Loading...
3704e3 ' NOTE: = With proper validation this form constitutes an encroachmr ent`permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: 73/02 Subdivision Improvement Permit— Class III Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Aaar,+IMIV 4-7 A'"n �•arr+.ram=�A� (Street address or Description of Location) PURPOSE OF CONSTRUCTION CONSTRUCT INGRESS MM RGRESS TO LA QUINTA PROFESSIONAL PLAZA DESCRIPTION OF CONSTRUCTIONRRNOVE C11" AND R.RInCATF; SIGNAL BOC AND INSTALL DR:LVWAX APPROArR DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN Sketch (attach construction plans if appropriate) SEE ATTACHED SPECIAL CONDITIONS APPROXIMATE TIME OF COMPLETION 8126107 ESTIMATED CONSTRUCTION COST•$ 5-427-AA (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: a� U illl 0 131 ClTYOFLAQUINTiQ FINANCEDEPT. Indemnify,.defend- and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to ,his application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all a plicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work; �Sgnatur�e of Appl_ ica„dt or Agent ".A" l'OWIRTUTIrTTON ;n,; r% Mr.'RWAV I I I �f!R'�AD�i 1 x.A Vr!A 01116 714A 10A 99AA Name of Applicant (please print) Business'Address Telephone'No. SAME AS ABOVE Name of Contractor and Job Foreman Business Address Telephone No. 396698 00031 Contractor's License No. City Business License No. ADMIRAL INSURANCE CO A02AG12412 exp 01/15/03 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. $ 164.76 100.00 $ 264.76 Received by Date Recorded by 3744 PERMIT VALIDATION PERMIT NO. 37n4 DATE APPROVED 07/03/02 1z/31/02 EXPIRATION DATE DATE ISSUED By�'� Admine Authority Telephone: (760) 777-7075 The following General and Special Provisions are attached to and made a part of Permit No. 3-704 GENERAL PROVISIONS The following shall always apply: ENROACHMENf ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of way ONLY. Whenever concoction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment small not be permitted to operate on any paved surface 'unless fined with smooth -faced street pads. All mechanical outriggers street shall be fitted with rubber shoes to protect the paving during excavations. Rubber -tired equipmentmaly shall be used in backfill operations in paved areas. If the existing . pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred, City of La Quints shall request that these portions of road be resurfaced over their eatire width. Resurfacing shall consist of one coat of two inches (2) of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quints City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE MUCTI)RES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in hind. In the event it becomes necessary to remove or cut existing drainage structures, City of L Quints shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill-operationsehaltbe removed