4186NOTE:
With proper validation
this form constitutes an
encroachment permit
CITY OF LA QUINTA ,
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
0
For the construction of public or private curbs, driveways, pavements, sidewalks, 'parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
DATE: July 15, 2004 Subdivision Improvement Permit — Class I I I
Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION Rancho La Quinta TN! 27840 and TM 29457
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION TV Cameras
Surveillance Perimeters
DESCRIPTION OF CONSTRUCTION Trench approx. 1.2,0001
of 2" conduit for TV cameras
DIMENSION OF INSTALLATION OR REMOVAL 12,000'
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN 7/19/04
Sketch (attach construction plans if appropriate)
f
*See Attached Special Conditions*
APPROXIMATE TIME OF COMPLETION
ESTIMATED CONSTRUCTION COST $ 10-7! I IL JJ 10
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify,defend• and save the City, its authorized agents, officers, representatives and employees, harmless from and against any�and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and DDtions of/AF},e CityLa Quinta and to pay for any additional replacement necessary as the result of this work. Itttrrrvvvv U
JUL 2 0 2004
Signature of Applicant or Agent
Cochran Communications (Jason Cochran) , 36630 Cathedral Canyon, CC (760) 328 �I 9E � QUIbTA
F �NCE DEPT
Name of Applicant (please print) Business Address ., Telephone No.
Same as Above `'-
Name of Contractor and Job Foreman Business Address Telephone No.
478543 00865
Contractor's License No. City Business License No.
Fred SadeShi Insurance Services LHA126.303
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class II I
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor. Improvement Permit — Class IV: See attached schedule
Inspection Fee $ ,, Q
r
Permit Fee` i ���• ,J ��
Penalty
Cash Deposit -Surety Bond
if requi44
TOTAL: $ �� • J -�
Receipt No.
Received by Date
4186
PERMIT VALIDATION
PERMIT NO. 4186
DATE APPROVED 7/16/04
EXPIRATION DATE 7/16/05 '
DATE ISSUED 7 - 19 - 24
Administrative Authority
Recorded by
Telephone: (760) 777-7075
O
PUBLIC WORKS DEPARTMENT
APPLICATION FOR PERMIT _
Date: Y— (S-- D1( .
Location of Construction: �,,�/ eh o L A „j
7t- i7 S Li —J, 7r\ 2-1 4 S 7
Purpose of Construction: ^T- V, . Goo-CeIV S
Description of Construction ) j}Joy o N0U,0_ Ir4S�
TU . C4V,
Dimension of Installation or Removal:
Approximate Construction Start Date: -7-
Approximate Construction Completion Date:,
Estimated Construction Cost: $
Estimated Construction Cost shall include the removal of all obstructions, materials, and debris, back -filling, compaction and
placing permanent resurfacing and or replacing improvements.
Contact Name:.. 6oQeP- Phone Number: 7f-c"
Name of Applicant:. (:! a, p_j (fo s -t-.
Applicant Address: 3 Uo 3
Applicant Telephone Number:. 7 W^ 3 Z 9 `V778
Name of Contractort fl e-
Contractor Address: 3 r.G20
Contractor Telephone Number: 7 32� '(a 7 79
Contractor State License Number:. �!7 5 s 4 3
Contractor City Business License Number: 0 94,,57 '
► A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED
Applicant or Contractor General Liability Insurance Company:
Applicant or Contra for General Liability Insurance Policy Numlier:
�-0 6 I Z6303
Office Use Only:
Inspection Fee:
Permit Fee:
As -Built
Deposit:
Dust Control
Deposit:
Credit
Amount:
Office Use Only:
Assigned Permit Number:
Approval Date:
Expiration
Date:
Issue
Date:
Administrative Authority:
TOTAL FEE DUE: /
Cochran .Communications..Constructio:n �" Estimate
36630 'Cathedral Canyon' Drive Date Estimate
Cathedral City, Ca. 92234 July 19, 2004 1 - Boring
License #:478543 ' Rancho La Quinta
Estimate To:
JDC Security Systems Inc.
