Loading...
BRES2018-0255 Geotechnical UpdateO Sladden Engineering 45090 Golf Center Parkway, Suite F, Indio, CA 9220] (76(1) 863-0713 Fax (760) 863-0847 6782 Stanton Avenue, Suite C, Buena. Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 800 E. Florida Avenue, Hemel, CA. 92543 (951) 766-8777 Fax (951) 766-8778 May 7, 2018 Project No. 544-18135 18-04-209 Kristi Hanson Architects 72-185 Painters Path, Suite A RECEIVEI) Palm Desert, California 92260 JUL. 13 2018 Subject: Geotechnical Update Project: Proposed Custom Residence CITY OF LA gUIpiTA COMMUIVITYDEVELOPMENT 81-303 Columbus Way — Lot lOB The Madison Club La Quinta, California Ref: Geotechnical Investigation Report 28, 2005; Project No. 544-4810, Report prepared by Sladden Engineering dated January No. 05-01-101 Report of Testing and Observation During Rough Grading prepared by Sladden Engineering dated March 2, 2006; Project No. 522-4810; Report No. 06-02-120 In accordance with your request, we have reviewed the above referenced geotechnical reports as they relate to the design and construction of the proposed custom residence to be constructed on the site located at 81-303 Columbus Way (identified as Lot 10B) within the Madison Club development in the City of La Quinta, California. It is our understanding that the proposed residential structure will be of relatively lightweight wood -frame construction and will be supported by conventional shallow spread footings and concrete slabs on grade. The subject lot was previously graded during the rough grading of the Madison Club project site. The rough grading included over -excavation and recompaction of the native surface soil along with the placement of engineered fill material to construct the building pads. The site grading is summarized in the referenced report of Testing and Observation During Rough Grading along with the compaction test results. Because the lot has been previously rough graded, the remedial grading required at this time should be minimal provided that the building area falls within the previously assumed building envelope. The building area should be cleared of surface vegetation, scarified and moisture conditioned prior to precise grading. The exposed surface should be compacted to a minimujn of 90 percent relative compaction prior to fill placement. The previously removed soil and any fill material should be placed in thin lifts at near optimum moisture content and compacted to at least 90 percent relative compaction. Slaelden Engineering w w w. Sl ad den elrgi n eerhig, c o m May 7, 2018 -2- Project No. 544-18135 18-04-209 The referenced reports include recommendations pertaining to the construction of residential structure foundations. The previous reports also address the potential for liquefaction, subsidence and differential settlement. Based upon our review of the referenced reports, it is our opinion that the structural values included in these reports remain applicable for the design and construction of the proposed residential structure foundations. The allowable bearing pressures recommended in the referenced Geotechnical Investigation report remain applicable. Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent grade. Continuous footings should be at least 12 inches wide and isolated pad footings should be at least 2 feet wide. Continuous footings and isolated pad footings should be designed utilizing allowable bearing pressures of 1500 psf and 2000 psf, respectively. Allowable increases of 300 psf for each additional 1 foot of width and 300 psf for each additional 6 inches of depth may be utilized, if desired. The maximum allowable bearing pressure should be 3000 psf. The recommended allowable bearing pressures may be increased by one-third for wind and seismic loading. Lateral forces may be resisted by friction along the base of the foundations and passive resistance along the sides of the footings. A friction coefficient of 0.48 times the normal dead load forces is recommended for use in design. Passive resistance may be estimated using an equivalent fluid weight of 300 pcf. If used in combination with the passive resistance, the frictional resistance should be reduced by one third to 0.33 times the normal dead load forces. The bearing soil is generally non -expansive and falls within the "very low" expansion category in accordance with the 2016 (CBC) classification criteria. Sladden has reviewed the 2016 California Building Code (CBC) and summarized the current seismic design parameters for the proposed structure. The seismic design category for a structure may be determined in accordance with Section 1613 of the 2016 CBC or ASCE7. According to the 2016 CBC, Site Class D may be used to estimate design seismic loading for the proposed structures. The 2016 CBC Seismic Design Parameters are summarized below. Risk Category (Table 1.5-1): I/II/I1I Site Class (Table 1613.3.2): D Ss (Figure 1613.3.1): 1.522g S1 (Figure 1613.3.1): 0.719g Fa (Table 1613.3.3(1)): 1.0 Fv (Table 1613.5.3(2)): 1.5 Sms (Equation 16-37 {Fa X Sal): 1.522g Sm1 (Equation 16-38 {Fv X Si)); 1.079g SDS (Equation 16-39 (2/3 X Smsl): 1.014g SDI (Equation 16-40 (2/3 X Sm1 j): 0.719g Seismic Design Category; D Sladden Engineering www. Sladdenenzin eerie p. cam May 7, 2018 -3- Project No. 544-18135 18-04-209 In addition, we have sampled the surface soil on the subject lot to determine the soluble sulfate content as it relates to selecting appropriate concrete mix designs. The testing indicated soluble sulfate content of 2500 ppm (0.250 percent) that corresponds with the "severe" exposure category in accordance with ACI 318-08, Table 3. Based upon this, the use of sulfate resistant concrete mixes will be required. Structural concrete in contact with the soil should have a minimum compressive strength of 4500 psi and a maximum water -cement ratio of 0.45. We appreciate the opportunity to provide service to you on this project. If you have any questions regarding this letter or the referenced reports, please contact the undersigned. Respectfully submitted, SLADDEN ENGINEERING Brett L. Anders14 Principal Engineer SER/gvm �QRot=r=ssIo BRETT L. 21 ,D A SON G ] No. C4 39 rr 1 E9/30/18 xp.rr G CIVIL s% ENGINEERING >f.� Copies: 4/ Kristi Hanson Architects Sladden Engineering www.Sladdenengiiieering.com 6 0 9/)�5 -)iK"C9'.�_(i f continuity between the Investigation/reporting stage Please verify that soils reports contain all of the above information. In addition, to assure and the execution stage, please Use the following checklist to verify that the conclusions and recommendations in the report cover all the required elements. Only then can we be assured that the construction documents address all of the site soil conditions. La Quiinta Geotechnical Report Checklist Does the "Conclusions and Recommendations" following criteria? section of the report address each of the "Address" means: (a) the criterion is considered significant and mitigation measure(s) no or; (la) the criterion is considered insignificant and explicitly so stated. NO Gilterion ® Foundation criteria based upon bearing capacity of natural or compacted soil_ Foundation criteria to mitigate the effects of expansive soils. Foundation criteria based upon bearing capacity of natural or compacted soil_ Foundation criteria to mitigate the effects of liquefaction. ® Foundation criteria to mitigate the effects of seismically induced differential settlement. ® Foundation criteria to Mitigate 9 the effects of long-term differential settlement_ ® Foundation criteria to mitigate the effects of varying soil strength. Foundation criteria to mitigate expected total and differential settlement. Any -No- answers to the above checklist shou corrections. ld be noted as specific required BRETt. / mDERSON �1 G No. C45U9 FXP.9l3011S rr ENGINEERING rr �+ 1 Sladden Engineering 6782 Stanton Ave., Suite A. Buena park, CA 90621 (714) 523-0952 Fax (714) 523-1369 45090 Golf Center Pkwy, Suite F. Indio, CA 92201 (760) 863-0713 Fax (760) 863.0847 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 Date: May 4, 2018 Account No.: 544-18135 Customer: Kristi Hanson Location: Madison Club, Lot 1013, 81-303 Columbus Way, La Quinta Sulfate Series Analytical Report Soluble Sulfates per CA 417 ppm 2500 RECEIVED JUL 13 2018 CITY OF LA QUINTA COMMUNITY DEVELOPMENT Soluble Chloride per CA 422 ppm M ojs� Sulfate 544-18135 050418 C—F-69 TABLE 19-A-2—REQUIREMENTS FOR SPECIAL EXPOSURE CONDMONS MINIMUM %c, MAXIMUM NORMAL -WEIGHT AND WATER-CEMENTITIOUS LIGHTWEIGHT MATERIALS RATIO, BY AGGREGATE CONCRETE, WEIGHT, NORMAL -WEIGHT pal EXPOSURE CONDITION AGGREGATE CONCRETE x 0.00689 for MPa Concrete intended to have low permeability when exposed to water 1 0.50 1 4,000 Concrete exposed to freezing and thawing in a moist condition or to deicing chemicals 0.45 4,500 corrosion protection for reinforced concrete exposed to chlorides from deicing chemicals, salts or I0For brackish water, or spray From these sources .40 5,000 TABLE 19-A-3—REQUIREMENTS FOR CONCRETE EXPOSED TO SULFATE -CONTAINING SOLUTIONS NORMAL -WEIGHT AGGREGATE LIGHTWEIGHT AGGREGATE CONCRETE Maximum Water- V Normal- VM1 WATER- SOLUBLE Camenliflous Maledsts Ratio, by Ight and Ughtwelght SULFATE SULFATE IN BY PERCENTAGE Weiql'+f. Nog ai wale ht Aggregate Concrete, psi' EXPOSURE By WEIGHT SULFATE (SO4) IN WATER, ppm CEMENT TYPE Conereter x 0.00689 for MPa Negligible 0.001-0.10 0-150 Moderate2 0.10-0.20 150-1,500 II, IP(MS), IS 0.50 4,000 (MS) Severe 0.20-2.00 1,500-10,000 V 0.45 4,500 Very severe Over 2.00 Over 10,000 V plus 0.45 4,500 pozzolan3 ^ iuw« wa., ccsncuunuus maienafs ratio or risgher strength may be required for low permeability or for protection against corrosion of embedded i:ems or freezing and drawing ("Table 19-A-2)- 2SCawater, 3Pozzolan that has been determined by test or service record to improve sulfate resistance when used in concrete con- taining Type V cement. 264 Sladden August 23, 2018 Engineering 45090 Gulf Center Parinvay, Suite F. 3ndio, CA 92201 (760) 063-0713 Fax 1760) 8634847 6782 Sian [on Avenue, 5ua C, Buena Purk, CA 90621 (714) 523.0952 Fax (714) 5 23 -13 69 450 Egan Avenue, Seuumont, CA 92223 (951) 845-7743 Fux (951) 945,8863 800 E. Florida Avenue, 1•lerne t, CA 92543 (951) 766.8777 Fax (951) 766-8778 KHA Architects 72-185 Painters Path, Suite A Palm Desert, California 92260 Project: Custom Residence 81303 Columbus Way Madison Club La Quinta, California Subject: Foundation Plan Review Project No. 544-18135 18-08-561 RErry.. , SEP 0 5 2018 CITY OF I.A0.'ilA'rJ\ COMMUNITY DEVELOPPIENT Ref: Geotechnical Update prepared by Sladden Engineering dated May 7, 2018; Project No. 544-18135, Report No. 18-04-209 In accordance with your request, we have reviewed the Foundation Plans and Details prepared by Young Engineering. The plans reviewed were prepared for the custom residence proposed for the site located at 81303 Columbus Way within the Madison Club development in the City of La Quinta, Califomia. Based on our review, it is our opinion that the recommendations provided in the above referenced Geotechnical Update as well as previous geotechnical reports have been properly incorporated into these plans. If you have questions regarding this memo or the referenced report, please contact the undersigned. Respectfully submitted, SLADDEN ENGINEERING w E3Rl=T1 L. ANDERSON 0 Brett L. Anderson 0 No. C45389 i�_; Ul Principal Engineer 9/30/18 m P g CIVIL M zt ENGINEERING ~k Letter/ra �gtiQr aF CAl-1� Copies: 4 / KHA Architects Sladden Eitgitteerirtg rvwrv.Sladdetteitguteering.cont Sladden Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 March 2, 2006 East of Madison, L,LC 80-349 Via Mirasol La Quinta, California 92253 Project: Madison Club - Tract 33076 N WC Avenue 54 and Monroe Street La Quinta, California Subject: Report of Observations and Testing During Rough Grading Project No. 522-4810 06-02-120 Ref: Geotechnical Investigation Report prepared by Sladden Engineering dated January 28, 2005, Project No. 544-4810; Report No. 05-01-101 Summarized in this report are the results of in -place density tests performed at the subject site during the rough grading of the building pads along with pertinent observations. The subject site is located on the northwest corner of Avenue 54 and Monroe Street in the City of La Quinta, California. Rough grading was performed by Nuevo Engineering using conventional heavy equipment. The building pad areas were overexcavated to a depth of at least 3 feet below existing grade or 4 feet below pad grade, whichever was deeper. Deep removals up to 10 feet in depth were performed in areas where substantial roots were encountered. The previously removed native soils and native soils obtained from cut areas of the site were placed in thin lifts at near optimum moisture content and compacted to at least 90 percent relative compaction. The overexcavation generally extended laterally at least 5 feet beyond the previously approved building setbacks as indicated on the rough grading plans prepared by RCE, The remedial grading including overexcavation of the surface soil was performed as recommended within the above referenced Geotechnical Investigation report. Observations and field testing was performed from April 22, 2003 through January 4, 2006. Testing indicates that after reworking areas of low density, a minimum of 90 percent relative compaction was attained in the areas tested, The passing test results indicate compliance with the project specifications at the tested locations and depths but are no guarantee or warranty of the contractors work. RECEI1iki 'JUL 13 2018 CITY OF LA QUINTA COMMUNITY )VEViELOPMENT rs �C March 2, 2006 2- Project No. 522-4810 06-02-120 Field Tests: In -place moisture/density tests, were performed using a nuclear density gauge in accordance with test methods ASTM D 2922 and ASTM D 3017. A total of 2355 density tests were performed by Sladden Engineering personnel during rough grading. The approximate test locations are indicated by lot number and on the attached plans and test results are summarized on the attached data sheets. Laboratory Tests: The moisture -density relationships for the tested materials were determined in the laboratory in accordance with test method ASTM D 1557-91. Allowable Bearing Pressures: The structural values recommended in the referenced Geotechnical investigation report prepared by Sladden Engineering remain applicable for use in foundation design. Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent grade. Contiguous footings should be at least 12 inches wide and isolated pad footings should be at least 2 feet wide. Continuous footings and isolated pad footings should be designed utilizing allowable bearing pressure: of 1500 psf and 1800 p.5f, respectively. The allowable bearing pressures are for dead and frequently applied live loads and may be increased by 1/3 to resist wind, seismic or other transient loading. The recommended allowable bearing pressures may be increased by one- third for wind and seismic loading. The bearing soils are non -expansive and fall within the "very low" expansion category in accordance with Uniform Building Code {UBQ classification criteria. If there are any questions regarding this report or the testing summarized herein, please contact the undersigned. Respectfully submitted SLADDEN ENGINEERING to A Npc,�,, Brett L.. n e n Principal Engineer Exp. 913006 dr 'r Grading/lh S'T CIvl�- Copies 4/East of Madison, LLC PROJECT NAME; Madison Club LOCATION: La Quinta, California Test No, I Date Tested I LooatiOn 1 2 3 4 5 7 9 10 1.1 12 04�22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 13 04-25-05 14 04-25-05 15 04-25-05 16 04-25-05 17 04-25-05 18 04-23-05 19 04-25-05 20 04-25-05 21 04-25-05 22 04-25-05 23 04-25-05 24 04-25-05 25 04-25-05 26 04-25-05 27 04-25-05 28 04-25-05 29 04-25-05 30 04-25-05 31 04-25-05 32 04-25-05 33 04-25-05 34 04-25-05 Building Pads Lot 8A back half Lot $A back half Lot 8A front half Lot $A front half Lot 9A back half Lot 9A back half Lot 9A front half Lot 9A front half Lot 10A back half Lot 10A back half Lot 10A front half Lot 10A front half Lot 14A front half Lot 14A front half Lot 14A back half Lot 14A back half Lot 1.2A back half Lot 12A back half Lot 12A front half Lot 12A front half Lot 11A back half Lot 11A back half Lot 11A front half Lot 11A front half Lot 15A back half Lot 15A back half Lot 15A front half Lot 1.5.A front half Lot 13A back half Lot 13A back half Lot 13A front half Lot 13A front half Lot 12A front ha If Lot 12A front half TEST RESULTS PROJECT NO: 5224810 REPORT NO: 06-02-120 Elevation � DTY Tensity+ % Moisture In Place _I In Place 994 992 994 992 994 992 994 991 992 993 993 988 990 995 993 996 998 1000.5 1 98.5 1 991 993 1 991 993 109.2 104.4 106.6 105.6 109.2 101.7 109.0 104.1 100,'1 106.6 1.06.3 98.7 105.4 106.1 106.3 103.4 98.9 107.9 101.6 108.9 98.6 100.0 103.6 98.4 991 105.3 993 1.09.1 992 104.2 994 104.0 996 "109.6 998 103.9 992 1 109.9 994 107.2 1002.5 1 109.7 1004.5 98.9 10.2 8.0 9.7 12.4 11.0 8.5 10.3 10.6 1.9.3 13.2 15.0 12.0 1.0.4 8.6 9.4 12.0 10.3 13.0 12.0 11.3 8.0 12.3 10.1 8.2 9.6 8.9 9.7 7.6 7.3 7.6 12.2 13.7 12.5 8.9 Relative J Maximum 99 95 97 96 99 92 99 95 91. 97 97 90 96 96 92 94 90 98 92 99 90 91 94 90 96 99 95 95 99 94 99 98 99 90 110,0 110.0 1.3.0.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 1 110.0 1 110.0 11.0.0 110.0 120.0 110,0 110.0 110.0 110.0 110.0 110.0 110.0 f 110.0 i 110.0 ? 110.0 110.0 110.0 110.0 110.0 j 110.0 11.0.0 110.0 1.10.0 i DATE: March 2, 2006 Sladden Enflirtot;,.o PROJECT NAME'. Madison Club LOCATION: La Quinta, California Test No. Date'rested ! Location I 35 36 37 38 39 40 41. 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26.05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-26-05 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation I Dry Density l % Moisture I Relative Maximum In Place i In Place com action Ilensi over -excavation Lot 15A back half 995 109.7 11.1 99 110.0 Lot 15A back half 997 109.4 4.8 99 110.0 Lot 1.4A back half 999 109.4 11.9 99 110.0 Lot 14A back half 1001 105.8 12.0 96 '110.0 Lot 13A back half 1000 107.3 13.5 97 110.0 Lot 13A back half 1002 103.3 7.6 94 110.0 Lot 12A back half 1000 109.5 7.3 99 110,0 Lot 12A back half 1000 109.6 6.1 99 110.0 Lot 11A back half 995 104,7 9.6 95 1100 Lot 11A back half 997 108.9 9.3 99 110.0 Lot 10A back half 995 109.6 13.0 99 110.0 Lot 10A back half 997 107.5 14.4 98 110.0 Lot 9A back half 996 109.1 9.4 99 110,0 Lot 9A back half 998 108.9 7.8 99 110.0 Lot 8A back half 996 109.9 13.8 99 11.0.0 Lot 8A back half 998 106.9 1 11.7 97 110.0 Lot 8 B 993.3 99.0 21.2 90 1.1.0.0 Lot 8 6 994.3 103.6 1 10.9 94 110.0 Lot 6 B 994.6 99.9 1.4.3 91 110,0 Lot 6 B 996.6 108.0 9.5 98 110.0 Lot 6 B 994.0 99.2 12.9 90 110.0 Lot 6 B 996.0 ! 103.9 13.7 94 110.0 Lot 4 B 995.3 90.3 9.3 82 110.0 Lot 4 B 995.3 103.4 1.1.3 94 11.0.0 Lot 5 B 996.3 99.2 ` 15.8 90 110.0 Lot 5 B 994.0 1.05.3 12.0 96 110.0 Lot 8 A front half 996 109.6 8.2 99 110.0 Lot 8 A front half 998 109.3 8.6 99 110.0 Lot 9 A front half 996 107.7 9.7 97 110.0 Lot 9 A front half 998 102.1 8.4 93 110.0 Lot 13 A front half 994 1.03,9 8.8 94 110.0 Lot 13 A front half 996 105.4 10.1 96 1 11.0.0 ! Lot 13 A front half 990 1 101.8 9.3 93 110.0 Lot 13 A front half 992 ` 106.9 11.4 97 110.0 Lot 13 A front half 994 104.5 8.3 95 110.0 Lot 13 A front half 996 1.05.8 1 13.1 96 110.0 wt 13 A front half. 997 108.1 11.4 98 110.0 Lot 13 A front half 998 106.8 10.9 97 110.0 Lot 13 A front half 994 106.1 9.8 96 120.0 Lot 13 A front half 995 103.8 8.6 94 110.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Date Tested Location I 75 76 77 78 79 80 81 82 83 84. 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 1.07 108 1.09 110 f 11.1. 112 113 114 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 04-27-05 TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture In Place In Place Lot 17 A front half 993.5 Lot 26 A front half 988 Lot 26 A front half 990 Lot 25 A front half 988 Lot 25 A front half 990 Lot 24 A front half 988 Lot 24 A front half 990 Lot 8 A Back half 994.5 Lot 8 A Back half 996.5 Lot 9 A Back half 994 Lot 9 A Back half 996 04-28-05 Lot 24 A back half 989 04-28-05 Lot 24 A back half 991 04-28-05 Lot 25 A back half 993 04-28-05 Lot 25 A back half 993 04-28-05 Lot 26 A back half 993 04-28-05 Lot 26 A back half 995 04-28-05 Lot 24 A front half 992 04-28-05 Lot 24 A front half 994 04-28-05 I Lot 25 A front half 992 04-28-05 Lot 25 A front half 994 04-28-05 Lot 20 A front half 992 04-28-05 Lot 20 A front half 994 04-28-05 Lot 21 A front half 992 04-28-05 Lot 21 A front half 994 04-28-05 Lot 22 A front half 992 04-28-05 Lot 22 A front half 994 04-28-05 Lot 26 A front half 992 04-28-05 Lot 26 A front half 994 04-28-05 Lot 24 A Back half 993 04-28-05 Lot 24 A Back half 995 04-28-05 Lot 25 A Back half 996 04-28-05 1 Lot 25 A Back half 998 04-28-05 Lot 26 A Back half 996 04-28-05 Lot 26 A Back half 998 04-29-05 Lot 16 A Back half 994.5 04-29-05 Lot 16 A Back half 996 04-29-05 Lot15 A Back half 996 04-29-05 Lot 14 A Back half 999 04-29-05 Lot13 A Back half 999 106.1 103.0 105.6 101.5 102.8 100.3 "102.5 106.9 104.7 107.0 105.3 103.0 104,4 99.6 105.3 98.7 106.6 102.5 110.3 103.6 100.5 108.6 109.6 108.7 102.8 107.2 100.6 109.1 107.7 '101.7 105.4 106.8 '101.3 105.5 100.9 102.4 [ 00.'1 97.0 104.5 101.8 9.8 6.9 7.2 8.1 7.9 9.1 8.0 10.5 12.5 11.6 13.4 9.6 12,9 10.3 7.4 6.7 11.6 13.3 10.8 11.5 10.3 9.1 6.4 7.1 5.5 5.1 11.5 9.5 7.8 9.8 9.8 11.3 6.7 6.3 7.3 8.3 7.6 10.8 12.9 9,0 Relative Maximum )m action Densiuv 96 11.0.0 94 110.0 96 110.0 92 110.0 93 110.0 91 110.0 93 110.0 97 110.0 95 110.0 97 ; 1'10.0 96 ? 110.0 94 110.0 95 110.0 91 110.0 96 110.0 90 110.0 97 110.0 93 i 110.0 91 110.0 94 110.0 92 110.0 99 110.0 99 110.0 99 110.0 93 110.0 97 110.0 91 110.0 99 110.0 98 + 110.0 97 110.0 96 110.0 97 110.0 92 110.0 96 110.0 92 110.0 93 110.0 91 110.0 881, 110.0 95 f 110.0 93 110.0 DATE: March 2, 2006 .S1&dd &Y1 Fni+rnvarrna TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. ; Date Tested Location 115 04-29-06 116 04-29-05 117 04-29-05 118 04-29-05 119 04-29-05 120 04-29-05 121 04-29-05 122 j 05-02-05 123 i 05-02-05 124 05-02-05 1 125 05-02-05 126 05-02-05 127 05-02-05 1.28 05-02-05 1.29 05-02-05 130 05-02-05 131 05-02-05 132 05-02-05. 1,33 05-02-05 134 05-02-05 135 05-02-05 136 05.02-05 137 05-02-05 138 05-02-05 1.39 I 05-02-05 140 05-02-05 141 05-02-05 ` 142 i 05-03-05 143 05-03-05 144 ! 05-03-05 145 05-03-05 146 E 05-03-05 147 05-03-05 148 05-03-05 149 05-03-05 150 05-03-05 151 05-03-05 152 05-03-05 I 153 05-03-05 154 ' 05-03-05 Lot 21 A Back half Lot 21 A Back half Lot 20 A Back half Lot 20 A Back half Lot 1.8 A Back half. Retest ✓R 57 Lot 4 B Back half 'Lot 21 A Back Half Lot 21 A Back Half Lot 23 A Back Half Lot 23 A Back Half 1.ot 21 A Front Half Lot 21 A Front Half Lot 24 A Back Half Lot 24 A Back Half Lot 24 A Back Half Lot 24 A Back Half Lot 24 A Center Lot 25 A Center. Lot 26 A Center Lot 24 A Front Half Lot 25 A Front Half Lot 26 A 'Front Half Lot 23 A Front Half Lot 23 A .Front Half Lot 22 A Front Half Lot 22 A Front Half Lot 20 A Front Half Lot 20 A Back Half Lot 20 A Back Half Lot 25 A Back Half Lot 25 A Back Half Lot 25 A Front Half Lot 25 A Front Half Lot 24 A Front Half Lot 24 A Front Half Lot 23 A Front Half Lot 23 A Front Half Lot 22 A Back Half Tot 22 A Back Half Elevation PROJECT NO: 522-4810 REPORT NO: 06-02-120 Dry Density % Moisture In Place I In Place 992.2 99.6 994 99.1 993.2 103.2 994.5 102A 995.6 94.1 1.06.0 997 107.5 995 102.9 996.5 101.5 993 108.1 995 103.2 996 107.6 997.5 103.7 996 106.3 997.5 100.9 998.5 104.6 999.5 101.9 994 106.3 993 105.1 994 105.8 995.5 101.8 995.5 106.6 996 105.0 994 106.3 996 100.9 99515 104.6 996.5 101.9 996 95.4 996 107,1 997.5 104.7 999 103.5 1000 101.3 997 99.9 999 "108,2 997 99.5 999 99.2 998 106.4 1000 101.0 997 1.04.9 999 109.4 Relative I Maximum I 10.8 91 11.1 90 8.8 94 10,1 93 12.8 86* 9.1 96*w 12.2 98 17.4 93 9,8 92 7.4 98 13,1 96 9.5 98 6.9 94 14.0 97 12.8 92 15.1 ` 95 13.2 I 93 14.1 97 12.2 96 13.5 96 10.4 93 13.0 97 11.9 95 '14,0 97 12.8 92 1.5.1. 95 13.2 93 25.1 $1 I 8.8 97 11.4 95 16.9 I 94 :17.4 92 17.1 90 7.7 98 16.0 90 20.1 i 90 14.6 97 15.2 92 14.9 95 1 11.7 99 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 110,0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 '1'10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California t et No. I Date Tested I Location 155 05-03-05 156 1 05-03-05 157 05-03-05 158 05-03-05 159 05-03-05 160 05.03-05 161 05-03-05 162 05-03-05 163 05-03-05 164 05-03-05 Lot 23 A Back Half Lot 23 A Back Half Retest # 142 Lot 20 A Center Lot 21 A Center Lot 21 A Center Lot 22 A Center' Lot 22 A Center Lot 23 A Center Lot 24 A Center 165 05-04-05 I Lot 54 A Center 166 05-04-05 Lot 54 A Center 167 05-04-05 Lot 53 A Center 168 ! 05-04-05 Lot 53 A Center 169 05-04-05 Lot 54 A Front Half 170 05-04-05 Lot 54 A Front Half 177 05-04-05 Lot 53 A Front Half 172 05-04-05 Lot 2 A Back Half 173 05-04-05 Lot 1. A Back Half 174 05-04-05 Lot 1 A Back Half 175 05-04-05 Lot 1 A Center 176 05-04-05 Lot 1 A Center 177 05-04-05 Lot 2 A Center 178 05-04-05 Lot 2 A Center 7.79 i 05-04-05 ! Lot 2 A Front Half 180 05-04-05 Lot 2 A Front Half 181 05-04-05 Lot 1 A. Front Half 1.82 ' f 05-04-05 Lot 1 A Front Half 183 , 05-05-05- Lot 2 A Front Half 184 05-05-05- Lot 2 A Front Half 183 05-05-05- Lot 1 A Front Half 1.86 05-05-05- Lot 1 A Front Half 187 05-05-05- Lot 1 B Back Half 188 05-05-05- 1 Lot 1 B Back Half 189 05-05-05 Lot 1 B Center 1.90 05-05-05 ; Lot 1 B Center 191 ± 05-05-05 j Lot 2 B Center 192 05-05-05 Lot 2 B Center 193 05-05-05 {{ 3 8 Front Half 194 05-05-05 3 B Front Half TEST RESULTS Elevation Dry In 996 I 102.9 998 100.6 101.4 998 103.9 996 99,9 997.5 109.7 995 106.3 997 107.1 996 108.7 998 109.1 988.7 107,7 990 99.1 988.3 1 105.8 990.5 ' 102.5 990 105A 992 101.7 987.5 105.4 993 106.0 993.5 108.1 995 101.3 993.5 108.4 995 99.8 991 106.4 992.5 98.9 992.5 109.6 994 104.0 992 108.9 993.5 105.9 992.5 994.5 992 994 999 1001 1000 1002 997 999 998 1000 109.6 104.0 108.0 105.9 104.E 99.3 101.9 102.2 105.9 100.5 109.6 107.2 PROJECT NO: 522-4810 REPORT NO: 06-02-120 �( %Moisture Relative } Maximum In PIacC j Compaction j Densi 16.8 93 110.0 12.9 91 110.0 9.5 + 92** 1,1.0.0 12.2 94 110.0 13.6 1 91 110.0 11.3 99 110.0 14.1 96 110.0 15.0 97 110.0 11.3 99 17(I.0 14.2 I 99 110.0 6.9 14.8 6.7 7.8 6.8 10.0 8.7 8.2 7.8 6.6 7.6 11.5 5.8 9.4 8,3 6.1 7.7 5.9 8.3 4.3 7.7 4.4 :1.3.6 14.5 11.1 12.9 13.8 11.4 11.5 5.9 98 90 96 93 96 92 96 96 98 92 98 90 97 90 99 94 99 96 94 94 99 96 95 90 93 93 96 91 99 97 110.0 11.0.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 II 110.0 170.0 110.0 11.0.0 110.0 110.0 i 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 1.10.0 110.0 DATE: March 2, 2006 Sladdern F-m-minvorinn PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. Date Tested Location TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density' °r6 Moisture - Relative Maximum I In Place In Place I Compaction Densit 195 05-05-05 Lot 2 B Front Half 997 1100.1. 8•8 196 05-05-05 Lot 2 B Back Half 1000 103.1 11.4 197 05-05-05 Lot 2 B Back Half 1002 102.8 12.1 198 05-05-05 lyot 3 8 Back Half 999 104,5 10.2 199 05-05-05 Lot 2 A Back Half 993 106.0 8.2 200 05-05-05 Lot 1 A Back Half 993.5 109,1 7,8 201 05-05-05 Lot 1 A Back Half 995 101.3 3.4 202 05-05-05 l..ot 1 A Center 993 108,4 7,6 203 05-05-05 Lot 1 A Center 995.2 1 99.8 11.52 204 05-05-05 Lot 2 A Center 991 106.4 4.5 205 05-05-05 Lot 2 A Center 993 1 98.9 9.4 206 05-06-05 Lot 54 A Front Ialf 993 i 109.1 9.1 207 05-06-05 Lot 53 A Front Half 991.5 107.9 12.6 20S ' 05-06-05 Lot 52 A Front Half 992 100.9 17.4 209 05-06-05 Lot 51 A Front Half 991 n 103.5 8.8 210 05-06-05 Lot 54 A Front Ha If 991 104.9 13.6 211 05-06-05 Lot 54 A Back Half 992.5 98.6 12.0 212 05-06-05 Lot 53 A Back Half 988.5 104.3 1.3.6 213 05-06-05 Lot 53 A Back Half 990 101.0 15.8 214 i 05-06-05 Lot 52 A Back Half 988.5 105.3 16.1 215 05-06-05 Lot 52 A Back Half 990 107.5 1.0:0 216 05-06-05 Lot 51 A Back 1-ialf 990.5 105.9 ` 17.1 217 i 05-06-05 1 Lot 51 A Back Half 992 107.6 16.9 i 218 l 05-09-05 Lot 18 A Front 994 108.9 16.1 219 05-09-05 Lot 18 A Front 996 106.1 12.5 220 05-09-05 Retest # 119 109.7 11.5 221. { 05-09-05 Lot 18 A Back 999 107.9 13.8 222 05-09-05 tot 1.9 A Front 996.5 106.1 8.5 223 05-09-05 Lot 19 A Front 997.5 102.8 8.6 224 05-09-05 Lot 19 A Back 997 1.04.9 14.1 225 05-09-05 Lot 19 A Back 997 106.4 14.8 226 05-09-05 Lot 21 Front 998.5 106.1 1.3.3 227 05-09-05 Lot 21 Front 999.5 105.7 12.9 228 05-09-05 Lot 21 Back 998 1 99•1 6'1 i 229 ` 05-09-05 Lot 21 Back 1000 98.8 5.2 230 05-09-05 Lot 4 B Back 997 99.0 9.7 231 05-09-05 Lot 4 B Back 999 104.5 5,6 232 05-09-05 Lot 4 B Front 997 105.6 7.7 233 05-09-05 i Lot 4 B Front 999 105.1 7.8 234 � 05-09-05 Lot 7 B Back 996 1 104.1 9.0 91, 99 93 95 96 99 92 98 90 97 90 99 98 92 94 95 90 95 92 96 98 96 98 99 96 99** 98 96 93 95 97 96 96 90 90 90 95 96 95 95 110.01 110.0 110.0 1.1.0.0 110.0 1.10.0 110.0 110.0 110.0 110.0 11.0.0 11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11, 0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110,0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME, Madison Club PROJECT NO: 522-4810 LOCATION; La Quinta, California REPOWf NO: 06-02-120 Test No. Date Tested Location Elevation ityll' 2�InPlace % Moisture Relative Maximum f In Place Com action Denaity 235 05-09-05 Lot 7 B Back 994 103.9 8.6 94 110.0 236 05-09-05 ? Lot 7 B Front 996 107.7 13.7 98 110.0 237 05-09-05 Lot 7 B Front 994 103.2 5.3 99 ' 110.0 238 05-09-05 Lot 8 B Front 994 98.9 7.6 1 91 110,0 239 I 05-09-05 Lot 8 B Front 996 1,03.6 8.3 94 110.0 240 1 05-10-05 Lot 44 A Front 991 1.U4.6 11.9 I 95 110.0 241 05-10-05 Ixt• 4.5 A Front 991.5 100.5 13.8 91 110.0 242 05-10-05 Lot 46 A Front 993.5 94,1 :13.5 86" 110.0 243 05-10-05 Lot 51 A Front 993 101.1 16.9 ! 92 244 05-10-05 Lot 51 A Front 995 99.6 11,2 90 i 110.0 245 05-10-05 Lot 52 A Front 994 104.5 16.5 95 f 110.0 246 05-10-05 Lot 52 A Front 996 703.5 1.0.6 94 110.0 110.0 247 05-10-05 Lot 53 A Front 993.5 108.8 14.8 99 11.0.0 248 05-10-05 Lot 53 A Front 995 708,0 13.3 98 110.0 249 05-10-05 i i Lot 54 A Front 993.5 1092 1.7.0 99 110.0 250 05-10-05 Lot 54 A Front 995 108.9 13.0 99 110.0 251 05-10-05 Lot 54 A Back 993.5 108,7 17.2 99 110.0 252 1 05-1.0-05 Lot 54 A Hack 995 108.4 16,0 99 110,0 253 05-10-05 I Lot 53 A Back 993 102.7 11.9 93 ' 11 a:0 254 05-10-05 Lot 53 A Back 995 � 99.1. 8.5 90 110.0 255 05-10-05 Lot 52 A Back 994 108.0 13.2 98 256 f 1 05-10-05 Lot 52 A Back 995.5 108.1 11.3 98 110.0 110,0 257 05-10-05 Lot 89 B Back 984.5 100.5 14,3 91, 110.0 258 05-10-05 Lot 8913 Back 986 104.4 111, 95 259 05-10-05 Lot 90 B Back 985 � 1.04,5 14.8 95 110.0 260 05-10-05 Lot 90 13 Hack 987 109.7 6.3 99 110.0 261 i 05-10-05 I Lot 91 B Back 982 1.04.6 12.8 95 1.10.0 262 i 05-10-05 Lot 91 B Back 984 ll 1.08,1 I 11.3 98 71.(?.0 110,0 263 05-10-05 Lot 4. B Back 1003 98.9 12.7 i 90 71U.0 264 f 05-10-05 Lot 3 B Front 1001 1073 F 1 6.8 97 110.0 265 ' ! 05-11-05 Lot 4 B Front I 1003 104.3 j 9.9 95 � 11.0.0 266 05-11-05 Lot 4 B Frot n 1004 109,5 i 4.0 99 110,0 267 + 05-11-05 1 Lot 4 B Front 1005 103.2 13.9 '. 96 110.0 268 { ! 05-11-05 Lot 3 B Front 1003.5 I 106.5 16.1 97 1 110 U 269 05-11-05 Lot 3 B Front 1004.2 109.5 11,6 98 110.0 270 i 05-11-05 Lot 3 B Front 1005.5 108.0 7.0 96 110,0 271 i 05-11-05 Lot 4 B Back 1004 107.7 7.3 98 110.0 272 05-11-05 Lot 4 B Back 1005.5 109.8 5.4 99 11U.0 273 05-71-05 Lot 4 B Sack 1007 104.4 5.8 95 i 110.0 274 05-1.1-05 Lot 3 B Back 1003 106.6 77..4 I 97 110.0 DATE: March 2, 2006 Sladden E�:¢inPnrfito TESL' RESULTS PROJECT NAME, Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture I In Place Ii in Place 275 I 05-11-05 1 Lot 3 B Back 1004 108.3 9.1 276 05-11.-05 Lot 3 B Back 1005.5 107.9 7.0 277 05-11-05 Lot 46 A Front 993 4 100.9 6.3 278 05-11-05 Lot 49 A Back 898 107.1 10.2 279 05-11-05 Lot 49 A Back 991 108.1 8.5 280 05-11-05 Lot 50 A. Back 989.5 1.01.5 16.3 281 ; 05-11-05 Lot 50 A Back 991 107.4 7.4 282 05-11-05 Lot 51 ,A Back 991 109.6 9.8 283 05-11-05 Lot 51 A Back 993 101.6 9.3 284 05-11-05 Lot 44 A Back 991 103.9 13.0 285 05-11-05 Lot 48 A Front 991 105.1 11.4 286 05-11-05 Lot 48 A Front 992 100.9 10.2 287 05-11-05 Lot 49 A Front 991 10 �II ' 9.9 288 05-11-05 Lot 49 A Front 992 1010 . 