4185-------------------------
NOTE:
-With proper validation .
this form constitutes an
encroachment permit CITY OF LA QUINTA
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
July 14, 2004 Subdivision Improvement Permit —Class I I I
DATE: Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION Desert Club Drive Borth of Calla Amigo
lNispero office Building VUP 2002-015
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION Installation of phone service Sketch (attach construction plans if appropriate)
to feed office buildingo (Utilities)
DESCRIPTION OF CONSTRUCTION Trench & Install 2-4t1
conduit rung from existing Veriaon.manhole to
office buiidinst
DIMENSION OF INSTALLATION OR REMOVAL LspPr0A# w
see attached plan
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN 7121104
*See Attached Special Conditions*
APPROXIMATE TIME OF COMPLETION 7/23/04 JID
ESTIMATED CONSTRUCTION COST $ 7.500.00 I1
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Q u
juL 2 0 2004
Indemnify, defend• and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalti6s, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this w rk.
Signat `sof Applicant or Agent
GR Underground Inc. (Michael Kemberling), 39-725 Garand Lane, Ste. A. PD (760) 360-7994
Name of Applicant (please print) Business Address Telephone No.
Same as Above
Name of Contractor and Job Foreman Business Address Telephone No.
765654
Contractor's License No.
American Safety Indemnity
00587
City Business License No.
ESLOO12020402
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit —Class III
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor. Improvement Permit — Class IV: See attached schedule
Inspection Fee $ 230.00 II
100.00
Permit Fee
0.00
Penalty
Cash Deposit -Surety Bond
0.00
if required
TOTAL: $
330.00
Receipt No.
Received by
Date
Recorded by
It0 4185
PERMIT VALIDATION e-
PERMIT NO. 4185
DATE APPROVED 7/16/04
EXPIRATION DATE 7/16/05
DATE\ISSUED 'r�.�'�i L�
Administrative Authority
Telephone: (760) 777-7075
City of La Quinta
The following General and Special Provisions are attached to and made a part of
Permit Number 4185
The following shall always apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right.of way
ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission
from abutting property. owners. Such authorization must be secured by the permittee prior to starting work.
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved
surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street.shoes to protect the paving
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced
over their entire width.. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, -steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or
cut existing drainage structures, City of La Quinta shall be notified' prior to commencement of this work. Drainage structures and open drains
shall be kept free of debris at all times for proper drainage.
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard'or better. All excess material shall be removed prior to paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE -WATER OPERTATIONS:-If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for
the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting
construction.
® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
permittee.
® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with ( ** N/A ** ) inches of A.C. paving placed on ( ** N/A *' ) inches of ( ** N/A ** ) aggregate sub -base course having an
"R" value of not less than ( `* N/A ") and in conformance with the City. of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
❑ R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
one-fourth inch ('/4") to one foot (1').
❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (** N/A ") feet shall
be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. 'Surfacing between the property
line and the existing road paving shallbe two and a half inches (2 Y2") of A.C. paving'on (. ** N/A *') of class (" N/A ** )
aggregate base.
® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600').in all directions shall be assured and maintained at all
times.
❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the
manufacturer's specifications.
City of La Quinta
® R11 COORDINATE WORK: The proposed work shall be subordinated to. any operation, which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State or City of La Quinta projects.
® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon completion or replacement of all survey monuments for proper clearance.
❑ R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be
used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the
protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
❑ R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or
.saturated material) which is encountered during excavation shall not be used for backfill, but shall be'supplemented or
replaced by an approved sand or gravel.
❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than
three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any
case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.
❑ R17 'BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the
trench before flooding or a maximum of five feet (6) lifts where trenches are of excessive depths. Care is to be exercised
that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuos.
❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one -
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
® R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after
a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5) day limit.
® R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( 3 ) inches of A.0 surfacing placed on a ( 6 )
inch ( crushed ) aggregate base shall be placed no later than ( 5 ) days after completion of temporary road repair.
❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
® R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon
completion of permanent repairs.
1
® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished
by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump, shall be removed and disposed of so that�no debris remains in view of the highway. The
stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method.
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.
PERMIT NO.4185
DESERT CLUB CROSSING (NISPERO)/PHONE LINE/VUP 2002-015
In addition to the standard permit conditions, the following shall apply:
1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
Work shall be performed in accordance with the latest edition of the Standard Specifications For Public
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. GR Underground, Inc, hereinafter referred to as "Permittee", shall be responsible for providing
continuous dust and erosion control.
3. This permit or copy of it shall be on the work site.for inspection during the actual work performed.
4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more
frequently, if required. n
5. Pursuant to Section 6.08.050.of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the
work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October 1st to April 30: Monday -Friday 7:00 a.m. to. 5:30 p.m.
Saturday 8:00 a.m. to 5:00•p.m.
-May 1st to September 30: Monday -Friday 6:00 a.m. to 1:00 p-.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays: .
Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial
street (ie any 4 lane street) before 8:00 a.m.
6. Work within 500 feet of a signalized'intersection shall be performed between the hours of 9 a.m. - 3
p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact
the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at
the intersection is to be altered in any way. '
7. Pursuant to Section 14.16.110 of the .La Quinta Municipal Code (Ordinance 10 § • 1 (part), 1982),
Permittee shall assume responsibility for.repair of any pavement damage to any public or private street
and for any damage to other City streets or facilities as a •result of work performed under this permit.
8. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic'control shall be installed and maintained in, accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan shall be prepared,in accordance, With -the WATCH Manual and submitted to the City for
Special Conditions Page I of 4
PERMIT NO.4185
DESERT CLUB CROSSING (NISPERO)/PHONE LINE/VUP 2002-015
review and approval one (1) week prior to starting any construction. It shall be the Permittee's
responsibility to appropriately detour and barricade all construction sites.
Pursuant to Section 14:16.290 of the La Quinta Municipal Code (Ordinance 10-§ 1•(part), 1982), street
closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be
maintained at all times'.
9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify,the Public Works Department of anticipated
excavation which impact City facilities, including but not -limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
10. Should additional work, materials, or modifications of the work be- required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be
performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the
City of La Quints.