906 N. Lake Street
Burbank, Ca 91505-1622
ATTN: -Bob Coffeen
Quantity Item Code Construction Item
-- La Quinta
e Due Date f
Price
U.G. Construction
13315
Foot
2" Directional Drilling
$6.00
75
Foot
2" Pneumatic Boring
$16.00
•
4501,
Each
Hand Trenching @ 18" Cover
$5..90
15
Each
Install 17"x30" Vaults
$52.00
17000
Foot
.Install Fiber In Unoccupied Conduit
$0.81
Material'
14000
Foot
2" Sch 40 Conduit
$0.49
30
Each
Z x90x24" Sweeps
$3.00
200
Each
2" Couplers
$0.68
15'
.Each
Vault 17"x30" Marked Security
$115.00
Note: This is an Estimate Only and does not reflect a true or final
billing of the construction to be performed. Only after
construction is complete can a true final billing be given due
to unanticipated circumstances, such as items that may have
been overlooked, or items listed that may not be required.
act Number
$79,890.00
$1,200.00
$2,655.00
$780.00
$13,770.00
$6,860.00
$90.00
$136.00
$1,725.00
Estimated Cost.OflConstruction: 1 $107,106.00
{
-PERMIT NO.4186
' Rancho La Quinta Surveillance/Boring & Trenching/Tract No. 27840 & 29457
In "addition to the standard permit conditions, the following'shall apply:
1. Pursuant to Section 14.16.320 of the'La Quinta Municipal Code (Ordinance 10 § f (part), 1982), all work
shall be performed in accordance, with the latest edition of.the Standard Specifications For Public Works
Construction (SSPWC) and as directed by and to the satisfaction of the City. Engineer.
2. Cochran Communications, hereinafter. referred to as "Permittee", shall be responsible for providing
continuous dust and erosion control.
3: ' The permittee,shall keep pedestrian traffic open -at all times.
4. Prior to crossing any Traffic Signalized Intersections (ex. entrance to -Rancho La Quinta Country Club), the
permittee must. inform the City Inspection. Staff of the, locations of the signal loops and the trenching or
boring area.
5. No parking is allowed on`Jefferson Street or Avenue 48.
6. No lane closures are allowed without prior City approval (approval has been granted on Washington per
traffic plan, but lane closure hours are restricted between 9AM and 3PM).
• "7. No work is anticipated on paved streets (all work is behind curb). Reapply for a permit if construction work
enters paved areas.
8. Streets shall be "kept clean. They shall be' completely cleaned at the end of each working day and more
frequently, if required
9. Pursuant to Section 6.08.050 of the La Quirita Municipal'Code'(Ordinance 18 § 1, 1982), throughout.the
work site, the Permittee shall comply with, City regulated work hours. IOperation and maintenance of
equipment within one-half mi'le.of human occupancy shall beperformedonly during the following time
periods:
October lst:to April 30:. , Monday -Friday 7:00 a.m. to.5:30 p.m.
Saturday 8:00 A.m. to 5:00 p.m.
May 1st to.September 30: Monday -Friday . 6:00 a.m. to 7:00 p.m.
h
r. Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
Note:' Construction work (including setting up traffic' control devices) is not permitted on any Arterial
'street (ie any'4 lane street) before 8:00 a.m.
Special Conditions
Page 1 of 5
PERMIT NO.4186
Rancho La Quinta Surveillance/Boring & Trenching/Tract No. 27840 & 29457
10. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m.
Traffic control shall be set up after 9 a.m. and removed before 3 p'.m. The Permittee shall contact the
Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the
intersection is to be altered in any way.
11. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee
shall assume responsibility for repair of any pavement damage to any public or private street and for any
damage to other City streets or facilities as a result of work performed under this permit.
12. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance
warning signs and traffic control shall. be,installed and maintained in accordance with Cal Trans Standards
or.the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall be
prepared . in accordance with the WATCH Manual and_ submitted to the City for review and
approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to
appropriately, detour and barricade all construction sites.
Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be
maintained at all times.
13. Prior to excavating, if required, the Permittee shall contact Underground Service.Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
14. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be
.performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the
City of La Quinta.
15. Pursuant to Section 14.16.370 of the La Quinta Municipal. Code (Ordinance 10 § l (part), 1982),
backfill compaction within street rights -of -way shall conform to Section 306-1.3 of the latest edition of
.the Standard Specifications for Public.Works Construction (SSPWC), except as otherwise specified
herein.
