Loading...
3973' NOTE '• With.proper validation i this form constitutes an ' o CITY OF, LA QUINTA ,encroachment'permit APPUCATION FOR PERMIT r $ . PUBLIC . WORKS• CONSTRUCTION .(ENCROACHMENT).' OF For. the construction of public. or :private curbs,' driveways,'. pavements; sidewalks; parking -lots, .:sewers, water mains,. and,cither Pike public works.improveme'nts in connection -with MINOR IMPROVEMENTS and APPROVED,SUBDIVISIONS Subdivision Improvement,Permit.= Class III X DATE: Ausniax' 19. 2003 Minor. Improvement Permit Class IV. ; LOCATION OF CONSTRUCTION-Trrici J05.2.1.- 'Forbee Circle (Street address or Description of-Locatio'n) " PURPOSE OF • ..: ' : ...' . ION hieW Be;Wtii3Y mein ' .,. •. • CONSTRUCTSketch (attach constructionplans if appropriate) b.ESCRIPTI10N.OF CONSTRUCTION 1401F.. of 8 : VCP 'Pine Plan .S eff *See' Attached Specitil .Oaztditionti* . DIMENSION -OF INSTALLATION .OR REMOVAL 140" •3•' 10r: x. 9! . `SIZE OF EXCAVATION, IF°NEEDED' 140f. a, 10f x' 8' ? ` APPROXIMATE TIME WHEN WORK WILL BEGIN Auauat 13.`• 2003. D d •APPROXIMATE TIME OF COMPLETLON '10' ien��)//��wQrk3irg cawe�' AU�'. q ..ESTIMATED CONSTRUCTION'COST $ 1.Ow0UQw4767 ?t'2 ?®®�{ (Including removail of all obstruction, materials, and debris;,backfilling; com paction and placing permanent resurfacing and/or' replacing improvements) :'In consideration of'the granting of. this permit; the applicant hereby. agrees .to: PT� lhdemnify,.defend•'and•sive the Ciiy,'its authorized agents; officers,representatives and employees; harmless from and against any and all penalties, liabilities or -loss resulting from claims .or court action °and. arising out' of any';` accident, loss or damage to -persons or 'property. happening or occurring as a 'proximate, result of any work undertaken under, the, permit granted pursuant to ;this application. ' Notify the Administrative Authority at least twenty-four, (24) hours• in advance of the time when 'work will be started. Comply.with all applicable City'Ordinances, the terms and conditions of the permit andNalI applicable rules'and regulations of the City of La Quinta 'and 'to pay for -any additional replacement necessary as the result of thin work. Signature of Applicantor Agent Cornerstone - Davelopere b. Ine' . 5005 Ce�'3 a San RaphaelSn3 to 8� P.S. _ (760) . 3.25-4259.: r Name of Applicant (please print) ? : Business Address Telephone No. V 6 M CConstrruc ,Jon. Ca. Ima.:(Steye Vatter) .00-975 Judio '�ttite C49 -India (760) 347-3933 Name of ContractoF and Job Foreman ' Business Address, Telephone No: 111113 .1956 Contractor's License No. City Business License No. 1•a;Kington tusurande' Company 1141839 Applicant's Insurance Company Potic Number -FEES:". Subdivision Improvement Permit - Class I II• Public improvements: 3% of estimated construction .costs Private improvements: 3% of estimated construction costs Minor Improvement Permit '—'C:lass IV : See attache,d'schedule' _ 39,73. Inspection Fee $ '300.00. PERMIT VALIDATION r - - :; Permit Fee : 100..013 3973 PERMIT.NO... Penalty DATE APPROVED August 14, 2003 . Cash Deposit -Surety Bond if required • Au u�Q->w�3 D2004 EXPI'RATIO,N,DATE- i�1�,� TOTAL: $ 400.00 ✓ta' l.V DATE ISSUE. " Receipt No: �B ` Received by Date Administrative Authority.. Recorded byTelephone: ('760),777-7075 P.O. Box 1504 78-495 CALLS TAMPICO (760) 777-7"000 cF^roF LA QUINTA, CALIFORNIA 92253 FAX (760) 777-7101 September 5, 2003 Mr. Joseph Swain _ Vice PrIsident of Construction. Operation Corners,one Developers: 5005 CIlle San Raphael'Suite B-1 Palm Springs; CA 92264 I RE: Encroachment Permit No. 3973 for La Quinta Del Oro Dear 14 Swain: . In accordance with Section 107.5 of the Uniform Building Code, I have assessed double the pen t fee ($400) for additional investigative work necessary in connection with the sewer 1•a installation on Forbes Circle. ,Please remit this payment at once to the City. Please I e advised that work within the city's right-of-way without a permit is in violation of the Municipal Code punishable by up to a misdemeanor for violators of this provision. Attachei-is Section 2.04.100 of the Municipal Code should you choose to appeal my decision. If you lave any questions, please contact Steve Speer, Assistant