Loading...
3825 (8)f � ' >.p k N .. - - s v •a° a ".�=4 �2+R'`'j' ..r. Z. r 5 i PERMIT NO.3825 _i�; ,- Y .a CASHMAN PIPELINE CORP-,,,,, jr tr �, i Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § ,1 •(part); 1982), street- closures shall -not be permitted. A minimum of two (2) travel lane of paved surface shall be maintained at all times. 8. . Prior to excavating, if required, the Permittee shall contact'Underground`Service Alert at I' 00-422 f "4133. It shall be the Permittee's responsibility to notify the Public Works Department of,anticipated. excavation which impact City facilities, including but not limited to. traffic signal: conduits and�loops, , '' IN- irrigationlines, electrical conduits, and storm drain facilities. 79., 'Should additional work, materials,, or modifications of the work be required in order to meet City"-" standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be. ; performed by the Permittee as directed by and to the satisfaction of the City Engineer at no costto the City of La Quinta. . 10: 'Pursuant to Section 14.16.370 of the La Quinta Municipal Code. (Ordinance' 10 § 1-(part), :1982); c 1• `' '':backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition`.; ,.--of the Standard.Specifications For Public Works Construction (SSPWC), except'as otherwise specified • herein: f . ' Native material •may be used as backfill material provided that minimum compaction, achieved iri the -", manner prescribed herein, is achieved.. Backfill shall be performed by mechanical means; no water ;densified compaction via jetting or flooding or other means shallbe allowed. It'shall be'the Permittee's ` . response approprate geotec ibility to providihnical supervision, testing, and,in'spection,� onsiie, at a1F"" times during backfill operations.• " ` Backfill compaction shall be achieved by the following conditions.' A. i When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such' material shall be removed to the limits directed by the GeotechnicalInspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. `;. -�' .• B.', Backfill materials shall be brought to or maintained at,an appropriate -moisture content'for, compaction. The appropriate moisture content range shall be established at.the onset of the. project and ensured prior to use of the materials through progress testing on the stockpiles. { C: The first length of trench backfilled shall be backfilled in the presence,of the City Inspector.:,' " Compaction shall be tested at random depths at approximate three-foot= vertical 'intervals as- , ' backfill is placed to ensure the effectiveness of the compaction inethods and to establish the deptli�'- of lift that can be compacted. { Special Conditions - PERMIT NO. 3844 - , ,.. i Page 2 of 5• ` : •t ` ,- T r.. . , v ���st"`� •tom s};V ,,, • - - ± Y;t 'i•!t. �f f -.r.. -.Z PERMIT NO.3825 'CASHMAN PIPELINE CORP.— . d' Kx D., If lifts greater than one foot are attempted in this trial length of trench, compaction testsshall be " . taken within the lifts to ensure that the full depth of the lift is compacted.'. Upon. satisfactory' =s - ` completion of this portion of trench, the City Inspector shall establish the maximum lift thickness? + '- to be compacted for the remainder of the project. • ht .0 4. ti p E., In subsequent lengths of trench, the frequency of compaction tests shall equal one per,each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open�length' .. • ' of trench., •;= rr� , }F.- The depth of the randomly selected compaction tests shall also be randomly selected except'that`= = , + • .,,,where multiple tests are required in a given length of trench the tests shall be no closer than three.., _ ` P q g � 4 ,�-�- rfeet (vertically) from each other. r G:- If any compaction test fails, previously placed backfill (in the same, length of open trench ' previous lengths of trench) which is represented by the failing test (as determine&by the City;,' -i •> �: J. A • F 1 .' t _ M • it r t ,:.:• Inspector). shall be tested for compliance with compaction requirements.: , ` r" c . * j ; ✓ i •'R, All costs incurred due to the conditions above shall be borne by the Permittee: *Copies of all test results shall be furnished to the City Inspector. " . 11 All' excavations within City of La Quinta right-of-way shall be backfilled, arid terriporarily paved > f Y , r within the existing travel way, at the end of every workday as directed by and to the satisfaction of the ' City Engineer for the protection of the public. Lengths of open trench,shall not greatlyexcee'd that; which can not be backfilled in the same day. Excavated trenches shall not be allowed'open overnight,,' '..however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet'`in length,': r ., -A open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. _ x ` -12: All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc.,,shall be replaced to its ` - original condition.. 