Gr suds- t 5 G lex-1 8 /o. y fs ,/a Zy 4.ZS _ /GS / /7 / 5'z z I. . Z Z Y40'�' i I 1 ��y _7' s1 z z d 7s \V 166 Commentsayo (_,,Field Tech. Super. or Agent 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. �,���eYr��`'+'�"°"*^r''fi-+.y►+r•C.i�++'-�s�6`++C�+#..7�'ar - - "i" - -.tL�:�..rt'w.�^•eR'�'�.�r7-..w.+wA'i°sc+tl�ryF:_ri; 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 a Date 7, Z 5 - G Z ( Job No. A91 FIELD MEMO Project Name' -lA Client: Site Address ' Job Phone Work Done UtAl P C, -� ('C — Test Summary / Footings Inspected Test Dry Moist % Relative Ref. Max Moist No. Location Elev. Density % Compaction pcf % C'J'r6 moo' (,s wmej s,•, & cF 4-e r'xk /v C;r, - S-S //0 C,k -7 4M MoAO, Co 16 ss r - .1� /G5•� l3. SS � 3 i lk,�, lo4s . a .� - �� f 0 L4,9 �f q5 L t �s���� lV ((�. V 9 , 97 Comments 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. .. I+ ... .� Y.. - MI` ,x Sladddn -Engineering'..... . ......:. -, V 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 T 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 77273893 Fax (760) 772-3895 j6� -e'-3 FIELD MEMO Project Name Client: Site Address, t Job Phone Work Done Test Summary / Footings Inspected Date. 7— Z y—eZ Job No.SZ Test No. t Location Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist % 5 Z RnA vto I 5. YU- 41f Ale S- v�-! —S /!> L SS Comments Ad �6��� �o U u - i - Super. or Agent 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. Sladdw!-Etigif!6erin � s 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 -'f 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 .-(760) 772-3893 . Fax.(760) 772-3895 Date `7- / 7- UZ : ~. Job No. sL7- FIELD MEMO Project Name Client: Site Address Job Phone J� f Work Done _s r, _ t Test Summary / Footings Inspeced Test No. Location Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist % /o / / Z (n /GS. �/ 5'-T 5 7 Mr 7Z le A .S 3 7 SS / -/Cr-7 c/ f tip U� s ss Comments Super. or Agent 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. Sladden E'n` ineenn'- 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date 7—/—�Z Job No. SZZ- /II FIELD MEMO Project Name ti!.'i�° Fjar�s. Client: Site Address Job Phone Work Done -;R � " � - l' rZ'St, Test Summary / Footings Inspected Test No. Location Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist % ,v /o1. 7 �. Z 77 I /67 y 'Y:-s y 1 6 I 1, 3 9 7 /6a .S C 3 �% Z2 I /G s S' s, Commen "s /7 io?.0 3 - l 17 I I j /6 I /0(- y 61 9z I I 1 1S I I lip 2- S �3 1 1 1 1 I /� o<< 4 t ►ac"U'r 1 I 1 IGs71y s� 1 1" �5 L;01 I l- VFielld Tech Super. or Agent s 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. , 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln.,'Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date 7 0z, 4. 7� Job No. ZZI i3 FIELD MEMO Project Name A Client: 4A Site Address Job Phone Work Done Test Summary / Footings Inspected Test No. Location El Elev. Dry Density Moist % % Relative Compaction Ref. Max Pcf Moist % 12.5 5 Z d Comments V Jt iFlVeld Tech. Super. or Agent 24 hour notice requested to schedule- Field,.Technician. Thank you for the opportunity to be of service. 0 a Sladden Engineering 6782 Stanton Ave.. Suite " Suens Park. CA 90821 (362) 864.4.21 ,714) 523-0952 Fax (714) 523.1359 34-725 GarRw X.. Sui.e G. Palm Desert, CA 92211 (760)'72-3e93 Fax i760 77c^-3895 Date cTe&- 3C 7 4/ Job Na. FIELD MEMO Project Name tom--' Client: Site Address —. Job Phone Work Done Test Summary / Footings Inspected Test P,a. LoC,ation � Elev. Dry i Moist % Relative i Ref. Max Moist - � h, °� ICompact:on pct ° Density ° i a /Z, 3 E. ! i I 1 i Comments '• Field Tech. Super. or Agent 9a hnur notice requested to schedule Field Technician. Thank you for the oDoortu-iity to be of service. '(*Sladden engineering 6782 Stanton Ave.. Suite