RFQ - Parks Landscape Maintenance Services Project No. 2018-32
PARKS LANDSCAPE
MAINTENANCE SERVICES
Project No 2018-32
CITY OF LA QUINTA
1 | P a g e
2 | P a g e
REQUEST FOR QUALIFICATIONS AND PROPOSALS
PARKS LANDSCAPE MAINTENANCE SERVICES; PROJECT NO. 2018-32
The City of La Quinta (“City”) requests Qualifications and Proposals (RFQ/RFP) from
qualified contractors (“Contractors”) to provide landscape maintenance services for City of
La Quinta Parks, Project No. 2018-32.
A mandatory pre-proposal meeting is scheduled for Wednesday, April 24, 2019, at 2:00
p.m. at La Quinta City Hall, 78495 Calle Tampico, La Quinta, CA 92253.
PROPOSAL FORMAT AND CONTENT:
The City is seeking a separate Qualification Work Proposal and a separate Cost Proposal.
They should be submitted in separate envelopes clearly marked with the Contractor’s
name, address, phone number, and email address. Given that this is a solicitation for
maintenance services, the City will rank the proposals based upon qualifications and then
consider cost. Only one proposal per Contractor will be considered.
All qualifications and proposals shall be enclosed in a sealed envelope with the words
clearly written on the front:
“PARKS LANDSCAPE MAINTENANCE SERVICES, PROJECT NO 2018-32, - DO NOT
OPEN WITH REGULAR MAIL.”
All proposals shall be firm offers subject to acceptance by the City and may not be
withdrawn for a period of 180 calendar days following the last day to accept proposals.
Proposals may not be amended after the due date except by consent of the City. All
proposals must clearly address all of the requirements outlined in this RFP.
Proposal packages are to be submitted to the City on/or before Wednesday, May 8,
2019, at/or before 5:00 p.m. Proposal packages received after the stated deadline will
not be accepted. Proposal packages are to be delivered to
Robert Ambriz, Jr.
Parks Superintendent
City of La Quinta
78495 Calle Tampico
La Quinta, CA 92253
3 | P a g e
Envelope 1; Qualification Work Proposal must include:
(Submit four (4) copies and one (1) electronic PDF via USB drive)
(1) Work Proposal Qualification Summary Sheets (page numbers 6-13);
(2) Section 1200; Contract Documents;
(3) Section 1205; Examination of Contract Documents
(4) Section 1210; Compliance Form;
(5) Section 1220; Certification of Proposers Experience and Qualifications;
(6) Section 1230; Non-Collusion Affidavit.
Envelope 2; Cost Proposal must include:
(Submit two (2) copies)
(1) Section 1240; Summation - Proposal Form
(2) Section 1300; Contract (pages 1 through 6) from Contract filled out completely.
Qualification Work Proposals will be reviewed by a Selection Committee. Contractors will
be selected for possible contract negotiations based upon the materials submitted. The
Committee may choose to interview two or more closely-rated contractors.
The City of La Quinta will open contract negotiations with the top-ranked proposer. The
successful Contractor will be expected to enter into the City’s standard Contract.
The tentative schedule is as follows:
Request for Qualifications and Proposals Posted Monday, April 15, 2019
Mandatory Pre-Proposal Meeting Wednesday, April 24, 2019
Questions Due Tuesday, April 30, 2019
Qualifications and Proposals Due Wednesday, May 8, 2019
City Council Approval Tuesday, May 21, 2019
Start Date for Services Monday, July 1, 2019
Thank you for your interest,
Robert Ambriz, Jr.
Parks Superintendent
4 | P a g e
Pre-contractual Expenses:
The City shall not be responsible for, under any circumstances, any claims of expenses
necessary for the proposer to receive, evaluate, complete and deliver the proposal. The
proposer should also not include any pre-contractual expenses or fees in the proposal.
Conflicts of Interest:
The proposer affirms that to the best of his or her knowledge, there exists no actual or
potential conflicts between the firm’s business or financial interests, under the Contract,
or any officer, employee, or agent of the City. For the duration of the Contract, the
proposer shall refrain from undertaking any work for any individual, business, or legal
entity, in which direct conflicts of interest regarding the services to be provided thereunder
or herein may arise.
RFP Addenda and Clarifications in Written Comments:
All comments and questions from proposers must be submitted in writing and received
at/or before 5:00 P.M. on Tuesday, April 30, 2019 (“Addenda Due Date”), and must be
submitted via the following approved written methods addressed to Robert Ambriz, Jr.,
Parks Superintendent, Facilities Department:
• Via e-mail to Robert Ambriz, Jr. at rambrizj@laquintaca.gov
• Via mail, if the correspondence is received and date stamped by the City on
or prior to Tuesday, April 30, 2019.
Any questions raised verbally shall not be addressed by the City. Submittal of written
comments or questions shall not be considered by the City unless submitted in an approved
method on or before the addenda due date. Written comments or questions received via
approved method within the time prescribed herein will be addressed by the City’s issuance
of an addendum to this RFQ/RFP. Notwithstanding anything else herein, if it becomes
necessary for the City to revise any part of this RFQ/RFP, or to provide clarification or
additional information after this RFQ/RFP has been issued, a written addendum will be
posted and published on the City’s website, http://www.laquintaca.gov. It shall be the
responsibility of the proposer to check the City’s website for any changes or questions
submitted. All addenda shall become part of the RFP.
5 | P a g e
PROPOSAL EVALUATION AND CONTRACT AWARD:
Selection Committee:
The Selection Committee consisting of City staff will be responsible for reviewing,
analyzing, and evaluating the proposals received. Interviews may be included in the
evaluation process. The Committee may also conduct contract negotiations with the
highest rated proposer.
Evaluation Criteria:
Proposals will be evaluated by the panel, considering the factors listed below and in no
order of significance.
➢ The Contractor's demonstrated competence in similar work and/or their
demonstrated ability to take on, train, and retain personnel sufficient to do
landscape work of this scope.
➢ The Contractor's ability to provide adequate scheduling, supervision, and the
distribution of work crews.
➢ The Contractor's references.
➢ The Contractor's ability to effectively show proof of implementing and managing a
thorough quality control program.
➢ Contract Labor Summary.
➢ Facilities, equipment, and on-site evaluations.
Facilities equipment on-site evaluation:
Upon selection of the most qualified proposers, the City may require the finalists to make
an oral presentation to the Selection Committee and/or the City Council and/or City
Manager. The City expressly reserves the right to reject any or all proposals, with or
without providing a reason and to waive any irregularities or informalities in the offers
received. In the event of any such rejection, or in the event a proposer’s offer is not
rejected but does not result in contract award, the City shall not be liable for any costs
incurred by the proposer in connection with the preparation and submittal of the proposal.
6 | P a g e
REQUEST FOR QUALIFICATIONS SUMMARY
(Use additional pages if needed)
Company Name:_________________________________________________________
Mission Statement:_______________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
Statement of Values:______________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
7 | P a g e
Work Schedule
(Use additional pages or an alternate format if needed)
Provide a proposed detailed schedule of work. The proposed schedule should address
weed control, plant replacement, tree maintenance and include weekly/monthly
strategies to improve the overall appearance of the City’s parks, retention basins, and
Civic facilities.
Proposed weekly schedule of work: ______________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
8 | P a g e
PARKS AND CIVIC FACILITIES DETAILS
Park Facility Turf Shrub /
Ground
Cover
Irrigation Trees Maxicom
or IQ
Play
Equip
Trash and
Receptacles
Adams Park
(44425 Adams Street)
X X X X X X X
Bear Creek Trail (Avenida Carranza
to Calle Tecate) curb to curb/fence
between Carranza and Ensenada,
then trail and 30 feet east and to
fence west
X X X X X
Civic Center Campus
(78495 Calle Tampico)
Park
X X X X X X
City Hall X X X X X X
Library X X X X X X
Wellness Center X X X X X X
La Fonda Open Area X X X X X
Tampico X X X X
Colonel Mitchell Paige Middle School
Sports Fields
(Washington Street/Palm Royale
Drive)
X X
Cove Oasis
Trailhead
(above Calle Tecate)
X X X X X
Entryway
(Calle Tecate and Avenida Madero)
X X X X X
Parking Lot
(Calle Tecate and Avenida
Bermudas)
X
Desert Pride Park
(Bayberry Lane/Birchcrest Circle)
X X X X X X X
Eisenhower Mini Park
(53490 Eisenhower Drive)
X X X X X X X
Fred Wolff Bear Creek Nature
Preserve
(West side of Avenida Montezuma)
X X X
9 | P a g e
Fritz Burns Park
(78107 Avenue 52)
X X X X X X X
La Quinta Park
(79120 Blackhawk Way)
X X X X X X X
Monticello Park [Excluding Retention
Basin]
(Jefferson Street/Fred Waring Drive)
X X X X X X
Museum
(77885 Avenida Montezuma)
X X X X
Pioneer Park
(Seeley Drive/Miles Avenue)
X X X X X X
Saguaro Park
(Saguaro Road/Bottlebrush Avenue)
X X X X X X X
Seasons Retention Basin
(Cloud View Way)
X X X X X X X
Sports Complex
(78900 Avenue 50)
X X X X
Velasco Mini Park
(Calle Temecula/Avenida Velasco)
X X X X X X X
10 | P a g e
RETENTION BASINS/OTHER AREAS DETAILS
Retention Basins/Other Areas Turf Shrub /
Ground
Cover
Irrigation Trees Maxicom
or IQ
Play
Equip
Trash and
Receptacles
Calle Rondo Channel X X X X X
Green Belt –
(Calle Tampico/Eisenhower Dr.)
X X X X X
Youth Center (YMCA)
(Moon River Dr. and Ave. 50)
X X X X X
Perimeter – Moon River east side
(North of Ave. 50)
X X X X X
Retention Basin - Acacia (Miles
Ave./N. Harland Dr.)
X X X X X
Retention Basin - Cactus Flower #1
(Goldenrod Cir.)
X X X X X
Retention Basin - Cactus Flower #2
(Foxtail Cir.)
X X X X X
Retention Basin - Cactus Flower #3
(Iris Ct.)
X X X X X
Retention Basin - Cactus Flower #4
(Star Flower)
X X X X X
Retention Basin - Del Rey
(Bridgette Way/Desert Stream Dr.)
X X X X X
Retention Basin - L.Q. Highlands X X X X X
Retention Basin - Quinterra #1
(West Side) Los Manos Dr.
X X X X X
Retention Basin - Quinterra #2 (East
Side) Los Manos Dr.
X X X X X
Retention Basin - Rancho Ocotillo
#1 (Camino La Cresta)
X X X X X
Retention Basin - Rancho Ocotillo
#2 (Ocotillo Dr.)
X X X X X
Retention Basin - Topaz
(Desert Stream Dr./Dune Palms Rd.)
X X X X X
Retention Basin - Washington St.
(west side, south of Ave. 47)
X X X X X
Retention Basin – Adams Park
(44425 Adams Street)
X X X X X
11 | P a g e
EQUIPMENT TO BE USED
(Use additional pages or an alternate format if needed)
List equipment to be used on this project (include any specialized equipment), projected
preventative maintenance program, and frequency of maintenance performed.
Equipment & Maintenance List:_________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
12 | P a g e
CERTIFICATIONS
List any certifications that apply to this project held by your company and/or staff and
how many staff members have those certifications.
Certification:____________________________________________________
Certification:____________________________________________________
Certification:____________________________________________________
Certification:____________________________________________________
Certification:____________________________________________________
Certification:____________________________________________________
Certification:____________________________________________________
Certification:____________________________________________________
Certification:____________________________________________________
Certification:____________________________________________________
Certification:____________________________________________________
Additional Comments:___________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
13 | P a g e
PROPOSED PERSONNEL
Provide a list of proposed management personnel for this project. Provide details as to
what would make your staff more qualified than anyone else. List the assigned
Supervisor’s and Foreman’s experience in working with municipalities,
businesses, and HOA’s.
Occupation/Title:____________________________________________________
Occupation/Title:____________________________________________________
Occupation/Title:____________________________________________________
Occupation/Title:____________________________________________________
Occupation/Title:____________________________________________________
Occupation/Title:____________________________________________________
Occupation/Title:____________________________________________________
Occupation/Title:____________________________________________________
Occupation/Title:____________________________________________________
Occupation/Title:____________________________________________________
Occupation/Title:____________________________________________________
Additional Comments:________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
REQUEST FOR
QUALIFICATIONS AND PROPOSALS
CONTRACT SPECIFICATIONS
CITY PROJECT NO. 2018-32
PARK LANDSCAPE MAINTENANCE SERVICES
CITY OF LA QUINTA, CALIFORNIA
PREPARED FOR:
CITY OF LA QUINTA
FACILITIES DEPARTMENT
78495 CALLE TAMPICO
LA QUINTA, CA 92253
(760) 777-7091
APPROVED BY:
______________________________________ DATE: April 15, 2019
Steve Howlett, Facilities Director
i
TABLE OF CONTENTS
PARKS LANDSCAPE MAINTENANCE
PROJECT NO 2018-32
DIVISION 1 - PROPOSAL AND CONTRACT REQUIREMENTS PAGE
1100 Invitation to Propose 1100-1
1110 Instructions to Proposers 1100-3
1200 Contract Documents 1200-1
1205 Examination of Contract Documents 1200-3
1210 Compliance Form 1200-4
1220 Certification of Proposer's Experience and Qualif 1200-7
1230 Non-Collusion Affidavit 1200-8
1240 Summation – Proposal Form 1200-10
1250 Notice to Contractor 1200-11
1300 Contract 1300-1
1310 Performance Bond 1300-7
1320 Payment Bond 1300-12
1330 Workers' Compensation Insurance Certificate 1300-14
1340 Liability and Insurance Requirements 1300-16
1.0 Indemnification 1300-16
2.0 Insurance Requirements 1300-17
2.1 General 1300-17
2.2 Commercial General Liability Policy 1300-18
2.3 Workers’ Compensation Insurance 1300-18
2.4 Business Auto Policy 1300-18
2.5 Excess or Umbrella Liability Insurance 1300-19
2.6 Change in Terms 1300-22
1400 General Conditions 1400-1
1.0 General 1400-1
1.1 Intent of Contract Documents 1400-1
1.2 Discrepancies and Omissions 1400-1
1.3 Headings 1400-2
1.4 Penalty for Collusion 1400-2
1.5 Successors and Assigns 1400-2
1.6 Assignment to City 1400-2
1.7 Rights and Remedies 1400-2
1.8 Definitions 1400-2
2.0 Administration 1400-6
2.1 Administration of the Contract 1400-6
2.2 Parks Superintendent 1400-7
2.3 Consultants 1400-7
ii
3.0 City 1400-7
3.1 General 1400-7
3.2 Attention to Work 1400-8
3.3 Inspection 1400-8
3.4 City's Right to Carry Out the Work 1400-8
3.5 City's Right to Perform Work and to
Award Separate Contracts 1400-8
4.0 Contractor 1400-9
4.1 Office 1400-9
4.2 Contractor's Representative 1400-9
4.3 Project Procedures 1400-9
4.4 Contractor's Employees 1400-9
4.5 Subcontractors 1400-10
4.6 Contractor's Equipment and Facilities 1400-10
4.7 Public Safety and Convenience 1400-10
4.8 City-Contractor Coordination 1400-10
4.9 Permits 1400-11
4.10 Contractor's Responsibility for the Work
and Material 1400-12
4.11 Laws to be Observed 1400-12
4.12 Safety 1400-14
5.0 Control of Work and Material 1400-15
5.1 Means and Method 1400-15
5.2 City-Furnished Materials 1400-16
5.3 Defective and Unauthorized Work 1400-16
5.4 Unnoticed Defects 1400-16
5.5 Right to Retain Imperfect Work 1400-16
6.0 Progress of the Work 1400-17
6.1 Beginning of Work 1400-17
6.2 Time of Completion 1400-17
6.3 Delays 1400-17
6.4 Temporary Suspension of Work 1400-18
6.5 Termination of Contract 1400-18
7.0 Changes in Scope of Work 1400-19
7.1 Change Orders 1400-19
7.2 Differing Site Conditions 1400-20
7.3 Resolution of Disputes 1400-20
8.0 Project Modifications Procedures 1400-24
8.1 Changes in Contract Price 1400-24
8.2 Negotiated Change Orders 1400-24
8.3 Force Account Payment 1400-26
9.0 Payment 1400-28
9.1 Scope of Payment 1400-28
9.2 Partial Payments 1400-29
9.3 Partial Payments - Inclusion of Material on Hand 1400-30
9.4 Right to Withhold Amounts 1400-30
9.5 Warranty of Title 1400-31
iii
DIVISION 2 - GENERAL PROJECT REQUIREMENTS
2000 General 2000-1
1.0 Contract Location 2000-1
2.0 Contract Items 2000-1
3.0 Permits and Licenses 2000-1
4.0 Workman’s Compensation Coverage 2000-1
5.0 Insurance Compliance Requirements 2000-1
6.0 Working Hours 2000-2
7.0 Holidays 2000-2
8.0 Performance Deficiencies and Reduction in Payment 2000-2
9.0 Termination 2000-3
9.1 Termination Prior to Expiration of Term 2000-3
9.2 Termination for Default of Contractor 2000-3
9.3 Attorneys’ Fees 2000-4
10.0 Labor Charges 2000-4
11.0 Damages 2000-4
12.0 Materials 2000-4
13.0 Water 2000-5
14.0 Acceptance 2000-5
15.0 Complaints Received by the City 2000-5
16.0 Communications 2000-5
17.0 Contractor’s Employees 2000-6
18.0 Quality Control/Quality Assurance 2000-6
18.1 Quality Control 2000-6
18.2 Supervision and Manpower Allocation 2000-7
18.3 Safety 2000-7
18.4 Weekly Maintenance Schedule 2000-7
18.5 Authorization 2000-7
18.6 Landfill Diversion 2000-7
19.0 Landscape Maintenance Equipment Inventory 2000-8
iv
20.0 Special Requests 2000-10
21.0 Project Inspections 2000-10
22.0 Safety 2000-10
23.0 Traffic Control 2000-11
24.0 City’s Right To Do Work 2000-11
25.0 Cooperation/Collateral Work 2000-11
26.0 Protection of Property During Inclement Weather 2000-11
27.0 Protection of Existing Facilities and Structures 2000-11
28.0 City Liaison 2000-12
29.0 Method of Payment 2000-12
30.0 Work Not Included 2000-12
31.0 Contractor Neglect 2000-12
32.0 Sound Control Requirements 2000-12
33.0 Administration 2000-13
DIVISION 3 – SPECIFIC PROJECT REQUIREMENTS
SECTION 3000
1.0 Scope of Work 3000-1
2.0 Scheduling of Work 3000-1
3.0 Services to be Performed 3000-1
3.1 General 3000-1
3.2 Trash Collection, Cleaning, and Maintenance 3000-1
3.3 Fertilizing of Turf 3000-2
3.4 Weeding 3000-3
3.5 Mowing 3000-3
3.6 Vegetation Maintenance 3000-4
3.7 Pest Control of Plant Material 3000-7
3.8 Drainage Facilities 3000-10
3.9 Fertilization 3000-10
3.10 Plant Additions and/or Replacements 3000-11
3.11 Clean-Up 3000-11
4.0 Sprinkler Maintenance Details 3000-11
5.0 Weed Control of Paved Surfaces 3000-17
v
6.0 Guarantee and/or Replacement Policy 3000-17
7.0 Turfgrass 3000-17
8.0 Facility Maintenance 3000-19
8.1 Landfill Diversion 3000-21
SECTION 5000- Fertilization Schedule 5000-1
SECTION 6000- Periodic Services 6000-1
1.0 Services Due December – February 6000-1
2.0 Services Due March – May 6000-1
3.0 Services Due June – August 6000-2
4.0 Services Due September – November 6000-2
SECTION 7000– Pruning and Training Quality Standards 7000-1
SECTION 8000– Reports and Schedules 8000-1
Form 1 – Performance Deficiency Deduction 8000-2
Form 2 – Landfill Diversion Report Form 8000-3
Form 3 – Weekly Maintenance Schedule 8000-4
Appendix - Parks and Civic Facilities Details
Appendix - Retention Basins/Other Areas Details
vi
THIS PAGE INTENTIONALLY LEFT BLANK
Invitation to Proposal 1100-1
SECTION 1100
INVITATION TO PROPOSE
PARK LANDSCAPE MAINTENANCE SERVICES
PROJECT NO. 2018-32
SEALED REQUESTS FOR QUALIFICATIONS AND PROPOSALS will be received by the City
of La Quinta (City) located at 78495 Calle Tampico, La Quinta, California, 92253, until
5:00 p.m. on Wednesday, May 8, 2019, at which time they will be publicly opened
and read for performing work as follows:
Furnish all necessary materials, equipment, labor, and incidentals as
required to perform landscape maintenance duties for the parks, retention
basins, and civic facilities. The work involved is in the Park Landscape
Maintenance Services consisting of maintenance and repair of all plant
material, ground cover, irrigation, and cleaning of all park facilities
excluding building interiors. A listing of sites for each landscape
maintenance area of responsibility has been included in the Appendix
section of this Specification and Request for Proposal.
A mandatory pre-proposal meeting is scheduled for Wednesday, April 24, 2019
at 2 p.m. in the La Quinta City Hall Study Session Room located at 78495 Calle
Tampico, La Quinta, CA 92253.
IMPORTANT: It is the responsibility of the proposer to check the City’s website for any
changes or questions submitted prior to April 30, 2019.
Proposal procedures are prescribed in the specifications. Proposals shall be executed on
the forms bound and made a part of said Specifications. The City reserves the right to
reject any or all proposals, and to waive any irregularities in the proposals.
All proposers shall be licensed under the provisions of Chapter 9, Division 3 of the
Business and Professions Code of the State of California to do the type of work
contemplated in the project. In accordance with provisions of California Public Contract
Code Section 3300, the City has determined that the Contractor shall possess a valid
Class C-27 (Landscaping Contractor) License at the time that the proposal is
submitted. Failure to possess the specified license(s) shall render the proposal as non-
responsive. Additionally, the Contractor will also qualify themselves at the time of
PROPOSAL SUBMISSION by providing at least one staff member who has a State
Pesticide Applicators License (QAL), a staff member who is a Certified Arborist, a
staff member who is certified in the Operation of Maxicom and IQ systems, and a
staff member who is a Certified Landscape Irrigation Auditor (CLIA).
This project is subject to Prevailing Wage. The Contractor shall not knowingly pay
less than the general prevailing rate for per diem wages, as determined by the State of
California Department of Industrial Relations and referred to in the Invitation to
Proposal, to any workman employed for the work to be performed under this contract;
and the Contractor shall forfeit as a penalty to the City the sum of Twenty -Five Dollars
($25.00) for each calendar day, or fraction thereof, for such workman paid by him or
by any subcontractor under him in violation of this provision (Sections 1770-1777,
Labor Code of California).
Invitation to Proposal 1100-2
Pursuant to Section 1770, et. seq., of the California Labor Code, the successful
proposer shall pay not less than the prevailing rate of per diem wages as determined by
the Director of the California Department of Industrial Relations. These wage rates are
available from the California Department of Industrial Relations’ Internet website at
http://www.dir.ca.gov.
Pursuant to Section 1725.5 of the California Labor Code, no contractor or subcontractor
may be awarded a contract for public work on a public works project unless registered
with the Department of Industrial Relations at the time the contract is awarded.
Contractors and subcontractors may find additional information for registering at the
Department of Industrial Relations website at http://www.dir.ca.gov/Public-
Works/PublicWorks.html.
Pursuant to Labor Code section 1771.1, no contractor or subcontractor may be listed on
a proposal for a public works project submitted on or after March 1, 2015 unless
registered with the Department of Industrial Relations. Furthermore, all proposers and
contractors are hereby notified that no contractor or subcontractor may be awarded, on
or after April 1, 2015, a contract for public work on a public works project unless
registered with the Department of Industrial Relations.
Pursuant to Labor Code section 1771.4, all proposers are hereby notified that this
project is subject to compliance monitoring and enforcement by the Department of
Industrial Relations.
The successful proposer will be required to furnish a Performance Bond in the amount
equal to one-hundred percent (100%) and a Payment bond in the amount equal to
twenty-five percent (25%) of the Contract Annual amount.
Proposal forms received after the designated time will not be accepted. No proposer
may withdraw its proposal for a period of sixty (60) days after the date set for the
opening of proposals.
Proposals shall be submitted only in a sealed envelope.
Approved By: Date:
Steve Howlett
Facilities Director
1100-3
SECTION 1110
INSTRUCTIONS TO PROPOSERS
1.0 WORK TO BE DONE
It is the intention of the City to maintain the parks, retention basins, and civic facilities
as shown and set forth in the specifications and in the particular locations listed in the
appendix of the specifications. All of the work is particularly set forth in the
specifications and all of said work, together with all other work incidental thereto, is
included.
The work includes the furnishing of all labor, materials, incidentals and equipment
necessary for the perpetual maintenance of park landscape areas and irrigation
systems in the Park Maintenance Landscape Services. The Contractor shall be required
to provide, at its own cost and expense, all necessary insurance, as required by law or
these specifications, and shall pay the cost and expense of any and all incidental
matters herein required.
2.0 EXAMINATION OF CONTRACT DOCUMENTS
Each proposer shall thoroughly examine and be familiar with the Contract documents
contained in the Project Manual, drawings and addenda, if any. The submission of a
proposal shall constitute an acknowledgment upon which the City may rely that the
proposer has thoroughly examined and is familiar with the Contract documents. The
failure or neglect of a proposer to receive or examine any of the Contract documents
shall in no way relieve him from any obligation with respect to its proposal or to the
Contract. No claim for additional compensation will be allowed which is based upon a
lack of knowledge of any Contract documents.
3.0 INSPECTION OF SITES
Proposers are required to inspect all sites (i.e., parks) to satisfy themselves by personal
examination, or, by such other means, as they may prefer, of the locations of the
proposed work and of the actual conditions of and at the site s of work. If during the
course of its examination, a proposer finds facts or conditions that appear to be in
conflict with the letter or spirit of the proposal documents, the proposer may apply to
the City, in writing, for additional information and explanation before submitting its
proposal.
Submission of a proposal by the proposer shall constitute acknowledgment that if
awarded the Contract; is relying on its own examination of the following:
A. All sites of the work;
B. Access to the sites; and
C. All other data and matters requisite to the fulfillment of the work and on its
own knowledge of existing facilities on and in the vicinity of the sites of the
work to be maintained under the Contract.
1100-4
The information provided by the City is not intended to be a substitute for, or a
supplement to the independent verification by the proposer to the extent such
independent investigation of site conditions is deemed necessary or desirable by the
proposer.
4.0 INTERPRETATION OF CONTRACT DOCUMENTS
No oral representations or interpretations will be made to any proposer as to the
meaning of the Contract documents. Requests for an interpretation shall be made in
writing and delivered to the following address at least five (5) days before the proposal
opening:
Robert Ambriz, Jr., Parks Superintendent
City of La Quinta
78495 Calle Tampico
La Quinta, CA 92253
Requests to clarify the source of materials, equipment, suppliers or any other such
matters which does not modify, change, increase, or decrease the scope of work that
requires no action by the City other than a response to the proposer requesting the
clarification. Requests to clarify possible ambiguous or incomplete statements or
designs, or any other such clarification, which modifies, changes, increase s or
decreases the scope of work, requires issuance of an addendum by the City for the
interpretation to become effective.
5.0 POSTPONEMENT OF OPENING
The City reserves the right to postpone the date and time for receiving and/or opening
of proposals at any time prior to the date and time established in the Request for
Proposal (RFP). Postponement notices will be posted on the City’s RFP website page.
6.0 OPENING OF PROPOSALS
The Selection Committee will rank the Contractors for contract negotiations based upon
the materials submitted. The Committee may choose to interview two or more closely
rated candidates.
The City of La Quinta will open contract negotiations with the top-ranked proposer. The
successful Contractor will be expected to enter into the City of La Quinta’s standard
Contract Services Agreement.
7.0 PREPARATION OF PROPOSAL FORMS
Proposals shall be made on the blank forms in this manual and must be submitted at
the time and place stated in the Invitation to Proposal. All blanks in the proposal forms
must be appropriately filled in, and all prices must be stated in figures. Work and cost
proposals must be submitted in separate sealed envelopes. It is the sole responsibility
of the proposer to see that its submittal was received in proper time. Any proposal
received after the scheduled closing time for receipt of proposals shall not be
considered. City shall not be responsible for errors or omissions in the proposal.
1100-5
8.0 PROPOSER'S SIGNATURE AND AUTHORITY
If the proposal is made by an individual, his/her name, signature, and post office
address must be shown. If the proposal is made by a firm or partnership, the name,
post office address of the firm or partnership, a list of the partners, and the signature of
at least one of the general partners must be shown. If the proposal is made by a
corporation, the proposal shall show the name of the state under the laws of which the
corporation is chartered, the name, post office address of the corporation, and the title
of the person who signs on behalf of the corporation. If the proposal is made by a
corporation, a certified copy of the bylaws or resolution of the Board of Directors of the
corporation shall be furnished showing the authority of the officer signing the proposal
to execute Contracts on behalf of the corporation. If the proposal is made by a joint
venture, a representative of one of the joint venture firms shall sign the proposal.
Additionally, the proposal shall include a copy of the resolution or agreement
empowering the representative to execute the proposal and bind the joint venture.
9.0 ERASURES
The proposal submitted must not contain any erasure, interlineations, or other
corrections unless each such correction is suitably authenticated by affixing in the
margin immediately opposite the correction the signature or signatures of the person or
persons submitting the proposal.
10.0 PROPOSAL IRREGULARITIES
Changes in or additions, alternate proposals, or any other modifications of the proposal
form which is not specifically called for in the Contract Documents may result in
rejection of the proposal by the City, as non-responsive. No oral or telephonic
modification of any proposal submitted will be considered.
11.0 MODIFICATION OF PROPOSAL
Modification of a proposal already received will be considered only if the modification is
received prior to the time established for receiving proposals. Modifications shall be
made in writing, executed, and submitted in the same form and manner as the original
proposal.
