Loading...
11 Appendix 4 - HCM Signalized Intersection Methodology and Wordsheetsrn C) T I I cz L 1 I I i Aft � r Oft -� f w ► •°D w -o Ikk Appendices 1. 1998 Peak Hour Traffic Count Data 2. HCM Unsignalized Intersection Methodology and Worksheets 3. Traffic Signal Warrants 4. HCM Signalized Intersection Methodology and Worksheets 5. Consistency With General Plan Circulation Policies Appendix 4 HCM SIGNALIZED INTERSECTION METHODOLOGY AND WORKSHEETS HCM Methodology HCS Worksheets Appendix 4 Highway Capacity Manual Signalized Intersection Methodology The "Highway Capacity Manual" (HCM) signalized intersection capacity and level of service methodology addresses the capacity and level of service of intersection approaches as well as the level of service of the intersection as a whole. The analysis is undertaken in terms of the ratio of demand flow rate to capacity (V/C ratio) for individual movements during a peak 15 -minute interval and the composite V/C ratio for the sum of critical movements or lane groups within the intersection. The level of service is determined based upon average stopped delay per vehicle, as shown in Table A-2 below. Table A-2 1994 HCM Signalized Intersection LOS Criteria Level of Traffic Flow Average. Stopped Delay Service Characteristics (SecondsNehicle) A Extremely favorable progression with very low delay.<_ 5.0 Most vehicles do not stop at all. B Good progression and stable flow with an occasional 5.0- 15.0 approach phase fully utilized. C Satisfactory operation with fair progression and longer 15.0-25.0 cycle lengths. Individual cycle failures may begin to appear. A significant number of vehicles stop but many pass through without stopping. D Tolerable delay where congestion becomes noticeable and 25.0-40.0 many vehicles stop. Individual cycle failures are noticeable. E Unstable flow with poor progression and frequent cycle 40.0-60.0 failures. This is considered the limit of acceptable delay by many agencies. F Oversaturation with arrival flow rates exceeding the capacity > 60.0 of the intersection and many individual cycle failures. Considered unacceptable to most drivers. Source: "Highway Capacity Manual, Special Report 209", Transportation Research Board, 1994; pp. 9-6. Year 2004 Signalized Intersection HCS Worksheets HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Jefferson Street Analyst: Greg File Name: JE_504A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- No. Lanes ---- ---- 1 1 < ----,---- ---- 1 1 ---- 1 ----- ---- 1 1 1 1 1 < Volumes 166 211 130 13 200 133 167 707 34 89 520 237 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00,3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right * EB Right SB Right WB Right Green 23.OA Green 9.OA 46.OA Yellow/AR 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 204 764 0.815 0.267 34.7 D 28.4 D TR 442 1659 0.771 0.267 25.3 D WB L 80 297 0.162 0.267 16.4 C 11.0 B T 469 1759 0.426 0.267 18.0 C R 1495 1495 0.089 1.000 0.0 A NB L 186 1671 0.899 0.111 52.9 E 20.6 C T 919 1759 0.770 0.522 13.9 B R 1229 1495 0.028 0.822 0.9 A SB L 186 1671 0.479 0.111 25.8 D 19.2 C TR 876 1677 0.864 0.522 18.5 C Intersection Delay = 20.4 sec/veh Intersection LOS = C Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.854 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Jefferson Street Analyst: Greg File Name: JE_504P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 No Proj Conditions ------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1 < 1 1 1 1 1 1 1 1 < Volumes 80 191 168 22 192 117 128 611 29 153 737 138 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right * EB Right SB Right WB Right Green 21.OA Green 9.OA 48.OA Yellow/AR 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 187 763 0.429 0.244 19.5 C 33.8 D TR 400 1636 0.898 0.244 37.0 D WB L 80 320 0.275 0.244 18.3 C 12.3 B T 430 1759 0.447 0.244 19.1 C R 1495 1495 0.078 1.000 0.0 A NB L 186 1671 0.689 0.111 31.8 D 13.5 B T 958 1759 0.638 0.544 10.3 B R 1229 1495 0.024 0.822 0.9 A SB L 186 1671 0.824 0.111 42.1 E 26.7 D TR 935 1718 0.935 0.544 24.0 C Intersection Delay = 22.1 sec/veh Intersection LOS = C Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.911 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Jefferson Street Analyst: Greg File Name: JE_50PA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- No. Lanes 1 1 < 1 1 1 1 2 < 1 2 < Volumes 166 211 149 13 201 135 205 827 34 89 581 237 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 5.OA 7.OA 18.OA Green 13.OA 31.OA Yellow/AR 4.0 0.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #3 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 241 1671 0.688 0.144 29.0 D 25.2 D TR 477 1650 0.755 0.289 23.5 C WB L 111 1671 0.117 0.067 25.5 D 14.0 B T 371 1759 0.541 0.211 21.7 C R 1179 1495 0.114 0.789 1.4 A NB L 260 1671 0.789 0.156 33.7 D 20.7 C TR 1244 3498 0.727 0.356 17.8 C SB L 260 1671 0.342 0.156 22.2 C 18.1 C TR 1197 3366 0.718 0.356 17.7 C Intersection Delay = 19.9 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.700 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation __------- Streets: (E -W) Avenue -------- 50 (N -S) Jefferson Street Analyst: Greg File Name: JE_50PP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 W/ Proj Conditions --------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes - 1 1< 1 1 1 1 2< 1 2< Volumes 80 192 211 22 193 118 155 693 29 155 873 138 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 5.OA 26.OA Green 9.OA 34.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 46 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 111 1671 0.718 0.067 39.6 D 29.0 D TR 486 1621 0.829 0.300 26.9 D WB L 111 1671 0.197 0.067 25.8 D 11.3 B T 528 1759 0.366 0.300 16.2 C R 1296 1495 0.091 0.867 0.6 A NB L 186 1671 0.835 0.111 43.4 E 19.2 C TR 1360 3497 0.557 0.389 14.3 B SB L 186 1671 0.835 0.111 43.4 E 21.3 C TR 1340 3446 0.792 0.389 18.0 C Intersection Delay = 20.8 sec/veh Intersection LOS - C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.805 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 52 (N -S) Jefferson Street Analyst: Greg File Name: JE_524A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 No Proj Conditions ------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes -1 1^ 1 1 2 1 1 2< 1 2 1 Volumes 118 243 207 51 110 83 205 611 68 46 515 72 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 7.OA 16.OA Green 17.OA 34.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 149 1671 0.794 0.089 42.6 E 21.0 C T 332 1759 0.731 0.189 27.7 D R 1262 1495 0.164 0.844 0.8 A WB L 149 1671 0.343 0.089 25.5 D 14.6 B T 665 3519 0.173 0.189 19.8 C R 1262 1495 0.066 0.844 0.7 A NB L 334 1671 0.613 0.200 23.6 C 16.1 C TR 1348 3466 0.529 0.389 14.0 B SB L 334 1671 0.138 0.200 19.1 C 13.2 B T 1368 3519 0.395 0.389 12.9 B R 581 1495 0.124 0.389 11.4 B Intersection Delay = 16.3 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.620 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 52 (N -S) Jefferson Street Analyst: Greg File Name: JE_524P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- No. Lanes 1 1 1 1 2 1 1 2 < 1 2 1 Volumes 84 160 262 78 161 42 205 569 61 70 630 126 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ------------------- 3.00 3.00 3.00 --------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds * Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 6.OA 14.OA Green 17.OA 37.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 130 1671 0.646 0.078 33.2 D 13.4 B T 293 1759 0.546 0.167 23.8 C R 1279 1495 0.205 0.856 0.7 A WB L 130 1671 0.600 0.078 31.1 D 20.9 C T 586 3519 0.288 0.167 21.3 C R 1279 1495 0.033 0.856 0.6 A NB L 334 1671 0.613 0.200 23.6 C 14.9 B TR 1464 3467 0.452 0.422 12.1 B SB L 334 1671 0.209 0.200 19.5 C 12.5 B T 1486 3519 0.445 0.422 12.1 B R 631 1495 0.200 0.422 10.6 B Intersection Delay = 14.5 sec/veh Intersection LOS = B Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.524 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Jefferson Street Analyst: Greg File Name: JE-52PA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 W/ Proj Conditions ------------------------------------- Eastbound westbound Northbound Southbound L T R L T R L T R L T R ---- No. Lanes 1 1 1 1 2 1 1 2 < 1 2 1 Volumes 118 243 238 51 111 84 266 767 68 46 595 72 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 7.OA 16.OA Green 17.OA 34.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 149 1671 0.794 0.089 42.6 E 19.9 C T 332 1759 0.731 0.189 27.7 D R 1262 1495 0.189 0.844 0.8 A WB L 149 1671 0.343 0.089 25.5 D 14.6 B T 665 3519 0.176 0.189 19.8 C R 1262 1495 0.067 0.844 0.7 A NB L 334 1671 0.796 0.200 30.7 D 18.9 C TR 1352 3476 0.649 0.389 15.3 C SB L 334 1671 0.138 0.200 19.1 C 13.5 B T 1368 3519 0.457 0.389 13.4 B R 581 1495 0.124 0.389 11.4 B Intersection Delay = 17.3 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.716 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Jefferson Street Analyst: Greg File Name: JE_52PP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 W/ Proj Conditions -------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- No. Lanes 1 1 1 1 2 1 1 2 < 1 2 1 Volumes 84 161 332 78 161 43, 247 678 61 71 808 126 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ------------------- 3.00 3.00 3.00 ------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 6.OA 14.OA Green 17.OA 37.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 130 1671 0.646 0.078 33.2 D 12.0 B T 293 1759 0.549 0.167 23.9 C R 1279 1495 0.260 0.856 0.8 A WB L 130 1671 0.600 0.078 31.1 D 20.9 C T 586 3519 0.288 0.167 21.3 C R 1279 1495 0.034 0.856 0.6 A NB L 334 1671 0.739 0.200 27.6 D 16.4 C TR 1467 3475 0.529 0.422 12.8 B SB L 334 1671 0.212 0.200 19.5 C 13.3 B T 1486 3519 0.571 0.422 13.2 B R 631 1495 0.200 0.422 10.6 B Intersection Delay = 14.9 sec/veh Intersection LOS = B Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.612 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Jefferson Street Analyst: Greg File Name: JE_544A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 No Proj Conditions Eastbound - Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 2 < > 1 1 1 1 1 1 1< Volumes 1 1 1 103 1 464 4 387 73 293 418 1 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 9.OA Green 28.OA 41.OA Yellow/AR 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 327 2946 0.009 0.111 23.0 C 23.0 C WB LT 184 1654 0.566 0.111 27.5 D 5.1 B R 1495 1495 0.310 1.000 0.0 A NB L 538 1671 0.007 0.322 13.4 B 10.6 B T 821 1759 0.471 0.467 10.9 B R 698 1495 0.105 0.467 8.7 B SB L 538 1671 0.544 0.322 17.1 C 13.7 B TR 821 1759 0.510 0.467 11.3 B Intersection Delay = 10.1 sec/veh Intersection LOS m B Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.529 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Jefferson Street Analyst: Greg File Name: JE_544P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes �^ > 2 < > 1 1 1 1 1 1 1< Volumes 1 2 2 86 1 359 6 430 115 487 447 1 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds * Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 6.OA Green 37.OA 35.OA Yellow/AR 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 232 2983 0.022 0.078 24.8 C 24.8 C WB LT 128 1640 0.682 0.078 35.3 D 6.9 B R 1495 1495 0.240 1.000 0.0 A NB L 706 1671 0.009 0.422 9.7 B 14.2 B T 704 1759 0.611 0.400 15.0 B R 598 1495 0.192 0.400 11.4 B SB L 706 1671 