from the -right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backftll and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material aball be.removed Prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: if de -watering operations are required and pumps are forcing water on City of La Quints roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.. CLOSING SI'REM: No street sball be closed: A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property, owners and emergency vehicles. In the event it is felt by the permittee that he'muat close a street for any length of time, perminee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: Rd NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 481ours in advance of starting construction. RZ LTn JTY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quints right of way authorized by permit, the permin" shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. R3 I)TILITY CLEARANCE: (Surface Structures)'No work shall be done under this permit until all utilities are clear of the proposed work site. The perminee shall notify all concerned utility companies of the proposed work. R4 PAVEMEKI WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of clew allmgeu subbase course having an 'R' value of not less thanabd in conformance with City of" Quints Road Improvement Standards and Specifications, Ordinance 0461. R5' PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall - be graded to a slope of 1/4 inch to one foot (11). R6 GRADE. CHECKING: City of La Quints shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete.curb and/or curb and gutter i`-feet) ihall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be cooswcted in conformance with City of La Quints Standard I=. Its DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1R inches of A.C. paving placed on ( ) of class aggregate base. Driveway construction shall conform to attached drawing. R9 SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. RIO SOIL STERI IZE3 • The area to be surfaced shall be treated with soil steriliser. Rate of application shall commply with.the' manufacturer's specifications. 'EL61 XMn011C Palep 'wtwo;t" Jo al'nS '9.(Rmgl11{ Jo uotstA!Q 'suo!lsoy!x;dS PiePumS atp la [0'E'9 aogaag qt!M Cldmoa 1psge natal cop-dmoO •poglam play Jo loedmt aql Lq paataumap 9e uogaedmoo imsaJV atp 91 JaAag3!gM'panol8 VatpanoJJns aql os taalaemba Jo lwaaJad 06 aegl seal loa m pasaedmoa pus Pally>faeq aq IIBVs IenomaJ aaq moll tun lnvaJ saloq alm l tamp Its to a!Ignd VatlaAal aql laatwd a1 pop!AoJd aq llegs aapeauieq Jo paw aawlet; 'ealte atenbapV -awn aao 4us is laaJ 005 la mnwtxwm a of palauleaJ aq lIBg9 4joM agl 13gjan Iaul9a of bessaaaa 9amoaaq 9! aJagM •gdwftmd Vaimollol aql at pag!aadv se palaedwoa ,ClggnoJo(p paw pally)laeq aq Ilegv aloq dmms atLL ',(eMgV!q agl;o Mau at sU!Vma sugap ou ts4l as