12.0 WITHDRAWAL OF PROPOSALS
In accordance with Public Contract Code 5103, within five days after the opening of
proposals, a proposer may withdraw its proposal providing the proposer can establish to
the City's satisfaction that a mistake was made in preparing the proposal. A proposer
desiring to withdraw shall give written notice to the City, specifying, in detail, how the
mistake occurred and how the mistake made the proposal materially different than it
was intended to be. Withdrawal will not be permitted for mistakes resulting from errors
in judgment or carelessness in inspecting the site of the work or in reading the Project
Documents.
1100-6
13.0 ADDENDA
Addenda issued during the RFP process shall become a part of the documents furnished
to proposers for the preparation of proposals, shall be covered in the proposals, and
shall be made a part of the Contract. Each proposal shall include specific
acknowledgment in the space provided of receipt of all Addenda issued during the
proposing period. Failure to acknowledge may result in the proposal being rejected as
non-responsive. Failure of any proposer to receive such Addenda shall not be grounds
for non-compliance with the terms of the instructions. Addenda will be posted on the
City’s website. The contractor is responsible to check the website for any additional
Addenda.
14.0 PROPOSAL PRICES
Proposal prices shall include everything necessary for the completion of the work
including but not limited to providing the materials, equipment, tools, plants, and other
facilities, and the management, superintendence, labor and services. Proposal prices
shall include allowance for all federal, state and local taxes.
In the event of a difference between a price quoted in words and a price quoted in
figures for the same quotation, the words shall be the amount proposal. In the event
that the product of a unit price and an estimated quantity does not equal the extended
amount quoted, the unit price shall govern, and the correct product of the unit price
and the estimated quantity shall be deemed the amount proposal. If the sum of two or
more items in a proposing schedule does not equal the total amount quoted, th e
individual item amounts shall govern and the correct total shall be deemed the amount
proposal.
15.0 BONDS
The Successful Proposer shall execute and submit a Performance Bond in the amount of
One Hundred percent (100%) of the contract price, and a Payment Bond in the amount
of Twenty-five percent (25%) of the contract price. All bonds required under these
specifications must be on the City’s forms contained in the contract documents. Binds
shall be provided by a company admitted as Surety in the State of California, as defined
in Code of Civil Procedure Section 995.120 in the event the contract is extended, a new
Payment Bond and Performance Bond are required.
Bonds required under these specifications and Civil Code section 9100 et seq shall be
provided by a company admitted as Surety in the Sate of California and shall; in
addition, to the bind form provide all information as follows:
a. The original, or a certified wet copy, of the un-revoked appointment, power of
attorney, bylaws, or other instrument entitling or authorizing the person who
executed the bond to do so, within ten (10) calendar days of the insurer’s receipt
of a request to submit the instrument.
16.0 QUALIFICATION OF PROPOSER
Each proposer shall complete and submit with their proposal Section 1220,
CERTIFICATION OF PROPOSER’S EXPERIENCE AND QUALIFICATIONS.
1100-7
17.0 PROPOSERS INTERESTED IN MORE THAN ONE PROPOSAL
No person, firm, or corporation, under the same or different name, shall make, file, or
be interested in more than one proposal for the same work unless alternate proposals
are called for.
The City may reject the proposals of the known participants in such collusion. Pursuant
to Public Contract Code Section 7106, proposers shall execute and furnish with their
proposals Section 1250, NON-COLLUSION AFFIDAVIT.
18.0 OFFER OF ASSIGNMENT OF ANTITRUST ACTIONS
As provided by Sections 4551 and 4552 of the California Government Code, in
submitting a proposal to the City, the proposer offers and agrees that if the proposal is
accepted it will assign to the City, all rights, title, and interest in and to all causes of
action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under
the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7
of the Business and Professions Code), arising from purchases of goods, materials, or
services by the proposer for sale to the City pursuant to the proposal. Such assignment
shall be made and become effective at the time the City tenders final payment to the
proposer.
19.0 ASSIGNMENT OF CONTRACT
No assignment by the Contractor of any contract to be entered into hereunder, or any
part thereof, or of funds to be received there under by the Contractor, will be
recognized by City unless such assignment has had prior approval of City and the
Surety has been given due notice of such assignment in writing and has consented
thereto in writing.
20.0 REJECTION OF PROPOSALS
The City reserves the right to reject all proposals for any reason. The City further
reserves the right to reject any proposal which is non-responsive, incomplete, obscure,
or irregular; which omits a proposal on any one or more of the required proposal items;
which does not contain satisfactory documentation of the proposer’s qualifications as
required by Section 1110-16.0, QUALIFICATIONS OF PROPOSER; which, in the
City's opinion, the unit prices are unbalanced, which is accompanied by insufficient or
irregular proposal security, or which is from a proposer who has previously failed on a
contract of any nature to perform properly or to complete it on time. The City also
reserves the right to waive proposal irregularities.
21.0 CONTRACT AND BONDS
The successful proposer, simultaneously, with the execution of the Contract, will be
required to furnish a Performance Bond in the amount equal to one-hundred percent
(100%) and a Payment bond in the amount equal to twenty-five percent (25%) of the
Contract Annual amount, and the WORKER'S COMPENSATION INSURANCE
CERTIFICATE in Section 1330. Said bonds shall be secured from a surety company
satisfactory to City.
1100-8
The form of Agreement, as provided in Section 1300, which the successful proposer, as
Contractor, will be required to execute, and the forms of bonds as provided in Sections
1310 and 1320, which it will be required to furnish, shall be carefully examined by the
proposer.
22.0 AWARD OF CONTRACT
Within sixty (60) days after the time of opening of the proposals, the City will act either
to accept a proposal, to reject all proposals or, with the consent of the proposers and
their sureties, to extend the time in which the City may act. The acceptance of a
proposal will be evidenced by a notice of award of Contract in writing, delivered in
person or by certified mail to the proposer whose proposal is accepted. No other act of
City will constitute acceptance of a proposal. The award of Contract shall obligate the
proposer whose proposal is accepted to furnish a payment bond and evidences of
insurance, and to execute the Agreement in the form set forth in the Contract
documents.
The selection of a Contractor will depend primarily on the following criteria:
A. The Contractor's demonstrated competence in similar work and
demonstrated ability to do landscape work of this scope.
B. The Contractor's ability to provide adequate supervision and the distribution
of work crews.
C. The lowest responsive, responsible proposer.
D. The Contractor's references.
E. The Contractor's ability to provide proof of required QAL, Certified Arborist,
and Certified Maxicom/IQ personnel.
F. Contract Labor Summary.
G. Contractors Facilities and equipment.
Selection of any or all alternates shall be at the sole discretion of the City.
23.0 EXECUTION OF CONTRACT
The Contract shall be executed by the successful proposer and returned, together with
the contract bonds and evidence of insurance, within ten (10) days after receiving
written notice of the award of the Contract. Time is of the essence in this regard. After
execution by City, one copy shall be returned to Contractor.
24.0 FAILURE TO ACCEPT CONTRACT
If the proposer to whom the award is made fails to enter into the contract, the award
will be annulled, an award may be made to the next lowest responsib le proposer, and
that proposer shall fulfill every stipulation as if it were the party to whom the first
award was made.
1100-9
25.0 CONTRACT ASSIGNMENT
The proposer shall not assign, transfer, convey or otherwise dispose of the contract, or
its right, title or interest, or its power to execute such a contract to any individual or
business entity of any kind without the previous written consent of the City Council of
the City of La Quinta.
26.0 NON-DISCRIMINATION
In the performance of the terms of this contract, the proposer agrees that it will not
engage in, or permit such subcontractors as it may employ, to engage in discrimination
in employment or persons because of age, race, color, sex, national origin or ancestry,
or religion of such persons.
27.0 LABOR ACTIONS
In the event that the successful proposer is experiencing a labor action at the time of
the award of the proposal (or if its suppliers or subcontractors are experiencing such a
labor action), the City reserves the right to declare said proposer is no longer the lowest
responsible proposer and accept the next acceptable low proposal from a proposer that
is not experiencing a labor action, and declare it to be the lowest responsible proposer.
28.0 BUSINESS LICENSE
All proposers shall be aware of the City's Business License Ordinance, which requires
that a Business License is obtained before any business, trade, profession, enterprise,
establishment, occupation, or calling is conducted within the City. A Business License is
required when business is conducted in the City even when the principal location of the
business may be outside of the City or a Business License is only evidence of the fact
that the fee has been paid; it does not sanction or approve any operation not otherwise
permitted. Verification that the proposer has a valid City of La Quinta Business License
will be obtained by City prior to the execution of the purchase contract.
29.0 DEFINITIONS
Whenever these words occur in this specification, they shall have the following
meaning:
A. Specification: Proposal, Instructions to Proposers, General Information,
General Requirements, Specific Requirements, and any supplements,
drawings, sketches, and data sheets, attached or referenced, comprise the
complete specification.
B. City: City of La Quinta.
C. Contractor: The party or parties executing a contract with the City of La
Quinta for the work specified herein.
D. Project or Work: All landscape maintenance work specified, implied, or
directed pursuant to these specifications.
1100-10
E. As Directed: Where this word appears in the specification, it shall signify
that the item or items referred to are indicated on the drawing or exhibits
which are a part of this specification.
F. Approved, Approval: Satisfactory to the Facilities Director.
G. Parks Superintendent: The person designated as the project representative
for administration of the parks landscape maintenance contract. (Robert
Ambriz, Jr., Parks Superintendent (760) 777-7091).
H. Extra Work: Services, materials, or equipment furnished by the Contractor
which is over and above his contract provisions and which are reimbursed by
the City.
I. Proposer: The party or parties competing for a contract with the City for the
work specified herein.
J. Contractor Control: Conditions or events that are reasonably within the
Contractor's ability to guide or manage.
K. City Representative: The person(s) designated by the City as the project
representative for administration of compliance of this specification by the
Contractor.
L. Daily: Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, and
Sunday.
M. Holidays: Those holidays observed by the City.
30.0 DILIGENT PERFORMANCE OF WORK
If, in the opinion of the City representative or City Inspector, the labor furnished by the
Contractor is incompetent, unskilled, or unreliable, his equipment inadequate,
improper, or unsafe, or if the Contractor shall fail to continuously and diligently execute
the work, the City shall, in writing, instruct the Contractor to remove all such causes of
complaint and the Contractor shall promptly comply.
31.0 DISCREPANCIES, OMISSIONS, AND CLARIFICATIONS
After executing the agreement, no consideration will be given to any claim or
misunderstanding of the documents or alleged unfamiliarity of the site conditions
affecting the work. Should a proposer discover discrepancies or omissions in the
Specifications and/or should he be in doubt as to their meaning, he shall at once notify
the City who will issue a written clarification or supplementary information by an
addendum. Request for clarification must be made to the City not later than five (5)
working days prior to the date of submission of proposals. Clarifications of a technical
nature should be made by telephone to:
Robert Ambriz, Jr., Parks Superintendent
PHONE: (760) 777-7091
EMAIL: rambrizj@laquintaca.gov
1100-11
32.0 SUPPORT INFORMATION/QUANTITIES
The support information or quantities such as square footage or acreage are prepared
from the best information available. The purpose is to assist the proposer and the City
takes no responsibility for complete accuracy.
33. WAGE RATES
Pursuant to Section 1770, et. seq., of the California Labor Code, the successful
proposer shall pay not less than the prevailing rate of per diem wages as determined by
the Director of the California Department of Industrial Relations. These wage rates are
available from the California Department of Industrial Relations’ Internet website at
http://www.dir.ca.gov.
End of Section 1100
1200-1
SECTION 1200
CONTRACT DOCUMENTS
DATE:
The undersigned, as proposer, declares that we have received and examined the
Contract Documents entitled Park Landscape Maintenance Services, for the City of
La Quinta, Project No. 2018-32 and will contract with the City, on the form of
Agreement provided herewith, to do everything required for the fulfillment of the
contract for said work at the prices and on the terms and conditions herein contained.
We have included the following items and agree that they shall form a part of this
proposal:
SECTION TITLE
1200 Contract Documents
1205 Examination of Contract Documents
1210 Compliance Form
1220 Certification of Proposer's Experience and Qualifications
1230 Non-Collusion Affidavit
1240 Summation – Proposal Form
1250 Notice to Contractor
We acknowledge that the following addenda/s have been received and have been
examined as part of the Contract Documents.
Addendum # Date Received Initials
Name of Proposer Date
Proposer Telephone Number Email Address
1200-2
If our proposal is accepted, we agree to sign the agreement without reservations and to
furnish the performance bond and payment bond and the required evidences of
insurance within ten (10) calendar days after receiving written notice of the award of
the Contract.
We further agree, if our proposal is accepted, and a contract for performance of the
work is entered into with the City, to plan work and to execute it with such diligence
that the work shall be completed within the time stipulated.
__________________________ __________________________
Company Name Owner’s Representative
Address of Proposer Contractor's License No.
State of Incorporation License Expiration Date
Department of Industrial Relations No. Telephone Number
Signature of Proposer Title of Signatory
__________
Witness Title of Witness
1200-3
SECTION 1205
EXAMINATION OF CONTRACT DOCUMENTS
PARK LANDSCAPE MAINTENANCE SERVICES
PROJECT NO. 2018-32
Proposal to the City of La Quinta,
In compliance with the Advertisement for Proposals, the undersigned Contractor:
Has examined the contract documents, site of work, and being familiar with the
conditions to be met, hereby submits the following Proposal for furnishing the material,
equipment, labor, and everything necessary for the completion of the work listed and
agrees to execute the contract documents and furnish the required bonds and
certificates of insurance for the completion of said work, at the locations and for the
prices set forth on the inside pages of this form.
Understands that services of this project shall be in accordance with all applicable
specifications in this document.
Agrees that, upon receipt of a Notice of Award, from the City, the contractor will
execute the contract documents.
Work shall be completed within one (1) year (twelve [12] months), by June 30, 2020,
beginning on July 1, 2019 as specified in the Notice to Proceed.
Name of Proposer Date
1200-4
SECTION 1210
COMPLIANCE FORM
AGREEMENT FOR CONTRACT SERVICES
PARK LANDSCAPE MAINTENANCE SERVICES
PROJECT NO. 2018-32
Read and initial one of the paragraphs below, then sign at the bottom.
_____I have read and understand the conditions of the Contract Services Agreement
for the Park Landscape Maintenance services. If I am selected to perform landscape
maintenance services for the City, I am willing and able to comply with all contract
documents.
_____ I have read and understand the conditions of the Contract Services Agreement
for Park Landscape Maintenance services but am not able commit to all of the
conditions required. Below are the portions I contest. Changing the described items
would enable me to comply. (If you need more space please attach more pages and fill
in the number of sheets at the bottom of the page. Any requested changes to the
Contract Services Agreement must be approved by the City Attorney.)
Print Name Signature Date
1200-5
SECTION 1220
CERTIFICATION OF PROPOSER'S
EXPERIENCE AND QUALIFICATIONS
The undersigned Proposer certifies that he is, at the time of proposing, and shall be,
throughout the period of the Contract, licensed under the provisions of Chapter 9,
Division 3, of the Business and Professions Code of the State of California, to do the
type of work contemplated in the Contract Documents. Proposer shall further certify
that it is skilled and regularly engaged in the general class and type of work called for in
the Contract Documents.
The Proposer represents that it is competent, knowledgeable, and has special skills on
the nature, extent, and inherent conditions of the work to be perf ormed. Proposer
further acknowledges that there are certain peculiar and inherent conditions existent in
the maintenance of the particular facilities, which may create, during the landscape
contract, unusual or peculiar unsafe conditions hazardous to p ersons and property.
Proposer expressly acknowledges that it is aware of such peculiar risks and that it has
the skill and experience to foresee and to adopt protective measures to adequately, and
safely, perform the work with respect to such hazards.
The Proposer shall list below three (3) contracts completed in the last seven (7) years
of similar size and complexity that indicate the Proposer's experience as a Landscape
Maintenance Contractor. The projects must be similar in scope of work (i.e. commercial
and/or municipal). Please indicate on additional paper if a quality control program was
implemented, and managed, as part of the work efforts, and if written proof of the
quality control program can be provided to the City of La Quinta prior to the award of
proposal for this previous assignment.
A. Project Name:
Owner:
Contract Amount: $ Contract Time: Calendar Days
Owner's Representative: Owner's Telephone No:
Duration of Contract: Years from to
Prevailing Wage: __Yes __ No
B. Project Name:
Owner:
Contract Amount: $ Contract Time: Calendar Days
Owner's Representative: Owner's Telephone No:
Duration of Contract: Years from to
Prevailing Wage: __Yes __ No
1200-6
C. Project Name:
Owner:
Contract Amount: $ Contract Time: Calendar Days
Owner's Representative: Owner's Telephone No:
Duration of Contract: Years from to
Prevailing Wage: __Yes __ No
Signed this day of , 2019.
Name of Proposer Contractor's License No.
Address of Proposer License Expiration Date
DIR Number (Prevailing Wage)
Signature of Proposer Title of Signatory
1200-7
SECTIN 1230
NON-COLLUSION AFFIDAVIT TO BE EXECUTED
BY PROPOSER AND SUBMITTED WITH PROPOSAL
State of California )
)ss.
County of )
, being first duly sworn, deposes
and says that he/she is of
, the party making the foregoing proposal that the proposal is not made in
the interest of, or on behalf of, any undisclosed person, partnership, company,
association, organization, or corporation; that the proposal is genuine and not collusive
or sham; that the proposer has not directly or indirectly induced or solicited any other
proposer to put in a false or sham proposal, and has not directly or indirect ly colluded,
conspired, connived, or agreed with any proposer or anyone else to put in a sham
proposal, or that anyone shall refrain from proposing; that the proposer has not in any
manner, directly or indirectly sought by agreement, communication, or conference with
anyone to fix the proposal price of the proposer or any other proposer, or to fix any
overhead, profit, or cost element of the proposal price, or of that of any other proposer,
or to secure any advantage against the public body awarding the con tract of anyone
interested in the proposed contract; that all statements contained in the proposal are
true; and, further, that the proposer has not, directly or indirectly, submitted his or her
proposal price of any breakdown thereof, or the contents thereof, or divulged
information or data relative thereto, or paid, and will not pay, any fee to any
corporation, partnership, company association, organization, proposal depository, or to
any member of agent thereof to effectuate a collusive or sham proposal.
Signature
Name of Proposer
Title
Date
1200-8
SECTION 1240
PARK LANDSCAPE MAINTENANCE SERVICES
PROJECT NO. 2018-32
SUMMATION – PROPOSAL FORM
PARKS AND CIVIC FACILITIES
Park Facility Unit Price Annual Price
Adams Park
Bear Creek Trail
Civic Center Campus:
Park
City Hall
Library
Wellness Center
La Fonda Open Area
Tampico
Colonel Mitchell Paige Middle School Sports Fields
Cove Oasis:
Trailhead
Entryway
(corner of Calle Tecate and Avenida Madero)
Parking Lot
(corner of Calle Tecate and Avenida Bermudas)
Desert Pride Park
Eisenhower Park
Fred Wolff Nature Preserve
Fritz Burns Park
La Quinta Park
Monticello Park (excluding Retention Basin)
Museum
Pioneer Park
Saguaro Park
Seasons Retention Basin
Sports Complex
Velasco Mini Park
Total Combined Projects
TOTAL BASE PROPOSAL FOR THE 24 PARKS AND CIVIC FACILITIES:
________ (IN WORDS) ($ )
1200-9
SUMMATION – PROPOSAL FORM
RETENTION BASINS
Retention Basins/Other Areas Unit Price Annual Price
Calle Rondo Channel
Green Belt –
Calle Tampico/Eisenhower Dr
Youth Center (YMCA) on Moon River
Perimeter – Moon River east side |
(North of Ave 50)
Retention Basin - Acacia (Miles Ave/N Harland Dr)
Retention Basin - Cactus Flower #1 (Goldenrod Cir.)
Retention Basin - Cactus Flower #2
(Foxtail Cir.)
Retention Basin - Cactus Flower #3
(Iris Ct.)
Retention Basin - Cactus Flower #4
(Star Flower)
Retention Basin - Del Rey
(Bridgette Way/Desert Stream Dr)
Retention Basin - L.Q. Highlands
Retention Basin - Quinterra #1 (West Side)
Los Manos Dr.
Retention Basin - Quinterra #2 (East Side)
Los Manos Dr.
Retention Basin - Rancho Ocotillo #1
(Camino La Cresta)
Retention Basin - Rancho Ocotillo #2 (Ocotillo Dr.)
Retention Basin - Topaz
(Desert Stream Dr/Dune Palms Rd)
Retention Basin - Washington St. |
(west side, south of Ave 47)
Retention Basin – Adams Park
(44425 Adams Street)
Total Combined Projects:
TOTAL BASE PROPOSAL FOR THE 18 RETENTION BASINS AND OTHER AREAS:
________ (IN WORDS) ($ )
1200-10
COMBINED PARKS AND CIVIC FACILITIES AND RETENTION BASINS
Item No. Description Unit Quantity Unit Price Annual Price
1 PARKS AND CIVIC FACILITIES LS 24
2 RETENTION BASINS LS 18
TOTAL
TOTAL COMBINED BASE PROPOSAL ITEMS:
(IN WORDS)
($ )
A. Initial Annual Contract Period will be for one year (12 months) or until June 30, 2020.
B. The City may elect to exercise an extension to renew this contract for four additional
one-year terms with a ninety-day notice, on a year-to-year basis, contingent upon satisfactory
work of the Contractor.
C. The City may authorize a maximum increase per year to the above listed contract
amount based on the Local Greater Los Angeles Consumer Price Index for Los Angeles,
Anaheim, and Riverside areas.
1200-11
SECTION 1250
NOTICE TO CONTRACTOR TO ENTER INTO CONTRACT
TO:
(Name of Contractor)
YOU ARE HEREBY NOTIFIED that a Contract has been awarded to you by the City of La
Quinta (hereinafter referred to as “City”) for the landscape maintenance services
designated as:
PARK LANDSCAPE MAINTENANCE SERVICES
PROJECT N0. 2018-32
(hereinafter referred to as the "Work") in the CITY OF LA QUINTA, STATE OF
CALIFORNIA. The Contract for said work is on file in the office of the City Clerk, and
further, you are hereby required within fifteen days (15 days) after this Notice to enter
into a contract with said City for the doing of said work and to furnish a Performance
Bond in the amount equal to one-hundred percent (100%) and a Payment Bond, as
required by law, in a sum of twenty-five percent (25%) of the contract price.
DATED this day of , 2019.
Monika Radeva, CITY CLERK
CITY OF LA QUINTA
STATE OF CALIFORNIA
Contract 1300-1
SECTION 1300
CONTRACT
THIS CONTRACT, by and between the CITY OF LA QUINTA, a municipal
corporation, herein referred to as "City,” and
_______________________________, herein referred to as, "Contractor."
W I T N E S S E T H:
In consideration of their mutual covenants, the parties hereto agree as follows:
1. Contractor shall furnish all necessary labor, material, equipment,
transportation and services to perform Project No. 2018-32, Park Landscape
Maintenance Services in the City of La Quinta, California pursuant to the Request
For Proposal (RFP), the project Specifications, and Contractor's Proposal, all of
which documents shall be considered a part hereof as though fully set herein.
Should any provisions of Contractor's Proposal be in conflict with the Notice
Inviting Proposals, Specifications, or this Contract, then the provisions of said
Contract, Specifications, and Invitation to Propose shall be controlling in that order
of precedence. The time frame for work shall be in accordance with that specified
in the Requests for Qualifications and Proposals.
2. Contractor will comply with all Federal, State, County, and La Quinta
Municipal Code Regulations, which are, as amended from time to time, incorporated
herein by reference.
3. All work shall be done in a manner satisfactory to the Parks Superintendent.
4. Contractor shall commence work on July 1, 2019 after the issuance of a
written Notice to Proceed.
5. In consideration of said work, City agrees to pay Contractor such sums as
shall be approved by Parks Superintendent at monthly sums and/or unit prices
stated in the Contractor's Proposal, the base consideration
($__________,____.00). All payments shall be subject to approval by the Parks
Superintendent and shall be in accordance with the terms, conditions, and
procedures provided in the Specifications.
6. The Contractor shall not knowingly pay less than the general prevailing rate
for per diem wages, as determined by the State of California Department of
Industrial Relations and referred to in the Invitation to Propose, to any workman
employed for the work to be performed under this contract; and the Contractor
shall forfeit as a penalty to the City the sum of Twenty-Five Dollars ($25.00) for
each calendar day, or fraction thereof, for such workman paid by him or by any
subcontractor under him in violation of this provision (Sections 1770-1777, Labor
Code of California).
Contract 1300-2
Pursuant to Section 1770, et. seq., of the California Labor Code, the successful
proposer shall pay not less than the prevailing rate of per diem wages as
determined by the Director of the California Department of Industrial Relations.
These wage rates are available from the California Department of Industrial
Relations’ Internet website at http://www.dir.ca.gov.
Pursuant to Section 1725.5 of the California Labor Code, no contractor or
subcontractor may be awarded a contract for public work on a public works project
unless registered with the Department of Industrial Relations at the time the
contract is awarded. Contractors and subcontractors may find additional
information for registering at the Department of Industrial Relations website at
http://www.dir.ca.gov/Public-Works/PublicWorks.html.
Pursuant to Labor Code section 1771.1, no contractor or subcontractor may be
listed on a bid proposal for a public works project submitted on or after March 1,
2015 unless registered with the Department of Industrial Relations. Furthermore,
all proposers and contractors are hereby notified that no contractor or
subcontractor may be awarded, on or after April 1, 2015, a contract for public work
on a public works project unless registered with the Department of Industrial
Relations.
Pursuant to Labor Code section 1771.4, all proposers are hereby notified that this
project is subject to compliance monitoring and enforcement by the Department of
Industrial Relations.
7. Concurrently with the execution of this Contract, Contractor shall furnish
bonds of a surety satisfactory to City, as provided in said Specifications or
Invitation to Propose, the cost of which shall be paid by Contractor.
8. Except for the gross negligence or willful misconduct of an Indemnified Party
(as hereinafter defined), the Contractor hereby assumes liability for and agrees to
defend (at Indemnified Parties’ option), indemnify, protect and hold harmless City
and its Project Consultants, and Engineers, officers, agents, and employees
(“Indemnified Parties”) from and against any and all claims, charges, damages,
demands, actions, proceedings, losses, stop notices, costs, expenses (including
counsel fees), judgments, civil fines and penalties, liabilities of any kind or nature
whatsoever, which may be sustained or suffered by or secured against the
Indemnified Parties arising out of or encountered in connection with this Contract or
the performance of the Work including, but not limited to, death of or bodily or
personal injury to persons or damage to property, including property owned by or
under the care and custody of City, and for civil fines and penalties, that may arise
from or be caused, in whole or in part, by any negligent or other act or omission of
Contractor, its officers, agents, employees or Subcontractors including, but not
limited to, liability arising from:
1. Any dangerous, hazardous, unsafe or defective condition of, in or on
the premises, of any nature whatsoever, which may exist by reason of any
act, omission, neglect, or any use or occupation of the premises by
Contractor, its officers, agents, employees, or subcontractors;
Contract 1300-3
2. Any operation conducted upon or any use or occupation of the
premises by Contractor, its officers, agents, employees, or subcontractors
under or pursuant to the provisions of this contract or otherwise;
3. Any act, omission or negligence of Contractor, its officers, agents,
employees, or Subcontractors;
4. Any failure of Contractor, its officers, agents or employees to comply
with any of the terms or conditions of this Contract or any applicable federal,
state, regional, or municipal law, ordinance, rule or regulation; and
5. The conditions, operations, uses, occupations, acts, omissions or
negligence referred to in Sub-subsections (1), (2), (3), and (4), existing or
conducted upon or arising from the use or occupation by Contractor on any
other premises in the care, custody and control of City.
The Contractor also agrees to indemnify City and pay for all damages or loss
suffered by City including but not limited to damage to or loss of City property, to
the extent not insured by City and loss of City revenue from any source, caused by
or arising out of the conditions, operations, uses, occupations, acts, omissions or
negligence referred to in Sub-subsections (1), (2), (3), (4) and (5).
Contractor’s obligations under this Section apply regardless of whether or not such
claim, charge, damage, demand, action, proceeding, loss, stop notice, cost
expense, judgment, civil fine or penalty, or liability was caused in part or
contributed to by an Indemnified Party. However, without affecting the rights of
City under any provision of this Contract, Contractor shall not be required to
indemnify and hold harmless City for liability attributable to the active negligence of
City, provided such active negligence is determined by Contract between the parties
or by the findings of a court of competent jurisdiction. In instances where City is
shown to have been actively negligent and where City’s active negligence accounts
for only a percentage of the liability involved, the obligation of Contractor will be for
that entire portion or percentage of liability not attributable to the active negligence
of City.
Contractor agrees to obtain executed indemnity agreements with provisions
identical to those set forth here in this section from each and every subcontractor
or any other person or entity involved by, for, with or on behalf of Contractor in the
performance of this Contract. In the event Contractor fails to obtain such
indemnity obligations from others as required here, Contractor agrees to be fully
responsible according to the terms of this section.
Failure of City to monitor compliance with these requirements imposes no additional
obligations on City and will in no way act as a waiver of any rights hereunder. This
obligation to indemnify and defend City as set forth here is binding on the
successors, assigns or heirs of Contractor and shall survive the termination of this
Contract or this section.
This indemnity shall survive termination of the Contract or Final Payment
hereunder. This Indemnity is in addition to any other rights or remedies that the
Indemnified Parties may have under the law or under any other Contract
Contract 1300-4
Documents or Agreements. In the event of any claim or demand made against any
party which is entitled to be indemnified hereunder, City may, in i ts sole discretion,
reserve, retain or apply any monies to the Contractor under this Contract for the
purpose of resolving such claims; provided, however, City may release such funds if
the Contractor provides City with reasonable assurance of protection of the
Indemnified Parties’ interests. City shall, in its sole discretion, determine whether
such assurances are reasonable.
