4092NOTE:'. {
With proper validation?
this form constitutes an
encroachment.,permit
5.10
CITY OF. LA QUINTA
APPLICATION FOJR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
I For'the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
-and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit — Class II I X
DATE: Februnry 13. 2004 Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION Hidden Canyon, Tract 29436. Eiaenhower and Coachella
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION DrK utilities (on;site) Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION Conduit Vaults
*See Attached Special Conditions*
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN February 11.- 2004
r'FINA:NCE
APPROXIMATE TIME OF COMPLETION February 24, 2004 9 2004ESTIMATED CONSTRUCTION COST $309,729.25 A DUINTA(Including removal of all obstruction, materials, and debris,-backfilling, com- DEPT.
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend, and save.the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any.work undertaken under the permit.granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms.and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and. to pay for any additional replacement necessary as the result of this work.
Signatutre of Applican,or Agent
lvsnhoe La Quinta Cove, LLC 9968 Hibert"St.,.Sto. 102,SD 92131 (760) 801-8770
Name of Applicant (please print) Business Address Telephone No.
Trcinswest Housing SAME AS ,ABOVE
Name of Contractor and Job Foreman Business Address Telephone No.
8701039 04972
Contractor's License No. City Business License No.
Everest Indemnity Ins. SOOOOOO-212-031
Applicant's Insurance Company Policy Number
FEES: , Subdivision Improvement Permit — Class I I
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor. Improvement Permit — Class IV: See attached schedule
Inspection Fee $ 9,292.00
Permit Fee 100.00 II
Penalty '
Cash Deposit -Surety Bond
if required y
$ 9', 392.00
TOTAL:
Receipt No.
Received by Date
Recorded by
tvn .4092
PERMIT VALIDATION
PERMIT NO. 4092
DATE APPROVED February 13, 2004
EXPIRATION DATE ?lurch 25s 2004
DATE,ISSUED
Administrative Authority
4
Telephone: (760) 777-7075
Purpose of Construction:
Description of Construction: CHI 144t
Dimension of Installation or Removal: GZ
Approximate Construction Start Date:
Approximate Construction Completi n Date: 00
eEstimated Construction Cost: $ 2 Z
�• Estimated Construction Cost shall include the removaf of all obstructions, miteriais, and debris, back -filling, compaction and
placing permanent resurfacing and or replacing improvements
a -
Name of Applicant: L�
Applicant Address: kLf
e 02
+ Annlirant TalanhnnP Nnmhar• •'%
Name of Contractor- kof h/o A*51*
Contractor Address:
Contractor Telephone Number: P; — ? O
Contractor State License Number: b -7 0% li
Contractor City Business License Number: 0 72
"7ican Co actpr General Lei ,bility Insurance Company:
rr�G D06 0 212• G
,pplicant or Contractor Gen ral Liability Insurance Policy Number:
Office Use Only:
Inspection Fee:
9
Permit Fee:
As -Built
Deposit: •Alrpjti
?'A
Dust Control
Deposit:
Credit
Amount:
q
TOTAL FEE DUE:_.
Office Use OnW
Assigned Permit Number:
Approval Date:
Expiration
Date;—.
' h-' J�
Issue
Date:
Administrative Authority
Proposal No. 04-041
G Sheet No. One
Date 10-Feb-04
39-725 Garand Lane, Suite A, Palm Desert, CA 92211
760 360-7994 Fax 760) 360-1334 LICENSE NO.765664
Proposal Submitted To Work To Be Performed At
Name Transwest Housing, Inc. Street Hidden Canyon - Tract 29436
Street City La Quinta State California
City Date of Plans 10/9/2003
State
Architect IID Project # P-3895 I
Attn: Matt Oj� 1 `__V-/jV We hereby propose to fumish all the materials and perform all the labor necessary for the completion of
Installation of I.I.D. ON SITE conduit system to feed tract.