11. Pursuant to .Section 141.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform to Section 30671.3 of the latest edition of
the Standard Specifications for Public Works Construction (SSPWC), except as otherwise specified
herein.
1 .
Native material may be used as backfill material provided that minimum compaction, achieved in the
manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water
densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's
responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all
times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material; such
material shall be removed to the limits directed by the Geotechnical Inspector and/or the City
Inspector and the resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be brought to or maintained at appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through progress testing on the stockpiles.
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be. tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth
of lift that can be compacted.
D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be
taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
Special Conditions Page 2 of 4
0
PERMIT NO.4185
DESERT CLUB CROSSING (NISPERO)/PHONE LINE/VUP 2002-015
completion of this portion of trench, the City Inspector shall establish the maximum lift thickness
to be compacted for the remainder of the project.
E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of
backfill, per 300 linear feet of open trench, at randomly selected locations within the open length
of trench.
F. The depth of the randomly selected compaction tests shall also be randomly selected except that
where multiple tests are required in a given length of trench, the tests shall be no closer than three
feet (vertically) from each other.
G. If any compaction tesi fails, previously placed backfill (in the same length .of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test
results shall be furnished to the City Inspector.
12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of the
City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that
which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight,
however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length,
open overnight at a point where construction will begin the next day, provided that this length of trench
is completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its
original condition..
14. Access and egress to all local properties shall be maintained at all times.
15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
of the work. Permanent pavement -replacement shall conform to the following conditions:
A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall
' be straight and clean.
B. Permanent pavement replacement structural section, within all.trenches, shall be 1" thicker than
existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed
miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard
Specifications for Public Works Construction. The replaced pavement and base material shall be
compacted to 951/orelative compaction and respectively tested, for each 3001inear feet of trench.
Verify exact structural replacement section thicknesses with the City prior to installation.
Special Conditions Page 3 of 4
PERMIT NO.4185
DESERT CLUB CROSSING (NISPERO)/PHONE LINE/VUP 2002-015
C. Permanent pavement replacement shall be installed using a City approved 1/4" max medium
asphalt concrete as the base course lift and a City approved %2" max medium finish course lift for
capping. Asphalt concrete mix design shall be approved by'the City prior to its placement.
D. Cold -Mill and Overlay - The existing.pavement which was properly protected in place during the
trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10
feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area
And base asphalt concrete in the trench area.shall be overlaid with a City approved C2-AR-4000
asphalt concrete mix. The width ofthe cold milling area shall be as follows:
• For longitudinal trenches located in. a parking lane: three (3) feet outside the sawcut
removal lines.'
• For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal
lines, or to the lane line striping, whichever is greater.
• For transverse trenches across existing street: `two (2) feet outside the sawcut removal lines.
E. If grinding and capping operations are not performed'in the same day as base paving operations,
the base course lift of 1/4" max medium asphalt concrete shall be installed from saw -cut edge to
saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left
0.10' low in anticipation of grinding and capping.
F. Any existing lane striping or any existing detour, lane striping affected by this resurfacing shall be
replaced in kind by the Permittee, as directed by and to the satisfaction, of the City Engineer.
Affected traffic signal loops shall,be removed and replaced in kind. The finished. pavement
surface shall be smooth, consistent, and shall conform to the surrounding. grades.
16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization shall be done immediately
after completing the operation.. r
17. Pursuant to Chapter 42.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part),,1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants
permission to use the street to deliver street construction materials and/or equipment.
18. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
19. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages,
delay costs, costs or expenses in law or equity that may arise out of work under this permit.
20: If it is the intent of the permittee to cut the pavement and have it restored_ by a third party, the
e permittee shall postpone cutting the, pavement until the intended third party has acquired a permit from
the City to perform the required restoration work.
Special Conditions
Page 4 of 4
r
.Lb?...07/14/2904 13:08. 1903601334 GRSUNDERGROUND Ik' 4 nPAGE 01"` "
.. ... ... ..__. ,._...• ri guiuuu , Nv, 111 � I�IijUV�r V
PG
Date:
Location of Conatruction:
n 1 % r.
Purpose
PUBLIC WORKS DEPARTMENT
APPLICATION FOR PERMIT
29
oaf Construction_ /(( - '� -► h
of installation or oval•
Approximate Construction Stan Date. � 1 • y
Approximate Constiruction Completion Date:
Estimated Construction Cost: $✓--
13st4neted Conetruettph Cos eiroll btclade ue,e®vet pf wI o i V-tl s nutctta>9, nad de6ds, back.tilL
P-•-•-r pout re i ong and or NP16cmg tfoProvCMMM �. emotion red
Contact NamE: M ;
Name of Applicant.
Applicant Address: `
Applicud Telephone
Name of Contractor.
Contractor Address: a
Contractor Telephone Nwnber.�
Contractor State License Number��
Contractor City Businma License Number
or Contractor
Or Contraotor
e
Pumb
At-8ulh
Depwit:
Dist cmztr 1
Dopostt
-�'
Qedit
TOTAL PEE DUE:
3 3 0, ,7 J
Phone Number.
A \ cti .
Insurance Company-.
Insurance Policy Dumber;
09121Use only:
Atdgned Permit Nuattbc
Xpprovol Date,
P�cPitalian
theC:
Issue
Date;
Adrninhmmlvc Aud,mttr
Post-Ir Fax Note 7671
Date
oa°ges�
To
From „ l�
Co./Dept.
Phone a
Phone #
Fax N
Fax 9
V
LM `f1
05/20/20.04 .:.:13:44.
7503601.334
' ..:GR�.UNDERGROUND:;
INC .
