Loading...
06-3832 (RC) (STRUCTURAL CALCS)TITLLE.14 PORT 4 Title 24 Report For. Circle K_ Store No. 457.. a 78110 Calle Tampico •-La,Quinta, CA 9225.3 Project Designer: a CONTEL Project Development, 1662 N. Magnolia Avenue, Suite' 1 EI..Cajon, -CA 92020.. ` ti (619)•448-6773 _ Report Prepared By: Walter D. Camp, PE i Electrical Eriginee'r a a CA. Reg. E07061 .1880. Sheep Ranch Loop Chula Vista, CA; 91913 (619) 934-1815 o QaoFEsso Lu CITY OF MQ A =BUILDING & sAFErY obi'. Date: �' �P - •c.c APPROVED November 1:0; 2006• c FOR CONSTI�U'C?lON F; a . i'N` 'i` Holl mgr f-101 0 f • r 14 t AQ CERTIFICATE OF ACCEPTANCE (Part 1 of 3) LTG— 1—A PROJECT NAME CIRCLE K 0457 DATE _1 PROJECT ADDRESS 78110 CAME TAMPICo, LA OUIHTA, CA 92253 Checkedtry/Date Enforcement Agen Use BUILDING TYPE ® NONRESIDENTIAL ❑ HIGH RISE RESIDENTIAL ❑. HOTEL/MOTEL GUEST ROOM TESTING AUTHORITY TELEPHONE GENERAL INFORMATION DATE OF BLDG. PERMIT PERMIT # ' BLDG. CONDITIONED FLOOR AREA 3190 CLIMATE ZONE BUILDING TYPE ® NONRESIDENTIAL ❑ HIGH RISE RESIDENTIAL ❑. HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION NEW CONSTRUCTION ❑ ADDITION ® ALTERATION ❑ UNCONDITIONED SPACES STATEMENT OF COMPLIANCE I This Certificate of Acceptance summarizes the results of the acceptance tests related to building mechanical requirements .per Title 24, Part 6. (Section 10-103.b, 121.f, 122.h, 125.a, 125.b, 125.c, 125.0.5, 125.d) Please check one: I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed architect. ® I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for its ,preparation; and that I am a licensed. contractor performing this work. ❑ I affirm that I am eligible under Div' ion 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of wo described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. (These sections of the Business and P fessions Code are printed in full in the Nonresidential Manual) TESTING AUTHORITY — NAME SIGMA E DATE UC. 06 t, INSTRUCTIONS TO APPLICANT I For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please• refer to the Nonresidential Manual published by the California Energy Commission. Part 1 of 3 — Statement of Acceptance Part 2 of 3 — Summary of Acceptance Tests Part 3 of 3 — Summary -of Acceptance Testing Results D L CERTIFICATE OF ACCEPTANCE (Part 2 of 3) LTG -1 —A PROJECT NAME • CIRCLE K #457 STATEMENT OF COMPLIANCE SYSTEM ACCEPTANCE DOCUMENT (From of ) TESTING AUTHORRY DATE OF TEST PASS / FAIL NOTES Bldg. Dept. Use NOTE. • Use additional sheets as necessary Certified N/A CERTIFICATE OF ACCEPTANCE (Part 3 of 3) LTG -1 —A Q PROJECT NAME CIRCLE K. {457 The occupant sensors with ultrasonic radiation. as a signal for sensing occupants shall The occupant sensors with microwave- radiation as a signal. for sensing occupants shall Automatic Daylighting Controls SUMMARY OF ACCEPTANCE TESTING RESULTS The continuous dimming control systems meet the requirements of Section 119(e) 13 stepped dimming control systems meet the requirements ' ' of of Section 119(e) �. ,p( YAl The stepped switching control systems meet the requirements of Section 119(e) Automatic Time Switch Controls E:] The automatic time switch control devices meet the requirements . of 119(e) Manual Daylighting Controls � The manual daylighting controls meet the requirements of:.. Certified N/A Q Certified N/A Occupant & Motion Sensors Q � The occupant sensors with ultrasonic radiation. as a signal for sensing occupants shall The occupant sensors with microwave- radiation as a signal. for sensing occupants shall Automatic Daylighting Controls � The continuous dimming control systems meet the