Qty
Description
Unit Price
Total
16,714
0
I.f. of Trench, Shade and Backfill
Lf. of 6" Conduit `'"
$2.75
$4.25
$45,963.50
$0.00
8,022
10,214
8,859
975
I.f. of 5" Conduit
Lf. of 4" Conduit
I.f. of 3" Conduit
I.f. of 2" Conduit
$4.00
$3.75
$3.50
$2.75
$32,088.00
$38,302..50
$31,006-.50
$2,681.25
2,470
91
27
0
I.f. of Concrete Encasement
Secondary Handholes
Single Phase Transformer Pads
5' x8.5' Vaults
$8.75
$375.00
$675.00
$5,100.00
$21612.50
<,`$34,125:00
<'$;18;225'0 0
4
4.5' x6.5' Medium Pullboxes
$3,450.00
:$13,800 Q0
3
3'x6'x5'Primary Pullboxes
$2,975.00
...$8,925.00:
168
House Services
$375.00
;$63:000.00
S.
aL_ J..
All material is guaranteed to be as specified and the above wont to be performea in accoraance witn.inC uiawniya
and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of
Dollars $309,729.25
Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will
-become and extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our
control. Owner to carry fire, tornado and other necessary insurance upon above work. Workman's Compensation and Public
Liability Insurance on above work to be taken out by HRH Insurance Services.
Respectfully submitted, G.R. Underground, Inc.
Exhibit A attached and made a part hereof. ---%L
Per k1. _R _ . ) 0_, . ... 14.
This Proposal may be withdrawn by us if not accepted H 30
George Ruark, President
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as
specified Payment will be made as outlined above.
Accepted Signature
Date Signature
+ , '� i
T' "UMkil I ' , "� Q"
wli A i., W I'l -:. �F; '=&,'2004 P',,j ft;jIg 2 01
�-Q t. t HTto
" DID *14-vt.,,,fn�",-r��,"f,�,,41,�'
. e u ai., r, yv M � , rg
-�`-:'.�- k. ,��. .F.r '��;l �s. r. �� .6��^'j� t ,�a.r,��r i er' _;./ i :�wN.�•i€,v 1i'.+�� .Vf< p.:{,� �..• �t'� � '�.r
IITYI'i
4,7660b
ilz
��-fdiAi:
WYO
-A10MMM6MW
5TC
-I'.bV
Mf
.51-arl G
0 NO
mttr. _MMOR
Puo"
Op
%
o'm
�'c
'OU +rwt
6U. .1
�q5*A
2/5/2004
,�. %••st. 5.�-�147_ 1, s�u _ r - ••S -�>' �_r L .i I ti.^ f ;,�. ��.Ir•� F, .�• «<.� }^ - "_, .
'�'' {�+-+• g$Y "~.f, 'r.Yi=. •� � ;C, •i +'. -a, .` } i _; .l � • _ «'r ,f « 'y � A :c i r�.
;y r«. t• 1 j « ,y _ T x « . R • «
h _ys_�i r� 5.,..�r *, I - ,i, - ,+..,« ��` 'T•' - .�'. < ,�` t �" it •5l `", Y"�". 'I...r �t ',�.
r`
�a t �-w,4"i .^J'a X-`�',': .. �) •J ..d ,
rr _,.a},,, a ? a�-..,5. ::!' y < ..A%.y:J•+
•'S!•��.'u;?x[.''S.
.S.a7 y<., y.1f - :�xi 1,•;-" t F'i4:.
q a
x_K!-1. - p �' I.W s,,., �`'.Z,;..rKq
:.a?:° ;«
;;s - ':' .t• ..S s' : ?•"
'e.n, "�,s,:Y'a+t
'S''�.':2"�ti. v?Tl � .'�..e -a`1 "ei'Z.P�. .•teal .71uu��-1 .. Yli +�,;i::.,t ... �. i�r ;N. ;'�:Z{. iP1yy 5':'.,,,tiY u.�' S.ya .7Tq,�:'�
s:3.. 3 .� .,. r•:.F.Aii.!i: kFEI CIE 1. -`
S{i84'"r•{,e: rt��
iS. _ f'9y,4 •.sK y�,y . x '^ w'7 "`1rt-'.••F i F' "li: '•Y• '..%11, ....
. { ADrII 20�4 .