Native material may be used as backfill material provided that minimum compaction, achieved in the
manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water
densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's
responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all
times during backfill operations.
Special Conditions ' Page 2 of 5
PERMIT NO.4186
Rancho La Quinta Surveillance/Boring & Trenching/Tract No. 27840 & 294.57
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such
material shall be removed to the limits directed by the Geotechnical Inspector and/or the City
Inspector and the resulting excavation backfilled with pipe bedding material..
R Backfill materials shall be brought to or maintained at appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through. progress testing on the stockpiles.
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth
of lift that can be compacted.
D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be
taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift thickness
to be compacted for.the remainder of the project.
E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of
backfill, per 300 linear feet of open trench, at randomly'selected locations within the open length
of trench.
F. The depth of the randomly selected compaction .tests shall also be randomly selected except that
where multiple tests are required in a given length of trench, the tests shall be no closer than three
feet (vertically) from each other.
. r
G. If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which- is represented by the,, failing test (as determined by the City
Inspector), shall be tested•for compliance with compaction requirements.
H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test
results shall be. furnished to the City Inspector.
16. All excavations within City of La Quinta right -of --way shall be backfilled,. and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of the
City Engineer for the protection of the public. Lengths of open trench shall* not greatly exceed that
which cannot be backfilled in the same day. Excavated trenches shall not be allowed open overnight,
however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length,
open overnight at apoint where construction will begin thenext day, provided that this length of trench
is completely covered by steel plating.
Special Conditions Page 3 of 5
PERMIT NO.4186
Rancho La Quinta Surveillance/Boring & Trenching/Tract No. 27840 & 29457.
17. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its,
original condition.
18. Access and.egress to all local properties shall be maintained at all times.
19. Pursuant to Section 14.:16.375 of .the La Quinta Municipal Code (Ordinance 10 § 1, (part), 1982),
permanent pavement 'replacement shall be completed no later than seven (7) days after the completion
of the work. Permanent. pavement replacement shall conform to the following conditions:
A. Existing asphalt concrete pavement. shall be sawcut one (1) foot beyond trench edges. Edges shall
be straight and clean.
B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than
existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed
miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4. of the Standard
Specifications for Public Works.Construction: The replaced pavement and base material shall be
compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench.
Verify exact structural replacement section thicknesses with the City prior to installation.
C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium
asphalt concrete as the base course lift and a City approved %2" max medium finish course lift for
capping. Asphalt concrete mix design shall be -approved by the City prior to its placement.
D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the
trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10
feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area
and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000
asphalt concrete mix. The width of the,cold milling area shall be as follows:
• /For longitudinal trenches located in a 'parking lane: three (3) feet outside the sawcut
removal lines.
• For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal
lines, or to the lane line striping, whichever'is-greater.
• For transverse trenches across existing street: two (2) feet outside the sawcut removal lines.
.. � .. Special Conditions Page 4 of 5
~ PERMIT No. 4186.,
Rancho La Quinta SurveillanceBoring & Trenching/Tract No. 27840 & 29457
E-. If grinding and capping operations are not performed in the same day as base paving operations,
the base course lift of 3/a" max medium asphalt concrete shall be installed from saw -cut edge to
saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left
' 0.10' low in anticipation of grinding and capping.
F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be
replaced .in kind ,by the Permittee, as directed by and to the satisfaction of the City Engineer.
Affected traffic signal loops sliall be removed and replaced in kind. The finished pavement
surface shall be smooth, consistent, andshall conform to the surrounding grades. ,
20. . Permittee shall permanently stabilize any and all soil that was disturbed as a result.of work performed
under this permit with an approved dust control treatment.. Soil stabilization shall be done immediately
after completing the operation.
21. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance.l0'§ 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e.; streets -
not part of. the Truck Route network). is three (3) tons;. trucks exceeding the "weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants
permission to use the street to deliver street construction materials and/or equipment.
-22. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
23. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages;
delay costs, costs or expenses in law or equity that may arise out of work under this permit.
