Appendix 2
HCM UNSIGNALIZED INTERSECTION
METHODOLOGY AND WORKSHEETS
HCM Methodology
HCS Worksheets
Appendix 2
Highway Capacity Manual
Unsignalized Intersection Methodology
All of the key intersections in the study area is currently unsignalized and controlled by stop
signs on one or more approaches. To evaluate the ability of thess intersections to serve
traffic demands during peak hours, the capacity was determined for each minor approach
movement and the left turns onto the minor street, and then compared to the demand for
each movement. In this manner, the probable delay and level of service were estimated
during the peak hour from Table A-1.
The methodology utilized to determine the maximum capacity of the minor approach
movements and the left turn onto the minor street (in passenger car equivalents per hour or
PCPH) accounts for approach grade and speed, traffic mix, lane configuration, and type of
traffic control. It allows the maximum potential capacity to be determined from the
conflicting volumes and the critical gap associated with each type of vehicle maneuver.
Once the capacity of each of the critical movements is calculated, the anticipated delay and
the level of service for each critical movement can be evaluated. Typically, the movement
with the longest average total delay or worst level or service defines the overall evaluation;
however, this may be tempered by engineering judgment, when conditions warrant it.
For example, left turns from the minor leg may experience delay consistent with LOS F
operation, but the major through movements will experience no delay. If the delay is
reduced for the traffic on the minor leg by installing a traffic signal, it may increase the
overall intersection delay. For this reason, excessive delays on the minor legs of two-way
stop intersections are only mitigated with a traffic signal when traffic signal warrants are
met. This eliminates the situation where a large number of cars are delayed for the benefit
of only a few cars.
Table A-1
1994 HCM Unsignalized Intersection
Level of Service Criteria
Level of Service Average Total Delay (SecondsNehicle)
A <_ 5.0
B >5.0 and <_10.0
C >10.0 and <_20.0
D >20.0 and :!00.0
E >30.0 and <_45.0
F > 45.0
Source: "Highway Capacity Manual, Special Report 209", Transportation Research Board, 1994; pp. 10-12.
Existing (Year 1999)
Unsignalized Intersection
HCS Worksheets
o �
U
o
>
C
N
w
O
^
N
u
O
LL U
M
O
C
O
O
y
OA T
o
S
>
Ga
y
o
0
0
0
Q
O
v
'>
w
0
0
¢
0
as
w
0
on
Q
a�
c
ra
O\
N
00
y0
N O
00
w y
�
3
cC
O Ri
OV
00
00
O O
N
O
�
O
v1
O
�
O
o
.a
C
00
00
N
O�
>
O
N
p!
^
O
^
� T
GL 3
0
N
C
M
C
N
C
a�
^
C
s
O
w
O
n
9;
o
o
C:w
M
a
V
O
3
Ln 3
N
O
O
E
N
O
M
O
E
o O
0
eau"
�y
�.
6. W
E
S
H
a
r
u
cU
Q
c3
.0v
-
�-..
^
1(1
--CD
l/'I
ON
U
_
c�
Ca c
U
:a
U_ p
Cl-
tn
�
= o
^
c p
�^
o ¢
U
a w
en
c
ami
�
u
0
en
00
M
N
`o
-a
O Q
3
c
O
t-
kn
O
er
to
�c
�o ^
^
N
to
_
O
>CL
_
N
N
o
F-
0
0
0
O
2
c
N
00
O
V
"�
c
0
0
0
0
c
¢
3
3
3
z
z z
w
w
w
O
OM
N
M
In
&: ¢
0 c
C
N
O
^
N
O
LL U
M
O
C
O
O
a Q
o
a`c
0 o
y
o
0
0
0
a` U
a 0
0
0
0
0
0
Q
a�
c
ra
O\
N
00
w y
�
cC
O Ri
OV
00
00
O O
N
v1
O
�
O
v1
O
�
O
o
GL 3
0
N
C
M
C
N
C
^
C
s
O
w
O
n
a
Ln 3
N
O
O
N
O
M
O
E
o O
0
eau"
�y
E
S
a
a
r
� s
�
U
U_ p
Cl-
tn
�
^
c p
o ¢
U
en
c
u
0
en
00
M
N
V)
O Q
O
0; w
o
0
0
0
O
2
N
00
O
V
"�
0
0
0
0
¢
N
OM
N
M
In
O
M
G
N
M
t�
N N
w rx
HCS: Unsignalized Intersections Release 2.1d JE_50EP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Jefferson Street (E -W) Avenue 50
Analyst...................Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
All -way Stop -controlled Intersection
^�
Eastbound I WestboundNorthbound L
bounI Southbound
LR LR L
No. Lanes
0 > 1 < 0
0 > 1 1
0 >
1 1
0 > 1
< 0
Volumes
72 133 20
19 151 90
29
278 25
112 250
125
PHF
-----------------------------------------------------------------------
1 1 1
1 1 1
1
1 1
1 1
1
Volume Summary and Capacity Analysis
------------------------------------------------------------------------
WorkSheet
B
NB
-----------------------------------------------------------------------
EB
WB
NB
SB
LT Flow Rate
72
19
29
112
RT Flow Rate
20
90
25
125
Approach Flow Rate
225
260
332
487
Proportion LT
0.32
0.07
0.09
0.23
Proportion RT
0.09
0.35
0.08
0.26
Opposing Approach Flow Rate
260
225
487
332
Conflicting Approaches Flow Rate
819
819
485
485
Proportion, Subject Approach Flow Rate
0.17
0.20
0.25
0.37
Proportion, Opposing Approach Flow Rate
0.20
0.17
0.37
0.25
Lanes on Subject Approach
1
2
2
1
Lanes on Opposing Approach
2
1
1
2
LT, Opposing Approach
19
72
112
29
RT, Opposing Approach
90
20
125
25
LT, Conflicting Approaches
141
141
91
91
RT, Conflicting Approaches
150
150
110
110
Proportion LT, Opposing Approach
0.07
0.32
0.23
0.09
Proportion RT, Opposing Approach
0.35
0.09
0.26
0.08
Proportion LT, Conflicting Approaches
0.17
0.17
0.19
0.19
Proportion RT, Conflicting Approaches
0.18
0.18
0.23
0.23
Approach Capacity
------------------------------------------------------------------------
363
545
810
552
Intersection Performance Summary
Intersection Delay = 14.9
Level of Service (Intersection) C
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
225
363
0.62
10.5
C
WB
260
545
0.48
6.1
B
NB
332
810
0.41
4.7
A
SB
487
552
0.88
28.6
D
Intersection Delay = 14.9
Level of Service (Intersection) C
HCS: Unsignalized Intersections Release
2.1d
Approach
V/C
Page 1
Center For Microcomputers In Transportation
Movement
Flow Rate
Capacity
University of Florida
Total Delay
LOS
EB
423
512 Weil Hall
0.38
4.2
A
WB
Gainesville, FL 32611-2083
365
0.47
5.9
B
Ph: (904) 392-0378
247
428
0.58
9.0
Streets (N -S) Jefferson Street
(E -W)
Avenue
52
0.30
Analyst ................... Greg
A
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM Pk
All -way Stop -controlled Intersection
----------------------------------
Eastbound
Westbound
Northbound
Southbound
L T R
L T R
L T
R
L T
R
----
No. Lanes
1 2 1
1 1 < 0
1 1
< 0
1 2
1
Volumes
94 215 114
9 89 73
75 165
7
41 202 45
P HF
1 1 1
1 1 1
1 1
1
1
1 1
------------------------------------------------------------------------
Volume Summary and Capacity Analysis WorkSheet
EB
WB
NB
SB
-------------------------------------------------------------------------
LT Flow Rate
94
9
75
41
RT Flow Rate
114
73
7
45
Approach Flow Rate
423
171
247
288
Proportion LT
0.22
0.05
0.30
0.14
Proportion RT
0.27
0.43
0.03
0.16
Opposing Approach Flow Rate
171
423
288
247
Conflicting Approaches Flow Rate
535
535
594
594
Proportion, Subject Approach Flow Rate
0.37
0.15
0.22
0.26
Proportion, Opposing Approach Flow Rate
0.15
0.37
0.26
0.22
Lanes on Subject Approach
4
2
2
4
Lanes on Opposing Approach
2
4
4
2
LT, Opposing Approach
9
94
41
75
RT, Opposing Approach
73
114
45
7
LT, Conflicting Approaches
116
116
103
103
RT, Conflicting Approaches
52
52
187
187
Proportion LT, Opposing Approach
0.05
0.22
0.14
0.30
Proportion RT, Opposing Approach
0.43
0.27
0.16
0.03
Proportion LT, Conflicting Approaches
0.22
0.22
0.17
0.17
Proportion RT, Conflicting Approaches
0.10
0.10
0.31
0.31
Approach Capacity
1114
365
428
965
Intersection Performance Summary
Intersection Delay = 5.2
Level of Service (Intersection) = B
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
423
1114
0.38
4.2
A
WB
171
365
0.47
5.9
B
NB
247
428
0.58
9.0
B
SB
288
965
0.30
3.1
A
Intersection Delay = 5.2
Level of Service (Intersection) = B
HCS: Unsignalized Intersections Release 2.1d JE_52EP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
--------------------------------
Streets: (N -S) Jefferson Street (E -W) Avenue 52
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
All -way Stop -controlled Intersection
--------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
----
No. Lanes 1 2 1 1 1 < 0 1 1 < 0 1 2 1
Volumes 60 134 110 7 138 37 99 208 12 62 120 96
PHF 1 1 1 1 1 1 1 1 1 1 1 1
Volume Summary and Capacity Analysis WorkSheet
Approach
Approach
------__ -'
EB
WB
NB
SB
'_
LT Flow Rate
60
7
99
62
RT Flow Rate
110
37
12
96
Approach Flow Rate
304
182
319
278
Proportion LT
0.20
0.04
0.31
0.22
Proportion RT
0.36
0.20
0.04
0.35
Opposing Approach Flow Rate
182
304
278
319
Conflicting Approaches Flow Rate
597
597
486
486
Proportion, Subject Approach Flow Rate
0.28
0.17
0.29
0.26
Proportion, Opposing Approach Flow Rate
0.17
0.28
0.26
0.29
Lanes on Subject Approach
4
2
2
4
Lanes on Opposing Approach
2
4
4
2
LT, Opposing Approach
7
60
62
99
RT, Opposing Approach
37
110
96
12
LT, Conflicting Approaches
161
161
67
67
RT, Conflicting Approaches
108
108
147
147
Proportion LT, Opposing Approach
0.04
0.20
0.22
0.31
Proportion RT, Opposing Approach
0.20
0.36
0.35
0.04
Proportion LT, Conflicting Approaches
0.27
0.27
0.14
0.14
Proportion RT, Conflicting Approaches
0.18
0.18
0.30
0.30
Approach Capacity
1001
351
526
1027
Intersection Performance Summary
Intersection Delay = 5.8
Level of Service (Intersection) B
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
304
1001
0.30
3.2
A
WB
182
351
0.52
7.2
B
NB
319
526
0.61
10.0
C
SB
278
1027
0.27
2.8
A
Intersection Delay = 5.8
Level of Service (Intersection) B
HCS: Unsignalized Intersections Release 2.1d JE-_54EA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------
Streets: (N -S) Jefferson Street (E -W) Avenue 54
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM Pk
All -way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
----
No. Lanes 0 > 2 < 0 1 1 < 0 1 1 1 0 > 1 < 0
Volumes 0 0 1 26 1 72 3 171 23 123 190 1
PHF 1 1 1 1 1 1 1 1 1 1 1 1
-----------------------------------------------------------------------
Volume Summary and Capacity Analysis WorkSheet
------------------------------------------------------------------------
Intersection Performance Summary
EB
WB
NB
SB
-----------------------------------------------------------------------
LT Flow Rate
0
26
3
123
RT Flow Rate
1
72
23
1
Approach Flow Rate
1
99
197
314
Proportion LT
0.00
0.26
0.02
0.39
Proportion RT
1.00
0.73
0.12
0.00
Opposing Approach Flow Rate
99
1
314
197
Conflicting Approaches Flow Rate
511
511
100
100
Proportion, Subject Approach Flow Rate
0.00
0.16
0.32
0.51
Proportion, Opposing Approach Flow Rate
0.16
0.00
0.51
0.32
Lanes on Subject Approach
2
2
3
1
Lanes on Opposing Approach
2
2
1
3
LT, Opposing Approach
26
0
123
3
RT, Opposing Approach
72
1
1
23
LT, Conflicting Approaches
126
126
26
26
RT, Conflicting Approaches
24
24
73
73
Proportion LT, Opposing Approach
0.26
0.00
0.39
0.02
Proportion RT, Opposing Approach
0.73
1.00
0.00
0.12
Proportion LT, Conflicting Approaches
0.25
0.25
0.26
0.26
Proportion RT, Conflicting Approaches
0.05
0.05
0.73
0.73
Approach Capacity
322
503
1206
799
Intersection Performance Summary
Intersection Delay = 3.2
Level of Service (Intersection) = A
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
1
322
0.00
1.0
A
WB
99
503
0.20
2.1
A
NB
197
1206
0.16
1.9
A
SB
314
799
0.39
4.5
A
Intersection Delay = 3.2
Level of Service (Intersection) = A
HCS: Unsignalized Intersections Release 2.1d JE_54EP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Jefferson Street (E -W) Avenue 54
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
All -way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 0 > 2 < 0 1 1 < 0 1 1 1 0 > 1 < 0
Volumes 1 2 2 17 1 105 6 208 35 68 174 1
PHF 1 1 1 1 1 1 1 1 1 1 1 1
Volume Summary and Capacity Analysis WorkSheet
-----------------------------------------------------------------------
EB
WB
NB
SB
-----------------------------------------------------------------------
LT Flow Rate
1
17
6
68
RT Flow Rate
2
105
35
1
Approach Flow Rate
5
123
249
243
Proportion LT
0.20
0.14
0.02
0.28
Proportion RT
0.40
0.85
0.14
0.00
Opposing Approach Flow Rate
123
5
243
249
Conflicting Approaches Flow Rate
492
492
128
128
Proportion, Subject Approach Flow Rate
0.01
0.20
0.40
0.39
Proportion, Opposing Approach Flow Rate
0.20
0.01
0.39
0.40
Lanes on Subject Approach
2
2
3
1
Lanes on Opposing Approach
2
2
1
3
LT, Opposing Approach
17
1
68
6
RT, Opposing Approach
105
2
1
35
LT, Conflicting Approaches
74
74
18
18
RT, Conflicting Approaches
36
36
107
107
Proportion LT, Opposing Approach
0.14
0.20
0.28
0.02
Proportion RT, Opposing Approach
0.85
0.40
0.00
0.14
Proportion LT, Conflicting Approaches
0.15
0.15
0.14
0.14
Proportion RT, Conflicting Approaches
0.07
0.07
0.84
0.84
Approach Capacity
453
401
1301
803
Intersection Performance
Summary
Approach Approach
V/C
Average
Movement Flow Rate Capacity
Ratio
Total Delay
LOS
EB 5 453
0.01
1.0
A
WB 123 401
0.31
3.2
A
NB 249 1301
0.19
2.1
A
SB 243 803
0.30
3.2
A
Intersection Delay = 2.7
Level of Service (Intersection) = A
HCS: Unsignalized Intersections Release 2.1d MA 50EA.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Madison Street (E -W) Avenue 50
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM Pk
Two-way Stop -controlled Intersection
--------------------------------------
Eastbound Westbound NorthboundSouthbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC, s (�)
SU/RV's (�)
CV's (�)
PCE's
0 1 < 0
N
242 8
1 1
0
0 > 1 0
N
4 284
1 1
0
1.10
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
-------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA_50EA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
246
Potential Capacity:
(pcph)
1039
Movement Capacity:
(pcph)
1039
Prob. of Queue -Free
State:
1.00
--------------------------------------------------------
Step 2: LT from Major Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
250
Potential Capacity:
(pcph)
1303
Movement Capacity:
(pcph)
1303
Prob. of Queue -Free
State:
1.00
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
0.0
of Queue -Free State:
NB R 1
1.00
--------------------------------------------------------
Step 4: LT from Minor
Street
NB SB
--------------------------------------------------------
Conflicting Flows:
(vph)
534
Potential Capacity:
(pcph)
520
Major LT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance
Factor:
1.00
Capacity Adjustment
Factor
due to Impeding Movements
1.00
Movement Capacity:
--------------------------------------------------------
(pcph)
518
Intersection Performance Summary
Intersection Delay = 0.1 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement (pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
NB L 6
518
>
558
6.5
0.0
B 6.5
NB R 1
1039
>
WB L 4
1303
2.8
0.0
A 0.0
Intersection Delay = 0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA_50EP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Madison Street (E -W) Avenue 50
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
Two-way Stop -controlled Intersection
---------------------------------
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC, s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 1 < 0
N
252 3
1 1
0
0 > 1 0
N
7 270
1 1
0
11.10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections
Release 2.1d
MA_50EP.HC0 Page 2
Worksheet for TWSC Intersection
Avg.