;..S•.^'S•.,:Z••, rt mr..w� r',-
. t ,�,',.- " it;�•• ' .:i..i� aa-.•u,-.4Y'.. z . ?. te.i5 '+i;,«. t. rt
(. .. x}'. �"' >,.✓ ` ,.+.. t '.,. y . '•,3t is;`.' , � :. ' .rz, .a . ,�>i1- i- . ,'',#`, •. �
'�5. 51c t SC...::?cM T F._.i.Ck � C.a -1'; L,W'
�y�L
�- 5 +:�'
Sr� I. �9 i.. %,l <7. ...'1.. ;., -
.1+ �.. n�4. `s.:,�?p•
. �., _ ,.. ti 'n ; • .'`;. , .. ,.<,
.� v,' �i`itb.K ..1,a 4s .. �'z: 1, 'r.r•-
'L: .rx<,;_,,.: n•e,t ,Sn t,... _ U � 5,"a ,,.ah.--.':
.. o;„*•«.�'Li
�.•s�.T ''�'' �
k's .`3E:. j .S. ,a.,.s7'.....>:WH .. •n. .R -T�.
..3.. .:�5�,.��. Y .f '3v.'-uJr . a,, •t t �:'.4s,
� .;•.,. .3 'i^1•, -w,x,. dzfc4. a 9 `f �'4. k# §;-.: s.:.- ";:9+,:X S S:'� p �� ,��,
�
, �. r �'"s:: `t �.�-,. ++�-..� .s, .t � _ {{ I.aS �`' .!,. .ir34"74: F:37;.0 2�°' 3''`s.w"`S'?'.
a5.�: .�„I & w^�;.: air 3 pn7' �B •.<10'-EI 11 12 :13: 7 4:: ' ]6 7s , 8's' :9'. i0>•
'??:. ? m a f,'i'..t• f1. � �.
.J..� k -. v
..yg +f��'.�', �, i� I
! i - , L.t \ . - 1 . ,1
.IK
,�;br. $ �_i\: t C.G.. Ar•. -
4 r F
:,,• s, � . r.} `:r• rr
U n, 1y F a°i:.E., a<
✓.•� 1. .i , «h„'•'x
GkG�uP<.
'ifaL+i' }}��.t 1' �d ^+�+'
. ,-§9
,... .b.J-'i 1... ��s1, �i .�yu .k': .��i �'.at
Of
5'S A n^... 4( _� -;3 F. :1• - b.:. .-i, - `�^.5�... . ..1 �'.�-i1. s.3
� y..<�6. ��.s. f r`f'r�<i �� '4Fi! •:ITt&.. � FfYI. -, ✓<.. y �.• �i�" '.%�.
, ,, t.. i,., '�*.�" � <#a: , a� . - T a - as 21, �'22 r•M, 23 ': 24 � 25 :."�x36' ' `•, 27 y18 v-�19 20.. r 2P? 22? '.23 + 24'
t
�. sY. ,?J E. F � .g. a"zltl.-y:i:-:° i p.
'i.. :Ta. ..P' .:,�, =.( ,`C" f.�'biki•'� .+ � 29
'�' �� �a e �, ''29=.: 30 '31�: �-
�S4ssvFdS..Mn
!%�.P ,. ��r�' s
t. €c .e .
i. ' . 'S :sir(' � <t•�.,
."M F .:>'iS' _ ,1.'£: -C- '.
.5 GC f.. •�!-,i} ..';^ �..... ..v i .,. ,l>- i�jt ,"� S �i'.:ir�i`
f i,� :ft
s Y. �`•i ems'"` - :;:28> +25s>e26 :2Z...28 .30`.
�. �: r 35 #lice •"S''': . ••>4` 5 ['> t3'.: sypy - .ter. i rj'�{ iq - Y.. •c .. _
a, 't"t' w Y il.. ..}.,...A '..:... 7.,.;.n .'•S:cw 5i.:; " :y:{?.} -: "1.
(�•�.,
5 - #'J 1: E� :n L .i:nbbZ`r'a. i :. .. .4 , p •• Y' '�': i' .C'JF.