24. If it is the intent of the permittee to cut the pavement and have it restored by a third party;.the
ermittee shall postpone cuttin the pavement until the intended third party has acquired a permit from
p P tP g p
the City to perform the required restoration work.
Page 5 of 5
Special Conditions '
Sn F 4 =s,y-r f, p i,-.y . „` _ . ,y+H+= s ?;: ;jt,. ; : 4 't: _.; r '� cb;1'` - .•-•'r 1 `� .
.c c '•c +t -f Y:ity :-tt. ,,y"r`.i. r. .ti -:..,' ...+ r. Y yy: .t L ;"_
� .•�-� _ .f,` .1 �� sts f .{. -.ti„•� ,�"4, f,. wt,, .ti. :tom,. .,.•- F' l7"'.. ry .+'. •"�' t"
01
.i" r°�" ♦ y �'' - t .� ` � ` a '.' ~ t{.',A h ,s • ..y"± � i n ,r--"'��r , � y 't l
r .t. i r. t i t% a!•}� �d A,,..
`'� - r-;-,•'� - s•:r -_r .a t+' •t'•2- +�" },
`EISENHOWER DR'�`n�! r �� ai'•i {'' :fit {•7 + �. //fl`
-• ,f.���.. `-.. ,cL, f�,°, ` � •.: .� •,` `t }+ ::� ..a lM '", c•: _',` .�:•'�t }:4 fit- *>� �.�F y' �r''ai •j"��.i,
C-1 B,4.
a* .; b _ + '�' `. `tl: '.a y ...s s -. d `- j S •,r to .:•rr.,, ..
"•"N. _ j� '"'Y .fw"7.r, +-y ._ .,r J .i11 zF,ipUCll :i '� 'v,�y �• •1-?-"',►," i rl'
{. .• tel ,_. -Y _: fa M f -^.K J f 'itNYAO.YY :,tt t r t - '1. �� `A t Z.a" T. y'r'e
NO SCALE
�, .� x' t` � �' �•�'�{ i. - � 'S. J.: 5r '�iJ'` ., A^ .Vs -f� :i Y+ f �.t
� � i'� s.,f r`"�. Y� r'a�;i„a.b• � aa.}' l � Fyi } C� - Y, _ a .* 'y't, "� '♦.l. -'. `',� f - .-i �:
-; "•.:,1 '•1 i ,•s• tik.. t 4yjte; ^':"' '�` ". r.^•�f '��*� .L '� - - '•'�:��' :<'' ,'��,•+..
WASHINGTIC ST:
e
�A ', _ .. 'a •�'z.� b8"'."' 't: .rim •�,. � s.y ,. - •,.' . t. '. r • ,J '�C,� 'r T• g � :ti'r $' x-
�,. a :t '�?• -�!4h, � .�:..,_ r ,!', Nt �, v �. i'�•. dr ts.e f �' '`'G!o k r ;i. $.`. r �' .�:-, jnj _ ,U' •�: t:. � , a' .,Y'
r r ,. , . '``�"` .. t ar - `,<,• 'PLAN! .} ` ,-? - +�-,�' .... y
i 500 ET 350 FT wl
�, ,1 s
C 18
'SUB FT... r ;G18' .:z
..'V.b20(RT►' h - .•.,, it om `C. a. ?C?18'. ,'c Y w;7x t` F: �j.:: c,ie *}
..1
:'b . - ♦ r:.L 4. rT ' v+^.M�«re3 OftLY - t f • r '- .; Z.
s
ONLY ' Lt C '3h 'e';,_ " "man . '4, „t . ''s •" '� -.a
ti.:�'- 3N1E1U8'' .. 'v c apertg3V 4, wNRµfAp :.1 _-. F „'f i d F ,. { �,�,� _ls'. •�.
{. -y;:. --_ f . J t � ,': 'xNior `. 1 � �r�•_'. • �"� � •,•yr ,�.;.• _ . , x,".? :.,� St „,ram.
