Loading...
44011 .NOT:E:�_— I Wifh;proper validation this form cornstitutes an encroachment permit •'Y 0 CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: May 11, 2005 Subdivision Improvement Permit — Class II I Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION 77-935 Calle Tampico Navarro Office Building VUP 2004-021 (Street address or Description of Location) PURPOSE OF CONSTRUCTION InRtal 1 lot qPT-171091Q Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION Rnrp ar•rnca ,traaf- DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN Will nnl l APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the•result of this work. Signature' Applicant or Agent V r.11n R7..-I1•..,� T.T..a__ 11.7•..t-11 ..a O-ANY L1`�. tI1=Q v t; �•1VY d1A 92236 'anO 114C1 '0137 C111 Name of Applicant (please print) Business Address _ Telephone No._ Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit-- Class III Public improvements: 3% of estimated construction costs Private improvements: 3%of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee $ N/A Permit Fee *T i A Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. No Fee Received by Date - 4401 PERMIT VALIDATION PERMIT NO. 4401 c p DATE APPROVED EXPIRATION DATE DATE ISSUEID By Administrative Authority Recorded by Telephone: (760) 777-7075 /o�xys- r? o Y2 F� o I(d(gp � PERMIT NO.4401 Navarro Office Building / 1" Water Service / VUP 2004-021 In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. Coachella Valley Water District, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. 3. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the actual work performed. 4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) before 8:00 a.m. 6. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 7. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the Public Works Department, an approved traffic control plan at least 2 weeks prior to start of construction or parking on the paved R/W. 8. Prior to performing construction work and closing any lanes in the Public Right of Way, the permittee shall call the City at (760) 777-7097 at least 48hrs prior to work and request an appointment for a preconstruction meeting with the City Inspection staff. Special Conditions Page 1 of 5 r PERMIT NO.4401, Navarro Office Building / 1" Water Service / VUP 2004-021 9. The permittee shall be responsible for calling the city inspector to arrange the city inspector to observe random trench compaction testing performed by a city approved material testing firm. If the inspector's phone number is unknown, the permittee shall call the Public Works front counter phone at 777-7075 or the Assistant Engineer I at 777-7089 to determine the city inspector's phone number. The inspector shall determine the number and location of the test location/s. The above testing does not relieve the permittee's responsibility for future repairs due to settlement at and near the locations of the work area. Materials testing must be performed under direct supervision of a California Registered Civil Engineer. 10. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 11. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. 12. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 13. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 14. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Special Conditions Page 2 of 5 • PERMIT NO.4401 Navarro Office Building / 1" Water Service / VUP 2004-021 Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable in such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. F. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. G. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 15. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. Special Conditions Page 3 of 5 PERMIT NO.4401 Navarro Office Building / 1" Water Service / VUP 2004-021 16. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 17. Access and egress to all local properties shall be maintained at all times. 18. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the.work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved %2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: For longitudinal trenches located in a parking lane: three (3) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. _ If grinding and capping operations are not performed in the 'same day as base paving operations, the base course lift of 1/4" max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. Special Conditions Page 4 of 5 PERMIT NO.4401 Navarro Office Building / 1" Water Service / V .P 2004-021 F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 19. Permittee shall permanently stabilize'any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 20. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 21. The City of La Quinta reserves the right to revoke, suspend or void this permit at anytime. 22. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. 23. If it is the intent of the permittee to cut the pavement and have it restored by a third party, the permittee shall postpone cutting the pavement until the intended third party has acquired a permit from the City to perform the required restoration work. Special Conditions Page 5 of 5 Y City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number 4401 1 I' The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures; City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( ** N/A ** ) inches of A.C. paving placed on ( ** N/A ** ) inches of ( ** N/A **) aggregate sub -base course having an "R" value of not less than ( ** N/A'*) and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. ® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch ('/4") to one foot (1'). ❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (** N/A **) feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 '/z") of A.C. paving on (** N/A **) of class (" N/A ** ) aggregate base. ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all times. ❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer's specifications. .:.; City of La Quinta ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the included shall be completely tied out so they may be readily and correctly, centerline of all streets or property lines when replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut.to a straight edge prior to excavation. Method of pavement Engineer. (Under no circumstances shall excavating equipment be cutting shall be approved through the office of the City used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ® R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill be barricaded with lights overnight, on weekends and holidays for the operations must begin. All excavations shall properly protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. ® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. ❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ❑ RI BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the of five feet (5) lifts where trenches are of excessive depths. Care is to be exercised trench before flooding or a maximum that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the than (90%) or equivalent to the surrounding ground, whichever is the resulting compaction shall not be less ninety percent greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. ❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one- . thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. to the City Engineer for approval and filed prior to making permanent repairs. One (1) copy of each test shall be forwarded Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ® R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction -operations, a temporary patch consisting of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ® R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of A of ( 3 ) inches of A.0 surfacing placed on a ( 6 ) two inches (2") of SC-800 shall be placed immediately. permanent patch inch ( crushed ) aggregate base shall be placed no later than ( 5 ) days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ® R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished handled safely without interference or hazard to the traveling public. It by a licensed, bonded and insured tree service, and shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. be handled safely without interference or hazard to highway traffic. The Trees to be removed shall be in sections, which can entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes be to a maximum of five,hundred feet (500') at any one time. Adequate necessary to restrict traffic, the work shall restricted signs, flagmen and or barricades