PUBLIC WORKS. CONSTRUCTION. (ENCROACHMENT) �� w
c� 0F9�s
t For. the construction of public -or private curbs, -driveways,. pavements, sidewalks, parking` lots, sewers;.water. mains
". and other•like public works improvements.in connection with MINOR IMPROVEMENTS.and.APPROVED.SUBDIVISIONS
'Subdivision.Improvement Permit — Class-111
DATE:' July Us .2003 Minor Improvement Permit Class IV X
LOCATION OF CONSTRUCTION East side of Washi ri8C6n Street at Fre4 .WarIng. .
(Street'aciclress.oe Description of ILocation) `
PURP•O,$E:OF CONSTRUCTION System .#xnJ�rove Brits Sketch (attach constructioh.plans if appropriate)
DESCRIPTION: OF'CONSTRUCTION Excavation'of Undargr. A a
. See Attached 57eecial. Cohditions
condisit (185 . 1 ':roarer Hale 'racond%igtorine,..
'4-34'9:S,X AAg on.•eixiatt±it:a aal.ara .
DIMENSION OF INSTALLATION,,OR REMOVAL' 1 ��t=nr pole
185' `txenehia & of 4�3.97.5
HCH 'dire as 6ki.'st
.SIZE OF EXCAVATION, IF NEEDED 4,' '_185r. k 4''
APPROXIMATE TIME WHEN WORK WILL BEGIN. UJDon recei0t
of perm9.0
APPROXIMATE TIME OF -,COMPLETION 15 wor' ki.ns 'dave
ESTIMATED.CONSTRUCTION COST. $ `95..000.
(Including removal of a1I`obstruction,'m6terials, `and debris; backfi)ling;.com-
paction and ''placing permanent resurfacing and/or replacing improvements)
In consideration .of the' granting of this .permit; the applicant hereby agrees to:
Indemnify,defend, and save the City, its authorized'agents, officers,. representatives and employees, Harmless from and against any and all
penalties,' Iiabitities 'or loss resulting from claims or court action. and arising out'of• any. accident,, Joss or damage to persons or property.
rring 'as a proximate result of any work the ,permit granted pursuant to this,application.
happening:or occu
Notify the•,Aclminisfrative Authority at least twenty' -four (24) hours in'advance.of the'.time when' work will be started..
Comply with all •applicable City: Ordinances, the terms and conditions of.the permit 'and 'all applicable rules and regulations of the City of • `"
is
La Quinta,and to, pay for any additional replacement nece'ssary.as the.'result of tF�is work:
Signature oJApplircantor Age�it••
PX. Box'.937, ,lmyeeriai.. CA 921181 '(760}.139;9238
Name of Applicant (please print) Business Address Telephone. No.
Name of -Contractor and Job Foreman Business Address ."Telephone No.
Contractor's License No. City Business License No.
Applicant''s'Irisurance Company . Policy, .Number
FEES: . Subdivision Improvement Permit —.Class III
Public improveinents:' 3% of estimated construction costs 3 .
Private •improvements: 3% of estimated construction costs
-
Minor Improvement Permit— Class IV: See attached schedule.$
44
Inspection Fee $• T- & •Me" PERMIV VALIDATION
Permit Fee PERMIT NO:.- 3944
Penalty Ju1v 16 2003
Cash Deposit -Surety Bond • , DATE APPROVED
if required EXPIRATION -DATE', July 31. 2,004
TOTAL. $ DATE ISSUED
*S®.e. Spoclal t C6nditioacr ,/'� f l �✓`
' Receipt No.
Received by Date' ° Administrative Authority o It
Y
Recorded by Telephones (760) .777-7075J
OPERATING HEADQUARTERS .• P. O. BOX 937 • IMPERIAL. CALIFORNIA 92251,
GENERAL SERVICES • REAL ESTATE SECTION
(760) 339-9239 PHONE • (760) 339-91 27 FAX
GS-RE July 14, 2003 RECEIVED
JUL 16 2001-
PUBLIC)k®RKs
Timothy R. Jonasson, P.E.