0.690 0.422 15.7 C 15.6 C TR 704 1759 0.637 0.400 15.4 C Intersection Delay = 13.2 sec/veh Intersection LOS = B Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.666 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 54 (N -S) Jefferson Street Analyst: Greg File Name: JE_54PA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 2 < > 1 1 1 1 1 1 1< Volumes 1 1 1 115 1 681 4 387 79 404 418 1 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 9.OA Green 34.OA 35.OA Yellow/AR 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 325 2928 0.009 0.111 23.0 C 23.0 C WB LT 184 1654 0.631 0.111 29.4 D 4.4 A R 1495 1495 0.456 1.000 0.2 A NB L 650 1671 0.006 0.389 10.9 B 13.6 B T 704 1759 0.550 0.400 14.1 B R 598 1495 0.132 0.400 11.1 B SB L 650 1671 0.622 0.389 15.6 C 15.2 C TR 704 1759 0.596 0.400 14.7 B Intersection Delay = 10.7 sec/veh Intersection LOS = B Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.611 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Jefferson Street Analyst: Greg File Name: JE_54PP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 W/ Proj Conditions ------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 2 < > 1 1 1 1 1 1 1< Volumes 1 2 2 93 1 510 6 430 128 733 447 1 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 5.OA Green 50.OA 23.OA Yellow/AR 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 197 2956 0.025 0.067 25.4 D 25.4 D WB LT 109 1640 0.860 0.067 57.7 E 9.0 B R 1495 1495 0.341 1.000 0.1 A NB L 947 1671 0.006 0.567 5.5 B 32.2 D T 469 1759 0.917 0.267 37.0 D R 399 1495 0.321 0.267 17.3 C SB L 947 1671 0.774 0.567 12.6 B 24.2 C TR 469 1759 0.955 0.267 43.2 E Intersection Delay = 22.2 sec/veh Intersection LOS = C Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.834 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 54 (N -S) Madison Street Analyst: Greg File Name: MA 544A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1 > 1 1 1 Volumes 77 305 54 97 474 133 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 21.OA Green 61.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB T 430 1759 0.179 0.244 17.4 C 3.5 A R 1495 1495 0.204 1.000 0.0 A WB LT 385 1577 0.392 0.244 18.7 C 18.7 C NB L 1151 1671 0.412 0.689 4.1 A 3.9 A R 1030 1495 0.129 0.689 3.1 A Intersection Delay = 5.7 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.407 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation ---------------------- Streets: (E -W) Avenue 54 (N -S) Madison Street Analyst: Greg File Name: MA_544P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1 > 1 1 1 Volumes 118 472 139 112 355 85 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right Right Peds * Peds NB Right EB Right SB Right WB Right Green 41.OA Green 41.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB T v 821 1759 0.144 0.467 8.9 B 1.8 A R 1495 1495 0.316 1.000 0.0 A WB LT 630 1349 0.399 0.467 10.4 B 10.4 B NB L 780 1671 0.455 0.467 10.8 B 10.4 B R 698 1495 0.122 0.467 8.8 B Intersection Delay = 6.4 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.427 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 54 (N -S) Madison Street Analyst: Greg File Name: MA 54PA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1 > 1 1 1 Volumes 95 405 87 135 665 197 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 22.OA Green 60.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB T 450 1759 0.211 0.256 17.1 C 3.3 A R 1495 1495 0.271 1.000 0.0 A WB LT 384 1501 0.579 0.256 20.5 C 20.5 C NB L 1133 1671 0.587 0.678 5.6 B 5.1 B R 1013 1495 0.194 0.678 3.5 A Intersection Delay = 6.7 sec/veh Intersection LOS � B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.585 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 54 (N -S) Madison Street Analyst: Greg File Name: MA_54PP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 W/ Proj Conditions Eastbound___ Westbound^^ _ Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1 > 1 1 1 Volumes 160 690 212 137 489 129 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 41.OA Green 41.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB T 821 1759 0.195 0.467 9.1 B 1.9 A R 1495 1495 0.462 1.000 0.2 A WB LT 539 1154 0.648 0.467 13.8 B 13.8 B NB L 780 1671 0.627 0.467 12.8 B 12.0 B R 698 1495 0.185 0.467 9.1 B Intersection Delay = 7.6 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.638 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Airport Blvd. (N -S) Madison Street Analyst: Greg File Name: MA_AP4A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 No Proj Conditions ----------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes __ > < 1 < 1 1 Volumes 42 38 533 54 48 297 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 9.OA Green 73.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS WB LR 159 1433 0.502 0.111 26.4 D 26.4 D NB TR 1283 1561 0.457 0.822 1.7 A 1.7 A SB L 303 369 0.158 0.822 1.1 A 1.1 A T 1446 1759 0.205 0.822 1.1 A Intersection Delay = 3.4 sec/veh Intersection LOS = A Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.463 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Airport Blvd. (N -S) Madison Street Analyst: Greg File Name: MA_AP4P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > < 1 < 1 1 Volumes 61 54 365 41 33 540 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 13.OA Green 69.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ------------------------------------------------------------------------ Intersection Performance Summary Lane Group: Adj Sat v/C g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS WB LR 223 1434 0.516 0.156 24.2 C 24.2 C NB TR 1213 1559 0.335 0.778 2.0 A 2-.0 A SB L 493 634 0.067 0.778 1.5 A 2.1 A T 1368 1759 0.395 0.778 2.2 A Intersection Delay = 4.4 sec/veh Intersection LOS = A Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.415 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Airport Blvd. (N -S) Madison Street Analyst: Greg File Name: MA_APPA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 W/ Proj Conditions Eastbound westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > < 1 < 1 1 Volumes 57 41 785 82 49 429 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 9.OA Green 73.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS WB LR 160 1442 0.612 0.111 29.3 D 29.3 D NB TR 1283 1561 0.676 0.822 3.1 A 3.1 A SB L 129 157 0.380 0.822 2.3 A 1.4 A T 1446 1759 0.297 0.822 1.3 A Intersection Delay = 4.3 sec/veh Intersection LOS = A Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.668 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Airport Blvd. (N -S) Madison Street Analyst: Greg File Name: MA APPP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 W/ Proj Conditions ----------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes - _ > < 1 < 1 1 Volumes 93 56 541 61 37 826 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 13.OA Green 69.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS WB LR 225 1449 0.661 0.156 27.9 D 27.9 D NB TR 1213 1559 0.496 0.778 2.6 A 2.6 A SB L 268 344 0.138 0.778 1.6 A 3.2 A T 1368 1759 0.604 0.778 3.3 A Intersection Delay = 5.3 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.613 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 58 (N -S) Madison Street Analyst: Greg File Name: MA_584A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 No Proj Conditions ------------------------------------ Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 1 < > 1 < > 1 < > 1 < Volumes 97 10 3 27 18 60 1 380 64 53 175 60 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 19.OA Green 63.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ------------------------------------------------------------------------ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 241 1085 0.456 0.222 20.5 C 20.5 C WB LTR 294 1324 0.357 0.222 19.4 C 19.4 C NB LTR 1101 1548 0.404 0.711 3.5 A 3.5 A SB LTR 820 1153 0.351 0.711 3.3 A 3.3 A Intersection Delay = 7.2 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.417 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 58 (N -S) Madison Street Analyst: Greg File Name: MA 584P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 No Proj Conditions ----------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 1 < > 1 < > 1 < > 1 < Volumes 69 12 3 65 13 42 2 230 39 61 384 103 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 15.OA Green 67.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 196 1102 0.429 0.178 22.2 C 22.2 C WB LTR 226 1274 0.530 0.178 23.6 C 23.6 C NB LTR 1164 1540 0.233 0.756 2.1 A 2.1 A SB LTR 1045 1383 0.524 0.756 3.3 A 3.3 A Intersection Delay = 6.9 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.525 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 58 (N -S) Madison Street Analyst: Greg File Name: MA_58PA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 W/ Proj Conditions ------------------------------------ Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 1 < > 1 < > 1 < > 1 < Volumes 97 10 3 53 18 65 1 654 112 54 321 60 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left SB Left Thru * Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 15.OA Green 67.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 163 915 0.676 0.178 29.5 D 29.5 D WB LTR 228 1285 0.595 0.178 25.0 C 25.0 C NB LTR 1170 1548 0.656 0.756 4.4 A 4.4 A SB LTR 663 877 0.656 0.756 5.1 B 5.1 B Intersection Delay = 8.4 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.660 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 58 (N -S) Madison Street Analyst: Greg File Name: MA_58PP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 W/ Proj Conditions ------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 1 < > 1 < > 1 < > 1 < Volumes 69 12 3 121 13 45 2 423 73 66 698 103 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds * Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 15.OA Green 67.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 193 1086 0.435 0.178 22.3 C 22.3 C WB LTR 216 1217 0.827 0.178 38.3 D 38.3 D NB LTR 1158 1533 0.430 0.756 2.7 A 2.7 A SB LTR 977 1293 0.887 0.756 12.4 B 12.4 B Intersection Delay = 12.8 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.876 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-07-1999 Center For Microcomputers In Transportation Streets: (E -W) Resort Village (N -S) Madison Street Analyst: Greg File Name: MA RVPA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > < 1 1 1 1 Volumes 147 8 5 620 291 86 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds * Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right * WB Right Green 17.OA Green 65.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination ----------------------------------------------------------------------- order: #1 #5 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LR 300 1500 0.517 0.200 22.0 C 22.0 C NB L 596 813 0.008 0.733 2.1 A 3.4 A T 1290 1759 0.481 0.733 3.4 A SB T 1290 1759 0.226 0.733 2.5 A 1.9 A R 1495 1495 0.058 1.000 0.0 A Intersection Delay = 5.4 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.488 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-07-1999 Center For Microcomputers In Transportation Streets: (E -W) Resort Village (N -S) Madison Street Analyst: Greg File Name: MA RVPP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > < 1 1 1 1 Volumes 110 6 9 388 646 176 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right * WB Right Green 13.OA Green 69.