Approval of any insurance contracts by the City does not relieve the Contractor or
subcontractors from liability under Section 1340-1.0, Indemnification of the
Specifications. The City will not be liable for any accident, loss, or damage to the
work prior to its completion and acceptance.
9. Contractor shall hold the County of Riverside, its officers, agents and
employees free and harmless from any liability whatsoever, including wrongful
death, based or asserted upon any act or omission of principal, its officers, agents,
employees or sub-contractors relating to or in any way connected with or arising
from the accomplishment of the work, whether or not such acts or omissions were
in furtherance of the work requires by the Contract Documents and agrees to
defend at his expense, including attorney fees, City of La Quinta, County of
Riverside, its officers, agents, employees and Independent Architect in any legal
action based on any such alleged acts or omissions.
10. Except as otherwise required, Contractor shall concurrently with the
execution of this contract, furnish the City satisfactory evidence of insurance of the
kinds and in the amounts provided in said Specifications, Section 1340-2.0,
Insurance Requirements. This insurance shall be kept in full force and effect by
Contractor during this entire contract and all premiums thereon shall be promptly
paid by it. Each policy shall further state that it cannot be canceled without 30
days unconditional written notice to the City and shall name the City as an
additional insured on the Commercial General Liability policy only. Contractor shall
furnish evidence of having in effect, and shall maintain Workers Compensation
Insurance coverage of not less than the statutory amount or otherwise show a
certificate of self-insurance, in accordance with the Workers Compensation laws of
the State of California. Failure to maintain the required amounts and types of
coverage throughout the duration of this Contract shall constitute a material breach
of this Contract.
11. Contractor shall forfeit as a penalty to City $25.00 for each laborer,
workman, or mechanic employed in the execution of this Contract by said
Contractor, or any subcontractor under it, upon any of the work herein mentioned,
for each calendar day during which such laborer, workman, or mechanic is required
or permitted to work at other than a rate of pay provided by law for more t han 8
hours in any one calendar day and 40 hours in any one calendar week, in violation
of the provisions of Sections 1810-1815 of the Labor Code of the State of California.
12. In accepting this Contract, Contractor certifies that in the conduct of its
business it does not deny the right of any individual to seek, obtain and hold
employment without discrimination because of race, religious creed, color, national
origin, ancestry, physical handicap, medical condition, marital status, sex or age as
provided in the California Fair Employment Practice Act (Government Code Sections
Contract 1300-5
12900, et seq.) Contractor agrees that a finding by the State Fair Employment
Practices Commission that Contractor has engaged during the term of this Contract
in any unlawful employment practice shall be deemed a breach of this Contract and
Contractor shall pay to City $1,607.00 liquidated damages for each such breach
committed under this contract.
13. Contractor also agrees that for contracts in excess of $30,000 and more than
20 calendar days duration, that apprentices will be employed without discrimination
in an approved program in a ratio established in the apprenticeship standards of the
craft involved (Sections 1777.5 and 1777.6, Labor Code of California). Contractors
who willfully fail to comply will be denied the right to submit proposals for public
projects for a period of six months in addition to other penalties provided by law.
14. This Contract shall not be assignable by Contractor without the written
consent of City.
15. In accepting this Contract, Contractor certifies that no member or officer of
the firm or corporation is an officer or employee of the City except to the extent
permitted by law.
16. Contractor certifies that it is the holder of any necessary California State
Contractor's License and authorized to undertake the above work.
17. The City, or its authorized auditors or representatives, shall have access to
and the right to audit and reproduce any of the Contractor records to the extent the
City deems necessary to insure it is receiving all money to which it is entitled under
the contract and/or is paying only the amounts to which Contractor is properly
entitled under the Contract or for other purposes relating to the Contract.
18. The Contractor shall maintain and preserve all such records for a period of at
least three years after termination of the contract.
19. The Contractor shall maintain all such records in the City of La Quinta. If
not, the Contractor shall, upon request, promptly deliver the records to the City or
reimburse the City for all reasonable and extra costs incurred in conducting the
audit at a location other than at City offices including, but not limited to, such
additional (out of the City) expenses for personnel, salaries, private auditors,
travel, lodging, meals and overhead.
20. The further terms, conditions, and covenants of the Contract are set forth in
the Contract Documents, each of which is by this reference made a part hereof.
Contract 1300-6
IN WITNESS WHEREOF, the parties have executed this Contract
as of the dates stated below.
"CITY"
CITY OF LA QUINTA,
a California municipal corporation
Dated: By:
Frank J. Spevacek, City Manager
ATTEST:
______________________________ Dated:
Monika Radeva, City Clerk
APPROVED AS TO FORM:
Dated:
City Attorney
"CONTRACTOR"
(If corporation, affix seal)
Dated: By:
Signature
Name: Title:
Address:
___________________________________________________________
Street Address City State Zip Code
E-mail:
Dated: By:
Signature
Name: Title:
Address:
___________________________________________________________
Street Address City State Zip Code
E-mail:
Performance Bond 1300-7
SECTION 1310
PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the City of La Quinta (hereinafter referred to as “City”) has
awarded to ____________________, (hereinafter referred to as the “Contractor”)
_______________________ an agreement for ____________________________
(hereinafter referred to as the “Contract”).
WHEREAS, the work to be performed by the Contractor is more particularly set
forth in the Contract Documents for the Project dated ________________,
(hereinafter referred to as “Contract Documents”), the terms and conditions of which
are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform
the terms thereof and to furnish a bond for the faithful performance of said Contract
Documents.
NOW, THEREFORE, we, _______________, the undersigned Contractor and
_____________________________________________ as Surety, a corporation
organized and duly authorized to transact business under the laws of the State of
California, are held and firmly bound unto the City in the sum of
___________________________ DOLLARS, ($____________), said sum being not
less than one hundred percent (100%) of the total amount of the Contract, for which
amount well and truly to be made, we bind ourselves, our heirs, executors and
administrators, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or
its heirs, executors, administrators, successors or assigns, shall in all things stand to
and abide by, and well and truly keep and perform the covenants, conditions and
agreements in the Contract Documents and any alteration thereof made as therein
provided, on its part, to be kept and performed at the time and in the manner therein
specified, and in all respects according to their intent and meaning; and shall faithfully
fulfill all obligations including the one-year guarantee of all materials and
workmanship; and shall indemnify and save harmless the City, its officers and agents,
as stipulated in said Contract Documents, then this obligation shall become null and
void; otherwise it shall be and remain in full force and effect.
As a condition precedent to the satisfactory completion of the Contract
Documents, unless otherwise provided for in the Contract Documents, the above
obligation shall hold good for a period of one (1) year after the acceptance of the
work by City, during which time if Contractor shall fail to make full, complete, and
satisfactory repair and replacements and totally protect the City from loss or damage
resulting from or caused by defective materials or faulty workmanship, Surety shall
undertake and faithfully fulfill all such obligations. The obligations of Surety
hereunder shall continue so long as any obligation of Contractor remains. Nothing
herein shall limit the City’s rights or the Contractor or Surety’s obligations under the
Performance Bond 1300-8
Contract, law or equity, including, but not limited to, California Code of Civil
Procedure section 337.15.
Whenever Contractor shall be, and is declared by the City to be, in default
under the Contract Documents, the Surety shall remedy the default pursuant to the
Contract Documents, or shall promptly, at the City’s option:
(1) Take over and complete the Project in accordance with all terms and
conditions in the Contract Documents; or
(2) Obtain a proposal or proposals for completing the Project in accordance with
all terms and conditions in the Contract Documents and upon determination
by Surety of the lowest responsive and responsible proposer, arrange for a
Contract between such proposer, the Surety and the City, and make
available as work progresses sufficient funds to pay the cost of completion
of the Project, less the balance of the contract price, including other costs
and damages for which Surety may be liable. The term “balance of the
contract price” as used in this paragraph shall mean the total amount
payable to Contractor by the City under the Contract and any modification
thereto, less any amount previously paid by the City to the Contractor and
any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with local,
California and federal law and make available as work progresses sufficient
funds to pay the cost of completion of the Project, less the balance of the
contract price, including other costs and damages for which Surety may be
liable. The term “balance of the contract price” as used in this paragraph
shall mean the total amount payable to Contractor by the City under the
Contract and any modification thereto, less any amount previously paid by
the City to the Contractor and any other set offs pursuant to the Contract
Documents.
Surety expressly agrees that the City may reject any contractor or
subcontractor which may be proposed by Surety in fulfillment of its obligations in the
event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety
accept a proposal from Contractor for completion of the Project if the City, when
declaring the Contractor in default, notifies Surety of the City’s objection to
Contractor’s further participation in the completion of the Project.
The Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alteration or addition to the terms of the Contract Documents or
to the Project to be performed thereunder shall in any way affect its obligations on
this bond, and it does hereby waive notice of any such change, extension of time,
alteration or addition to the terms of the Contract Documents or to the Project,
including but not limited to the provisions of sections 2819 and 2845 of the California
Civil Code.
Performance Bond 1300-9
IN WITNESS WHEREOF, we have hereunto set our hands and seals this
_______ day of ______________, 20__).
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and
evidence of corporate authority attached.
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is ____________ per thousand. The total amount
of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety)
(Name and Address of Agent or
Representative for service of
process in California, if different
from above)
(Telephone number of Surety
and Agent or Representative for
service of process in California)
NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be
attached hereto.
Performance Bond 1300-10
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary
Public, personally appeared
, who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and
acknowledged to me that he/she/they executed the same in his/her/their authorized
capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity
upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons
relying on the document and could prevent fraudulent removal and reattachment of this
form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other: Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
Performance Bond 1300-11
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The
Power-of-Attorney to local representatives of the bonding company must also be
attached.
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary
Public, personally appeared
, who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and
acknowledged to me that he/she/they executed the same in his/her/their authorized
capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity
upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons
relying on the document and could prevent fraudulent removal and reattachment of this
form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other: Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
Payment Bond 1300-12
SECTION 1320
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT the City of La Quinta, a municipal corporation, hereinafter designated
the City, has on , 2019, awarded to
, hereinafter designated as the Principal, a Contract for
City Project No. 2018-32, Park Landscape Maintenance Services.
WHEREAS, said Principal is required to furnish a bond in connection and with
said Contract, providing that if said Principal, or any of it or its subcontractors shall
fail to pay for any materials, provisions, or other supplies used in, upon, for, or
about the performance of the work contracted to be done, or for any work or labor
done thereon of any kind, the Surety of this bond will pay the same to the extent
hereinafter set forth:
NOW, THEREFORE, we, the Principal, and , as
Surety, are held and firmly bound unto the City in the just and full amount of
DOLLARS ($ ) lawful
money of the United States, for the payment of which sum well and truly to be
made, we bind ourselves, our heirs, executors, administrators, and successors,
jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, it or
its heirs, executors, administrators, successors, or assigns, shall fail to pay for any
materials, provisions, or other supplies used in, upon, for, or about the
performance of the work contracted to be done, or for any work or labor thereon of
any kind or for amount due under the Unemployment Insurance Act with respect to
such work or labor, or for any amounts due, or to be withheld pursuant to Sections
18806 of the Revenue and Taxation Code of the State of California with respect to
such work or labor, then said surety will pay the same in or to an amount not
exceeding the amount hereinabove set forth, and also will pay in case suit is
brought upon this bond, such reasonable attorney's fees to the City as shall be
fixed by the court.
This bond shall insure to the benefit of any and all persons, companies, and
corporations named in Section 3181 of the Civil Code of the State of California so as
to give a right of action to them or their assigns in any suit brought upon this bond.
And the said Surety, for value received, hereby stipulates and agrees that no
change, extension of time, alteration, or addition of the terms of the Contract or to
the work to be performed thereunder or the specifications accompanying the same
shall, in any way, affect its obligations of this bond, and it does hereby waive notice
of any change, extension of time, alteration, or addition to the terms of the contract
or to the work or to the specifications. Said Surety hereby waives the provisions of
Sections 2819 and 2845 of the Civil Code of the State of California.
Payment Bond 1300-13
IN WITNESS WHEREOF, the Principal and Surety have executed this
instrument under their seals
this day of , 2019, the name and corporate
seal of each corporate party being hereto affixed and these presents duly signed by
its undersigned representative, pursuant to authority of its governing body.
Principal
(Seal)
Signature for Principal
Title of Signatory
Surety
(Seal)
Signature for Surety
Title of Signatory
Address of Surety
Phone # of Surety
Contact Person for Surety
Workers Compensation Insurance Certificate 1300-14
SECTION 1330
WORKERS' COMPENSATION INSURANCE CERTIFICATE
In accordance with California Labor Code Section 1861, prior to commencement of
work on the Contract, the Contractor shall sign and file with the City the following
certification:
"I am aware of the provisions of Section 3700 of the Labor Code which require
every employer to be insured against liability for workers' compensation or to
undertake self-insurance in accordance with the provisions of that code, and I will
comply with such provisions before commencing the performance of the work of
this contract."
Signature
Title
Date
Workers Compensation Insurance Certificate 1300-15
THIS PAGE INTENTIONALLY LEFT BLANK
Liability and Insurance Requirements 1300-16
SECTION 1340
LIABILITY AND INSURANCE REQUIREMENTS
1.0 INDEMNIFICATION
Except for the gross negligence or willful misconduct of an Indemnified Party (as
hereinafter defined), the Contractor hereby assumes liability for and agrees to
defend (at Indemnified Parties’ option), indemnify, protect and hold harmless City
and its Project Consultants, and Engineers, officers, agents, and employees
(“Indemnified Parties”) from and against any and all claims, charges, damages,
demands, actions, proceedings, losses, stop notices, costs, expenses (including
counsel fees), judgments, civil fines and penalties, liabilities of any kind or nature
whatsoever, which may be sustained or suffered by or secured against the
Indemnified Parties arising out of or encountered in connection with this Contract or
the performance of the Work including, but not limited to, death of or bodily or
personal injury to persons or damage to property, including property owned by or
under the care and custody of City, and for civil fines and penalties, that may arise
from or be caused, in whole or in part, by any negligent or other act or omission of
Contractor, its officers, agents, employees or Subcontractors including, but not
limited to, liability arising from:
1. Any dangerous, hazardous, unsafe or defective condition of, in or on
the premises, of any nature whatsoever, which may exist by reason of any
act, omission, neglect, or any use or occupation of the premises by
Contractor, its officers, agents, employees, or subcontractors;
2. Any operation conducted upon or any use or occupation of the
premises by Contractor, its officers, agents, employees, or subcontractors
under or pursuant to the provisions of this contract or otherwise;
3. Any act, omission or negligence of Contractor, its officers, agents,
employees, or Subcontractors;
4. Any failure of Contractor, its officers, agents or employees to comply
with any of the terms or conditions of this Contract or any applicable federal,
state, regional, or municipal law, ordinance, rule or regulation; and
5. The conditions, operations, uses, occupations, acts, omissions or
negligence referred to in Sub-subsections (1), (2), (3), and (4), existing or
conducted upon or arising from the use or occupation by Contractor on any
other premises in the care, custody and control of City.
The Contractor also agrees to indemnify City and pay for all damages or loss
suffered by City including but not limited to damage to or loss of City property, to
the extent not insured by City and loss of City revenue from any source, caused by
or arising out of the conditions, operations, uses, occupations, acts, omissions or
negligence referred to in Sub-subsections (1), (2), (3), (4) and (5).
Liability and Insurance Requirements 1300-17
Contractor’s obligations under this Section apply regardless of whether or not such
claim, charge, damage, demand, action, proceeding, loss, stop notice, cost
expense, judgment, civil fine or penalty, or liability was caused in part or
contributed to by an Indemnified Party. However, without affecting the rights of
City under any provision of this Contract, Contractor shall not be required to
indemnify and hold harmless City for liability attributable to the active negligence of
City, provided such active negligence is determined by Contract between the parties
or by the findings of a court of competent jurisdiction. In instances where City is
shown to have been actively negligent and where City’s active negligence accounts
for only a percentage of the liability involved, the obligation of Contractor will be for
that entire portion or percentage of liability not attributable to the active negligence
of City.
Contractor agrees to obtain executed indemnity agreements with provisions
identical to those set forth here in this section from each and every subcontractor
or any other person or entity involved by, for, with or on behalf of Contractor in the
performance of this Contract. In the event Contractor fails to obtain such
indemnity obligations from others as required here, Contractor agrees to be fully
responsible according to the terms of this section.
Failure of City to monitor compliance with these requirements imposes no additional
obligations on City and will in no way act as a waiver of any rights hereunder. This
obligation to indemnify and defend City as set forth here is binding on the
successors, assigns or heirs of Contractor and shall survive the termination of this
Contract or this section.
This indemnity shall survive termination of the Contract or Final Payment
hereunder. This Indemnity is in addition to any other rights or remedies that the
Indemnified Parties may have under the law or under any other Contract
Documents or Agreements. In the event of any claim or demand made against any
party which is entitled to be indemnified hereunder, City may, in its sole discretion,
reserve, retain or apply any monies to the Contractor under this Contract for the
purpose of resolving such claims; provided, however, City may release such funds if
the Contractor provides City with reasonable assurance of protection of the
Indemnified Parties’ interests. City shall, in its sole discretion, determine whether
such assurances are reasonable.
Approval of any insurance contracts by the City does not relieve the Contractor or
subcontractors from liability under Section 1340-1.0, Indemnification. The City will
not be liable for any accident, loss, or damage to the work prior to its completion
and acceptance.
2.0 INSURANCE REQUIREMENTS
2.1 General
Prior to the beginning of and throughout the duration of the Work, Contractor will
maintain insurance in conformance with the requirements set forth below.
Contractor will use existing coverage to comply with these requirements. If that
existing coverage does not meet the requirements set forth here, it will be
amended to do so. Contractor acknowledges that the insurance coverage and
Liability and Insurance Requirements 1300-18
policy limits set forth in this section constitute the minimum amount of coverage
required. Any insurance proceeds available to City in excess of the limits and
coverage required in this Contract and which is applicable to a given loss, will be
available to City.
Contractor shall submit coverage verification for review and approval by the City
upon execution of the Contract.
The Notice to Proceed with the Work under this Contract will not be issued, and the
Contractor shall not commence work, until such insurance has been approved by
the City. The Contractor shall not allow any subcontractors to commence work on
its subcontract until all similar insurance required of the subcontractor has been
obtained and verified by Contractor. Such insurance shall remain in full force and
effect at all times during the prosecution of the Work and until the final completion
and acceptance thereof.
The Notice to Proceed does not relieve the Contractor of the duty to obtain such
insurance as required by Paragraph 1340-2.0 INSURANCE REQUIREMENTS.
Contractor shall provide the following types and amounts of insurance:
2.2 Commercial General Liability Policy
Commercial General Liability Insurance using Insurance Services Office
“Commercial General Liability” policy form CG 00 01 or the equivalent. Defense
costs must be paid in addition to limits. Limits shall be no less than Two Million
Dollars ($2,000,000) per occurrence for all covered losses and no less than Four
Million Dollars ($4,000,000) general aggregate.
Contractor’s policy shall contain no endorsements limiting coverage beyond the
basic policy coverage grant for any of the following:
a. Explosion, Collapse or Underground Hazard (X CU).
b. Products and Completed Operations.
c. Pollution liability.
d. Contractual liability.
Coverage shall be applicable to City for injury to employees of: contractors,
subcontractors or others involved in the project. Policy shall be endorsed to
provide a separate limit applicable to this project.
2.3 Workers' Compensation Insurance
Workers’ Compensation on a state-approved policy form providing statutory
benefits as required by law with employer’s liability limits no less than $1,000,000
per accident for all covered losses.
2.4 Business Auto Policy
Business Auto Coverage on ISO Business Auto Coverage form CA 00 01 06 92
including symbol 1 (Any Auto) or the equivalent. Limits shall be no less than
Liability and Insurance Requirements 1300-19
$1,000,000 per accident, combined single limit. If Contractor owns no vehicles,
this requirement may be satisfied by a non-owned auto endorsement to the general
liability policy described above.
2.5 Excess or Umbrella Liability Insurance
Excess or Umbrella Liability Insurance (Over Primary) if used to meet limit
requirements, shall provide coverage at least as broad as specified for the
underlying coverage. Any such coverage provided under an umbrella liability policy
shall include a drop-down provision providing primary coverage for liability not
covered by primary but covered by the umbrella. Self-insured retentions are not
permitted. Coverage shall be provided on a “pay on behalf” basis, with defense
costs payable in addition to policy limits. There shall be no cross-liability exclusion
precluding coverage for claims or suits by one insured against another. Coverage
shall be applicable to City for injury to employees of Contractor, subcontractors or
others involved in the Work. The scope of coverage provided is subject to approval
of City following receipt of proof of insurance as required herein. Limits are subject
to review but in no event less than $1,000,000 per occurrence and aggregate.
Insurance procured pursuant to these requirements shall be written by insurers that
are authorized carriers in the state of California and with an A.M. Best rating of A-
or better and a minimum financial size of VII.
Contractor and City agree as follows:
1. Contractor agrees to endorse the third party Commercial General
Liability coverage required herein to include as additional insureds City, its
officials, employees and agents, and County, its officials, employees and
agents, using standard ISO endorsement No. CG 2010 with an edition date of
1985 or equivalent. Contractor also agrees to require all contractors,
subcontractors, and anyone else involved in any way with the project
contemplated by this agreement to do likewise.
2. Any waiver of subrogation expressed or implied on the part of City to
any party involved in this Contract or related documents applies only to the
extent of insurance proceeds actually paid. City, having required that it be
named as an additional insured to all insurance coverage required herein,
expressly retains the right to subrogate against any party for sums not paid
by insurance. For its part, Contractor agrees to waive subrogation rights
against City regardless of the applicability of any insurance proceeds, and to
require all contractors, subcontractors or others involved in any way with the
project(s) contemplated by this Contract, to do likewise.
3. All insurance coverage maintained or procured by Contractor or
required of others by Contractor pursuant to this Contract shall be endorsed
to delete the subrogation condition as to City, or to specifically allow
Contractors or others providing insurance herein to waive subrogation prior
to a loss. This endorsement shall be obtained regardless of existing policy
wording that may appear to allow such waivers.
Liability and Insurance Requirements 1300-20
4. It is agreed by Contractor and City that insurance provided pursuant to
these requirements is not intended by any party to be limited to providing
coverage for the vicarious liability of City, or to the supervisory role, if any,
of City. All insurance coverage provided pursuant to this or any other
Contract (express or implied) in any way relating to City is intended to apply
to the full extent of the policies involved. Nothing referred to here or
contained in any Contract involving City in relation to the project(s)
contemplated by this Contract is intended to be construed to limit the
application of insurance coverage in any way.
5. None of the coverages required herein will be in compliance with these
requirements if they include any limiting endorsement of any kind that has
not been first submitted to City and approved of in writing.
6. All coverage types and limits required are subject to approval,
modification and additional requirements by the City, as the need arises.
Contractor shall not make any reductions in scope of coverage (e.g.
elimination of contractual liability or reduction of discovery period) that may
affect City’s protection without City’s prior written consent.
7. Proof of compliance with these insurance requirements, consisting of
binders of coverage, or endorsements, or certificates of insurance, at the
option of City, shall be delivered to City at or prior to the execution of this
Contract. In the event such proof of any insurance is not delivered as
required, or in the event such insurance is canceled at any time and no
replacement coverage is provided, City has the right, but not the duty, to
obtain any insurance it deems necessary to protect its interests under this or
any other agreement and to pay the premium. Any premium so paid by City
shall be charged to and promptly paid by Contractor or deducted from sums
due Contractor, at City option.
8. Contractor agrees to endorse, and to require others to endorse, the
insurance provided pursuant to these requirements, to require written notice
to City and the appropriate tender prior to cancellation of such liability
coverage and notice of any material alteration of non-renewal of any such
coverage, and to require contractors, subcontractors, and any other party in
any way involved with the project contemplated by this Contract to do
likewise.
9. It is acknowledged by the parties of this Contract that all insurance
coverage required to be provided by Contractor or any subcontractor, is
intended to apply first and on a primary non-contributing basis in relation to
any other insurance or self-insurance available to the City.
10. Contractor agrees to ensure that subcontractors, and any other party
involved with the project that is brought onto or involved in the project by
contractor, provide the same minimum insurance coverage required of
Contractor. Contractor agrees to monitor and review all such coverage and
assumes all responsibility for ensuring that such coverage is provided in
conformity with the requirements of this section. Contractor agrees that
Liability and Insurance Requirements 1300-21
upon request, all agreements with subcontractors and others engaged in the
project will be submitted to City for review.
11. Contractor agrees not to self-insure or to use any self-insured
retentions or deductibles on any portion of the insurance required herein and
further agrees that it will not allow any contractor, subcontractor, Architect,
Engineer or other entity or person in any way involved in the performance of
work on the project contemplated by this Contract to self-insure its
obligations to City. If contractor’s existing coverage includes a deductible or
self-insured retention, the deductible or self-insured retention must be
declared to the City. At that time the City shall review options with the
contractor, which may include reduction or elimination of the deductible or
self-insured retention, substitution of other coverage, or other solutions.
12. The City reserves the right at any time during the term of the contract
to change the amounts and types of insurance required by giving the
Contractor ninety (90) days advance written notice of such change. If such
change results in substantial additional cost to the Contractor, the City will
negotiate additional compensation proportional to the increased benefit to
City.
13. For purposes of applying insurance coverage only, all contracts
pertaining to the project will be deemed to be executed when finalized and
any activity commences in furtherance of performance under this Contract.
14. Contractor acknowledges and agrees that any actual or alleged failure
on the part of City to inform Contractor of non-compliance with any
insurance requirement in no way imposes any additional obligations on City
nor does it waive any rights hereunder in this or any other regard.
15. Contractor will renew the required coverage annually as long as City,
or its employees or agents face an exposure from operations of any type
pursuant to this Contract. This obligation applies whether or not the Contract
is canceled or terminated for any reason. The insurance shall include but not
be limited to products and completed operations and discontinued
operations, where applicable. Termination of this obligation is not effective
until City executes a written statement to that effect.
16. Contractor agrees to waive its statutory immunity under any workers’
compensation statute or similar statute, in relation to the city, and to require
all subcontractors and any other person or entity involved in the project
contemplated by this Contract to do likewise.
17. Requirements of specific coverage features are not intended as
limitations on other requirements or as a waiver of any coverage normally
provided by any given policy. Specific reference to a given coverage feature
is for purposes of clarification only as it pertains to a given issue and is not
intended by any party or insured to be all-inclusive.
18. Any provision in any of the documents dealing with the insurance
coverage provided pursuant to these requirements is subordinate to and
Liability and Insurance Requirements 1300-22
superseded by the requirements contained herein. These insurance
requirements are intended to be separate and distinct from any other
provision in this Contract and are intended by the parties here to be
interpreted as such.
19. All liability coverage provided according to these requirements must be
endorsed to provide a separate aggregate limit for the project that is the
subject of this Contract and evidencing products and completed operations
coverage for not less than two years after issuance of a final certificate of
occupancy by all appropriate government agencies or acceptance of the
completed work by City.
20. Contractor agrees to be responsible for ensuring that no contract used
by any party involved in any way with the project reserves the right to
charge City or Contractor for the cost of additional insurance coverage
required by this Contract. Any such provisions are to be deleted with
reference to City. It is not the intent of City to reimburse any third party for
the cost of complying with these requirements. There shall be no recourse
against City for payment of premiums or other amounts with respect thereto.
2.6 Change in Terms
The Contractor shall provide immediate written notice to the City of any change in
terms and conditions and/or reduction in the coverage of any nature to the
insurance policies. The notice shall be sent to:
Steve Howlett, Facilities Director
City of La Quinta
78495 Calle Tampico
La Quinta, CA 92253
General Conditions 1400-1
SECTION 1400
GENERAL CONDITIONS
1.0 GENERAL
1.1 Intent of Contract Documents
Where the Plans or Specifications describe portions of the Work in general terms but
not in complete detail, it is understood that only the best general practice is to prevail
and that only materials and workmanship of the first quality are to be used. Unless
otherwise specified, the Contractor shall furnish tools, equipment, and incidentals, and
do all the work involved in executing the Contract in a satisfactory and workmanl ike
manner.
Unless specifically noted otherwise, all sections of the Specifications and the Plans shall
be complimentary and applicable to each other.
In the event the materials and/or equipment are to be furnished by the City, as
designated in the Specific Project Requirements or as agreed on, this shall not relieve
the Contractor of the above requirements to furnish all other labor, materials, and
equipment to complete the Contract.
Words and abbreviations which have well known technical or trade meaning are used in
the Contract Documents in accordance with such recognized meanings.
1.2 Discrepancies and Omissions
Any discrepancies or omissions found in the Contract Documents shall be immediately
reported to the Parks Superintendent who will clarify discrepancies or omissions, in
writing, within a reasonable time.
In resolving inconsistencies among two or more sections of the Contract Documents,
precedence shall be given in the following order:
1. Contract
a. Agreement
b. Permits
c. Change Orders
2. Instruction to Proposers
3. Permits issued by other agencies
4. Specific Project Requirements
5. General Project Requirements
6. Supplementary Conditions
7. General Conditions
8. Technical Specifications
9. Standard Specifications
10. Reference Specifications
General Conditions 1400-2
1.3 Headings
Headings to parts, divisions, sections, articles, paragraphs, subparagraphs, and forms are
inserted for convenience of reference only and shall not affect the interpretation of the
Contract Documents.
1.4 Penalty for Collusion
If, at any time, it is found that the person, firm, or corporation to whom the Contract
has been awarded has, in presenting any proposal or proposals, colluded with any other
party or parties, then the Contract shall be null and void, and the Contractor and its
sureties shall be liable for loss or damage which the City may suffer thereby, and the
City may advertise for new proposals for said Work.
1.5 Successors and Assigns
The City and the Contractor, respectively, bind themselves, their partners, successors,
assigns, and legal representatives to the other party hereto and to the partners,
successors, assigns, and legal representatives of such other party with respect to all
covenants, contracts, agreements, and obligation contained in the Contract Documents.