13 .,Access and egress to all local properties shall be maintained at all times. 14. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 §:1 (part), 1982), .' permanent pavement replacement shall be completed no later than seven (7) days after the completion` ems' " ,• of the work. Permanent pavement replacement shall•conform to the following conditions:,, r"x A'r - . , • s � : �,fir.' L♦ .• ' �� k } t Special Conditions - PERMIT NO. 3844 r . Page 3 of A:. .Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall. be straight and clean., PERMIT NO.3825 CASHMAN PIPELINE CORP.-.��' a `M 1 B. Permanent pavement replacement structural section, within all trenches; shall be'�"1'-' thicker'than ' existing of asphalt concrete over the same existing thickness.of crushed Iaggregate base'or crushed ... miscellaneous base, meeting the requirements of Sections 200-2:2'and 200-2'.4 of the Standard" Specifications for Public -Works Construction. The replaced pavement and base material shall -be -..' compacted to'95% relative compaction and respectively tested, for each-300 linear feet of.trencli: Verify exact structural replacement section thicknesses with the City,prior to installation Permanent pavement replacement shall be. installed using a"City approved1. 3 .. max medium asphalt concrete as the base course lift and a City approved t/z" max medium finish`course lift for -, capping. Asphalt concrete mix design shall be approved by the City prior to.its placement. -D. t Cold -Mill and Overlay - The existing pavement which was properly protected in place during the •. = t, trenching operation located adjacent to the trench saw cut shall be cold -milled to a'depth of 0.10--' t , feet with butt joint created next to the existing unmilled pavement surface. The cold' milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 r`- ' asphalt concrete mix. The width of the cold milling area shall be as follows: � • For longitudinal trenches located in '" �' a parking lane: two Q) feet_outside the sawcut removal < lines. • ' For., longitudinal trenches located in a -traffic lane: two 3 feet outside the sawcut removal- dines, or to the lane lirie striping, whichever is greater... For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. a x E. If and capping • grinding operations are not performed in the same day as base.paving operations, the base course lift of /4 max medium asphalt concrete shall' be installed from saw -cut edge to ' - f: saw -cut edge flush with the existing street surface: The base,course lift of paving shall not be left t't to 0.10' low in anticipation 'of grinding and capping. •, �[ �� �_• - ,Y , , • � 'a -t.. � ` . •� i w, .. a - , s ; `Any existing lane striping or any "existing detour lane striping affected bythis resurfacing shallbe `•v ' t ,- ` replaced in kind by.the Permittee; as' directed by and to the satisfaction the City Engineer:.? "• `� °` .of Affected traffic signal loops shall be removed and replaced in kind. The `finished,pavement '* surface shall be smooth, consistent; and shall conform to the surrounding grades: Special Conditions t h. ? - PERMIT NO. 3844 �, c Page 4'of 15 kPermitt6e shall permanently stabilize any and all soil that was disturbed as a result of workfperformed" • F ' .:5� t • . :. `under this permit with an approved dust control treatment. Soil stabilizaiion shall be done immediatelyt after completing the operation. tI PERMIT NO.3825- • q;ti CASHMAN PIPELINE CORP.' 16 - Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1(part), J 982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., ;streets riot.. w " part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted ° • - „street if making a delivery or pickup on the subject street, or if this permit specifically grants permission >4o.use the street to deliver street construction materials and/or equipment 17. ' The City of La Quinta reserves the right to revoke, suspend or_void this•permrt -at any time z 18 The permittee shall indemnify, hold harmless and assume the defense of the City from all , 5 damages, delay costs, costs or expenses in law or equity that may arise.out of work under this permit. ' .may . [j l 1• .,. VP T s4 ,r y rat• l'p.. , �`•• �•i �-tt.'+ `.r , • ' - ,f •t •� r < .�t[__,� ' - yid _,` t- �. A'} t, . S • •Fy- - + •y. .f t , <r•-' :�a t4j - +j '' OR a •' ff i i'