't.-la• , �. � F �A .}, ^� � , � � . i ; dam., t.� h;. r.. . 7 . � 7 � . � • . ,tr.i `a��;
io
600 FT
k" TAPER SHALL BE VISIBLE ;RANCHO; LA
.BEFORETHE CURVE
'- --"+. ,u '`,� .3° •� `1-
<�" F ...�„4i "C .d_u. '! t, "J,'v .. wt;.'t rs. •'-,.w - ,:a1' " - ti'',t F 'f F. ;r .•. A. r -
•� -:s' :a.- .,ti.', Hr t .::,%.. 't,s. t :.Y Y.i.. ''� ..ti•-,ter. ,t .r :t-,a •_tY a ''•_ sr"a•,� sr; .Z
ash y �, .yws s: `4"`- :.�. �}, .efi. �,,. _,';' .�.�-.. �l .,r -. F .�+ •�! r 'r+ l�` ; i - AYE 48 -�� .i"`r t
FT SPGRTATION«CALTRANS :"
3: �, i NOTES' 1: ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL IN ACCORDANCE STATE OF CALIFORNIA DEPARTMENT 0 RAN e ( ) ... i •� A
�r 1 MANUAL OF TRAFFIC CONTROLS FOR CONSTRUCTION AND MAINTENANCE WORK ZONES : , y'. _ ;; ,'r „ i -ti': Y'.: ... f �. ' . } ' " r�
„2 +;TRAFFIC CONTROL SHOWN HEREIN ISTHE MINIMUM REQUIRED: ADDITIONAL TRAFFIC CONTROL'MAY BEREQUIRED TO FACILITATE PUBLICSAFETYAND
' TRAFF.IQFLOW {F-DEEMED NECESSARY.BY CITY OF LA QUINTA..REPRESENTATIVE.: +� ' f Spee°
r 3.'THROUGHOUTEACHWiORK PERIOD; CONTRACTOR SHALL INSPECT.TRAFFIC CONTROL (SIGNS; BARRICADES AND DELINEATORS) AND MAINTAIN SAME IN .t * r l ' ^.4 ?,, , r " -50 s t
ACCORDANCE WITH TRAFFIC CONTROL PLANS. • . r?•` a
k' 4 CONTRACTOR SHALL MAINTAIN AMINIMUM12TRAFFIOLANEWIDTH ATALLTIMES,` THERE SHALL BEAMINIMUM 2BETWEEN THE EDGE OF.CUT AND THE ` � � "' Install Monitor Cable for RanchoLa_Qulnta -
J -'NEAREST
TRAFFIC .LANE rt`" • t 1`+ a *; } �'. Conueclu, ti r camel ca new-
@ ACCESS Tor PRIVATE PROPERTY SHACLBEMAINTAINED ATALL TIMES �k. ° cochranGommunications"'TopsN.Eearllcades,inc:
' 6..*S TRAFFIC OONTROL SHALL BE IN PLACEDURING WORK HOURS ONLY. ;AT END OF:THE WORK HOURS, THE ROAD SHALL BE CLEAR OF DEBRIS AND ,. s` p' Ae� ea �^�^ s� aem
- > -� y , �; � °, ,. (800)852-TOPS Ronfifield �CALTF;ANS.T 11
-RETURNED. TO NORMAL 4' r _' " `-4'L - '-
7: THE WORK WILLBE BORED UNDER THE GROUND BEHIND THE CURBFROM POTHOLES AT. DI - • vq
r STANCE$ APARTaTHEREFORE INTERSECTIONS WILL BE BORED `- t Dam
! F -• , „ 1'' 7/22/04 ,To Be Issued on Approval
ACROSS AND NOT" AFFECTING TRAFFIC UNLESS THERE IS ANOTHER UTILITY TO LOCATE. THE LANE CLOSURE IS FOR EQUIPMENT.
4 > ',,' Z. ! •= x. - y _ ry x - itr„ .. '',} - trr. r - •w �: 1'] ' µ a i',
1• - - e.N, �" ,f .. '� -.i ,*F.. ,c: �.•� •� �?? � . "+1 .r+-yea ` � i, +• f e
J.
t. r` r�- A.. � .r, t � .. 7'1 '.'fie' .. .r .� f - - [ ,. • -"f-. Y - 'i
••f� ah' i�l-: , _ � 1 - '�.! _ - ![, .1. .T try' k.I i - ,.:T!
