CITY OF LA WINTA'
APPLICATION ' FOR -PERMIT
PUBLIC WORKS .CONSTRUCTION (ENCROACHMENT)
L
For the construction of public or private curbs, driveways, pavements, sidewalks, parking' lots, sewers, water mains .
and other like public works improvements in connection with MINOR. IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit — Class III
DAT•E:'"'12/1S/03. Minor Improvement Permit Class IV
LOCATION OF.CONSTRUCTION29894-2 The Hideaway Sttlxin,Drsin.
-- i. (Street address or'Description of Location) '
PURPOSE OF CONSTRUCTION Avenue 54 Stoma Drain Sketch (attach' construction plans if
f � P appropriate)
fffMMM indtallatift ref. - i see .��' ?� o . � f 7
DESCRIPTION'OF.CONSTRUCTION P•
dry►ells"', .etc:.
*See attached special conditians*
I DIMENSION OF INSTALLATION OR REMOVAL See pis
SIZE OF EXCAVATION, IF NEEDED -See U18n>3 '
" APPROXIMATE TIME WHEN WORK WILL BEGIN 12/11/03 .
APPROXIMATE TIME'OF•COMPLETION 1/30/04
ESTIMATED CONSTRUCT•ION'COST $ 61,;754.00
(Including removal•of.all obstruction, materials, and debris, backfilling, com=
paction and placing permanent resurfacing and/or 'replacing improvements)
In.'consideration_' Of the granting of this permit, the applicarit hereby agrees to:
Indemnify, defend• and save the City, its ,authorized agents, officers, representatives and employees,. harmless from''and against any and all
penalties, liabilities or loss resulting from' claims or court• action' and arising out of any accident, loss or damage to persops or property
happening.or`occurring a's'a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority .at least twenty, -four (24) hours in advance of the time when work will' be started.
Comply. with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of.
La Quinta and to pay for any additional replacement necessary as the result of this work.
Signature of Appli nt 60P t
T1a® Nideaw0. ,Dan W�11:>i:nms, 81-100 Avenue 53, La.'Qu1ntaa, CA ' 9223 (760)• 391,-4072
'Name of Applicant (please print) Business Address Telephone No.
m co 94u1' iat R#.ntals 74091 Larrea streak, Ste.:•(C, Palm Deaeri, Ck. 92260.176034.1-0822
• Name of Contractor and Job Foreman Business Address Telephone No.
799087 06732
Contractor's License No. City Business License No. '
Hui. dens and .Contractors Ins.. RES4000045'
Applicant's Insurance•Company Policy�Number
FEES: ` Subdivision Improvement Permit — Class I I I
ff Public improvements: 3% of estimated construction costs �p
improvements:,3% of estimated construction costs
y ..
DEC 16 2003
Minor, Improvement Permit - Class IV: See attached schedule ` 1 0
4.. .`, 4'qToFLAQUINTA
INANCE DEPT.
,Inspection Fee $ 1 i.852.62 PERMIT VALIDATION
/ it. Fee 100.00
PERMIT NO. Q039 '
Penalty S�q i� A►�n�i %i 'W, 00
Cash Deposit -Surety Bond
DATE'APPROVED.'• 12/i5/03
if required (3,750.00) F1.ancheck Credit EXPIRATION DATE 12/31/04
'TOTAL:
Receipt No.
Received by Date
Recorded by
DATE ISSUED
By
Administrative Authority
Telephone:.(760) 777-7075 ,
. ",-ram. .. •' 1 :-I� ��1 �� _ .
CASH'DEPOSIT STATUS SHEET*
Budget Account No. 101-000-261-
-DIN:298942 ' Project Location:THE.HIDEAWAY ( STORM DRAN - AVENUE 54)
Developer:ND LA QUINTA LLC - THE HIDEAWAY
®CASH -SECURITY 2 DESCRIPTION OF OBLIGATION PROMPTING DEPOSIT
HDust control; ®As -built plans; ❑Removal,of temporary improvements
Other,.'
