7142.'4 Qum rcu
Tiiit -4-�-'
ENCROACHMENT PERMIT
PUBLIC WORKS CONSTRUCTION
See below for Finance Revenue Codes
00mt, n m
For the construction of public or private curbs, driveways, pavements; sidewalks, parking `lots, sewers, water mains and other like public
works improvements in connection with, MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS.
Subdivision Improvement Permit - Class III
DATE:July 17, 2007 U I
LOCATION OF CONSTRUCTION (Street address or Description): Madison Street and Avenue 58
PURPOSE OF CONSTRUCTION: Install Dry Utilites , gas, electric, cable TV� `��� 20�7 .
DESCRIPTION OF CONSTRUCTION: See Attached Plans CITY OF LAQUINTA
FI CE DEPT.
DIMENSION OFINSTALLATION OR REMOVAL: See Attached Plans
APPROXIMATE TIME WHEN WORK WILL BEGIN:July 16, 2007 TIME OF COMPLETION:August 17, 2007
ESTIMATED CONSTRUCTION COST: $35,000 (Including removal of all obstruction, materials, and debris, backfilling, compaction
and placing permanent
COMMENTS:
acing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any
and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or
property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777-
7075.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regula i ns of the City
of La Quinta and to pay for any additional replacement necessary as the result of this work. t_-7 n � \ f
le Constr cu lion -Bob Engle III
ne of Applicant -(please print)=
64939.Little Court, De
Business Address
CA 92240
Telephone No.
;Same.as above
Name of Contractor. and Job Foreman Business Address Telephone No.
619208
Contractor's License No.
3146
City Business License No.
Lantana Insurance �ACL201400
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit - Class III
Minor Improvement Permit - Class IV
Finance Revenue Code
Inspection Fee E_1 $1,050
Permit Fee E-1 $100
As -Built Deposit E_A $0
Cash Deposit -Surety Bond, E=B $0
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
See attached schedule
PERMIT NO % 1 42. 7
DATE APPROVED: / 94 ydo
EXPIRATIGN DATE:
TOTAL$1,150 required I I Administrative Authority
T
It
City of La Quinta
The following General and Special Provisions are attached to and made a part of
Permit Number 7142
The following shall always apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way
ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission
from abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved
surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced
over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or
cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains
shall be kept free of debris at all times for proper drainage.
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the
responsibility of the permittee (contrat;tor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for
the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting
construction.
® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
permittee.
® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with ( " N/A " ) inches of A.C. paving placed on ( "` N/A " ) inches of ( " N/A " ) aggregate sub -base course having an
"R" value of not less than ( " N/A ") and in conformance with the City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
one-fourth inch ('/<") to one foot (1').
❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A "`) feet shall
be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2 Y2") of A.C. paving on (" N/A ") of class (" N/A " )
aggregate base.
® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all
times.
❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the
manufacturer's specifications.
City of La Quinta
® R11 COORDINATE WORK: The proposed work .shall be subordinated to any operation, which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State or City of La Quinta projects.
® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all surrey monuments which exist on the
centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon completion or replacement of all survey monuments for proper clearance.
® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be
used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the
protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than
three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any
case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.
❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the
trench before flooding or a maximum of five feet (5') lifts where trenches are of excessive depths. Care is to be exercised
that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuos.
® R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one -
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making per repairs.
Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
® R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after
a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5) day limit.
® R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( 3 ) inches of A.0 surfacing placed on a ( 6 )
inch ( crushed ) aggregate base shall be placed no later than ( 5 ) days after completion of temporary road repair.
❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
® R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon
completion of permanent repairs.
❑ R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished
by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The
stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method.
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.
PERMIT NO.7142
Santerra / Install Dry Utilities - gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
In addition to the standard permit conditions, the following shall apply:
1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For Public
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the
actual work performed.
3. Prior to commencing the excavation of a trench 5 feet in depth or greater and into which.a person will
be required to descend, the Contractor shall first obtain a permit to do so from the Division of Industrial
Safety pursuant to 7-10.4.1.
4. Engle Construction — Bob Encle III, hereinafter referred to as "Permittee", shall be responsible for
providing continuous dust and erosion control.
5. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more
frequently, if required.
6. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the
work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October 1 st to April 30:. Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1 st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m.
Saturday. 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial
street (ie any 4 lane street) before 8:00 a.m.
7. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3
p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact
the Riverside Country Traffic Signal Maintenance Department at (951) 955-6894 if signal operation at
the intersection is to be altered in any way.
Special Conditions
Page 1 of 7
PERMIT NO.7142
Santerra / Install Dry Utilities = gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
8. The permittee and/or contractor placing engineered fill must provide adequate time and safety for the
Geotechnical Engineer of Record to perform soils testing during engineeredf ll placement. The testing
frequency shall be determined by the Geotechnical Engineer of Record such that the fill can be
determined to be placed according to the city approved plans.
9. The permittee and/or contractor shall provide surveyor staking information adequate for the City
Inspector to determine horizontal and vertical locations relative 'to the approved city plans. The
minimum required wood lath type stakes shall be placed at all proposed building corners, and they shall
state the horizontal location relative to building corner and the elevation of the top of hub next to the
lath.
10. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Pennittee shall assume responsibility for repair of any pavement damage to any public or private street
and for any damage to other City streets or facilities as a result of work performed under this permit.
11. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to
start of construction, a letter from any owners of the driveways/access ways that will be closed down
due to the construction. The letter must be approved by the city and at minimum state from the owner
the following:
A. Approval of the construction
B. Plan identification
C. Time Frame of Closure
D. Alternative Routes
12. Any land on which Williamson Act contracts apply shall remain undisturbed.
13. The permittee shall place temporary no parking signs along the parking area affected by the
construction. The signs shall be placed along the area 48hrs prior to the start of closing the area, and
removed immediately after the construction completion date.
14. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan shall be prepared in accordance with the WATCH Manual and submitted to the City for
review and approval one (1) week prior to starting any construction. It shall be the Permi.ttee's
responsibility to appropriately detour and barricade all construction sites.
Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982), street
closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be
maintained at all times.
Special Conditions Page 2 of 7
PERMIT NO.7142
Santerra / Install Dry Utilities — gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
15. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-8007422-
4133. It shall be the Permittee's. responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
16. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be
performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the
City of La Quinta.
17. The permittee shall be responsible for calling the city inspector to arrange the city inspector to observe
random trench compaction testing performed by a city approved material testing firm. If the inspector's
phone number is unknown, the permittee shall call the Public Works front counter phone at 777-7075 or
the Assistant Engineer 11 at 777-7047 to determine the city inspector's phone number. The inspector shall
determine the number and location of the test location/s. The above testing does not relieve the permittee's
responsibility for future repairs due to settlement at and near the locations of the work area. Materials
testing must be performed under direct supervision of a California Registered Civil Engineer.
