Loading...
4502NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS September 19, 2005 Subdivision Improvement Permit — Class III DATE: p Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION _Desert Club Drive and. Main Street; Old Town LQ Phase II (Street address or Description of Location) PURPOSE OF CONSTRUCTION Temporary Rower for Sketch (attach construction plans if appropriate) construction site DESCRIPTION OF CONSTRUCTION Span Desert C1,ub Dr_ with overhead wire DIMENSION OF INSTALLATION'OR REMOVAL 60' SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN ASAP APPROXIMATE TIME OF COMPLETION ASAP + 1 da3r ESTIMATED CONSTRUCTION COST$ 5,000-00 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Joseph Jeffress 250--9050 y - """-"'" Signature`of-Ap'plicant'or,Agent Desert Power 1999 S. Navajo Dr. Palm Springs CA 92264 27-8851 Name of Applicant (please print) Business Address Telephone No. Same As ABove Name of Contractor and Job Foreman Business Address Telephone No. 824337 5077 Contractor's License No. " City Business License No. Michael_ Crothers Insuracne 6320020932 Applicant's Insurance Company -Policy Number i FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of 'estimated construction costs Private improvements: 3% of estimated construction costs - I Minor. Improvement Permit — Class IV,: See attached schedule K18:. Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required $ 150.00 100.00 TOTAL: $ 250.00 Receipt No. Received by Date Recorded by I 4502. PERMIT VALIDATION PERMIT NO. 4502 DATE APPROVED EXPIRATION DATE DATE ISSUED By Administrative Authority Telephone: (760) 777-7075 i P � (c � O NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE September 19, 2005 Subdivision Improvement Permit — Class II I Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Desert Club Drive and Main Street; Old Town LQ Phase II (Street address or Description of Location) PURPOSE OF CONSTRUCTION Temporary Dower for Sketch (attach construction plans if appropriate) construction site DESCRIPTION OF CONSTRUCTION Span Desert Cl xh Dr- w; t-h overhead wire DIMENSION OF INSTALLATION OR REMOVAL 60' SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN ASAP APPROXIMATE TIME OF COMPLETION ASAP +' 1 rla�E ESTIMATED CONSTRUCTION COST $ 5 , 000.00 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Joseph Jeffress 250-9050 Signature of Applicant or Agent Desert Power 1999 S. Nava;o Dr. Palm Springs CA 92264 327-8851 Name of Applicant (please print) Business Address Telephone No. Same As ABove Name of Contractor and Job Foreman Business Address Telephone No. 824337 Contractor's License No. 5077 City Business License No. Michael Crothers Insuracne 6320020932 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class I II Public improvements: 31/. of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee $ 150.00 Permit Fee 100.00 Penalty Cash Deposit -Surety Bond if required TOTAL: $ 250.00 Receipt No. Received by Date Recorded by 4502.: PERMIT VALIDATION PERMIT NO. 4502 DATE APPROVED EXPIRATION DATE DATE ISSUED By Administrative Authority Telephone: (760) 777-7075 1 Ra• n s NOTE:'• With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit \\\ APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS September 19, 2005 Subdivision Improvement Permit — Class III DATE: Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Desert Club Drive zand Main._Street; 001d Town LQ Phase II —f✓►I BOASD t . (Street address or Description of Location) PURPOSE OF CONSTRUCTION Temnorary power for 1 Sketch(attach construction plans if appropriate) construction site DESCRIPTION OF.CONSTRUCTION Snan Desert Cltth Dr- Frith r overhead wire j I DIMENSION OF INSTALLATION OR REMOVAL, 60' I r i• - t SIZEOF EXCAVATION, IF NEEDED r• • APPROXIMATE'TIME WHEN WORK,WILL BEGIN ASAP APPROXIMATE TIME OF COMPLETION -ASAP 4- 1 !12[r ESTIMATED CONSTRUCTION COST $ c; - nnn . nn (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) r In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend• and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all ' penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Joseph Jeffress 250-9050 Signature of Applicant or Agent Desert Power 1999 S. Navajo Dr. Palm S-orines._CA 92264 327-8851 Name of Applicant (please print) Business Address / Telephone No. Same As ABove Name of Contractor and Job Foreman Business Address Telephone No. 824337 5077 Contractor's License No. City Business License No. Michael Crothers Insuracne 6320020932 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class I I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee $ 150.00 Permit Fee Penalty,, Cash Deposit -Surety Bond if required TOTAL: Receipt No. Received by Recorded by 100.00 $ 250.00 Date 4502 PERMIT VALIDATION PERMIT NO. 4502 DATE APPROVED EXPIRATION DATE DATE ISSUED _ By Administrative Authority Telephone: (760) 777-7075 •r1i�'a a�, _ � y.M}yin t<.cLa'k+1t�M'rt'i±;Lr .. s .. s NOTE: With proper validation this form constitutes an ..encroachment permit 3 CITY OF LA QUINTA APPLICATION FOR . PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, .parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class I II DATE: September 19, 2005 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Desert Club Drive and Maur. -Street• 4Old Town LQ Phase 11 (Street address or Description of Location) Temoorary tfower £ior PURPOSE OF CONSTRUCTION Sketch (attach construction plans if appropriate) construction site DESCRIPTION OF CONSTRUCTION SDan Desert Club Dr_ with overhead wire DIMENSION OF INSTALLATION OR REMOVAL, 601 SIZE Fi OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN ASAP APPROXIMATE TIME OF COMPLETION ACAP + I Any ESTIMATED CONSTRUCTION COST $ 54WO-00 - (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Joseph Jeffress' 250-9050 , Signature of Applicant or Agent Dese t Power 1999 S. Navaio Dr. Palm Shrines. CA 92264 327--8851 Name of Applicant (please print) Business Address Telephone No. Sane As ABove F{j 4— Name of Contractor and Job Foreman Business Address Telephone No. 824337 5077 Contractor's License No.