®CASH PAYMENT - DESCRIPTION OF OBLIGATION PROMPTING DEPOSIT
ONE THOUSAND AND 00/100-DOLLARS
DATE
DEPOSIT
DEBIT
BALANCE
Amount
Receipt #
- 12/16/03 -
$1,000.00
$1,000.00
0
COMMENTS PREVIOUSLY PART -OF -PLAN CHECK FEES.. DEVELOPER HAS REQUESTED THAT THE MON Y
BE TRANSERED FROM. 101 000 443,31 a (PLAN GHECK ACCOUNT) AND USED TOWARD-9-TIFIE'AS BUI -T
Cash deposits placed in City administered trust accounts are typically received.for two basic reasons: 1) CASH SECURITY- to provide a source of funds foi the
City to draw upon if the City incurs costs satisfying obligations of the developer, or 2) CASH PAYMENT- to.provide a source of funding for improvements, 'prop rty,
or services to be acquired, or administered, by the City at the. developer's expense. The City will release the fund balance when the developer's obligations hat
prompted the cash deposit are fully satisfied. The release function is Initiated via the Request/Demand for Release of Cash Deposit (Form F058)
' r
' i ' NOTE:
With proper validation
-this form constitutes an . CITY OF LA QUINTA.
encroachment permit
APPLICATION .FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT). �-
OFF
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water.mains
and other like public works improvements in connection with MINOR. IMPROVEMENTS and'APPROVED SUBDIVISIONS '
Subdivision Improvement Permit —Class III
DATE: a Minor Improvement Permit Class IV
Lt �/J ^1p
LOCATION OF ONSTRUCTION 1��T &WAy. 2,94,4 .
(street address or Description of Location)
PU POSE OF C STRUCTIONR Sketch (attach construction plans if.appropriate)
DESCRIPTION 'F.0 NSTRUCT ON J O '
S ee—
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED s
APPROXIMATE TIME WHEN WORK WILL BEGIN
APPROXIMATE TIME OF COMPLETION
ESTIMATED CONSTRUCTION COST $
.(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing' permanent resurfacing and/or replacing improveme
In consideration of the granting of this permit, the applicant he f ree to.
Indemni}y,.defend: and rave the City, Its. authorized agents en,�P r tat( ployees; hermlen from and ageintt any and all
s or ct and ng p ny accident, lose or damage to persons or property
penalties, liabilities or loss resulting from claim
happening or-occurrIng as a proximate result of n or nd) ken nder t permit granted pursuant to this. application.
Notify the Adminlstrative.Authorltyy at to ant -f r 1 I'hou dva of the a when work will be started. -
Comply with all applicable City Ordinance th arm d rditlons of t e permit and I applicable rules and regulations of the City of
La. QuInta and to pay for any additional re la nt s,�ry as the resu t oPhls wor
f� ^ SlgnatTife-crMpplicant or Agent
14-1 )./l. 'Q. I t4_r • AU T EL � � I —�(� `7 oZ
Name of Applicant (please print) Business Address -Telephone No.
-n t7 >'dy r n� fir.. i � i " �G l A►l 1��:4__ OF- Sul
Name of Contractor and Job Foremen, Business Address 73.2 Telephone No. 341-- OQ
O
Contractor's License No. City Business License No.
EZ ., Lz n a >2 'n.�-� c lrt�r �-t�Q c ' L�✓. PZT < 4 M go c
Applicart s Insurance Comp y T---�p Policy Number
FEES: Subdivision Improvement Permit —Class III
Public improvements: 3% of'estimated construction costs
Private Improvements: 3% of estimated construction costs 1
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee $ jig's 2 ,
PERMIT VALIDATION
Permit Fee / Oy
PERMIT NO.
Penalty
Cash DepositSurety-Bond DATE APPROVED
If required P / EXPIRATION INATE
TOTAL: $ !. �, 7 Q 7 _3
DATEUE
Receipt No.
By `
Received by Date'_�Administrative Authority
Recorded by . Telephone: (760) 777-7075
Maco Equipment Rentals, Inc, � Y. Proposal
A General Engineering Firm
74-091 Larrea St. Suite C
Palm Desert, CA 92260
Date
Proposal #
07/31 /2003.
5423
Proposed To: cWta'i i
ND La Quinta Partners, LLC
PO Box.1,482 2
La Quinta, CA 02253
` Requested By: Project Expiration Date:, Estimator'
Dan Williams The Hideaway 07/31/2003 TB
Qty Description Rate Proposed Total
Scope of Work: Install 18" Storm drain from back of structure to • "
Drywell, excluding street improvements and structures along Ave 54
in (2) moves, Golf Course move (1), Ave 54 Move (2)..Bid was
figured from plans by Tetra Tech, dated 5/29/03, Unapproved with a '
scale of 1 "=40'.