Step 1: RT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
254
Shared
Potential Capacity: (pcph)
1030
Approach
Movement Capacity: (pcph)
1030
Cap
Prob. of Queue -Free State:
0.99
Length LOS
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
255
Potential Capacity: (pcph)
1296
NB L
Movement Capacity: (pcph)
1296
>
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
5.1
0.0 B
Major LT Shared Lane Prob.
NB R
8
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
530
Potential Capacity: (pcph)
522
0.1
Major LT, Minor TH
Intersection Delay
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
518
Intersection Performance Summary
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
NB L
6
518
>
724
5.1
0.0 B
5.1
NB R
8
1030
>
WB L
8
1296
2.8
0.0 A
0.1
Intersection Delay
=
0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA_52EA.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
--------------------------------
Streets: (N -S) Madison Street (E -W) Avenue 52
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM Pk
Two-way Stop -controlled Intersection
---------------------------------
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
0 > 1 0
N
4 296
1 1
0
1.10
0 1 < 0
N
165 6
1 1
0
---------------
Adjustment Factors
0 > 0 < 0
2 1
1 1
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 52EA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
168
Potential Capacity: (pcph)
1138
Movement Capacity: (pcph)
1138
Prob. of Queue -Free State:
1.00
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
171
Potential Capacity: (pcph)
1421
Movement Capacity: (pcph)
1421
Prob. of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
468
Potential Capacity: (pcph)
567
Major LT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
--------------------------------------------------------
565
Intersection Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sec/veh)
SB L 2 565 >
679
5.3 0.0 B
5.3
SB R 1 1138 >
EB L 4 1421
2.5 0.0 A
0.0
Intersection Delay - 0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA 52EP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Madison Street (E -W) Avenue 52
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
Two-way Stop -controlled Intersection
--------------------------------
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (%)
CV's M
PCE's
------------
0 > 1 0
N
7 184
1 1
0
1.10
0 1 < 0
N
191 4
1 1
0
----------------
Adjustment Factors
0 > 0 < 0
4 5
1 1
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
-------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA_52EP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
193
Potential Capacity:
(pcph)
1105
Movement Capacity:
(pcph)
1105
Prob. of Queue -Free
State:
0.99
---------------------------------------------------------
Step 2: LT from Major
Street WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
195
Potential Capacity:
(pcph)
1384
Movement Capacity:
(pcph)
1384
Prob. of Queue -Free
State:
0.99
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor
Street NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
384
Potential Capacity:
(pcph)
635
Major LT, Minor TH
EB L
8
Impedance Factor:
0.99
Adjusted Impedance
Factor:
0.99
Capacity Adjustment
Factor
due to Impeding Movements
0.99
Movement Capacity:
--------------------------------------------------------
(pcph)
631
Intersection Performance Summary
Intersection Delay = 0.1 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
SB L
4
631
>
850
4.3
0.0
A 4.3
SB R
6
1105
>
EB L
8
1384
2.6
0.0
A 0.1
Intersection Delay = 0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA_54EA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
---------------------------------
Streets: (N -S) Madison Street (E -W) Avenue 54
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM Pk
All -way Stop -controlled Intersection
---------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 0 1 1 0 > 1 0 1 0 1 0 0 0
Volumes 26 134 2 26 76 3
PHF 1 1 1 1 1 1
Volume Summary and Capacity Analysis WorkSheet
Approach
-----------------------------------------------------------------------
EB
WB
NB SB
-----------------------------------------------------------------------
LT Flow Rate
0
2
76
RT Flow Rate
134
0
3
Approach Flow Rate
160
28
79
Proportion LT
0.00
0.07
0.96
Proportion RT
0.84
0.00
0.04
Opposing Approach Flow Rate
28
160
0
Conflicting Approaches Flow Rate
79
79
188
Proportion, Subject Approach Flow Rate
0.60
0.10
0.30
Proportion, Opposing Approach Flow Rate
0.10
0.60
0.00
Lanes on Subject Approach
2
1
2
Lanes on Opposing Approach
1
2
0
LT, Opposing Approach
2
0
0
RT, Opposing Approach
0
134
0
LT, Conflicting Approaches
76
76
2
RT, Conflicting Approaches
3
3
134
Proportion LT, Opposing Approach
0.07
0.00
0.00
Proportion RT, Opposing Approach
0.00
0.84
0.00
Proportion LT, Conflicting Approaches
0.96
0.96
0.01
Proportion RT, Conflicting Approaches
0.04
0.04
0.71
Approach Capacity
674
415
907
Intersection Performance Summary
Intersection Delay = 2.0
Level of Service (Intersection) = A
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
160
674
0.24
2.5
A
WB
28
415
0.07
1.3
A
NB
79
907
0.09
1.4
A
Intersection Delay = 2.0
Level of Service (Intersection) = A
HCS: Unsignalized Intersections Release
2.1d MA 54EP.HCO Page 1
Center For Microcomputers In Transportation
V/C
Average
University of Florida
Movement
Flow Rate
Capacity
512 Weil Hall
Total Delay
LOS
EB
Gainesville, FL 32611-2083
535
0.17
1.9
Ph: (904) 392-0378
WB
43
277
Streets: (N -S) Madison Street
(E -W)
Avenue
54
Analyst ................... Greg
937
0.11
1.5
Date of Analysis.......... 2/3/99
Intersection Delay
= 1.7
Other Information ......... Existing Conditions PM Pk
All -way Stop -controlled Intersection
of Service (Intersection)
= A
Eastbound
Westbound
Northbound
Southbound
L T R
L T R
L T
R
L T R
----
No. Lanes
0 1 1
0 > 1 0
1 0
1
0 0 0
Volumes
44 49
0 43
99
3
PHF
1 1
1 1
1
1
-----------------------------------------------------------------------
Volume Summary and Capacity Analysis WorkSheet
-----------------------------------------------------------------------
EB
WB
NB SB
-----------------------------------------------------------------------
LT Flow Rate
0
0
99
RT Flow Rate
49
0
3
Approach Flow Rate
93
43
102
Proportion LT
0.00
0.00
0.97
Proportion RT
0.53
0.00
0.03
Opposing Approach Flow Rate
43
93
0
Conflicting Approaches Flow Rate
102
102
136
Proportion, Subject Approach Flow Rate
0.39
0.18
0.43
Proportion, Opposing Approach Flow Rate
0.18
0.39
0.00
Lanes on Subject Approach
2
1
2
Lanes on Opposing Approach
1
2
0
LT, Opposing Approach
0
0
0
RT, Opposing Approach
0
49
0
LT, Conflicting Approaches
99
99
0
RT, Conflicting Approaches
3
3
49
Proportion LT, Opposing Approach
0.00
0.00
0.00
Proportion RT, Opposing Approach
0.00
0.53
0.00
Proportion LT, Conflicting Approaches
0.97
0.97
0.00
Proportion RT, Conflicting Approaches
0.03
0.03
0.36
Approach Capacity
-----------------------------------------------------------------------
535
277
937
Intersection Performance Summary
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
93
535
0.17
1.9
A
WB
43
277
0.16
1.8
A
NB
102
937
0.11
1.5
A
Intersection Delay
= 1.7
Level
of Service (Intersection)
= A
HCS: Unsignalized Intersections Release 2.1d MA_54EP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
--------------------------------------
Streets: (N -S) Madison Street (E -W) Airport Blvd.
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM Pk
Two-way Stop -controlled Intersection
-----------------------------------------------
Northbound SouthboundEastbound Westbound
L T R L T R L T R L T R -
No. Lanes 0 < 0
Stop/Yield
Volumes
PHF
Grade
MC,S (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0
1 <
0
Maneuver
Gap (tg)
Time (tf)
Left Turn Major Road
N
2.10
53
5.50
1
Through Traffic Minor Road
1
3.30
1
6.50
0
Adjustment Factors
0 >
19 24
1 1
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 54EP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
54
Potential Capacity: (pcph)
1300
Movement Capacity: (pcph)
1300
Prob. of Queue -Free State:
0.98
--------------------------------------------------------
Step 2: LT from Major Street
--------------------------------------------------------
SB
NB
Conflicting Flows: (vph)
54
Potential Capacity: (pcph)
1616
Movement Capacity: (pcph)
1616
Prob. of Queue -Free State:
--------------------------------------------------------
0.97
Step 4: LT from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
186
Potential Capacity: (pcph)
826
Major LT, Minor TH
Impedance Factor:
0.97
Adjusted Impedance Factor:
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.97
Movement Capacity: (pcph)
--------------------------------------------------------
804
Intersection
Performance Summary
Avg.
95%
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
WB L 21 804 >
1019
3.7
0.0 A
3.7
WB R 26 1300 >
SB L 44 1616
2.3
0.0 A
0.7
Intersection Delay = 1.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA_54EP.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Madison Street (E -W) Airport Blvd.
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst...... ............. Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
Two-way Stop -controlled Intersection
Northbound SouthboundEastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's (�)
CV's M
PCE's
------------
0
1 <
0
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
N
2.10
60
5.50
8
Through Traffic Minor Road
1
3.30
1
---------------
0
0 > 0 < 0
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 54EP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
64
Potential Capacity:
(pcph)
1285
Movement Capacity:
(pcph)
1285
Prob. of Queue -Free
--------------------------------------------------------
State:
0.96
Step 2: LT from Major
Street
SB NB
--------------------------------------------------------
Conflicting Flows:
(vph)
68
Potential Capacity:
(pcph)
1591
Movement Capacity:
(pcph)
1591
Prob. of Queue -Free
--------------------------------------------------------
State:
0.99
Step 4: LT from Minor
--------------------------------------------------------
Street
WB EB
Conflicting Flows:
(vph)
111
Potential Capacity:
(pcph)
913
Major LT, Minor TH
1225
Impedance Factor:
0.0
0.99
Adjusted Impedance
Factor:
0.99
Capacity Adjustment
Factor
due to Impeding Movements
SB L
0.99
Movement Capacity:
--------------------------------------------------------
(pcph)
902
Intersection Performance Summary
Intersection Delay = 1.1 sec/veh
Avg.
