ENCROACHMENT PERMIT
PUBLIC WORKS CONSTRUCTION
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public
works improvements in connection with MINOR IMPROVEMENTS and APPROVED S.UBDIVISIONS.
Subdivision Improvement Permit - Class III
Minor Improvement Permit Class IV
DATE:January 17, 2007
LOCATION OF CONSTRUCTION (Street address or Description): Various locations; Calle Tampico West of Eisenhower (Cove Area)
PURPOSE OF CONSTRUCTION: Install PVC piping and various hand sized holes for fiber optics
DESCRIPTION OF CONSTRUCTION: -See attached maps and plans
DIMENSION OFINSTALLATION OR REMOVAL: See attached maps and plans
APPROXIMATE TIME WHEN WORK WILL BEGIN:Will Call TIME OF COMPLETION:4 months from start
ESTIMATED CONSTRUCTION COST: $169,000.00 -(Including removal of all obstruction, materials, and debris, backfilling,
compaction and placing permanent resurfacing and/or replacing improvements)
COMMENTS:
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless. from and against any
and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or
property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify -the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777-
7075.
Comply with all applicable City Ordinances, the terms and conditions of. the permit and all applicable rules and regulations of the City
of La Quinta and to pay for any additional replacement necessary as the result of this work.
qL
Signature of 4plicant or Agent
Verizon - Darywl Bowden 870 Mountain Ave. Upland, CA 91786 (909) 608-1358
Name of Applicant (please print) Business Address Telephone No.
Name of Contractor and Job Foreman Business Address
Contractor's License No.
licant's Insurance Company
FEES: Subdivision IMDrovement Permit - Clahs III CITY OF LA
Minor Improvement Permit - Class IV
Ins'pection Fee
Permit Fee
As -Built Deposit
Cash Deposit -Surety Bond,
if required
TOTAL
$�5,070.00
$100.00
s. 95
$ 05
$5.170.00
Telephone No.
City Business License No.
TBD
Policy Numb6r
blic improvements: 3% of estimated con * struction costs
'ate improvements: 3% of estimated construction costs
Seeattached schedule
PERMIT NO.5216 F
DATEAPPROVED: 11ZF10-1
EXPIRATION 9�ATE: // Z-S'/C 7
BY:
jAdministrative Authority
I �
I )
PUBLIC'WORKSI)EPA-RTMENT
APPLICATION F OR PERMIT,
Datel
Tract No: See a�ached paLcel maps�rOject.Name: 0543-7PFAO 1319 -H lioo-2_
Oj
Ni6inity; 'IVY/6 c4rtle
D'es�ription.of.-.C. onstructi.on. (E�x:'See Plan'Set'No'. 01234) See aftached -maps a�d P1 - ans
'Dimension Of Instal.lation-or R-emovah See aftac'hed maps and plans
ApproximateC. OnstrUctibla- StArt'Date: 6 - 67
Approximate:Constructi'on Completion Date:
4
Estimated Construction -Cosi:
. . . '. .. . - _/e,
Estirnai�d Constructioacost $hall incluOthermoval ofig obstructions,-matcrials, -and dtbris,back�filling, compaction.aud.�
-placing pennanent.resurfachig And..or:rcplacing improvements
Contact..N - ame: QarvW1 Bowden Phone Number, 909-608-1358
Name -of Ap�licantlowner: Verizon
A
PPlicant Address:: 870 Mountain Avip, Upland, CA 91786
-Applicant'Telqphon�:Nuinber:.', 9-608-1358
'Name of Contractor::
C ontractor Address:
�ContractofTdlephone-Numb.CV,
Qoniractor 8tate'Lic einse'Number:
:Contractor -City 13usiness:License Number:
A THE-C URRENT INSUR—ANCE'CERTWICATF. MUST �u.P.RovrDrsp-<
Applicant or.Contractor Gen6ral:.Lidbihty:Insurance:Company.:
ApAcant.-or-Contraotor Gederdl Liability Insurance Policy Number:
of�jce'use Only:
Inspec; tionTce4. -5—, 0 0.
A rBuilt
Deposit:
Dust Control
Deposit:
C.redit
Amiount,".
TOTALIZ,E-EDUE: 77 O....�.
Office-Uge Only:
.Assigned Pertnit.-Number:
Approval Dito;
Expiration
Date:
Issue
Date:
.--Adiiiiiiisti-ativetAutliorit3l.1-1
August 3, 2006
Timothy-R. Jonasson, P.E.
Public Works Director/City Engineer.
7 8-495 Caller Tampico
La Quinta, CA 92253
Reference: fo . r the City of La Quinta, Plan #0543-7PFAOBBH4002
Encroachment Permit
Locatio n:
La Quinta, CA 92253 —
-z . a:--AvenidrRamirez---.—*Avenida�Vallei-0----.
