Loading...
4263NOTE: With proper validation this form constitutes an encroachment permit t 61 CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of- public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class I I I DATE: 10/19/0!A Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Avenue( 52 - The Hideaway TM 29894 (Street address or Description of Location) PURPOSE OF CONSTRUCTION Stm npd r-orerskte on ImIlAnd DESCRIPTION OF CONSTRUCTION • p.R tai.An nAt No. 117114095 DIMENSION OF INSTALLATION OR REMOVAL SAA nl-nf*a SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN Thom enn+nv%Ia1-dnxx of 'I:.rknil ieono ilmnxntrp�pn>t-rt APPROXIMATE TIME OF COMPLETION') — pfte-c start, dal- ESTIMATED CONSTRUCTION COST $ 33,500.00 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Sketch (attach construction plans if appropriate) ENTERED Indemnify, defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit andiall applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of tFiiswork. X..(i�_. Signature of Applicant or Agent Kim Fincher - ND La Quinta Partners 81100 Ave 53 La Quints 760-535-9443 Name of Applicant (please print) Business Address Telephone No. Archuleta Concrete Palm Desert, CA 760-275--8193 Name of Contractor and Job Foreman Business Address Telephone No. 4-1 F2._ 0(_(+ 0 .) o ray Contractor's License No. City Business License No. �11 ( -- ".j c i ,-_ 5 ;x'• " f. % 7 Z. DPI (� < Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class II I Public improvements: 3% of estimated'construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ . 01 0 • � � Permit Fee ! ` .), Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No Received by Date f, � 4263 PERMIT VALIDATION PERMIT NO. DATE APPROVED EXPIRATION DATE I I DATE ISSUED` `'f `2'1 1.1 By Administrative Authority Recorded by II Telephone: (760) 777-7075 APPLICATION FOR PERMIT Date: Location of Construction: rN Purpose of Construction: ,`� S Description of Construction:. Set a 5z+ �J a. C) Lj d '� Dimension of Installation or Removal: Approximate Construction Start Date: S Approximate Construction Completion Date: Estimated Construction Cost: $ 33.500 Estimated Construction Cost shall include the removal of all obstructions, materials, and debris, back -filling, compaction and placing permanent resurfacing and or replacing improvements Contact Name: ► l- Phone Number: Name of Applicant: F 4 t Z, D Applicant Address: -10 J .rc 53 Applicant Telephone Number: Name of Contractor: a �x Contractor Address: Contractor Telephone Number: S Contractor State License .Number: a Contractor City Business License Number: ► A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED Applicant or Contractor General Liability Insurance Company: Applicancor Contractor General Liability Insurance Policy Number: Office Use Only: Inspection Fee: . f O l u Permit Fee: 1D0; o .7 As -Built Deposit: Dust Control Deposit: Credit Amount: TOTAL: FEE DUE: Office Use Only: Assigned Permit Number. Approval Date: Expiration Date: Issue Date: Administrative Authority: 10/05/2004 10:34 7603458223 ARCHULETA CONCRETE PAGE 01 ,A Date: 30-Sep-04 PROPOSAL e . 574JC suBmiTTED To: Kim Fincher PROJECT NAME: LOCATION: ARCHULETA CONCRETE 79-607 Country Club Ste 1 Bermuda Dunes, CA 92201 (760)•346.8722 Fair 345-8223 Lic. No 672066 The Hldeway. . La Quinta, CA CONTRACT Job No. SCOPE OF WORK: stamp Concrete Median Unit Ext. ITEMS DESCRIPTION AMT. Unit Price Color Concrete Stamp Median 6154 SF $ 5.20 plsf $ 32,000.80 $ - s - Barricades 1 EA $1,500.00 ea $ 1,600.00 - S - S - S Notes DETAIL STIPULATIONS: 1) Grade to be Within .1 (One Tenth of One Foot) 2) Builder to thoroughly wet area during ALL operations 3) Addltlonal Move -Ins to be $1,100.00 ea 4) Subgrade to be Free of Rocks Initials: / Contractor Sub Contractor Page 1 of 2 PERMIT NO.4263 Hideaway / Stamped Median Concrete / TM 29894 In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance°with the latest edition of the Standard Specifications for Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. Provide a 2'x2' mock-up of a cast -in -place colored stamped pattern concrete for approval prior to installation in the median nose. ND La Quinta Patners, (Kim Fincher)., hereinafter referred to as"Permittee", shall be responsible for providing continuous dust and erosion control. 4. This permit or copy of it shall be on the work site for inspection during the actual work performed. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. 6. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices).is not permitted on any Arterial street (ie any 4 lane street) before 8:00 a.m. 7. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 8. Pursuant to Section 14.16.11.0 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other. City streets or facilities as a result of work performed under this permit. Special Conditions Page 1 of 3 IP t PERMIT NO.4263 Hideaway / Stamped Median Concrete / TM 29894 �. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic.control plan shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14'.16.290 of the La Quinta Municipal Code (Ordinance 10 § .1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. 10. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 11. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements; signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 12. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform to Section 306-1.3 of the latest edition of the Standard Specifications for Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction.via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: Backfill or excavation is not in the scope of work of this permit. 13. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is. completely covered by steel plating. Page 2 of 3 Special Conditions PERMIT NO.4263 Hideaway / Stamped Median Concrete / TM 29894 1-4. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition: 15. Access and egress to all local .properties shall be maintained at all times. 16. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: Asphalt construction is not anticipated in this permit. Please apply for an additional permit if asphalt construction is required. . 17. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 18. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 19. The City of La Quinta reserves the .right to revoke, suspend or void this permit at any time. 20. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. 21. If it is the intent of the permittee to cut the pavement and have it restored by'a third party, the permittee shall postpone cutting the pavement until the intended third party has acquired a permit from the City to perform the required restoration work. Special Conditions Page 3 of 3