18 289 05-11-05 Lot 50 A Front 992 I 100..5 . 111.0 290 05-11-05 Lot 50 A Front 993 i 0 .7 291 05-11-05 Retest # 242 991..5 7 01.4 9.0 292 05-1.2-05 ! Lot 50 A Back 993 107.6 12.5 293 05-12-05 j Lot 50 A Back 994.5 109.2 9.1 294 05-12-05 Lot 49 A Back 991 105.1 13.1 295 05-12-05 Lot 49 A Back 993 104.4 13.9 296 05-12-05 Lot 51 A Front 997 108.9 10.5 297 05-12-05 Lot 51 A Front 999 105,9 1.0.6 298 4 05-12-05 i Lot 54 A Front 997.5 104.0 14.1 299 05-12-05 1 Lot 54 A Front 999.5 100.5 5.1 300 05-12-05 Lot 59 A Front 997 1 106,4 '14.8 301 05-12-05 Lot 53 A Front 999 1 98.9 11.2 302 05-12-05 Lot 53 A Back 994.5 107.6 12.7 303 '; 05-12-05 Lot 53 A Back 996.5 106.5 13.4 304 05-1.2-05 Lot 54 ,A Back 997 108.3 8.7 305 05-12-05 1 Lot 54 A Back 998.5 99.3 12.5 306 i 05-12-05 Lot 1 A Back 996 100.8 E 10.4 307 05-12-03 Lot 2 A Back 995 101.3 11.2 308 f15-72-05 Lot 2 A Front 996 99.5 9.0 309 05-12-05 Lot 52 A Front 996 1 q6.7 1,4.3 310 05-12-05 Lot 49 A Front 992.5 105.3 12.5 311 05-12-05 Lot 50 A front 994 103.8 10.9 312 y 05-12-05 Lot 31 A Front 991..5 y 100.3 1.0.6 313 05-12-05 l..ot 31 A Front 992.5 103.5 10.4 314 05-12-05 Lot 30 A Front 991 102.1 8.7 Relative 98 98 92 97 98 I 92 98 99 92 94 96 92 93 92 93 91 92*w 98 99 95 95 99 96 95 92 97 90 98 97 98 90 92 92 99 96 96 94 91 94 93 Maximum 110A 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 11.0.0 110.0 1101) 11.0.0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 11.0.0 110.0 110,0 110.0 110.0 110.0 110.0 110.0 110-0 110.0 110.0 � 710.0 110.0 110.0 110.0 l DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Te,it No, J Date Tested Location I I 315 05-13-05 Lot 2 B Front 316 05-13=05 Lot 2 B Center 317 05-1.3-05 Lot 2 B Front 318 05-13-05 Lot 1 B Front 319 05-13-05 Lot 1 8 Front 320 05-13-05 Lot 1 B Center 321 + 05-1.3-05 Lot 1 B Back 322 J 05-13-05 Lot 1 B Back 323 1 05-13-05 Lot 1 8 Center 324 05-13-05 Lot 2 B Back 325 05-1.3-05 foot 213 Back 326 05-13-05 Lot 2 B Center 327 05-1.3-05 Lot 17 A Back 328 05-13-05 Lot 17 A Back 329 05-13-05 Lot 3.7 A Center 330 ' 05-13-05 Lot33 A Front 331 05-13-05 Lot 32 A Center 332 05-13-05 Lot 32 A Center 333 05-13-05 Lot 14 A Back 334 j 05-13-05 Lot 13 A Back 33.5 05-16-05 Retest # 112 336 05-16-05 Lot 15 A Back 337 05-16-05 Retest # 333 338 05-16-05 Lot 14 A Back 339 05-16-05 1.ot 14 A Center 340 05-16-05 Lot 13 A Back 341 ' 05-16-05 Lot 13 A Back 342 05-16-05 i Lot 13 A Center 343 05-16-05 Lot 15 A Front 344 05-16-05 Lot 15 A 'Front 345 i 05-16-05 i Lot 15 A Center 346 ! 05-16-05 Lot 14 A Front 347 05-16-05 Lot 14 A Front 348 05-16-05 Lot 15 A Center 349 05-16-05 1_,ot 13 A Front 350 = 05-16-05 Lot 13 A Front 351 05-16-05 Lot 13 A Front 352 05-17-05 353 05-17-05 354 05-17-05 Lot 17 A Center Lot 1.6 A Back Lot 15 A Back TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation ' Dry Density % Moisture I Relative Maximum InPlacc� In Place i Compaction Dcnvih, 1001 100.4 14.6 91 1001 104.5 12.1 95 1003 100.0 13.2 91 1001.5 105.9 16.4 96 1003 i 101.5 11.2 92 1001 103.2 13,0 ! 94 1003.5 101.5 143 92 1005 99.2 12.9 1 90 1003 104.5 11,3 i g5 1002 102.0 11.6 93 1003.5 104.6 8.1 95 1003 104.1 9.5 95 998 103.7 7,7 94 1000 98.7 9.4 90 998 1.06.5 10.1 97 999 101.8 14.3 93 990 I 108.6 I 8.9 99 990 100.8 10.5 92 998 ; 95.1 18.1 86" 998 104.4 11.0 95 109.5 10.9 99** 998.5 106.8 10.3 97 99.2 17.4 90- 1002.5 102.3 11.9 93 7 007 104,E 10.2 95 1001 104.1 17.9 95 1003 100.4 8.5 91 1001.5 103.1 10.5 94 998 108.7 J 13.2 99 1000 99.3 9.4 90 998.5 106.0 10, 7 96 1001.5 103.8 18.0 i 94 1003.5 i 101.9 15.4 93 1001 104.4 11.3 95 1000 101.0 1 16.7 92 1.002 104.9 '12,1 95 1000 106.8 10.9 97 999 109.1. 10.9 99 1002 [� 107.5 12.0 98 1000 ! 103.0 10.6 94 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 11.0.0 110.0 11.0.0 110.0 110.0 110.0 110.0 j 710.0 110.0 110.0 1.10.0 11.0.0 1.10.0 110.0 1.1(W 110.0 110.0 170.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 I 110.0 110.0 110.0 DATE: March 2, 2006 Sladden .Enzineering PROJECT NAME: Madison Club LOCATION: La Quinta, California 'Pest No. I Date Tested Location TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density I `% Moisture xeiauve In Place i In Place 1. COmpactit 355 05-17-05 Lot 15 A Front 1000 106.4 356 05-17-05 Lot 16 A Front 999 105.3 357 05-17-05 Lot 10 A Back 999 108.1 358 05-17-05 Lot 10 A Back 1001 106.7 359 05-17-05 Lot 11 A Back 999 105.9 360 05-17-05 Lot 11 A Back 1001 107.8 361 05-17-05 Lot 9 A Front 999 107.7 362 05-17-05 Lot 10 A Front 998.5 105.7 363 05-1.7-05 Lot 37 A Back 990 102.3 364 05-17-05 Lot 37 A Front 990 103.3 365 05-17-05 Lot 37 A 'Front 992 1.04.1 366 ! 05-17-05 Lot 8 A Back 998.5 104.7 367 05-1.7-05 Lot 6 A Back 1000.5 106.5 368 ! 05-17-05 Lot 9 A Back 998 104.1 369 05-17-05 Lot 9 A Back 1000 102.0 370 ! 05-1.7-05 Lot 36 A Front 990.5 1 100.6 371 05-17-05 Lot 36 A Front 991.5 101.4 372E 05-1.7-05 Lot 35 A Front 990 1,02.5 373 1 05-17-05 1 Lot 35 A Front 991 103.8 374 05-1.7-05 Lot 16 A Center 1000 105.0 375 f 05-17-05 Lot 15 A Center 999.5 104.4 376 ; 05-17-05 Lot 17 A Center 1000 106.3 377 05-18-05 Lot 18 A Center 99.5 107.9 378 '; 05-18 05 Lot 18 A Center 1000 98.5 379 05-18-05 Lot 19 A Front 998.5 108.7 380 05-18-05 Lot 19 A Front 1000 105.3 381 05-18-05 Lot 20 A Front 998 103.E 382 05-1.8-05 Lot 20 ,A Front 1000 i 106.6 383 05-18-05 Lot 14 A Front 999 107.2 384 05-18-05 Lot 14 A Front 1001 •. 109.0 383 05-1.8-05 Lot 1.1 ,A Front 997.5 105.E 386 05-18-05 1 Lot 11 A Front 999 1 107.0 387 05-15-05 L,ot ,17 A Back 998.5 104.06 388 05-18-05 Lot 17 A Back 1000.5 104.4 389 05-18-05 Lot 18 A Back 999.0 106.6 390 05-18-05 3 1 Lot 18 A Back 9995 100.6 391 05-18-05 Lot 19 A Back 997.5 103.6 392 05-18-05 I,ot 19 A Back 999.5 101.1 393 05-18-05 Lot 20 A Back 99$.0 107'2 394 05-16-05 Lot 20 A Back 1000 107.5 395 05-18-05 Lot 17 A Front 997.5 1.06.4 9.3 97 11..7 96 12.4 98 13.0 1 97 7.1 I 96 11.4 98 8.1 98 13.4 96 1.4..3 93 11.6 94 1.0.9 95 15.8 95 11.3 97 13.8 95 12,0 93 12,1 91 11.3 92 10.6 93 10.4 94 12.5 1 95 13,2 95 13.8 97 8.0 98 12.7 90 9.7 ` 90 13.1 96 9.3 i 96 10.8 96 14.6 97 10.6 1 99 11.3 96 10.6 97 9.9 95 16.3 95 8.0 97 16.4 94 15.3 94 15.0 92 11..9 97 9.7 98 14.4 97 Maximum 110.0 110.0 110,0 110.0 110.0 110.0 110.0 110.0 110.0 110,0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 1,1010 110.0 11U 110,0 110.0 � 170,0 110.0 i 110.0 110.0 110.0 110.0 110,0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME; Madison Club LOCATION: La Quinta, California Test No, Date Tested I Location 396 05-18-05 Lot 17 A Front 397 05-18-05 Lot 8 A Front 398 05-18-05 Lot 8 A Front 399 05-19-05 Lott A Front 400 05-19-05 Lot 1 A Front 401 05-19-05 Lot 105 Back 402 05-19-05 Lot 104 Back 403 05-19-05 Lot103 Back 404 1 05-19-05 Lot 105 Center 405 1 05-19-05 ! Lot 104 Center 406 1 05-19-05 Lot 103 Center 407 05-19-05 Lot 2 A Front 408 I 05-19-05 Lott A Front 409 05-20-05 Lot22 A Back 410 05-20-05 Lot23 A Back 411 05-20-05 Lot18 A Front 412 05-20-05 Lot22 A Front 413 05-20-05 1 Lot22 A Front 414 05-20-05 Lot23 A Front 415 ' 05-20-05 Lot25 A Back 416 05-20-05 Lot 26 A -Back 417 05-20-05 Lot 22 Center 418 05-20-05 Lot 23 Center 419 05-23-05 Lot 102 B Back 420 05-23-05 Lot103 U Back 421 05-23-05 Lot 104 B Back 422 05-23-05 Lot 105 B.Back 423 05-23-05 Lot 54 A Front 424 05-23-05 Lot 54 A Front 425 J 05-23-05 Lot 54 A Back 426 05-23-05 Lot 54 A Back 427 05-23-05 Lot 33 A Back 428 05-23-05 Lot53 A Back 429 05-23-05 Lot 54 A Front 430 05-23-05 Lot 54 A Front 431 05-23-05 Lot53 A Front 432 05-23-05 Lot 53 A Front 433 05-23-05 Lot 52 A Front 434 05-23-05 Lot 32 A Front TEST RESULTS PROJECT NO; 522-4810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture I In Place In Place I I 999.5 1 102.4 997 j 105.4 998.5 103.9 996 104.7 998 1.04.8 983 104.1 982 105.0 982 105.7 983 1 103.2 982 102.9 982 104,1 997 1 105.4 998.5 1.04.0 I 1.001 106.8 1001 105.1 998 107.7 998.5 j 104.5 1001 94.1 1001 95.3 1001 97.2 1001.5 96.5 995.5 1 102.4 1000 103.6 983 101.5 984 105.6 984 106.1 984 102.7 1001 108.1 1002 104.0 1000.5 103.3 1001.5 104.5 998.5 104.1 1000.5 102,9 1000 109.7 1001.5 101.9 1000 102.5 1001.5 101.0 998 108.1 1000 100.3 11.8 14.0 13.3 15.9 1.1-6 16.9 89 1 13.0 11.8 10.1 1 10.8 16.9 1 14.2 Relative Maximum 93 1 110.0 96 110.0 94 110.0 95 110.0 95 110.0 95 110.0 95 110.0 95 110.0 95 110.0 94 f 110.0 95 ' 110.0 96 110.0 95 11.0.0 15.2 97 110.0 1.3.7 95 110.0 9.6 98 110.0 14.5 95 110.0 20.1 86* 110.0 19.4 87* 110.0 21.4 88* 110.0 18.4 80* 110.0 -106.2 93 + 110.0 15.6 94 ! 110.0 1.4.8 92 110.0 13.4 96 110.0 12.3 96 110.0 20.4 93 110.0 13.9 98 110.0 12.8 94 110.0 14.1 94 11.0.0 13.2 95 1.10.0 11.6 95 110.0 72.0 93 110.0 7.5 93 112.0 11.0 91 112,0 16.6 91 110.0 12.9 90 112.0 13.2 96 *112.0 11.6 90 -112.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME; Madison Club LOCATION: La Quinta, California Tcst No. Date Tested I Location 435 05-23-05 436 05-23-05 437 05-23-05 438 05-23-05 439 05-23-05 440 05-23-05 441 442 443 1 444 445 446 447 448 449 450 451 4-12 453 454 455 456 457 458 f 459 460 461, i 462 463 k 464 465 466 467 468 469 470 471 472 473 474 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 l 05-24-05 05-24-05 05-24-05 j 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 Retest # 413 Lot 22 A Front Retest # 414 Lot 23 A Front Retest # 415 Lot 25 A back Lot 52 A Back Lot 51 A Back Lot 52 A Center Lot 51 A Center Lot 104 B Front Lot 103 B Front Lot 103 B Front Lot 102 B Front Lot 102 B Front Lot 101 B Front Lot 101 B Front Lot 103 B Ccntcr Lot 1.02 B Center Lot 101 B Center TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density Relative 1 Maximum % Moisture !Comp In Place i i In Place Corn ction f Density 104.7 14.2 93** 112.0 1003 1 106.3 14.0 95 112.0 1 101.9 17.2 91** 112.0 1003 ! 103.9 18.0 93 1.12.0 108.5 7.8 1 97** 112.0 1001 1.00.9 22.1, 90 112.0 997.5 995 997 995 983 983 984.5 982 983.5 981,5 983 984 984 982.5 109.3 108.7 105.1 103.8 1.03.9 106.2 108.3 100.8 101.9 99.9 106.1 103.3 105.8 102.4 05-25-05 Lot 50 A Front 996 100.4 05-25-05 i Lot 50 A Front 997 102.5 05-25-05 i Lot 51 A Front 1000 104.4 05-25-05 Lot 51 A Front 1000.5 106.1 05-25-05 Retest # 416 94.3 05-25-05 [.,ot 26 A Front 999.5 1 95.6 05-25-05 I [.ot 27 A Front 996 ` 101.3 05-25-05 Lot 27 A Front 998 103.1 05-25-05 j Lot 1 B Back 1005 ; 106.2 05-25-05 I Lot 1 8 Back 1007 107.6 05-25-05 Lot 1 B Front 1005 105.1 05-25-05 j Lot 2 B Front 1005.5 105.9 05-25-05 Lot 2 B flack 1005 102.0 05-25-05 Lot 51 A Front 1001 1.00.2 05-25-05 1 Lot 51 A Center 1001.5 108.7 05-25-05 Lot 50 A Front 996 107.8 05-25-05 Lot 50 A Front 998 103.2 05-25-05 Lot 49 A Front 994.5 105.1 05-25-05 laot 49 A Front 996.5 104.5 05-25-05 Lot 51 A Back 997 101.0 9.5 8.8 9.9 10.6 1,1.4 . 8.1 7.7 11.9 13.1 16.5 8.1 9.4 10.1 8.8 16.8 13.3 14.8 12.9 22.1* 18.4* 16.6 14.0 10.9 7.0 13.4 1.6.9 17.1 16.3 6.4 9.7 13.0 1.3.2 12.1 15.1 98 97 94 93 93 96 97 92 93 91 95 92 94 93 91 93 95 96 86** 82* 92 94 95 96 94 95 93 91 97 98 94 95 95 92 112.0 112.0 112.0 112.0 112.0 110.0 112.0 11.0.0 110.0 110.0 112.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 '110.0 112.0 112.0 112.0 112.0 1'10.0 110.0 112.0 110.0 110.0 110.0 110.0 1 110.0 DATE: March 2, 2006 ,Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California lest No. Date Tested Location I 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 05-25-05 05-25-05 05-25-05 05-25-05 05-25-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 Lot51 A Back Lot 27 A Back Lot 27 A Back Lot 28 A Back Lot 28 A Front Lot 2 A Back Lot-2 A Back Lot 1 A Back Lot I A Back Lot 47 A Back Lot 48 A Back Lot 49 A Back Lot 50 A Back Lot 47 Center Lot 48 Center Lot 49 Center Lot 50 Center 492 05-27-05 ; Lot 31, A Back 493 + 05-27-05 Lot 34 A Front 494 05-27-05 E Lot 33 A Front 495 05-27-05 Lot 32 A Front 496 05-27-05 Lot 31 A Front 497 05-27-05 1 Lot 31 A Center 498 05-27-05 Lot 32 A Center 499 05-27-05 Lot 33 A Center 500 05-27-05 Lot M A Center TEST RESULTS PROJECTNO: 5224810 REPORT NO: 06-02-120 ricvauun Dry uenstty 1 % Moisture Relative Maximum I In Place In Place Cornaction + Density 999 102.6 12.1 93 +I 110.0 998.5 107.1 6.8 96 ; 11 z.o 990 102.1 11.9 93 1 110.0 988 106.9 7.1 95 112.0 992 1 100.1 7.4 91 110.0 997 1 106.5 999 101.3 998 109.1 1000 1.04.2 991.5 1 104.0 995 106.2 995 1 108.9 996.5 109.4 992 103.7 994.5 102.9 994 f 106.1. 993.3 J 104.0 994 993 993 992.3 994.5 992.5 992 993 993 100.7 109.4 107.6 103.9 101.3 102.4 105.5 107.2 104A 16.4 12.4 9.8 12.1 10.6 6.3 13.0 12.3 11.2 8.9 10.1 9.3 10.0 6.2 11.8 8.3 9.1 7.9 10.3 9.0 1'1..4 501. 1 05-31-05 I Lot 34 A Luck 995 108.3 8.9 502 05-31-05 Lot 34 A Back 997 104.1 9.3 503 05-31-05 Lot 32 A Back 994.5 103.6 8.4 504 05-31-05 Lot 32 A Hack 996.5 101.9 10.1 505 05-31-05 Lot 31 A Back 996 104.1 9.0 306 507 05-31-05 I,ot 3l A Back 997 '105.3 '11.1 05-31-05 Lot 29 A Back 996 104.9 10.5 508 05-31-05 Lot 29 A Back 997 103.0 8.7 509 05-31-05 Lot 1 B Front 1007 105.4 13,3 510 05-31-05 Lot 1 B Back 1007 102.1 16.5 511 05-31-05 Lot 5 B Back 997.5 104.8 14.1 512 + 05-31-05 Lot 5 B Back 999 101.6 10.9 513 05.31-05 1 Lot 33 A Center 994.5 108.4 8.6 95 1.12,0 90 112.0 97 1012.0 93 1 112.0 93 112,0 95 112.0 97 1.12.0 98 112.0 93 1.12.0 92 112.0 95 112.0 93 112.0 90 112.0 98 11.2.0 96 112.0 93 '1'12.0 90 I 112.0 91 11.2.0 94 I 112,0 96 f 112.0 93 112.0 97 112,0 93 112.0 93 112,0 9.1 112.0 93 112.0 94 1 l 2.0 94 112.0 92 ! 112.0 94 11.2.0 91 112.0 94 .112.0 93 112.0 97 112.0 DATE: March 2, 2006 Sladden Ertzineeri►tr. PROJECT NAME: Madison Club LOCATION- La Quinta, California Test No. I Date Tested I Location TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture In Place In Place 514 05-31-05 Lot 33 A Center 996 j 105.5 7.1 515 05-31-05 Lot 32 A Center 994 1 106.2 8.5 516 05-31-05 Lot 32 A Center 996 106.6 9.0 517 05-31-05 Lot 33 A Back 992 107.2 6.7 518 05-31-05 Lot 30 A Back 994 107.5 11.2 519 05-31-05 Lot 30 A Back 996 107.0 14A 520 05-31-05 Lot 31 Center 994.5 103.8 10.5 521 05-31-05 ! l,ot 213'Back 1007 100.1 16.8 522 i 05-31-05 Lot 2 B Front 1007 105.7 13.7 523 05-31-05 Lot 6 B Back 998 107.6 5.3 524 i 05-31-05 Lot 6 B Back I 1000 E 105.9 8.7 � 525 ! 06-01-05 Lot 34 A Back 991 103.3 8.5 526 i 06-01-05 Lot 33 A Back 991 102.4 8.1 527 06-01-05 Lot 32 A Back 990.5 ' 104.1 1 9.0 528 06-01-05 Lot 34 A Back 993 100.6 9.1 529 06-01.-05 Lot 34, A Back 994 1,a2.1. 8.3 530 ? 06-01-05 I jI Lot 33 A Back 993.5 103.7 10.6 531 06-01-05 ` Lot 33 A Back 994,5 10110 8.8 532 ! 06-01-05 Lot 32 A Hack 993 101.9 10.1 533 06-01-05 Lot 32 A Back 994.5 106.8 9.0 5,M 06-01-05 Lot 48 A Back 997 1 106.5 7.4 535 06-01-05 1_,ot 48 A Back 999 t 105.6 5.9 536 06-01-05 Lot 48 A Front 992 108.5 1 8.1 537 06-01-05 , Lot50 A Front 994 102,5 8.7 538 {. 06-01-05 Lot 33 A Center 993.5 102.9 9.9 539 ! 06-01-05 I Lot 31 A Center 994 104.6 11,4 540 06-01-05 Lot 34 A Center 994 103.3 10.0 541 06-02-05 Lot 34 A Front 995 108. I 14.8 542 06-02-05 I Lot 34 A Front 996.5 108.4 12.7 543 06-02-05 1 Lot 31 A Front 996.5 I 105.1 1 12.0 544 06-02-05 Lot 31 A Front 998 10:1.1 13.2 545 06-02-05 Lot 33 A Back 996.5 1 106.3 11.5 546 06-02-05 Lot 33 A Back 998 102.8 13.1 547 06-02-05 i Lot 31 A Back 998 107.6 12.$ 548 06-02-05 Lot 31 A Back 999.5 108.2 1 13.0 549 06-02-05 Lot 33 A Front 993 109.9 10.7 550 06-02-05 I Lot 33 A Front 995 103.3 11.4 551 06-02-05 Lot 32 A Front 994 101.4 15.7 552 06-02-05 Lot 32 A Front 996 106.5 6.8 553 06-02-05 1 Lot 32 A Back 997.5 106.0 12 Relative 94 95 95 96 96 96 93 91 94 96 95 92 91 93 90 91 93 90 91 90 95 94 97 92 92 93 92 97 97 94 90 95 92 96 97 98 92 91 95 95 Maximum 112,0 112.0 112.0 112.0 1,12.0 112.0 112,0 110.0 1.1.2.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 DATE: March 2, 2006 Sludden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California I csi No. I uate 1 ested J Location TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density I % Moisture ' Relative Maximum In Place f In Place I Cam a do D c n ens1C 554 06-02-05 Lot32 A Back 999 107.3 1 10.6 96 112.0 555 06-02-05 Lot 34 A Back 997 1.06.5 i 13.6 95 112.0 556 06-02-05 Lot 34 A Back 998 1 104.0 10.5 93 112,0 557 06-03-05 Lot 47 A Back 991 1 106.E 9.9 95 11.2,0 558 06-03-05 Lot 47 A Front 991 104.5 11.3 93 112.0 559 06-03-05 Lot 46 A Front 991.5 1 103.8 10.1 93 112,0 560 06-03-05 Lot 46 .A Back 992 101.6 13.9 I 91 112.0 561 06-03-05 Lot 45 A Back 991.5 1 105.1 8.3 94 112.0 562 06-03-05 Lot 45 A Front 991.5 ! 102.6 12.2 92 I 112 0 563 06-03-05 Lot 42 A Front 992 106.6 10.5 95 112.0 564 06-03-05 Lot 42 A Front 993 ' 103.0 9.1 92 112.0 565 06-03-05 Lot 41, A Front 989 f 102.2 i 6,3 91 112.0 566 06-03-05 Lot 42 A Back 991 108.4 9.7 97 112.0 567 06-03-05 Lot 43 Back 992 101.6 16.5 97 112.0 568 06-03-05 Lot 44 A Back 993 106.3 6.7 95 112.0 369 06-03-05 Lot 44 A Front 992 108.0 6.0 96 112.0 570 06-03-05 Lot 41 A Front 991 101.3 17.0 90 112.0 571 06-03-05 Lot 42 A Front 994 102.1 14.8 91 112,0 572 06-03-05 1..ot 41 A Back 992 1.05.1 14.5 94 112.0 573 06-03-05 Lot 42 A Back 993 1 100.5 1.6.0 90 112.0 374 06-03-05 Lot 43 A Back 993.5 104.5 17.1 93 172 0 575 06-03-05 Lot 44 A Fuck 994 103.8 15.9 11 93 112.0 576 06-03-05 Lot 44 A Front 993.5 106.0 15.3 95 11.2.0 577 06-06-05 Lot 41 Front 993 105.1 I 14.9 94 112.0 578 06-06-05 Lot 41 Front 995 I 107.1 12.6 96 112.0 579 06-06-05 Lot 41 Center 992.5 i 103,5 11,8 92 112.0 580 06-06-05 i.ot 43 Front 991 103.E 17.6 93 112.0 581 06-06-05 Lot 43 Front 993 101.0 17.2 90 112.0 582 1 06-06-05 Lot 43 Center 991.5 i 106.3 12.7 95 11.2.0 583 06-06-05 Lot 44 Front 995 101.3 18.3 90 f 112.0 584 06-06-05 Lot 44 Fr ont 996 1 105.9 14.2 ! 95 112.0 585 06-06-05 Lot 44 Center 994 104.0 13.1 93 112.0586 06-06-05 Lot 43 Back 995 105.2 1.5.5 94 112.0 587 i 06-06-05 Lot 43 Center 994.5 107.2 12.6 96 112.0 588 1 06-06-05 1.,ot 41 hack 994 109.0 13.9 97 11210 589 ' 06-06-05 Lot 41 Back 996 101.5 14.2 91 112.0 590 j 06-06-05 Lot 41 Center 994 103.3 10.9 92 112.0 591 ' 06-06-05 + Lot 42 A Front 993.5 108.4 15,8 97 1.12.0 592 06-06-05 Lot 42 A Front 994.5 103.0 14.4 92 112.0 593 06-06-05 Lot 42 A Center 994 101,4 16.6 1 91 112.0 DATE: Match 2, 2006 Sladden Envineerinv TEST RESULTS PROJECT NAME: Madison Club - The Hideaway LOCATION: Ira Quinta, California Test No. I Date Tested Location PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density 1 0 o Moisture l Relative I Maximum In Place In Place I Com action Densit 594 06-06-05 loot 44 A Back 994.5 101.8 595 06-06-05 Lot 44 A Back 995.5 103.7 596 06-06-05 Lot 44 A Center 995 106,6 597 06-06-05q Lot 42 A Back 993.5 106.3 598 06-06-05 Lot 42 A Back 994.5 102.7 599 I 06-06-05 Lot 42 A Center 994 104.6 600 06-67-05 j Lot 38 A Front 601 06-07-05 Lot39 A Back 602 06-07-05 Lot39 A Front 603 06-07-05 Lot39 A Back 604 06-07-05 Lot 40 A Front 605 06-07-05 Lot 40 A Back 606 l 06-07-05 Lot 40 A Front 607 06-07-05 Lot 40 A Back 608 06-07-05 No `Pest 609 06-07-05 No Test 610 06-07-05 Lot 40 A Back 611, 06-07-05 ` Trot 40 A Back 612 ` 06-07-05 Lot39 A Back 613 06-07-05 Lot39 A Back 614 06-07-05 Lot 38 A Back 615 06-07-05 Lot 38 A Back 616 06-07-05 Lot 37 A Back 617 06-07-05 Lot 37 A Back 618 ' 06-07-05 i Lot 36 A Back 619 I 06-07-05 Lot 36 A Back 620 06-07-05 Lot 36 A Front 621 06-07-05 Lot 36 A Front 622 06-07-05 Lot 36 A Center 623 06-07-05 Lot 37 A Front 624 06-07-05 Lot 37 A Center 625 06-07-05 Lot 38 A Front 626 06-07-05 ; Lot 38 A Front 627 06-07-05 Lot 38 A Center 628 1 06-07-05 1 Lot39 A Front 629 06-07-05 Lot39 A Front 630 1 06-07-05 Lot 39 A Center 631 06-07-05 Lot 40 Front 632 06-08-05 633 06-08-05 Retest # 611 Retest # 631 991 103.4 991 105.3 990.5 101.4 991 104.0 '991 106.7 990.5 ; 102.2 992.5 105.4 992 105.1 15.3 10.9 11,7 14.5 10.9 11.3 11.1 10.6 12.9 1,1..8 13.1 10.2 9.3 10,0 91 11,2.0 93 112.0 95 112.0 95 112.0 92 112.0 93 11.2.0 92 1,12.0 94 112.0 91 112,0 93 112.0 95 11.2.0 91 112.0 94 112,0 94 112.0 994 109.4 11.4 98 995 94.8 15,2 85* 993.5 106.9 13.5 90 994.5 98.0 1.6,0 88" 993 97.6 20.1 80* 994 96.2 } 18.9 86" 993 98,4 21.9 88* 994 95.0 ! 22.6 85* 993.5 93,2 21.5 83" 994.5 96.7 20.3 86* 993.5 96.5 i 23.2 86" 995 96.1 21.3 86" 993.5 102.4 i 16.6 91 994 90.8 24.7 81 " 993' 94.0 21.8 84* 992.5 104.8 15.5 94 994 106.1 ! 14.0 95 994 102.9 16,2 1 92 993 95.1 19.9 85* 994.5 94,3 22.0 1 84* 994 83.7 21.2 84* 994 97,8 20.5 1 S7* 103.1 17.5 92** 105,3 14.0 94** 112.0 112.0 112.0 112.0 11.2.0 112.0 112,0 112.0 11, 2.0 112.0 112.0 1,12.0 1.1.2.0 112.0 112,0 112.0 112.0 112,0 112.0 112.0 112.0 112.0 112.0 DATE: March 2, 2006 SYadden Engineering TES`' RESULTS PROJECT NAME, Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO06-02-120 'Pest No. I Date Tested Location Elevation Dry Density I % Moisture ' Relative Maximum In Place in Place I Compaction Density 634 06-08-05 Retest # 613 101.2 16.9 j 90** 112.0 635 06-08-05 Detest # 628 104.1 ! 15.3 93*w i 112.0 636 06-08-05 Retest # 629 103.3 12.9 92- 112.0 637 06-08-05 Retest # 630 106.0 14.8 95** 112.0 638 06-08-05 Retest # 614 107.1 14.2 96µ* 11.2.0 639 06-08-05 Retest # 615 , 103.6 13.9 93** 112.0 640 06-08-05 Retest 0 616 105.2 16.2 94** 112.0 641 06-08-05 Retest # 617 97.6 18.6 87* 112.0 642 06-08-05 Retest # 618 101.4 17.2 91 ** 11.2.0 643 06-08-05 Retest 9 61.9 97.0 24.2 87* 112.0 644 06-08-05 Retest # 623 103.4 16,8 92** 112.0 645 06-08-05 Retest 9 624 102.2 j 18.0 91** 112.0 646 j 06-08-05 Retest 1121 100.9 17.0 90'"* 112.0 647 06-08-05 Retest # 621 101.6 1 16.5 f 91** 112.0 648 06-08-05 Lot 7 B A Front 998 109.1 1.3.5 97 112.0 649 06-08-(i5 Lot 7 B A Front 1000 1()2.0 18.1 + 91 j 112.0 650 06-08-05 Lot 6 B Back 998 1 103.2 14.4 k 92 112.0 651 ' 06-08-05 Lot 6 B Back 1000 100.8 12.1 +I 90 1,12.0 652 06-08-05 ' Lot 5 B Front 1001 1 99.6 12.7 91 110.0 653 06-08-05 Lot 513 Front 1003 99.8 17.6 j 91 110.0 654 06-08-05 i Lot 6 B Front 1002 101.3 1.1..0 90 112.0 655 06-08-05 Lot 6 B Front 1003 104.9 13.1 94 112.0 656 1 06-08-05 Lot 7 B Back 998 102.2 16.0 91 112.0 657 06-08-05 Lot 7 B Back 999 102.8 74,7 f 92 112.0 658 06-08-05 { Lot 5 B Back 999.5 101.4 1 12.9 I 91 112.0 659 I 06-08-05 - Lot 5 B Back 1000.5 1,00.1, 1.4.4 1 91. 110.0 660 j 06-09-05 Lot 35 A Front 993 1 99.0 10.9 90 110.0 661 06-09-05 Lot 35 A Front 995 � 1.02.9 15,1 92 112.0 662 06-09-05 Lot 33 A Front 997 108.7 13.2 97 112.0 663 1 06-09-05 Lot 32 A Front 998 107.3 10.3 + 96 112.0 664 06-09-05 Lot 30 A Front. 993 1.01.2 15.2 I 92 110.0 665 06-09-05 Lot 30 A Front 995 j 102.7 16.6 92 j 112.0 666 i 06-09-05 Lot 30 A Front 997 102.8 1 18.2 92 112.0 667 06-09-05 Lot 35 A Back 990 103.4 9.6 92 112.0 668 06-09-05 Lot 35 A Back 992 108.9 11.7 97 712.0 669 j 06-09-05 Lot 35 A Back 994 106.3 114.4 95 112.0 670 06-09-05 Lot 45 A Back 993.5 1 109.6 16.3 98 112.0 671 I 06-09-05 Lot 45 A Back 995.5 102.8 13.8 92 1120 672 06-09-05 Lot 46 A Back 995 105.4 6.9 94 112.0 673 06-09-05 Lot 46 A Back 997 ! 101.6 14.1 91 112.0 674 06-09-05 Lot 47 A Back 993 3035 9.1 92 112,0 DATE: March 2, 2006 SYadden Engineering PROJECT NAME: Madison Club LOCATION. La Quinta, California Test No. I Tate Tested I Location TEST RESULTS PROJECT NO; 522-4810 REPORT NO: 06-02-120 Elevation I Dry Density I % Moisture In Place I In Place 675 1 _ 9_p5 060 Lot 47 A Back 995 101.8 676 06-09-05 Lot 47 A Back 997 99.0 677 06-09-05 Lot 31 A Front 999 104.5 678 1 06-09-05 II Lot 30 A Back 998 108.0 679 06-09-()5 4 Lot 30 A Back 1000 105.5 680 i 06-09-05 i Lot 50 A Back PC 106.1 681 06-09-05 Lot50'A Back PG 702.9 I 682 ' 06-10-05 Lot 44 A Back 996.5 102.3 683 06-10-05 Lot 45 A Back 993.5 101.6 684 06-10-05 Lot 45 A Back 995.5 109.3 685 06-10-05 Lot 46 A Back 995 107.4 686 06-10-05 I..ot 46 A Back 997 104,2 687 06-10-05 Lot 47 A Back 993 105.1 688 06-10-05 Lot 47 A Back 995 103.6 689 06-10-05 Lot 47 A Back 997 102.4 I 690 1 06-10-05 Lot 49 A Back 997 103.9 691 1 06-10-05 Lot 49 A Back 999 107.7 692 ; 06-10-05 Lot 51 A Back 1601 109.2 693 1 06-10-05 Lot 52 A Back 999 105.E 694 06-10-05 Lot 52 A Back 7 001 104.7 695 06-10-05 Lot 53 A Back 1002.5 109.3 696 d 06-10-05 Lot 54 A Back 1003.5 103.6 697 I 06-10-05 ` Lot 3 A Back 998 107.9 698 06-10-05 ! Lot 36 A Back 996 103.2 699 06-10-05 i I:ot 45 A Front 993.5 `= 99.5 700 I 06-10-05 Lot 45 A Front 995.5 105.7 701 06-10-05 Lot 46 A front 993.5 102.3 702 t . 06-10-05 Lot 46 A Front 996.5 i 99.5 703 06-10-05 ' Lot 47 A Front 993 105.4 704 06-10-05 Lot 47 A Front 995 I 107.1 705 06-10-05 Lot 47 A front 997 1.01.E 706 , 06-10-05 ; Lot 48 A Front 994 ; 109.3 707 06-10-05 Lot 48 A Front 996 1()5.4 708E 06-10-05 s Lot 48 A Front 998 101.E 709 06-10-05 ! Lot 49 A front 998.5 .103.0 f 710 i 06-10-05 ; Lot 50 A Front 996 106.9 711 06-10-05 Lot 50 A Front 998 106.1 712 i 06-10=05 I Lot 50 ,A Front 1000 l 103.7 713 06-10-05 1 Lot 52 A Front 1002 106.3 714 06-10-05 1 [.of 53 A Front 1003.5 k f 109.4 715 06-10-05 Lot 41 Front ?G 103.3 Relative I Maximum 11.6 91 13.6 90 13.8 93 12.9 96 13.1 94 13.4 95 11.3 94 9.9 ! 93 12.6 92 17.9 94 14.6 . ! 97 15.3 94 13.7 95 15.6 94 16.2 93 8.6 94 13.7 98 9.2 99 11.9 96 13.3 95 12.9 99 14.8 94 13.1 98 8.9 , 93 14,9 90 20.0 I 96 11..4 93 19.3 ; 90 12.9 95 14.6 i 97 13.9 i 92 15.0 99 11 A 96 10.2 92 16.1 j 93 14.0 }� 97 13.5 I 96 15.1 i 94 15.3 96 16.3 99 9.9 92 112.0 110.0 112.0 112.0 '112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110_0 DATE; March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. ` Date ,rested � Location TEST RESULTS PROJECT NO: 522-4810 REPOR7" NO; 06-02-120 �Elevation Dry Density % Moisture I Relative I Maximum _ In Place In Place I Compaction I De""dw 1 716 06-10-05 Lot 41 Center PG 102.7 9.1 f I 93 110.0 717 06-10-05 Lot 41 Back PG 104.5 1 16.5 1 95 110.0 718 06-10-05 Lot 42 Front PG 105.3 16.1 95 110.0 719 06-10-05 Lot 42 Center PG 104.3 16.6 94 110.0 720 06-10-05 Lot 42 Back PG 103.4 11.1 94 110.0 721 06-10-05 Lot 43 Front PG 106.6 14,1 97 110.0 722 06-10-05 Lot 43 Center PG 103.0 12.5 93 110.0 723 06-10-05 Lot 43 Back PC, 107.9 10.9 98 f f 1.10.0 724 06-10-05 I.,ot 44 Front PG 103.1 13.3 93 11.0.0 725 06-10-05 Lot 44 Center PC 104.7 16.1 95 110.0 726 06-10-05 Lot 44 Back PG 101.3 10.7 92 110.0 727 06-13-05 Lot 21, A Front 1001.5 1 107.9 13.2 98 110.0 728 06-13-05 Lot 24 A Front 1001 104.0 1 17.0 94 110.0 729 06-13-05 Lot 24 .A Front 1003 104.8 14.1 95 110.0 730 06-13-05 Lot 25 A front 1001 106.9 11.3 97 110,0 731 06-13-05 Lot 25 A Front 1003 1 105.3 16.1 95 110.0 732 06-13-05 Lot 26 A Front 1001 108.0 15.5 98 110.0 733 06-13-05 Lot 26 A Front 1003 109.7 1 16.0 99 110.0 734 06-13-05 Lot 27 A Front 1000 1 109.0 13.8 99 110.0 735 1 06-13-05 Lot 27 A front 1002 108,6 15.1 99 110,0 736 06-13-05 Lot 28 A Front 994 102.0 12.0 93 110.0 737 i 06-13-05 Lot 28 A Front 996 I 106.8 18.3 97 110.0 738 ! 06-13-05 l..ot 29 A Front 998 j 103.0 16.0 94 110.0 739 ` 06-13-05 Lot 38 A Front 993 I 107.1 9.6 1 97 110.0 740 06-1.3-05 I Lot 38 A Front 995 106.3 15.7 96 l 110.0 741 06-13-05 Lot 40 A Front 996 108.6 17.1 99 ! 110.0 742 06-13-05 Lot 4.3 A Front 995 103.0 9.5 94 110.0 743 ' 06-13-05 Lot 54 A Front 1003.5 100.6 18.8 91 110.0 744. 06-13-05 Lot 49 A Center 998.5 101.0 14.7 92 ! 1,1.0.0 745 06-13-05 Lot 23 A Back 1003 104.6 14.6 95 110.0 746 06-13-05 Lot 24 A Back 999.3 109.3 15,4 99 110.0 747 06-13-05 Lot 24 A Back 1001.5 108.1 9.3 f 98 1.1.0.0 748 06-13-05 Lot 24 A Back 1,003.5 101.4 9.9 92 110.0 749 06-13-05 Lot 25 A Back 1003 1 109.7 14.1 99 710.0 750 06-13-05 Lot 26 A Back 1003 107.8 17.7 98 110.0 751 06-13-05 Lot 27 A Back 992 102.7 11.8 93 110.0 752 06-13-05 Lot 27 A Back 994 107.0 11.3. 97 110.0 753 06-13-05 Lot 27 A Back 996 106.1 13.6 96 110.0 754 06-13-05 Lot 28 A Back 990 102.5 13.3 93 110.0 755 06-13-05 Lot 28 A Hack 992 106.6 11.2 97 1.10.0 756 ; 06-13-05 . Lot 28 A Back 994 , 103.6 12.8 I 94 110.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. '1 bate Tested: Location 757 06-13-05 Lot 29 A Back 758 06-13-05 Lot29 A Back f 759 ' 06-14-05 Lot 50 A Back 760 1 06-14-05 Lot 50 A Back 761 i 06-14-05 Lot 27 A Back 762 I 06-14-05 Lot 27 .A Back 763 06-14-05 Lot 28 A Back 764 06-14-05 Lot 28 A Back 765 06-14-05 Lot 28 A Back 766 1 06-14-05 1 Lot 28 A Front 767 06-14-05 Lot 30 A Front 768 06-14.-05 Lot 54 A Front 769 06-14-05 Lot 54 A Center 770 06-14-05 Lot 54 A Back 771 06-14-05 Lot 53 A Front 772 i 06-14-05 Lot 53 A Center 773 06-14-05 Lot53 A Back 774 06-14-05 Lot 52 A Front 11 775 ! 06-14-05 Lot 52 A Center 776 06-14-05 Lot 52 A Back 777 ' 06-14-05 Lot 51 A Front 778 06-14-05 Lot 51 A Center 779 1 06-14-05 Lot 51 A Back 780 06-14-05 Lot 50 A Front 781 06-14-05 1. Lot 50 A Center 782 06-14-05 ! Lot 50 A Back 783 06-14-05 I Lot 99 A Front 784 06-14-05 Lot 99 A Back 785 06-14-05 Lot 99 A Center 1 786 06-14-05 1 Lot 98 A Front 787 06-14-05 Lot 98 A Back 788 06-14-05 'Lot 98 A Center 789 790 791 792 793 794 795 796 06-15-05 Retest # 780 06-15-05 Retest # 782 06-15-05 Retest# 781 06-15-05 Lot 47 A Front 06-15-05 Lot 47 A Back 06-15-05 Lot 47 A Center 06-15-05 1 Lot 46 A Front 06-15-05 Lot46 A Back TEST RESULTS Elevation 999 1 1001 998.5 1 100.0 998 100.0 996 i 998 1000 998 999 PG PG PG 1 PG PG f PG I'G 1 PC., PG PC .PG PG PC PG 1 PG PG PG PG PG PG PG PROJECT NO: 522-4810 REPORT NO: 06-02-120 Dry Density 1 % Moisture Relative Maximum In Place in Place j Compaction Density 102.5 9.7 93 110.0 108.3 14.8 98 110.0 104.4 102.8 105.0 104.2 101.5 108.7 105.4 105.3 102.1 99.2 100.5 105.9 105.5 106.1 99.1 103.0 109.3 104.4 101.4 100.2 101.6 91.4 92.8 94.4 101.2 103.3 102.6 99.6 103.1 107.0 98.9 100.2 101.9 PG 102.1 PG 99.7 1'G 103.6 PG 1 100.0 PG 102.8 13.3 12.6 20.0 16.7 11.2 15.0 14.2 17.1 13.3 11.5 8.3 9.4 10.3 7.7 9.3 13.7 12.8 11.1 12.3 9.5 10.3 10.2 9.5 8.8 9.3 12,2 11.6 8.6 11.2 10.5 94 97 95 95 92 99 96 95 93 90 91 96 96 96 90 94 99 95 92 91 92 83* 84.* 86* 92 94 93 90 93 97 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11010 110.0 110.0 110.0 110.0 110.0 1.10.0 1.2.9 1 90** 110.0 12.5 91** 10.4 92" 110.0 9.1 93 110.0 8.8 91 110.0 9.2 94 110.0 9.1 1 91 110.0 10.7 1 93 110'a DATE: March 2, 2006 Sludden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. f Date Tested Location I , 797 798 799 800 801 802 803 06-15-05 Lot 46 A Center 06-15-05 Lot 45 A Front 06-15-05 Lot 45 A Back 06-15-05 Lot 45 A Center 06-15-05 Lot 41 A Front 06-15-05 Lot 41 A Back 06-15-05 Lot 41 A Center 804 06-16-05 Lot25 A Front 805 06-16-05 Lot 25 A Center 806 06-16-05 Lot25 A Back 807 06-16-05 Lot26 A Front 808 06-16-05 Lot 26 A Center 809 06-16-05 Lot26 A Back 810 06-1.6-05 i Lot 27 A Front 81 *1 06-16-05 Lot 27 A Center 812 06-16-05 Lot 27 A Back 813 06-17-05 Lot 28 A Front 814 06-17-05 •. Lot 28 A Center 815 06-17-05 Lot 28 A Back 816 06-17-05 Lot 29 A Front 817 1 06-17-05 Lot. 29 A Center 818 06-17-05 Lot 29 A Back 819 06-17-05 Lot30 A Front 820 06-17-05 Lot 30 A Center 821 06-17-05 Lot30 A Back 822 ! 06-17-05 Lot 31 A Front 823 , 06-17-05 Lot 31 A Center 824 ' 06-17-05 Lot 31 A Back 825 06-17-05 Lot 55 A Back 826 i 06-17-05 Lot 56 A Back 827 06-17-05 Lot 57 A Back 828 06-17-05 1 of 58 ,A Back 829 1 06-17-05 Lot 55 A Front 830 j 06-17-05 Lot 56 A Front 821 06-17-05 Lot 57 A Front 832 06-17-05 L.ot 58 A Front 833 06-17-05 Lot 59 A Front 834 1 06-20-05 835 06-20-05 DATE: March 2, 2006 Lot 55 A Front Lot 55 A Front TEST RESULTS PROJECT NO: 5224810 REPOWf NO: 06-02-120 Elevation Dry Density � % Moisture I Relative I Maximum In Place in Place Compaction I Deitsiry_ PG 105.4 8.9 96 110.0 PG 1.09.2 12.2 99 110.0 PG 104.1 11.1 1 95 11.0.0 PC 106.8 11.3 97 110.0 PG 101.3 12.1 92 110.0 PG 106.2 13.3 96 i 110.0 PG ' 102.9 17.1 93 I 110.0 PG 107.9 13.4 1 98 110.0 PG 102.8 11.5 93 110.0 PG 107.1 1 13.2 97 110.0 PG 100.3 18.1 91 110.0 I1G 100.4 12.4 91 110.0 PG 108.3 12,5 , 98 110.0PG 106.4 16.9 i 97 110.0 PG 1.01.2 13.9 92 110.0 PG 99.4 11.2 90 110.0 PG 103.3 13.7 94 110.0 PC 103.7 18.1 94 110.0 PG 102.5 12.9 93 110.0 PC 103.7 10.4 94 110.0 PG 104.2 15.1 915 f 110.0 PG 100.0 10.9 91 I '110.0 PC 107.2 13.9 97 , Imo PG 109.9 10.7 99 110.0 PG 108.5 12.1 98 110.0 PC 106.4 11.1 96 110.0 PG 109.31 15.0 99 110.0 PC 106.9 9.1 97 110.0 989 100.1 8.8 91 110,0 988 99.5 9.0 90 110.0 989 99.0 11.2 90 110.0 989.5 102.8 7.9 93 110.0 989 103.0 17.1 94 110.0 988 104.1 9.4 95 110.0 989 94.1 12.9 85* 110.0 989.5 105.E 7.8 96 110.0 990 93.1 11.5 85* '110.0 991 102.8 I 13.1 92 ? 