A-venida-Carran
*Eisenhower:Dr
*Avenida, Herrera *Avenida, Velasco
*Calle Hidalgo *Calle Sinaloa
*Avenida. Montezuma
Calle Tampico
-�La,ne CZosures
'Materials:
Conduit - 430 ft
4" PVC
1.25" PVC_J�� �5�33 ft
.1.5" PVC ft
"2" PVC--= ft
1.25" Shadow Conduit ft
Boxes -
17" x 3 O"Hand Holes
24' x 3 6" Hand Hole �Sq
36" x. 60." Pull Bok,__
15!'x 20" Hand Holes
Construction-
ge
Bore. Foota, Trench F.00tage�
Dear Timothy:
Please find enclosed herewith in a Verizon permit application- packet completev�ith.
encroachment application, area map, assessor's maps, location detail for fiber distribution
hub, hub location pi6tures, and placement/construction ' work 6 rder map. Assigned
contractor will provide license and.insurance documents to city of La Quinta, before -
beginning work. The Verizon contact is Darywl Bowden and may be contacted at (909)
608-1358. If you require* any further assistance please contact meat (909) 985-6643. -
Sincerely,
Jim Bishop
Cendera Technologies, Inc*
820 N. Mountain Ave
Upland, CA 91786
(90?) 98.5-6643
4
Ti
llla�.
T1 IT
t !t
N
w A VENIDA CARRANZA
=04
40
3r.vz
A MENIDA RAMIREZ
BL
OC
OC
b
G . )le
8
@
(S)
E)
(D
@
72
I
A IVENENIDA
VALLEJC
01*7.
1
RL
7 CK
".27
71
AVENIDA -HERRERA
,rj
j/-
OCK
z; A z
ti
Z,
ZL
to
zz
N
lom
70
AvEffloA
VELASCO
DRIVE
(Aff S"'")
/Z--I\
k6i
0
AVENIDA
ME$
OQ
0
ft to
42
/-g
rn
E)
MA'02"Mt
3.
0.
It
��ll
68
AVENIDA
CARRAM
tb
Z 04
'o
MA
Ad
aap�m
TO
6s.
0
.S-
Sg
� r.
ff.
..
[*MA
th
-4
v2v
it?
AVENIP14 - RA MIREZ
MA ozwg
BLOC
S
E)
166
T --�PEWIDA VALLE.10
BL.
�:k
N.
81
s
a i.
G
ow lot -let.
-to
a*
-AMDA -NERRERA
0204W 92W -Av
@ G
S i
Z;
3.
—AV Y-rLA$00
ENIVA
zu
a � � -
1)
lb
- lw .
1z,
0.0
iZ6_`
i
-AVENIDA DIAZ
0 Cl A
wnt�n)
10 Z
....
ot
,-A
RQ
4gr jr or,"
ta CA
AYENIRA
jz, RUBIO.
B L C K
0 +�K
99.42
tot Itt,
on-lod .
I
T
- AVEA1104
v
gig jz�
APEWD4 ALVARADO-
-BLOCK
B
ZZ
2 21
MV10A
OARRANZ4
a-
5b
a .
5
V.
mo-
"T
51 L
.
0
ch
AVENIDA 'RAMIREZ
R
V,
lei
0
L.:3
C.0 ,
a�i
C,nE; -
CIO
La �=
"! Z3
QR gre
0
51:3
10 '1 OL
a
G
cvsegU YQIM3AVI
H3A81IN39HI
N30-18
0
(a
G)
is
NO
-Td
Y(LIW7AV_
IX
a
e
a
�e)
OT211ttlity,wim
V G 1 N�3
EC31
gj
.. I
6 70 (D.-' (5--
3
E38 i wy.8 V El 1 M 3*�'-�� -f
:k'CitV bf La Quinta
The following General and Special Provisions are attached to and made a part of
Permit Number 5216
The following shaH atways apply:
ENCROACHMENT ON PRIVATE PROPERTY: This per mit authorizes work to be accomplished within the City of La Quinta's right of way
ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission
from abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not. be permitted to operate on any paved
surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that *these portions of road be resurfaced
over theirentire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or
cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains
shall be kept free of debris at all times for proper drainage.
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DEMATER OPERTATIONS: If de -watering operations are'required and pumps are forcing water on City of La Quinta roads, it shall be the
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for
the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The fbilowing shall apply when indicated.
0 RI NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting
construction.
0 R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
permittee.
R3 UTILITY CLEARANCE (Surface Structures) No work shall'be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
R4 PAVEMENT WIDEN ING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
Wth N/A inches of A.C. paving placed on N/A inches of N/A aggregate sub -base course having an
" R" value of not less than ( ** N/A and in conformance with the City of La Quinta Road Improvement Standards and
Specifications, Ordinance.#461.
R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb, shall be graded to a slope of
one-fourth inch (W) to one foot (1').
R6 GRADE CHECKING: City.of La Q6inta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
0 R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter N/A feet shall
be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainag . e pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2 Y2") of A.C. paving on N/A of class N/A
-aggregate base.
[D R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all
es.