Neither party to the Contract shall assign the Contract or sublet it as a whole without
the written consent of the other.
1.6 Assignment to City
Pursuant to Public Contract Code 4551, in entering into t he Contract and all
subcontracts, to supply goods, services, or materials pursuant to the Contract, the
Contractor and its subcontractors offer and agree to assign to the City all rights, title,
and interest in and to all causes of action it may have under Section 4 of the Clayton
Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with
section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising
from purchases of goods, services, or materials pursuant to the Contract and
subcontracts. This assignment shall be made and become effectiv e at the time the City
tenders final payment to the Contractor, without further acknowledgment by the
parties.
1.7 Rights and Remedies
The duties and obligations imposed by the Contract Documents and the rights and
remedies available thereunder shall be in addition to, and not a limitation of, any
duties, obligations, rights, and remedies otherwise imposed or available by law.
No action or failure to act by the City and its representatives or the consultants, shall
constitute a waiver of any right or duty afforded any of them under the Contract, nor
shall any such action or failure to act constitute an approval of or acquiescence in any
breach thereunder, except as may be specifically agreed in writing.
1.8 Definitions
Unless otherwise stated, the words directed, required, permitted, ordered, instructed,
designated, applicable, appropriate, sufficient, proper, desirable, necessary, prescribed,
General Conditions 1400-3
approved, acceptable, satisfactory or words of like import, refer to actions, expressions,
and prerogatives of the City.
Masculine gender words include the feminine. References to gender, such as
"workman" and "flagman" and the pronouns "he" or "his" referring to such titles, are
abstract in the specifications, used for the sake of brevity are intended to refer to
persons of either sex.
Singular words include the plural and "person" includes firms, companies, and
corporations.
Where used in the Contract Documents, the following words and terms shall have the
meanings indicated. The meanings shall be applicable to the singular, plural,
masculine, and feminine of the words and terms.
Acceptance - The formal written acceptance by the City of an entire Contract which
has been completed in all respects in accordance with the Contract Documents and any
modifications thereof previously approved.
Act of God - An earthquake, flood, cyclone, or other cataclysmic phenomenon of
nature. A rain, windstorm, high water, or other na tural phenomenon, which might
reasonably have been anticipated from historical records of the general locality of the
work, shall not be construed as an Act of God.
Addenda - Written or graphic instruments issued prior to the proposal which modify or
interpret the Contract Documents, drawings, and specifications, by additions, deletions,
clarifications, or corrections.
Proposal - The offer or proposal of the Proposer submitted on the prescribed form
setting forth the price for the work to be performed.
Bond(s) - Bid, Performance, or Payment Bonds and other instruments of surety,
furnished by the Contractor and Contractor's surety in accordance with the Contract
Documents.
Proposer - Any properly licensed and qualified individual, firm, partnership,
corporation, joint venture, or combination thereof, submitting a proposal for the work
contemplated, acting directly or through a duly authorized representative.
Calendar Day - Any day including legal holidays, Saturdays and Sundays.
City - The City of La Quinta, a Municipal Corporation in the State of California.
City Representative - The person designated in writing by the City to act as its agent
on specified matters relating to this Contract. The City's Representative is not the City
Engineer, but is another individual who has been designated to represent the City.
Contract - The written document covering the performance of the Work as more fully
described in, but not limited to, the plans, standard specifications, special and technical
provisions, Contract bonds, proposal, addenda, and Contract Change Orders.
General Conditions 1400-4
Contract Change Order - A written order to the Contractor, covering changes in the
services or quantities, or both, and establishing the basis of payment and time
adjustments for the work affected by the changes. Also referred to as a Change Order
or Amendment.
Contract Documents or Amendment - The words "Contract Documents" shall mean
any or all of, but not limited to, the following items, as applicable:
Acknowledgments
Addenda, if any
Contract
Designation of Subcontractors
Executed Change Orders, if any Notice of Award
General Conditions
General Project Requirements
Instructions to Proposers
Invitation to Propose
Notice to Proceed
Payment Bond
Performance Bond
Permits from other agencies
Proposal Documents
Proposal Guaranty Bond
Proposals
Specific Project Requirements
Standard Specifications
State Standard Specifications
Supplementary General Conditions
Each of these items is to be considered by reference as part of the Contract Documents,
also referred to as Contract.
Contract Price - The amount payable to the Contractor under the terms and
conditions of the Contract based on the price given on the proposal schedule, with
adjustments made in accordance with the Contract. The base amount given in the
proposal schedule shall be either a lump sum proposal amount or the summation of the
unit price proposals multiplied by the estimated quantities set forth in the proposal
form. Also referred to as Contract Amount or Contract Sum.
Contract Time – One fiscal year with options for extensions.
Contract Completion Date – June 30, 2020.
Contractor - The person or persons, firms, partnership, corporation, or combination
thereof, who have entered with the City, as party or parties of the second part of his or
their legal representatives.
Contractor's Equipment - Equipment, material, supplies, and all other items, except
labor, brought onto the site by the Contractor to carry out the Work, but not to be
incorporated in the Work.
General Conditions 1400-5
Consultant - Individuals and/or companies retained by the City to provide specific
professional services.
Day(s) - Calendar Day(s), unless contract time is indicated in working days.
Direct - Action of the City or Parks Superintendent by which the Contractor is ordered
to perform or refrain from performing work under the Contract.
Furnish - To deliver to the job site or other specified location any item, equipment, or
material.
General Conditions - Part of the Contract Documents representing the general clauses
that establishes how the project is to be administered.
Herein - Refers to information presented in the Project Specifications.
Holidays - Legal holidays designated by the City or specifically identified in the
Contract.
Install - Placing, erecting, or constructing any item, equipment, or material.
Liquidated Damages - A fixed amount to be paid to the City or to be deducted from
any payments due, or to become due, to the Contractor as a result of the Contractor
not completing the work in the time allowed in the specifications.
Notice of Award - A written notice by the City to the Contractor informing him that
the Contract has been awarded to him.
Notice to Proceed - The written notice by the City to the Contractor authorizing him
to proceed with the Work and establishing the date of commencement of the Work.
Paragraph - For references or citation purposes, refers to the paragraph(s) in these
Specifications, called out by paragraph number and alphanumeric designator.
Person - Includes firms, companies, corporations, partnerships, and joint ventures.
Project - The undertaking to be performed under the provisions of the Contract.
Project Manual - Those Contract Documents which are bound into one or more
volumes prior to bidding.
Provide - Furnish and install, complete in place.
Shall - Refers to actions by either the Contractor or the City and means the Contractor
or City has entered into a covenant with the other party to do or perform the action.
Site - The property as described where work is performed.
Specific Project Requirements - Part of the Contract Documents establishing specific
conditions or requirements peculiar to the work.
General Conditions 1400-6
Specifications - That part of the Contract Documents consisting of the General
Conditions, Supplementary General Conditions, General Project Requirements, Specific
Project Requirements, applicable portions of the Standard Specifications and State
Standard Specifications, and Technical Specifications.
Specify - Refers to information described, shown, noted or presented in any manner in
any part of the Contract.
Subcontractor - A subcontractor is a person or entity who has a direct contract with
the Contractor to perform any of the Work at the Site. The term subcontractor means
a subcontractor or subcontractor's authorized representative. The term subcontractor
does not include any separate contractor or any separate contractor's subcontractors.
Submittals - The information which is specified for submission to the Parks
Superintendent in accordance with the Project Specifications.
Sub-subcontractor - A sub-subcontractor is a person or entity who has a direct or
indirect contract with a subcontractor to perform any of the Work at the Site. The term
sub-subcontractor means a sub-subcontractor or an authorized representative thereof.
Supplier - Any person, firm, corporation, or organization who supplies materials or
equipment for the Work, including that fabricated to a special design, and may also be
a Subcontractor or a Sub-subcontractor.
Surety - The person, firm, corporation, or organization that joins with the Contractor in
assuming the liability for the faithful performance of the Work and for the payment of
all obligations pertaining to the Work in accordance with the Contract Documents by
issuing the Bonds required by the Contract Documents or by law.
Will - Actions entered into by the Contractor or the City as a covenant with the other
party to do or to perform the action.
Work - The labor, materials, equipment, supplies, and other items necessary for the
execution, completion, and fulfillment of the Contract.
Working Day - Any day, other than a holiday on which the Contractor may proceed
with regular work on the current controlling operation as determined by the Parks
Superintendent toward the meeting of contract requirements.
2.0 ADMINISTRATION
2.1 Administration of the Contract
The Parks Superintendent will provide administration of the Contract as hereinafter
discussed. The duties, responsibilities and limitations of authority of City retained
consultants and the Parks Superintendent during the contract, as set forth in the
Contract Documents, will not be modified or extended without written consent of the
City.
General Conditions 1400-7
2.2 Parks Superintendent
2.2.1 General - The Parks Superintendent has the authority to act on behalf of
the City on change orders, progress payments, Contract decisions, acceptability
of the Contractor's work, and early possession.
2.2.2 Change Orders - The Parks Superintendent has the authority to accept
or reject change orders and cost proposals submitted by the Contractor or as
recommended by the Parks Superintendent within purchasing authority..
2.2.3 Progress Payments - The Parks Superintendent has the authority to
accept or reject requests for progress payments which have been submitted by
the Contractor.
2.2.4 Contract Decisions - Should the Contractor disagree with decisions
rendered under this Contract, the Contractor may appeal to the Parks
Superintendent in accordance with the provisions of the Contract.
2.2.5 Acceptability of Work - The Parks Superintendent has the authority to
make the final determination of the acceptability of the Work.
2.2.6 Contract Schedule - The Parks Superintendent has the authority to
review and recommend acceptance of the progress schedule submitted by the
Contractor at the start of the Work and subsequent significant revisions for
conformance to the specified sequence of work and logic.
2.2.7 Inspection - The Parks Superintendent will observe the progress, quality,
and quantity of the Work to determine, in general, if the Work is proceeding in
accordance with the intent of the Contract Documents. The Parks Superintendent
shall not be responsible for means, methods, techniques, sequences, or
procedures, or for safety precautions and programs in connection with the Work.
In accordance with the provisions detailed elsewhere in these General Conditions, the
Parks Superintendent will make decisions relative to all matters of interpretation or
execution of the Contract Documents.
2.3 Consultants
2.3.1 General - Consultants will have the authority to act on behalf of the City
only to the extent provided in the Supplemental General Conditions.
3.0 City
3.1 General
The City, acting through the Parks Superintendent, shall have the authority to act as
the sole judge of the Work and materials with respect to both quantity and quality as
set forth in the Contract.
General Conditions 1400-8
3.2 Attention to Work
The City shall notify the Contractor in writing of the name of individuals designated as
representatives of the Parks Superintendent. The representative will normally be at the
Site of the Work. During the representative's absences, the Contractor may contact the
Parks Superintendent or a previously designated representative.
3.3 Inspection
The City’s Parks Superintendent will observe the Work and act in matters of inspection
under this Contract. The Parks Superintendent will call the attention of the Contractor
to any failure of the Work or materials to conform to the Contract Documents. Th e
Parks Superintendent shall have the authority to reject material or, in any emergency,
suspend the Work.
Separate and independent from the inspection above, the project may be inspected by
code compliance. Such inspectors shall have the authority provided to them by local
jurisdiction.
3.4 City's Right to Carry Out the Work
If the Contractor defaults or neglects to carry out the Work in accordance with the
Contract Documents, and fails within seven (7) days after receipt of written notice from
the City to commence and continue correction of such default or neglect with diligence
and promptness, the City may, after seven (7) days following receipt by the Contractor
of an additional written notice and without prejudice to any other remedy make good
such deficiencies.
The City also reserves the right to perform any portion of the work due to an
emergency threatening the safety of the Work, public, City, and any property or
equipment.
3.5 City's Right to Perform Work and to Award Separate Contracts
The City reserves the right to perform the work related to the Project with the City's
own forces, and to award separate Contracts in connection with other portions of the
Project or other work on the Site under these or similar Conditions of the Contract. If
the Contractor claims that delay, damage, or additional cost is involved because of such
action by the City, the Contractor shall make such claim as provided elsewhere in the
Contract Documents.
When separate Contracts are awarded for different portions of the Project or other work
on the Site, the term "Contractor" in the Contract Documents in each case shall mean
the Contractor who executes each separate Contract.
The City will provide for the coordination of the work of the City's own forces and of
each separate Contractor with the Work of the Contractor, who shall cooperate
therewith as provided in Paragraph 1400-4.8.3, Cooperation.
General Conditions 1400-9
4.0 CONTRACTOR
4.1 Office
The Contractor's address stated in the Proposal is hereby designated as the legal
address of the Contractor for the receipt of documents, samples, notices, letters, and
other Articles of communication.
4.2 Contractor's Representative
The Contractor shall notify the City in writing of the name of the person who will act as
the Contractor's representative and shall have the authority to act in matters relating to
this Contract. The Contractor, acting through its representative, shall give personal
attention to, and shall manage the Work, so that it shall be prosecuted faithfully. The
Contractor's representative shall be an employee of the Contractor. Upon written
request of the Contractor, this requirement may be waived by the City. The City's
waiver, if granted will be in writing. There is no obligation by the City to waive this
provision regardless of the effect on the Contractor's operations.
At all times during the progress of the Work, the Contractor's representative shall be
personally present at the Project site, or a designated alternate shall be available who
has the authority to act in matters relating to the Contract. The Contractor's
representative or designated alternate shall have the authority to carry out the
provisions of the Contract and to supply materials, equipment, tools, and labor without
delay for the performance of the Work. Before initial work is begun on the Contract,
the Contractor shall file with the Parks Superintendent addresses and telephone
numbers where the Contractor's and all subcontractors' representatives can be reached
during all hours, including nights and weekends when work is not in progress.
4.3 Project Procedures
The Contractor will supervise and direct the work. The Contractor has the authority to
determine the means, methods, techniques, sequences, and procedures of
construction, except in those instances where the City, to define the quality of an item
of work, specifies in the Contract, a means, method, technique, sequence, or procedure
for construction of that item of Work.
4.4 Contractor's Employees
The Contractor shall be responsible for the adequacy, efficiency, and sufficiency of its
employees. Workers shall have sufficient knowledge, skill, and experience to perform
properly the work assigned to them.
The Contractor shall employ only competent, skillful workers to perform the Work. If
any subcontractor or person employed by the Contractor or its subcontractors, appear
to the Parks Superintendent to be incompetent or act in a disorderly or improper
manner, such person or subcontractor shall be discharged from the site immediately by
the Contractor upon written direction of the Parks Superintendent, and such person
shall not again be employed on the Project.
General Conditions 1400-10
4.5 Subcontractors
Subcontractors will not be recognized as having a direct relationship with the City. The
persons engaged in the Work, including employees of subcontractors and suppliers, will
be considered employees of the Contractor. The Contractor will be responsible for their
work and their work shall be subject to the provisions of the Contract. The Contractor
is as fully responsible to the City for the acts and omissions of its subcontractors and of
persons either directly or indirectly employed by them as the Contractor is for the acts
and omissions of persons directly employed by the Contractor. Nothing contained in
the Contract Documents shall create any contractual relation between any
subcontractor and the City. References in the Contract Document to actions required of
subcontractors, manufacturers, suppliers, or any party other than the Contractor, the
City, the Parks Superintendent, its consultants shall be interpreted as requiring that the
Contractor shall require such subcontractor, manufacturer, supplier, utility company, or
party to perform the specified action, unless the Contract Documents specifically state
that the Work is not included in the Contract.
The Contractor shall not employ any subcontractors that are not properly licensed in
accordance with State law. Prior to commencement of any work by a subcontractor,
the Contractor shall submit verification to the Parks Superintendent that the
subcontractor is properly licensed for the work it will perform. Changes to
subcontractors listed in the Proposal in accordance with Public Contract Code 4100 et.
seq., shall be made only with the approval of the City.
4.6 Contractor's Equipment and Facilities
The Contractor shall furnish and maintain in good condition all equipment and facilities
as required for the proper execution and inspection of the Work. Such equipment and
facilities shall meet all requirements of applicable ordinances and laws.
4.7 Public Safety and Convenience
The Contractor shall conduct its work so as to insure the least possible obstruction to
traffic and inconvenience to the general public and the residents in the vicinity of the
Work and to insure the protection of persons and property at no extra cost to the City.
4.8 City-Contractor Coordination
4.8.1 Service of Notice - Notice, order, direction, request, or other
communication given by the City or the Parks Superintendent to the Contractor
shall be deemed to be well and sufficiently given to the Contractor if delivered to
the Contractor's Representative designated in Paragr aph 1400-4.2,
Contractor's Representative, to the Contractor's office designated in
Paragraph 1400-4.1, Office, or to the Contractor's address provided in the
Proposal.
4.8.2 Suggestions to Contractor - Plans or methods of work suggested by the
City, Parks Superintendent, or authorized representatives to the Contractor, but
not specified or required, if adopted or followed by the Contractor in whole or in
part, shall be used at the risk and responsibility of the Contr actor. The City,
Parks Superintendent, or authorized representatives assume no responsibility
General Conditions 1400-11
therefore, and in no way will be held liable for any defects in the Work which
may result from or be caused by use of such plan or method of work.
4.8.3 Cooperation - The Contractor shall afford the City, the Parks
Superintendent, and separate Contractors reasonable opportunity for the
introduction and storage of their materials and equipment and the execution of
their work and shall coordinate the Work with theirs as required by the Contract
Documents.
If any part of the Contractor's Work depends for proper execution or results
upon the work of the City or any separate Contractor, the Contractor shall, prior
to proceeding with the Work, promptly report to the Parks Superintendent any
apparent discrepancies or defects in such other work that render it unsuitable for
such proper execution and results. Failure of the Contractor to so report shall
constitute an acceptance of the City's or separate Contractor's work as fit and
proper to receive the Work, except as to defects which may subsequently
become apparent in such work by others.
If requested by the Contractor, the City shall arrange meetings with other
contractors performing work on behalf of the City to plan coordination of
activities. The City shall keep the Contractor informed of the planned activities of
other contractors.
Any costs caused by defective or ill-timed work shall be borne by the responsible
party.
Differences and conflicts arising between the Contractor and other contractors
employed by the City or between the Contractor and the workers of the City with
regard to their work, shall be submitted to the City for its decision in the matter.
If such separate contractor sues the City on account of any delay or damage
alleged to have been caused by the Contractor, the City shall notify the
Contractor who shall, at the City's election, defend such proceedings at the
Contractor's expense. If any judgement or award against the City arises from
any such litigation whether defended by City or by Contractor, the Contractor
shall pay or satisfy said judgement or award and shall reimburse the City for all
attorney's fees and court costs which the City has incurred or for which it is
liable.
4.9 Permits
Unless specifically stated to be provided by the City, Contractor shall apply for, obtain,
and comply with all the terms, conditions and requirements attached to all permits,
bonds and licenses required by local, state, or federal agencies to perform work,
construct, erect, test and start up of any equipment or facility for this Contract. Where
operating permits are required, the Contractor shall apply for and obtain such operating
permits in the name of the City and provide the permit in an appropriate frame or
fileholder when the City accepts substantial completion of the equipment or facility.
The Contractor shall give all notices necessary or incidental to the due and lawful
prosecution of the work.
General Conditions 1400-12
Any permits, bonds, licenses and fees therefore required for the performance of work
under this Contract and not specifically mentioned herein as having been obtained and
paid by the City shall be included in the Contractor's proposal price.
4.10 Contractor's Responsibility for the Work and Materials
The Contractor shall have the charge and care of the Work and of the materials to be
used therein and shall bear the risk of injury, loss, or damage, to any part thereof by
the action of the elements or from any other cause, whether arising from the
non-execution of the Work. The Contractor shall rebuild, repair, restore, and make
good all injuries, losses, or damages to any portion of the Work or the materials
occasioned by any cause and shall bear the expense thereof, except for such injuries,
losses, or damages as are directly and approximately caused by acts of the City.
4.11 Laws to be Observed
The Contractor shall keep himself fully informed of all existing and future County, State,
and National laws and regulations and all municipal ordinances and regulations of the
City which in any manner affect those engaged or employed in the Work and of all such
orders and decrees of bodies having any jurisdiction or authority over the same; and
shall protect and indemnify the City and all of its officers, agents, and servants against
any claim or liability arising from or based on the violation of any such laws,
ordinances, regulations, orders, or decrees whether by himself or its employees. If any
discrepancy or inconsistency is discovered, the Contractor shall immediately report the
same to the Parks Superintendent in writing.
4.11.1 Prevailing Wage - In accordance with Section 1770 of the Labor Code,
the City has ascertained and does hereby specify that the prevailing wage rates
shall be those provided in Article 1110-20.0, WAGE RATES. The said rates shall
include all employer payments that are required by Section 1773.1 of the Labor
Code. The City will furnish to the Contractor, upon request, a copy of such
prevailing rates. It shall be the duty of the Contractor to post a copy of such
prevailing wages at the job site.
For each worker paid less than the stipula ted rate in the execution of the
Contract by the Contractor, or any subcontractor under him, in violation of the
provisions of the Labor Code, and in particular, Section 1770 to Section 1780,
inclusive, the Contractor shall be subject to the provisions and penalties of
Section 1775 of the Labor Code. In addition to said penalty, and pursuant to
said Section 1775, the difference between such stipulated prevailing wage rates
and the amounts paid to each worker for each calendar day, or portion thereof,
for which each worker was paid less than the stipulated prevailing rate shall be
paid to each worker by the Contractor.
The wage rates set forth are the minimum that may be paid by the Contractor.
Nothing herein contained shall be construed as preventing the Contractor from
paying more than the minimum set forth.
No extra compensation whatever shall be allowed by the City due to the inability
of the Contractor to hire labor at the minimum rate nor for any necessity for
payment by the Contractor for subsistence, travel time, overtime, or other added
General Conditions 1400-13
compensation, all of which possibilities are elements to be considered and
ascertained to the Contractor's own satisfaction in preparing the proposal.
If it becomes necessary to employ a craft other than those listed, the Contractor
shall notify the City immediately and the City will determine the additional
prevailing rate from the Director of the Department of Industrial Relations and
the rate thus determined shall be applicable as a minimum at the time of initial
employment.
The Contractor shall pay travel and subsistence payments to workers needed to
execute the work as such travel and subsistence payments are defined in the
applicable collective bargaining agreement filed with the Department of
Industrial Relations pursuant to Labor Code Section 1773.8.
4.11.2 Certified Payrolls - In accordance with Section 1776 of the Labor Code,
each Contractor and subcontractor shall keep an accurate payroll record,
showing the name, address, social security number, work classification, straight
time, and overtime hours worked each day and week, and the actual per diem
wages paid to each journeyman, apprentice, worker, or other employee
employed by him or her in connection with the project.
The payroll records shall be certified and shall be available for inspection at all
reasonable hours at the principal office of the Contractor on the following basis:
a. A certified copy of an employee's payroll record shall be made
available for inspection or furnished to the employee or his or her
authorized representative on request.
b. A certified copy of all payroll records shall be made available for
inspection or furnished upon request to a representative of the City, the
Division of Labor Standards Enforcement, and the Division of
Apprenticeship Standards of the Department of Industrial Relations.
c. A certified copy of all payroll records shall be made available upon
request by the public in accordance with Section 1776 of the Labor Code.
The Contractor is responsible for its and its subcontractor’s compliance with the
provisions of Section 1776 of the Labor Code.
4.11.3 Overtime Requirements - The Contractor shall forfeit, as a penalty to
the City, the penalty as provided in Section 1813 of the Labor Code for each
worker employed in the execution of the Contract by the Contractor, or any
subcontractor under the Contractor, for each day during which such worker is
required or permitted to work more than eight (8) hours in any one day and
forty (40) hours in any one week, in violation of the provisions of the Labor
Code, and in particular, Section 1810 to Section 1815 thereof, inclusive, except
that work performed by employees of Contractors in excess of eight (8) hours a
day and forty (40) hours during one week, shall be permitted upon
compensation for all hours worked in excess of eight (8) hours per day, at not
less than one and a half (1½) times the basic rate of pay as provided for in
Section 1815 of the Labor Code.
General Conditions 1400-14
4.11.4 Apprentice and Trainee - Attention is directed to the provisions in
Section 1777.5 of the Labor Code and in accordance with the regulations of the
California Apprenticeship Council concerning the employment of apprentices by
the Contractor or any subcontractor under the Contractor.
Section 1777.5 requires the Contractor or subcontractors employing
tradespersons in any apprenticeable occupation to apply to the joint
apprenticeship committee nearest the site of the project and which administers
the apprenticeship program in that trade for a certificate of approval. The
Contractor and subcontractors are required to submit contract award information
to the applicable joint apprenticeship committee. As provided for in Section
1777.5 of the Labor Code, the Contractor is required to make contributions to
funds established for the administration of apprenticeship programs.
It shall be the responsibility of the Contractor to abide by the provisions of
Section 1777.5 (except 1777.5(b)) of the Labor Code and to require all
subcontractors employed by or contracting with the Contractor to abide by said
provisions. The Contractor shall furnish the City any and all evidence of
compliance with this code section when requested by the City.
For failure to comply with Section 1777.5 (except 1777.5(b)) of the Labor Code,
the Contractor shall be subject to the penalties in Section 1777.7 of the Labor
Code.
4.11.5 Workers' Compensation Insurance - The Contractor is required to
secure the payment of compensation to its employees in accordance with the
provisions of Sections 1860 and 3700 of the Labor Code and Paragraph 1340-2.4
Workers' Compensation Insurance
4.12 Safety
The Contractor shall be solely and completely responsible for conditions of the project
site, including safety of all persons and property during performance of the work. This
requirement shall apply continuously and not be limited to normal working hours.
Safety provisions shall conform to U.S. Department of Labor (OSHA), the California
Occupational Safety and Health Act, and all other applicable Federal, State, County, and
local laws, ordinances, codes, the requirements set forth below, and any regulations
that may be detailed in other parts of these Documents. Where any of these are in
conflict, the more stringent requirement shall be followed.
The Work shall include all necessary permanent safety devices, such as machinery
guards and similar ordinary safety items, required by the State and Federal (OSHA)
industrial authorities and applicable local and national codes. Further, any fe atures of
the Work, including City-selected equipment, subject to such safety regulations shall be
fabricated, furnished, and installed in compliance with these requirements. All
equipment furnished shall be grounded and provided with guards and protectio n as
required by safety codes. Contractors and manufacturers of equipment shall be held
responsible for compliance with the requirements included herein. The Contractor shall
notify all equipment suppliers and subcontractors of the provisions of this paragraph.
General Conditions 1400-15
Before proceeding with any work, the Contractor shall take the necessary action to
comply with all provisions for safety and accident prevention. The Contractor shall
develop and maintain for the duration of this Contract, a safety program that wi ll
effectively incorporate and implement all required safety provisions. The Contractor
shall appoint an employee as safety supervisor who is qualified and authorized to
supervise and enforce compliance with the safety program. The Contractor, as a part
of his safety program, shall maintain at his office or other well-known place at the Site,
safety equipment applicable to the Work as prescribed by the aforementioned
authorities, all items necessary for giving first aid to the injured, and shall establish the
procedure for the immediate removal to a hospital or a doctor's care of persons who
may be injured on the job site.
If death or serious injuries or serious damages are caused, the accident shall be
reported immediately by telephone or messenger to the City. In addition, the
Contractor must promptly report in writing to the Parks Superintendent all accidents
whatsoever arising out of, or in connection with, the performance of the Work whether
on, or adjacent to, the Site, giving full details and statements of witnesses. The
Contractor shall make all reports as are, or may be, required by any authority having
jurisdiction, and permit all safety inspections of the work being performed under this
Contract. If a claim is made by anyone against the Contractor or any subcontractor on
account of any accident, the Contractor shall promptly report the facts in writing to the
Parks Superintendent, giving full details of the claim.
5.0 CONTROL OF WORK AND MATERIALS
5.1 Means and Methods
It is expressly stipulated that the drawings, specifications and other Contract
Documents set forth the requirements as to the nature of the completed Work and do
not purport to control the method of performing work except in those instances where
the nature of the completed Work is dependent on the method of performance.
Except as provided elsewhere in the Contract Documents, neither the City, its
consultants, or the Parks Superintendent will be responsible for or have control or
charge of construction means, methods, techniques, sequences or procedures, or for
safety precautions and programs in connection with the Work. Except as provided
elsewhere in the Contract Documents, neither the City, its consultants, or the Parks
Superintendent will be responsible for or have control or charge over the acts or
omissions of the Contractor, or any of their subcontractors, agents or employees, or
any other persons performing any of the Work. Any general control of the Work
exercised by the City or its authorized representatives shall not make the Contractor an
agent of the City, and the liability of the Contractor for all damages to persons and/or
to public or private property arising from the Contractor's execution of the Work shall
not be lessened because of such general control.
Neither the inspection by the City, its consultants, or the Parks Superintendent, nor any
order, measurement, approved modification, or payment of monies, nor acceptance of
any part or whole of the Work by the City, the Parks Superintendent or the consultant,
or their agents, shall operate as a waiver of any provision of the Contract.
General Conditions 1400-16
5.2 City-Furnished Materials
Materials, if furnished by the City, will be made available as designated in the Specific
Project Requirements. The cost of loading, unloading, hauling and handling, and
placing City-furnished materials shall be considered as included in the price proposal for
the Contract item involving such City-furnished material.
Contractor shall inspect and assure himself of the amount and soundness of such
materials.
The Contractor will be held responsible for all materials furnished to it and shall pay all
demurrage and storage charges. City-furnished materials lost or damaged from any
cause whatsoever shall be replaced by the Contractor. The Contractor will be liable to
the City for the cost of replacing City-furnished material and such costs may be
deducted from any monies due or to become due the Contractor.
5.3 Defective and Unauthorized Work
Materials and workmanship not conforming to the requirements of the Contract
Documents shall be considered defective and will be subject to rejection. Defective
work or material, whether in place or not, shall be removed immediately from the Site
by the Contractor, at its expense, when so directed by the Parks Superintendent.
