Loading...
5196�. c% 4 OF T o ENCROACHMENT PERMIT PUBLIC WORKS CONSTRUCTION Finance Revenue Code E-1 Al- ` For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS. Subdivision Improvement Permit - Class III Minor Improvement Permit Class IV DATE:November 7, 2006 a LOCATION OF CONSTRUCTION (Street address or Description): Griffin Ranch Lakes TM 32879; Madison south of 54" Street PURPOSE OF CONSTRUCTION: Retaining walls rock edge DESCRIPTION OF CONSTRUCTION: See sheet WF6 of 11 DIMENSION OFINSTALLATION OR REMOVAL: Plan "Waterscapers" proiect 0607 and street drawing 53.1 from Joseph N. Cicchini ** APPROXIMATE TIME WHEN WORK WILL BEGIN:Will Call TIME OF COMPLETiON:Less than 1 year from start ESTIMATED CONSTRUCTION COST: $62,000.00 (Including removal of all obstruction, materials, and debris, backfilling, compaction and placing permanent resurfacing and/or replacing improvements) COMMENTS:.** Proiect-No. 2006-014 In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, .officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777- 7075. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of fpplicant or Agent Trans West Housing - Marty Butler 47-120 Dune Palms Road Suite C La Quinta, CA 92253 777-4307 or 277-0334 Name of Applicant (please print) Business Address Telephone No. Site Development Studios, Inc. 711 West 17'h St. E-1. Costa Mesa, CA 92627 (949) 515-4270 ext 300 Name of Contractor and Job Foreman Business Address Telephone No. 688782 102532 Contractor's License No. n ity Business License No. Applicant's Insurance Company FEES: Subdivision Improvement Permit - Class III Minor Improvement Permit - Class IV ' Inspection Fee $1,860 + TBD Permit Fee $100.00 As -Built Deposit $ Cash Deposit -Surety Bond, $ if required TOTAL $1,960 + TBD BLO6890 v Number imp' ovements: 3% of estimated construction costs I ovements: 3% of estimated construction costs See attached schedule PERMIT NO.5 1 96 DATE APPROVED: EXPIRNTIO DATE: 1 `� J BY: \\1. - - Administrative AQtority Date: • CV oil -PUBLIC WORKS DEPARTMENT APPLICATION FOR PERMIT 4,S Wa.s 5 KiCdti.N1 .Pt ?'VJ Nz. S Z00 M Name of Contractor: JA1& &±v Contractor Address: "-7% l?. 1 .5Kw Contractor Telephone Number: yC�7O ca, 3CT 9Z6 7 Contractor State License Number: 7 P Z Contractor City Business License Number: /D S'3 Contractor E-mail Address: ►A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED -4 Applicant or Contractor General Liability Insurance Company: Dl(Q�� Zo —161 S 66 Applicant or Contractor General Liability Insurance Policy Number: Office. Use Only: Inspection Fee: Permit Fee: As -Built Deposit: Dust Control Deposit: Credit Amount: Office Use Only: Assigned Permit Number. I Approval Date: Expiration Issue Date: Administrative Authority: TOTAL FEE DUE: 1160 ,t— T 3 p FOR PERMIT.doc Nov., 2. 2006 -3:37PM Ljmda November Aeuuu I -,u5 PM -389-4538 No. 3619-.5- P. 2/21"". Lance Neu 949 on November 2, 2006 Marty Butler Fax- 760-777-4309 Trans. West Housing 47-120 Dune Palms Rd. Suite C La Quinta, CA 92253 Reference: Griffin Ranch Entry Feature — Retaining Walls Dear Ms. Butler: . I Per your request for information) we are placing approximately 194 cubic yards Of swictuml concrete retaining walls at a cost of $62,000. with your py an We hope this information meets expectations and if you have y questions please don't hesitate to call, Sincerely, The Sits Development Studios Inc. Friesz Business Development C.; Bill A,.k==. SUS Elton LinI4 SDS Cwjinc pwm, -5DS Go" I r t t e 2 Al Ih m i N 1 4 4 N a 2. saes ea.aaasacse JuH l fl LU z 4 )t -j 4. ul 'A 9 uj ww D lu tu Z t� < tu z �LLas IL %D 0,11 0 zi nj > of iL 0 1U oQ 1U , A IL (L tu 0 aj u t.- 4 z A 44 K lu rf QQ wi UN 3a n--.— City of La Quinta TIME & MATERIAL MONTHLY LEDGER This time & material ledger summarizes the office and field staff time devoted to encroachment permits issued, • to the subject Permittee, including contract staff. STAFF MtMBER: HOURLY �. RATE Cv F270 8m Sheet of City of La Quinta The following General and Special Provisions are attached to and, made a part of Permit Number 5196 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. • Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERTATIONS:. If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following sha0 apply when indicated: ® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface. Structures) No work shall be done under this permit until all utilities are Gear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with (" N/A ") inches of A.C. paving placed on ( " N/A ") inches of ( " N/A ") aggregate sub -base course having an "R" value of not less than ( " N/A ") and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. ® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch (%") to one foot (1'). ❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A ") feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 Y2") of A.C. paving on (" N/A ") of class (" N/A " ) aggregate base. ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all times. ❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer's specifications. 7 City of La Quinta ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. ® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. ❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (6) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, ,adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. ® RI COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one - thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R19. COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ® R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ® R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( " N/A " ) inches of A.0 surfacing placed on a (" N/A ") inch (" N/A " ) aggregate base shall be placed no later than ( 5 ) days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ® R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ❑ R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. � PERMIT NO.4525 GRIFFIN RANCH (LIMITED INSPECTION) INSPECTION REQUIRED SEE ITEM 6 BELOW TM 32879 In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. . This permit or copy of it shall be on the work site (usually the job trailer) for inspection during -the actual work performed. 3. Site Development Studios and/or Trans West Housing, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. 4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. 5. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:0.0 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) before 8:00 a.m. 6. Inspections shall be limited to: a). Retaining Masohry/Rebar/Grout (at structural locations), b) Pond Liner to Bridge Connection, c) Rip -Rap Stabilization. If inspections performed by the city exceed the estimated. inspection fee found on the Permit No. 5196, the cost shall be recorded by the inspector and billed to the developer as a To Be Determined (TBD) amount. 7. The permittee and/or contractor placing engineered fill must provide adequate time and safety for the Geotechnical Engineer of Record to perform soils testing during engineered fill placement. The testing frequency shall be determined by the Geotechnical Engineer of Record such that the fill can be determined to be placed according to the city approved plans. 0� Z 8. The permittee and/or contractor shall provide surveyor staking information adequate for the City Inspector to determine horizontal and vertical locations relative to the approved city plans. The minimum required wood lath type stakes shall be placed at all proposed building corners, and they shall state the horizontal location relative to building corner and the elevation of the top of hub next to the lath. 9. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 10. Prior to excavating, if required, -the Permittee shall contact.Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 11. The issuance of this permit and the City approval of the related construction improvement plans do not provide a vested entitlement for all design parameters that may have been utilized for the plans. As such, plans approved for this permit may be "at risk" for further modifications as it relates to any follow up improvement plan requirements as required by the city or existing errors & omissions by the architect or engineer of record. 12. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 13. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 14. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § l (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e:, streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 15. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 16. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. Zd�z STRUCTURAL CALCULATIONS FOR TRACT 32879 GRIFFIN RANCH LA QUINTA, CALIFORNIA CONCRETE AND MASONRY RETAINING WALLS FOR SITE WATER FEATURES DESIGNED BY WATERSCAPERS 17011 BEACH BLVD., SUITE 900 HUNTINGTON BEACH, CALIFORNIA 92647 CALCULATIONS BY:. JOSEPH N. CICCHINI, P.E. P.O. BOX 4206 PALM DESERT, CALIFORNIA 92260 TEL: 760-776-6687 FAX: 760-346-3460 OCTOBER 24, 2006 rr CIvN r JOB GeIFFN fiANe- SHEET NO. OF I CALCULATED BY JN C DATE 10—I9-06 CHECKED BY DATE SCALE f��TAI►�)►•! !� WALL DL-j<16W C�L,Foe,.r ►� i3viL,DtN6 Cc-06 Loot e.01'tl o N ►6N CQ17gr�►�SotLS Rupop---' gY sz-oDe RA(G L OI vABL Spl L 95p-P- tv,. G P,�t�SS v eg _ /SOD SF 'S g;7 FoR W tncD .4N1D SDI P S IFit c^ �GL = D • 4D P,-s 51 ve = ZSo Psi' 9�S l 5�� � !-�SS v m ►sD ��. 2 : / SL oPi� ) oN PLF-.KS $y W� 2SctaP fit, o eq. STW • GON C.�.�'T� _.. I'tjALC - -T-,(P,, O Ca�cR,s78 7q,0 I—st11 5 Tw o vo. o -77.o TF I I I I I I I I I I $�, CON e-Aeie gum rtYPr� JOB GP Irl SHEET NO. 2OF to J CALCULATED BY lU C DATE (O- kq- 06 CHECKED BY DATE SCALE 02. S-TW `7 7. b TF 7w :._.: -7 7. 0 Tr t_opsD : P ugc. I bi 16�9� (bz� 1�z2 \14 $P Cg zw QS Cam. - 1.0& - rW I,0b (TABIz S Pap u g IqR SB�rivv 1(0 3 • 42. 2 P rP C l + 3-(Tf3L 16-0 M ) R P h P = 3. 00 NL I b-D N FP 0:17 (1t 3t�44 =l Z (S�aDD�H) r _ ND G o00 t'p L Q, �C,� Tp WP�� hx - 0,60 0 Tp =1,00 (rBc, 16-9) gyp= 155PsF i J 1;_ F Title: Griffen Ranch Dsgnr. JNC Description: Wall Detail Awf2 Scope: Job # Date: 4:51 PM, 22 OCT 06 6;�r. RW6&5049, Ver5.6.1, 25-0ct-2002 Cantilevered Retaining Wall Design Page 1 ' (6103-2072 ENERCALC Enaineerina Software r. \nrnirrilmr mirinriffanlralr_clawf7 a r'al Description WaL-L TYN Criteria Retained Height = 6.50ft Wall height above soil = 0.50 ft Slope Behind Wall = 0.00: 1' Height of Soil over Toe = 18.00 in Soil Density = 110.00 pcf Wind on Stem = 0.0 psf Surcharge Loads Surcharge Over Heel = 62.4 psf NOT Used To Resist Sliding & Overturning Surcharge Over Toe = 62.4 psf ,NOT Used for Sliding & Overturning Design Summary Total Bearing Load = 4,970 Ibs ...resultant ecc. 9.03 in Soil Data Allow Soil Bearing = 1,500.0 psf Equivalent Fluid Pressure Method Heel Active Pressure = 35.0 Toe Active Pressure = 0.0 Passive Pressure = 250.0 Water height over heel = 0.0 ft Footingl[Soil Friction = 0.400 Soil height to ignore for passive pressure = 0.00 in Soil Pressure @ Toe = 1,229 psf OK Soil Pressure @ Heel = 244 psf OK Allowable = 1,500 psf Soil Pressure Less Than Allowable ACI Factored @ Toe = 1,621 psf ACI Factored @ Heel = 322 psf Footing Shear @ Toe = 14.6 psi OK Footing Shear @ Heel = 33-3 psi OK Allowable = 85.0 psi Wall Stability Ratios Overturning = 2.67 OK Sliding = 1.90 OK Sliding Calcs (Vertical Component NOT Used Lateral Sliding Force = 1,992.0lbs less 100% Passive Force = - 1,917.5 Ibs less 100% Friction Force = - 1,873.2lbs Added Force Req'd = .0.0 Ibs OK ....for 1.5 :,1 Stability = 0.0 Ibs OK Footing Design Results ai Toe Heel Factored Pressure = 1,621 322 psf Mu': Upward = 6,595 0 ft-# 'Mu': Downward = 2,606 7,650 ft-# Mu: Design = 3,989 7,650 ft-# Actual 1-Way Shear = 14.60 33.33 psi Allow 1-Way Shear = 85.00 85.00 psi Toe Reinforcing = # 5 @ 18.00 in Heel Reinforcing = # 5 @ 18.00 in Key Reinforcing = None Speed Lateral Load Applied to Stem Lateral Load = 202.8 #/ft ...Height to Top = 6.50 ft ...Height to Bottom = 2.50 ft Stem Construction M _ Design height ft= Wall Material Above "Ht" _ Thickness = Rebar Size = Rebar Spacing = Rebar Placed at Design Data fb1FB + fa/Fa = Total Force @ Section Ibs = Moment.... Actual ft-#= Moment..... Allowable = Shear..... Actual psi = Shear..... Allowable psi = Bar Develop ABOVE Ht. Bar Lap/Hook BELOW Ht. Wall Weight Rebar Depth 'd' Masonry Data im Fs Solid Grouting Special Inspection Modular Ration' Short Term Factor in = in = in = PSI = psi = Footing Strengths & Dimensions fc = 2,500 psi Fy = 60,000 psi Min. As % = 0.0014 Toe Width = 3.04 ft Heel Width = 3.71 Total Footing Width Footing Thickness = 14.00 in Key Width = 8.00 in Key Depth = 15.00 in Key Distance from Toe = 3.04 It Cover @ Top = 2.00 in @ Btm = 3.00 in Axial Load Applied to Stem Axial Dead Load = 0.0 Ibs Axial Live Load = 0.0 Ibs Axial Load Eccentricity = 0.0 in ip Stem Stem OK 0.00 Concrete 8.00 # 5 7.00 Edge 0.726 2,855.4 9,642.1 t5 b/e- 13,297.3 �J 38.5 85.0 23.40 7.36 100.0 6.19 Equiv. Solid Thick. _ Masonry Block Type = Normal Weight Concrete Data Pc psi = 2,500.0 Fy psi = 60,000.0 Other Acceptable Sizes & Spacings Toe: #4@ 13.75 in, #S@ 21.25 in, #6@ 30.00 in, #7@ 41.00 in, #8@ 48.25 in, #9@ 4 Heel: #4@ 12.25 in, #5@1 18.75 in, #6@ 26.50 in, #7@ 36.25 in, #8@ 47.50 in, #9@ 4 Key: #4@ 28.75 in, #5@ 44.50 in, #6@ 48. I 1 L ' Title: Griffen Ranch Job # Dsgnr: JNC Date: 4:51 PM, 22 OCT 06 Description: Wall Detail Awf2 ' Scope: Rev. 560100 User KW-0605049,ver5.6.1,25-oGt-2002 Cantilevered Retaining Wall Design Page 2 (c119832002 ENERCALC Engineering S&Nwrre c:korojecftmccomic%griffenkalcsXawf2.ecw.Cal Description Summa of Overturnin � Resistin Forces � Moments .....OVERTURNING..... .....RESISTING..... Force Distance Moment Force Distance Moment Item Ibs Itft�# Ibs ft ft-# - Heel Active Pressure 1,180.8 2.72 3,212.2 Soil Over Heel - 2,174.8 5.23 11,372.3 Toe Active Pressure = Sloped Soil Over Heel = ' Surcharge Over Toe _ 1.33 Adjacent Footing Load Surcharge Over Heel = Adjacent Footing Load Added Lateral Load 811.2 5.67 4,596.8 A)dal Dead Load on Stem - 0.00 Load @ Stem Above Soil = Soil Over Toe = 501.9 1.52 763.3 SeismicLoad Surcharge Over Toe = Stem Weight(s) 700.0 3.38 2,362.5 Total 1,992.0 O.T.M. = 7,809.0 Earth @ Stem Transitions Resisting/Overturning Ratio . = 2.67 Footing Weight = 1,181.2 3.38 • 3,986.7 Vertical Loads used for Soil Pressure = 4,969.6 Ibs Key Weight 125.0 3.38 421.9 ' Vert. Component 286.7 6.75 1,935.1 Vertical component of active pressure used for soil pressure Total = 4,969.6 Ibs R.M = 20,841.8 I I . I 1 ["I s 8.00005in Conc w/ 95 (r7 7 in n/r. 1'-6" #5@18.in @Toe Des #5@18.in all @ Heel 1 I 202.8ps 62.4psf 62.4psf 1180.8# Pp= 1917.5# 243.78psf 1228.7psf I ri I ] CI F Title : Griffen Ranch Dsgnr. JNC Description: Wall Detail Awf2 Scope: . Job # Date: 4:41 PM; 22 OCT 06 7 User3-202ENE VeLCEn.2eerinaSo Cantilevered Retaining Wall Design Page 1' i (c179832002 ENERCALC Enaineerina Software rtnminr.RmrrnmiNnriffan4airQuwn oe.,wr i Description ljA,� -TY Criteria Retained Height = 5.0011 Wall height above soil = 0.50 it Slope Behind Wall = 0.00: 1 Height of Sol over Toe = 48.00 in Soil Density = 110.00 pef Wind on Stem = 0.0 psf Surcharge Loads Surcharge Over Heel 62.4 psf NOT Used To Resist Sliding & Overturning Surcharge Over Toe = 62.4 psf NOT Used for Sliding & Overturning Design Summary Total Bearing Load = 3,569 Ibs ...resultant ecc. = 9.97 in ;Soil Data Allow Soil Bearing = 1,500.0 psf Equivalent Fluid Pressure Method Heel Active Pressure = 35.0 Toe Active Pressure = 0.0 Passive Pressure = 250.0 Water height over heel = 0.0 It FootingIlSoil Friction = 0.400 Soil height to ignore for passive pressure 0.00 in Soil Pressure @ Toe = 1,460 psf OK Soil Pressure @ Heel = 0 psf OK Allowable = 1,500 psf Soil Pressure Less Than Allowable ACI Factored @ Toe 1,944 psf ACI Factored @ Heel = 0 psf Footing Shear @ Toe = 10.4 psi OK Footing Shear @ Heel = 22.9 psi OK Allowable = 85.0 psi Wall Stability Ratios Overturning = 2.56 OK Sliding = 3.68 OK Sliding Calcs (Vertical Component NOT Used) Lateral Sliding Force = 1,217.1 Ibs less 100% Passive Force = - 3,125.0 Ibs less 100% Friction Force = - 1,357.41bs Added Force Req'd = 0.0 Ibs OK ....for 1.5 : 1 Stability = 0.0 Ibs OK Footing Design Results Toe Heel Factored Pressure = 1,944 0 psf Mu': Upward = 3,758 0 ft-# Mu': Downward = 2,065 3,048 it-# Mu: Design = 1.693 3,048 ft-# Actual 1-Way Shear = 10.41 22.88 psi Allow 1-Way Shear = 85.00 85.00 psi Toe Reinforcing = # 5 @ 18.00 in Heel Reinforcing = # 5 @ 19.50 in Key Reinforcing = None Spedd Lateral Load Applied to Stem Lateral Load = 156.0 #/ft ...Height to Top = 5.00 ft ...Height to Bottom = 2.00 ft Stem Construction M Top s St, Footing Strengths & Dimensions fc = 2,500 psi Fy = 60,000 psi Min. As % = 0.0014 Toe Width = 2.13 ft Heel Width = 2.79 Total Footing Width = �Y Footing Thickness = 12.00 in Key Width = 0.00 in Key Depth = 0.00 in Key Distance from Toe = 0.00 ft Cover @ Top = 2.00 in @ Btm.= 3.00 in Axial Load Applied to Stem Axial Dead Load = 0.0 Ibs Axial Live Load = 0.0 Ibs Axial Load Eccentricity = 0.0 in tem rn OK 0.00 Crete 8.00 # 5 4.00 Edge 0.633 '08.1 4461 OK 023.62 23.0 85.0 23.40 6.51 00.0 6.19 500.0 000.0 Other Acceptable Sizes & Spacings Toe: Not req'd, Mu < S ' Fr Heel: #4@ 15.25 in, #5@ 23.50 in, #6@ 33.25 in, #7@ 45.25 in, #8@ 48.25 in, #9@ 4 Key: No key defined tem rn OK 0.00 Crete 8.00 # 5 4.00 Edge 0.633 '08.1 4461 OK 023.62 23.0 85.0 23.40 6.51 00.0 6.19 500.0 000.0 Other Acceptable Sizes & Spacings Toe: Not req'd, Mu < S ' Fr Heel: #4@ 15.25 in, #5@ 23.50 in, #6@ 33.25 in, #7@ 45.25 in, #8@ 48.25 in, #9@ 4 Key: No key defined 11 k Ij 1 u 1 Title: Griffen Ranch Job # Dsgnr: JNC Date: 4:41 PM, 22 OCT 06 Description: Wall Detail Awf2 Scope: User. SKW-100 05OW49, Ver 5.6.1, 25-0cF2002 Page 2 (c)1983-2002 ENERCALC Engineering Software Cantilevered Retaining Wall Design clpmjedUnccomL\griftenkxics\awrl.ecw.Cai Description Summa of Overturning & ResistingForces & Moments .....OVERTURNING..... .....RESISTING..... Force Distance Moment Force Distance Moment Item Ibs ft ft-# Ibs ft ft-9 Heel Active Pressure = 749.1 2.16 1,617.4 Soil Over Heel = 1,169.7 3.86 4,511.0 Toe Active Pressure = Sloped Soil Over Heel = Surcharge Over Toe = 2.50 Surcharge Over Heel = Adjacent Footing Load = Adjacent Footing Load = Added Lateral Load = 468.0 4.50 2,106.0 Axial Dead Load on Stem = 0.00 Load @ Stem Above Soil = Soil Over Toe = 935.7 1.06 995.0 SeismicLoad = Surcharge Over Toe = Stem Weight(s) = 550.0 2.46 1,353.0 Total = 1,217.1 O.T.M = 3,723.4 Earth CD Stem Transitions = Resisting/Overturning Ratio = 2.56 Footing Weight = 738.0 2.46 1,815.5 Vertical Loads used for Soil Pressure = 3,569.0 Ibs Key Weight = Vert. Component = 175.6 4.92 863.9 Vertical component of active pressure used for soil pressure Total = 3,569.0 Ibs R.M = 9,538.4 11 F I 8.00005in Conc w/ #5 0 14_in o/c 4'-0" #5@18.in @Toe Di #5@19.5in @ Heel 1 [I 1� ;sd£'09b 1 #£ l'6tiL #'SZL£ =dd ;sdyZ9 QN ;sdy'Z9 sd'95 L 1 1 1 1 1 1 '� n 1 L 1 TRIe : Griffen Ranch Dsgnr: JNC Description: Wall Detail Awf2 Scope: Job # Date: 4:58PM, 22 OCT 06 iI User.K V-=5049,Ver5.6.1,25-Oct-2002 Cantilevered Retaining Wall Design Page 1 (c)1983-2002 ENERCALC Engineering Software c:lproiec0mccomiclgriffenlcalcsl5ftwall.ecw. Description wp,L�_ "P€ Criteria Retained Height = 5.50ft Wall height above soil = 0.50 It Slope Behind Wall = 2.00: 1 Height of Soil over Toe = 18.00 in Soil Density = 110.00 pcf Wind on Stem = 