Loading...
RFP - Wellness Center Basin LS Project No 2018-21 PROJECT NO 2018-21 WELLNESS CENTER BASIN LS Dianne Hansen DHANSEN@LAQUINTACA.GOV City of La Quinta Project No. 2018-21 WELLNESS CENTER BASIN LS Contractor will provide labor, fertilizer, irrigation materials, and equipment for installation of plant and hardscape materials. Contractor is responsible for mobilization, site protection, traffic and dust control within the parking lot. Means and methods required to perform the work are to be determined by Contractor. Decomposed granite (DG), rock and plant material to be provided by the City. Item No. Description Qty Unit Unit Price (Dollars) Item Total (Dollars) 1 Remove two tree stumps, existing plants in three parking lot islands, street frontage, three plants in the turf. Turf removal near La Fonda, marked with a red X. Clear and grub the bottom of the retention basin. 1 LS 2 Furnish and Install Irrigation to new plant material in parking lot and the side by the retention basin. Re-align or add irrigation in the turf at two existing palm trees locations where turf is not getting watered. 1 LS 3 Install Plants at the side of the parking lot, three parking lot islands and the area between the street and the parking lot. 1 LS 4 Install Cobble; ¾ Stone; DG; and Boulders (Est. 15 - 20) 1 SF Total: Existng: Basic Concept: (Adjustments will be made on site) Parking Lot: Mobilization includes expenditures for all preparatory work and operations, including but not limited to, those costs necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for the establishment of all facilities necessary for work on the project; and for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items on the project site as well as the related demobilization costs anticipated at the completion of the project. Irrigation: All pipe 3” and smaller shall be Schedule 40 PVC Type 1, Grade 1 pipe. All plastic pipes will bear the following markings: the manufacturer’s name, nominal pipe size or schedules. Note: Irrigation sleeves have been previously installed at the landscape islands. Contactor is responsible to connect irrigation to the existing system. Main Line Fittings will be solvent welded using pipe primer ASTM F656 and pipe solvent ASTM D-2564. All other fittings will be solvent welded with pipe solvent ASTM D-2564, NSF or approved equal. Fertilizer is to be applied at planting of palm trees and shrubs. Industry standard generic fertilizer on installation. Boulders: Bury boulders 1/3 of boulder dimension so that they appear in natural state. Orientation of boulder shall expose most surface area possible set as approved by Project Manager. Crushed rock is to be spread over the planting area to a 2” depth. Apply moisture after spreading and raking to compact and remove dust.