Any work done beyond the limits of work or established by the Parks Superintendent, or
any extra work done without written authority, will be considered as unauthorized and
will not be paid for.
Upon failure on the part of the Contractor to comply with any order of the Parks
Superintendent made under the provisions of this section, the Parks Superintendent
shall have authority to cause defective work to be remedied, or removed and replaced,
and unauthorized work to be removed, and to deduct the costs thereof from any
monies due or to become due the Contractor. The time, cost and compliance
requirements stipulated in Paragraph 1400-3.4, City's Right to Carry Out the Work,
shall apply for this paragraph also.
5.4 Unnoticed Defects
Any defective work or material that may be discovered by the City, its consultants, or
the Parks Superintendent during the contract period, shall be removed and replaced by
work and materials which shall conform to the provisions of the Contract Documents.
Failure on the part of the City, its consultants, or the Parks Superintendent to condemn
or reject bad or inferior work or materials shall not be construed to imply acceptance of
such work or materials.
5.5 Right to Retain Imperfect Work
If any part or portion of the work performed or material furnished under this Contract
shall prove defective and not in accordance with the Specifications, and if the
imperfection in the same shall not be of sufficient magnitude or importance as to make
the work dangerous or unsuitable, or if the removal of such work will create conditions
which are dangerous or undesirable, the City shall have the right and authority to retain
such work but shall make such deductions in the final payment therefor e as may be
just and reasonable.
General Conditions 1400-17
6.0 PROGRESS OF THE WORK
6.1 Beginning of Work
The Contractor shall begin work within ten (10) days after receiving Notice to Proceed
and shall diligently execute the same to completion within the time limit.
Should the Contractor begin work in advance of receiving Notice to Proceed, any work
performed in advance of the said date of approval shall be considered as having been
done by the Contractor at its own risk and as a volunteer.
6.2 Time of Completion
Each day (Monday-Sunday) the contractor will have specific duties to be completed for
the week. It is expressly understood and agreed by and between the Contractor and
the City that the Contract time for the work described herein is a reasonable time
taking into consideration the average climatic and economic conditions and other
factors prevailing in the locality and the nature of the work.
6.3 Delays
6.3.1 Notice of Delays - When the Contractor foresees a delay in the
prosecution of the Work and, in any event, immediately upon the occurrence of a
delay, the Contractor shall notify the Facilities Director in writing of the
probability of the occurrence and the estimated extent of the delay, and its
cause. The Contractor shall take immediate steps to prevent, if possible the
occurrence or continuance of the delay. The Contractor agrees that no claim
shall be made for delays which are not called to the attention of the Parks
Superintendent at the time of their occurrence.
6.3.2 Avoidable Delays - Avoidable delays in the prosecution of the Work shall
include delays which could have been avoided by the exercise of care, prudence,
foresight, and diligence on the part of the Contractor or its subcontractors, at
any tier level, or suppliers.
6.3.3 Unavoidable Delays - Unavoidable delays in the prosecution of the Work
shall include delays which result from causes beyond the control of the
Contractor and which could not have been avoided by the exercise of care,
prudence, foresight, and diligence on the part of the Contractor or his
subcontractors, at any tier level, or suppliers. Delays in the Work of other
Contractors employed by the City will be considered unavoidable delays insofar
as they interfere with the Contractor's completion of the current critical activity
item of the Work.
6.3.3.1 Abnormal Delays - Delays caused by Acts of God, fire, unusual
storms, floods, tidal waves, earthquakes, strikes, labor disputes, freight
embargoes, and shortages of materials shall be considered as unavoidable
delays insofar as they prevent the Contractor from proceeding with at
least seventy-five percent (75%) of the normal labor and equipment force
for at least five (5) hours per day toward completion of the current critical
activity item on the favorably reviewed progress schedule.
General Conditions 1400-18
6.3.3.2 Material Shortages - Upon the submission of satisfactory proof
to the Parks Superintendent by the Contractor, shortages of material will
be acceptable as grounds for granting extensions. In order that such
proof may be satisfactory and acceptable to the Parks Superintendent, it
must be demonstrated by the Contractor that the Contractor has made
every effort to obtain such materials from all known sources within
reasonable reach of the proposed Work.
Only the physical shortage of material, caused by unusual circumstances,
will be considered under these provisions as a cause for extension of time,
and no consideration will be given to any claim that material could not be
obtained at a reasonable, practical, or economical cost or price, unless it is
shown to the satisfaction of the Parks Superintendent that such material
could have been obtained only at exorbitant prices entirely out of line with
current rates, taking into account the quantities involved and usual
practices in obtaining such quantities. A time extension for shortage of
material will not be considered for material ordered or delivered late or
whose availability is affected by virtue of the mishandling of procurement.
The above provisions apply equally to equipment to be installed in the
work.
6.4 Temporary Suspension of Work
6.4.1 If the Contractor fails to correct defective work as required by Paragraph
1400-5.3, Defective and Unauthorized Work, or fails to carry out the Work in
accordance with the Contract Documents or any other applicable rules and
regulations, the City, by a written order of the Parks Superintendent or a
representative specifically empowered to do so, may order the Contractor to stop
the work, or any portion thereof, until the cause for such order has been
eliminated; however, this right of the City to stop the Work shall not give rise to
any duty on the part of the City to exercise this right for the benefit of the
Contractor or any other person or entity. All delays in the Work occasioned by
such stoppage shall not relieve the Contractor of any duty to p erform. Any and
all necessary corrective work done in order to comply with the Contract
Documents shall be performed at no cost to the City.
6.5 Termination of Contract
If at any time the Contractor is determined to be in material breach of the Contract,
notice thereof in writing will be served upon the Contractor and its sureties, and should
the Contractor neglect or refuse to provide means for a satisfactory compliance with the
Contract, as directed by the Parks Superintendent, within the time specified in such
notice, the City shall have the authority to terminate the operation of the Contract with
a ten-day written notice per Section 2000, 9.1 Termination..
Upon such termination, the Contractor shall discontinue the Work, or such parts of it as
the City may designate. Upon such termination, the Contractor's control shall
terminate and thereupon the City or its fully authorized representative may take
possession of all or any part of the Contractor's materials, tools, equipment, and
appliances upon the premises and use the same for the purposes of completing the
Work and hire such force and buy or rent such additional machinery, tools, appliances,
General Conditions 1400-19
and equipment, and buy such additional materials and supplies at the Contractor's
expense as may be necessary for the proper conduct of the Work and for the
completion thereof; or the City may employ other parties to carry the Contract to
completion, employ the necessary workers, substitute other machinery or materials and
purchase the materials contracted for, in such manner as the City may deem proper; or
the City may annul and cancel the Contract and relet the Work or any part thereof.
Any excess of cost arising there from over and above the Contract price will be charged
against the Contractor and its sureties, who will be liable therefore.
In the event of such termination, all monies due the Contractor or retained under the
terms of this Contract shall be held by the City in an escrow account; however, such
holdings will not release the Contractor or its sureties from liability for failure to fulfill
the Contract. Any excess cost over and above the C ontract Amount incurred by the
City arising from the termination of the operations of the Contract and the completion
of the Work by the City as above provided shall be paid for by any available funds in
the escrow account. The Contractor will be so credited with any surplus remaining after
all just claims for such completion have been paid.
7.0 CHANGES IN THE SCOPE OF WORK
7.1 Change Orders and Amendments
7.1.1 Without invalidating the Contract and without notice to sureties or
insurers, the City, through the Parks Superintendent, may at any time or from
time to time, order additions, deletions, or revisions in the Work; these will be
authorized by Change Order. The Contractor shall comply promptly with the
requirements for all Change Orders. The work involved in Change Orders shall
be executed under the applicable conditions and requirements of the Contract
Documents. A Contract Change Order may increase or decrease in the Contract
Amount or an extension or shortening of the Contract Time.
7.1.2 Extra work shall be that work not shown or detailed in the Contract. Such
work shall be governed by all applicable provisions of the Contract Documents.
In giving instructions, the Parks Superintendent shall have authority to make
minor changes in the work, not involving extra cost, and not inconsistent with
the purposes of the work; but otherwise, except in an emergency endangering
life or property, no extra work or change shall be made unless in pursuance of a
written order by the City through the Parks Superintendent, and no claim for an
addition to the total amount of the Contract shall be valid unless so ordered.
7.1.3 In case any change increases or decr eases the work shown, the
Contractor shall be paid for the work actually done at a mutually agreed upon
adjustment to the Contract price, based upon the provisions of Paragraph 1400-
8.0 PROJECT MODIFICATION PROCEDURES
7.1.4 If the Contractor refuses to accept a Change Order, the City may issue it
unilaterally. The Contractor shall comply with the requirements of the Change
Order. The City shall provide for an equitable adjustment to the Contract and
compensate the Contractor accordingly. If the Contractor does not agree that
the adjustment is equitable, it may submit a claim in accordance with Paragraph
1400-7.3.2, Claims.
General Conditions 1400-20
7.2 Differing Site Conditions
7.3 Resolution of Disputes
7.3.1 Contract Interpretation by the Parks Superintendent - Questions
regarding the meaning and intent of the Contract Documents shall be referred in
writing by the Contractor to the Parks Superintendent. The Parks
Superintendent shall respond to the Contractor in writing with a decision.
7.3.2 Claims - Submission of a claim, properly certified, with all required
supporting documentation, and written rejection or denial of all or part of the
claim by the City, is a condition precedent to any action, proceeding, litigation,
suit or demand for arbitration by the Contractor.
7.3.2.1 Notice - If the Contractor disagrees with the Parks
Superintendent's decision in Paragraph 1400-7.3.1, Contract
Interpretation by the Parks Superintendent, or in any case where the
Contractor deems additional compensation for work or materials not
covered in the Contract or which the Parks Superintendent has not
recognized as extra work, the Contractor shall notify the Parks
Superintendent, in writing, of his intention to make claim. Claims
pertaining to decisions provided in Paragraph 1400-7.3.1 shall be filed in
writing to the Parks Superintendent within five (5) days of receipt of such
decision. All other claims notices for extra work shall be filed in writing to
the Parks Superintendent prior to the commencement of such work.
Written notice shall use the words "Notice of Potential Claim". Such
Notice of Potential Claim shall state the circumstances and the reasons for
the claim but need not state the amount. Additionally, no claim for
additional compensation will be considered unless the provisions of
Paragraphs 1400-6.3, Delays, and 6.4, Time Extensions, are complied
with. No claim filed after the date of final payment will be considered.
It is agreed that unless notice is properly given, the Contractor shall not
recover costs incurred by him as a result of the alleged extra work,
changed work or other situation which had proper notice been given
would have given rise to a right for additional compensation. The
Contractor should understand that timely notice of potential claim is of
great importance to the City and is not merely a formality. Such notice
allows the City to consider preventative action, to monitor the
Contractor's increased costs resulting from the situation, to marshall facts,
and to plan its affairs. Such notice by the Contractor, and the fact that
the Parks Superintendent has kept account of the cost as aforesaid, shall
not in any way be construed as proving the validity of the claim.
7.3.2.2 Submission of claim costs - Within 30 days after the last cost of
work for which the Contractor contends additional compensation is due,
but if costs are incurred over a span of more than 30 days, then within 15
days after the thirtieth day and every month thereafter, the Contractor
shall submit to the Parks Superintendent the costs incurred for the
claimed matter. Claims shall be made in itemized detail satisfactory to
the Parks Superintendent in content, detail and format of presentation. If
General Conditions 1400-21
the additional costs are in any respect not knowable with certainty, they
shall be estimated. If the claim is found to be just, it shall be allowed and
paid for as provided in Section 1400-8.0, PROJECT MODIFICATION
PROCEDURES.
7.3.2.3 Affidavit required - All claims submitted to the City shall be
accompanied with a type written affidavit containing the following
language; it must be signed, dated, and notarized on the Contractor's
letterhead:
I, (must be an officer) , being the (title) of (contractor's
name) , declare under penalty of perjury under the laws of the state
of California, and do personally certify and attest that: I have
thoroughly reviewed the attached claim for additional compensation
and/or extension of time, and know its contents, and said claim is
made in good faith; the supporting data is truthful and accurate; the
amount requested accurately reflects the contract adjustment for
which the contractor believes the City of La Quinta is liable; and
further, that I am familiar with California Penal Code Section 72 and
California Government Code Section 12560, Et Seq, pertaining to false
claims, and further know and understand that subm ission or
certification of a false claim may lead to fines, imprisonment and/or
other severe legal consequences.
7.3.2.4 Claim meetings - From time to time the Parks Superintendent
may call special meetings to discuss outstanding claims. The Contractor
shall cooperate and attend, prepared to discuss outstanding claims,
making available the personnel necessary for claim resolution, and
providing documents reasonably requested by the Parks Superintendent.
7.3.3 Resolution of Claims - For all contracts awarded during the effective
dates of Public Contract Code Section 20104, where claims cannot be resolved
between the parties, claims for three hundred and seventy-five thousand dollars
($375,000) or less shall be resolved pursuant to the provisions of that code
section, which is summarized in Paragraphs 1400-7.3.3.1 to 1400-7.3.3.5. For
claims greater than three hundred and seventy-five thousand dollars ($375,000)
Paragraphs 1400-7.3.3.2 to 1400-7.3.3.4 are applicable; however, Paragraph
1400-7.3.3.5, Civil Actions for claims less than $375,000, is not applicable.
7.3.3.1 Claims Less Than $50,000
a. For claims of less than fifty thousand dollars ($50,000), the
Parks Superintendent shall respond in writing to written claims
within 45 days of receipt of the claim in Paragraph 1400 -7.3.2,
Claims, or may request, in writing, within 30 days of receipt of the
claim, any additional documentation supporting the claim or
relating to defenses or claims the City may have against the
Contractor.
b. If additional information is thereafter required, it shall be
requested and provided pursuant to this section, upon mutual
agreement of the City and the Contractor.
General Conditions 1400-22
c. The Parks Superintendent's written response to the claim, as
further documented, shall be submitted to the Contractor within 15
days after receipt of the further documentation or within a period
of time no greater than that taken by the Contractor in producing
the additional information, whichever is greater.
7.3.3.2 Claims Greater Than $50,000
a. For claims of over fifty thousand dollars ($50,000), the Parks
Superintendent shall respond in writing to all written claims within
60 days of receipt of the claim in Paragraph 1400-7.3.2, Claims, or
may request, in writing, within 30 days of receipt of the claim, any
additional documentation supporting the claim or relating to
defenses or claims the City may have against the Contractor.
b. If additional information is thereafter required, it shall be
requested and provided pursuant to this paragraph, upon mutual
agreement of the City and the Contractor.
c. The Parks Superintendent’s written response to the claim, as
further documented, shall be submitted to the Contractor within 30
days after receipt of the further documentation, or within a period
of time no greater than that taken by the Contractor in producing
the additional information or requested documentation, whichever
is greater.
7.3.3.3 Claim Conference - If the Contractor disputes the Parks
Superintendent’s written response, or if the Parks Superintendent fails to
respond within the time prescribed, the Contractor may so notify the City,
in writing, either within 15 days of receipt of the Parks Superintendent’s
response or within 15 days of the Parks Superintendent’s failure to
respond within the time prescribed, respectively, and demand an informal
conference to meet and confer for settlement of the issues in dispute.
Upon a demand, the City shall schedule a meet and conference within 30
days for settlement of the dispute.
7.3.3.4 Claim Filing - If the claim or any portion remains in dispute after
the claim conference noted in Paragraph 1400-7.3.3.4, Claim Conference,
the Contractor may file a claim pursuant to Chapter 1 (commencing with
Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of
Division 3.6 of Title 1 of the Government Code. For purposes of those
provisions, the running of the period of time within which a claim must be
filed shall be tolled from the time the Contractor submits his or her written
claim pursuant to Paragraph 1400-7.3.2, Claims, until the time the claim
is denied, including any period of time utilized in the meet and confer
process.
7.3.3.5 Civil Actions For Claims Less Than $375,000 - The following
procedures are established for all civil actions filed to resolve claims for
less than three hundred seventy-five thousand dollars ($375,000):
General Conditions 1400-23
a. Within 60 days, but no earlier than 30 days, following the
filing or responsive pleading, the court shall submit the matter to
non-binding mediation unless waived by mutual stipulation of both
parties. The mediation process shall provide for the selection
within 15 days by both parties of a disinterested third person as
mediator, shall be commenced within 30 days of the submittal, and
shall be concluded within 15 days from the commencement of the
mediation unless a time requirement is extended upon a good
cause showing to the court.
b. If the matter remains in dispute, the case shall be submitted
to judicial arbitration pursuant to Chapter 2.5 (commencing with
Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure,
notwithstanding Section 1141.11 of that Code. The Civil Discovery
Act of 1986 (Article 3 (commencing with Section 2016) of Chapter
3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to
any proceeding brought under this subdivision consistent with the
rules pertaining to judicial arbitration.
c. In addition to Chapter 2.5 (commencing with Section
1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A)
arbitrators shall, when possible, be experienced in construction law,
and (B) any party appealing an arbitration award who does not
obtain a more favorable judgement shall, in addition to payment of
costs and fees under the chapter, also pay the attorney's fees on
appeal of the other party.
7.3.3.6 Unresolved Issues - Unless this Contract provides otherwise, all
claims, counterclaims, disputes, and other matters in question between
the City and the Contractor that are not resolved between the City and
the Contractor and are not governed by Public Contract Code 20104 shall
be decided by a court of competent jurisdiction. Arbitration shall not be
used for resolution of these disputes.
Should either party to this Contract bring legal action against the other,
the case shall be handled in the California county where the work is being
performed.
7.3.4 Records of Disputed Work - In proceeding with a disputed portion of
the Work, the Contractor shall keep accurate records of its costs and shall make
available, to the Facilities Director, a daily summary of the hours and
classification of equipment and labor utilized on the disputed work, as well as a
summary of any materials or any specialized services which are used. Such
information shall be submitted to the Parks Superintendent on a monthly basis,
receipt of which shall not be construed as an authorization for or acceptance of
the disputed work.
General Conditions 1400-24
8.0 PROJECT MODIFICATION PROCEDURES
8.1 Changes in Contract Price
Whenever corrections, alterations, or modifications of the work under this Contract are
ordered by the Parks Superintendent and approved by the City and increase the
amount of work to be done, such added work shall be known as extra work; and when
such corrections, alterations, or modifications decrease the amount of work to be done,
such subtracted work shall be known as work omitted.
The difference in cost of the work affected by such change will be added to or deducted
from the amount of said Contract price, as the case may be, by a fair and reasonable
valuation, which shall be determined in one or more of the following ways as directed
by the Parks Superintendent:
a. By unit prices subsequently fixed by agreement between the parties;
b. By an acceptable lump sum proposal from the Contractor; or
c. By Force Account (as described in Paragraph 1400 -8.3, Force Account
Payment), when directed in writing and administered by the City through
its agents.
When required by the Parks Superintendent, the Contractor shall submit, in the form
prescribed by the Parks Superintendent, an itemized breakdown with supporting data of
the quantities and prices used in computing the value of any change that may be
ordered.
The Parks Superintendent will review the Contractor's proposal for the change and
negotiate an equitable adjustment with the Contractor. After there is an agreement the
Parks Superintendent will prepare and process the Change Order and make a
recommendation for action by the City. All Change Orders must be approved by the
City in writing before the work can be authorized and the Change Order executed.
The prices agreed upon and any agreed upon adjustment in Contract Time shall be
incorporated in the written order issued by the City, which shall be written so as to
indicate an acceptance on the part of the Contractor as evidenced by its signature. By
signature of the Change Order, the Contractor acknowledges that the adjustments to
cost and time contained in the Change Order are in full satisfaction and accord,
payment in full, and so waives any right to claim further cost and time impacts at any
time during and after completion of the Contract for the changes encompassed by the
Change Order.
8.2 Negotiated Change Orders
Under the methods described in Paragraph 1400-8.1b and 8.1c above, the Contractor
shall submit substantiating documentation with an itemized breakdown of Contractor
and subcontractor direct costs, including labor, material, equipment rentals, and
approved services, pertaining to such ordered work in the form and detail acceptable to
the Parks Superintendent. The direct costs shall include only the payroll cost for
workers and foremen, including wages, fringe benefits as established by negotiated
labor agreements or state prevailing wages, workers' compensation and labor
insurance, and labor taxes as established by law. No other fixed labor burdens will be
General Conditions 1400-25
considered, unless approved in writing by the Parks Superintendent; the cost of
materials used and equipment delivered and installed in such work as substantiated by
appropriate documents; the cost of construction machinery and equipment based on
fair rental or ownership values acceptable to the Parks Superintendent as described in
Paragraph 1400-8.3, Force Account Payment; and the cost of incidentals directly
related to such work. The direct costs shall not include any labor or office costs
pertaining to the Contractor's managers or superintendents, his office staff and office
facilities, or anyone not directly employed on such work, nor the cost of rental of small
tools as all such indirect costs form a part of the Contractor's overhead expense.
Under the method described in Paragraph 1400-8.1b and 8.1c the maximum
percentage which will be allowed for the Contractor's combined overhead and profit will
be:
a. For work by its own organization, the Contractor may add the following
percentages:
• Direct Labor 25 percent
• Materials 15 percent
• Equipment (owned or rented) 15 percent
b. For all such work done by subcontractors, such subcontractor may add the
same percentages as the Contractor as listed in (1) above to its actual net
increase in costs for combined overhead and profit and the Contractor may add
up to ten (10) percent of the subcontractor's total for its combined overhead and
profit.
c. For all such work done by subtier-subcontractors, such sub-subcontractors
may add the same percentages as the Contractor as listed in (1) above to its
actual net increase in costs for combined overhead and profit and the
subcontractor may add up to ten (10) percent of the sub -subcontractor's total
for his combined overhead and profit. The Contractor may add u p to five (5)
percent of the subcontractor's total for its combined overhead and profit.
d. To the total of the actual costs and fees allowed hereinunder, not more
than two (2) percent shall be added for additional bond and insurance other than
labor insurance.
The above fees represent the maximum limits which will be allowed, and they include
the Contractor's and all subcontractors' indirect home office expenses and all costs for
cost proposal preparation.
When both additions and credits are involved in any one change, the combined
overhead and profit shall be figured on the basis of the net increase, if any, for each
area of work, i.e. direct labor, materials, equipment, and subcontractors. The amount
of credit to be allowed by the Contractor to the City for any such change which results
in a net decrease in cost will be the amount of the actual net decrease and a credit in
accordance with the markups allowed under the use of the method described in
Paragraph 1400-8.3, Force Account Payment. The Contractor shall not claim for
anticipated profits on work that may be omitted.
General Conditions 1400-26
8.3 Force Account Payment
If either the amount of work or payment for a Change Order cannot be determined or
agreed upon beforehand, the City may direct by written Change Order that the work be
done on a force account basis. The term "force account" shall be understood to mean
that payment for the work will be done on a time and expense basis, that is, on an
accounting of the Contractor's forces, materials, equipment, and other items of cost as
required and used to do the work. For the work performed, payment will be made for
the documented actual cost of the following:
a. Direct labor cost for workers, including foremen, who are directly assigned
to the force account work: Direct labor cost is the actual payroll cost, including
wages, fringe benefits as established by negotiated labor agreements or state
prevailing wages, workers' compensation and labor insurance, and labor taxes as
established by law. No other fixed labor burdens will be considered, unless
approved in writing by the City.
b. Material delivered and used on the designated work, including sales tax, if
paid for by the Contractor or its subcontractor.
c. Equipment rental, including necessary transportation for items having a
value in excess of One Thousand Dollars ($1,000.00).
d. Additional bond.
e. Additional insurance, other than labor insurance.
To the preceding costs, there shall be added the following fees for the Contractor,
subcontractor, or sub-subcontractor actually performing the work:
• A fixed fee not to exceed fifteen (15) percent of the costs of Items a, b,
and c above.
• To the total of the actual costs and fees allowed hereunder, not more than
two (2) percent shall be added for additional bond and insurance as the cost of
Items d and e above.
For work performed by an approved subcontractor, the Contractor may add to the total
of the actual costs and fixed fees allowed under the preceding paragraph an additional
fixed fee of five (5) percent of said total. No further compensation will be allowed for
the Contractor's administration of the work performed by the subcontractor.
For work performed by a subtier-subcontractor, the subcontractor may add to the total
of the actual costs and fixed fees allowed under the preceding paragraph an additional
fixed fee of five (5) percent of said total. No further compensation will be allowed for
the subcontractor's administration of the work performed by the subtier-subcontractor.
The Contractor may add to the total of the actual costs and fixed fees allowed under
this paragraph an additional fixed fee of five (5) percent of said total. No further
compensation will be allowed for the Contractor's administration of the work performed
by the subcontractor.
General Conditions 1400-27
The added fixed fees shall be considered to be full compensation, covering the cost of
general supervision, overhead, profit, and any other general expense. The above fixed
fees represent the maximum limits which will be allowed, and they include the
Contractor's and all subcontractors' indirect home office expenses and all costs for cost
proposal preparation and record keeping.
The City reserves the right to furnish such materials and equipment as it deems
expedient, and the Contractor shall have no claim for profit or added fees on the cost of
such materials and equipment.
For equipment under Item c above, rental or equivalent rental cost will be allowed for
only those days or hours during which the equipment is in actual use. Payment shall be
based on actual rental and transportation invoices but shall not exceed the monthly
rate in the Rental Rate Blue Book. Owner-operated equipment rates shall not exceed
the monthly rate in the Rental Rate Blue Book plus the labor costs as provided in Item
a. above. The rental cost allowed for equipment will, in all cases, be understood to
cover all fuel, supplies, repairs, ownership, and incidental costs and no further
allowances will be made for those items, unless specific agreement to that effect is
made. For Contractor owned equipment, the rental rate shall be as listed for such
equipment in the California Department of Transportation publication entitled "Labor
Surcharge and Equipment Rental Rates", which is in effect on the date the work is
accomplished. When equipment is not listed in said publication, a suitable rental rate
for such equipment will be established by the Parks Superintendent.
Prior to the commencement of force account work, the Contractor shall notify the Parks
Superintendent of its intent to begin work. Labor, equipment and materials furnished
on force account work shall be recorded daily by the Contractor upon report sheets
furnished by the Parks Superintendent to the Contractor. The reports, if found to be
correct, shall be signed by both the Contractor and Parks Superintendent and a copy of
which shall be furnished to the Parks Superintendent no later than the working day
following the performance of said work. The daily report sheet shall thereafter be
considered the true record of force account work provided.
The Contractor shall maintain its records in such a manner as to p rovide a clear
distinction between the direct costs of work paid for on a force account basis and the
costs of other operations.
To receive partial payments and final payment for force account work, the Contractor
shall submit, in a manner approved by the Parks Superintendent, detailed and complete
documented verification of the Contractor's and any of its subcontractor's actual costs
involved in the force account pursuant to the pertinent Change Order. Such costs shall
be submitted within thirty (30) days after said work has been performed. No payments
will be made for work billed and submitted to the Parks Superintendent after the thirty
(30) day period has expired.
The force account invoice shall itemize the materials used and shall cover the direct
costs of labor and the charges for equipment rental, whether furnished by the
Contractor, subcontractor, or other forces. The invoice shall be in a form acceptable to
the Parks Superintendent and shall provide names or identifications and classifications
of workers, the hourly rate of pay and hours worked, and also the size, type, and
General Conditions 1400-28
identification number of equipment and hours operated. Material charges shall be
substantiated by valid copies of vendor's invoices.
When both additions and credits are involved in any one change, the combined
overhead and profit shall be figured on the basis of the net increase, if any. The
amount of credit to be allowed by the Contractor to the City for any such change which
results in a net decrease in cost will be the amount of the actual net decrease and a
credit in accordance with the markups allowed under the use of the method described
in this Paragraph. The Contractor shall not claim for anticipated profits on work that
may be omitted.
9.0 PAYMENT
9.1 Scope of Payment
9.1.1 General - The Contractor shall accept the compensation, as herein
provided, as full payment for furnishing all labor, materials, tools, equipme nt,
and incidentals necessary for completing the Work according to the Contract
Documents. Neither the payment of any partial payment estimates nor of any
retained percentage shall relieve the Contractor of any obligation to make good
any defective work or material.
9.1.2 Payment for Patents and Patent Infringement - All fees or claims for
any patented invention, article, or arrangement that may be used upon, or in,
any manner connected with the performance of the work or any part thereof
shall be included in the price proposal for doing the work, and the Contractor and
its sureties shall defend, protect, and hold the City, its consultants, the Parks
Superintendent, together with all their officers, agents, and employees harmless
against liability of any nature or kind for any and all costs, legal expenses, and
damages made for such fees or claims and against any and all suits and claims
brought or made by the holder of any invention or patent, or on account of any
patented or unpatented invention, process, article, or appliance manufactured
for or used in the performance of the Contract, including its use by the City,
unless otherwise specifically stipulated in the Contract. Before final payment is
made on the Contract, the Contractor shall furnish an affidavit to the City
regarding patent rights for the project. The affidavit shall state that all fees and
payments due as a result of the work incorporated into the project or methods
utilized during the Contract have been paid in full. The Contractor shall certify in
the affidavit that no other fees or claims exist for work in this project.
9.1.3 Payment of Taxes - The Contractor shall pay and shall assume exclusive
liability for all taxes levied or assessed on or in connection with the Contractor's
performance of this Contract, including, but not limited to, State and local sales
and use taxes, Federal and State payroll taxes or assessments, and excise taxes,
and no separate allowance will be made therefor, and a ll costs in connection
therewith shall be included in the total amount of the Contract price.
9.1.4 Payment for Labor and Materials - The Contractor shall pay and
require its subcontractors to pay any and all accounts for labor including
worker's compensation premiums, state unemployment and federal social
security payments and other wage and salary deductions required by law. The
General Conditions 1400-29
Contractor also shall pay and cause its subcontractors to pay any and all
accounts for services, equipment, and materials used by the Contractor and its
subcontractors during the performance of work under this Contract. Such
accounts shall be paid as they become due and payable. If requested by the
City, the Contractor shall furnish proof of payment of such accounts to the City.