El R1 0 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply With the
manufacturer's specifications.
. �'City of La'Quinta
R1 1. COORDINATE WORK: The proposed work shall be subordinated -to any operation, which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces. to preclude delay or interference with State or City of La Quinta projects.
R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon.completion or replacement of all survey monuments for proper clearance.
R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be
used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the
protection of the traveling public. - The Public Works Inspector shall determine the suitability of excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented'or
replaced by an approved sand or gravel.
RI 6 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than
three feet (T) and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any
case, a relative compaction of ninety-five percent (95%) shall bernaintained with the structural section of the roadway.
R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the
trench before flooding or a maximum of five feet (6) lifts where trenches are of excessive depths. Care is to be'exercised
that the backfi * 11 material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuos.
R18 COMPACTION TESTS If so required by the inspector, compaction test shall be made at intervals of not more than one -
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or, service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after
a maximurn of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5). day limit.
R21 PERMANENT PAVEMENT RE PAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC-800 shall be placed immediately. A permane * nt patch of ( ** N/A ** ) inches of A.0 surfacing placed on
a ( ** N/A inch ( crushed ) aggregate base shall be placed no later than ( 5 ) days after completion of temporary road
repair.
R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
R23 STREET RESTRIPING: Where street striping is still visible on stfeet-to be excavated, such striping shall'be replaced upon
completion of permanent repairs.
R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished
by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The
stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be provided to protect the traveling public at all times.
Large holes resulting frqm tree removal shall be backfilled and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground, whichever is the greater. compaction as determined by the impact or field method.
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.
PERMIT NO. 5216
Verizon Upgrade #5/Upgrade Network/CaHe Tampico West of Eisenhower (Cove
Area)
In addition to the standard permit conditions, the following shall apply:
Pursuant to Section 14.16.320 -of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications for Public
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. Prior to commencing the excavation of a trench 5 feet in depth or greater and into which a person will
be required to descend, the Contractor shall first obtain a permit to do so from theDivision of Industrial
Safety pursuant to 7-10.4. 1.
3. "The permittee shall not construct an improvement that reduces vehi c*ular sight distances. If such
improvement is found to reduce the vehicular sight distance, then the permittee shall relocate the
improvement prior to sign off of their encroachment permit." *
4., The permittee shall not install improvements with the intention ofproviding video transmission services
unless the permittee obtains a v alid Franchise Agreement.
5. The perinittee shall remove any underground utility markings that are no longer being used for this
project. The permittee shall remove markings on paved areas using high pressure wash or a method
equivalent and at the discretion of the City Engineer.
6'. Any asphalt or concrete repairs shall closely match the existing paved areas in color at the discretion of
the City Engineer. A finish product with a checkerboard appearance will not be accepted.
7. The permittee shall maintain the existing pedestrian path of travel and must maintain ADA complaint
, pathways leading to areas for use of public transportation systems.,
8. No stockpiling of any materials will. be allowed within the City R/W without an approved permit
. explicitly stating the use for stockpiling and/or storage.
9. The following city streets obtain a newly placed slurry seal and cutting through these streets will not be
allowed without the approval of the City Engineer.
a. See attached after page 7.
10. . The permittee. shall provide a list of individuals that can provide immediate assistance'to the public.
The permittee is responsible for assisting.the public which have inquires with regard to this project.
The list shall. be provided to the city and attached to this permit.
This list of individuals with phone numbers shall be identified on the proposed door hangers which the
permittee shall provide 48hrs prior to start of any work, which includes marking of the underground
utilities.
The individuals identified on this list shall be capable of responding on any work day and within 1 hour
of an y work day'.
Special Conditions Page I of 7
I
PERMIT NO. 5216
Verizon Upgrade #5/Upgrade Network/Calle Tampico West of Eisenhower (Cove
Area) I
11. Door hangers shall be provided to all residents affected by the project. At a minimum, the door hanger
shall provide the following information:
a. Short description of the improvements. (Include Verizon as the applicant and permit
number.)
b. Schedule of the improvements
C. Suggested alternate routes of travel
d. Phone numbers and individuals for questions and answers with the city being the last phone
number, (760)-777-7075.
12. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the
actual work performed.
13. Verizon and TBD Contractor, hereinafter referred to as "Permittee", shall be responsible for providing
continuous dust and erosion control. .
14. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more
frequently, if required.
15. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the
work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May lst to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial
street (i.e. any 4 lane street) before 8:00 a.m.
16,. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3
p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact
the Riverside Country Traffic Signal Maintenance Department at (951) 955-6894 if signal operation at
the intersection is to be altered in any way.
17. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Pennittee shall assume responsibility for repair of any pavement damage to any public or private street
and for any damage to other City streets or facilities as a result of work performed under this permit.