- City Business License No. Michael Crothers lnsuracn@ 6320020932 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs . Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee $ 150.00 Permit Fee 100.00 II Penalty, Cash Deposit -Surety Bond if required TOTAL: $ 250.00 Receipt No. Received by Recorded by Date 4502 PERMIT VALIDATION PERMIT NO. 4502 DATE APPROVED EXPIRATION DATE DATE ISSUED By Administrative Authority •.., .....r.,,. :was I Telephone: (760) 777-7075 4. �_-c-'' '`-�--- -'-- -'--,._,.._ _._ .. Zr «4'1""•ui.:.ti.�+Xdt.. .: .. ,%:a''+A!".. v��k.8h'rh,2f. a NOTE: - With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS September 19, 2005 Subdivision Improvement Permit — Class I II DATE: Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Dlasert •Club Driven atzd ]gain Street; Old Town LQ Pheso 11 (Street address or Description of Location) PURPOSE OF CONSTRUCTION Tl norary vower for Sketch (attach construction plans if appropriate) COnOt>ruceioa site DESCRIPTION OF CONSTRUCTION Sloan Denart Club Dr. with overhead wire DIMENSION OF INSTALLATION OR REMOVAL 601 SIZE OF EXCAVATION, IF NEEDED. APPROXIMATE TIME WHEN WORK WILL BEGIN ASAP APPROXIMATE TIME OF COMPLETION ASAP + 1 d v ESTIMATED CONSTRUCTION COST $ 5-10t)(11.00 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify,. defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Joseph Jeffrass 250-9050 Signature of Applicant or Agent Desert Power 1999 S. Navajo Dr. Palm SprinAG, CA 92.264 327--8851 Name of Applicant (please print) Business Address Telephone No. Same As ABove �. Name of Contractor and Job Foreman Business Address Telephone No. 8 ,4337 Contractor's License No. Michael Cruthe rs Insurarne 5077 City Business License No. 6320020932 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee $ 150.00 Permit Fee Penalty, Cash Deposit -Surety Bond if required TOTAL Receipt No. Received by Recorded by 100.00 $ 250.00 Date 4 4502 PERMIT VALIDATION PERMIT NO. 450 " DATE APPROVED EXPIRATION DATE 'DATE ISSUED By r Administrative Authority Telephone: (760) 777-7075 NOTE: With proper validation this form constitutes an encroachment permit 1 CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Sopteember 19, 2005 Subdivision Improvement Permit — Class I II DATE: Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION 'O"ert Club Drive aftd ViAi- .Street;. 014 Town LQ Ptuloe. 12 (Street address or Description of Location) PURPOSE OF CONSTRUCTION Temocrary rower for Sketch (attach construction plans if appropriate) CoFiatructCion afteb DESCRIPTION OF CONSTRUCTION Sort Damgrt Club Dr. with overhead wire DIMENSION OF INSTALLATION OR REMOVAL 601 SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN ASAP APPROXIMATE TIME OF COMPLETION ASAP + 1. dAv ESTIMATED CONSTRUCTION COST $ g •ODD-00 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) _ In consideration of the granting of this permit, the applicant hereby agrees to: t Indemnify, defend, and save the City, its authorized agents, officers, representatives and employees, harmles's from and against any and -all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. a Jondptt Jeffrons 250-9050 Signature of Applicant or Agent 0406rt Power 1999 S. Navajo Jr. PA11a Sprlags, CA 92264 327- 801 Name of Applicant (please print) Business Address Telephone No. SwA6 As Above Name of Contractor and Job Foreman Business Address Telephone No. 824337 5077 Contractor's License No. City Business License No. olar a Cr�atPa rs Ztituretczye 6320020932 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule 150.00 ,. Inspection Fee $ Permit Fee - 100'00 Penalty. Cash Deposit -Surety Bond if required TOTAL: $ Receipt No. Received by Date Recorded by EW.A 4S0 PERMIT VALIDATION 4502 PERMIT NO. DATE APPROVED EXPIRATION DATE DATE ISSUED t By Administrative Authority Telephone: (760).777-7075 a .L A Dimension of Installation or Removal: �O Approximate Construction Start Date: Approximate Construction Completion Date: Estimated Construction Cost: $ S, ocx-.