Loading...
4457NOTE: With proper validation this form constitutes an , encroachment permit i r CITY ,,,OF APPLICATION LA QU I NTA FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)" 11 For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS COMPLETE® Subdivision Improvement Permit- Class III DATE: August 3. 2005 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION-1-7699 ral pan Ran (Street address or Description of Location) PURPOSE OF CONSTRUCTION Pool Construction Access Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION Cone o££ traffic lame for t)arking construction vehicle4 DIMENSION OF INSTALLATION OR REMOVAL 146 X 1901 + ✓1E.1v a ' SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN __%1v 97_ 9OnS Inl /1 APPROXIMATE TIME OF COMPLETION Septeynbs— 97- 20nc; Fl., ESTIMATED CONSTRUCTION COST $ 12-0 t o publ i c unta AUO (Including removal of all obstruction, materials, and debris, backfilling, com- paction and' placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: FITA Indemnify, defend -and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the timewhenwork will be started. - Comply with all applicable City Ordinances, the terms and conditions of the permit and,a""41 appricab�es and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this rk� of Applicant or Dan Bjelde California Pools & Spas 86100 Av�-54 275-1167 Name of Applicant (please print) Business Address Telephone No. Same as above Name of Contractor and Job Foreman 656128 Contractor's License No. if Business Address Telephone No. � 355 City Business License No. �snw a.c a. olr;, .rc`vt�,`c� Vl �t➢ �l.tL�1CI1 �1.8i1]LYC1YilY%i A.-ptIivV' amber lnsu-- Applicant'sce Company FEES: Subdivision Improvement Permit - Class I I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit - Class IV: See attached schedule Inspection Fee $ Permit Fee 100.00 Penalty Cash Deposit -Surety Bond if required TOTAL: $ 100.00 Receipt No. Received by Date Recorded by v t 4457 PERMIT VALIDATION PERMIT NO. 4457 DATE APPROVED - `I - J 5 EXPIRATION DATE Ll - J� DATER\ISSUED Administrative Authority Telephone: (760) 777-7075 'NOTE: 'r . With pro ':vi rq. 4 .this forrrJcon 14t ericroac,'ent ;. • i ,r. } idation itutes an a �ermrt t CITY_NOF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT). y ,For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public•works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS r Subdivision Improvement Permit — Class I I I DATE: • August: 3- 2005 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION 47fiAR nPlAn Rag (Street address or Description of Location) PURPOSE OF CONSTRUCTION P001 Coustruntion Aace sr� Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION Cone off traffic lane for harking construction vehicles DIMENSION OF INSTALLATION OR REMOVAL 146 X 1201 SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN Jiily 27, 2no% APPROXIMATE TIME OF COMPLETION 9pnt PMhpr 27 - 9nn i ESTIMATED CONSTRUCTION COST $ None to n11 I f e, RAM (Including removal of all obstruction, materials, and debris, backfilling, com- paction and, placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify,. defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. • Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and -all apol`icab�es and regulations of th'e City of 19M La Quinta an IRED. ny additional replacement necessary as the result of th•s work' Signatu a of Applicant or Agen�""t'""�� Ban Bjelde California Pools & Spas 86100 Ave _54 275--1167 Name of Applicant (please print) Business Address Telephone No. Same as above Name of Contractor and Job Foreman Business Address Telephone No., 656128 355 Contractor's License No. City Business License No. TCTt9 .. w+•....!urarie�4. Y ♦, i4GD VS OV Y:Yi1tl1i! l..'.11.3.L©�CXiiLdi iij1"fl4y(11tl!b "' Applicant's Insurance Company Polley Number FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ Permit Fee 100.00 Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. $ 100.00 Received by Date Recorded by 4457 PERMIT VALIDATION PERMIT NO. 4457 DATE APPROVED EXPIRATION DATE �(' -2 DATEASSU ED ) gy .