Loading...
7061Finance Revenue Code E-1 Tjht 4 4 Q" ENCROACHMENT PERMIT PUBLIC WORKS CONSTRUCTION For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS. Subdivision Improvement Permit - Class III Minor Improvement Permit Class IV DATE:March 27, 2007 LOCATION OF CONSTRUCTION (Street address or Description): 54-885 Avenida Madero - Legacy Homes - LQ Cove Intersection of Calle Tecate & Avenida Madero - APN 774-264-020 PURPOSE OF CONSTRUCTION: Provide Temp. Power DESCRIPTION OF CONSTRUCTION: Install 3 temp. power poles to provide temp. electrical �� DIMENSION OFINSTALLATION OR REMOVAL: See Drawing A - APPROXIMATE TIME WHEN WORK WILL BEGIN:Will call TIME OF COMPLETION:July 1, 2007 A*� ESTIMATED CONSTRUCTION COST: $2,308.00 (Including removal of all obstruction, materials, and debris, backfilling, compaction and placing permanent resurfacing and/or replacing improvements) COMMENTS: In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777- 7075. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules d regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. ignature of App ' ant r Agent Randy•Bills 54-425 Avenida Martinez, La Quinta, CA 92247 (760) 880-3445 Name of Applicant (please print) Business Address Telephone No. Legacy Homes Same Same Name of Contractor and Job Foreman Business Address Telephone No. 850833 100526 Contractor's License No. City Business License No. Lloyds of London PC1513 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit - Class III Minor Improvement Permit - Class IV Inspection Fee Permit Fee As -Built Deposit Cash Deposit -Surety Bond, if required TOTAL SNo Fee $100.00 $0 $0 $100.00 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs See attached schedule PERMIT NO.%OG DATE APPROVED: h'lA+e• 30j Ut EXPIRAT19 Dtv /1% z0Cr7 BY: Administrative Authority 71Y LLJ � O Q LLJ I Q w M-4 UNI- '710P P W2, TECATE IN 2 #1/0 kA-.C.--72KV-io pp (20 Z14 1�s d, CONDUIT NOTES: 1102 1) INSTALL 1-3"CND.R-R PER -SHOWN- FOR ALL. HOUSE SERVICES. 2) ATYPICAL TRENCH DETAIL FOR HOUSE SERVICES. AND SECONDARY 3) INSTALL 1-3"CND.R-R PER SHOWN FOR ALL SECONDARY RUNS. INSTALL 1-4" CND. PER SHOWN CURVE DATA TABLE # RADIUS < LEN( 12.5' 90- 1'9.( Description of Construction (i.e.: See Plan Set No. 01234) Dimension of Installation or Approximate Construction Start Date:. 7 Approximate Construction Completi n Date: v Estimated Construction Cost: $3406. Estimated'Construction Cost shall include the removal of a obstructions, materials, and debris, back -filling; compaction and placing permanent resurfacing and or replacing improvements Contact Name: kmw .6111( Phone jq ber: �M.3a&lc� Name .of Applicant/Ownede:;)i7rr_ 7. Applicant Address: Dz , Applicant Telephone Number: eOD - 3cf — -3 ,& . ao,0 Applicant E-mail Address: Name of Contractor: p'�v_-�2��1 Contractor Address: Contractor Telephone Number: It- ,6 Contractor State License Number:: —0—G093 Contractor City Business License Number: 10 G s ?Ae Contractor E-mail Address: I( d n 11 ►A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED -4 Applicant or Contractor General Liability Insurance Company: �. 0/_ 10 7 tas &F 46ti D a Aj Applicant or Contractor General Liability Insurance Policy Number: V PC /5_/� V Office Use Only: Inspection Fee: ,- Permit Fee��OO �..�..� , As -Built Deposit: Dust Control Deposit: Credit Amount: Office Use Only: Assigned Permit Number 7 ©/_ / Approval Date: Expiration Date:_ Issue Date: Administrative Authority: TOTAL FEE DUE: 0 f.. FOR PERMrr.doc � � S � � pit t' J y t� d .i � M1. • � r . ' .e ♦� w � f L � t� � 1 i. � i . . � 1 I ` C � S' ,. �n 03/08/2007 07:51 9516570441 POWERPLUS SALES OFC PAGE 06/08 QUOTE: 318623 DS 3/82007 7;49:06 AM eb MB POWER TO PRODUCTION PPArea: °s PALM SPRINGS, CA 92240 (760) 288-2775 FAX (760) 288-2372 Customer: Legacy Homes Job: La Quanta Cove Job#. 