� A �. � '�4 �� � A.�,.,�. i} iy.,. �j,:. f.�`, i--.��g{�.'' �• �H�
e„ 54fv,r...r'%�,'iY�..Y:•::as,_S%�+-_ ItiX�'��C�.i.�i.�"<�i;'���'.'.�.�7<fI',x
F .r,:�'. .. :'T4;�T'. t:��, .1 ..4Ji5
�:l',:..£.� r,J".C� .-�;:L�-1*.. :. i>.... v. N, .etS �ck.�:'"Ie.J��..�`c�, 1:>�•�r':�,.: _L.�,.,+. w���'�r. :�a..Y
� ... : ,:. a
�'�.�7uesda ...�-i,<!zt�,
�t£'`R •:' ":' sr li, . .. '�
�.��W,�dn�sda .��,.��_Q�:?�.'��„'Thuf'sda
k,x -r c .Aay, ... .»-::,,.- 7 ' i '?�5.`
'�.r�.,�4',
� , n b.,•..:
''��'�...5��,,��Frida
i• .�.
r, ,
`"
�"` -
4Twt r t('
- ..
;I. ..
< M~
•.�,1 k ,<��a ..
y' r r'
. f ••
�'r .F F�
S '_t i• 4n
�?v''I
r:•
t � �,.''
,,."
' b.
�
' - '1, �•�;4" tS +:. r
`'1b»
Lea �.
t , ••n : a . .(
«•1=
' } },
y r, �•. !�
-
1.
y L • � .. ` w.
� 1 �iy
V 1- *
`i ..+. t�
Ffi,
.i S' q.� •t :."vr � K
.. \„
:�4
�:oiw• r A�Sa>y tv�Ar' �`•
"r;,l
�.;rti- x' - t+�''�
*•-�,`
"i
{+i
-fi'� � - i..y ��i. ri
'
�
•'•f. Y•��- i
r .:"i e r
:a!
.:�
N5 'y. i �. - ; t ..•
2•.. 'F Stc. 1
Y_,'•e'y,,.
+t -
ti' `•
. • �L r`• i. 11. fi ., ;,. -.-*
` �s':. z � ''T"•` ' •5k TM
� � F ,�.. yt
t t �. 1 �1 y
{ •r.` r � - � -y'r. _
- .,.
_ r.. .i".
'w
z1 4
'�
C
'+...f .•r ,
r f. e. •:!` f•`
4.
d n
�.t ,�
�
L �Ea ff ,,f a f fi._.i
-J`�, •. 6 r '}
_� �..
fi.. ,��
•
� vc
w,
�.
�r aG
n r, �. •,
r G: v>
.IN
t. •
-
'
. .. q. � .. .. � i �'
- �� � ,,.-� f Yti +
• ' ,p t.i �I.•.-; a ?ri . �.•
r`r s- ,,,.�, • v w ,,}
�� t '� s .2 �
•ty �a � ��
'4,T '} � p 'M, 6•..
s .� -+• � � �. 4:ti n *;:.'
� ��}... � � - � ? : �
.• 1� 1 �;� " � � �,.,
n s .. ^•,
,� -
1• _ ��� ,;•
,� 1,
�. � t- a Y'
a., �",,
, ''f.- • ...y t
i „1,1. ♦ :,1 v -.
`. .• f I �,f.Yi' '�
�
•- � w "•, t ..f • i
�
1R �I.
-`
` .a JJ t .,x
Iii, 4
�'�; .
�, ,R �. t Y :w +•
f�.•t';
"°?� yY✓�A t4 M.•r +r`
~ '4�
5 r 4aILK F.
'�'�`-
- x `: .sa« .. 'a
..
• � ` ? ,
�1�<S
;� ��tr.,• � r
'•
•:
+, r YZ � F7' `r Ny.
� � i ti..••.ifY ".,I Fn
s;
'i+. , k d �.:
.•V .x. •.F {,A
r ,..r 8 r :i
4.yi tom..
a j*
. } l `
' 4!,1 T.0 t i.• ,
•�� !'+:.•
� .�
': ,f,.. - „ir t .. ' ''�
<�' " Y 1•
�
r- � � r t 1 5 AYi.