�E r. ,•••. �1 _tom �-- Administrative Authority Telephone: (760) 777-7075 1.11; PUBLIC WORKS DEPARTMENT' APPLICATION FOR PERMIT Date: 7,2 z-0 5 Location of Construction: `I "1 61$ Purpose of Construction: Description of Construction: 41,4ne U L54A / 4;�►2 u ., e Dimension of..Installation or Removal: /// X Ab Approximate Construction Start Date: 7 2% -0T- Approximate Construction Completion Date: -0=1 _ Estimated Construction Cost: $ 4^0Me Estimated Constriction Cost shall include the removal of all obstructions, m—ateGals, and debris, ack-filling, compaction d placing permanent resurfacing and or replacing improvements Contact Name: Dnv,, IJe Phone Number: 762- ij //6 % Name of Applicant:ri$� Applicant Address: c r o Applicant Telephone Number: Name of, Contractor: /i 4,wjvl-r- 140 -,4-3-5 Contractor Address: Z100 Contractor Telephone Number: 6 0 Z24 Contractor State License Number: Contractor City Business License Number: 35s- 0- A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED t Applicant or Contractor General Liab)jlitv Insurance Com an fzf Applicant or Contractor General Liability Insurance Policy Number: - -- - --- --- ,�- Gb 1060 2R3 Office Use Only: Inspection Fee: Permit Fee: V �o V As -Built Deposit: Dust Control Deposit: Credit Amount: r� TOTAL FEE DUE: 00, n PJ Office Use Only: Assigned Permit Number: Approval Date: Expiration Date: Issue Date: Administrative Authority: 50 QQ q4/11AIS LAI Client#: 23039 2CALIPOO A� ©n CERTIFICATE OF LIABILITY INSURANCE DATE 07/15/ 5D) PRboucER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION HRH Insurance Services of ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Southern Calif LIC#0684503 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR. ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. 77-564 Country Club Dr. #401 Palm Desert, CA 92211 INSURERS AFFORDING COVERAGE NAIC # INSURED INSURERA: Clarendon America Insurance 43095 California Pools Spas ion Top Man Corporation PO Box 1280 Coachella, CA 92236 INSURERB: Netherlands Insurance Company 24171 INSURERC: SeaBright Insurance Co 15563 INSURER D: 'INSURERE: %HDR COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. NSR LTR DD' NSR TYPE OF INSUP.ANCE POLICY NUMBER POLICY EFFECTIVE PATE (MMIDDtYY)MM POLICY EXPIRATION DD LIMITS A GENERAL LIABILITY A001000293 08/01/04 08/01/05 . EACH OCCURRENCE $1 000 000 X X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $1 OO OOO CLAIMS MADE FE OCCUR MED EXP (Any one person) $5 QQQ PERSONAL & ADV INJURY $1 QQQ 000 GENERAL AGGREGATE s2,000.000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG s2,000,000 POLICY FX1 PECT RO LOC Ded PD $5,000 B AUTOMOBILE LIABILITY X ANY AUTO BA9778186 11/11/04 11/11/05 COMBINED SINGLE LIMIT (Ea accident) $1r0O 0,000 BODILY INJURY (Per person) ., .. $ ALL OWNED AUTOS SCHEDULED AUTOS- X HIRED AUTOS X NON -OWNED AUTOS .. � ..... - • BODILY INJURY Per abddenl ( ) PROPERTY DAMAGE (Per accident) $ ~GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC $ ANY AUTO $ AUTO ONLY: AGG A EXCESSNMBRELLALIABILITY X OCCUR CLAIMS MADE A040000004 08/01/04 08/01/05 EACH OCCURRENCE $1000000 AGGREGATE $1 00O 000 $ $ DEDUCTIBLE $ RETENTION $ C WORKERS COMPENSATION AND BB1050510 01/01/05 01/01/06 X I TW.RCYSITATU- OTH- rR EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $1 00O 000 E.L. DISEASE - EA EMPLOYEE $1 000,000 ' OFFICER/MEMBER EXCLUDED? If yes, describe under SPECIAL PROVISIONS below ' E.L. DISEASE - POLICY LIMIT $1,000 000 OTHER DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS A 111223iiltlZL�%11 ACORD 25 (2001103) 1 of 1 #S192425/M162283 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 3 n DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVE 2GGRE O ACORD CORPORATION 1988 LICENSE #0511289 ti Work Area Traffic Control Handbook 49 — CHART A — MINIMUM RECOMMENDED DELINEATOR AND SIGN PLACEMENT SIGN SPACING TRAFFIC SPEED** TAPER DELINEATOR SPACING (Advance of Taper & Between Signs) LENGTH (Taper) (Tangent) Each Lane 25 MPH (40 Km4t)F 30 MPH (45 Km/h)0m) 0m) 25 FL (Sm) 30 FL (9m) 50 FL (15m) 60 Ft. (18m) 150 Ft (50m) 200 R. (60m) c,o ! 35 MPH (50 Kmm)5m) 35 Ft (11 m) 70 FL (21 m) 250 R. (75m) 40 MPH (60 Kmm)10m) '45 MPH (70 K'070m) 40 R. (12m) 45 Ft (14m) 80 FL (24m) 90 Ft (27m) 350 Ft (110m) 550 FL (170m) FL) * 50 MPH (80 Kmrh)80m) 50 Ft (15m) 50 FL 100 R. (30m) 100 Ft (30m) 600 FL (180m) 1000 Ft (300m) *55MPH+(85 R (15m) r. K 300m) NOTES: - *See Section 8 for high speed situations. Distances shown in parenthesis are approximate. . **85th Percentiles eed or as directed b the Engineer. — CHART B — PARKING LANE OR SHOULDER MINIMUM MAXIMUM MAXIMUM SIGN SPACING TRAFFIC SPEED** TAPER LENGTH DELINEATOR SPACING (Taper) (Tangent) (Advance of Taper & Between Each Lane 25 MPH (40 KmVh) 30 MPH (45 KrrVh) 50 Ft 05m) 66 Ft (I 8m) 25 Ft. (Bm) 25 Ft. (8m) 50 Ft. (15m) 50 Ft. (15m) 50 Ft (15m) 66 R (18m) 35 MPH (50 Knyh) 40 MPH (60 KnVh) 83 R (21 m) 116 Ft (24m) 25 Ft. (8m) 25 FL (8m) 50 Ft. (15m) 50 R. (15m) 83 R (21 m) 116 Ft (24m) *45 MPH (70 KrtVh) 50 MPH (80 Km/h) 183 Ft (27m) 200 R (30m) 25 Ft. (8m) 25 R. (8m) 50 Ft. (15m) 50 R. (15m) 183 R (27m) 200 R (30m) * 55 MPH+(85 333 Ft (30m) 25 Ft. (8m) 50 Ft. It 5m) 333 R (30m) Knyh NOTES: - *See Section 8 for high speed situations. - Distances shown in parenthesis are approximate. 