3862 (2)City of La Quinta
',•. r � '• c • _r%" ''�"ems .3, �� �:.r � '���' ' {� ry� •5�
e ' ; The following General and Special Provisions are attached to and made a part of V �.. �}Sz
n Permit Number tiS `I
71
The followinq shall always apply: _ r' . • ."
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of'La Quinta's'right of way
ONLY. Whenever construction extends within private property, it is the responsibility of the.permittee for his contractors to -secure permission 'rpz,
j c - from abutting property owners. Such authorization must be secured by the permittee prior to starting work:
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved m,4
-,surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes toyprotect the paving
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, ;
" or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced '• .• '
over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed`necessary'by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the # s:
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or' r;
t cut existing drainage structures, City of La Quinta shall be notified prior to.commencement of this work. Drainage structures and open drains : y
• shall be kept free of debris at all times for proper drainage. a '
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All '. 3
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. ;Water tanker
` shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
,'DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the }"
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for `
the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, l '
permittee shall contact this office to obtain the necessary permission.
' SPECIAL• PROVISIONS
' A i•
The following shall apply when indicated:
®.>R1 ,- NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7075 at least forty-eight hours (48) in advance'of starting +
' z •` • construction.
• = ® R2�; UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by .permit, the permittee shall contact all concerned utility companies relative io- the location of existing substructures. r
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
permittee. �•
® R3 ';: UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the G .
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
® R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with (*' N/A *') inches of A.C. paving placed on ( *' N/A **) inches of ( *' N/A **) aggregate sub -base course having an
"R' value of not less than ( ** N/A **) and in conformance with the City of La`Quinta Road Improvement Standards and
M _ Specifications, Ordinance #461.
❑ R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
+> one-fourth inch (%") to one foot (1').
❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by - +, - •Aye ,.'.
a licensed engineer. t i
•'%
❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A ") feet shall y 11
f .�be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and 'l
' concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ' o
- N, R8' ,DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property..
line and the existing road paving shall be two and a half inches (2 '/2') of A.C. paving on (*', N/A *_�) of,class (," N/A
aggregate base. -
R9 • SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured. and maintained at all ;
times. x•
❑•R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer: Rate of application shall comply with the',', - �• �`
a manufacturerspecifications. 's .
' '" � Y. � .�y •i Sax �,a h� ' �. - ` ,i
City of La Quinta r. ;
. r •. The following General and Special Provisions are attached to and made a part of,, "
,• 3 Permit Number
} 7
The following shall always apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right 'of way
ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to.secure permission
,. 'from abutting property owners. Such authorization must be secured by the permittee prior to starting work.•` �•
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved ,.
surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the'paving•'�
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, c'
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced"
over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above...` ` : `•
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City - +�
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation: *..
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete` _ +
structures encountered, during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or
cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains
shall be kept free of debris at all times for proper drainage. '
• RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and. backfill operations shall be removed •from the right of way1 All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line,
"'µ;
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving: Water tanker. , n
_ shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE -WATER OPERTATIONS: If de -watering operations are required and�pumps_are forcing water on City of La Quinta roads, it'shall be the
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. ,
• CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for
the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time;
permittee shall contact this office to obtain the necessary permission. '
may. SPECIAL PROVISIONS r-
The following shall apply when indicated:
r ® R1 ' NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7075 at least forty-eight hours (48) in advance of starting .` • ; '
,. • ' construction.
® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized''
by permit, the permittee shall contact all concerned utility companies relative to the' location of existing substructures. .
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the '
permittee. ,
® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities.are clear of the' s
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
®,R4• ` PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with (** N/A **•) inches of A.C. paving placed on ( ** N/A **) inches of ( " N/A **) aggregate sub -base course having an
k "R" value of not less than ( ** N/A'** ) and in conformance with'.the City. of. La Quinta Road Improvement Standards and
c Specifications, Ordinance #461.
❑ 'R5 ' r„ ` PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to,a slope of. �r •"
one-fourth inch (%") to one foot (1').
'❑: R6- • . • GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established liy
. a licensed engineer.
❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curband/or curb and gutter ('* N/A **) feet shall
be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
` concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. '� L
A ® .R8 •. DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2") of.A.Caving on (*' N/A'.*) of class (`* N/A ** )
a '/2 . pA
aggregate base.
® R9' SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all
times. s
- ❑sR10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the•
w manufacturer's specifications. ? . ;T . " •,
WEEKLY. INSPECTION REFOT
PROJECT NAME ' Fd,9,,ervc 'S1 f7 _r C° eS' DIN
PERMIT.NO.PLAN SET NO. INSPECTOR
DATE JOURNAL OF NOTABLE ACTIVITY & ACTION
-Da7`e ei vwd Caoris t:
0Y779 fe a Curbs
03 far n� !�`�u r r� s' ��c 1 r
i
NOTICE SUMMARY FOR THIS WEEK: (INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 04/02 Page 1 of 2
WEEKLY INSPECTION RF-P*-*
PROJECT NAME - 8_ Fad A/" 7� DIN
INSPECTOR
PERMIT NO.. ��� PLAN SET NO.