18. The issuance of this permit and the City approval of the related construction improvement plans do not
provide a vested entitlement for all design parameters that may have been utilized for the plans. As such,
plans approved for this permit may be "at risk" for further modifications as it relates to any follow up
improvement plan requirements as required by the city or existing errors & omissions by the architect or
engineer of record.
19. The permittee is responsible for obtaining a valid separate permit from the California Department of
Transportation Department (CalTrans) or any other agency such as City of Indio, Coachella, County of
Riverside, ...etc, if any of the work or traffic control devices extend into the CalTrans or other agency right
of way.
20. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start
of construction, the name of the City approved contractor, who shall submit to the City the following items:
a. General Liability Insurance Company and Policy Number
b. City Business License
c. Contractors State License Number
21. Work within 500 feet of any designated School Zone shall be performed between the hours of 8 a.m. —1:30
p.m. Traffic control shall be set up after 8 a.m. and removed before 1:30 p.m.
22. Prior to performing construction work and closing any lanes in the Public Right of Way, the permittee shall
.call the City at (760) 777-7097 at least 48hrs prior to work and request an appointment for a
preconstruction meeting with the City Inspection staff.
23. The permittee shall haul all offsite debris to a certified landfill. Prior to hauling debris; the permittee shall
inform the City (Inspection staff or 777-7047) of the name and location of the certified dump site.
Special Conditions Page 3 of 7
PERMIT NO.7142
Santerra / Install Dry Utilities — gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
24. Prior to excavating in native Soils, the owner of the project shall have employed by proposal contract an
archaeological observer for the site excavations within native undisturbed soils. A copy of the contract
must be submitted to the Public Works Department and attention this to the Assistant Engineer II. If the
archaeologist determines the site note to be required to be observed, please submit a letter signed by the
archaeologist stating their determination.
25. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the
Public Works Department, an approved traffic control plan at least 2 weeks prior to start of construction or
parking on the paved R/W.
26. If traffic lanes are closed on an any Arterial street (any street with more than 2 lanes) within the City of La
Quinta right of way, The permittee is required to provide an informative message board (approved by the
City Engineer). It shall inform the commuters using the affected roadways of possible traffic delays, time of
construction, and if possible alternate routes. The message board shall be provided for the commuters 48
hours prior to the start of traffic delays. The board does not have to be electrical or solar powered.
27. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m.
.Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the
Riverside Country Traffic Signal Maintenance Department at (951) 955-6894 if signal operation at the
intersection is to be altered in any way.
28. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition
of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified
herein.
Native material may be used as backfill material provided that minimum compaction, -achieved in the
manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water
densified compaction via jetting or flooding or other means shall be allowed. It shall be the Pennittee's
responsibility to provide appropriate -geotechnical supervision, testing, and inspection, onsite, at all
times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such
material shall be removed to the limits directed by the Geotechnical Inspector and/or the City
Inspector and the resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be brought to or maintained at appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through progress testing on the stockpiles.
Special Conditions Page 4 of 7
PERMIT NO.7142
Santerra / Install Dry Utilities — gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
C. The first length of trench backfilled shall be backfilled in the. presence of.the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth
of lift that can be compacted.
D. If lifts greater than one foot ate attempted in this trial length of trench, compaction tests'shall be
taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift thickness
to be compacted for the remainder of the project.
E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of
backfill, per 300 linear feet of open trench, at randomly selected locations within the open length
of trench.
F. The depth of the randomly selected compaction tests shall also be randomly selected except that
where multiple tests are required in a given length of trench, the tests shall be.no closer than three
feet (vertically) from each other.
G. If any compaction test.fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested .for compliance with compaction requirements.
H. . All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test
results shall be furnished to -the City Inspector.
29. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of the
City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that
which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight;
however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length,
open overnight at a point where construction will begin the next day, provided that this length of trench
is completely covered by steel plating.
30. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its
original condition.
31. Access and egress to all local properties shall be maintained at all times.
32. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
of the work. Permanent pavement replacement shall conform to the following conditions:.
A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall
be straight and clean.
Special Conditions Page 5 of 7
PERMIT NO.7142
Santerra / Install Dry Utilities — gas, III) electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than
existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed
miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard
Specifications for Public Works Construction. The replaced pavement and base material shall be
compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench.
Verify exact structural replacement section thicknesses with the City prior to installation.
C. Permanent pavement replacement shall be installed using a City approved 3/" max medium
asphalt concrete as the base course lift and a City approved''/2" max medium finish course lift for
capping. Asphalt concrete mix design shall be approved by the City prior to its placement.
D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the
trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10
feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area
and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000
asphalt concrete mix. The width of the cold milling area shall be as follows:
• For longitudinal trenches located in a parking lane: three (3) feet outside the sawcut
removal lines.
• For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal
lines, or to the lane line striping, whichever is greater.
• For transverse trenches across existing street: two (2) feet outside the sawcut removal lines.
E. If grinding and capping operations are not performed in the same day as base paving operations,
the base course lift'of'/" max medium asphalt concrete shall be installed from saw -cut edge to
saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left
0.10' low in anticipation of grinding and capping.
F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be
replaced in kind by the Permittee; as directed by and to the satisfaction of the City Engineer.
Affected traffic signal loops shall be removed and replaced in kind. The finished pavement
surface shall be smooth, consistent, and shall conform to the surrounding grades.
31 Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization shall be done immediately
after completing the operation.
34. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck. Route network) is three. (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants
permission to use the street to deliver street construction materials and/or equipment.
Special Conditions Page 6 of 7
PERMIT NO.7142
Santerra / Install Dry Utilities = gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
35. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
36. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages,
delay costs, costs or expenses in law or equity that may arise out of work under this permit.
37. If it is the intent of the permittee to cut the pavement and have it restored by a third party, the
permittee shall postpone cutting the pavement until the intended third party has acquired a permit from
the City to. perform the required restoration work.
Special Conditions
Page 7 of 7
r
Christine Kern
Subject: Santerra Pre -con, Permit No!: 7142 TM 32225 - Potholing and Boring on Madison and 58th
Location: East Conference Room
Start: Tue 7/24/2007 11:00 AM
End: Tue 7/24/2007 12:00 PM
Recurrence: (none)
Pre -con for Santerra
- Potholing and Boring
Bob Engle 200-7346
Bryan
Leonard
Jim
See below for Finance Revenue Codes
ENCROACHMENT PERMIT
PUBLIC WORKS CONSTRUCTION
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public
works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS.