PAGE 02
FAQ :160 717
7155 City of La.-Quinta
:Pub; Wk
Z 00.2/002
0
PUBLIC WORKS DEPARTMENT
APPLICATION FOR PERMIT
ILocation of Construction:
Purpose of Construction: 1� l OL
Description of C
Dimension of Installation or Removal: Q S --
Approximate Construction Start Date: a y�C)Lt
Approximate Construction Completion Date: . 5 .Dlap t�q
Estimated Construction Cost: $ n
"nawd Co�ucdon Coat Man inelub the remml of all o h nq%TI % tmd ddWo. MA-Mlim to "Coon Ed
Piecirw'Pesrr U"t MMw1acing and or replacing imprevetetenta
Contact Name; Phone Number:
Name of Applicant:
Applicant Address: 9
Applicant Telephone Number: nj d1 . ?I 1 •"'� qt.�
Name of Contractor-• ��
Contractor Address:
Contractor Telephone Number;
Contractor State License Number:^"\%�
Contractor Ciry Business License Number;��
it or Contractor, General.Liability Insurance Company:.
Applicant or Contractor Policy Number;
Me Use only:
kupeat;oa Frye:
Penult Fee:
Ar.-Bu11t
Dgmi�
Dust Control
Aaposia
Gnda
An.wm
TOTAL FEE DUt3;
Me Use onb:
Asetatted Permot NumDmr:
Appmvul Doc
Exyaalian
thzs .
lseue
Adminisesnre Authority: .
00
E)G"NG '
�(.,r • � • 'i: .r " , u .F t /` _ fit... . ♦ # � - 'y Z ' � ; ' 3 _
CALLE AMIGO,
` r, i ♦ .. V ' �Y.v' 4n - • +'[,.. 1 +♦ �Ir ? -C µ * �. F a Ty
1. 4ALLTRAFI`IC OONTROI DEVICES FOR TT#9 PROJECT SHALL BE N ACCOFWAWE WRH TW STATE OF CAllfOF>lpll DEPART L8i10F i ;
2 TRAFFlCCbffTROI�FDRCONSTRUMONANDMANDMICEMIMMMSTHE REJURiEp, (CALTTtANe�IF
ti "T ♦ 4
DEBED IEDESIS* ITY CITY OF LA QUMTA FSPRESENTATM. ADDITIONJLLTRAFRC OOMJTi�L WY 8E REQIiiED TO FACILITATE PI OM SAFE TYAND TRAFFC F
3, i1' O)OMO EACH WORK F'E M. COHTRIICTOR �
r h SHALLIFf TT(84FFICOOUITROLPOWBMQIDESAMDRIEKO )ANDANMMNMEINACCORpAjICEyyTiH r j ' • 35 : !' Z
TRAFFC CONTROL PL k ' IFIeteN EIBCtrlc Condu� for New Pro}eCl ty
i 1.COMRACfOR8Fi4LLAdifALTAIHA41N lroTRAFFIClJ1TEMLeTHIiTALCT 4 THERESWUlBEAMIMINr - :•
x S ACOES3T0PR(1AiTEPROPEItTYSHALLBEANWTAM®ATALLTI
Y; BETIYEEN THE EDGE aF OUT AND THE tEMES1 TRAFFC LAATEoxwaxioc ur
* z .'
` 8. THSTRAFFICOONTROLSHALLBEINPLACEDLAWWORNNoMof&y. AT END OFTHEWOW G. R. UndeItmc(1d L Tops NB8111Cede5. Inc. . ,L--C�
' T. THIS IS ATYPICALAS THE CLbsM W1Y NEED TO MOW FURTHER ALM THE ROAD ORTO THE , THE ROAD SHAH BE CLEAR OF DEBRIS AND RETURNED m NORIIL4L .
OPPOBTTE SIDE AAA'
8 RAOOERS SHALL HAVE 24MY RADIO DOM MICATM OR BEABLETO SEE EACH OTHER. FLADOERAND PFUlkRE 7O STOP 510NS SHALL BE RE#1011ED OR COVERED NfF�I 2-TOPS _ . Ron Fftld CALTRANS T-13 4
f RA0013iSARENOTPRESBiL. r 2 524/" ► To Be ISSu6d on Approval `
Comments
M!
Li�� . .. .. . _ �/ rl'. A .0. - 0 --)IV1 A An 6:!th
Field Tech.:
Super. or Agent
24-bour'riotice requested,to schedule Field T'echniciart;.Than k..you -for the oppbrtunity to -be of service.
4.
• NOTE:
2.
With proper validatioi: 04
this form constitutes an
encroachment permit .CITY OF LA QUINTA
APPLICATION FOR PERMIT -
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT):
OF
For -the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
{
July 14 , 2004 Subdivision Improvement Permit - Class I I I
DATE: Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION Desert Club Drive north of Caile Anigo
.0.s aro Office Building VUP 2002-015
(Street address or Description of Location) -
Installation of phone service
PURPOSE OF CONSTRUCTION Sketch (attach construction plans if appropriate)
to feed office buildittgs Uti it es
DESCRIPTION OF CONSTRUCTION" Trench 6 Install 2-417 .
conduit runs from existing Verizon manhole; to
o-f ice building
DIMENSION OF, INSTALLATION OR REMOVAL Approx. 50 *See ,Attached Special Conditionsx
race at•tacht d plan
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN 7/21 04
APPROXIMATE TIME OF COMPLETION 7/23/04
ESTIMATED CONSTRUCTION COST $ 7.500.00. JUL 2 0 2004
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements) QuINTA
In consideration of the granting of this permit, the applicant hereby agrees to: FINANCED
Indemnify, defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and�against-any and all "
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or. property .
happening or occurring as a.proximate result of any work undertaken under'the permit granted pursuant to this application. '
Notify the Administrative- Authority at least twenty-four (24) hours in advance, of the time when work' will be started..
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules_ and re6ulations of the City of
La Quinta and to pay for any additional replacement necessary as, the result of this work.
Signat r -o`f Applicant or Agent g'
6K Uade.rground 1-nc. (Michael Kemberlirtg), 391-725 Garand Lane,, Ste. A, PD (760)'360-7994
Name of Applicant (please print) Business Address - Telephone No.
Same'as.Above
Name of Contractor and Job,Foreman Business Address Telephone No.'
765654 00587,
Contractor's License No. City Business License No.
Axerican Safety Indemnity t ESLOO12020402 ,
Applicant's Insurance Company Policy Number
,F
FEES: Subdivision Improvement Permit -Class III R 0
Public improvements: 3% of estimated construction costs E1
Private improvements: 3% of estimated construction costs
Minor Improvement Permit - Class IV: See attached schedule
4`4� !T
=..:. .05.