0.0 psf Surcharge Loads Surcharge Over Heel = 0.0 psf NOT Used To Resist Sliding & Overturning Surcharge Over Toe = 62.4 psf NOT Used for Sliding & Overturning Design Summary Total Bearing Load + _ 3,231 Ibs ...resultant ecc. = 5.18 in Soil Data Allow Sol Bearing = 1,500.0 psf Equivalent Fluid Pressure Method Heel Active Pressure = 45.0 Toe Active Pressure = 0.0 Passive Pressure = 250.0 Water height over heel = 0.0 It Soil Pressure @ Toe = 1,331 psf OK Soil Pressure @ Heel = 284 psf OK Allowable = 1,500 psf Soil Pressure Less Than Allowable ACI Factored @ Toe = 1,515 psf ACI Factored @ Heel = 324 psf Footing Shear @ Toe = 7.9 psi OK Footing Shear @ Heel = 25.4 psi OK Allowable 85.0 psi Wall Stability Ratios Overturning = 2.42 OK Sliding = 1.71 OK Sliding Calcs (Vertical Component NOT Used) Lateral Sliding Force = 1,346.4lbs less 100% Passive Force = - 1,253.5 Ibs less 1.00% Friction Force = - 1,050.6 lbs Added Force Req'd = 0.0 Ibs OK ....for 1.5: 1 Stability = 0.0 Ibs OK Footing Design Results Toe Heel Factored Pressure = 1,515 324 psf Mu': Upward = 1,874 0 ft-# Mu': Downward = 734 0 ft_# Mu: Design = 1,140 2,933ft-# Actual 1-Way Shear = 7.93 25.41 psi Allow 1-Way Shear = 85.00 85.00 psi Toe Reinforcing = # 5 @ 18.00 in Heel Reinforcing = # 5 @ 18.00 in Key Reinforcing = None Spec'd FootingjlSoil Friction = 0.400 Soil height to ignore for passive pressure = 0.00 in Lateral Load Applied to Stem Lateral Load = 34.1 #/ft ...Height to Top = 5.50 ft ...Height to Bottom - 1.50 It Footing Strengths 8r Dimensions fc = 2,500 psi Fy = 60,000 psi Min. As % = 0.0014 Toe Width = 1.67 It Heel Width = 2.33 Total Footing Width = -� Footing Thickness = 12.00 in Key Width = 8.00 in Key Depth = 8.00 in Key Distance from Toe = 1.67 It Cover @ Top = 2.00 in @ Btm.= 3.00 in Axial Load A lied to Stem Axial Dead Load = 0.0 Ibs Axial Live Load = 0.0 Ibs Axial Load Eccentricity 0.0 in Stem Construction Top stem Stem OK Design height ft = 0.00 Wall Material Above "Ht" = Concrete Thickness = 8.00 Rebar Size = # 4 Rebar Spacing = 16.00 Rebar Placed at = Edge Design Data fb/FB + fa/Fa = 0.715 Total Force @ Section Ibs= 1,388.9 Moment.... Actual ft-# = 2,932.9 0 Moment..... Allowable = 4,099.3 Shear.....Actual psi = 18.5 Shear..... Allowable psi = 85.0 Bar Develop ABOVE Ht. Bar Lap/Hook BELOW Ht. Wall Weight Rebar Depth 'd' Masonry Data I'm Fs Solid Grouting Special Inspection Modular Ration' Short Term Factor Equiv. Solid Thick. in = 18.72 in = 6.00 100.0 in 6.25 psi = psi .= Masonry Block Type = Normal Weight Concrete Data fc psi = 2,500.0 Fy psi = 60,000.0 Other Acceptable Sizes & Spacings Toe: Not req'd, Mu < S ' Fr Heel: #4@ 15.25 in, #5@ 23.50 in, #6@ 33.25 in, #7@ 45.25 in, #8@ 48.25 in, #9@ 4 Key: Not req'd, Mu < S ' Fr 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Title: Griffen Ranch Job # Dsgnr. JNC Date: 4:58PM, 22 OCT O6 Description: Wall Detail Awf2 Scope: 12 Rev. 560100 User. KW-0605049, Ver5.6.1, 25w0d-= Cantilevered Retaining Wall Design Page 2 (c)198&2002 ENERCALC Engineering Software clproject\mcoomidgrlffenlcalcsZftwall.ecw Description wp,\—L ` \(P€ n Summa of Overturnin & Resisting Forces & Moments OVERTURNING..... .....RESISTING..... Force Distance Moment Force Distance Moment Item Ibs It ft-# lbs ft ft-# Heel Active Pressure = 1,210.0 2.44 2,957.8 Soil Over Heel = 1,008.3 3.17 3,193.1 Toe Active Pressure = Sloped Soil Over Heel = 76.4 3.44 263.1 Surcharge Over Toe = 1.25 Surcharge Over Heel = Adjacent Footing Load = Adjacent Footing Load = Added Lateral Load = 136.4 4.50 613.8 A)aal Dead Load on Stem = 000 Load @ Stem Above Soil = SeismicLoad = Total = 1,346.4 O.T.M. = 3,571.6 Resisting/Overturning Ratio = 2.42 Vertical Loads used for Soil Pressure = 3,231.3 Ibs Vertical component of active pressure used for soil pressure Soil Over Toe = 275.0 0.83 229.2 Surcharge Over Toe = Stem Weight(s) = 600.0 2.00 1,200.0 Earth @ Stem Transitions = Footing Weight = 600.0 2.00 1,200.0 Key Weight = 66.7 2.00 133.3 Vert. Component = 605.0 4.00 2,419.9 Total = 3,231.3 Ibs R.M: 8,638.5 1 2. 8.00005in Conc #5@18.in @Toe Designer select #5@18.in all horiz. reinf. @ Heel 13 1 I 2. 62.4psf 1210.# Pp= 1253.5# PPP W284.43psf 1331.2psf �i C� 'I I�I ri Title: Griffen Ranch Dsgnr: JNC Description: Wall Detail Awf2 Scope: User.3-202ENE, ALCE,,2eefingooz Cantilevered Retaining Wall Design (c)1983-2002 ENERCAIC Engineering Softvrare Description �.t�PLI- •-�-YP� Criteria Retained Height = 5.50 it Wall height above soil = 0.00 It Slope Behind Wall = 2.00: 1 Height of Soil over Toe = 18.00 in Soil Density = 110.00 pcf Wind on Stem = 0.0 psf Surcharge Loads Surcharge Over Heel = 0.0 psf NOT Used To Resist Sliding & Overturning Surcharge Over Toe = 62.4 psf NOT Used for Sliding & Overturning Design Summary . Total Bearing Load = 3,230 Ibs ' ...resultant ecc. = 4.30 in :Soil Data Allow Soil Bearing = 1,500.0 psf Equivalent Fluid Pressure Method Heel Active Pressure = 35.0 Toe Active Pressure = 0.0 Passive Pressure = 250.0 Water height over heel = 0.0 ft Soil Pressure @ Toe = 1,241 psf OK Soil Pressure @ Heel = 374 psf OK Allowable = 1,500 psf . Soil Pressure Less Than Allowable ACI Factored @ Toe = 1,484 psf ACI Factored @ Heel = 447 psf Footing Shear Toe - 12.1 psi OK Footing Shear Heel = 23.4 psi OK Allowable = 85.0 psi Wall Stability Ratios Overturning = 2.82 OK Sliding = 1.75 OK Sliding Callas (Vertical Component NOT Used) Lateral Sliding Force = 1,077.5lbs less 100% Passive Force = - 781.3 Ibs less 100% Friction Force = 1,103.7 Ibs Added Force Req'd = 0.0 Ibs OK ....for 1.5 : 1 Stability = 0.0 Ibs OK Footing Design Results -A Toe Heel Factored Pressure = 1,484 447 psf Mu': Upward = 2,228 0 ft-# Mu': Downward = 888 0 ft-# Mu: Design = 1,340 2,715 ft-# Actual 1-Way Shear = 12.09 23.41 psi Allow 1-Way Shear = 85.00 85.00 psi Toe Reinforcing = # 5 @ 18.00 in Heel Reinforcing = # 5 @ 18.00 in Key Reinforcing = None Spec'd FootingjjSoil Friction = 0.400 Soil height to ignore for passive pressure = 0.00 in Lateral Load Applied to Stem Lateral Load = 34.1 #/ft ...Height to Top = 5.50 It ...Height to Bottom = 1.50 ft Job # Date: 5:03PM, 22 OCT 06 1.5 Page 1 Footing Strengths & Dimensions fc = 2,500 psi Fy = 60,000 psi Min. As % = 0.0014 Toe Width = 1.67 It Heel Width = 2.33 Total Footing Width =0� Footing Thickness = 12.00 in Key Width = 0.00 in Key Depth = 0.00 in Key Distance from Toe = 0.00 ft Cover @ Top = 2.00 in Btm.