Special Conditions
Page 2 of 7
PERMIT NO. 5216
Verizon Upgrade #5/Upgrade Network/Calle Tampico West of Eisenhower (Cove
Area)
18. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to
start of construction, a letter from any owners of the driveways/access ways that will be closed down
due to the construction. The letter must be approved by the city and at minimum state from the owner
the following:
A. Approval of the construction
B. Plan identification
C. Time Frame of Closure
D. Alternative Routes
19. The permittee shall place temporary no parking signs along the parking area affected by the
construction. The signs shall be'placed along the area 48hrs'prior to the start of closing the area, and
.removed immediately after the construction completion date.
20. Pursuant to Section' 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982), at
residential Streets, advance warning signs and traffic control shall be installed and maintained in
accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual).
A traffic control plan shall be prepared in accordance with the WATCH Manual.
On Collector to Major Arter ' ial Streets, the pqrmittee must submit a traffic control plan which shall be
prepared under the guidance of the Manual of Uniform Traffic Control Devices (MUTCD) 2003 Edition
with Revision No. 1 Incorporated, dated November 2004 (HTML) and the California Supplement. As
of October of 2006, these documents can be observed at
hl!p://mutcd.fhwa.dot.gov/HTNV2003rl/�art6/�)art6-toc.htm and
htlp://www.dot.ca.gov/hq/traffops/signtech/mutcdsppp/�df/CA-Chap6A-ChV6F.pdf, respectively. It
shall be the Permittee's responsibility to appropriately detour and barricade all construction sites.
Pursuant to Section 14.16.290 ' of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street
closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be
maintained at all times.
21. Prior to excavating, if required, the Pennittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Pennittee's responsibility to notify the.Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.'
22. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be
performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the
City of La Quinta.
Special Conditions Rage 3 of 7
PERMIT NO. 5216
Verizon Upgrade #5/Upgrade Network/CaHe Tampico West of Eisenhower (Cove
Area)
.23. The permittee shall be respon ' sible for calling the city inspector to arrange the city inspector to observe
random trench compaction testing performed by a city approved material testing firm. If the inspector's
phone number is *unknown, the permittee shall call the Public Works front counter phone at 777-7075 or
the Assistant Engineer I at 777-7047 to determine the city inspector's phone number. The inspector shall
determine the number and location of the test location/s. The above testing does not relieve the permittee's
responsibility for future repairs due to settlement at and near the locations of the work area. Materials
testing must be performed under direct supervision of a California Registered Civil Engmeer.
24. The issuance of this permit and the City approval of the related construction improvement plans do not
provide a vested entitlement for all design parameters that may have been utilized for the plans. As such,
plans approved for this permit may be "at risk" for further modifications as it relates to any follow up
improvement plan requirements as required by the city or existing errors- & omissions by the architect or
engineer of record.
25. This permit is not valid until the permittee submits, to the.Public Works Department 2 weeks prior -to start
of construction, the name of the City approved contractor, who shall submit to the City the following items:
a. General Liability Insurance Company and Policy Number
b. City Business License -
C. Contractors State License Number
26. The permittee shall not encroach upon private property without prior written approval (submit to the Public
Works Department, attention to the Assistant Engineer 1) of the private- land owner whom is being
,encroached upon.
27. Prior to performing construction work and closing any lanes in the Public Right of Way, the permittee shall -
call the City at (.760) 777-7097 at least .48hrs prior to work and request an appointment for a
preconstruction meeting with the City Inspection staff.
28. The permittee shall haul all offsite debris to a certified landfill. Prior to hauling debris, the permittee shall
inform the City (Inspection staff or 777-7047) of the name and location of the certified dump site.
29. Prior to excavating in native soils, the owner of the project shall have employed by proposal contract an
archaeological observer for the site excavations within native undisturbed soils. A copy of the contract
must be submitted ' to the Public Works Department and attention this to the Assistant Engineer 1. If the
archaeologist determines the site note to be required to be observed, please submit a letter signed by the
archaeologist stating their determination.
30. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the
Public Works Department, an approved traffic control plan at least 2 weeks prior to start of construction or
parking on the paved R/W.
3 1. The permittee is required to provide an informative message board (approved by the City Engineer)
.informing the commuters using the affected public Primary Arterial roads or heavier traffic of possible
Special Conditions Page 4 of 7
PERMIT NO. 5216
Verizo,n Upgrade #5/Upgrade.Network/Calle Tampico West of Eisenhower (Cove
Area)
traffic delays, time of construction, and if possible alternate routes. The message board shall be provided
for the commuters 48 hours prior to the startof traffic delays.
32. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § - 1 (part), 1982),
backfill compaction within street rights -of -way shall conform to Section 3 06-1.3 of the latest edition of
the Standard Specifications for Public Works Construction (SSPWC), exceptas otherwise specified
herein.
Native material may be used as backfill material provided that minimum compaction, achieved in the
manner prescribed herein, is' achieved. Backfill shall be performed by mechanical means; no water
densified compaction viajetting or flooding or other means shall be allowed. It shall be the Permittee's
responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all
times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such
material shall be removed to the limits directed by the Geotechnical Inspector and/or the City
Inspector and the resulting excavation backfilled with pipe bedding material.