230.00.
Inspection Fee $
PERMIT VALIDATION
Permit Fee 1.0.0.00
4185
•. (�
0.00
PERMIT N0.
Penalty
7/16/04
Cash Deposit -Surety Bond
0.00
DATE APPROVED
if re 4 aired
7/161/05 '
EXPIRATION DATE 1
TOTA06
L: $ 330.
-
t.
DATE,ISSVED 7`4/" -"•� I
Receipt No.
Received by Date
Administrative Authority .
Recorded by r =
Telephone: (760) 77777075
1
PERMIT NO.4185
DESERT_ CLUB CROSSING (NISPERO)/PHONE LINE/VUP 2002=015
In addition to the standard permit conditions, the following shall apply:
1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For Public
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. ,. GR Underground, Inc, hereinafter referred to as "Permittee", shall be responsible for providing
continuous dust and erosion control.
1 This permit or copy of it shall be on the work site for inspection during the actual work performed.
4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more
frequently, if required.
,5. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982), throughout the
work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be. performed only during the following time
periods`
' _ l
October 1st to April 30: Monday -Friday 7:00 a.m. to`5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
"May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m:
Saturday 8:00 a.m. to-5:00 p.m.
Work shall be prohibited on legal holidays and Sundays:
Note: Construction work (including setting up traffic control devices) is not,permitted on any Arterial
street (ie any 4 lane street) before 8:00 a.m.
6. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3
p:m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall 'contact
the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at
the intersection is to be altered in any way.
•7. Pursuant to. Section.14.1&1.10 of the La ouinta Municipal' Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility. for repair of any pavement damage to any public or private street
and for any damage to other City streets or. facilities as a result.of work performed under'this permit.
8. Pursuant to Section'14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signsand traffic control shall be installed and maintained in accordance with Cal
Trans Standards or, the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan shall be prepared in accordance with the WATCH -Manual and submitted to the City for
Special Conditions Page I of 4
PERMIT NO.4185
DESERT CLUB CROSSING (NISPERO)/PHONE LINE/VUP 2002-015
review and approval one (1) week prior to starting any construction. It shall be the Permittee's
responsibility to appropriately detour and barricade all construction sites.
Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 • (part), 1982), street
closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be
maintained at all times.
9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133: It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
10. Should additional work, materials, or modifications of the work be, required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be
performed by the Permittee as directed by and to the satisfaction of the City.Engineer at no cost to the
City of La Quinta.
11. Pursuant to Section 14.16.370.of the La Quinta Municipal Code'(Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform to Section 306-1.3 of the latest edition of
the Standard Specifications for Public Works Construction (SSPWC), except as otherwise specified
herein.
Native material may be used as backfill material provided that minimum compaction, achieved in the
manner prescribed herein, is achieved.. Backfill shall be performed by mechanical means; no water
densified compaction via j etting or flooding or other means shall be allowed. It shall be the Permittee's
responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all
times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such
material shall be removed to the limits directed by the Geotechnical Inspector and/or the City
Inspector and the resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be brought to ' or maintained at appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prionto use of the materials through progress testing on the'stockpiles.
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at• random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and•to establish the depth
of lift that can be compacted.
D. If lifts greater than one foot are attempted in this trial length of trench; compaction tests shall be
taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
Special Conditions Page 2 of 4
PERMIT NO.4185
DESERT CLUB CROSSING (NISPERO)/PHONE LINEXUP 2002-015
completion of this portion of trench, the City Inspector shall establish the maximum lift thickness
to be compacted for the remainder of the project.
E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of
backfill, per 300 linear feet of open trench, at randomly selected locations within the open length
of trench.
F. The depth of the randomly selected. compaction tests shall also be randomly selected except that
where multiple tests are required in a given length of trench, the tests shall be no closer than three
feet (vertically) from each other.
G. If any compaction' test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
H. :All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test
results shall be furnished to the City Inspector.
12. All excavations within City of La Quinta'right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of the
City Engineer for.the protection of the public.., Lengths of open trench shall not greatly exceed that
which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight,
however, Permittee may leave a length of excavated trench, not to exceed twenty (20). feet in length,
open overnight at a point where construction will begin the next day, provided that this length of trench
iscoinpletely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its
original condition.
14.` Access and egress to all local properties shall be maintained at all times,
15._ Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall he completed no later than seven (7) days after the completion
of the work. Permanent pavement replacement shall, conform to the following conditions: .
A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall
be straight and clean-
B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than
existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed
miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard
Specifications for Public Works Construction. The replaced. pavement and base material shall be
compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench.
Verify exact structural replacement section thicknesses with the City prior to installation..
Special Conditions Page 3 of 4
PERMIT NO.4185
DESERT CLUB CROSSING MSPERO)/PHONE LINE/VUP 2002-015
C. Permanent pavement replacement• shall.be installed using a City approved 3/4" max medium
asphalt concrete as the base course lift and a City approved %z" max medium finish course lift for
capping: Asphalt concrete'mix design shall be approved by the City prior to its placement.
D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the
trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10
feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area
and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000'
asphalt concrete mix.. The width of the cold milling area shall be as follows:
• For longitudinal trenches located in a parking lane: three (3) feet outside the sawcut
removal lines.
• For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal
lines, or to the lane line striping; whichever is greater.
• For transverse trenches across existing street: two (2) feet outside the sawcut removal lines.
E. If grinding and capping operations are not performed in the same day as base paving operations,
the base course •lift of 1/4" max medium asphalt concrete shall be installed from saw -cut edge to -
saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left
0.10' low in anticipation of grinding and capping.
F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be
replaced in kind by"the Permittee, as directed by and to the satisfaction of the City Engineer.
Affected traffic signal loops shall be removed and replaced in kind. The finished pavement
surface shall be:smooth, consistent, and shall' conform to the surrounding grades.
16. - Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization -shall be done immediately
after completing the operation.