'r,, . __ - ''�. ...-k .� , ''- ac , r; .• sue. .t .. . ._ � .< .. •y�4 =.r ';�
m
c �a . ' 500 FT. 350 FT
500 FT C-40 (Rp.
r: co C-20 (Rn �r S�<; aav
txua
600 FT . * RANCHO LA QUINTA C C. - •
. TAPER SHALL BE.VISIBLE Yr '.
BEFORE THE CURVE
AVE'. 48.
NOTES: I., ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS)
t."a�UAL OF TRAFFIC CONTROLS FOR CONSTRUCTION AND MAINTENANCE WORKQONES . - , 2.'TRAFFIC CONTROL SHOWN HEREIN IS,THE MINIMUM REQUIRED. ADDITIONAL TRAFFIC CONTROL MAYBE_ REQUIRED TO:FACIUTATE.PUBLIC SAFETY AND
"TRAFFIC FLOW IF DEEMED NECESSARY BY CITY OF•LAQUINTA REPRESENTATIVE.'. !1650' +_
3.- THROUGHOUT EACH WORK PERIOD, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARRICADES AND DELINEATORS)AND MAINTAIN SAME IN.
ACCORDANCE WITH TRAFFIC OONTROL PLANS.
4.CONTRACTORSHALLMNNTAINAMINIMUMITTRAFFICLANEWIDTHATALLTIMES.THERESHALLBEAMINIMUM2'BETWEENTHEEDGEOFCUTANDTHE = Install Monitor Cable for Rancho LaQuinta' ;
NEAREST TRAFFIC LANE r i, ,
5:-ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED AT ALL TIMES. CoChTen.COrTlrrluniCetlOns'.TOpsNBafflCade$ InC:
6.?,THIS:TRAFFIC CONTROL SHALL BE IN PLACE DURING WORK HOURS ONLY. -AT END OF THE WORK HOURS, THE ROAD SHALL BE CLEAR OF DEBRIS AND, "ro"eO sedan
` su'REruRNEOTOtJORMAL r (800)852-TOPS RonFifield :CALTRANST=11
7.=THE WORK WILL -BE BORED UNDER THE GROUND BEHIND THE CURBFROM POTHOLES AT CERTAIN DISTANCES APART THEREFORE INTERSECTIONS WILL BE BORED Dam ACROSS AND.NOT AFFECTING TRAFFIC UNLESS THEREISANOTHER UTILITYTO LOCATE. THE LANE CLOSURE IS FOR EQUIPMENT. 1 7/22/04 ' To Be Issued On Approdal
PERMIT NO.4186
Rancho'La Quinta Surveillance/Boring & Trenching/Tract No. 27840 & 29457
In addition to the standard permit conditions, the. following shall apply:
1. Pursuant to Section 14.16:320 of the La Quinta 'Municipal Code (Ordinance 10 § 1 (part)," 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For Public
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. Cochran Communications, hereinafter referred to as "Permittee",;shall be responsible for providing
continuous dust and erosion control.
3. The permittee shall keep pedestrian traffic open at all -times.
4. No parking is allowed on Jefferson Street, Washington Street, nor Avenue 48.
5., No lane closures are allowed without prior City approval.
6.: No work is anticipated on paved streets (all.work is behind curb). Reapply for a permit if construction
work enters paved areas:
7. Streets shall be kept clean. They.shall be completely cleaned at the end of each working day and more
frequently, if required.
8. ,Pursuant to Section 6.68.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982), throughout the
work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October Ist to April 30 Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.mAo 5:00 p.m.
May 1st to September. 30:_ Monday -Friday 6:00 a.m. to 7:00 p.m.
Saturday, 8:00 a.m. to 5:00 p.m. "
Work shall be prohibited on legal holidays and Sundays.
Note: Construction work (including setting up traffic control devices) is not permitted on any,Arterial
street (ie any. 4 lane street) before` 8:0.0 a.m:
9. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3
p.m. Traffic control shall be setup after 9 am' and removed before 3 p.m.. The Permittee shall contact
the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at .
the intersection is to be altered in anyway. '
special Conditions Page f of 5
PERMIT NO.4186
Rancho La Quinta Sur*eillanceBoring & Trenching/Tract No. 27840 & 29457
10. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee.shall assume responsibility for repair of any pavement damage to any public or private street
and for any damage to other City streets or -facilities as a result of work performed under this permit.
11. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook°(WATCH Manual). A traffic control
plan shall be prepared in accordance with the WATCH Manual and submitted to the City for
review and approval. one (1) week prior to starting any .construction. It shall he the Permittee's
responsibility to appropriately detour and barricade all construction sites..
Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street
closures shall not be permitted. A minimum of two (2) travel lanes of paved -surface shall be
maintained at all times.
(Note, lane closures are not allowed within this permit) _
12. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and'loops,
irrigation lines, electrical conduits,,and storm drain facilities.
13. Should :additional work, materials, or modifications of the work be required in order to meet City
- standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be
performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the
City of La Quinta:
14. Pursuant to Section 14.16.370 .of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction -within street rights -of --way shall conform to Section 306-1.3.of the latest edition of
the Standard Specifications for. Public Works Construction (SSPWC), except as otherwise specified
herein. r
Native material may be used as backfill material provided,}that minimum compaction, achieved in the
manner prescribed herein, is achieved. Backfill shall be performed.by mechanical means; no water
densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's
responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all
times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A.. When a firm foundation is not encountered due to soft, spongy or other unsuitable material; such
material shall be removed to the limits directed by the Geotechnical Inspector and/or the City
Inspector and the resulting excavation backfilled with pipe bedding material.
Special Conditions Page 2 of 5
PERMIT NO.4186
Rancho La Quinta SurveillanceB.oring & Trenching/Tract No. 27840 & 29457
B. Backfill materials ,shall.. be brought to or maintained at appropriate moisture .content for
compaction. The. appropriate moisture content range shall be established at the onset of the,
project and ensured prior to'use of the materials through progress testing on the stockpiles.
C: The first length_of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate'thre.e foot vertical intervals as
backfill is placed to ensure the effectiveness ofthe compaction methods and to establish the depth
of lift that can be compacted.
D. If lifts greater than one foot are attempted in -this trial.length of trench, compaction tests shall be
taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift thickness
to be compacted for the remainder of the project:
E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of
backfill, per 300 linear feet of open trench, at randomly selected locations within the open length
of trench.
F.' The depth of the randomly selected compaction tests shall also be randomly selected except that
where multiple tests are required in a given length of trench, the tests shall be no closer than three
feet (vertically) from each other.
G. ,If any compaction, test fails, ,previously. placed backfill (in the same length of open trench or
previous lengths of -trench) which is represented by, the failing test (as determined by the- City,
Inspector); shall -be tested for compliance with compaction, requirements.
H. -_�A11 costs incurred due to the conditions above shall be borne by the.P.ermittee.' Copies of all test
results shall be fiimished'to the City Inspector.
15. All excavations within City, of La .Quinia` right -of --way shall be backfilled, and temporarily paved. if
within the.existing travel way,:at the end of every workday as directed by and to the- satisfaction of the,
City Engineer for the protection of the public. Lengths of open trench shall not,greatly exceed that
which can not be backfilled in the same day. Excavated trenches shall.not be allowed open overnight,
however, Permittee.mayleave a length of excavated trench, not'to exceed twenty (20) feet in length,
open overnight at a point where construction will begin the next day, provided that this length of trench
is completely covered by steel plating.
16. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its
:original condition.
17. Access and. egress to all local properties shall -be maintained at all, times,
special Conditions Page 3 of 5 .
PERMIT NO.4186
Rancho La Quinta Surveillance/Boring & Trenching/Tract No. 27840 & 29457
18.. Pursuant to Section 14.16.375 of the'L•a Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
' permanent. pavement replacement shall be completed no later than 'seven (7) days after the completion
of the work. Permanent pavement replacement shall conform to the following conditions:
A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall
be straight and clean.
B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than
existing of asphalt concrete the same existing thickness of crushed aggregate base or crushed
miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard
Specifications for. Public Works Construction. The replaced pavement and base material shall be
compacted to 956/o relative compaction and respectively tested, for each 300 linear feet of trench.
Verify exact structural replacement section thicknesses with the City prior to installation.
ti
C. Permanent pavement replacement shall be installed using a City "approved '/4" max medium.
asphalt concrete as the base course lift and a City approved %" max medium finish course lift for
capping. Asphalt concrete mix design shall be approved by the City prior to its placement.