City Engineer at (760) 777-7043 or me at (760)777-7.042. Sincere. y, Eubl oth R. J asson, ic . orks Director/City Engineer W/acj j. P • cc: omas P. Genovese, City Manager �tve Speer, Assistant City Engineer in , P eer f +. r i 1.04:100 Appe i s to council., Pagel of 1 Title 8DMItAISTRATION AND PERSONNEL Chadter 2 04 COUNCIL l 2.04.100 I ppeals to council. A. Except hen an appeals procedure is otherwise specifically set forth in this code, any person excepting t the denial', suspension, or revocation of a permit applied for or held by him pursuant to any of the provions of this code, or to any administrative decision made by any official of the city, if the denial, sus ension, or.revocation of the permit or the determination of the administrative decision involves theexercise of administrative discretion or personal judgment exercised pursuant to any of the provisions I f this code, may appeal In writing to the council by filing with the city clerk a written notice of the appeal: B. No appe 31 may be taken to any such administrative decision made by an official of the city pursuant to any of th provisions of this chapter unless the decision to appeal has been first taken up with the departmeni head concernedand with the city manager, and each such official has not adjusted the matter to th3 appellant's satisfaction. C. No right 3f appeal to the council from any administrative decision made by an official of the city pursuant to any of the provisions of this code shall exist when the decision is ministerial and thus does not involve he exercise of administrative discretion or personal judgment exercised pursuant to any of the'provisic ns of this code, whether the administrative decision involves the denial, suspension, or revocation[ f a permit or any other administrative decision. Also, there shall be no such right of appeal with regard to law enforcement activities Involving state law. (Ord. 2 § 1 (part); 1982) r ' . /c'uV� U�ti;CL I nr� rtiuf f i r l�� LA QUlNiA PUd. WKS. ®® _ l�jtiplipi;�1 NOTEI With proper yalldat on AUG 14 2003 this form aonatitutf-s an CITY OF LA QUINTA oneroeohtriant perrr,lt APPLICATION; FOR ,PERMIT PUBLIC, MR. PUBLIC WORKS CONSTRUCTION (ENCROACHMENT] For the oonitructlon of publto or private aurbs, drlVewey>•, pavaments, sidewalks, parking lots, towers, water mains and other Ilkil public works Improvements In connemicin with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdlvlslon Improvement.Perm It„ -Chas I II X DATE;. 14, 2003 Minor Improvement Permit Clan IV _ LOCATION OF CCNSTRUCTION Fames Circle I Brach '�521 s latrnt eddrnsa v! Deu:rtptlae et t_ooetlohf PU SCE OP sTRUCTION I�n7 9C min Sketth Iettat:h Construction plena If epproprleto). DESCRIPTION OF CONSTRUCTION i� DIMENSION OF INSTALI,gTXON px8ff M?cep size of ExcAVA'rloN'S' 1E8€x8 cleep APPROXIMATE TIME WHEN WORK WILL BEGIN1�nn� APPROXIMATE TIME OP'COMPLETION 10 wor7intr car s ESTIMATED CON:TRUCTION COSTS iUU Uncluding removal 'of all obstruction, materials, and debris, backtllling, com• pectlon and plaoMli permanent resurfacing and/or replacing Improvema In oonsiderstlon of the grit lnp of this parmlt, the eppllcent h role to Irtdpnnity, dKttmO and Rya the City, Its lutnorltod seem n, utl Ioyeas, hefmleY from end ■palrut any and ell ponstda, 110111tlu or loco rotulting from olelrno or an no nv eocldsnt, Ion or demape to poriont or properiv Aepporlea at exurrinp $e a prexlrnats ruult of or learn nder parmlt Reniod purw■nl to this epplloetlan, Notify the Adnllnletrati," Arthorlty at I" n r r I ou woof or tM`ilme when work Will De flerefd.'