Loading...
45544�_ le. . 4 r.. NOW, With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCRft��LT) 2 1405 For the construction of public or private curbs, driveways, pavements, sidew�fttT�}1��ve�s, v(iater mains and other like public works improvements in connection with MINOR IMPROVEMENTS and AP DIVISIONS DATE: December 5, 2005 LOCATION OF CONSTRUCTION 78-045 Calle Cadiz La (Street address or Description of Location) PURPOSE OF CONSTRUCTION See L001-it revised PSN 03016 DESCRIPTION OF CONSTRUCTION Remove and replace walk— way and restripe parking spaces DIMENSION OF INSTALLATION OR REMOVAL 10' x 30' t 30' x 50' Subdivision Improvement Permit — Class I II Minor Improvement Permit Class IV Il Grill (Revision) Sketch (attach construction plans if appropriate) SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN Will Call APPROXIMATE TIME OF COMPLETION December 31. 2005 FM ���� ESTIMATED CONSTRUCTION COST $ 10,000.00 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend, and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result . f this work. Q/✓ Michael D. Carpenter (909) 724-9572 Signaturelof Applicant or Agent La Quinta Office Park 78-030 Cabe Barcelona Ste "A" La Quinta, CA 92253 777-8300 Name of Applicant (please print) Business Address Telephone No. C & G Construction 965 2nd Avenue Upland CA 91786 (909) 982-9965 Damon Petta (909) 816-7633 Name of Contractor and Job Foreman Business Address Telephone No. 692234 Contractor's License No. 3339 City Business License No. Allied Insurance BgCwp00S l 4A-f}t1 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ 300.00 1 Permit Fee Penalty - Cash Deposit -Surety Bond if required TOTAL: Receipt No. Received by Recorded by 100.00 $ 400.00 Date ` 4554 PERMIT VALIDATION PERMIT NO. 4554 DATE APPROVED 1 Z• / 9 i -') '5 EXPIRATION DATE r, ' J � DATE ISSUED Administrative Authority Telephone: (760) 777-7075 PUBLIC-WORKSDAP TM�NT AP iCATION FOR ERmT ' Diati; !i •I• ors � • . . oatlon of C�otian: - %B ECyr• Qi\/fy lb up Z-0c . — Pwpom of cau u0im.. C tJ • C D 08ofConaft dom; oVa ;MfLA4 ti DLmeeeivn of Ine0tllatloii of Ratm�el� �c �,iasipx a t ApP+oo WIAW Ca ndrmdon Boot Dab: Z S o oy Ql3gpll/RtDnD+c �1�• Eed � UaaCkn••cam. r O�od Aoor�rdoe 40o i0 looms � /�Mt ��si1 o�rAob� � ar � impoetiar� CauM Nwm: EAUMA ,yt tARi,ttTrm..,p . No= of Applicuit LA AM A vF FiLe pAv .AppbM* Addrek: - o1 a 4�' AnUft* T Humber, '-i,'1- -.— . bee: . tl•a '� 9 • •8lis 'Nam O! CpQ+er,�abo�; G o K C�Qfbto� A�p' e,1 p CQUftwtw TWcpbow N=bor. (plon t. , Cattrsc�oor 8p�b L+ceoma rii�mbe�r, x�� • � • � . city Budam f 4m Nqmbw.• o or CGw"Q Lfiwily Inwr�ttba i.: C Appuea d Or cam"ator (WMW Lia�b! b one Y. . n�. 300.40 a� ' AWA Do �.. DO; TOTALMDUNt W O ` DEC 1 2005 Allied Insurance AMCO INSURANCE COMPANY 1100 LOCUST ST DEPT 110DES MOINES IA 50391-1100 a Nationwide' company On Your Side" PREMIER BUSINESSOWNERS POLICY PREMIER OFFICE COMMON DECLARATIONS Policy Number: ACP BPO 7811616936 Named Insured: LA QUINTA OFFICE PARK LLC Mailing Address: PO BOX 5588 BEVERLY HILLS, CA 90209.5588 Agency: JULES BERLIN AGENCY INC Address: BEVERLY HILLS CA 90209-5588 Agency Phone Number: (323)655-6470 84 51234 RENEWAL Policy Period: Effective From 07-06-05 To 07-06-06 12:01 AM Standard Time at your principal place of business. Form of your business entity: LIMITED LIABILITY CO Description of your business: OFFICE BLDGS IN RETURN FOR THE PAYMENT OF THE PREMIUM