85th Percentile speed or as directed by the Engineer. w NO SCALE w-1 tti�1 C-1(LT) W-1 (Rn /i r /J noao / �ETOURR. cptsrwcnai AHEAD QV _� _ v s = 47698 CNE� ISO 15c CALED BAY = - 320 FT T T -40 KEEP C- 8 KEEP �.� - RIGHT RIGHT�CO cor�snvcno ` Approved By Data Speed Limo NOTES: 1. ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.TC.D.) 2003 AND THE 2003 M.U.T.C.D. 40 CALIFORNIA SUPPLEMENT. ' PmjedName 2. TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM. REQUIRED. ADDITIONAL TRAFFIC CONTROL MAY BE REQUIRED TO FACILITATE PUBLIC SAFETYAND TRAFFIC FLOW IF Install Pool at 47698 Caleo Bay DEEMED NECESSARY BY CITY OF LA QUINTA REPRESENTATIVE. Pdme Corftc or Tmft CDnUWWC ftftr 3. THROUGHOUT EACH WORK PERIOD, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARRICADES AND DELINEATORS) AND MAINTAIN SAME IN ACCORDANCE WITH California Pools Tops N Barricades, Inc. TRAFFIC CONTROL PLANS. Pnone ftpulad By Based on Standard 4. CONTRACTOR SHALL MAINTAIN A MINIMUM 12'TRAFFIC LANE WIDTH AT ALL TIMES. THERE SHALL BE A MINIMUM T BETWEEN THE EQUIPMENT AND THE NEAREST TRAFFIC LANE. (800)852-TOPS Ron Fifield N/A 5. ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED ATALL TIMES. i t Numbw DO PemBNwmer 6. THIS TRAFFIC CONTROL SHALL BE IN PLACE DURING WORK HOURS ONLY. AT END OF THE WORK HOURS, THE ROAD SHALL BE CLEAR OF DEBRIS AND RETURNED TO NORMAL. 1 7/29/05 To Be Issued on Approval s:. City of La Quinta z The following General and Special Provisions are attached to and made a part of Permit Number 4457 The following shall always apply., ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City,shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free. of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard -or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated ® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( ** N/A ** ) inches of A.C. paving placed on ( ** N/A ** ) inches of ( ** N/A ** ) aggregate sub -base course having an "R" value of not less than (*" N/A *') and in conformance with the City of La Quinta Road'improvement Standards and Specifications, Ordinance #461. ® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch ('/V) to one foot (1'). ❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (*` N/A **) feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 %") of A.C. paving on (** N/A `*) of class (" N/A " ) aggregate base. ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all times. ❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer's specifications. City of La Quinta ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines whenincluded shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall. remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. ❑ R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. ❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three feet (T) and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with,the structural section of the roadway. ❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (5) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. ❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at .intervals of not more than one - thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( ** N/A ** ) inches of A.0 surfacing placed on a ( ** N/A ** ) inch (** N/A ** ) aggregate base shall be placed no later than (`* N/A **) days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ® R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ❑ R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or'hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall'be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of *California, dated January 1973. PERMIT NO.4457 California Pools / Lane Closure at Caleo Bay / Residence 47-698' In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as. directed by and to the satisfaction of the City Engineer. 2. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the actual work'performed. 3. California Pools, (Dan Bjelde), hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. 4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. 5. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work'shall be prohibited on legal holidays and Sundays.. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) before 8:00 a.m., 6. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (951) 955-6894 if signal operation at the intersection is to be altered in any way. 7. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 8. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, a letter from any owners of the driveways/access ways that will be closed down due to the construction. The letter must be approved by the city and at minimum state from the owner the following: Special Conditions Page 1 of 4 PERMIT NO.4457 California Pools / Lane Closure at Caleo Bay / Residence 47-698 A. Approval of the construction B. Plan identification C. Time Frame of Closure D. Alternative Routes 9. The permittee shall place temporary no parking signs along the parking area affected by the construction. The signs shall be placed along the area 48hrs prior to the start of closing the area, and removed immediately after the construction completion date. 10. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 1.0 § 1 (part), 1982), .advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be . maintained at all times. 11. Prior to excavating -,if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 12. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or, to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to ,the City of La Quinta. 13. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, the name of the City approved contractor, who shall submit to the City the following items: a. General Liability Insurance Company- and Policy Number b. City Business License c. Contractors State License Number 14. The permittee shall not encroach upon private property without prior written approval (submit to the Public Works Department, attention to the Assistant Engineer I) of the private land owner whom is being encroached upon. Special Conditions Page 2 of 4 PERMIT NO.4457 California Pools / Lane Closure at Caleo Bay / Residence 47-698 15. Prior to performing construction work and closing any lanes in the Public Right of Way, the permittee shall call the City at (760) 777-7097 at least 48hrs prior to work and request an appointment for a preconstruction meeting with the City Inspection staff. 16. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the Public Works Department, an approved traffic control plan at least 2 weeks prior to start of construction or parking on the paved R/W. Not excavation (earthwork) nor asphalt work of any kind (except repair if required) is allowed within the scope of work of this permit. 17. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 18. Access and egress to all local properties shall be maintained at all times. 19. Cold -Mill and Overlay (for Asphalt Repair) - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench saw cut shall be cold -milled to a .depth of 0.10 feet with butt joint created next to the existing unmilled pavement, surface. The cold - milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR- 4000 asphalt concrete mix. The width"of the cold milling area shall be as follows: • For longitudinal trenches located in a parking lane: three (3) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. • For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. a. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. b. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be .replaced in kind by the Permittee, as directed by and to,the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 20. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. Special Conditions Page 3 of 4 PERMIT NO.4457 California Pools / Lane Closure at Caleo Bay / Residence 47-698 21. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 22% The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 23. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. 24. If it is the intent of the permittee to cut the pavement and have it restored by a third party, the permittee shall postpone cutting the pavement until the intended third party has acquired a permit from the City to perform the required restoration work. Special Conditions Page 4 of 4