953%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
WB L
6
902
>
1225
3.1
0.0
A 3.1
WB R
46
1285
>
SB L
20
1591
2.3
0.0
A 0.9
Intersection Delay = 1.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA 58EA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Madison Street (E -W) Avenue 58
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM Pk
Two-way Stop -controlled Intersection
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
0 14 36
1 1 1
0
1.10
----------------
0 > 1 < 0
0 23 1
1 1 1
0
1.10 1.10 1.10
---------------
Adjustment Factors
0 > 1 < 0
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 58EA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
4
32
Potential Capacity: (pcph)
1378
1334
Movement Capacity: (pcph)
1378
1334
Prob. of Queue -Free State:
--------------------------------------------------------
1.00
0.98
Step 2: LT from Major Street
WB
EB
Conflicting Flows: (vph)
4
50
Potential Capacity: (pcph)
1707
1623
Movement Capacity: (pcph)
1707
1623
Prob. of Queue -Free State:
1.00
0.99
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
--------------------------------------------------------
1.00
0.99
Step 3: TH from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
66
48
Potential Capacity: (pcph)
1007
1029
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
999
1021
Prob. of Queue -Free State:
--------------------------------------------------------
0.97
0.98
Step 4: LT from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
70
60
Potential Capacity: (pcph)
964
977
Major LT, Minor TH
Impedance Factor:
0.97
0.97
Adjusted Impedance Factor:
0.98
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.96
0.97
Movement Capacity: (pcph)
923
952
HCS:
Unsignalized
Intersections
Release
2.1d MA
58EA.HCO Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
NH
L
0
923 >
NB
T
25
999 > 1010
3.7
0.0 A
3.7
NB
R
1
1378 >
SB
L
42
952 >
SB
T
18
1021 > 1073
3.7
0.2 A
3.7
SB
R
32
1334 >
EB
L
13
1623
2.2
0.0 A
1.7
WB
L
0
1707
2.1
0.0 A
0.0
Intersection Delay
=
2.4 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA 58EP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-------------
Streets: (N -S) Madison Street (E -W) Avenue 58
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
Two-way Stop -controlled Intersection
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
0 4 23
1 1 1
0
1.10
----------------
0 > 1 < 0
0 5 0
1 1 1
0
1.10 1.10 1.10
----------------
Adjustment Factors
0 > 1 < 0
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 58EP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
8
16
Potential Capacity: (pcph)
1372
1359
Movement Capacity: (pcph)
1372
1359
Prob. of Queue -Free State:
--------------------------------------------------------
1.00
0.99
Step 2: LT from Major Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
8
27
Potential Capacity: (pcph)
1699
1664
Movement Capacity: (pcph)
1699
1664
Prob. of Queue -Free State:
1.00
0.99
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
0.99
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
50
38
Potential Capacity: (pcph)
1027
1042
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
1016
1031
Prob. of Queue -Free State:
--------------------------------------------------------
0.99
0.99
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
48
40
Potential Capacity: (pcph)
993
1004
Major LT, Minor TH
Impedance Factor:
0.98
0.98
Adjusted Impedance Factor:
0.98
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.98
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
969
992
HCS: Unsignalized Intersections Release 2.1d MA.58EP.HCO Page 3
Intersection Performance Summary
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
NB
L
0
969
>
NB
T
6
1016
> 1016
3.6
0.0
A
3.6
NB
R
0
1372
>
SB
L
37
992
>
SB
T
12
1031
> 1052
3.6
0.0
A
3.6
SB
R
11
1359
>
EB
L
17
1664
2.2
0.0
A
1.4
WB
L
0
1699
2.1
0.0
A
0.0
Intersection
Delay =
2.3 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO__50EA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 50
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM Pk
All -way Stop -controlled Intersection
Eastbound I WestboundNorthd Northbound I Southbound
LRLR L
No. Lanes
0> 1 1
0> 1 1
0>
1 < 0
0> 1
1
Volumes
86 144 25
10 180 71
21
207 15
61 224
64
PHF
-----------------------------------------------------------------------
1 1 1
1 1 1
1
1 1
1 1
1
Volume Summary and Capacity Analysis
-----------------------------------------------------------------------
WorkSheet
B
NB
-----------------------------------------------------------------------
EB
WB
NB
SB
LT Flow Rate
86
10
21
61
RT Flow Rate
25
71
15
64
Approach Flow Rate
255
261
243
349
Proportion LT
0.34
0.04
0.09
0.17
Proportion RT
0.10
0.27
0.06
0.18
Opposing Approach Flow Rate
261
255
349
243
Conflicting Approaches Flow Rate
592
592
516
516
Proportion, Subject Approach Flow Rate
0.23
0.24
0.22
0.31
Proportion, Opposing Approach Flow Rate
0.24
0.23
0.31
0.22
Lanes on Subject Approach
2
2
1
2
Lanes on Opposing Approach
2
2
2
1
LT, Opposing Approach
10
86
61
21
RT, Opposing Approach
71
25
64
15
LT, Conflicting Approaches
82
82
96
96
RT, Conflicting Approaches
79
79
96
96
Proportion LT, Opposing Approach
0.04
0.34
0.17
0.09
Proportion RT, Opposing Approach
0.27
0.10
0.18
0.06
Proportion LT, Conflicting Approaches
0.14
0.14
0.19
0.19
Proportion RT, Conflicting Approaches
0.13
0.13
0.19
0.19
Approach Capacity
-----------------------------------------------------------------------
636
514
424
755
Intersection Performance Summary
Intersection Delay = 6.4
Level of Service (Intersection) = B
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
255
636
0.40
4.6
A
WB
261
514
0.51
6.9
B
NB
243
424
0.57
8.8
B
SB
349
755
0.46
5.8
B
Intersection Delay = 6.4
Level of Service (Intersection) = B
HCS: Unsignalized Intersections Release 2.1d MO_50EP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 50
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
All -way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 0> 1 1 0> 1 1 0> 1 < 0 0> 1 1
Volumes 82 116 40 16 129 81 57 220 25 122 277 113
PHF 1 1 1 1 1 1 1 1 1 1 1 1
Volume Summary and Capacity Analysis WorkSheet
---------------------------------------------------------------
EB WB NB SB
LT Flow Rate
82
16
57
122
RT Flow Rate
40
81
25
113
Approach Flow Rate
238
226
302
512
Proportion LT
0.34
0.07
0.19
0.24
Proportion RT
0.17
0.36
0.08
0.22
Opposing Approach Flow Rate
226
238
512
302
Conflicting Approaches Flow Rate
814
814
464
464
Proportion, Subject Approach Flow Rate
0.19
0.18
0.24
0.40
Proportion, Opposing Approach Flow Rate
0.18
0.19
0.40
0.24
Lanes on Subject Approach
2
2
1
2
Lanes on Opposing Approach
2
2
2
1
LT, Opposing Approach
16
82
122
57
RT, Opposing Approach
81
40
113
25
LT, Conflicting Approaches
179
179
98
98
RT, Conflicting Approaches
138
138
121
121
Proportion LT, Opposing Approach
0.07
0.34
0.24
0.19
Proportion RT, Opposing Approach
0.36
0.17
0.22
0.08
Proportion LT, Conflicting Approaches
0.22
0.22
0.21
0.21
Proportion RT, Conflicting Approaches
0.17
0.17
0.26
0.26
Approach Capacity
-----------------------------------------------------------------------
545
422
504
841
Intersection Performance Summary
Intersection Delay = 8.7
Level of Service (Intersection) = B
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
-------
Total Delay
LOS
----------
EB
----------
238
---------
545
0.44
-----------
5.3
B
WB
226
422
0.54
7.7
B
NB
302
504
0.60
9.7
B
SB
512
841
0.61
10.1
C
Intersection Delay = 8.7
Level of Service (Intersection) = B
HCS: Unsignalized Intersections Release 2.1d MO`52EA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 52
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM Pk
All -way Stop -controlled Intersection
Eastbound Westbound Northbound l Southbound
L T R L T R L T R I L T R
No. Lanes 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0
Volumes 92 188 28 10 128 41 20 86 3 45 130 23
PHF 1 1 1 1 1 1 1 1 1 1 1 1
Volume Summary and Capacity Analysis WorkSheet
-----------------------------------------------------------------
EB WB NB SB
LT Flow Rate
92
10
20
45
RT Flow Rate
28
41
3
23
Approach Flow Rate
308
179
109
198
Proportion LT
0.30
0.06
0.18
0.23
Proportion RT
0.09
0.23
0.03
0.12
Opposing Approach Flow Rate
179
308
198
109
Conflicting Approaches Flow Rate
307
307
487
487
Proportion, Subject Approach Flow Rate
0.39
0.23
0.14
0.25
Proportion, Opposing Approach Flow Rate
0.23
0.39
0.25
0.14
Lanes on Subject Approach
1
1
1
1
Lanes on Opposing Approach
1
1
1
1
LT, Opposing Approach
10
92
45
20
RT, Opposing Approach
41
28
23
3
LT, Conflicting Approaches
65
65
102
102
RT, Conflicting Approaches
26
26
69
69
Proportion LT, Opposing Approach
0.06
0.30
0.23
0.18
Proportion RT, Opposing Approach
0.23
0.09
0.12
0.03
Proportion LT, Conflicting Approaches
0.21
0.21
0.21
0.21
Proportion RT, Conflicting Approaches
0.08
0.08
0.14
0.14
Approach Capacity
-----------------------------------------------------------------------
637
487
347
376
Intersection Performance Summary
Intersection Delay = 5.6
Level of Service (Intersection) = B
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
308
637
0.48
6.3
B
WB
179
487
0.37
4.0
A
NB
109
347
0.31
3.3
A
SB
198
376
0.53
7.4
B
Intersection Delay = 5.6
Level of Service (Intersection) = B
HCS: Unsignalized Intersections Release 2.1d MO-52EP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 52
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
All -way Stop -controlled Intersection
^�TLEastboundR 1 LWestboundR I LNorthboundd' LSouthboundR
No. Lanes 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0
Volumes 42 121 25 2 134 47 20 136 6 57 104 34
PHF 1 1 1 1 1 1 1 1 1 1 1 1
Volume Summary and Capacity Analysis WorkSheet
---------------------------------------------------------------
EB WB NB SB
LT Flow Rate
42
2
20
57
RT Flow Rate
25
47
6
34
Approach Flow Rate
188
183
162
195
Proportion LT
0.22
0.01
0.12
0.29
Proportion RT
0.13
0.26
0.04
0.17
Opposing Approach Flow Rate
183
188
195
162
Conflicting Approaches Flow Rate
357
357
371
371
Proportion, Subject Approach Flow Rate
0.26
0.25
0.22
0.27
Proportion, Opposing Approach Flow Rate
0.25
0.26
0.27
0.22
Lanes on Subject Approach
1
1
1
1
Lanes on Opposing Approach
1
1
1
1
LT, Opposing Approach
2
42
57
20
RT, Opposing Approach
47
25
34
6
LT, Conflicting Approaches
77
77
44
44
RT, Conflicting Approaches
40
40
72
72
Proportion LT, Opposing Approach
0.01
0.22
0.29
0.12
Proportion RT, Opposing Approach
0.26
0.13
0.17
0.04
Proportion LT, Conflicting Approaches
0.22
0.22
0.12
0.12
Proportion RT, Conflicting Approaches
0.11
0.11
0.19
0.19
Approach Capacity
551
461
480
517
Intersection Performance Summary
Intersection Delay = 4.0
Level of Service (Intersection) A
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
188
551
0.34
3.7
A
WB
183
461
0.40
4.5
A
NB
162
480
0.34
3.6
A
SB
195
517
0.38
4.2
A
Intersection Delay = 4.0
Level of Service (Intersection) A
HCS: Unsignalized Intersections Release 2.1d M0-54EA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 54
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM Pk
Two-way Stop -controlled Intersection
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (t)
CV's (�)
PCE's
------------
0 > 1 < 0
N
5 121 5
1 1 1
0
1.10
--------------
0 > 1 < 0
N
28 142 9
1 1 1
0
1.10
----------------
0 > 1 < 0
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_54EA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
124
146
Potential Capacity: (pcph)
1198
1168
Movement Capacity: (pcph)
1198
1168
Prob. of Queue -Free State:
--------------------------------------------------------
0.98
0.99
Step 2: LT from Major Street
SB
NB
---------------------------------------------------------
Conflicting Flows: (vph)
126
151
Potential Capacity: (pcph)
1493
1453
Movement Capacity: (pcph)
1493
1453
Prob. of Queue -Free State:
0.98
1.00
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.98
1.00
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
------------_-------------------------------------------
Conflicting Flows: (vph)
308
306
Potential Capacity: (pcph)
752
754
Capacity Adjustment Factor
due to Impeding Movements
0.97
0.97
Movement Capacity: (pcph)
732
734
Prob. of Queue -Free State:
0.97
0.96
----------------------------------------------------------
Step 4: LT from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
320
324
Potential Capacity: (pcph)
691
687
Major LT, Minor TH
Impedance Factor:
0.93
0.94
Adjusted Impedance Factor:
0.95
0.96
Capacity Adjustment Factor
due to Impeding Movements
0.94
0.94
Movement Capacity: (pcph)
651
644
HCS:
Unsignalized
Intersections
Release
2.1d
MO_54EA.HCO
Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length
LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
EB
L
12
644 >
EB
T
32
734 > 742
5.2
0.1
B
5.2
EB
R
6
1168 >
WB
L
11
651 >
WB
T
21
732 > 862
4.5
0.1
A
4.5
WB
R
26
1198 >
NB
L
6
1453
2.5
0.0
A
0.1
SB
L
31
1493
2.5
0.0
A
0.4
Intersection Delay = 1.4 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_54EP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 54
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
Two-way Stop -controlled Intersection
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
1 123 3
1 1 1
0
1.10
0 > 1 < 0
N
39 104 4
1 1 1
0
1.10
---------------
Adjustment Factors
0 > 1 < 0
4 18 9
1 1 1
0
1.10 1.10 1.10
---------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_.54EP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
124
106
Potential Capacity: (pcph)
1198
1224
Movement Capacity: (pcph)
1198
1224
Prob. of Queue -Free State:
--------------------------------------------------------
0.99
1.00
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
126
108
Potential Capacity: (pcph)
1493
1523
Movement Capacity: (pcph)
1493
1523
Prob. of Queue -Free State:
0.97
1.00
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.97
1.00
Step 3: TH from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
272
272
Potential Capacity: (pcph)
785
785
Capacity Adjustment Factor
due to Impeding Movements
0.97
0.97
Movement Capacity: (pcph)
760
760
Prob. of Queue -Free State:
--------------------------------------------------------
0.97
0.94
Step 4: LT from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
291
284
Potential Capacity: (pcph)
718
725
Major LT, Minor TH
Impedance Factor:
0.92
0.94
Adjusted Impedance Factor:
0.93
0.96
Capacity Adjustment Factor
due to Impeding Movements
0.93
0.95
Movement Capacity: (pcph)
670
688
HCS:
Unsignalized
Intersections
Release
2.1d MO_54EP.HCO
Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Belay
Length LOS
Delay
Movement
(pcph)
(pcph) (pcph)(see/veh)
(veh)
(sec/veh)
EB
L
12
688 >
EB
T
42
760 > 758
5.1
0.2 B
5.1
EB
R
3
1224 >
WB
L
4
670 >
WB
T
20
760 > 837
4.5
0.0 A
4.5
WB
R
10
1198 >
NB
L
1
1523
2.4
0.0 A
0.0
SB
L
43
1493
2.5
0.0 A
0.7
Intersection Delay
R
1.4 sec/veh
HCS: Unsignalized Intersections Release
2.1d
MO_APEA.HCO
Page 1
Center For Microcomputers In Transportation
Movement
Flow Rate
University of Florida
Ratio
Total Delay
LOS
EB
512 Weil Hall
422
0.09
1.4
A
Gainesville, FL 32611-2083
142
446
0.32
3.4
Ph: (904) 392-0378
NB
88
508
0.17
Streets: (N -S) Monroe Street
(E
-W) Airport
Blvd.
742
Analyst................... Greg
2.2
A
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM
Pk
All -way Stop -controlled Intersection
Eastbound
Westbound
Northbound
Southbound
L T R
L T R
L
T R
L T
R
No. Lanes
0 > 1 < 0
0 > 1 < 0
0 >
1 < 0
0 > 1
< 0
Volumes
1 37 1
31 32 79
3
58 27
80 60
15
PHF
1 1 1
1 1 1
1
1 1
1
1 1
-----------------------------------------------------------------------
Volume Summary and Capacity Analysis WorkSheet
------------------------------------------------------------------------
EB
WB
NB
SB
-----------------------------------------------------------------------
LT Flow Rate
1
31
3
80
RT Flow Rate
1
79
27
15
Approach Flow Rate
39
142
88
155
Proportion LT
0.03
0.22
0.03
0.52
Proportion RT
0.03
0.56
0.31
0.10
Opposing Approach Flow Rate
142
39
155
88
Conflicting Approaches Flow Rate
243
243
181
181
Proportion, Subject Approach Flow Rate
0.09
0.33
0.21
0.37
Proportion, Opposing Approach Flow Rate
0.33
0.09
0.37
0.21
Lanes on Subject Approach
1
1
1
1
Lanes on Opposing Approach
1
1
1
1
LT, Opposing Approach
31
1
80
3
RT, Opposing Approach
79
1
15
27
LT, Conflicting Approaches
83
83
32
32
RT, Conflicting Approaches
42
42
80
80
Proportion LT, Opposing Approach
0.22
0.03
0.52
0.03
Proportion RT, Opposing Approach
0.56
0.03
0.10
0.31
Proportion LT, Conflicting Approaches
0.34
0.34
0.18
0.18
Proportion RT, Conflicting Approaches
0.17
0.17
0.44
0.44
Approach Capacity
422
446
508
742
Intersection Performance Summary
Intersection Delay = 2.5
Level of Service (Intersection) = A
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
39
422
0.09
1.4
A
WB
142
446
0.32
3.4
A
NB
88
508
0.17
1.9
A
SB
155
742
0.21
2.2
A
Intersection Delay = 2.5
Level of Service (Intersection) = A
HCS: Unsignalized Intersections Release
2.1d MO APEP.HCO
Page 1
Center For Microcomputers In Transportation
Average
Movement
University of Florida
Capacity
Ratio
Total Delay
LOS
512 Weil Hall
21
383
0.05
1.2
Gainesville, FL 32611-2083
WB
94
439
0.21
Ph: (904) 392-0378
A
NB
81
604
Streets: (N -S) Monroe Street
(E -W)
Airport
Blvd.