.2�'
,Ir _
y Lr' .r-G. ♦ �
i
ir'C
,�•ka.
T a ,� • i n
ur.. wv ' F ✓ >;., e`
y .'•N i � } ` µ � N-
.i •;.r
�„ ,
• � �Y ' _ t T` $`r �'
5 . 4'v
r ' � �
..
'7,. •r . >'.`_
y
�,'� • i� : • •, ;►
,+ .- 1.-
.-i.►. ter',,. re i `''✓{_ V Y-
: i ...5
.t': � s' 'it- ' t � +.
'<
yf''"�v`
' ?- o _ .• =.b r
'„" +i:. •• .i .t....
- i.
",,,,r,•'r: .h'�. -.tee.. .r_;y _
'
"air
-e 3,a I, 3�_
.�-'�!'
.l, ;". ;. !4 ,
k "'�:r, �>t' ,s. ,;'•
-.•�•, S
.�
.'
14.
. �`c=:. v^�+: ���� aP�'k�'gi�c�'�
l;•',�ii?�Fj'�'s '�'�ilr, s4�3�+L(4Y6
�`�'V'-.nx�id. �'�Eu�."�S➢,'�t''���b 1.L���
"s1'� `-:tt 4� !3� i.8
: (•' ,� '�tK �`'�.
�' - �'
=J- f'-4
�
•`�
,r
J. +•
• ,
�.t5ry . - .f
h , h
b i w '!s.•. 4 � � �j
T
•-'
"i r.. � - r •
i
�i A- �.r � �
�"•K
1
,� t
• .#
!
•
� s rn
++.. <.
C ; ,• ate. 6,' d :"
+ j
t
••
( y
a
.i.
Yt'
}
�.-�
1 yi « ',
-
'
"S- v�,�
i
,� r�vt•
! "tY T
�
� hT � «!k � '� ��,
_?
�+I s_ {y^
r � >
_
•4 1 �'�< J K'
`
!
3• S
t . s`y a
. ,7 _ " . 1
. !. • ta. .•....�^!w fir.
r�.<
2
p1
� !. f _ T"F p. ' s • a
iit �� �•Y7 .�..
�'•x�Ca '..� �+' •ry,, .ri �� �<� v
s
i. � . ~�„ ..+. `�" - ! '-,y-
1M• ` _♦ +'ri
" .�'- -:.+ - -'* • i. � . ''` t.,ti.
//%% / i y^� S.//���[/�: �-\ .. � i.-.
1.�4�Y nY
' '^ �'�. _ ..;<; a r . '� ;
fa k �
l _t'Y
t1
-
,,
'
�
• t • i. �' � `�r.-t L ry, , 5 . _
, ;.,, � -
`r tt t.
i
�
� �y • . !' �r_ a
-•C4 �. -f. Y "nw
'k.. R' r ii c
F
51 '.
t'�' J -L.
- �
.. .', r.°f ],.#.»
w
'
' u ' l 1 t '' G i 1
' - r';' r V `
"- •�'
. :�
Tt `{ ♦. ♦ !"
(�, -
t :fd tk 3' �t •!�!
x•-" e7{' .3,.i[r, '��«
rS t t
a#-
<•U`,r
ft`
ix •'I• fv
a '•' _Y
•i r w
•
,` tt • h .. r •
- - r ' �` �
'
a•Y'1.
� ' ,N••� i
• ,
_ ..�
.
_ !
•,
r • e �
, .
6' �` ,. 't : r .
>< e: + ?
' it r-' ~ �. #,
- ... �
1
2/5/2004 `
a
. a
Proposal No. 04-041
Sheet No. Two
� I UFQEGRO 0, H C. Date
39-725 Garand Lane, Suite A, Palm Desert, CA 92211
(760) 360-7994 Fax (760) 3604334 LICENSE NO.765654
10-Feb-04
Proposal Submitted To I Work To Be Performed At I
Name Transwest Housing, Inc. Street Hidden Canyon - Tract 29436
Street City La Quinta State California
City Date of Plans 10/9/2003
State Architect IID Project # P-3895
Attn: Matt Zo I - 170
We hereby propose to furnish all the materials and perform all the labor necessary for the completion of
Installation of Verizon Rule 34 and I.I.D. OFF SITE conduit system to feed tract.