2 Mobilization-(2) Moves --}age-ep g8
Line 1
112 18" ADS N-I2.Storm Drain Pipe 17.60 1,971.20
1 Purchase amd Install Drywell-Per City Spec. 2,600:00 2,600.00
25 Demo T-0" Concrete Cart Path (Per LF) 7.00 175.00
l Overburden removal -US 1,850.00 1,850.00
•
' Line 2
360 18" ADS N-12 Storm Drain Pipe 1 17.60 6,336.00
1 Purchase amd Install Drywell-Per City Spec. 2,600.00 2,600.00
35 Demo T-0" Concrete Cart Path (Per LF) 7.00 245.00
1 - Overburden removal -US 1,850.00 1,850.00
Linea
172 18" ADS N-12 Storm Drain Pipe 17.60 3,027.20
1 Purchase amd Install Drywell-Per City Spec. 2,600.00 2,600.00
1 Overburden removal -US . 1,850.00 1,850.00
Line 4
194 18" ADS N-12 Storm Drain Pipe 17. 0 3,414.40
1 Purchase amd Install DryweII-Per City Spec. 2,600.00 2,600.00
35 Demo T-0" Concrete Cart Path (Per LF) 7.00 245.00
1 Overburden removal -US ` o� 1,850.00 1,850.00
Proposed Total 33 2t�
Maco Equipment Rentals,' -Inc. is authorized to proceed with the work
described above. Payment wll. be made upon reciept of progress invoices,
allowing for 10% retention to be with held. Retention will be billed 30 days Approved by:
from the date of this invoice. All past due, accounts are subject to the
maximum interest penalties allowable by law. 1.
Phone #
Fax #
E-mail
Web Site .
760-341-0822
760-341-3045
todd@macoequip.com
www.macoequip.com
rage i.,
T
�Macoo Equipment.Renta/s, Inc, Proposal
` A General Engineering Firm
74-091 'Larrea St. Suite C
Palm Desert, CA 92260 ,
,Date
Proposal #
07/31 /2003
5423
Proposed To:
ND La Quinta Partners, LLC
PO -Box 1482
' La Quinta, CA 92253 _
Requested By. Project Expiration Dater Estimator
Dan Williams The Hideaway 07/31/2003 T13
`Qty
• _ Description -
Rate
Proposed Total
Line 5
186
18" ADS N-12 Storm Drain Pipe
17.60
3,273.60
1
Purchase amd Install Drywell-Per City Spec
. 2,600.00
2,600.00
45
Demo 7-0" Concrete Cart Path (Per LF)
7.00
31'5.00
1
Overburden removal-L/S,
I,850.00
1,850.00'
n 2
Line 6 03
.15
305 •
18" ADS N-12 Storm Drairi Pipe
17.60
5,368.00
I
Purchase amd Install Drywell-Per City Spec
2,600.00
2,600.00
25
Demo T-0" Concrete Cart Path (Per LF)
7.00
175.00
1
Overburden removal-L/S �/y3
' 21400.00
2,400.00
Line?
254 .`
18" ADS N-12 Storm Drain Pipe -
17.60
4,470.40
1 _
Purchase amd Install Drywell-Per City Spec
2,600.00
2,600.00
30 _
Demo T-0" Concrete Cart Path (Per LF).
7.00
210.00
1 •
Overburden removal-L/S
2,680.00
2,680.00'
r
3 213
-
- $65,255.80
Proposed Total- 2>��5l ' • , -
Maco Equipment Rentals., Inc. is authorized to proceed with the work
describedv J above. Payment wll be made upon reciept of progress invoices,
allowing for 10%retention to be with held. Retention will be billed 30 days Approved.by:
from'the date of this invoice. All past due accounts are subject to the
maximum interest penalties allowable by law.
Phone #
Fax #
E-mail
Web Site
760-341-0822
760-341-3045
todd@macoequip.com
www.macoequip.com .
r Qy�
r
APPLICANT TELEPHONE. DIN 29894-3 `,
APPLICANT FAX
DEVELOPMENT TYPE.. ' TRACT "•
--- - - ---
PROJ' ENG.TELEPHONE ' 7,60 674 0629 '.—� 'RTSN + • 7609 +
_;- _„ PROJ ENGINEER FAX!