requirements of Section 119(e) 13 stepped dimming control systems meet the requirements ' ' of of Section 119(e) �. ,p( YAl The stepped switching control systems meet the requirements of Section 119(e) Automatic Time Switch Controls E:] The automatic time switch control devices meet the requirements . of 119(e) Manual Daylighting Controls � The manual daylighting controls meet the requirements of:.. CERTIFICATE OF COMPLIANCE (Part 1 of 4) LTG— 1—C PROJECT NAME CIRCLE K 0457 Certificate of compliance. Part 3 of 4 submittals are required only if Control Credits are claimed. E3 LTG -1-C, Parts 4 of 4 DATE 9-08-6 PROJECT ADDRESS 78110 CALLS TAMPICO, LA QUINTA, CA 92253 Interior Lighting Schedule. ❑ LTG -3-C Building Permit d Checked by/Date Enforcement Ageney Use PRINCIPAL DESIGNER-uGHnNG WALTER D. CAMP TI]FPHONE 619-934-1815 E3 LTG -5-C DOCUMENTATION AUTHOR WALTER D. CAMP TELEPHONE 619-934-1815 Tailored Method Worksheet. GENERAL INFORMATION Room Cavity Ratio Worksheet. ❑ LTG -8-C DATE OF PLANS 6-23-6 BUILDING CONDITIONED FLOOR AREA 1590 CLIMATE ZONE - BUILDING TYPE ® NONRESIDENTIAL ❑ HIGH RISE RESIDENTIAL ❑ HOTEL/MOTEL GUEST ROOM CONDITIONED SPACES ❑ UNCONDITIONED SPACES ❑ INDOOR/OUTDOOR SIGNS PHASE OF CONSTRUCTION ❑ NEW ❑ ADDITION ® ALTERATION METHOD OF COMPLIANCE ❑ PERFORMANCE ❑ COMPLETE BLDG. ® AREA CATEGORY ❑ TAILORED ❑ COMMON LIGHTING STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and pertormance speclrlcauons neeaea to compry wlm 11UC I.,, rulw and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements. The documentation preparer hereby certifies that the clcumentation is acc rate and complete. DOCUMENTATION AUTHOR SIGNATURE DATE WALTER D. CAMP - 9-08-06 The Principal Lighting Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in the applicable parts of Sections 110, 119, 130 through 132, 146, 148, and 149 of Title 24, Part 6. ® The plans & specifications meet the requirements of Part 6 (Sections 10-1030).0 The installation certificates meet the requirements of Part 6 (Sections 10-103a 3). ❑ The operation & maintenance information meet the requirements of Part 6 (10-103c). Please check one: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual). ® 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed architect. ❑ I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. PRINCIPAL— SIGNATURE DAAC' WALTER D. CAMP 9-08-06 E07061 LIGHTING MANDATORY MEASURES 177Y Indirnte location on alans of Note Block for Mandatory Measures SHEET T-24 LIGHTING COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included) E3 LTG -1-C, Parts 1 of 4 and 2 of 4 Certificate of compliance. Part 1 of 4 and 2 of 4 are required for all submittals. ❑ LTG -1-C, Parts 3 of 4 Certificate of compliance. Part 3 of 4 submittals are required only if Control Credits are claimed. E3 LTG -1-C, Parts 4 of 4 Certificate of compliance. Part 4 of 4 submittals are required when lighting controls are installed. E3 LTG -2-C Interior Lighting Schedule. ❑ LTG -3-C Portable Lighting Worksheet. ❑ LTG -4-C Lighting Control Credit Worksheet. E3 LTG -5-C Interior Lighting Power Allowance. ❑ LTG -6-C Tailored Method Worksheet. ❑ LTG -7-C Room Cavity Ratio Worksheet. ❑ LTG -8-C Common Lighting Systems Method Worksheet. ❑ LTG -9-C Line Voltage Track Lighting Worksheet. E3 OLTG-4-C Signs (See 0LTG-4-C Sign Worksheet in Chapter 6, Outdoor lighting and Signs Chapter). 