AND SUBJECT TO ALL THE TERMS OF THIS POLICY, WE AGREE TO PROVIDE THE INSURANCE STATED IN THIS POLICY. CONTINUATION PROVISION: If we offer to continue your coverage and you or your representative do not accept, this policy will automatically terminate on the expiration date of the current policy period stated above. Failure to pay the required premium when due shall mean that you have not accepted our offer to continue your coverage. This policy will terminate sooner if any portion of the current policy period premium is not paid when due. RENEWAL POLICY NOTICE: In an effort to keep insurance premiums as low as possible, we have streamlined your renewal policy by not including printed copies of policy forms or endorsements that have not changed from your expiring policies, unless they include variable information that is unique to you. Refer to your prior policies for printed copies of thes forms. If you have a need for any form, they are available by request from your agent IMPORTANT INFORMATION FOR CALIFORNIA POLICYHOLDERS: Companies writing property and casualty insurance in California are required to participate in the California Insurance Guarantee Association. If a company becomes insolvent, the California Insurance Guarantee Association settles unpaid claims and assesses each insurance company for its fair share. California law requires all companies to surcharge policies to recover these assessments. If your policy is surcharged, "CA Surcharge" with an amount will appear on your premium notice. If you should have any questions or problems with this policy, please first contact your agent or a Company representative. If after doing so, we have failed to produce a satisfactory solution to your problem, you may contact the CALIFORNIA DEPARTMENT OF INSURANCE at 1-800-927-4357 (for TDD, 1-800-482-4833) or write them at: California Department of Insurance, Consumer Communication Bureau, 300 South Spring Street, South Tower, Los Angeles, CA 90013. PREMIUM FOR CERTIFIED ACTS OF TERRORISM $ TOTAL POLICY PREMIUM $ Previous Policy Number ACP BPO 7801616936 ENTRY DATE 07-08-05 Countersignature Date 0.00 These Common Policy Declarations, together with the Common Policy Conditions, Coverage Form Declarations, Coverage Forms and any endorsements issued to form a part thereof, complete the Policy numbered above. PB 81 00 (01-01) Page 1 of 2 DIRECT BILL 78MM LKM INSURED COPY UID 41 78 33605 FW AiLAN R I IN THE CITY OF LA QUINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORN'A LA QUINTA GRILL PRECISE GRADING PLAN GRADING NOTES .1. ,K EOMNI.Tw T RESPONSBIL TO PREVEM sal COMAYWATION Of - WATER UIFRL-- l-UTTEs 01rPIHG CONSTRUCTION OF SUBAOUOrt nIPROYnIFaTiS BY lK CONIPACF00. OUED.TFLY PPOR TO FWR ALOPIANCE Or 510.1 OIWNAGt REFENION/INRFWJON rAnmts. Flit CO-tOR SIULL EcwvuEI. W Tilt PKSNCE O' TKE CDY INSPECTOR. A RPFORUANCt lESf DESONED TO OEAALY BEu0N5T41E THE NrRCIgNAL AaWKT Or iNE FACMIES. 02. ALL 1rOnK AWL K OlK W ACCOROARCE - TIE - WD PLANS OF TIE CITY OP LA WIMA AHD TIE VT O,UID SROTEATONs FOR PUBLO WORKS CONSTRUCMu. "EST EOTION, MO RNEPsmE COUMY STNAxn15 AND SRCDIGIONS ORD,,-E RE. A81, 4TESI COTTON. 