City
Description
Unit Price
Total
VERIZON - OFF SITE
'
5,702
71
I.f. of 4" Conduit
I.f. of Concrete Encasement
$3.50
$8.75
$19;957.00
$621.25
3
10.5' x5' x6.5' Manholes
$4,150.00
$12,450:00
1,420
5,945
2,108
1,420
2
Imperial Irrigation District - OFF SITE
LF Trench, shade and backfill
LF 6" Schedule 40 conduit
LF 5" Schedule 40 conduit
LF Concrete encasement
EA 5' x8.5' I.I.D. vault
$2.75
$4.25
$4.00
$8.75
$5,100.00
$3;905.00
$25266:25
.:.,$4,432.00
�`$1.2;425.00
_$1.0,200.00
1
1
4.5' x6.5' Medium pull: box
Street Crossing @ Eisenhower Drive
$3,450.00
$17,500.00
$3;450:00
$17,500.00,
ctvt r S'. `
All material is guaranteed to be as specmea ano the above Wors io uc Pt:I FVI IIICU III VVILII t— M W••...y�
and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of
Dollars $1-1.4,206'.50
Any°alteration),' ,deviation from'above specifications involving extra costs, will be executed only upon written orders, and will
become and extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our
control. Owner to carry fire, tornado and other necessary insurance upon above work. Workman's Compensation and Public
Liability Insurance on above work to be taken out by HRH Insurance.Services.
- Res ectfully submitted G R. Underground Inc.
Exhibit A attached and made.a part hereof.
This Proposal may be withdrawn. by us if not a A
N 30
Per
George Ruark, President
i . ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as
specified Payment will be made as outlined above.
Accepted
Date
Signature
Signature
PERMIT NO.4092
Hidden Canyon/On-Site Dry Utilities/Tract No. 29436
In addition to the standard permit conditions, the following shall apply:
1. Pursuant to Section 14-16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard_ Specifications For Public
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. Ivanhoe La Quinta Cove, LLC, hereinafter referred to as "Permittee", shall be responsible for
providing continuous dust and erosion control:
3. This permit or copy of it shall be on the work site for inspection during the actual work performed.
4. Streets shall be kept clean.. They shall be completely cleaned at the endof each working day and more
frequently, if required.
5. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982), throughout the
work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October 1 st to April .310: Monday -Friday 7:00 a.m. to, 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May lst to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays
Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial
street-(ie any 4 lane street) before 8:00 a.m.
6. Work within 500 feet of.a signalized intersection shall be performed between the hours of 9 a.m. - 3
p.m. Traffic control shall be set up after 9 a.m. and removed before 3,p.m. The Permittee shall contact
the Riverside. Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at
the intersection is to be altered in any way.
7. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private street
and for any damage to other City streets or facilities as a result of work performed under this permit.
8. Pursuant to.Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part),' 1982),
advance warning signs and traffic control shall be .installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan shall be prepared in accordance with the WATCH Manual and submitted to the City for
Special Conditions Page I of 3
PERMIT NO.4092
Hidden Canyon/On-Site Dry Utilities/Tract No. 29436
review and approval one (1) week .prior to starting any construction. It shall be the Permittee's
responsibility to appropriately detour and barricade all construction sites.
Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street
closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be
maintained at all times.
9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at'1-800-422-
4133.1t shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
10. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to
the City of La Quinta..
11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform. with Section 306-1.3 of the latest
edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise "
specified herein.
12. All excavations within City of La Quinta right -of --way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of the
City -Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that
which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight,
however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length,
open overnight at a point where construction will begin the next day, provided that this length of trench
is completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its
original condition.
14. Access and'egress to all local properties shall be maintained at all times.
15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
of the work. Permanent pavement replacement.shall conform to the following conditions:
A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall
be straight and clean.