9.2 Partial Payments
In consideration of the faithful performance of the work prosecuted in accordance with
the provisions of these Specifications and the Contract, the City will pay the Contractor
for all such work installed on the basis of percentage completion.
Payments will be made by the City to the Contractor on estimates duly certified and
approved by the Parks Superintendent, based on the value of equipment installed and
tested, labor and materials incorporated into said permanent work by the Contractor
during the preceding month. Payments will not be made for temporary construction
unless specifically provided for in the Contract Documents.
Partial payments will be made monthly based on work accomplished as of a day
mutually agreed to by the City and the Contractor.
The Contractor shall submit his estimate of the work completed during the prior month
and the work completed to date in a format corresponding to the accepted cost
breakdown. The Parks Superintendent shall review the submitted estimate, and upon
approval, the Contractor may submit a detailed invoice for those amounts approved by
the Parks Superintendent.
If requested, the Contractor shall provide such additional data as may be reasonably
required to support the partial payment request. If the Parks Superintendent does not
agree with the Contractor's estimate of amount earned, the partial payment request
will be returned for revision. The Parks Superintendent will be available to meet to
discuss the partial payment request prior to its re-submittal. When the Contractor's
estimate of amount earned conforms with the Parks Superintendent’s evaluation, the
Parks Superintendent will calculate the amount due the Contractor, prepare the
progress payment request for signature by the Contractor, and submit the
recommended progress payment request for the City's approval and processing.
Payment will be made by the City to the Contractor in accordance with City's normal
accounts payable procedures; the City shall retain amounts in accordance with
Paragraph 1400-9.4, Right to Withhold Amounts.
No such estimate or payment shall be required to be made, when in the judgement of
the Parks Superintendent, the Work is not proceeding in accordance with the provisions
of the Contract, or when in the Parks Superintendent’s judgement the total value of the
Work done since the last estimate amounts to less than One Thousand Dollars
($1,000.00).
9.3 Partial Payments - Inclusion of Materials on Hand
No payment will be made for materials delivered to the site that are not yet
incorporated into the work.
General Conditions 1400-30
9.4 Right to Withhold Amounts
9.4.1 Retention - The City MAY deduct from each partial payment and retain as
part security, ten (10) percent of the amount earned until the final payment.
Pursuant to Public Contract Code Section 22300, for monies earned by the
Contractor and withheld by the City to ensure the performance of the Contract,
the Contractor, may, at his or her option, choose to substitute securities meeting
the requirements of said Section 22300. In the event the Contractor desires to
choose this option, the Contractor shall enter into an escrow agreement with the
City, and the escrow agent, a qualified bank to be chosen by City, in the for m of
the contract included in the project specifications. The costs of such escrow shall
be paid by the Contractor. The securities to be deposited in said escrow account
shall be equivalent, in fair market value, to the amount to be withheld as
performance retention. The securities shall be held in accordance with the
provisions of Public Contract Code Section 22300, and the implementing
contract.
Contractor shall have the obligation of ensuring that such securities deposited
are sufficient so as to maintain, in total fair market value, an amount equal to
the cash amount of the sums to be withheld under the Contract. If, upon written
notice from the City, or from the appropriate escrow agent, indicating that the
fair market value of the securities has dropped below the dollar amount of
monies to be withheld by the City to ensure performance, Contractor shall,
within five days of the date of such notice, post additional securities as necessary
to ensure that the total fair market value of all such securities held by the City,
or in escrow, is equivalent to the amount of money to be withheld by the City
under the Contract.
Any Contractor that desires to exercise this option shall give notice in writing to
City and shall thereafter execute the escrow agreement form provided in
Appendix A of these Specifications.
9.4.2 Other Withholds - In addition to the amount which the City may
otherwise retain under the Contract, the City may withhold a sufficient amount
or amounts of any payment or payments otherwise due the Contractor, as in its
judgement may be necessary to cover:
a. Payments which may be past due and payable for just claims
against the Contractor or any subcontractor for labor or materials
furnished for the performance of this Contract.
b. For defective work not remedied.
c. For failure of the Contractor to make proper payments to its
subcontractors or suppliers.
d. A reasonable doubt that the Contract can be completed for the
balance then unpaid.
e. Damage to another Contractor or third party, or to property.
General Conditions 1400-31
f. Failure of the Contractor to keep its work progressing in accordance
with its progress schedule.
g. The City's costs for the Contractor's failure to complete within the
allowed time.
h. Cost of insurance arranged by the City d ue to cancellation or
reduction of the Contractor's insurance.
i. Failure of the Contractor to make proper submissions, as herein
specified.
j. Failure to submit, revise, resubmit, or otherwise conform to the
requirements herein for preparing and maintaining a project schedule.
k. Payments due the City from the Contractor.
l. Reduction of Contract Amount because of modifications.
m. The Contractor's neglect or unsatisfactory prosecution of the work
including failure to clean up.
n. Provisions of law that enable or require the City to withhold such
payments in whole or in part.
When the above reasons for withholding amounts are removed, payment may be made
to the Contractor for amounts withheld.
The City in its discretion may apply any withheld amount or amounts to the payment of
valid claims. In so doing, the City shall be deemed the agent of the Contractor, and
any payment so made by the City shall be considered as a payment made under the
Contract by the City to the Contractor, and the City shall not be liable to the Contractor
for such payment made in good faith. Such payments may be made without prior
judicial determination of the claim or claims. The City will render to the Contractor a
proper accounting of such funds disbursed in beh alf of the Contractor.
9.5 Warranty of Title
No material, supplies, or equipment for the work under this Contract shall be purchased
subject to any chattel mortgage, security agreement, or under a conditional sale or
other agreement by which an interest therein or any part thereof is retained by the
seller or supplier. The Contractor warrants good title to all material, supplies, and
equipment installed or incorporated in the work and agrees upon completion of all work
to deliver the premises, together with all improvements and appurtenances constructed
or placed thereon by the Contractor, free from any claim, liens, security interest, or
charges, and further agrees that neither the Contractor nor any person, firm, or
corporation furnishing any materials or labor for any work covered by this Contract
shall have any right to a lien upon the premises or any improvement or appurtenances
thereon.
General Conditions 1400-32
End of Section 1400
General Project Requirements 2000-1
DIVISION 2
SECTION 2000
GENERAL PROJECT REQUIREMENTS
1.0 CONTRACT LOCATION
The work involves the perpetual yearly maintenance of all of the Parks within the City of
La Quinta consisting of maintenance and repair of amenities, planting, and irrigation in
the parks, retention basins, and civic facilities. See the Appendix section and bid forms
for a listing and depiction of areas to be maintained as part of this specification and
request for bid.
2.0 CONTRACT TERMS
The contract shall be for a period of twelve (12) months, or until June 30, 2020,
beginning with the date of execution of the contract (July 1, 2019). The City of La
Quinta has the option to renew the contract for four (4) additional one-year extensions.
If the contract is renewed, the total length of the contract shall not exceed five (5)
years from the original date of award. If the City intends to renew the contract, the
Contractor will be given ninety (90) days advance notice in writing prior to the
termination date of the contract. The City and the Contractor shall negotiate any
changes to increase the current annual contract amount. If the Contractor decides to
refuse the offer to renew, the Contractor shall notify the City in writing within sixty (60)
days prior to the termination date of the contract with their intent not to accept the
offer.
3.0 PERMITS AND LICENSES
The Contractor shall be responsible for obtaining any and all permits required to
perform this service.
4.0 WORKER'S COMPENSATION COVERAGE
The Contractor shall procure and maintain, during the life of the contract, Worker's
Compensation Insurance for all his or her employees engaged on or at the site of the
project, and in case any of the work is sublet, the Contractor shall require all
subcontractors to similarly provide Worker's Compensation Insurance for all the latter's
employees unless such employees are covered by protection afforded by Worker's
Compensation Insurance carried by the Contractor.
5.0 INSURANCE COMPLIANCE REQUIREMENTS
The Contractor shall furnish City satisfactory proof of full compliance with all insurance
requirements prior to execution of the contract on forms herein provided. The
Contractor shall submit Certificate(s) of Insurance which must indicate which policy
covers each insurance item as per Section 1340, LIABILITY AND INSURANCE
REQUIREMENTS.
General Project Requirements 2000-2
6.0 WORKING HOURS
Maintenance and operation of equipment within one half mile of human occupancy shall
be performed only during the time periods as follows:
October 1st to April 30th Monday – Friday 7 a.m. to 5:30 p.m.
Saturday - Sunday 8 a.m. to 5 p.m.
May 1st to September 30th Monday - Friday 7 a.m. to 7 p.m.
Saturday - Sunday 8 a.m. to 5 p.m.
The Contractor shall notify the Parks Superintendent at least 24 hours prior to any work
outside the normal working hours defined above, on weekends or holidays.
7.0 HOLIDAYS
During the week of a holiday, the Contractor shall adjust his schedule to return to
normal weekly schedule the following week for all items.
8.0 PERFORMANCE DEFICIENCIES AND REDUCTION IN PAYMENT
The City of La Quinta has set up very specific criteria in which to evaluate the
performance of the contractor on a weekly basis during the perpetual maintenance of
the annual contract.
As the City representative identifies performance deficiencies, fines may be deducted
from the Contractor's monthly invoice. The following deficiencies, terms, and fines
apply to this specific contract and scope of work.
Deficiency No. 1 - Lack of compliance to specifications, work conditions, i.e., failure to
adequately mow, edge, sweep, pick-up trash/debris and animal feces, and apply
chemicals and prune, etc.
Each week the Contractor's performance for each maintenance area will be evaluated.
In the event the performance is unsatisfactory and the poor performance is clearly the
fault of the Contractor (any service not performed which is required by the contract),
the Contractor will be given written notice stating the deficient area(s), a date
deficiencies must be completed by, and the amount of money being withheld until
deficiency is corrected and satisfactory to the City (up to $100 per instance per work
day).
If the Contractor has been notified of a deficiency and the deficiency is not corrected
within the time period specified in work statement for each task, the withheld funds will
not be paid. (Exceptions will be made with prior approval of the City for delays in the
ordering of parts and adverse weather conditions.)
In the event the Contractor is deficient in any required service, the City may perform
the service by City personnel or by separate contract. The cost of services performed
by City personnel or separate contract will be deducted from the Contractor's monthly
invoice. The Contractor shall not have the exclusive right during the term of this
contract and all renewals thereof within the City.
General Project Requirements 2000-3
If this type of deficiency should occur in the same location more than once, the fine
identified above will be automatically deducted from the Contractor's monthly invoice
for that maintenance area.
Deficiency No. 2 - Failure to provide adequate equipment in compliance with City
specifications and/or as requested by the City representative may result in a deduction
of up to $100 per instance per work day.
Deficiency No. 3 - Failure to protect public health and/or correct safety concerns.
These include, but are not limited to, policing City property for hazards, responding to
emergencies, providing adequate traffic control measures (per W.A.T.C.H. guidelines),
$100 per occurrence.
Deficiency No. 4 - Failure to comply with water restrictions imposed by the Water
Authority and failure to have the irrigation controllers programmed per the City -
provided schedules. Up to $100 deduction per occurrence. Addition ally, Contractor
shall be responsible for any imposed penalties or/and additional tier costs in water bill.
Deficiency No. 5 - Minor irrigation deficiencies (non-continuous water flow) shall be
repaired within forty-eight (48) hours. Major irrigation deficiencies (continuous water
flow) shall be repaired within twelve (12) hours. $100 per day may be deducted from
the monthly invoice.
Deficiency No. 6 - Contractor is deficient for not following or managing, on a daily
basis, the Contractor-submitted and City-approved quality control program, including
but not limited to weekly schedules, weekly manpower allocation form, weekly irrigation
maintenance form for minor repairs, weekly irrigation material purchase request for
major repairs and weekly performance requirements summary reports. Up to $100
deduction per occurrence from the monthly invoice.
Deficiency No. 7 - Failure to provide requested Landfill Diversion Report forms. Up to
a $100 deduction per occurrence from the monthly invoice.
9.0 TERMINATION
9.1 Termination prior to expiration of term.
This section shall govern any termination of this Agreement except as specifically
provided in Section 9.2 for termination for cause. City reserves the right to terminate
this Agreement at any time, with or without cause, upon a ten-day written notice to
Contractor. Upon receipt of any notice of termination, Contractor shall immediately
cease all services, hereunder except such as may be specifically approved by the
Contract Officer. Contractor shall be entitled to compensation for all services rendered
prior to receipt of the notice of termination and for any services authorized by the
Contract Officer thereafter in accordance with the Schedule of Compensation or such as
may be approved by the Contract Officer, except as provided in Section 9.3.
9.2 Termination for Default of Contractor.
If termination is due to the failure of Contractor to fulfill its obligations under this
Agreement, City may, after compliance with the provisions, take over work and
General Project Requirements 2000-4
prosecute the same to completion by contract or otherwise. Contractor shall be liable
to the extent that the total cost for completion of the services required, hereunder
exceeds the compensation herein stipulated (provided that City use reasonable efforts
to mitigate such damages), and City may withhold any payments to Contractor for the
purpose of setoff or partial payment of the amounts owed City as previously stated in
Section 9.3.
9.3 Attorneys' Fees.
If either party commences an action aga inst the other party arising out of or in
connection with this Agreement, the prevailing party shall be entitled to recover
reasonable attorneys' fees and costs of suit from the losing party.
10.0 LABOR CHARGES
Labor charges for services not covered in line items of the proposal shall be approved
by the City in writing prior to starting work. If no authorization is obtained, the
Contractor will not be paid. The Contractor shall submit an estimate to the City for
approval prior to beginning work. The charges shall be reviewed, by the City, to
determine if they are fair and reasonable. The City reserves the right to perform the
work by others if the Contractor's estimate is not considered fair and reasonable. The
Contractors shall submit their proposal labor charges for specified extra work. These
charges will remain firm for the duration of the contract.
11.0 DAMAGES
Any damages done to the landscape areas, which are clearly determined as the fault of
the Contractor, due to neglect or careless operation, will be paid for by the Contractor.
This will include, but not be limited to, damages, facilities, equipment, sprinklers, and
structures.
12.0 MATERIALS
Seed, fertilizer, pesticides, and sprinkler parts (excluding controllers and mainlines),
pre-emergence, herbicides, and growth regulators (considered a management tool and
therefore excluded from reimbursement) are all materials to be included in the lump
sum contract amount. See the specific project requirement specifications for a thorough
definition of minor and major irrigation repairs.
Dog Bags are also considered to be materials in the contract and can be purchased
from:
Zero Waste USA Inc
12316 World Trade Drive, #102
San Diego, CA 92128
Telephone: (800) 789-2563
Fax: (800) 789-6619
There are currently 39 dog bag dispensers in the Park Landscape Maintenance Services
area. Current usage is 21,000 bags per month (3.5 cases of 6,000 bags). Any increase
or decrease in dispensers and dog bag usage will not change the contract amount.
General Project Requirements 2000-5
13.0 WATER
The City shall furnish only metered water. Contractor shall provide daily water
management by staff Certified in Maxicom/IQ and a Certified Landscape Irrigation
Auditor. Contractor will be responsible to pay for additional costs for water bills that are
within their control and not rated as “Efficient” or Excellent”. In situations of backflow
theft, vandalism, broken mainlines, or City Events that require additional water, the
contractor will not be responsible for the difference.
14.0 ACCEPTANCE
All work specified shall be completed under the direction and satisfaction of the City and
in accordance with these specifications. The City will monitor the Contractor's
performance and review weekly submittal of forms and schedules if necessary to
conduct evaluations of the Contractor's overall compliance with administration and
physical performance of said contract.
15.0 COMPLAINTS RECEIVED BY THE CITY
The City will notify the Contractor, in writing, of each contract complaint reported by
the public. A citizen complaint will be indicated on the Performance Deficiency Form
and Contract Maintenance Incidence Report and will be given to the Contractor
indicating the day and hour the complaint was observed or reported, the location and
description of the complaint, and the section (or fraction thereof) to be deducted from
contract payment, if appropriate.
The Contractor will have twenty-four (24) consecutive hours to correct the problem
except complaints received on trash collection, cleaning, and maintenance where the
Contractor will have one (1) hour to respond with corrective action as specified by a
City of La Quinta representative (if applicable, exceptions will be made for ordering of
parts and adverse weather conditions). The Contractor will submit to the City, in
writing, when and how the problem was corrected, and the action to prevent the
situation from recurring. If the Contractor fails to correct the problem of the citizen's
complaint within the time constraints, the City shall correct the situation with the City
personnel or separate contract and the cost will be deducted from the Contractor's
monthly invoice.
16.0 COMMUNICATIONS
Throughout the period of this contract, the Contractor shall establish and maintain a
local office with a quality control managing agent. The Contractor's quality control
managing agent shall serve as the point of contact for dealing and communicating with
the Contractor and City Inspector.
The Contractor shall have the capability to receive and to respond immediately to calls
of an emergency nature during normal working hours and during hours outside of
normal working hours. Calls of an emergency nature received by the City shall be
referred to the Contractor for immediate disposition.
General Project Requirements 2000-6
A. In the event that emergency work is required, the Contractor shall notify the City
representative by telephone in advance before any emergency work is commenced.
Non-emergency maintenance work outside of this contract scope requires written
approval before the work is performed.
B. In situations involving emergency work after normal work hours, the Contractor
shall dispatch qualified personnel and equipment to reach the site within two (2) hours.
Contractor's vehicle shall carry sufficient equipment to effect safe control of traffic.
When the Contractor arrives at the site, the Contractor shall set up traffic warning and
control devices, if deemed necessary, and proceed to repair the system on a temporary
basis.
C. The Contractor shall supply the City with name(s) an d phone number(s) of
responsible person(s) representing the Contractor for 24-hour emergency response.
The above-mentioned information shall remain current at all times. Any changes shall
be forwarded to the City in writing within 12 hours of any such ch ange. Failure to
maintain emergency information current shall result in a $100 penalty for each
occurrence.
Emergency response defined:
As per City representative(s)
By prior agreement
Public health/safety matters
Public health/safety matters include but are not limited to broken water mains, stuck
valves, threat to private property resulting from the responsible Contractor's
operations, fallen trees, natural disasters, etc.
D. During periods of inclement weather, (i.e., excessive rainfall), Contractor shall
be responsible for removing water from all play areas and keeping all drainage facilities
clear and in operating condition within the contract areas.
17.0 CONTRACTOR'S EMPLOYEES
The Contractor's employees, supervisors, and representatives shall not identify
themselves as employees of the City of La Quinta. All employees shall conduct
themselves in a professional and courteous manner while in public areas. Obscene
language or gestures of deviant behavior by the Contractor's employees will be
reported to the Contractor immediately for corrective action.
18.0 QUALITY CONTROL/QUALITY ASSURANCE
18.1 Quality Control
The Contractor shall establish quality control program to assure the requirements of the
contract are performed as specified. The quality control program will be used by the
Contractor to monitor their performance of the contract. The Contractor's quality
control program must be managed by an individual whose primary responsibility is to
monitor and implement the quality control program. This manager will be responsible
for communicating with the City representative, signing all schedules and reports, and
have the authority to schedule the Contractor's employees and authorize extraordinary
General Project Requirements 2000-7
work hours to accommodate emergency repairs. Upon request by the Parks
Superintendent, a copy of the Contractor's quality control program shall be provided for
review and approval. The City will approve or disapprove the Contractor's program
within ten (10) working days of submittal.
18.2 Supervision and Manpower Allocation
The Contractor shall provide adequate supervisors each day of the workweek during the
life of the contract. The Contractor shall assign a supervisor full-time (40 hours per
week) within the City limits of the City of La Quinta, working regular working hours for
the duration of this contract. They shall have a minimum of five (5) years experience
in landscape maintenance supervision. The Contractor, or his staff, should have
expertise and experience in turf and tree management, entomology and pest control,
soils, fertilizers, plant identification, park facilities, and irrigation system maintenance.
Supervisor shall be capable of communicating effectively both in written and spoken
English. When requested by the City representative, the Contractor shall submit to the
City a Manpower Allocation Form (see Section 8000 for form) the Friday prior to the
upcoming week. The form shall completely define the number of positions being used
during the upcoming week and type of tasks to be completed.
18.3 Safety
The Contractor will assist the City in reducing hazards and dangerous situations in the
contract landscape areas. Any safety hazard will be reported within one (1) hour after
it is noted. Any vandalism shall be reported within two (2) hours after it is noted.
18.4 Weekly Maintenance Schedule
This contract requires the Contractor to maintain each month a Weekly Schedule.
When requested by the City representative this form (Section 8000) shall indicate what
landscape maintenance area work will be performed, what day of the week, what type
of work is to be performed, and if this is current work or make-up work (due to
inclement weather only).
18.5 Authorization
The Parks Superintendent, or his authorized designee, will decide all questions, which
may arise as to the quality and acceptance of any work, performed under the contract.
18.6 Landfill Diversion
This contract requires that all "green waste," i.e., grass clippings, shrubbery cuttings,
tree trimmings, and land clearing debris, be removed and delivered to one of the
following types of facilities:
· Composting facility
· Mulching facility
· Biomass facility
· Green Waste Reuse Facility
General Project Requirements 2000-8
Collected green waste, grass clippings, shrubbery cutting, tree trimmings, and land
clearing debris shall not be delivered to a landfill for disposal. All such waste must be
recycled, composted, processed at a biomass facility, or otherwise reused.
Contractor shall deliver to the City upon request during the term of this contract, a
Landfill Diversion Form (Section 8000) with attached proof consisting of receipts for
tipping fees or other written documentation that all collected green waste, grass
clippings, shrubbery cuttings, tree trimmings, and land clearing debris were delivered to
a recycling, composting, mulching, biomass, or other green waste reuse facility.
If additional information concerning the disposition of the green waste by Contractor is
required by City, Contractor shall supply such information promptly to City.
Contractor's failure to comply with any requirement contained in this Section of the
contract requirements shall be grounds for immediate termination of this contract, for
cause, by the City. A list and location of composting facilities local to the City are
available from the Parks Superintendent.
19.0 Landscape Maintenance Equipment Inventory
The following equipment is to be included within the Contractor's maintena nce
equipment inventory for the City. All equipment shall receive scheduled preventative
maintenance to promote equipment reliability and ensure optimum performance at all
times. All equipment is subject to City representative approval. Any piece of
equipment deemed unsatisfactory by City representative shall be repaired or replaced
immediately.
Maxicom/IQ Irrigation Software
The Contractor shall posses and maintain a computer and Maxicom/IQ software capable
of providing central irrigation control of the City’s Rainbird Irrigation Systems.
Mowing Equipment
A. Mechanically, ground driven, or hydraulic driven gang reel mowers capable of
providing variable cutting widths and cutting heights of 3/4" to 11/2” shall be used on
warm season turf grasses such as Bermuda and cool season grasses such as Rye.
B. Hydraulic driven reel mower (Triplex) with reels having a minimum of nine blades
shall be used on all Rye grass and hybrid Bermuda turf grasses. Mowers shall provide a
maximum cutting width not to exceed 84". Mowers shall be capable of providing
cutting heights from 1/2" to 11/2" and have the ability of collecting grass clippings if
deemed necessary by City representative.
C. Rotary mowing lawn tractors shall be used to cut cool season and warm season
grasses where applicable. Mower deck widths shall vary depending on terrain and
location; however, a minimum width of 48" shall be maintained. Mowers shall be
capable of providing cutting heights from 1" to 1 1/2", and have the option of collecting
grass clippings if deemed necessary by City representative.
D. Walk behind rotary mowers with the capability of collecting grass clippings may
be required on small turf areas.
General Project Requirements 2000-9
Vertical Mowers/De-Thatcher
A. Self propelled walk behind vertical cutting mowers (renovators) shall be used on
small turf areas, not easily accessed by larger vertical cutting mowers, or areas deemed
necessary by City representatives.
B. A vertical cutting mower (de-thatcher) hydraulically or P.T.O. driven from
attached tractor with a minimum cutting width of 60" shall be used on large turf areas.
Blades shall be free swinging and spaced a maximum of 2" apart.
C. A vertical cutting mower (renovator) hydraulically or P.T.O. driven from attached
tractor with fixed 1/8" thick, 12" diameter, 8-10 pointed slicing type blades, spaced a
maximum of 2" apart, shall be used on all hybrid Bermuda grasses.
Turf Vacuum/Power Rake
Contractor shall include a turf vacuum/power rake having the capability to pick up
leaves, verticut clippings, and other debris. Turf vacuum/power rake shall be a
minimum of 60" wide and have an agitating raking mechanism to aid in the proficiency
of the vacuum.
Aerators
A. Walk behind self-propelled aerators shall be used on smaller turf areas, not easily
accessed by larger aerators, or other areas deemed necessary by City representative.
Aerators shall have tines 3/8” to 3/4" in diameter and spaced a maximum of 3" apart.
B. Aerators a minimum of 60" wide shall be used on large turf areas. Aerators shall
run under their own power or by a tractor PTO. Aerators shall be capable of following
contours and minor grade changes in the turf grasses. Aerator tines shall be 3/8” to
3/4" in diameter, spaced a maximum of 3" apart, and be capable of penetrating the soil
to a minimum depth of 3".
String Trimmers and Edgers
Contractor shall include sting trimmers and edger’s for trimming and edging around
walks, trees, planters, shrubs, fences, and all other areas of the park requiring detailed
trimming. Trimming and edging shall be performed each time a turf area is mowed.
Fertilizer Spreader
Contractor shall include equipment that is specifically designed for the proper
application of fertilizer at measured rates.
Utility Tractor
Contractor shall include a utility tractor capable of operating specified equipment.
Tractor shall provide power to auxiliary equipment. Power provided (hydraulic of
P.T.O.) shall be within manufacturer specified limits for attached equipment.
General Project Requirements 2000-10
Trimming and Pruning Equipment
A. Contractor shall include a tree chipper equivalent of commercial capacity.
Chipper shall operate from its own power source. Chipper shall be capable of ejecting
wood chips and debris into a truck bed.
B. Contractor shall include a "chipping truck". Truck shall have hydraulic dump bed
with fully enclosed sides, and partial top and rear gate capable of receiving chippings
from attached tree chipper.
C. Contractor shall include gas powered chainsaws.
D. Contractor shall include pole saws. The pole saw can be either gas powered or
manually operated.
Pesticide Application Equipment
Contractor shall include a large capacity (50 -gallon minimum) pesticide sprayer.
Sprayer shall also have a spray wand/gun with a minimum of 100' of hose.
Pressure Washer
Contractor shall provide a pressure washer for regular cleaning of facilities including but
not limited to; picnic areas, concession areas, benches, tables, trash cans, playgrounds,
play courts, skate areas, and walkways.
20.0 SPECIAL REQUESTS
The Contractor may be requested by a City representative to perform special tasks,
which are above his normal scheduled work (i.e., citizen action requests, coordination
with utility locations or special work orders). It is intended that the Specifications are
indicative of the work to be anticipated by the Contractor and will allow for reasonable
additional work at no additional cost to the City which is considered normal
maintenance to meet the objectives and criteria of this contract.
21.0 PROJECT INSPECTIONS
Upon request, the Contractor or his representative will walk the project with a City
representative for determining compliance with the specifications, or to discuss the
required work. Contractor representative must be authorized to sign documents and
effect changes to the job.
22.0 SAFETY
Contractor shall be responsible for providing a safe work place, and compliance with
standards and regulations of the California Occupational Safety and Health Act
(CalOSHA), Federal Occupational Safety and Health Act (OSHA), California Division of
Industrial Safety Orders (CDIS), State of California Manual of Traffic Controls, California
Department of Food and Agriculture (CDFA) Laws and Regulations, and any other
applicable governmental law or City risk management standards. Non-compliance with
previously mentioned standards and regulations will result in a deficiency of
performance deduction.
General Project Requirements 2000-11
23.0 TRAFFIC CONTROL
The Contractor shall not impede or block public access to the parks, roads, or parking
areas.
When entering or leaving roadways carrying public traffic, the Contractor's equipment,
whether empty or loaded, shall in all cases yield to public traffic.
24.0 THE CITY'S RIGHT TO DO WORK
The City reserves the right to do work as required within the contract area. If such
alterations affect the provision of this agreement, the Contractor will be asked to
submit a cost as a result of the alterations.
25.0 COOPERATION/COLLATERAL WORK
A. The Contractor shall recognize that during the course of the contract other
activities and operations will be conducted by the City and/or other Contractors. These
activities will include but are not limited to landscape refurbishment, irrigation system
modification or repair, construction, and storm related operations.
B. The Contractor may be required to modify or curtail certain operations and shall
promptly comply with any request by the City representative to cooperate.
26.0 PROTECTION OF PROPERTY DURING INCLEMENT WEATHER
A. During periods of storms, the Contractor will provide supervisory inspection of
the project during regular working hours to prevent or minimize possible damage from
inclement weather. The Contractor shall submit a report identifying any storm damage
to the City's representative attached to a site map (see Appendix for Landscape
Maintenance Maps), identifying location of damage and cost estimate to repair and/or
replace. If remedial work is required beyond the scope of this contract, it will be
reimbursed on a separate purchase order.
B. It is the Contractor's responsibility to remove debris accumulated by high winds
or other typical or non-typical environmental conditions.
27.0 PROTECTION OF EXISTING FACILITIES AND STRUCTURES
The Contractor shall exercise due care in protecting from damage all existing facilities,
structures, and utilities both above surface and underground on the City's property.
Any damage to City property deemed to be caused by the Contractor's neglect shall be
corrected or paid for by the Contractor at no cost to the City.
If the City requests or directs the Contractor to perform work in a given area, it will be
the Contractor's responsibility to verify and locate any underground systems, i.e., utility
lines. This does not release the Contractor of the responsibility for taking reasonable
precaution when working in these areas. Any damage or problems shall be reported
immediately to the City.
General Project Requirements 2000-12
28.0 CITY LIAISON
The Parks Superintendent and the Contractor's Supervision representative will meet on
a weekly basis. The purpose of this meeting will be to discuss specific project problems.