Public Works Director/City Engineer
CITY OF LA QUINTA
P.O. Box 1504
La Quinta, CA 92253-'1504-,
Subject: Application'for'Encroachment Eermit, Washington Street/Fred Waring
Dear Mr. Jonasson:
The Imperial Irrigation District hereby requests permission to enter the
City of La Quinta's street,right of way for the installation of electrical
facilities.
Construction consists of the excavation and installation of underground
conduit. One (1) power pole approximately 185 feet trenching in conduit
installation. Installation includes 4,100 feet of four (4) #397.5 MCM AAC
wires on existing poles as shown on IID Drawing for Network No. 4012734,
Project No. P-4171.
The District would greatly appreciate approval of this necessary permit.
Please call-(760)' 339-9239 if you have any questions.
Sincerely,
JIM KELLEY, Supervisor
Real Estate Section
/OTE:
Yth proper validation his form constitutes an CITY OF LA QUINTA o
ncroachment permit g
APPLICATION FOR PERMIT -
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) '-56
OF
For'the construction of public or private curbs, driveways, pavements, sidewalks,, parking lots, sewers,. water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
%-8-03 Subdivision Improvement Permit — Class III
DATE: , Minor Improvement Permit Class IV
LOCATION OFCONSTRUCTION EAST SIDE OF WASHINGTON STREET AND BETWEEN FRED
WARING AND AVENUE
(Street address or Description of Location) • _ ,
PURPOSE OF CONSTRUCTION SYSTEM IMPROVEMENT. Sketch (attach constructio tans i appr rate • r ".
1jWM[TA1f
II'c.�Cl N LXUAVAIION AND
U PUFF
AA ON SITO(
° 'sP�'V �" ft�"T��`519 T° L I 4 0 E
SIZE OF EXCAVATION, E ED ,
APPROXIMATE TIME EN W L — ;
APPROXIMATE TIME O F ETI
ESTIMATED CONSTRU O -
(Including removal of all r o11,
ma i a Is, d deb i , a g, com-
paction and placing per anent r s rtaci 9 nd/o re g improvements)
In consideration of the n f this )-omit, the applicant hereby agrees to:
Indemnify, defend w _ e City, its authorized agents, officers, 'representatives and -employees, harmless from and against any and all ' -
f
penalties, liabilities r -loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
cc i happening or ourring as a proximate result of any work undertaken under the permit granted, pursuant to this application..
Notiiy the Administrative Authority at least twenty-four (24) hours in advance ol'the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
r
La Quints and to pay for any additional replacement necessary as the result of this work.-,,
Signature of Applicant or Agent
JIM KELLEY, SUPERVISOR RFAi ESTATE p n ROX 917, IMPERIAL, CA 922(760) 339-9239 4
"PFdRJ)A[sa-1RR4sGAMON DISTRICT Business Address Telephone No.
Name of Contractor and Job Foreman Business Address Telephone No.
Contractor's License No. City Business License No.
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit —Class III ***I I D DRAWING FOR NETWORK #4012734
Public improvements: 3%of estimated construction costs - PROJECT #P-4171
Private lmptovenlents:3%ofestimated construction costs ATTACHED• HERETO AND .MADE PART `OF.
Minor Improvement Permit - Class IV: See attached schedule
r
Inspection Fee $ PERMIT VALIDATION
Permit Fee ° PERMIT NO.,
Penalty
DATE APPROVED
Cash Deposit -Surety Bored I r I ! '
if required 1 EXPIRATION DATE ;
TOTAL: S DATE ISSUED
Receipt No.
BY
Received by Date I • Administrative Authority
Recorded by Telephone: (760) 777-7075
I
Jul 16 03 04:55p LQ CONST 5875 3985875 p.2
NOTE:
With proper validation
this.form constitutes an CITY OF LA QUINTA V/
encroachment;;permit APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like publlc works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit — Class III t
$z 2003 Minor Improvement Permit Class IV
GATE:
LOCATION OF GON TRUCTION
J:/L*—T 3JDE cF VVASHJNG7bf4'OT— B��FiJ66N
(Street address of Description of Locasionl 'j'' t _
�y-uk! I MFKO Sketch (attach constructio lans i appr r ate
PURPOSE OF CONSTRUCTION
DESCRIPTION OF CONST UCTlrOMCCAVAT7CWj
'N 66a*+tOv�1�4M6
tJ• . Cori wtj
sfsfVG
DIMENSION OF INSTA ATT16N OR REMOVAL
29 M
SITE 0F. EXCAVATION. E ED
APPROXIMATE TIME EN W
APPROXIMATE TIME O ETI _
ESTIMATED CONSTRU 0
(including'''removal of all r o , ma r 1s, a d deb I , a 9. corn
-
(including' and placing per anent r s act nd/o 're g Improvements) .