112.0 993 I 103.9 8.6 93 112.t) Sladden Engineeriniz TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 'Pest No. Date Tested Location Elevation Dry Dcnsity j % Moisture i Relative Maximum In Place In Place Com action Density $36 1 06-20-05 Lot 56 A Front 990 101.4 9.3 91 112.0 837 06-20-05 Lot 56 A Front 991.5 100.8 10.3 90 112.0 $38 06-20-05 Retest # 821 & 833 1 104.3 14.1 93** 112.0 839 06-20-05 Lot 57 A Front 992.5 101.5 11.0 91 112.0 840 06-20-05 Lot 55 A Back 991 104.3 10.9 93 112.0 841 06-20-05 Lot 55 A Back 992 105.1 8.8 94 112.0 842 06-20-05 Lot 56 A Back 990 103.0 15,0 92 112.0 843 06-20-05 ; Lot 56 A Back 991.5 I 102.4 j 9.8 1 91 112,0 844 06-20-05 Lot 57 A Back 991 105.3 11.4 94 112,0 845 06-20-05 I Lot 57 A Back 992.5 102.2 9.2 91 112.0 846 06-20-05 I Lot 32 A Front PG 103.8 8.8 93 112.0 847 06-20-05 Lot 32 A Center PG 109.3 10.0 98 112.0 848 06-20-05 Lot 32 A Back PC 106.3 11.2 95 112.0 849 06-20-05 Lot 33 A Front PG 1l17.8 11.5 96 112.0 850 1 06-20-05 Lot 33 A Center PC 1 108.6 12.0 97 112.0 851 06-20-05 Lot 33 A Fuck PC 107.1 9.8 96 112.0 852 ! 06-20-05 Lot 55 A Center 991 104.4 10.9 93 112.0 853 06-20-05 Lot 56 A Center 990 102.0 11.5 91 112.0 854 06-20-05 Lot 57 A Center 991 105.1 9.4 94 112.0 855 06-21.-05 Lot 13 A Front 1004.5 100.9 1 1 12.1 92 110.0 856 06-21-05 1 Lot 13 A Front 1006 104.3 1 10.9 l 95 110.0 857 06-21-05 i Lot 13 A Back 1004.5 1 102.8 11.0 93 110.0 858 06-21-05 Lot 13 A Back 1006 103.4 9.1 94 110.0 859 i 06-21-05 Lot 13 A Center 1004.5 105.9 1 9.3 96 110.0 860 06-21-05 Lot 13 A Center. 1006 101.4 12.5 92 110.0 861 06-21-05 Lot 12 A Front 1006.5 101.1 7.6 92 11.0.0 862 06-21-05 f .ok 12 A Front 1008 1 94.4. 9.9 86* 110.0 1 863 j 06-21-05 Lot 12 A Back 1006.5 100.1 10.2 91 110.0 864 06-21-05 Lot 12 A Back 1008 103.3 8.7 94 110.0 865 i 06-21-05 Lot 56 A Back 993.5 104.7 1.5.2 III 93 1.12.0 866 06-21-05 Lot 58 A Back 991.5 106.4 14.4 95 112.0 $67 06-21-05 I Lot 34 A Front PG 107.0 8.5 96 1.12.0 868 06-21-05 Lot 34 A Center PG 105.3 1 9.6 94 112.0 869 1 06-21-05 Lot M A Back PG 108.4 8.9 97 112.0 870 06-21-05 Lot 35 A Front PG 99.8 10.7 91 110.0 871 06-21-05 Lot 35 A Back PC 106.7 9.0 95 112.0 872 I 06-21-05 Lot 35 A Center PG 104.5 9.9 93 112.0 873 06-21-05 Lot 36 A Front PC 100,E 9,1 91 110.0 874 06-21-05 Lot 36 A Back PG 105.3 10.7 94 112.0 875 06-21-05 Lot 36 A Center PG 102.4 8.0 91 112.0 876 06-21-03 , 1,ot 55 A Back 994 103.5 13.3 92 117.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California i esr No. 1 Date tested J Location I 877 ! 06-21-05 878 J 06-21-05 879 06-21-05 $80 881 882 883 884. 885 886 887 888 889 06-22-05 06-22-05 06-22-05 06-22-05 06-22-05 06-22-05 06-22-05 06-22-05 06-22-05 06-22-05 890 06-23-05 891 06-23-05 $92 ! 06-23-05 893 06-23-05 894 06-23-05 $95 06-23-05 896 06-23-05 897 06-23-05 898 1 06-23-05 899 06-23-05 900 06-23-05 901 I 06-23-05 902 06-23-03 903 06-23-05 904 06-23-05 905 06-23-05 906 06-23-05 907 06-23-05 908 06-23-05 909 06-23-05 910 06-23-05 911 06-23-05 Lot 57 A Back Lot 55 A Center Lot 57 A Center Lot 60 A Front Lot 60 A Front Lot 59 A Front Lot 58 A Front Lot 57 A Front Lot 57 A Front Lot 56 A Front Lot 56 A Front Lot 55 A Front Lot 55 A Front Lot 60 A Center Lot 59 A Center Lot 57 A Center Lot 56 A Front Lot 56 A Front Lot 55 A Front Lot 55 A Front Lot 55 A Back Lot 55 A Flack Lot 56 A Back j Lot 56 A Back i Lot 56 A Center j Lot 55 A Center Lot 37 A Front Lot 37 A Back Lot 37 A Center Lot 38 A Front Lot 3$ A flack Lot 38 A Center Lot39 A Front Lot 39 A Bark Lot 39 A Center 912 06-24-05 1 Lot 30 B Center 913 06-24-05 Lot 30 B Center 914 06-24-05 Lot 31 B Front 915 06-24-05 1 Lot 31 B Front TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation ' Dry Density '% Moisture Relative 1 Maximum i In Placc In Place Compaction 1 Drusiry i 994.5 101.4 993,5 1 105.0 994 103.1 990.5 93.7 992 103.1 990.5 102.1 991.5 ! 100.6 994 104.5 995 104.1 990 106.2 991.5 102,7 991 103.8 992.5 103.1, 993 104.1 991.5 106.9 994 1 103.0 993 101.8 994.5 101 A 994 104.8 995 102.0 995 1 107.1 996 104.4 994.5 106.0 996 I 103.2 994 f. 107.3 995 104.5 i PG 105.1 PG 102:2 PC 103.6 PC 103.9 PG '106.5 PC 104.7 PG 101.19 PC 105.3 PC 104.0 989.5 102.6 991 101.41 989.5 , 94.9 991 103.5 10.9 J 8.7 7.9 8.4 10.6 11.3 7.1 8.8 8.2 10.1 7.9 9.0 7.8 13.4 11.8 14.0 10.5 1.0.1. 14.0 11.9 10.4 8.7 1.:1..5 11.1 8.8 9.0 8.3 9A 9.1 8.5 1.0.4 9.9 10.6 10.2 7.9 8.3 9.9 10.1 11.3 92 94 92 85* 94 93 91 95 95 97 93 94 94 93 95 92 91 91 94 91 96 93 95 92 96 93 94 91 93 93 95 93 9"1 94 93 93 92 93 94 1 1 11.0.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 :110.0 110.0 110.0 110.0 1:1.2.0 112.0 112,0 112.0 110.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 110.0 11.0.0 102.0 110.0 DATE.- March 2, 2006 Slada+en Enrineerinr PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Date Tested TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Location Elevation Dry Density % Moisture I Relative I Maximum I in Place In Place I Compaction j Denser 916 06-24-05 Lot 3213 Front 990 96.2 � 8.3 917 06-24-05 Lot 32 B Front 991.5 104.1 10.6 918 06-24-05 Lot 33 B Front 989 101.8 12.1 919 j 06-24-05 Lot 33 B Front 991 104,7 9.0 920 06-24-05 Lot 34 B Front 988 100.8 10.3. 921 06-24-05 Lot 34 B Front 989 105.1 8.1 922 06-24-05 Lot 30 B Back ' 990 100.5 9.5 923 06-24-05 Lot 30 B Back 991 101.6 8.3 924 06-24-05 Lot 31 B Back 990 97.3 10.1 925 06-24-05 Lot 32 B Back 990 1.01..4 :1.1.5 926 06-24-05 1 Lot 33 B Back 990 96.2 8.9 927 06-24-05 j Lot 3013 Center 991.5 103.6 1 10.4 928 06-24-05 ; Lot 31 B Center 990.5 1 106.7 12.9 929 06-24-05 l..ot 32 D Center 991.5 104.4 11.3 930 06-24-05 Lot 33 B Center 992 107.1 9.9 931 06-24-05 Lot 34 B Center 991 i 103.3 10.4 932 06-27-05 Lot 33 B Back 991.5 100.2 11.2 933 06-27-05 Lot 33 B Back 993 93.1 12.8 934. 06-27-05 Lot 55 A Front 997 106.2 '16.7 935 06-27-05 Lot 55 A Front 999 99.2 13.9 936 06-27-05 y Lot 56 A Front 997 102.4 1.0.5 937 06-27-05 Lot 56 A Front 999 102.0 13.7 938 06-27-05 ` Lot 57 A Front 995 100.9 15.3 939 06-27-05 I Lot 57 A Front 996 99.2 1 9.6 940 1 06-27-05 Lot 58 A Front 991 105.5 10.1 941 06-27-05 Lot 59 A Front 991.5 106.1 1 11.3 942 , 06-27-05 Lot 55 A Back 997 99.6 16.8 943 I 06-27-05 Lot 55 A Back 999 99.2 9.3 944 j 06-27-05 Lot 56 A Back 997 106.4 11.7 945 j 06-27-05 Lot 57 A Back 992 109.5 15.8 946 06-27-05 1 I..ot 57 A Back 994 104.8 16.0 947 06-27-05 j Lot 59 A Back 991.5 103.0 9.7 948 06-27-05 Lot 59 A Back 993.3 102.4 15.9 949 06-27-05 1Wot 31 B Back 991.5 106.3 1.1.4 950 06-27-05 Lot 31 B Back 993 102.9 9.9 951 06-27-05 wt 32 8 Back 991.5 96.8 12.8 952 06-27-05 Lot 32 B Back 993 99.2 8.7 953 06-27-05 Retest # 880 101.5 7.6 954 06-27-05 Lot 60 A Front 990.5 101.0 8.3 955 06-27-05 Lot 58 A Back 992.5 104.8 13.1 956 06-27-05 Lot 58 A Back 994. 106.1 11.6 94 95 93 95 92 96 91 92 95 92 94 94 97 95 97 97 91 91 95 90 93 93 92 90 94 95 91 90 95 98 94 94 93 97 92 95 90 92** 92 94 95 102.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.02.0 110.0 102.0 110.0 110.0 110.0 1.1.0.0 110.0 110.0 102.0 112.0 11.0.0 110.0 110.0 110.0 110.0 112.0 112.0 110.0 11.0.0 112.0 112.0 11.2.0 110.0 110.0 1.10.0 112.0 102.0 110.0 110.0 110.0 112.0 112.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. ' Date "Tested j Location 957 + 06-27-05 958 j 06-27-05 959 06-28-05 960 06-28-05 961 ' 06-28-05 962 06-28-05 963 06-28-05 964 06-28-05 965 06-28-05 966 06-28-05 967 .' 06-28-05 968 06-28-05 969 06-28-05 970 06-28-05 971 ? 06-28-05 972 06-28-05 973 j' 06-28-05 974 I 06-28-05 975 06-28-05 976 06-28-05 977 06-28-05 978 ! 06-28-05 979 06-28-05 980 06-28-05 981 06-28-05 982 06-28-05 983 06-28-05 984 06-28-05 TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 l-levation Dry Density C % Moisture I Relative f Maximum In Place In Place omnartinn II T ant,;f- Lot 60 A Back 990 103.4 9.9 Lot 60 A Back 992 102.2 10.4 Lot 58 A Front 993 103.7 15.1 Lot 58 A Front 994.5 102.6 12.3 Lot 55 A Back 1001 ff 100.9 9.3 Lot 55 A Back 1002 i 101.5 10.6 Lot 55 A Front 1000 1 104.7 13.8 Lot 55 A Front 1001 j 104.1 12.7 Lot 56 A Front 1000 106.8 '14.5 Lot 56 A Front 1001 103.4 11.9 Lot 56 A Back 999 105.5 '15.3 Lot 56 A Back 1000.5 102.9 13.1 Retest # 862 103.4 i 9.8 Lot 15 A Front 1002 1.06.1. 1.0.5 Lot 15 A Back 1002 104.3 11.6 Lot 16 A Front 1001 105.5 8.3 Lot 57 A Front 998 101.9 13.1 Lot 57 A Front 999.5 103.0 10.2 Lot 57 A back 996 103.9 1.1.4 Lot 57 A Back 997.3 105.4 9.9 Lot 58 A Front 993 106.6 10.7 Lot 58 A Front 995 104.0 8.4 Lot 58 A Back 996 101.3 9.9 Lot 58 A Back 997.5 100.9 10.3 Lot 59 A Front 993.5 107.1 10.5 Lot 59 A Front 995 105.6 8.8 Lot 59 A Back 995 102.2 13.1 Lot 59 A Back 996.5 103.4 11.4 985 06-29-05 r Lot 55 A Front 1002 +1 102.0 16.3 986 06-29-05 f Lot 55 A Front 1003.5 j 101.2 16.5 987 06-29-05 Lot 56 A Front 1001.5 + 103.1 11-9 988 { 06-29-05 Lot 56 A Front 1002.5 104.4 11.4 989 06-29-05 Lot 55 A Back 1002.5 106.1 1.0.2 990 06-29-05 1 Lot 55 A Back 1.003.5 1.03.4 1.3A 991 06-29-05 Lot 56 A Back 1001.5 103.6 9.1 992 06-29-05 Lot 56 A Back 1.002.5 105.5 � 8.4 993 06-29-05 Lot 57 A Front 1000.5 107.4 13.4 994 06-29-05 Lot 57 A Front 1001.5 106.2 14.5 995 1 06-29-05 ! Lot 57 .A Back 999 99.1 17.1 92 91 94 93 92 93 95 95 97 94 96 94 94" 96 95 96 95 94 94 96 97 95 92 92 96 94 93 94 93 92 94 95 95 94 94 96 96 95 90 112.0 1.12.0 11,0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110,0 110.0 11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 1.'10.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 112.0 110.0 110.0 11,0.0 112.0 112.0 110-0 DATE: March 2, 2006 Sladden F.nvi nparb.a PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. pate Tested I Location 996 06-29-05 997 06-29-05 998 06-29-05 999 06-29-05 1000 06-29-05 1001 06-29-05 1002 06-29-05 1003, 06-29-05 1004 06-29-05 7005 06-29-05 1006 06-29-05 1007 06-29-05 1008 06-29-05 1009 06-29-05 1010 06-29-05 1011 06-29-05 1012 06-29-05 1013 06-29-05 1014 06-29-05 1015 06-29-05 1016 06-29-05 1.01.7 06-29-05 1018 1019 1020 1021; 1022� 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 06-30-05 06-30-05 06-30-05 06-30-05 06-30-05 06-30-05 06-30-05 06-30-05 06-30-05 06-30-05 06-30-05 �II 06-30-05 06-30-05 06-30-05 06-30-05 06-30-05 06-30-05 06-30-05 06-30-05 Lot 57 A Back Lot 58 A Front Lot 58 A Front Lot 58 A Back Lot 58 A Back Lot 59 A Front Lot 60 A Front Lot 60 A Font Lot 61 Front Lot 61 Front Lot 12 A Front wt 1.2 A Center Lot 12 A Back Lot 1.3 A Front Lot 13 A Center Lot 13 A Back Lot 14 A Front Lot 14 A Back Lot 14 A Center Lot 15 A Front Lot 15 A Center I_.ot 15 A hack Lot 68 Front Lot 68 Front Lot 67 Front Lot 67 Front Lot 66 Front Lot 66 Front Lot 65 Front Lot 64 Front Lot 69 Front Lot 69 Front Lot 62 Front Lot 62 Front Lot 63 Back Lot 63 Back Lot 62 Back Lot 62 Back I,.ot 63 Front Lot 63 Front Lot 69 Front TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Tory Density I % Mo'sture In Place j In Place 1.000.5 996.5 998 998.5 999.5 ` 996 992.5 994.5 992.5 994.5 PG PG PG PG PG PG I'G PG PG PG PG I7G 989 j 991 { 989 991 989 i. 991 990 990 993 994.5 990.5 k 992.5 990.5 992.3 990 992 990 992 989 1.01.3 105.2 106.6 107.3 1,04.2 104,1 105.5 99.8 108.4 103.1 99.2 99.8 102.4 101..1 103.5 100.4 99.0 101.4 102.4 102,0 100.E 106.3 100.6 102.2 101.0 1.03.1 104.5 102.5 102.3 104.1. 106.3 1.03.9 105.4 102.9 1.04.4 104.1 101.8 106.3 103.4 100.8 103.3 11.8 13.4 10.8 12.5 14.0 11.6 8.0 12.1 10.9 10.3 10.6 8.3 9.6 15.4 9.9 12.1 9.2 8.3 10.4 16.1 15.8 16,4 15.5 10.2 13.4 11,1 14.2 12.3 10.8 11.4 9.0 10,1 8.8 11.4 11.8 10.2 13.1 9.9 12.7 11.0 Relative I Maximum 92 96 97 98 95 95 96 91 99 94 90 91. 93 92 94 94 90 92 93 93 91 97 91 93 92 94 95 93 93 95 97 94 96 94 95 95 93 97 I94 92 94 110.0 110.0 110.0 110,0 110.0 110.0 110.0 1.10.0 110.0 1.1.0.0 110.0 110.0 110,0 110.0 1.10,0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 1.1.0.0 110.0 110.0 110.0 110.0 110,0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110,0 110.0 110.0 110.0 � 770.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME; Madison Club LOCATION: La Quinta, California Test No. j Date Tested I Location 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051�1052 1053� 1054 1055 1056+ 1057� 1058 1059 1060I 1061. 1062 1063 1064. 1065; 10661 10671' 10681'I 1069? 1070i 1071 10721 1073, 10741 1 10751 1076j 06-30-05 06-30-052 06-30-05 06-30-05 06-30-052 06-30-05 06-30-05 J 06-30-05 06-30-05 06-30-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01.-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-01-05 07-05-05 07-05-05 Lot 69 Front Lot 68 Front Lot 68 Front Lot 67 Front Lot 67 Front Lot 66 Front Lot 66 Front Lot 65 Front Lot 65 Front Lot 64 Front Lot 69 A Front Lot 69 A Front Lot 68 A Front Lot 68 A Front Lot 67 A Front Lot 67 A Front Lot62 A Front Lot 62 A Front Lot 63 A Front Lot 63 A Front Lot 66 A Front Lot 66 A Front Lot 65 A Front Lot 65 A Front Lot 64 A Front Lot 64 A Front Lot 24 A Front Lot 24 A Center Lot 24 A Back Lot 23 A Front Lot 23 A Center Lot 23 A Back Lot 22 A Front Lot 22 A Center Lot 22 A Back Lot 21 A Front Lot 21 A Center Lot 21 A Back Lot 69 A Front Lot 69 A Front TEST RESULTS LTS PROJECT NO: 522-4910 REPORT NO: 06-02-120 Elevation Dry Density % Moisture ( Relative Maximum In Place in Place + Cnmmntinn i n1 picit„ 991 993 994.5' 993 995 993 994.5 992 994 992 996 997.5 996 997.5 996 997.5 993 994.5 993 994.5 996 997 995 996.5 994 995.3 PG 13C; PG PCB PC PG PC PG PG PG PG PG 998.5 1000 105.0 101.6 104.5 103.3 105.0 100.8 101.,5 104.7 107,1. 102.2 101.4 1.01..6 104.3 1.02.6 103.4 100.8 105.7 104.6 102.5 101.4 103.4 103.0 101,4 100.8 106.0 104.2 104.6 104.2 107.8 99.1 106.9 107.4 106.5 104.6 107.1 105.9 100.5 103.7 102.4 104.0 10.1 95 110.0 9.9 920 110.0 11.3 95 11010 i 14.4 94 110.0 10.6 95 1.1.0,0 13.5 92 11.0.0 1.1..7 92 110.0 8.3 95 110.0 8.9 97 110.0 12.4 93 110.0 11.3 92 110.0 10.7 92 110.0 9.8 95 '110.0 12.5 93 110.0 10,0 94 110.0 11.3 92 110.0 14•1 96 110.0 13.2 95 110.0 12.9 93 110.0 11.6 92 11.0.0 12.6 + 94 110.0 11.8 94 110,0 13.5 92 110.0 12.0 92 110.0 10.7 96 110.0 11.9 95 110.0 11.1 G 95 110.0 15.6 j 95 110.0 8.4 ! 98 110.0 10.0 90 110.0 9.3 1 95 112.0 8.4 96 112.0 11.1. 95 112.0 7.7 93 112.0 8.6 96 112.0 6.8 96 112.0 7.7 91 110.0 6.5 I 94 110,0 9.9 91. 112.0 7.1..1 93 112.() DATE: March 2, 2006 Madden FnninPOri,.o PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. Date Tested � Location 1.077 07-05-05 Lot 68 A Front 1078 07-05-05 Lot 68 A Front 1.079 07-05-05 Lot 67 A Front 1080 07-05-05 Lot67 A Front 10i31 07-05-05 Lot 62 A Front 10821 07-05-05 Lot 62 A Front 1083 07-05-05 Lot 63 A front 1084 07-05-05 Lot 63 A Front 1085 07-05-05 Lot 60 A Front 1086 07-05-05 Lot 60 A Front 1087 07-05-05 Lot 61 A Front 10881 07-05-05 Lot 61 A Front 1089 07-05-05 Lot 60 A Back 10901 07-05-05 Lot 60 A Back 1091; 07-05-05 Lot 61 A Back 1092' 07-05-05 Lot 61 A Back 1093; 07-05-05 Lot 63 A Back 1094 07-05-05 Lot 63 A Back 1095 07-05-05 Lot 62 A Back 1096 07-05-05 Lot. 62 A Back i 1097' 07-06-05 Lot 44 B Front 10981 07-06-05 Lot 45 B Front 1.099 07-06-05 i Lot 45 B Front 1100 07-06-05 I Lot 45 8 [lack 1.101' 07-06-05 ! Lot 45 B Back 1102 07-06-05 ' Lot 1.06 B Back 1103 07-06-05 l Lot 107 B Back 1104' 07-06-05 Lot 106 B Back 11051 07-06-05 Lot 107 5 Rack 1106 07-06-05 Lot 108 B Front 1107 07-16-15 Lot 108 B Back 11,08 07-06-05 Lot 44 B Back 1109 07-06-05 Lot 44 B Back 1110 07-06-05 Lot 46 B Back 1111 07-06-05 Lot 46 B Back 1112 07-06-05 Lot 106 B front 1113 07-06-05 1 Lot 106 B Front 1114 07-06-05 Lot 107 B Front 1115 1 07-06-05 ' Lot 107 B Front 1116' 07407-05 1 Lot 45 B Back DATE: March 2, 2006 TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation I Dry Densityj % Moisture In Place i In Place 998.5 1000.5 998.5 1.000 995.5 997 995.5 997 996 997 995.5 997 994 995.5 994 996 994 1 996 994 996 104.5 101.3 106.1. 102.7 100.8 103.4 1.05.7 102.0 107.1 104.4 1.03.8 105.1 101,.8 100.6 104.8 102.6 101.1 101.5 103.0 102.4 984 102.2 984 1 100.4 986 102.5 985 1.04.6 987 105.9 980.5 f 100.7 979.5 C 101.4 982 96.4 981.5 94.2 978 99.8 978 101.4 985 105.1 987 102.4 985 101.3 987 103.0 981 106.3 982.5 102.5 979.5 104.4 981.5 96.0 989 107.1 Relativc I Maximum I 10.7 i 93 112.0 8.6 90 112.0 12,4 95 j 112.0 9.0 92 1.12.0 12.8 90 112.0 10.2 94 11.0.0 11.4 94 112.0 9.1 91 112.0 9.3 96 112,0 1.3.5 93 112.0 13.1 93 112.0 14.3 94 112.0 11.4 91 1.12.0 14.1 91. 110.0 10.3 94 112.0 8.9 93 110.0 10.5 92 110.0 8.4. 92 110.0 12.9 94 110.0 10.8 93 110.0 9.5 !` 93 110.0 15.6 91 110.0 153 93 110.0 9.0 95 110.0 13.3 96 110.0 17.2 90 112.0 16.9 92 112.0 5.1* 86* 112.0 3.8* 84* 112.0 8.7 91 110.0 9.2 92 1 *10.0 j 9.8 94 112.0 1 10.3 91 112.0 11.4 90 112'0 i 8.6 92 112.0 10.4 95 11.2.0 8.1 92 112.0 11,6 93 112.0 5.3* 86* 112.0 1 12.8 96 112.0 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No, ! Date Tested 3117 07-07-05 1118 07-07-05 1119 07-07-05 1120 07-07-05 1121j 07-07-05 1122+ 07-07-05 1123 I 07-07-05 11241 07-07-05 1125� 07-07-05 1126 07-07-05 1127 07-07-05 1128 07-07-05 11291 07-07-05 1130; 07-07-05 13,31' . 07-07-05 11.321 07-07-05 11331 07-07-05 1134, 07-07-05 1135, 07-08-05 11361 07-08-05 11371 07-08-05 113$! 07-08-05 1139 07-08-05 1140 07-08-05 1141� 07-08-05 1142 07-08-05 3.1431 07-08-05 1144 07-08-05 j 1145� 07-08-05 11461 07-08-05 11.47'. 07-08-05 11481 07-08-05 1 1149! 07-08-05 f 11501 07-08-05 1,151.1 07-08-05 10521 07-08-05 11531 07-08-05 11541 07-08-05 11551 07-08-05 1.1.56 ! 07-08-05 11371 07-08-05 TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 i.acation Elevation ' Dry Density I % Moisture i Relative Maximum i In Place In .place Cmmnacr;An t n..., f- Lot 45 B Back 991 108.3 Lot 44 B Back 989 101.9 10.4 Lot 44 8 Fuck 991 101.1 14.5 Lot 43 B Back 984 300.8 -8,2 Lot 43 B back 986 101.8 11.0 Lot 45 B Front 988 109.5 14.8 Lot 45 B Front 990 104.6 9.1 Lot 44 B Front -986 103.4 10 7 Lot 44 B Front 988 1 102.3 11.5 Lot 43 B Front 984 10.3 16,6 Lot 43 8 Front 986 104.0 12.7 Lot 42 B Front 984.5 108.7 10.5 Lot 42 13 Front 986.5 100.6 15.2 Lot 41 B Front 984,5 1.01A I 11.5 Lot 41 B Front 986.5 105.5 9.0 Lot 43 B Center 986 106.8 11.3 Lot 42 B Center 985.5 103.6 9,4 Lot 41 8 Center 986 102.0 13.2 Lot 46 B Front 985 1 1016 8.8 Lot 46 B Front 987 101.9 8.2 Lot 45 B Front 992 105.5 1.0.7 Lot 45 B Front i 993.5 i 104.0 r 11.5 Lot 44 B Front 990 � 1.01..4 9.9 Lot 44 B Front 991.5 ' 105.7 13A l..ot 43 B Front 988 j 106.2 12.6 Lot 43 B Front 989.5 102.8 11.3 Lot 42 B Front 988.5 104.1 8.7 Lot 42 B Front 990 101.3 10.5 Lot 41 B Front 988.5 101.4 11.5 Lot 41 B Front 990 105.0 9.0 Lot 46 B Back 989 1 102.8 10.6 Lot 46 B Back 991 106.3 8 8 I.-ot 4513 Back 992 1 1.04.0 12.4 Lot 45 B Back 993.5 103.3 j 11,1 Lot 44 B Back 992 101.4 9.3 Lot 44 B Back 993 101.8 10.2 Lot 43 6 Back 988 1.07.3 &6 Lot 43 B Back 989.5 103.1 9,9 Lot 42 B Back 985 102.4 1,0.5 Lot 42 6 Back 986.5 100.6 13,4 Lot 41 B Back 984.5 104.4 9,2 97 91 90 90 91 98 93 92 91 92 93 97 90 1 91 94 90 93 91 93 91 94 93 92 94 95 93 93 92 91 94 92 95 f 93 92 91 91 96 92 91 90 93 112.0 1 11.2.0 112.0 112.0 112,0 112.0 112.0 112.0 112,0 112.0 112,0 112.0 112,0 112.0 1.12.0 112,0 112.0 � 772,0 112.0 112,0 112.0 112.0 110,0 112.0 112,0 110.0 112,0 110,0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 DATE: March 2, 2006 Sladden Etwineerin. PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. 1 Date Tested I Location 1158 07-08-05 11591 07-11-05 1 1160 07-11-05 1161� 07-11-05 1162, 07-11-05 1163, 07-11-05 1164 07-11-05 ` 11651 07-11-05 1166' 07-11-05 1167 07-11-05 11681 07-11-05 i 1169� 07-11-05 1,1701 07-11-05 1171 07-11-05 1172 07-11-05 1173 07-11-05 1174 07-11-05 11751 07-11-05 1176 07-11-05 1177 07-11-05 1178 07-11-05 1179 07-11-05 1180 07-11-05 1181 07-1,1.-05 1182� 07-11-05 1183 07-11-05 1184 1185 1186 1187 1188 1189 1190 1191 1192 1193 1194 1195 1196 1197 07-12-05 07-12-05 07-12-05 07-12-05 07-12-052 07-12-05 07-12-05 07-12-05 07-12-05 07-12-05 07-12-05 07-12-05 07-12-05 07-12-05 Lot 41 B Back Lot 109 B Back Lot 109 B back Lot 110 B Back i,.ot 110 8 Back Lot 110 B Front Lot 110 B Front Lot 109 B Front Lot 109 B Front Lot 70 A Back Lot 70 A Back Lot 69 A Back Lot 69 A Back Lot 68 A Back Lot 68 A Back Lot 67 A Back Lot 67 A Back Lot66 A Back Lot66 A Back Lot 65 A Back Lot65 A Back Lot 70 A Back Lot 69 A Back Lot 68 A Back Lot 67 A Back Lot66 A Back Lot 7 B Back Lot 7 B Back Lot 8 B Back Lot 8 B Back Lot 813 Nront Lot 8 B Front Lot 7 B Pront Lot 7 B Front Lot. 9 A Front Lot 10 A Front Lot 10 A Front Lot 11 A Front Lot 11 A Front Lot 11 A Back TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture Relative Maximum In Place In Place Compaction ` Dcmtiit 986.5 104.1 11.3 } 93 } 112.0 977 V 978.5 V 997 979 977 978.5 977 978.5 990.5 992.5 990 992 990 992 989 991 990 992 990.5 992.5 994.5 994 994 993 f 994. 1001 S 1003 1002.5 1004.5 1,000.5 1002.5 1002 j 1004 1001 1000.5 1002.5 100'1 1003 1003 99.3 1, 06.2 102.2 101.4 99.8 99.3 106.7 102.8 103.5 100.8 102.0 108.5 100.0 105.9 108.5 107.0 102.2 107.3 104.4 105.3 101.1 103.6 107.2 105.5 103.2 9.2 1.0.0 9.1 10.8 13.0 16.7 10.0 9.2 16.8 14.2 17.1 13.3 16.6 9.0 16.5 16.8 15.9 13.6 10.8 12.7 11.0 9.9 12.4 10.6 :13.3 90 96 93 92 91 90 97 93 94 92 91 97 91 95 97 96 93 96 95 96 92 94 96 94 94 101.5 i 17.3 92 108.4 13.5 1 97 99.2 14.8 90 102.1 9.6 93 103.6 101 92 104.1 13.6 95 103.6 16.9 94 108.9 12.1 99 10810 16.6 96 107.8 16.2 96 102.0 7.4 93 101.4 9.2 92 1, 02.6 14.1 j 93 99.7 8.5 91. 110.0 110.0 110.0 110.0 110.0 110.0 110,0 110.0 110.0 110.0 11.2.0, 112.0 110.0 112.0 112.0 112.0 110.0 112.0 110.0 110.0 110.0 110.0 112.0 112.0 110.0 110.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 112.0 110.0 110.0 1.1.0.0 110.0 DATE: March 2, 2006 Madden Engineering PROJECT NAME: Madison Club LOCATION- La Quinta, California Test No. ,..aie i estew Location i 11981 07-12-05 1 Lot11 A Back 1199 07-12-05 Lot10 A Back 1200 07-12-05 Lot 10 A Back 1201 07-12-05 Lot A Back 12021 07-13-05 Lot III B Front 1203 07-1.3-05 Lot 111 B Front 1204 07-13-05 Lot 112 B Front 1205 07-1.3-05 Lot 112 B Front 1206 07-13-05 Lot 113 B Front 1207 07-13-05 Lot 113 B Front 1208 07-13-05 Lot 112 B Back 1209 07-13-05 Lot 112 B Back 1,210 07-13-05 Lot 111 8 Back 1211 07-13-05 ' Lot III B Back 1212 07-13-05 Lot 70 B Back 12131 0743-05 Lot 70 B Back 1214+ 07-13-05 Lot69 B Back 1215' 1 1 07-13-05 J Lot 69 B Back 1216 1 07-13-05 Lot 68 B back 1217 07-13-05 Lot 68 B Back 1218 i 07-14-05 Lot 57 A Front 1219 + 07-14-05 Lot 57 A Center 1220' 07-14-05 Lot 57 A Back 1221' 07-14-05 Lot 98 B Back 1222 07-14-05 Lot 97 8 Back 12231 07-14-05 Lot 98 B Front 1224i 07-14-05 ' Lot 98 B Front 1225 07-14-05 1 Lot 97 B Front 1226 07-14-05 Lot 97 B Front 12271 07-14-05 ' Lot 98 8 Center 1.228 07-14-05 I.,ot 9813 Con ter 12291 07-14-05 Lot 97 B Center 1230. 07-14-05 Lot 97 B Center 1231 07-18-05 Lot 90 B Back 1232 07-18-05 Lot 90 B Back 1233 07-18-05 1 Lot 89 B Back 1234 07-18-05 Lot 9013 Front 1235 i 07-18-05 Lot 90 B Front 1236 07-18-05 Lot 916 Front TEST RESULTS PROJECT NO; 5224810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture Relative Maximum In Place In Place I COE�acrion Deitsiw 1005 104.5 1003 103.0 1005 109.1 1002 106,3 987 f 1, 02.4 980 104.3 977,5 99.5 979 102.2 975 98.8 977 98.9 977.5 99.7 979 103.1 978 104.7 979.5 99,1 996.5 99.0 998.5 98.7 996 104.0 998 105.0 996 102.5 998 102.9 PG 108.3 PG 1 108.6 PC I� 106.7 975 I 103.2 976,5 -104.8 975 105.2 977 99.7 976,5 91.0 978.5 ( 94.3 975 I 104.1 976 102.2 976 101.3 977 102.9 978.5 108.1 '980 102.4 .978 90.1 978 103,5 980 105.2 977 96.3 7.0 14.5 9.4 10.7 8.6 12.1 16.6 17.4 16.3 15,4 12.5 14.6 14.3 13.3 'I TO 1 14.1 17,3 14.2 11.5 12.9 10.5 9.3 12.6 17,2 11.2 14.0 19,9 20.5 18.8 16.5 15.8 16,7 14.8 13.9 8.9 7.2 1.0.6 13.8 6.2 95 94 97 95 93 95 90 93 90 90 91 94 95 90 90 91 95 95 93 94 97 97 95 94 95 96 89" 83* 86* 95 93 92 94 97 91 80* 92 94 W 110,0 110.0 112.0 112.0 110.0 110.0 110.0 110.0 110,0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110,0 110.0 110.0 112.0 112.0 112,0 110.0 i 110.0 I 110.0 112.0 i 110.0 -110.0 110.0 110.0 110.0 110.0 112.0 112.0 112,0 112.0 112.0 112.0 DATE: March 2, 2006 Sladden En;Qineerinr PROJECT NAME: Madison Club LOCATION. La Quinta, California Test No. Date Tested Location TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elcvation Dry Density % Moisture Relative Maximum In Place In Place Compaction Density 1237 07-18=05 Lot 92 B Front 977 101.4 1238 07-18-05 Retest # 1.236 977 103.0 1239 07-18-05 Lot 91 B Front 979 1.04.5 1240 07-18-05 Retest # 1.233 102.2 1241 07-18-05 Lot 89 B Back 980 106.1 1.242 07-18-05 j 1,ot 89 B Center 978 103.4 1243, 07-18-05 Lot 89 B Center 980 103.7 1244 ° 07-18-05 Lot 90 B Center 978.5 101.9 1245 i 07-18-05 Lot 90 B Center 980.5 104.5 1246 07-18-05 Lot 91 B Center 977.5 100.9 1247i 07-18-05 Lot 90 B Center 979.5 105.0 1248 07-18-05 Lot 90 B Front 978,2 1,02.3 12491 07-18-05 Lot 89'B Front 980.5 102.9 1250 07-18-05 Lot 90 B Back 979 106.6 1251. 07-18-05 1..ot 90 8 Back 981 103.0 1 12521 07-19-05 Lot 84 B Front 981.5 1.03.3 1253 07-19-05 Lot 89 B Front 982.5 104.6 12541 07-19-05 Lot 89 B Back 981.5 99.8 12551 07-19-05 Lot 89 B Back 9825 101.3 1256: 07-19-05 Lot 90 B Front 981 105.4 1257{ 07-19-05 Lot 90 B Front 982 101.4 12581 07-19-05 IWot 91 8 Back 977 99.3 12591 07-19-05 Lot 91 B Back 979 107.2 1260; 07-1.9-05 Lot 92 B Back 979.5 105.9 1261 07-19-05 Lot 92 B Back 981.5 108.0 1262 07-1- -- Lot 91 B Front 980 104.4 1263 07-19-05 Lot 91, 6 Front 981.3 102.9 1264, 07-19-05 Lot 92 B Front 979 106.1 12651 07-19-05 Lot 92 B Front 981 1 101.1 a 12661 07-20-05 Lot 58 A front PG 104.3 1267, 07-20-05 Lot 58 A Center PG 109.8 1268 - 07-20-05 Lot 58 A Back PC 106.3 ]269 07-20-05 I I Lot 59 A Front PG 103.9 1270 07-20-05 Lot 59 A Center PG 1 106.5 1271 07-20-05 Lot 59 A Back PC 105.1 1272 07-20-05 Lot 60 A Front PG 109.1 1273 07-20-05 Lot 60 A Center PG 108.7 1274 07-20-05 Lot 60 A Back PG 105,2 *1275 07-20-05 Lot 64 A Back 994 101.9 1276, 07-20-05 , Lot 64 A Back 996 103.3 8.3 9.9 11.4 10.3 12.1 11.0 11.5 10.1 12.4 9.3 13.6 8.8 10.7 9.2 10.5 8.8 9.3 16.8 11.6 7.1 9.7 11.2 12.7 13.6 15.3 9.9 8.7 11.5 10.8 10.1 7.7 83 9.2 8.6 9.1 10.1 11.3 8.8 10.5 12.4 91 92** 93 91 95 92 93 91 93 90 94 91 92 95 92 92 93 91 92 94 92 90 96 95 96 93 92 95 90 93 98 95 93 95 94 97 97 94 91 92 112.0 112.0 112.0 112.0 11, 2.0 112.0 112.0 112.0 112:0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 110.0 110.0 112.0 1'10,0 110.0 112.0 112.0 1.12.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112,0 112.0 1.12.0 112.0 112.0 12.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT .NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. mate Tested Location Elevation Dry Density % Moisture l Relative Maximum In Place f to Place ! Cora action Pemity 1277 07-20-05 Lot 65 A Back 994.5 107.2 9. 1 96 f 112.00 1278 07-20-05 i Lot 65 A Back 996 104.3 13.4 93 I 112..0 1279 07-20-025 Lot 66 A Back 995.5 101.8 11.3 91 1280 07-20-05 Lot 66 A Back 996.5 105.0 12.0 94 112.0 112.0 1281 07-20-05 Lot 67 A Back 995 106.9 8.5 95 112.0 1282 07-20-05 Lot 67 A Back 996.5 103.3 10.2 92 112.0 1283 07-20-05 Lot 64 A Back 997.5 100.9 14,0 9U 112.0 1284 07-20-05 Lot 65 A Back 998 I 103.8 11.2 ' 93 ? 112.0 1285 07-20-05 Lot 65 A Back 1000 ' 100.4 14,3 90 112.0 1286 07-20-05 Lot64 a Back 999 101.6 1 13.1 91 112.0 1287 1288 07-20-05 Lot 64 A Back 1001 104.7 1 13.6 93 112.0 . 07-20-05 Lot 66 A Hack 998 108.1 II 12.9 97 112.01289 07-20-05 Lot 66 A Back 1000 109.0' f 14.5 , 97 112.0 1290; 07-20-05 1 Lot 67 A Back 998 1 105.8 13.2 1 94 112.0 1291 + 07-20-05 Lot 67 A Back 1.000 + 1.01..5 9.8 + 91 7.12.0 1292 07-21.-05 Lot 89 B Front 984.5 103.1 9.8 92 112.0 1293 07-21-05 1 Lot 89 B Front 986.5 99.2 14.8 I 90 110.0 1294 12951 07-21-05 07-21-05 Lot 89 B Back 984 105.3 11,9 94 112.0 I Lot 89 B Back 986 102.8 13.0 92 112.0 1296+ 07-21-05 Lot 90 B Front 984 106.6 9.8 95 112.0 12971 07-21-05 Lot 90 B Front 985.3 100.3 15.7 ! 91 1298 07-21-05 Lot 90 B Back 983 1.04.7 [ 12.5 93 110.0 12991 07-21-05 Lot 90 B Back 985 101.8 1.2.7 91 112.0 1300 07-21-05 Lot 91 B Front 984 ' 105.1 13.5 94 112.0 1301 +'+ 07-21-05 Lot 91 B Front 986 105.3 17.6 94 112.0 112.0 13021 1303 07-21-05 [lot 91. B Back 981 1 103.1 9.9 92 1.12.0 1304 ; 07-21-05 07-21-05 Lot 91 B Back 983 � 107.2 14.0 96 1.12.0 Lot 92 B Front 983 104.6 13.4 93 112.0' 1305' 07-21.-05 ' Lot 92 B Front 984.5 101.0 12.1 90 11.2.0 13W 07-21-05 Lot 92 B Back 983 107.8 17.5 96 112.0 1307: 07-21-05 Lot 92 B Back 984.5 104A 12,8 93 112.0 1308; 07-21-05 Lot 93 0 Front 980 105.1. ; 9.4 94 112,0 1309 i 07-21-05 Lot 93 B Front 981.5 108.3 8.5 97 1310 07-21-05 Lot 93 B Back 980 103.3 10.1 � 92 112.0 112,0 1311 I 07-21-05 Lot 93 B Back 981.5 104.0 11.3 93 112.0 1312 07-21-05 Lot 93 8 i� Front t 982.5 7 04.3 f 9.1 93 112.0 1313 07-21-05 Lot 93 B Front 984 103.4 13.0 92 f 112.0 1314 07-21-05 Lot 93 B Back 983 100.8 15.5 90 112.0 1315 07-21-05 Lot 93 B Back 984 102.4 10.8 + 91 i 112.0 DATE- March 2, 2006 Nitz. don I'!HAiHaani�f is PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Tate Testes! I Location TEST RESULTS 'PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation I Dry Density % Moisture I In Place ` In Place I I 134 07-22-05 Lot 71 A Front PG 102.9 13171 07-22-05 Lot 71 A Center PG 104.5 13181 .07-22-05 Lot 71 A Back 15G 102.2 1319 07-22705 Lot 70 A 'Front PG 101.4 1320 07-22-05 Lot 70 A Center PG 104.4 1321 07-22-05 Lot 70 A Back PG 106.9 1322 07-22-05 Lot 69 A Front PG 105.5 1323 07-22-05 Lot 69 A Center PG 99.7 1324 07-22-05 Lot 69 A Back I'C, 102.7 13251 07-22-05 Lot 6S A Front PG 104.6 13261 07-22-05 Lot 68 A Center pe, 108.9 1327 07-22-05 Lot 68 A Back PG 107.6 1328 07-22-05 Lot 67 A Front PC 101.6 1329 07-22-05 Lot 67 A Center PG 1.02.1 1330 07-22-05 Lot 67 A Back FIG 106.6 1331 07-22-05 Lot 66 A Front PC 105.4 ` 13321 07-22-05 Lot 66 A Center PG 106.E 1333 07-22-05 Lot 66 A Back PG 107.2 13341 07-22-05 Lot 65 A Front I'G 1.08.5 1335 1 07-22-05 Lot 65 A Center PG 104.1 1336 07-22-05 Lot 65 A Back PC 101.8 1337 07-22-05 Lot 64 A Front PG 105.0 13381 07-22-05 Lot 64 A Center PC 107.5 13391. 07-22-05 Lot 64 A Back FIG 106.4 1340 ' 07-22-05 ` Lot 63 A 'Front PG 107.6 13411 07-22-05 LOT 63 A Center I'G 106.3 1342' 07-22-05 Lot 63 A Back PG 1.03.2 1343 07-22-05 Lot 62 A Front PG 1091 V 1344, 07-22-05 Lot 62 A Center PG 107.3 13451 07-22=05 Lot 62 A. Back PG 108.6 73461 07-22-052 Lot 61 A Front PG -104.5 1347. 07-22-05 Lot 61 A Center PC, ` 109.3 13481 07-22-05 Lot 61. A Back PG 1 109.2 1349 07-25-05 Retest 9 1224 103.3 1350 07-25-05 Lot 98 B Front 979 105.1 1351 07-25-05 Lot 98 B Back 977 101.6 1352 • 07-25-05 ` Lot 98 B Back 979 104.4 1353 07-25-05 Retest # 1225 102.2 1354 07-25-05 Retest # 1226 101.8 1355 07-25-05 Lot 97 B Back 978.5 105.3 11.8 11.9 8.7 9.1 9.6 10.1 14.1 15.2 13.5 8.2 10.1 9.5 12.5 8.4 7.5 10.3 71..8 8.3 10.6 9.5 7.7 13.5 11,0 9.6 9.2 9.4 10.1 7.8 8.8 9.2 11.5 10.4 11.6 Relative 93 95 93 91. 93 95 94 91 93. 93 97 96 91 91 95 94 95 96 97 93 91 94 96 95 96 95 92 97 96 93 93 98 98 16.7 92** 14.5 94 17.0 91 15.1 93 16.0 91** 13.6 91** 13.9 94 Maximum 110.0 110.0 110.0 112.0 112.0 112.0 112.0 110.0 1.10.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 11,2.0 11.2.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 1,12.0 112.0 112.0 12.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. � Date Tested I Location 1356 1357 1358 1359 1360 1361I 1.362 1363 1.364 07-25-05 07-25-05 07-25-05 07-25-05 07-25-05 07-25-05 07-25-05 07-25-05 07-25-05 13651 07-26-05 1366 07-26-05 1367 07-26-05 1368 07-26-05 1369 07-26-05 1370 07-26-05 1371 07-26-05 1372 07-26-05 1373 07-26-05 1374 07-26-05 1375 07-26-05 1376' 07,26-05 1377� 07-26-05 1378 07-26-05 1379f 07-26-05 1380I1f 07.26-05 1381 07-27-05 1382 ! 