Frequent contact may be required between the City ’s Parks Superintendent and the
Contractor's representative separately from these meetings.
29.0 METHOD OF PAYMENT
The Contractor shall present, for the previous month, monthly invoices for contracted
monthly amount. Included with monthly billing will be the work functions accomplished
during that period, other than what is indicated on the Maintenance Schedule (i.e.,
fertilization, pest control, etc.).
Send monthly invoices to: City of La Quinta
Robert Ambriz, Jr.
Parks Superintendent
rambrizj@laquintaca.gov
The monthly proposal amount is the amount set forth in Proposal form submitted.
30.0 WORK NOT INCLUDED
Water and electrical billings, except in instances where excessive costs are incurred by
the City due to water waste or negligence by the Contractor, are not included within
this contract. If the City, based upon all the facts gathered, determines that excessive
utility costs have occurred, the City may withhold from the payment to Contractor
those funds necessary to reimburse the City for these additional costs.
31.0 CONTRACTOR NEGLECT
Any damage to the City's property, which has been determined to be due to the
Contractor’s neglect, shall be corrected at no additional cost to the City. Loss of plant
material due to improper care is also included.
32.0 SOUND CONTROL REQUIREMENTS
The Contractor shall comply with all local sound control and noise level rules,
regulations, and ordinances, which apply to any work performed pursuant to the
Contract.
Each internal combustion engine used for any purpose on the job or related to the job
shall be equipped with a muffler of a type recommended by the manufacturer of such
equipment. No internal combustion engine shall be operated on the project without
said muffler.
Full compensation for conforming to the requirements of this section shall be considered
as included in the prices paid for the various contract items of work involved and no
additional compensation will be allowed therefore.
General Project Requirements 2000-13
33.0 ADMINISTRATION
A. Periodic Services
1. The Periodic Services (Section 6000), which is provided in these
documents, indicates the time frames when items of work shall be accomplished.
2. The Contractor shall submit revised schedules when actual performance
differs substantially from planned performance.
B. Reports and Schedules
1. The report and schedule forms, provided herein, indicate the major items
of work and further delineate the time frames for accomplishment.
2. The Contractor shall provide and complete a schedule for each item of
work and each area of work.
3. Failure to notify of a change and/or failure to perform an item of work on
a scheduled day may result in deduction of payment for that date or work, even
though the work is performed on a subsequent day.
4. The Contractor shall adjust his schedule to compensate for all City-
observed holidays.
C. Performance during Inclement Weather
1. During the periods when inclement weather hinders normal operations,
the Contractor shall adjust his work force in order to accomplish those activities
that are not affected by weather.
2. The prime factors in assigning work shall be the safety of the work force
and damage to landscaping, in that order.
3. Failure to adjust the work force to show good progress on the work may
result in deduction of payments.
D. Performance on Schedule
1. The Contractor has been provided the latitude in establishing work
schedules which correspond to Contract-defined minimum manpower (Section
1210) and equipment resource requirements. The Contractor has also been
provided the opportunity and procedure for adjusting those schedules to meet
special circumstances.
2. Therefore, all work shall be completed on the day scheduled (as shown on
the Contractor-submitted schedule).
3. Failure to complete the work as scheduled or as specified herein will result
in a Performance Deficiency and Reduction. These actions shall not be construed
as penalty but as adjustment of payment to the Contracto r for only the work
General Project Requirements 2000-14
actually performed or as the cost to the City for inspection and other related
costs from the failure by the Contractor to complete the work according to
schedule.
E. Deficient Performance
The Contractor shall be notified in writing each time performance is unsatisfactory and
corrective action is necessary.
General Project Requirements 2000-15
End of Section 2000
Specific Project Requirements 3000-1
DIVISION 3
SECTION 3000
SPECIFIC PROJECT REQUIREMENTS
1.0 SCOPE OF WORK
The work shall include furnishing all labor and equipment necessary to maintain the
parks, retention basins, and civic facilities. Duties include, but are not limited to, trash
collection, cleaning, maintaining turf, maintaining ground cover, shrubs and trees,
maintaining and repairing irrigation systems, providing weed and pest control, and
removing animal feces.
2.0 SCHEDULING OF WORK
Upon request, the Contractor shall provide the City with a weekly schedule for the Park
Landscape Maintenance Services.
3.0 SERVICES TO BE PERFORMED
3.1 General
A. The removal of all trash such as paper, cans, bottles, broken glass, animal feces,
and any out-of-place or discarded items, including the replacement of trash can liners
on a daily basis.
B. The removal of dried plant material such as hanging or fallen tree limbs, leaves,
branches, dried up plants, and wood pieces.
C. All material, which is picked up during cleaning, shall be disposed of by the
Contractor by placing such material in a refuse container where available or to the
sanitary landfill. All green waste must be disposed of in accordance with Division 2
Section 2000 No. 18.7.
3.2 Trash Collection, Cleaning, and Maintenance
The City has designated priority/ high profile areas due to high use or programmed
events as follows:
La Quinta Park (Blackhawk Way and Adams Street)
Civic Center Campus (Washington Street and Calle Tampico)
Fritz Burns Park (Avenue 52 and Avenida Bermudas)
Bear Creek Trail (Avenida Montezuma between Tampico and Tecate)
Sports Complex (off of Avenue 50, end of Moon River)
Pioneer Dog Park (Miles Avenue and Seeley Drive)
Seasons Dog Park (Cloud View Way and Desert Fall Way)
YMCA (Moon River at Avenue 50)
Where applicable in the above areas the following items of work will require attention
on a daily basis:
Specific Project Requirements 3000-2
A. Empty all trash receptacles. Transfer collected recyclable materials
appropriately to divert from landfills. Restore liners or replace as necessary.
Re-fill all dog bag dispensers.
B. Pick up all trash, debris, and dog feces in landscape areas, sidewalks areas,
parking lot areas, playground areas, park turf areas, and parkways.
C. Wash or wet wipe down all public seating areas that require cleaning
including seat walls and park benches and picnic tables.
D. Sweep dirt and DG off walkways.
E. Open restrooms by 6:00 a.m. (La Quinta Park and Fritz Burns Park)
Where applicable the following items of work require attention on a weekly basis:
A. Mow, trim, and edge all turf areas.
B. Keep all areas weed free.
C. All shrubs and trees trimmed and/or pruned so as not to impede pedestrian
traffic.
D. Pressure wash the tennis and pickleball courts, dog parks, skate parks,
basketball court, picnic pavilion areas, gazebos, splash pads/water features,
concession areas, and facility entrances (i.e. Library, Wellness Center, and City
Hall). Pressure wash dog park gate entryways with green product disinfectant.
Playground equipment will be washed monthly but may require additional
cleaning as necessary.
E. Gopher eradication, level dirt piles, and fill holes made by gophers and dogs.
F. Fire ant control: application of fire ant bait as needed.
G. Rake playground safety material (EWF).
H. Empty all hot ash receptacles at La Quinta Park and Fritz Burns Park.
I. Monitor and maintain irrigation system by means of operational testing.
3.3 Fertilizing of Turf
A. Winter fertilization period shall begin November 1st and continue until the end of
March. A minimum of 2lbs N/1,000 sq. ft. of commercial fertilizer shall be required
annually for cool season grasses.
B. Summer fertilization period shall begin May 15th and continue until the end of
September. A minimum of 2lbs N/1,000 sq. ft. of commercial fertilizer shall be required
annually for warm season grasses.
Specific Project Requirements 3000-3
C. Additional or special applications may be requested by the City to maintain quality
turf conditions at the Contractors expense.
D. The Contractor shall supply to the City - A list of dates and approximate times each
park is scheduled for fertilizer application before the Contractor begins fertilization.
3.4 Weeding
A. Turf, planters, ground cover areas, sidewalks, underneath shrubs, and flower boxes
shall be kept free of weed grasses and broadleaf weeds.
B. Weeds in turf areas shall be controlled in such a manner, and at such intervals that
their height does not exceed the height of the grass. Weed species such as clover, bind
weed, and other low growing varieties shall be controlled so the density of the weed
shall not exceed 10% of the area covered by turf or ground cover.
C. The Contractor shall spray weeds with herbicide for weed control (except for the
Fred Wolff Nature Preserve) at no additional cost to the City. Preventive weed control is
the responsibility of the Contractor. Pre-emergent herbicide will be applied between
January 15 and March 1 as a management tool at no additional cost to the City.
D. The Contractor shall complete and furnish copies of an herbicide spray log to the
City.
E. The Contractor shall post 24 hours prior and submit a letter naming the herbicide
proposed for use, where and how it is to be applied, and a copy of the product label to
the City before use begins.
F. The Contractor shall be responsible for the results of application of all herbicides and
chemicals. Plants killed or severely damaged by the use of herbicides shall be replaced
at no cost to the City, with the nearest size nursery stock available to the size of the
dead or severely damaged plant. The soil in the area of the affected plant(s) and
planting pit shall be treated with activated charcoal and other soil amendments that
may be required to enhance the potential survival and growth of the existing or
replacement plants. The treatment and materials must be approved by the City and
shall be furnished at no cost to the City.
3.5 Mowing
All turf areas shall be mowed, trimmed, and edged no less than once a week.
A. Mowing shall include cutting all grass to a minimum height of 3/4” and a
maximum height of 1½”. Uneven cuts, scalping, and varying heights of turf
areas will be considered unsatisfactory to City standards.
B. Mechanical edging along all walkways and curbing.
C. Trimming around and underneath all fixed structures (tables, benches, posts,
trees, play equipment, etc.).
Specific Project Requirements 3000-4
D. Grass clippings shall be collected and removed to a refuse container if they
do not disburse evenly over turf area or the City designates the grass clippings
as unsightly.
3.6 Vegetation Maintenance
Trees shall be pruned within the following criteria:
A. Designated broadleaf trees as needed, but no less than annually.
B. Designated conifers as needed, but no less than annually.
C. Palm Trees as needed, but no less than annually (Dates by May 31st,
Washingtonias by July 31st, and Filferas by August 31st).
D. Trees shall be pruned as required to remove broken or diseased branches, or
for safety. It shall be the Contractor's prime responsibility to conduct a pruning
program, which will ultimately develop proper tree scaffolding, strength, and
appearance consistent with the intended use. Before any work commences, the
Contractor will prune one typical tree of each different species scheduled for
pruning as an example. All major pruning operations shall be scheduled and
approved by a City representative before work begins.
E. All trees which are located within the landscape maintenance areas
(including Palm trees), shall be included.
F. Topping trees will not be allowed without approval of the City representative.
Pruning shall be done by those experienced and skilled in pruning techniques.
All cuts shall be done using proper horticultural practices. Dressing wounds will
not be allowed.
G. Prune trees along sidewalks to allow seven-foot (7’) clearance for pedestrians
and fourteen feet (14’) above curb and gutters for vehicular traffic.
H. Under no circumstances will stripping of lower branches (rising up) of young
trees be permitted. Lower branches shall be retained in a "tipped back" or
pinched condition with as much foliage as possible to promote caliper-retained
growth (tapered trunk). If there are doubts or questions, contact the City
representative. Tree suckers and sprouts will be removed as needed. Lower
branches can be cut flush with trunk only after tree is able to stand erect without
staking or other support.
I. All debris from pruning, trimming, and tree maintenance shall be removed by
the Contractor during the same working day accumulated.
J. During the fall season, the Contractor shall provide weekly pick-up of fallen
leaves after the initial request to begin is given by the City.
K. Perform minor tree surgery as required.
L. Ailing or stunted trees, which fail to meet expected growth expectations, shall
be brought to the attention of the City representative.
Specific Project Requirements 3000-5
M. The Contractor will be responsible for staking and tying trees and removing
staking and tying.
N. Tree stakes and ties shall be checked and corrected as needed. Ties will be
adjusted to prevent girdling. Remove unneeded stakes and ties as per City's
request. Replace broken stakes as required.
O. All holes from removed trees shall be filled and refilled until it maintains
grade level, or a replacement tree is installed.
P. If trees are not pruned by the specified date, the Contractor shall be issued a
Performance Deficiency Notice, unless the Contractor submits an acceptable
written request to the City stating the reason why they cannot complete the
pruning by the stated date and what date the pruning service will be completed.
Q. Any dead limb or branch, detached or not, are a safety hazard and will be
removed as needed, including the root ball as part of the contract price.
R. Tree removal service provided as needed at all City parks, retention basins,
and Civic facilities. Stump grinding and/or stump removal to be included.
S. A log of tree removal and replacement will be kept by the Contractor stating
where and when the trees were removed and replanted, species, site, and
approximate location.
T. Any plants broken, damaged, and/or uprooted as a direct result of storm
damage, wind damage, accident, or vandalism, shall be trimmed, replanted, or
replaced, and debris removed within twenty-four (24) hours of notification. Any
debris blocking roadways or parking areas shall be removed within one (1) hour
of notification to Contractor. The Contractor shall call the City to confirm the
damage, prepare a material request and estimate of plant material replacement
based on contract unit prices. After receiving City authorization, the Contractor
will submit an invoice with the monthly statement for additional labor and
applicable materials. The City will use the quoted extra labor charges submitted
with the proposal for reimbursement.
U. The Contractor will be held liable for any damages done to trees due to poor
management procedures (i.e., improper staking, damage done by not removing
tie wires, improper pruning, etc.).
V. If the planted ground cover, shrub, or tree, dies as a direct result of neglect,
inadequate care, or inadequate maintenance, the replacement item and
required labor shall be provided by the Contractor at no cost to the City.
This includes material newly planted and material which has been planted.
Replacement must be of comparable size.
Shrubs
A. All shrubs and hedges shall be trimmed in such a manner that they present a
pleasing and natural appearance and do not obstruct the vision from building
windows or the vision of vehicle drivers. Use of hedge trimmers will not be
allowed on shrubs and ground cover with the exception of grasses and
designated formal hedges.
Specific Project Requirements 3000-6
B. All shrubs, hedges, and ground vegetation shall be maintained so the
vegetation does not overgrow its designated growth perimeter as specified in
Section 7000 Pruning and Training Quality Standards.
C. Whenever ground cover, shrubs, or trees die, the Contractor shall contact the
City to confirm the vegetation is dead, request authorization for replanting,
replant it and submit an invoice with the monthly statement for additional labor
and applicable materials. The City reserves the right to furnish the required
plant, shrub, or tree. The City will use the quoted extra labor charges and unit
prices submitted with the proposal for reimbursement.
D. Remove any spent blossoms or dead flower stalks as required to present a
neat and clean appearance.
E. Shrub and ground cover mounding shall not exceed 2 feet (2’) in height
within areas required for vehicular sight distance depending upon roa dway
topography. Contractor to inform the City representative if plant material is
placed in areas where this will continually be a problem.
Vines
A. Vines and espalier plants shall be checked and retied as required. Secure
vines with appropriate ties to promote directional growth on supports.
B. Do not use nails to secure vines on masonry walls.
C. Deep water vines in pockets not provided with sprinklers as required
promoting optimum growth.
D. Pruning of vines will be in accordance with good horticultural practices.
Ground Cover
A. Trim ground cover adjacent to walks, walls, and/or fences as required for
general containment to present a neat, clean appearance.
B. Cultivate and/or spray approved herbicide to remove broad -leafed and grass
weeds as required. Weeds shall be controlled and not allowed to reach an
objectionable height. City representative shall be responsible for determining
objective height. Remove weeds by chemical or mechanical means as approved
by City representative.
C. Prevent soil compaction by cultivating regularly all ground cover areas.
D. Any paper or litter that accumulates in ground cover areas shall be picked up
on a daily basis.
E. Keep ground cover trimmed back from all controller units, valve boxes, quick
couplers, or other appurtenances or fixtures. Do not allow ground covers to
grow up trees, into shrubs, or on structures or walls. Keep trimmed back
approximately 4 inches from structure or walls. Coordinate trimming around
base of shrubs/trees with City representative.
Specific Project Requirements 3000-7
F. Decomposed Granite (DG) areas shall be raked smooth a minimum of once
per week.
3.7 Pest Control of Plant Material
A. The Contractor shall provide complete and continuous control and/or eradication of
all plant pests or diseases. The Contractor shall obtain any necessary permits and
licenses to comply with City, County, State, or Federal regulations or laws.
B. Contractor will assume responsibility and liability for the use of all chemical controls.
Pests and diseases to include, but not limited to, all insects, aphids, mites, other
invertebrates, pathogens, and nematodes. Controls to include necessary use of
integrated pest control systems involving the use of life history information and
extensive monitoring. Control through prevention, cultural practices, pesticide
applications, exclusion, natural enemies, biological control, and host resistance.
C. All material used shall be in strict accordance and applied within the most current
EPA regulations and the California Food and Agricultural Code.
D. City shall be notified prior to the application of pesticides and other chemicals.
Pesticide applications shall be recorded on the Maintenance Schedule and coordinated
with City representative. Material use reports for all pesticides shall be filed with the
City no later than the 10th of every month for the preceding month.
E. Application of Pesticides
1. Timing: Pesticides shall be applied at times which limit the possibility of
contamination from climatic or other factors and at the proper life cycle of the
pests. Early morning application shall be used when possible to avoid
contamination from drift. Applicator shall monitor forecast weather conditions to
avoid making application prior to inclement weather to eliminate potential runoff
of treated areas. Irrigation water applied after treatment shall be reduced to
eliminate runoff. When water is required to increase pesticide efficiency, it shall
be applied only in quantities of which each area is capable of receiving without
excessive runoff.
2. Handling of Pesticides: Care shall be taken in transferring and mixing
pesticides to prevent contaminating areas outside the target area. Application
methods shall be used which ensure that materials are confined to the target
area. Spray tanks containing leftover materials shall not be drained on the site
to prevent any contamination. Disposal of pesticides and tank rinsing materials
shall be within the guidelines established in the State of California Food and
Agricultural Code or EPA regulations.
3. Equipment and Methods: Spray equipment shall be in good operating
conditions, quality, and design to efficiently apply materials to the target area.
Drift will be minimized by using proper application pressure as instructed on the
product label and using water-soluble drift agents.
4. Selection of Materials: Pesticides shall be selected from those materials,
which characteristically have the lowest residual persistence. Use of emulsifiable
concentrates shall be used when possible to limit windblown particles. The use
Specific Project Requirements 3000-8
of adjuvants will be to increase pesticide efficiency thereby reducing the total
amount of technical material required to gain control. All materials used at the
Sports Complex must be approved by the Desert Sands Unified School District.
5. Substitution: Wherever a specific type of material is specified, no
substitutions shall be allowed without the written consent of the City
representative.
6. Certification of Materials: All materials shall be delivered on the site in
original unopened containers. Materials shall be subject to inspection by the City
representative.
F. All areas of the landscape shall be inspected for infestations of harmful pests such as
ants, insects, mites, snails, and sow bugs. Plants shall be observed closely for leaves
that may be blotched, blighted, deformed, mildewed, rusted, scorched, discolored,
defoliated, or wilted.
G. Identify the cause of injury and consult a Pest Control Advisor before application of
chemical treatments.
1. The State of California Agricultural Code requires that toxic pest control
chemicals may be used only after a written recommendation by a State of
California licensed Pest Control Advisor is obtained. A recommendation consists
of all the applicator should know for an accurate and safe usage. The
recommendation must be time and site specific.
2. Applications of all pesticides shall conform to State regulations under a
Licensed Pest Control Operator or a Certified Applicator of Pesticides as per the
State Department of Pesticide Regulations.
3. There shall be no application of a “RESTRICTED” pesticide without written
permission of the City.
4. In case a Restricted Use Pesticide is recommended, the City must have a use
permit issued only by the County of Riverside Agricultural Commissioner.
H. Start preventative cultural methods before a pest is visible. At certain times of the
year, and with certain environmental conditions, the presence of certain pests can be
anticipated. Look at new growth for the presence of aphids, leafhoppers, scale, mealy
bugs, and mites. Use a 10-power magnifying glass to see mites. Look for ants on soil,
along walks, and trunks of shrubs and trees.
1. When ants are present, there will be sucking insects. Control of ants will aid
in the control of plant feeding insects. Do not use toxic pesticides to control
pests when predatory or parasitic insects are present.
I. Dusty foliage and warm temperatures are indicators of mites. So long as the foliag e
is washed, mite populations are low. Keep mite populations low to prevent plant injury.
1. Conifers are especially susceptible to mite infestation.
J. Bark beetles feed in the cambium of scaffold branches and trunks. Older and
Specific Project Requirements 3000-9
weaker trees are the first to be infested. Any cause of stress is cause to inspect trees.
Look for ants on the ground or in the base of branches. Also, there may be dying
branches.
1. Control adult beetles before they lay eggs on bark in the spring. All trees
near one infested the previous year should be sprayed in March and again in
May. On-going inspections are necessary to determine if there is a summer
brood.
K. Snails shall be controlled before becoming epidemic. They can be anticipated as a
menace from Spring until the advent of high temperatures, wherever moist soil
prevails.
L. Pruning is an effective prevention of an epidemic of insects and diseases. Pruning
away infected parts and disposing of them off-site separates the pest or pathogen from
the host. Examples are Pine tree tip moth, Juniper twig girdler, Verticillium wilt, fire
blight, and other blights of foliage.
1. Thinning of tree foliage, to provide light and aeration for the tree and ground
cover is a type of disease prevention.
2. Use care when pruning not to spread disease by keeping all cutting edges
sterile by dipping in an alcohol or bleach solution after each cut.
M. Weeds must be removed upon appearance. Selective post emergence herbicides
shall be used to kill weeds without permanent injury to other plants.
1. All creeping grasses, as well as broadleaf weeds, shall be kept out of
shrubs and ground covers.
2. Broadleaf weeds in turf shall be removed selectively, without injury to the
turf grass other than slight, temporary discoloration.
3. Grass weeds in lawns shall be controlled with pre-emergent herbicides.
See Seasonal Work for pre-emergent herbicide controls of weed grass seeds
(i.e., crabgrass).
N. Weeds not killed with herbicides shall be removed manually. However, manual
weed control shall not be substituted for herbicide applications.
O. Turf and other plants killed by weeds, chemicals, etc., shall be replaced at the
Contractor's expense. All replacements must be made within 10 days after receiving
notice from the City.
P. The Contractor shall establish a continuing program to control insects and
rodents. All materials used at the Sports Complex must be approved by the Desert
Sands Unified School District.
Specific Project Requirements 3000-10
Q. With the program, the following information shall be included:
1. The pest to be controlled
2. Method of control
3. The product labels
4. A schedule as to frequency of control
R. Monthly, the Contractor shall complete a pesticide log for any pesticides used.
S. When using pesticides, the instructions on the label shall be followed explicitly
and special care shall be exercised in application.
3.8 Drainage Facilities
The Contractor shall be responsible for continual inspection of surface drains (i.e.,
bench drains, flow structures, storm drain outlets), located within the landscaped areas.
Surface drains shall be checked and maintained free of obstruction and debris at all
times to assure proper drainage. Remove any debris or vegetation that might
accumulate to prevent proper flow of water.
3.9 Fertilization
A. Scheduling: Fertilization will be applied in accordance with FERTILIZER
SCHEDULE A, or as otherwise directed by the City representative. All applications shall
be recorded and specifically identified on the weekly schedule indicating the fertilize r
used and frequency applied, the landscape material applied to (i.e., turf, trees, shrubs,
ground cover, etc.).
B. General: Application shall be in accordance with manufacturer specifications.
C. Method of Application: In making application of fertilizer granules, precautions
shall be taken to contain these materials in the planting areas. Caution should be used
when using a cyclone spreader, which tends to throw material onto paved areas. The
Contractor will be responsible for removing all fertilizer stains from concrete caused by
his application. Fertilizer shall be applied at manufacturer's recommended rate.
D. Timing of Application: When climatic factors cause problems of the general use
of fertilizers, an adjustment of the fertilizer schedule may be necessary. After fertilizer
application, monitor watering schedule to eliminate runoff or leaching of fertilizer
materials.
E. Trees and Shrubs: Fertilizers, pre-approved by a City representative, shall be
applied to trees and shrubs that require supplemental feeding. Annual spring feeding
shall be done in accordance with the rate indicated by the manufacturer. Fertilization
may require deep root feeding or foliar applications to correct iron chlorosis and other
micronutrient deficiencies.
3.10 Plant Additions and/or Replacements
As part of this agreement, the Contractor may be requested to replace damaged or
destroyed trees, shrubs, vines, ground cover, or flowers. Such work will be paid for as
extra work, based on contract unit prices, by the City unless otherwise specified within
Specific Project Requirements 3000-11
these specifications. Exceptions will be replacements due to Contractor's neglect. This
will be determined by the City representative.
3.11 Clean-Up
A. At no time will it be allowed to blow grass cuttings/debris into public streets or
gutters without being swept or vacuumed clean. Debris generated from adjacent
maintained landscape areas shall be the responsibility of the Contractor to remove,
(i.e., sidewalks, streets, gutters).
B. Contractor shall remove all debris resulting from the maintenance operations and
dispose of it off-site at the time of occurrence. All grass clippings shall be picked up
after each mowing or trimming operation.
C. All debris resulting from any of the Contractor's operations shall be removed and
disposed of legally at the Contractor's expense. No debris will be allowed to remain at
the end of the workday. All municipal Green Waste generated from Contractor's
operations shall be diverted from County landfill to an approved reclamation site and
processed for recycling. (See Landfill Diversion Form Section 8000)
D. All walkways will be kept clean/clear of debris and plant growth. Care shall be
taken not to create unnecessary hazards to foot traffic.
E. All shrub areas not inter-planted with ground cover will be raked clean a
minimum of once a month.
F. The Contractor shall provide a general clean -up operation on a daily basis for
picking up papers, trash, or debris, which may accumulate in the landscape areas,
caused by winds or normal conditions.
G. Animal feces shall be removed from all recreational facilities (i.e. parks, bike
paths, etc.) on a daily basis.
4.0 SPRINKLER MAINTENANCE DETAILS
A. General
The controlling factor in the performance of water management within the City
landscape maintenance area is the application of water to landscape plants at a rate,
which closely matches the actual demands of plant material with little or no runoff.
Other important water management considerations include safe and dry turf areas for
community use, water costs, and plant health.
Failure to perform irrigation system maintenance as described shall constitute a
deficiency as defined in paragraph 8.0 of Section 2000.
Contractor must have a staff member who is a Certified Landscape Irrigation Auditor
(CLIA). The City recognizes the importance of water management and encourages
Contractors to provide the most efficient landscapes without impacting the conditions of
the parks and facilities.
Specific Project Requirements 3000-12
B. Reports
See Reports and Schedules, and Forms, Sections 4000 and 8000.
C. Irrigation/Operation and Maintenance
Irrigation shall be accomplished without impacting the public use of the parks and
facilities. During periods when it is necessary to operate the irrigation dur ing the
daytime, the contractor shall have staff on-site to adjust the irrigation as to not impact
the public use. Contractor will not operate the irrigation systems, unless for system
testing, during restricted times as determined by the water authority . Standing water
will not be permitted one hour after completion of water schedule.
Failure to adjust irrigation controllers to comply with designated watering windows,
water authority restrictions, and City-provided schedules will result in a Performance
Deficiency Reduction.
D. Operation/Repair
1. The entire irrigation system to include all components from connection at
meters shall be maintained in an operational state at all times. This coverage
shall include but not be limited to the following: Maxicom/IQ systems, all
controllers and remote-control valves; gate valves, low meters, pressure
regulators and backflow devices. Contractor responsibility for mainlines shall
consist of continual monitoring and any necessary repairs not to exceed one
mainline failure per controller each month. Contractor is required to notify City
representative of mainline failures within twelve (12) hours of occurrence.
2. All irrigation systems equipped with Maxicom/IQ shall be tested
and inspected weekly. Reports generated by Maxicom/IQ, shall be available to
the City’s representative upon request. Any systems not currently equipped with
Maxicom²/IQ shall be inspected a minimum of once per week. The City’s
representative may request a written report (see Section 4000) to be submitted
weekly showing the location, day of week, and time of day that each system is
tested. Any changes shall be submitted for approval prior to enactment. Failure
to operate the Maxicom/IQ controller for regular irrigation schedules will result in
a deficiency.
3. All systems shall be adjusted in order to:
a. Provide adequate coverage of all landscape areas
b. Prevent excessive runoff and/or erosion
c. Prevent watering roadways, facilities such as tennis or basketball
courts, walkways, trails, fences, and private property
d. Match evapotranspiration rates
e. Limit hazardous conditions
4. All system malfunctions, damage, and obstructions shall be recorded and
timely corrective action taken.
Specific Project Requirements 3000-13
5. In addition to weekly testing, all irrigation systems shall be tested and
inspected daily, if necessary, when damage is suspected, observed, or reported.
a. Repair malfunctioning controllers, quick couplers, manual or
automatic valves, and sprinkler heads within twelve (12) hours of receipt
of written notice.
b. Correct deficient irrigation systems and equipment as necessary
following written notification from the City representative. The Contractor
shall turn-off irrigation system immediately as directed during periods of
rainfall and times when suspension of irrigation is desirable to conserve
water while remaining within the guidelines of good horticultural
maintenance practices.
c. Once the City representative acknowledges the necessity to turn-on
the water once again, all controllers shall be activated within twelve (12)
hours.
6. The entire irrigation system to include all components from connection at
meters shall be maintained in an operational state at all times. This coverage
applies to all controllers and remote-control valves, gate valves and backflow
devices, flow meters, main and lateral lines, sprinkler heads, moisture sensing
devices, and all related equipment.
7. Contractor shall provide personnel fully trained in all phases of
landscaping and irrigation systems operation, maintenance, adjustment, and
repair; in all types of components to include Maxicom²/IQ, irrigation control
clocks, valves, and sprinkler heads; and with all brands and models of irrigation
equipment.
8. Adjustment, damage, and repairs shall be divided into the following
categories and actions:
a. All sprinkler heads shall be adjusted to maintain proper coverage.
Adjustment shall include, but not be limited to, actual adjustments to
heads, cleaning and flushing heads and lines, and removal of obstructions.