B . Backfill materials shall be brought to or maintained at appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through progress testing on the stockpiles.
C. The first length.of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth
of lift that can be compacted.
D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be
taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift thickness
to be compacted for the remainder of the project.
E. In subsequent lengths of trench, the frequency of compaction tests shall equal 'one per each lift of
backfill, per 300 linear feet of open trench, at randomly selected locations within the open length
of trench.
F. The depth of the randomly selected compaction tests shall also be randomly selected except that
where multiple tests are required in a given length of trench, the tests shall be no closer than three
feet (vertically) from each other.
Special Conditions Page 5 of 7
PERMIT NO. 5216
Verizon Upgrade #5/Upgrade Network/Calle Tampico, West of Eisenhower (Cove
Area)
G. If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
H. All costs incurred due to the conditions above shall be bome by the Permittee. Copies of all test
results shall be furnished to the City Inspector.
33. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of the
City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that
which can not be backfifled in the same day. Excavated trenches shall not be allowed open overnight;
however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length,
open overnight at a point where construction will begin the next day, provided that this length of trench
is completely covered by steel plating..
34. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its
original condition.
35. Access and egress to all local properties, shall be maintained at all times.
36. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
of the work. Permanent pavement replacement shall conform to the following conditions:
A. Exi sting asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall
be straight and clean. *
B. Permanent pavement replacement structural section, within all trenches, shall be I" thicker than
existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed
miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard
Specifications for Public Works Construction. The replaced pavement and base material shall be
compacted to 95% relative compaction and respectively tested, for each 3 00 linear feet of trench.
Verify exact structural replacement section thicknesses with the City prior to installation.
C. Permanent pavement replacement shall be installed using City approved3/4" max medium asphalt
concrete as the base course lift and a City approved Y2" max medium finish course lift for
capping. Asphalt concrete mix design shall be approved by the -City prior to its placement.
D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the
trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0. 10
feet with butt joint created next to the existing unmilled pavement surface. The cold-mill'ed area
and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000
a sphalt concrete mix. The width of the cold milling area shall be as follows:
Special Conditions Page 6 of 7
PERMIT NO. 5216
Verizon Upgrade #5/Upgrade Network/Catte Tampico West of Eisenhower. (Cove
Area)
For longitudinal trenches located in a parking lane: three (3) feet outside the sawcut
removal . lines.
For longitudinal trenches located in a traffic lane: three (3) feet outside the'sawcut removal
lines, or to the lane line striping, whichever is greater.
For transverse trenches across existing street: two (2) feet outside the sawcut removal line s*.
E. If grinding and capping operations are not performed in the same day as base paving operations,
the base course lift of3/4" max medium asphalt concrete shall be installed from saw -cut edge to
saw -cut edge flush with the existing street surface. The base course lift of paving shall not -be left
0. 10' low in anticipation of grinding and capping.
F., Any existing lane stri acing shall be
. ping or any existing detour lane striping affected by this resurf
replaced in kind by the Pennittee, as directed by and to the satisfaction of the City Engineer.
Affected traffic signal loops shall be removed and replaced in kind. The finished pavement
surface shall be smooth, consistent, and shall conform to the surrounding grades.
37. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization shall be done immediately
after completing the operation..
38. Pursuant. to Chapter 12.56*of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982) the City
has designated certain city streets as Truck Routes.. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants
permission to use the street to deliver street construction material's and/or equipment.
39. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
40. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages,
delay costs, costs or expenses in law or equity that may arise out of work under this permit.
41. If it is the intent of the permittee to cut the pavement and have it restored by a third party, the
permittee shall postpone cutting the pavement until the.intended third party has acquired a permit from
the City to perform the required restoration work.
Special Conditions Page 7 of 7
.054
ED
:;t
(L
.16'—
MH#358
PL FDH 432.
PL FDH 432.HANDHOLE ASSEMBLY
36'.IX36"X4% M# 11022806
PL 250 GROUND
----ROW
5'Csw
5'PKWY
CF
ow —
ow,
BIKE TRAIL
CALLE TAMPICO
PARKING LOT
cv)
ROW�
1-4" PVC - 305'W-S
EXISTING
151'_
5CSW
ROW
7
V
INTERCEPT EXISTING 4"
PVC
37"
PL 1-4"PVC -30',
Lu
z
.0
z
Lu
'co
uj
VERIZON
LEGEND
BURIED PLANT
0 BORE PIT
Z�, FIBER CALLOUT REFERENCE
El HHfMH CALLOUT REFERENCE
SUBDUCT CALLOUT REFERENCE
TERMINAL CALLOUT REFERE NCE'
FIBER DISTRIBUTION HUB (FDH)
NEW HANDHOLE
M NEW MANHOLE
SLACK I STORAGE LOOP
GROUND RD'
250hm
CABLE IN CONDUIT
AERIAL
POLE ANCHOR
POLE
DOWN GUY
RISER DETAIL
GENERAL
PROPERTY ADDRESS
SPLICE
PROPOSED RUNNING LINE
FDH BOUNDARY
—CF— CURB FACE
—EOP— EDGE OF PAVEMENT
—FIL— FENCE LINE
RIGHT OF WAY
GUARDRAIL
—COM— COMMUNICATIONS LINE
—DRN— STORM DRAIN LINE
—GAS— GAS LIKE
�PWR— POWER LINE
—SAN7— SANITARY SEWER LINE
—WrR— WATER LINE - : .