76Q674 0639 PLAN, CHECK.ITEM,' ISTORM DRAIN IMPROVEMENT (AVENUE 54) ;
TO FROM 1 PROJECT
OJ CENGINEER;: JESSEDEAWAY::,
- - --
PLAN CHECKER.
5/28/2003 6/19/2003 PLAN CHECKBOX
COMM' DEVELOPMENT, PROJECT ENG-FIRM NAME TETRA TECH; INC.
�', 0,__: _DEVELOPER/. ENG_;" PROJECT ENGINEER ROB'EISENBEISZ, PE
TO FROM
PROJ ENG EMAIL ADDRESS
2 , NO OF SHEETS 5 a
DEVE_LOPER/ENG 6/19/2003 7/1/2003
s PLAN CHECKER 7/l/200::PLAN CHECK FEE AMOUNT ,. $3,750 00�'
COMM DEVELOPMENT
.],
BUILDING/SAFETY MYLAR TO PLAN CHECKER I ;PROJECT
' ENGINEER
"MYLAR FROM PLAN CHECKER 11/26/2003 APPROVED 6
" MYLAR TO CITY ENGINEER
� � 1 /26/2003
INEER 1
CITY ENGIN
TO FROM, MYLAR APPROVED 12/5/2003j 0.,
MYLARV .
DEVELOPER/ENG 7/9/2003 7/24/2003
FROM DEVELOPER/E
''SCANNED PLAN SET. NUMBER:' 03137
'PLAN CHECKER. 7/24/2003. ,
COMM DEVELOPMENT ' INTERNAL PLAN CHECKElCURRENT
. Q
BUILDING/SAFETY" EXTERNAL. PLAN CHECK � INACTIVE ❑t
CITY ENGINEER �' Or
Tq, . FROM APPLICANT: ND LA QUINTA PARTNERS LLC, PO BOX 1482 LA QUINTA, CA 922W,'ENG
7/31/2003 8/18/2003 :3 FIRM: TETRA TECH, 42-580 CAROLINE COURT, SUITE B, PALM DESERT; CA 92211,;
DEVELOPER/ENG' . 06/29/2003 - REC'D APPROVAL LETTER FROM B-& H. 09/16/2003 RECEIVED PLANS,.FOR
PLAN CHECKER 8/18/2003 8/29/2003 FINAL _REVIEW':QN BLUEL'INE PRIOR TO MYLAR.- PER BRIAN CHING THIS PLAN IS YO GO
TO REVIEW ONCE MORE EVEN THOUGH THE APPROVAL LETTER WAS RECEIVED
COMM 'DEVELOPMENT. FROM BERRYMAN,AND HENIGAR AS PER STEVE SPEERS REQUEST., 11/26/03 TONY
BUILDING/SAFETY-" REQUESTED DEVELOPER TO, SEND .MYLARS-
CITY'ENGINEER'
TO FROM `
DEVELOPER/ENG 8/29/2003 9/15/2003
PLAN CHECKER 9/15/200._3 11/26/200 t
COMM DEVELOPMENT % a
BUILDING/SAFETY".
CITY ENGINEER,�
BH ACCOUNT-#: :161.79.42
SEARCH CURRENT PLAN CHECK ITEMS:
CLICK -THE BUTTONS BELOW. .
INVOICE 65%_':.DATE SENT AMOUNT.PAID ` BALANCE ;INVOICE
r.g. , - STATUS _
0 1
Z CURRENT. .. , 6/26/2003 $2 437S0 " $1,312.50 40684
,. h
' PLAN CHECK NUMBER
JINVOICE 85 % DATE SENT -AMOUNT PAID BALANCE INVOICE
is STATUS _
>- 7/25/2003 $750.00 $562:50 s 41169
=-v INVOICE ' 100 : ^DATE.SENT" AMOUNT PAID, BALANCE : INVOICE
t- —_... ..._ ..