• D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the
trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10 .
feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area
and base, asphalt concrete in the trench • area shall be overlaid with a City approved C2-AR-4000
asphalt concrete mix. The width of the cold milling area shall be as follows:
• For longitudinal trenches located in a parking lane: three (3) feet outside the sawcut
removal lines.
• For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal
lines, or to the lane line striping, whichever is greater. '
• For transverse trenches across existing, street: two (2) feet outside the sawcut removal lines:
E. If grinding and capping operations are not performed in the same day as base paving operations,
the base course lift of/4" max medium asphalt concrete shall be installed from saw -cut edge to
saw -cut edge flush with -the existing street surface. The base course lift of paving shall not be left
0.10' low in anticipation of grinding and capping. ,
F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be
replaced in kind by the Permittee, as directed by and to the satisfaction -of the City Engineer.
Affected traffic signal loops shall be removed and replaced in kind. The finished pavement
surface -shall be smooth, consistent, and shall conform to the surrounding grades.
Special Conditions Page 4 of 5
PERMIT NO.4186
Rancho La Quinta Surveillance./Boring & ,Trenching/Tract No. 27840 & 29457
19. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization shall be done immediately
after completing thetoperation.
20: Pursuant to Chapter 12.56 of the La Quinta. Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has. designated certain city streets, as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck, Route network) is, three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or;pickup on the subject street,.or if this permit specifically grants
permission to use the street to deliver street construction materials and/or equipment.
21. The City of La Quinta reserves the right,to revoke, suspend or void this permit'at any time.
22. The permittee shall indemnify; hold harmless and assume the defense of the City from all damages,
delay costs, costs or expenses. in law or equity that may arise out of work under this permit:
23. If it is the intent of the permittee to cut the pavement and have it restored by a third party, the
permittee. shall postpone cutting the,pavement until the intended third partyhas acquired a permit from
the City to perform the required restoration,work.
e5of5
Pa
Special Conditions g
. 1`
- City of La Quinta
The following General and Special Provisions are attached to and made a part of
Permit Number 4186
The following shall always apply.,
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY.
Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from
abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted' to operate on any paved
surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced
over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF. TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove,or
cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains
shall be kept free of debris at all times for proper drainage.
RIGHT-OF-WAY CLEANUP: Any surplus'material resulting from excavation and backfill operations shall be removed from the right of way. All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the
adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The followina shall apply when indicated
® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting
construction.
® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by permit,.the permittee shall contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations, conducted under this permit shall be the sole responsibility of the
permittee.
® R3 UTILITY CLEARANCE (Surface Structures) No work shall be -done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with ( '* N/A ** ) inches of A.C. paving placed on ( ** N/A *' ) inches of ( ** N/A ** ) aggregate sub -base course having an
"R"-value of not less than ( ** N/A *`) and in conformance with the City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
❑ R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
one-fourth inch ('/4") to one foot (1').
❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a
licensed engineer.
❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (`* N/A `*) feet shall be
removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2 M.") of A.C. paving on ('* N/A **) of class (** N/A'* )
aggregate base.
® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in. all directions shall be assured and maintained at all
times.
❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the
manufacturer's specifications.
- - City of La Quinta
® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La
Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State or City of La Quinta projects.
® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when included'shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the pennittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon completion or replacement of all survey monuments for proper clearance.
❑ R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under'no circumstances shall excavating equipment be
used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the
protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
❑ R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of
producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three
feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a
relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.
❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%)-of the total depth of the
Trench before flooding or a maximum of five feet (5) lifts where trenches are of excessive depths. Care is to be exercised
that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuos.
❑ R16 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one -
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
® R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State
of California, dated January 1973..
❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after
a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5) day limit.
❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( *' N/A *' ) inches of A.0 surfacing placed on
a ( ** N/A ** ) inch (** N/A" ) aggregate base shall be placed no later than ('* N/A ") days after completion of temporary
road repair.
❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
❑ R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon
completion of permanent repairs.
® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by
a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The
stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be provided to protect the traveling publicat all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground;. whichever is the greater compaction as determined by the impact or field method.
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.