07-27-05 13831 07-27-05 13841 07-27-05 1385 07-27-05 1386 ' 07-27-05 1387 07-27-05 1388 07-27-05 1389 07-27-05 1390 07-27-05 1391 07-27-05 13921 07-27-05 1393i 07-27-05 13941 07-27-05 TEST RESULTS PROJECT NO; 522-4810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture f Relative ; Maximum In Place In Place Compaction I Density 1 Lot 97 B Back 980.5 103.4 14.7 92 1 112.0 [aot 98 6Frprlt 981 106.6 12.9 1 95 1.12.0 Lot 98 B Front 983 103.5 12.4 92 112.0 Lot 98 B Back 981 1 1.02.1 � 1.3.6 91 112.0 Lot 98 B Back 983 102.9 ' 17.0 1 92 112.0 Lot 97 B Front 980.5 100.9 15.5 90 112.0 Lot 97 B Front 987.5 1.05.0 1 11.6 94 112.0 Lot 97 B Back 981.5 106.6 13.3 95 112.0 Lot 97 B Back 983 104.8 11,2 94 7.1.2.0 Lot 114 B. Front 977.5 105,1 8.3 94 112.0 Lot 114 B. Front 979.5 103.7 17.5 93 112.0 Lot 114 B Back 977.5 102,5 8.9 92 112.0 Lot 114 B Back 979.5 101.1 14.5 90 1.12,0 Lot 115 B Front 977 106.0 '9.6 + 95 112.0 Lot 11513 Front 978.5 105.1 12.4 i 94 112.0 Lot 115 B Back 977 100.8 10.0 90 112.0 Lot 115 B Back 978.5 107,1 17.2 f 96 j 112.0 Lot 1.1.6 8 Front 975.5 � 103.8 10.3 93 112.0 Lot 116 B Front 977 103.6 11.2 93 , 112.0 Lot 1.1.61313ack 975.5 � 105.3 15,7 94 1.12.0 Lot 116 B Back 977 104.0 16.9 93 1 112.0 Lot 114 B Front 981. 103.7 7 0 0 92 112.0 Lot 114 B Back 981 f 106.3 71.4 95 112.0 Lot 115 B Front 980.5 107.0 16.8 96 112.0 Lot 115 B Back 980 106,7 17.1 95 ! 11.2.0 Lot 39 B Front 984.5 101.4 + I 9.3 91 112.0 Lot 39 B Front 986.5 105.0 10.8 94 112.0 Lot 38 B Front 984 3.06.8 12.5 I 95 112.0 Lot 38 B Front 986 104.3 11.1 93 112.0 Lot 37 B Front 984.5 103.1 8.8 92 112.0 Lot 37 B Front 986.5 103.9 10.4 93 112.0 Lot 39 B Front 988.5 107.5 11.3 96 112.0 Lot 39 B Front 990.5 105.6 1.3.3 94 11210 Lot 38 B Front 788 101.8 14.8 91. 112.0 Lot 38 B Front 989.6 1 100.9 12.2 90 112.0 Lot 37 B Front 988.5 108.1 13.5 97 112.0 Lot 37 B Front 990 106.3 12.6 95 112.0 Lot 39 B Back 984.5 '103.9 14.4 93 11210 Lot 39 B Fuck 986 103.2 1 12.0 92 112.0 DATE: March 2, 2006 Sladden En-eineerinp PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Date Tested Location TEST RESULTS PROJECT NO: 522-4810 REPORT NO; 06-02-120 Elevation Dry Density I % Moisture In Place I In Place 1395 07-27-03 Lot 38 B Back 984 1396 07-27-05 Lot 38 B Back 986 1397 07-27-05 Lot 37 B Back 984.5 1398 07-27-05 Lot 37 B Back 986.5 1399 07-27-05 Lot 39 B Back 988 14001 07-27-05 Lot 39 B Back 989.5 14011 07-27-05 Lot 38 B Back 988 14021 07-27-05 Lot 38 B Back 989.5 1403 i 07-27-05 Lot 37 B Back 988.5 1404 ! 07-27-05 Lot 37 B Back 990 1405 07-28-05 ' 1406 , 07-28-05 1407; 07-28-05 a 1408i 07-28-05 { 14M 07-28-05 141.0 07-28-05 1411 07-28-05 1412 07-28-05 1.413 i 07-28-05 1414 07-28-05 1415 07-28-05 14164 07-28-05 1417! 07-29-05 14181 07-29-05 1419 07-29-05 1420; 07-29-05 1421j 07-29-05 1422! 07-29-05 1423� 07-29-05 1424 07-29-05 1425 07-29-05 1426 07-29-05 1.427 07-29-05 1428 07-29-05 1.429 07-29-05 1430 07-29-05 1.431, 07-29-05 1432 07-29-05 Lot 39 B Back Lot 39 B Back Lot 38 B Back Lot 38 B Back Lot 37 B Back Lot 37 B Back Lot 39 B Front Lot 39 B Front Lot 38 B Front Lot 38 B Front Lot 37 B Front 1,ot 37 B Front Lot 37 B Front Lot 37 B Back Lot 38 B Front Lot 38 B Back Lot 39 B Front Lot 39 B Back Lot 98 B Front Lot 98 B Front Lot 98 B Back Lot 98 B Back Lot 97 B Front Lot 97 B Front Lot 97 B Back Lot 97 B Back Lot 88 8 .Front Lot 88 B Back 991.5 992.5 991 992.5 991 992.5 991.5 992.5 991 992.5 991 992.5 I 993.5 993.5 993.5 993.5 994 994 985 986 985 986 984 985.5 984.5 985.5 976 975.5 107.0 104.5 102.9 101.0 108.0 105.1 102.0 105.7 101.5 106.0 1,08.4 103.7 109.6 '103.7 104.2 108.6 102.5 1.01.0 102.9 105.8 107.3 108.5 99.9 105.2 99.7 10:1.5 1.03.3 100.1 93.1 92.4 102.8 104.4 106.3 105.8 104.0 1.01.6 107.6 104.9 9.9 10.7 15.1 11.0 12.2 15.1 9.6 13.2 11.3 8.7 14.1 10.7 12.4 12.6 16.7 12.9 "12.4 17.6 12.1 10.7 16.6 15.1 15.6 10.8 10.8 11..2 16.3 11.2 7.1"� 6.6" 10.9 13.6 14.1 12.9 11.8 10.7 14.5 12.3 Relative - Maximum _Compaction 1 _Mnsity i 96 I 112.0 93 112.0 92 112.0 90 112.0 96 112.0 94 11.2.0 91 112.0 94 112.0 91 112.0 95 112.0 97 112.0 92 1,12.0 98 1 112.0 93 j 112.0 93 1.12.0 97 112.0 92 112.0 90 112.0 92 112.0 94 112,0 ` 96 112.0 97 112.0 j 91 110.0 94 112.0 91 ? 110.0 91 ; 112.0 i 92 112.0 91 110.0 85w j 11,0.0 84" i 110.0 1 93 110.0 95 110.0 95 112.0 94 112.0 93 112.0 91 112.0 96 112.0 94 112.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Tcst No. Uatc 'restcd Location TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Ivry Tensity ' % Moisture In Place I In Place 1433 08-01-05 i Lot 52 B Front 979 104.1 11.9 1434 08-01-05 Lot 52 B Back 978.5 102.4 9.7 1435 08-01-05 Lot 53 B Front 978 101.8 12.5 1436 08-01-05 I.,ot53 B Back 978.5 105.9 10.6 1437 08-01-05 Lot 54 B Front 977.5 106.6 12.3 1438 08-01-05 Lot 5413 Back 977 1 101.0 J :1.4.9 1439 08-01-05 Lot 55 B Front 977.5 103.4 9.8 '1440 08-01-05 1.,ot 5513 Back 977.5 t 103.8 13.2 1441 08-01-05 Lot 56 B Front 977 107.3 13 9 1.442 08-07-05 Lot 56 B Back 976.5 104.4 11.0 14431 08-01-05 Lot 57 B Front 976.5 101..3 8.9 1444 08-01-05 Lot 57 B Back 977 102.7 12.1 1A 08-01-05 Club House 966.0 1 99.3 1 17.2 2A i 08-01.-05 Club House 968.0 102.0 18.7 3A 08-01-05 Club House 966.0 1 99.7 1 19.2 4A 08-01-05 I Club 1-louse 961.0 100.9 1.9.9 5A 08-01-05 Club House 963.0 103.3 20.9 6A 08-01-05 Club House 967.0 100.1 19.2 7A 08-01-05 Club House 969.0 1 102.9 14.9 8A 08-01-05 Club House 965.0 102,3 17.5 9A i f 08-01-05 1 Club House 967.0 98.6 1 12.7 10A ± 08-02-05 Club House i 969.0 104.0 17.0 11 A 08-02-05 Club House 971.0 100.1 16.4 12A 08-02-05 Club House 970.0 101.2 18.7 13A 08-02-05 Club House 971.0 102.7 19.4 14A i 08-02-05 Club House 973.0 102.4 20.5 14451 08-02-05 Per flan 979.5 100.8 16.6 14461 08-02-05 Per Plan 980.5 101.9 10.8 14471 08-02-05 Per Plan 979.5 104.3 11.9 1448 08-02-05 Per Plan 981 1.01.5 9.4 1449 i 08-02-05 Per Plan 978.5 102.7 12.5 14.50j I 08-02-05 Per Ilan 979.5 '100.9 1451 08-02-03 Per Plan 979.5 104.8 10.2 1452,1 08-02-05 Per Plan 981.5 104.E 10.9 14531 08-02-05 Per Plan 980 108.1 13.3 1454 08-02-05 Per Plan 981.5 105.4 11.6 1455. 08-02-05 Per Plan 980 106,3 11.0 1456 08-02-05 Per Plan 981.5 103.9 12.5 Relative Maximum 2T action DvnsitX 93 91 91 95 95 90 92 93 96 96 90 92 90 94 91 92 95 91 94 93 90 95 91 92 94 93 92 93 95 92 92 92 94 93 97 94 95 93 112.0 112.0 F 112.0 112.0 1.12.0 f 112.0 112.0 112.0 112.0 712,0 112.0 11.2.0 1.10.0 1'10.0 110.0 110.0 110.0 110.0 170.0 110.0 110.0 110.0 110.0 110.0 11().0 110.0 110.0 110.0 110.0 110.0 '112.0 110.0 112.0 112,0 112.0 112,0 112.0 112.0 DATE: March 2, 2006 Sladden EnuineerinQ PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. j Date Tested I Location 1457` 14581 1459- 14601 14.61. 1. 1462 1.4631 1464 1465 1466 1467 1468 1469 1470 147I A B D E F 1472 1.473 1474; 1475 1476 1477 1478 1479 1480 1481 1482 1483 1484 1485 1486 1487 1488 1489 1490 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-05 08-03-0.5 08-04-05 08-04-05 { 08-04-05 08-04-05 08-04-05 08-04-05 08-04-05 08-04-05 08-04-05 08-04-05 08-04-05 08-04-05 08-04-05 08-04-05 j 08-04-05 08-04-05 j 08-04-05 08-04-05 08-04-05 { TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Tensity % Moisture Kelative In Place In Place Cq attic Lot 89 B Front 988.5 105.1 Lot 89 B Front 990.5 104.2 Lot 89 B Back 988 107.9 Lot 89 B Back 990. 103.8 Lot 90 B Front 978.5 106.6 Lot 90 B Front 989,5 106.1 Lot 90 B Back 987 102.5 Lot 90 B Back 989 102.8 Lot 91 B Front 988 108.1 Lot 91 B •Back 985 105.3 Lot 91 B Back 987 101.6 Lot 92 B Front 986.5 103.7 Lot 92 B Back 986.5 103.5 Lot 9313 Front 985.5 i W.8 1.ot 9313 Hack 985 104.4 Lot 60 Front 975 102,4 Lot 60 Back 975 101.1 Lot 59 Back 975 1.03,7 Lot 59 Front 975 100.2 Lot 58 Front 976 103.1 Lot 58 Back 976 101,8 Lot 94 B Front 980 1.01.8 Lot 94 B Back 979.5 103.3 Lot 95 A Front 979 107.5 Lot 95 B Back 797 104.4 Lot 46 B Front 978 102.9 Lot 46 B flack 978.5 105.1 Lot 94 B Front 982 108.2 Lot 94 B Front 983,5 106.1 Lot 9513 Front 981 104.5 Lot 95 B Front 983 102.4 Lot 96 B Front 980 103.9 Lot 96 B Front 982 105.5 Lot 94 B Back 981.5 101.2 Lot 94 8 Back 983.5 103.1 Lot 95 B Back 981 107.4 1..ot 95 B Back 983 104.6 Lot 96 B Back 980.5 104.8 Lot 96 B Back 982 .101.6 Retest 91423 101.3 13.3 11.6 9.9 12.0 10.5 11.3 34.5 13.4 10.7 13.8 1.0.0 9.2 1.2.4 11.0 14.1 1.6.0 10.1. 19.3 10.2 15.9 17.5 10.9 '13.5 11.0 8.8 12.6 11.7 14,1 12.5 10.8 13.0 11.4 14.5 9.6 10.3 13.2 11.4 10.2 '12'.7 8.6 94 93 96 93 95 95 92 92 97 94 91 93 92 96 93 93 92 95 91 94 93 91 92 96 93 92 94 97 95 93 91 93 94 90 92 96 93 94 91 9()*W 11.2.0 112.0 112.0 112.0 112.0 112.0 112.0' 112.0 112.0 112.0 112.0 112,0 112.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 112.0 112.0 112.0 1.12.0 112.0 112.0 112.0 112.0 112.0 1.1.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 '112.0 112.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION; I.,a Quinta, California Test No. I Date Tested J Location 1491 1.492 1493 1494 1495 1496 TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture I Relative j Maximum In Place In Place Comnenti�,n r1P„"r., 08-04-05 Retest # 1424 103.5' 9.0 08-04-05 Lot 98 B Back 986 104.4 8.5 08-04-05 Lot 97 B Front 987.5 1 102.0 { 11..3 08-04-05 Lot 97 B Back 987.5 105.1 10.5 08-04-05 Lot 96 B Front 984 103.3 13.9 08-04-05 Lot 96 13 Back 984 1.07.6 1 12.7 1497 08-05-05 l,ot 89 B Front 1498 08-05-05 Lot 89 B Center 1499 08-05-05 l..ot 89 B Back 1500 08-05-05 Lot 90 B Front 1501 08-05-05 laot 90 B Back 1502 08-05-05 Lot 90 B Center 1503 08-05-05 Contour between 1504 08-05-05 Meriwether & 1505 08-05-05 Humboldt 1506 08-05-05 Per Plan 1507 08-05-05 Per Plan 1508 08-05-05 Per Plant 1509 08-05-05 Per Plan 1510 08-05-05 Per Plan 1511 I 08-05-05 Per Ulan 113 ! 08-05-05 Club House 213 08 05-()5 Club House 3B 1 08-05-05 Club House 4B 08-05-05 Club House 513 08-05-05 Club House 6B 08-05-05 Club House 7B 1 08-05-05 Club House 8B 08-05-05 Club House 913 08-05-05 Club House 1013 08-05-05 Club House 11B 08-05-05 Club House 12B 08-05-05 Club House 13B 08-05-05 Club House 14B 1 08-05-05 Club House 15B 08-05-05 Club House 1.61) 08-05-05 Club House 17B 08-05-05 Club House 18B ; 08-05-05 : Club House PG 108.3 10.4 PC 1.05.5 :11..6 PG 108.4 10.9 PC 103.8 13.8 PG 105.9 12.1 PG 102.6 12.9 981, 104.7 14.8 981.5 102,0 13.2 981 108.9 15.3 982 106.1 12.8 980.5 103.6 10.7 980.5 105.5 15.5 981 109.1 13.3 982 106.4 11.8 981,5 104.5 12.5 92** 93 94 94 93 96 97 94 97 93 95 92 93 91 97 95 93 94 97 95 93 112.0 112.0 112.0 112,0 112.0 112.0 ' 112.0 II 112.0 j 112,0 112.0 112.0 112.0 1.12.0 112.0 112.0 1.1.2.0 112.0 112.0 112.0 112.0 112.0 975.0 101.8 1 17.8 93 110.0 975.0 100.1 8.9 91 110.0 975.0 1.04.0 1 15.8 96 110.0 975.0 108.8 9.4 99 110.0 975.0 99.2 10.1 90 110.0 972.0 107.6 9.5 98 110.0 974.0 100.4 9.7 91 110.0 975.0 102.5 12.4 94 '110.0 977.0 101.3 10.9 92 1.10.0 977.0 105.2 8.9 95 110.0 479.0 100.3 13.1 91. 1.10.0. 975.0 103.2 10.8 94 110.0 977.0 101.4 10.1 92 110.0 975.0 108.2 15.9 98 110.0 977.0 106.8 18.1 97 110.0 977.0 1 105.6 16.2 96 1 110.0 977.0 101.0 13.9 92 1 110.0 977.0 f 104.4 1 19.2 95 110_t) DATE: March 2, 2006 Sladden 1. rtgoineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No, Date Tc%tcd I Location Elevation Dry Density % Moisture Relative maximum ` 1 In Place in Place Com action Densi 19B I OS-05-05 ' Club House 977.0 105.6 10.2 95 110.0 20B 08-05-05 Club House 977.0 106.3 12.8 96 110.0 E 1512' 08-08-05 Lot 91 B Front PG 108.3 9.0 97 112.0 15131 08-08-05 Lot 91 R Center PG 105.1 11.4 94 ! 112.0 15144 08-08-05 Lot 91 B Back PG 106.5 10.7 95 1.12.0 1515, 08-08-05 Lot 92 B Front PG 103.8 12.6 93 1.12.0 1.516 08-08-05 Lot 92 B Center PG 102.9 1.1..1 II 92 112.0 1517 08-08-05 Lot 92 B Back PG 104.7 13.3 1 93 11.2.0 1518 08-08-05 { Lot 93 B Front PG 101.3 9.9 90 112.0 1519 08-08-05 Lot 93 B Center PC 107.2 1 11.7 96 112.0 1520 08-08-05 Lot 93 B Back PG 104,4 13.8 93 112.0 1521 08-08-05 Lot 94 B Front PG 108.5 1 10.7 97 ! 112.0 1522 08-08-05 Lot 94 B Center PG :1.05.6 8.8 94 1 112.0 1523 0$-08-05 Lot 94 B Back PG 103.0 12.4 92 112,0 15241 08-08-05 Lot 9513 Front PG 103.9 10.0 93 112.0 1525 08-08-05 Lot 95 B Center PG 107.2 I 8.3 96 1 112.0 1526 08-08-05 Lot 95 B Back PG 104.6 11..5 93 112.0 1527 08-08-05 Lot 88 8 Front 997.5 1 102.2 9.6 91 112.0 1528 08-08-5 Lot 88 B Back 977.5 1 104.0 8.1 93 112.0 1529 ()8-08-05 Lot 88 B Front 979.5 I 101.6 12,7 91. I 112.0 1530 08-08-05 i Lot 88 B Back 9795 105.0 9.0 94 11.2.0 1.537. 08-0$-05 4 Lot 88 B Front 981 103.6 13.2 93 1 112.0 1532. 08-08-05 1 . Lot 88 B flack 981 103 .8 12.1 93 112.0 1 C I I 08-08-05 I Club House 979.0 106.2 15.7 96 110.0 2C 08-08-03 I Club House 981.0 106, 10.2 96 110.0 3C ` 08-08-05 Club House 979.0 104.5 I 12.4 95 11'0.0 4C 08-08-05 Club House 981.0 105.3 11.2 95 11.0.0 ` 5C 08-08-05 Club House 979.0 I 103.8 12.3 95 110.0 6C 08-08-05 Club House 981.0 1.02.1 9.8 93 110.0 7C 08-08-05 Club House 979.0 104.9 12.2 95 110.0 8C 08-08-05 Club House 981.0707.3 13.4 97 110.0 9C 08-08-05 1 Club House 979.0 104.1 13.9 95 110.0 10C 08-08-05 Club House 981.0 105.9 12.6 96 110.0 11C 1 08-08-05 Club Bowie 979.0 108.0 15.8 1 98 110.0 12C 08-08-05 Club House j 981.0 101.2 16.2 92 110.0 I 15331 08-09-05 Lot 12 B Back 975.5 100.8 1 22.4* 85* 119.0 1534 08-09-05 1` Lot 12 B Back 976.5 101.3 18.5* 85* 17 9,0 1535 08-09-05 Lot 63 B Back 975 1 1.01.2 12.7 90 112.0 DATE: March 2, 2006 $ladder Engineering PROJECT NAME": Madison Club LOCATION: La Quinta, California l e$m 1,40, 1 uate Vested I Location 15361 08-09-05 f Lot 63 B Back 1537 08-09-05 Lot 64 B Back 1538, 08-09-05 Lot 64 B Back 1.539 08-09-05 Lot 65 B Back 15401 08-09-05 Lot 65 B Back 1541 08-09-05 Lot 66 B Back 1542 08-09-05 Lot 66 8 Back 1D j 08-09-05 Club House 2D 08-09-05 CIub House 3D 08-09-05 Club House 4D 08-09-05 Club House 5D 08-09-05 Club .House 6D 08-09-05 Club House 7D 08-09-05 Club House 8D 08-09-05 Club House 9D 10D ? 08-09-05 Club House 08-09-05 Club House 11D 08-09-05 Club House 12D ; 08-09-05 Club House 15431 I 08-10-05 Lot 62 B Front 15441 15451 08-10-05 Lot 62 B Front 08-10-05 Lot 63 1) Front 1546 08-10-05 Lot 64 B Front 1647 08-10-05 Lot 65 B Front 1548 08-10-05 Lot 66 B Front 1549: 08-10-05 1 Lot 67 B Front 1550 i 08-10-05 i Retest # 1.533 & :1.534. 1551 I 08-10-05 Lot 63 B Back 1552 08-10-05 Lot 64 B Back 1553 08-10-05 Retest k 1538 1554 08-10-05 Retest # 1539 & 1.540 1555 08-10-05 Retest # 1541 1556 08-10-05 Lot 67 B Back A 08-10-05 Lot 47 B 08-10-05 Lot 47 C 08-10-05 Lot48 D 08-10-05 Lot 48 TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02420 rnevatton Dry Density j % Moisture In Place f in Place 976 ! 103.6 974.5 106.4 975.5 102.3 975 97.1 976 95.6 976 99.5 977 103.4 983.0 103.6 985.0 100.1 983.0 105.4 985.0 1.01.5 983.0 102.5 9,95.0 100.7 983.0 1.061. 985.0 ? 103,4 983.0 103.8 985.0 101.7 983.0 107.2 985.0 105.1 975.5 j 109.4 9763.5 108.3 976.5 104.5 978 1.06.6 975 103.9 977 105.5 973 104.1 104.5 976 101.3 974.5 103.4 105.3 975 103.1 976 104.7 972 100.8 983 104.1 985 102,9 983 105.2 985 101.4 Relativc I Maximum 17.8* 93 112.0 19.4* 90 112.0 20.2* 86* 11.9.0 14.3 87" 112.0 13.1 85* 112.0 20.1* 1 89* 112,0 18.2* 92 112.0 13.8 10.3 14.7 15.3 14.5 12:4 13.6 10.5 17.9 18.6 16.8 15.2 16.5 13.7 11.0 14.8 16.2 15.3 13.0 14.8 17,1 1.6.0 15.6 14.0 16.3 11.4 13.9 12.7 14.6 113.4 95 110.0 91 110,0 95 110.0 -93 11.0.0 94 110.0 92 1.10.0 98 110.0 94 110.0 95 110.0 93 110.0 97 i 110.0 95 110.0 92 119.0 91 119.0 93 112.0 95 11.2.0 93 112.0 94 112.0 93 112.0 93** 112 90 ' 112.0 92 112,0 94 112.0 92** 112.0 93** 112.0 90 112.0 95 110.0 94 110.0 94 110.0 92 110.0 DATE: March 21,2006 Sl¢ddett Eitidneerinn PROTECT NAME: Madison Club LOCATION: La Quinta, California Test No. Date Tested Location 1E 08-10-05 2E 08-1.0-05 3E 08-10-05 41:, 08-10-05 1 5E 08-10-05 6E 08-10-05 7E 08-10-05 8E 08-10-05 9 F, 08-10-05 10E 08-10-05 11 E 08-10-05 12E 08-10-05 1557j 08-11-05 1558 08-11-05 j 1559i 08-11-05 15601 08-11-05 1561! 08-1.1-05 15621 08-11-05 1563! 08-11-05 1564 • 08-11-05 ` 1565 08-11-05 1566 08-11-05 1 15671 08-11-05 y 1568' 08-11-05 15691 08-11-05 1570' 08-11-05 15711 08-11-05 1572 08-11-05 1573 08-11-05 A 08-11-05 B 08-11-05 C 08-11-05 p 08-11-05 TEST RESULTS Elevation Club House 987.0 Club House 989.0 Club House 987.0 Club House 989.0 Club House 987.0 Club House 989.0 Club House 987.0 Club House 989.0 Club House 987.0 Club House 989.0 Club House 987.0 Club House 989.0 Lot 88 B Front Lot 88 B Back I..ot 88 B Front Lot 88 B Back Lot 96 B Front Lot 96 B Center Lot 96 B Back Lot 97 B Front Lot 97 B Back Lot 97 B Center Lot 98 B Front Lot 98 B Center Lot 98 8 Back Lot 68 B Front Lot 68 B Back Lot 69 B Front Lot 69 B Back Lot 47 B Back Lot 47 B Back Lot 48 B Back Lot 48 B Back PROJECT NO: 522-4810 REPORT NO: 06-02-120 Y Dry Density % Moisture Relative Maximum In P1aoc In P1aoo Compaction Densi 982.5 983 964 984.5 PC PC PG PG PC PG PG PG PC i 971 970.5 972 971.5 987,0 989.0 989.0 989.0 1.01..9 104.8 100.2 100.3 104.0 1.01.4 102.9 100.2 101.8 104.2 103.1 102A 103.9 101.E 105.8 107.7 106.0 104.4 1.08.1 102.3 105.1 107.4 108.8 105.3 104.7 93.6 94.3 96.5 95.1 99.6 100.7 102.3 105.1 IF 08-11-05 Club Flouse 991.0 1 105.3 2F 08-11-05 Club House 991.0 1.05.9 3F 08-11-05 Club House 991.0 104.5 4F 08-11-05 Club House 991.0 1.02.1 5F 08-11-05 i Club House 991.0 103.4 6F 08-1-1-05 Club House 991.0 100.7 �14.8 13.9 18.1 14.4 16.1 13.2 17.8 16.5 18.2 11.7 15.1 16.7 10.6 11.5 9.6 9.2 8.8 12.4 9.2 10.6 13.0 11.8 9.0 1.3.1 10.4 17.1 1.8.9 19.4 18.5 10.9 13.1 14.7 12.8 13.7 18.5 13.5 1.0.9 11.7 1.3.4 93 95 91 91 95 94 94 91 93 95 94 93 93 91 94 96 95 93 97 91 94 96 97 94 93 83* 84* 86* 85* 91 92 93 95 95 96 95 93 94 92 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11.0.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. 1C; 20 3G 4C 5G Tate Tested � Location 08-12-05 Club House 08-12-05 i Club I -louse 08-12-05 Club House 08-12-05 Club House 08-12-05 Club House 1H 08-13-05 2H 08-13-05 31-I 08-13-05 4H 08-13-05 5H 08-13-05 6 H 08-13-05 7H 08-13-05 Club House Club House ClubIlouse Club House Club House Club House Club House A 08-15-05 Lot 48 B Back B 08-15-05 Lot 48 B Back C 08-15-05 Lot 47 B Back D 08-15-05 Lot 47 B Back E 08-15-05 Lot 72 F 1 08-15-05 Lot 72 G ; 08-15-05 Lot 71 H 1 08-15-05 Lot 71 I 08-15-05 I,.ot 70 J 08-15-05 Lot 70 K 08-1.5-05 Wt 69 L 08-15-05 Lot 69 M 08-15-05 Lot 68 N j I 08-15-05 Lot 68 AA 08-16-05 { Lot 60 Front 1313 j 08-16-05 Lot 59 Front CC 08-16-05 Lot 58 Front DD 08-16-05 Lot 57 Front EE 08-16-05 Lot 56 Front FF 08-16-05 Lot 55 Front GG 08-16-05 Lot 54 Front HH 08-16-05 Lot 5413ack it 08-16-05 Lot 54 Back Il 08-16-05 Lot 56 Back KK 08-16-05 Lot57 Back LL ' 08-16-05 Lot 58 Back TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture In Place In Place i 993.0 105.3 14.0 995,0 103.2 13.2 993.0 103.9 13.8 995.0 101.7 12.7 993.0 107.9 11.3 993.0 103.1 10.2 995.0 1 105.2 12.1 993.0 105.4 13.8 995.0 103.6 12.1 993.0 103.1 15.2 995.0 101.9 13.7 995.0 104.4 17.1 991.0 I 102.5 12.1 993.0 ! 104.6 11.9 991.0 106.2 1 15.2 993.0 105.9 1 14.6 990.0 108.1 ' 17.8 972.0 105.2 15.1 970.0 104.5 20.5 972.0 105.1 18.2 970.0 100.4 22.1. 972.0 105.7 19.8 97"1.0 100.9 1,6.9 973.0 102.3 17.2 971.0 108.2 20.1 973.0 106.4 15.9 977 99.6 15,7 977 1.05.6 1.5.8 977 104.3 11.9 979 101.8 16.3 974 108.8 14.7 979 152.4 20.1. 979 102.9 17.2 979 103.6 16.1 979 105.2 15.5 979 102.1 17.3 979 101.2 92 977 99.3 13.4 Relative j Maximum I 95 � 110.0 94 110.0 95 110.0 93 110.0 98 110.0 94 110.0 95 110.0 95 110.0 95 110.0 94 110.0 93 110.0 95 110.0 93 110,0 95 110.0 96 110.0 95 1.10.0 98 110.0 95 110.0 95 110.0 94 110.0 91 110.0 95 1.1.0.0 92 110.0 93 110.0 98 JJ1 110.0 96 I 110.0 91 110.0 96 110.0 95 110.0 93 110.0 99 110,0 93 110.0 94 110.0 95 110.0 95 110.0 93 . 110.0 110.0 90 110.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California 'Pest No. f Date Tested I Location MM 08-16-05 NN ; 08-16-05 00 08-16-05 PP 08-16-05 TEST RESULTS S PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Den,city % Moisturc I Rclativc I maximum +, In Place I In Place I Com action I Density Lot 59 Back 977 1 105.1 Lot 60 Back 977 1.03.2 Lot 47 Back 995 102.1 Lot 48 Back 995 104.3 QQ 08-17-05 Lot 68 Back RR 08-17-25 Lot 68 Back SS 08-17-05 Lot 70 Back TT 08-17-05 Lot 70 Back CJC1 08-17-05 Lot 72 Back W 08-17-05 Lot 72 Back W W 08-17-05 Lot 74 Back XX 08-17-05 Lot 74 Back YY j 08-17-05 Lot 75 Back %% ! ()6-17-05 Lot 75 back AAA! 08-17-05 Lot 76 Back BBB 08-17-05 i Lot 76 Back I CCC 08-19-05 i Lot 83 Back DDD 08-19-05 Lot 84 Back EEE 08-19-05 Lot 85 Back FFF : 08-1.9-05 Lot 86 Back GGG 08-19-05 Lot 87 Back HHH! 08-19-05 Lot 75 A 111 : 08-19-05 j Lot 75 A jjj 08-19-05 i Lot 75 A KKK; 09-19-05 1 Lot 75 A LLL 08-19-05 Lot 80 B M 08-19-05 Lot 88 B NNN i 08-19-05 Lot 81 B 000 08-19-05 Lot 816 1 PPP 08-19-05 Lot 82 B QQQ . 0&19.05 Lot 82 B RRR 08-20-05 Lot 75 A SSS 08-20-05 Lot 75 A '11T 08-20-05 'Lot 75 A UUU 08-20-05 Lot 75 A A � 08-22-05 Lot83 B Back B f 08-22-05 Lot 84 B Back 974 108.3 976 103.2 975 i 100.8 977 101.7 975 102.1 933 105.9 975 104.2 977 102.0 974 103.5 976.0 100.4 973.0 105.2 975.0 102.1 971.0 1 1.00.5 972.0 101.6 972.0 103.2 972.0 j 104.0 973.0 102A 965.0 94.4 967.0 1.01.7 965.0 106.3 967.0 '100.8 971.5 100.7 973.5 102.3 971.5 101.3 973.5 104.6 971.0 102.9 973.0 100.1 969 102.6 969 104.0 PG 105.1 PC 102.8 1 973.0 108.2 974.0 1 304.3 11.9 15.2 13.6 12.9 11.2 14.4 13.2 15.7 16.3 15.2 18.1 17.4 15.7 13.2 16.7 14.8 17.5 18.5 19.2 20.4 16.9 18.7 17.2 18.4 22.1 19.5 19.2 20.1 17.8 19.2 20,4 95 94 93 95 98 94 92 93 93 96 95 93 95 91 95 93 92 93 94 95 93 90 93 96 92 92 93 92 95 94 91 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 '11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 1.1.0.0 110.0 110.0 110.0 11.0.0 11010 110.0 � 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 7.4 93 110.0 i 7.7 I 95 110.0 6.9 96 110.0 7.3 93 1 110.0 13.2 98 110.0 19.g 95 j 110_0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: Ira Quinta, California Test No. Date Tested j Location I C 08-22-052 D + 08-22-05 E 1 08-22-05 Lot 85 B Back Lot 86 B Back Lot 87 B Back 15741 08-23-05 Lot 35 6 Front 1575 08-23-05 Lot 35 B Front 1576 08-23-05 Lot 36 B Front 1577 08-23-05 Lot 36 B Front 1578• 0823-05 I Lot 35 B Back 1579 OZ3-05 Lot 35 B Back 1580 08-23-05 Lot 36 B Back 1581 08-23-05 Lot 36 8 Back 7582+ 08-23-05 Lot 35 B Front 1583 08-23-05 [,ot 35 B Front 1584 08-23-05 Lot 36 B Front 1585 08-23-05 Lot 36 B Front 1586 08-23-05 Lot 35 B Back, 1587 08-23,05 Lot 35 B Back 1588 08-23-05 Lot 36 B Back 1589 08-23-05 Lot 36 B Back A 08-23-05 Lot 77 B Back B 08-23-05 Lot 77 B Back C 08-23-05 Lot75 B Back D 08-23-05 Lot 75 B Back E ? 08-23-05 Lot 76 B Back F 08-23-05 Lot 76 B Back C 08-23-05 Lot 77 B Back H ! 08-23-05 Lot 77 B Back 15901 08-24-05 Lot 34 B Front 1591i 08-24-05 Lot M B Front 1592; 08-24-05 Lot 34 B Back 15931 08-24-05 Lot 34 B Back 1594 j 08-24-05 Lot 35 B Front 15951 08-24-05 'Lot 35 B Front 1596 08-24-05 1 Lot 36 B Back 1.597 08-24-05 I Lot 36 B Back 1598 08-24-05 J� Lot 34 B Back 1599 08-24-05 Lot 34 B Back 1600 - 08-24-05 1 Lot 34 B Back 16011 08-24-05 1 Lot 34 B Back TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation DryDensity� °oMoisture In Place In Place � E 974.0 102.9 17.7 974.0 105.2 16.9 975.0 100.9 1.8.2 989 103.4 8.8 991 101.5 9.9 990 101.4 12,5 992 105.0 10.7 984 ? 104.3 1.012 986 102.2 11.7 984 100.8 9.1 986 J 104.5 ! 8.4 993 106.7 8.9 995 103.3 10.4 994 101.0 7.9 996 •I05.4 9.2 988 104.6 11.8 990 100.9 10.6 988 102.3 10A 990 101.7 I 9.0 966.0 107.1 12.6 968.0 105.4 16,2 967.5 98.1 22.9 967.5 98.1 22.9 967,0 107.8 i 1.8.2 969.0 101.2 16.7 966.0 105.9 17.2 968.0 103.1 15.1 992 993,5 985 987 996 997 992 994 988.5 990.5 992 993 Relative Maximum impaction Density 94 110.0 95 110.0 92 110.0 94 i 110.0 92 llE 110.0 92 f 110.0 95 11 0.0 95 110.0 93 110.0 92 110.0 95 110.0 97 110.0 94 110.0 92 110.0 96 110.0 95 110.0 93 110.0 93 11.0.0 92 110.0 97 110.0 95 1.10.0 89* 110.0 W 110.0 97 110.0 92 110.0 95 110.0 94 110.0 103.3 1 8.6 1 94 1 110.0 102.1 10.5 93 110.0 1.06.0 9,4 96 ! 11010 103.9 8.8 94 ! 110.0 105.5 12.1 96 1100 104.4 1 11.3 95 110.0 106.9 10.0 97 110.0 102.8 13.5 93 11010 100.7 11.0 92 110.0 102.5 9.5 93 11.0.0 105.8 8,7 96 110.0 104.0 10.4 i 95 0 0 DATE: March 2, 2006 Sladden Enkineerin¢ PROJECT NAME; Madison Club LOCATION: La Quinta, California Test No. 1 Date Tested ` Location 1602 08-25-05 Lot 3413 Front 1603 08-25-05 Lot 34 B Back 1604 08-25-052 Lot 35 B Front 1605 08-25-05 1 Lot 35 B Back 1606 08-25-05 Lot 36 B Front 1607 08-25-05 Lot 36 b Back 1608 06-26-05 Lot 35 B Hack A 08-25-05 Lot 66 B Back B 08-25-05 Lot 66 B Back C 08-25-05 Lot 64B Back D 08-25-05 Lot 64 B hack E { 08-25-05 Lot 65 B Back F 08-25-05 Lot 65 6 Back C 08-25-05 Lot 64 B Back H 08-25-05 Lot 64 B Back ! 08-25-05 Lot 66 B Back J 08-25-05 Lot 66 B Back K 08-25-05 Tot 65 B Back L 08-25-05 Lot 65 B Back M. 08-25-05 Lot 67 B Back N 08-25-05 Lot 67 B Back 0 1 08-25-05 Lot 67 B Back P I 08-25-05 i. Lot 67 B Back 16091 08-26-05 Lot 33 B Center 1610 08-26-05 Lot 34 8 Center 16111 08-26-05 I Lot 35 B Center 1612, 08-26-05 l Lot 36 B Center 16131 08-26,05 Lot 34 B Back 16141 08-26-05 Lot 35 B Back 1615; 08-26-05 Lot 35 B Back 1616' 08-26-05 Lot 36 H Front 16171 08-26-05 Lot 36 B Back 16181 08-26-05 Lot 7513 Front 16191 08-26-05 1 Lot 75 B Front 1620 08-26-05 Lot 76 B Front 1. 162I 08-26-05 1 Lot 76 B Front 1622 1623 *1624 08-29-05 I.,ot 55 6 Hack 08-29-05 Lot 55 B Back 08-29-05 Lot 58 B Back TEST RESULTS PROJECT NO; 522-4810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture Relative Maximum In Placc in Placc Compaction DenLi ' I 995 100.4. 9.1 91. 110.0 994.5 102.3 13.7 93 1 110.0 998 105.1 11.0 96 1 110.0 992 103.6 9.0 1 94 110.0 997.5 107,1 8.6 97 110.0 996 104.0 10.4 95 110,0 994 105.5 12.6 96 110.0 997.0 104.1 13.2 95 110.0 999.0 1.01..2 14.9 92 110.0 978.0 106.3 15.6 96 110.0 980.0 102.9 12.9 94 110.0 977.0 103.7 13.9 93 110.0 979.0 104.2 15.2 95 { 110.0 978.0 1 109.0 13.9 99 j 11.0.0 980.0 101.4 17.2 92 ! 110.0 977.0 103.9 '19'5 95 110.0 979.0 106.2 14.7 96 110.0 979.0 101.3 17.0 92 110.0 979.0 105.3 1.3.4 95 110.0 976.0 105.1 13.9 95 11.0.0 978.0 102.4 13.0 93 110.0 976.0 104.7 ! 13.6 95 ` 110.0 978.0 101.8 11.9 93. V 110.0 992 101.1 11.3 1 92 110,0 994. 102.5 14.1 93 110.0 994 105.3 12.4 96 11.0.0 995 101.7 11.3 92 11.0.0 995.5 *103,6 10.0 i , 94 110.0 995.5 100.1 8.3 91 11.0.0 997 101.8 13.4 93 110.0 996,5 1 106,'] 13.2 96 110.0 997.5 104.0 12.5 95 110.0 966 1 101.3 16.9 90 112.0 968 94.5 20.4 84* 112.0 966 103.3 15.5 92 112.0 968 102.0 I 14.3 91 11.2.0 981,0 108.2 15.5 91 11.9.0 983 102.5 14.9 92 112.0 979,5 105,4 19.2 94 112.0 DATE: March 2, 2006 .Madden Engineering PROJECT NAME; Madison Club LOCATION: La Quinta, California Test No. I Date Tested Location I _ 1625 08-29-05 Lot 58 B Back 1626 08-29-05 Lot 54 B Back 16271 08-29-05 Lot 54 B Back 1628 08-29-05 Lot 53 13 Front 16291 08-29-05 Lot 53 Front 1630E 08-29-05 Lot 56 B Front 1631: 08-29-05 Lot 56 B Front 1632 08-29-05 Lot 57 B Front 1633 } 08-29-05 Lot 57 B Front 1634; 08-29-05 Lot 54 B Front 1635 i 08-29-05 Lot 54 B Front 1636� 08-29-05 Lot 55 B Front 1637 08-29-05 Lot 55 B Front 1638'�' 08-29-05 + Lot 58 B Front 16391 08-29-05 Lot 58 B Front 1640 i 08-29-05 f Lot 56 B Back 16411 08-29-05 ; Lot 56 B Back 1642 08-29-05 Lot 57 B Back 16431 i 08-29-05 Lot 57 B Back 16441 08-30-05 Lot 53 B Back 1645 08-30-05 Lot 54 B Back 1646 08-30-05 Lot 55 B Back 1.647: 08-30-05 1 Lot 56 B Back 1648 ! 08-30-05 Lot 57 8 Back 1649 j 08-30-05 Lot 58 B Back 16501 08-30-05 Lot 59 B Back 1651 08-30-05 Lot 59 B Back 1.652 ! 08-30-05 Lot 60 B Back 1653 08-30-05 Lot 60 B Back 1654 08-30-05 Lot 35 B Front 1655 08-30-05 ! Lot 36 B Front 16561 08-30-05 Lot 35 B Back 1657 08-30-05 Lot 35 B Back 1658 08-30-05 Lot 36 B Back 1659 08-30-05 Lot 36 B Back 1660 1661 1662 1663 08-31-05 Lot 59 B Front 08-31-05 Lot 59 B 'Front 08-31-05 Lot 60B Front 08-31-05 Lot 60 B Front TEST RESULTS PROJECT NO: 5224810 REPORT NO: 06-02-120 Elcvation Dry Denaity� % Moisture relative Maximum In Place In Place Camnactibn npncih, 981.5 981 983 980 982.0 981 983 981 983 781 983 983. 983 980 982 981 983 980 982 984 985 985 984.5 984.0 983.0 979.0 981.0 979.0 981,0 999 999.5 998 999 998.5 f 1000 105.6 103.8 103.4 106.5 102.3 108,9 107.6 1.04,8 103.4 107.2 105.6 104,0 105.3 1.03,3 101.5 108.0 106.1 105.5 104.7 105.9 106.5 108.9 102.3 104.2 107.3 103.1 100.8 105.2 103.4 104.1 106.8 102.2 101.3 105.1 103,0 I 16.7 16.0 15.3 14.7 17.3 16.5 13.2 15.1 12.0 11,6 13.1 13,8 12.6 10.9 3.2.4 11.3 1.5.0 14.4 11.9 16.6 12.5 9.8 15.2 13.9 17.1 16.4 11,9 13.7 15.5 1.4,3 15.2 13.1 1.:1..8 13.3 14,7 94 93 92 95 91 92 96 94 92 96 94 93 94 92 91 93 95 94 93 96 96 99 93 95 97 94 92 95 94 93 95 91 90 91 92 112.0 112.0 112.0 112.0 112.0 1.19.0 112.0 112.0 112.0 112.0 112.0 1.12.0 112,0 112.0 112.0 112,0 112.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 112.0 1.12,0 112,0 112.0 112.0 112.0 982,, "12 12.8 94 110.0 984.0 102.3 15.5 93 110.0 982,0 106,8 10.9 95 110.0 984.0 102.4 11.2 93 110_0 DATE: March 2, 2006 Madder: En-aineerine PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. Date Tested Location A 1664 1665 1666 1661 1668 1669 1670 1671 1672 1673 1674 08-31-03 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 Lot 64 B Center Lot 61 8 Center Lot 61 B Center Lot 59 B Back Lot 59 B Back Lot 601113ack Lot 60 B Back Lot 31 B front Lot 31 B Back Lot 3213 Front Lot 32 B Back 1675 09-01 -05 Lot 60 B Front 1676 09-01-05 Lot 61 B Front 1677 09-01-05 Lot 61 B Front 1.675 09-01-05 Lot 62 B Front 1679 09-01-05 Lot 62 B Front 1680 09-01-05 Lot 6313 Front 1681 09-01-05 Lot 63 B Front 1682 09-01-05 Lot 64 B Front 16831 09-01-05 Lot 64 B Front 16841 09-01-05 I Lot 64 B Back 1685, 09-01-05 Isot 64 B Back 16861 09-01-05 Lot 63 B Back 16871 09-01-05 Lot 63 B 8Dck 1688 09-01-05 Lot 62 B Back 1689 09-01-05 Lot 62 B Back 16901 09-01-05 Lot 61 B Back 1691 09-01-()5 Lot 61 B Back I 16921 09-07-05 Lot 103 B Front 1693 09-07-05 Lot 103 B Center 1694 09-07-05 Lot 103 B Back 1695 09-07-05 Lot 104 B Front 1696 09-07-05 Lot 1.04 B Center 1697 09-07-05 Lot 104 B Back 1698 09-07-05 Lot 60 B Front 1699 09-07-05 Lot 60 B Back 1700 09-07-05 Lot 60 B Center 1701 09-07-05 l Lot 61 B Front 1,702 09-07-05 j Lot: 61 B Back TEST RESULTS Elevation 975.0 977,0 979.0 982.0 984.0 982.0 984.0 993 1 995 993,5 995 PROJECT NO: 522-4810 REPORT NO: 06-02-120 D Den;sitY ry % Momturc In Place In Place 104.9 13.8 985.0 981.0 983.0 978.0 980.0 979.0 981.0 981..0 983.0 f 980.0 I 982 979 981.0 979.0 i 981.0 981.0 985.0 PC PG PG PC PG PG 986 985.5 986 986 985.5 103.2 106.4 102.2 105.6 104.3 106.8 101.3 100.4 102.5 101.8 102.7 99.1 107.6 100.4 103.3 1.00.2 104.2 165.4 106.9 103.7 103,2 101.4 107.2 100.2 105.8 103.6 102.9 107.1 105.4 104.3 106.0 103.3 104.5 107.3 103.5 103.7 104.5 10'1.3 15,2 14.7 15,8 11.9 14,3 113.6 8.1 7.6 9.3 8.4 15.4 17.7 14.6 12.8 17.4 13.7 13.3 15.2 16.3 14.4 15.2 13.9 16.3 15.4 14.6 15.9 15.3 8.8 10.2 9.7 10.5 8.7 8.1 9.9 12.5 13.4 11.2 14.1 Kela[lve I LVIdAmua111 rsmnaction I Dellsity 95 94 96 93 96 95 97 92 91 93 93 94 90 98 91 94 91 95 95 97 95 94 92 97 91 96 95 94 96 94 93 95 92 93 96 92 93 93 90 110.0 110.0 110.0 1.10.0 110.0 10.0 110.0 110.0 110.0 110.0 110.0 3 110.0 110.0 110.0 110.0 1 I 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 ' 110.0 110.0 110.0 110.0 110.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La' Quinta, California Test No. I Date 'Tested 1703 09-07-05 1704 09-07-05 1705 09-07-05 L00at'ion Lot 61 B Center I,Ot 62 B Front Lot 62 B Back 1706 09-08-05 Retest # 1104 1707 09-08-05 Retest # 1.3.15 1708 09-08-03 Retest # 1105 1709 09-08-05 Lot 10813 Front 1710 09-08-05 Lot 108 B Back 17.1.1. ' 09-08-05 Lot 112 B Front 1712 09-08-05 I Lot112 B Back 1713: 09-08-05 Lot 113 B Front 17141 09-08-05 Lot 113 1) Front 1715 09-08-05 Lot 113 B Back 1716 09-08-05 Lot 113 B Back 1717 09-08-05 Lot 11413 Front 1.718 09-08-05 Lot 114 B Back 1719 09-08-05 Lot 116 B Front 1720 09-08-05 Lot 116 B Back 1721 09-08-05 Lot 106 B Front 1722 09-08-05 Lot 106 B Center 1723 09-08-05 Lot 106 B Back 17241 09-08-05 Lot 107 B Front 17251 09-08-05 Lot 107 B Back 1726 09-08-05 Lot 108 B Front 1727! 