112
Analyst ................... Greg
0.15
1.8
A
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
All -way Stop -controlled Intersection
Eastbound
Westbound
Northbound
Southbound
L T R
L T R
L T
R
L T
R
----
No. Lanes
0 > 1 < 0
0 > 1 < 0
0 > 1
< 0
0 > 1
< 0
Volumes
2 14 5
20 28 46
3 63
15
34 77 1
PHF
1 1 1
1 1 1
1 1
1
1
1 1
-----------------------------------------------------------------------
Volume Summary and Capacity Analysis WorkSheet
-----------------------------------------------------------------------
EB
WB
NB
SB
------------------------------------------------------------------------
LT Flow Rate
2
20
3
34
RT Flow Rate
5
46
15
1
Approach Flow Rate
21
94
81
112
Proportion LT
0.10
0.21
0.04
0.30
Proportion RT
0.24
0.49
0.19
0.01
Opposing Approach Flow Rate
94
21
112
81
Conflicting Approaches Flow Rate
193
193
115
115
Proportion, Subject Approach Flow Rate
0.07
0.31
0.26
0.36
Proportion, Opposing Approach Flow Rate
0.31
0.07
0.36
0.26
Lanes on Subject Approach
1
1
1
1
Lanes on Opposing Approach
1
1
1
1
LT, Opposing Approach
20
2
34
3
RT, Opposing Approach
46
5
1
15
LT, Conflicting Approaches
37
37
22
22
RT, Conflicting Approaches
16
16
51
51
Proportion LT, Opposing Approach
0.21
0.10
0.30
0.04
Proportion RT, Opposing Approach
0.49
0.24
0.01
0.19
Proportion LT, Conflicting Approaches
0.19
0.19
0.19
0.19
Proportion RT, Conflicting Approaches
0.08
0.08
0.44
0.44
Approach Capacity
----------------------------------------------------------------------------
383
439
604
749
Intersection Performance Summary
Intersection Delay = 1.9
Level of Service (Intersection) = A
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
21
383
0.05
1.2
A
WB
94
439
0.21
2.3
A
NB
81
604
0.13
1.7
A
SB
112
749
0.15
1.8
A
Intersection Delay = 1.9
Level of Service (Intersection) = A
HCS: Unsignalized Intersections Release 2.1d MO_58EA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 58
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM Pk
Two-way Stop -controlled Intersection
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC' s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
10 20 3
1 1 1
0
1.10
0 > 1 < 0
N
0 27 14
1 1 1
0
1.10
----------------
0 > 1 < 0
2 23 1
1 1 1
0
1.10 1.10 1.10
---------------
Adjustment Factors
0 > 1 < 0
9 29 19
1 1 1
0
1.10 1.10 1.10
---------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
--------------------------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d M0,58EA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step l: RT from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
22
34
Potential Capacity: (pcph)
1350
1331
Movement Capacity: (pcph)
1350
1331
Prob. of Queue -Free State:
--------------------------------------------------------
1.00
0.98
Step 2: LT from Major Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
23
41
Potential Capacity: (pcph)
1672
1639
Movement Capacity: (pcph)
1672
1639
Prob. of Queue -Free State:
1.00
0.99
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
--------------------------------------------------------
1.00
0.99
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
72
67
Potential Capacity: (pcph)
1000
1006
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
993
999
Prob. of Queue -Free State:
--------------------------------------------------
0.97
0.97
Step 4: LT from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
90
78
Potential Capacity: (pcph)
939
954
Major LT, Minor TH
Impedance Factor:
0.96
0.97
Adjusted Impedance Factor:
0.97
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.96
0.97
Movement Capacity: (pcph)
897
930
HCS:
Unsignalized
Intersections
Release
2.1d MO-58EA.HCO
Page 3
Intersection
Performance
Summary
Avg.
95%
Flaw
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Belay
Length LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
NB
L
2
897 >
NB
T
25
993 > 995
3.7
0.0 A
3.7
NB
R
1
1350 >
SB
L
10
930 >
SB
T
32
999 > 1076
3.6
0.1 A
3.6
SB
R
21
1331 >
EB
L
11
1639
2.2
0.0 A
0.7
WB
L
0
1672
2.2
0.0 A
0.0
Intersection Delay
=
2.0 sec/veh
HCS: Unsignalized Intersections Release 2.1d M0,_58EP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 58
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC, s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
23 27 2
1 1 1
0
1.10
0 > 1 < 0
9 32 3
1 1 1
0
1.10 1.10 1.10
----------------
Adjustment Factors
0 > 1 < 0
26 42 10
1 1 1
0
1.10 1.10 1.10
---------------
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_58EP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
28
24
Potential Capacity: (pcph)
1340
1346
Movement Capacity: (pcph)
1340
1346
Prob. of Queue -Free State:
1.00
0.99
---------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
29
33
Potential Capacity: (pcph)
1661
1653
Movement Capacity: (pcph)
1661
1653
Prob. of Queue -Free State:
1.00
0.98
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
0.98
--------------------------------------------------------
Step 3: TH from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
90
82
Potential Capacity: (pcph)
978
988
Capacity Adjustment Factor
due to Impeding Movements
0.98
0.98
Movement Capacity: (pcph)
959
969
Prob. of Queue -Free State:
--------------------------------------------------------
0.96
0.95
Step 4: LT from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
108
99
Potential Capacity: (pcph)
917
928
Major LT, Minor TH
Impedance Factor:
0.93
0.94
Adjusted Impedance Factor:
0.95
0.96
Capacity Adjustment Factor
due to Impeding Movements
0.94
0.96
Movement Capacity: (pcph)
864
887
HCS:
Unsignalized
Intersections.
Release
2.1d
MO_58EP.HCO
Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
NB
L
10
864
>
NB
T
35
959
> 954
4.0
0.0
A
4.0
NB
R
3
1340
>
SB
L
29
887
>
SB
T
46
969
> 974
4.1
0.2
A
4.1
SB
R
11
1346
>
EB
L
25
1653
2.2
0.0
A
1.0
WB
L
7
1661
2.2
0.0
A
0.3
Intersection Delay = 2.6 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO.__60EA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 60
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions AM Pk
Two-way Stop -controlled Intersection
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
3 25 0
1 1 1
0
1.10
---------------
0 > 1 < 0
N
8 38 0
1 1 1
0
1.10
----------------
0 > 1 < 0
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_60EA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
25
38
Potential Capacity: (pcph)
1345
1325
Movement Capacity: (pcph)
1345
1325
Prob. of Queue -Free State:
0.99
1.00
--------------------------------------------------------
Step 2: LT from Major Street
--------------------------------------------------------
SB
NB
Conflicting Flows: (vph)
25
38
Potential Capacity: (pcph)
1668
1644
Movement Capacity: (pcph)
1668
1644
Prob. of Queue -Free State:
0.99
1.00
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
1.00
--------------------------------------------------------
Step 3: TH from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
74
74
Potential Capacity: (pcph)
998
998
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
991
991
Prob. of Queue -Free State:
0.99
0.99
---------------------------------------------------------
Step 4: LT from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
78
84
Potential Capacity: (pcph)
954
947
Major LT, Minor TH
Impedance Factor:
0.99
0.98
Adjusted Impedance Factor:
0.99
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.98
Movement Capacity: (pcph)
941
926
HCS:
Unsignalized
Intersections
Release
2.1d MO_60EA.HCO
Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Belay
Length LOS
Delay
Movement
(pcph)
(pcph) (gcph)(sec/veh)
(veh)
(sec/veh)
EB
L
1
926 >
EB
T
6
991 > 1083
3.4
0.0 A
3.4
EB
R
4
1325 >
WB
L
0
941 >
WB
T
9
991 > 1174
3.1
0.0 A
3.1
WB
R
13
1345 >
NB
L
3
1644
2.2
0.0 A
0.2
SB
L
9
1568
2.2
0.0 A
0.4
Intersection Delay
=
1.2 sec/veh.
HCS: Unsignalized Intersections Release 2.1d MO_60EP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 60
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Existing Conditions PM Pk
Two-way Stop -controlled Intersection
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
4 20 0
1 1 1
0
1.10
0 > 1 < 0
N
5 62 0
1 1 1
0
1.10
----------------
0 > 1 < 0
0 7 3
1 1 1
0
1.10 1.10 1.10
----------------
Adjustment Factors
0 > 1 < 0
1 4 7
1 1 1
0
1.10 1.10 1.10
---------------
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_60EP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
20
62
Potential Capacity: (pcph)
1353
1288
Movement Capacity: (pcph)
1353
1288
Prob. of Queue -Free State:
0.99
1.00
--------------------------------------------------------
Step 2: LT from Major Street
--------------------------------------------------------
SB
NB
Conflicting Flows: (vph)
20
62
Potential Capacity: (pcph)
1677
1602
Movement Capacity: (pcph)
1677
1602
Prob. of Queue -Free State:
1.00
1.00
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 3: TH from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
91
91
Potential Capacity: (pcph)
977
977
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
971
971
Prob. of Queue -Free State:
1.00
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
Conflicting Flows: (vph)
96
96
Potential Capacity: (pcph)
932
932
Major LT, Minor TH
Impedance Factor:
0.99
0.99
Adjusted Impedance Factor:
0.99
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
920
919
HCS:
Unsignalized
Intersections
Release
2.1d
MC?_60EP.HCO
Page 3
Intersection
Performance
Summary
Avg.
951%
Flaw
Move Shared
Total.
Queue
Approach
Rate
Cap Cap
Delay
Length
LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
EB
L
0
919 >
EB
T
8
971 > 1041
3.5
0.0
A
3.5
EB
R
3
1288 >
WB
L
1
920 >
WB
T
4
971 > 1169
3.1
0.0
A
3.1
WB
R
8
1353 >
NB
L
4
1602
2.3
0.0
A
0.4
SB
L
6
16'77
2.2
0.0
A
0.2
Intersection Delay
=
0.8 sec/veh
Year 2004
Unsignalized Intersection
HCS Worksheets
HCS: Unsignalized Intersections Release 2.1d MA 504A.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Madison Street (E -W) Avenue 50
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions AM Pk
Two-way Stop -controlled Intersection
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's (�)
SU/RV's (�)
CV's M
PCE's
0 1 < 0
N
313 9
1 1
0
0 > 1 0
N
5 338
1 1
0
1.10
----------------
0 > 0 < 0
6 2
1 1
0
1.10 1.10
---------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 504A.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
318
Potential Capacity:
(pcph)
955
Movement Capacity:
(pcph)
955
Prob. of Queue -Free
State:
1.00
Step 2: LT from Major Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
322
Potential Capacity:
(pcph)
1204
Movement Capacity:
(pcph)
1204
Prob. of Queue -Free
State:
1.00
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
>
Major LT Shared Lane
Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor
Street
NB SB
--------------------------------------------------------
Conflicting Flows:
(vph)
660
Potential Capacity:
(pcph)
439
Major LT, Minor TH
WB L
Impedance Factor:
1204
0.99
Adjusted Impedance
Factor:
0.99
Capacity Adjustment
Factor
due to Impeding Movements
0.99
Movement Capacity:
---------------------------------------------------------
(pcph)
436
Intersection Performance Summary
Intersection Delay = 0.1 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
NB L
7
436
>
496
7.4
0.0
B 7.4
NB R
2
955
>
WB L
6
1204
3.0
0.0
A 0.0
Intersection Delay = 0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA 504P.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Madison Street (E -W) Avenue 50
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions PM Pk
Two-way Stop -controlled Intersection
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC, s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 1 < 0
N
314 3
1 1
0
0 > 1 0
N
8 347
1 1
0
1.10
---------------
0 > 0 < 0
6 8
1 1
0
1. 10 1. 10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 504P.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
316
Potential Capacity:
(pcph)
958
Movement Capacity:
(pcph)
958
Prob. of Queue -Free
---------------------------------------------------------
State:
0.99
Step 2: LT from Major
--------------------------------------------------------
Street
WB EB
Conflicting Flows:
(vph)
317
Potential Capacity:
(pcph)
1211
Movement Capacity:
(pcph)
1211
Prob. of Queue -Free
State:
0.99
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
--------------------------------------------------------
0.99
Step 4: LT from Minor
Street
NB SB
--------------------------------------------------------
Conflicting Flows:
(vph)
670
Potential Capacity:
(pcph)
433
Major LT, Minor TH
WB L
9
Impedance Factor:
0.99
Adjusted Impedance
Factor:
0.99
Capacity Adjustment
Factor
due to Impeding Movements
0.99
Movement Capacity:
--------------------------------------------------------
(pcph)
429
Intersection Performance Summary
Intersection Delay = 0.2 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
NB L
7
429
>
622
5.9
0.0
B 5.9
NB R
9
958
>
WB L
9
1211
3.0
0.0
A 0.1
Intersection Delay = 0.2 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA 50PA.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Madison Street (E -W) Avenue 50
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions AM Pk
Two-way Stop -controlled Intersection
----------------------- ---
Eastbound Westbound NorthboundSouthbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 1 < 0
N
315 9
1 1
0
0 > 1 0
N
5 340
1 1
0
1.10
----------------
0 > 0 < 0
6 2
1 1
0
1.10 1.10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
-------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MAa50PA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
320
Potential Capacity: (pcph)
953
Movement Capacity: (pcph)
953
Prob. of Queue -Free State:
1.00
--------------------------------------------------------
Step 2: LT from Major Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
324
Potential Capacity: (pcph)
1201
Movement Capacity: (pcph)
1201
Prob. of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
664
Potential Capacity: (pcph)
437
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
434
Intersection Performance
Summary
Avg.