2005 Nonresidential Compliance Forms APR/L 2005 CERTIFICATE OF COMPLIANCE (Part 2 of 4) LTG— 1—C PRQIECT NAME CIRCLE K #457 SATE 9-08-06 INSTALLED INTERIOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES INSTALLED LIGTHING, CONDITIONED SPACES PORTABLE LIGHTING LIGHTING CONTROL CREDIT, CONDITIONED SPACES CONDITIONED SPACE ADJUSTED INSTALLED INSTALLED LIGTHING, UNCONDITIONED SPACES LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES UNCONDITIONED SPACE ADJUSTED INSTALLED (From LTG -2—C) (From LTG -3—C) (From LTG -4—C) LIGHTING POWER. (From LTG -2—C) (From LTG --:4—C) LIGHTING POWER INSTALLED WATTS 2448 + — — — = 2448 TS 0 — — — = — ALLOWED INTERIOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5—C) E3 AREA CATEGORY METHOD (From LTG -5—C) ALLOWED WATTS ❑ TAILORED METHOD (From LTG -5—C) ALLOWED, LIGHTING POWER 2703 ALTERNATE COMPLIANCE ❑ PERFORMANCE METHOD ❑, COMMON LIGHTING SYSTEM (From LTG -8—C) ALLOWED INTERIOR LIGHTING POWER -FOR UNCONDITIONED SPACES (From LTG -5—C) watts MANDATORY LIGHTING MEASURES FOR INTERIOR LIGHTING AND 'DAYLIT AREAS MANDATORY INTERIOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #, Area #, or Description) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming Photosensor, etc.) SPACE CONTROLLED . Lists the Location of Controlled Lights If Control is for Daylighting NOTE TO FIELD BACK STORAGE TS 0 AUTO TIME ENTIRE ROOM S SWITCH STORE / ROOF PE PHOTO CELL EXTERIOR LIGHTING & SIGNS __APRIL 2005 2005 Nonresidential Compliance Forms CERTIFICATE OF COMPLIANCE (Part a of a) LTG -1 —C 2005 APRIL 2005 Nonresidential Compliance Forms PROJECT NAME I DATE CLE K #4579-08-06 Designer: This form is to be used by the designer and attached to the plans. listed below are all the acceptance tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all . equipment ofa certain type requires a test, list the equipoment description and the number of. systems to be tested in parentheses. The NJ number designates the Section in the Appendix of .the Nonresidential ACM Manual that describes the test. Also indicate the person reasponsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building, Departments: Systems acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a new . space—conditioning systems serving a building or space is operated for normal. use, all control devices. serving the building or space shall be certified as meeting the Acceptance Requirements for. Code Compliance. in additon a- Certificate of Acceptance, MECH—I—A, Forms shall be submitted .to the building department that: A. Certifies plans, specifications, installation certificates; and operating and maintenance information meet the requirements of paragraph 10-103(b) and Title 24 Part 6. Test Description Test Performedd by: LTG -2—A: Lighting Control Acceptance Document Occupancy Sensor Acceptance [� Manual Daylight Controls Accceptance • Automatic Time _Switch Control Acceptance Equipment requiring acceptance testing by installing Contractor Manual Daylight. Controls • �i ❑ LTG -3—A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing by installing Contractor 2005 ACCEPTANCE REQUIREMENTS .FOR CODE COMPLIANCE Lighting. Control Acceptance Document LTG -2—A Form 1 of 2 PROJECT NAME DATE gRgF K /457 � i g- A. Select Acceptance Test (Indicate lighting control systems Names / Designations by the applicable test below) ❑ 1 Occupancy Sensor ❑ 2 Manual. Daylighting Controls ❑ 3 Automatic Time Switch Controls Alnfu• Qhnrfoff nrens do not DDDiv for DORIDWar rest pro auuic C. PASS / FAIL Evaluation (Check one) . Applicable Lighting Control Systems B. Equipment Testing Requirements Check and verify those items applicable to selected systems 1 2 3 Occupancy Sensor — Step 1: Simulate an unoccupied condition response in any applicable equipment testing requirements