09-08-05 Lot 108 B Back 1728 09-08-05 Lot 108 B Center 1729 09-08-05 Lot 109 B Front 1730 09-08-05 Lot 109 B Back 1731 09-08-05 Lot 110 B Front 1732 09-08-05 Lot 110 8 Back 1733 09-08-05 Lot 113 B Front 1734 09-08-05 Lot 113 B Back 1735 09-08-05 i l.,ot 11.3 8 Center I Contour Grading 17361 09-12-05 Per Plan 17371 09-12-05 1 Per Plan 17381 09-1.2-05 I Per flan 17391 09-12-05 Per Plan 1740 09-12-05 Per Plan TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density l % Moisture ' Relative I ,Maximum In Place ! I in Place Compaction Densi[ 985.5 1.03.5 � 12.6 92 112,0 983 105.5 11.2 94 112.0 983.5 101.0 I 10.7 90 1.12.0 103.4 9.0 92 112.0 104.6 ' 3 0.3 93 112.0 1 101..9 8.7 91 112,0 980 100.8 8.5 90 112.0 980 102.6 10.6 92 172.0 981 105.5 1.1..3 94 112.0 981 105.2 9.4 94 112.0 979 104,3 ' 12.2 93 112.0 981 103.1 11.0 92 112.0 979.5 100.6 13.3 90 112.0 981.5 106.1 8.3 95 112.0 983 104.3 12.7 93 112.0 983 104,1 1.0.9 93 112.0 979 96.3 5.4* 86* 112.0 979 95.1 4.63* i 85* 11.2.0 PG 107,2 8.1 96 112,0 PC i 105.3 11.4 i i 94 I 112.0 PG 106.5 9.9 95 1.12.0 PG 104.1 8.8 93 112.0 PG 102.6 7.9 92 112.0 PG 101,4 10.7 91 J 1.12,0 PG 105.5 13.0 94 112.0 PG 103,7 1.1.8 93 11.2.0 PG 103.4 10.9 92 r 112.0 PC I 106.6 9.4 95 ; 112.0 PG 107,7 7.8 96 1 112,0 PG '106.3 8.4 95 112.0 PC 1.08.5 8.9 ; 97 112,0 15G 105.3 10.5 94 112.0 PG 106.9 9.8 95 1.12.0 980 100.4 12.3 90 112.0 980 108.1 9.6 97 112.0 979.5 95.7 10.3 85* 132.0 980 96.3 12.8 86* 112.0 979.5 103.5 1 11.1 93 112.0 DATE: March 2, 2006 Sladden Enzineerine TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. mate Tested j Location Elevation Dry Density ` % Moisture 1 Relative Maximum In Place I In Place Cam action ` Densi 1741 09-12-05 Per flan 980.5 104.0 10.2 93 1.12.0 1742 09-12-05 Retest # 1719 '103.2 8.4 92- 112.0 1743 09-12-05 ' Retest # 1720 101.5 8.9 91 112.0 17441 09-12-05 Lot 116 B Front PC 106.3 1,1.4 95 112.0 17451 09-12-05 Lot 116 5 (lack PG 104.7 13.5 93 112.0 1746 09-12-05 Lot 116 B Center PC 104.1 12.6 93 112.0 1747 09-12-05 Lot 50 B Front 985 104.6 9.8 93 112.0 1748 09-13-05 ` Lot 50 B Front 987 104.8 12.3 94 112.0 1.749 1 09-13-05 Lot 49 B Back 986 1.06.3 10.5 95 112.0 1750 09-13-05 Lot 4913 tack 988 103.5 13.2 92 112.0 1751 09-13-05 Lot 50 B Back 985 107.1 11.3 96 112.0 1752 09-13-05 Lot 50 B Back 987 102.9 14.0 92 112.0 1753 09-13-05 I,.ot 49 B Front 982.5 105.7 13.4 94 112.0 1754. 09-1.3-05 Lot 46 B Front 987.5 103.5 11.1 92 j 112.0 17551 09-13-05 Lot 8713 Front PG 102.8 9.3 92 112.0 1756 09-1.3-05 Lot 87 B Back PG 104.0 8.8 93 j 112.0 1757- 09-13-05 Lot 86 B Front PG 106,4 10.5 95 112.0 17581 09-13-05 Lot 86 B Back PG 105.5 I 9.1 94 112.0 1759 09.13-05 Lot 85 B Front PG 103.3 12.1 ` 92 112.0 1760 09-13-05 Lot 85 8 Back PG 107.1 8.7 96 112.0 17611 09-13-05. Lot 84 B Front PG 101.8 8.5 91 112.30 1762 09-13-05 Lot 84 B Back PG 104.6 10.4 ' 93 112.0 1763 09-13-05 L.ot 83 B Front PG 100.8 9.3 90 112,0 1764 ' 09-13-05 Lot 83 B Back PG 101.4 I 9.9 91 112.0 1765 09-13-05 Lot 82 B Front PC, 96.5 1 12.2 83* 112.0 1766 09-13-05 I of 81 B Front PG 97.1 1.1.4 I 89" 112.0 1767 09-13-05 Lot 80 8 Front PG � 95.4 I 1.0.2 � 85 112.(] 1768 09-14-05 Retest # 1738 104.1 14.4 93 112.0 1769 09-14-05 Retest # 1739 101.5 11.5 91 112.0 1770 i 09-14-05 Per Plan 981.5 101.6 12,4 91 112.0 1771 09-14-05 Per Plan 982 105.5 12.9 94 112.0 1772 09-14-05 Per flan 982 103.7 10.7 93 i 112.0 1.77; 3 09-14-05 Per Plan 983 100.9 I 15.1 9Q 112,Q 1.771 09-14-05 Per flan 983.5 105.4. 14.2 94 112.0 1775 09-14-05 Per Plan 983.5 102.7 10.7 92 112.0 1776 09-14-05 Per Plan 984. 107.1 12.0 96 112.0 1777 09-14-05 Per Plan 983.5 105.3 14.1 94 112.0 1778 09-14.-05 Per Plan 984 104.0 16.7 93 i 1.12.0 1779 09-14-05 Per Plan 983.5 102.3 12.5 91 112.0 DATE: March 2, 2006 Slradden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No, J Date Tested j Location 7 780 09-15-05 1781 09-15-05 1782 09-15-05 1783 09-15-05 1784 09-15-05 1785j 09-15-05 1786� 09-15-05 17871 09-15-05 1788i 09-15-05 1789! 09-15-05 1790; 09-15-05 1791, 09-15-05 1792 09-15-05 1793i 09-15-05 17941 09-15-05 1795' 09-15-05 17961 09-15-05 17971 09-15-05 1 17981 09-16-05 1799: 09-16-05 1800, 09-16-05 1801! 09-16-05 18021 09-16-05 1803! 09-16-05 18041 09-1.6-05 1805' 09-16-05 1806; 09-16-05 1807 - 09-16-05 18081 09-16-05 18091 09-16-05 1810' 09-16-05 1811' 09-16-05 1812 + 09-16-05 1813� 09-16-05 1.814, 09-16-05 1815 09-16-05 1816 09-16-05 1817 09-16-05 1818� 09-16-05 1819 09-16-05 TEST RESULTS PROJECT NO: 5224810 REPORT NO: 06-02-120 Elevation I Dry Density % Moisture I In Place I in Place Lot 77 B Front 969 Lot 77 0 Back 969 Lot 76 B Front 970 Lot 76 B Back 969.5 Retest # Lot 75 B Front 970 Retest # D 8/23/05 Retest# D 8/23/05 Lot 75 B Back 969.5 Lot 74 B Front 970.5 Lot 74 B Back 970.5 Lot 73 B Front 971.5 Lot 73 6 Back 971.5 Lot 72 B Front 973.5 Lot 72 B Back 973.5 Lot 77 8 Front PG Lot 77 B Back PC Lot 77 B Center PG Lot 70 B Back PC, Lot 70 B Center PG Lot 71 B Back PG Lot 71 Center PC Lot 71 B Front PG Lot 72 B Front PC I.ot 72 B Center PG Lot 72 B Back PC Lot 73 B Back PC Lot 73 B Center PG Lot 73 B Front PG Lot 74 B PC Lot 74 B PC Lot 74 B PC T,ot 75 8 PG Lot 75 B PG Lot 75 6 PC Lot 76 B PG Lot 76 B pC' Lot 76 B PC Lot 21 B Front 990 Lot 67 B Front PC Relative I Maximum 103.4 j 1.1..5 92 112.0 105.1 JI 9.6 94 112.0 101.8 1 13.5 91 112.0 102,1 10.7 91 112.01 104.3 15.1 93 112.0 100.9 14.0 90 112.0 103.3 12.8 92 112.0 105.5 I 16,5 94 112.0 107.2 11.8 96 112.0 1.03.4 14.9 92 112.0 101.1 12.8 90 112.0 106.6 1.3.3 95 112.0 104.0 10.6 93 112.0 108.1 1 11.3 97 112.0 106.2 9.7 95 112.0 10.8 125.0 93 112.0 1.06.9 10,7 95 1.12.0 102.6 11.1 92 11.2,0 1.1.3.0 1115 95 119.0 113.4 9.9 95 11.9.0 116.3 9.4 98 119.0 1.12.8 12.3 I 95 119.0 116.1 10.2 J 98 119.0 111.8 8.7 94 119.0 107.1 10.6 90 112.0 114.0 8.8 96 ' 119.0 106.3 .13.4 95 112.0 115.9 11.0 97 19.0 1173 12,7 99 119.0 112.6 9.8 95 119,0 11.2.111. 14.0 94 119,0 108.1 11.1 97 1 112.0 107.2 8.4 96 112.0 11.6.6 10.7 98 119.0 116.1. 12.4 98 i 119,0 108.3 9.6 97 1 112.0 117.7 8.3 99 119.0 114.4 10.5 96 119.0 Ion� 11.0 I 90 I 112.0 109.1. j 9.4 92 1 119.0 DATE: March 2, 2006 Sladden F-m nevrinn PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Date Tested 18201 09-16-05 1.821. 09-16-05 1822 09-16-05 1823 09-16-05 1824� 09,16-05 1825 09-16-05 1826 09-16-05 1827 09-16-05 1828 09-16-05 1829 09-16-05 18301 09-16-05 1831 09-16-05 1.832 09-16-05 1833 09-16-05 1834 09-16-05 1835 1 09-16-05 Location Lot 67 B Back Lot 67 B Center, Lot 68 B Front Lot 68 B Center Lot 68 B Back Lot 69 B Back Lot 69 B Center Lot 69 B Front Lot 70 B Front Lot 21 B Back Lot 201) Front Lot 20 B Back l.,ot'19 BN Front Lot 19 B Back Lot 18 B Front Lot 18 B Back 1836 09-19-05 Lot 21 B Front 1837 09-19-05 Lot 21 B Back 1838 09-19-05 Lot 20 B Front 18391 09-19-05 Lot 20 B Back 1840, 09-19-05 Lot 19 B Front 1.841 09-1.9-05 1,ot 1913 Bock 1842 09-19-05 Lot 21 B Front 1843 09-19-05 Lot 21 B Back 1.84.4 09-19-05 Lot 2013 Front 1845 09-19-05 ; Lot 20 B Back 1846 ()9-19-05 Lot 19 B Front 1847 09-1905 Lot 19 8 Back 1848 09-20-05 ; Lot 21 B Front 1849 09-20-05 Lot 21 B [lack 1850 09-20-05 Lot 20 B Front 1851 09-20-05 I.,ot 20 B Back 1852 09-20-05 Lot 19 B Front 1853 119-20-05 Lot 19 B Back 1854 09-20-05 Lot 22 B Front 1855 09-20-05 Lot 22 B Back 1856 09-20-05 Lot 23 B Front 1857 09-20-05 Lot 23 B Back 1858 09-20-05 1 Lot 22 B Front TEST RESULTS PROJECT NO: 522-4810 REPORT NO; 06-02-120 Elevation l Dry Density % Moisture Relative Maximum I In Place I In PI cc Com action Dcn%ity PG 108.4 10.1 97 112.0 PC 107.0 9.2 96 112.0 PG 111.5 10.9 94 11.9.0 PC 113.4 8.8 95 119.0 PG 110.9 8.5 93 1 119.0 PG 115.1 13.1 97 119.0 PG 1163 11.5 98 119.0 PG 113.8 12.6 96 119.0 i't ; 114.3 10.0 96 j 119.0 898.5 102.1 13.4 91 112.0 989 1.05.3 10.6 94 112.0 989 101.5 11.9 91 1.1.2.0 988.5 100.9 9.3 90 112.0 988.5 101A 10.7 91 1.12.0 989 103.3 11.8 92 112.0 988.5 102,2 14..1 i 91 1 ` 112.0 991 991 990.5 99"1 990.5 990 992.5 992 j 992 992.5 992.5 992 993.5 993 993 993., 994 993.5 990 990 986 988 991.5 103.1 101.6 105.3 '104.4 101.3 1.02.7 106.1 103.3 104A 100.8 102.0 104.1 100.5 94.3 93.6 99,1 95.3 97.1 101A 101.1 103.3 102.7 104.1 10.0 92 9.6 91, 11A 94 9.3 93 12.4 90 11.8 92 13.1. 95 10.9 92 8.8. .93 11.3 90 12.9 91 12.5 93 8.1 90 4.2"' 84" 3.3* 84* 2.9* 88* 4.0" 85" 3.6* 87* 9.1 92 8.3 92 10.0 94 9.6 93 &0 95 112:0 112.0 1.12.0 112.0 1.1.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 1.12,0 112.0 112.0 112.0 112.0 112.0 1.10.0 110.0 110,0 j 110.0 } 110.0 IRATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. � Date Tested I Location 1859 : 09-20-05 Lot 22 B Back 18601 09-20-05 Lot 23 B Front 1861 1 09-20-05 Lot 23 B Back 1862 09-21-05 Retest# 1863 09-21-05 Retest # 1864 09-21-05 Retest # 1865 09-21-05 Retest # 1866 09-21-05 Retest # 1867 09-21-05 I I Lot 21 B Front 1868 09-21-05 l..ot 21 B Back 1869 09-21-05 Lot 20 B Front 1.870 09-21-05 Lot 20 B Back 18711 09-21-05 Lot 19 B Front 1872 09-21-05 Lot 19 B Back 18731 09-21-05 Lot 17 13 Front 18741 09-21-05 Lot 17 B Back 1875, 09-21-05 Lot 16 8 Front 1876' 09-21-05 Lot 16 B Back 18771 09-22-05 1,ot3013 Front 1878 ' 09-22-05 Lot 30 B Front '1879 09-22-05 Lot 30 B Back 1880 09-22-05 Lot 30 B Back 1881 ! 09-22-05 { Lot 31 B Front 1882 09-22-05 Lot 31 B Front 1883! 09-22-05 Lot 31 B Back 1884i 09-22-05 Lot 31 B Back 1885' 09-22-05 Lot 30 B Back 1.886, 09-22-05 Lot 30 B Back 1887 09-22-05 Lot 18 B Front 1888 09-22-05 Lot 18 B Back 1889! 09-22-05 Lot 17 B Front 1890 j 09-22-05 Lot 17 B Back 1891 J 09-22-05 Lot 16 B Front 1892 09-22-05 i Lot 16 B Back 1893 1894 1895 1896 09-23-05 Lot 1.7 Front 09-23-05 Lot 17 Front 09-23-05 Lot 18 Front 09-23-05 Lot 18 Back TEST RESULTS PROTECT NO: 522-4810 REPORT NO.06-02-120 0evation Dry Density % Moisture Relative Maximum In Place In Place Compaction Density 991 I 101.6 11.3 92 110.0 987.5 94.0 4.5* 85* 110.0 989 I 94.1 3.3 86* 110.0 102.6 12.5 92 112.0 105.3 j 1.4.8 94 112.0 104.7 I 15.7 93 112,0 100.8 11.3 90 112.0 103.0 9.9 92 112.0 994.5 95.1 13.3 93 102.0 995 96.5 15.1 95 102.0 995 94.1 12.4 92 102.0 994.5 97.2 11.8 95 102.0 995 93.1 14,7 91 102.0 995 97.3 10.9 95 102.0 989 103.1 8.7 94 110.0 989.5 100.6 12.1 91 110.0 989.5 ff 101.5 9.6 92 110.0 990 I 102.0 13.4 93 110.0 993 101.4 10.3 91 112,0 995 103.0 1.4.1 92 112.0 990 104.5 13.6 93 112.0 992 104.1 12.2 93 112.0 995 100.4 8.8 90 112.0 996.5 106.3 11.4 95 11.2.0 997 102.7 1 15.6 E 92 112.0 998 102.5 14.1 , 92 112.0 994 105.25 1.2.1 1 94 112.0 996 + 106.8 16.3 R 95 112.0 990.5 100.3 9.2 i 91 110,0 990 101.3 10.4 92 110.0 990 102.5 8.7 ! 93 , 110.0 990.5 99.1 9.5 g0 110.0 990.5 99.4 8.1 90 110.0 991 101.0 10.7 92 11,0.0 989.6 99.9 13.6 91 110.0 990.0 99.2 14.74 90 110.0 991.5 101.2 12.9 92 110.0 995.4 99.5 13.1 90 f 110_o DATE: March 2, 2006 Sladden EnQineerinn PROJECT NAME: Madison Club LOCATION: La Quinta, California Tcst No. 1 Date Tested f Location 1897 1898 1899 1900 1901. 09-23-05 09-23-05 09-23-05 09-23-05 09-23-05 TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation I Dry Density % Moisture In Place j In Place Lot 23 Front 996.5 99 Lot 23 Back 989.5 101.7 Lot 24 Front 989.5 99.6 Lot 24 Back 986.5 49.9 Lot 23 Front 989.5 100.4 1902 09-26-05 1 Lot 29 B Front 1903 09-26-05 Lot 29 B Front 1904 09-26-05 Lot 2813 Front 1905 09-26-05 Lot 28 B Front 1906 09-26-05 Lot 2913 Back 1907 09-26-05 Lot 29 B Back 1908 09-26-05 Lot 28 B Back 1909 09-26-05 Lot 28 B Back 1910 09-26-05 Lot 25 B Front 1911 09-26-05 Lot 25 B Front 1912 09-26-05 Lot 25 B Back 1913 09-26-05 Lot 25 B Back 1914 09-26-05 Lot 26 B Front 1915 09-26-05 Lot 26 B Front 19161 09-26-05 Lot 26 B Back 1917 09-26-05 Lot 27 B Front 1918 09-26-05 Lot 27 B Back 1919 09-27-05 Lot 9 B Front 19201 09-27-05 1_,ot 9 B Front 19211 09-27-05 I Lot 9 B Back 1922 09-27-05 Lot 9 B Back 1923 09-27-05 1,ot 1.0 F3 front 1924 09-27-05 Lot 10 B Front 1925 09-27-05 Lot 10 B Back 1926 09-27-05 Lot 10 B Back 1927 09-27-05 Lot 11 B Front 1928 09-27-05 Lot 11 B Front 1929 09-27-05 Lot 11 B Back 1930 09-27-05 Lotl1 B Back 1931 09-27-05 Lot 12 B Front 1932 09-27-05 Lot 12 B Front 1933 09-27-05 Lot 12 B Back 1.934 f 09-27-05 1 Lot 12 B Back 990.5 992 991 992.5 990.5 992.5 990 992 j 989 I 991 990 992 989.5 991.5 991 991.5 991 995 997 995 997 994.5 996.5 994.5 996 994.5 996 994 996 994..5 996.5 994.5 996 1,01.6 103.8 104.0 100.8 100.4 102.0 104.3 101.2 101.8 1.03.4 105.5 102.7 101.0 106.3 100.4 103.3 102.5 101.3 100,9 102.04 102.6 103.5 100.3 99.4 104.1 101.8 100.6 103.9 103.5 1.00.4 99.3 104.4 102.7 18.1 13.2 12.1 15.6 15.9 9.9 11.1 8.6 10.7 1.2.5 10.3 9.5 13.41 16.6 17.1. 13.6 14.8 12.6 10.8 16.0 12.9 11.1 8.4 9.1 11.8 10.7 8.1 12.6 11.0 8.9 10.5 13.1 11A 14.3 10.7 101.1 9.2 12.1 Relative I Maximum 90 92 91 91 91 92 94 95 92 91. 93 95 92 93 92 96 93 92 97 91 94 93 92 92 93 93 94 91 90 95 93 91 94 94 91 90 95 93 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 130.0 110.0 110.0 110.0 110.0 110.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110,0 110.0 110.0 110.0 110.0 110.0 ` 110.0 110.0 T 10.0 110.0 110.0 110.0 1 110.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Teat No. I Date'1'ested Location 1935 09-28-05 Lot $ Front 19361 09-28-05 Lot 9 B Back 1.9371 09-28-05 Lot 10 B Front 1938 09-28-05 + Lot 10 B Back 19391 09-28-05 Lot 118 Front 1940 09-28-05 Lot 11 B Back 1.941.1 09-28-05 Lot 12 B Front 1942 # 09-28-05 Lot 12 B Back 1.943; 09-28-05 Lot 25 B Front 1944 09-28-05 Lot 25 B Back 194.51: 09-28-05 Lot 26 B Front 1946' 09-28-05 Lot 26 B Back 19471 09-28-05 Lot 27 B Front 19481 09-28-05 Lot 27 B Back 19491 09-28-05 Lot 23 B Front 1950 09-28-05 Lot 23 B Back 1951 09-28-05 Lot 24 B Front 1952 09-28-05 ! Lot 24 B Back 1953 09-28-05 I Lot 2313 Front 1954+, 09-28-05 I Lot 23 B Back 1955j 09-28-05 Lot 2413 Front 1956 09-28-05 Lot 24 B Back 1957 09-28-05 Lot 24 B Front 1958; 09-28-05 Lot 24 B Back 1.959? 09-29-05 Lot 9 B Front 19601 09-29-05 1 I.ot 9 B Back 1961 09-29-05 Lot 10 B Front, 1962 09-29-05 Lot 10 B Back 1963 i 09-29-05 i Lot 11 B Front 1964; 09-29-05 Lot 11 B Hack 1965 09-29-05 Lot 12 9 Front 1966' 09-29-05 Lot 12 B Back 1967 09-29-05 :. Lot 1.3 B Front 1968 09-29-05 i Lot 13 B Back 1969 10-03-05 Lot 9 B Front 1970 10-03-()5 Lot 9 B Back 1971 10-03-05 Lot 10 B Front 1972 10-03-05 Lot 10 B Back 1973' 10-03-05 ; Lot 11 B Front TEST RE, SULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Wevation Dry Density % Moisture In Place I In Place Relative I Maximum 999 100.2 8.1 91 110.0 999 1.00.6 11.6 1 91 110.0 998 104.1 10.5 95 110.0 998.5 10210 1.4.1. 93 110.0 998 102.8 12.7 93 f 110.0 9975 105.1 1.1.0 96 110.0 998 103.3 9.7 94 1.10.0 998.5 101.4 1.2.5 92 110.0 993 104.3 ' 10.6 95 110.0 994 103.0 14.4 94 110.0 993.5 ' 100.6 12.7 91 1.10.0 993 101.1. 1.1.1 92 110.0 993.5 105.6 1 13.6 96 ' 110.0 993 1 1.02.5 15.1 93 i 110.0 9W5 102.8 1 1.3.8 93 110.0 991.5 100.5 10.9 91 11.0.0 989.5 104.4 13.6 95 110.0 988.5 101.5 11.3 92 110.0 992.5 106.1 14.5 96 110,0 993.5 105.6 12.7 96 110.0 991.5 f 102.9 11.8 94 , 110.0 990.5 104.1 12.8 95 f 110.0 993.5 100.5 10,0 91 110.0 992.5 102.6 11.9 93 110.0 1000.5 105.3 13.1 96 110.0 1000.5 1.02.6 15.7 93 110.0 1000 i 100.3 1.5.4 91 110.0 1000 1, 03.1, 12.8 94 110.0 999.5 101.5 a 16.3 92 110.0 999 101.8 14.0 93 110.0 1000 100.5 16.8 91 110.0 999.5 106.6 13.0 97 110.0 995 103.9 11.7 94 110.0 994.5 3 99.4 15.9 i 90 110.0 1002.5 106.1 11.0 i 95 ' 112.0 1002.5 108.2 9.8 1 97 112.0 1002 104.7 10.6 93 112.0 1001.5 104.3 10.4 93 112.0 1001 107.5 9.5 96 112.0 DATE: March 2, 2006 Sladden Envinpnrinn TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested 1 Location Lot 11 B Back Elevation 1001.5 Dry Dcn%ity In Place I I 1 103.4 °/a Moisture In Place 13.1. Relative Com action 92 Maximum Density 1,10.0 1974 10 03-05 1975 10-03-05 � Lot 13 B Front 996 � 101.$ � 12.3 I 91 112.0 1076 10-03-05 1 Lot 13 B Back 996 103.9 11.2 93 112A 1977 1.978 1979 1960 1981 1982 1.983 1984• 1985� 1986! 19871 19881 19891 1.990' 1991� 1992I 19931 19941 1995` 19961 1997 1998 1999 2000 20011 2002� 2003 20041 2005 2006 2007 2008{ 2009 2010 2011 2012. 10-03-05 10-03-05 10-03-05 10-03-05 10-03-05 10-03-05 10-04-05 10-04-05 1,0-04-05 10-04-05 10-04-05 10-04-05 10-04-05 10-04-05 10-04-05 10-04-05 10-04-05 10-04-05 10-04-05 10-04-05 Lot 23 B Front 994.5 100.3 8.8 Lot 23 B Back 995.5 102.7 11.5 Lot 24 B Front 995.5 103.8 13.7 Lot 24 B Back 994.5 100.4 12.6 Lot 2513 Front 995 99.5 14.1 Lot 25 B Back 996 104.4 10.2 Lot 3 A Back 993 104.3 17.1 Lot 3 A Back 994.5 100.4 12.6 Lot 4 A Back 993 96.1 21.3* Lot 4 A Back 995 98.4 1511 Lot 5 A Back 995 98.1 1 20.6* Lot 5 A Back 996 101.3 14.4 Lot 6 A Back 993.5 101.6 9.1 Lot 6 A Back 995.5 102.9 13.4 Lot 17 B Front 991.5 103.6 1.0.5 Lot 17 B Back 992 103,8 12.7 Lot 16 B Front 992.5 19.5* 87* Lot 16 B Back 993 101.3 13.3 Lot 15 B Front 990 100.4 11.2 Lot 15 B Back 990 104.1 i 12.3 10-05-05 Lot 3 A tack 996 96.1 i 23.4 10-05-05 I Lot A Back 997 97A I 11.8 10-05-05 Retest # 1985 100,2 ` 20.1 10-05-05 Retest # 1986 102.3 12.9 10-05-05 Retest # 1987 95.2 1 20.7" i 10-05-05 Lot 5 A hack 996 96.9 13.5 '10-05-05 Lot 6 A Back 996.5 102A 15.2 10-05-05 ; Lot 6 A Back 997.5 1033 14.3 10-05-05 Lot 6 A Front 994 101.1 10.6 10-05-05 ! Lot 6 A Front 996 104.5 9.3 10-05-05 i Lot 7 A Front 994 100.8 11.4 10-05-05 Lot A Front 996 961 9.3 10-05-05 Lot 3 A Front 994 104.4 14.4 10-05-05 Lot 3 A Front 996 103.8 1310 10-05-05 Lot 4 .A Front 993.5 102.7 15.3 '10-05-05 Lot 4 A Front 995.5 98.1 11.6 91 93 94 91 90 95 95 91 87* 89* W 92 92 94 94 94 110.0 92 91 95 87* 84* 91 93 87* 88* 93 94 92 95 92 87w 95 94 93 89* 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110,0 110.0 110.0 'I M0 110.0 110.0 110.0 1.10.0 11010 110.0 110.0 110.0 110.0 1,10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 DATE: March 2, 2006 Sladden ,Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. Date Tested Location r 2014 2014 10-05-05 10-05-05 Lot 5 A Front Lot 5 A Front 201,5 10-06-05 1 Retest # 1997 20161 10-06-05 Retest # 1998 2017 10-06.05 Lot 4 A Back 2018 10-06-05 Lot 4 A Back 2019 10-06-05 Retest # 2001 2020 10-06-05 Retest # 2002 2021 10-06-05 Lot A Back 2022 10-06-05 Lot A Back 2023 10-06-05 ' Lot 7 A Back 2024 10-06-05 1 Lot 7 A Back 2025 10-06--05 l Retest # 2012 2026 10-06-05 Lot A Front 2027 10-06-05 Lot A Front 2028 10-06-05 Lots A Front 2029 10-06-05 Lot A Front 2030 10-06-05 ' Lot 6 A Front 2031 10-06-05 a Retest # 2008 2032 10-06-05 Lot 7 A 'Front 2033 10-07-05 Lot 3 A Back 2034 2035 f 10-07-05 ' Lot A Back 10-07-05 Lot 4 A Back 2036 10-07-05 Lot 4 A Back 2037 10-07-05 Lot 5 A Back 2038 10-07-05 Lot A Back 20391 10-07-05 Lot 6 A Back 2040 10-07-05 Lot 6 A [lack 2041 10-07-05 ' Lot 7 A Back 2042 10-07-05 Lot 7 A Back 2043 10-07-05 Lot 4 A Front 2044 10-07-05 Lot 4 A Front 2045 10-07-05 Lot 5 A Front 2046 10-07-05 Lot A Front 2047 10-07-05 Lot A Front 2048 10-07-05 Lot 6 A Front 2049 1.0-07-05 Lot 7 A Front 2050 10-07-05 , Lot 7 A Front TEST RESULTS PROJECT NO: 5224810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture Relative Maximum 1 In Place In Place I C.nmroctjpn J ri �JAIN 994.5 104.4 14.8 95 110.0 996.5 101.0 12.3 92 110.0 101.8 10.3 93** 110.0 108.3 14.6 98** 110.0 996.5 101.4 15.1 1 92 110.0 998.5 1 102.8 14.0 93 110.0 1 99.5 16.1 90** 110.0 1.00.3 14.3 91 "* 110.0 998.5 103.1 10.4 94 110.0 1000 i 102,0 11,6 93 110.0 996 104.4 13.1 95 110,0 998 101.7 9.6 92 110.0 106.9 8.8 97** 110,0 997.5 103.7 12.6 94 110.0 997.5 103.5 11.3 94 110.0 998 100.1 } 15.4 91 110.0 997,5 103,2 i 10.7 1 96 10.0 999 101.6 14.4 1 92 110.0 99.6 13.3 91** 110.0 998 100.8 7.6.0 92 110.0 999 101.3 8.6 92 110.0 1001 102.4 11.5 f 93 110.0 1000 99.3 10.0 90 110.0 1001.5 99.2 9.1 90 1.1.0.0 998 103.6 8.9 94 110.0 1000 1 102.8 10.7 i 93 110.0 1001.5 102.5 12.8 f 93 110,0 1003 104.1 11,0 ° 95 110.0 1000 100,6 9.9 1 91 110.0 1002 103.4 18.0 i 94 110.0 999.5 106.5 8.4 97 110.0 1001 ! 104.0 12.5 i 95 110.0 1000 j II 104.8 11.3 + 95 110.0 1001.5 101.5 13.4 92 110.0 1000.5 102.6 9.7 93 110.0 .1.002 100,2 9.5 91 '110.0 1000 102.4 11.1 93 110,0 1001.5 f i 99,6 10,3 I 91 DATE: Marcia 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Date Tested � Location 2051 10-10-05� Lot A Back 2052 10-10-05 1 Lot 4 A Back 2053 10-10-05 Lot5 A Back 20641 10-10-05 Lot 117 B Front 2055i 10-10-05 Lot117 B Back 2056 10-10-05 l.ot 1181) Front 2057 t 10-10-05 Lot 118 B Back 2058 10-11-05 Lot 3 A Back 2059 10-11-05 1 of 4 A Back 20601 10-11-05 Lot 5 A Back 20611 10-11-05 Lot A Front 2062 �! 10-11-05 Lot 3 A Front 2063': 10-11-05 Lot A Back 2064! 10-11-05 Lot A Back 2065! 10-1.1-05 Lot 5 A Front 20661 10-11-05 Lot A Front 2067� 10-11-05` Lot 7 A Front 2068' 10-1.1-05 ` Lot 3 A Front 2069`. 10-11-05 Lot A Front 2070=. 10-11-05 Lot 5 A Front 2071 10-11-05 Lot A Front 2072 10-11-05 Lot A Front 2073, 10-11-05 Lot 3 A Back 20741 10-11-05 Lot A Back 2075 10-11-05 Lot 5 A Back 20761 10-11-05 Lot A Back 20771 10-11-05 Lot 7 A Back 207$1 10-12-05 Parking Lot 20791 10-12-05 Parking Lot 20801. 10-12-05 Parking Lot 20811 10-12-05 Parking Lot 2082.. 10-12-05 Parking Lot 2083 10-12-05 Parking Lot 20844 10-12-05 i I Parking Lot 2085 10-12-05 Parking Lot i 2086i 10-13-052 Lot A 2087 10-13-05 Lot B 2088 10-13-05 . Lot C TEST RESULTS Elevation PROJECT NO: 522-4810 REPORT NO: 06-02-120 Dry Density + % Moisture Relative Maximum In Place 1 In Place Conpacrian Density 1002 104.5 1002.5 1.01.6 1001.5 101.8 974 92.3 974 93.4 973.5 91.8 973 95.0 1004 11.5.9 1004.5 103.8 1005 1.01.4 1004.5 100.1 1004 106.0 1005.2 109.7 1004.5 1 104.1 1.005 1 105.3 1005.5 j 103.4 1004.5 i 103.8 1002.5 } 105.4 1003 102.6 1003 106.3 1004 100.2 1003 99.4 1002.5 103.5 1003.5 1 101.4 1002 104.0 1004 101.8 1003 102.5 988 1.01..3 98$ 103.6 989 99.3 988.5 105.4 990 j 102.0 990 11)1.3 991 104.1 990.5 102.8 982.5 102.1 983 105.4 985 100.3 11.9 14.8 1.5.3 17.1* 18,9* 20.4* 21.3* *12.0 13.1 14,6 11.8 11.4 8.8 12.9 1.0.6 14.1 13.5 13.5 11.8 14.1 12.0 10.7 12.8 15.6 11.1 9.9 13.3 9.1 8.2 10.3 13.1 11.8 12.9 10.7 13.5 95 110.0 92 110.0 93 110.0 84* 110.0 85w 110.0 83* 110.0 86* 110.0 97 119.0 94 110.0 92 110.0 91 1.10.0 96 110.0 92 1.19.0 95 i 1.10.0 96 110.0 94 110.0 94 110.0 96 110.0 93 110.0 97 110.0 91 110.0 90 110.0 94 110.0 92 110.0 95 110.0 93 110.0 93 110.0 92 110.0 94 1 100.0 90 110.0 96 110.0 93 110.0 92 1.10.0 95 110.0 93 110.0 93 1.10.0 96 110.0 91 110.0 DATE; March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. Date 'rested I Location 2089 1.0-13-05 2090 10-13-05 2091 1.0-13-05 2092 10-13-05 2093 1.0-1.3-05 2094 10-13-05 2095 10-13-05 2096 10-14-05 2097 10-14-05 2098E 10-14-05 2099 10-14-05 2100 10-14-05 2101 10-14-05 21.02 10-14-05 2103 10-14-05 2104 10-14-05 2105� 10-14-05 2106 1.0-24-05 2107 10-24-05 2108 10-24-05 2109 10-24-05 2110, 10-24-05 2111j 10-24-05 2112. 10-24-05 21131 10-24-05 2114 10-24-05 2115 10-24-05 2116 10-24-05 2117 10-24-05 2118 10-24-05 21191 10-24-05 Lot D Lot E Lot F Lot C Lot 1-I Lot Lott Lot A Lot B Lot C Lot D Lot E Lot F Lot G Lot H Lot I Lot Lot A Front Lot 8 A Front Lot A Front Lot 9 A Front Lot 10 A Front Lot 10 A Front Lot11 A Front Lot11 A Front Lot 8 A Back Lot 8 A Hack Lot 9 A Back Lot 9 A Back Lot 10 A Back Lot11 A Back 212010-26-05 1 Lot17 B Front 2121 10-26-05 Lot 1713 Front 2122 10-26-05 Lot 18 B Front 2123 10-26-05 Lot 18 8 Front 2124 10-26-05 Lot 19 B Front 21251 10-26-05 Lot 20 B Front 21261 10-26-05 Lot 20 B Front TEST RESULTS PROJECT NO: 5224810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture In Place I In Placc 985.5 985 987 987.5 987 988 988.5 987 987.5 989.5 990 989.5 991.5 991 989.5 991 992 1000.5 1002.5 1003 1005 1002.5 1004.5 1005 1006 1002.5 1004.5 1.004 1005.5 1006 1006.5 106.1 103.5 101.6 10L2 104.3 107.1 103.1 101.1 101.6 103.9 102.8 99.3 1.04..5 100.8 104.1 103.9 102.5 102.9 105.8 1.03.5 101.4 100.8 1.04.7 99.5 103.0 1.06.1 105.3 101.9 103.4 10-1.9 101.3 993.5 104.5 995.5 102.6 993.5 100.3 995.5 101.6 997 105.4 997 101.8 999 101.3 9.6 8.9 12.4 12.9 14.1 8.9 10.2 9.3 11..8 12.4 1.0.2 9.6 11.2 1.3.8 11.0 10.7 12.4 13.2 11.0 14.5 12.6 10.7 10A 14.1 12.7 11.0 15.1 13.4 10.5 10.7 1.2.1. 9.9 11.4 8.6 10.0 102.8 11.1 8.7 Relative I Maximum 96 1.10.0 94 110.0 92 110.0 92 110.0 95 110.0 97 110.0 94 110.0 92 110.0 92 110.0 94 110.0 93 1.10.0 90 110.0 95 110.0 92 1.10.0 95 110.0 94 110.0 93 110.0 94 110.0 96 110.0 94 110.0 92 110.0 92 110.0 95 110.0 90 110.0 94 .11010 96 110.0 96 110.0 93 ! 110.0 94 11.0.0 94 110.0 92 110.0 95 110.0 93 1.10.0 91 110.0 92 110.0 96 110.0 93 110.0 92 110.0 DATE: March 2, 2006 Sladden E►tvineerirt, PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No_ I Date Testcd I Location 2127 10-26-05 2128 10-26-05 2129 10-26-05 2130 10-26-05 2131 10-26-05 2132 10-26-05 2133 10-26-05 2134 10-26-05 2135 10-26-205 2136 10-26-05 2137 10-27-05 21381 10-27-05 21.39 10-27-05 2140. 10-27-05 2141 10-27-05 2142 10-27-05 2143 10-27-05 2144 10-27-05 2145; 10-27-05 2146! 10-27-05 2147� 10-27-05 2148. 10-27-05 21491 10-27-05 2150 10-27-05 21511 10-28-05 2152;. 10-28-05 2153 10-28-05 2154! 10-28-05 2155 10-28-05 2156; 10-28-05 2157i 10-28-05 2158, 1.0-28-05 2159' 10-28-05 21601 10-28-05 21611 10-28-05 2162 10-28-05 2163 10-28-05 2164 10-28-05 2165 10-28-05 2166 10-28-05 TEST RESULTS Elevation PROJECT NO: 522-4810 REPORT NO: 06-02-120 Dry Density % Moisture in Place I In Place Lot 21 B Front 998.5 106.6 Lot 21 B Front 1000 103.9 Lot 22 B Front 993.5 100.6 Lot 22 B Front 995.5 102.2 Lot 23 B Front 996.5 102.9 Lot 23 B .Front 998.5 ! 105.3 Lot 22 B Front 997.5 } 103.0 Lot 22 B Front 999 1 106.1 Sales Center 989.5 103.9 fiales Center 989.5 70111 Lot 17 B Back 994 ° 102.2 Lot 17 B Back 996 1.00.4 Lot 18 B Back 997.5 104.1 I Lot 19 B Back 997 ! 103.0 Lot 20 B Back 996.5 106.1 Lot 20 B Back 998 104.5 Lot 21 13 Back 997 101.1 Lot 21 B Back 999 100.3 Lot 22 B Back 993 103.1 Lot 22 B Back 995 102.8 1_.ot 22 E3 Back 997 101.5 Lot 22 B Back 999 101 Gate House 992 99.1 Gate House 994 ` 100.6 l Front ` T,.ot 1 A � 996 1 101.6 Lot 1 A Front 998 101.9 ` Lot 2 A Front 998 1,04.7 Lot 2 A Front 1000 102.8 l.,ot 1 A Front 1000 . 103.4 Lot 1 A Front 1002 100.2 Lot 2 A Front 1002 105.3 Lot 2 A Front 1003.5 101.2 Lot 2 A Back 1003.5 103.1 i Lot 11 A Front PG 107.2 " Lot 11 A Back PG 1 103.8 Lot 11 A Center PG 104.3 Lot 10 A Front PG 101.5 l..ot 10 A Back PG 100.1 Lot 10 A Center PG ` 102.6 Lot 9 A Front PG 105.4 Relative i Maximum 1.3.4 97 13.0 94 10.1 91. 14.3 93 12.6 96 11.8 96 13.2 94 1.0.7 96 12.5 94 10,6 92 8.8. 93 10.9 91. 11.6 95 9.3 94 13.2 96 12.1 95 14,0 92 11.4 91 13.2 96 13.2 93 1,0.3 92 14.1 93 7.1 90 8.3 91 13.1 92 11.5 93 14.3 95 12.6 93 12.1 94 15.1. 91 13.0 96 11.6 92 10.7 94 9.6 97 1 11.1 94 10.8 95 12.6 92 8.7 I 91 11.0 93 9.3 96 110.0 110.0 110.0 1.1.0.0 110.0 110.0 110.0 1.10.0 110.0 1,10.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 DATE: March 2, 2006 Sladden Engineering PROTECT NAME; Madison Club LOCATION: La Quinta, California I est No. Date Tc%tcd Location 2167 10-28-05 Lot A Back 21.68 10-28-05 Lot 9 A Center 2169,, 10-28-05 Lot 8 A Front 21701 10-28-05 Lot 8 A Back 21711 10-28-05 ! Lot 7 A Front 21721 1.0-28-05 i Lot.7 A Back 21.73 � 10-28-05 i Lot 6 A Front 2174, 10-28-05 Loth A Back 2175 10-28-05 Lot 6 A Center 2176 I 10-28-05 + Lot A Front 2177 10-28-05 Lot 5 A Back 2178 10-28-05 Lot 4 A 'Front 2179 1.0-28-05 Lot 4 A Back 2180 10-28-05 Lot 4 A Center 2181 10-28-05 1.0t 3 A Front 2182 10-28-05 Lot 3 A Back 2183 10-28-05 Lot 2 A Front 2184 10-28-05 Lot 2 A Back 2185 10-28-05 Lot 1 A Front 2186 10-28-05 Lot A Back 2187 11-01-05 Lot 10 B Back 2188 11-01-05 I.ot 10 B Front 2189 � 11-01-05 Lot 13 B Front 21* 17 -01-05 , Lot 13 B Back 21911 11-01-05 Lot 14 B Front 21921 11-01-05 Lot 1413 hack 2193 11-01-05 Lot 15 6 Front 2194 11-01-05 Lot 15 B Front 2195 11-01-05 Lot 15 B Back 21961 11-01-05 Lot 15 8 Back 2197 11-01.-05 Retest # 21981 11-01-05 Lot 16 B Front 2199' 11-01-05 Lot16 B Back 2200 1 11-01-05 Lot 15 B Front 2201 i 11-01-05 Lot 15 B Back 2202 11-02-05 Lot 23 B Back 2203 17 02-05 Lot 23 B Back 2204 11-02-05 ' Lot 24 B Front 2205 11-02-05 Lot 24 B Front TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 blevation DryDensity % Moisture In Place I In Place PG PG PG PG PG PG PC PG PG PG PG PG PC PG PG I PC PG f PG fC PG i 1003 1002 1 998 998 997 997 992 994 992 994 994.5 995 996 996 997.5 999.5 997.5 999.3 103,7 106.6 102,4 102.7 104,7 108.1 106.3 103.4 105.3 1.00.9 102.6 104.4 107.1 105.4 103.2 103.5 106.6 102.4 99.3 100.7 104.0 102.0 100,4 103.3 105.1 101.4 100.1 100.E 1.03.7 104.8 99.3 102.5 105,E 103.4 106.8 104.9 102.6 106.7 103.5 11.0 1 9.2 12.5 13.0 73.1 11.0 11.4 14.1 10.9 14.5 3.2.0 9.8 1.1..0 12.6 8.8 10A 11.8 12.4 9.1 9.6 9,3 10.7 11,6 13.1 9.8 11.0 10.7 10.2 12, 6 10.1 8.7 12.3 13.4 10.8 9.5 Relative 94 97 93 93 95 98 97 94 96 92 93 95 97 96 94 94 97 93 90 92 95 93 91 94, 96 92 91 91 94 95 90 95 96 94 97 Maximum 110.0 110.0 110,0 110.0 110.0 110.0 110.0 110,0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.1.0.0 110.0 110.0 11.0.0 110.0 110.0 110.0 '110.0 110.0 110.0 110.0 110.0 110.0 170.0 110.0 110.0 110.0 110.0 110.0 11..8 I 95 110.0 10.1 ! 93 110.0 13.4 97 110.0 9.6 94 j 110.0 DATE: March 2, 2006 Sladden 1:nQinPnrinv PROJECT NAME: Madison Club LOCATION: La Quinta, California Test. No. Date Tested Location TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density 'Yo Moisture KeLat]Ve WIdAUuuui In P1acc In Place Campsction Dcnsi 2206 11-02-05 Lot 24 B Back 996.5 100.3 2207 11-02-05 Lot 24 B Back 998.5 104.1 2208 11-02-05 Lot 25 B .Front 997 101,1 2209 f 11-02-05 J Lot 25 B Front 999 101.4 2210, 11-02-05 Lot 25 B Back 998 1.04.4 2211 1.1-02-05 Lot 25 B Back 1000 ' 103.6 2212 I 11-02-05 ! Lot 26 B Front 995.5 106.0 2213 11-02-05 Lot 26 B Front 997.5 ° 10.5 2214 11-02-05 Lot 26 B Back 995 j 101.8 2215� 11-02-05 ff L''ot 26 B Back 997 I 103.7 2216 11-03-05 Lot 9 B Front PG 105.1 2217 11-03-05 1 Lot 9 B Back PG 102.8 2218, 11-03-05 Lot 10 B Front PG 102.5 22191 11-03-05 ; Lot 10 B Back PG 104.0 2220 11-03-05 Lot 11 B Front PG 1.00.5 2221 1.1-03-05 Lot 11 B Back PG 100.8 2222 11-03-05 Lot 12 B Front PG 1 103.1 2223 11-03-05 ; Lot 12 B Back PG 105.7 2224� 11-03-05 1 Lot 13 B Front PG 106.9 2225; 11-03-05 Lot 13 B Back PG 104.4 2226 11-03-05 Lot 14.13 Front PG � 101,7 ` 2227 11-03-05 I Lot 14 B Back PC 1,02.1 2223 11-03-05 Lot 15 B Front PG 105.5 2229 11-03-05 Lot 15 B Back PG 103.3 2230' 11-03-05 Lot 1613 Front PG 107.1 22311 11-03-05 Lot 16 B Back PG 104.2 2232 i 11-04-05 Lot 17 B Front 997.5 103.6 2233 11-04-05 Lot 17 B Back 998 105.4 2234 11-04-05 Lot 18 B Front 997.5 101.0 2235 11-04-05 Lot 18 B Back 998 100.6 2236 11-04-05 Lot 19 B Front 999 � 104.3 22371 11-04-05 Lot 19 B Back 999 104.1 2238 11-04-05 Lot 20 B Back 1.000 1.02.8 2239 11-04-05 Lot 21 B Front 1001.5 107.3 2240 11-04-05 Lot 21 B Back 1001 1.05.0 2241 11-04-05 1.,ot 22 B Front 1001 103.3 2242 11-04-05 4 Lot 22 B Back '10011 104.6 2243I 11.07-05 i Lvt 17 B Front PC j 103.3 11.1 91 110.0 10.0 95 110.0 12A 1 92 1.10.0 14.1 92 110.0 9.7 95 110.0 8.8 94 110.0 11.4 96 110.0 9.9 93 110.0 12.9 93 110.0 13.4 94 110.0 9.5 96 j 110.0 11.0 93 110.0 10.4 93 `: 110.o 12.3 95 l 110.o 11.1 91. 110.0 9.3 92 110.0 12.8 94 110.0 123 96 110.0 9.7 97 110.0 9.2 95 110.0 10.0 93 110.0 10.5 93 110.0 12.6 96 1.1.0.0 13.1 94q 110.0 8.8 97 11010 10.7 95 110.0 10.1 94 I 4 110.0 11.5 96 110.0 12.5 92 110.0 9,8 91 y 110.0 14.6 95 1 110.0 12.9 95 110.0 13.6 93 1.10.0 11.4 9S 110.0 11.9 95 110.0 l 15.1 94 110.0 13.0 95 110.0 9.0 1 94 110.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I mate Tested f 224- 224; 2241 224' 224! 224! 225( 225] 225: 225; 2254 Location 11-07-05 Lot 1.7 B Back 11-07-05 Lot 17 B Center 11-07-05 Lot 18 B Front 11-07-05 Lot M B Back 11-07-05 1 Lot 18 B Center 11-07-05 + Lot 19 B Front 11-07-05 Lot 19 B Back 11-07-05 Lot 1.9 B Center 11-07-05 Lot 20 B Front 11-07-05 Lot 20 B Back 11-07-05 Lot 20 B Center 2255 11-08-05 2256 11-08-05 2257 11-08-05 2258 11-08-05 2259 11-08-05 Lot 118 B Lot 119 B Lot 120 B Lot 121 B Lot 122 B 2260 11-09-05 + Lot 25 B 2261 11-09-05 I,.ot 25 B 2262 11-09-05 Lot 25 B 2263 11-09-05 Lot 26 B 2264 1.1-09-05 1-ot 26 B 2265 11-09-05 Lot 26 B 2266 11-09-05 Lot27 B 2267 11-09-05 Lot27 B 22681 11-09-05 Lot27 B 2269 11-09-05 Lot 21 B 2270 11-09-05 Lot 21 B 2271 1.1.