= CormolY wtln ell 1opIIGBIe City Ordlnen Ih I Itlens of the permit slid all eppllcable rules end repuletlone a o1 V t3uints and to pay for any eddittonel re o of it the result /this red/rk, Slgnaturo of Applloent or Agent le DeveL=, Irlc. 5005 CLlle San 1, B1 Palen ems, CA 92264 (760) 325-4239 Namo of Applloant I;plauo print) Butlivess Address Telephone No, VE � 0D.,.. Il-c. Stye Vatber 80-975 Irrlio, C4 Lrldio, CA` 92201 (760) 347-3933 Nance of ContrieW end Job Foromen Butinear Address Telephone No, 711113 1 195E COr+ttaotar'e License No, City elidnees Lloenee No, Lexington Insurance Company 1141839 Appllcent's Inturence Company Policy Number PEES, Subdividgn Improvement Permit— Clou Ili Public Ift1mvelnentn 3% of ettlmeted construction costa E Prlvete 1trtp►6vementt:3%cfeetlmetad conttruation costs Minor linprpwnunt Perrnit — Claee IV:: 5ee etuohed tahedule Inrpectlon Fed 3 Co. 00 I DD PERMIT VALIDATION Permit Fee Penalty _ Ceeh Depoelt•Svrety Bond -� It rsqulred TOTAL: $ .OD Receipt No, Received by - Deter Recorded by PERMIT NO, PATE APPROVED EXPIRATION BATE DATE ISSUED By 1 Adminietiniva Authority,:. Telephone: (180) 777.707S PERMIT NO.3973 Cornerstone Developers, Inc. In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all . work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. Cornerstone Developers, Inc., hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. 3. Streets shall be kept clean.. They shall be completely cleaned at the end of each working. day and more frequently, if required. 4. Pursuant to Section 6.08.050 of the. La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the.Permittee shall comply with City regulated work hours. 'Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October Ist to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May l st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays -and Sundays. 5. Work performed within 500 feet -'of a signalized intersection is restricted. between the hours of 9 a.m.' - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal. Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in anyway. 6. Pursuant ' to Section .14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any -damage to other City streets or facilities as a result of work performed under, this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § .1 (part), 1982), . . . advance warning signs and traffic control shall be installed and maintained in' accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall be prepared in "accordance with the WATCH'Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions Page l of 4 PERMIT NO.'3973 Cornerstone Developers, Inc. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A'Minimum of two. (2) travel lanes of paved surface shall be maintained at all times. 8. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which'impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and. storm drain facilities. 9. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements; signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 10. Pursuant to Section 14:16.370 of the La'Quinta Municipal Code (Ordinance *10 § 1 '(part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection; onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is: not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and .the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at appropriate . moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be'backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction.tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions Page 2 of 4 - PERMIT NO.3973 Cornerstone Developers, Inc. E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per'each lift of backfill; per 300 linear feet of open trench, at randomly selected locations within the, open length of trench. F. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench,.the tests shall be no closer than three feet (vertically) from each other. G. If any compaction test fails, previously placed backfill (in the, same length of open trench or previous lengths of trench) which is'represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. H. All costs incurred due to -the conditions above shall be borne by the Permittee. Copies of all test .results shall'be furnished to the City Inspector. 11. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection,of the public. Lengths of open trench shall not greatly exceed that which can not be=backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. . 12. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 13. Access and egress to all local properties shall be maintained at all.times. 14. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent -pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness .of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95%. relative compaction. and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as. the base course lift and a City. approved ''/z" max medium finish course lift for capping. Asplialt'concrete mix design shall be approved by the'City prior to its placement. Special Conditions Page 3 of 4 PERMIT NO., 3973 Cornerstone Developers, Inc. D. Cold -Mill and Overlay -. The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area . and base asphalt concrete in the trench area shall be.overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: • For longitudinal -trenches located in a parking lane: three (3) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal lines,. or to the lane line striping, whichever is greater. • For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 3/4" maxmedium asphalt concrete shall -be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. I Any existing lane striping or any existing detour lane striping affected by this. resurfacing shall . be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. - Affected. traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 15. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with . an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 16. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets. as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street.if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 17.. The City of La Quinta reserves the right to revoke, suspend or void this permit at anytime. 18. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs.or expenses in law or equity that may arise out of work under this permit. 19. If it is the intent of the permittee to, cut the pavement and have it restored by a third party, the permittee shall postpone cutting the pavement until the intended third party has acquired a permit from the City to perform the required restoration work. Special -Conditions Page 4 of 4 City of La Quinta The following General and Special Provisions are attached to and made atpart of Permit Number 3973 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from. abutting property owners. Such authorization must be secured by the permittee prior to starting work. .TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be' properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains° shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving.. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles.• In the event it is felt by the permittee that he must close a, street for any length of time, permittee shall.contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ® R1 NOTIFICATION: Permittee shall be notified the City at (760) 77.7 - 7075 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE, (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the .permittee.. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( ** N/A ** ) inches of A.C. paving placed on (' ** WA ** ) inches of ( ** N/A ** ) aggregate sub -base course having an "R" value of not less than ( ** N/A **) and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. ® R5 PARKWAY GRADING:. Area between the property line and top of the proposed concrete curb shall be graded to a slope•of one-fourth inch (%") to one foot (1'). ® R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A ") feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard.#207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern., Surfacing between the property line and the existing road paving shall be two and a half inches (2 Y2") of A.C. paving on (" N/A **) of class (" N/A ** ) aggregate base. ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured .and maintained at all times. ® R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply.with the manufacturer's specifications. Citv of La Quinta ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® RI SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any' monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ® R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine. the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the .construction material is actually on the work site. ® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. ® R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three