IT. Pursuant to Chapter 12,56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a.delivery or pickup on the subject,street, or if this permit specifically grants
permission to use the street to deliver street construction materials and/or equipment.
18. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
19. The permittee. shall indemnify, hold harmless and assume the defense of the City from all damages,
delay costs, costs or expenses in law'or equity that may arise out of work under this permit.,
20. . If it is the intent of the: permittee to cut the pavement and have it restored by a third party, the
permittee shall postpone cutting the. pavement until the intended third party has acquired a permit from
the City'to.perform the required restoration work.
Pa e4of4
Special Conditions • B
�,. DAILY CONSTRUCTION
REPORT
v 5 I DATE
w� I S M T W TH F S
cF' OFT
DAY
_ WEATHER
Project:
Job No. r• -S./ TEMPERATURE
Client -
Contractor Tii�C- Lo1JQ.aep_ : - WIND
Project Mgr , 14. RAz7/o
HUMIDITY
Brite
Clear.
Overcast
Rain
Snow
To 32
32-50
150-70
70-85
85 up
Still
Moder
High
Report No.
Dry
Moder
Humid
FORCE
FIELD
Nameof Contractor
Non -Manual
Manual
Remarks
Representing
Representing
Remarks .
Distribution:. 1. Project Manager
2. Field Office Page 1 of Pages
3. File,
4. Clie . Bv: `�� / �/_ / Jl�L-,rZ Title Inspector.
F:\pwdept\st lyCon st.xl s
Project
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES
DAILY CONSTRUCTION
REPORT
(Continued)
No. Sheet of Sheets
F:\pwdept\stafRfuller\inspections\DailyConst.xis
DAILY -CONSTRUCTION, �.
REPORT
5 i DATE
S I M I T J.W ITHI. F PI
of9 I DAY
WEATHER
Project
Job No. ..TEMPERATURE
• Client _
Contractor jiYJC zz2!Q x)eVA_ WIND.
t Project Mgr 4n,4 aa'eAt L/o.
T% HUMIDITY
Brite
Clear.
Overcast
Rain
Snow
To 32
32-50
50-70
70-85
85 up
Still
Moder
High
Report No.
[DL,yModer
Humid
El
ERAGE FIELD FORCE
- Name of Contractor
r
Non -Manual
-Manual
Remarks
VISITORS
Time
Representing -
Representing
Remarks
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES.
r_ -
Distribution: 1. Project Manager
2. Field Office Page 1 of Pages
3. File
4. Bv:�y_ t)/� Title . Inspector
F:\pwdept\stChet fuller\inspections\DailyConst.xls
Project
AT THE SITE
DAILY CONSTRUCTION
. REPORT
(Continued)
No. Sheet of Sheets
(CONSTRUCTION ACTIVITIES I1
F:\pwdept\staff\fuller\inspections\DailyConst.xis
Lai � �•� I � :
DAILY CONSTRUCTION
REPORT -
DATE
' I
w� I S I M T W TH F I S
DAY
WEATHER
Project nU AI-J,
Job No:TEMPERATURE
Client
Contractor ,T%214 4e2Qa e-?P WIND
Project Mgr 40,E QQtI/o
—�T HUMIDITY
Brite
Clear
Overcast
Rain
Snow
To 32
32-50
50-70
70-85
185 up
Still
Moder
High
Reporl No.
Dry
Moder
Humid
FORCEName
FIELD
of Contractor
Non -Manual
Manual
Remarks
Representing
Representing
Remarks
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES
r:
',e l
ibution: 1. Project Manager
2. Field Office Pape 1 of Pages
3. File
4. Clie t Bv::- _ Title Inspector
F:\pwdept\staff�fuller\inspections\Dai lyCon st. xl s
Project
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES
DAILY CONSTRUCTION
REPORT
(Continued)
No. Sheet of Sheets
F:\pwd ept\staff\fu I ler\inspections\D ai IyConst. xl s
pp , I DAILY CONSTRUCTION
REPORT
DATE
cF'� oF't�p� I DAY. S M I T W I TH F LJ
WEATHER
Project
Job No.TEMPERATURE
Client
Contractor Z00. ,f)e2P WIND
Project Mgr , ag, Z-110
HUMIDITY
Brite
Clear
Overcast
Rain
Snow
To 32
32-50
50-70
70-85
85 up
Still
Moder
High
Report No.
Dry
Moder
Humid
AVERAGE FIELD FORCE.
Name of Contractor
Non -Manual
Manual
Remarks
VISITORS
Time
Representing
Representing
Remarks
PEQUIPNM�ENTAT-THE SITE -
Distribution: 1. Project Manager
2. Field Office Page 1 of Pages
3. File
F:\pwdept\sta, fuller\inspections\DailyConst.xls By. _`�� / �Z'' )�� Title Inspector
Project
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES
DAILY CONSTRUCTION
REPORT
(Continued)
No. Sheet of Sheets
F:\pwdept\stafRfuller\inspections\DailyConst.xls
DAILY CONSTRUCTION
REPORT
u 5 I DATE
S I M 1. T J,W ITHI F 1.1
cam' O TSB I DAY J
WEATHER
Project 4 Lfr� —4010
Job No.TEMPERATURE
Client
Contractor T� _ Gl�JQ�� . WIND
Project Mgr JC130e4 i2ALedP_"11P
HUMIDITY
Brite
Clear
AL
Overcast
Rain
Snow
To 32
32-50.
50-70
70-85
85 up
Still
Moder
High
Report No.
Dry
Moder
Humid '
ERAGE FIELD FORCE
Name of Contractor
F
Non -Manual
Manual
Remarks
VISITORS
Time
Representing
Representing
Remarks
EQUIPMENT
CONSTRUCTION
117,4
ribution: 1. Project Manager
2. Field Office. 'Page 1 of Pages
3. File
4. Ch By `��,Q(� it — t) l Title Inspector
F:\pwdept\stg f uller\inspections\Dai lyConst.xl s
DAILY CONSTRUCTION
REPORT
(Continued)
Project No. Sheet of Sheets
r
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES
11
F:\pwdept\staff\fuller\inspections\DailyConst.xis
DAILY CONSTRUCTION
REPORT
5 DATE
S M T W ITHI F S
cF'M of� I DAY K. .
