Loading...
4313- NIJ NOTE: With proper validation this form constitutes an encroachment permit CITY `OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)' For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS x r Subdivision Improvement Permit— Class III DATE: 01-13-04 Minor Improvement Permit Class IV :LOCATION OF CONSTRUCTION MADISON CLUB 33078 NE CO)E31ii3R MADISON 6 AVE 54 (Street address or Description of Location) PURPOSE..OF CONSTRUCTION CIX" 6 GRUB FK10 k F. DESCRIPTION OF CONSTRUCTION SAS SZE FS No. IJ4125 DIMENSION OF INSTALLATION OR REMOVAL 472 ACM SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN 01-14-05 Sketch (attach construction plans if appropriate) APPROXIMATE TIME OF COMPLETION 04-01-0.5 JAN 18 2005 ESTIMATED CONSTRUCTION COST $ 419,000.00 (Including removal of all obstruction, materials, and debris, backfilling, com- U:C:1F1NANC__EE TYOFLAQUINTA paction and placing permanent resurfacing avid/or replacing improvements) DEPT.. In consideration of the granting of this permit, the. applicant hereby agrees to: Indemnify,. defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and against any,'and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quip to and to pay for any additional replacement necessary as the result of this work. �dt fher5 Signature of Applicant or Agent Alb LQ Gnu In RUBEN URMIA -- p 81r-100 AVE 53, 760-275-7721 Name of Applicant (please print) DEW UHLIMITE D, INC.. Business Address 81-750 AVENUE 50, INDIO, CA 92201 Telephone No. Name of Contractor and Job Foreman Business Address' i Telephone No. 473325 AMM1546 Contractor's License No. fir' City Business License No. FAST IsBCE COMPA SC0388195503 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class II I " Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule 12,570.00 Inspection Fee $ 1.00.00 Permit Fee Penalty Cash Deposit -Surety Bond ` 0000.00 if required 13,670:00 TOTAL: $ Receipt No. Received by Date Recorded by 4313 � PERMIT VALIDATION PERMIT NO. — A313 .i. DATE APPROVED 01-18-05 EXPIRATION DATE` 01* 18-06 DATE ISSU:ED ��/ kL-1 1 �� Administrative Authority Telephone: (760) 777-7075 PUBLIC- WORM -DEPARTMENT. APPLICATION FOR PERMIT . Date: Purpose of Construction: Description of Construction: 4�zA 4A!i� 0 LiI LS Dimension of Insiallation.or Removal: /-/ 7 7- A G1 5 Approximate. Construction Start Date: Approximate. Construction Completio Date: 4 - I t3 ��� -•-- Estimated. Construction Cost: $ Estimated Constriction Cost shall include the removal o all obstruAions, materials, and debris, back -filling, compaction and Placing pent resurfacing and or replacing improvements Contact Name: R)5<0 Q9P4 )-r l R Phone Number: `76o _ a7S 77a I Name of Applicant: T�:ac ,. _<� _ , t r Applicant Address:' loi, 5 3 Applicant Telephone Number: -2 a..7 5. 77 21 Name of Contractor: Z Contractor Address: .UEC Contractor Telephone Number: I- g pC) / -;s-7 _ 5kr 4/MY) f7 2 5_ � Contractor State License Number: -7 3 z g G Contractor City Business License Number: ► A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED -4 plicant or Contractor General Liability Insurance Company: plicant.or C�Ofitrac or eneral Liability lqsurance Policy Number: ~, 66 _ Office Use Only: (c� X bfi�1 Inspection Fee: I Z S7 0. o' Permit Fee: to ,� DU As -Built Deposit:_ 00c), Dust control Deposit: credit- Amew t. TOTAL; FEE DUE: Office Use Only. ' Assigned Permit Number. . y3 Approval Date: t 0 Expiration Date: Issue Date: Administrative Authority: ' PERMIT NO.4313 Madison Club'/ Clear. & Grub and PM10 / Tract No. 33078 In addition to the standard permit conditions, the following shall apply':. 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works ,Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. Demo Unlimited and/or ND' La Quinta Partners, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. 3. This permit or copy of it shall be on the work site for inspection during the actual work performed. . 4. The permittee shall haul all offsite debris to a certified landfill. Prior to hauling debris, the permittee shall inform the City (Inspection staff or 777-7089) of the name and location. of the certified dump site. 5. Prior to performing construction work, the permittee shall call the City at (760) 777-7089 at least 48hrs prior -to work and request an appointment for a preconstruction meeting with the City Inspection staff. 6. Prior to excavating in native soils, the owner of the project shall have employed byproposal contract an archaeological observer for the. site excavations within native undisturbed soils. A copy of the'contract must be submitted to the Public Works Deparhnent.and attention this to the Assistant Engineer I. If the archaeologist determines the site note to be required to be observed, please.submit a letter signed by the archaeologist stating their determination. 7. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and, 'more frequently, if required. 8. Pursuant to Section 6.08.050 of the La. Quinta Municipal Code (Ordinance 18 § 1;1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation. and maintenance of equipment within one-half mile of human occupancy shall be .performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday . 8:00 a.m. to ,5:00 p.m. May 1st to September 30:. Monday -Friday 6:00. a.m. to 7:00 p.m: . Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices).is not permitted on any Arterial street (ie any 4 lane street) before 8:00 a.m. Page 1 of 5 Special Conditions PERMIT NO.4313 Madison Club / Clear & Grub and PM10 / Tract Noi 33078. 9. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control shall be setup after 9 a.m. and removed before 3 p:m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if.signal operation at the intersection is to be altered in anyway. 10. Pursuant to Section 14.16.1.101 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or.private street and for any damage to other City. streets or facilities as a result of work performed, under. this permit. 11. Pursuant to -Section 14.167250 of the La Quinta Municipal Code (Ordinance -10 § 1 (part),` 1982), advance warning signs and traffic control shall be'installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall,be prepared in accordance with the WATCH. Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour, and barricade all construction sites. Pursuant to Section 14.16.290.6f the La Quinta Municipal Code (Ordinance,10 § 1 (part), 1982), street closures shall not'be permitted. ' A minimum of two (2) travel lanes of paved surface shall be maintained at all times: 12. Prior to excay .. ing if required, the Permittee shall contact Underground Service Alert at,1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact: City facilities, including but not limited to traffic signal conduits and loops, �. irrigation lines, electrical.conduits;.. storm drain facilities. 13. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to.f t actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. J 14. Pursuant to Section 14.-16.370 of the La Quinta Municipal. Code (Ordinance. 10 § 1 (part), 1982), backfill compaction within street rights=of--way shall conform with Section 306-1.3'of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise•specified .. herein. Native material may be,used as backfill material provided that minimum, compaction, achieved in the manner prescribed herein,.is achieved. Backfill shall be performed -by mechanicatmeans; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's to provide appropriate geotechnical supervision,. testing, and. inspection, onsite; at all responsibility times during backfill operations. Special Conditions Page 2 of 5 PERMIT NO.4313 Madison Club / Clear & Grub and PM10 / Tract No. 33018. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechni cal Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at appropriate moisture content for compaction. The appropriate moisture content range shall be -established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths. at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that. can be compacted. D. If lifts greater than one foot are attempted in this trial- length of trench, compaction tests shall be taken within the lifts to ensure that the frill depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum -lift thickness to be compacted for the remainder of the project. E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of.open trench, at randomly selected locations within the open length of trench. F.. The depth of the randomly selected compaction tests shall also .be randomly selected except that where multiple tests are required in a"given length -of trench, the tests shall be no closer than three feet (vertically) from each other. G. If any compaction test fails, previously placed backfill (in the same length of -open trench or previous lengths of trench) which. is represented by the failing test (as determined by the City Inspector), shall be tested -for compliance.with compaction requirements. H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths" of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. Page 3 of 5 Special Conditions PERMIT NO.4313 Madison Club / Clear. & Grub and 'PM10 / Tract No.• 33078 16. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition: 17.1. Access and egress to all local properties shall be maintained at all times. 18. Pursuant to Section 14.16:375 of the La Quinta. Municipal Code (Ordinance 10 . § 1 (part), 1982), permanent replacement shall be completed no later than seven`(7) days after the completion .paveof the work. Permanent -pavement replacement shall conform to"the'foll6wing conditions: A. Existing•asphalt concrete pavement shall be sawcut one (l) foot beyond,trench edges. Edges shall be straight and clean. B. Permanent pavement replacement. structural section, within all trenches; shall be I" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed :. miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested; for.each 300 linear feet.of trench. Verify exact structural replacement section thicknesses with the City prior to installation: C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base.course lift and a City approved %2" max medium finish course lift for capping. Asphaltconcrete mix design shall.be approved by the City prior to its,placernent. D. Cold -Mill and Overlay -The existing pavement.which was properly protected inplace during the. trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: ' o For longitudinal trenches located iri a parking lane: three (3). feet outside the sawcut removal lines. •' For longitudinal'trencheslocated in atraffic lane: three (3) feet outside.the sawcut removal lines; or to the lane .line -striping, whichever, is greater. • For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. .If.grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from saw -cut edge to, saw -cut edge flush with the existing street surface:. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. Page 4 of 5 special Conditions PERMIT NO. 4313 . Madison Club / Clear & Grub and PM10 / Tract No. 33078 F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be replaced in kind by.the Permitted, as directed by and to -the satisfaction of the City Engineer.. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 19. ' Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control -treatment. Soil stabilization shall be done immediately after completing the operation. 20. Pursuant to Chapter. 12.56 of the La Quinta Municipal Code (Ordinance 10 §' 1 (part),1982) the.City -has designated- certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the Subject street, or if this permit, specifically grants permission to use the street to deliver street construction materials and/or, equipment. 21. The City of La Quinta reserves the right to revoke,' suspend or void this -permit at any time. 22: - The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. ,1 23. If it is the intent: of the permitted to cut the pavement and have it restored by a third party, the permittee shall postpone cutting the pavement until the intended third partyhas acquired a permit from the City to perform the required restoration work. Page 5 of 5 Special Conditions. City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number 4313 _The followind shall always apply, ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City. of La Quinta's right of way ONLY. Whenever construction extends within.private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving' during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas: If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable°detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be.replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of -La Quinta shall. be notified.prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP:. Any surplus material resulting from excavation and backfill operations. shall be removed from the right of way. All paved surfaces shall be broomed clean of.earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and. drainage ditches shall be replaced to their original. standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down. dust conditions and shall be used immediately after backfill. DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be.closed. A minimum of one lane of traffic shall be maintained at,all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated ® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact. all concerned utility companies relative to the "location of existing substructures.. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done" under this permit. until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ('* N/A *") inches of A.C. paving placed on ( ** N/A **) inches of ( ** N/A"" ) aggregate sub -base course having an "R" value of not less than (*' N/A "") and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461: ® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch ('/<'') to one foot (1'). ❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (** N/A") feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be consiru.cted as not to alter existing drainage pattern.- Surfacing between the property line and "the existing road paving shall be two and a half inches (2 '/_") of A.C. paving on (*' N/A *") of class (** N/A " ) aggregate base. , ® R9 SIGHT CLEARANCE: Sight Clearance'of six -hundred. feet. (600') in all directions shall be assured and maintained at all times. ❑ R16 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the 'manufacturer's specifications. City of La Quinta. ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of Work be' coordinated with the State or City of. La La Quinta may conduct in this area during the period of this permit. shall Quinta forces to preclude delay or interference_ with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on -the lines. when included shall be completely tied out so they may be readily and correctly, centerline of all streets or property replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of'notes showing the ties . to the City Engineer prior to the removal -of any monuments. This office shall be to these monuments shall be furnished notified upon completion or replacement of all survey monuments for proper clearance.' ❑ R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement Engineer. no circumstances shall excavating equipment be through the office of the City .