RAILROAD TRACKS.
CENTERLINE
u_.
�Qm &J" STATM
CALIFORNIA
Pg.*s849 GrId#:F7
cm OF
LA QUINTA
�C.xrm
LA QUINTA 05"
T'RrAow
08103tO6
7FFAOAF
JIM BISHOP sUAL11
08703756 N.T.&
FUN HUM�
13P R 0 a H4002'
C,Mi=rlrr
r w rmiR caur. Ftours . 1prmrr-2,op 4'
Ila
v
p
IN
all.
In
v
I
it
lot
U t. 1 .9
'0
c
; 1
2t
ftr I * . t ,
at
lit
ri
to
NANO
4 Jill
2t
it
i1c,
to
.i4 . t
Ila
4
s
)K
to
4�4
I
LOD 00
OF 13 >0
.1 x
= a v 3 a . a m z z
;1 z
z
0 0 M
c ?A
M z
0 M
r A a 1 -0 a
m
c
z A *4
c a 3 z
z
M
z
MR
z I
M
M
1.1 u1i
VERIZON
LEGEND'
ALL MOMAPPLruxLew anowtv avr
AGWCUr
1. THE TMEPHOME COMPANYMAS DILICENFLYArTEMP750 TO CaRRrcnY`LaCATEAMV SHOWALL RJOSTIND
PIPELIMES AND OTHER 8 uvmRss im THE v7rjmffr OF THE waRK, our rwis COMPANY oars Nor
HISAW
aLtARAmrEsimEAffAituNoaiptERsuasmutrmRzL AuLuRuaF7wvcamPANrYvsmvwALL
5
Mar
BUBSTAUCMAEVIM"WRCaRREVrLaa47iam*7LLNorDBAXAMSPVRA CLNMFVRMfrlt4 WOMAND
Asr—YS—cs
VMCVArYMCMRAM"LONAMPONSIEWPORALLDAm4ang7osuasmucmRssmomERemawmaR
STREffrOUSSURFACH VARIM'
NOT.
ALL WORKSMALLcompajuirm 7wELATrsrwmaNaPT7WSrAMA0tRP vpCC1jqCA7YvNSrvRpusLranvsxv
wAawma rApa wEELiwaunma
.471ONS or
AND SUFFIRIKENTV 7HEROM (APWA%OCr aRMMNBVJQ AND TO 7XV87ANDARP PLAMBAND SPECIFIC
1
PILE WYM 7KL'DIRECrVR OFPUBUC WORMIL
REWAWVMDNBTVTNECffr ORCOUNrrREVMMCONSMVCnVNMM*7NG8HALLSEAL4DEArTHeOMAMOMOF
THE C"T OR COUNTY COMMUCIZOM tNVPECMJL
3 S.
JX
991
1
C-SUBDUCY
PROINCTLON OFSUNDUCr
ALL NEWC&MrRUCffDM(ANDABUVVaROUNVAPPURYEMVI=V SMALL CONFORM TO C1TYAMDCOUNTYZQMWQAND
_rVER
SUROMMOM ORMAUNCES,
CONSTRUCTION WORK IMARrURIAL HIUMWAYS 15 SUBJ5Cr TVA MAJUMUM OF29"00'r OPEN TRONCH ArA
UNHAND WORMHOURSEErNEUMMODAMAND"OPM, UWASPALL UJADMIALKWAARKSMA080N env
COMTR4C7ORm TRENCH
I
BYRUM CUSF, GUrrZ%AM08nlS1MALM,
ANDBACMUMAGEMOr
STANDARDS
POLLO*7MO5tVXlPlCAWOMPLUITONOPPYAWCONSMUC"ON,TNBCDMM40MRNUBrRBKOVJYALLU&4 M9,11i
ALamrbL4n=muoomeirra7nwmauao4aumasAmvsivmwALKiL RAC107LLMUST'RECOPMATERIAL
70RACLLFrA7UA=WSTVIJMNDMLCCAVIOAfSOPWOR14TxffcaNTn4cmmmusrAppLrPVRA RESTOMCONCREFEANDASPHALl
MMAMYNI)PAR)UNOPgRUffFRMT7LECffrXOUNrrSFUWOWV�C�"YMAgff
TR4MC CONTROL PLANSARALL REPREPAREVAND SUBMITTED FOR REMYEWANDAPPROVED DrIND C?YMOUMM TYPICAL 14" TRENCH
CONSMUCITON TRAPPICE L PAM PREPARATION OUMEUXIM NO TYM CONSECUTIVE
INTEIZBECTIVASSMALLSE
a CONTACT 7marnoxv coupAuriuspErraR -a Kauxv aw AuvAmce OF coNsTaucTram
Z NV7TFrALL UTUMNS, OTHER SUB&TRUCTURV USERA AND UAVANCROUND SEffVTCffALERrffda34=4f33)
TWO IWARYNO AUS PRIVR TO CONSTRUCTION,
-4 MOMYLOCAL FIREAND POLICE REPARTWNYV48 HOURS LVAOVAN*ff TO CONSMUCYTOM,
AL NO"Pr— AT
IMADVANCHOPCONSYRUCITAM.