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LR 233 1500 0.497 0.156 23.9 C 23.9 C NB L 201 258 0.045 0.778 1.5 A 1.9 A T 1368 1759 0.284 0.778 1.9 A SB T 1368 1759 0.472 0.778 2.5 A 1.9 A R 1495 1495 0.118 1.000 0.0 A Intersection Delay = 3.8 sec/veh Intersection LOS = A Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.476 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Monroe Street Analyst: Greg File Name: MO_504A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 No Proj Conditions ----------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1< 1 1< Volumes 99 194 33 27 210 79 35 413 48 67 339 72 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 30.OA Green 52.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 211 614 0.468 0.344 16.1 C 15.1 C TR 593 1721 0.383 0.344 14.6 B WB L 273 794 0.099 0.344 12.9 B 15.4 C TR 581 1687 0.497 0.344 15.7 C NB L 324 551 0.108 0.589 5.3 B 6.8 B TR 1020 1732 0.452 0.589 6.9 B SB L 261 443 0.257 0.589 5.9 B 6.5 B TR 1009 1713 0.407 0.589 6.6 B Intersection Delay = 10.1 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.469 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Monroe Street Analyst: Greg File Name: MO_504P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1< 1 1< Volumes 93 150 56 53 180 90 70 369 49 135 509 129 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 25.OA Green 57.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 172 595 0.541 0.289 20.1 C 18.0 C TR 488 1688 0.422 0.289 17.1 C WB L 235 812 0.226 0.289 15.8 C 18.2 C TR 483 1671 0.559 0.289 18.6 C NB L 147 228 0.476 0.644 7.2 B 5.3 B TR 1114 1728 0.375 0.644 5.0 A SB L 360 558 0.375 0.644 5.2 B 6.2 B TR 1099 1706 0.580 0.644 6.4 B Intersection Delay = 9.9 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.574 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Monroe Street Analyst: Greg File Name: MO_50PA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 W/ Proj Conditions ----------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1< 1 1< Volumes 99 194 34 38 210 79 38 527 70 67 393 72 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 27.OA Green 55.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 178 573 0.555 0.311 19.5 C 17.2 C TR 535 1720 0.426 0.311 16.2 C WB L 236 757 0.161 0.311 14.6 B 17.3 C TR 525 1687 0.551 0.311 17.6 C NB L 281 451 0.135 0.622 4.5 A 6.7 B TR 1075 1728 0.555 0.622 6.8 B SB L 176 283 0.380 0.622 6.1 B 5.9 B TR 1069 1718 0.435 0.622 5.9 B Intersection Delay = 10.3 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.555 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 50 (N -S) Monroe Street Analyst: Greg File Name: MO_50PP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 W/ Proj Conditions ---------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1< 1 1< Volumes 93 150 59 77 180 90 72 445 64 135 635 129 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 22.OA Green 60.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 137 538 0.676 0.256 27.8 D 21.8 C TR 431 1685 0.485 0.256 19.1 C WB L 193 756 0.399 0.256 18.7 C 20.8 C TR 427 1671 0.632 0.256 21.4 C NB L 89 131 0.811 0.678 33.7 D 8.1 B TR 1170 1726 0.435 0.678 4.5 A SB L 274 405 0.492 0.678 5.7 B 6.3 B TR 1162 1715 0.657 0.678 6.4 B Intersection Delay = 11.3 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.774 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Monroe Street Analyst: Greg File Name: M0-524A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 No Proj Conditions ------------------------------------ Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1< 1 1< Volumes 126 245 36 15 167 45 34 298 13 50 240 42 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00:3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 34.OA Green 48.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 342 879 0.369 0.389 13.0 B 13.2 B TR 671 1725 0.419 0.389 13.2 B WB L 263 677 0.057 0.389 11.1 B 12.4 B TR 662 1703 0.320 0.389 12.5 B NB L 419 770 0.081 0.544 6.3 B 7.3 B TR 952 1748 0.327 0.544 7.4 B SB L 386 709 0.130 0.544 6.5 B 7.2 B TR 936 1720 0.301 0.544 7.3 B Intersection Delay = 10.0 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.365 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Monroe Street Analyst: Greg File Name: MO_524P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 No Proj Conditions ------------------------------------ Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1< 1 1< Volumes 66 163 40 12 192 52 30 285 12 62 337 66 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00'3.00 3.00 3.003.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 29.OA Green 53.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 243 729 0.272 0.333 14.4 B 14.7 B TR 569 1707 0.357 0.333 14.8 B WB L 289 868 0.041 0.333 13.1 B 15.3 C TR 568 1703 0.430 0.333 15.4 C NB L 346 577 0.087 0.600 4.9 A 5.6 B TR 1049 1749 0.283 0.600 5.6 B SB L 457 761 0.136 0.600 5.1 B 6.1 B TR 1030 1716 0.391 0.600 6.2 B Intersection Delay = 9.5 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.405 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 52 (N -S) Monroe Street Analyst: Greg File Name: MO_52PA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2004 W/ Proj Conditions ------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1< 1 1< Volumes 126 245 37 24 167 45 35 437 30 50 306 42 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 -------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 29.OA Green 53.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 278 835 0.453 0.333 16.0 C 16.0 C TR 57.5 1725 0.490 0.333 16.0 C WB L 206 619 0.116 0.333 13.5 B 14.8 B TR 568 1703 0.373 0.333 15.0 B NB L 400 666 0.088 0.600 4.9 A 6.5 B TR 1045 1742 0.447 0.600 6.6 B SB L 263 438 0.190 0.600 5.3 B 5.8 B TR 1036 1727 0.336 0.600 5.9 B Intersection Delay = 10.1 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.462 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Monroe Street Analyst: Greg File Name: MO_52PP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2004 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1< 1 1< Volumes 66 163 41 32 192 52 31 378 24 62 491 66 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00'3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 24.OA Green 58.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 183 660 0.360 0.278 17.4 C 17.6 C TR 474 1706 0.430 0.278 17.6 C WB L 224 807 0.143 0.278 15.8 C 18.2 C TR 473 1703 0.516 0.278 18.5 C NB L 222 338 0.140 0.656 3.8 A 4.5 A TR 1143 1744 0.352 0.656 4.6 A SB L 396 604 0.157 0.656 3.9 A 5.2 B TR 1133 1728 0.492 0.656 5.4 B Intersection Delay = 9.4 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.499 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-09-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 54 (N -S) Monroe Street Analyst: Greg File Name: MO_54PA2.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2004 W/ Proj Conditions -------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 1 < > 1 < > 1 < > 1 < Volumes 194 78 38 20 45 27 79 332 26 31 244 104 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 32.OA Green 50.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ------------------------------------------------------------------------ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 441 1204 0.702 0.367 19.1 C 19.1 C WB LTR 474 1294 0.194 0.367 12.6 B 12.6 B NB LTR 690 1218 0.633 0.567 9.9 B 9.9 B SB LTR 764 1348 0.496 0.567 8.0 B 8.0 B Intersection Delay = 11.9 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.660 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-09-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Monroe Street Analyst: Greg File Name: MO_54PP2.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2004 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes - '-----„- --- - > 1 < > 1 < > 1 < > 1 < Volumes 139 74 82 26 71 10 48 264 16 43 331 208 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0, 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00'3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 30.OA Green 52.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR -426 -1236 0.693 0.344 19.7 C 19.7 C WB LTR 447 1299 0.239 0.344 13.7 B 13.7 B NB LTR 652 1108 0.503 0.589 7.5 B 7.5 B SB LTR 813 1381 0.716 0.589 10.6 B 10.6 B Intersection Delay = 12.1 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.707 Year 2010 Signalized Intersection HCS Worksheets HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation --------------------------- Streets: (E -W) Avenue 50 (N -S) Jefferson Street Analyst: Greg File Name: JE,500A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 No Project Conditions ------------------------------------------------ Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes ^ 1 2 1 1 2< 2 2< 2 2< Volumes 187 295 199 30 374 260 243 969 45 143 753 267 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 11.OA 20.OA Green 5.OA 5.OA 33.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 0.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 #7 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 223 1671 0.839 0.133 40.8 E 19.7 C T 821 3519 0.378 0.233 18.9 C R 1196 1495 0.166 0.800 1.3 A WB L 223 1671 0.135 0.133 22.3 C 28.2 D TR 770 3302 0.864 0.233 28.5 D NB L 409 3343 0.612 0.122 26.1 D 16.7 C TR 1514 3495 0.703 0.433 14.5 B SB L 223 3343 0.660 0.067 31.3 D 21.5 C TR 1277 3380 0.839 0.378 20.1 C Intersection Delay = 20.8 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.814 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 50 (N -S) Jefferson Street Analyst: Greg File Name: JE_500P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010 No Project Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 2 1 1 2< 2 2< 2 2< Volumes 90 374 258 35 309 200 196 851 50 290 1047 156 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 5.OA 18.OA Green 7.OA 5.OA 39.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 0.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 #7 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 111 1671 0.808 0.067 49.2 E 17.3 C T 743 3519 0.529 0.211 20.9 C R 1296 1495 0.199 0.867 0.6 A WB L 111 1671 0.314 0.067 26.4 D 25.1 D TR 699 3311 0.764 0.211 25.1 D NB L 297 3343 0.680 0.089 29.9 D 15.8 C TR 1551 3489 0.610 0.444 12.8 B SB L 483 3343 0.619 0.144 25.1 D 15.0 B TR 1725 3450 0.732 0.500 12.6 B Intersection Delay = 17.1 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.740 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Jefferson Street Analyst: Greg File Name: JE_50TA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 W/ Project Conditions ---------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- No. Lanes 1 2 1 1 2 < 2 2 < 2 2 < Volumes 187 315 218 30 434 300 299 1148 45 156 812 267 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00'3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 10.OA 22.OA Green 5.OA 4.OA 33.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 0.