B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than
existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed
miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard
Special Conditions Page 2 of 3
PERMIT NO.4092
Hidden Canyon/On-Site Dry Utilities/Tract No. 29436
Specifications for Public. Works Construction. The replaced pavement -and base material shall be
compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench.
Verify exact structural replacement section thicknesses with -the City prior to installation.
C. Permanent pavement replacement shall, be installed using a City approved 3/4" max medium
asphalt concrete as the base course lift and a City approved''/2" max medium finish course lift for
capping. Asphalt concrete mix design shall be approved by the City prior to its placement.
D. If grinding and capping operations are not performed in the same day as base paving operations,
the base course lift of/4" max medium asphalt concrete shall be installed from saw -cut edge to
saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left
0.10',low in anticipation of grinding and capping.
E. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be
replaced. in kind by the Permittee, as directed by and to the satisfaction of the City Engineer.
Affected traffic signal loops .shall be removed and replaced in kind. The finished pavement
surface shall be smooth, consistent; and shall conform to the surrounding: grades.
16. Permittee shall permanently stabilize, any and all soil that was disturbed as a result of work performed
under this permit with anapproved dust control treatment. Soil stabilization shall be done immediately
after completing the operation..
17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10. § 1 (part), 1982) the City
has designated certain,city streets as Truck Routes. The weight limit for restricted, streets (i.e., streets
not part of the Truck Route -'network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery -or pickup on the subject street, or if this permit specifically grants
permission to use the street to deliver street construction,materials, and/or equipment.
1.8. The City of La Quinta reserves the rig$t to revoke, suspend or void this permit at any time.
19. The permittee shall .indemnify, hold harmless and assume the defense of the City from all damages,
delay costs, costs or expenses in law- or equity that may arise out of work under this permit.
20. If it is the intent of the permittee to cut the pavement and have it restored by a third party, the
permittee-shall postpone cutting the pavement until the intended third party has acquired a permit from
the City to' perform the required restoration work.
Special Conditions Page 3 of 3
City of La Quinta
The following General and Special Provisions are attached to and made a part of
Permit Number 4092
The following shall always apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way
ONLY. Whenever construction extends within. private property, it is the responsibility of the permittee for his contractors to secure permission
from abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved
surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced
over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or
cut existing drainage structures, City of La. Quinta shall be notified prior to commencement of this work. Drainage structures and open drains
shall be kept free of debris at all times for proper drainage.
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for
the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
® R1 NOTIFICATION: Permittee shall'be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting
construction. `
® R2 UTILITY CLEARANCE: (Subst(uctures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by permit, the permittee shall contact .all concerned utility companies relative to the location bf existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
permittee.
® R3 UTILITY CLEARANCE (Surface Structures)'.No work shall -be done. under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with ( ** N/A ** ) inches of A.C. paving placed on ( ** N/A ** ) inches of ( ** N/A ** ) aggregate sub -base course having an
"R" value of not less than ( '* N/A'*) and in conformance with the City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
i
❑ R5 PARKWAY GRADING: Area between. the property line and top of the proposed concrete curb shall be graded to a slope of
one-fourth inch ('/<") to one foot (1').
❑ R6 GRADE CHECKING -.City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (** N/A **) feet shall
be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2'/V) of A.C. paving on ( **,N/A **) of class ('* N/A" )
aggregate base.
® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all
times.
❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the
manufacturer's specifications.
City of La Quinta
® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State or City of La Quinta projects.,
® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the,
centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon completion or replacement of all survey monuments for proper clearance.
® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be
used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the
protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than
three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any
case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.
❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the
trench before flooding or a maximum of five feet (5') lifts where trenches are of excessive depths. Care is to be exercised
that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuos.
® R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one -
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after
a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5) day limit.
❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( 3 ) inches of A.0 surfacing placed on a ( 6 )
inch ( crushed ) aggregate base shall be placed no later than ( 7 ) days after completion of temporary road repair.
❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
® R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon
completion of permanent repairs.
® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished
by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections, which can be handled safely.without interference or hazard to highway traffic. The
entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The
stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be provided to protect the traveling public at all times.
Large holes resulting, from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method.
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.