Jo pasodstp paw POAOmaJ aq llegs dmnts aen. atp Jo glp!M aqua at L *oyjan ,CRmg219 of pzwnq to aavaaliatU! lnogl!M ,Ctojes palpueq aq Ono ga!gM 9uo!laae at aq Iltogv PoAOmaJ aq o1 mj L •aogsool Mau sls le aoglPaoa 8atMOJB anoJOVIA a at aaI agl a!wla!em a1 aaa!uuad agl Jo L1!1!q!soodaJ aqI aq llagv tl •o!lgnd 2Ugaw1n atp of pJMq to iaaaJ'alJasat tnogl!M ,(12)e9 Palpawq POW'aa!AJas aan PoJnsa! POW papuoq'PMUOO!t a ,(q pagvtldm000e aq INge ,(—Jo lgVu Pew 11101110 e'1AAD aql a!gl!M uonea013J nJJ• MIVAMAK 110 NOLLV:)(Y i 331LL Nt •smda luaawwad to aogoedmoa aodn pooeldaJ aq Itwgs 8ald.no g3n6 'PolsAeoxa aq of noaJts ao alq!e!A 11!12 9! Vutduts laaJts aagM :9NId1V1S31L I3311J$ £ t >aaU18a3 dll, aql Cq pau!mjatap es esaJs gmod iP Jowo pogdde aq ils4s ao!slntua aoto3 I6a eaVol -WIS 0O3gtt. o Z i J!edaa peoi dJnJodmal Jo uogoldmoa Jaye eXap . asgl Jatej on paaeld aq Mega aseq esela qaa! 9 no pavoid Vatoopns •O'V saga;! Jo gated tuaaemJad y •Llalelpawmt pa'Jeld aq Ilegv 002-JS Ja U) sag391 oMl Jo gut e!auoa gaPd Aiwadmol v'paloldmoa uaaq aAeq aottaedwoa pan Ilyllaeq IayV -"Ndr 1 j g3Ly3Ayd.1.%Z NV1.M,( Ittag Lep (s) *Ay a PaaOxo IaamaAed Xivuodmat aql Jo tuamaoeld 0Il1 IPge aeea oa at lnq 'palaldwoa vaogesado Ilytlaeq PUB PatwAeaxa uaaq seq gaual Jo laaJ Jaaall 000E Jo mnaMw e Jays paaold aq little famed kiwodmal 008-OS aq•t• •apwggns pandatd a no paaeld aq Iiegv 00V•JS Jo sagaa! Z Jo lottetsuoo gmwd ,CJB.todmal a 'vaonsiado aogaedmoo paw lly)laeq Jo aogaedmoa Jayy :Sl Wd31i .I GMAVd AIMOdIN3L 02 'EL61. Snuw1 palep 'emJoJ!lo'J Jo aMS ",Cemgltg Jo ao!v1A!(1 'saogeay!oadS pnptmS aql Jo •10•E•9 aonraS at paa!pno a apem aq Ilwgs s19a1 aog3edmo0 u!edaJ laoaeasiad Vtlnlsm at Joud poly PUB IBAoidde JoJ Jaaat8a3 (ltatp of papJRAuoJ aq hogs teal tuna Jo Cdoa (l) aa0 'oatl aal.uos Jo Vatsswo Ilona Jo; apem aq llwgs 9tsm aogaedmoa'Jolaadsot aql (q•pa!nba os11 :Srcxt MOLUMEK0J 6*1 EL61 CJ--C PateP ' oJ!le0 Jo aletg '9(BMgt1.R to uo!v!AtQ •ewogeoy!3adS pJepcmg aq1 Jo 10•E'9 aogooS at paa!pno se apem aq Ilvgv 9teat ao!laedmo:) 'sJ!sdaJ luaoewJad Vunlem of Joud poly pae laAosdde Jo) Jaaa!Vag p!O aql os papJBMto; aq Ilegs teat gaea Jo Ldoa (1) aa0 'pmm gowa no lm (1) aoo Jo mnm!a!w a pas Iaa; 0001 Usgl atom loa Jo eloAxnal 1s apoto aq Ilego vital nogaedwoa •Jotaadsat atp ,(q paJ!nbaJ or JI :qffSar. N0LL3VdN100 S1 stanagaoa aq llegs Clddns Jalam apt pan Jadel qMM Jo monoq atp g3931 of g1tual taa!ayJns Jo aq IIs4s nlof aqt 'pain 9! Vatuaf aJagM '"Ism aql U!ela of posannvooa aq ptM 9a:ltp alenbape'Inamaluas mnmtxem a Jo; pain 9! Va!pool; Jo Vatpaod aagM -not oedmoa JasaaV atp os JoAoq*1gA% 4panoJV Vatpanouns aql of laalew!nba Jo taaaad 06 aegl sal IOa aq llegs act aedmoa 213111 aJ apt teal ov paoeld aq llegv Iwualeat Ilytlasa •eao!leJado Vatpooy Cq 112mv amanxa at patoafgns too it leuatem Ilyt(aaq oql tsgl PoslaJaxa aq as it aJeO •sgldap aA!eaoxa Jo