Costs for adjustment shall be included in costs for operation and
maintenance of the irrigation system.
b. All damage resulting from the Contractor's operations shall be
repaired or replaced prior to the end of the workday at the Contractor's
expense.
c. Damage and repairs shall be divided as follows:
i. Minor repairs shall include, but not be limited to, all irrigation
components from, and including, the valve to lateral line and
heads/emitters, replacement of adjusting pins, friction collars,
washers, trip assemblies, tubing, and other small parts. The cost
for minor repairs shall be included in the costs for operations and
maintenance of the irrigation system.
Specific Project Requirements 3000-14
ii. Major repairs shall include controllers and control wires and
all items before the automatic control valve including but not
limited to backflow, pressure regulators, and mainlines (except as
previously noted). The cost for major repairs, except as noted, will
be considered extra services based on the contract labor and unit
cost.
d. Repairs to the irrigation system shall be completed within 24 hours
after approval of the Irrigation Materials Request Form by the City
representative on major component damage such as broken irrigation
mainlines.
e. All replacements shall be with original type and model materials
unless a substitute is approved by the City representative.
f. Contractor shall maintain an adequate stock of medium and high
usage items for repair of the irrigation system.
g. Contractor shall implement repairs in accordance with all effective
warrants and no separate payment will be made for repairs on equipment
covered by warranty.
h. Contractor shall pay for all excessive utility usage due to failure to
repair malfunctions on a timely basis for unauthorized increases in the
frequency of irrigation. Contractor will also be responsible to pay for
additional costs for water bills that are within their control and not rated
as “Efficient” or “Excellent”. In situations of backflow theft, vandalism,
broken mainlines, or City events that require additional water, the
contractor will not be responsible for the difference. Costs to be deducted
from payments will be presented to the Contractor by the City.
i. The City will do spot inspections to check the efficiency of the
Contractor's water management. If discrepancies are found, the
Contractor will have twenty-four (24) consecutive hours to correct
problems. While the Contractor is correcting problems in unsatisfactory
areas, the specified level of service will be maintained in all other aspects
of this contract.
j. The City reserves the right to provide repair parts for major
irrigation repairs. In such an event, the Contractor shall pick up sprinkler
repair parts from the City Maintenance Service Yard at the established
hours.
k. Upon request by the Park Superintendent, the Contractor shall
return all sprinkler parts, control valves, and valve parts that have been
replaced due to damage or malfunction to the City's Maintenance Service
Yard. Control clocks will be returned to the City the day removed for
repair or replacement.
l. Under the authorization of the City, the Contractor will repair
sprinklers, control valves, and control clocks.
Specific Project Requirements 3000-15
m. The Contractor shall adjust sprinkler heads and valve boxes to the
level of the ground surface.
n. Control valves, sprinklers, and direct burial control wires shall be
located and repaired by the Contractor.
o. The Contractor shall be responsible for properly removing control
clocks needing repair, marking station wires, delivering clocks to the City
Maintenance Service Yard for repairs, and reinstalling the control clock
with station wires in the original order as found. If repairs encountered
will take more than two working days to correct, a temporary controller,
supplied by the City, will be installed by the Contractor until the
permanent controller can be repaired.
p. When sprinkler systems are out of service due to the Contractor's
neglect, the Contractor shall be required to water by hand or other means
in accordance with plant and vegetation needs. This shall not be an extra
labor charge.
q. When rain occurs or is in the forecast with some certainty, all
sprinkler system controllers shall be turned-off by the Contractor's
personnel. The Contractor will notify the City before the turn-off process
starts and when the turn-off process is completed. The City will notify the
Contractor when the sprinkler system controllers are to be turned back
on.
r. The Contractor shall be held responsible for damage done to
sprinkler heads, landscape lighting, valves, and valve box lids due to
careless operation of vehicles and lawn mowers.
s. Personnel
1. The Contractor shall provide personnel Certified in all phases
of Maxicom²/IQ landscape irrigation system operation,
maintenance, adjustments, and repair; in all types of components
to include irrigation controllers, valves, moisture sensing devices,
and sprinkler heads; and with all brands and models of irrigation
equipment used within the City.
2. The Contractor shall provide personnel that is a Certified
Landscape Irrigation Auditor who has knowledgeable of, and
proficient in, current water management concepts, with the
capability of working with City staff in implementing more
advanced water management strategies.
3. The Contractor shall provide personnel capable of verbal and
written communication in a professional level of English.
Specific Project Requirements 3000-16
t. Materials
1. All replacement materials are to be with original types and
model materials, unless a substitute is approved by the City
representative.
2. Contractor shall maintain an adequate inventory of medium
to high usage stock items for repair of the irrigation systems.
3. Contractor shall implement repairs in accordance with all
effective warranties, and no separate payment shall be made for
repairs on equipment covered by warranty.
4. The actual cost of all material passed on to the City shall be
wholesale cost of the material.
a. The wholesale cost shall be the actual cost paid by the
Contractor reflecting the best price, including discount
available.
b. At no time shall the cost of materials exceed the retail
cost from the current price list, minus the discount rates
quoted in the bid.
c. The total cost of materials shall include the following:
-Wholesale cost (retail costs minus Contractor's
discount, as stated above).
-Applicable sales tax.
-A markup of 15% maximum for all overhead costs
and profits.
5. All materials are to be new and identical to existing
materials, unless directed otherwise by the City representative.
u. Invoicing
1. Since all labor costs are to be included in the contract
amount, emergency call-outs after working hours will be considered
extra work compensation. This type of work shall be defined as
"extra work."
2. Irrigation Repair Invoices shall be organized according to
park location and submitted on a monthly basis.
v. Water Management
1. All systems shall be programmed daily, weekly, and/or as
needed to maintain healthy plant material and landscape.
2. Program changes may be required to be recorded on the
Irrigation Management Form. See section 8000 Forms.
Specific Project Requirements 3000-17
3. Water meter reading for each system may be provided to
Contractor upon request.
4. Contractor will be subject to a deficiency for any meter billed
as “Inefficient” or higher due to Contractors neglect. In situations
of backflow theft, vandalism, broken mainlines, or City events that
require additional water, the contractor will not be billed.
5.0 WEED CONTROL OF PAVED SURFACES
Contractor shall be responsible for controlling weeds by mechanical or chemical means,
weeds growing in cracks, or expansion joints, and areas contiguous to the City
landscape.
6.0 GUARANTEE AND/OR REPLACEMENT POLICY
All new plant material and irrigation installations shall be guaranteed for a period of one
calendar year except due to "Acts of God", i.e., damage or death of plant material due
to wind or storm, or vandalism, theft, or other willful acts over which the maintenance
contractor has no control. Existing plants shall be replaced by Contractor, if it is
determined by the City representative that they died due to Contractor's negligence.
7.0 TURFGRASS
A. General
1. Watering: A regular, deep watering program shall be accomplished to
give the best results. The established turf should not be allowed to dry beyond
50% of the soil water holding capacity between watering. At a minimum, omit
irrigation the night prior to occurrence of turf mowing.
2. Aeration: Mechanically aerate all turf areas as often as required (no
less than 2 times annually), to reduce compaction/stress conditions, which will
offer greater water penetration and reduce runoff. In those areas where soil
condition is poor, top dressing will be required. Use core aeration with 3/8” to
3/4" tines. Any areas that show excessive compaction shall receive additional
treatment as required to alleviate this condition at no extra cost to the City.
Removal of cores may be required.
3. Mowing: Mow, trim, and edge parks, retention basins, and civic areas
weekly. Avoid removing more than one-third of the leaf blade at any one time.
Turf in this contract shall be mowed with power-propelled mowers equipped to
mow and collect clippings in one operation. City representative, may in some
instances, allow mowing without the attached collection device to recycle organic
material into the soils providing the machine is equipped with approved safety
features. The mowers shall be maintained and sharpened to provide a smooth
even cut without tearing of the leaf blade. The reel or blade adjustment shall
provide a uniform, level cut without ridges or depressions. Care shall be
exercised during the mowing operation to prevent damage to trees and other
obstacles located within the turf areas such as electrical boxes or fixtures. Do
not mow areas that are wet or where frost is present. Alternate mowing
patterns whenever possible, to prevent wheel ruts. If ruts are made, Contractor
will make repairs at their expense.
Specific Project Requirements 3000-18
4. Trimming and Edging: Trim around walls, buildings, curbs, header
boards, valve boxes, quick couplers, and paved areas on a weekly basis to
present a neat, clean appearance. Chemically edge around trees, within an 8"
radius from the trunk, using care not to damage tree, trunk, or roots.
5. Renovation: Renovate all turf areas (especially sports fields) once per
year at a time when there will be the least amount of stress to turf. Renovations
will be in accordance with the following methods:
Step 1. Aerify entire area with an aerifier with 3/8” to 3/4" tines x 3"
deep. Top dress on sports fields may be required for an additional cost.
Step 2. Verticut entire area using a verticutter set to soil line contact.
Verticut twice in parallel directions, or as directed. Pick up debris at
completion of this operation. Turf vacuum/power rakes shall be utilized
as needed.
Step 3. Mow with rotary or reel mower as directed, at regular cutting
height.
B. Refurbishment of Turf grass
Turf areas that thin out due to shading effect of trees, structures, and foot traffic will be
reseeded with an approved grass seed to restore thinning areas. Coordinate with City
representative.
C. Winter Over-seeding
Winter over-seeding will only occur at the Civic Center Campus, Desert Pride Park,
Eisenhower Park, Fritz Burns Park, Monticello Park, Pioneer Park, Saguaro Park, Velasco
Park, La Quinta Park picnic area, and the three (3) dog parks.
1. The over-seeding shall comply with PM- 10 requirements. The Bermuda
grass will be lowered in two stages by mowing with sharp mowers. This process
will be done until grass height is less than ½". After the Bermuda grass is
lowered, the entire area will be vacuumed. Seed with rye grass at the rate of 15
lbs per 1000 square feet or as approved by the City Inspector.
2. Fertilize Bermuda grass areas after over-seeding. Broadcast fertilizer at
the product recommended rate. Apply fertilizers by constant flow P.T.O. driven
rotary spreaders when applicable or walk behind cyclone spreaders in smaller
areas.
3. Follow CVAG recommended over-seeding procedures (“Smart Scalping”).
4. Cultivate base and aerate compacted area thoroughly. Where substantial
but thin turf remains, rake, aerate if compacted, and cultivate soil.
5. Remove diseased or unsatisfactory turf areas. Remove and do not bury
into soil. Remove top soil containing foreign materials, i.e., gas/oil drippings,
stones, gravel, debris, etc.
Specific Project Requirements 3000-19
6. Top-dressing, when applicable, shall be applied with materials and method
approved by City representative.
7. Maintain seeded turf areas until successful seed germination and complete
establishment of turf. Seeded areas will be maintained until inspection and
acceptance by the City representative.
8. After preparation and seeding have been completed, the area will be
watered as needed for successful germination.
9. The rye grass will be completely established by November 1.
10. Due to the schedules of the organized sports, annual winter over-seeding
will not be performed on the sports fields.
D. Weed Control
Contractor shall maintain a weed-free turf at all times by chemical and/or mechanical
means. Pre-emergent herbicide applications shall be required to control annual grasses
in all turf areas. The Contractor shall be especially careful if applying chemicals to
control weeds because of possible damage to the turf. Before such applications are
made, the turf should be well established and in vigorous condition. All chemicals
applied will be recorded and coordinated with the City representative.
E. String Trimmers
Care shall be exercised with regard to the use of motorized line trimmers (i.e. weed
eaters) to prevent damage to building surfaces, walls, header board, light fixtures,
signage, etc. No weed eaters shall be used around trees or wooden park signs not
equipped with arbor guards. An 8" bare soil buffer zone shall be maintained around the
circumference at the base of all trees (Trees damaged by Contractor's operations
will be replaced at Contractor's expense).
8.0 FACILITY MAINTENANCE
A. Specialty/Sports Areas
1. General (applies to all parks, retention basins, and civic facilities within the
landscape maintenance areas):
a. All animal feces or other materials detrimental to human health
shall be removed from the areas daily.
b. All broken glass and sharp objects shall be removed daily.
c. All areas shall be inspected daily and maintained in a neat, clean,
and safe condition at all times.
d. All playground areas shall be raked to remove leaves and debris
daily. Surface shall be leveled under the swings and slides daily.
Specific Project Requirements 3000-20
2. Sand/Wood Safety Surfaces
a. These areas shall include tot lots, play areas, volleyball courts, etc.
b. All areas shall be maintained weed free.
c. Compacted sand areas shall be rotor-tilled to the maximum depth
that will allow complete loosening of the sand but will not cause lower
base materials to be mixed in with the sand. After rotor-tilling, all areas
shall be raked level.
d. Fill material shall be replenished as necessary to maintain optimum
level in each area, generally six (6) inches below the top of the concrete
curbing but dependent upon play equipment footing and final level shall
be determined by the City representative for each area.
e. Each week, all sand areas shall be raked level and kept free of any
foreign debris. Sidewalks adjacent to tot lots shall be swept daily.
f. In the event of inclement weather if at anytime the sand court
areas become flooded and there is standing water, it will be the
Contractor's responsibility to remove water immediately.
3. Hard Surface Areas:
a. These areas shall include concrete sidewalks, tennis/pickleball
courts, skate courts, basketball courts, bicycle trails, A.C. walkways, etc.
b. All areas shall be swept weekly to remove all deposits of silt and/or
sand and glass.
c. All areas shall be inspected daily and maintained in a neat, clean,
and safe condition at all times.
d. Cracks and crevices shall be kept free of weeds at all times.
e. All areas shall be pressure washed weekly to remove food,
beverages, and gum from the surface areas. Concession areas, picnic
areas, and dog parks may require additional washing as needed at no
additional expense. Dog park gate entryways should be pressure washed
with green product disinfectant.
B. General Facility Operations
1. All drinking fountains including dog parks and trails shall be kept clean and
operational at all times.
a. Minor repairs to include but not limited to unclogging drains,
replacing damaged or broken parts shall be included in the contract price.
b. All repairs shall be completed within twenty-four (24) hours after
damage occurs.
Specific Project Requirements 3000-21
c. Every instance of damage shall be reported to the City
representative.
d. Should damage be repetitive, the City representative will evaluate
replacement with a more damage resistant model through extra work or
separate action.
2. All sidewalks within the City areas shall be swept or cleaned daily, if
necessary, to remove any glass or heavy debris. In addition, all sidewalk areas
shall be thoroughly cleaned once every week by sweeping.
3. All sidewalk areas abutting maintained areas shall be cleaned when dirtied
by Contractor's operations and at other times as required.
4. All leaves, paper, and debris shall be removed from landscaped areas and
disposed of off-site.
5. Trash cans provided by City shall be emptied daily and washed after
emptying (when necessary) to be determined by the City Inspector. Transfer
collected recyclable materials appropriately to divert from landfills. Contractor
shall provide plastic liners for all trashcans at Contractor's expense.
6. All concrete bench drains and other surface drains to include the portion
under the sidewalk shall be kept free of vegetation, debris, and algae to allow
unrestricted water flow.
7. All other drainage facilities shall be cleaned of all vegetation and debris.
All grates shall be tested for security and refastened as necessary. Missing or
damaged grates shall be reported to City representative.
8. All barbecue grills shall be emptied of all ashes weekly.
8.1 Landfill Diversion
Contractor shall be responsible for the recycling of all green waste generated from
maintenance operations within the City. Green wastes shall be diverted from County
Landfill to an approved reclamation site and processed for recycling. Contractor shall
submit a Landfill Diversion Report (see Section 8000 Forms and Reports), upon request
to the City.
Specific Project Requirements 3000-22
End of Section 3000
Fertilization Schedule 5000-1
SECTION 5000
FERTILIZATION SCHEDULE
FREQUENCY SOURCE TIME OF YEAR
TURF:
No less than 2x/yr Commercial Fertilizer Winter (November 1 - end of March)
No less than 2x/yr Commercial Fertilizer Summer (May 15 - end of September)
GROUND COVER/SHRUBS/SLOPES:
No less than 2x/yr Commercial Fertilizer February - October 15
Note: Avoid fertilization between October 15 and end of January.
TREES:
Trees shall be fertilized and aerated in accordance with the National Arborist Association
Standard for Fertilizing Shade and Ornamental Trees, National Arborist Association
Standards current edition.
Compliance with fertilization specification will be enforced by application inspections,
bag counts, and periodic soil analysis by independent soils laboratory.
Fertilization Schedule 5000-2
THIS PAGE INTENTIONALLY LEFT BLANK
Periodic Services 6000-1
SECTION 6000
PERIODIC SERVICES
1.0 Services Due December through February
A. Turf areas that have at least one of the following weed grasses shall receive a
long lasting broad-spectrum pre-emergence herbicide between January 20, and March
1: Crabgrass; Dallisgrass; Goosegrass; Kikuyugrass (Herbicide must be registered for
use on the turf grasses and weeds to be treated).
i. Follow directions on label of the herbicide. Apply evenly. Calibrate spreader
or sprayer before treatment to apply the right dosage.
B. Prune deciduous trees before buds emerge. Quality of pruning shall be as
described in the section on Pruning Quality Standards (Section 7000).
C. Prune ground covers back to established edge. Cut off and dispose of dead flower
stems.
D. Prune the following as needed as to Pruning Quality Standards (Section 7000):
Junipers and Pines, December and January; Star Jasmine and other ground covers,
limiting height to 2 feet in February; Cotoneaster, Pyracantha for fruit removal; unlisted
species as specified by the City.
2.0 Services Due March through May
A. Remove broadleaf weeds in lawns with selective post-emergence herbicide that is
registered to kill weed species growing in the turf grasses being treated.
B. Non-turf vegetation, (i.e., slopes, planters), with residues of weed seeds made
last year, will receive a broad-spectrum pre-emergence herbicide registered for target
weed species. Check label to be sure the chemical is safe for use on the ornamental
species in the area.
i. Growing weeds shall be removed by any method before a pre-emergence
herbicide is applied.
C. Prune all plants overgrowing boundaries. One situation is vegetation-impeding
traffic both horizontally and vertically.
D. Pruning of the following shall be for size and shape control: Raphiolepis shrubs,
remove terminals of dead flower and fruits; Lantana in early March; Hibiscus after frost
and before new shoots; Acacia after flowering; cuts must be at a leafy bud. Naked
stubs die back. Remove flush at origin; unlisted species as specified by the City.
E. A broad-spectrum pre-emergence type herbicide may be applied for the
prevention of weed seed germination in turf grasses and ornamentals.
i. Apply only in areas that had seeding of weeds the previous year.
ii. The herbicide must be registered for use on turf grasses, ornamental plants,
and weeds to be treated.
Periodic Services 6000-2
F. In April, fertilize all turf areas.
i. Match fertilizer to soil and plant needs as determined by soil analysis.
ii. Immediately following distribution of chemicals, irrigate without flooding turf.
G. Any plant that does not produce new leaves before April 15, or new leaves at
stem terminals that are yellow between veins, shall be treated as follows: evenly apply
soil sulphur on soil under foliage at the label recommended rate. Apply a chelate
ferrous compound on soil under foliage at rate on product label. An injection kit shall
be provided by Contractor for trees with chlorotic or sparse foliage. Prevent stains by
washing iron off hard surfaces.
3.0 Services Due June through August
A. Remove grass weeds in all turf grasses with the proper selective post-emergence
herbicide. Look for and eradicate any crabgrass, dallisgrass, goosegrass, kikuyugrass,
etc. Contractor shall determine which herbicides shall be used and communicate to the
City before application.
B. Prune all plants, overgrowing boundaries. Provide for clearance of traffic.
C. Pruning of the following shall be for size, shape, and control as needed:
Baccharis - dead growth and plants; Daylily, Lily-of-the-Nile, dead flower stems; Diets
for dead clumps and competitive invasion of neighbors; Myoporum and Meleleuca,
Rosemary, Pittosporum, and Xylosma shrubs, if fruiting, remove; Unlisted species as
specified by the City.
D. In all turf, small and enlarging patches of dying grass shall be treated for
damaged cause by pests eating roots or basal stems.
i. If injured turf can be lifted like a piece of carpet, white or grey colored grubs
will be seen on soil. Treat surrounding area with an insecticide registered for
grubs or billbug larvae.
ii. If there are no grubs, then Chinch bugs may be the cause. Shake turf
bottom side up over a newspaper. Tiny, black, and excited bugs will be seen.
Treat area with an approved insecticide labeled for Chinch Bugs.
4.0 Services Due September through November
A. Prune all plants overgrowing edges. Prune for traffic clearance in height.
B. Pruning of the following shall be for size and shape control. A need will be
clarified by City Inspector where there is doubt. The reference for need is in the
Training and Pruning Quality Standards in Section 7000: Ficus & Rhus, in September
before winds; Callistemom; Natal Plum; Oleander; Star Jasmine; Grevillea Trees;
Unlisted species as specified by the City.
C. All non-sports areas of Bermuda grass shall be winter over-seeded.
D. Fertilize all winter grass turf areas.
Periodic Services 6000-3
End of Section 6000
Pruning and Training Quality Standards 7000-1
SECTION 7000
PRUNING AND TRAINING QUALITY STANDARDS
A. Shrubs, herbaceous plants, and ground covers shall be pruned soon after the
completion of a flowering and fruiting cycle, if fruits are desired. Additional regular pruning is
required such that no more than 25% of the plant is removed during pruning.
1. Remove flower stems to point of origin.
2. Remove branches growing beyond perimeter of foliage. It is an outline of a
plant's shape. Cuts shall be inside of outer foliage, and flush with branch o f origin.
Leave no butts or stubs. Do not trim off all foliage on one plane with hedge shears.
Shearing is only for hedges, after thinning out big, long shoots.
3. Prune to retain natural shape of plant, shape vary according to plant species.
Some are wider than tall like Tam or Pfitzer junipers. Some are upright like Xylosma
and Photinia. There shall be no flat, square tops or unnatural forms.
4. Use of powered hedge trimmers is not allowed except for ornamental grasses
and designated hedges.
B. Prune trees to maintain their characteristic shape, density, and texture. The natural
appearance is an open, light textured perimeter or new foliage. The greatest density is in the
interior and lower half. The center of gravity, or location of mass, is close to the center and
close to the ground. This distribution fits a tree to withstand strong winds. Do not thin or "lace
out" dense foliage except the outside branches. This is defoliation. Roots could die and create
a weak tree that may die or blow over.
C. Prune out branches extending beyond the shape (foliage perimeter) of a tree. Prune to
control size and shape. Bare scaffold branches with foliage only at ends will break in wind.
1. Cuts shall be inside perimeter of foliage almost flush with a parent branch. No
butts or stubs are permitted. Old stubs with an outgrowth of multiple shoots shall be
removed.
D. Prune off lower branches high enough for traffic clearance.
E. Cut out dead, crossing, and rubbing branches.
F. Undercut branches over 2" in diameter before final cut is made close to a scaffold
(main) branch. Shredded, torn, or ripped branches shall be re-cut cleanly.
G. An exposed wound, as where a branch was removed, shall remain exposed. Do not
paint or apply any substance on a wound. It heals faster, with less disease, than a covered
wound.
H. Trees close together shall be separated by removal of intermingling branches. The
exception is a large hedge or windbreak consisting of one species.
Pruning and Training Quality Standards 7000-2
I. A young tree unable to stand upright in a seasonal wind shall be double staked. A tree
too heavy for support by stakes shall have three equally spaced wire ties to immoveable
stakes. The wire shall be on a 45 angle with the tree trunk.
1. Ties and wires shall always be tight and in place between stakes or tree trunk.
2. Loosen ties that are so tight they are almost starting to girdle a branch or trunk.
3. An immoveable trunk in wet soil is an indication it can stand without suppo rt.
Therefore, the stakes and wires should be removed for the tree to support itself.
End of Section 7000
Reports and Schedules 8000-1
SECTION 8000
REPORTS AND SCHEDULES
The Contractor, as part of this agreement, will submit reports and schedules as
requested. Failure to submit reports and schedules in the time specified will result in a
delay of monthly payments or a Performance Deficiency Deduction (Form 1). Such
reports must be detailed and thorough and may include but not be limited to the
following:
A. Suggestions for improving problem areas.
B. Reports of work planned.
C. Cost information to perform extra work for upgrading specific areas.
D. Pesticide Use Reports.
E. Landfill Diversion Reports (Form 2).
F. Weekly Maintenance Schedule(s). When requested by the City representative,
Contractor shall provide a weekly landscape maintenance schedule and/or
weekly irrigation maintenance schedule (Form 3).
Reports and Schedules 8000-2
FORM 1
CITY OF LA QUINTA
PERFORMANCE DEFICIENCY DEDUCTION
Notification to:
Date: Time: Method:
The following performance deficiency(ies) has been observed and requires immediate
attention to correct.
Location/Description:
______
Value of Deduction: $
City representative to check deficient items and comment below.
1. Lack of compliance to Specifications. $200 per incident per day.
2. Failure to provide adequate equipment. $200 per incident per day.
3. Failure to protect public health and/or correct safety concerns. $200 per
occurrence.
4. Failure to comply with water restrictions. $200 per occurrence.
5. Major irrigation deficiencies not corrected in time frame. $200 per
occurrence.
6. Failure to provide requested reports and schedules (Section 8000). $200
per occurrence.
7. Failure to provide requested Landfill Diversion Report forms. $200 per
occurrence.
8. Other
Please initiate the necessary corrective action(s) and notify the City when complete for
re-inspection.
Parks Superintendent
Facilities Director
Reports and Schedules 8000-3
FORM 2
CITY OF LA QUINTA
LANDFILL DIVERSION REPORT FORM
DATE:
SOURCE (LANDSCAPE MAINTENANCE AREA):
MATERIAL TYPE
HERBACIOUS
SEMI-HERBACIOUS
HARDWOOD
GROSS WEIGHT (Tons):
DIVERSION SITE (Co. Name):
DIVERSION SITE ADDRESS:
WASTE BI-PRODUCT
MULCH
SOIL CONDITIONER
OTHER
BI-PRODUCT VOLUME/WEIGHT:
(If Known)
Reports and Schedules 8000-4
FORM 3
CITY OF LA QUINTA
WEEKLY MAINTENANCE SCHEDULE
Landscape Maintenance
Area (Location)
Day of
Week
Equipment
and Material
Used
Type of
Work
Status
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Report Comments:
APPENDIX
PARKS AND CIVIC FACILITIES DETAILS
Park Facility Turf Shrub /
Ground
Cover
Irrigation Trees Maxicom
or IQ
Play
Equip
Trash and
Receptacles
Adams Park
(44425 Adams Street)
X X X X X X X
Bear Creek Trail (Avenida
Carranza to Calle Tecate) curb to
curb/fence between Carranza
and Ensenada, then trail and 30
feet east and to fence west
X X X X X
Civic Center Campus
(78495 Calle Tampico)
Park
X X X X X X
City Hall X X X X X X
Library X X X X X X
Wellness Center X X X X X X
La Fonda Open Area X X X X X
Tampico X X X X
Colonel Mitchell Paige Middle
School Sports Fields
(Washington Street/Palm Royale
Drive)
X X
Cove Oasis
Trailhead
(above Calle Tecate)
X X X X X
Entryway
(Calle Tecate and Avenida
Madero)
X X X X X
Parking Lot
(Calle Tecate and Avenida
Bermudas)
X
Desert Pride Park
(Bayberry Lane/Birchcrest Circle)
X X X X X X X
Eisenhower Mini Park
(53490 Eisenhower Drive)
X X X X X X X
Fred Wolff Bear Creek Nature
Preserve
(West side of Avenida
Montezuma)
X X X
Fritz Burns Park
(78107 Avenue 52)
X X X X X X X
La Quinta Park
(79120 Blackhawk Way)
X X X X X X X
Monticello Park [Excluding
Retention Basin]
(Jefferson Street/Fred Waring
Drive)
X X X X X X
Museum
(77885 Avenida Montezuma)
X X X X
Pioneer Park
(Seeley Drive/Miles Avenue)
X X X X X X
Saguaro Park
(Saguaro Road/Bottlebrush
Avenue)
X X X X X X X
Seasons Retention Basin
(Cloud View Way)
X X X X X X X
Sports Complex
(78900 Avenue 50)
X X X X
Velasco Mini Park
(Calle Temecula/Avenida
Velasco)
X X X X X X X
APPENDIX
RETENTION BASINS/OTHER AREAS DETAILS
Retention Basins/Other Areas Turf Shrub /
Ground
Cover
Irrigation Trees Maxicom
or IQ
Play
Equip
Trash and
Receptacles
Calle Rondo Channel X X X X X
Green Belt –
(Calle Tampico/Eisenhower Dr.)
X X X X X
Youth Center (YMCA)
(Moon River Dr. and Ave. 50)
X X X X X
Perimeter – Moon River east side
(North of Ave. 50)
X X X X X
Retention Basin - Acacia (Miles
Ave./N. Harland Dr.)
X X X X X
Retention Basin - Cactus Flower
#1 (Goldenrod Cir.)
X X X X X
Retention Basin - Cactus Flower
#2 (Foxtail Cir.)
X X X X X
Retention Basin - Cactus Flower
#3 (Iris Ct.)
X X X X X
Retention Basin - Cactus Flower
#4 (Star Flower)
X X X X X
Retention Basin - Del Rey
(Bridgette Way/Desert Stream
Dr.)
X X X X X
Retention Basin - L.Q. Highlands X X X X X
Retention Basin - Quinterra #1
(West Side) Los Manos Dr.
X X X X X
Retention Basin - Quinterra #2
(East Side) Los Manos Dr.
X X X X X
Retention Basin - Rancho Ocotillo
#1 (Camino La Cresta)
X X X X X
Retention Basin - Rancho Ocotillo
#2 (Ocotillo Dr.)
X X X X X
Retention Basin - Topaz
(Desert Stream Dr./Dune Palms
Rd.)
X X X X X
Retention Basin - Washington St.
(west side, south of Ave. 47)
X X X X X
Retention Basin – Adams Park
(44425 Adams Street)
X X X X X