Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Dudek Cost Proposal
City of La Quinta Washington Street and Fred Waring Drive Street Improvement Plan Dudek Fee Estimate 3/27/2019 Tank 1 -Project Meetings 8 Management 1A Project Kick -Off meeting (1 at 2 hours) 2 2 4 860 $ 860 IS Progress Meetings (up to 5 at 1.5 his ea,) + utility meetings (3 at 1.5 hrs ea.) 12 12 - 2,700 $ 2,700 1C City Council Meeting (1 at 2 hours) 2 2 5 450 $ 450 1D Project Management 24 24 $ 5,400 $ 250 $ 5,650 Subtotal Task 1 40 2 42 S 9,410 $ $ - $ 250 $ 9,660 oak 2 - CEOA Document 2A Project Initiation 1 6 9 $ 1.470 $ 1,470 2B Prepare NOE 1 a 6 15 8 2.220 $ 100 $ 2,320 Subtotal Task 2 2 16 6 $ 8,690 $ - $ - $ 100 $ 3,790 ask 3 - Utility Coordination 3A Field Review and As -Built Research 4 12 16 $ 2,620 $ 2,620 3B Utility Research & Coordination 6 8 12 8 34 $ 5,950 $ 5,950 Subtotal Task 3 6 12 24 8 50 S 8,570 $ 8,570 Teak 4 -Base Map and Topographic Survey 4A Topo Survey 2 2 $ 410 513.188 $ 13,578 4B Supplemental field survey 2 2 $ 410 84.099 $ 5,309 4C Baseman preparation 4 6 10 S 1,690 52 599 $ 4,289 Subtotal Task 8 6 14 $ 2,510 $ 20.6E6 S $ 23,176 raA 5 -Preparation of Final Plans, Specifications, and Engineers Cost Estimate 5A Street Improvement Plans 18 72 95 224 411) $ 65,690 8 250 $ 5B Traffic Signal Plan 4 4 3 900 $25,013 25,9 $ 5,91313 5C Staging and Phasing Plan 2 4 8 20 34 S 5,370 $ 5,370 5D Signing and Striping Plan 4 8 12 24 8 3,760 $ 3,760 5E Specifications & Cost Estimate 6 8 16 4 84 $ 5,970 $ 5,970 Subtotal Task 5 30 88 128 260 609 $ 81,690 25013 250 $ 106,963 oak 6 - Right of Way 6A Legal description and plats 2 8 10 $ 2,090 $4,531 $ 6.621 Subtotal Task 2 8 10 $ 2,090 $ 4,531 $ - $ 6,621 Task 7 - Construction Support 7A Pre -Bid Conference 3 3 6 $ 1,290 $ 1,290 7B Design issues inquiry 4 8 16 12 40 S 6,680 $600 $ 7,280 7C Respond to RFI's 8 8 16 8 40 $ 7,000 $1,500 $ 8,500 7D Review Submittals, Change Orders, Design Issues, etc. 8 8 24 8 48 S 8.200 $1,350 $ 7E Field Meetings -12 meetings onsite at 2 hours each 8 24 32 $ 6,720 $ 200 6, 0 $ ,920 7F As Built Plans 2 4 8 36 50 $ 7,690 $1,500 $ 150 $ 9,340 Subtotal Task 33 55 64 64 216 S 37,580 $ $ 4,950 $ 350 $ 42,880 • Porten! vl rivura I Foe: 143E 23'A 25% 39% 0'/. 1% 1% 100% Optlonal SeNjoas 1 ironic Vparaui= vernlarerl 3 3 $ 075 $5.750 $ 6.425 2 H1010g103t yivrvcV 4 12 28 44 $ 6,260 $ 3 Yo noting [up ro lu pwbWeal 2 6 e $ 1350 $ 10,000 ,0 $ 11,35350 Subtotal Optional Services 5 6 4 12 28 11 $ 8,305 S - $ 5,750 $ 10,000 $ 24,066 rank 1 -Project Meetings & Management 1A Project Kick -Off meeting (1 at 2 hours) 2 1B Progress Meetings (up to 5 at 1.5 hrs ea.)