E, Buera Park, CA 90621 (5e2) 864-4121 (714) 523.0952 Fax (7141, 523-1369 39-725 Garand Ln., Suite G, Pal-n Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date 7-z- O-z— Job No. FIELD MEMO Project Name V"Y'o (4 r&- Client: Site Address Job Phone Wwk Dom Test Summary I Footings inspected Test No. Location Elev. Dry Density 1410ist % % RelatKe Compaction Ref. Max Pcf 10oist % 15 J fol. 5 76 L Comments Field Tech, Super. or Agent 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service, Sladden Engineering 6782 Stanton Ave., Suite 5, 9Lena Park, CA M621 (562) 804-4121 (714) 523.0952 Fax (714) 523-1369 39-725 Garand Ln.. Suite G, Palm Desert, CA 92211 (7439) 772-3893 Fax (760) 772-3895 Date Job No.,� FIELD MEMO Project Name _ T- lo,rif. '5 Client: Site Address ___ __.____ V °�" r- — 1..G IYV:J`"Lc Job Phone��+�►-.. �— Work Done vpQt Summary / Footlnas lnsoected _ Test No.�, .._- Location Elev. Density Moist ty i " T i w Reletive f Compaction Ref. Max p;.f Moist % Joss Field Te Super. or Age. 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. e80:80 ZO 60 T.nr SlacJclen Enineerin9 9 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 ,y Date Job No. FIELD MEMO Project Name Client: Site Address Job Phone Work Done 60 5� J s Test Summary / Footings Inspected Test No. Location Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist % Wet L A ;7 / /.S Y Y Comments Field Tech Super. or Agent 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service FIELDDate 44 MEMO SdeAddrmso � <JobPhona .- Work Done Test Summary Footings Inspected ` Test Location Elev. Dry Moist %Relative Re-f.Max Moist Af Comments ' - .�' � PSuper. ^ ______ uo�� _ . '~ � 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. � �u-�-^w��C#�F`r+4.;.�'�'.+�'�-••{.;�,.r...:�-;,�_.,��—^�'�'�Y`t'a.••.-��+^-4.�-.�:a,x�7�L,.�.,��r-C�`'d'',,,,`�..�..sr�.-v.rc"'"�r"a� Sladden Engineering. -6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952, Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date S- o'o- O-L Job No. FIELD MEMO Project Name 44�4 Fte'c S Client: Site Address Job Phone Work Done O -) F; Pi'49 `'j t'A d e , Test Summary / Footings Inspected Test No. Location Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist 0 o _ 3 u�6 S; yZ / 4 11 1 iv, °jq 36 t ZG f l i ? 01-7 -5.5 U Sal � �+ 1 10,3 Comments 3L /aq,s ti,t I0.� 33 I � 3 .v S►v �i � Field Tiech. Super. or Agent 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. 3 r. Sladden Engineering - 6782 Stanton Ave., Suite E, Buena Park, CA 90621T (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 r - .%.. Date y—e-5' - G Z Job No. FIELD MEMO Project Name '_ `�'� A 't KEY ES . Client: Site Address Job Phone Work Done lri�c� CICI D mot- CA-- O b� �j / /` Test Summary / Footings Inspected Test No. Location Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist % .1 �Z I y /0/ 95 3.5 i 10- 1 8.6 17 3c /07s / 13 ly Comments r � (/i ield Tech. Super. or Agent 24 hour notice requested to schedule Field Technician.. Thank you for the opportunity to be of service. .s'Lvih - :Fr.r�.-1-.,.xti's.1:•.,,�+'^..+t<o•.+.-.-.,•..+`.,+.�.••:...:'..._r.i..--+"`*1'.,._s�..+----'�vt-"n �i.. LAW— S Iadd en Engineering _ i 6782 StantonAve., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date °F Job No. 5 — // l FIELD MEMO. Project Name MI r��� y M y Client: Site Address .. ._ . _ ._�_ • ... __ ..� __. �. _.�� __ z � Job Phone Work Done V Test Summary / Footings Inspected Test No. Location iElev. Dry „ Density Moist % % Relative Compaction Ref. Max pcf Moist % __ • /��`..,-f7 � Z %� S� � 1. z. f. � S `7// S - - -- a S 64- SS / 7 7. yf /07.7 6 ' i 6.9-) s s I 3 1G�. 7 5 53 1 `l � � /G 3. 5 � • f i'4 t Comments Vr ield T ch. Super. or Agent 1 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service.