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 #7 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 204 1671 0.916 0.122 53.7 E 22.1 C T 899 3519 0.368 0.256 17.9 C R 1213 1495 0.180 0.811 1.2 A WB L 204 1671 0.147 0.122 22.8 C 30.9 D TR 844 3303 0.913 0.256 31.3 D NB L 371 3343 0.829 0.111 35.3 D 21.9 C TR 1477 3499 0.848 0.422 18.6 C SB L 223 3343 0.722 0.067 34.0 D 23.9 C TR 1280 3388 0.885 0.378 22.5 C Intersection Delay = 24.1 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.891 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation ---------------------------- Streets: (E -W) Avenue 50 (N -S) Jefferson Street Analyst: Greg File Name: JE_50TP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010+Project Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 2 1 1 2< 2 2< 2 2< Volumes 90 433 313 35 340 221 226 944 50 330 1221 156 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.0013.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 5.OA 18.OA Green 7.OA 5.OA 39.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 0.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 #7 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 111 1671 0.808 0.067 49.2 E 17.0 C T 743 3519 0.612 0.211 21.9 C R 1296 1495 0.242 0.867 0.7 A WB L 111 1671 0.314 0.067 26.4 D 28.3 D TR 699 3311 0.843 0.211 28.5 D NB L 297 3343 0.784 0.089 34.7 D 17.5 C TR 1552 3492 0.673 0.444 13.6 B SB L 483 3343 0.704 0.144 26.9 D 17.4 C TR 1730 3459 0.836 0.500 15.2 C Intersection Delay = 18.8 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.830 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Jefferson Street Analyst: Greg File Name: JE_520A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 No Project Conditions Eastbound^ Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 2 1 1 2 1 1 2 < 1 2 1 Volumes 148 379 275 94 383 141 252 765 93 71 752 105 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right * * WB Right Green 9.OA 15.OA Green 17.OA 33.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 186 1671 0.797 0.111 39.3 D 19.0 C T 626 3519 0.636 0.178 23.7 C R 1229 1495 0.224 0.822 1.1 A WB L 186 1671 0.506 0.111 26.2 D 19.1 C T 626 3519 0.643 0.178 23.8 C R 1229 1495 0.115 0.822 1.0 A NB L 334 1671 0.754 0.200 28.3 D 18.9 C TR 1307 3461 0.689 0.378 16.3 C SB L 334 1671 0.212 0.200 19.5 C 14.0 B T 1329 3519 0.594 0.378 15.0 B R 1047 1495 0.100 0.700 2.8 A Intersection Delay = 17.6 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.708 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Jefferson Street Analyst: Greg File Name: JE_520P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010 No Project Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 2 1 1 2 1 1 2 < 1 2 1 Volumes 114 458 329 114 345 78 263 779 102 131 838 164 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time -------------------------------------------------------------------------- 3.00 3.00 3.0013.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right * * WB Right Green 6.OA 19.OA Green 15.OA 34.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 ----------------------------------------------------------------------- secs Phase combination order: #1 #2 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 130 1671 0.877 0.078 56.9 E 18.5 C T 782 3519 0.615 0.222 21.4 C R 1279 1495 0.257 0.856 0.8 A WB L 130 1671 0.877 0.078- 56.9 E 24.8 C T 782 3519 0.463 0-222 19.9 C R 1279 1495 0.061 0.856 0.6 A NB L 297 1671 0.885 0.178 41.2 E 21.5 C TR 1344 3457 0.688 0.389 15.9 C SB L 297 1671 0.441 0.178 22.0 C 14.2 B T 1368 3519 0.643 0.389 15.2 C R 1080 1495 0.152 0.722 2.5 A Intersection Delay = 19.0 sec/veh Intersection LOS - C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.727 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Jefferson Street Analyst: Greg File Name: JE_52TA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010+Project Conditions vEastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- No. Lanes 1 2 1 1 2 1 1 2 < 1 2 1 Volumes 148 419 293 94 506 163 305 978 93 78 822 105 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right Right Peds Peds NB Right EB Right SB Right * * WB Right Green 8.OA 15.OA Green 18.OA 33.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 167 1671 0.886 0.100 52.8 E 21.7 C T 626 3519 0.703 0.178 24.9 C R 1246 1495 0.235 0.833 1.0 A WB L 167 1671 0.563 0.100 28.1 D 24.2 C T 626 3519 0.849 0.178 30.6 D R 1246 1495 0.131 0.833 0.9 A NB L 353 1671 0.865 0.211 35.6 D 24.0 C TR 1312 3473 0.857 0.378 20.8 C SB L 353 1671 0.221 0.211 19.0 C 14.7 B T 1329 3519 0.649 0.378 15.7 C R 1030 1495 0.102 0.689 3.0 A Intersection Delay = 21.2 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.861 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 52 (N -S) Jefferson Street Analyst: Greg File Name: MA_52TP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010+Project Conditions ----------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- No. Lanes 1 2 1 1 2 1 1 2 < 1 2 1 Volumes 114 579 380 114 409 89 291 889 102 152 1044 164 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right * * WB Right Green 6.OA 19.OA Green 15.OA 34.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ------------------------------------------------------------------------ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio ----- Ratio Delay ----- ----- LOS Delay --- ----- LOS ---- ----- EB L ----------- 130 1671 0.877 0.078 56.9 E 19.8 C T 782 3519 0.777 0.222 24.7 C R 1279 1495 0.297 0.856 0.9 A WB L 130 1671 0.877 0.078 56.9 E 24.4 C T 782 3519 0.549 0.222 20.7 C R 1279 1495 0.070 0.856 0.6 A NB L 297 1671 0.980 0.178 58.7 E 26.5 D TR 1347 3464 0.773 0.389 17.5 C SB L 297 1671 0.512 0.178 22.9 C 16.9 C T 1368 3519 0.801 0.389 18.2 C R 1080 1495 0.152 0.722 2.5 A Intersection Delay = 21.5 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.838 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 54 (N -S) Jefferson Street Analyst: Greg File Name: JE_540A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 No Proj Conditions ------------------------ Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 2 < > 1 1 1 1 1 2 1< Volumes 1 1 1 135 1 384 4 658 110 285 714 1 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 -------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 9.OA Green 11.OA 58.OA Yellow/AR 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 322 2901 0.009 0.111 23.0 C 23.0 C WB LT 184 1654 0.740 0.111 34.8 D 9.1 B R 1495 1495 0.257 1.000 0.0 A NB L 223 1671 0.018 0.133 21.9 C 5.8 B T 1153 1759 0.571 0.656 6.0 B R 980 1495 0.112 0.656 3.7 A SB L 446 3343 0.660 0.133 26.4 D 12.3 B TR 1153 1759 0.620 0.656 6.6 B Intersection Delay = 9.4 sec/veh Intersection LOS B Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.641 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E-W)^Avenue 54 (N -S) Jefferson Street Analyst: Greg File Name: JE_540P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 2 < > 1 1 1 1 1 2 1< Volumes 1 3 3 129 1 329 7 722 145 401 790 1 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 9.OA Green 14.OA 55.OA Yellow/AR 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow ----- ------------ Ratio ----- Ratio Delay ------ ----- LOS Delay LOS --- ----- --- EB LTR 332 2992 0.021 0.111 23.0 C 23.0 C WB LT 181 1625 0.720 0.111 33.7 D 9.5 B R 1495 1495 0.220 1.000 0.0 A NB L 278 1671 0.025 0.167 20.3 C 7.6 B T 1094 1759 0.660 0.622 8.1 B R 930 1495 0.156 0.622 4.6 A SB L 557 3343 0.741 0.167 26.7 D 15.2 C TR 1094 1759 0.723 0.622 9.2 B Intersection Delay = 11.6 sec/veh Intersection LOS = B Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.726 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Jefferson Street Analyst: Greg File Name: JE_54TA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 W/ Proj Conditions --------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 2 < > 1 1 1 1 1 2 1< Volumes 1 1 1 164 1 649 4 658 120 373 714 1 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 9.OA Green 14.OA 55.OA Yellow/AR 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 319 2867 0.009 0.111 23.0 C 23.0 C WB LT 184 1654 0.898 0.111 52.8 E 10.8 B R 1495 1495 0.434 1.000 0.1 A NB L 278 1671 0.014 0.167 20.2 C 6.9 B T 1094 1759 0.601 0.622 7.3 B R 930 1495 0.129 0.622 4.5 A SB L 557 3343 0.689 0.167 25.3 D 14.0 B TR 1094 1759 0.653 0.622 8.0 B Intersection Delay = 11.0 sec/veh Intersection LOS = B Lost Time/Cycle, L = 9.0 --------------------------------------------------------------------------- sec Critical v/c(x) = 0.690 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Jefferson Street Analyst: Greg File Name: JE_54TP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 2 < > 1 1 1 1 1 2 1< Volumes 1 3 3 145 1 467 7 722 174 660 790 1 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 9.OA Green 21.OA 48.OA Yellow/AR 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 331 2978 0.021 0.111 23.0 C 23.0 C WB LT 181 1625 0.809 0.111 40.8 E 9.8 B R 1495 1495 0.312 1.000 0.0 A NB L 408 1671 0.017 0.244 16.7 C 11.5 B T 958 1759 0.754 0.544 12.6 B R 814 1495 0.214 0.544 6.8 B SB L 817 3343 0.832 0.244 26.0 D 20.2 C TR 958 1759 0.826 0.544 15.2 C Intersection Delay = 15.5 sec/veh Intersection LOS = C Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.825 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Madison Street Analyst: Greg File Name: MA-500A.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 No Project Conditions Eastbound westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 2< 1 2< 1 2< 1 2< Volumes 1 397 94 39 399 2 214 539 85 1 219 1 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 5.OA 22.OA Green 16.OA 31.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 111 1671 0.009 0.067 25.3 D 19.8 C TR 873 3417 0.591 0.256 19.8 C WB L 111 1671 0.350 0.067 26.7 D 19.3 C TR 899 3516 0.469 0.256 18.6 C NB L 316 1671 0.678 0.189 25.9 D 17.9 C TR 1226 3447 0.534 0.356 15.3 C SB L 316 1671 0.003 0.189 19.1 C 13.0 B TR 1250 3516 0.185 0.356 12.9 B Intersection Delay = 18.1 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.568 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 50 (N -S) Madison Street Analyst: Greg File Name: MA_500P.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 No Project Conditions ------------------------------ Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 2< 1 2< 1 2< 1 2< Volumes 1 383 226 98 438 2 137 340 61 2 579 1 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 8.OA 28.OA Green 10.OA 28.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 167 1671 0.006 0.100 23.6 C 17.2 C TR 1071 3323 0.597 0.322 17.2 C WB L 167 1671 0.586 0.100 28.8 D 17.8 C TR 1133 3516 0.408 0.322 15.5 C NB L 204 1671 0.671 0.122 30.0 D 18.9 C TR 1108 3438 0.380 0.322 15.3 C SB L 204 1671 0.010 0.122 22.4 C 16.6 C TR 1134 3518 0.537 0.322 16.6 C Intersection Delay = 17.6 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.584 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Madison Street Analyst: Greg File Name: MA 50TA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010+Project Conditions Eastbound Westbound Northbound Southbound L T ---- ---- R -------- L T ---- R L T R L T R ---- No. Lanes 1 2< 1 2< ---�- ----- ---- ---- 1 2< ----- ---- 1 2< Volumes 1 402 121 50 415 4 297 754 118 1 289 1 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time --------------------------------------------------------------------------- 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 5.OA 19.OA Green 19.OA 31.