section. Provide explanation below. Use and attach additional pages if necessary. a. Lights controlled by occupancy sensors tum off within a maximum of 30 minutes from start of an occupied condition per Standard Section 119(d). b. The occupant sensor does not trigger a false "on" from movement in an area adjacent to the controlled space or from HVAC operation C. Signal sensitivity is adequate to achieve desired control Step 2: Simulate on occupied condition a. Status indicator or annunciator operates correctly b. Lights controlled by occupancy sensors tum on when immediate upon an occupie condition OR (this requirement is mutually exclusive with Step 2.c) C. Sensor indicates space is. "occupied" and lights turn on manually Step 3: System returned to initial operating conditions Manual Daylighting Controls — Step 1: Manual Switching Control a. At least 50% of lighting power in daylit areas is separately controlled from other lights b. The amount of light delivered to the space is uniformly reduced Step 2: System returned to initial operating conditions Automatic Time Switch Controls -- Step 1: Manual Switching Control a. All lights can be turned on and off by their, respective area control switch b. Verify the switch only operates lighting in the ceiling—height partitioned area in which the switch is located Step 2: Simulate an unoccupied condition a. All non—exempt lighting turns off per Section 131(d)l b. IManual 'override switch allows only the lights in the selected ceiling height partitioned space where the override switch is located, to turn on or remain on until the next scheduled shut off occurs c. I All non—exempt lighting turns off Step 3: System returned to initial operating conditions Alnfu• Qhnrfoff nrens do not DDDiv for DORIDWar rest pro auuic C. PASS / FAIL Evaluation (Check one) . PASS: All applicable construction inspection responses are complete and all applicable equipment testing requirements ❑ responses are positive (Y = yes). FAIL: Any applicable construction inspection responses are incomplete OR there is one or more negative (N = no) ❑ response in any applicable equipment testing requirements section. Provide explanation below. Use and attach additional pages if necessary. 2005' ACCEPTANCE REQUIREMENTS FOR CODE COMPLIANCE Lighting Control Acceptance Document LTG -2—A From 2 of •2 , PROJECT NAME DATE ' . CIRCLE K #457 V , PROJECT. ADDRESS 49594 29 PALMS HYYY, MORONGO VALLEY.. CA 92256 , TESTING AUTHORITY LIGHTING CONTROL SYSTEM NAME / DESIGNATION Check by Date ❑ Enforcement Agency Use ' Intent I Lights are turned off when not needed per 119(d) 6 131(d) Construction Insoection 1. Instruction to perform test includes, but limited to: a. Light meter b. Hand-held amperage and voltage meter C. Power meter 2. Occupancy Sensor Construction Inspection Cl -Occupancy sensor has been located to minimize false signals ❑ Occupancy sensors do not encounter any obstructions that could• adversely affect desired performance ❑ Ultrasonic occupancy sensors do not emit audible sound (119a) 5 feet from source 3. Manual Daylighting Controls Construction Inspection ❑ If dimming ballasts are specified for light fixtures within the daylit area, make sure they meet. all Standards requirements, including "reduced flicker operation" for -manual dimming control systems 4. Automatic Time Switch Controls Construction Inspection a: Automatic time switch control is programmed for (Check all) ❑ Weekdays ❑ ' Weekend ❑ Holidays b.' Document for the owner automatic time switch programming (Check all) ❑ Weekdays settings ' ❑ Weekend settings ❑ Holidays setting ❑ Set—up settings ' ❑ Preference program setting ` ❑ Verify the correct time and date is properly set in the time switch ❑ Verify the battery is installed and energized ❑ Override time limit is no more than 2 hours Certification 'Statement: I certify that all statements,are.true on this LTG -2—A form including the PASS/FAIL Evaluation I affirm I am, eligible to sign this form under the provisions described in the Statement of Acceptance on form . LTG -1-A Name: Company: Signature: Date: License: Expires: 0 INTERIOR LIGHTING SCHEDULE (Part 1 of 2). LTG -2—C PRO CT NAM DATE e_na_nr UM;LL K INSTALLED LIGHTING POWER FOR CONDITIONED SPACES Luminaire Lampsj Ballasts Installed Watts A B C D E F G H I J Name Type Description �07 7 J a z c r 3 3 3 3 N D ° r 00 �� B c O m r g � 3, �_� p 6 - �� 3 rt O �✓ C�_ c 0 _ c c �.� �•CD ' � ^ to x C - .. a A FLUORESCENT 2 X 4 T8 3 22 1 72 ./ 34 2448 PAGE TOTAL 2448 BUILDING TOTAL (sum of all pages) + PORTABLE LIGHTING (From LTG -3—C) + CONTROL CREDIT (From LTG -4—C) — ADJUSTED ACTUAL WATTS + 2448 2005 Nonresidential Compliance Forms APRIL 2005 INTERIOR LIGHTING POWER ALLOWANCE LTG -5-C PROJECT NAME CIRCLE K #457 DATE 9-08-06 ALLOWED LIGHTING POWER (Choose One Method) COMPLETE BUILDING METHOD — CONDITIONED SPACES BUILDING CATAGORY (From § 146 Table 146-8WATTS COMPLETE ALLOWED PER (ft BLDG. AREA WATTS AREA CATAGORY METHOD — CONDITIONED SPACES AREA CATAGORY (From §146 Table 146—C) I RETAIL SALES/MERCHANDISE I B C D WATTS PER (ft AR (ft ALLOWED WATTS 1.7 1540 2703 1590 2703 TOTALS AREA WATTS TAILORED METHOD — CONDITIONED SPACES TOTAL ALLOWED WATTS (From LTG -6—C) UNCONDITIONED SPACES A Complete Building and Area Category Methods CATAGORY (From § 146 Table 146—B & C) B C D WATTS AR ALLOWED PER (ft (ft� WATTS TOTALS AREA WATTS TAILORED METHOD — UNCONDITIONED SPACES TOTAL UNCONDITIONED SPACES ALLOWED WATTS (From LTG -5—C and LTG -6—C) 2005 Nonresidential Compliance Forms APRIL 2005 MANDATORY MEASURES Building Lighting Shut—Off The building lighting shut—off system consists of an' automatic time switch, with a zone for each floor or the building is separately metered and exempt from the shut—off requirement. Override for Building Lighting shut—Off The automatic building shut—off system is provided with a manual accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. Automatic Control Devices Certified All automatic control devices specified are certified, all alternated equipment shall be certified and installed as directed by the manufacturer. Fluorescent Ballast and Luminaries Certified All fluorescent fixtures subject to certification and specified for the projects are certified. Individual Room/Area Controls Each room and area in this building is equipped with a separate switch or. occupancy sensor device for each area with floor—to—ceiling walls. Uniform reduction for Individual Rooms All rooms and areas greater than 100 square feet and more. than 0.8 watts per square foot of lighting load shall be controlled with multi—level switching for uniform reduction of lighting within the room. Daylit Area Control All rooms that are greater than 250 square feet and contain windows and skylights, that allow for the effective use of daylight, in the area shall have 50% of the lighting power in each daylit area controlled by a separate switch or The effective use of daylight throughout cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during. different times of year is included on plans. The above notes are only examples of wording. Each mandatory measure that requires a separate note should be listed on the plans.