CONSTRWION ACTIVITY SUMP
YR MO DATES: thru WORK BY SPECIAL
PERMISSION
MON I TUE I WED I THU I FRI I SAT I SUN NITS
TRAFFIC CONTROL
(CONTROL
Onsite Measures
Track -out Cleanup
Conforming implement;
Non -conforming impler
)ING
Clearing & Grubbing
Earth Moving: Cut & Fill
Fine Grading
Compaction Testing/Rel
-ET IMPROVEMENTS
AGGREGATE BASE
AC - BASE LIFT
AC -'CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/Reports
Material Certifications
AC Design Mix
WA R IMPROVEMENTS TE
MAINS
SERVICES
Compaction Testing/Reports
Material Certifications
SEWER IMPROVEMENTS.;:<•::•:;•>:�;::.::::•;::«:::>:.;::•:;•:::;:.::•::•:;;.;;:.::.::..::.:r;;::;::;:;•:;.
:�•::•;;•:::•>;>::::•::�:sz:;:;;:<;<;.•;:.:::•:::.•;:;•.::.;:•:•;,•:;•;::.;::•:_:•::•;;•>::•;:•;:•:;:•::;:•;:•>::.:•:;•>::
,••:,�::N:::�;•::•
:�.:;<�•,.;:,,,:n.;::..>,::::�.:.;..:;.>�:.fi.::.,;:;<.::v,,,
::::..:...:::::.::.z,.,.,.;�w;�,:
:: •tz::.;..;:
MAINS,
LATERALS
STRUCTURES
Compaction Testing/Reports
Material Certifications
STORM DRAINS
:isO::i:^i;:}:isr:{j:iii:isi'<>.�iy{ii`iiii'r'�:•:•:{>4iiiii:'v:'vii'ri'�i::i
::.•..:.•::::�•::•::::,:.::::,:..•::::::::::::::..:.
G:iji
.�,„>.,..;v::^::::.>.:.N.,:>::.,,•:::..::;'s:i<:3;;;•:�..
;r;: ;•:
•:<
MAINS
STRUCTURES
SANDFILTERS
UTILTIES
CONDUITS
Certifications
PERIMETER I I I v 1
F130 04/02 pane 9 of 7
WEEKLY INSPECTION REP
PROJECTNAMEC9{�;C,?*Bui[l1t7S' 78-90D W✓t"V7 DIN /�
PERMIT NO. Lo 2 PLAN SET NO. INSPECTOR T/2d"y-cl � "t�.Pn rOrl'1
DATE JOURNAL OF NOTABLE ACTIVITY & ACTION
03 e % d �o7�s 1`. r7> V ul4 C %a s. s L� Ga e
12-&-63 7'y19 r . J f. cYs cl. -7--il 0 e -D Ls ur(r
NOTICE SUMMARY FOR THIS WEEK 1INDICATE ONLY DATE & TYPE OF NOTICE ISSUED IN THIS SECTION)
F130 04/02 Page 1 of 2
CONSTR TION ACTIVITY SUMMA
YR MO DATES: thru
WORK BY SPECIAL
PERMISSION
MON
TUE
WED THU FRI
SAT SUN NITE
TEMPORARY TRAFFICL ONT
.r».. <::... ?•?«v
Conforming implementaton
Non -conforming implementation
DUST CONTROL
Onsite Measures
Conforming implementaton
Non -conforming implementation
Track -out Cleanup
implementation
GRADING
Clearing & Grubbing
Earth Moving: Cut & I
Fine Grading
Compaction Testing/F
STREET IMPROVEMENTS
C&G
SUBGRADE
AGGREGATE BASE
AC - BASE LIFT
AC -'CAP
STRIPING & SIGNS
TRAFFIC SIGNAL
Compaction Testing/F
Material Certifications
AC Design Mbc
WATER IMPROVEMENTS
MAINS
SERVICES
Compaction Testing/F
Material Certifications
SEWER IMPROVEMENTS
MAINS,
LATERALS
STRUCTURES
Compaction Testing/F
Material Certifications
STORM DRAINS
MAINS
anFvur�� i cnv
Compaction Testing/Reports
Material Certifications
:z::ti:::>:;:::::;ri:;::::?::;:i:>: i:::::::::::;•;::;:::?:;:;::;;::;::sir: � <:::z:;::::::>:r�;:>>::i �:;::;•xz:i; �::?
DRY UTILTIES::??;.>::??.?:zx.N?.;,:<:,.•::,�::<:::_:«:�:<;M.�:;.>....r._.r.....,....r..;.<;>,:•;>:?.�............ ��ti:�>s»>.�.>:s.:,,�:<•»>��;��h:.vs•?�:.:
Material Certifications
ISCAPING
MEDIAN
Penn 9 of 9
' WEEKLY INSPECTION. REOST
PROJECT NAME T�'' �iGl� rgV'C �/7 ��/ Ce DIN
PERMIT NO. 2-8g 4 2 PLAN SET NO. INSPECTOR ( "t5y h "Awl
DATE JOURNAL OF NOTABLE ACTIVITY & ACTION
F130" 04/02- rage i oT