95%
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sec/veh)
NB L 7 434 >
494
7.4
0.0 B
7.4
NB R 2 953 >
WB L 6 1201
3.0
0.0 A
0.0
Intersection Delay = 0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA 50PP.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Madison Street (E -W) Avenue 50
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions PM Pk
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
L T RL T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC, s (�)
SU/RV's (�}
CV's (�)
PCE's
------------
0 1 < 0
N
317 3
1 1
0
0 > 1 0
N
8 349
1 1
0
1.10
----------------
0 > 0 < 0
6 8
1 1
0
1.10 1.10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 50PP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
318
Potential Capacity:
(pcph)
955
Movement Capacity:
(pcph)
955
Prob. of Queue -Free
--------------------------------------------------------
State:
0.99
Step 2: LT from Major
Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
320
Potential Capacity:
(pcph)
1207
Movement Capacity:
(pcph)
1207
Prob. of Queue -Free
State:
0.99
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
NB SB
----------------------------------------------------------
Conflicting Flows:
(vph)
676
Potential Capacity:
(pcph)
430
Major LT, Minor TH
WB L
Impedance Factor:
1207
0.99
Adjusted Impedance
Factor:
0.99
Capacity Adjustment
Factor
due to Impeding Movements
0.99
Movement Capacity:
--------------------------------------------------------
(pcph)
426
Intersection Performance Summary
Intersection Delay = 0.2 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
NB L
7
426
>
619
6.0
0.0 B
6.0
NB R
9
955
>
WB L
9
1207
3.0
0.0 A
0.1
Intersection Delay = 0.2 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA_524A.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Streets: (N -S) Madison Street (E -W) Avenue 52
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions AM Pk
Two-way Stop -controlled Intersection
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 0
N
4 395
1 1
0
1.10
---------------
0 1 < 0
N
235 7
1 1
0
---------------
0 > 0 < 0
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 524A.HC0 Page 2
Worksheet for TWSC Intersection
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
238
Potential Capacity: (pcph)
1049
Movement Capacity: (pcph)
1049
Prob. of Queue -Free State:
--------------------------------------------------------
1.00
Step 2: LT from Major Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
242
Potential Capacity: (pcph)
1315
Movement Capacity: (pcph)
1315
Prob. of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
--------------------------------------------------------
1.00
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
638
Potential Capacity: (pcph)
452
Major LT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
--------------------------------------------------------
450
Intersection Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sec/veh)
SB L 3 450 >
525
6.9 0.0 B
6.9
SB R 1 1049 >
EB L 4 1315
2.7 0.0 A
0.0
Intersection Delay = 0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA 52PA.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Madison Street (E -W) Avenue 52
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions AM Pk
Two-way Stop -controlled Intersection
Eastbound - WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 0
N
4 396
1 1
0
1.10
---------------
0 1 < 0
N
235 7
1 1
0
---------------
0 > 0 < 0
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 52PA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
238
Potential Capacity: (pcph)
1049
Movement Capacity: (pcph)
1049
Prob. of Queue -Free State:
--------------------------------------------------------
1.00
Step 2: LT from Major Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
242
Potential Capacity: (pcph)
1315
Movement Capacity: (pcph)
1315
Prob. of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
--------------------------------------------------------
1.00
Step 4: LT from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
638
Potential Capacity: (pcph)
452
Major LT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
---------------------------------------------------------
450
Intersection Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sec/veh)
SB L 3 450 >
525
6.9 0.0 B
6.9
SB R 1 1049 >
EB L 4 1315
2.7 0.0 A
0.0
Intersection Delay - 0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA_524P.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Madison Street (E -W) Avenue 52
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions PM Pk
Two-way Stop -controlled Intersection
-------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 0
Stop/Yield
Volumes
PHF
Grade
MC,s M
SU/RV's (�)
CV's M
PCE's
------------
0 > 1 0
N
8 264
1 1
0
1.10
0 1 < 0
N
291 4
1 1
0
Adjustment Factors
0 > 0 <
4 5
1 1
0
1. 10 1. 10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA_524P.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
293
Potential Capacity: (pcph)
984
Movement Capacity: (pcph)
984
Prob. of Queue -Free State:
--------------------------------------------------------
0.99
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
295
Potential Capacity: (pcph)
1240
Movement Capacity: (pcph)
1240
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
--------------------------------------------------------
0.99
Step 4: LT from Minor Street
---------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
565
Potential Capacity: (pcph)
498
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
494
Intersection Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
SB L 4 494 >
704
5.2 0.0 B
5.2
SB R 6 984 >
EB L 9 1240
2.9 0.0 A
0.1
Intersection Delay = 0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA 52PP.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Madison Street (E -W) Avenue 52
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions PM Pk
Two-way Stop -controlled Intersection
Eastbound Westbound NorthboundSouthbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (%)
SU/RV's (�)
CV's (V
PCE's
------------
0 > 1 0
N
8 266
1 1
0
1.10
--------------
0 1 < 0
N
292 4
1 1
0
---------------
0 > 0 < 0
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 52PP.HCO Page 2
Worksheet for TWSC Intersection
-------___---------------------------------___-----------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
294
Potential Capacity:
(pcph)
983
Movement Capacity:
(pcph)
983
Prob. of Queue -Free
State:
0.99
--------------------------------------------------------
Step 2: LT from Major
Street WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
296
Potential Capacity:
(pcph)
1239
Movement Capacity:
(pcph)
1239
Prob. of Queue -Free
State:
0.99
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
--------------------------------------------------------
0.99
Step 4: LT from Minor
--------------------------------------------------------
Street NB
SB
Conflicting Flows:
(vph)
568
Potential Capacity:
(pcph)
496
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance
Factor:
0.99
Capacity Adjustment
Factor
due to Impeding Movements
0.99
Movement Capacity:
----------------------------------------------------------
(pcph)
492
Flow
Rate
Movement (pcph)
SB L 4
SB R 6
EB L 9
Intersection Performance Summary
Avg. 95%
Move Shared Total Queue Approach
Cap Cap Delay Length LOS Delay
(pcph) (pcph)(sec/veh) (veh) (sec/veh)
492 >
419M
1239
703 5.2
0.0
B
5.2
2.9
0.0
A
0.1
Intersection Delay
0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA 604A.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Madison Street (E -W) Avenue 60
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions AM Pk
Two-way Stop -controlled Intersection
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
1 1 0
N
9 31
1 1
0
1.10
0 > 0 < 0
413 22
1 1
0
1.10 1.10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 604A.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
26
Potential Capacity:
(pcph)
1343
Movement Capacity:
(pcph)
1343
Prob. of Queue -Free
State:
0.98
--------------------------------------------------------
Step 2: LT from Major Street
SB NB
--------------------------------------------------------
Conflicting Flows:
(vph)
206
Potential Capacity:
(pcph)
1367
Movement Capacity:
(pcph)
1367
Prob. of Queue -Free
--------------------------------------------------------
State:
0.99
Step 4: LT from Minor Street
WB EB
Conflicting Flows:
(vph)
156
Potential Capacity:
(pcph)
860
Major LT, Minor TH
Impedance Factor:
870
0.99
Adjusted Impedance
Factor:
0.99
Capacity Adjustment
Factor
>
due to Impeding Movements
0.99
Movement Capacity:
--------------------------------------------------------
(pcph)
854
Intersection Performance Summary
Intersection Delay = 5.9 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
EB L
454
854
>
870
9.2
3.9
B 9.2
EB R
24
1343
>
NB L
10
1367
2.7
0.0
A 0.6
Intersection Delay = 5.9 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA 604P.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Madison Street (E -W) Avenue 60
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions PM Pk
Two-way Stop -controlled Intersection
Northbound SouthboundEastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
1 1 0
N
23 13
1 1
0
1.10
0 > 0 < 0
258 14
1 1
0
1.10 1.10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA`604P.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
18
Potential Capacity: (pcph)
1356
Movement Capacity: (pcph)
1356
Prob. of Queue -Free State:
--------------------------------------------------------
0.99
Step 2: LT from Major Street
--------------------------------------------------------
SB
NB
Conflicting Flows: (vph)
451
Potential Capacity: (pcph)
1045
Movement Capacity: (pcph)
1045
Prob. of Queue -Free State:
--------------------------------------------------------
0.98
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
270
Potential Capacity: (pcph)
739
Major LT, Minor TH
Impedance Factor:
0.98
Adjusted Impedance Factor:
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.98
Movement Capacity: (pcph)
--------------------------------------------------------
721
Intersection
Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
EB L 284 721 >
738
8.2 2.3 B
8.2
EB R 15 1356 >
NB L 25 1045
3.5 0.0 A
2.3
Intersection Delay = 3.0 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA 60PA.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Madison Street (E -W) Avenue 60
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions AM Pk
Two-way Stop -controlled Intersection
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's (-%)
SU/RV's (t)
CV's (�)
PCE's
------------
1 1 0
N
9 211
1 1
0
1.10
0 > 0 < 0
413 22
1 1
0
1.10 1.10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 60PA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
119
Potential Capacity: (pcph)
1205
Movement Capacity: (pcph)
1205
Prob. of Queue -Free State:
0.98
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
299
Potential Capacity: (pcph)
1235
Movement Capacity: (pcph)
1235
Prob. of Queue -Free State:
--------------------------------------------------------
0.99
Step 4: LT from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
429
Potential Capacity: (pcph)
598
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
593
Intersection
Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
EB L 454 593 >
609
26.4 9.6 D
26.4
EB R 24 1205 >
NB L 10 1235
2.9 0.0 A
0.1
Intersection Delay
= 12.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MA 60PP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Madison Street (E -W) Avenue 60
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions PM Pk
Two-way Stop -controlled Intersection
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
1 1 0
N
23 139
1 1
0
1.10
0 1 1
N
218 433
1 1
0
----------------
0 > 0 < 0
258 14
1 1
0
1.10 1.10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MA 60PP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
218
Potential Capacity:
(pcph)
1074
Movement Capacity:
(pcph)
1074
Prob. of Queue -Free
--------------------------------------------------------
State:
0.99
Step 2: LT from Major
--------------------------------------------------------
Street
SB NB
Conflicting Flows:
(vph)
651
Potential Capacity:
(pcph)
839
Movement Capacity:
(pcph)
839
Prob. of Queue -Free
--------------------------------------------------------
State:
0.97
Step 4: LT from Minor
Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
596
Potential Capacity:
(pcph)
478
Major LT, Minor TH
1074
>
Impedance Factor:
0.97
Adjusted Impedance
Factor:
0.97
Capacity Adjustment
Factor
A 0.6
due to Impeding Movements
0.97
Movement Capacity:
--------------------------------------------------------
(pcph)
464
Intersection Performance Summary
Intersection Delay = 5.1 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement (pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
EB L 284
464
>
478
19.9
5.0
C 19.9
EB R 15
1074
>
NB L 25
839
4.4
0.0
A 0.6
Intersection Delay = 5.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_544A.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Monroe Street (E -W) Avenue 54
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions AM Pk
Two-way Stop -controlled Intersection
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
41 26 18
1 1 1
0
1.10
0 > 1 < 0
N
31 196 77
1 1 1
0
1.10
Adjustment Factors
0 > 1 < 0
16 38 27
1 1 1
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
-------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_544A.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
35
234
Potential Capacity: (pcph)
1329
1054
Movement Capacity: (pcph)
1329
1054
Prob. of Queue -Free State:
0.98
0.98
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
---------------------------------------------------------
Conflicting Flows: (vph)
44
273
Potential Capacity: (pcph)
1633
1271
Movement Capacity: (pcph)
1633
1271
Prob. of Queue -Free State:
0.98
0.96
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.98
0.96
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
380
350
Potential Capacity: (pcph)
689
715
Capacity Adjustment Factor
due to Impeding Movements
0.94
0.94
Movement Capacity: (pcph)
647
672
Prob. of Queue -Free State:
0.94
0.89
--------------------------------------------------------
Step 4: LT from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
384
374
Potential Capacity: (pcph)
635
643
Major LT, Minor TH
Impedance Factor:
0.84
0.88
Adjusted Impedance Factor:
0.88
0.91
Capacity Adjustment Factor
due to Impeding Movements
0.86
0.89
Movement Capacity: (pcph)
545
570
HCS:
Unsignalized
Intersections
Release
2.1d MO_544A.HC0
Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
EB
L
157
570
>
EB
T
72
672
> 522
9.7
2.2 B
9.7
EB
R
22
1054
>
WB
L
18
545
>
WB
T
42
647
> 747
5.5
0.4 B
5.5
WB
R
30
1329
>
NB L 45 1271
SB L 34 1633
2.9
2.3
Intersection Delay =
0.0 A 1.4
0.0 A o.2
4.1 sec%veh
HCS: Unsignalized Intersections Release 2.1d MO_544P.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------
Streets: (N -S) Monroe Street (E -W) Avenue 54
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions PM Pk
Two-way Stop -controlled Intersection
--------------------------
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s W
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
23 194 11
1 1 1
0
1.10
0 > 1 < 0
N
43 214 150
1 1 1
0
1.10
---------------
Adjustment Factors
0 > 1 < 0
18 56 10
1 1 1
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_544P.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
200
289
Potential Capacity: (pcph)
1096
988
Movement Capacity: (pcph)
1096
988
Prob. of Queue -Free State:
--------------------------------------------------------
0.99
0.96
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
205
364
Potential Capacity: (pcph)
1369
1150
Movement Capacity: (pcph)
1369
1150
Prob. of Queue -Free State:
0.97
0.98
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
--------------------------------------------------------
0.96
0.98
Step 3: TH from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
630
560
Potential Capacity: (pcph)
510
555
Capacity Adjustment Factor
due to Impeding Movements
0.93
0.93
Movement Capacity: (pcph)
476
518
Prob. of Queue -Free State:
--------------------------------------------------------
0.87
0.86
Step 4: LT from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
607
588
Potential Capacity: (pcph)
471
483
Major LT, Minor TH
Impedance Factor:
0.80
0.81
Adjusted Impedance Factor:
0.85
0.85
Capacity Adjustment Factor
due to Impeding Movements
0.81
0.85
Movement Capacity: (pcph)
382
409
HCS:
Unsignalized
Intersections
Release
2.1d Mo_544P.HC0
Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LDS
Delay
Movement
(pcph)
(pcph) (pcph)[sec/veh)
(veh)
(sec/veh)
EB
L
113
409 >
EB
T
72
518 > 498
13.3
2.7 C
13.3
EB
R
44
988 >
WB
L
20
382 >
WB
T
62
476 > 483
9.2
0.8 B
9.2
WB
R
11
1096 >
NB
L
25
1150
3.2
0.0 A
0.3
SB
L
47
1369
2.7
0.0 A
0.3
Intersection Delay
=
4.0 sec/veh
HCS: Unsignalized Intersections Release 2.1d
MO_AP4A.HC0
Page 1
Center For Microcomputers In Transportation
Average
Movement
Flow Rate
University of Florida
Ratio
Total Delay
LOS
EB
512 Weil Hall
429
0.24
2.5
A
Gainesville, FL 32611-2083
172
299
0.58
8.9
Ph: (904) 392-0378
NB
220
536
0.41
Streets: (N -S) Monroe Street
(E -W) Airport Blvd.
SB
Analyst ................... Greg
669
0.34
3.7
A
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj
Conditions AM
Pk
All -way Stop -controlled Intersection
Eastbound
Westbound
Northbound
Southbound
L T R
L T R
L
T R
L T
R
----
No. Lanes
0 > 1 < 0
0 > 1 < 0
0 >
1 < 0
0 > 1
< 0
Volumes
48 53 2
45 40 87
6
157 57
89 106 35
PHF
1 1 1
1 1 1
1
1 1
1
1 1
-----------------------------------------------------------------------
Volume Summary and Capacity Analysis
Worksheet
EB
WB
NB
SB
-----------------------------------------------------------------------
LT Flow Rate
48
45
6
89
RT Flow Rate
2
87
57
35
Approach Flow Rate
103
172
220
230
Proportion LT
0.47
0.26
0.03
0.39
Proportion RT
0.02
0.51
0.26
0.15
Opposing Approach Flow Rate
172
103
230
220
Conflicting Approaches Flow Rate
450
450
275
275
Proportion, Subject Approach Flow Rate
0.14
0.24
0.30
0.32
Proportion, Opposing Approach Flow Rate
0.24
0.14
0.32
0.30
Lanes on Subject Approach
1
1
1
1
Lanes on Opposing Approach
1
1
1
1
LT, Opposing Approach
45
48
89
6
RT, Opposing Approach
87
2
35
57
LT, Conflicting Approaches
95
95
93
93
RT, Conflicting Approaches
92
92
89
89
Proportion LT, Opposing Approach
0.26
0.47
0.39
0.03
Proportion RT, Opposing Approach
0.51
0.02
0.15
0.26
Proportion LT, Conflicting Approaches
0.21
0.21
0.34
0.34
Proportion RT, Conflicting Approaches
0.20
0.20
0.32
0.32
Approach Capacity
-----------------------------------------------------------------------
429
299
536
669
Intersection Performance Summary
Intersection Delay = 5.1
Level of Service (Intersection) B
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
103
429
0.24
2.5
A
WB
172
299
0.58
8.9
B
NB
220
536
0.41
4.8
A
SB
230
669
0.34
3.7
A
Intersection Delay = 5.1
Level of Service (Intersection) B
HCS: Unsignalized Intersections Release 2.1d MO_AP4P.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Airport Blvd.
Analyst................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions PM Pk
All -way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
----
No. Lanes 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0
Volumes 32 22 8 51 44 51 5 128 33 37 184 52
PHF I 1 1 1 1 1 1 1 1 1 1 1 1
Volume Summary and Capacity Analysis Worksheet
---------------------------------------------------------------
EB WB NB SB
LT Flow Rate
32
51
5
37
RT Flow Rate
8
51
33
52
Approach Flow Rate
62
146
166
273
Proportion LT
0.52
0.35
0.03
0.14
Proportion RT
0.13
0.35
0.20
0.19
Opposing Approach Flow Rate
146
62
273
166
Conflicting Approaches Flow Rate
439
439
208
208
Proportion, Subject Approach Flow Rate
0.10
0.23
0.26
0.42
Proportion, Opposing Approach Flow Rate
0.23
0.10
0.42
0.26
Lanes on Subject Approach
1
1
1
1
Lanes on Opposing Approach
1
1
1
1
LT, Opposing Approach
51
32
37
5
RT, Opposing Approach
51
8
52
33
LT, Conflicting Approaches
42
42
83
83
RT, Conflicting Approaches
85
85
59
59
Proportion LT, Opposing Approach
0.35
0.52
0.14
0.03
Proportion RT, Opposing Approach
0.35
0.13
0.19
0.20
Proportion LT, Conflicting Approaches
0.10
0.10
0.40
0.40
Proportion RT, Conflicting Approaches
0.19
0.19
0.28
0.28
Approach Capacity
348
293
615
698
Intersection Performance Summary
Intersection Delay = 4.3
Level of Service (Intersection) A
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
62
348
0.18
2.0
A
WB
146
293
0.50
6.6
B
NB
166
615
0.27
2.8
A
SB
273
698
0.39
4.4
A
Intersection Delay = 4.3
Level of Service (Intersection) A
HCS: Unsignalized Intersections Release 2.1d MO APPA.HCO
Page 1
Center For Microcomputers In Transportation
V/C
Average
Movement
University of Florida
Capacity
Ratio
Total Delay
LOS
512 Weil Hall
132
375
0.35
3.8
Gainesville, FL 32611-2083
WB
192
246
0.78
Ph: (904) 392-0378
C
NB
391
596
Streets (N -S) Monroe Street
(E -W)
Airport Blvd.
