3682NOTE:
With proper validation
this form constitutes an CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
5/24/02 Subdivision Improvement Permit — Class I II
DATE: Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION 54-175 AVENIDA VELASCO
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION BLOCK WALL IN3r�'1'A`TIO`a Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION BLMK WA`U INSTALLATION
5 (W IN la`&YOT OTC' ADDus5 AND 6, (Ih) IN SIDE
DIMENSION OF INSTALLATION OR REMOVAL SEE ATTACHED CONDATIONS
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN�2
APPROXIMATE TIME OF COMPLETION AUGUST 2002
ESTIMATED CONSTRUCTION COST $ 32A0-
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend- and save the City, its authorized agents, officers, representatives and employees, harmless from and 'against any and all
.penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of thiis,irk.
Signature of A 0 icant or Agent
DANNY CRIBBINS 54-175 AVENIDA VELASCO LA QUINTA CA 922.51 760 779 0340
Name of Applicant (please print) Business Address Telephone No.
r
SAME AS ABOVE (ER BUILDER
Name of Contractor and Job Foreman Business Address Telephone No.
Contractor's License No.
BLUE CROSS INSURANCE CO
XDS 543740821
City Business License No.
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class I II
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor. Improvement Permit — Class IV: See attached schedule
Inspection Fee $ eA
Permit Fee 100400
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
Receipt No.
$
Received by Date
Recorded by
i
r ,
F
3662
PERMIT VALIDATION
PERMIT NO. 36$2 f
DATE APPROVED 05/24/02`
EXPIRATION DATE
DATE ISSUED
gyp
Adm nistrative Authority
ele `p hone: ( )760 1777-7075
4 Y
A
S
geuyp3 m�•So �Q u�.9
m I & 2
a
cJp@put+ t,Aa
C � q r Y e •Y O 0.
e'u
10,
Y ° y. a �� a,Q b•�
° YQ Yv b oa o v B a a s
ec . 9 Ky c a Y c7 a0 :3
Y •= W A Y u F 9 Ya Y
Y
12
d a m U o.s O(� F o o .{oy�yyos Uqq o •6 u
'= u Q Y 3
aqp Ad
•p m Oqp 3 p Y
(� q j � y •C j� •> O p aip Y� 7 Y� •C j�• Y f0
p� u
0. '� 8 Y y Y C 0 9 m T 5. Y vyyy
a Y m '' m 'O 5 v y
gip, �•'W `� � ��mA Y3 � a '•�•� �� �� �•aT@. s c
m �GIaY+XOC� �Uu �Y•Ya may 0.
N �Yo = Y m Z
v p °u t um�'— y A.
o m y O� z coo,,
g
72 a oY° $a0.
a Y o "� � �� a a off•° � °-C
� yr• � � :,9 A 3'` _
o.a FOa 4r�s� Cam'9a.. op 9�
�.°. O U m0. 8 'J •� �O W 'm W �+.�
�1 2W m fy,� a Y Y �f •w m �
u A
a
t
.a
a a
°
o B m o
a�° y •r Y a u L` g° � o
I.,p Y m S
0 0 . :� p m
v >u. 0° u c a .112
On.
•p r U O Y u
o a$ a 0 4? o S
`o
3
p u 0 0 a ° 3 g y ii
Z� o0 6 Q u c �. �•9$ � ji
r, a
oCa
? e u a p N u
y m .9
aye
{7 g a.
y
In
3
v
Ad m
9 O C9� Um
3 G •.7 3 •Y
3 3 3� w RR 39 a�
CC iR�� 95 (f�y.�j Y d p
0. 0. i '7 i$ R .7 B a R p C r O
>Y, �.., C�m� UUQ°u A_A iii vie
0
a a
COORDINATE WORK: The proposed work shall be subordinated to any operation which the Stated California or City of
Ls Quints may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quints forces to preclude delay or interference with State of City of L Quints projects.
SURVEY MONUMUM: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to
these monuments shall be furnished to the City Engineer prior to the removal of any monuments: This office shall be notified
upon completion or replacement of all survey monuments for proper project clearance.
PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method
of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating
equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best
facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
LIMIT OF EXCAVATIONS! Excavations shall be limited to 1000 linear feet of open trench before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the
traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No
excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction
material is actually on the work site.
3 BACKFUL MATERIAL. Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quints deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced
by an approved sand or gravel.
BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than
three feet (Y) and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case,
a relative compaction of 95 percent shall be attained with the structural section of the roadway.
BACKFILL PLACENEENl: Backfill shall be applied. in layers of not more than 50 percent of the total depth of the treacb
before flooding or a maximum of five-foot (5) lifts where trenches are of excessive depths. Care is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting
compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction.
Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where
jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous.
COMPACTION TEST$; If so required by the inspector, compaction tests shall be made at intervals of not more than 1000
feet and a minimum of one (1) test on each road: One (1) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications, Division of Highways, State of California, dated January 1973.
COMPACTION TEST'S: If so required -by the inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each feat shall be forwarded to the, City Engineer for approval and filed prior to making permanent repairs.
Compaction testa shall be made as outlined in Section 6.3.01• of the Standard Specifications, Division of Highways, State of
California, dated January 1973.
TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC400 temporary paving shall be placed after a
maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the
placement of the temporary pavement exceed a five (5) day limit.
PL-RMANEN-PAVEMErTf REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
TWO incbi;a (2') of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a
inch class base shall be placed no later than days after completion of temporary road repair.
FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
TREE RELOCATION OR REMOVAL: Tree relocation within the City -of La Quints road right of way shall be
accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling
public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The
entire width of the -tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump
bole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to
restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or
barricades shall be provided to protect the traveling public at all times.
Large boles resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall
comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
.k SPECIAL CONDITIONS --PERMIT NO. 3682
--- DANNY CRIBBINS - 54-.175 AVENIDA VELASCO---
In addition to the standard permit conditions, the following shall apply:
Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For
Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. Danny Cribbins, hereinafter referred to as "Permittee", shall be responsible for'providing continuous
dust and erosion control. All areas shall be kept watered down daily including weekends.
3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and
more frequently if required.
4. Pursuant to Section 6,08.050 of the La Quinta Municipal Code (Ordinance 18 § 1) 1982), throughout
the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance
of equipment within one-half mile of human occupancy shall be performed only during the following
time periods:
October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May Ist to September 30: Monday -Friday 6:00 a.m to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
5. Work performed within 500 feet of a signalized intersection is restricted between the hours of .9 a.m.
- 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall
contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal
operation at the intersection is to be altered in any way.
6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance .10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private
street and for any damage to other City streets or facilities as a result of work performed .under this
permit.
Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City
for review and approval one (1) week prior to starting any construction. It shall be the Permitted's
responsibility to appropriately detour and barricade all .construction sites.
8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance-10 § 1 (part), 1982),
street closures shall not be permitted. A minimum of one travel lane of paved surface shall be
maintained with flagmen at all times.
Special Conditions - Permit No. 3684 Page 1 of 4
{ F
SPECIAL CONDITIONS --PERMIT NO. 3682
--- DANNY CRIBBINS - 54-175 AVENIDA VELASCO---
9. Prior to excavating, if required, the Permittee shall. contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
10.* Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost
to the City of La Quinta.
11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 §. I (part), 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest
edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise
specified herein.
Native material may be used as backfill material provided that minimum compaction, achieved in the
manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water
densified compaction via jetting or flooding or other means shall be allowed. It shall be the
Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection,
onsite, at all times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material,
such material shall be removed to the limits directed by the Geotechnical Inspector and/or the
City Inspector and the resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be brought to or maintained at an appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through progress testing on the stockpiles.
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the
depth of lift that can be compacted.
D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall
be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift
thickness to be compacted for the remainder of the project.
F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift
of backfill, per 300 linear feet of open trench, at randomly selected locations within the open
length of trench.
Special Conditions - Permit No. 3684 Page 2 of 4
SPECIAL CONDITIONS --PERMIT NO. 3682
--- DANNY CRIBBINS - 54-175 AVENIDA VELASCO---
G. The depth of the randomly selected compaction tests shall also be randomly selected except
that where multiple tests are required in a given length of trench, the tests shall be no closer
than three feet (vertically) from each other.,
H. If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all
test results shall be furnished to the City Inspector.
12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of
the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed
that which can not be backfilled in the same day. Excavated trenches shall not be allowed open
overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet
in length, open overnight at a point where construction will begin the next day, provided that this
length of trench is completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to
its original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization shall be done immediately
after completing the operation.
16. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if -this permit specifically grants
permission to use the street to deliver street construction materials and/or equipment.
17. This permit allows for Danny Cribbins to install a block garden wall along the property frontage
approximately 9" to 11 " within the City's right of way. The permittee recognizes that the City has
the right, if necessary, to remove any encroachments in the right of way, including the proposed wall.
The City is not responsible for the replacement of, or reimbursement for removal of such
encroachments.
18. The Permittee is required to obtain a separate permit from the La Quinta Building and Safety
Department for the construction. and inspection of the block wall. Any special wall designs which
vary from the City's standard garden wall design shall be submitted to Building and Safety for review
and approval.
19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
Special Conditions - Permit No. 3684 Page 3 of 4