Loading...
4547NOTE: '" w With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORM0 N (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connet'', n with MINOR IMPR prove nt Permit —Class III MENTS an PPROVED SUBDIVISIONS Sub vision Improve DATE: November 18, 2005 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Andalusia Parking lot for Skins Game (Street address or Description of Location) PURPOSE OF CONSTRUCTION TPmnnrstry narkirp Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION TPmnnrn.ry ,rwarkino fnr ( quinq rpma DIMENSION OF INSTALLATION OR REMOVAL Room Plan, -7 — /77 _ -7) ( S SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN lwlmrFarnhrar 21, 2005 APPROXIMATE TIME OF COMPLETION M—rr..w1— 27 - ?OnS ESTIMATED CONSTRUCTION COST $ 551620 On D d (Including removal of all obstruction,,.materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) Aj In consideration of the granting of this permit, the applicant hereby agrees to: �'�7� ?� 200[ Indemnify, defend and 'save the City, its authorized agents, officers, representatives and employees, harmless rom ancM11fr swan -and-a •L penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or dam e-to-pe6=,Ale_r-- happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the, result of this work. /AU Signature of Applicant or Agent i'\:<<,�`L _ Shea Homes; Ulrich Sauerbrey 81-260 Avenue 62 La Quinta, CA 92253 7 7 7 — 6� Name of Applicant (please print) Business Address Telephone No. Trilogy Staff Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ N'A Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL 100.00 $ 100.00 Receipt No. Received by Date PERMIT NO * ` 4547 PERMIT -VALIDATION 4547 DATE APPROVED /2 7 EXPIRATION DATE() �� �,?6 DATE1ISSUE DD I'(V,1(9Vz 5 Administrative Authority Recorded by If Telephone: (760) 777-7075 m ROTE: s With proper validation this form constitutes an CITY OF LA QUINTA a erieroachment permit 4. X APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE November 18, 2005 Subdivision Improvement Permit — Class III Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Andalusia Parking lot for Skins Game (Street address or Description of Location) < PURPOSE OF CONSTRUCTION Temporary narking Sketch (attach construction plans if ap propriate) ppropriate) DESCRIPTION OF CONSTRUCTION Tennoraxv nazrkine for Rkl.nn rZAMP, DIMENSION OF INSTALLATION OR REMOVAL SAA PI-AnR SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN NQVA,nhAr 2l ; 9005 G ENTERED' APPROXIMATE TIME OF COMPLETION Ai—s.taih,900S D p ESTIMATED'CONSTRUCTION- COST $ L-5- fh.n %_nn11_Iln (Including removal of al•I obstruction, materials, and debris, backfilling, com- NOW 12005 paction and placing permanent resurfacing and/or replacing improvements) CITY OF LA QUINTA In consideration of the granting of this permit, the applicant hereby agrees to: FINANCE DEPT y Indemnify, defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and agains nd all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. I Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable lur es and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this w%orR' kt)6 IN 6.,t Signature of Applicant or Agent �, `,`, -`e _ Shea Homes; Ulrich Sauerbrey 81-260 Avenue 62 La Quinta, CA 92253 7 % 7 - i Name of Applicant (please print) Business Address Telephone No. Trilogyl Staff Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. A—Mo,w u on 0 - C L O 6 6 62 2. Rj i s App icant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee $ NA 1� Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. 100.00 $ 100.00 Received by Date 4547 PERMIT VALIDATION PERMIT NO. 4547 _ DATE APPROVED / t 2 %2 EXPIRATION DATE �� r 126 DATE, ISSUED Byl Administrative Authority Recorded by 11 Telephone: (760) 777-7075 )RKS DEPARTMENT TION FOR PERMIT Location of_ jgA1DA&Q61,q Purpose of Construction:, p/9'2,_//VG--7E>7)P6P/W y Description of Construction: TEMP. PP%24LI4A = 6411\1�5 6#' -Me- Dimension of Installation or Removal: Approximate Construction Start Date: / Approximate Construction Completion Date: / of -7 Estimated Construction Cost: $ Le 5 , k-t ' L) �J Estimated Construction Cost shall include the removal of all obstructions, materials, and debris, back -filling, compaction and placing permanent resurfacing and or replacing improvements Contact Name: UG/P-01-1 Phone Number: '7 77— &065- Name of Applicant: e-s Applicant Address: - Q /09'U oZ ,A- Q l & 04 aa, Applicant Telephone Number: (ph 7 — &6M VAz&- e--777-6037 Name of Contractor: Contractor Address: Contractor Telephone Number: r,w -trac �L-- =taie l,ic--_ase ;•: umber: Contractor City Business License Number: e cant or Contractor General Liability Insurance Company: or Contractor General Office Use Only: Inspection Fee: 0 F F12. Permit Fee: As -Built Deposit: Dust Control Deposit: Credit Amount: TOTAL FEE DUE: w / t) .' Policy Number: Office Use Only: Assigned Permit Number: Approval Date: Expiration Date: Issue Date: Administrative Authority: ;.