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs ----------------------------------------------------------------------- Phase combination order: #1 #2 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 111 1671 0.009 0.067 25.3 D 23.4 C TR 755 3396 0.727 0.222 23.4 C WB L 111 1671 0.449 0.067 28.0 D 21.6 C TR 781 3513 0.564 0.222 20.8 C NB L 371 1671 0.800 0.222 29.4 D 21.0 C TR 1226 3447 0.747 0.356 18.2 C SB L 371 1671 0.003 0.222 17.6 C 13.3 B TR 1250 3517 0.243 0.356 13.2 B Intersection Delay = 20.7 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.733 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Madison Street Analyst: Greg File Name: MA_50TP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010+Project Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 2< 1 2< 1 2< 1 2< Volumes 1 399 308 130 447 2 181 454 78 4 791 1 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 8.OA 25.OA Green 12.OA 29.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 167 167.1 0.006 0.100 23.6 C 22.0 C TR 950 3289 0.781 0.289 22.0 C WB L 167 1671 0.778 0.100 39.1 D 22.0 C TR 1016 3516 0.464 0.289 17.2 C NB L 241 1671 0.750 0.144 32.1 D 19.7 C TR 1147 3441 0.487 0.333 15.7 C SB L 241 1671 0.017 0.144 21.3 C 18.3 C TR 1173 3518 0.709 0.333 18.3 C Intersection Delay = 20.4 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.748 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Madison Street Analyst: Greg File Name: MA-520A.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 No Project Conditions ---------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 2< 2 2< 2 2< 1 2< Volumes 5 456 129 52 291 9 318 827 127 4 336 2 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 5.OA 24.OA Green 5.OA 10.OA 30.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 0.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 #7 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 111 1671 0.045 0.067 25.4 D 19.7 C TR 945 3402 0.650 0.278 19.6 C WB L 223 3343 0.242 0.067 25.9 D 18.1 C TR 973 3503 0.324 0.278 16.7 C NB L 594 3343 0.552 0.178 22.6 C 15.2 C TR 1571 3448 0.638 0.456 12.8 B SB L 111 1671 0.036 0.067 25.4 D 14.1 B TR 1211 3515 0.293 0.344 13.9 B Intersection Delay = 16.5 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.565 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Madison Street Analyst: Greg File Name: MA 520P.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 No Project Conditions -------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 2< 2 2< 2 2< 1 2< Volumes 9 317 342 137 347 6 201 522 80 6 889 6 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 5.OA 25.OA Green 7.OA 37.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 111 1671 0.081 0.067 25.5 D 20.9 C TR 937 3245 0.738 0.289 20.9 C WB L 223 3343 0.633 0.067 30.4 D 20.4 C TR 1014 3510 0.366 0.289 16.5 C NB L 297 3343 0.697 b.089 30.5 D 16.6 C TR 1456 3448 0.434 0.422 12.0 B SB L 149 1671 0.040 0.089 24.2 C 14.0 B TR 1484 3515 0.633 0.422 13.9 B Intersection Delay = 17.4 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.675 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Madison Street Analyst: Greg File Name: MA_52TA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010+Project Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 2< 2 2< 2 2< 1 2< Volumes 5 463 170 68 309 11 445 1156 178 4 443 2 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 5.OA 21.OA Green 5.OA 12.OA 31.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 0.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 #7 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 111 1671 0.045 0.067 25.4 D 24.8 C TR 825 3377 0.806 0.244 24.8 C WB L 223 3343 0.314 0.067 26.1 D 19.8 C TR 856 3500 0.393 0.244 18.5 C NB L 669 3343 0.685 0.200 23.6 C 17.4 C TR 1686 3448 0.831 0.489 15.4 C SB L 111 1671 0.036 0.067 25.4 D 14.1 B TR 1250 3516 0.374 0.356 14.0 B Intersection Delay = 18.7 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.723 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-04-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 52 (N -S) Madison Street Analyst: Greg File Name: MA^52TP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010+Project Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 2< 2 2< 2 2< 1 2< Volumes 9 335 467 187 357 7 268 696 107 8 1214 6 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00.3.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 5.OA 25.OA Green 7.OA 37.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 111 1671 0.081 0.067 25.5 D 28.9 D TR 928 3211 0.908 0.289 28.9 D WB L 223 3343 0.866 0.067 46.2 E 26.5 D TR 1013 3508 0.377 0.289 16.6 C NB L 297 3343 0.929 0.089 50.7 E 22.5 C TR 1456 3448 0.579 0.422 13.3 B SB L 149 1671 0.054 0.089 24.2 C 19.2 C TR 1485 3516 0.863 0.422 19.2 C Intersection Delay = 23.4 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.885 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-09-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Madison Street Analyst: Greg File Name: MA 540A2.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 No Project Conditions ----------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- No. Lanes 1 2 1 1 2 < 2 2 1 1 2 < Volumes 75 76 262 44 119 13 326 823 107 17 363 77 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right * * EB Right SB Right WB Right Green 6.OA 7.OA Green 15.OA 46.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 130 1671 0.577 0.078 30.3 D 10.7 B T 313 3519 0.256 0.089 24.8 C R 1279 1495 0.205 0.856 0.7 A WB L 130 1671 0.339 0.078 26.0 D 25.9 D TR 308 3467 0.451 0.089 25.9 D NB L 594 3343 0.565 0.178 22.8 C 12.0 B T 1838 3519 0.470 0.522 8.9 B R 1080 1495 0.099 0.722 2.4 A SB L 297 1671 0.057 0.178 19.9 C 8.1 B TR 1789 3426 0.258 0.522 7.7 B Intersection Delay = 12.0 sec/veh Intersection LOS = B Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.497 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-09-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Madison Street Analyst: Greg File Name: MA 540P2.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 No Project Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- No. Lanes 1 2 1 1 2 < 2 2 1 1 2 < Volumes 78 146 309 110 116 19 272 550 68 17 893 95 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right * * EB Right SB Right WB Right Green 8.OA 8.OA Green 10.OA 48.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 167 1671 0.467 0.100 26.2 D 11.5 B T 352 3519 0.435 0.100 25.2 D R 1246 1495 0.248 0.833 1.0 A WB L 167 1671 0.658 0.100 31.4 D 27.8 D TR 344 3444 0.412 0.100 25.0 C NB L 409 3343 0.685 0.122 27.7 D 13.0 B T 1916 3519 0.301 0.544 7.2 B R 1163 1495 0.058 0.778 1.5 A SB L 204 1671 0.083 0.122 22.6 C 9.1 B TR 1888 3468 0.549 0.544 8.9 B Intersection Delay = 12.6 sec/veh Intersection LOS = B Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.568 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-09-1999 Center For Microcomputers In Transportation Streets:4(E-W) Avenue 54 (N -S) Madison Street Analyst: Greg File Name: MA 54TA2.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010+Project Conditions -------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 2 1 1 2 < 2 2 1 1 2 < Volumes 75 130 307 64 277 30 464 1311 169 23 521 77 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 5.OA 9.OA Green 15.OA 45.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 111 1671 0.673 0.067 36.3 D 12.0 B T 391 3519 0.348 0.111 24.1 C R 1296 1495 0.237 0.867 0.7 A WB L 111 1671 0.575 0.067 31.4 D 34.8 D TR 385 3467 0.836 0.111 35.5 D NB L 594 3343 0.804 0.178 28.4 D 16.1 C T 1799 3519 0.766 0.511 12.8 B R 764 1495 0.221 0.511 7.9 B SB L 297 1671 0.077 0.178 19.9 C 9.0 B TR 1764 3451 0.356 0.511 8.5 B Intersection Delay = 16.2 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.775 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-09-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Madison Street Analyst: Greg File Name: MA_54TP2.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010+Project Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- No. Lanes 1 2 1 1 2 < 2 2 1 1 2 < Volumes 78 297 445 171 197 28 345 808 101 34 1377 95 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right * * EB Right SB Right WB Right Green 10.OA 9.OA Green 10.OA 45.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 204 1671 0.382 0.122 24.1 C 15.3 C T 391 3519 0.798 0.111 32.8 D R 1213 1495 0.367 0.811 1.6 A WB L 204 1671 0.837 0.122 42.0 E 33.2 D TR 384 3453 0.615 0.111 26.7 D NB L 409 3343 0.869 0.122 37.5 D 16.4 C T 1799 3519 0.471 0.511 9.3 B R 1163 1495 0.087 0.778 1.5 A SB L 204 1671 0.166 0.122 22.9 C 16.1 C TR 1781 3484 0.868 0.511 16.0 C Intersection Delay = 17.7 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.855 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Airport Blvd. (N -S) Madison Street Analyst: Greg File Name: MA—APOA.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 No Proj Conditions ----- ----------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > < 2 < 1 2 Volumes 70 56 1124 117 58 584 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 13.OA Green 69.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS WB LR 224 1438 0.563 0.156 25.1 D 25.1 D NB TR 2698 3469 0.483 0.778 2.4 A 2.4 A SB L 116 149 0.500 0.778 5.2 B 2.0 A T 2737 3519 0.224 0.778 1.7 A Intersection Delay = 3.7 sec/veh Intersection LOS � A Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.511 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets: (E -W) Airport Blvd. (N -S) Madison Street Analyst: Greg File Name: MA APOP.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > < 2 < 1 2 Volumes 129 69 776 82 52 1177 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0. 0 Lost Time , 3.00 3.00 3.00 3.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right Right Peds * Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 19.OA Green 63.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS WB LR 323 1453 0.613 0.222 22.8 C 22.8 C NB TR 2466 3468 0.365 0.711 3.3 A 3.3 A SB L 221 311 0.235 0.711 3.0 A 3.8 A T 2502 3519 0.494 0.711 3.9 A Intersection Delay = 5.2 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.522 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation -------------- Streets: (E -W) Airport Blvd. (N -S) Madison Street Analyst: Greg File Name: MA_APTA.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T .R L T R No. Lanes > < 2 < 1 2 Volumes 95 70 1798 192 63 802 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 13.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right Right Peds * Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 13.OA Green 69.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS WB LR 224 1441 0.736 0.156 31.4 D 31.4 D NB TR 2697 3468 0.774 0.778 4.6 A 4.6 A SB L 86 110 0.736 0.778 21.3 C 3.3 A T 2737 3519 0.308 0.778 1.9 A Intersection Delay = 5.6 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.768 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-05-1999 Center For Microcomputers In Transportation Streets (E -W) Airport Blvd. (N -S) Madison Street Analyst: Greg File Name: MA_APTP.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > < 2 < 1 2 Volumes 203 76 1134 122 65 1844 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right Right Peds * Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 19.OA Green 63.