shall be provided to protect the traveling public at all times. be backfilled and compacted to not less than ninety percent (90%) or Large holes resulting from tree removal shall equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. a� NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS 11 2005 Subdivision Improvement Permit — Class I I I DATE: Fl�' a Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION 77-935 Calle Tampico Navarro Office Building � VUP 2004-021 _- (Street address or Description of Location) PURPOSE OF CONSTRUCTION-Zx1�11`aLl. f10 Sarv4cpa Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION Bore nr.rnx:w ;�tt'rtnat .. i DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN wit'I ral l APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- I paction and p acmg permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify,.defen6 and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signatur 'f Applicant or Agent r^M$4s.nlln_pnl1esei Wrn*a 114,nt•-4 D n Qn 1()qQ CA g22 a 40Sa ')4.P.1 Sa h 6111 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. . Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class III �0 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee $ NSA Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt, No. Received by Al/A No Fee Date 4401 PERMIT VALIDATION PERMIT NO. 4401 DATE APPROVED EXPIRATION DATE ,DATE ISSUED By Administrative Authority Recorded by Telephone: (760) 777-7075 . m NOTE: With pro—per•validation this form constitutes an A! `A}' CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, .driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class I I I DATE:' ��> �flt�5 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION 77`935 C411le Tampico I4avarro office Building VITP 2004--02I (Street address or Description of Location) PURPOSE OF CONSTRUCTION Inoitnl.l. I" .Sprvjpmp Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION %ar �z�rar�rt rctr *- DIMENSION OF INSTALLATION OR REMOVAL - SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN gill PAt.' APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend• and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, .liabiliti s or loss resulting from claims or court action and arising out of any accident, loss or damage to persons. or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24)�hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. 4 � Signature of Applicant or Agent (:anchealayniiow wnt,r t) At,4.,t, rA A'tg<tA '3(s2 Any $1-4 K1AI Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Contractor's License No. Business Address Telephone No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ N/A Permit Fee MIA Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. Received by Recorded by No Fee Date 4401 PERMIT VALIDATION PERMIT NO. 4401 DATE APPROVED f 4 EXPIRATION DATE 1 DATE ISSUED ' Y Administrative Authority Telephone: (760) 777-7075 'NOTE: With proper_ validation r` this form costitutes an °'� a. CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT - PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) t For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit —Class I II DATE: ��' ?�345 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION 77-9,35 Ga:lle Ttimpfco Nwwa ro Cffica I"uj,jd+ja.g VUP (Street address or Description of Location) PURPOSE OF CONSTRUCTION+' Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION POKE ACKOk-ts ��` • DIMENSION OF INSTALLATION OR REMOVAL r SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WI LL BEGIN Will l eA11 APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify,defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (Whours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applicant or Agent COaC136110 V41-10V WAtOr Difftrl.et P.O. BOX 1.058 Ca arhel3A, CA Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. 1 Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule II Inspection Fee $ R/A Permit Fee Nt /A Penalty Cash Deposit -Surety Bond if required Y'?td Y�^ni1 TOTAL: $ Receipt No. Received by Date •a,�.«......-.._ ...._...._ hid PERMIT VALIDATION PERMIT NO. 44 DATE APPROVED y . EXPIRATION DATE DATE ISSUED By Administrative Authority Recorded by Telephone: (760) 777-7075 "a 1. — . 