Subdivision Improvement Permit - Class III
DATE:July 17, 2007
LOCATION OF CONSTRUCTION (Street address or Description): Madison Street and Avenue 58
PURPOSE OF CONSTRUCTION: Install Dry Utilites - gas, electric, cable TV JUL 199 2007,
DESCRIPTION OF CONSTRUCTION: See Attached Plans CITY OF LAQUINTA
FI C E
DIMENSION OFINSTALLATION OR REMOVAL: See Attached Plans
APPROXIMATE TIME WHEN WORK WILL BEGIN:July 16, 2007 TIME OF COMPLETION:August 17, 2007
ESTIMATED CONSTRUCTION COST: $35,000 (Including removal of all obstruction, materials, and debris, backfilling, compaction
and placing permanent resurfacing and/or replacing improvements)
COMMENTS: Call for Pre -Construction Meeting
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any
and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or
property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777-
7075.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regula ' ns of the City
of La Quinta and to pay for any additional replacement necessary as the result of this work.
Engle Construction - Bob Engle III 64939 Little Court, Desert Hot Springs, CA 92240 (760) 200-7346
Name of Applicant (please print) Business Address Telephone No.
Same as above
Name of Contractor and Job Foreman Business Address
619208 3146
Contractor's License No. City Business License No.
Lantana Insurance ACL201400
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit - Class III
Minor Improvement Permit - Class IV
Finance Revenue Code
Inspection Fee
EE=1
$1,050
Permit Fee
E-1
$100
As -Built Deposit
E_A
$0
Cash Deposit -Surety Bond,
EE=B
$0
if required
TOTAL
$1,150
Telephone No.
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
See attached schedule
PERMIT NO.% 1 42. E��d
DATE APPROVED: / Zdo
EXPIRATI DATE:
BY:
Administrative Authority
L
1
,
1C
iy}
w .. 4
i
•E 4� 1
PUBLIC WORKS DEPAR
APPLICATION FOR PE
Date:
Tract No: - Project Name: �$� NT�RRt}-
Vicinity: :f�/ ,101,41-saV
Purpose of Construction (i.e.: Rough Grading, Offsite Street, etc.)
O6c 5/,�'� 2f" 7-- .6).V
of Construction (i.e.: See Plan Set No. 01234)
Dimension of Installation or Removal:
1 3 2007
Approximate Construction Start Date:. /k D 7
Approximate Construction Completion Date: Zle 17
Estimated Construction Cost: $ ,rF.G<A oH/v 3. coo A�bT>°lykey%.e
Estimated Construction Cost shall include the removal of all'obshuctions, materials, and debris, back filling; compaction and.
placing permanent resurfacing and or replacing improvements
Contact Name: /.f08 Phone Number: Xo-.,�• 73<,,
Name of Applicant/Owner: ze
Applicant Address:
Applicant Telephone Number:
Applicant E-mail Address:
Name of Contractor:,/�l;F
Contractor Address:
Contractor Telephone Number:
Contractor State License Number:. l 79 �pR
Contractor City Business License Number: "3 y- jo
Contractor E-mail Address: lwo_o_
►A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED -4
Applicant or Contractor General Liability Insurance Company:
Applicant or Contractor General Liability Insurance Policy Number:
Office.Use Only:
Office Use Only:
Inspection Fee: *• ( S0 O
Assigned Permit Number / J
1 Y(
Permit Fee: (00
Approval Date: .
As -Built
Deposit:
Dust Control
Deposit:
Expiration
Date:
Issue
Date:
Credit
Amount: -� 1 b�
Administrative Authority:
TOTAL FEE DUE: I
\Admumstrative Services Division\Fonns\APPLICAT[ON FOR PERMrr.doc
J
BID PROPOSAL
ENGLE CONSTRUCTION
Date prepared: June 7, 2007
Project Name: Sorrento Sunrise Tract #29991 Sales Rep: DW
Customer: Sky Construction Contact: Mack Stead
Address: Phone: 594-2282
Fax: 200-3079
Email:
City
Descripon
Unit Price
Total
On and Off Site Work
1
Move -ins
$800.00
$800.00
1200
Joint Trench
$5.95
$7,140.00
250
6" Sch 40 IID Conduit
$4.75
$1,187.50
750
5" Sch 40 IID Conduit
$4.20
$3,150.00
0
4" Sch 40 IID Conduit
$3.36
$0.00
0
3" Sch 40 IID Conduit
$3.08
$0.00
0
2" Sch 40 IID Conduit
$2.60
$0.00
0
48"x72" IID Transformer Pads
$595.00
$0.00
1
4'x6'6"x7' IID Medium Primary Pullbox
$4,950.00
$4,950.00
1
3'x6'x5' IID Primary Pullbox
$4,300.00
$4,300.00
0
6'6"x8'6"x6' IID Vault
$8,640.00
$0.00
1
6'6'x8'6"x6' IID Switch Enclosure
$8,640.00
$8,640.00
1
Street Crossing Ave 58 IID
$6,650.00
$6,650.00
0
13"x24" IID Secondary Pullboxes
$285.00
$0.00
397
Concrete Encasement L.F.
$20.65
$8,198.05
0
House Service Lump Sum
$525.00
$0.00
0
Water trucks as needed
$2,100.00
$0.00
260
4" DB-100 Verizon conduit IF NEEDED
$2.90
$754.00
0
2" DB-100 Verizon Conduit
$1.85
$0.00
0
17"X30" Verizon Handhole
$285.00
$0.00
0
15"X20" Verizon Handhole
$245.00
$0.00
0
3'X5'X4' Verizon Pullbox IF NEEDED
$4,350.00
$0.00
1
Street Crossing Madison Street Verizon IF NEEDED
$14,200.00
$14,200.00
0
2" Sch 40 Conduit Time Warner
$2.60
$0.00
0
3" Sch 40 Gas Conduit
$3.28
$0.00
ALL LANDSCAPE REPLACEMENT INCLUDED IF NEEDED
'• An additional house service cost will be incurred if short side gas services are not extended.
" All crossings to be surveyed by engineer before work will commence.