03. TK COMMCFOR -L OBLDR ALL pEAY1T5 As REOORED M THE CRY OF LA WPITA OR UTRA GOVERNING AGLNOES. oA. TE IDGTOuS III, DraTUIG UNDERGROUND UIIIITmn; ARF SIgAT W THE APPROO TE RAT ONLY. TE COMRILTOR - OEFERYWE IRE [%ACT LOCATKN OF ALL EKTTNG UTMES BEFORE GO. ENCWG MORN. K AGREES TO BE FULLY RESPoRSNE FOR ANY AND ALL OAUAG0 WWOI uO BE OCCKOKD W HT FAILURE TO EKACFLY' L Ft AND PRESERvE ANY AND ALL UNDERGROUND UTILIIIES Oe. FIE COMPACfO 9WL BE RFSPoNSIAR TOIL TE PEooG RAL PLEIREM OR RElOUTIDN aALL CpAAtOR1', W.RARNING AND GUOE SCNs. GRADING NOTES (GO,,T,um) i>. LUCATONS Ol' FIELD DE TEST SNALL BE OEMINNFED . ME 50a ENpNEER OR APPRO/ED TESTING AGftICY AND -L' BE SIR>TCIaT W BOTH -OM. AND vEmK:LL PLACEUEM TO PRWIDE REPRFSENTATIK TESTI- OF ALL FILL RACED. TESTING W AREAS a A I-L NATURE OF s CYL EYPHAST SNALL BE W ADOTION TO TIE RarLWL RCPRESE- SAMPLES. 04 m COVT4OOR SNNL - gSF11R0 E'O-G SI1R1'LY MONUMENTS OR BEAM YANKS ROTED W IK PLANS. aR FOUND DURING 1B. 1I,E foul COImACTON REPORT AJID APPRO'A FRO. TE 5 D-urOI SNALL CONTAW lK TYPE 0f FIELD TES OTC PERMFOm. CONSFRUCION. RE- AND REPLIA.EM SI,AIL BE OONE BY A K=TERED Cml ENONEER WIM A P.C.E. NUMBER BELOW s3966. OR A LICENSED LAND SURVEYOR OMLY. EAGN TEST SI BE OERTUED WRIT ilE YEMOD Or O.AWWO THE IN -PLACE DOVSIx. MNEDIEP SAMD COK OR DRY[ RWa AYO SIW! a SO NOTED FOR EACH TEST. SUR,aDll -U. - O>. GRAONG Stall BF IN ALWPoNRCE WON THE ENGINEERED GRADWC REOAI0RDJEMS Of TIE UNIFORM BUIIDWG CODE LATEST EDmON. OETERYI."0. SHI1L BE PERMR.EO TO VER6Y TIE AftUPKY OF E YAOYUY DER- NAVES USED BY TIE TELD TELNRICYN. ANp 50¢S REPORT .O. SS-69O0-Pl DATED iWWT' I.. zaoo PREPARED BY EAR. SYSTEMS. SOIROFST (PHONE N0. >80-NS-1588). 1e. ALL TRA\ELED WAYS MUTT BE CLEANED IUAY OF ALL DIRT..UD AND DEBRB BEPOSTIED OR MEx . A REAILT a TIE CRtDMC ORAATON. cuwRuG 6 TO BE DONE TO 111E SA"SFIGION OF T,E GO. lK co,-CMFI SNNL NOi6Y TE - PUDM NORMS DEPA . m OT ENCWEFR. FOR ROIq, GRAmRG b HOURS PROR TO ANY GRAONG. BRUSHING OR OUbNG. AND EACH PRASE OF CORSTRUCrON AT R.) »>-ro>3 ZO. BLOa M'AUS ARE NOI PNR O' lK G40WG PFRWI. SImNI fIXr SEPARATE &AWE OEnurt. AND b HOIRS PFDOR 1O RE - INSPECTONS. 31. ALL CONSIRUCIOR APEK SIWL BE PROPERLY PWiTED AND LIOHtEp m. WPIMG EuT GRACING ORMIprT AND PROR TO CONSTRUCTION OF PERYA DPNNY:E STRUCTURES, I RRAINAOE CONTROL CONfORYAMLE w1T1I R STATE THE PE MI WARONG F M. LrA,TS. AND OOA TOIL USE W THE PEPfatYANLR Of M. UPON BE WATER -C BE PRWmED TO PFREA2Rf PO,OTIG WAFER AND OAIIACE i0 AD4GENr PROPER",. mGMaYS. W OIODI TO FLIYWKE AM I,Af1R05. I. TIE COMPACTOR SHALL BE RESPOnsT1E FOP PnDADDm AN AOED n uE-S 0< LUST CORFROI w3OCJ1 SlrAtl INCLUDE PROASONS FOR ADEO4TE WATEA1rG WmiO TK CRAOnG PROEEW AND PROVamIIs 1. COaxUANCE O' OUST mMTTmI AFIFA TIE GPAOIrIG UNA SUCH TOE - TE GPADED SU.ACE PRESENR ErrK3ENT PROTECT4 COVED AGNRST M'u1D OR WAFER rRosKW T l SPELUL DUST COMRO YE LaFs AK NO LONGW KCESSaY. 11. MRE3/5 OF FUTURE�CTOEYSIRUL7a 5rBE ]IANTED wfM A S® IL COMSIRUCTIOR OPq m. ANp YNMENANCE OE' MI RNEM W1F101 OK ,U, F IRE Or HUYAR OttLPI2IC'r S- BE PERfORYED ONLY DlrPllO tK TbIE PCNWS AS FOL.m' OLT. C ro APR ]OUc MDR.-m >:m Au. To S:JO P.LL .TURDAY e:m Au. FO SNO P.M. WY In TO SEPT. ]OR uOR.-Erb. 6D0 AY. TO >:00 P.Y. sAlUROAY em Au. M e.'00 P.R. WORK SWal BE PPOaB.D AM nut ON SUuOAY OR RDERA ROauY. 13. AFTER CIE0VONG. DOST IC GTIWND SHALL BE SCARFED TO A OF 6 WCNES ON TK EMOTE 611E OR K RCO.1aNDL0 BY 5005 REPO.. - YAYWUII art AND FILL SLOLS - 3:1. 11 PAD$ S14YL a muPACIED TO A YINIWY OF eoK PlUU"E 00N PER AS A. SRCIi'K:AIKNT AND -E uEuTOuEU SOILS REM"'. n TI¢ sans ENGwEOi xm [NpxEERWG GEOOf.TI sW1 OLERO4 sIIF>TaENr tYCWEEmNG aesElWKlml OIrMIG cRAOYc Wm coYsn6xTaN ro vER6Y colpLlArx:[ MTrH FlE PIANs. sRalpAToxs AND Goof wrtla� TNOR PURR+[ . 