251556 54-425 Martinez Avenue Ord Supr: Randy Bills supr Cell: LaQuinta, CA92253- Supr Phone- (760) 880-3445 (760) 777-8317 Fax: (760) 564-8601 Tract #: Residential Phase: Production Lot(s): Power Contract #: Location: 54885 Avenida Madero P O M Cross Str: Avenida Madero x Avenida Tecate, La Quinta Phone: Fax. Remarks: Monthly rental charges will be $145.00 per month after the first 6 months. Quantity EquipmentlService 1 Meter -1 Ph 100a 240v 4 Clip O/H Res 1 Riser - 3 Wire 110 1112" Flax 6 foot 100A 1 Ph 2 Pole - Bare Support 1 Pole - 3 Plug Service 3 Wire - 01H #2 (1 Span) 1 Ground Rod - 8 Foot 1 Overhead Utility Meter Hookup Fee . **This quote covers 6 months of equipment rental: $2,308.00 Quote Notes: POWER TO PRODUCTION. POWER SOURCE BEHIND HOMES ON AVENIDA MADERO. Quote is layout specific. Any changes to equipment and / or services may incur additional cost. Customer is to provide access for installation and removal. Quote includes installation and removal. This quote is subject to utility and municipality approvals for source or special circumstances. Severe digging conditions may incur an additional cost. Installation date subject to weather conditions. USA Underground Dig Alert must Gear before installation of poles. Customer to spot all pole locations with a Power Plus! representative. Please allow two full days for Underground Service Alert to dear. Please sign quote as notice to proceed. When quote i3 faxed back, if required, please include P.O. Please include any necessary billing requirements. Prevailing wages are not included in pricing. Power Plus! does not pro -rate. Rentals are billed on a 4-week month. Pricing is only applicable if signed and returned within 15 business days upon receipt of quote. Preliminary information & billing requirements MUST be completed prior to installation. The scheduling and ordering of this equipment is determined from the date Power Plus! receives the. signed quote. Note, After the meter is set and inspected, please allow 7 to 10 working days for the utility company to energize your motor. Please figure on more days during and Immediately after periods of RAIN, HIGH WINDS, and excesslvery HOT DAYS. *Power Plus) is not responsible for the accuracy of Information provided by the utility company in relation to the source vetifimbon, —Perot appltc 0n tees to be determinO by respective city and UdI ty. Legacy Homes will provide Power Plusl with exact equipment locations prior to Installation. An additional service fee will be charged for any equipment relocation. Legacy Homes will be responsible fir locating and marking all private underground utilities including landscape irrigation systems not identified by USA Dig Alert Legacy Homes will be financially rosponSlble for any damage and repair work for any urKwgriund private utility systems (Including landscape Imgadon systems) not marked prior to equipment Installation. Legacy Homes wiN pay any additional cost for adverse digging conditions, special equipment required for We Installation, additional permits, permit deposits or any other unusual cost or fee required to perform installations services. Page 1 Qf 2 " ,. O r G• 03/08/2007 07:51 9516570441 POWERPLUS SALES OFC PAGE 07/08 Prier to equipment delivery, a w8naturc by an authorized representative of Legacy Homes is required on N5 Quote Form. Furthenrnom,l Legacy Homes requires a Purchaw Order (P.O.). a P.O. # and document must be lssr ed to Power Plusl before work is completed. Rental period is based on 4' weeK monms. Invoices are due upon receipt QUOTE SUBJECT TO SOURCE VERIFICATION PER ELECTRICAL AND / OR TELEPHONE UTILITY COMPANY(S). Legacy Homes Signature: _ Dater Print Name: Powerfts! Representative: Date: 3/8/2007 Eric Freeman Quote: 318623 Page 2 of 2 1 j 03/08/2007 07:51. 9516570441 POWERPLUS SALES OFC PAGE 08/08 TEMP POWER QUOTE: 318620 AREA: DS PALM SPRINGS, CA 92240 (760) 288-2775 FAX, (760) 288-2372 Quantity Equipment: installation: Monthly Rental: _ (4) Camera Platform {Minimufn Stand AIOn $780 $800 (4) Camera Platform with PT $780 $1200 (5) Camera Platform* $780 $850 _... ... _... (6) Camera Platform* $780 $900 _ .. Pan Tilt Zoom (PTZ) Stand Alone Platfor $780 $000 _ PTZ with 1-2 Fixed Camera Platform $780 $1000 PTZ with a 3 Fixed Camera Platform $780 $1100 Add Additional Platforms: (1-2) Camera Platform -(Fixed) $580 $400 PTZ with 1-2 Fixed Camera Platform $680 $1000 (3) Camera Platform -(Fixed) $580 $600 _ PTZ with a 3 Fixed Camera Platform $580 $110o _ — (4) Camera Platform-(Flzed) $580 $800 __, • (4) Camera Platform with PTZ $580 $1200 (5) Camera Platform— $580 $850 (6) Camera Platform" $580 $900 _ PTZ Stand Alone Platform $580 $800 Add Additional Equipment: Add Monitor 8 Mouse* $0 $50 Add Monitor 8 Joy. Stick for PTZ w/out PC* $0 $150 Replace DVR WNt/eb Server for live view ONLY* $0 $0 Add Web Server with DVR* $0 $200 (No additional software needed for vietwirig a wab semo Off -Site Installation Software $280 $0 _ Monitoring (Motion Sensor w/unlimited alarms) $0 $500 _ Guard Tours (1 tour/hr for 12 hm/day, 7 days a wk) $0 $750 Other $ $ _ — Quote Total: S ......_ $ ..... ..._-- *Installation is free at the time of Vila original se ONLY. Any additional service will incur additional costs. *' Pan Tilt Zoom (PTZ) is only available for 1 - 4 camera platforms. CUSTOMER AGREES TO PROVIDE THE FOLLOWING: 1. Provide Lessor with exact camera location prior to Installation and/or relocation of equipment 2. Previte Lessor wIth truck access for system Installatton and removal. 3. Provide Lessor with a dean static free phone connection with a ring voltage of 96-102 volts. 4. Payment for damaged or missing equipment. 5. Payment for relocating equipment. 6. Payment for special equipment needed for installation an0tor removal of system, 7, Authorization for Power Plusl to umrD4 exWng Mower poles on site for power line and data cable extension. S. All billing requirements needed to be paid Wthln 30 days of receipt of rental invoices. CUSTOMER AGREES THAT: 1. Lessor to provide software and technical support for computers with camera viewing capability. 2. Lessee to provide computers with equipment to support software for camera viewing: IBM compatible PC, Pentium processor, $2 megabytes of RAM, 20 megabytes availabl hard drive space. CD-ROM drive, video Card and monitor that supports a minimum of 80OX000 plxeb with 64K oolor. Dial up connections require a minimum of a 28.8K modem ISDN terminal adapter, A network interface card Is required ter r>-t�1a arv,ar ar,—h,nanoW arxt meyae c&n be cuppoed by power PI , l for gin no pa month 3. Lessee shall Indemnify, defend and hold harmless all claims, demands, and liabilities of every nature arising from lessee's utilization of the equipment under this agreement included but not limited to claims for the invasion of privacy unless solely Caused by the negligence. Sales Rep Signature: Quote Date: 3/8/2007 Acceptance Signature: Accepted Date: Print Name: Page 3 of 5 City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number 7061 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( " N/A " ) inches of A.C. paving placed on ( " N/A " ) inches of ( " N/A " ) aggregate sub -base course having an "R° value of not less than ( " N/A ") and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. ® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch (%") to one foot (1'). ❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A ") feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be.constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 %") of A.C. paving on (" N/A ") of class (" N/A " ) aggregate base. ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all times. ❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer's specifications. City of La Quinta J ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ❑ R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. ❑ R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. ❑ R16 i, BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (5) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. ❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one - thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent.repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. :. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( " N/A " ) inches of A.0 surfacing placed on a ( '" N/A "" ) inch ("" N/A " ) aggregate base shall be placed no later than (" N/A '") days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined.by the City Engineer. ❑ R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. /' PERMIT NO. 7061 Legacy Homes / 54-885 Ave. Madero (La Quinta Cove) / Temporary Power In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the actual work performed. 