= 3.00 in Axial Load Applied to Stem Abal Dead Load = 337.5 Ibs A)aal Live Load = 0.0 Ibs Axial Load Eccentricity = 5.3 in Stem Construction Top stem Design height ft= Stem OK 0.00 Wall Material Above "Ht" = Masonry Thickness = 8.00 Rebar Size = # 6 Rebar Spacing = 8.00 Rebar Placed at = Edge Design Data fb/FB + fa/Fa = 0.875 Total Force @ Section Ibs = 665.8 Moment.... Actual ft-# = 1,597.0p (7, Moment..... Allowable = 1,929.0 Shear..... Actual psi = 12.7 Shear..... Allowable psi = 25.8 Bar Develop ABOVE Ht. in = 36.00 Bar Lap/Hook BELOW Ht. in = 6.00 Wall Weight = 84.0 Rebar Depth 'd' in:;; 5.25 Masonry Data I'm psi= 1,500 Fs psi = 24,000 Solid Grouting = Yes Special Inspection = No Modular Ration' = 25.78 Short Term Factor = 1.330 Equiv. Solid Thick. in = 7.60 Masonry Block Type = Normal Weight Concrete Data fc psi = Fy psi = Other Acceptable Sizes & Spacings Toe: Not req'd, Mu < S ' Fr Heel: #4@ 15.25 in, #5@ 23.50 in, #6@ 33.25 in, #7@ 45.25 in, #8@ 48.25 in, #9@ 4 Key: No key defined I 1 L Title: Griffen Ranch Job # Dsgnr: JNC Date: 5:03PM, 22 OCT 06 Description: {Nall Detail Awf2 Scope Rev. 560100 User. KW-0605049, Ver5.6.1, 25-Od-2002 Cantilevered Retaining Wall Design Page 2 (c)1983-2002 ENERCALC Engineering Software = c:lprojecdmccomiclgriffenlcaicslmawnry.ecw.. Description WAt-L. 7`06 Summa of Overturning & Resisting Forces & Moments .....OVERTURNING..... .....RESISTING..... Force Distance Moment Force Distance Moment Item Ibs It ft-# Ibs It ft-# Heel Active Pressure = 941.1 2.44 2,300.5 Soil Over Heel = 1,008.3 3.17 3,193.1 Toe Active Pressure = Sloped Soil Over Heel = 76.4 3.44 263.1 Surcharge Over Toe = 1.25 Surcharge Over Heel = Adjacent Footing Load = Adjacent Footing Load = Added Lateral Load = 136.4 4.50 613.8 Apal Dead Load on Stem = 337.5 1.56 525.9 Load @ Stem Above Soil = Soil Over Toe = 275.0 0.83 229.2 Seismict-oad = Surcharge Over Toe = Stem Weight(s) = 462.0 2.00 924.0 Total = 1,077.5 O.T.M. = 2,914.3 Earth @ Stem Transitions = Resisting/Overturning Ratio = 2.82 Footing Weight = 600.0 2.00 1,200.0 Vertical Loads used for Soil Pressure = 3,229.7 Ibs Key Weight = Vert. Component = 470.4 4.00 1,881.8 Vertical component of active pressure used for soil pressure Total = 3,229.7 Ibs R.M = 8,217.0 i-7 2. 8.00005in Ma #5@18.in @Toe Designer si #5@18.in all horiz. r @ Heel 0 2. 337.5, LL= Ecc= 5.3004999999DL= 337.5, LL= 0.0005#, Ecc= in Pp= 781.25# 941.11# FPW373.7psf 1241.1 psf I I I I , la. eEng:1-neering 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 December 2, 2005 Trans West Housing, Inc. 47-120 Dune Palms Road; Suite C La Quinta, California 99953 Attention:. Ms, Marty Butler Project: Griffin Ranch SEC Avenue 54 and Madison Street La Quinta, California Subject: Geotechnical Update Project No. 544-4402 05-11-1133 Ref: Geotechnical Investigation Report prepared by Sladden Engineering dated August 17,. 2004, Project No. 544-4402, Report No. 04-08-571. As, requested, we. have reviewed the above referenced geotechnical report as it relates -to the design and construction of the proposed residential development.' The project site is identified as Tract 32879 and is located in the City of La Quinta, California. It is our understanding that the proposed- residences will' be relatively lightweight wood frame structures supporte& by conventional shallow spread:foogs;and concrete slabs on grade. The -lots are presently being graded during the rough grading of the Griffin Ranch project site. The'ro-ugh: grading includes overexcavation of the native surface soils along with the placement of engineered fill material to construct the building pads. . The referenced report includes recommendations pertaining to. the construction of residential structure foundations. Based upon our review of the referenced report, it is our opinion that the structural values included in the referenced-geoteclinical report remain applicable for the design and construction of the proposed residential structure foundations. Because the majority of the lots have been previous rough graded, the remedial grading required at this time should be minimal_ The building area should be cleared of surface vegetation, scarified and moisture conditioned prior to precise grading. The exposed surface should be compacted so that a minimum of 90f percent relative compaction is attained prior to fill placement. Any fill material should be placed in thin.lifts at near optimum moisture content and compacted to at least 90 percent relative compaction. I December 2, 2005 -2- Project No. 544-4402 05-11-1133 Allowable Bearing . Pressures: The allowable bearing pressures recommended in . the geoterhnical report prepared by Sladden Engineering remain applicable. Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 E— inches below lowest adjacent grade. Continuous footings should be at least 12 inches wide and < - isolated pad footings should be at least 2 feet wide. Continuous footings' and isolated pad 4--- footings may be designed utilizing an allowable bearing pressure of 1500 psf. An allowable --e increase of 300 psf for each additional 1 foot of width and 300vsf for each additional 6 inches of --ec- depth may.be utilized if desired. The maximum allowable bearing pressure should be 1800 psf. The recommended allowable bearing. pressures may be increased by one-third for wind and seismic loading. The bearing soils are non -expansive and fall within the "very low" expansion category in accordance with Uniform Building Code (UBC) classification criteria. Pertinent 1997 UBC Seismic Design parameters are summarized on the attached data sheet. If you have questions regarding this letter or the referenced report, please contact the undersigned. Respectfully submitted, SLADDEN ENGINEERINGlF� Brett L. Anders& - Principal Engineer SER/pc 2 No. C 46389 2 M Dcp.9/30/08 M .CIVI � 'fir �T9TFCF caUFa��\� Copies: 4/Trans West Housing, Inc. I i December 2, 2005 -3- Project No. 544 4402 05-11-1133 1997 UNIFORM BUILDING CODE INFORMAVON The International 'Conference of Building Officials 1997 Uniform Building Code contains substantial revisions and additions to the earthquake engineering section in Chapter - 16. Cohcepts.c.ontained in the code that will be relevant to construction of the proposed structure are summarized below. Ground sh4dno,, is . expected to be the primary.hazard. most likely to affect the site,'based upon proximity to- significant faults capable of 'generating largq! earthquakes. Major fault zones considered to be most likely to create strong ground shaking at the site are listed below. 'Fault Zone- Approximate Distance From Site Fault Type .