feet (T) and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ® R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. ® R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one - thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ® R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ® R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent,patch of ( " N/A") inches of A.0 surfacing placed on a ( " N/A " ) inch (" N/A " ) aggregate base shall be placed no later than (" N/A ") days after completion of temporary road repair. ® R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ® R23 STREET RESTRIPING: Where -street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ❑ R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees -to be removed shall be in sections, Which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled ,and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public'at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ,`c- � ` : } • �_ .. , — � ` ram„ _ �q _ .. f, > .. > + r : t•. r - a t: ..R-� � . y = _ =- r + � �. N - h VIA' CORO.NADO Wa $ F: y �'t -. . • N �a a..;e ' z � - =r. � h�'�,',e w;i y � - r `.,' •, • c i ; - NO SCALE } ,+ �• _ ; sue. r r.'a .. � AC-18 ,'`' i•s�• y fj•' ... . ! .s� , r + •� ` . � � :` ,-`.,.*. •:.. w � • r J t r ' s , s ! CD R� � a. _ '' , • . t_ J - '' S .. �!•. •r ,. , 2 j •' _ y � s_ ' � ". ` i C-$Q , C-9A C-18 0 F�1 20T ! �. a. ~ •; , r �� • _ .- r �• - ,R r•' AD ic -*AHEAD/ ~ = ' : MINIMUM 10 FT WIDE, 2 TRAFFIC LANE 200 F j '200 FT } 200 FT f 1777 ,ao*� FORBES.CIR. _ NOTES: 1. ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) ' MANUAL OF TRAFFIC CONTROLS FOR CONSTRUCTION AND MAINTENANCE WORK ZONES . �.2. TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM REQUIRED -ADDITIONAL TRAFFIC CONTROL MAY BE REQUIRED TO FACILITATE PUBLIC SAFETY_AND APPMVed By s J DO Sp25 TRAFFIC FLOW IF DEEMED NECESSARY BY CITY OF LA QUINTA REPRESENTATIVE. - 3. THROUGHOUT EACH WORK PERIOD, CONTRACTOR'SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARRICADES_ AND DELINEATORS) AND MAINTAIN SAME IN }', i' Ned Nam ' ACCORDANCE WITH TRAFFIC CONTROL PLANS. - P Sewer Line for, La Quinta Del Oro 4. CONTRACTOR SHALL MAINTAIN A MINIMUM 12' TRAFFIC LANE WIDTH AT ALL TIMES. THERE SHALL BE A_MINIMUM T BETWEEN THE EDGE OF CUT AND THE.' �e��r T�COMMIC DvMN NEAREST TRAFFIC LANE. V & M Construction Tops N Barricades, Inca 5. ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED AT ALL TIMES: ' lt'• " ,# + 8r ` B880a an s18Ddmd 6. 'THIS TRAFFIC CONTROL SHALL BE1N PLACE DURING WORK HOURS ONLY. AT END OF THE WORK HOURS, THE ROAD SHALL BE CLEAR O_ F DEBRIS AND, (800)852-TOPS Ron Fifield = CALTRANS 5-18 RETURNED TO NORMAL.. ' 7. THIS IS ATYPICAL AS THE MAY NEED TO MOVE FURTHER ALONG THE ROAD OR TO THE OPPOSITE SIDE. a 8/13/03 ' ; To Be -Issued on Approval LICENSE NUMBER BOND NUMBER '�l1113 b019blb V 8 M CONSTRUCTION COMPANY IN BOND EXPIRATION DATE 0 4/ 3 0/ 2 0 0 4 State Of California �j� CONTRACTORS STATE LICENSE BOARD Z`1°"' ACTIVE LICENSE m Cun u mer . W,.owmo, 711113 CORP V & M CONSTRUCTION COMPANY INC 08/31 /2005 C._.. _.. _ PJ�cPcPcPcicPrfcPePcPcPrJcPrJ�cPcPcPrJcPrJcPcPrJcPJrJ�rJ�rJ�cPcfrJrJrJcPrJcPrJrJcPrJrSr�cPrJ�rJcPcPcPcPcPrJcPcPrJrJcPcPcPrPrJrJ�rJrJPJrJrJrJcPcPcP�fr�rJ@PJrJ�rJ�rJcPrlcPcPrJrP�rJ�rJ�cPrJcPcPcPcPcPcPr�rJrPcP�PcPcPrPP�PJ� El BUSINESS LICENSE' CERiIFICAiE NONTRANSFERABLE 5 CITY OVLA QUINTA S The Licensee named herein having paid to the City of La Quinta all fees required, license is hereby granted said Licensee to transact the 5 business herein set forth, for the period stated, in comformity with the Provisions of Ordinance No. 2 of this city. This License is issued 5 without verification that the licensee is subject to or exempt from licensing by the Slate of California. NUMBER 5 LOC: 80975 INDIO BLVD C-4 01956 5 INDIO,CA 92201— 5 BUSINESS LICENSE ID TYPE V & M CONSTRUCTION COMP 1500 GENERAL CONTRACTOR LICENSEE: V & M CONSTRUCTION COMPANY INC 80975 INDIO BLVD C-4 5 INDIO, CA 92201— ISSUED EXPIRES 09/06/02 09/13/03 PLEASE POST IN A CONSPICUOUS PLACE CONTROL NO. 1,3892 ScPu�cJ'rJ'rJ"rJ"cPr.PcPcPcicPcPe.P�J"r�rJ'rJrJ�r.PrJ"�.frJ-cPcPcPcPJr.PcPr.Pr�rlr.frPcPcPcPcPcPr. rc