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS WB LR 326 1465 0.857 0.222 35.3 D 35.3 D NB TR 2465 3467 0.535 0.711 4.1 A 4.1 A SB L 97 137 0.667 0.711 15.1 C 6.8 B T 2502 3519 0.774 0.711 6.5 B Intersection Delay = 8.0 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.794 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 58 (N -S) Madison Street Analyst: Greg File Name: MA_580A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 No Proj Conditions -------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1 < 1 1 1 1 2 < 1 2 < Volumes 197 20 6 60 23 98 1 815 139 91 387 98 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 14.OA 5.OA Green 7.OA 48.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ------------------------------------------------------------------------ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 278 1671 0.707 0.167 28.3 D 28.0 D TR 113 1698 0.230 0.067 25.9 D WB L 278 1671 0.215 0.167 21.0 C 11.2 B T 117 1759 0.196 0.067 25.8 D R 1146 1495 0.086 0.767 1.7 A NB L 149 1671 0.007 0.089 24.1 C 8.8 B TR 1874 3442 0.535 0.544 8.8 B SB L 149 1671 0.613 0.089 30.6 D 10.7 B TR 1858 3412 0.274 0.544 7.1 B Intersection Delay = 11.7 sec/veh Intersection LOS = B Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.552 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 58 (N -S) Madison Street Analyst: Greg File Name: MA_580P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1 1 1 2< 1 2< Volumes 134 19 4 143 23 86 5 521 85 107 843 215 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00,3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 17.OA Green 65.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 313 1564 0.428 0.200 20.9 C 20.6 C TR 343 1713 0.067 0.200 18.9 C WB L 313 1564 0.457 0.200 21.2 C 13.8 B T 352 1759 0.065 0.200 18.9 C R 1495 1495 0.058 1.000 0.0 A NB L 133 182 0.037 0.733 2.1 A 2.5 A TR 2526 3444 0.252 0.733 2.5 A SB L 400 546 0.267 0.733 2.7 A 3.1 A TR 2501 3411 0.444 0.733 3.2 A Intersection Delay = 5.3 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.447 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 58 (N -S) Madison Street Analyst: Greg File Name: MA_58TA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1 < 1 1 1 1 2 < 1 2 < Volumes 197 20 6 101 23 117 1 1544 267 98 623 98 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 -------------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 11.OA 5.OA Green 6.OA 52.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 223 1671 0.884 0.133 46.6 E 44.2 E TR 113 1698 0.230 0.067 25.9 D WB L 223 1671 0.453 0.133 24.3 C 13.2 B T 117 1759 0.196 0.067 25.8 D R 1196 1495 0.098 0.800 1.3 A NB L 130 1671 0.008 0.078 24.7 C 17.7 C TR 2026 3441 0.939 0.589 17.7 C SB L 130 1671 0.754 0.078 40.6 E 10.3 B TR 2030 3447 0.373 0.589 6.4 B Intersection Delay = 17.3 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.859 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 58 (N -S) Madison Street Analyst: Greg File Name: MA_58TP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1 1 1 2< 1 2< Volumes 134 19 4 271 23 96 5 909 154 126 1567 215 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 17.OA Green 65.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ------------------------------------------------------------------------ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 313 1564 0.428 0.200 20.9 C 20.6 C TR 343 1713 0.067 0.200 18.9 C WB L 313 1564 0.866 0.200 37.5 D 27.2 D T 352 1759 0.065 0.200 18.9 C R 1495 1495 0.064 1.000 0.0 A NB L 81 110 0.062 0.733 2.2 A 3.1 A TR 2524 3442 0.442 0.733 3.1 A SB L 132 180 0.955 0.733 53.8 E 8.4 B TR 2534 3455 0.738 0.733 5.3 B Intersection Delay = 9.3 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.936 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-07-1999 Center For Microcomputers In Transportation Streets: (E -W) Resort Village (N -S) Madison Street Analyst: Greg File Name: MA_RVTA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 W/ Proj Conditions ------------------ Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > < 1 2 2 1 Volumes 346 18 6 1467 618 111 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right * WB Right Green 27.OA Green 55.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LR 467 1500 0.780 0.311 23.9 C 23.9 C NB L 315 507 0.019 0.622 4.2 A 8.1 B T 2190 3519 0.703 0.622 8.1 B SB T 2190 3519 0.296 0.622 5.1 B 4.4 A R 1495 1495 0.074 1.000 0.0 A Intersection Delay = 9.2 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.729 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-07-1999 Center For Microcomputers In Transportation Streets: (E -W) Resort Village (N -S) Madison Street Analyst: Greg File Name: MA_RVTP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > < 1 2 2 1 Volumes 178 9 17 889 1519 323 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru _ Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right * WB Right Green 15.OA Green 67.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination ----------------------------------------------------------------------- order: #1 45 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LR 267 1500 0.701 0.178 27.9 D 27.9 D NB L 100 133 0.169 0.756 2.1 A 2.4 A T 2659 3519 0.351 0.756 2.4 A SB T 2659 3519 0.600 0.756 3.5 A 2.9 A R 1495 1495 0.216 1.000 0.0 A Intersection Delay = 4.3 sec/veh Intersection LOS = A Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.619 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-07-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 60 (N -S) Madison Street Analyst: Greg File Name: MA_600A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1> < 1 1 1 1 Volumes 910 48 21 45 56 397 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 77.OA Green 5.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 1448 1671 0.628 0.867 1.8 A 1.7 A LR 1296 1495 0.037 0.867 0.5 A NB L 95 1428 0.221 0.067 25.9 D 26.7 D T 117 1759 0.384 0.067 27.0 D SB T 117 1759 0.478 0.067 28.5 D 3.5 A R 1495 1495 0.266 1.000 0.0 A Intersection Delay = 3.4 sec/veh Intersection LOS = A Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.618 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-07-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 60 (N -S) Madison Street Analyst: Greg File Name: MA_600P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1> < 1 1 1 1 Volumes 576 30 50 44 38 953 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds * Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right * WB Right Green 44.OA Green 38.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ------------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 836 1671 0.689 0.500 12.8 B 12.5 B LR 748 1495 0.040 0.500 7.4 B NB L 650 1499 0.077 0.433 9.7 B 9.6 B T 762 1759 0.058 0.433 9.6 B SB T 762 1759 0.050 0.433 9.5 B 1.0 A R 1495 1495 0.637 1.000 0.7 A Intersection Delay = 5.6 sec/veh Intersection LOS = B Lost Time/Cycle, L = 0.0 sec Critical v/c(x) = 0.637 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-07-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 60 (N -S) Madison Street Analyst: Greg File Name: MA 60TA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1> < 1 1 1 1 Volumes 911 48 22 562 228 409 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time ------------------------------------------------------------------------ 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right * WB Right Green 52.OA Green 30.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase ----------------------------------------------------------------------- combination order: #1 #5 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 984 1671 0.926 0.589 21.1 C 20.3 C LR 880 1495 0.055 0.589 5.1 B NB L 272 791 0.081 0.344 12.9 B 32.5 D T 606 1759 0.928 0.344 33.2 D SB T 606 1759 0.376 0.344 14.5 B 5.2 B R 1495 1495 0.274 1.000 0.0 A Intersection Delay = 19.1 sec/veh Intersection LOS = C Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.926 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-07-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 60 (N -S) Madison Street Analyst: Greg File Name: MA 60TP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1> < 1 1 1 1 Volumes 576 30 50 330 574 955 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right * WB Right Green 44.OA Green 38.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ------------------------------------------------------------------------ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 836 1671 0.689 0.500 12.8 B 12.5 B LR 748 1495 0.040 0.500 7.4 B NB L 80 185 0.624 0.433 22.2 C 13.1 B T 762 1759 0.433 0.433 11.7 B SB T 762 1759 0.753 0.433 16.8 C 6.7 B R 1495 1495 0.639 1.000 0.7 A Intersection Delay = 9.1 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.719 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Monroe Street Analyst: Greg File Name: MO_500A.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 2< 1 2< Volumes 127 332 40 37 280 89 46 563 71 76 418 86 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00'3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 9.OA 28.OA Green 5.OA 32.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs -------_-------------------------------------------------------------------- Phase combination order: #1 #2 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 186 1671 0.684 0.111 31.5 D 22.3 C TR 558 1731 0.667 0.322 19.1 C WB L 186 1671 0.199 0.111 23.6 C 19.7 C TR 546 1696 0.675 0.322 19.4 C NB L ill 1671 0.413 0.067 27.5 D 15.6 C TR 1268 3459 0.525 0.367 14.8 B SB L 111 1671 0.682 0.067 36.9 D 16.8 C TR 1257 3428 0.421 0.367 13.9 B Intersection Delay = 18.2 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.613 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Monroe Street Analyst: Greg File Name: MO_500P.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 2< 1 2< Volumes 113 238 70 77 323 101 83 474 66 152 676 159 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 7.OA 28.OA Green 5.OA 7.OA 27.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 0.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 #7 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 149 1671 0.761 0.089 39.3 D 23.2 C TR 547 1699 0.563 0.322 17.3 C WB L 149 1671 0.518 0.089 27.8 D 23.4 C TR 546 1696 0.776 0.322 22.6 C NB L 111 1671 0.745 0.067 42.0 E 20.1 C TR 1075 3454 0.528 0.311 16.9 C SB L 241 1671 0.630 0.144 27.0 D 17.2 C TR 1329 3418 0.660 0.389 15.5 C Intersection Delay = 20.1 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.720 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For ------------- Microcomputers In Transportation Streets: (E -W) Avenue 50 (N -S) Monroe Street Analyst: Greg File Name: MO_50TA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 2< 1 2< Volumes 127 362 46 54 290 89 64 862 123 76 519 87 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time ----------------------------------------------------------------------- 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.0013.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 8.OA 26.OA Green 5.OA 35.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs ----------------------------------------------------------------------- Phase combination order: #1 #2 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 167 1671 0.760 0.100 37.6 D 27.3 D TR 519 1730 0.786 0.300 24.1 C WB L 167 1671 0.323 0.100 24.7 C 22.7 C TR 509 1697 0.744 0.300 22.4 C NB L 111 1671 0.575 0.067 31.4 D 17.4 C TR 1381 3453 0.749 0.400 16.6 C SB L 111 1671 0.682 0.067 36.9 D 15.6 C TR 1377 3443 0.462 0.400 13.0 B Intersection Delay = 19.7 sec/veh Intersection LOS w C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.758 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets (E -W) Avenue 50 (N -S) Monroe Street Analyst: Greg File Name: MO_50TP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010 W/ Proj Conditions ---------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 2< 1 2< Volumes 115 254 87 127 352 101 92 629 92 152 963 162 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.0013.