1. , • "._ S 1 , . .1", � ems' NOTE: r With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCR For the construction of public or private curbs, driveways, paver and other like public works Improvements In connection with MINOR DATE: w ` QS LOCATION OF CONSTRUCTION 99 93 Q0,_4 _ e /. (Street address of Description of Location) PURPOSE OF CONSTRUCTION DESCRIPTION OF CONSTRUCTION DIMENSION OF INSTALLATIOlIkOR SIZE OF EXCAVATIQW,, IF APPROXIMA APPROXI M NT1�\ ` 6s, Up" 1 pa kil{g' lots, sewers, water mains S d APPROVED SUBDIVISIONS Improvement Permit — Class I I I x Improvement Permit Class IV — — t'% 04— 021 Sketch (attach construction plans if appropriate) P., s x t-, � °T ' e � I�� So a MAY 1 0 2005 i. ESTIMAT D ORAS RIlGTI N COST $ ' 1—"".v_..� E,•y•�tr .�`{r'� � ts•. sw.. (lncl Ing r mova f ail struction, materials 9n b is, fillir� , com• ; p c�Ion • nd lac �g permanent resurfacing d/ rep) ng prbVements) �- • •= F — - - -- — "" _ -_ .-y in c side ti n o'f the granting of this P. ml , th pa li n he agrees to: emni et//end and save the City, Its a th [zed ge ts, officers, representatives and employees, harmless from and against any and all en�l`eg/ [abilities or loss resulting from lai ._o c rt action and arising out of any accident, lose or damage to persons or property I Opeidng or occurring as a proximate resul of any Aork undertaken under the permit granted pursuant to this application. tify the Administrative Authority at least twlfKfy four (24) hours In advance of the time when work will be started. 'Comply with all applicable laity Ordinances, the terms and conditions of the permit and all applicable rules and Aulations of the City of La Qulme and to pay for any additional replacement necessary es tre rejA 94 this work. /' ^ r� BEGIN jignature of Applicant or Agent r 1`7641 ? r/ 35 UIw� D � a. �e,< !os& L1111 s1/A 1 Ca/s c 12 t�O 0,L,,) Name of Applicant (please print) Business Address Telephone No. C L Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. icant's Insurance Company FEES: Subdivision Improvement Permit —Class III Public Improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Cl ass IV: See attached schedule Inspection Fee $ "i ps Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: O e e— Recelpt No. Received by Date Recorded by City Busintss License Npn Lb PERMIT VALIDATION PERMIT NO.�y 1 DATE APPROVED EXPIRATION DATE DATE ISSUED By Administrative Authority Telephone: (760) 777-7075 has 3eMe �j • �j T � .off �6d, , ` � 1 , iIj\ m d nl rya el • � I . TO no 02 BI GI 91 51 tl 1. ZI v tI Z 2Z� I2 02 6I G g 6 01 11, .:,Ib 1 .. . `... BI G! 9r 5I El t2' 6 e jn ; OL2lVMRJ'F' ITT era e9629. on. a . iJ.'�*• :$Qg R y1 [I 0[' 6 8 [ S•' f' ' . wn i •,'� '1 [_ 2 o t?JI, lfrot. ^ .nl S. b. � ,,q,, 'd � Et �ZpI a11�. Ot 6g C�1' � q►2. � VAIN I" r• . A• N �-�te29d� V71U1 10- eta. -k .. .s— .� 0t: 68 G 9. ^ 2tc � � .a�•� � a Yr r~� z`I � , >p^ �a ���£ s+ t �"dl"� �'1 k.4 ;r - ;,•.. icG � ' ,.s y'.Si�CN� ;LBe LL.N � ��� ISo.: ���c , g� ,�, a 2 da ' g .��.� T (OLa9iF S y ) '�j� n. �N -. '. Waad - J ^Y Y;�VI h t 'Y'tiPk"Y• �y 1 Z' „ - ' 9tE..Lc - �� FS,' a��V � ����"fc`9''.���� ,�Y.r�,�.w,rf ''�i�. 4 ^•i'IFtg 4{ �� • � nyya� ,,,IiD ^ � `•- ,�-4i �'� ."� s k •� 3 � �' XS�7+"F i' -�'g + �t •rn � Q U o o' ' a r5cc ' •a,Ay3�� ,�. 4 r � r '' y,Yj f � ,�j' �k12 �� & ,,�� p� v J �. �� OI^ 6g G'• : 9' ��2RIfAd Iz ''H 's �a-,f •+2, i tiul 2 4'r4trf 3iY.L•i M �I�t' ,.ui Xq - MT I RIM LL— a V �� $ � Au a •�c i� 4n � M' � ti' * ra^,:a r n wsi• •,; ` �'- tY �S"c.c•.Dr -,4t .z - .et'•,A `1,�_. tili�,si`: +1 �'�`'��."y��, 4Y! 4 .nF, -Mc`19i'r'�.' s - '� �. i. E 'Y' �.L-.•..- ,fry?^" �h'�b 1'v`i',' . fSYli ti ::67:' .nFJiY•_ s.a_< � P fStJQf1W�238� . m E6 'Cfa.9 9tt t0- dTa.9 cG029a� gin npp �. l' n-E ► S 9 '_�a6 n 02" at LI 9t SI ' ►I l' • at - 1 2 22 L; /2 02: 6T gl & 6 01 III 21 '� 1 q� " ^o, r � • � �, � ^ rol^ ol,.. �'tY mIo ' � al � � � '�.iG � �'�,' �� "�' „d °�� { 6 ern 9j 0212roAVN`• to-dr0.9 •� � 2 C` j�l jrr•�771 p11 «,• .. -..� 0[. -. 5- a.. L �; ♦. p' .. i i 2 • E . ♦ S 9 i'.L 'p 1._t .• ' � . nl � v � � • ,� . h\sy\ ` P a "d> � � � 'Et -. - 21 � 11 � 0[ 6 .,8 tl .� �1 .. ". 5 ii nl .. b • �� r �J`�. , � "1' O , .� e � � �e- > el� mom$ Y nl� t1. "} n� n VOIN • - '. +' � ... � � � n � 1 i . � � V71v1 t0- QI'0 y � cS'.� R,� K{ : :r '^ w.•' nI - n1S a . � o� *e•- ap.a't 'im iR � ,,r� iY!`��'€ ! Z E ► S' � � 1 k.f".., � n �la-x �-�� �s� :.ryj�� L�' f w`a}'' N•1 .. � �' . 