aus ragaaaa aagM v11t1 G;) IOoJ-any 10 mnm!xwm a Jo BOIPOOy aJO)aq q-an aqs Jo gidap pnos aql Jo tawmad 05 uegs atom too Jo ssa,(el al'pa!ldde aq Mugs IlytlaeH -.jN iWMV'id TUDOVH Ll •LttvtpeoJ aql Jo aotloav lemons aql gt!M paa!eu4 aq Mega tuawad 56 Jo aogaedmoa aAgetaJ e 'ieea tin Intnq 'PaltOgsgns aq (tom spoqlam algwvliV 'luamd!nba lua1BA!nba Jo Jadmeloaq!A Va!vn PaleJq!A POW (.E) 1221 aagl UtoT JO —2 too Jo B11!1 at paoeid.aq llwgs PUB �021eA!nba Jo Pass %!UI-I!9ae4 paAwdde aq Ilvgo llg4oeH :QNVS TU1XZ)yQ 91 paaaldaJ Jo palaama ddns goAuV Jo puss pawoidde tm ,(q 1 aq Ilegs Inq Ilytlaeq JoJ pain aq too psgs uo!IaAeaxa Vaunp p-alanooua 9! galgM (leualem paleJmes Jo dVuode) atgellnsun amoop esatno eZ Jo 41:) aql go!gM leuatew Cav •Ilytlaeq patepgoeaoa Ximenbaps as VatanpoJd Jo 9a9odJnd Jo; asn R! Ol pnaamtnap aaamgtls am s,to Jagto Jo noa 'g9nlq JO aaJJ aq Ileg9 IlgAoeg-rfrdMLyW 1r Ld 0VE( gj •alu tIJOM alp ao Lllemoe 21 Iwualem aaq;nnvaoa ;gl e9amn ipem >Q Ilegs aOIIBAeaxa ON '9.(Bp (S) aAy Vaipaaaxa pouad B JOj oado ammaJ IIBge aotI9Ae3xa ON. •;toil* gawp m VatpeatJJwg aollueaxa Jo 43glgmtn9 aql aatuualap llv4v Jolaad-f v1ioM a!lgnj atl•L •atlgnd VugaAeJI agl;o aogaomd aql Jo; s,Cep!loq pae spaatlaaM no ygBmiaAo ngV!l qI1*+ papoo!Jnq dl»dad aq IIe49 9130gBAeaxa 11V u!Vaq loam eaogeJado 111943Eq a-Jaq gaaaq ;ado Jo Iaal Jwaug 0001 at pm!m!I aq Rego M6.gvA83n3 :SN0LLVAV0X3 -40. JM-1 ►1 'PmMMOO aq IIBgv e2SPO Ig1MJI9 laamoAed oI aVemwp •Cato'yaopsiado VUTAed Iway of Joud •atjjvn Awl; SuguaV alp alet!p3s) uaq a1 a aoq!sod a gaTM at paaeld aq llwgv leualem aogeAeax3 (•laamoAed JO Vagina of Joud aleneaxa oa pain aq laamdtnba VageAeoxa l(togs MOUMUIR Jla oa Jopall) •Jaaalga3 4!:) atp Jo aatyo aql ggnagt panadde aq Ilegv Vatuna laamaAed Jo poglapl aollwAsaxa m Joud a8pa 1g8tteno a of IgVtwnv a o1 in* Mee Xlleatue43am aq 11" loamaeed :E)NLLLfk3.1x3MAVd •aaaBJeala laofoJd JodoJd Jol 9la0011111Om daAJne Im Jo laamaaeldaJ Jo aogaedmoo aodn paygoa aq IRW -Wo, elq.L ,•stoamnaom ,(tm Jo IwnomaJ atp at Joud Jaaut8a3 ,(u, aql of pagv!uJty aq llegv naamnuom aagl 07 vaq aql VatMogv yaloa Jo lie alaldmoa V •aattimJad aqt Jo avaadxa agl to Jo,(aAJta Jo JaautBUa I!A!a pasaao!t s ,Cq paoeldaJ aq (ilaattoo pan LttpeaJ (tom (aql a itw pag dlaroldmoa N 11949 PaAIOAU! aagM 9auq dUadOJd Jo naans 1[e Jo aatlJalaaa a* Ito la!xo ga!gM naamnaom ,(aAJns lie 'aog3nJl9U0a JO NUMU132q Jo aotleneori m Joud :MSMIALMO6N A3Axm Z T staafwd slmtt� eT Jo 4.j Jo a1vIS ql!M aoaaalJata! Jo Cvlap apnioaid of saam; ga!no W1 JO ,(l10 Jo aswtS aql ql!M p-m!ptooa aq Itwge 4jolA •llmrad opp Jo pouad aql Vaunp aJe etgl at tanpaoa Cem ela!tttj e 1 ;o ,G10 Jo elaJo;tnjp ;tits atp ga!gM aogsiado Cato of pateutpJogre aq llBgs IIJoM posodad aqL :}[EOM 3LYNI([1i000 j j' I SPECIAL CONDITIONS --PERMIT NO. 3704 Dateland ConstructionCompany, Inc. In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. Dateland Construction Company, Inc., hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m.. May 1 st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. = 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result 'of work performed under this permit. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No3704 Pagel of 4 SPECIAL CONDITIONS --PERMIT NO. 3704 Dateland ConstructionCompany, Inc. 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lane of paved surface shall be maintained at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at.no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at an appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No3704 Page 2 of 4 SPECIAL CONDITIONS --PERMIT NO.3704 Dateland ConstructionCompany, Inc. E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. F. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests,are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. G. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement. structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous -base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted.to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. Special Conditions - Permit No3704 Page 3 of 4 SPECIAL CONDITIONS --PERMIT NO. 3704 Dateland ConstructionCompany, Inc. C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved '/2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: For longitudinal trenches located in a parking lane: two (3) feet outside the sawcut removal lines. For longitudinal trenches located in a traffic lane: two (3) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 18. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 19. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. 20. This permit allows for the removal of existing curb, relocation of a traffic signal box and installation of a new drive approach into the La Quinta Professional Plaza. It is imperitive that Dateland coodinate all its' work with the City Engineering Department and its contractor performing the Washington Street Rehabilitation Project. Special Conditions - Permit No3704 Page 4 of 4 SPECIAL CONDITIONS --PERMIT NO. 3704 Dateland ConstructionCompany, Inc. Special Conditions - Permit N03704 Page 5 of 4 w • WEEKLY INSPECTION REF&T PROJE AME �P� c�PERMI O. ET NO. INSPECTOR Ac Loa ref rn -nl Q An - DATE JOURNAL OF NOTABLE ACTIVITY S ACTION e3 �Yade Coo c oSrd� �( /o e rr Ie7 -t IC10777 41 p Y .5, Lo a t ,� F J ! i NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE 8 TYPE OF NOTICE ISSUED IN THIS SECTION) mtFlvl 04/02 Page 1 of 2 CONSTRW�TION ACTIVITY SUMMAY YR MO DATES: thru . WORK BY SPECIAL PERMISSION MON TUE WED THU FRI SAT SUN NITE TEMPORARY TRAFFIC CONTROL �<:>::::�:>:>�:>:::•':?<::_: iiik::j•;•i;}}iri}t:})r$:}ivi{i}{?+rii�.'J.v v:4,:•:::.i:::4%4.i,•::: J.4'f.•.4:,vr.v:w:.