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 7.OA 26.OA Green 5.OA 7.OA 29.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 0.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 #7 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 149 1671 0.774 0.089 40.5 E 25.4 D TR 508 1692 0.672 0.300 20.2 C WB L 149 1671 0.855 0.089 50.3 E 35.7 D TR 510 1700 0.888 0.300 31.6 D NB L 111 1671 0.826 0.067 51.8 E 21.2 C TR 1150 3451 0.658 0.333 17.5 C SB L 241 1671 0.630 0.144 27.0 D 19.5 C TR 1415 3443 0.834 0.411 18.5 C Intersection Delay = 23.7 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.854 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Monroe Street Analyst: Greg File Name: MO_520A.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 2< 1 2< Volumes 197 359 42 18 233 51 41 401 17 56 285 77 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 14.OA 31.OA Green 5.OA 24.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs ----------------------------------------------------------------------- Phase combination order: #1 #2 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 278 1671 0.707 0.167 28.3 D 21.0 C TR 616 1732 0.651 0.356 17.4 C WB L 278 1671 0.065 0.167 20.4 C 15.2 C TR 609 1712 0.467 0.356 14.9 B NB L ill 1671 0.368 0.067 26.9 D 18.4 C TR 971 3497 0.452 0.278 17.6 C SB L 111 1671 0.503 0.067 29.2 D 18.8 C TR 946 3406 0.402 0.278 17.2 C Intersection Delay = 18.8 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.587 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Monroe Street Analyst: Greg File Name: MO_520P.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 2< 1 2< Volumes 113 242 48 17 309 59 36 355 15 70 444 137 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru * Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 7.OA 30.OA Green 5.OA 32.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ---------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 149 1671 0.761 0.089 39.3 D 22.2 C TR 591 1716 0.491 0.344 15.6 C WB L 149 1671 0.114 0.089 24.4 C 17.7 C TR 591 1717 0.622 0.344 17.4 C NB L 111 1671 0.323 0.067 26.5 D 14.3 B TR 1282 3497 0.303 0.367 13.2 B SB L 111 1671 0.628 0.067 33.7 D 16.4 C TR 1244 3394 0.490 0.367 14.5 B Intersection Delay = 17.4 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.581 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Monroe Street Analyst: Greg File Name: MO_52TA.HC9 Area Type: Other 2-2-99 AM Pk Comment: 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 2< 1 2< Volumes 197 409 49 24 249 51 62 770 33 56 410 77 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds * Peds WB Left SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 13.OA 29.OA Green 5.OA 27.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 260 1671 0.758 0.156 31.7 D 25.5 D TR 577 1731 0.794 0.333 22.8 C WB L 260 1671 0.092 0.156 21.0 C 16.7 C TR 571 1714 0.525 0.333 16.4 C NB L 111 1671 0.557 0.067 30.7 D 21.4 C TR 1088 3497 0.775 0.311 20.7 C SB L ill 1671 0.503 0.067 29.2 D 17.7 C TR 1069 3435 0.478 0.311 16.5 C Intersection Delay = 21.0 sec/veh Intersection LOS n C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.762 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 52 (N -S) Monroe Street Analyst: Greg File Name: MO_52TP.HC9 Area Type: Other 2-2-99 PM Pk Comment: 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 2< 1 2< Volumes 113 269 68 32 359 59 46 545 24 70 799 137 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 7.OA 28.OA Green 5.OA 34.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs ----------------------------------------------------------------------- Phase combination order: #1 #2 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 149 1.671 0.761 0.089 39.3 D 23.4 C TR 550 1706 0.613 0.322 18.1 C WB L 149 1671 0.215 0.089 24.7 C 21.8 C TR 555 1722 0.753 0.322 21.6 C NB L 111 1671 0.413 0.067 27.5 D 14.3 B TR 1360 3496 0.439 0.389 13.2 B SB L 111 1671 0.628 0.067 33.7 D 17.8 C TR 1338 3441 0.735 0.389 16.7 C Intersection Delay = 18.6 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.736 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Monroe Street Analyst: Greg File Name: MO_540A.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 2< 1 2< Volumes 118 62 40 25 35 30 89 370 36 35 267 57 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 13.OA 16.OA Green 11.OA 34.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs Phase combination order: #1 #2 #5 #6 --------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 260 1671 0.454 0.156 23.2 C 22.0 C TR 313 1656 0.326 0.189 20.6 C WB L 260 1671 0.096 0.156 21.0 C 20.3 C TR 309 1637 0.210 0.189 20.0 C NB L 223 1671 0.399 0.133 23.7 C 14.4 B TR 1350 3472 0.316 0.389 12.4 B SB L 223 1671 0.157 0.133 22.3 C 13.0 B TR 1332 3426 0.255 0.389 12.1 B Intersection Delay = 15.8 sec/veh Intersection LOS e C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.356 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Airport Blvd. (N -S) Monroe Street Analyst: Greg File Name: MO_APOP.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1 1 1 1< Volumes 67 33 12 96 63 58 8 222 60 42 338 112 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.012.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left ISB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 18.OA Green 64.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: ----------------------------------------------------------------------- 90 secs Phase combination order: #1 #5 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 229 1083 0.293 0.211 19.5 C 19.1 C TR 357 1689 0.126 0.211 18.6 C WB L 311 1471 0.309 0.211 19.5 C 19.7 C TR 345 1633 0.351 0.211 19.8 C NB L 373 517 0.021 0.722 2.3 A 2.5 A T 1270 1759 0.175 0.722 2.6 A R 1080 1495 0.056 0.722 2.3 A SB L 701 970 0.060 0.722 2.3 A 3.1 A TR 1223 1694 0.368 0.722 3.1 A Intersection Delay = 7.8 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.364 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Monroe Street Analyst: Greg File Name: MO_54TA.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 2< 1 2< Volumes 167 75 100 43 39 30 265 726 89 35 388 73 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 11.OA 14.OA Green 18.OA 31.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs ----------------------------------------------------------------------- Phase combination order: #1 #2 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 223 1671 0.750 0.133 33.1 D 29.7 D TR 268 1608 0.653 0.167 26.5 D WB L 223 1671 0.193 0.133 22.5 C 21.7 C TR 274 1645 0.252 0.167 21.2 C NB L 353 1671 0.751 0.211 27.5 D 19.7 C TR 1231 3461 0.696 0.356 17.3 C SB L 353 1671 0.099 0.211 18.5 C 14.5 B TR 1221 3435 0.396 0.356 14.2 B Intersection Delay = 20.1 sec/veh Intersection LOS C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.709 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Monroe Street Analyst: Greg File Name: MO_540P.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 2< 1 2< Volumes 82 64 92 37 50 11 54 290 22 49 363 117 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time ------------------------------------------------------------------------ 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 8.OA 25.OA Green 6.OA 35.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs ----------------------------------------------------------------------- Phase combination order: #1 #2 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 167 1671 0.491 0.100 26.6 D 20.0 C TR 463 1604 0.337 0.289 16.5 C WB L 167 1671 0.221 0.100 24.2 C 18.6 C TR 495 1712 0.123 0.289 15.2 C NB L 130 1671 0.415 0.078 26.8 D 13.7 B TR 1392 3481 0.236 0.400 11.6 B SB L 130 1671 0.377 0.078 26.4 D 13.6 B TR 1356 3390 0.372 0.400 12.4 B Intersection Delay = 15.2 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.378 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 54 (N -S) Monroe Street Analyst: Greg File Name: MO_54TP.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes ---- ---- 1 1< -------- ---- 1 1< ----- ---- ---- 1 2< ---- ---- ---- ----- 1 2< Volumes 108 71 259 87 63 11 143 473 49 49 704 166 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time ----------------------------------------------------------------------- 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 7.OA 26.OA Green 9.OA 32.OA Yellow/AR 4.0 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs ----------------------------------------------------------------------- Phase combination order: #1 #2 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 149 1671 0.727 0.089 36.6 D 25.2 D TR 466 1552 0.709 0.300 21.5 C WB L 149 1671 0.586 0.089 29.6 D 22.9 C TR 516 1720 0.143 0.300 14.9 B NB L 186 1671 0.770 0.111 37.0 D 18.8 C TR 1272 3469 0.431 0.367 14.0 B SB L 186 1671 0.264 0.111 23.8 C 17.8 C TR 1253 3418 0.728 0.367 17.4 C Intersection Delay = 19.9 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.727 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Airport Blvd. (N -S) Monroe Street Analyst: Greg File Name: MO APOA.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1 1 1 1< Volumes 105 72 4 66 50 98 10 301 100 100 170 59 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time ------------------------------------------------------------------------ 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right * EB Right SB Right WB Right Green 22.OA Green 8.OA 48.OA Yellow/AR 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs ----------------------------------------------------------------------- Phase combination order: #1 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 244 953 0.431 0.256 18.9 C 18.0 C TR 446 1745 0.170 0.256 16.9 C WB L 337 1318 0.196 0.256 17.0 C 17.7 C TR 405 1585 0.365 0.256 18.0 C NB L 167 1671 0.060 0.100 23.7 C 6.2 B T 958 1759 0.314 0.544 7.3 B R 1246 1495 0.080 0.833 0.9 A SB L 167 1671 0.598 0.100 29.1 D 13.7 B TR 921 1691 0.249 0.544 7.0 B Intersection Delay = 12.4 sec/veh Intersection LOS = B Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.379 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Airport Blvd. (N -S) Monroe Street Analyst: Greg File Name: MO_APTA.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1 < 1 1 < 1 1 1 1 1 < Volumes 164 87 9 117 54 98 24 826 252 100 349 78 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time ----------------------------------------------------------------------- 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.0013.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right * EB Right SB Right WB Right Green 20.OA Green 6.OA 52.OA Yellow/AR 4.0 Yellow/AR 4.0 4.0 Cycle Length: 90 secs ----------------------------------------------------------------------- Phase combination order: #1 #5 #6 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 213 912 0.771 0.233 31.4 D 26.5 D TR 405 1735 0.237 0.233 18.1 C WB L 279 1195 0.420 0.233 19.6 C 19.4 C TR 371 1589 0.410 0.233 19.3 C NB L 130 1671 0.185 0.078 25.2 D 10.0 B T 1036 1759 0.797 0.589 12.4 B R 1279 1495 0.197 0.856 0.7 A SB L 130 1671 0.769 0.078 42.1 E 13.4 B TR 1008 1711 0.424 0.589 6.7 B Intersection Delay = 14.0 sec/veh Intersection LOS = B Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.788 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Airport Blvd. (N -S) Monroe Street Analyst: Greg File Name: MO APTP.