TERMS: NET30 TOTAL BID PROPOSAL: $59,969.55
THIS PROPOSAL IS VALID FOR 15 DAYS FROM DATE PREPARED. IT DOES NOT INCLUDE ANY STANDBY TIME FOR INSPECTIONS. IN THE EVENT
OF UNFORSEEN CONDITIONS, DELAYS CAUSED BY OTHERS, OR PLAN CHANGES, T&M RATES MAY APPLY UNTIL NORMAL WORK RESUMES. THIS
PRICE DOES NOT INCLUDE ENGINEERING, HANDLING ANY HAZARDOUS WASTE, WATER METER, ADDITIONAL MOVE INS, TRAFFIC CONTROL,
ARROW BOARDS, REDWOOD HEADERBOARD, EXPORT, WEEDKILL, FOGSEAL, RELOCATION OR REPAIR OF ANY UNDERGROUND IMPROVEMENTS
OF ANY KIND, LANDSCAPING, IRRIGATION, PERMITS, INSPECTION OR TEST FEES, UNLESS SPECIFIED ABOVE. DOES NOT INCLUDE ANY GRASS
OR ROOT REMOVAL. NO GUARANTEES ON DRAINAGE. NOT RESPONSIBLE FOR DAMAGES TO ANY UNMARKED UTILITIES. NOT RESPONSIBLE
FOR SUB OR FINISH GRADE MADE BY OTHER CONTRACTORS. THESE PRICES GIVEN FOR MINIMUM QUANTITIES ABOVE, IF LINEAL FOOTAGE OR
QUANTITIES CHANGE, UNIT PRICES MAY CHANGE. ALL EXISTING GOLF COURSE AND PUBLIC UTILITIES TO BE POTHOLED ON A TIME AND
MATERIAL BASIS BEFORE WORK COMMENCES. CART PATH REMOVAL, PALM TREE REMOVAL AND REPLACEMENT BY OTHERS. ALL EXISTING
TREES, SHRUBS AND IRRIGATION TO BE REMOVED PRIOR TO COMMENCEMENT OF WORK. DISC RETAINS FIRST RIGHT TO REPAIR ANY SEWER
LATERALS DAMAGED DURING DRY UTILITY INSTALLATION, TERMS ARE DUE UPON RECEIPT. A 1 1/2% PER MONTH SERVICE CHARGE
WILL APPLY TO ALL PAST DUE ACCOUNTS. APPLICANT AGREES TO PAY COURT COSTS AND LEGAL FEES, SHOULD LEGAL ACTION BE
NECESSARY TO EFFECT PAYMENT.
Siqnature . Date Signature Date
Printed Name and Title Printed Name and Title
NotA AMT-
Proposal 10097.x1s
7-�-
Ei
NO SCALE
WESKOPH
DURSE
MADISON ST.
o�000ve= r=c
PGA WEST
7c=L"tiaL OC= C=G
a o W20.5 (tn � ..
PLACE AT CORNER FOR
R*' W2as cRn
WARNING TURNING TRAFFICRIA
Q a
C-„ EM
C-17 a D
Arin FT
25 a
- ORK - a 0 - - --
1
1 c=EV==
1
p�y5g�� 1 Ri-1
AVE 58
NOTES: 1. ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH 2O06 CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D.) Rmmw By DM 5dLhm
o
2. TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM REQUIRED. ADDITIONAL TRAFFIC CONTROL MAY BE REQUIRED TO FACILITATE PUBLIC SAFETY AND TRAFFIC FLOW IF
DEEMED NECESSARY BY CITY OF LA QUINTA REPRESENTATIVE. TtaftCOW Pan du
3. THROUGHOUT EACH WORK PERIOD, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARRICADESAND DELINEATORS) AND MAINTAIN SAME IN ACCORDANCE WITH Install Verizon Conduit
TRAFFIC CONTROL PLANS. P&MCW&S tar Bawd °nSW and
4. CONTRACTOR SHALL MAINTAIN A MINIMUM 10 '(12' TYR) TRAFFIC LANE WIDTH AT ALL TIMES AND A MINIMUM T BETWEEN THE EDGE OF CUT AND THE NEAREST TRAFFIC LANE. Engle Const. CALTRANS T 11
5. ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED ATALLTIMES. TmkD*sanb' Phone P"powBy
6. THIS TRAFFIC CONTROL SHALL BE IN PLACE DURING WORK HOURS ONLY. AT END OF THE WORK HOURS, THE TRENCH SHALL BE BACKFILLED OR COVERED WITH STEEL TRAFFIC Tops N Barricades, Inc. (800)852-TOPS Ron Fifield
PLATES, THE ROAD SHALL BE CLEAR OF DEBRIS AND TRAFFIC RETURNED TO NORMAL. —SgRlEi� Deft
7. THIS IS ATYPICALAS THE CLOSURE MAY NEED TO MOVE FURTHER ALONG THE ROAD OR TO THE OPPOSITE SIDE. 1 of 3 7/6/07 To Be Issued on Approval
- t r ,
w
z�y
a
NO SCALE
WESKOPH
DURSE
ra
MADISON ST.
`oovac=sue ovc c=c= c=000r c=c
o� o0o t7G7v�oclroo
PGA WEST
PLACE AT CORNER FOR V
WARNING TURNING TRAFFIC
(LT)
C-'17
a C9G=K�L�aG* - - - $ o�C
RKI
t �gA
AREA
1
1
1
�00 FT
Ca�o cmC=7C �.dgC�C7 CS OCC�K7 ��
.voc Cal= C=ooC�o�s
AVE 58
NOTES: 1. ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH 2O06 CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D.)
Pz4wmd By
Um 'me um
50
2. TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM REQUIRED. ADDITIONAL TRAFFIC CONTROL MAY BE REQUIRED TO FACILITATE PUBLIC SAFETY AND TRAFFIC FLOW IF
DEEMED NECESSARY BY CITY OF LA QUINTA REPRESENTATIVE.
T1 ftca ho1Pionfor
3. THROUGHOUT EACH WORK PERIOD, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARRICADESAND DELINEATORS) AND MAINTAIN SAME IN ACCORDANCE WITH
Install Verizon Conduit
TRAFFIC CONTROL PLANS.
4. CONTRACTOR SHALL MAINTAIN A MINIMUM 10 '(12' TYP.) TRAFFIC LANE WIDTH ATALL TIMES AND A MINIMUM 2' BETWEEN THE EDGE OF CUT AND THE NEAREST TRAFFIC LANE.
P1111BC0"u°0f
Engle Const.
B3SWon
CALTRANS T 11
5. ACCESSTO PRIVATE PROPERTY SHALLBE MAINTAINED AT ALL TIMES.
6. THIS TRAFFIC CONTROL SHALL BE IN PLACE DURING WORK HOURS ONLY. AT END OF THE WORK HOURS, THE TRENCH SHALL BE BACKFILLED OR COVERED WITH STEEL TRAFFIC
Tmft CoWd Deso by
Tops N Barricades, Inc.