+ri+ti,y., ,:w � : , �Ci }{ti+F.C::}r�i'.'{}�;.;{:vi:;ivi+;{:{,4 '>}v?hyy>r: : }:;.. ,.f::�•: • •:�,.r�....{i.,: r. 1t4:'r,:\.'ih„th ,.].�,4h },;Y,( . i'}�i1. 4:}'•rr: \. {•ti;v{+h�C Conforming implementaton Non-confonning implementation DUST CONTROL {•.;rv......:. . \4tiii:0iii}•i::'.}}:i:: >,:y:,: h:v.,•. : +::•>:y[:{:+:'\?•:}}:ii.X}v�i:: .vn4.....,....... :. h�{tii•} r} :}:}•:{}•:}:;•: :i•%...}{,7,v{C`•?.�: {vn{: ,4{:.: ,}ih{{v, h„-0t,.:�}:C4 k:. •:{r•}. .. v�•,..C.�'.;'•„ \,v IX{nv:;�h�..•: k:{� Onsite Measures Conforming implementaton Non -conforming implementation Track -out Cleanup ^;s�i''����:��:; is\:}:ti�i::4�4:: :c,;i:;ti �y:.:''9':+ •:>:.�.;.::. .:.\:•iyi } ::•`+n':t• y$:$t}•`,;;C•::•:' ' .,. :: iiv\v:: QSv:::y ,:,...,•:;:•): v..{-.v :k;;:: (?>i }; ••� # :{h!4:::?ri}:Li:}?4 .>„ ` X}{:::?+:::\fvy}.�*`?`y :.� :�:. 'n\;: . {. �i}}ti\h{#:i4 4 '.} � {. 4��?:�Sr� Conforming im lementaton Non -conforming implementation GRADING }v;{:iY;i ;ii:}:;}}:•.;{j':{}:: .?i!:4:; :v,.,-.:. ;..; ,}::.:: my .Y.: :.. �h}tvi}},.i:}Y4:i::{:i;:•:: E`x°w�•;vzYsi:;:;;•x; •>{.•s.v�.:.};{x.v{�:::.: ?•:�.i:•}"{.?.. Clearing & Grubbing Earth Moving: Cut & Fill Fine Griding . Compaction Testing/Reports STREET IMPROVEMENTS .....::.::4:::: ::4....:{?;.:: .• " n.........:...:..}.vr}.. is:ii.;{.;h•: }::: +•\ {::4.::}:>.vrh>..r:. :v.}�.,\v-vh}s:::{:z:;::>.:.h.k.:,r,:.: ........ `i�,..a .y.y, h::\:gxt:?}vi•#,,:.�:,:, •�• {, v.,•y\�4: i�\v,,.� •..:. . C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC -CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/Reports Material Certifications AC Design Ma WATER IMPROVEMENTS Y:.C•::}v:.v; }.xv4i v;?{{{i:i'; i $:„ y: ...... j;;:}}{:;; ::ram {?4•_:;;:%;? :•:..4}:4}:.: v: r:vv?vvy,. :Y"4}: {i.};:.,vY;'v"4•;{•%+ir\\nY 4h{}: Yh}{}�:y }.:r ,x:•hit •f,• •iyJ\i.'n\}v.'{,'i`}{{.}{;4 '{?ttr ":f.•n}:! ::��.. �.:..:•:. MAINS SERVICES Compaction Testing/Reports Material Certifications SEWER IMPROVEMENTS :{;::::::+;;:;: iY;>.:::.,>^::::}:;:%?•:::}•,• ,.:.ay.{;•::4:•<}};{:}:4:;;:s;:;;::>•}^;:<,c;:a};:,<:•<>.:?>::«<:s;!•: :..{,.}»:ih•:r,•::,.,}. �, 4:::,;F :::: .?•::::: :.::{. g:�>.:;<x::.Y e:>,�sa}:!?{M?c:�:!t�:•}t;}.+ :,:.,.,r` :.{}hx.�•: •-k+• �:.,vv.,:}•:.,,{{ >.{.x}:h,#>}:4} MAINS LATERALS STRUCTURES Compaction Testing/Reports Material Certifications STORM DRAINS •:. !;Jyr{},:i:�• ;>::�::z<:>s::>::z::s::;:�>.•••s..,?• {44:::vii� iii �:i<n'i: ,:•f•:.,. `:n,.,.,: :Or.{ {,4};.{.r+,�•$: •}:.�vK. .h4h#�vh. i\a\.+{.C�%4��4�:4:•\4t?4:•\^4Y.:�+•;•'.vi•: .nv{. MAINS STRUCTURES SANDFILTERS Compaction Testing/Reports Material Certifications DRY UTILTIES :t'••r,!,.:.:.:,., ti`y. .. �w ;,w:<.,;;•?;•:ti'i:;w;•:<:c .. h.;{,y�;yy\.4yy : r?,v}•{:{;:.> n\..;y}�r;: {r : } {W\.r::ti:;:::M1 x,{y::. •,: iP• }�f:ti?��)v."a;i\y, }}:}};: ;.;.\. ti;•�, n:ti?}-:7C4:��:L:}�;r•1 CONDUITS STRUCTURES Compaction Testing/Reports Material Certifications LANDSCAPING „•::r:.:::..::.v...:.:v:.h":,:".,,},}«{.;,v:.,.:,.