this form constitutes an CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORM0 N (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connet'', n with MINOR IMPR prove nt Permit —Class III MENTS an PPROVED SUBDIVISIONS
Sub vision Improve DATE: November 18, 2005 Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION Andalusia Parking lot for Skins Game
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION TPmnnrstry narkirp Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION TPmnnrn.ry ,rwarkino fnr
(
quinq rpma
DIMENSION OF INSTALLATION OR REMOVAL Room Plan,
-7 —
/77
_
-7) ( S
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN lwlmrFarnhrar 21, 2005
APPROXIMATE TIME OF COMPLETION M—rr..w1— 27 - ?OnS
ESTIMATED CONSTRUCTION COST $ 551620 On D d
(Including removal of all obstruction,,.materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
Aj
In consideration of the granting of this permit, the applicant hereby agrees to: �'�7� ?� 200[
Indemnify, defend and 'save the City, its authorized agents, officers, representatives and employees, harmless rom ancM11fr swan -and-a •L
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or dam e-to-pe6=,Ale_r--
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the, result of this work.
/AU
Signature of Applicant or Agent i'\:<<,�`L _
Shea Homes; Ulrich Sauerbrey 81-260 Avenue 62 La Quinta, CA 92253 7 7 7 — 6�
Name of Applicant (please print) Business Address Telephone No.
Trilogy Staff
Name of Contractor and Job Foreman Business Address Telephone No.
Contractor's License No.
City Business License No.
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class 111
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee $ N'A
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL
100.00
$ 100.00
Receipt No.
Received by Date
PERMIT NO
* ` 4547
PERMIT -VALIDATION
4547
DATE APPROVED /2 7
EXPIRATION DATE() �� �,?6
DATE1ISSUE DD I'(V,1(9Vz 5
Administrative Authority
Recorded by
If
Telephone: (760) 777-7075
m
ROTE: s
With proper validation
this form constitutes an CITY OF LA QUINTA
a erieroachment permit
4.
X APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
DATE
November 18, 2005
Subdivision Improvement Permit — Class III
Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION Andalusia Parking lot for Skins Game
(Street address or Description of Location) <
PURPOSE OF CONSTRUCTION Temporary narking Sketch (attach construction plans if ap
propriate)
ppropriate)
DESCRIPTION OF CONSTRUCTION Tennoraxv nazrkine for
Rkl.nn rZAMP,
DIMENSION OF INSTALLATION OR REMOVAL SAA PI-AnR
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN NQVA,nhAr 2l ; 9005
G
ENTERED'
APPROXIMATE TIME OF COMPLETION Ai—s.taih,900S
D p
ESTIMATED'CONSTRUCTION- COST $ L-5- fh.n %_nn11_Iln
(Including removal of al•I obstruction, materials, and debris, backfilling, com- NOW 12005
paction and placing permanent resurfacing and/or replacing improvements)
CITY OF LA QUINTA
In consideration of the granting of this permit, the applicant hereby agrees to: FINANCE
DEPT
y
Indemnify, defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and agains nd all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
I
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable lur es and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this
w%orR' kt)6
IN 6.,t
Signature of Applicant or Agent �, `,`, -`e _
Shea Homes; Ulrich Sauerbrey 81-260 Avenue 62 La Quinta, CA 92253 7 % 7 - i
Name of Applicant (please print) Business Address Telephone No.
Trilogyl Staff
Name of Contractor and Job Foreman Business Address Telephone No.
Contractor's License No. City Business License No.
A—Mo,w u on 0 - C L O 6 6 62 2. Rj i s
App icant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class III
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor. Improvement Permit — Class IV: See attached schedule
Inspection Fee $ NA 1�
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
Receipt No.
100.00
$ 100.00
Received by Date
4547
PERMIT VALIDATION
PERMIT NO. 4547 _
DATE APPROVED / t 2 %2
EXPIRATION DATE �� r 126
DATE, ISSUED
Byl
Administrative Authority
Recorded by 11 Telephone: (760) 777-7075
)RKS DEPARTMENT
TION FOR PERMIT
Location of_ jgA1DA&Q61,q
Purpose of Construction:, p/9'2,_//VG--7E>7)P6P/W y
Description of Construction: TEMP. PP%24LI4A = 6411\1�5 6#' -Me-
Dimension of Installation or Removal:
Approximate Construction Start Date: /
Approximate Construction Completion Date: / of -7
Estimated Construction Cost: $ Le 5 , k-t ' L) �J
Estimated Construction Cost shall include the removal of all obstructions, materials, and debris, back -filling, compaction and
placing permanent resurfacing and or replacing improvements
Contact Name: UG/P-01-1 Phone Number: '7 77— &065-
Name of Applicant: e-s
Applicant Address: - Q /09'U oZ ,A- Q l & 04 aa,
Applicant Telephone Number: (ph 7 — &6M VAz&- e--777-6037
Name of Contractor:
Contractor Address:
Contractor Telephone Number:
r,w -trac �L-- =taie l,ic--_ase ;•: umber:
Contractor City Business License Number:
e
cant or Contractor General Liability Insurance Company:
or Contractor General
Office Use Only:
Inspection Fee:
0 F F12.
Permit Fee:
As -Built
Deposit:
Dust Control
Deposit:
Credit
Amount:
TOTAL FEE DUE:
w / t) .'
Policy Number:
Office Use Only:
Assigned Permit Number:
Approval Date:
Expiration
Date:
Issue
Date:
Administrative Authority:
;.� � _ r ..
•,
City of'La Ouinta - PM 10 Proiect Information (<1 acre per Lot or Infill Project)" Paje 1 of 3.
Form updated & effective 8/25/2005
Project Information Project Contractor:
Project Phase
Project Phase Project Name:
(Check One .
Y1
�( 'w �cI Project Tract
❑ Constru&tion Number:,
Demolition Lot Number(s):
-6�
Antici to ate:
�\ Project Street < S K S
Anticipa d Co pletion: Address: V` /
Total acres in active
construction <1* acre per GQG•\
Lot
fir(
Project Contact Please Note: Dust control is required 24 hours a day, 7 days a week,
Information regardless of construction status. Person listed below is responsible for
dust cont rokdprinj busine and non- business hours.
Name: V W VNC\
Title: Mn w. �artt� c 1c�r'
Company Name: S
Mailing Address: Z-
City: a -
CRY OF LA Q tate: CIN
Cgde:
ubllc WorkslEngine
PPROV D Telephone
Number:
te: 1 i Fax:
24 Hour
° - ccess mergency � i 0
Phone:
Cell Phone:
PM10 Certificate
Number: ' (' o� -Jc0%
* Expanded PM10 plans for commercial and residential developments > 1 acre are required -by the
City of La Quinta.
T:\PWDEPT\STAFFIGobIAGreen Sheet PW Releas"50824MIN1 PM 10 PACKET GREEN SHEET.dtx
0
v
PM 10 (<1 acre per Lot or Infill Project) Fugitive Dust Control Plan Page 2 of 3
Plan updated & effective 8/25/2005
This plan shall take into account applicable SCAQMD Rule 403 regulations. Training may.be obtained by .
contacting SCAQMD (Sharon Zamora (909) 396 2183). This plan shall consist.of the following action items:
• . WATERING: Continuous watering is required to prevent dust and must occur a minimum of 4
times daily:
. Water sha
ll be
applied to d soils to stop:
PP dry P
•. Visible dust emissions over 20% opacity
• Visible dust emissions that travel over 100 feet.
• Water source 3/4 inch water meter at front (south) side of pad.
• EDUCATION: Responsible Dust Control Individual and key personnel shall attend SCAQMD
PM 10 class and obtain PMIOcertifcate number prior to construction activity.
• WEATHER MONITORING: Wind predictions shall be monitored.
• SIGNAGE: Use Coachella Valley Fugitive Dust Control Plan Handbook. Construction Site Signage
Guidelines.
• TRAFFIC: Construction traffic shall. not be allowed on the pad, unless absolutely necessary. If
-vehicles operate :on pad, pad shall be kept firm and moist through hose watering, or sprinklers.
.Fugitive Dust shall be prevented by fencing off site to prevent unauthorized traffic on pad. (15 mph
maximum traffic speed).
• PARKING: Parking is not allowed on the pad. All vehicles must park on street (at designated areas
only)..
• TRACK OUT: Provide 24 hour street cleaning and track out system as approved by City Public
Works Inspector. (No dirt on public or private roads). Track out shall be cleaned up within one hour
of incident.
• DIRT PILES: Dirt piles shall be limited to 50 cubic yards and built per California Building Code
grading requirements. Piles shall be kept moist or, covered with tarp material. Larger dirt piles will
require stockpile or grading permit.
• FENCING: Provide PM10 fencing at perimeter of public roads and where applicable. Wood slat
fencing can be installed at rear of property and return 20 feet on either side if HOA restrictions apply.