Phase PRepwWBy
(800)852-TOPS Ron Fifield
PLATES, THE ROAD SHALL BE CLEAR OF DEBRIS AND TRAFFIC RETURNED TO NORMAL.
2 of 3 7/6/07
To Be Issued on Approval
7. THIS IS ATYPICALAS THE CLOSURE MAY NEED TO MOVE FURTHER ALONG THE ROAD OR TO THE OPPOSITE SIDE.
w 1
z�y r I fl
`ate
NO SCALE KEEP
TOM WESKOPH ""�' �G" R}'
CO URSE �'� 1 �((u{{J (p�
I,
KEEP W&3 �
M2 RIGHT C-1 (y 1
:�cAai�tspit 25 Q
MADISON ST.
ocovc000 race 0000s�voovQccp
Qov=aQoa a vc s Ica + -cam aC
AREA
i R4.1
500 FT 500 M, 500 FT 600 FT
W1-4 (LT)
1 RM 1
c IV
PGA WEST
W20-5 (RT)
(RT) N 7
vunurT
oxax -
AVE 58
NOTES: 1. ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH 2O06 CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D.)
2. TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM REQUIRED. ADDITIONAL TRAFFIC CONTROL MAY BE REQUIRED TO FACILITATE PUBLIC SAFETY AND TRAFFIC FLOW IF
DEEMED NECESSARY BY CITY OF LA QUINTA REPRESENTATIVE.
3. THROUGHOUT EACH WORK PERIOD, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARRICADES AND DELINEATORS) AND MAINTAIN SAME IN ACCORDANCE WITH
TRAFFIC CONTROL PLANS.
4. CONTRACTOR SHALL MAINTAIN A MINIMUM 10 '(12' TYP.) TRAFFIC LANE WIDTH ATALL TIMES AND AMINIMUM T BETWEEN THE EDGE OF CUT AND THE NEAREST TRAFFIC LANE.
5. ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED ATALLTIMES.
6. THIS TRAFFIC CONTROL SHALL BE IN PLACE DURING WORK HOURS ONLY. AT END OF THE WORK HOURS, THE TRENCH SHALL BE BACKFILLED OR COVERED WITH STEEL TRAFFIC
PLATES, THE ROAD SHALL BE CLEAR OF DEBRIS AND TRAFFIC RETURNED TO NORMAL.
7. THIS IS ATYPICAL AS THE CLOSURE MAY NEED TO MOVE FURTHER ALONG THE ROAD OR TO THE OPPOSITE SIDE.
50 I
Install Verizon Conduit
Pdroa ow6aft Based an Stefdmd
Engle Const. CALTRANS T-12
TMfEc C4X" DWV W Ph" Prepared By
Tops N Barricades, Inc. (800)852-TOPS Ron Fifield
STFM�� DaW FORM Now
3 of 3 7/6/07 To Be Issued on Approval
City of La Quinta
The following General and Special Provisions are attached to and made a part of
Permit Number 7142
The following shall always apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way
ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission
from abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved
surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced
over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or
cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains
shall be kept free of debris at all times for proper drainage.
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE -WATER OPERTATIONS: If de -watering operations are required and. pumps are forcing water on City of La Quinta roads, it shall be the
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for
the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting
construction.
® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
permittee.
® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with ( "" N/A "" ) inches of A.C. paving placed on ( "" N/A "" ) inches of ( "" N/A "" ) aggregate sub -base course having an
"R" value of not less than ( "" N/A ") and in conformance with the City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
one-fourth inch (W) to one foot (1').
❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A ") feet shall
be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2 Y2") of A.C. paving on ('* N/A "") of class (" N/A " )
aggregate base.
® R9 SIGHT CLEARANCE: Sight Clearance of.six-hundred feet (600') in all directions shall be assured and maintained at all
times.
❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the
manufacturer's specifications.
City of La Quinta
® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State or City of La Quinta projects.
® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon completion or replacement of all survey monuments for proper clearance.
® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be
used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to -one -thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the
protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots.or other organic substance detrimental to its use for purposes
of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than
three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any
case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.
❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the
trench before flooding or a maximum of five feet (5) lifts where trenches are of excessive depths. Care is to be exercised
that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuos.
® R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one -
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
® R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after
a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5) day limit.
® R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( 3 ) inches of A.0 surfacing placed on a ( 6 )
inch ( crushed ) aggregate base shall be placed no later than ( 5 ) days after completion of temporary road repair.
❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
® R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon
completion of permanent repairs.
❑ R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished
by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The
stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method.
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.
PERMIT NO. 7142
Santerra / Install Dry Utilities — gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
In addition to the standard permit conditions, the following shall apply:
1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § ] (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For Public
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the
actual work performed.
3. Prior to commencing the excavation of a trench 5 feet in depth or greater and into which a person will
be required to descend, the Contractor shall first obtain a permit to do so from the Division of Industrial
Safety pursuant to 7-10.4.1.
4. Enele Construction — Bob Engle III, hereinafter referred to as "Permittee", shall be responsible for
providing continuous dust and erosion control.
5. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more
frequently, if required.
6. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the
work site, the Pen-nittee shall. comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1 st to September 30:. Monday -Friday 6:00 a.m. to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays. .
Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial
street (ie any 4 lane street) before 8:00 a.m.
7. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3
p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact
the Riverside Country Traffic Signal Maintenance Department at (951) 955-6894 if signal operation at
the intersection is to be altered in any way.
Special Conditions Page I of 7
PERMIT NO.7142
Santerra / Install Dry Utilities — gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
8. The permittee and/or contractor placing engineered fill must provide adequate time and safety for the
Geotechnical Engineer of Record to perform soils testing during engineered fill placement. The testing
frequency shall be determined by the Geotechnical Engineer of Record such that the fill can be
determined to be placed according to the city approved plans.
9. The permittee and/or contractor shall provide surveyor staking information adequate for the City
Inspector to determine horizontal and vertical locations relative to the approved city plans. The
minimum required wood lath type stakes. shall be placed at all proposed building corners, and they shall
state the horizontal location relative to building corner and the elevation of the top of hub next to the
lath.
10. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private street
and for any damage to other City streets or facilities as a result of work performed under this permit.
11. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to
start of construction, a letter from any owners of the driveways/access ways that will be closed down
due to the construction. The letter must be approved by the city and at minimum state from the owner
the following:
A. Approval of the construction
B. Plan identification
C. Time Frame of Closure
D. Alternative Routes
12. Any land on which Williamson Act contracts apply shall remain undisturbed.
13. The permittee shall place temporary no parking signs along the parking area affected by the
construction. The signs shall be placed along the area 48hrs prior to the start of closing the area, and
removed immediately after the construction completion date.
14. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan shall be prepared in accordance with the WATCH Manual and submitted to the City for
review and approval one (1) week prior to starting any construction. It shall be the Permittee's
responsibility to appropriately detour and barricade all construction sites.
Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street
closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be
maintained at all times.
Special Conditions Page 2 of 7
PERMIT NO.7142
Santerra / Install Dry Utilities — gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
15. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
16. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be
performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the
City of La Quinta.
17. The permittee shall be responsible for calling the city inspector to arrange the city inspector to observe
random trench compaction testing performed by a city approved material testing firm. If the inspector's
phone, number is unknown, the permittee shall call the Public Works front counter phone at 777-7075 or
the Assistant Engineer II at 777-7047 to determine the city inspector's phone number. The inspector shall
determine the number and location of the test location/s. The above testing does not relieve the permittee's
responsibility for future repairs due to settlement at and near the locations of the work area. Materials
testing must be performed under direct supervision of a California Registered Civil Engineer.
18. The issuance of this permit and the City approval of the related construction improvement plans do not
provide a vested entitlement for all design parameters that may have been utilized for the plans. As such,
plans approved for this permit may be "at risk" for further modifications as it relates to any follow up
improvement plan requirements as required by the city or existing errors & omissions by the architect or
engineer of record.
19. The permittee is responsible for obtaining a valid separate permit from the California Department of
Transportation Department (CalTrans) or any other agency such as City of Indio, Coachella, County of
Riverside, ...etc, if any of the work or traffic control devices extend into the CalTrans or other agency right
of way.
20. This permit is not valid until the pennittee submits, to the Public Works Department 2 weeks prior to start
of construction, the name of the City approved contractor, who shall submit to the City the following items:
a. General Liability Insurance Company and Policy Number
b. City Business License
Contractors State License Number
21. Work within 500 feet of any designated School Zone shall be performed between the hours of 8 a.m. —1:30
p.m. Traffic control shall be set up after 8 a.m. and removed before 1:30 p.m.
22. Prior to performing construction work and closing any lanes in the Public Right of Way, the permittee shall
call the City at (760) 777-7097 at least 48hrs prior to work and request an appointment for a
preconstruction meeting with the City Inspection staff.
23. The permittee shall haul all offsite debris to a certified landfill. Prior to hauling debris, the pennittee shall
inform the City (Inspection staff or 777-7047) of the name and location of the certified dump site.
Special Conditions Page 3 of 7
PERMIT NO.7142
Santerra / Install Dry Utilities — gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
24. Prior to excavating in native Soils, the owner of the project shall have employed by proposal contract an
archaeological observer for the site excavations within native undisturbed soils. A copy of the contract
must be submitted to the Public Works Department and attention this to the Assistant Engineer II. If the
archaeologist determines the site note to be required to be observed, please submit a letter signed by the
archaeologist stating their determination.
25. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the
Public Works Department, an approved traffic control plan at least 2 weeks prior to start of construction or
parking on the paved R/W.
26. If traffic lanes are closed on an any Arterial street (any street with more than 2 lanes) within the City of La
Quinta right of way, The permittee is required to provide an informative message board (approved by the
City Engineer). It shall inform the commuters using the affected roadways of possible traffic delays, time of
construction, and if possible alternate routes. The message board shall be provided for the commuters 48
hours prior to.the start of traffic delays. The board does not have to be electrical or solar powered.
27. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m.
Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the
Riverside Country Traffic Signal Maintenance Department at (951) 955-6894 if signal operation at the
intersection is to be altered in any way.
28. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition
of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified
herein.
Native material may be used as backfill material provided that minimum compaction, achieved in the
manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water
densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's
responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all
times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such
material shall be removed to the limits directed by the Geotechnical Inspector and/or the City
Inspector and the resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be brought to or maintained at appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the.
project and ensured prior to use of the materials through progress testing on the stockpiles.
Special Conditions Page 4 of 7
PERMIT NO. 7142
Santerra / Install Dry Utilities — gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and.to establish the depth
of lift that can be compacted.
D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be
taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift thickness
to be compacted for the remainder of the project.
i
E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of
backfill, per 300 linear feet of open trench, at randomly selected locations within the open length
of trench.
F. The depth of the randomly selected compaction tests shall also be randomly selected except that
where multiple tests are required in a given length of trench, the tests shall be no closer than three
feet (vertically) from each other.
G. If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test
results shall be furnished to the City Inspector.
29. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of the
City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that
which can.not be backfilled in the same day. Excavated trenches shall not be allowed open overnight;
however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length,
open overnight at a point where construction will begin the next day, provided that this length of trench
is completely covered by steel plating.
30. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its
original condition.
31. Access and egress to all local properties shall be maintained at all times.
32. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1. (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
.of the work. Permanent pavement replacement shall conform to the following conditions:
A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall
be straight and clean.
Special Conditions Page 5 of 7
PERMIT NO.7142
Santerra / Install Dry Utilities — gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
B. Permanent pavement replacement structural section, within all trenches, shall be I" thicker than
existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed
miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard
Specifications for Public Works Construction. The replaced pavement and base material shall be
compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench.
Verify exact structural replacement section thicknesses with the City prior to installation.
C. Permanent pavement replacement shall be installed using a City approved 3/" max medium
asphalt concrete as the base course lift and a City approved ''/2" max medium finish course lift for
capping. Asphalt concrete mix design shall be approved by the City prior to its placement.
D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the
trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10
feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area
and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000
asphalt concrete mix. The width of the cold milling area shall be as follows:
For longitudinal trenches located in a parking lane: three (3) feet outside the sawcut
removal lines.
For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal
lines, or to the lane line striping, whichever is greater.
For transverse trenches across existing street: two (2) feet outside the sawcut removal lines.
E. If grinding and capping operations are not performed in the same day as base paving operations,
the base course lift of 3/" max medium asphalt concrete shall be installed from saw -cut edge to
saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left
0.10' low in anticipation of grinding and capping.
F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be
replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer.
Affected traffic signal loops shall be removed and replaced in kind. The finished pavement
surface shall be smooth, consistent, and shall conform to the surrounding grades.
33. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization shall be done immediately
after completing the operation.
34. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants
permission to use the street to deliver street construction materials and/or equipment.
special Conditions Page 6 of 7
I PERMIT NO.7142
Santerra / Install Dry Utilities -_gas, IID electric, & cable TV /Tract No. 32225;
Madison St and Avenue 58
35. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
36. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages,
delay costs, costs or expenses in law or equity that may arise out of work under this permit.