+ utility meetings (3 at 1.5 hire ea.) 12 1C City Council Meeting (1 at 2 hours) 2 1 D Project Management 24 Subtotal Task 1 40 'ask I- "GA Document 2A Project Inrhation 26 Prepare NNE Subtotal Task 2 'ask 3 - Utility Coordination 3A Field Review and As -Built Research 3B Utility Research & Coordination 6 Subtotal Task 3 6 'W Ir 4 - Base Map and Topographic Survey 4A Topo Survey 4B Supplemental field survey 4C Basemap preparation Subtotal Task 4 ask 5 - Preparation of Final Plans, Specifications, and Engineer's Cost Estimate 5A Street Improvement Plans 18 5B Traffic Signal Plan 4 5C Staging and Phasing Plan 2 5D Signing and Striping Plan 5E Specifications & Cost Estimate 6 Subtotal Task 5 30 *Sk 6 - Right of Way 6A Legal description and plats 2 Subtotal Task 6 2 'ssk 7 - Construction Support 7A Pre -Bid Conference 3 713 Design issues inquiry 4 7C Respond to BFI's 8 7D Review Submittals, Change Orders, Design Issues, etc. e 7E Field Meetings -12 meetings onsite at 2 hours each 8 7F As Built Plans 2 Subtotal Task 7 33 opwrial Seridess 1 1remc uveraaorrs Verbal lon 2 HiongrGl Survey 3 Yotholurg(up to 1u ponrolesl Percent of Hours / Fee. 1451 3 2 Subtotal Optional Services 5 City of La Quinta Washington Street and Fred Waring Drive Street Improvement Plan Dudek Fee Estimate 3/27/2019 2 2 4 8 12 2 2 4 8 72 4 4 8 88 8 8 3 8 8 8 24 4 55 1, 12 12 6 24 e 6 6 96 224 8 20 8 12 16 4 128 260 16 12 16 8 24 8 6 36 64 64 5% 39% V 6 6 4 8 16 4 S 860 $ 860 12 $ 2,700 $ 2,700 2 $ 450 $ 450 24 $ 5,400 $ 250 $ 5.650 42 $ 9,410 S - S - $ 250 $ 9,660 9 $ 1,470 $ 1,470 6 15 $ 2,220 $ 100 $ 2.320 6 $ 3,690 $ - S $ 100 $ 3.190 16 $ 2,620 $ 2,620 34 $ 5,950 $ 5,950 so $ 8,570 $ 8,570 2 $ 410 $13.160 S 13,578 2 $ 410 34,599 $ 5,309 10 $ 1,690 $2-599 6 4,289 14 $ 2,610 $ 20,696 11 _ S 23,176 410 $ 65,690 $ 250 6 65,940 4 $ 900 $25,013 $ 25.913 34 $ 5.370 S 5,370 24 $ 3,760 $ 3,760 34 $ 5,970 5 5,970 506 $ 81,690 25013 250 $ 106,953 10 $ 2,090 $4,531 i 6,621 10 $ 2,090 $ 4,531 $ - $ 6,621 6 $ 1,290 S 1,290 40 $ 0,680 $600 S 7,280 40 $ 7,000 $1,500 $ 8,500 46 $ 13' 0w $1,350 S 9,550 n $ 6,720 $ 200 S 6,920 s0 $ 7690 $1,500 $ 150 S 9,340 216 $ 37 580 $ $ 4,950 $ 350 S 42,880 3 $ 076 $5.750 $ 6,425 28 44 $ 6,zl0 $ 6,280 8 $ 1,350 $ 10,000 $ 11,350 28 11 $ 8 305 S $ 5,750 $ 10,000 $ 24,055