In consideration of the r •n f this mlt, the applicant hereby agrees to:
Indemnify. �tlt*fend ta• c Cay, its •uthori:ed agents, officers, repreiunWtives and employees, loss
orsstrommar toed arsons any and all
penalties, liabilities r loss resulting from claims or court' action and arising ous o1 any accident, loft or damage pplicato com or property
- happening or occurring as a proximate rasuit of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority as soon twenty -lour (gal hours in advance of the Ilme when work will be started. -
Comply with all applicale City Ordlnencas, tho %arms and eonditlons of the permit and all applicable rules and regulations of the City of `
' La Quinta end %o pay, for any additional replacement necessary as the result of this .work. -
Signature of Applicant or Agent
D p6. (36?c 93� � HpCMAL✓ R Y�ZS� (`76O) 339-
Name of Applicant (please print(
usiness Address Telephone No.
Telephone No.
Nome of Contractor and .lob Foreman Business Ad - •
Contractor's License No. City Business License No. ,
e
Policy Number
Applicant's Insurance Company
FEES: •'Subdivision Improvement Permit — Class -I I
Public improvements: 3`a6 of estimated construction Cosa
Private Imptovetnenu: 3%of-estimated construction costs
Minor improvement Permit — Class IV: See attached schedule '
} PERMIT VALIDATION
Inspection Fee $ ,
Permit Fee PERMIT NO.
Penalty DATE APPROVED
Cash Deposit -Surety Bond
If required EXPIRATION DATE +
TOTAL: S DATE ISSUED
Receipt No. By
Administrative Authority
Received by Date i
Recorded by I Telephone: (760) 777r7a75
1
2
3.
4.
5.
N
PERMIT NO.3944
Imperial Irrigation District
In addtt><on to the standard permit conditions, the followmg shall apply:
Imperial .Irrigation District is hereinafter referred to as "Permittee". As a public agency, the
'Permittee is entitled to pay only direct expenses incurred by the City while administering tasks related
to the permit, in lieu of paying the standardencroachment permit fee adopted by the City Council. City '
staff and its contract staff will maintain monthly time and material ledgers of expenses incurred, and
the City will invoice the Permittee on a monthly basis for the accrued cost.
The "T&M" note; and the "TBD" note, that appear in the "FEE" section on the face of the permit
form, respectively mean "Time & Material" and "To Be Documented" and is a reference to the
direct expense method defined in the previous paragraph.
Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For Public
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more
frequently, if required.
Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout
the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance
of equipment within one-half mile of human occupancy shall be performed only during the following
time periods:
October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May lst.to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
_ 1
Work shall be prohibited on legal holidays and Sundays.
Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m.
- 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m: The Permittee shall
contact the Riverside Country Traffic- Signal Maintenance Department at (909) 275-6894 if signal
operation at the intersection is to be altered in any way.
Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private street
and for any damage to other City streets onfacilities as a result of work performed under this permit. .
Special Conditions
Page 1 of 5
PERMIT NO. `3944
Imperial Irrigation District
7. Pursuant to Section 14.16.250 of the La Quinta Municipal.Code (Ordinance 10 § 1 (part), 1982),.
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan shall be prepared in accordance with the WATCH Manual and submitted to the City for
review and approval one (1) week prior to starting any construction. ' It shall be the'Permittee's
responsibility -to appropriately detour and barricade all construction sites.
Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street
closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be
maintained at all times.
8. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but,not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
9: Should additional work, materials, or modifications of the work be required in order to meet City.
standards,, safety requirements, signage requirements, or to fit actual field conditions, the work shall be
performed by the Permittee as directed by, and to the satisfaction of the City, Engineer at no cost to the
City of La Quinta.
10. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition
of the Standard Specifications For Public Works Construction (SSPWC), except as.otherwise specified_
herein.
Native material may be used as backfill material provided that minimum compaction, achieved in the
manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water
densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's
responsibility to provide appropriate geotechnical supervision, testing, and inspection; onsite, at all -
times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When, a firm foundation is not encountered due to soft, spongy or other unsuitable material, such
material shall be removed to the limits directed by the Geotechnical Inspector and/or the City
Inspector and the resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be brought to or maintained at appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through progresstesting on the stockpiles.
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths'at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth
of lift that can be compacted.
Special Conditions Page 2 of 5
D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be
taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall -establish the maximum lift thickness.
to be compacted for the remainder of the project.
E. In subsequent lengths of trench, the frequency of compaction tests shall equal one.per each lift
of backfill, per 300 linear feet of open trench, at randomly selected locations within the open
length of trench.
F. The depth of the randomly selected compaction tests shall also be randomly selected except that
where multiple tests are. required in a given length of trench, the tests shall be no closer than three
feet (vertically) from -each other.
G. If any compaction. test fails, previously' placed backfill (in the same length of, open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test
results shall be furnished to the City Inspector.
11. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction -of the
City Engineer for the protection of the public. "Lengths of open trench shall not greatly exceed that
which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight,
however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length,
open overnight at a point where construction will begin the next day, provided that this length of trench
is completely covered by steel plating. -
12. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its
original condition.
13. Access and egress to all local properties shall be maintained at all times.
14. Pursuant to Section 14.16.375 of the. La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
of the work. Permanent pavement replacement shall conform to the following conditions -
A. Existing asphalt concrete pavement shall be sawcui one (1) foot beyond trench edges. Edges shall
be straight and clean.
Special Conditions Page 3 of 5'
PERMIT NO.3944
Imperial Irrigation District
B. Permanent pavement replacement structural section, within all trenches; shall be 1" thicker than
existing of asphalt concrete over the same'existing thickness of crushed aggregate base or crushed
miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard
Specifications for Public Works Construction. The replaced pavement andbase material shall
be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of
trench. Verify exact structural replacement section thicknesses with the City prior to installation.
C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium
asphalt concrete as the base course lift and a City approved % max medium finish course lift for
capping. Asphalt concrete mix design shall be approved by the City prior to its placement. t
D. _ Cold -Mill and Overlay - The existing pavement which was properly protected in place during the
trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10
feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area
and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000
asphalt concrete mix. The width of the cold milling area shall be as follows:
For longitudinal' trenches located in a parking lane: three (3) feet outside the sawcut
removal lines.
For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal
lines, or to the lane line striping, whichever is greater.
For transverse trenches across existing street: two (2) feet outside the sawcut removal lines.
E. If grinding and capping operations are not performed in the same day as base paving operations,
the base course lift of 3/4" max medium asphalt concrete shall be installed from saw -cut edge to
saw -cut edge flush with the existing'street surface. The base course lift of paving shall not be left
0.10' low in anticipation of grinding and capping.
F. Any existing lane striping or. any existing detour lane striping affected by this resurfacing .shall
be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer.
Affected traffic signal loops shall be removed and replaced in kind. The finished pavement
surface shall be smooth, consistent, and shall conform to the surrounding grades.
15. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization shall be done
immediately after completing the operation.
16. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants
permission to use the street to deliver street construction materials and/or equipment..
17. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
Special Conditions Page 4 of 5
�r
City of La Quinta
The following General and Special Provisions a e�attached to and made a part of
Permit Number
The following shall always apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY.
Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from
abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved
surface unless fitted with smoother -faced 'street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced
over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or
cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains
shall be kept free of debris at all times for proper drainage.
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall.be the
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the
adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777, - 7075 at least forty-eight hours (48) in advance of starting
construction.
® R2 UTILITY CLEARANCE: I(Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
permittee.
® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with ( ** N/A ** ) inches of A.C. paving placed on ( ** N/A ** ) inches of ( ** N/A ** ) aggregate sub -base course.having.an
"R" value of not less than (" N/A `*) and in conformance with the City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
® IRS PARKWAY GRADING: Area between the property line and top of the proposed concrete.curb shall be graded,to a slope of
one-fourth inch (%") to one foot (1'). /
® R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a
licensed engineer.
❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A *`) feet shall be
removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter• and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2'/2") of A.C. paving on (** N/A **.) of class (** N/A.** )
aggregate base.
® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all.
times.
® R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the
manufacturer's specifications.
City of La Quinta
R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or. City of La
Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State. or, City of La
Quinta forces to preclude delay or interference with State.or City of La Quinta projects.
® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon completion or replacement of all survey monuments for proper clearance.
® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straightedge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be
used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected..
® R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the
protection of the traveling public. The Public Works Inspector shall determine the suitability, of excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of
producing and adequately consolidated backfill. Ant material which the City of La'Quinta deems unsuitable (spongy or
saturated material) which'is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three
feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a
relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.
® R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the
trench before flooding or a maximum of three feet (3') lifts where trenches are of excessive depths. Care is to be exercised
that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuos.
® R18 . COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one -
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973,
® R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
® R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after
a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5) day limit.
® R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting'of
two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( 4 ) inches of A.0 surfacing placed on a ( 6 )
inch ( crushed ) aggregate base shall be placed no later than ( 7 ) days after completion of temporary road repair.
® R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
® R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon
completion of permanent repairs.
❑ R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by
a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The
stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method:
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.
t
er
NuJ
Z
p
r
,I ( ;Q $I { i H, I� i j
10 U !,*' ZI
--------
---IN:
I
Q
,
i
I
3501I�CM U.G. ABLE 690'
.. ..
__ _._..._...... _. _ __ .. �_
> _ ....._..._._._._..._.._._ ... ( ICK-UP , W A S H I N G.......
W A S H I N G T 0 N ST.
- - v - - -- - '--_.<— : _ ' _�-�z:- - - ' • s�:= - - - - NQ POlE ! 9759-40 2 6 CND S
- -- - -- - - -- .- . ---- --- - --e_i� --.. - - _.: 5Q _.: 250.- - 5 217
EXISTING6-6 'NDS � _ !�-D4.€=���z._—�-_= -- _ _- �. �>,�_T<•-----2=.rR:��.;—_=�.=,�r:-__-30�----- -- -- --- -- �_�05--NEk�#!< N(#=P6L€- 19�•----- .:—��t#1�-�-�QEI NO POLE __�00�--__=..-=NO=-P� 2 __ --# - --- ---� - - --- '
�10 - -- —= �_- . - - -- - -- - - ---- - - -- - — - -- .15
., .. .._�.• STUB -OUT -- - - - - - --
✓ 1091 40 _ ..
3-1 //0 ACN 3 r'"' 1093106-40T - 1093112-40, __—_ _,. _ -0 IN: S11RR-UPS
ABANJ�O�� _� 1 31 - 1 1 9760-
093i16-4O' _ .
_ _ --
e � 10
- - �(
9 0931 8- 40
❑ F / C 98�0- Q 911190 UN604H
= UN3276V0 1093109-40
H1 I ; I 1093105-40 lire S71RR-UPS
-= = UN1 , I INi 4- 397.5 MCM AAC 7r2/12r5KV 30 PRIM. (4100 CA.)
I ; W z 185' I ;
RM. 4-1/0 AAC 7,2/12.5KV 30 PRIM, EXISTING (4200 CA.) o
4011_ (EXISTING ❑LES
QUINTLA I Z
17>S i'
RM: 30 PRIM. I12.5KV
MT.
Z
0
w
w
CITY CIF LA QUINTA PERMIT
...
PROJECT P- 4171 NW 4012734 C.S.P.# SHEET 20F 2
REVISION CHART IMPERIAL IRRIGATION DISTRICT
_ DESCRIPTION IMPERIAL, CA.
COACHELLA VALLEY DIVISION
— — UNDERGROUND DISTRIBUTION
' y CITY for
4011 CIRCUIT
p NORTH LA QUINTA SUBSTATION
WIRE LAYOUT