SB
Analyst ................... Greg
667
0.45
5.5
B
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj
Conditions AM
Pk
All -way Stop -controlled Intersection
Eastbound
Westbound
Northbound
Southbound
L T R
L T R
L T
R
L T
R
----
No. Lanes
0 > 1 < 0
0 > 1 < 0
0 > 1
< 0
0 > 1
< 0
Volumes
70 58 4
62 43 87
10 287
94
89 163 47
PHF
1 1 1
1 1 1
1 1
1
1
1 1
-----------------------------------------------------------------------
Volume Summary and Capacity Analysis
Worksheet
-----------------------------------------------------------------------
EB
WB
NB
SB
-----------------------------------------------------------------------
LT Flow Rate
70
62
10
89
RT Flow Rate
4
87
94
47
Approach Flow Rate
132
192
391
299
Proportion LT
0.53
0.32
0.03
0.30
Proportion RT
0.03
0.45
0.24
0.16
Opposing Approach Flow Rate
192
132
299
391
Conflicting Approaches Flow Rate
690
690
324
324
Proportion, Subject Approach Flow Rate
0.13
0.19
0.39
0.29
Proportion, Opposing Approach Flow Rate
0.19
0.13
0.29
0.39
Lanes on Subject Approach
1
1
1
1
Lanes on Opposing Approach
1
1
1
1
LT, Opposing Approach
62
70
89
10
RT, Opposing Approach
87
4
47
94
LT, Conflicting Approaches
99
99
132
132
RT, Conflicting Approaches
141
141
91
91
Proportion LT, Opposing Approach
0.32
0.53
0.30
0.03
Proportion RT, Opposing Approach
0.45
0.03
0.16
0.24
Proportion LT, Conflicting Approaches
0.14
0.14
0.41
0.41
Proportion RT, Conflicting Approaches
0.20
0.20
0.28
0.28
Approach Capacity
-----------------------------------------------------------------------
375
246
596
667
Intersection Performance Summary
Intersection Delay = 10.5
Level of Service (Intersection) C
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
132
375
0.35
3.8
A
WB
192
246
0.78
19.4
C
NB
391
596
0.66
12.1
C
SB
299
667
0.45
5.5
B
Intersection Delay = 10.5
Level of Service (Intersection) C
HCS: Unsignalized Intersections Release 2.1d MO_APPP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Monroe Street (E -W) Airport Blvd.
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions PM Pk
All -way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
----
No. Lanes 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0
Volumes 48 26 11 92 50 51 7 212 57 37 326 77
PHF 1 1 1 1 1 1 1 1 1 1 1 1
Volume Summary and Capacity Analysis WorkSheet
Approach
Approach
-----------------------------------------------------------------------
EB
WB
NB
SB
-----------------------------------------------------------------------
LT Flow Rate
48
92
7
37
RT Flow Rate
11
51
57
77
Approach Flow Rate
85
193
276
440
Proportion LT
0.56
0.48
0.03
0.08
Proportion RT
0.13
0.26
0.21
0.17
Opposing Approach Flow Rate
193
85
440
276
Conflicting Approaches Flow Rate
716
716
278
278
Proportion, Subject Approach Flow Rate
0.09
0.19
0.28
0.44
Proportion, Opposing Approach Flow Rate
0.19
0.09
0.44
0.28
Lanes on Subject Approach
1
1
1
1
Lanes on Opposing Approach
1
1
1
1
LT, Opposing Approach
92
48
37
7
RT, Opposing Approach
51
11
77
57
LT, Conflicting Approaches
44
44
140
140
RT, Conflicting Approaches
134
134
62
62
Proportion LT, Opposing Approach
0.48
0.56
0.08
0.03
Proportion RT, Opposing Approach
0.26
0.13
0.17
0.21
Proportion LT, Conflicting Approaches
0.06
0.06
0.50
0.50
Proportion RT, Conflicting Approaches
0.19
0.19
0.22
0.22
Approach Capacity
------------------------------------------------------------------------
269
248
613
687
Intersection Performance Summary
Intersection Delay = 10.6
Level of Service (Intersection) = C
Approach
Approach
V/C
Average
Movement
Flow Rate
Capacity
Ratio
Total Delay
LOS
EB
85
269
0.32
3.3
A
WB
193
248
0.78
19,2
C
NB
276
613
0.45
5.5
B
SB
440
687
0.64
11.4
C
Intersection Delay = 10.6
Level of Service (Intersection) = C
HCS: Unsignalized Intersections Release 2.1d MO_584A.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 58
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions AM Pk
Two-way Stop -controlled Intersection
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,S M
SU/RV's (�)
CV's M
PCE'S
------------
0 > 1 < 0
N
76 39 5
1 1 1
0
1.10
---------------
0 > 1 < 0
N
2 37 15
1 1 1
0
1.10
----------------
0 > 1 < 0
4 83 5
1 1 1
0
1.10 1.10 1.10
----------------
Adjustment Factors
0 > 1 < 0
10 58 48
1 1 1
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_584A.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
42
44
Potential Capacity: (pcph)
1318
1315
Movement Capacity: (pcph)
1318
1315
Prob. of Queue -Free State:
1.00
0.96
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
44
52
Potential Capacity: (pcph)
1633
1619
Movement Capacity: (pcph)
1633
1619
Prob. of Queue -Free State:
1.00
0.95
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
0.95
--------------------------------------------------------
Step 3: TH from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
172
166
Potential Capacity: (pcph)
886
893
Capacity Adjustment Factor
due to Impeding Movements
0.95
0.95
Movement Capacity: (pcph)
838
844
Prob. of Queue -Free State:
--------------------------------------------------------
0.89
0.92
Step 4: LT from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
217
208
Potential Capacity: (pcph)
793
802
Major LT, Minor TH
Impedance Factor:
0.87
0.84
Adjusted Impedance Factor:
0.90
0.88
Capacity Adjustment Factor
due to Impeding Movements
0.87
0.88
Movement Capacity: (pcph)
687
702
HCS:
Unsignalized
Intersections
Release
2.1d MO_584A.HC0
Page 3
Intersection
Performance
Summary
Avg.
955%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
NB
L
4
687 >
NB
T
91
838 > 849
4.8
0.4 A
4.8
NB
R
6
1318 >
SB
L
11
702 >
SB
T
64
844 > 971
4.3
0.5 A
4.3
SB
R
53
1315 >
EB
L
84
1619
2.3
0.0 A
1.5
WB
L
2
1633
2.2
0.0 A
0.1
Intersection Delay
=
2.9 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_584P.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Monroe Street (E -W) Avenue 58
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions PM Pk
Two-way Stop -controlled Intersection
---------------
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV' s (�)
PCE's
------------
0 > 1 < 0
N
65 40 5
1 1 1
0
1.10
0 > 1 < 0
N
10 35 19
1 1 1
0
1.10
----------------
0 > 1 < 0
11 72 6
1 1 1
0
1.10 1.10 1.10
Adjustment Factors
0 > 1 < 0
29 108 80
1 1 1
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_584P.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
42
44
Potential Capacity: (pcph)
1318
1315
Movement Capacity: (pcph)
1318
1315
Prob. of Queue -Free State:
--------------------------------------------------------
0.99
0.93
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
45
54
Potential Capacity: (pcph)
1632
1616
Movement Capacity: (pcph)
1632
1616
Prob. of Queue -Free State:
0.99
0.96
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
--------------------------------------------------------
0.99
0.95
Step 3: TH from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
172
164
Potential Capacity: (pcph)
886
895
Capacity Adjustment Factor
due to Impeding Movements
0.95
0.95
Movement Capacity: (pcph)
840
848
Prob. of Queue -Free State:
--------------------------------------------------------
0.91
0.86
Step 4: LT from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
256
201
Potential Capacity: (pcph)
753
810
Major LT, Minor TH
Impedance Factor:
0.81
0.86
Adjusted Impedance Factor:
0.86
0.89
Capacity Adjustment Factor
due to Impeding Movements
0.80
0.89
Movement Capacity: (pcph)
602
718
HCS:
Unsignalized
Intersections
Release
2.1d MO_584P.HC0
Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
NB
L
12
602 >
NB
T
79
840 > 822
5.0
0.4 A
5.0
NB
R
7
1318 >
SB
L
32
718 >
SB
T
119
848 > 949
5.1
1.2 B
5.1
SB
R
88
1315 >
EB
L
72
1616
2.3
0.0 A
1.4
WB
L
11
1632
2.2
0.0 A
0.3
Intersection Delay
=
3.6 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_58PA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Monroe Street (E -W) Avenue 58
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst .................. Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions AM Pk
Two-way Stop -controlled Intersection
^T �_ Eastbound__ WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (%)
PCE's
------------
0 > 1 < 0
N
114 48 6
1 1 1
0
1.10
0 > 1 < 0
N
5 42 15
1 1 1
0
1.10
---------------
Adjustment Factors
0 > 1 < 0
10 113 69
1 1 1
0
1.10 1.10 1.10
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_58PA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
51
50
Potential Capacity: (pcph)
1305
1306
Movement Capacity: (pcph)
1305
1306
Prob. of Queue -Free State:
0.99
0.94
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
54
57
Potential Capacity: (pcph)
1616
1610
Movement Capacity: (pcph)
1616
1610
Prob. of Queue -Free State:
1.00
0.92
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
0.92
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
227
222
Potential Capacity: (pcph)
829
834
Capacity Adjustment Factor
due to Impeding Movements
0.92
0.92
Movement Capacity: (pcph)
760
764
Prob. of Queue -Free State:
0.69
0.84
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
310
334
Potential Capacity: (pcph)
700
678
Major LT, Minor TH
Impedance Factor:
0.77
0.63
Adjusted Impedance Factor:
0.82
0.71
Capacity Adjustment Factor
due to Impeding Movements
0.77
0.70
Movement Capacity: (pcph)
541
478
HCS:
Unsignalized
Intersections
Release
2.1d MO_58PA.HCO
Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
NB
L
10
541 >
NB
T
237
760 > 766
7.1
1.8 B
7.1
NB
R
15
1305 >
SB
L
11
478 >
SB
T
124
764 > 866
5.5
1.1 B
5.5
SB
R
76
1306 >
EB
L
125
1610
2.4
0.2 A
1.6
WB
L
6
1616
2.2
0.0 A
0.2
Intersection Delay
=
4.6 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_58PP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 58
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions PM Pk
Two-way Stop -controlled Intersection
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC, s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
93 47 9
1 1 1
0
1.10
--------------
0 > 1 < 0
N
20 46 19
1 1 1
0
1.10
----------------
Adjustment Factors
0 > 1 < 0
29 250 124
1 1 1
0
1.10 1.10 1.10
---------------
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_58PP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
52
56
Potential Capacity: (pcph)
1303
1297
Movement Capacity: (pcph)
1303
1297
Prob. of Queue -Free State:
0.99
0.90
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
56
65
Potential Capacity: (pcph)
1612
1596
Movement Capacity: (pcph)
1612
1596
Prob. of Queue -Free State:
0.99
0.94
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
--------------------------------------------------------
0.99
0.93
Step 3: TH from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
230
224
Potential Capacity: (pcph)
826
832
Capacity Adjustment Factor
due to Impeding Movements
0.92
0.92
Movement Capacity: (pcph)
760
766
Prob. of Queue -Free State:
--------------------------------------------------------
0.98
0.64
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
407
234
Potential Capacity: (pcph)
615
775
Major LT, Minor TH
Impedance Factor:
0.59
0.90
Adjusted Impedance Factor:
0.68
0.92
Capacity Adjustment Factor
due to Impeding Movements
0.61
0.91
Movement Capacity: (pcph)
374
709
HCS: Unsignalized Intersections Release 2.1d VC_60PP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------
Streets: (N -S) Active Adult Village (E -W) Avenue 60
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/,Prof Conditions PM Pk
Two-way Stop -controlled Intersection
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (V
PCE's
------------
0 1 < 0
N
76 153
1 1
0
0 > 0 < 0
94 40
1 1
0
1.10 1.10
---------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d VC_60PP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
152
Potential Capacity: (pcph)
1160
Movement Capacity: (pcph)
1160
Prob. of Queue -Free State:
--------------------------------------------------------
0.96
Step 2: LT from Major Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
229
Potential Capacity: (pcph)
1333
Movement Capacity: (pcph)
1333
Prob. of Queue -Free State:
0.95
--------------------------------------------------------
Step 4: LT from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
288
Potential Capacity: (pcph)
721
Major LT, Minor TH
Impedance Factor:
0.95
Adjusted Impedance Factor:
0.95
Capacity Adjustment Factor
due to Impeding Movements
0.95
Movement Capacity: (pcph)
--------------------------------------------------------
682
Intersection
Performance Summary
Avg.