WEATHER
Project s anu VJ_
Job No: /gS ,Q TEMPERATURE
Client
Contractor ��C G��JQ.c���_ . WIND
Project Mgr 4or! aa wi,1/o
HUMIDITY
Brite
Clear
Overcast
Rain
Snow
To 32
32-50
50770
70-85
85 up
Still
Moder
High
ReportNo.
Dry .
ftM.de,
Humid
FIELD FORCE
Name of Contractor Non -Manual. Manual Remarks
Representing Representing . .Remarks
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES .
C -AA1 Q aad mbilf., (.
fAMW
,1
--•
LII _ ......
Distribution: 1. Project Manager
2. Field Office Page 1 of Pages
i 3. File I
4. Clie t B_v:> �� �)/ L Title Inspector
F:\pwdept\statt�fuller\inspections\DailyCon st.xls
Project
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES
DAILY CONSTRUCTION
REPORT
(Continued)
No. Sheet of Sheets
F:\pwdept\staff\ful ler\inspections\Dai IyConst. xl s
DAILY CONSTRUCTION
REPORT
5 DATE A2 - D3 - 0
.1 ' S M T J.W TH F S
cF OFT9 F ... DAY . Y
Brite
Clear
Overcast
Rain
Snow
To 32
32-50
50-70
70785.
85 up
Still
Moder
High
Report No.
Dry .
Moder
Humid
FIELD FORCE
Nameof Contractor• Non -Manual Manual Remarks
Representing Representing Remarks
Distribution:. 1. Project Manager
2. Field Office .. Page I of Pages .
3. File
4. Ch t BY - t )l L--� Title Inspector
F:\pwdept\sta�\fuller\inspections\DailyConst.xls r
Project
AT THE SITE
ACTIVITIES
No.
j
DAILY CONSTRUCTION
REPORT
(Continued)
Sheet of Sheets
F:\pwdept\staff\ful ler\inspections\DailyConst.xl s
p T' DAILY CONSTRUCTION
REPORT
5 DATE
cF,y 9 S M T W TH FM
OF z I' DAY
WEATHER
Project 4 lfr�G�Q 4atau.t�
Job No.; - l/ TEMPERATURE
Client
Contractor WIND
Project Mgr JIZ44 tL/G
—T HUMIDITY
Brite
Clear
Overcast
Rain
Snow
To 32
32-50
501-70
70785.
85 up
Still
Moder
High
ReportNo.
Dry .
Moder
Humid
AVERAGE FIELD FORCE -
Name of Contractor
Non-Malival
Manual
Remarks
VISITORS .
.Time
Representing
Representing
Remarks
Distribution: 1. Project Manager `
2. Field Office Page 1 of ages
3. File "
4. Clie t By > l�,Qfl - )! L--� Title Inspector
F:\pwdept\staf�\fuller\inspections\DailyConst.xls
DAILY CONSTRUCTION .
Project
AT THE SITE
ACTIVITIES
No.
REPORT
(Continued)
Sheet of Sheets
F:\pwdept\staff\ful ler\inspections\Dai IyC onst.xl s
DAILY CONSTRUCTION
o� o REPORT
5 I - DATE
w S. I M 1.3 I-W I TH F S
cF' OF DAY
WEATHER
Protect aq
Job No. Aw,& a. TEMPERATURE
Client
Contractor 1��C G�JQ,[�C-'� WrND
Project Mgr -464 a"il/o
HUMIDITY
Brite
Clear,
Overcast
Rain
Snow
To 32
32-50.
50-76
70-85
85 up
Still
Moder
High
Report No.
Dry
Moder
Humid
AVERAGE FIELD FORCE
Name of Contractor
Non -Manual
Manual
Remarks
VISITORS
Time
Representing
Representing
Remarks.
bution: 1: Project Manager
2. Field Office Pagel of Pages
3. File
B�Inspector4.C1�y: Title
F:\pwdepttau\
Project
AT THE SITE
TRUCTION ACTIVITIES
DAILY CONSTRUCTION
REPORT
(Continued)
No. Sheet of Sheets
F:\pwdept\stafRfuller\inspections\DailyConst.xls
WEATHER
Project 11.r�G��gatau.t,
Job No. TEMPERATURE
Client
Contractor Ji;�r L(.-YJQ�L�P WIND
Project Mgr
HUMIDITY
stribution: 1. Project Manager
2. Field Office'
3. File
4, Ch
F:\pwdept\sti!e t fuller\inspections\DailyConst.xls
S. M T J.W
TH F S
Brite
Clear.
Overcast
Rain
Snow
To 32
32-50
50-76 •
70-85
85 up
Still
Moder
High
Report No.
Dry
Moder
Hunud.
'Page 1 of Pages
By::c! .� - �)�/L Title Inspector
DAILY CONSTRUCTION
Project
AT THE SITE
CONSTRUCTION ACTIVITIES
REPORT
(Continued}
No. Sheet of Sheets
F:\pwdept\staff\fuller\inspections\DailyConst.xis
T ' DAILY CONSTRUCTION
00
Li
REPORT DATE
�F. � I • S I M T 1,W ITHI F S
CF OF I DAY
w WEATHER..
Project 44 Ll P_a'o x%
Job No:TEMPERATURE
Client
Contractor Tic- WIND
Project Mgr .404, g:�0 t L/D .
—` HUMIDITY
Brite
Clear
Overcast 4
Rain
Snow'
To 32
32-50
50-70
70-85.
85 up
Still
Moder
High
Report No.
L
LMod
Humid
FORCE
7AVERAGELD
ame of Contractor
Non -Manual
Manual
Remarks
VISITORS ..
.Time
Representing
Representing
- Remarks
Distribution. 1. Project Manager
2. Field Office Paee 1 of Pages
3: File
4.'Clie t By: `���►fy_ I���LQ Title Inspector
F:\pwdept\staf fuller\inspections\DailyConst.xls �.. .
r,.