37. If it is the intent of the permittee to cut the pavement and have it restored by a third party, the
permittee shall postpone cutting the pavement until the intended third party has acquired a permit from
the City to perform the required restoration work.
Special Conditions Page 7 of 7
City of La Quinta
Public Works Engineering Department
ws Inspector's Daily Log
Commercial/Residential Development
Dt• of D�Zao%
a
e.
S
S
1M.
T
W
TH
F
.`SCAT/oA/
1,f0%/
r� J�
(,-s/ xoul. ea� � .�%�
1-14
Page
Title: Construction Inspector
of
'U
AP
ap e
OR,
ME, 'P�
ot" wl� )IM
, 7P
Almo
W-0
CALIFORNIA _I_N_ C'
_--XI �7 _v- i ..v
f i
I 'i I 'T -77
7 'r
jr,
777-' .7-
4.0
ij,
.7
'79
41
a If!"
� 5
Al
won__
�17
RULE 34
TRACT 32225
SANTERRA SUBDIVISION
vi 6�11 11TY I
3
}
Z. SEAT. ETIDS OF ALL CMUIT PLACED.
3a ALL CONDUITS PLACE%] WILL BE PROVISIONED Wr1TH A TONABLE VJLE TAPE'.
IfAULE TAPE` TO BE BIND AND GROUNDED EVERY 1000 FEET OR LESS
4, FOLLOW ALL VERZ{)A BONDING AND GROUNDING PROCEDURES.
S. COIL FIBER ATTERWALS AND SPLICE LOCATIONS AS PER M&P.
?
6. ALL HAND HOLES ARE IT= UNLESS OTHEWASE SPECIFIED
t
7. ALL SUBDUCTS AND S 4ADOW DUCTS ARE Z' UNLESS OT14ER'A M SPECIFIED.
`
S. EXISTING ROAD CROSSINGS SMALL NEED TO BE FIELD VERIFIED PRIOR TO OR
DURING CONSTRUCTION, EXiS11NG ROAD CROSSINGS ARE REFERERCED FROM
I
THE VERIZON PRt7VII M ICGS MAPS AVAILABLE AT TIME OF
ENGINEERINGIE7ESIGNi.
I
e
LU's (ACTUAL)
28
�
tL u
� �-
Q
; '-
LU's (FUTURE)
0
MDU's (ACTUAL)
0
MDVs (FUTURE)
0
SSU`S ACTUAL "
Q
SSU S (FUTURE)
P
1
1-800-227-2600
CAU
TION J AT i£4tST rW DAYS
T,G. PAGE: 5470 - GRJ0 C6 j ZIP CODE 9453 evwx YOU me � ti
LOCATION & DEPTH OF EXISTING
SUBSTRUCTURES ARE NOT GUARANTEED.
OTHER SUBSURFACE STRUCTURES NOT
SHO M MAY EXIST.
VERIZON AREA: SOUTH
STATE: CALFORNIA
DIVISION:
MRE CENTER NAME: LA QUINTA '
W.C.#: 0543
EXCH COC E:
RELATED W.O.
0543.3PQAMU
RMT COM
W:0.9. 3PFADAB
CONTROL*
WO TITLE: RULE 34 TRACT 32225 - MTRUCTURE DR IW NG
TAX DST:
TWP:
RING: ;SEC: SAL:
FILE;
REV:
REV. DATE:
REASON FOR CHANGE:
ENGR:
am:
CARD:
DRWG BY:
CRIS R
ENGR & OFC f'H APRt�D: DATE:
SSI-682.3747 09,25,06
SCALE:
NITS
A
PRINT:
1 OF 2
.. . ........
a
i
J
J
1
I
i
?
l
ti
i
I�
{
�_n` i
PLAN .F IL.E # 4 BASE SKETCH CONSTR. -SKETCH COMPL. SKETCH
Z .. 1BY:MGJ 10-2-06 BY: W.O. SHEET # 1
BY. OF 1
PIPE PRESSURE TEST
GAS STD GAS STD
4 F. MEDIUM#184.0150' HIGH❑#
„ 182.0170 1
POINT TO POINT
C TEST PRESSURE:
MINIMUM Ss PSIG MAXIMUM PSIG
l t ACTUAL TEST PRESSURE: PSIG
SoUTX VAI �.. �..
TEST MEDIUM:
[AIR ❑NITROGEN [:]OTHER
1A- 3 R/44.281- 3-off
__ DURATION. HRS. AND/OR _ MIN.
II
I` +
• j -
I.0 SIGN GATE:
PRINT NAME/TITLE:____
... � : GAS HANDLING ; I G WAS REVIEWED AND PERFORMED
AS PLANNED PER GAS STANDARD #184.06
s
NO ❑ YES ❑
IF NO PLEASE GIVE EXPLANATION TO LEFT
SIGN: DATE: ;
PRINT NAME/TITLE:
ANY CHANGES TO THE DESIGNED RIPE AND
COMPONENTS REOUIRES APPROVAL FROM
TECHNICAL SERVICES PLANNING.
tf��+� I ,, IF CHANGES WERE MADE TO THE PLANS.
f ENGINEER CONTACTED: I
.�. -
DATE:
I FPA / PA:
• DATE.
UPDATED TO R.E.R..
•
+e SOIL TYPE GROUP RED YELLOW GREEN
t —• (LA CITY ONLY) 1 .2 3
BACKFILL TYPE:
I USED MECHANICAL COMPACTION Yes [Ell No Q
JOINT TRENCH YesQ No[]
Ln
•
( T Y P I CAL_ } .�---
1 \ Yes [INo ❑ / z T cr
:. rT - __--------• mot--o
-. F(rn
IST: ❑ INST: ❑ ABAND: INT:
�y Li D U_
nF: P / 1 nT:
I�
F -- —
Is
r
' r =
Q ` N
i
( CURB ) t CURBTEL
)
— —
<i
CATV
i t k O �. p i�
_ — — -- — — — — -- — O
_
--—
'�—POWER
-- O OO
— — — _ — - — — - — — — — — — — — -- —• --- � — — — _ _ — .— _ —
f` ..... ! - I _ A r. +„r—.~.:us. w+ymc..:.rnw,..•.>tir: ,•,r.,w.a..•,w...s.,u.:v:•rnw wrvr.:.u,.,em w�++oxrA.r+h.. p .. :u.a +}...,wrxm.e.,m..w„x+.,rv,r•nvmu:a-;m -,.wmc'.r. ups...;.e,E.u+•>a...:r,.,++na4'+«R. .� ..+.»-.`•.,:.n..cear4.,w,.:. �
i � , ,� ` ; •,.._..... ..«•ra ,...ere - 1 CIIRI� /_'.. , •n - reau>,:r •.w•.;.:,n.,i*,..nev.z,.uGxm.:n:s::.,...:.r„ ...htro.enye ...•.raw..mwr•.u+a>„e., ...... .. � � t
;
T
a •. r s;.,.'•• /- i — SERVICE STUB .:SUMMARY
MY
SHORT SIDET SUBS
C31
I I n
•- � _LONG SIDE STUBS
-�•- ~ '
'"
s
L " .Tj Z . '' { FT. INSIDE PROP.