21 A REGIsrtRm CM eiGvaER SHALL MREEE sURTaEMT ENfAIEEA0IO OBSEPVKON OOONC GRApRG xm W,ISTRYCTON TO LgOY COUPWIOE W1TM TIE RAYS. BPEOrTurIDl6 AND LOOS MT P1nME . ]A. ALL EOS1biG OTWNAGE COIRSEs OR TYE PROTECT SRE .UST cEu,,,IUE TO FU-L ESPECWLY WRWG STORY CONOTONS RREIIE E MEASURES MUST BE USED TO PROECT ADIOINUK: PRORATES OY 10 {1MmRFD WON[ W TIE SITE WPoNG CPAOIMa OPDUIOUS 2e, N!! 1WOEDLPOIMD STRIECTURES SUM AS CE-ODLs. SCPIO TARNS. WELLS OR PWES NOF lOO- PRIOR l0 GPApNG ARE TO BE REMOVED OR TREATED W A lIAl1NER -D BY EYE .- ENGWFEA. 2n CONTRACTOR -L PROVIDE MO EROSION AMO OUST CONTROL YFASUREs AS REOUxFD BY TIE FUGRRE Mf CON1ROl PLW APPRplED FOR TOs PROJER. 2). ALL fLLls Shill BE COUPACTD TO A u... a N"c" (Po) PERCENT OF YAO.U..0- AS OETpNWEO BY 1wiaRu B10DING CODE m- 7.10. OR EWNALENI. As APPROVED BY TE LnY ENfJIrFE0. rTEID MRI50Y SHNL BE DETERYUrEO W ACCp..Lc E WRN ru UNrO1Y TwE oC CLUE ACTOY Tm2 aI+ EOUNAIEM. AS OETEAYORFD Br Art CITY ENGW[E0. -00PFRATIVF RED IMPORTED FIRE ANT PROJECT NOTICE m�,Iue,alrF a1.a AEmm Y�� Dvnr a a ,r Ala .a�aaw.� m.o-i RD a4ae.A a>oL ,mGY10AsAA+oe°e"�Dm. vs+- >J.rl n'Mm n� ale-6m .Aa0no1 , . �. a Fssm IMPORTANT NOTICE PREPARED FOR: SECTION A216 121T Of 111E W2RlNCM CODE DIG A1EAT FERIE A TON NUYBTO K ATE' BEFORE A rErturt TO -ATE' wu BE vARm FOR YOUR OK; MEAT LD. uBER LUL xpEPORWND SD ALERT Tm prl.aM M TOLL FREE 1-6m-227-3em p TWD (3) -o DAYS BEFORE YW OG 8496 OE BFJIIBACS rK swrG a KOOTOTr mD TIE CYIp 4C 6A10�I xeFdf LA OUINTA GRILL It OU"M GRILL L.L.C.♦1865 BCWU`m U(. STE 214 PALM DESERT. CA 922A BEING A PORTION OF SECTION 6, T. 6 S., R. 7 E.. S.B.M. EROSION CONTROL NOTES (SUPPP) r, ro uro atw.G w aeRmc sNa xvr wn Au EDmv more Atmlla NM 'fl➢.' AR.WUS z .YL NOSlD AOCIf SNYI a mtm K �ID xD// AOOS v nl. OLOa 1 9OAa malACTOV 31n° /OP 10•.tDf OW IJ Oa IlE SIB SNIU 4 Snlm K ¢FIXER A mYaRCrOR � aRE A � mlBO 1Ca9Rs' plfa NO AnA Ltll i nx FY.W .91A'1 M TIE m6RIL® ALL A1216nf K DE NVrRRL1pP 91Y! ua Ala A�wr F#lAIR9G ro /NiOT ma seuorr.v0 Faalr.nTs Fax r4lsD' Dr snc a mnwam v.B mnr xnr Au srt.vx Tau aaasmaNr wraY. r. .I6.nlu aysaY Am sln4wr mxax rAvra vwa a tazvlm r aEElm ATmswr er ar-mE Es¢rLN n WD a611/lOa ACINf6 vrva ror mP.0.1r wR A9AOIIIt m m m rNs tmv AEDmm er aAEsxa AurromQ A ! A6TRLUa' O mix atlxK slJrn 9QED BC MDOJPIID x' 6,110t m wrrAu aWxAGroa sNYN mNx x PFE DN>: Irnr rtFu Ras rn Ra nmlw srAmAa rDlac rR¢3 at xnwr mo LUTiay.a¢, SNa S AD01ID x0 D'YT✓Sm a a:-SrrE RR OM1 Rp1Q790i MY elxxa aE-srt vwa a sTxm m 4ar omrY.ta Aro Fans vEaama rr. mrrRUTm vwa a x3Prmr m u1r xllRlm TARS Kr:swr m tsrAamr FEreRrow sn sTAeIDAmY Pm an xa/mO.'II Iz saarr viva eE ,HiDlm rRuv TIE smear BL9r moa n a 3nr P., r1 ninon easx amn sauaua • aP � m rota mRmzT vuARr Fa ra rcw srxx . 1A. RNDTARr aDSOY mma Aro tmar nnR rtzlrrrw rrmuaw a.«. a+x1Pf 1xLUar ,FAART sro.rr 9N1 LORE ra M a4anll Liner MlIR BnT .AVIm'Bn ITICr121rUR2O(. ��� tiles ��■,,. LmTNL•IJ9.l9J.li3iK-`.'EEES':�E.aYrZ�1J:.) ��sTiJ• VICINITY MAP (NO SCALE) SLORW R F. S Rm ngYK BROT23 WV IOU P�a9, r-) CONSTRUCTION NOTES h QUANTITY ESTIMATE Oi mmAv r P1FE AsJ azx • amu xv munr � DIME swam nAY ro aan ns v OmISIAIGT r m D) mx mr m (DWM1 AntICEE Stwalm xAv ro mI. ram v J oO6la1T SECWWn HA Omni a' In[RiE mR0 SF iT.VI ro Tar. OIT AID O.W rWlaral PD! DELL O aAma r4o1 ! YAC OMRwT'OAsf SAe (viva a 18wrD x rm er sms naay Jtlns a maraAT vcn sET[Wv.6 xx oE2u. a am a Rm 4 O) mIJ1ACI PEE' OB.LWY AP{WOI RR mlxw 6 xKRs<L SA m>. T- eO maTRu2 axe R4P sW DEEu a vm a I urn IO mOTxCt O.x01 Wa RA OT4 Ov 9QT J Ar(llf 9pgR R>exi 2N EE OarmxAY �r arrnr wr azu. w vm i OAaLUL ululeu raEaw Amr: Ir E le rRWrs RGm Rua 6AaY FAO GRATE nr 4 a cur OIaiALL A11111BL GFOJC.YUC 11•I IS'TRAFFIC RA/Lp IW BUT.' NTT OAIL rt ASN1 PK sFax wx Esc t axl JN 4 OF6'rAU V• PR: s a- PRE Oarr I RGOT. R M, .