�, Estimated Construction Cost shall include the removal of all obstructions, placing permanent resurfacing and or replacing improvements. -r- and debris, back -filling, compaction and Contact Name: JCS e �, J e_j%=c ss Phone Number: S cD 90 S-10 Name of Applicant: ", t Applicant Address: Applicant Telephone Number: a SQ r S e �p Name of Contractor: Contractor Address: S. /v�-va o tr S • C. 07 &\• Contractor Telephone Number: Contractor State License Number: ;2 Contractor City Business License Number: �:; 0 -77 ► A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDEDA Applicant or Contractor General Liability Insurance Company: IM C o aCe Applicant or Contractor General Liability Insurance Policy Number: G� 3 2 002- 0332, Office Use Only: Inspection Fee: Permit Fee: / w. �p d As-Built—�L Deposit:_f:_ . Dust Control �- Deposit: Credit Amount:. a d TOTAL FEE DUE: Office Use Only: Assigned Permit Number: /f Approval Date: Expiration Date:_ Issue Date: . Administrative Authority: _ S� pIA 2S :PR01''{ cAESERT POWER FAX NO. :17603278852 Sep..16'2005 02:42PM P2 .00/16/2005 1.4:34 FAX 760202842e mcis 0 002 8D., CERTIFICATE OF LIABILITY INSURANCE °9//1912 03 �. um"t MICHAEL CROTHER$ INSURANCE SERVICES THIS CORTIMATS IS ISSUED AS A MATTER OF INFO A ON ONLY ANG CONFERS NO RIGHTS UPON THE CMnFICATE HOLDER THM CERTIFICATE DOES NOT AMEND, EXT5NO OR IV 36323 DATE PALM DRE I;F113 ALTER THE COVERAGE AFFORDED BY THE POUCIES BELOW CATHEDRAL CITY CA 92234 QlrRS AFFORDING COVERAGE _66� 202�a06 pdSUg ._.. _�.�--__... l�+ I wSvItCIL n LINCOLN GENERAL INSURANCE COMPANY DESERT POWER ' uasuReR o: InfinItif Ins Co 1099 S. NAVAJO DRIVE PALM SPPJNGS CA 92254 �'----- .-- — •- — ---- iNSUTlfB L THE POLIGIED OF INSURANCE LISTED UELOW HAVE BEEN *8VED TO THE INtURED NAMED AEOYE fOA THIE POLICY PER100 INDICATED. NOTWI T MANDINO ANY REQUIREMENT, TERM OR GONCNTION NY OP ACONTRACT OR OTHtA DOCUMENT WITH RESPECT. Tap WHION TH16 CBRTIFICATE MAY BL' ISUED Olt MAY OMIAIN, THE INSURANCC AFFORDED BY THE POLICIES D65CMUO HFPEIN IS SULLA-:GT TO ALL TH£ TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICES. AGGREGATE LOFTS SHOVMi MAT KAYE BEEN REpucEG IST PAID CLAwA. .... ...—..--- IN Y — —� -- , EC i w` E7Io 7IO- LIMITS TTTCGfursURANCf T raurrYHu�a[r�R I � IEtMMIO . O8N�_ uA�LY - c t 1.000,000 COMME+Ctq� r�nAL LYAUTY I I 100.000 _ � o 1MEWI e.000I A 6320020932 I lw2008 vcrioos I.F so�Ld,vr,t�nmT i� 1,000,000 I a[9MJiALAOOREAATE I It 1000 000 NICN'LAICCRECATEUMITAP IlaP6t ! I rROOucit.COW1013Ac�O 0 1,000 000 X PoucT M F LAG _ AVTCVQV C LIMd1TY CNCO 6ok ie .fi IWIT if 1,000,000 ANTAUTO NI— 10xw I f ALL OWM AUT08 I ! B X BCHEO',L 0 AUTOS 504�0195-0356-001 I 4/29120a5 . � aIi8/�006 p rwm DO ILLY I HOM AUTO® I I I� U ! DARW ' ' (I VO 7 WLNAm LIAB[.RY — wTQ QMY • FA AQQqKNT m t� ANV AUTO CTTHER THEW fw ACCACC { AUTbONLY-. AGG aaY LI Itmf EACH OCCUP1tM f 1 OCCUR u CLAIM MAIM i ACWWCIATE t IOerniCTIBLE I I i � i ----� p ItQTQTTION f I v000xm R0YPEN"TK7NArD I �.,, ,I_T.QR�Y 4! ��F;a _ . QMM A�T3111; 1lABQTTY I .� _ El EACH ACCCDENT _. t E.L DoteAee • CA 11W.Ont s _ 1 i F.LmW-ASE-PCUOYUMIT / OTHM >PTiON OF O�AgTgN51lOCAYtONSfVEN10.R�1(ClU31QIt8 AOOED FRY FNpOCb+�IEM�'SfECIAL Pf10VIS10�N5 CERTiFiCAT1! HOLbeIt IADDRtONal.au[faED te1SYRFR tdrrait CANCELR�LTION GRO"ANYOFTMABOVEOIMOPOLAyESOECAHCELLSD BLFORELTHkEVIRAT" DATFi nLERrOF, THE F;:SUR4 64UMA WILL QNOSAVOR TO NAIL DAYS WRn"N 0 WTICRIO'HE CERTMATE HOLDERNAM TO THE LEFT, EIUTFAL um TO Pavow" INFM NO VDIJOAMOM ON LKMUYY Of ANY KIND UPON THE IISURM na A091M OR REPRetcNTAnveLt Avt40w96D RB OMINIIAVE ..` .. AC090 2 S-(7rsT) — 0 ACORD CORPORAnoN i9 a LAN: LPW v%.RB an 9hACd -142T 09 UW WOM . Ur LrWv1.9.B an emdZ . 1 c3floyi Usalome PP ML0.1 City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number 4502 The following shall always apply., ENCROACHMENT ON PRIVATE PROPERTY: This. permit authorizes work to be accomplished within the City of La Quinta's'right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal, pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or . cut existing drainage structures, City of La Qdinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and. shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length'of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all.concemed utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface. Structures) No.work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with (" N/A ") inches of A.C. paving placed on ( " N/A ") inches of ( " N/A ") aggregate sub -base course having an "R" value of not less than ( " N/A'") and in conformance with. the City of La Quinta Road Improvement. Standards and Specifications, Ordinance #461. ® R5 PARKWAY_ GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch (%") to one foot (1'). ❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ("' N/A "") feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 %:") of A.C. paving on (" N/A ") of class (" N/A'.' ) aggregate base. . ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all times. ❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer's specifications. City of La Quinta ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ❑ RI PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case: No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. ❑ R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall -be supplemented or replaced by an approved sand or gravel. ❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.. ❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (6) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. ❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one - thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January. 