(1997 bBC) San Andreas 9.8 kin A San Jacinto 26 km A Based on our field observations and understanding of local geologic conditions, the soil. profile type judged applicable to this site is Sp, generally described as stiff or dense soil. The -site is located. Within UBC Seismic Zone 4. The following table presents additional coefficients and factors tors relevant to seismic mitigation for new construction upon adoption of the 1507'code.- Near-Source Near -Source Seismiq Seismic Seismic Acceleration -Velocity Coefficient Coefficient S . durce Factor, Na Factor, N� C. C11 _Sari Am-dreas 0.64-1N, jacin . to 1.0 1.0 0.44 Na-San 0.64 Nv 1 it I August 17, 2004 -3- Project No. 544-4402 04-08-571 ' SUBSURFACE CONDITIONS ' The soils underlying the site consist primarily of fine-grained silty sands with scattered generally thin sandy clayey silt layers. As is typical for the area, the silty sand and sandy silt layers are inconsistently interbedded and vary in thickness. Silty sands were the most prominent soils within our exploratory borings but several prominent sandy silt and clayey silt layers were also encountered. 1 The silty sands encountered near the existing ground surface appeared somewhat loose but the deeper silty sand and sandy silt layers appeared relatively firm. Sampler penetration resistance (as measured by field blowcounts) indicate that density generally increases with depth. The site soils were dry on the surface but moist below a depth of approximately 5 feet. Laboratory testing indicates that the surface soils within the upper 5 feet consist primarily of silty sands. Expansion testing indicates that the surface silty sands are generally non -expansive and are classified as "very low" expansion category soils in accordance with Table 18-I B of the 1997 Uniform Building Code. Groundwater was not encountered within our borings that extended to a depth of approximately 50 feet below the existing ground surface. Groundwater should not be a factor in design or construction. LIQUEFACTION . Liquefaction occurs with sudden loss of soil strength due to rapid increases in pore pressures within cohesionless soils as a result of repeated cyclic loading during seismic events. Several conditions must be present for liquefaction to occur including; the presence of relatively shallow groundwater, generally loose soils conditions, the susceptibility of soils to liquefaction -based upon grain -size characteristics and the generation of significant and repeated seismically induced ground. accelerations. Liquefaction affects primarily loose, uniform grained cohesionless sands with low relative densities. In the case of this project site, several of the. factors required for liquefaction to occur are absent. As previously indicated, groundwater was not encountered within our borings that extended to a depth of approximately 50 feet below the —existing ground surface on the site. Due to the depth to groundwater, the potential for liquefaction affecting the site is considered negligible. ' CONCLUSIONS AND RECOMMENDATIONS Based upon our field investigation'and laboratory testing, it is our opinion that the proposed residential ' development is feasible from a soil mechanic's standpoint provided that the recommendations included in this report are considered in building foundation design and site preparation. Due to the somewhat . ' loose condition, of the surface soils, remedial grading is recommended for the building areas. We recommend that remedial grading within the proposed building. areas include the overexcavation and recompaction of the primary foundation bearing soils. Specific recommendations for site preparation are ' presented in the Site Grading section of this report. 11 P Sladden Engineering August 17, 2004 -4- ProjectNo. 544-4402 r 04-08-571 Based upon the depth to groundwater and the generally firm condition of the deeper sand layers, it is our opinion that the potential for liquefaction affecting the site is minimal- The remedial grading recommended for -building areas will result in the construction of a uniform compacted. soil mat beneath all footings_ In our opinion, liquefaction related mitigation measures in addition to the site grading and foundation design recommendations included in this report should not be necessary. The site is located in one of the more seismically active areas in California. Design professionals should be aware of the site setting and the potential for earthquake activity during the anticipated life of the 1 structure should be acknowledged. The accelerations that may be experienced on the site (as previously discussed) should be considered in design. The seismic provisions included in the Uniform Building Code for Seismic Zone 4 should be considered the minimum design criteria. Pertinent 1997 UBC Seismic ' Design Criteria is summarized in Appendix C. Caving did occur within our borings and the .potential for caving should be expected within deeper excavations. All excavations should be constructed in accordance with the normal CalOSHA excavation ' criteria. On the basis of our observations of the materials encountered, we anticipate that the near surface silty sands will be classified by CalOSHA as Type C. Soil conditions should be verified in the field by a ' "Competent person" employed by the Contractor. The near surface soils encountered during our investigation were found to be non -expansive. Laboratory testing indicated an Expansion index of 0 for the surface silty sands and.sandy silts that corresponds with ' .. the "very. low"expansion category in accordance with UBC Table 18-I B. The following recommendations present more detailed design criteria which have been developed on the ' basis of- our field and laboratory investigation. The recommendations are based upon non -expansive soils criteria. ' Fouridafion Design: The results of our investigation indicate that either conventional shallow continuous footings or isolated pad footings that are supported upon properly compacted soils, may be expected to provide adequate support for the proposed structure foundations. Building ' pad grading should be performed as described in the Site Grading Section of this report. to provide for uniform and firm bearing conditions for the structure foundations. 