•;.•}:•};}; •` r•?4• 4}•Wr: }..... #Y,�t, .. ^:..{!. v t}:;:i;\. .44 �$:Y%v.::.\,:.ti'Kw,'l.%•'�•.:. : , v �y... .:..;#:tzY.::::...•, •�`,{... \v:n\�?{$n',,. *:.%:i ,y'?•. :hv.:;?.:hAi' ���. v\\}�..�.!Nh`4\y.•�{•k. ,?•...,. y. v' \ < ~ S K'tiih�:: MEDIAN PERIMETER ""' V4/u/ Page 2 of 2 I - 4 7 f _lam x.. f j Y i !I tTa4 NY C� H " ZJ f� � �� � ~� � R & \� y .. � ` 1, � } � � \:�� . ' ��/ � � �� � � \: . , , ,.{ ..,� � , t • � ) « / ~� . a �. . , 1� \��y\ . . __ & � . *(\� . � }�¥ _ _ ` . � � }f% - �y� ��\\. _; f. / ,< / � ..� � °� ~ _ _ . _ i-•- i - � ..... }YJ :. � .•ram 4 .. y_ k ; ._ a lk r ET % z > :3 Lr Untjk) L \- Lr V - \t)J5j5Q( \—l- \MM WEEKLY INSPECTION REPO PROJECT NAME Wa£% 1 a1 y' f o r,14 I -IV y7 ^ (9 1-1/4"Z o DIN PERMIT NO.. 3TO 'Y PLAN SET NO. INSPECTOR IY n _0=2Z4� DATE JOURNAL OF NOTABLE ACTIVITY & ACTION NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION) F130 04/02 Page 1 of 2 CONSTR TION ACTIVITY SUMMA YR 3 MO DATES: _ thru WORK BY SPECIAL PERMISSION MON TUE WED THU FRI SAT SUN I NITE ITEMPORARY TRAFFIC CONTROL Onsite Measures Track -out Clearing & Grubbing Earth Moving: Cut & Fill Fine Grading Compaction Testing/Reports STREET IMPROVEMENTS C&G SUBGRADE AGGREGATE BASE AC - BASE LIFT AC -'CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/Reports Material Certifications AC Design Mb( A OVEMENTS WATER IM PR MAINS SEWER IMPROVEMENTS MAINS., LATERALS STRUCTURES Compaction Testing/F Material Certifications STORM DRAINS MAINS STRUCTURES Material Certifications UTILTIES CONDUITS STRUCTURES Compaction Testing/Reporl Material Certifications )SCAPING MEDIAN I F'tKIMt I tK I I I I I , 1 �� F13n Heim WEEKLY INSPECTION REPO PROJECT NAME ;d Cf/o2.7 a- DIN PERMIT NO. 37,0y PLAN SET NO. INSPECTOR AL)Ala DATE JOURNAL OF NOTABLE ACTIVITY & ACTION. NOTICE SUMMARY FOR THIS WEEK (INDICATE ONLY DATE s TYPE OF NOTICE ISSUED IN THIS SECTION) F130 04/02 Page 1 of 2 CO . NSTRWION ACTIVITY SUMM.4 YR MO DATES: /61 thru. WORK BY SPECIAL PERMISSION MON TUE I WED THU I FRI SAT I SUN [ NITE TEMPORARY TRAFFIC CONTROL r IDUST CONTROL I Onsfte Measures Track -out Cleanup . . . . . . . . . . . . . . . . Conforming implementaton Non -conforming implementation ...... . . . . . . . GRADING ..... . . . . . . . Clearing & Grubbing Earth Moving: Cut& Fill I Fine Grading :ET IMPROVEMENTS- C&G AGGREGATE BASE AC - BASE LIFT AC -'CAP STRIPING & SIGNS TRAFFIC SIGNAL Compaction Testing/F Material Certifications AC Design Ma WATER IMPROVEMENTS MAINS SERVICES Compaction Testing/F Material Certifications SEWER IMPROVEMENTS MAINS, LATERALS STRUCTURES Compaction Testing/F Material Certifications ISTORM DRAINS SANDFILTERS Compaction Testing/Reports Material Certifications I, ML . ..... . ............. DRY UTILTIES .......... CONDUITS Material Certifications PERIMETER F1 30 04/02 0 ... 1).113