95%
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
NB L 103 682 >
778
5.7
0.8 B
5.7
NB R 44 1160 >
WB L 72 1333
2.9
0.0 A
1.4
Intersection Delay = 1.9 sec/veh
Year 2010
Unsignalized Intersection
HCS Worksheets
HCS: Unsignalized Intersections Release 2.1d MO_600A.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 60
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2010 No Proj Conditions AM Pk
Two-way Stop -controlled Intersection
Northbound SouthboundEastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
6 125 24
1 1 1
0
1.10
0 > 1 < 0
N
10 87 26
1 1 1
0
1.10
----------------
0 > 1 < 0
66 23 6
1 1 1
0
1.10 1.10 1.10
----------------
Adjustment Factors
0 > 1 < 0
10 17 15
1 1 1
0
1.10 1.10 1.10
---------------
Vehicle
Critical
Follow-up
Maneuver
-------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS:
Unsignalized
Intersections
Release
2.1d MO_58PP.HCO
Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
NB
L
15
374 >
NB
T
17
760 > 621
6.2
0.1 B
6.2
NB
R
13
1303 >
SB
L
32
709 >
SB
T
275
766 > 870
8.4
3.3 B
8.4
SB
R
136
1297 >
EB
L
102
1596
2.4
0.1 A
1.5
WB
L
22
1612
2.3
0.0 A
0.5
Intersection Delay
=
5.8 sec/veh
I
HCS: Unsignalized Intersections Release 2.1d MO_604A.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 60
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions AM Pk
Two-way Stop -controlled Intersection
--------------------------
Northbound SouthboundEastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's M
PCE's
------------
0 > 1 < 0
N
4 71 11
1 1 1
0
1.10
0 > 1 < 0
N
9 60 10
1 1 1
0
1.10
---------------
Adjustment Factors
0 > 1 < 0
5 11 13
1 1 1
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_604A.HC0 Page 2
Worksheet for TWSC Intersection
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
76
65
Potential Capacity: (pcph)
1267
1283
Movement Capacity: (pcph)
1267
1283
Prob. of Queue -Free State:
0.99
1.00
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
82
70
Potential Capacity: (pcph)
1567
1588
Movement Capacity: (pcph)
1567
1588
Prob. of Queue -Free State:
0.99
1.00
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
1.00
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
160
160
Potential Capacity: (pcph)
899
899
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
891
891
Prob. of Queue -Free State:
--------------------------------------------------------
0.99
0.99
Step 4: LT from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
162
166
Potential Capacity: (pcph)
853
849
Major LT, Minor TH
Impedance Factor:
0.98
0.98
Adjusted Impedance Factor:
0.98
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.98
0.97
Movement Capacity: (pcph)
834
825
HCS:
Unsignalized
Intersections
Release
2.1d MO_604A.HC0
Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
EB
L
25
825 >
EB
T
12
891 > 888
4.3
0.0 A
4.3
EB
R
6
1283 >
WB
L
6
834 >
WB
T
12
891 > 1009
3.7
0.0 A
3.7
WB
R
14
1267 >
NB
L
4
1588
2.3
0.0 A
0.1
SB
L
10
1567
2.3
0.0 A
0.3
Intersection Delay
=
1.3 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO-604P.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 60
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions PM Pk
Two-way Stop -controlled Intersection
_�--___----NorthboundSouthbound Eastbound westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
5 49 7
1 1 1
0
1.10
0 > 1 < 0
N
6 113 23
1 1 1
0
1.10
----------------
Adjustment Factors
0 > 1 < 0
13 10 7
1 1 1
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MOw604P.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
52
124
Potential Capacity: (pcph)
1303
1198
Movement Capacity: (pcph)
1303
1198
Prob. of Queue -Free State:
--------------------------------------------------------
0.99
1.00
Step 2: LT from Major Street
--------------------------------------------------------
SB
NB
Conflicting Flows: (vph)
56
136
Potential Capacity: (pcph)
1612
1477
Movement Capacity: (pcph)
1612
1477
Prob. of Queue -Free State:
1.00
1.00
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 3: TH from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
200
192
Potential Capacity: (pcph)
857
865
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
849
857
Prob. of Queue -Free State:
--------------------------------------------------------
0.99
0.99
Step 4: LT from Minor Street
---------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
196
196
Potential Capacity: (pcph)
815
815
Major LT, Minor TH
Impedance Factor:
0.98
0.98
Adjusted Impedance Factor:
0.98
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.98
0.98
Movement Capacity: (pcph)
798
797
HCS:
Unsignaiized
Intersections
Release
2.1d
MO_604P.HC0
Page 3
Intersection
Performance Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length
LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
EB
L
15
797 >
EB
T
12
857 > 857
4.4
0.0
A
4.4
EB
R
4
1198 >
WB
L
14
798 >
WB
T
11
849 > 901
4.1
0.0
A
4.1
WB
R
8
1303 >
NB
L
6
1.477
2.4
0.0
A
0.2
SB
L
7
1612
2.2
0.0
A
0.1
Intersection Delay
=
1.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d M0,60PA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 60
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions AM Pk
Two-way Stop -controlled Intersection
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's (�)
SU/RV's (�)
CV' s (�)
PCE's
------------
0 > 1 < 0
N
43 156 17
1 1 1
0
1.10
---------------
0 > 1 < 0
N
9 89 41
1 1 1
0
1.10
----------------
Adjustment Factors
0 > 1 < 0
7 15 13
1 1 1
0
1.10 1.10 1.10
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_60PA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
164
110
Potential Capacity: (pcph)
1143
1218
Movement Capacity: (pcph)
1143
1218
Prob. of Queue -Free State:
0.99
0.98
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
173
130
Potential Capacity: (pcph)
1418
1486
Movement Capacity: (pcph)
1418
1486
Prob. of Queue -Free State:
0.99
0.97
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
0.96
--------------------------------------------------------
Step 3: TH from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
346
334
Potential Capacity: (pcph)
718
729
Capacity Adjustment Factor
due to Impeding Movements
0.96
0.96
Movement Capacity: (pcph)
687
698
Prob. of Queue -Free State:
--------------------------------------------------------
0.98
0.97
Step 4: LT from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
344
340
Potential Capacity: (pcph)
669
673
Major LT, Minor TH
Impedance Factor:
0.93
0.93
Adjusted Impedance Factor:
0.95
0.95
Capacity Adjustment Factor
due to Impeding Movements
0.93
0.94
Movement Capacity: (pcph)
623
631
HCS:
Unsignalized
Intersections
Release
2.1d MO_60PA.HCO
Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
EB
L
91
631
>
EB
T
20
698
> 692
6.4
0.8 B
6.4
EB
R
20
1218
>
WB
L
8
623
>
WB
T
17
687
> 783
4.8
0.0 A
4.8
WB
R
14
1143
>
NB L 47 1486
SB L 10 1418
2.5
2.6
Intersection Delay =
0.0 A 0.5
0.0 A 0.2
2.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_60PP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
------------------------------------
Streets: (N -S) Monroe Street (E -W) Avenue 60
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions PM Pk
Two-way Stop -controlled Intersection
--------------------------
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 < 0
N
28 99 11
1 1 1
0
1.10
0 > 1 < 0
N
6 202 90
1 1 1
0
;1.10
----------------
Adjustment Factors
0 > 1 < 0
20 18 7
1 1 1
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
--------------------------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_60PP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
104
247
Potential Capacity: (pcph)
1226
1038
Movement Capacity: (pcph)
1226
1038
Prob. of Queue -Free State:
0.99
0.95
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
110
292
Potential Capacity: (pcph)
1519
1244
Movement Capacity: (pcph)
1519
1244
Prob. of Queue -Free State:
1.00
0.98
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
0.97
---------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
430
391
Potential Capacity: (pcph)
649
680
Capacity Adjustment Factor
due to Impeding Movements
0.97
0.97
Movement Capacity: (pcph)
628
658
Prob. of Queue -Free State:
0.97
0.97
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
416
398
Potential Capacity: (pcph)
608
623
Major LT, Minor TH
Impedance Factor:
0.94
0.94
Adjusted Impedance Factor:
0.96
0.95
Capacity Adjustment Factor
due to Impeding Movements
0.91
0.95
Movement Capacity: (pcph)
553
589
HCS:
Unsignalized
Intersections
Release
2.1d MO_60PP.HCO Page 3
-------------
Intersection
Performance
Summary
Avg.
955%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
EB
L
61
589 >
EB
T
17
658 > 721
6.1
0.7 B
6.1
EB
R
50
1038 >
WB
L
22
553 >
WB
T
20
628 > 640
6.1
0.2 B
6.1
WB
R
8
1226 >
NB
L
31
1244
3.0
0.0 A
0.6
SB
L
7
1519
2.4
0.0 A
0.0
Intersection Delay
=
1.8 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_SPPA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
---------------------------------------
Streets: (N -S) Monroe Street (E -W) S. Primary Housing V
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions AM Pk
Two-way Stop -controlled Intersection
--------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T RL T R
- -
No. Lanes 0 < 0
Stop/Yield
Volumes
PHF
Grade
MC's (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0
1 <
0
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
N
2.10
85
5.50
0
Through Traffic Minor Road
1
3.30
1
6.50
0
Adjustment Factors
0 >
0 131
1 1
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_SPPA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
85
Potential Capacity: (pcph)
1254
Movement Capacity: (pcph)
1254
Prob. of Queue -Free State:
--------------------------------------------------------
0.89
Step 2: LT from Major Street
--------------------------------------------------------
SB
NB
Conflicting Flows: (vph)
85
Potential Capacity: (pcph)
1562
Movement Capacity: (pcph)
1562
Prob. of Queue -Free State:
0.97
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
199
Potential Capacity: (pcph)
812
Major LT, Minor TH
Impedance Factor:
0.97
Adjusted Impedance Factor:
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.97
Movement Capacity: (pcph)
--------------------------------------------------------
787
Intersection
Performance Summary
Avg.
95%
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
WB L 0 787 >
1254
3.2
0.4 A
3.2
WB R 144 1254 >
SB L 48 1562
2.4
0.0 A
0.9
Intersection Delay = 1.6 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_SPPP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) S. Primary Housing V
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions PM Pk
Two-way Stop -controlled Intersection
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC, s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0
1 <
0
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
N
2.10
61
5.50
0
Through Traffic Minor Road
1
3.30
1
---------------
0
0 > 0 < 0
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO—SPPP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
61
Potential Capacity:
(pcph)
1290
Movement Capacity:
(pcph)
1290
Prob. of Queue -Free
State:
0.93
--------------------------------------------------------
Step 2: LT from Major Street
--------------------------------------------------------
SB NB
Conflicting Flows:
(vph)
61
Potential Capacity:
(pcph)
1603
Movement Capacity:
(pcph)
1603
Prob. of Queue -Free
State:
0.91
--------------------------------------------------------
Step 4: LT from Minor
Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
328
Potential Capacity:
(pcph)
684
Major LT, Minor TH
Impedance Factor:
3.0
0.91
Adjusted Impedance
Factor:
0.91
Capacity Adjustment
Factor
due to Impeding Movements
0.91
Movement Capacity:
--------------------------------------------------------
(pcph)
620
Intersection Performance Summary
Intersection Delay = 1.4 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
WB L
0
620
>
1290
3.0
0.1
A 3.0
WB R
85
1290
>
SB L
151
1603
2.5
0.3
A 1.3
Intersection Delay = 1.4 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_624A.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 62
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions AM Pk
Two-way Stop -controlled Intersection
Eastbound Westbound NorthboundSouthbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's (�)
SU/RV's (�)
CV' s (�)
PCE's
------------
0 > 1 0
N
62 26
1 1
0
1.10
---------------
0
1 <
0
Maneuver
Gap (tg)
N
------------------------------------------------------------------
Left Turn Major Road
13
24
Right Turn Minor Road
1
1
----------------
0
3.30
0 > 0 < 0
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_624A.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
25
Potential Capacity:
(pcph)
1345
Movement Capacity:
(pcph)
1345
Prob. of Queue -Free
State:
0.98
--------------------------------------------------------
Step 2: LT from Major
Street WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
37
Potential Capacity:
(pcph)
1646
Movement Capacity:
(pcph)
1646
Prob. of Queue -Free
State:
0.96
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
0.96
--------------------------------------------------------
Step 4: LT from Minor
--------------------------------------------------------
Street NB
SB
Conflicting Flows:
(vph)
113
Potential Capacity:
(pcph)
911
Major LT, Minor TH
EB L
68
Impedance Factor:
0.96
Adjusted Impedance
Factor:
0.96
Capacity Adjustment
Factor
2.1 sec/veh
due to Impeding Movements
0.96
Movement Capacity:
--------------------------------------------------------
(pcph)
873
Intersection Performance Summary
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
SB L
45
873
>
1019
3.8
0.2 A
3.8
SB R
31
1345
>
EB L
68
1646
2.3
0.0 A
1.6
Intersection Delay =
2.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_62PA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Monroe Street (E -W) Avenue 62
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions AM Pk
Two-way Stop -controlled Intersection
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 0
N
62 26
1 1
0
1.10
0
1 <
0
Maneuver
Gap (tg)
N
------------------------------------------------------------------
Left Turn Major Road
13
24
Right Turn Minor Road
1
1
----------------
0
3.30
Adjustment Factors
0 > 0 < 0
41 28
1 1
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_62PA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
25
Potential Capacity:
(pcph)
1345
Movement Capacity:
(pcph)
1345
Prob. of Queue -Free
State:
0.98
--------------------------------------------------------
Step 2: LT from Major Street WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
37
Potential Capacity:
(pcph)
1646
Movement Capacity:
(pcph)
1646
Prob. of Queue -Free
State:
0.96
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
>
Major LT Shared Lane
Prob.
of Queue -Free State:
0.96
--------------------------------------------------------
Step 4: LT from Minor
Street NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
113
Potential Capacity:
(pcph)
911
Major LT, Minor TH
EB L
Impedance Factor:
1646
0.96
Adjusted Impedance
Factor:
0.96
Capacity Adjustment
Factor
due to Impeding Movements
0.96
Movement Capacity:
(pcph)
873
Intersection Performance Summary
Intersection Delay = 2.1 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
SB L
45
873
>
1019
3.8
0.2
A 3.8
SB R
31
1345
>
EB L
68
1646
2.3
0.0
A 1.6
Intersection Delay = 2.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d M0-62PP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) -Monroe Street (E -W) Avenue 62
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 No Proj Conditions PM Pk
Two-way Stop -controlled Intersection
Eastbound - WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 0
N
40 17
1 1
0
1.10
0
1 <
0
Maneuver
Gap (tg)
N
------------------------------------------------------------------
Left Turn Major Road
27
21
Right Turn Minor Road
1
1
---------------
0
3.30
Adjustment Factors
0 > 0 < 0
67 63
1 1
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_62PP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
38
Potential Capacity: (pcph)
1325
Movement Capacity: (pcph)
1325
Prob. of Queue -Free State:
--------------------------------------------------------
0.95
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
48
Potential Capacity: (pcph)
1626
Movement Capacity: (pcph)
1626
Prob. of Queue -Free State:
0.97
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
--------------------------------------------------------
0.97
Step 4: LT from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
94
Potential Capacity: (pcph)
934
Major LT, Minor TH
Impedance Factor:
0.97
Adjusted Impedance Factor:
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.97
Movement Capacity: (pcph)
908
Intersection Performance Summary
Avg. 953%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
SB L 74 908 >
1071
3.9 0.5 A
3.9
SB R 69 1325 >
EB L 44 1626
2.3 0.0 A
1.6
Intersection Delay = 2.5 sec/veh
HCS: Unsignalized Intersections Release 2.1d VC_60PA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Active Adult Village (E -W) Avenue 60
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions AM Pk
Two-way Stop -controlled Intersection
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0
1 <
0
Maneuver
------------------------------------------------------------------
Gap (tg)
N
Left Turn Major Road
61
72
Right Turn Minor Road
1
1
Through Traffic Minor Road
0
3.30
0 > 0 < 0
137 59
1 1
0
1.10 1.10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d VC_60PA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
97
Potential Capacity:
(pcph)
1236
Movement Capacity:
(pcph)
1236
Prob. of Queue -Free
State:
0.95
--------------------------------------------------------
Step 2: LT from Major Street
---------------------------------------------------------
WB EB
Conflicting Flows:
(vph)
133
Potential Capacity:
(pcph)
1482
Movement Capacity:
(pcph)
1482
Prob. of Queue -Free
--------------------------------------------------------
State:
0.98
Step 4: LT from Minor Street
NB SB
--------------------------------------------------------
Conflicting Flows:
(vph)
197
Potential Capacity:
(pcph)
814
Major LT, Minor TH
Impedance Factor:
891
0.98
Adjusted Impedance
Factor:
0.98
Capacity Adjustment
Factor
>
due to Impeding Movements
0.98
Movement Capacity:
--------------------------------------------------------
(pcph)
795
Intersection Performance Summary
Intersection Delay = 2.6 sec/veh
Avg.