a COMINACTOR TO VDJAINA 87AM DIMON OPINDUSTROLL, SAPffTr WfCAVA710M PERUM (SEC SAYS OF Two
CAUFORMNLAOOXCOAZAAMOJ�7Z LOCAL =NSMU=OWPMUffMOOKOrALEETTKISAMLFLQEMENr
r, coN7nacyvxspmwrrouvom7pwjoaeymArAuraum
& 7RAFFICECOMM01, TO VEACUMMINEVEYSTRIPANO, aARMCADA PLAMWAM ASSFEWFIED ON THE
Pmuffr.
A CUMSYRUCTIONANDMAYMUAL UNEOIS TO CONFORM WYN VZMWMT=93WdNECOMPAKrOPEC4F=47MAM
10. COMTRACfflRmL4YVUrM4MMOLff9 PJUOR70ANrZ=VATIVAGIPSURFACEAWAfftMEMMMDffVA4TVFPdff
PWrORMCAffFROMSEMONLENMWDSHOWMNMPYTM"NOAWINSP==PL ANOMMUUMOd"LLAS
CONSULTED TO DETERMINE IF TIM 9"14170N HILL CONFLICT WYN CARLO ORDERIM
It. MANHOLE ANDIOR PULLROXES TV ED PLACED BEFORE CONCEPT PLACAUMM AD 1.
1Z PRECAST MANHOLES AND OR PULL BOXES TV BE SET ON A MINIMUM OF SOr(g) INCHES OF COARSE ROOM OR
BAND —99 VSP 604=4204 AND MP Off-410"10"
IL MAMMOLESAND FULL SOXES TO ROMACKED TO VERZZON OPMPMATTON UNLESS OTHERMSESHOWNOM
D�ALLSGSP0222-502-2W ANVOSP911,200*10C&
14 COMP��IWCMWWANDRANNOAVMrCKLBIGVM(aRAVETVCMUNQ70SUMMIM
-15. FuLumGivmomsmoopA.4cwont=mrsELowmmRuoucrEArmhrz%ANounoppwnvmu
OMFUTUANDUCrENTRANCe
I& JFPLX584XW�CNAREJOLNEDIVOYMMB=59,PCL&40RAE4AWDLWWMCO)MUffSHALLOU 7YFICAL01ANVROLUPLACEMENT
EQUIPPAWIVITHFuuININDIAL I YAMA47IR"INSICEWALK
PROFIL
L
Ir. ALL a&PrYZRAM1l=BU1UW CABLOTO MAVVA WWMUMCPSD'CVM BaOWOVr= ORADANDPLOW
LouruxLewsprafnZWOMMI)MR,
ia immupwArAWA*?MWPROP4VJWEU54CDAPA"EOL49JCVrBMJWPLAOMANARAMOM"
Ejam=m(fB-)Imwe$70=VMMuummviuranowiwHpx�aurrERdRAVOCAnOWLiMM
.19 SHOW�UMANZWRBURWCAULBGAMEORVUMDMWMf J ADJACENT= MANHOLEM Arm,
�VALSALONSTEMCHANDArAfffO7MMPWMrWAUMVCOVgRDIPPZWZUIWr�y�M.
PROPOSED
A�afl
Ducr
29L MANCRUALLOUCINFOROLMUMCNEM AMMAM70fiffli -fvRr*p�,$*-rvHjkp-CMA"
(LENOW10ARJEEl
3J-MR�ftucr.
PROPOSED HANDHOLE
�af. fp� V�
imsma
4FnrmLLQC=pr 900977NO
PTEEVLCO�C�l
��Eft,.MLLO TEL,,.
0.1 PED
CLEA44NCVPWDMC�BUBSMVFLfJUMORP"PAfRgArl�CELNM AL4NhVLffL
SA AWMMWCL94RANCiFOPMZMI�BMLLRJIMWNrAINIMAEVMAFUVWOXAWVBANVMa$fZX0
SUBSTRUCTURE.