3. Ley-acy Homes — Randy Bills, hereinafter referred to as "Permittee", shall be responsible f6r providing continuous dust and erosion control. 4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. 5. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m. to 7:00. p.m. Saturday. 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (le any 4 lane street) before 8:00 a.m. 6. Work within 500 feet of a signalized intersection shall be performed between the hours. of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (951) 955-6894 if signal operation at the intersection is to be altered in any way. 7. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Pennittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. Special Conditions Page I of 4 IJ PERMIT NO.7061 Legacy Homes / 54-885 Ave. Madero (La Quinta Cove) / Temporary Power This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, a letter from any owners of the driveways/access ways that will be closed down due to the construction. The letter must be approved by the city and at minimum state from the owner the following: A. Approval of the construction B. Plan identification C. Time Frame of Closure D. Alternative Routes 9. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan shall be prepared in accordance with the WATCH Manual and submitted. to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour -and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. 10. Prior to excavating, if required, the Permittee shall contact Underground -Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 11. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 12. This permit is not valid until the penmittee submits, to the Public Works Department 2 weeks prior to start of construction, the name of the City approved contractor, who shall submit to the City the following items: a. General Liability Insurance Company and Policy Number b. City Business License c. Contractors State License Number 13. The permittee shall not encroach upon private property without prior written approval (submit to the Public Works Department, attention to the Assistant Engineer I) of the private land owner whom is being encroached upon. Special Conditions Page 2 of 4 I PERMIT NO.7061 Legacy Homes / 54-885 Ave. Madero (La Quinta Cove) / Temporary Power 14. Prior to performing construction work and closing any lanes in the Public Right of Way, the permittee shall call the City at (760) 777-7097 at least 48hrs prior to work and request an appointment for a preconstruction meeting with the City Inspection staff. 15. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the Public Works Department, an approved traffic control plan at least 2 weeks prior to start of construction or parking on the paved R/W. — � 16. As shown on the sketch to the left, a minimum distance of 18 feet between the surface and power lines must be kept at all time. 17. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. Special Conditions Page 3 of 4 PERMIT NO.7061 Legacy Homes / 54-885 Ave. Madero (La Quinta Cove) / Temporary Power 18. All excavations within City of La Quinta right-of-way shall be backfilled,. and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight., 19. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 20. Access and egress to all local properties shall be maintained at all times. 21. Pursuant to Section 14.16.375 of the La Quirita Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: Asphalt work is not anticipated. 22. ..Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be. done immediately after completing the operation. 23. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 24. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. Permit is valid for 60 days from issuance. 25. Power is to be established from an internal connection from -adjacent Phase I Old Town La Quinta within 60 days. 26. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. Special Conditions Page 4 of 4