953%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
NB L
151
795
>
891
5.3
1.1
B 5.3
NB R
65
1236
>
WB L
34
1482
2.5
0.0
A 0.8
Intersection Delay = 2.6 sec/veh
HCS: Unsignalized Intersections Release 2.1d MOe62PP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Monroe Street (E -W) Avenue 62
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2004 W/ Proj Conditions PM Pk
Two-way Stop -controlled Intersection
Eastbound Westbound NorthboundSouthbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV' s (�)
PCE's
------------
0 > 1 0
N
40 17
1 1
0
1.10
--------------
0
1 <
0
Maneuver
Gap (tg)
N
------------------------------------------------------------------
Left Turn Major Road
27
21
Right Turn Minor Road
1
1
----------------
0
3.30
0 > 0 < 0
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_62PP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
38
Potential Capacity:
(pcph)
1325
Movement Capacity:
(pcph)
1325
Prob. of Queue -Free
State:
0.95
--------------------------------------------------------
Step 2: LT from Major
Street WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
48
Potential Capacity:
(pcph)
1626
Movement Capacity:
(pcph)
1626
Prob. of Queue -Free
State:
0.97
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
0.97
--------------------------------------------------------
Step 4: LT from Minor
Street NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
94
Potential Capacity:
(pcph)
934
Major LT, Minor TH
EB L
44
Impedance Factor:
0.97
Adjusted Impedance
Factor:
0.97
Capacity Adjustment
Factor
due to Impeding Movements
0.97
Movement Capacity:
--------------------------------------------------------
(pcph)
908
Intersection Performance Summary
Intersection Delay = 2.5 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
SB L
74
908
>
1071
3.9
0.5
A 3.9
SB R
69
1325
>
EB L
44
1626
2.3
0.0
A 1.6
Intersection Delay = 2.5 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_600A.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
137
100
Potential Capacity: (pcph)
1180
1232
Movement Capacity: (pcph)
1180
1232
Prob. of Queue -Free State:
0.99
0.99
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
149
113
Potential Capacity: (pcph)
1456
1514
Movement Capacity: (pcph)
1456
1514
Prob. of Queue -Free State:
0.99
1.00
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
0.99
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
266
265
Potential Capacity: (pcph)
791
792
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
781
782
Prob. of Queue -Free State:
0.98
0.97
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
268
269
Potential Capacity: (pcph)
741
740
Major LT, Minor TH
Impedance Factor:
0.96
0.96
Adjusted Impedance Factor:
0.97
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.96
0.96
Movement Capacity: (pcph)
712
709
HCS:
Unsignalized
Intersections
Release
2.1d MO_600A.HC0 Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
EB
L
73
709 >
EB
T
25
782 > 747
5.6
0.5 B
5.6
EB
R
7
1232 >
WB
L
11
712 >
WB
T
19
781 > 867
4.4
0.0 A
4.4
WB
R
17
1180 >
NB
L
7
1514
2.4
0.0 A
0.1
SB
L
11
1456
2.5
0.0 A
0.2
Intersection Delay =
1.8 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_600P.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) Avenue 60
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ..... .... Year 2010 No Proj Conditions PM Pk
Two-way Stop -controlled Intersection
---------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes 1 0 > 1 < 0 0 > 1 < 0 1 0 > 1 < 0 1 0 > 1 < 0
Stop/Yield
Volumes
PHF
Grade
MC, s (�)
SU/RV's (�)
CV's W
PCE's
------------
N N
6 83 15 7 174 68
1 1 1 1 1 1
0 0
1.10 1.10
------------------------------
Adjustment Factors
27 22 8
1 1 1
0
1.10 1.10 1.10
---------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
-----------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_600P.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
90
208
Potential Capacity: (pcph)
1247
1086
Movement Capacity: (pcph)
1247
1086
Prob. of Queue -Free State:
0.99
0.99
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
98
242
Potential Capacity: (pcph)
1540
1315
Movement Capacity: (pcph)
1540
1315
Prob. of Queue -Free State:
0.99
0.99
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
0.99
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
346
319
Potential Capacity: (pcph)
718
742
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
710
733
Prob. of Queue -Free State:
0.97
0.97
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
324
326
Potential Capacity: (pcph)
687
686
Major LT, Minor TH
Impedance Factor:
0.96
0.95
Adjusted Impedance Factor:
0.97
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.96
0.96
Movement Capacity: (pcph)
662
658
HCS:
Unsignalized
Intersections
Release
2.1d MO_600P.HC0
Page 3
Intersection
Performance
Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
EB
L
44
658 >
EB
T
20
733 > 706
5.7
0.3 B
5.7
EB
R
7
1086 >
WB
L
30
662 >
WB
T
24
710 > 730
5.4
0.2 B
5.4
WB
R
9
1247 >
NB
L
7
1315
2.8
0.0 A
0.2
SB
L
8
1540
2.3
0.0 A
0.1
Intersection Delay
=
1.5 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_SPTA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Monroe Street (E -W) S. Primary Housing V
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2010 W/ Proj Conditions AM Pk
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound Westbound
L T R L T R L T RL T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
0 1 < 0
N
250 0
1 1
0
1 1 0
N
72 132
1 1
0
1.10
----------------
Adjustment Factors
0 > 0 < 0
0 215
1 1
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_SPTA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
250
Potential Capacity:
(pcph)
1034
Movement Capacity:
(pcph)
1034
Prob. of Queue -Free
State:
0.77
--------------------------------------------------------
Step 2: LT from Major Street
SB NB
--------------------------------------------------------
Conflicting Flows:
(vph)
250
Potential Capacity:
(pcph)
1303
Movement Capacity:
(pcph)
1303
Prob. of Queue -Free
State:
0.94
--------------------------------------------------------
Step 4: LT from Minor
Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
454
Potential Capacity:
(pcph)
578
Major LT, Minor TH
Impedance Factor:
4.5
0.94
Adjusted Impedance
Factor:
0.94
Capacity Adjustment
Factor
due to Impeding Movements
0.94
Movement Capacity:
--------------------------------------------------------
(pcph)
543
Intersection Performance Summary
Intersection Delay = 1.8 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
WB L
0
543
>
1034
4.5
1.0
A 4.5
WB R
237
1034
>
SB L
79
1303
2.9
0.1
A 1.0
Intersection Delay = 1.8 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO—SPTP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N -S) Monroe Street (E -W) S. Primary Housing V
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2010 W/ Proj Conditions PM Pk
Two-way Stop -controlled Intersection
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's (�)
SU/RV's (�)
CV's (�)
PCE's
------------
1 1 0
N
226 291
1 1
0
1.10
---------------
0 > 0 < 0
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_SPTP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
151
Potential Capacity:
(pcph)
1161
Movement Capacity:
(pcph)
1161
Prob. of Queue -Free
State:
0.88
--------------------------------------------------------
Step 2: LT from Major Street
--------------------------------------------------------
SB NB
Conflicting Flows:
(vph)
151
Potential Capacity:
(pcph)
1453
Movement Capacity:
(pcph)
1453
Prob. of Queue -Free
--------------------------------------------------------
State:
0.83
Step 4: LT from Minor Street
--------------------------------------------------------
WB EB
Conflicting Flows:
(vph)
668
Potential Capacity:
(pcph)
435
Major LT, Minor TH
A 3.5
Impedance Factor:
0.83
Adjusted Impedance
Factor:
0.83
Capacity Adjustment
Factor
due to Impeding Movements
0.83
Movement Capacity:
--------------------------------------------------------
(pcph)
360
Intersection Performance Summary
WB R 140
SB L 249
1453
Intersection Delay
3.0 0.7 A 1.3
1.4 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement (pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
WB L 0
360
>
1161
3.5
0.4
A 3.5
WB R 140
SB L 249
1453
Intersection Delay
3.0 0.7 A 1.3
1.4 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO-AATA.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------
Streets: (N -S) Monroe Street (E -W) Active Adult Village
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2010 W/ Proj Conditions AM Pk
Two-way Stop -controlled Intersection
---------------------------
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s M
SU/RV's (�)
CV's (�)
PCE's
0 > 1 0
N
0 155
1 1
0
1.10
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_AATA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
118
Potential Capacity:
(pcph)
1207
Movement Capacity:
(pcph)
1207
Prob. of Queue -Free
--------------------------------------------------------
State:
1.00
Step 2: LT from Major
Street SB
NB
--------------------------------------------------------
Conflicting Flows:
(vph)
133
Potential Capacity:
(pcph)
1482
Movement Capacity:
(pcph)
1482
Prob. of Queue -Free
State:
1.00
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
1.00
--------------------------------------------------------
Step 4: LT from Minor
Street WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
274
Potential Capacity:
(pcph)
735
Major LT, Minor TH
NB L
0
Impedance Factor:
1.00
Adjusted Impedance
Factor:
1.00
Capacity Adjustment
Factor
due to Impeding Movements
1.00
Movement Capacity:
--------------------------------------------------------
(pcph)
735
Intersection Performance Summary
Intersection Delay = 1.4 sec/veh
Avg.
955%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
EB L
105
735
>
735
5.7
0.5
B 5.7
EB R
0
1207
>
NB L
0
1482
2.4
0.0
A 0.0
Intersection Delay = 1.4 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_AATP.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Monroe Street (E -W) Active Adult Village
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2010 W/ Proj Conditions PM Pk
Two-way Stop -controlled Intersection
NorthboundSouthbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV's (�)
PCE's
0 > 1 0
N
0 105
1 1
0
1.10
0 1 < 0
N
207 84
1 1
0
----------------
0 > 0 < 0
47 0
1 1
0
1.10 1.10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO AATP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
249
Potential Capacity: (pcph)
1036
Movement Capacity: (pcph)
1036
Prob. of Queue -Free State:
1.00
--------------------------------------------------------
Step 2: LT from Major Street SB
NB
Conflicting Flows: (vph)
291
Potential Capacity: (pcph)
1246
Movement Capacity: (pcph)
1246
Prob. of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Movement
Major LT Shared Lane Prob.
(pcph)
of Queue -Free State:
1.00
--------------------------------------------------------
Step 4: LT from Minor Street WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
354
Potential Capacity: (pcph)
660
Major LT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
5.9
due to Impeding Movements
1.00
Movement Capacity: (pcph)
--------------------------------------------------------
660
Intersection Performance Summary
Intersection Delay = 0.6 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
EB L
52
660
>
660
5.9
0.2
B 5.9
EB R
0
1036
>
NB L
0
1246
2.9
0.0
A 0.0
Intersection Delay = 0.6 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_620A.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
------------------------------
Streets: (N -S) Monroe Street (E -W) Avenue 62
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2010 No Proj Conditions AM Pk
Two-way Stop -controlled Intersection
------------------------------
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC,s (�)
SU/RV's (�)
CV' s (�)
PCE's
0 > 1 0
N
128 55
1 1
0
1.10
0
1 <
0
0
47
N
Left Turn Major Road
26
27
Right Turn Minor Road
1
1
---------------
0
0
Adjustment Factors
0 >
0
<
0
47
Time (tf)
Left Turn Major Road
57
1
Right Turn Minor Road
5.50
1
Through Traffic Minor Road
6.00
0
Left Turn Minor Road
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_620A.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
40
Potential Capacity:
(pcph)
1321
Movement Capacity:
(pcph)
1321
Prob. of Queue -Free
State:
0.95
--------------------------------------------------------
Step 2: LT from Major
Street WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
53
Potential Capacity:
(pcph)
1617
Movement Capacity:
(pcph)
1617
Prob. of Queue -Free
State:
0.91
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
0.91
--------------------------------------------------------
Step 4: LT from Minor
Street NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
222
Potential Capacity:
(pcph)
788
Major LT, Minor TH
EB L
141
Impedance Factor:
0.91
Adjusted Impedance
Factor:
0.91
Capacity Adjustment
Factor
due to Impeding Movements
0.91
Movement Capacity:
--------------------------------------------------------
(pcph)
717
Intersection Performance Summary
Intersection Delay = 2.2 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
SB L
52
717
>
957
4.3
0.4 A
4.3
SB R
63
1321
>
EB L
141
1617
2.4
0.2 A
1.7
Intersection Delay = 2.2 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_620P.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
------------------------------
Streets: (N -S) Monroe Street (E -W) Avenue 62
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2010 No Proj Conditions PM Pk
Two-way Stop -controlled Intersection
^� ----- Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's W
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 0
N
81 35
1 1
0
1.10
0
1 <
0
Follow-up
Maneuver
N
Gap (tg)
57
23
Road
1
1
---------------
0
5.50
Adjustment Factors
0 > 0 < 0
75 132
1 1
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_620P.HC0 Page 2
------------
worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
68
Potential Capacity: (pcph)
1279
Movement Capacity: (pcph)
1279
Prob. of Queue -Free State:
0.89
--------------------------------------------------------
Step 2: LT from Major Street WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
80
Potential Capacity: (pcph)
1570
Movement Capacity: (pcph)
1570
Prob. of Queue -Free State:
0.94
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Movement
Major LT Shared Lane Prob.
(pcph)
of Queue -Free State:
0.94
--------------------------------------------------------
Step 4: LT from Minor Street NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
184
Potential Capacity: (pcph)
828
Major LT, Minor TH
Impedance Factor:
0.94
Adjusted Impedance Factor:
0.94
Capacity Adjustment Factor
4.4
due to Impeding Movements
0.94
Movement Capacity: (pcph)
--------------------------------------------------------
780
Intersection Performance Summary
Intersection Delay = 2.8 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
SB L
83
780
>
1037
4.4
1.0 A
4.4
SB R
145
1279
>
EB L
89
1570
2.4
0.0 A
1.7
Intersection Delay = 2.8 sec/veh
HCS: Unsignalized Intersections Release 2.1d MOa62TA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N -S) Monroe Street (E -W) Avenue 62
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information ......... Year 2010 W/ Proj Conditions AM Pk
Two-way Stop -controlled Intersection
-------------------------
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC, s (�)
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 0
N
128 55
1 1
0
1.10
0
1 <
0
Maneuver
Gap (tg)
N
------------------------------------------------------------------
Left Turn Major Road
26
27
Right Turn Minor Road
1
1
Through Traffic Minor Road
0
3.30
Adjustment Factors
0 > 0 < 0
47 57
1 1
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_62TA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
40
Potential Capacity:
(pcph)
1321
Movement Capacity:
(pcph)
1321
Prob. of Queue -Free
State:
0.95
--------------------------------------------------------
Step 2: LT from Major
Street WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
53
Potential Capacity:
(pcph)
1617
Movement Capacity:
(pcph)
1617
Prob. of Queue -Free
State:
0.91
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
0.91
--------------------------------------------------------
Step 4: LT from Minor
Street NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
222
Potential Capacity:
(pcph)
788
Major LT, Minor TH
EB L
141
Impedance Factor:
0.91
Adjusted Impedance
Factor:
0.91
Capacity Adjustment
Factor
due to Impeding Movements
0.91
Movement Capacity:
--------------------------------------------------------
(pcph)
717
Intersection Performance Summary
Intersection Delay = 2.2 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
SB L
52
717
>
957
4.3
0.4
A 4.3
SB R
63
1321
>
EB L
141
1617
2.4
0.2
A 1.7
Intersection Delay = 2.2 sec/veh
HCS: Unsignalized Intersections Release 2.1d MO_62TP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
----------------------------------
Streets: (N -S) Monroe Street (E -W) Avenue 62
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... Greg
Date of Analysis.......... 2/3/99
Other Information.. ....... Year 2010 W/ Proj Conditions PM Pk
Two-way Stop -controlled Intersection
-------------------
Eastbound WestboundNorthbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's (�)
CV's (�)
PCE's
------------
0 > 1 0
N
81 35
1 1
0
1.10
0
1 <
0
Maneuver
Gap (tg)
N
------------------------------------------------------------------
Left Turn Major Road
57
23
Right Turn Minor Road
1
1
----------------
0
3.30
Adjustment Factors
0 > 0 < 0
75 132
1 1
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d MO_62TP.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
68
Potential Capacity:
(pcph)
1279
Movement Capacity:
(pcph)
1279
Prob. of Queue -Free
State:
0.89
--------------------------------------------------------
Step 2: LT from Major
Street WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
80
Potential Capacity:
(pcph)
1570
Movement Capacity:
(pcph)
1570
Prob. of Queue -Free
State:
0.94
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
0.94
--------------------------------------------------------
Step 4: LT from Minor Street NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
184
Potential Capacity:
(pcph)
828
Major LT, Minor TH
EB L
Impedance Factor:
1570
0.94
Adjusted Impedance
Factor:
0.94
Capacity Adjustment
Factor
due to Impeding Movements
0.94
Movement Capacity:
--------------------------------------------------------
(pcph)
780
Intersection Performance Summary
Intersection Delay = 2.8 sec/veh
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
SB L
83
780
>
1037
4.4
1.0 A
4.4
SB R
145
1279
>
EB L
89
1570
2.4
0.0 A
1.7
Intersection Delay = 2.8 sec/veh