10 >a� .e a d .x o � x t:Me 29 �Ft 'T ►� i;'.rS k d +,T'! i`�j " � .. -.� ,..�' i � �� c[c ' � t�� � t � i � z� .�-,-. � "� 0��6 xl; i� ery .'tltt➢� 9 Y � r2t E Z n� ^ ^ it ,F:�9't Ja� �i•�ja r �� �t�� a a Gie-LL c. •'�•f^ ��` �e �� 15yaiMr t• Ta^ t VZOONM ..+k-c`F y ro.rthL h ki7�.w.. Y.• r ,r.. w 6 �.�w;t 3W. k•rYl /ii yam' �'r k� �"�. Yt'OA errs• •.a, . � { � �- . . � ' - n . .^ �, 9tB= L[ 2"i -:!$- �: a ti ,tds�`Y ',. :�i +� �� fy��•s S. , ,rap � . �y �_ � ,.Q V' n� •2 E ► "rstc _ �'� �,ttt� 9i� zt. �� a. r ';, � Y n .' 'P'^.' � .:r � 4EX - "J , r�ty 9 FYLL .�"� �v i✓ra.�'i�4��' .. b,;t � :' �'. • kl� 2 t }E3 'off' ,'��• . r'�+. a ' - �1J Q _Iw a �' .,. Ada _ � , � is ,� � �`}01' ,6.asyY .�� . Lav �c.'y;,c �► a n Vti , t121VWr _' � ��4+pi+�'1Y-x �,,y, r �, `W•m.. " +m.0 � � *#�� � �; Z3N y �y � � $ � ,- t � ��`•�,t y�taoaraa; ..m q„ r -!!'� 5r�r. �Y ',1•i .'.Y' sl's' �''rlhk } t0� �' w�< ��V:'!?$4«s`.+ ,rv,c.-+craY'im•+ ` t� fib; .•t�i—..m_. Y f .-.�'z. ..:i i..., 3A .�'....._._ i. •'_., fe r� -,.., .ev .- *ran x� °�_ �k1_ `�yat .. tw, iaa?4=az ° eL�i `�[`w"���•���� '� �' � '�f- ..•y.�...� --��ci.E rrna-ary-:axcwswtixv—'-•.°'2"-....:�6d .�"^'•*�"i�9 �� '� 7�'dt3i SY .sT .s sa�'r, ? � -- - w � � *c'�" � ���yg; k, + y`°�' q�`-•�'"•'l�tt,"^'¢i,'IQgd�iT E"a'�S •'�y vk .ate % U S EZ 2 ii Ah" 74 is-eXW 51 iMEND OZA I t�p11 fv i 2 YP ro ow 273 --Aw v Vy "t-COU"Y71, lb 0 yam. V 'llbA 7i 13 v d r - .14 O ISlet' P- 16 17' Is. .19 20 21 1 12 -122 12 14 15, 17 6 5 4 .3 6 20 a ZZ A 14, 00.11 'oe e �ox eV Z, TAZ CARMELITA -: UNIT No. 14 `^3 TAMPAM ICO_, e / i �'. �j•. +77-» 7^sl Wts. Syl �.�"77=�33- - -3��-' a- N .. ,.e7• 7—e» S � \ - \ o Nfu \�J�V t W. bl 0 m f7 Sl�OLS b `fir Z, bm 0/ - Z Oa TL(. S Sy_B6 - P im �£ ¢ 297 _ see ° la m•`� s-1 • /[�//�/' ``� ` UI bl-IDS Sr-U6W5 AIM m N / :3.000 40 .D +O Zoi ni y 9 W Biz565.2 • Ps' - RK `�q " n ;N� "" PARK ,°x".•.,• - •-4.> .-L� . d <fi . t-a,e,a-.. _ , 01`� . �J- � B�• _v - .. - ' „��4h�=7Ff+�'su•Y m1t� �E�•t.s�r ..� ° : ael_N t• - - „ ,q .. -_P d Zza 77 ' e -"O n spivs a vo mS�s = ZZA- i� .art cr > w 7 a •]D y, aiiit • e2e T 'c 1 33 .6Vt fmw o -- �y r ^ • ub ,r� sl-uo P m a�isa` .P s7��q7t _ ,y t•F .m IO.:pbyf�M31'T'•a'.+a L bt •9p.7p^ s 7 -%0� y i 4 71 evB �t �;.✓ +wY'. �tr s,n " ���,��� MIDALG04 ,� " `�7t•tNaittrc. 4 e p !1 sAl f�''� yt • sea ees. • .. os• zY S7-D70d Df3jb •SfTJ7D .l� - _ . .. ` �'+R �X:Fj � ^,�"•kC7tat. .� t]., +rx_.Vpz "•� x ,r ..x N "'- ' - - .. \ - _ N v .r_+._�fh "�-.�;r.;l. a �•: 763t ._ , .',. so, ,� _ - - 5 City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number 4401 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to -remove or cut existing drainage structures; City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean'of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the pennittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eiglit hours (48) in advance ofstarting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the pennittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted'under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( " N/A " ) inches of A.C. paving placed on ( " N/A " ) inches of ( " N/A " ) aggregate sub -base course having an "R" value of not less than ( " N/A ") and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. . ® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch ('/4") to one foot (1'). ❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A'") feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 '/2") of A.C. paving on (" N/A ") of class (" N/A " ) aggregate base. ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured.and maintained at all times. ❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with, the manufacturer's specifications. t I k, 0 City of La Quinta ® R11 -COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut.to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ® R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. ® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City.of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. ❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than. three feet (T) and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfili material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. ❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one- . thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ® R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ® R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( 3 ) inches of A.0 surfacing placed on a ( 6 ) inch ( crushed ) aggregate base shall be placed no later than ( 5 ) days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ® R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. Y' 2. 