= 11a - Ou , OR SNOT 1 I Ear M= KNa FEB mpfAR mim IO3 F6TN! 5Y0 nor PD) ORS 4 aI.T sImLm x.W N2 JA r OF6Wa O(xAVi PDE CRNR O D1Lf3R SrwD+m {1K AO 6Pl J TROT O-Kmn- 1f.,Or OAeTAB tADtR sEEWux atw xs ror� mum sTAa4m nAv w ti r tAw 0 A61Aa sAADm mmxtra anRxx m am Is, vm a I tAw OF6TN1 Al RA{ ICI OTN A 9I[I a 14OI n mllaEA� axe RRP rtR:IaraF- a, z.IFef e. r ua A BIEL LEGEND PAD-5aD ,ADru its nxo=IOAn vAo nnR rKv+ FF-50.0 L.aU rEs PR6tlR'D Ne9l noon EIEYAnav a Wau r[s now rat rc DacA its Fro or amB TO nmlG rts rM [f GPA R EP xwcl its tDar p• vA1EYExF a AWCARs mrnamt Rw xLY.I]LS RKaII-O�-WAY GH xOCATE's O'ar BRGN M DIaC I ms YILW P T LP PIbC -10W PIWI 2 -ms faR9RD Fx.10E a aVLL'GTETwracan lxr J9.m -' s `.vmED SIAOF TIN nOV xpYw TES rAS 90I [4T'A TRW -0-.mN'A RS PROPGSED -FOW' W ,rs E-. C,WR)W u Waurrr vRLwAD tR•arNr -y y Y xnFc1 Rs PRD4DSED owl sac ��i P4Y RS LO•ISIAU6'lrbr mow -our �- � � AVOG RS OPfI SWAY P1Y(' !Es PROID50) CAfA TEEw M;1LL �W .t rts' PRO[RIY la£ O OVOG Its Eaf]WC TREE Wau TEs tJ15TWt vAlc22rar smxWc SHEET INDEX SPOT. NO. DESCRIPTION 1 ONE KEE 2 PRECISE GRADING PLAN (PARR I) 3 PRECISE GRADING PLAN (BET. 9"Em � S INIRIALCOMPANYH DISTRICT EG4 WATER/SEWER: COACHELIA VALLEY WATER DISTRICT SCHOOL DISTRICT.: DESERT SANDS UNIRED . APPROXIMATE EARTHWORK QUANMES CUT: 100 CU. YDS. �,rl atlr0:•U: A. FAT: 950 CU. VDS. NOTES REGARDING EARTHWORK OUANTMES .-..._..__._.._ 1') � FEE Pu°�aPosis o4$XOwNir .N°ND ACRE � ww raaw�A�I A�TION'�s sa4W ATOiRm ON TK giWNO ELLVATKWs WNpR CIOSim K THE TORE OF TE TOPorEURa D.AWED rRMEOY A�tl � SUS � wE�iPPRo[ iMYV�PIH� SIANOVAS). 2J TO E-I). WA,rt016. WNRUCFOR SHALL REOUFSt AM NFR US,LIENTS. NOTALL K.ES" ADAST 0- W41-ECEsSA l BE NEED APPRWED. SI CO -.IN BOONG TRS PRORO. SHALL BE RESPONSOIE FOR PERFOP4WG VIOEPENOEM OU- TAKE -ORS ANO SHALL 8 TE NL BIDS W THAT TAKE -OFF. Nm SHALL BE RESPONSIBLE iKRFO1L ACCEPT OIi SHALL IN ITS ASENRY VEPoR' ALL FIELD ARO Sm COxOTONs AND SHALL ACCEPT 111E SIR W ITS AS-T muIRTON A TIE F.E OF m�ON.T. LOHO/L OR S,- muPlETE ,K PNAIECT (WOuOxc AM REaImED SOL NPO. OR nuPoRO W ACCOaxJCE wO1 INa- EK6TWG OONOTONs AND I. s11RST-L WlraaYARGE - THE BURG. GRADES SHORN O. TK APPROVED GRApNa RAN (AND/OR K ADMTED) Y/IINOUR CHYrcE ORDERS OR M. COUR.SATON. OAIE 1-, O3 a FALY 06F1:f IN RSrP- mFe a_Q � Warnerr°BAN rLA engineenng�: e0 n1CU�4lE 20SION RILL DEC-08-2005 02:07 PM CARPENTER 909 946 9499 P.02 SVB)ECTi MINOR REVISION, LA QVINTA GRILL (VVP 2001-03 PRECISE GRADING PLAN ) DATE. TO, CITY OF LA QVINTA PVBL.IC WORKS DEPARTMENT, ATTN: ANTHONY REFER TO: PLAN SET AR)SO16, REVISED SHEETS 02 8t #3 CONSTRUCTION COST ESTIMATES PER YOVR RECIVEST CONSTRVCTION NOTES QVANTllY ESTIMATES COST ESTIMAIZ 28 ADD 77 VUA04TED DOME$AT VEHICULAR WAY, SEEDETAIL 225HEET3 5 PLACES $ 4,102.00 27 wDE'NGUTTERATPEDESTRIANaWsslNGa rO48' (SL.OPSINDIRECIION 40 50. Fr. $ 2,150.00 OF TRAVEL NOT O(CEED 6%. CROSS SLOPE NOT TO EXCEED M . 