� � _ r .. •, City of'La Ouinta - PM 10 Proiect Information (<1 acre per Lot or Infill Project)" Paje 1 of 3. Form updated & effective 8/25/2005 Project Information Project Contractor: Project Phase Project Phase Project Name: (Check One . Y1 �( 'w �cI Project Tract ❑ Constru&tion Number:, Demolition Lot Number(s): -6� Antici to ate: �\ Project Street < S K S Anticipa d Co pletion: Address: V` / Total acres in active construction <1* acre per GQG•\ Lot fir( Project Contact Please Note: Dust control is required 24 hours a day, 7 days a week, Information regardless of construction status. Person listed below is responsible for dust cont rokdprinj busine and non- business hours. Name: V W VNC\ Title: Mn w. �artt� c 1c�r' Company Name: S Mailing Address: Z- City: a - CRY OF LA Q tate: CIN Cgde: ubllc WorkslEngine PPROV D Telephone Number: te: 1 i Fax: 24 Hour ° - ccess mergency � i 0 Phone: Cell Phone: PM10 Certificate Number: ' (' o� -Jc0% * Expanded PM10 plans for commercial and residential developments > 1 acre are required -by the City of La Quinta. T:\PWDEPT\STAFFIGobIAGreen Sheet PW Releas"50824MIN1 PM 10 PACKET GREEN SHEET.dtx 0 v PM 10 (<1 acre per Lot or Infill Project) Fugitive Dust Control Plan Page 2 of 3 Plan updated & effective 8/25/2005 This plan shall take into account applicable SCAQMD Rule 403 regulations. Training may.be obtained by . contacting SCAQMD (Sharon Zamora (909) 396 2183). This plan shall consist.of the following action items: • . WATERING: Continuous watering is required to prevent dust and must occur a minimum of 4 times daily: . Water sha ll be applied to d soils to stop: PP dry P •. Visible dust emissions over 20% opacity • Visible dust emissions that travel over 100 feet. • Water source 3/4 inch water meter at front (south) side of pad. • EDUCATION: Responsible Dust Control Individual and key personnel shall attend SCAQMD PM 10 class and obtain PMIOcertifcate number prior to construction activity. • WEATHER MONITORING: Wind predictions shall be monitored. • SIGNAGE: Use Coachella Valley Fugitive Dust Control Plan Handbook. Construction Site Signage Guidelines. • TRAFFIC: Construction traffic shall. not be allowed on the pad, unless absolutely necessary. If -vehicles operate :on pad, pad shall be kept firm and moist through hose watering, or sprinklers. .Fugitive Dust shall be prevented by fencing off site to prevent unauthorized traffic on pad. (15 mph maximum traffic speed). • PARKING: Parking is not allowed on the pad. All vehicles must park on street (at designated areas only).. • TRACK OUT: Provide 24 hour street cleaning and track out system as approved by City Public Works Inspector. (No dirt on public or private roads). Track out shall be cleaned up within one hour of incident. • DIRT PILES: Dirt piles shall be limited to 50 cubic yards and built per California Building Code grading requirements. Piles shall be kept moist or, covered with tarp material. Larger dirt piles will require stockpile or grading permit. • FENCING: Provide PM10 fencing at perimeter of public roads and where applicable. Wood slat fencing can be installed at rear of property and return 20 feet on either side if HOA restrictions apply. Block walls can replace PM 10 fencing during the construction phase. • EQUIPMENT: Extra hoses and sprinklers shall be maintained on site. • EXCAVATION MEASURES: All areas to be excavated or graded shall be pre -watered. Water shall be applied during excavation or grading operations also. • DUMP TRUCKS: Open top dump trucks to be wet down, moist and tarped.prior to leaving site. •. INACTIVE SITE: Within 10 days of -ceasing of activities, re -vegetate or permanently stabilize as required. City. of La Ouinta - Site Specific Construction Phase PM 10 Agreement Page 3 of 3 Agreement updated & effective 8/25/2005 The signature of the property owner (or authorized representative): • Shall act as his/her acknowledgement 'of. dust control requirements and their enforceability, pursuant to AQMD Rules 403 and 403.1; • Shall constitute and agreement to comply with all project conditions as identified in the approved dust control plan;. The property owner (or authorized representative): • Acknowledges that dust control is required 24 hours a day, 7 days a week, throughout. the period of project performance, regardless of project size or. status; • Shall ensure that each and every contractor/subcontractor and all. other persons associated with the.project shall be in continuous compliance with all requirements of the approved dust control plan; • Shall take all necessary precautions: to minimize dust, even if additional measures beyond those listed in' the dust control plan are necessary; • Shall authorize representative of the City/County to enter upon the above mentioned property for inspection and/or.abatement purposes; and • Shall hold harmless the City/County and its representatives from liability for any actions related to this dust control plan. or any. City/County initiated abatement activities. Signature of Property Ow Ulrich Sauerl or Authorized Representative Printed r ect Manager a \A \NV Title - c - Dal IAA p Company net lox City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number 4547 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment -shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist.of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. " CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ® R1 'NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the perm ittee. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of. the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( " N/A " ) inches of A.C. paving placed on ( " N/A " ) inches of ( " N/A " ) aggregate sub -base course having an "R" value of not less than (" N/A ") and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. ❑ R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch (%") to one foot (1'). ❑ R6 GRADE CHECKING: City. of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A ") feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta_Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 %") of A.C. paving on (" N/A ") of class (" N/A " ) aggregate base. ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all times. ® R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer's specifications. i City of La Quinta ® '1111 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ❑ R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of .excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. ❑ R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. ❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (6) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. ❑ R18 COMPACTION TESTS: If so. required by the inspector, compaction test shall be made at intervals of not more than one - thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( " N/A " ) inches of A.0 surfacing placed on a ( " N/A " ) inch (" N/A " ) aggregate base shall be placed no later than ( " N/A ") days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ❑ R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. PERMIT NO.4547 Shea Homes / Skins Game Parking at Coral Mountain's Andalusia In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La.Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public .Works'Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. Shea Homes (Dave Lewis), hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. 3. The parking area must be stabilized to meet the applicable performance standards. The parking area must be stabilized a minimum of 24hrs prior to the start of the event parking usage. A contingency measure must be used and prevent a plume length of greater than 100ft to be formed or crossing any property line, or create 20 percent or greater opacity. 4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more . frequently, if required. 5. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) before 8:00 a.m. 6. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 7. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 8. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Special Conditions Page 1 of 2 r- r PERMIT NO.4547 Shea Homes / Skins Game Parking at Coral Mountain's Andalusia Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall be prepared in accordance with the WATCH Manual and submitted t& the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part),, 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Excavation nor backfill is not within the scope of work of this permit. 12. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 13. Access and egress to all local properties shall be maintained at all times. 14. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: Asphalt work of any type is not within the scope of work of this permit. 15. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 16. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 17. The permittee shall indemnify,'hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. Special Conditions Page 2 of 2 F ti 3• MADISON ST. 0 0 0 0 • 0 ,I C 0 C .f C =: THE EASTBOUND SIDE OF AVE. 60 IS 32 FEET WIDE INCLUDING THE BIKE LANE. WHAT IS BEING PROPOSED << IS TO CREATE 3 TEN FOOT WIDE LANES (OTHER 2' FOR CONES) AT 500 FEET BEFORE THE ENTRANCE TO TRILOGY. AT 340 FEET THE LANES CAN BE WIDEN TO 12 FEET AS THE CONCRETE MEDIAN CURB ENDS. THIS IS TO KEEP MORE TRAFFIC FLOWING INTO THE PARKING LOT rONLY •—•—•—•—•—•—•—•—•—•—•—•—•—•-•—•—•� EVENT PARKING AREA SKINS GAME R.1 FAftK1=0� ' • 1' I TENT • 500�T AVE.60 I•— —•—•—•—•—•—• _�a �.—.—.—. 0 CHANGEABLE MESSAGE SIGN TO READ Mil Ft -Iv U 1' MAIN ENTRANCE GENERAL PARKING LEFT2 LANES IMONLYAMI MT ILOGY VIP PARKING RIGHT LANE IRIGHTLANE TES.1.': ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECTSHALL BEINACCORDANCEWITH THE2003MANUEL ON UNIFORM TRAFFIC CONTROL DEt/ICES (MU T. C.D.) AND THECALIFORN/A SUPPLEMENT.. 2. TRAFFIC CONTROL SHOWNHEREINIS THEMINIMUMREQUIRED. ADDITIONAL TRAFFIC CONTROL MAYBEREQUIRED TO FACILITATEPUBLIC SAFETYAND TR4FF/CFLOW/FDEEMEDNECESSARYBYC/TYOFLAQUINTA REPRESENTATIVE. 3 7 THROUGHOUTEACHWORKPERI00, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARR/CADESAND DELINEATORS)AND MAINTA/N SAMEIN ACCORDANCEWITH TRAFFIC CONTROL PLANS 4. CONTRACTOR SHALL MAINTA/NAM/N/MUM 10'TRAFRCLANEW/DTHATALL TIMES. LANESSHOULD 12'WIDEWHENPOSS/BLE 5. ACCESS TO PRIVATEPROPERTYSHALL BEMA/NTAINEDATALL TIMES. 6. THIS TRAFFIC CONTROL SHALL BELEFTINPLACE24HOURSADAYFORDURATIONOFTHEEVENT.. 7 IT IS RECOMAAENDED THAT THESPONSOR HAIEA FLAGGER TO DIRECT EVENTATTENDEESAND NORMAL TRAFFIC TO PROPER LANES. 500 FT 00 FT T V350 FT 500 FT R-61 TINS GAMEY PARKINII I N WE s NO SCALE 500 FT INSTALL 12" WIDE CROSSWALK LINES (LOCATION TO BE DETERMINED IN THE FIELD) ♦- VEHICLE DIRECTION 55 The Skins Game Parking at Trilogy aft calteds r1FftCW#dco Shay Homes Tops N Barricades, Inc. RAW fey amodw (800)852-TOPS Ron Fifield NIA 1 11 /16/05 To Be Issued on Approva coo