DAILY CONSTRUCTION
Project
AT THE SITE
CONSTRUCTION ACTIVITIES
REPORT
(Continued)
No. Sheet of Sheets
F:\pwdept\staff\fu I ler\inspections\D ailyConst.xls
DAILY CONSTRUCTION
REPORT
5 I DATE
S 1. M1,..T I.W. I TH F S
cF OF I DAY
WEATHER
Project zy, j �gatau�
Job No.
S a TEMPERATURE
Client
Contractor Q.0e--P_ -- WIND
Project Mgr 4,014 ag ZY/P _
`—% HUMIDITY
Clear•
Overcast
Rain
Snow
E32
32-50
50-70
70-85
85 up
Still .
Moder
High
Report No.
+
Dry
Moder
Humid.
FORCE
FAVERAGEIELD
'Name of Contractor
Non -Manual
Manual
Remarks '
VISITORS _
Time
Representing
- Representing
Remarks
Distribution: 1. Project Manager
2. Field Office - Page 1 of Pages
3. File
4. Clie t By: > _ �,Tit1e Inspector.
F:\pwdept\sta ful ler\inspections\Dai lyConst. xis
DAILY CONSTRUCTION
Project
AT THE SITE
ACTIVITIES
REPORT
(Continued)
No. Sheet of Sheets
F:\pwdept\staff\fuller\inspections\Dai IyCon st.xis
DAILY CONSTRUCTION
REPORT
u 5 I DATE
lei � I
ti� I S M .T I W I TH F S
cF' OF T 9 I DAY
WEATHER
Project
Job No. TEMPERATURE
Client -
Contractor �iii�C zou'aa" WIND
Project Mgr 4o,4t 1/0
HUMIDITY
Brite
Clear,
Overcast
Rain
Snow
To 32
32-50
50-70
70-85
85 up
Still
Moder
High
Report No.
Dry
Moder
Humid
AVERAGE FIELD FORCE -
Name of Contractor
Non -Manual
Manual
Remarks
VISITORS -
Time . '
Representing
Representing
Remarks.
Distribution: 1. Project Manager
2. Field Office Page I of Pages
3. File
4. Clie t By: Title
Title Inspector.
F:\pwdept\stat\fuller\inspections\DailyConst.xis
DAILY CONSTRUCTION
Project
AT THE SITE
CONSTRUCTION ACTIVITIES
REPORT
(Continued)
No. Sheet of Sheets
F:\pwdept\staff\f ul ler\inspections\Dai IyConst.xls
DAILY CONSTRUCTION
REPORT
v I _ DATE
of AY
S M J.T I.W TH F S
cF'y T� I D
WEATHER
Project Lfr�G�Q 4a�u.tx�,
Job No. !/8S _o TEMPERATURE
Client • . -
Contractorii�C- WIND
Project Mgr ,p014 Q i-110 .
—` HUMIDITY
Brite
Clear,
Overcast
Rain ;.
Snow
To 32
32-50.
50-76
70-85
85 up
Still
Moder
High
Report No.
Dry
IModer
Humid
FORCE
FAVERAGEIELD
Name of Contractor.
Non -Manual.
Manual
Remarks
VISITORS
Time
i Representing - -
Representing
Remarks
ribution: 1. Project Manager
2. Field Office.. 'Paee 1 of Pages
3. File
4. Clie t By: > _ Title Inspector.
F:\pwdept\staf fuller\inspections\DailyConst.xls —
a
DAILY CONSTRUCTION
Project
AT THE SITE
ACTIVITIES
REPORT
(Continued)
No. Sheet of Sheets
F:\pwdept\staff\fu I ler\inspections\Dai I yConst.xl s
DAILY CONSTRUCTION
,�.�,.� ' WEATHER. i
PIOJ eCt _S
Job No.!/gS �• TEMPERATURE
- Client
Contractor J2�4- WIND
Project Mg - 4o,4 g:Z9A t L/o
�. HUMIDITY
-
F S
Brite .
Clear
Overcast
Rain
Snow
To 32
32-50
50-70
70785,
85 up
Still
Moder
High
Report No.
Dry.
Moder
Humid
7AVERAGEIELD FORCE -
Name of Contractor. Non-Mdival Manual Remarks
'VISITORS
Time . ` Representing Representing Remarks
Distribution: 1. Project Manager
2. Field Office Page 1 of . Pages
3. File
4: Clie t By: ��y l�L,� Title Inspector
F-\pwdept\staf�ful ler\inspections\Dai lyConst.xls
DAILY CONSTRUCTION
Project
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES
No.
REPORT
(Continued)
Sheet of Sheets
F:\pwdept\staff\fuller\inspections\DailyConst.xls
�,(�,.� , DAILY CONSTRUCTION
.�o , REPORT
DATE
S IT. IN TH F S 1.
•F I DAY
WEATHER
Project G_,Q L/,rJn Q qa r�
Job No.TEMPERATURE
Client
Contractor TrQ�C WIND
Project Mg' 4 eL RA illo
HUMIDITY
Brite
Clear
Overcast
Rain
Snow '
To 32
32-50.
50-70
70-85
85 up
Still _
Moder
High
Report No.
Dry
Moder
Humid "
FORCE
FAVERAGEIELD
Name of Contractor
Non -Manual
Manual
Remarks.,
VISITORS
Time,
"Representing
r Representing -
Remarks
stribution: 1. Project Manager
2. Field Office 'Page 1 of . Pages
3. File '
4. Clie t ° By:��y. , t)!�L— Title Inspector.
F:\pwdept\st s
DAILY CONSTRUCTION
Project
AT THE SITE
ACTIVITIES
REPORT
(Continued)
No. Sheet of Sheets
F:\pwdept\staff\f uller\inspections\D ai IyC onst. xl s
DAILY CONSTRUCTION
REPORT
5 DATE
F`' I S M I T J.W I TH1. F I S
OF T1 I DAY
WEATHER
Project
Job No:!/8S ,p " : TEMPERATURE
Client -
Contractor. TQ-,c eaga aC1p_ WIND
Project Mgr 4o,4 "illo.
TT HUMIDITY
Brite
Clear-
Overcast
Rain
Snow
To 32
32-50
50-70
70785,
85 up
Still
Moder
High
Report No.