1973. ❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be.forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of•two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( " N/A " ) inches of A.0 surfacing placed on a ( " N/A " ) inch (" N/A " ) aggregate base shall be placed no later than ( " N/A ") days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ❑ R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. - City of La Quinta The following General -and Special Provisions are attached to and made a part of Permit Number 4502 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced .street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the:term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced' over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. I _ CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter tirie and the existing road pavement shall be surfaced with (" N/A ") inches of A.C. paving placed on ( " N/A "') inches of ( " N/A ") aggregate sub -base course having an "R" value of not less than ( " N/A ") and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. ® R5 PARKWAY GRADING: Area between the property line and top of the proposed ,concrete curb shall be graded to a slope of one-fourth inch ('W) to one foot (1'). ❑ R6 GRADE CHECKING: City of L"a Quinta shal(.check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( **MA ") feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 ''/z") of A.C. paving on (" N/A ") of class (" N/A " ) aggregate base. ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all times. ❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer's specifications. ;.y City of La Quinta ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ❑ R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. ❑ R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. ❑ RI BACKFILL SAND: Backfill shall be approved transit-miz sand or equivalent and shall be placed on lifts not greater than three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ❑ RI BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (5) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos: ❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one - thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, .Division of Highways, State of California, dated January 1973. ❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests -shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch.of ( " N/A ") inches of A.0 surfacing placed on a ( ** N/A ** ) inch (" N/A'" ) aggregate base shall be placed no later than (" N/A ") days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ❑ R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at'any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree .removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways; State of California, dated January 1973. .T City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number 4502 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it'is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe,. concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off=street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with (" N/A ") inches of A.C. paving placed on ( " N/A ") inches of ( " N/A ") aggregate sub -base course having an "R" value of not less than ( " N/A ") and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. ® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch (%") to one foot (1'). ❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and.profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A ") feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 Y2") of A.C. paving on (" N/A ") of class (" N/A " ) aggregate base. ® R9 SIGHT .CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all times. ❑ Rio SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer's specifications. iv J ' City of La Quinta ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of in this during the period of this permit. Work shall be coordinated with the State or City of La La Quinta may conduct area Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, •all survey monuments which exist on the lines when included shall be completely tied out so they may be readily and correctly, ties centerline of all streets or property replaced by a licensed civil engineer or surveyor'at the expense of the permittee. A complete set of notes showing the Engineer to the removal of any monuments. This office shall be to these monuments shall be furnished to the City prior upon completion or replacement of all survey monuments for proper clearance. ❑ R13 notified PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement Engineer. (Under no circumstances shall excavating equipment be cutting shall be approved through the office of the City Excavation material shall be placed in such a position as to best facilitate the used to excavate prior to cutting or pavement.) general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill All shall be properly barricaded with lights overnight, on weekends and holidays for the in operations must begin. excavations protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading open for a period exceeding five (5) days. No excavation shall be made unless the each case. No excavation shall remain construction material is actually on the work site. ❑ R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy.or or of producing saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented replaced by an approved sand or gravel. El R16 BACKFILL SAND: Backfill shall.be approved transit -mix sand or equivalent and shall.be placed on lifts not greater than using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any