� STATUS= :$562:50 $0.00 41508
4rCURRENT 3
�<E,. ai:`"'..:.. ..,s. .. '`?.G aI
`--'z`;.T " E •,':.r';'^r4 :r.x:':F..7" "::,:,: ..�.re
__,r -..,................T,RACT NUMBER _ . .- ;_Y.,W„ _ I .::. , r -€: _..• .. :::,, :"
�.<,qT.'r a E. "S" z s'r -s:; 9' a
Monday; December 15 2001,
17,
.. ' ,: ,_._r:: vx � av" . .'��-•s 'vl: �„"C�r:..=.--" �`«sEx rs"ii� �...w'._'"^,,,c'_ -s-i" mx .., tam'``
AN, CHECK NUMBER: 03089
PERMIT NO.4039
The Hideaway/Storm Drain Improvements/Tract No. 29894-2
In addition to the standard permit conditions, the following shall apply:
1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part),,1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For Public:
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. N.D. La Quinta Partners, LLC, hereinafter referred to as "Permittee",. shall be responsible for
providing continuous dust and erosion control.
3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more
frequently, if required.
4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance,18, § 1,1982), throughout the
work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October. 1st to April 30: Monday -Friday 7:00 a.mAo 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1st to September 30: Monday -Friday ' 6:00 a.m. to 7:00 p.m. .
Saturday 8:00 a.m. to 5:00 P.M.
Work shall be prohibited on legal holidays and Sundays.
5.. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility, for repair of any pavement damage to any public or private street
and for any damage to other City streets or facilities as a result of work performed under this permit.
6. Pursuant to Section 14.16.250 of the La. Quinta Municipal Code (Ordinance 10 § 1 (part); 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan shall be prepared in accordance with the WATCH Manual and submitted to the City for
_review and approval one (1) week prior to starting, any construction. It shall be the Permittee's
responsibility to appropriately detour and barricade all construction sites.
Pursuant -to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 19.82), street
closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be .
maintained at all times.
7. Prior, to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- ,
4133. It shall be the Permittee's responsibility to, notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain'facilities.
Special Conditions Page I of 4
PERMIT NO..4039
The Hideaway/Storm Drain Improvements/Tract No. 29894-2
Should additional work, materials, or- modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be .
performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the
City of La Quinta.
9. Pursuant to Section 14.16.370 of the La Quinta Municipal Code '(Ordinance 10 § 1 (part); 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition
of the Standard Specifications For Public Works- Construction (SSPWC), except as otherwise specified
herein.
Native material may be used as backfill material provided .that -minimum compaction, achieved in the
manner prescribed herein, is achieved. Backfill shall be -performed by mechanical means; no water
densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's
responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all
times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such -
material shall be removed to the limits directed by the Geotechnical Inspector and/or the City
Inspector and the resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be. brought to or maintained at appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use_ of the materials through progress testing on the stockpiles.
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth
of lift that can be compacted.
D. If lifts greater than one foot are. attempted in this trial length of trench, compaction tests shall be
taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift thickness
to be compacted for the remainder of the project.
E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of
backfill, per 300 linear feet of open trench, at randomly selected locations within the open length
of trench.
F. The depth of the randomly selected compaction tests shall also be randomly selected except that'
where multiple tests are required in a given length of trench, the tests shall be no closer than three
feet (vertically) from each other.
Special Conditions Page 2 of 4
PERMIT NO.4039
The Hideaway/Storm.Drain Improvements/Tract No. 29894-2
G., If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test
results shall be furnished to the City Inspector.
10. 'All excavations within City of La Quinta right-of-way shall be backf lied, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to- the satisfaction of the
City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that
which cannot be backfilled in the same day. Excavated trenches shall not be allowed open overnight,
however, Permittee may leave a length of excavated' trench, not to exceed twenty (20) feet in length,
open overnight at a point where construction will begin the next day, provided that this length of trench
is completely covered by steel plating.
11. All landscaping, irrigation, decorative rock; decorative concrete, lighting, etc., shall be replaced to its
original condition.
12. Access and egress to all local properties shall be maintained at all times.
13. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
-of the work.. Permanent pavement replacement shall conform to the following conditions:
A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges: Edges sliall
be straight and clean..
B. Permanent pavement replacement structural section, within all trenches, shall be�l" thicker than
existing of asphalt concrete,over the same existing thickness of crushed aggregate base or crushed
miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard
Specifications for Public Works Construction. -The replaced pavement and base material shall be
compacted to 95% relative compaction -and respectively tested, for each 300 linear feet of trench.
Verify exact structural replacement section thicknesses with the City prior to installation.
C. Permanent pavement replacement shall be installed using a City. approved '/4" max medium .
asphalt concrete as the base course lift and a City approved %" max medium finish course lift for
capping. Asphalt concrete mix design shall be approved by the City prior to its placement.