ZIL ALL AWILSIS YMNSO-TORRENGARM � CLAW SOL
WrBATWEAMPI
AS, C0NTR4CYORTO VXRfFrMJA TO WALL AHDvR isaiz mum
MILUBAW
SPMMALTR
ZIL XWORDMEW WALL TO WALL AMUIDUMUNTS INAMMMADJAC101YTO UtTERSUr
97. PIACE j�LWRCPn&WPVALAoNVfMDUCr1MXC4TZD
ZL MINOWN WALL Tlff� OF 87ZEL CASING SMAL fiV
2& sANDonewiLqr7var�oRF*R=u;mc4armri WHIMAUXISMWFADMEAT701WANCH
LSjpEplAjX_7
SE"Arsommasapalarim
TRENCHING
TYPICAL FOR USING
SM TVNMUUMDISPMLffn7ZOUAWARCLMDANPUUY7MjffM
EXISTING COMOUIT
St. DOMOROPSIVIRMUMFORSURLM-4910i OPLtCH(4'XO7MArNNRgRUIJtffLOrA77nWTVAY
A���VXR=MIAWP=TVP.CDMM4CTVR70afiMMUSPJJCUPnVAPIVRSPJJ=NDIB
COMPLerm
21. IFDif)UEVCASWOPMCMINOPAW7MWC*�DMC"aLWILLNERMUnUD. ANwvvxvPS=ow
AND IZ-ABOVVTMCA.LZTMWCMDA�TVAW"PHIOOf,100(APWAA-
YE=wmtmp=m)zroco=imTucAuLeon"gRrAmoPL4=aNr courAcr
Cvxs7wUC770M`NOM-
MHOUMPIU04705TAR17MOCONSMUO"Oft TXLZPH0MffMUMBM�
&NRUVERrAMPLANDSUMOMUM�L4C=70=5&47YSPAC=Mopp"pmtrrowmAwax
GOVEMUMITALACENOr.
SL RIM14MOISTOCCAUVANTO "770MOP771scnyopRBVL4A=.
3r. OOMMOTORWILLRESTOMAMrAAACAGED URV"MDMBVSMMU7EDMWPINO�PAftWMTM4=Afa� OR
fLU8fDfAVZMM%TM"XM9� PAMTREFAACAKENTSMALLAUDON870 7108ATTArACTIONapruff
XUM1&OAUTrORWUNYT(Nk=LV1OL
39L frMLL597HUCMWMVM"RWMNS=Lfrr=PROWDETRAP710�MAP-qDY/BAAJWCMAU
AL4jaRARYzR=ANDomAmroymmpLm=ivamr�F.wArmont=msrmEiTAmcwmff,m
LOOLLAUTHOR17r.
SX. CONTRACMRSHALLMO _MBU3UfCAr7yw7uwrHE
AM ALL FIBER OUTRIBU770NMRSARUM affCACUNDED MYRA
_—AL
MAK290MRS,
DETAIL FOR USINO
SUSTING CoNvurr
PLAN
PROFILE
. . - i L
,7YP1CAL RISER DZIALL
SLUARYTYPSAAMFILL '
aMmADENCYSIANDARUCCIUMOTIBM
TrPoopunuly
W&L VARY
rYPICAL VACUUM LOCA72BETALL
P"pammis-
SCRE
LfsomwevnuwTo�uiw .
PLACE
��ALCCNCIMXSTVA
FRO GROUNDING AETAIL
IMIN-W
BOREPff&HANDHOLEPLACEMEAWDEMIL
(AMS)
BURIED PLANT
0.
BORE PIT
AFIBER
CALLOUT REFERENCE
HWMH CALLOUT REFERENCE
UBDUCT CALLOUT REFERENCE
Emmiu. cALLOUT REFERENCE
FIBER DISTRIBUTION HUB (FOR)
E3
NEW HANDHOLE
C13
NEW MANHOLE
SLACK I STORAGE LOOP
GROUND ROD
2Schm
CABLE IN CONDUIT
AERIAL
POLEANCHOR
POLE
DOWN GUY
RISER DffrAIL
GENERAL
MR PROPEFITY ADDRESS
SPLICE
PROPOSED RUNNING LIKE
FDH BOUNDARY
—CF— CURB FACE
--EOP-7 EDGE OF PAVEMENT.
—FIL— PENCE LINE
RIGHT OF WAY
GUARDRAIL
—COM— -COMMUNICATIONS LINE
—DRN— STORM DRAIN LINE
--GAS— GAS LINE
—PWR— POWER LINE
—SAN --- : SANITARY SEWER LINE
—WrR— WATERLINE ,
RAILROAD TRACKS
CENTER LINE
Call: 1.601).227-2600
. . Pg.f:S49GrId#"_
cmaF
A QUINTA
�Cff�
LA QUINTA OS43
.MAWVTI —
jiggs—nop 7PFAOBB
nE.013103105 —
D___ "1 7 OAF
Y, i!M BISHOP
013403MO
�FFDH =;bar
ITIA, HI
lOUwYT Op RIVERSIDE H4002
3
qw nBER 098T. 2011TE 3- 4