three feet (T) and vibrated case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the five feet (6) lifts where trenches are of excessive depths. Care is to be exercised trench before flooding or a maximum of that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the to the surrounding ground, whichever is the resulting compaction shall not be less than ninety percent (90%) or equivalent Where or flooding is used for a maximum settlement, adequate dikes will be constructed to greater compaction. ponding retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply.shall be continuos. ❑ R1g COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one - feet a maximum of one (1) test on each road. One (1) copy of each test shall be fowarded tot the City Section thousand (1000') and Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Highways, State of California, dated January 1973. 6.3.01 of the Standard Specifications, Division of ❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. forwarded to the City Engineer for approval and filed prior to making permanent repairs. One (1) copy of each test shall be Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after of two inches (2") of a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of patch of ( " N/A inches of A.0 surfacing placed on A ") two inches (2") of SC-800 shall be placed immediately. permanent a (" N/A ") inch (" N/A " ) aggregate base shall be placed no later than (" N/A" ) days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ❑ R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished insured tree service, and handled safely without interference or hazard to the traveling public. It by a licensed, bonded and shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. be in sections, which can be handled safely without interference or hazard to highway traffic. The The Trees to be removed• shall entire width of the tree stump,.shall be removed an&disposed of so that no debris remains in view of the highway. as specified in the following paragraph. Where it becomes stump hole shall be backfilled and thoroughly compacted traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate necessary to restrict signs, flagmen and or barricades shall be provided to protect the traveling public at all times. tree removal shall be backfilled and compacted to not less than ninety percent (90%) or Large holes resulting from equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Division of Highways, State of California, Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, dated January 1973. , PERMIT NO.4502 Old Town La Quinta Phase II / Temporary Power / In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of�the City Engineer. 2. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the actual work performed. 3. Desert Power, hereinafter. referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. 4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. 5. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday . 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial .street (ie any 4 lane street) before 8:00 a.m. 6. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control 'shall be set. up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (951) 955-6894 if signal operation at the intersection is to be altered in any way. 7. Pursuant to Section 14.16:110 of the La Quinta Municipal Code .(Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City'streets or facilities as a result of work performed under this permit. Special -Conditions Pagel of PERMIT NO.4502 Old Town La. Quinta Phase II / Temporary Power / 8. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, a letter from any owners of the driveways/access ways that will be closed down due to the construction. The letter must be approved by the city and at minimum state from the owner the, following: A. Approval of the construction B. Plan identification C. Time Frame of Closure D: Alternative Routes 9. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 ,,§ 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall be prepared in accordance with the WATCH Manual and submitted to the City for review. and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be 'maintained at all times. 10. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 11. Should additional work, materials, or modifications of the work be required in order,to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as, directed by and to the satisfaction of the City.Engineer at no cost to the City of La Quinta. 12. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, the name of the City approved contractor, who shall submit to the City the following. items: A. General Liability Insurance Company and Policy Number b. City Business License c. Contractors State License Number. 13. The permittee shall not encroach upon private property without prior written approval (submit to the Public Works Department, attention to the Assistant Engineer I) of the private land owner whom is being encroached upon. Special Conditions Page 2 of 4 PERMIT NO.4502 Old Town La Quinta Phase II / Temporary Power / 14.. Prior to performing construction work and closing any lanes in the Public Right of Way, the permittee shall call, the .City at (760) 777-7097 at least 48hrs prior to work and request an appointment for a preconstruction meeting with the City Inspection staff. 15. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the Public Works Department, an approved traffic control plan at least 2 weeks prior'to start of construction or parking on the paved R/W. Pole IB Pt Hi 16. As shown on the sketch to the left, a minimum distance of 18 feet between the surface and power lines must be kept at all time. 17. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to -provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during Backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft; spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at appropriate moisture content for - compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. Special Conditions Page 3 of 4 PERMIT NO.. 4502 Old Town La Quinta Phase II./ Temporary Power, / 18. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the Satisfaction of the City Engineer for the protection of the public.. Length's of open trench shall not greatly exceed that which can not be backfilled in the same day.Excavated trenches shall not be allowed "open overnight. 19. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 20. Access and egress to all local properties shall be maintained at all times. 21. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: Asphalt work is not anticipated. 22. Permittee shall permanently stabilize any and all soil that was disturbed as -a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 23. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has*designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 24. The.City of La Quinta reserves the right to revoke, suspend or void this permit at any time. Permit is valid for 60 days from issuance. 25. Power is to be established from an internal connection from adjacent Phase I Old Town La Quinta within 60 days. 26. The permittee shall indemnify, hold harmless and assume the defense of the. City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. Special Conditions Page 4 of 4 PERMIT NO.4502 Old Town La Quinta Phase II / Temporary Power. / In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard; Specifications For Public. Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the actual work performed. 3. Desert Power, hereinafter referred to as "Permittee shall be responsible for providing continuous dust and erosion control. 4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. 5. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982), throughout the. work site, the Permittee shall comply with.City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday . 8:00' a.m. to 5.:00 p.m. May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) before 8:00 a.m. 6. Work within 500 feet of a signalized intersection shall be performed. between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at(951) 955-6894 if signal operation at the. intersection is to be altered in any way. 7. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10. § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. Special Conditions Page 1 of 4 PERMIT NO.4502 Old Town ]La Quinta Phase II / Temporary Power / 8. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, a letter from any owners of the driveways/access ways that will be closed down due to the construction. The letter must be approved by the city and at minimum state from the owner the following: A. Approval of the construction B. Plan' identification C. Time Frame of Closure ll. Alternative Routes 9. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans. Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall be, prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes- of paved surface shall be maintained at all times. 10. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 11 Should additional work, materials, or modifications of the work be required in order to meet City standards; safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 12. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, the .name of the City approved .contractor, who shall submit to the City the following items:. a. General Liability Insurance Company and Policy Number b. City Business License c. Contractors State License Number 13. Thepermittee shall not encroach upon private property without prior. written approval (submit to the. Public Works Department, attention to the Assistant Engineer I) of the private land owner whom is being encroached upon. Special Conditions Page 2 of 4 J PERMIT NO.4502 Old Town La Quinta Phase II / Temporary Power. / 14." Prior to performing construction work and closing any lanes in the Public Right of Way, the permittee shall call the City at (760) 777-7097 at least 48hrs prior to work and request an appointment for a preconstruction meeting with the City Inspection staff. 15. If public traffic lanes are required to be closed; this permit is not valid until the permittee submits, to the Public Works Department, an approved traffic control plan at least 2 weeks prior to start of construction. or parking on the paved R/W. 16. As shown on the sketch to the left, a minimum . distance of 18 feet between the surface and power lines must be kept at all time.. .17. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § .1 (part), 1982), backfill compaction within street rights -of -way shall conform with. Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material.may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation.backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at appropriate moisture content for compaction. The -appropriatemoisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. Special Conditions Page 3 of 4 1 PERMIT NO.4502 Old Town La Quinta Phase II / Temporary Power / 18. All. excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which cannot be backfilled in the same day. Excavated trenches shall not be allowed open overnight. 19.. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 20. Access and egress to all local properties shall be maintained at all times. 21. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: Asphalt work is not anticipated. 22. -Penmittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 23. Pursuant to Chapter .12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants. permission to use the street to deliver street construction materials and/or equipment. 24. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. Permit is valid for 60 days from issuance. 25. Power is to be established from an internal connection from adjacent Phase I Old Town La Quinta within 60 days. 26. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out.of work under this permit. Special Conditions Page 4 of 4 L PERMIT NO. 4502 . Old Town ]La Quinta Phase II / Temporary Power. / In addition to the standard permit conditions,the following shall apply: 1. . Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the actual work performed. 3. Desert.Power, hereinafter referred to as`LPermittee", shall be responsible for providing continuous dust and erosion control. 4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. 5. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30. Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday_ 8:00 a.m. to 5:00 p.m. May -1 st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to.5:00'p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) before 8:00 a.m. 6. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The, Permittee shall contact the Riverside Country. Traffic Signal Maintenance Department at (951) 955-6894 if signal operation at the intersection is to be altered in any way. ' p 7.. Pursuant to Section 14.16.110 of the. La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. Special Conditions Page l of 4 PERMIT NO.4502 Old Town ]La Quinta Phase II / Temporary Power. / 8.. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, a letter from any owners of the driveways/access ways that will be closed down due to the construction. The letter must be approved by the city and at minimum state from the owner the following: A. Approval of the construction B. Plan identification C. Time Frame of Closure D. Alternative Routes 9. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. 10. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities„including but not limited to traffic signal conduits and loops, irrigation -lines, electrical conduits, and storm drain facilities. 11. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 12. - This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, the name of the City approved contractor, who shall submit to the City the following items: a. General Liability Insurance Company and Policy Number b. City Business License c. Contractors State License Number 13. The permittee shall not encroach upon private property without prior written approval (submit to the Public Works Department, attention to the Assistant Engineer I) of the private land owner whom is being encroached upon. Special Conditions Page 2 of 4 PERMIT NO.4502 Old Town La Quinta Phase II / Temporary Power / 14. Prior to perf6rming construction work and closing any lanes in the Public Right of Way, the permittee shall call the City at (760) 777-7097 at least 48hrs prior to work and request an appointment for a preconstruction meeting with the City Inspection staff. 15. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the Public Works Department, an approved traffic control plan at least 2 weeks prior to start of construction or parking on the paved R/W. 16. As shown on the sketch to the left, a minimum distance of 18 feet between the.surface and power lines must be kept at all time. 17. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified, compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm f6undation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. Special Conditions Page 3 of 4 PERMIT NO.4502 Old Town ]La Quinta Phase II / Temporary Tower / 18. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which cannot be backfilled in the same day. Excavated trenches shall not be allowed open overnight. 19. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 20. Access and egress to all local properties shall be maintained at all times. 21. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: Asphalt work is not anticipated. 22. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 23. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or.equipment. 24. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. Permit is valid for 60 days from issuance. 25. Power is to be established from an internal connection from adjacent Phase I Old Town La Quinta within 60 days. 26. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this. permit. Special Conditions Page 4 of 4