3. 4. PERMIT NO.4401 Navarro Office Building / 1" Water Service / VUP 2004-021 In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. Coachella Valley Water District, hereinafter referred to as "Permittee", shall be responsible for . providing continuous dust and erosion control. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the actual work performed. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) before 8:00 a.m. 6. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 7. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the Public Works Department, an approved traffic control plan at least 2 weeks prior to start of construction or parking on the paved R/W. 8. Prior to performing construction work and closing any lanes in the Public Right of Way, the permittee shall call the City at (760) 777-7097 at least 48hrs prior to work and request an appointment for a preconstruction meeting with the City Inspection staff. Special Conditions Page l of 5 1. 4 , I 1p PERMIT NO.4401 Navarro Office Building / 1" Water Service / ViJP 2004-021 9. The permittee shall be responsible for calling the city inspector to arrange the city inspector to observe random trench compaction testing performed by a city approved material testing firm. If the inspector's phone number is unknown, the permittee shall call the Public Works front counter phone at 777-7075 or the Assistant Engineer I at 777-7089 to determine the city inspector's phone number. The inspector shall determine the number and location of the test location/s. The above testing does not relieve the permittee's responsibility for future repairs due to settlement at and near the locations of the work area. Materials testing must be performed under direct supervision of a California Registered Civil Engineer. 10. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 11. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal. Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. , 12. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 13. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 14. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at,all times during backfill operations. Special Conditions Page 2 of 5 1 4 . f PERMIT NO.4401 Navarro Office Building / 1" Water Service / VUP 2004-021 Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. ` F. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. G. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 15. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated_ trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. Special Conditions Page 3 of 5 0- PERMIT NO.4401 Navarro Office Building / 1" Water Service / VUP 2004-021 16. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 17. Access and egress to all local properties shall be maintained at all times. 18. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved %2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: For longitudinal trenches located in a parking lane: three (3) feet outside the sawcut removal lines. For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. Special Conditions Page 4 of 5 .,. PERMIT NO.4401 . Navarro Office Building / 1" Water Service / YUP 2004-021 F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 19. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 20. Pursuant to Chapter 12.56 of the La.Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes: The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 21. The City of La Quinta reserves the right to revoke, suspend or void this permit at anytime. 22. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. 23. If it is the intent of the permittee to cut the pavement and have it restored by a third party, the permittee shall postpone cutting the pavement until the intended third party has acquired a permit from the City to perform the required restoration work. Special Conditions Page 5 of 5 r