-09-05 Lot 21. B 2272 11-09-05 Lot22 B 2273 11-09-05 Lot22 B 2274 11-09-05 Lot22 B 2275 11-09-05 Lot 23 B 2276 11-09-05 Lot 23 B 2277 1.1-09-05 Lot 23 B 2278 11-09-05 Lot 2413 2279 11-09-05 Lot24 B 2280, 11-09-05 1 Lot24 B 22811 11-10-05 Lot 117 B TEST RESULTS PROJECT NO: 5224810 REPORT NO. 06-02-120 Elovation Dry Density' % Moisture f Relative f Maximum In P1aoc I I I in Place 1 Corn action I I Densi PG 101.4 PG 104.6 PC 100.5 PG 102.8 PG 104.9 PG 106,1 PG 103.5 PG 105.3 PG 1 101.8 PG 101,4 PG 104.0 3.0 BPG 110.2 3.0 BPG 110.2 3.0 B PC 1 104.3 3.0 BPG 104.9 3.0 BPG 101..8 PG 106.5 PG 99.9 PG 1 104.4 PG 106.8 PG 101.2 PG 102.7 PG 101.8 PG { 103.2 VG ' 104,1 PC 99.6 PG 99.9 PG 108.5 PG 99.0 PG 107.5 PC 103.8 PG 101.0 PG 104.6 PG 1 104.6 PG 101.0 PC 1 103.7 PG 100.5 PC 1 103.4 8.1 11.5 7.9 10.7 9.3 11.4 8.8 12.4 11.0 9.9 10.7 8.4 12.5 14.7 14.7 11.8 13.2 7.1 6.8 12.2 5.0 7.0 7.9 9.2 11.6 11.1 11.6 9.5 5.9 8.4 15.1 9.6 5.7 10.4 9.9 12.8 10.4 9.2 92 110.0 95 110.0 91 110.0 93 110.0 95 110.0 96 11.0.0 94 110.0 96 110.0 93 110.0 92 1.10.0 95 110.0 98 112.0 98 112.0 93 { 112.0 94 112.0 91 112.0 +I 97 I 110.0 91 110,0, 95 ; 110.0 97 110.0 92 110.0 93 110.0 92 110.0 94 I 110.0 95 110.0 91 1.10.0 91 110.0 99 110.0 90 11I 110.0 98 I 110.0 94 110.0 92 1.10.0 95 110.0 95 110.0 92 110.0 94 110.0 91 110.0 94 1 110.0 DATE: March 2, 2006 $ladders EnpimeerLiL, PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. ` Date Tested I Location TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation I Dry Density % Moisture xeiauve maxim lli In Place I In Place � compaction Dcntiit 2282 11-10-05 Lot 117 B PC 105.3 2283 11-10-05 Lot 118 5 PC 108.8 22841 1.1.-1.0-05 Lot 118 B 1'G 103.4 22851 11-10-05 Lot 1.1913 PC 105.3 2286 11-10-05 1 Lot 119 B PG 109.1 2287 11-10-05 Lot 4.0 8 PC i 108.3 2288 11-10-05 Lot 40 B PG 109.1 2289 11-10-05 Lot 11.813 1.0 BPG 99.9 2290 11-10-05 Lot 119 B 1.0 BPG 100.6 2291 11-10-05 Lot 120 8 1.0 BPC 1.00.0 2292 11 -10-05 - Lot 121 B 1.0 BPG 99.8 2293 11-10-05 Lot 1.22 B 1.0 BPG 102.0 2294 i 11-10-05 Lot 29 B PG' 1.09.2 2295 i 11-10-03 Lot 29 B PC 107.9 2296 11-10-05 Lot 29 6 PC ` 108.2 2297 11-10-05 1 Lot 28 B PG 108.9 2298 11-10-05 I.,ot 28 B PC j 108.9 22.99 11-10-05 1 Lot 28 B PC I 109.1 2300 11-10-05 Lot 30 B PG i 105.0 2301 11-10-05 I of 3U B PC 1,04.0 2302 i 11-1 U-05 Lot 30 B PG 105.9 23031 11-14-05 I,,ot 31 B PC 108.5 2304: 11-14-05 Lot 31 B PC 108.0 23051 11-14-05 + Lot 32 B PC 108.8 2306 1.1-14-05 E; Lot 32 $ PG 104.5 230'1 11-14-05 Lot 36 B PC 107.5 2308 11-14-05 ' Lot 36 B PC 100.4 2309 11-14-05 Lot 35 B PG 10.5 23101 11.-1.4-05 Lot 35 B I 1'G 103.3 2311 11-15-05 Lot 39 B PG 109.0 2312 11-15-05 Lot 39 8 PC 108.7 2313 11-15-05 Lot 38 B PC 103.1 2314, 11-15-05 Lot 38 5 PC 108.6 21 315 11-15-05 Lot 37 B PG 10$.4 2316 11-15-05 Lot 37 B PG 104.7 2917 11-15-05 Lot 33 B PC 108.2 2318 11-15-05 1 Lot 33 B PC 101.7 2319 11-15-05 ' Lot 34 B PC 103.1 2320 11-15-05 Lot 34 B PC 100.1 11.8 9,8 9.6 10.2 11.7 9.8 11.5 12.2 11.9 12.6 14.4 11..4 9.5 7.7 13.1. 14.6 8.3 11.4 15.1 15,2 14.2 7.5 6.2 7.1 7.4 11.7 6.4 11.2 15.1 8.1 6,0 15.1. 9.5 11.9 7.3 7.5 10.8 8.3 6.1 96 110.0 99 110.0 93 11.0.0 96 110.0 99 110.0 98 110.0 99 110.0 91 110.0 92 110.0 91 110.0 91 110.0 93 110.0 99 110.0 98 110.0 99 1110.0 99 110.0 99 110.0 99 11.0.0 95 110.0 95 110.0 96 110.0 99 i 110.0 98 110.0 99 110.0 95 110.0 98 110.0 91 93 1.10.0 94 1 11.0.0 I 99 11.0.0 99 110.0 94 110.0 99 110.0 98 110.0 95 110.0 98 110.0 93 1.10.0 94 110.0 92 110.0 DATE: March 2, 2006 .Sladden Engineering PROJECT NAME. Madison Club LOCATION: La Quinta, California Tcst No. I Date Tested I Location 2321 11-17-05 Lot 120 B 2322 11-17-05 Lot 120 B 2323 11-17-05 Lot 121 B 2324 1.1-17-05 Lot 121 B 2325 11-17-05 Lot 122 B 23261 11-17-05 Lot 122 B 2327 ! 11-17-05 f t 8213 10 2328 11-17-05 Lot82 B 2329 11-17-05 Lot 8*1 13 2330 11-17-05 Lot 81 B 2331 11-17-05 Lot 80 13 2332� 11-17-05 1 Lot 80 B 2333 11-21-05 Lot 43 B 2334 11-21-05 Lot43 B 2335 11-21,-05 Lot42 B 2336' 11-21-05 Lot 42 B 2337I 11-21-05 Lot 41 6 2338I 11-27-05 .Lot 41 B 2339 JJJJJJ; 11-21-05 f Lot 48 B 2340 - 11.-21-05 Lot 48 B 2341 11-21-05 Lot 47 B 2342 11-21-05 Lot 47 B 2343 ? 1.1-21-01 Lot 46 B 23441 11-21-05 Lot46 B 2345 11-21.-05 LOt 45 B 2346 11-21-05 Lot45 B 2347 11-21-05 Lot 44 B 2348 11-21-05 Lot 4.4 B 2349 11-28-05 Lot 63 B 2350' 11-28-05 Lot 63 B f 23511 01.-04-06 Sales Office 2352 01-04-06 Sales Office 2353 01.-04-06 � Sales Office 2354 2355 01-04-06 Sales Office 1 01-04-06 Sales Office TEST RESULTS PROJECT NO.522-4810 REPORT NO: 06-02-120 Elevation DryDensity f % Moisture Relative Maximum In Place • In Place I PC PC PC PC PC PC PC PG PC PC PC PC 109.1 f 9.9 99 103.5 16.5 94 105.2 11.1 96 109.0 j 1.3.7 99 105.1 11.4 96 106.7 13.3 97 101.1 "1 94 108.1 8.9 94 104.4 13.6 95 105.9 12.8 '96 103.1 11.9 94 99.9 10.6 91 PG 109.1 1'C; 108.1 PC 109.1 PG 1.08.9 PC 106.8 PC 109.1 PG 1.07.3 PC 108.7 PC 106.7 PC 105.9 PC 108.8 PC j 109.1. PC 108.7 PC 107.7 PC 107.8 PC 106.7 PC 1 1.07.9 PC 106.2 5.0 BSC 101.9 4.0 BSC 99.9 2.0 8SG 99.8 5.0 BSC 98.1 3.0 BSC 99.9 11.4 I 99 13.1 98 12.4 99 11.9 99 13,1 97 11.6 gg 7.4 97 7.0 99 6.1 97 7.1 96 6.5 99 6.1 99 7.1 99 6.5 98 10.2 98 9.4 97 i 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110,0 110.0 110,0 f 310,0 110.0 110.0 110.0 110.0 110.0 1.10.0 1 110.0 110.0 110.0 110.0 110.0 1,1.0.0 110.0 110.0. 10.2 98 I 110.0 10A 97. 1.10.0 9.7 93 109.0 8.3 92 109.0 9.6 92 1 109.0 10.6 90 109.0 15.4 92 109.0 DATE: March 2, 2006 Sladden En,-ineerina (W Sladden Engineering 5782 Stanton Ave., Suite A, Buena park, CA 90621 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 January 28, 2005 East of Madison, LLC 81-100 Avenue 53 La Quinta, California 92253 Attention: Mr, John Garnfin Project: Madison Club Tentative Tract Map 33076 NEC Avenue 54 and Madison Street La Quinta, California Subject: GeotecluticalInvestigation Project No. 544-4810 05-01-101 ITY OF LA C)IJIIVTA BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE DATE ,...BY Presented herewith is the report of our Geotechnfcal Investigation conducted for the construction of the proposed golf club and residential development to be located on the northeast corner of Avenue 54 and Madison Street in the City of La Quintal California. The investigation was performed in order to provide recommendations for site preparation and to assist in foundation design for the proposed residential structures and the related site improvements. This report presents the results of our field investigation and laboratory testing along with conclusions and recommendations for foundation design and site preparation. This report completes our original scope of services as outlined within our proposal dated December 13, 2004. We appreciate the opportunity to provide service to you on this project, if you have any questions regarding this report, please contact the undersigned Respectfully submitted, SLADD ENGINEERING Brett-L. Anderson Principal Engineer SER/pc Copies: 6/East of Madison, LLC gyp' 9 3�06 OF L.� GEOTECHNICAL. INVESTIGATION PROPOSED MADISON CLUB NEC AVENUE 54 & MADISON STREEI" LA QUINT& CALIFORNIA January 28, 2005 TABLE OF CONTENTS INTRODUCTION......................1.................................................................................................... 7 SCOPEOF WORK .................................................... PROJECT DESCRIPTION ...... ........... .................................. GEOLOGY AND SEISMICITY ............................. ..... ,.... .....:.... ................,.....,................ 1 .......... ....... ....................................................,............ 2 SUBSURFACE CONDITIONS ...................... LIQUEFACTION ...................................... ...............................................................................,,..., 3 CONCLUSIONS AND RECOMMENDATIONS...................................................... 3 Foundation Design.........................................,................................... ................. 4 Settlements..................................................................................... LateralDesign................................................................................................................................. 5 RetainingWalls......................................................1...................... 5 ExpansiveSoil.......................................................................,.....,...................................................,, 5 ConcreteSlabs-on-Grade................................................................................ 5 Soluble Sulfates............................................................................................................................ 6 Tentative Pavement Design............................................................................... ....,.......... Shrinkage and Subsidence...................................................... .........,.,............... 6 GeneralSite Grading.................................................................................... I. Site Clearing...................................................................................... .............................. 6 2. Preparation of Building and Foundation Areas................................................................ 7 3. Placement of Compacted Fill............................................................... 7 4. Preparation of Slab and Pavement Areas..................:............................................. 7 5. Testing and Inspection................................................................. ......,.......................... 7 GENERAL.................................. REFERENCES.......................................................................................................................................... 9 APPENDIX A - Site Plan and Boring Logs Field Exploration APPENDIX B - Laboratory Testing Laboratory Test Results APPENDIX C - 2001 California Building Code with 1997 UBC Seismic Design Criteria January 28, 2005 -1- Project No. 544-4810 05-01-101 INTRODUCTION This report presents the results of our Geotechnical Investigation performed in order to provide recommendations for site preparation and to assist in the design and construction of the foundations for the single-family residences proposed for the Madison Club golf course and residential development. The project site is located on the northeast corner of Avenue 54 and Madison Street in the City of La Quinta, California. The preliminary plans indicate that the proposed project will include an 18-hole golf course, clubhouse, and approximately 200 single-family residences along with various associated site improvements. The associated site improvements are expected to include paved roadways, concrete driveways and patios, underground utilities, and landscape areas. SCOPE OF WORK The purpose of our investigation was to determine certain engineering characteristics of the near surface soil on the site in order to develop recommendations for foundation design and site preparation. Our investigation included field exploration, laboratory testing, literature review, engineering analysis and the preparation of this report. Evaluation of hazardous materials or other environmental concerns was not within the scope of services provided. Our investigation was performed in accordance with contemporary geotechnical engineering principles and practice. We do not make other warranty, either express or implied. PROJECT DESCRIPTION The project site is located on the northeast corner of Avenue 54 and Madison Street in the City of Ira Quinta, California. It is our understanding that the project will consist of an 18-hole golf course, clubhouse, and approximately 200 single-family residences along with various associated site improvements. Tt is our understanding that the proposed residences and clubhouse will be of relatively lightweight wood -frame construction and will be supported by conventional shallow spread footings and concrete slabs on grade. The associated improvements will include paved roadways, concrete walkways, patios, driveways, landscape areas and various underground utilities. The majority of the subject site is presently vacant. The site includes several agricultural parcels as well as undeveloped desert land. Large tamarisk trees exist along the majority of the property lines within the southeastern portion of the site. The majority of the eastern portions of the property have been previously used for agricultural purposes. The property is level throughout and is near the elevation of the adjacent properties and roadways. A horse ranch occupies the southeast corner of the site. The ranch contains several residential structures and various outbuildings. Fenced pastures occupy most of the ranch. Several other residences and structures exist at locations throughout the site. Avenue 54 forms the southern site boundary, Monroe Street forms the eastern site boundary, and Madison Street forms the western site boundary. The Hideaway development is located just west of the site. Madden Engineering January 28, 2005 -2- Project No. 544-4810 05-01-101 Based upon our previous experience with lightweight residential structures, we expect that isolated column loads will be less than 30 kips and wail loading will be less than to 2.0 kips per linear foot. Grading is expected to include minor cuts and fills to match the nearby elevations and to construct slightly elevated building pads to accommodate site drainage. Extensive cuts are proposed for several of the golf holes with the preliminary plans indicating cuts in excess of 40 feet within some of the golf holes. This does not include removal and recompaction of the bearing soil within the building areas. If the anticipated foundation loading or site grading varies substantially from that assumed the recommendations included in this report should be reevaluated.. GEOLOGY AND SEISMICITY The project site is located within the central Coachella Valley that is part of the broader Salton Trough geomorphic province. The Salton Trough is a northwest trending depression that extends from the Gulf of California to the Banning Pass. Structurally the Salton Trough is dominated by several northwest trending faults, most notable of that is the San Andreas system. . A relatively thick sequence of sedimentary rocks have been deposited in the Coachella Valley portion of the Salton Trough from Miocene to present times. These sediments are predominately terrestrial in nature with some lacustrian and minor marine deposits. The mountains surrounding the Coachella Valley are composed primarily of Precambrian'metamorphic and Mesozoic granitic rock. The Coachella Valley is situated in one of the more seismically active areas of California. The $an Andreas fault zone is considered capable of generating a maximum credible earthquake of magnitude 8.0 and because of its proximity to the project site the distance of approximately 9.2 kilometers should be considered in design fault for the project. Seismic activity along the nearby faults continues to affect the area and the Coachella Valley is considered one of the more seismically active regions in California. A computer program and pertinent geologic literature were utilized to compile data related to earthquake fault zones in the region and previous seismic activity that may have affected the site. E.Q. Fault Version 3.00 (Blake) provides a compilation of data related to earthquake faults in the region, The program searches available databases and provides both distances to causitive faults and the corresponding accelerations that may be experienced on the site because of earthquake activity along these faults. The attenuation relationship utilized for this project was based upon Joyner & Boore (2001.) attenuation curves. The information generated was utilized in our liquefaction evaluation The site is not located in any Earthquake Fault zones as designated by the State but is mapped in the County's Liquefaction and Ground Shaking Hazard Zone V. Several significant seismic events have occurred within the Coachella Valley during the past 50 years. The events include Desert Hot Springs - 1948 (6.5 Magnitude), Palm Springs - 1986 (5.9 Magnitude), Desert Hot Springs - 1992 ((.1 Magnitude), Landers -1992 (7.5 Magnitude) and Big Bear -1992 (6.6 Magnitude). Rlnddan F.noinpprinn January 28, 2005 -3- Project No. 544-4810 05-01,-101 SUBSURFACE CONDITIONS The soil underlying the site consists primarily of fine-grained silty sands with scattered prominent sandy clay and sandy silt layers. As is typical for the area, the silty sand and sanely silt layers arc inconsistently interbedded and vary in thickness. Silty sands were the most prominent soil within our exploratory borings but several prominent sandy silt and clayey silt layers were also encountered. The silty sands encountered near the existing ground surface appeared somewhat loose but the deeper silty sand and sandy silt layers appeared relatively firm. Relatively undisturbed samples indicated dry density varying from 84 to 121 pcf. Sampler penetration resistance (as measured by field blowcounts) indicates that density generally increases with depth. the site soil was dry on the surface and moist below a depth of approximately 5 feet but some silty layers were typically wet. laboratory testing indicated moisture content varying from 1 to 33 percent. Laboratory testing indicates that the surface soil within the upper 5 feet consist primarily of silty sands. Expansion testing indicates that the surface silty sands are generally non -expansive and. are classified as .`very low" expansion category soil in accordance with Table 7.8-I-13 of. the 1997 Uniform Building Code. Groundwater was encountered within our borings at depths of approximately 51 to 79 feet below the existing ground surface. Groundwater should be considered in design and construction. LIQUEFACTION Liquefaction occurs with sudden loss of soil strength because of rapid increases in pore pressures within cohesionless soil as a result of repeated cyclic loading during seismic events. Several conditions must be present for liquefaction to occur including; the presence of relatively shallow groundwater, generally loose soil conditions, the susceptibility of soil to liquefaction based upon grain -size characteristics and the generation of significant and repeated seismically induced ground accelerations. Liquefaction affects primarily loose, uniform grained cohesionless sands with low relative densities. In the case of this project site, several of the factors required for Iiquefaction to occur are not present. As previously indicated, groundwater was encountered within our borings at depths of approximately 51 to 79 feet below the existing ground surface on the site. Because of the depth to g-toundwater, the potential for liquefaction affecting the site is considered negligible. CONCLUSIONS AND RECOMMENDATIONS Based upon our field investigation and laboratory testing, it is our opinion that the proposed golf course, Clubhouse, and residential development is feasible from a soil mechanic's standpoint provided that the recommendations included in this report are considered in building foundation design and site preparation. Because of the somewhat loose condition of the near surface soil, remedial grading is recommended for the building areas. We recommend that remedial grading within the proposed building areas include the overexcavation and recompaction of the primary foundation bearing soil. Specific recommendations for site preparation are presented in the Site Grading section of this report. Sladden Engineering January 28, 2005 -4.- Project No. 544-481.0 05-01-101 Based upon the depth to groundwater and the generally firm condition of the deeper sand layers, it is our opinion that the potential for liquefaction affecting the site is negligible. The remedial grading recommended for building areas will result in the construction of a uniform compacted soil mat beneath all footings. In our opinion, liquefaction related mitigation measures in addition to the site grading and foundation design recommendations included in this report should not be necessary. The site is located in one of the more seismically active areas in California. Design professionals should be aware of the site setting and the potential for earthquake activity during the anticipated life of the structure should be acknowledged, The accelerations that may be experienced on the site (as previously discussed) should be considered in design. The seismic provisions included in the Uniform Building Code for Seismic Zone 4 should be considered the minimum design criteria. Pertinent 1997 C1BC Seismic Design Criteria is summarized in Appendix C. Caving did occur within our borings and the potential for caving should be expected within deeper excavations. All excavations should be constructed in accordance with the normal CalOSHA excavation criteria. On the basis of our observations of the materials encountered, we anticipate that the near surface silty sands will be classified by C)JOSHA as Type C. Soil conditions should be verified in the field by a "Competent person" employed by the Contractor. The near surface soil encountered during our investigation was found to be non -expansive. Laboratory testing indicated an Expansion Index of 0 for the surface silty sands that corresponds with the "very low" expansion category in accordance with [IBC Table 18-I-B. The following recommendations present more detailed design criteria which have been developed on the basis of our field and laboratory investigation. The recommendations are based upon non -expansive soil criteria. Foundation Design: The results of our investigation indicate that either conventional shallow continuous footings or isolated pad footings that are supported upon properly compacted soil, may be expected to provide adequate support for the proposed structure foundations. Building pad grading should be performed as described in the Site Grading Section of this report to provide for uniform and firm bearing conditions for the structure foundations. Footings should extend at least 12 inches beneath lowest adjacent grade, Isolated square or rectangular footings should be at least two feet square and continuous footings should be at least 12 inches wide. Continuous footings may be designed using an allowable bearing value of 1500 pounds per square foot (psf) and isolated pad footings may be designed using an allowable bearing pressure of 1800 psf. Allowable increases of 250 psf for each additional 1 foot of width and 250 psf For each additional 6 inches of depth may be utilized if desired. The maximum allowable bearing pressure should be 2500 psf. The allowable bearing pressures are applicable to dead and frequently applied live loads. The allowable bearing pressures may be increased by 1/3 to resist wind and seismic loading. Care should be taken to see that bearing or subgrade soil is not allowed to become saturated from the ponding of rainwater or irrigation. Drainage from the building area should be rapid and complete. Sladden Engineering January 28, 2005 -5- Project No. 544-4810 05-01-101 The recommendations provided in the preceding paragraph are based on the assumption that all footings will be supported. upon properly compacted engineered fill soil. All grading should be performed under the testing and inspection of the Soil Engineer or his representative_ Prior to the placement of concrete, we recommend that the footing excavations be inspected in order to verify that they extend into compacted soil and are free of loose and disturbed materials. Settlements: Settlements resulting from the anticipated foundation loads should be minimal provided that the recommendations included in this report are considered in foundation design and construction. The estimated ultimate settlements are calculated to be approximately one inch when using the recommended bearing values. As a practical matter, differential settlements between footings can be assumed as one-half of the total settlement. Lateral Design: Resistance to lateral loads can be provided by a combination of friction acting at the base of the slabs or foundations and passive earth pressure along the sides of the foundations. A coefficient of friction of 0.40 between soil and concrete may be used with consideration to dead load forces only. A passive earth pressure of 250 pounds per square foot, per foot of depth, may be used for the sides of footings that are poured against properly compacted native or approved non -expansive import soil. Passive earth pressure should be ignored within the upper 1 foot except where confined (such as beneath a floor slab). Retaining Walls: Retaining walls may be necessary to accomplish the proposed construction. Lateral pressures for use in retaining wall design can be estimated using an equivalent fluid weight of 35 pcf for level free -draining native backfill conditions. For walls that are to be restrained at the top, the equivalent fluid weight should be increased to 55 pcf for level free - draining native backfill conditions. Backdrains should be provided for the full height of the walls. Expansive Soil. Because of the prominence of "very low" expansion category soil near the surface, the expansion potential of the foundation bearing soil should not be a controlling factor in foundation or floor slab design. Expansion potential should be reevaluated subsequent to grading. Concrete SIabs-on-Grade: All surfaces to receive concrete slabs -on -grade should be underlain by a minimum compacted non -expansive fill thickness of 24 inches, placed as described in the Site Grading Section of this report. Where slabs are to receive moisture sensitive floor coverings or where dampness of the floor slab is not desired, we recommend the use of an appropriate vapor barrier or an adequate capillary break. Vapor barriers should be protected by sand in order, to reduce the possibility of puncture and to aid in obtaining uniform concrete curing. Reinforcement of slabs -on -grade in order to resist expansive soil pressures should not be necessary, However, reinforcement will have a beneficial effect in containing cracking because of concrete shrinkage. Temperature and shrinkage related cracking should be anticipated in all concrete slabs -on -grade. Slab reinforcement and the spacing of control joints should be determined by the Structural Engineer. Sladden Enxineering January 28, 2005 -6. Project No. 544-4810 05-01-101 Soluble Sulfates: The soluble sulfate concentrations of the surface soil have not yet been determined but native soil in the area has been known to be potentially corrosive with respect to concrete. The use of Type V cement and specialized sulfate resistant concrete mix designs may be necessary for concrete in contact with the native soil. Tentative Pavement Design: All paving should be underlain by a minimum compacted fill thickness of 12 inches (excluding aggregate base). This may be performed as described in the Site Grading Section of this report. R-Value testing was not conducted during our investigation but based upon the sandy nature of the surface soil, an R-Value of approximately 50 appears appropriate for preliminary pavement design. The following preliminary onsite pavement section is based upon a design R-Value of 50. Onsite Pavement (Traffic Index = 5.0) Use 3.0 inches of asphalt on 4.5 inches of Class 2 base material Aggregate base should conform to the requirements for Class 2 Aggregate base in Section 26 of CalTrans Standard Specifications, January 1992. Asphaltic concrete should conform to Section 39 of the CalTrans Standard Specifications. The recommended sections should be provided with a uniformly compacted subgrade and precise control of thickness and elevations during placement. Pavement and slab designs are tentative and should be confirmed at the completion of site grading when the subgrade soil is in -place. This will include sampling and testing of the actual subgrade soil and an analysis based upon the specific traffic information Shrinkage and Subsidence: Volumetric shrinkage of the material that is excavated and replaced as controlled compacted fill should be anticipated.. We estimate that this shrinkage could vary from 20 to 25 percent. Subsidence of the surfaces that are scarified and compacted should be between 1 and 3 tenths of a foot. This will vary depending upon the type of equipment used, the moisture content of the soil at the time of grading and the actual degree of compaction attained. These values for shrinkage and subsidence are exclusive of losses that will occur because of the stripping of the organic material from the site and the removal of oversize material. The shrinkage losses are suspected to be somewhat less within areas where deeper cuts (more than 20 feet in depth) are planned. General Site Grading: All grading should be performed in accordance with the grading ordinance of the City of La Quinta, California. The following recommendations have been developed on the basis of our field and laboratory testing and are intended to provide a uniform compacted mat of soil beneath the building slabs and foundations. 1. Site Clearing: Proper site clearing will be very important. Any existing vegetation, slabs, foundations, abandoned underground utilities or irrigation lines should be removed from the proposed building areas and the resulting excavations should be properly backfilled. Soil that is disturbed during site clearing should be removed and replaced as controlled compacted fill under the direction of the Soil Engineer. Madden Engineering January 28, 2005 -7- Project No. 544-4810 05-01-101 Z preparation of Building and Foundation Areas: In order to provide adequate and uniform bearing conditions, we recommend overexcavation throughout the proposed residential building areas. The building areas should be overexcavatcd to a depth of at least 3 feet below existing grade or 3 feet below the bottom of the footings, whichever is deeper, The exposed soil should then be scarified to a depth of 1-foot, moisture conditioned and recompacted to at least 90 percent relative compaction: The excavated material may then be replaced as engineered fill material as recommended below. 3. placement of Compacted Fill: Within the building pad areas, fill materials should be spread in thin lifts, and compacted at near optimum moisture content to a minimum of 90 percent relative compaction. Imported fill material shall have an Expansion Index not exceeding 20. The contractor shall notify the Soil Engineer at least 48 hours in advance of importing soil in order to provide sufficient time for the evaluation of proposed import materials. The Contractor shall be responsible for delivering material to the site that complies with the project specifications. Approval by the Soil Engineer will be based upon material delivered to the site and not the preliminary evaluation of import sources. Our observations of the materials encountered during our investigation indicate that compaction within the native soil will be most readily obtained by means of heavy rubber tired equipment and/or sheepsfoot compactors. The moisture content of the near surface soils was somewhat inconsistent within our borings. In general, the sandy soils are dry and well below optimum moisture content but some of the deeper silt layers were wet. It is likely that wet silt/clay layers will be encountered during grading particularly in irrigated areas where deep cuts are planned. A uniform and near Optimum moisture content should be maintained during fill placement and compaction. 