Block walls can replace PM 10 fencing during the construction phase.
• EQUIPMENT: Extra hoses and sprinklers shall be maintained on site.
• EXCAVATION MEASURES: All areas to be excavated or graded shall be pre -watered. Water shall
be applied during excavation or grading operations also.
• DUMP TRUCKS: Open top dump trucks to be wet down, moist and tarped.prior to leaving site.
•. INACTIVE SITE: Within 10 days of -ceasing of activities, re -vegetate or permanently stabilize as
required.
City. of La Ouinta - Site Specific Construction Phase PM 10 Agreement Page 3 of 3
Agreement updated & effective 8/25/2005
The signature of the property owner (or authorized representative):
• Shall act as his/her acknowledgement 'of. dust control requirements and their enforceability,
pursuant to AQMD Rules 403 and 403.1;
• Shall constitute and agreement to comply with all project conditions as identified in the
approved dust control plan;.
The property owner (or authorized representative):
• Acknowledges that dust control is required 24 hours a day, 7 days a week, throughout. the
period of project performance, regardless of project size or. status;
• Shall ensure that each and every contractor/subcontractor and all. other persons associated
with the.project shall be in continuous compliance with all requirements of the approved dust
control plan;
• Shall take all necessary precautions: to minimize dust, even if additional measures beyond
those listed in' the dust control plan are necessary;
• Shall authorize representative of the City/County to enter upon the above mentioned property
for inspection and/or.abatement purposes; and
• Shall hold harmless the City/County and its representatives from liability for any actions
related to this dust control plan. or any. City/County initiated abatement activities.
Signature of Property Ow
Ulrich Sauerl
or Authorized Representative
Printed r ect Manager a
\A \NV
Title - c - Dal
IAA p
Company
net
lox
City of La Quinta
The following General and Special Provisions are attached to and made a part of
Permit Number 4547
The following shall always apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way
ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission
from abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment -shall not be permitted to operate on any paved
surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced
over their entire width. Resurfacing shall consist.of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. "
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or
cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains
shall be kept free of debris at all times for proper drainage.
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for
the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
® R1 'NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting
construction.
® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
perm ittee.
® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of. the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with ( " N/A " ) inches of A.C. paving placed on ( " N/A " ) inches of ( " N/A " ) aggregate sub -base course having an
"R" value of not less than (" N/A ") and in conformance with the City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
❑ R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
one-fourth inch (%") to one foot (1').
❑ R6 GRADE CHECKING: City. of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A ") feet shall
be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta_Standard #207.
❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2 %") of A.C. paving on (" N/A ") of class (" N/A " )
aggregate base.
® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all
times.
® R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the
manufacturer's specifications.
i
City of La Quinta
® '1111 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State or City of La Quinta projects.
® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon completion or replacement of all survey monuments for proper clearance.
❑ R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be
used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the
protection of the traveling public. The Public Works Inspector shall determine the suitability of .excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
❑ R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than
three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any
case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.
❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the
trench before flooding or a maximum of five feet (6) lifts where trenches are of excessive depths. Care is to be exercised
that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuos.
❑ R18 COMPACTION TESTS: If so. required by the inspector, compaction test shall be made at intervals of not more than one -
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after
a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5) day limit.
❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( " N/A " ) inches of A.0 surfacing placed on
a ( " N/A " ) inch (" N/A " ) aggregate base shall be placed no later than ( " N/A ") days after completion of temporary
road repair.
❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
❑ R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon
completion of permanent repairs.
® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished
by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The
stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method.
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.
PERMIT NO.4547
Shea Homes / Skins Game Parking at Coral Mountain's Andalusia
In addition to the standard permit conditions, the following shall apply:
1. Pursuant to Section 14.16.320 of the La.Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For Public
.Works'Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. Shea Homes (Dave Lewis), hereinafter referred to as "Permittee", shall be responsible for providing
continuous dust and erosion control.
3. The parking area must be stabilized to meet the applicable performance standards. The parking area
must be stabilized a minimum of 24hrs prior to the start of the event parking usage. A contingency
measure must be used and prevent a plume length of greater than 100ft to be formed or crossing any
property line, or create 20 percent or greater opacity.
4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more
. frequently, if required.
5. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982), throughout the
work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial
street (ie any 4 lane street) before 8:00 a.m.
6. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3
p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact
the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at
the intersection is to be altered in any way.
7. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private street
and for any damage to other City streets or facilities as a result of work performed under this permit.
8. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Special Conditions Page 1 of 2
r-
r
PERMIT NO.4547
Shea Homes / Skins Game Parking at Coral Mountain's Andalusia
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan shall be prepared in accordance with the WATCH Manual and submitted t& the City for
review and approval one (1) week prior to starting any construction. It shall be the Permittee's
responsibility to appropriately detour and barricade all construction sites.
Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part),, 1982), street
closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be
maintained at all times.
9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
10. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to
the City of La Quinta.
11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest
edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise
specified herein.
Excavation nor backfill is not within the scope of work of this permit.
12. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its
original condition.
13. Access and egress to all local properties shall be maintained at all times.
14. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
of the work. Permanent pavement replacement shall conform to the following conditions:
Asphalt work of any type is not within the scope of work of this permit.
15. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization shall be done immediately
after completing the operation.
16. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
17. The permittee shall indemnify,'hold harmless and assume the defense of the City from all damages,
delay costs, costs or expenses in law or equity that may arise out of work under this permit.
Special Conditions Page 2 of 2
F
ti
3•
MADISON ST.
0
0
0
0
• 0
,I C
0
C
.f C
=:
THE EASTBOUND SIDE OF AVE. 60 IS 32 FEET WIDE
INCLUDING THE BIKE LANE. WHAT IS BEING PROPOSED <<
IS TO CREATE 3 TEN FOOT WIDE LANES (OTHER 2' FOR CONES)
AT 500 FEET BEFORE THE ENTRANCE TO TRILOGY. AT 340 FEET
THE LANES CAN BE WIDEN TO 12 FEET AS THE CONCRETE
MEDIAN CURB ENDS. THIS IS TO KEEP MORE TRAFFIC FLOWING
INTO THE PARKING LOT rONLY
•—•—•—•—•—•—•—•—•—•—•—•—•—•-•—•—•�
EVENT PARKING AREA SKINS GAME
R.1 FAftK1=0� '
• 1'
I TENT
•
500�T
AVE.60 I•— —•—•—•—•—•—• _�a �.—.—.—.
0
CHANGEABLE MESSAGE SIGN TO READ
Mil
Ft -Iv U
1'
MAIN ENTRANCE
GENERAL PARKING LEFT2 LANES IMONLYAMI MT ILOGY
VIP PARKING RIGHT LANE IRIGHTLANE
TES.1.': ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECTSHALL BEINACCORDANCEWITH THE2003MANUEL ON UNIFORM TRAFFIC CONTROL DEt/ICES (MU T. C.D.)
AND THECALIFORN/A SUPPLEMENT..
2. TRAFFIC CONTROL SHOWNHEREINIS THEMINIMUMREQUIRED. ADDITIONAL TRAFFIC CONTROL MAYBEREQUIRED TO FACILITATEPUBLIC SAFETYAND
TR4FF/CFLOW/FDEEMEDNECESSARYBYC/TYOFLAQUINTA REPRESENTATIVE.
3 7 THROUGHOUTEACHWORKPERI00, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARR/CADESAND DELINEATORS)AND MAINTA/N SAMEIN
ACCORDANCEWITH TRAFFIC CONTROL PLANS
4. CONTRACTOR SHALL MAINTA/NAM/N/MUM 10'TRAFRCLANEW/DTHATALL TIMES. LANESSHOULD 12'WIDEWHENPOSS/BLE
5. ACCESS TO PRIVATEPROPERTYSHALL BEMA/NTAINEDATALL TIMES.
6. THIS TRAFFIC CONTROL SHALL BELEFTINPLACE24HOURSADAYFORDURATIONOFTHEEVENT..
7 IT IS RECOMAAENDED THAT THESPONSOR HAIEA FLAGGER TO DIRECT EVENTATTENDEESAND NORMAL TRAFFIC TO PROPER LANES.
500 FT 00 FT T V350 FT 500 FT
R-61
TINS GAMEY
PARKINII I
N
WE
s
NO SCALE
500 FT
INSTALL 12" WIDE CROSSWALK
LINES (LOCATION TO BE DETERMINED
IN THE FIELD)
♦- VEHICLE DIRECTION
55
The Skins Game Parking at Trilogy
aft calteds r1FftCW#dco
Shay Homes Tops N Barricades, Inc.
RAW fey amodw
(800)852-TOPS Ron Fifield NIA
1 11 /16/05 To Be Issued on Approva
coo