26 MINIMUMa6'WIDEAC.C: PAVED WAUCWAYPERDErA/L ONSHEFr3 NOT USED $ 00.00 (SLOPE IN DIREC7yoN of TRAVEL NOT EXczm 6% CR&" SLOPE NOT MEXCEEID2W . ae EWnNOP.C.C.APPRWCHCONS7RUCTEDPER EXISTING $00.00 LA QUWTA STANDARD CaWERC/AL DRIVEWAY. 30 00877NOPLANTERZ EXISTING $ 00.00 31 PRO WIDEPATHAS INDICATED, PATH TO BE 150 SCL FT. $1,500.00 MIN/MUW Ar WIDE WITH SLOPENOT rO PATCH EXCEED 5%AND CROSS BLOPIE'NOr rig EM77NO AC PAVfEDAREA H43 CROSS SLOPE IN EXCESS OiF2% BUILD UP W7THROLLED HOT PATCH ASPHAL r ro CORowcrstwAOESLOPIEAAv fE4 HEREGDEBACK7i Wr"NG. 32 mosnNoRca mmamGurrm EXISTING $ 00.00 PER DETAIL 9HEEr. 33 DOUBLE AWRPINS7R/P/NOPER 4 STALLS PLVS $ 950.00 CVTYSTANVARD. 140 L.F, STRIP OREMOVE 09S77NO CRICK NOW AND INSTALL 12 L.F. $1,020.00 ADA APPROVED CONCRETE NOSE WITH WAMUNO SMP 3g ACCESS/BLEPARIONOSrALLSAAILESMUST EXISTING $ 00.00 HAVEM4XIMUM2% StOPEINANYD/REC77ON 36 POSTS/QN 'NorANAC0MYAtEEXPTP47H' 2 PLACES $ 300.00 TOTAL $10,022.00 DEC-08-2005 02:06 PM CARPENTER 909 946 9499 P.01 MICHAEL D. CARPENTER DESIGN �DRAFTING 2009 PORTERFIELD WAY SUITE G UPLAND CA. 91786 FAX (909) 946--9499 (909) 724-9572 BVILDABLEPESIGNSVAOL.COM TO; ANTHONY FROM: MICHAEL DATE] 12 / 5 / 05 PAGES: 2 INCLUDING THIS ONE SUBJECT: LA QUINTA GRILL_ LA QUINTA GRILL MINOR REVISION QUANTITY / COST ESTIMATES PER YOUR REQUEST Oct 11 05 04:01p p.1 THE- C�PAR_RY a, LA 0_ U I Nra John Shaw Quarry Ranch LLC 78-030 Calle Barcelona La Quinta, CA 92253 Tim Jonasson City Engineer City of La Quinta 78-495 Calle Tampico La Quinta, CA 92253 cc: Brian Ching/Tony Colarossi DELIVERED VIA FAX (760) 777-7155 Re: release of improvement bonds for tract 30651 Dear Mr. Jonasson, October 11, 2005 I am writing to formally request a complete release of the on -site improvement bonds on Tract 30651. The amount of the performance security is $803,021.34, and all improvements have been completed and accepted by the City as of November 2004. All remaining as-builts have been provided to the city within the past 30 days. Our engineer, the Keith Companies, has provided your staff with documentation to this effect. If you have any questions, please feel free to contact Chris Pippin at (760) 799-7756. Thank you in advance for your attention to this matter. Very truly your , JoAn Shaw Quarry Ranch LLC City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number 4554 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors: Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( ** N/A ** ) inches of A.C. paving placed on ( ** N/A ** ) inches of ( ** N/A ** ) aggregate sub -base course having an "R" value of not less than ( ** N/A **) and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. ® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch ('/d") to one foot (1'). ❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (** N/A **) feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 ''/2") of A.C. paving on (** N/A *`) of class (** N/A ** ) aggregate base. ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all times. ❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer's specifications. City of La Quinta ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the perrnittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ® R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. ® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. ❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (5) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. ❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one - thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ® R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ® R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ® R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of .two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( ** N/A ** ) inches of A.0 surfacing placed on a ( ** N/A *") inch (** N/A ** ) aggregate base shall be placed no later than ( 5 ) days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ® R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. PERMIT NO.4554 La Quinta Grill / Precise Grading (Revision) / VUP 2001-013 In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 .§ 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the actual work performed. 3. This permit is issued with the understanding that the work is "At -Risk" due in part to unapproved Precise Grading Plan at the time of issuance of this permit. The permittee must obtain an approved Precise Grading plan within 1 week after issuance of the At -Risk permit. If the plan is not approved within 1 week, the permittee shall request (at the public works counter) a one week extension of the at - risk permit (signed and dated at the counter). 4. La Quinta Office Park, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. , 5. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. 6. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May Ist to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) before 8:00 a.m. 7. The permittee and/or contractor placing engineered fill must provide adequate time and safety for the Geotechnical Engineer of Record to perform soils testing during engineered fill placement. The testing frequency shall be determined by the Geotechnical Engineer of Record such that the fill can be determined to be placed according to the. city approved plans. Special Conditions Page I of 6 PERMIT NO.4554 La Quinta Grill / Precise Grading (Revision) / VUP 2001-013 8. The permittee and/or contractor shall provide surveyor staking information adequate for the City Inspector to determine horizontal and vertical locations relative to the approved city. plans. The minimum required wood lath type stakes shall be placed at all proposed building corners, and they shall state the horizontal location relative to building corner and the elevation of the top of hub next to the lath. 9. Pursuant to Section 1.4.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 10. The permittee shall place temporary no parking signs along the parking area affected by the construction. The signs shall be placed along the area 48hrs prior to the start of closing the area, and removed immediately after the construction completion date. 11. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) 'week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction. sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. 12. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 13. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 14. The issuance of this permit and the City approval of the related construction improvement plans do not provide a vested entitlement for all design parameters that may have been utilized for the plans. As such, plans approved for this permit may be "at risk" for further modifications as it relates to any follow up improvement plan requirements as required by the city or existing errors & omissions by the architect or engineer of record. Special Conditions Page 2 of 6 PERMIT NO.4554 La Quinta Grill / Precise Grading (Revision) / VUP 2001-013 15. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, the name of the City approved contractor, who shall submit to the City the following items: a. General Liability Insurance Company and Policy Number b. City Business License c. Contractors State License Number 16. The permittee shall not encroach upon private property without prior written approval (submit to the Public Works Department, attention to the Assistant Engineer I) of the private land owner whom is being encroached upon. 17. Prior to performing construction work and closing any lanes in the Public Right of Way, the permittee shall call the City at (760) 777-7697 at least 48hrs prior to work and request an appointment for a preconstruction meeting with the City Inspection staff. 18. The permittee shall haul all offsite debris to a certified landfill. Prior to hauling debris, the permittee shall inform the City (Inspection staff or 777-7089) of the name and location of the certified dump site. 19. If public traffic lanes are required to be closed, this'permit is not valid until the permittee submits, to the Public Works Department, an approved traffic control planat least 2 weeks prior to start of construction or parking on the paved R/W. 20. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein: Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or; maintained at appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. Special Conditions Page 3 of 6 PERMIT NO.4554 La Quinta Grill / Precise Grading (Revision) / VUP 2001-013 C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. F. The depth of the randomly. selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. G. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 21. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 22. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 23. Access and egress to all local properties shall be maintained at all times. 24. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. Special Conditions Page 4 of 6 PERMIT N0.4554 La Quinta Grill / Precise Grading (Revision) / VUP 2001-013 B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. C. Permanent pavement replacement shall be installed using a City approved 3/" max medium asphalt concrete as the base course lift and a City approved t/z" max medium finish course lift for capping. _Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: • For longitudinal trenches located in a parking lane: three (3) feet outside the sawcut removal lines. For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater.. For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of V max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 25. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. Special Conditions Page 5 of 6 PERMIT NO.4554 La Quinta Grill / Precise Grading (Revision) / VUP 2001-013 26. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 27. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 28. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. 29. If it is the intent of the permittee to cut the pavement and have it restored by a third party, the permittee shall postpone cutting the pavement until the intended third party has acquired a permit from the City to perform the required restoration work. Special Conditions Page 6 of 6