, ..
--_-.,. LINE
_-
t _ I t �,, S [/! 1' ---- FT. INSIOE L01' LINE
I I
' THOMAS GU `
I OE ,
74
�, m co O _ _ N �, N CITY OF
�, ao LA OUINTA
LOT C r
.. ,w... O t _.. s / S.
. AD I ON
Dlsr.
l:
_
i... ...... _... . ,. ..'.' b., ..s ... _ r
>
w yM _
.. , ..
. .. .. f .. .' ,. .. . s.. > .... .... .. r. .... . ..
N ... .- . .: w. --
, t ..CLASS LOCAT ON i
,. ❑ 1 2 3
, ISOMA1' N0. .�.
. i
Y. ,.
.,.
_._.—.-----'--------------------_ -- .--- — - — — SUPPLY LINE N0.
W. O
2SUPPLY LINE PRESS'..,
,.
STATIn>v.''I.D.tr
..:.: I
a,t VALV.E(S) REQUIRED
Yes Ll No .. ,
p p
�! i EL INE MARKERS REQUIRED.,
YGs ❑ No
T
IF YES SHOW LOCATION 1
R/WY 141.278 -- --- _._ LO S
S4140-564 1
4'140- 6 R!W 141278 'PUM tJT-PTV) u-00 4'PUM L
.
------------------•—_---_—._---— -- L07
T '. ENVIRONMENTAL
-
— (JT-PTV)
SPECIAL a I < CIAL ENV R A
o ...... - l I OMENT L PERMITS. YESQ NO
Il
— _ 00
_ —_ —
, / �,._..—W�_'----••------_.:_.—._._.-------•---•-------------._�___ .,_._. STORM WATER. BMP ONLY
_ 5 o� -►. - — - — - `•- .._ _>- _ ❑ PPP SW ❑
_ Pc
�-- ,� -- —.-- --- — — W
N/A PCB FREE AREA
E HOT POT S HOT D
- .. : — — — -- _. -- STR
TROON
REQUIRED ABANDONPIPELINE
SAMPLING COMPLETED
I
y N
._ PER GAS STANDARD 104.0042
NJ i
I , WAY INITIALS:
T A
I � .w.. � I I LS OATS.
x
—I. ii CHARGE
I I LABOR TO MWO# 99300.000
C7 , a
EXIST: INST: A _
.., _ ❑ ❑ BAND ❑ INT. i
p 37 r{
„ v I
C.P. AREA N0.
. _ m _ � CODE: P / 0 #: . ;
_ LOT
mI _
-s
� MAIN COND. .. C.P. CONTACT:
CODE
EXT INT
PHONE N0.
t.
1 , ,
THIS BLDG. OR AR
EA QUALIFIES
FOR ANtJJA
L LEAK .SURVEY. Yes No
.: (POST 'LIMITS)
A PRE JOB ME
ETING WILL BE HELD WI
TH TH A GAS
COMPANY REPRESENTATIVE
,.
,
rn
'PRIOR TO THE START
'OF ANY CONSTRU
CTION. Yes No
NAME
.
REVIEWED BY PR
i1NSiA WIN
t f S .,.i ME DATE
•
R_
tG, ._ENG. a=
I��_ TECH.,:.
,,... SUP
DOUBLE t�I
1.NS
17 h , �'V T•1~ Lr. -Fri
rusrAc.
,
I
f.•
Tl i
(
t N
P.A./F.P.A.
t
3 _
�U IZC-E D.O.M. /P. ,
Lrx.�T► n u.,s C � � � M
4:
F.O.S./F.S.
P�n1c E4 / LoC�4 t � Y
- r� 7�tt,. Under
,
• � _ ground Service Alert
I • MAIM '1
'- tr
a R
I� 5 �_. , T, '. Y
y o Call Two Working
, . ,, { � T Days
Nbr2—ASs
,.
12 Z.
L� C�
i �1S11T ; ; _ � r BEFORE .YOU D I G
. 4 � 4 Z s
1_ 800— 227_ 2600
• P
P
Ticket # t"
y. PARCEL #_39 8
t •
c PROJ . #
106342 WR. # 1701 783
t 1
Isolation Area Affected Yes ❑ No �I
EPOCH # RER,#
•.. Pressure District Affected Yes ❑ No ® , .. � '_ - _ _
DIRECTORY PATH 8 FILE NA
TOTAL FEET .:.
r .� INST D
Business District Affected Yes ❑ No [�)
WOS_ D1 /2006 / 3914.6052. s0 t
INSTALL MAIN WITH AT LEAST 3b COVER BELOW C-UTTC5 �4� — 1
. , Supply Line Affected Yes ❑ No �'
TOTAL FEET RETIRED
i COUNTY R DATE MOVED NOTICE OF DATE M V :'. OUNT RIVERSIDE ET[REMENTASJN. PERMIT ISSUED BY: PERM •#• O.ED
_ Regulator Station Affected Yes ❑ No ® PERMIT ON JOB: ,
DISTRICT PALM DESERT I i �4VIN;T-4 u, 1
OPER. DATE. OFF JOB.
_. Valve(s) Re fired Yes ❑ No r • _ r-. .
R/ s z, r13
qu a FEET TRACT # 32225,
The
. 30 0 30 60 • 1 Gas ATLAS # LAO 77
L
20 180 67 .YEAR C.P. IN � ALLED: ... CREW FOREMAN
Company ATLAS # PLANNED BY.
COMPANY
�(,4tY�et
TAX CODE # 5 - STAKED........... ❑
e 9�.
Sempra Energy OPER.'•20%.OR .OVER. 5.,�4.Y.S:. A SOUTH INLAND
8 9
STAKING N R L ND R
CATHOOICALLY'PR T .,; _
RED ❑ ON COST
I G EQUI REGION
'PROTECTED: YES❑ NO AT�LESS'THAN'2Oti., •_5.1�,Y.S.:'
_#:
_ TAKES NEEDED W 0. 39146 052' CENTER OG
NO
— - - g
_