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- ---- --- ---- ---- ---- ----- ---- ---- ---- ---- ---- No. Lanes 1 1< 1 1< 1 1 1 1 1< Volumes 99 41 25 240 78 58 15 490 137 42 838 172 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 13.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.003.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 18.OA Green 64.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 212 1005 0.467 0.211 21.3 C 20.3 C TR 350 1659 0.188 0.211 18.9 C WB L 294 1391 0.817 0.211 33.0 D 28.3 D TR 348 1647 0.391 0.211 20.1 C NB L 80 108 0.188 0.722 2.7 A 3.0 A T 1270 1759 0.386 0.722 3.2 A R 1080 1495 0.127 0.722 2.5 A SB L 324 448 0.130 0.722 2.5 A 8.3 B TR 1238 1714 0.816 0.722 8.5 B Intersection Delay = 11.0 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.816 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 58 (N -S) Monroe Street Analyst: Greg File Name: MO_580A.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 No Proj Conditions ------------------------ Eastbound Ld L bounI WestboundI Northbound LboundSouthboundd n L No. Lanes Volumes Lane W (ft) RTOR Vols Lost Time ------------ 1 1 < 171 65 6 12.0 12.0 0 3.00 3.00 3.00 ---------------- 1 1 < 4 50 17 12.0 12.0 0 3.00 3.00 3.00 ----------------- 1 1 < 8 172 11 12.0 12.0 0 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 EB Left L Thru 1388 Right 0.367 13.5 Peds 13.1 WB Left Thru 637 Right 0.111 Peds B NB Right SB Right L Green 32.OA Yellow/AR 4.0 Cycle Length: --------------------------------------- 90 secs Phase combinat: Lane Group: Mvmts Cap 1 1 < 11 98 89 12.0 12.0 0 3.00 3.00 3.00 ---------------- 5 6 7 8 NB Left Thru Right Peds SB Left Thru Right Peds EB Right WB Right Green 50.OA Yellow/AR 4.0 _on order: #1 #5 --------------------------------- Intersection Performance Adj Sat v/c g/C Flow Ratio Ratio Summary Approach: Delay LOS Delay LOS EB L 509 1388 0.336 0.367 13.5 B 13.1 B TR 637 1737 0.111 0.367 12.2 B WB L 504 1374 0.008 0.367 11.7 B 12.1 B TR 620 1692 0.108 0.367 12.1 B NB L 584 1030 0.014 0.567 5.5 B 6.1 B TR 988 1743 0.185 0.567 6.1 B SB L 589 1040 0.019 0.567 5.5 B 6.1 B TR 926 1634 0.202 0.567 6.2 B Intersection Delay = 9.1 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.255 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 58 (N -S) Monroe Street Analyst: Greg File Name: MO_580P.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 No Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1< 1 1< Volumes 127 58 8 17 62 21 14 129 10 32 203 181 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time ----------------------------------------------------------------------- 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 20.OA Green 62.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs ------------------------------------------------------------------------ Phase combination order: #1 #5 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 306 1-312 0.415 0.233 19.5 C 18.9 C TR 403 1727 0.164 0.233 17.8 C WB L 325 1391 0.052 0.233 17.3 C 17.9 C TR 395 1692 0.210 0.233 18.0 C NB L 454 648 0.031 0.700 2.7 A 2.8 A TR 1218 1740 0.114 0.700 2.8 A SB L 820 1171 0.039 0.700 2.7 A 3.4 A TR 1144 1635 0.336 0.700 3.5 A Intersection Delay = 8.5 sec/veh Intersection LOS B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.355 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 58 (N -S) Monroe Street Analyst: Greg File Name: MO J 58TA.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T ---- ----- R ---- L T R L T R L T R No. Lanes 1 1< ---- ---- 1 1< ------ ---- ---- 1 1< -------- --_-- ----- 1 1< Volumes 274 91 13 17 58 17 27 759 50 11 299 122 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time ----------------------------------------------------------------------- 3.00 3.00 3.003.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 20.OA Green 62.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs ----------------------------------------------------------------------- Phase combination order: #1 #5 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 317 1360 0.863 0.233 35.9 D 31.1 D TR 403 1726 0.258 0.233 18.3 C WB L 278 1193 0.061 0.233 17.3 C 17.8 C TR 396 1699 0.189 0.233 17.9 C NB L 400 572 0.067 0.700 2.7 A 5.7 B TR 1220 1743 0.663 0.700 5.8 B SB L 83 118 0.133 0.700 2.9 A 3.6 A TR 1178 1683 0.357 0.700 3.6 A Intersection Delay = 11.3 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.713 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 58 (N -S) Monroe Street Analyst: Greg File Name: M0-58TP.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1< 1 1< Volumes 182 72 26 54 87 21 24 427 30 32 758 283 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 17.OA Green 65.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 229 1144 0.795 0.200 33.9 D 29.0 D TR 338 1689 0.290 0.200 19.9 C WB L 241 1204 0.224 0.200 19.6 C 19.9 C TR 342 1708 0.316 0.200 20.0 C NB L 80 107 0.300 0.733 3.3 A 2.9 A TR 1277 1742 0.358 0.733 2.9 A SB L 372 507 0.086 0.733 2.2 A 9.0 B TR 1238 1688 0.841 0.733 9.2 B Intersection Delay = 11.2 sec/veh Intersection LOS B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.831 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-09-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 60 (N -S) Monroe Street Analyst: Greg File Name: MO_60TA2.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > 1 < > 1 < > 1 < > 1 < Volumes 363 43 51 14 23 18 118 308 38 17 139 223 Lane W (ft), 12.0 12.0 12.0 12.0 RTOR Vols I 0 0 0 0 Lost Time 3.00 3.00 3.003.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 37.OA Green 45.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination ----------------------------------------------------------------------- order: #1 #5 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 540 1280 0.846 0.422 23.3 C 23.3 C WB LTR 506 1198 0.109 0.422 10.2 B 10.2 B NB LTR 557 1090 0.833 0.511 19.4 C 19.4 C SB LTR 693 1355 0.547 0.511 10.4 B 10.4 B Intersection Delay = 17.8 sec/veh Intersection LOS = C Lost Time/Cycle, L = 6.0 sec Critical ----_-----------_-------------------------------------------------_-------- v/c(x) = 0.839 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-09-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 60 (N -S) Monroe Street Analyst: Greg File Name: MO_60TP2.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R ---- -------- L T R ----- ----- ---- L T R ---- ---- ---- L T ---- ---- R ---- No. Lanes > 1 < > 1 < > 1 < > 1 < Volumes 242 29 137 39 44 15 80 176 22 10 340 346 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time -_--------------------------------------------------------------------- 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 35.OA Green 47.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase ----------------------------------------------------------------------- combination order: #1 #5 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LTR 466 1164 0.876 0.400 28.0 D 28.0 D WB LTR 432 1081 0.227 0.400 11.6 B 11.6 B NB LTR 377 706 0.738 0.533 15.6 C 15.6 C SB LTR 775 1453 0.898 0.533 21.7 C 21.7 C Intersection Delay = 21.6 sec/veh Intersection LOS = C Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.889 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-07-1999 Center For Microcomputers In Transportation Streets: (E -W) N. Primary Housing V (N -S) Monroe Street Analyst: Greg File Name: MO_NPTA.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > < 1 < 1 1 Volumes 148 280 572 118 114 232 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 27.OA Green 55.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS WB LR 437 1404 0.980 0.311 48.1 E 48.1 E NB TR 960 1543 0.719 0.622 9.3 B 9.3 B SB L 117 188 0.975 0.622 66.5 F 25.1 D T 1094 1759 0.212 0.622 4.8 A Intersection Delay = 24.4 sec/veh Intersection LOS = C Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.976 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-07-1999 Center For Microcomputers In Transportation Streets: (E -W) N. Primary Housing V (N -S) Monroe Street Analyst: Greg File Name: MO—NPTP.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes > < 1 < 1 1 Volumes 84 136 323 109 247 612 Lane W (ft) 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 Lost Time 1 3.00 3.00 3.00 3.00 3.00 3.00 ------------------------------------------------------------------------ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 20.OA Green 62.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio . Delay LOS Delay LOS WB LR 329 1412 0.668 0.233 23.8 C 23.8 C NB TR 1066 1523 0.405 0.700 3.8 A 3.8 A SB L 383 547 0.645 0.700 7.4 B 5.2 B T 1231 1759 0.497 0.700 4.3 A Intersection Delay = 7.5 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.651 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 60 (N -S) Village Commons Analyst: Greg File Name: VC_60TA.HC9 Area Type: Other 2-2-99 AM Pk Comment: Year 2010 W/ Proj Conditions Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes 1 1< 1 1< 1 1< 1 1< Volumes 13 140 114 65 147 152 378 67 175 142 49 41 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time _-----_----------------------------------_-------------------------------- 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 31.OA Green 51.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs ----------------------------------------------------------------------- Phase combination order: 41 #5 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 214 601 0.061 0.356 12.3 B 14.5 B TR 583 1641 0.435 0.356 14.6 B WB L 256 721 0.254 0.356 13.4 B 15.1 C TR 578 1625 0.517 0.356 15.5 C NB L 757 1310 0.499 0.578 7.7 B 7.1 B TR 906 1568 0.267 0.578 6.2 B SB L 508 879 0.280 0.578 6.3 B 6.0 B TR 947 1639 0.095 0.578 5.5 B Intersection Delay = 10.2 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.506 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 02-06-1999 Center For Microcomputers In Transportation Streets: (E -W) Avenue 60 (N -S) Village Commons Analyst: Greg File Name: VC_60TP.HC9 Area Type: Other 2-2-99 PM Pk Comment: Year 2010 W/ Proj Conditions ------------- Eastbound Westbound Northbound Southbound L T R L T ---- R ---- L T ---- ---- R ---- L T R ---- ---- ---- No. Lanes ---- ---- ---- 1 1< ---- 1 1< 1 1< 1 1< Volumes 110 157 333 154 160 156 184 70 94 157 125 39 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left * SB Left Thru Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 53.OA Green 29.OA Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 90 secs Phase combination ----------------------------------------------------------------------- order: #1 #5 Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB L 434 723 0.254 0.600 5.6 B 6.9 B TR 948 1580 0.517 0.600 7.2 B WB L 240 400 0.642 0.600 11.5 B 7.7 B TR 977 1629 0.323 0.600 5.8 B NB L 333 1000 0.552 0.333 17.3 C 16.0 C TR 536 1608 0.306 0.333 14.5 B SB L 333 1000 0.471 0.333 16.1 C 15.2 C TR 566 1697 0.290 0.333 14.4 B Intersection Delay = 10.5 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.610