1 Footings should extend at least 12 inches beneath lowest adjacent grade. Isolated square or rectangular footings should be at least two feet square and continuous footings should be at least 12 inches wide. Continuous footings may be designed using an allowable bearing value of 1500 4— pounds per .square foot (psf) and isolated pad footings may be designed using an allowable bearing pressure of 1800 psf. The allowable bearing pressures are applicable to dead and frequently applied live Ioads. The allowable bearing pressures may be increased by 1/3 to resist winch and seismic loading. Care should be taken to see that bearing. or subgrade soils are not allowed to become saturated from the ponding of rainwater or irrigation. Drainage from the building area should be rapid and complete. Sladden Engineering I I I I ' August 17, 2004 -5- Project No. 544-4402 04-08-571 The recommendations provided in the preceding paragraph are based on the assumption that all footings will be supported upon properly compacted engineered fill soils. All grading should be performed under the testing and inspection of the Soils Engineer or his representative. Prior to the placement of concrete, we recommend that the footing excavations be inspected in order to verify that they extend'into compacted soil and are free of loose and disturbed materials. Settlements: Settlements resulting from the anticipated foundation loads should be minimal provided that the recommendations included in this report are considered in foundation design ' and construction. The estimated ultimate settlements are calculated to be approximately one inch when using the recommended bearing values. As a practical matter, differential settlements between footings can be assumed as one-half of the total settlement ' Lateral Design: Resistance to lateral loads can be provided by a combination of friction acting at the base of the slabs or foundations and passive earth pressure along the sides of the foundations. A coefficient of friction of 0.40 between soil and concrete may be used with consideration to dead load forces only. A passive earth pressure of 250 pounds per square foot, per foot of depth, may be used for the sides of footings that are poured against properly compacted native or approved *non -expansive import soils. Passive earth pressure should be ignored within the upper 1 foot f except where confined (such as beneath a floor slab). Retaining Walls: Retaining walls may be necessary to accomplish the proposed construction. Lateral pressures for use in retaining wall ;design can be estimated using an equivalent fluid weight of jjXcf for level free -draining native backfill conditions. For walls that are to be restrained at the top, the equivalent fluid weight should be increased to 55 pcf for level free - draining native backfill conditions. Backdrairis should be provided for the full height of the Walls - Expansive Soils: Due to the prominence of "very low" expansion category soils near the surface, the expansion potential of the foundation bearing soils should not .be a controlling factor in foundation or floor slab design. Expansion potential should be reevaluated subsequent to grading. ' Concrete Slabs -on -Grade: All surfaces to receive concrete slabs -on -grade should be underlain by a minimum compacted non -expansive fill thickness of 24 inches, placed as described in the Site Grading Section of this report. Where slabs are to receive moisture sensitive floor coverings or where ' dampness of the floor slab is not desired, we recommend the use of an appropriate vapor barrier or an adequate capillary break. Vapor barriers should be protected by sand in order to reduce the possibility of puncture and to aid in obtaining uniform concrete curing. ' Reinforcement of slabs -on -grade in order to resist expansive soil pressures should not be necessary. However, reinforcement will have a beneficial effect in containing cracking due to concrete shrinkage. Temperature and shrinkage related cracking should be anticipated in all concrete slabs -on -grade. Slab reinforcement and the spacing of control joints should be . determined by the Structural Engineer. Sladden ,E1na veering I tf r 17 D 1- N 1Y1 -1 1 m D ti r1 n z O c c 3 z w --1 i1 ;v z rn c 3 W" I rq T n D r m D Z m m O 8 S A C O 'DEC M5 Tx _ y O N JUN 2001 AS1E APit 1997 Tx = _ MAR r n CCD) 1995 MLA. ro�i O JAN 19" DEC 1993 MLA. J.R.R. (m•1 c y 13 p REVISION ]BY. A m A D tl Z o t11 O O 4[} fy Z ^ W o A o 0 O O Z C, I Q Z C) A Z w L1 C) 00 O O 5 - 7 - 30 - 2 P rtl•. � e p 1 5 - 7 - 29 - 2 STREET (268171 iBM'A[P.-01 T[1 'D P. 1 (26818) ,l a p < \e tiOTFC f o F L0 0 2 9 g \j 0lp a n G o HWY. 111 � O �'� N , PALM DETO tA S & p�' 02 TO NJDIO Z 0 PROJECT SITE to AVENUE 48 -Z El0 3 AVENUE 50 0 VICINITY MAP NTS IN THE WA R 28' C&G r N PROPOSED 12' DIP WATER MAIN 0 In 4' COVER • FINAL GRADE PROPOSED T VCP SEWER MAIN VARIES 12.33'-16.DO' 'PYPICAL SE4RI _wn= UTiI,u'Y Nair to scuF ESTIMATED QUANTITIES CONSTRUCT 12' DIP w/RESTRAINED JOINTS AND POLYETHYLENE ENCASEMENT 1500 LF INSTALL 8" DIP 96 LF INSTALL 6" DIP 59 LF INSTALL 6' FIRE HYDRANT ASS'Y (WET BARREL) 5 FA INSTALL 8' DETECTOR CHECK ASS'Y 4 EA INSTALL 6" DETECTOR CHECK ASS'Y 3 EA INSTALL f SERVICE AND 1 1 /2' METER 16 EA INSTALL 1-1/2' SERVICE. AND f METER 9 EA INSTALL 12" x45_ D.I. BEND 5 EA INSTALL 12" x22-1 /2 D.I. BEND 3 EA INSTALL 12"x11-1/4' D.I. BEND 4 EA INSTALL 12" X12" x6' 0.1. TEE 3 EA INSTALL 12" X 12" x8' D.I. TEE 4 EA INSTALL 12' x 12" x12' D.I. TEE 3 EA INSTALL 18"x18" x12" D.I. TEE 1 EA INSTALL 6' D.I. GATE VALVE 3 EA INSTALL 8' D.I. GATE VALVE 4 EA INSTALL 12" D.I. GATE VALVE 10 EA INSTALL 18' D.I. BUTTERFLY VALVE EPDXY LINED do COATED 2 EA INSTALL 2" AIR VACUUM do RELIEF VALVE 3 1 EA EA INSTALL 18" x 12" D.I. REDUCER 1 EA INSTALL 12" x6' D.I. REDUCER 2 INSTALL 6' BLOW -OFF ASS'Y EA # DESCRIPTION STATION FROM TO 1 TITLE SHEET 2 LINE 'A' - PLAN do PROFILE 17 DIP 10+00.00 17+69.43 2 LINE 'C' - PLAN do PROFILE 17 DIP 10+00.00 10+36.00 2 LINE 'D' - PLAN do PROFILE 12T DIP 10+00.00 10+36.00 3 LINE 'A' - PLAN do PROFILE 1 DIP 17+69.43 22+93.21 3 LINE 'B' - PLAN & PROFILE IT DIP 10+00.00 11+34.92 ENGINEER'S NOTE THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. THESE LOCATIONS ARE APPROXIMATE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE OR BELOW GROUND, SHOWN OR NOT SHOWN ON THESE PLANS. THE ENGINEER IS TO BE NOTIFIED OF ANY DISCREPANCIES, SO THAT ANY NECESSARY ADJUSTMENT CAN BE MADE IN THE ALIGNMENT AND/OR GRADE OF THE PROPOSED IMPROVEMENTS. THE CONTRACTOR IS REQUIRED TO TAKE PRECAUTIONARY MEASURES TO PROTECT ANY UTILITY LINES SHOWN, AND ANY OTHER LINES NOT OF RECORD, AND/OR NOT SHOWN ON THESE PLANS. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ALL DAMAGE TO ANY UTIUTIES OR STRUCTURES CAUSED BY HIS OPERATION. BASIS OF BEARINGS: THE BEARINGS SHOWN HEREON ARE BASED UPON THE CENTERLINE OF ADAMS STREET AS SHOWN ON TRACT 26152, M.B. 227/77-85, BEING N W20'DT W BENCHMARK: BENCHMARK No. P.D. 3-1-E BENCHMARK DESCRIPTION 1' IP WITH COUNTY TAG 1963 IN HANDWELL AT THE INTERSECTION OF MILES AVENUE AND ADAMS STREET. ELEVATION: 92.067 CITY OF LA QUINTA, STATE OF, CALIF IMPROV MI P-N-T WASHINGTON PARK ORNIA PLANS A POR I ON OF FARC LS 5-10 d­% UY PARCEL �ZA V iNUo � LOCATED IN THE NE 1 /4 OF SECTION 30, T 5 S, R 7 E, SBM .f CASTING 1$ WATER - 1 EXISTING 24" WATER { : PAD 6 - � EXI TIIv`G ` �\ (: , >, `.♦ RETAIL , I , \ (CIRCUIT CITY) .12' DIP c / f i 'WATER MAIN oPs s y r.. I ♦ /ti i SHEET 3 ! 1 l j I � LINE A� 12" DIP WATER MAIN r f SHEET 3 { j l EXIST. 10 SEINER I I �,'• �\ '/ I EXIST. If WATER 11A 1-3 \ EXI,, rItr�r N RETAIL i W 5 ��` (LOWE'� j t j E I ` B •`` \ \` !S Z , I " •` 1 SUB l FUTURIN RE�RL � � .� ., RETAIL \ SWR/WiR EESTS I \ \ C \ .\ 1 \ w , 2r WATER \ f I `\ WATER.�K tl , I 7 ► , , \ SHEET 2 RE '\ t I FliTURF. 1 ► I I 4 RETAIL SWR/WTR ESSTS► \. I � ' i jI PROP. g' VCP SEWER � N18 t I• t' E " / RE , �' ' ABBREVIATIONS BC BEGINNING OF CURVE C&G CURB AND GUTTER EC END OF CURVE INV INVERT ELEVATION MH MANHOLE WM WATER METER PA PLANTER AREA CO SEWER CLEANOUT 1 d 6 3 COACHELLA VALLEY WATER DISTRICT GENERAL NOTES FOR DOMESTIC WATER SYSTEMS ° 1. ALL MATERIALS AND CONSTRUCTION SHALL CONFORM TO THE STANDARD SPECIFICATIONS FOR THE CONSTRUCTION OF DOMESTIC WATER SYSTEMS (STANDARD SPECIFICATIONS) OF THE COACHELLA VALLEY WATER DISTRICT (CVWD). 2. THE CONTRACTOR SHALL POSSESS A VALID CLASS A OR C-34 STATE OF CALIFORNIA CONTRACTORS LICENSE. { 3. CONTRACTOR SHALL CONTACT CVWD'S CHIEF INSPECTOR UPON RECEIPT OF APPROVED DRAWINGS TO ARRANGE THE PRECONSTRUCTION CONFERENCE. NO CONSTRUCTION SHALL BEGIN PRIOR TO THE PRECONSTRUCTION CONFERENCE. 4. CONTRACTOR SHALL SUBMIT TO CVWD A LIST OF MATERIALS TO BE USED PRIOR TO THE PRECONSTRUCTION CONFERENCE. ONLY MATERIALS ON THE APPROVED LIST MAY BE USED. UST SHALL INCLUDE QUANTITY, MANUFACTURER, MODEL, SIZE AND OTHER PERTINENT DATA 5. ALL WORK SHALL BE INSPECTED BY CVWD. THE CHARGES FOR INSPECTION SHALL BE IN ACCORDANCE WITH CVWD'S REGULATIONS. 6, CONTRACTOR SHALL SCHEDULE HIS CONSTRUCTION ACTIVITIES DAILY WITH THE INSPECTION DEPARTMENT BETWEEN 3:30 P.M. AND 4:30 P.M. FOR THE FOLLOWING WORKING DAY. IF CVWD IS UNABLE TO PROVIDE AN INSPECTOR OR INSPECTORS, CONTRACTOR SHALL RESCHEDULE THE WORK FOR ANOTHER TIME. IF CONTRACTOR ELECTS TO CANCEL SCHEDULED WORK WITHOUT PRIOR NOTICE TO CVWD, CONTRACTOR SHALL BE CHARGED ONE HOUR OF INSPECTION TIME FOR EACH DAY OF OCCURRENCE. 7. WORK PERFORMED WITHOUT INSPECTION SHALL BE REJECTED. S. COPIES OF THE COMPACTION TEST RESULTS SHALL BE FURNISHED TO THE INSPECTOR PRIOR TO PRESSURE TESTING, MINIMUM FREQUENCY OF COMPACTION TESTING SHALL BE AS FOLLOWS: A SET OF PIPE ZONE AND MID -TRENCH TESTS SHALL BE CONDUCTED OVER THE PIPELINE EVERY 300 FEET AND AT EVERY THIRD WATER SEVICE, HYDRANT, DETECTOR CHECK OR MANIFOLD. 9. THE COVER FOR WATER DISTRIBUTION PIPELINES 24 INCHES IN DIAMETER AND SMALLER IN RESIDENTIAL DEVELOPMENTS WITH CURB AND GUTTER SHALL BE 36 INCHES. THE COVER FOR WATER DISTRIBUTION PIPELINES 30 INCHES AND GREATER AND ANY PIPELINES LOCATED IN NON-RESIDENTIAL AREAS SHALL BE 48 INCHES. STREETS SHALL BE BROUGHT TO SUBGRADE, SEWER INSTALLED AND CURB AND GUTTER INSTALLED BEFORE THE PIPELINE IS INSTALLED. 10. POLYETHYLENE ENCASEMENT SHALL BE USED FOR ALL FERROUS PIPES, VALVES AND FITTINGS IN THE AREAS OF CORROSIVE SOILS AND/OR WHERE THE ELECTROCONDUCTIVITY OF THE SOIL IS LESS THAN 2,000 OHMS PER CUBIC CENTIMETER OR AS DIRECTED BY CVWD. 11. ALL CONNECTIONS TO EXISTING FACILITIES WILL BE MADE BY CVWD AT THE OWNER'S EXPENSE. SIXTY DAYS NOTICE REQUIRED. CONTRACTOR SHALL START THE INSTALLATION AT THE TIE-IN CONNECTION PROVIDED. 12. THE SEPARATION BETWEEN WATER AND SEWER FACILITIES SHALL BE AS SPECIFIED IN CVWD STANDARD DRAWING NO. W-1/S-3. 13. PIPELINES SHALL BE KEPT FREE OF DIRT, ROCKS AND FOREIGN MATERIALS DURING CONSTRUCTION. MECHANICAL CLEANING MAY BE REQUIRED AT THE DISCRETION OF THE CHIEF INSPECTOR. 14. RESTRAINED JOINTS ARE REQUIRED UNDER PAVERS, DECORATIVE CONCRETE, AND THROUGH EACH ENTRYWAY TO THE PROJECT. NO WATER PIPELINES SHALL BE INSTALLED UNDER CURBS OR SIDEWALKS. 15. NO WATER SERVICE LINES OR METER BOXES SHALL BE INSTALLED IN DRIVEWAYS. -16. THESE PLANS MAYBE SUBJECT TO REVIEW AND/OR REVISION BY CVWD IF CONSTRUCTION HAS NOT STARTED WITHIN 12 MONTHS FROM DATE OF APPROVAL AS SHOWN IN CVWD DRAWING APPROVAL BLOCKS. 17. CONTRACTOR SHALL CALL UNDERGROUND SERVICE ALERT (USA) AT 1-M 422-4133 AT LEAST TWO WORKING DAYS PRIOR TO START OF CONSTRUCTION AND PROVIDE THE CVWD INSPECTOR THE USA NUMBER PRIOR TO EXCAVATION. Domestic Water General Notes-Final-7/15/05 j t I t EXISTING SEWER .10 f STATIC PRESSURE = 100 PSI , WATER WORKS MATERIAL SHALL BE RATED FOR 150 PSI I.rnTF 'A'' .�.��. .12"' DIP WATER 'MAILN \\\ q,. LEGEND ! � I � :- •SHEET 2 \\ . \\ � � , ` % / � COUNTY OF RIVERSIDE DEPARTMENT OF FIRE PROTECTION CURB LINE ! \♦ PNEeD RIGHT--OF-WAY I Ii I . `.\ 1 :i DIP II WATER MAIN EXISTING IIr WATER: BY DATE SHEET 2 I CERTIFY THAT THE DESIGN OF THE WATER SYSTEM IS 1� �I�I.{illlll{ 1, I► I i GRAPHIC SCALE .I i-� IN ACCORDANCE WITH THE REQUIREMENTS PRESCRIBED so a 100 SHEET INDEX 'r BY THE RIVERSIDE COUNTY FIRE OEPARTMEMNT. =11$0' lY1tiC SCALE: I' (INS') BY DATE I inch = !t "S THE LAlI1 o CALL AT LEAST Two �F/ PREPARED UNDER THE SUPERVISION OF !AL BEFORE WORKING DAYS PRIOR Q )U DIG! TO EXCAVATING 1-800-227-2600 r3 �� .2 , IL_• Il C-5 No. C54559^ - UNDERGROUND SERVICE ALERT DATE OF soun►�N cMJFORI#A Exp. 12/31/07 �(� � DANIEL R. RU12 0 /14L RCE NO. 54559 EXP. DATE 12 31 07 BEFORE EXCAVATING, THE CONTRACTOR SHALL VERIFY THE ,F OF DRAWN BY: CHECKED BY: DATE: LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UTILITY UNDERGROUND SERVICE ALERT AT 1-800-227-2WO DJ DRR FEB 201 �- STANTEC CONSULTING INC. 73-733 FRED WAKING DRIVE SUS 100 PALM DESERT, CA 92260 $tald2C 760.346.9844 WASHINGTON 111. LTD 30240 RANCHO VIEJA ROAD. SUITE B SAN JUAN CAPISTRANO. CA 92675 (949) 443-1234 CONTACT PERSON: JACK TARR FOR: C.V.W.D. DRAWING APPROVAL 2/23/06 o.o. N. 34728 P.wdane CASE 1 APM CffY OF L QUINTA SHEET NO. WATER IMPROVEMENT PLANS A OF PARCEL8 5-10 of 3 OF PARCEL. LW NO.3M TITLE SHEET FILE: WR30540501 LTED IN THE NE 1 4 OF SECTION 30, T 5 S, R 7 E, SBM DRAWING NO: WASHIN 3TC M PARK ., . -7e%^ 2 m W co 0 0 N Of U2