Dry.
1ModeT
Humid
FORCE .Name
FIELD
of Contractor .;
. Non -Manual
Manual
Remarks
Representing
Representing
Remarks
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES .
c '
Distribution: 1. Project Manager
2. Field Office Paee 1 of Pages
3. File
4. Clie t Bv: > Fy_ , - t i es Title Inspector
F:\pwdept\staff u ller\inspection slDailyConst.xI s
DAILY CONSTRUCTION
Project
AT THE SITE
ACTIVITIES
No.
REPORT
(Continued)
Sheet of Sheets
F:\pwdept\staff\fuller\inspections\DailyConst.xis
DAILY CONSTRUCTION
,. REPORT
DATE
I
9�5 - S 1. M I T I W I TH1. F S
OF T I DAY
WEATHER
•PIcject
Job No. / S _,e �� TEMPERATURE
Client
Contractor J%ii�C zz2ga c)Cso_ . WIND
Project Mgr 40a "ill
HUMIDITY
Brite
Clear
Overcast
Rain
Snow
To 32
32-50
50-70
70-85.
85 up
Still
Moder
High
Report No.
Dry .
IModer
Humid
FORCE
FAVERAGEIELD
Name of Contractor _
Non-Ma»uaI
Manual
Remarks
VISITORS ..
Time-
Representing
Representing.
Remarks ,
Distribution: 1. Project Manager
2. Field Office Page 1 of Pages
3. File
4. Clie t By: > ,�fy_ Title Inspector
F:\pwdept\st •
DAILY CONSTRUCTION
Project
AT THE SITE
TRUCTION ACTIVITIES
REPORT
(Continued)
No. Sheet of Sheets
F:\pwdept\staff\fuller\inspections\DailyConst.xls
DAILY CONSTRUCTION
REPORT
v — 5 DATE
} lwoovi� N .
ti S M T VW ITHI F S
cF' OF� I DAY
• WEATHER
Project
Jbb No.. �l/�S ,Q �� _ . TEMPERATURE
Client '-
Contractor Z24 4L1Q .c)C7,"'_ WIND
Project Mgr �, %, �QQ t L/D
HUMIDITY
Brite
Clear
Overcast
Rain
Snow
To 32
32-50
50-70
70-85
85 up
Still
Moder
High
Report No.
Dry
Moder
Humid
AVERAGE FIELD FORCE
Name of Contractor
Non -Manual
Manual
Remarks
VISITORS
Time
Representing
Representing
_Remarks
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES
ibution: L . Project Manager
2. Field Office Paee I of Pages
3. File
4. Clie t By: > _ _ Title , Inspector.
F:\pwdept\sta,W, ler\inspections\DailyConst.xls
DAILY CONSTRUCTION
Project
AT THE SITE
ACTIVITIES
REPORT
(Continued)
No. Sheet of Sheets
F:\pwdept\stafRfuller\inspectibns\DailyConst.xis
I
0J DAILY CONSTRUCTION
REPORT
i DATE
cF' OF
I S M T J.W TH F S
DAY
WEATHER
Project
Job No:l/8S w zz TEMPERATURE
Client
Contractor J,jQC ez.2Q,Q Qe.?A WIND ;
Project Mgr Q,ari ,4"Z-1/0
HUMIDITY
Brite
Clear
Overcast
Rain
Snow
To 32
32-50
50-70
70-85
85 up
Still
Moder
High
Report No.
Dry
IModer
JHumid ,
FORCE `
FAVERAGEIELD
Name of Contractor
Non -Manual
Manual
Remarks
VISITORS .:. _.
Time
Representing
Representing
Remarks
t
ibution: 1. Project Manager
2. Field Office Page 1 of - Pages
3. File .
4. Cl.i t By: , Fy. — tt )l /L—� Title , Inspector
F:\pwdept\sta\fuller\inspections\DailyC on st.xl s
DAILY CONSTRUCTION
REPORT
(Continued)
Project No. Sheet of Sheets
AT THE SITE
CONSTRUCTION ACTIVITIES
F:\pwdept\staff\fuller\inspections\DailyConst.xls
DAILY CONSTRUCTION
REPORT
S I DATE
S I M I..T I W ITHI F S
OF z I DAY
_ WEATHER
Project
Job No.. s>~ TEMPERATURE
Client
ContractorL2�C• WIND
Project Mgr �i ��i
HUMIDITY
Brite
Clear.
Overcast
Rain
Snow
To 32
32-50
50-70
70-85
85 up
Still
Moder
High
Report No.
Dry
IModer
Humid
FORCE
FIELD
Name of Contractor
Non -Manual
Manual
Remarks
Representing
Representing
Remarks:
ribution:' 1. ProjectManager
2. Field Office.Page I of Pages
3. File.
4. Ce t By: 1?,Ly_.u
- �)( Title Inspector
F:\pwdept\slt! fuller\inspections\DailyConst.xls
Project
AT THE SITE
ACTIVITIES
DAILY CONSTRUCTION
REPORT
(Continued)
No. Sheet of Sheets
F:\pwdept\staff\fuller\inspections\DailyConst.xis
7,7a
�. �, >.
+` �`�°'�
,,;,
�.�::.
�,:
�,
�:
+ - .�,
�� � - - � � j F l E
�- ..,,�
.1 .,
r • , ,,�1
0
.re
a.
3
. l'
Yam.,. .. ,. __. _. -•=r
ELL
loci
-
" - - loti
L4 - .
-�.�.
�<
..� - -
;. � �
� � �; 1
• i I , : fib,, ..
i2�
r 4 `�L.. ° �. � ems. J - � •�
1 q�s,, �r ''ICE � �,�, •r'°� '4:,
-0`' ry Jai.,' 4 •r ♦ Ikk l ' i
3:
V
,*
l �
j.
7 s•13�_
-
'.i �'1
1
w ��
V
�'.
J
vim' rY�;�\
.-<�.~
... rl lid.• r
;���.
� ;�
y •..
.etae�'. � '.+�
- SST _��--, �.e_
i ./.
r
r
_ ear _v3s"o'�Ar