4. Preparation of Slab and Paving .Areas: All surfaces to receive asphalt concrete paving or exterior concrete slabs -on -grade, should be underlain by a minimum compacted fill thickness of 12 inches. This may be accomplished by a combination of overexcavation, scarification and recompaction of the surface, and replacement of the excavated material a5 controlled compacted fill, Compaction of the slab and pavement areas Should be to a minimum of 90 percent relative compaction, 5. Testing and Inspection. During grading tests and observations should be performed by the Soil Engineer or his representative in order to verify that the grading is being performed in accordance with the project specifications, Field density testing shall be Performed in accordance with applicable ASTM test standards. The minimum acceptable degree of compaction shall be 90 percent of the maximum dry density as obtained by the ASTM D1557-91 test method. Where testing indicates insufficient density, additional compactioe effort shall be applied until retesting indicates satisfactory compaction. Sladden Engineering January 28, 2005 -8- Project No. 544-4810 05-01-101 GENERAL The findings and recommendations presented in this report are based upon an Interpolation of the soil conditions between boring locations and extrapolation of these conditions throughout the proposed building area. Should conditions encountered during grading appear different than those indicated in this report, this office should be notified. This report is considered to be applicable for use by East of Madison, LLC, for the specific site and project described herein, The use of this report by other parties or for other projects is not authorized. The recommendations of this report are contingent upon monitoring of the grading operations by a representative of Sladden Engineering.. All rocornmendations are considered to be tentative pending our review of the grading operations and additional testing, if indicated. If others are employed to perform any soil testing, this office should be notified prior to such testing in order to coordinate any required site visits by our representative and to assure indemnification of Sladden Engineering. We recommend that a pre -job conference be held on the site prior to the initiation of site grading. The purpose of this meeting will be to assure a complete understanding of -the recommendations presented in this report as they apply to the actual grading performed. Sladden Engineering January 28, 2005 -9- Project No. 544-4810 05-01-101 REFERENCES ASCE Journal of Geotechnical Engineering Division, April 1974. Boore, Joyner and Fumal (1994) Estimation of Response Spectra and Peak Accelerations from North American Earthquakes, U. S. Geological Survey, Open File Reports 94-127 and 93-509. Finn; W. E. Liam, (1996) Evaluation of Liquefaction Potential for Different Earthquake Magnitudes and Site Conditions, National Center for Earthquake Engineering Research Committee. Joyner and Boore, (1988) Measurements, Characterization and Prediction of Strong Ground Motion, ASCE Journal of Geotechnical Engineering, Special 'Publication No. 20. Lee & Albaisa (1974) "Earthquake Induced Settlements in Saturated Sands". Seed and 1driss (1982) Ground Motions and Sail Liquefaction During Earthquakes, Earthquake Engineering Research Institute Monograph. Seed, Tokimatsu, Harder and Chung, (1985), Influence of SPT Procedures in Soil Liquefaction Resistance Evaluations, ASCE Journal of Geotechnical Engineering, Volume 111, No.12, December. Rogers, Thomas H., Geologic Map of California, Santa Ana Map Sheet. Riverside County,1984, Seismic Safety Element of the Riverside County General Plan Sladden Engineering APPENDIX A Site Plan Boring Logs APPENDIX A FIELD EXPLORATION For our field investigation, 29 exploratory borings were excavated between December 13 and December 23, 2004 using a truck mounted hollow stem auger rig (Mobile B-61) in the approximate locations indicated on the site plan included in this appendix. Continuous log of the materials encountered were prepared on the site by a representative of Sladden Engineering. Boring logs are included in this appendix. Representative undisturbed samples were obtained within our boring by driving a thin -walled steel penetration sampler (California split spoon sampler) or a Standard Penetration Test (SPT),sampler with a 140 pound hammer, dropping approximately Winches (ASTM D1586), The number of blows required to drive the samplers 18 inches was recorded (generally in 6 inch increments). Blowcounts are indicated on the boring log. The California samplers are 3.0 inches in diameter, carrying brass sample rings having inner diameters of 2.5 inches. The standard penetration samplers are 2.0 inches in diameter with an inner diameter of 1.5 inches. Undisturbed samples were removed from the sampler and placed in moisture scaled containers in order to preserve the natural soil moisture content. Bulk samples were obtained from the excavation spoils and samples were then transported to our laboratory for further observations and testing. Madison Club -The Hideaway NEC Avenue 54 & Madison Stree4 La Quinta Date. 12/13/2004 Boring No. 1 Job Number; $44-4810 U Description .'�.` oRemarks 5 10 15 20 25 •`>= 6/4/6 Sand: Fine to Medium Grained and Sandy Silt Layer 2" SP 11 --- Native soil Grey in color 30 JL 5/6/7 Clayey Silt M4 6 64 Grey in color 35 9/13/10 Sand: Fine to Medium Gotined Layer —9" and Sandy Silt SP 2 10 Gny in color Grey in color 40 10/10/8 Silty Send: Fine Grained SM 2 14 45 8/10/8 Silt and Clay: Interbedded Thin LenseF ML 6 --- 3rey in color 50_JU 11/I6/21 Send; Finn to Medium Grained SF 3 8 +Croy in color Sudden Enizineering 55 ; `';'; 8/9/11 Sand: Fine to Medium Grained and Sandy Silt Layer -- 2" SP 4 6 Brownish Grcy in color 60 3/3/4 Clayey Silt ML 27 77 Grey in color 65 10/7/8 Sand: Fine to Medium Grainer! Layer-9" and Sandy Silt SP 23 Grey in color 70 1 t/13/16 Silty Sand: Fine Grained SM 26 22 Dark Grcy in color 75 - 7/9112 Silt and Clay: interbedded Thin Lenses ML 33 72 Dark Grcy in color Groundwater 78 Feet 80 85 90 5/7/8 6/10/10 Clayey Silt ML 32 70 Brownish Grey in color :sample Not Recovered 17 _ _ 95 _ 100 :Note: The stratification lines ,represent the approximate boundarics between the Bail types; the transition may be ;�adual. 'Total Depth = 90 Fcct Proundwater encounterededrock not encountered NMadlson Club -The Nideawny NEC ,Avenue 54 & Madison Street, La QuinO Date: 12/18/2004 Boring No. 2 Job Number: 5444810 t" N to U Description e emarlts 0 ative Soil 5 _ 3/3/3 Silty Sand: Finc Gtaincd SM 2 _._ fight Grey in color 10 5/6/7 Silty Sand: Finc Grained SM I --- Light Brown in color 15 3/4/6 Silt ML 9 97 1'an in color 20 4/5/7 Sandy Silt and Silt Layers ML 11 81 an in color 25 5/6/7 Silty Sand: Fine Grained SM 2 24 Greyish Brown in color 30 3/519 Sandy Silt and Silt Layers ML 5 64 Light Brown in color 35 4/5/7 Sandy Silt ML 6 56 reyish Brown in color 40 6/8/13 Silty Sand. Fine Grained SM 2 Browniob Grey in t,:plor 45 5/7/7 Sandy Silt ML 10 51 113rownish Grey in color 50 8/10/I 1 Silty Sand: Finc Grained anci Silt Layer --1" SM 3 18IBrownish GCcy in color Sladden Engineering ML 22 77 Brown in color SS 4/6/8 Claycy Silt 60 4/7/8 Sandy Silt with Tram of Clay ML 17 67 Brown in color ML 22 77 Brown in color 65 5/8/9 Sandy Silt " SM 12 34 Brown in color 70 7/8/18 Sand and Silt Lay= ML 31 83 town in color 75 3/3/6 Ciaycy Silt Grnundwater 79 Feet ML 27 88 Brown in color 80 JL 4/(i/9 Clayey Silt ML 26 63 rown in color $5 6/la/17 Clayey Silt 90 1/315 Silty Sand: Finc Grained SM 28 10 mwn in Wlor - Mote; The stratification lines - resent the approximate ' SM 28 16 undarics between the soil 95 I /7/l 6 Silty Sand: Fine Grained typal: the transition may be - otal VWth = W1.5 Fact SM 19 47 Groundvvatcr cncountered l00 5/6/12 Clayey Sand edrock not encountered q)%A e-n Rnainccrintr Sladden rneineerine JL 9/10117 Sand: Fine to Medium Grained SP 20 9 ]Brownish Grey in color Groundwater Q 56 Feet 60 416/7 Silt ML 27 66 Brown in color 65 1 6113/10 Silty Sand: Fine Grained Sm 24 14 Brownish Grey in color 70 2/5/14 Sandy Silt ML 24 52 Brown in color 75 5/12/22 Silty Sand, Fine Grained Sm 27 30 ' Brown in color so 6/21/34 Clayey Sand Sm 16 26 Brown in color 85 11/20/26 Sand: FinvtoMedium Grained S, p is 5 Brown in color go = to/16/11 Sand: Coars'drainod and Sandy Silt SP 28 --- roven in Color Note, The stratification lincs e-ptesemi the approximate Sm 19 ... boundwm; between the soil 95 7/15/21 Silty Sand: Fine Grained types; the transition mity be gradual. TOW Dcpth = 101.5 Feet 10 5/8/1 Sand: Coarse Grained Sp 17 Grolindwider encountered 8 OdTO Ck not encountered Madison Club-Tbe M'deaway NEC Avenue 54 & Madison Street, La uinto Date. 12/20/2004 Boring No. 4 Yob Number. $44-4910 0, -P E Description Remarks Nativo Soil Silty Sand: Fine to Medium Grained to IS 20 25 2/416 Clayey Silt ML I 1 78 Grey in color 30 5/8/9 Silty Sand: Fine Grained and Clay Layer -511 'SM 6 --- Grcy in color 35 7/8/12 Sand: Fine Grained Grey in color 40 = 5/8/13 Sand: Finc Grahicd SP 2 9 Cray in color 45 2/3/6 Clayey Silt Layer -8" and Silty Clay Layer- 8" ML 31 87 Grcy in color 50 516111 Silty Sand: M tic Grained SM 1:�_ 22 19 Greijndwater@-5" Fret 55 9/18/31 Sand: Fine Grained SP 22 11 DmTk Grey in color 60 LIL 6/8/16 Sandy Silt ML 24 61 IDark Grcy in color 65 3/4/7 Clay CL 23 91 DrQwnitih Grey in color 70 9113116 ;Sand: Fine to Coarra Grained SP 25 10 Gray in Color 75 9/15/17 Sand: Fine to Coarse Grained SP 23 11 rcy in color 80 `: >JIL 12116M Sand: Fine to Coarse Grained and Gravel SP 23 8 Grey in color 85 : 619/13 Sand- Fine to Coarse Grained and Silty Clay Laycr — 4" SP 23 Grey in color 90 6110115 Sand: Fine to Coarse Grained SP 28 11 Grey in color eta: The stratification lines LcIpromt the approximate 95 `.;` 17/26/29 Sand: Fine to Coarse Grained SP 27 7 urrdaries between the soil the transition may be 'gradwal. Total Dcpth = 101.5 Fact 100 ;: 8/17/29 Sand: Fine to Coarse Grained Sly 30 8 undwater encountered V�mck not encountered Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quintu Date: 12/20/2004 Bodug No. 5 Job Number- 544-4810 0 nk 41 Descri tioil CARemarks 0 Nativc Soil 5 5/7/10 Sandy Silt ML 96 14 77 Greyish Brown in color 10 3/5/9 Silty Sand: Fine Grained SM 110 5 16 Grey in color 15 S/7/l o Clayey Silt and Sandy Silt ML 108 3 74 Brownish Grey in color 20 4/8/13 Sand: Fine Grained SP 114 1 11 Grey in color 25 30 California Split -spoon Samplc r otal Depth —21' 1 Bedrock not cncountcred • Unrmovercd Sample Groundwater not encountered - Standard penetration Test Samplc 35 40 Notc: The stratification lines represent the approximate - boundaries between the soil types. the transition may be gradual. 45 SD gladden Enfyi-neenna Madison Club -The Hldceway NEC Avenue 54 & Madison Street, La Quinta Date: 12/20/20" Bering No. 6 Job Number: 5"4810 rq it cn V Cq Dc-mri tion rig .j Rornarks 0 Native Soil 5 5/9/11. Sand: Fine Grained and Claycy Silt SP 114 2 .•• arzy in color l U 9/10/10 Sand; Finc Graincd and Silty Sand: Fine Grained SP 107 2 11 try in cclor 15 4/6/10 Sand: Fine Grained and Sandy Silt SP 101 23 --- Grey ill color 20 :_ = 5110/17 Sand: Fine Grained SP 91 20 7 Grcy in color 25 30 California Split -spoon Sample Total Depth —21' _ I Bedrock not. cncounterod - Unrmovcred Sample Groundwator not cnco►mtcrad - Standard Penetration Tcst Sample 35 40 Notc; The stratification line: represent the approximate boundaries between the soil types; the transition may be _ grad ual. 45 5� Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/20/2004 Baring No. 7 Job Number: 544.4810 o ry � A rn U Deseri lion ;° a Rcrnark,4 0 Native Soil 5 4/5/8 Silty Sand; Finn Grained SM 102 3 21 IBrownish Grey in color 10 4/4/11 Clay and Silty Sand: Fine Grained SM 84 22 16 Brownish Grey in color 15 4/6/11 Sand- Fine to Coarse Grained and Sandy Silt SP 103 5 10 3ray in color 20' 5/9/13 Sandy Silt ML 110 6 77 Grey in color 25 30 California Split-bpoon Sample Total Depth ­21' - I nedrock not encountered - Unrecoverud Sample I Groundwater not encountered _ - Standard Penetration Test Sample 35 40 Note, The stratification lines represent the approximate boundaries between the soil typrs; the transition may be _ gradual, 45 50 klaelripn Rnainer.rina Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quints Dace: 12/20/2004 Boring No. 8 lob Number: 544-4810 o o � CJ 04 Dc3Cri tit)11 v¢s Remarks 0 Native Soil 5 4/7/11 Sandy Silt and Silty Clay Ml, I t14 2 67 Grey in color 10 7/9/9 Silty Clay and Silty Sand: Finc Grained ML 107 8 80 Grey in w1or 15 i' 10/16/24 Swd: Fine Grained SP 118 6 9 Gtcy in color 20 8/12/18 Silty Sand; Fine Grained and Sandy Silt SM III 7 15 Orey in color 25 30 California Split -spoon Sample Total Dcpth —2P I Scdrock not encountered - Unrecovered Sample Groundwater not encountered . Standard Penetration Test Sample 35 40 Now: The stratification lines represcnt the approximate boundaries between the soil typcs; the transition may be gradual. 45 5Q Madison Club -The Hideaway NEC Avenue 54 & Madison Street La uinta Dates 12/20/2004 Baring No. 9 Job Numbers S44-4810 s�. a b � q i!1 V Drscri tton f/] r� a RCioailts p Native Soil 5 .71 4/5/9 Sand: Fine Grained SP 101 3 7 Grey in color 1 a 5/9/15 Sandy Silt ML 90 22 75 13m in dolor 15 4/9/l5 Silty Stand: Fine Gruinc;d W 102 14 1'5 Grey in color 20 :: 8/16/20 Sand: Finn Grainud SFI 98 18 11 Grey in color 25 30 California Split -spoon Sample total Depth —2 V - I Bedrock not enCpuntercd - Unrecovered Sample umundwater not encountered - Standard Penetration Test Sample 35 40 Note: The stratification lines represent the approximate _ boundaries between the soil types; thn 6unvition may ba; gradual. 45 50 Cladrlr_n Rnninerrinv Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/21/2004 Boring No.10 Job Number: 544- 810 C° Description Remarks o Nativo Soil 5 12/15/23 Sand; Fine Grained and Sandy Silt SP l00 2 9 47JTCY in color 10 23/35/31 Sand: Fine Grained and Clayey Silt SP 108 3 9 !Brownish Grey in color 15 16/21/3$ Sand: Fine Grained SP 99 6 7 !Brownish Grey in Color 20 `• - 23/50-5 Sand: Fine Grained SP 106 3 7 Greyish Brown in color 25 30 California Split -spoon Sample Total Depth. m--21' IBedrock not encountered Unreoovered Sample I Groundwater not encountered . - Standard Penetration Tcst Sample 35 40 Notc; The stratification linen represent the approximate _ boundaries between the sail types; the transition may be gradual, 45 St) Madison Club-Thc Hidcaway NEC Avenue 54 & Madison Street, La uluta Date: 12/21/2004 Soretn Na. 11 Job Number: 544-4810 di ® O.22 Descri tioll rn° errtarks 0 stive Soil 5 10/14/19 Sand: Fine Grained SP 114 2 12 re} in color 10 _ $/l 1 /15 SNn[l; 1 inC (iT&ine i SP 115 3 11 rownish Grey in color 15 9/13/16 Sandy Silt and Sand: Fine Grained ML 121 2 72 grey i8h Brt)wn in color 20 8/11/15 Sand: Finn Grained 5P 113 2 12 rey in color 25 30 California Split -spoon Samplc otal Dcpth �-21' Unr oovored Sample Wrack not ancountcrad Groundwater not encountered - Standard Penetration Test Sample 35 40 Note: The stratification lines reprcucnt the approximate - boundaries between the soil types; the transition may be -8tadual. 45 50 Sladden Engineering filadAen Enkineeriniz 12/21/2004 0 U 0 S 10 15 20 25 30 35 40 45 30 Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La QuInta Boring No.13 Job Number: CD 4/6/6 1 Sand: Fine Grained 6/7/11 ISand: Fine Grained 9/14115 Silty Sand: Fine Grained California Split spoon Sample I Unreoovered Sample I Standard Pcntoration Tcst Sample The stratification lines represent the approximate arics between the soil typos; the transition may be Soil SP 11 115 1 1 1 10 1k,-T&,, in color SP 11 103 1 ! 1 8 pGm in color SM I 110 I 18 Groy in color ptal Depth 18' edrock not encountered Groundwatm not mcountmod Sladden Eneineruino Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date'. 12/21/2004 Bortug No.14 Job Number: 544-41810 8 v � 1 ° Descri lion ri � O fl Remarks Y adyc Sall 0 5 7110114 Clayey Silt and Silty Sand: Fine Grained ML 104 11 77 Grey in color 10 ;; 8/12/16 Sand: Fine Grained SP 99 6 8 Brownish Grey in color 15 6/10111 Clayey Silt ML 93 24 83 rownisle Grey in color 20 5/8/11 Clayey Silt and Sandy Silt ML 93 27 80 Grey in color 25 30 California Split -spoon Sample Total Depth —21' I cdmck not uncounturml - - Unrecovered Sample I Groundwater not encountered _ - Standard Penetration Tent Sample 35 40 Note: The stratification lints reprnsant the approximate . boundaries between the yell types; the transition may be . gradual. 45 SU Madison Chib-The Hideawny NEC Avenue 54 & Madison Street, La Quints Date: 12/2112004 Boring No.15 Job Number: 5444910 It v 0 v U Ueseri tion r° Remarks Native Soil 5 3/2/2 Sand: Fine Grained SP 3 10 rey in color 10 2/2/3 Silty Sand: Fine Grained SM 8 13 Grey in color 15 3/5/7 Silty Sand: Fine Grainai SM 3 15 Brown in color 20 6/7n Silty Sand; Fine Grained and Clay Layer •-3" SM 6 16 BTOWII in color 25 3/3/4 Clay Layer -7" and Clayey Silt Layer ^4" Brown in color 30 California Split -spoon Sample Total Depth =-26' I Badrock not encountered - Unrmorvered Sample I Groundwater not encountered _ - Standard Penetration Tcst Sample 35 40 Note: The stratification lines ro mwmt the approximate - bolindaricu between the soil types; the transition may he _ gradual, 45 50 5ladden Envineerina M€►discin Club -Tice Hideaway NEC Avenue 54 & Madison Street, La Quints Date: 12121l2004 Borilig No.16 Jab Number: $444810 a � G U pq Description V] _ o Native Soil 5 10/11/14 Silty Sand: Fine Grained and Clayey Silt SM 103 6 16 Grey in color 10 : 6/9/13 Sand: Fine Graiacd SP 110 2 7 rcy in color 15 7/11112 Snnd: FincGrained SP 109 2 6 Grey in color 20 7/13/20 Sandy Silt and Silty Sand: Fine Grained ML 99 7 60 rrey in color 25 30 Califamin Split -spoon Sampla Total Dcpth —21' ` odrock not a ncountcrcd _ Unrecovered Sample rotindwhim not cne;ountkTOj _ Standard Penetration Test Sample '35 40 Now The stratification lincs rcprescnt the up. pn)zimate _ boundarics bctwoun the soil types; the transition may be gradual. 45 50 Madison Club -The. Hideaway T NEC Avenue 54 & Madison Street, La 2uinta Date: 12/21/2004 Bming No.17 Job Number: 544-4810 o c5 � C I U M Denri tion 0 a Rs rrwrk5 0 Native Soil 5 6110116 Clayey Silt ML 109 1 76 Grey in color 10 12/14/22 Clayey Silt ML 108 8 71 Grey in color 15 619/12 Silty Sand: Fine Grained SM 107 2 16 Grey in color - Calironlia Split -spoon Sample Tow Depth —16, ` Bedrock not encounterW 20 Unrecovered Sample Groundwater not encountered - Standard Fenotnatipn Test Sample 25 - Note: The stratification lines represent the approximate - bc}undarieS between the soil types; the transition may be gradual. 30 35 40 45 SU Sladden Enn_innn ino Madison Club -The Hideaway NEC Avenue 54 & Madison Streett Ira Quinta Date: 1212112OM Boring No. 18 Job Number: 5�4 4810 w o o Sk ' Dori tion ri : cmarks Nativc Soil 0 5 6/8115 Silty Sand: Finc Grained SM 103 1 17 rey in color 10 i`'" 12/14/19 Sunni: Fine Grained $P i 12 U 7 rownish Grey in color 15 9/10113 Sand: Rine Grained SF 104 i 5 rownish Gray in color r otal_ Depth 16' California Split -spoon Sample Ce40tc npt ancounteaxxl Wr ' � Groundwatca not cncountcmW 20 Untocovcrod Sample _ Standard Penetration Test Samplc 25 _ Note: The stratification lines represent the approximate boundaries between the soil types; the transition may be _ gradual. 30 35 40 45 sn Madison C[uh-The Hideaway NEC Avenue 54 & Madison Street La Quinta Date: 12/21/2004 Boring No. 19 Job Number: 544-4810 E -q ao Desori tion Remarks 0 Native Soil 5 10/14/18 Silty Sand: fine Grained SM 103 l 14 Grey in color 10 4/7/9 Sand: Fine Grained SP 104 2 10 i5ruyincolor 15 517/10 Silty Sand: Fine Grained SM 111 4 18 Grey in color 20 _%%11, ; Gny in color 7111 /20 Sand- Fine Graincd SIR 109 4 8 25 30 California Split -spoon Sampic Cora! Depth —21' IBedrock not cneountered - Unrecovcrad Sample Groundwater not encountered - Standard Penetration Test Sample 35 40 Notc: Tho stratification lines rcprescnt the approximate - boundaries between the soil types: the transition may be _ gradual. 45 50 lndden RnvInP.P.rinO Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quintu Date: 12/21/2004 Boring No. 70 Job Number. 544-4810 8 a � � O 1L V 4 Description vai Ln r4 1'•1 c C[13nIit.S Native Soil 5 8/9112 Sand: Fine Grainal SP 113 1 $ rey in color 10 9/13/14 Sand; Fine Grained SP 109 5 - Grey in color 5 6/9/13 Sand: Fine Grained SP 109 1 $ Grey in color 20 8/14/27 Surd: Finc Grained5P 112 4 10 rvy in color 25 30 California Split -sin Sample Total Depth —21' IBedrock not encountered - Unrccovcred Sample romdwater not encountered Standard Penetration Test Sample 35 40 NuLe: The stratification lines represent the approximate boundaries between the soil types; the transition may be gradual, 45 50 I Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Ouluta jDate: 12/23/2004 Boring No. 21 JA Number: 544-48i[i q to C 7 DesEt tion M to �� � o Retntttks 0 ativc Soil 5 5110/21 Sand: FincGrainvd SP 1 9 Orcy in color 10 8/10/10 Sand: Finc Graincd SP 5 10 Grey in color 15 3/418 Silty Clay and Clay Layer-3" ML 11 75 :Brownish Grcy in color 20 3/6/1 1 Silt and Clay: Thin Interbedded Leases CL 10 95 l3rowniob GTey in color 25 30 C6lititrnia Split-spwn Sample Total Depth —21' 1 Bedrock not encountered - Unrecovered Sampic Groundwater not encountered - Standard Penetration Test Sample 35 40 Note: The stratification lines represent the approximate boundaries between the soil types: the transition tnay he _ gradue�l. 45 50 glnddrn Fnainnennv Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quint>a Dade: 12/Z3I2004 Boring No. 22 Job Number, 544-4810 � o N Description v°, Remarks atine Soil 0 5 4/4/1 fl Ciao, and Sandy Silt Layer •-6" ML 7 57 arownish Grey in color 10 5l$/i 1 Silty Clay and Silty Sand. Fine Grained Layer-2" CL 13 $6 Grcy in color 15 6/9/14 Silty Sand: Finc Grained and Silty Clay Layer —7" SM 1 B --- rey in color 20 : 5/$/1 I Sand: Fine Grained Sp i 14 rawnislt Grey in color 25 3/7/l0 Clayey Silt ML IL 3 $I r[Fwnish Grey in color 30 Gaiifomia Splitrspoon Sample l Dcpth =�-25.5' { rock not encountered _ jJ�rpeeyl Sampleundwater I not encountered [,d Standard Penetration Test Sample 35 40 Notc; The stratification lines represent the approximate, boundaries between the soil types; the transition may be grad Mkl. 45 50 Madison Club -The Hideaway NEC Avenue 54 & Madison Stree La Quinta Date: 12/23/2004 Boring No.23 Job Narnher: 5444810 O v, Description m 41 o Remarks 0 Grass Pasture 5 := 4/6/8 Sand: Pine Grained SP I 10 {Grey in color 10 = 3/5111 Sand' Fine Grained SP 7 10 3rcy in color 13 3/6/8 ClayeySilt and Sandy Silt Layer -7" ML 8 68 Brownish Grcy in color 20 3/3/5 Clay and Sandy Silty Layer - b" ML 20 71 Brownish Grey in color 25 30 California Split -spoon Sample total Depth —20.5' - I Bedrock not encountered - Unrecovered Sample I Groundwater not encountered _ - Standard penetration Test Sample 35 40 Note;: The stratification lines represent the approximate boundaries between the soil types; the transition may be _ gradual. 45 50 Sladden Eneineerina Madison Club -The IIideaway NEC Avenue 54 & Madison Street, La Quitlta Date: 12/23/2004 BoringNo. 24 Job Number; $44-4810 o � j Description rn Remarks t pp native Soil 0 5 5/20/20 Clayey Silt ML i --- Light Grey 10 : ':; 6/7/10 Sand: Fine G�uned 5P 2 9 rcy in color 5/6/10 Silty Sand: Finc Grained SM 2 12 rey in color ]20 5/718 Silty Sand: finc Graincd SM 1 12 rey in color 25 30 Cali€bmia Split -spoon Sample Total Depth —20.5' IB cdmck not cticountcrod - - Unr=vcrcd Sample i rOun4wutcr not encountered _ Standard Penctration Test Sample 35 40 Note: The stratification lines rcprescnt the appmximatc boundaries between die Soil types; the transition may be gradual. 45 50 Sladden Engineering G U Madison Club -The Hideaway NEC Avenue 54 & Madison Street, Ea Uinta Bering Na. 26 Jab Number: a +w3 e 4 l g 1I 316110 Silty Clay Lays' -�6" and Sand: Fine Granted ML I 81 Irrey in color 5/6/8 Sand: Fine Grained SP E; 10 ref' in cnlar 314/6 Sand: Fine Grained Layvr —3" and Clayey Silt SP g ... Grey in color oLd Depth5.5' California Split -spoon Sample edrock not cncountercd Iruundwater not encountered Unrecovered Sample I Standartt penetration Test Sample Note: The stratification lines represent the approximate boundwies between the soil types; the transition may be gr4dual. crgAAt F„nii teerin2 Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Uinta Date: 12/23/2004 BorinK No. 27 Job Number: 544-4810 O rr� 4 Description s Rem& 0 Nativc Soil 5 6/7/9 Sand: Finc Grained SP 4 9 Grey in color 10 3/4/5 Claycy Silt ML 2 84 5rownish Grey in color 15 4/5/5 Sandy Silt and Clayey Silt —3" ML 12 71 Brownish Grey in color 20 5/5/8 Sand: Fine to Medium Grained SP 6 10 Bmwn in color 25 30 California Split -spoon Sample Total Depth =-•20.5' Bedrock not encountered - Unrecovurod Sample I Groundwater not encountered - Standard Penetration Test Sample 35 40 Notc: The stratification lutes rcprcacnt the approximate - boundaries between the soil types; the transition may be gradual, 45 50 Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 & MidIson Street La Quin Boring No. ZS Job Number; o � soil 4n1q (Sandy Silt I ML 11 1 3 I bi J1 rey in color 3/3/6 4Clay Laycr —7" and Sandy Silt f ML 11 I 10 I 74 110 y in color 2/2/3 tlay CL 12 I- 90 Irrownish Grey in color Otal Depth —15'5' i forniu Split -spoon i Sample edrock not encountered veCed Sample roundwater not encountered ndard Pcnctration Tcst Semple 1 11 1 ` 11 Note: The stratification lines rVresett the approximate braundtui,% between the soil types; the transition may be gradual. Madison Club -Ile Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12J2312004 Boring No. 29 Job Number: S44-4810 v V) U w Description v°, !Rcmarlw 0 Native Soil 5 619114 Silty Send: Finc Graintxl SM 1 17 QM in color 6/7/8 Sand: Fine Grainpti SP 2 11 Grey in color 15 3/4/7 Sand: Fine Grained SP 4 10 Gny in wylor = California Split -spoon Sample Total Dcpth =—I5.51 Bedrock not encountered 20 Unrvmvomd Sunplc GToundwater not uncountered S[andard Penetration Test Sample 25 - Note: The stratification lines represent the approximatc - boundaries between the soil ty; the transition may be - gradual. 30 35 40 45 su Sladden Env_inrrnnv APPENDIX B Laboratory Testing Laboratory Test Results APPENDIX B LABORATORY TESTING Representative bulk and relatively undisturbed soil samples were obtained in the field and returned to our laboratory for additional observations and testing. Laboratory testing was generally performed in two phases. The first phase consisted of testing in order to determine the compaction of the existing natural soil and the general engineering classifications of the soil underlying the site. This testing was performed in order to estimate the engineering characteristics of the soil and to serve as a basis for selecting samples for the second phase of testing. The second phase consisted of soil mechanics testing. This testing including consolidation, shear strength and expansion testing was performed in order to provide a means of developing specific design recommendations based on the mechanical properties of the soil. CLASSIFICATION AND COMPACTION TESTING Unit Weight and Moisture Content Determinations: Each undisturbed sample was weighed and measured in order to determine its unit weight. A small portion of each sample was then subjected to testing in order to determine its moisture content. This was used in order to determine the dry density of the soil in its natural condition, The results of this testing are shown on the Boring Log. Maximum Density -Optimum Moisture Determinations: Representative soil types were selected for maximum density determinations. This testing was performed in accordance with the ASTM Standard D1557-41, Test Method A, The results of this testing are presented graphically in this appendix. The maximum densities are compared to the field densities of the soil in order to determine the existing relative compaction to the soil. This is shown on the Boring Log, and is useful in estimating the strength and compressibility of the soil. Classification Testing: Soil samples were selected for classification testing. This testing consists of mechanical grain size analyses and Atterberg Limits determinations. These provide information for developing classifications for the soil in accordance with the Unified Classification System. This classification system categorizes the soil into groups having similar engineering characteristics. The results of this test are very useful for detecting variations in the soil and in selecting samples for further testing. SOIL MECHANIC'S TESTING Direct $hear Testing: One bulk sample was selected for Direct Shear Testing. This testing measures the shear strength of the soil under various normal pressures and is used in developing parameters for foundation design and lateral design. Testing was performed using recompacted test specimens, which were saturated prior to testing. Testing was performed using a strain controlled test apparatus with normal pressures ranging from 800 to 2300 pounds per square foot. Expansion Testing: One bulk sample was selected for Fxpansion testing. Expansion testing was performed in accordance with the UBC Standard 18-2. This testing consists of remolding, 4-inch diameter by 1-inch thick test specimens to a moisture content and dry density corresponding to approximately 50 percent saturation. The samples are subjected to a surcharge of 144 pounds per square foot and allowed to reach equilibrium. At that point the specimens are inundated with distilled water. The linear expansion is then measured until complete. Consolidation Testing; 17611 relatively undisturbed samples were selected for consolidation testing. For this testing one -inch thick test specim s are subjected to vertical loads varying from 575 psf to 11520 psf applied progressively, The consolidation at each vad increment was recorded prior to placement of each subsequent load. The specimens were saturated at the 575 sf or 720 psf load increment, APPENDIX C 2001 California Building Code with 1,997 UBC Seismic Design Criteria January 28, 2005 -15- Project No. 544-4810 05-01-101 2001 CALIFORNIA BUILDING CODE SEISMIC DESIGN INFORMATION The California Code of Regulations, 'Title 24 (2001 California Building Code) and 1997 Uniform Building Code, Chapter 16 of this code, contain substantial revisions and additions to earthquake engineering design criteria. Concepts contained in the code that will be relevant to construction of the proposed structures are summarized below. Ground shaking is expected to be the primary hazard most likely to affect the site, based upon proximity to significant faults capable of generating large earthquakes. Major fault zones considered to be most likely to create strong ground shaking at the site are listed below. Approximate Distance Fault Type Fault Zone From Site (1997 UBC) San Andreas 8.9 km A San Jacinto 30.9 km A Based on our field observations and understanding of local geologic conditions, the soil profile type judged applicable to this site is So, generally described as stiff or dense soil. The site is located within L113C Seismic Zone 4. The following table presents additional coefficients and factors relevant to seismic mitigation for new construction upon adoption of the 1997 code. Near -Source Near -Source Seismic Seismic Seismic Acceleration Velocity Coefficient Coefficient Source Factor, N. Factor, NK Ca C" San Andreas 1.04 1.29 0.44Na 0.64N� San Jacinto 1.0 1.0 0.44N, 0.64N Sladden .Engineering CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd16x GENERAL INFORMATION i01 Project Name Wallace Residence 02 Calculation Description Title 24 Analysis 03 Project Location 81-303 Columbus Way Madison Club 04 City La Quinta 06 Zip Code 92253 08 Climate Zone CZ15 t/ 10 Building Type Single Family 12 Project Scope Newly Constructed 14 Total Cond. Floor Area (ftZ) 10517 16 Slab Area (ftZ) 8817 Y 18 Addition Cond. Floor Area(ftZ) n/a 20 Addition Slab Area (ftZ) n/a CF1 R-PRF-01 Page 1 of 19 05 Standards Version Compliance 2017 07 Compliance Manager Version BEMCmpMgr 2016.3.0 (1016 SP2) 09 Software Version EnergyPro 7.2 E13 Front Orientation (deg/Cardinal) 0 Number of Dwelling Units 1 15 Number of Zones 9 17 Number of Stories 2 19 Natural Gas Available Yes 21 Glazing Percentage (%) 33.8% COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 This building incorporates one or more Special Features shown below ENERGY USE SUMMARY 04 Energy Use (kTDV/ftZ-yr) Space Heating Space Cooling IAQ Ventilation Water Heating Photovoltaic Offset Compliance Energy Total 05 Standard Design 3.83 82.16 0.69 1.56 06 Proposed Design 4.02 81.73 0.69 1.49 0.00 87.93 07 Compliance Margin -0.19 0.43 0.00 0.07 0.00 0.31 08 Percent Improvement -5.0% 10.5% 0.0% 4.5% 0 4% REVIEWED ODE FOR RECEIVED COMPLIANCE JUL 13 Z018 DATE 9 Y Registration Number: CITY OF LA QUINTAe g 218-P010198193A-000-000-0000000-0o00 Registration Date/Time: 201 SCOMMUP.M. DEVELOPMENT CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 0 HERS Provider: CaICERTS inc Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd 1 6x ENERGY DESIGN RATING Energy Design Rating (EDR) is an alternate way to express the energy performance of a building using a scoring system wher Energy Services (RESNET) reference home characterization of the 2006 International Energy Conservation Code (IECC) with the energy performance of a building that combines high levels of energy efficiency with renewable generation to"zero out"its REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. • Window overhangs and/or fins • Non-standard duct location (any location other than attic) CF1 R-PRF-01 Page 2 of 19 HERS FEATURE SUMMARY The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the building components tables below - Building -level Verifications: • High quality insulation installation (QII) • Building Envelope Air Leakage • IAQ mechanical ventilation • High R-value Spray Foam Insulation Cooling System Verifications: • Minimum Airflow • Verified EER • Verified SEER • Verified Refrigerant Charge • Fan Efficacy Watts/CFM HVAC Distribution System Verifications: • Duct Sealing • Verified low -leakage ducts in conditioned space must meet maximum 25 cfm leakage to outside (RA3.1.4.3.8) Domestic Hot Water System Verifications: • Pipe Insulation, All Lines Registration Number: 218-Po10198193A-000-000-0000000-0000 Registration Date/Time: 2018-07-11 14:09:57 HERS Provider: CaICERTS inc CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1 R-PRF-01 Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Page 3 of 19 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd 1 6x BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (ft2) Number of Dwelling Number of Ventilation Number of Water Units Number of Bedrons Number of Zones Cooling Systems Heating Systems Wallace Residence 10517 1 6 9 I 0 1 Registration Number: 218-Po10198193A-000-000-0000000-0000 Registration DateMme: 2018-07-11 14:09:57 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence CF1 R-PRF-01 Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Page 4 of 19 Calculation, Description: Title 24 Analysis Input File Name: Wallace Residence. ribd16x OPAQUE SURFACES 01 02 03 04 05 06 07 08 Name Zone Construction Azimuth Orientation Gross Area (ft2) Window &Door Area (ft2) Tilt (deg) South Exterior Wall Zone 1 R-24 Wall1 180 Back 512 East Exterior Wall Zone 1 R-24 Wall1 90 226.5 90 West Exterior Wall Zone 1 R-24 Wall1 270 Left 656 102 90 North Interior Surface Zone 1 —Zone 5 R-24 Wall Right 320 0 90 West Interior Surface Zone 1 —Zone 2 R-24 Wall n/a n/a 216 0 n/a of 3 Zone 1 R-38 Roof Attic Plus n/a n/a n/a n/a 132 1228 0 n/a terior Wall Zone 2 R-24 Wall1 0 Front n/a n/a PNorth erior Wall 2 Zone 2 R-24 Wall1 494 194.02290 rior Wall 2 Zone 2 180 Back 737 437.03390 R-24 Wall1 270 Right 320 20 90 or Surface 2 Zone 2»Zone 4 R-24 Wall n/a or Surface Zone 2»Zone 1 R-24 Wall n/a n/a I 1400 n/a West Interior Surface 2 Zone 2»Zone 5 R-24 Wall n/a 120 0 n/a n/a n/a 312 0 n/a Roof 4 Zone 2 R-38 Roof Attic Plus n/a n/a 1298 North Exterior Wall 2 Zone 3 R-24 Wall1 0 Front n/a n/a East Exterior Wall 2 Zone 3 R-24 Wall1 90 Left 308 77 90 West Exterior Wall 3 Zone 3 R-24 Wall1 270 596 36.0006 90 South Interior Surface Zone 3»Zone 1 R-24 Wall Right 452 189 90 West Interior Surface 3 Zone 3»Zone 2 R-24 Wall n/a n/a 252 0 n/a North Interior Surface 3 Zone 3»Zone 9 R-24 Wall n/a n/a 84 0 n/a North Exterior Wall 3 Zone 4 R-24 Wall1 n/a 0 n/a 492 0 n/a East Exterior Wall 3 Zone 4 R-24 Wall1 90 90 Front 356 76 90 North Interior Surface 4 Zone 4»Zone 6 R-24 Wall Left 656 275.994 90 South Interior Surface 2 Zone 4»Zone 2 R-24 Wall n/a 96 96 0 n/a West Interior Surface 4 Zone 4»Zone 6 R-24 Wa!I n/a n/a 16 0 1n/a n/a n/a 552 0 n/a Roof 5 Zone 4 R-38 Roof Attic Plus n/a n/a 1025.98 n/a n/a North Exterior Wall 4 Zone 5 R-24 Wall1 0 Front 114 South Exterior Wall 3 Zone 5 R-24 Wall1 180 Back 584 6 90 East Exterior Wall 4 Zone 5 R-24 Wall1 90 Left 162 90 West Exterior Wall 4 Zone 5 R-24 Wall1 270 Right 512 910 0 90 North Interior Surface 5 Zone 5»Zone 6 R-24 Wall 113.01 90 n/a I n/a 312 0 n/a Registration Number: 218-P010198193A-000-000-0000000-0000 Registration Date/Time: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 2018-07-11 14:09:57 SP2 HERS Provider: CaIinc. Report Generated at: 2018-07-11 14:01:21 1:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd 1 6x CF1R-PRF-01 Page 5 of 19 East Interior Surface 2 Roof 6 North Exterior Wall 5 South Exterior Wall 4 East Exterior Wall 5 �EEHZone West Exterior Wall 5 South Interior Surface 3 Roof 7 North Exterior Wall 6 South Exterior Wall 5 Ea�ExteriorWall W South Interior Surface 4 Roof 8 Interior Surface South Exterior Wall 6 East Exterior Wall 7 West Exterior Wall 7 North Exterior Wall 7 North Interior Surface 6 Roof 9 Interior Surface 2 North Exterior Wall 8 East Exterior Wall 8 West Exterior Wall 8 South Interior Surface 5 Roof 10 Zone 5»Zone 2 Zone 5 Zone 6 Zone 6 6 Zone 6 Zone 6»Zone 5 Zone 6 Zone 7 Zone 7 Zone 7 Zone 7 Zone 7»Zone 8 Zone 7 Zone 7»Zone 3 Zone 8 Zone 8 Zone 8 Zone 8 Zone 8»Zone 7 Zone 8 Zone 8»Zone 3 Zone 9 Zone 9 Zone 9 Zone 9»Zone 3 Zone 9 R-24 Wall R-38 Roof Attic Plus R-24 Wall1 R-24 Wall1 R-24 Wall1 R-24 Wall1 R-24 Wall R-38 Roof Attic Plus R-24 Wall1 R-24 Wall1 R-24 Wall1 R-24 Wall1 R-24 Wall R-38 Roof Attic Plus R-30 Floor No Crawlspace R-24 Wall1 R-24 Wall1 R-24 Wall1 R-24 Wall1 R-24 Wall R-38 Roof Attic Plus R-30 Floor No Crawlspace R-24 Wall1 R-24 Wall1 R-24 Walli R-24 Wall R-38 Roof Attic Plus n/a n/a 0 180 90 270 n/a n/a 0 180 90 270 n/a n/a n/a 180 90 0 0 n/a n/a n/a 0 90 270 n/a n/a n/a n/a Front Back Left Right n/a n/a Front Back Left Right I n/a n/a n/a Back Left Front Front n/a n/a n/a Front Left Right n/a n/a 312 1339.98 692 440 796 1016 192 1324 560 40 572 704 324 900 900 768 644 560 370 324 800 800 548 740 740 288 1259 0 n/a 141 72 68 220 0 n/a 189 0 74.7 204 0 n/a n/a 96 225 8 49 0 n/a n/a 14 240 13 0 n/a n/a n/a 90 90 90 90 n/a n/a 90 90 90 90 n/a n/a n/a 90 90 90 90 n/a n/a n/a 90 90 90 n/a n/a Registration Number: 218-P010198193A-000-000-0000000-000o Registration Date/Time: 2018-07-11 14:09:57 HERS Provider: CaICERTS inc CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd 1 6x OPAQUE SURFACES - Cathedral Ceilings 01 02 Name Zone Roof Zone 4 Roof 2 1 Zone 5 ATTIC 03 04 05 06 07 Skylight Area Roof Ri! Type Orientation Area (ftZ) (ft2) (x in 1: R-38 Roof Attic Plus1 Front 5.12 5.02 0.2 R-38 Roof Attic Plus1 Front 23.12 23.02 02 C F 1 R-P RF-01 Page 6 of 19 08 09 10 e Roof Reflectance Roof Emittance Cool Roof 0.1 0.85 No 0.1 0.85 No 01 02 03 04 05 06 Name Construction Type Roof Rise Roof Reflectance Roof Emittance Attic Zone 1 Attic RoofZone 1 Unventilated 0.2 0.1 0.85 Attic Zone 2 Attic RoofZone 2 Unventilated 0.2 0.1 0.85 Attic Zone 4 Attic RoofZone 4 Unventilated 0.2 0.1 0.85 Attic Zone 5 Attic RoofZone 5 Unventilated 0.2 0.1 0.85 Attic Zone 6 Attic RoofZone 6 Unventilated 0.2 0.1 0.85 Attic Zone 7 Attic RoofZone 7 Unventilated 02 0.1 1 0.85 Attic Zone 8 Attic RoofZone 8 Unventilated 0.2 0.1 0.85 Attic Zone 9 Attic RoofZone 9 Unventilated ' 0.2 0.1 0.85 07 08 Radiant Barrier Cool Roof No No No No No No No No No No No No No No No No Registration Number: 218-Po10198193A-000-000-0000000-0000 Registration DateRme: 2018-07-11 14:09:57 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd16x CF1 R-PRF-01 Page 7 of 19 FENESTRATION / GLAZING 01 02 03 + 04 05 06 07 08 09 10 Height Area Name Type Surface (Orientation -Azimuth) Width (ft) (ft) Multiplier (ft2) U-factor SHGC Exterior Shading Window J1 Window South Exterior Wall (Back-180) - 1 180.0 0.32 0.31 Insect Screen (default) Window 25 Window South Exterior Wall (Back-180) -- 1 46.5 0.30 0.24 Insect Screen (default) Window K1 Window East Exterior Wall (Left-90) --- - 1 24.0 0.42 0.17 Insect Screen (default) Window 26 Window East Exterior Wall (Left-90) 6.5 12.0 1 78.0 0.30 0.24 Insect Screen (default) Window Al Window North Exterior Wall (Front-0) 7.0 12.0 1 84.0 0.70 0.70 Insect Screen (default) Window 01 Window North Exterior Wall (Front-0) 5.9 12.0 1.003 71.0 0.30 0.24 Insect Screen (default) Window 02 Window North Exterior Wall (Front-0) 12.9 3.0 1.008 39.0 0.30 0.24 Insect Screen (default) Window 11 Window South Exterior Wall 2 (Back-180) 22.0 12.0 1 264.0 0.30 0.24 Insect Screen (default) Window 22 Window South Exterior Wall 2 (Back-180) 22.0 2.0 1�01 0.24 Insect Screen (default) Window 23 Window South Exterior Wall 2 (Back-180) 11.2 9.2 1.029 0.20 Insect Screen (default) Window 24 Window South Exterior Wall 2 (Back-180) 11.2 2.0 1.027 23.0 0.30 0.24 Insect Screen (default) Window 51 Window West Exterior Wall 2 (Right-270) -- 1 20.0 0.30 0.24 Insect Screen (default) Window 30 Window North Exterior Wall 2 (Front-0) -- - 1 77.0 0.30 0.24 Insect Screen (default) Window M1 Window East Exterior Wall 2 (Left-90) -- - 1 24.0 0.42 0.17 Insect Screen (default) Window 27 Window East Exterior Wall 2 (Left-90) 5.9 2.0 1.017 12.0 0.30 0.24 Insect Screen (default) Window 31 Window West Exterior Wall 3 (Right-270) -- -.-- 1 189.0 0.30 0.24 Insect Screen (default) Window B2 Window I North Exterior Wall 3 (Front-0) 7.6 10.0 1 76.0 0.32 0.31 Insect Screen (default) Window B1 Window East Exterior Wall 3 (Left-90) 7.1 10.0 1.014 72.0 0.32 0.31 Insect Screen (default) Window 03 Window East Exterior Wall 3 (Left-90) ---- --- 1 204.0 0.30 0.24 Insect Screen (default) Skylight SO4 Skylight Roof (Front-0) 1 2.5 0.30 0.30 Skylight S05 Skylight Roof (Front-0) 1 2.5 0.30 0.30 Window 15 Window North Exterior Wall 4 (Front-0) --- -- 1 6.0 0.30 0.24 Insect Screen (default) Window H1 Window South Exterior Wall 3 (Back-180) 10.0 10.0 1 100.0 0.32 0.31 Insect Screen (default) Window 19 Window South Exterior Wall 3 (Back-180) 2.6 10.0 1 26.0 0.30 0.24 Insect Screen (default) Window 21 Window South Exterior Wall 3 (Back-180) 3.0 10.0 1 30.0 0.30 0.24 Insect Screen (default) Window 17 Window South Exterior Wall 3 (Back-180) - - - - 1 6.0 0.30 0.24 Insect Screen (default) Window 14 Window West Exterior Wall 4 (Right-270) 1.5 6.0 1 9.0 0.30 0.24 Insect Screen (default) Window 16 Window West Exterior Wall 4 (Right-270) 11.0 4.1 0.998 45.0 0.30 0.24 Insect Screen (default) Window 18 Window West Exterior Wall 4 (Right-270) 1.5 6.0 1 9.0 0.30 0.24 Insect Screen (default) Registration Number: 218-Po10198193A-000-000-0000000-0000 Registration DatelTime: 2018-07-11 14:09:57 HERS Provider: CaICERTS inc CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence CF1 R-PRF-01 Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Page 8 of 19 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd16x Window 20 Window West Exterior Wall 4 (Right-270) 3.0 10 0 1 30.0 0.30 Window 51 2 Window West Exterior Wall 4 (Right-270) 0.24 Insect Screen (default) Skylight S02 Skylight Roof 2 (Front-0) - 1 20.0 0.30 0 24 Insect Screen (default) Skylight S01 Skylight Roof 2 (Front-0) 1 2.5 0.30 0.30 Skylight S03 Skylight Roof 2 (Front-0) 1 18.0 0.32 0.39 Window 04 Window North Exterior Wall 5 (Front-0) 1 2.5 0.30 0.30 Window 06 Window North Exterior Wall 5 (Front-0) -- -- 1 6.5 28.0 0.30 0.24 Insect Screen (default) Window 07 Window North Exterior Wall 5 (Front-0) 10.0 1 --- 65.0 0.30 0.24 Insect Screen (default) Window 09 Window North Exterior Wail 5 (Front-0) --- 1 -- 9.0 0.30 0.24 Insect Screen (default) Window 10 Window North Exterior Wall 5 (Front-0) - 1 - 27.0 0.30 0.24 Insect Screen (default) Window C1 Window South Exterior Wall 4 (Back-180) 1 - 12.0 0.30 0.24 Insect Screen (default) Window 05 Window East Exterior Wall 5 (Left-90) - 1 - 72.0 0.35 0.22 Insect Screen (default) Window 08 Window West Exterior Wail 5 (Right-270) - - 1 -- 68.0 0.30 0.24 Insect Screen (default) Window 11 Window West Exterior Wall 5 (Right-270) - 1 6.0 0.30 024 Insect Screen (default) Window 12 Window West Exterior Wall 5 (Right-270) -- 1 13.0 0.30 0.24 Insect Screen (default) Window 13 Window West Exterior Wall 5 (Right-270) -- 1 -- 45.0 0.30 0.24 Insect Screen (default) Window E1 Window West Exterior Wall 5 (Right-270) -- 1 8.0 12.0 0.30 0.24 Insect Screen (default) Window F1 Window West Exterior Wall 5 (Right-270) 9.0 1 ---- 72.0 0.35 0.22 Insect Screen (default) Window 43 Window North Exterior Wall 6 (Front-0) -- 1 4.0 72.0 0.35 0.22 Insect Screen (default) Window 44 Window North Exterior Wall 6 (Front-0) 10.0 1 4.0 40.0 0.30 0.24 Insect Screen (default) Window 46 Window North Exterior Wall 6 (Front-0) 10.0 1 3.0 40.0 0.30 0.24 Insect Screen (default) Window 47 Window North Exterior Wall 6 (Front-0) 10.0 1 3.0 30.0 0.30 0.24 Insect Screen (default) Window P1 Window North Exterior Wall 6 (Front-0) 10.0 1 5.0 30.0 0.30 0.24 Insect Screen (default) Window 40 Window East Exterior Wall 6 (Left-90) 9.8 1 ---- 49.0 0.42 0.17 Insect Screen (default) Window 41 Window East Exterior Wall 6 (Left-90) -- 1 - 22.0 0.30 0.24 Insect Screen (default) Window 42 Window East Exterior Wall 6 (Left-90) - 1 - 12.7 0.30 0.24 Insect Screen (default) Window 45 Window West Exterior Wall 6 (Right-270) -- 1 3.5 40.0 0.30 0.24 Insect Screen (default) Window 48 Window West Exterior Wall 6 (Right-270) 10.0 1 --- 35.0 0.30 0.24 Insect Screen (default) Window 49 Window West Exterior Wall 6 (Right-270) ----- 1 -- 33.0 0.30 0.24 Insect Screen (default) Window 50 Window West Exterior Wall 6 (Right-270) - 1 29.0 0.30 0.24 Insect Screen (default) Window R1 Window West Exterior Wall 6 (Right-270) - - 1 35.0 0.30 0.24 Insect Screen (default) Window 32 Window South Exterior Wall 6 (Back-180) - 1 72.0 0.35 0.22 Insect Screen (default) Window 33 Window South Exterior Wall 6 (Back-180) -- 1 52.0 0.30 0.24 Insect Screen (default) 1 24.0 0.30 0.24 Insect Screen (default) Registration Number: 218-P010198193A-000-000-0000000-0000 Registration Date/Time: CA Building Energy Efficiency Standards 2018-07-11 14:09:57 - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 HERS Provider: CaICERTS inc Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Page 9 of 19 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd 1 6x Window 35 Window South Exterior Wall 6 (Back-180) -- 1 8.0 0.30 0.24 Insect Screen (default) Window 36 Window South Exterior Wall 6 (Back-180) -- - 1 12.0 0.30 0.24 Insect Screen (default) Window 37 Window East Exterior Wall 7 (Left-90) 1 39.0 0.30 0.24 Insect Screen (default) Window 38 Window East Exterior Wall 7 (Left-90) ' 5.8 10.0 1 58.0 0.30 0.24 Insect Screen (default) Window 39 Window East Exterior Wall 7 (Left-90) 48 10.0 1 48.0 0.30 0.24 Insect Screen (default) Window P3 Window East Exterior Wall 7 (Left-90) --- --- 1 80.0 0.35 0.22 Insect Screen (default) Window 34 Window West Exterior Wall 7 (Front-0) 4.0 ' 2.0 ! 1 8.0 0.30 0.24 Insect Screen (default) Window Q1 Window North Exterior Wall 7 (Front-0) 5 0 9.8 1 49.0 0.42 0.17 1 Insect Screen (default) Window 28 Window North Exterior Wall 8 (Front-0) ---- ---- 1 14.0 0.30 0.24 Insect Screen (default) Window N2 Window East Exterior Wall 8 (Left-90) -•-- - 1 80.0 0.59 0.57 Insect Screen (default) Window N3 Window East Exterior Wall 8 (Left-90) -- 1 80.0 0.59 0.57 Insect Screen (default) Window N4 Window East Exterior Wall 8 (Left-90) -- - 1 80.0 0.59 0.57 Insect Screen (default) Window 29 Window West Exterior Wall 8 (Right-270) -- 1 13.0 1 0.30 0.24 Insect Screen (default) Registration Number: 218-P010198193A-000-000-0000000-0000 Registration Date/Time: 2018-07-11 14:09:57 HERS Provider: CaICERTS inc CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence CF1 R-PRF-01 Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Calculation Description: Title 24 Analysis Page 10 of 19 Input File Name: Wallace Residence.ribdl6x OVERHANGS AND FINS 01 04 05 06 07 08 09 10 11 12 13 14 Overhang Left Fin Right Fin Window Left Extent Right Extent Flap Ht. Depth Top Up Dist L Bot Up Depth Top Up Dist R Bot Window 26 4 4 0 Up Window Al $40.1 4 4 0 0 0 0 0 0 0 0 Window 01 4 4 0 0 0 0 0 00 0 0 02 4 4 0 0 0 0Window 11 4 4 0Window 22 4 4 0 0 0Window Window 23 12 0.1 4 4 0 0 0 0 p 0 0 0 0 Window 24 12 0.1 4 4 0 0 0 0 0 0 0 0 0 Window 27 8 0.1 8 8 0 0 0 0 0 0 0 0 0 Window B2 2 0.1 2 2 0 0 0 0 0 0 0 0 0 Window B1 2 01 2 2 0 0 0 0 0 0 0 0 0 Window H1 4 0.1 4 4 0 0 0 0 0 0 0 0 0 Window 19 10 0.1 10 10 0 0 0 0 0 0 0 0 0 0 Window 21 4 0.1 4 4 0 -0 0 -0 0 0 0 0 0 0 Window 14 4 0.1 4 4 0 0 0 0 0 0 0 Window 16 2 0.1 2 2 0 0 0 0 0 0 0 0 0 Window 18 2 0.1 2 1 2 0 0 0 0 0 0 0 0 0 Window 20 10 0.1 10 10 0 0 0 0 0 0 0 0 0 0 Window 06 2 0.1 2 2 0 0 0 0 0 0 0 0 0 Window E1 8 0.1 8 8 0 0 0 0 0 0 0 0 Window 43 6 0.1 6 6 0 0 0 0 0 0 0 0 0 Window 44 12 0.1 4 4 0 0 0 0 0 0 0 0 0 Window 46 12 0.1 4 4 0 0 0 0 0 0 0 0 0 0 Window 47 12 0.1 4 4 0 0 0 0 0 0 0 0 0 Window P1 12 0.1 4 4 0 0 0 0 0 0 0 0 Window 45 12 0.1 4 4 0 0 0 0 0 0 0 0 0 0 Window 38 12 0.1 4 4 0 0 0 0 0 0 0 0 Window 39 12 0.1 4 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Registration Number: 218-Po10198193A-000-000-0000000-0000 Registration Date/Time: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report 2018-07-11 Version - CF1R-06212018-1016 SP2 14:09:57 HERS Provider: CaICERTS inc. Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence CF1 R-PRF-01 Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Page 12 of 19 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd16x OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 Construction Name Surface Type Construction Type FramingTotal Cavity R-value Winter Design U-factor Assembly Layers • Under Roof Joists: R-27.0 insul. Attic RoofZone 1 Attic Roofs Wood Framed Ceiling 2x4 Top Chord of Roof Truss 24 @ in. O.C. R 40 0.025 • Cavity/Frame: R-13.0/2x4 Top Chrd - : Roof DeckWood Siding/sheathingrdecking Roofing: Light Roof (Asphalt Shingle) R-24 Wall Interior Walls Wood Framed Wall 2x6 @ 16 in. O.C. R 24 0 060 • Inside Finish: Gypsum Board Cavity/Frame: R-24/2x6 Other Side Finish: Gypsum Board R-24 Wall1 R-38 Roof Attic Plus Exterior Walls Ceilings (below attic) Wood Framed Wall Wood Framed Ceilin 9 2x6 @ 16 in. O.C. 2x4 @ 24 in. O.C. R 24 none 0.065 0.481 • Inside Finish: Gypsum Board Cavity/Frame: R-24/2x6 •Exterior Finish: 3 Coat Stucco Inside Finish: Gypsum Board Cavity/Frame: no insul. 12x4 • Under Roof Joists: R-27.0 insul. Attic RoofZone 2 Attic Roofs Wood Framed Ceiling 2x4 Top Chord of Roof Truss @ 24 in. O.C. R 40 0.025 • Cavity/Frame: R-13.012x4 Top Chrd Roof Deck: Wood Siding/sheathingldecking Roofing: Light Roof (Asphalt Shingle) • Under Roof Joists: R-27.0 insul. Attic RoofZone 4 Attic Roofs Wood Framed Ceiling 2x4 Top Chord of Roof Truss @ 24 in. O.C. R 40 0.025 • CavitylFrame: R-13.012x4 Top Chrd • Roof Deck: Wood Siding/sheathingldecking • Roofing: Light Roof (Asphalt Shingle) • Inside Finish: Gypsum Board R-38 Roof Attic Plusi Cathedral Ceilings Wood Framed Ceiling 2x4 @ 24 in. O.C. none 0.024 • Sheathing/ Insulation: R40 Sheathing • Cavity I Frame: no insul./2x4 • Roof Deck: Wood Siding/sheathing/decking •Roofing: Light Roof (Asphalt Shingle) • Under Roof Joists: R-27.0 insul. Attic RoofZone 5 Attic Roofs Wood Framed Ceiling 2x4 Top Chord of Roof Truss @ 24 in. O.C. R 40 0.025 Cavity/Frame: R-13.0/2x4 Top Chrd Roof Deck: Wood Siding/sheathingldecking Roofing: Light Roof (Asphalt Shingle) • Under Roof Joists: R-27. 0 insut Attic RoofZone 6 Attic Roofs Wood Framed Ceiling 2x4 Top Chord of Roof Truss @ 24 in. O.C. R 40 0.025 • Cavityl Frame: R-13.012x4 Top Chrd Roof Deck: Wood Siding/sheathing/decking Roofing: Light Roof (Asphalt Shingle) • Under Roof Joists: R-27.0 insul. Attic RoofZone 7 =RoofftsWoodamed Ceiling 2x4 Top Chord of Roof Truss @ 24 in. O.C. R 40 0.025 • Cavity/Frame: R-13.0/2x4 Top Chrd - Roof Deck: Wood Siding/sheathing/decking Raofing: Light Roof (Asphalt Shingle) Registration Number: 218-P010198193A-000-000-0000000-0000 Registration DateMme: 2018-07-11 14:09:57 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence.ribdl6x R-30 Floor No Crawlspace I Interior Floors Attic RoofZone 8 1 Attic Roofs Attic RoofZone 9 Attic Roofs SLAB FLOORS 01 Name Slab -on -Grade Slab -on -Grade 2 Slab -on -Grade 3 Slab -on -Grade 4 Slab -on -Grade 5 Slab -on -Grade 6 Slab -on -Grade 7 BUILDING ENVELOPE - HERS VERIFICATION 01 Quality Insulation Installation (QII) Required WATER HEATING SYSTEMS 01 Name DHW Sys 1 CF1 R-PRF-01 Page 13 of 19 • Floor Surface: Carpeted • Floor Deck: Wood Siding/sheathingldecking • Cavity/Frame: R-38 in 11-1/4 in. fR-37}/ Wood Framed Floor 2x12 @ 16 in. O.C. R 38 in 11-1/4 in. cavity (R-37) 0.028 2x12 Ceiling Below Finish: Gypsum Board • Under Roof Joists: R-27.0 insul. 2x4 Top Chord of Roof Truss @ 24 • Cavity/Frame: R-13.0/2x4 Top Chrd Wood Framed Ceiling in. O.C. R 40 Roof Deck.' Wood Sidinglsheathingldecking 0.025 Roofing: Light Roof (Asphalt Shingle) • Under Roof Joists: R-27.0 insul. 2x4 Top Chord of Roof Truss @ 24 • Cavity/Frame: R-13.0/2x4 Top Chrd Wood Framed Ceiling in O.C. R 40 Roof Deck: Wood Sidinglsheathingldecking 0.025 Roofing: Light Roof (Asphalt Shingle) 02 03 04 05 06 07 Zone Area (ft2) Perimeter (ft) Edge Insul. R-value & Depth Carpeted Fraction Heated Zone 1 1228 90 None 1 No Zone 2 1298 70 None 1 No Zone 3 1314 110 None 1 No Zone 4 1031 120 None 1 No Zone 5 1363 140 None 1 No Zone 6 1324 200 None 1 No Zone 9 1259 140 None 1 No 02 03 04 Quality Installation of Spray Foam Insulation Building Envelope Air Leakage CFM50 Required Required 2018.4 02 System Type DHW 03 Distribution Type (HERS req'd) Pipe Insulation, All Lines 04 Water Heater DHW Heater 1 (2) 05 06 Number of Heaters Solar Fraction (%) 2 .0% Registration Number: 218-Po10198193A-000-000-0000000-0000 Registration Date/Time: 2018-07-11 14:09:57 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribdI6x WATER HEATERS 01 02 03 Heater Element Name Type Tank Type DHW Heater 1 Gas Small Storage WATER HEATING - HERS VERIFICATION 01 02 Name DHWDHW S SPACE CONDITIONING SYSTEMS 01 SC Sys Name HVAC Systrem 11 HVAC System 22 HVAC System 33 HVAC System 44 HVAC System 55 HVAC System 66 HVAC System 77 HVAC System 88 HVAC System 99 CFI R-PRF-01 Page 14 of 19 04 05 06 07 08 09 10 11 Tank Uniform Energy Input Rating / Pilot / Tank Standby 12 Number Volume Units Factor / Energy Thermal Insulation R-value Loss / Recovery First Hour Rating NEEA Heat Pump Tank Location of (gal) Factor / Efficiency Efficiency (Int/Ext Eff / Brand / Model / or Ambient 2 55 0.97 EF 75,000 Btu/hr R-0/R-0 Flow Rate Other Condition n/a n/a n/a n/a Pipe Insulation Pipe Insulation, All Lines 02 System Type Other Heating and Cooling System Other Heating and Cooling System Other Heating and Cooling System Other Heating and Cooling System Other Heating and Cooling System Other Heating and Cooling System Other Heating and Cooling System Other Heating and Cooling System Heat Pump Heating and Cooling System 03 04 � 05 Parallel Piping Compact Distribution Point -of Use n/a n/a n/a 03 Heating Unit Name Heating Component 1 Heating Component 2 Heating Component 3 Heating Component 4 Heating Component 5 Heating Component 6 Heating Component 7 Heating Component 8 Heat Pump System 9 04 Cooling Unit Name Cooling Component 1 Cooling Component 2 Cooling Component 3 Cooling Component 4 Cooling Component 5 Cooling Component 6 Cooling Component 7 Cooling Component 8 Heat Pump System 9 06 + 07 Recirculation Central DHW Control Distribution n/a I n/a 05 06 Fan Name Distribution Name HVAC Fan 1 Air Distribution System 1 HVAC Fan 2 Air Distribution System 2 HVAC Fan 3 Air Distribution System 3 HVAC Fan 4 Air Distribution System 4 HVAC Fan 5 Air Distribution System 5 HVAC Fan 6 Air Distribution System 6 HVAC Fan 7 Air Distribution System 7 HVAC Fan 8 Air Distribution System 8 HVAC Fan 9 Air Distribution System 9 Registration Number: 218-Po10198193A-000-000-0000000-0000 Registration Date/Time: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP211 14:09:57 HERS Provider: CaICEinc. Report Generated at: 2018-07-11 14:01:21 21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd16x HVAC - HEATING UNIT TYPES 01 Name Heating Component 1 Heating Component 2 Heating Component 3 Heating Component 4 Heating Component 5 Heating Component 6 Heating Component 7 Heating Component 8 HVAC - HEAT PUMPS 01 Name Heat Pump System 9 02 System Type CntrlFurnace CntrlFurnace CntrlFurnace CntrlFurnace CntrlFurnace CntrlFurnace CntrlFurnace CntrlFurnace CF1 R-PRF-01 Page 15 of 19 03 04 Number of Units Efficiency 1 78 AFUE 1 78 AFUE 1 78 AFUE 1 78 AFUE 1 78 AFUE 1 78 AFUE 1 78 AFUE 1 78 AFUE 02 03 System Number of Type Units SplitHeatPump i 04 05 06 Heating 07 08 Cooling 09 10 11 Zonally Controlled Compressor Type HERS Verification HSPF/COP 8.3 Cap 47 34800 Cap 17 27300 SEER EER 19.3 12.3 Not Zonal Multi -speed Heat Pump System 9-hers-cool Registration Number: 218-P010198193A-000-000-0000000-0000 Registration Date/Time: 2018-07-11 14:09:57 HERS Provider: CaICERTS inc A Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1 R-PRF-01 Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Page 16 of 19 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd16x HVAC - COOLING UNIT TYPES 01 02 03 04 05 06 07 08 Efficiency Name System Type Number of Units EER SEER Zonally Controlled Compressor Type HERS Verification Cooling Component 1 SplitAirCond 1 13 22 Not Zonal Multi -speed Cooling Component 1-hers-cool Cooling Component 2 SplitAirCond 1 13 20.5 Not Zonal Multi -speed Cooling Component 2-hers-cool Cooling Component 3 SplitAirCond 1 13 205 :N,ott:Z=onalMulti-speed Cooling Component 3-hers-cool Cooling Component 4 SplitAirCond 1 13 21 Not Zonal Multi -speed Cooling Component 4-hers-cool J Cooling Component 5 ! j SplitAirCond 1 13 20.5 Not Zonal I Multi -speed Cooling Component 5-hers-cool Cooling Component 6 SplitAirCond 1 13 20.5 Zonally Controlled Multi -speed Cooling Component 6-hers-cool Cooling Component 7 SplitAirCond 1 13 22 Not Zonal Multi -speed Cooling Component 7-hers-cool Cooling Component 8 SplitAirCond I 13 22 Not Zonal Multi -speed Cooling Component 8-hers-cool HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target Verified EER Verified SEER Verified Refrigerant Charge Cooling Component 1-hers-cool Required 350 Required Required Required Cooling Component 2-hers-cool Required 350 Required Required Required Cooling Component 3-hers-cool Required 350 Required Required Required Cooling Component 4-hers-cool Required 350 Required Required Required Cooling Component 5-hers-cool Required 350 Required Required Required Cooling Component 6-hers-cool Required 350 Required Required Required Cooling Component 7-hers-cool Required 350 Required Required Required Cooling Component 8-hers-cool Required 350 Required Required Required Heat Pump System 9-hers-cool Required 350 Required Required Not Required Registration Number: 218-PO10198193A-000-000-0000000-0000 Registration Date/Time: 2018-07-11 14:09:57 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd16x HVAC - DISTRIBUTION SYSTEMS 01 Name Air Distribution System 1 Air Distribution System 2 Air Distribution System 3 Air Distribution System 4 Air Distribution System 5 Air Distribution System 6 Air Distribution System 7 Air Distribution System 8 Air Distribution System 9 HVAC DISTRIBUTION - HERS VERIFICATION 01 02 Duct Leakage Verification Required Required Required Required Required Required Required Required Required Name Air Distribution System 1-hers-dist Air Distribution System 2-hers-dist Air Distribution System 3-hers-dist Air Distribution System 4-hers-dist Air Distribution System 5-hers-dist Air Distribution System 6-hers-dist Air Distribution System 7-hers-dist Air Distribution System 8-hers-dist Air Distribution System 9-hers-dist 02 Ty pe LowLlCod Lowl-lCod LowLlCod LowLlCod LowLlCod LowLlCod LowLlCod LowLlCod LowLlCod 03 Duct Leakage Sealed and tested Sealed and tested Sealed and tested Sealed and tested Sealed and tested Sealed and tested Sealed and tested Sealed and tested Sealed and tested 03 Duct Leakage Target (%) See RA3.1.4.3.8 See RA3.1.4.3.8 See RA3.1.4.3.8 See RA3.1.4.3.8 See RA3.1.4.3.8 See RA3.1.4.3.8 See RA3.1.4.3.8 See RA3.1.4.3.8 See RA3.1.4.3.8 04 Insulation R-value 8 8 8 04 Verified Duct Location Required Required Required Required Required Required Required Required Required 8 8 8 8 8 8 CF1 R-PRF-01 Page 17 of 19 05 06 07 Duct Location Bypass Duct HERS Verification Conditioned zone (VLL) None Air Distribution System 1-hers-dist Conditioned zone (VLL) None Air Distribution System 2-hers-dist Conditioned zone (VLL) None Air Distribution System 3-hers-dist Conditioned zone (VLL) None Air Distribution System 4-hers-dist Conditioned zone (VLL) Distribution System 5-hers-dist Conditioned zone (VLL) ENo EF Distribution System 6-hers-dist Conditioned zone (VLL) None Distribution System f 7-hers-dist Conditioned zone (VLL) None Air Distribution System 8-hers-dist None Air Distribution System Conditioned zone (VLL) 9-hers-dist 05 Verified Duct Design Not Required Not Required Not Required Not Required Not Required Not Required Not Required Not Required Not Required 06 07 08 Buried Ducts Deeply Buried Ducts Low -leakage Air Handler Not Required Not Required n/a Not Required Not Required n/a Not Required Not Required n/a Not Required Not Required n/a Not Required Not Required n/a Not Required Not Required n/a Not Required Not Required n/a Not Required Not Required n/a Not Required Not Required n/a Registration Number: 218-P010198193A-000-000-0000000-0000 Registration DateRme: 2018-07-11 14:09:57 HERS Provider: CaICERTS inc CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence.ribd16x HVAC -FAN SYSTEMS 01 Name HVAC Fan 1 HVAC Fan 2 HVAC Fan 3 HVAC Fan 4 HVAC Fan 5 HVAC Fan 6 HVAC Fan 7 HVAC Fan 8 HVAC Fan 9 CF1 R-PRF-01 Page 18 of 19 02 Type Single Speed PSC Furnace Fan Single Speed PSC Furnace Fan Single Speed PSC Furnace Fan Single Speed PSC Furnace Fan Single Speed PSC Furnace Fan Single Speed PSC Furnace Fan Single Speed PSC Furnace Fan Single Speed PSC Furnace Fan Single Speed PSC Furnace Fan 03 + Fan Power (Watts/CFM) 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 04 HERS Verification HVAC Fan 1-hers-fan HVAC Fan 2-hers-fan HVAC Fan 3-hers-fan HVAC Fan 4-hers-fan HVAC Fan 5-hers-fan HVAC Fan 6-hers-fan HVAC Fan 7-hers-fan HVAC Fan 8-hers-fan HVAC Fan 9-harc-fan wu (inaoor Air Quality) FANS 01 02 03 + 04 05 06 IAQ Recovery Dwelling Unit IAQ CFM IAQ Watts/CFM IAQ Fan Type Effectiveness ( ) HERS Verification SFam IAQVentRpt 158 025 I Default 0 Required Registration Number: 218-Po10198193A-000-000-0000000-0000 Registration Date/Time: 2018-07-11 14:09:57 HERS Provider: CaICERTS inc CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP2 Report Generated at: 2018-07-11 14:01:21 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Wallace Residence Calculation Date/Time: 13:58, Wed, Jul 11, 2018 Calculation Description: Title 24 Analysis Input File Name: Wallace Residence. ribd 1 6x DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Butch White Company: BREEZE AIR CONDITIONING INC Address: 75-145 ST CHARLES PLACE City/State/Zip: PALM DESERT, CA 92211 RESPONSIBLE PERSON'S DECLARATION STATEMENT Documentation Author Signature: 0�*/Acczpl Signature Date: 2018-07-11 14:09:57 CEA/HERS Certification Identification (If applicable): Phone: 760-346-0855 CF1 R-PRF-01 Page 19 of 19 I certify the following under penalty of perjury, under the laws of the State of California: 1- I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on thi Regulations. s Certificate of Compliance. 2. ! certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part :and Part 6 of the California Code of 3. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name: Responsible Designer Signature: Butch White Oti�2(/4*,- Company: BREEZE AIR CONDITIONING INC Address: 75-145 ST CHARLES PLACE City/State/Zip: PALM DESERT, CA 92211 Date Signed: 2018-07-11 14:09:57 License: 416394 Phone: 760-346-0855 Digitally signed by calcERTs. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 218-Po10198193A-000-000-0000000-0000 Registration Date/Time: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-06212018-1016 SP211 14:09:57 rol RRI�Llftv.' Easy to Verify at CaICERTS.com HERS Provider: CaICERTS inc Report Generated at: 2018-07-11 14:01:21