D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the
trenching operation located adjacentto the trench saw cut shall be cold -milled to a depth of 0.10
feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area
and base asphalt concrete in the trench,area shall be overlaid with a City approved C2-AR-4000
asphalt concrete mix. The width of the cold milling area shall be as follows:
Special Conditions . Page 3 of 4
i
PERMIT NO.4039
The Hideaway/Storm Drain Improvements/Tract No. 29894-2
0
• For longitudinal trenches .located in a parking lane: three (3) feet outside the sawcut
removal lines.
• For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal
lines, or to the lane line striping, whichever is greater.
• For transverse trenches across existing street: two (2) feet outside the sawcut removal lines.
E.. If grinding and capping operations are not performed'in the same day as base paving operations,
the base course lift of/4" max medium asphalt concrete shall be installed from saw -cut edge to
saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left
f 0.10' low in anticipation of grinding and capping.
F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be
replaced in kind by the Permittee, as directed by and to the satisfaction of the City :Engineer.
Affected traffic signal loops shall be removed and replaced in kind: The finished pavement
surface shall be smooth, consistent, and shall conform to the surrounding grades.
14. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization shall be done immediately
after completing the operation.
15. Pursuant to Chapter 12:56 of the La Quinta Municipal Code (Ordinance 10 § 1. (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i:e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants
permission to use the street to deliver street construction -materials and/or equipment.
16. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.:
17. The permittee shall indemnify, hold harmless and assume the defense of the City from all
damages, delay costs, costs or expenses in law or equity that may arise out of work under this
permit.
18. If it is the intent of the permittee to cut the pavement and have it restored by a third party, the
permittee shall postpone cutting the pavement until the intended third party has acquired a permit
from the City to perform the required restoration. work.
Special Conditions Page 4 of 4
i
4;_ City of La Quinta
The following General and Special Provisions are attached to and made a part of
Permit Number 4039
The following shall always apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY.
Whenever construction extends within private property, it is the responsibility. of the permittee for his contractors to secure permission from
abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved
surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas: If the existing pavement is scarred, spalled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced
over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All . excavations and work areas shall be properly lighted, and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained, for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessaryto remove or
cut existing drainage structures, City of La ,Quinta shall be notified prior to commencement of this work. Drainage structures and open drains .
shall be kept free of debris at all times for, proper drainage.
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All .
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to -paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE -WATER OPERTATIONS:'If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the
responsibility of the permittee (contractor) to control -this water and to provide off-street barricades when necessary.
CLOSING. STREETS: No.street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the
adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain.the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
® R1 , NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting
construction.
® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized .
by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
permittee.
® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work..
❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with ( ** N/A ** ) inches of A.C. paving placed on ( ** N/A **. ) inches of ( ** N/A ** ) aggregate sub -base course having an
"R" value of not less than (** N/A **) and in conformance with the City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
❑ R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
one-fourth inch (1/4") to one foot (1').
❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a
licensed engineer.
❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (** N/A'.*) feet shall be
removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to. alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2 '/z') of A.C. paving on ('* N/A **) of class (** N/A ** )
aggregate base.
® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all
times.
❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the
manufacturer's specifications.
City of La Quinta
Yr
® ,R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La
Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State or City of La Quinta projects.
® 11112 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon completion or replacement of all survey monuments for proper clearance.
® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be
used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
® R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the
protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use.for purposes of
producing and adequately consolidated backfill. Ant material which the City of�La Quinta.deems unsuitable (spongy or
saturated material) which .is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three
feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a
relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.
❑ 11117 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the
trench before flooding or a maximum of five feet (5) lifts where trenches are of excessive depths. Care is to be exercised
that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuos.
❑ RIB COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one -
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
® R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after
a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5) day limit.
❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC-800 shall be placed immediately. 'A permanent patch of ( 3 ) inches of A.0 surfacing placed on a ( 6 )
inch ( crushed ) aggregate base shall be placed no later than ( 7 ) days after completion of temporary road repair.
❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as.
determined by the City Engineer.
® R23 STREET RESTRIPING: Where street striping Is still visible on street to be excavated, such striping shall be replaced upon.
completion of permanent repairs.
® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by
a licensed, bonded and insured tree service, and handled safely without interference or hazard'to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump, shall be removed and disposed of so%that no debris remains in view of the highway. The
stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be'provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled'and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method.
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.