(Under cutting shall be approved ,thro 'or pavement.) Excavation material shall be placed in such. a position as to best facilitate the used to excavate prior to any damage to pavement straight edges shall be corrected. general flow traffic. Prior to final paving operations, ❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before .backfill barricaded with lights overnight, on weekends and holidays for the operations must,begin. All excavations shall be properly protection of the traveling'public. The Public Works. Inspector shall determine the suitability of excavation barricading in No shall be made unless the each case. No excavation shall remain open for a period exceeding five (5) days. excavation construction material is actually -on the work site. ❑ `R15 BACKFILL MATERIAL: Backfill shall be free of brush,- roots or other organic substance detrimental to its use for purposes and adequately consolidated backfill. Ant material which the. City of La Quinta deems unsuitable (spongy or of producing saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by -an approved sand or gravel. ❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be; placed on lifts not greater than using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any three feet (3') and vibrated case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ❑ R17 -BACKFILL PLACEMENT: Backfill shall be applied in layers of not .more than fifty. percent (50%) of the total depth of the lifts trenches are of excessive depths. Care is to be exercised trench before flooding or a maximum of five feet (5') where that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed ev that the or equivalent to the surrounding ground, whichever is the, resulting compaction shall not be less than ninety percent (90%) greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to length to reach the bottom of each layer and the water retain the water. Where jetting is used, the jets shall be of sufficient supply shall be continuos. ❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one- COMPnd COMPACTION )feet and a maximum of one (1) test on each road. One (1) copy of. each test shall be forwarded tot the City in Section 'thousaEngineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. . ❑ R19 • COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing.or'service line. test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. One (1) copy of each Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary. patch consisting SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after of two inches (Z') of of three -thousand linear feet.(3000') or trench has been excavated and backfill operations completed, but in no a maximum case shall the -placement of the temporary pavement exceed a five (5) day limit. ❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of'. A patch of ( ** N/A **) inches of A.0 surfacing placed on two inches (2") of SC-800 shall be placed immediately. permanent a . ( ** N/A **) inch (** N/A'* ) aggregate base shall be placed no later than (*' N/A *') days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas' as determined by the City Engineer: [].R23 STREET RESTRIPING: Where street striping is still, .visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ❑ R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished interference or hazard to the traveling public. It by a licensed, bonded and insured tree service, and handled safely without be the responsibility of the. permitte to maintain the tree in a vigorous growing condition at its new location. shall Trees to be removed shall be in.sections, which can be handled safely without. interference or hazard to highway traffic. The disposed. of so that no debris remains in view of the highway. The entire width of the tree stump, shall be removed and stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes to a maximum of five -hundred feet (500') at any one time. Adequate necessary to restrict traffic, the work shall be restricted signs, flagmen and or barricades shall be provided to protect the traveling public at all times. to not less than ninety percent (90%) or Large holes resulting from tree removal shall .be backfilled and compacted tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. equivalent Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways; State of California, dated January 1973. -Jan •13- 200.5 6 41PMw., DEMO UNLIMITED' No•3311 P• 1 Demo- Unfiffi •ted, Inc Estimate 81750 AVENUE 50, INDIO; CA 92201-9411 800-337-5884 LICENSE # 473328 A C 21" DATE ESTIMATE # 12/31 /2004 1005 DESCRIPTION TOTAL CLEAR AND GRUB 490 ACRES LOCATED ON AVE 52 ON THE NORTH, MONROE ON THE r: EAST, 54 ON THE SOUTH AND MADISON ON THE WEST. LUMP SUNS PRICE 419,000.00 WHILE ON SITE WE WILL BE RESPONSIBLE FOR THE PM 10 DUST CONTROL, WE. WILL ! , APPLY GROUND) CONTROL AT PRICE TO BE. DETERMINED ON WHAT PRODUCT WILL 13E USED. . EXCLUSIONS' 1.) Owner to supply water, water meter, testing; engineer*, staking, and permits. DEMO to t apply water- 2.) Demo Unlimited is notresponsible for the performance of any hazardous material testing . or removal, including asbestos- - 3.) Any items buried beneath the surface, such as footings, slabs, and septic tanks, will be removed and charged on a time and materials basis. ' TIUS BID IS GOOD FOR 30 DAYS . TOTAL $419,000.00 SIGNATURE Jan � 1'3. 2005 6:41PM • DEMO UNL'IMITED`"' ` `� No 3311 ;P 3 f Steadfast Insurance Company Endorsement N ,14 . THIS ENDORSEMENT CHANGES THE POLICY, PLEASE READ IT CAREFULLY. POLICY NO. EFF. DATE OF POL EXP. DATE OF POL EFF. DATE OF END.' PRODUCER. ADD•L.-PREM RETURN PREM. SCO388194403 12/16/04 12/16/05 12/16/04 18-332, n/a n/a Named Insured: Demo Unlimited, Inc; MekCar, Inc. 8175.0 Ave.. 50 Address (including ZIP Code): Indio, CA 92201 , This endorseWent modifies insurance provided by the following: COMMERCIAL. GENERAL LIABILITY COVERAGE FORM