Loading...
7160ENCROACHMENT PERMIT PUBLIC WORKS CONSTRUCTION See below for Finance Revenue Codes ,J- AUG `' o 2007 ' EN-6;?lCJ! a' !?!; For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS. Subdivision Improvement Permit - Class III Minor Improvement Permit Class IV DATE:August 15, 2007 LOCATION OF CONSTRUCTION (Street address or Description): Trilogy TM 30023; Monroe St. N/O Avenue 62 PURPOSE OF CONSTRUCTION: Temporary Parking along Monroe St DESCRIPTION OF CONSTRUCTION: See Attached Parking Exhibit DIMENSION OFINSTALLATION OR REMOVAL:.See Attached Parking Exhibit APPROXIMATE TIME WHEN WORK WILL BEGIN:August 20, 2007 TIME OF COMPLETION: December 15, 2007 ESTIMATED CONSTRUCTION COST: $N/A (Including removal of all obstruction, materials, and debris, backfilling, compaction and placing permanent resurfacing and/or replacing improvements) .COMMENTS: In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from- claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started 7075. 1-1 Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the C of La Quinta and to pay for any additional replacement necessary as the result of this work. / Shea Homes - Jeff Davies 60-800 Trilogy Parkway La 1 Name of Applicant (please print) Business Address or 272-9798/ (760)777-6002 Telephone No. Shea Homes, Inc. 81-260 Avenue 62 La Quinta CA 92274 (760) 272-9798 Name of Contractor and Job Foreman Business Address Telephone No. 672285 6876 Contractor's License No. City Business License No. American International Specialty Lines Inc. GL1506663 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit - Class III Minor Improvement Permit - Class IV Finance Revenue Code Inspection Fee E_1 $0 Permit Fee E_1 $100.00 As -Built Deposit EE=A $0 .Cash Deposit -Surety Bond, E_13 $0 if required TOTAL $100.00 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs See attached schedule PERMIT NO.% 1 6O DATE APPROVED: LI.S4 'ZD 007 EXPIRATI0 DATE: -F 2-0 - 008 BY: Administrative Authority 0 t I NOTES- 1. NO EXISTING CURB AND GUTTER FRONTING MONROE STREET. 2. SITE DISTANCE FOR CONSTRUCTION ENTRANCE IS 50'. 3. PROTECT EXISTING CATCH BASINS UNDER CONSTRUCTION. DIMENSIONS- 1. EDGE OF PAVEMENT TO BLOCK WALL - 50'. 2. EDGE OF PAVEMENT TO 10' WEST - NO PARKING. 3. PARKING AREA - 40' WIDE X 1.200 N/0 CHENILLE. 4. PARKING AREA - 40' WIDE X 500 S/O CHENILLE 0' 200' 400' 600' 800' SCALE 1"=200' NPDES BMP NOTES - I. USE ABSORBENT MATERIALS ON SMALL SPILLS. DO NOT HOSE DOWN OR BURY THE SPILL. REMOVE THE ABSORBENT MATERIALS PROMPTLY AND DISPOSE OF PROPERLY. 2. IMMEDIATELY CLEAN UP SPILLS AND PROPERLY DISPOSE OF CONTAMINATED SOIL AND CLEAN UP MATERIALS. MONROE STREET PM-10 DUST CONTROL MEASURES- -APPLY SOIL STABILIZER IN PARKING AREA. -SPRAY PARKING AREA EVERY DAY BEFORE .TRADES ARRIVE AND SPRAY PARKING AREA EVERYDAY AFTER TRADES LEAVE. -TRASH CLEAN-UP WILL BE PERFORMED DAILY. TEMPORARY PARKING FROM, A'vGUSr 2-O, 20o7 ?o DE�EiyiBE�Z iS, Z00% D0.:08/13/2007 A . V E. * PM-10 DUST CONTROL MEASURES TO BE AS FOLLOWS: -APPLY SOIL STABILIZER IN PARKING AREA. -SPRAY PARKING AREA EVERY DAY BEFORE TRADES ARRIVE & SPRAY PARKING AREA EVERYDAY AFTER TRADES LEAVE. • TRASH CLEAN-UP WILL BE PERFORMED DAILY. N � O L� A O OD 0 Vt N N O � V1 W a) Y \D1 N j W CAA W 111, I' N 2 I+e I N/W R/1Y R/W- 1'u'I I/ I NO EXISTING CURB & GUTTER 50'I I50' SITE DISTANCE FOR PROTECT EXISTING CATCH BASINS CONSTRUCTION UNDER. CONSTRUCTION ENTRANCE 50' SEE ABOVE 0' 200' 400' 600' 800' SCALE I"=200' G 1 i H/M R/w DEMENSIONS: EDGE OF PAVEMENT TO BLOCK WALL - 50' EDGE OF PAVEMENT TO 10' WEST - NO PARKING PARKING AREA - 40' WIDE X 1,200' N/O CHENILLE PARKING AREA - 40' WIDE X 500' S/O CHENILLE TEMPORARY PARKING FROM: 2 A060STZD 0amua/+3/a007I Pagel of 2 Amy Yu From:. Brian Ching Sent: Friday, August 17, 2007 5:24 PM To: Ed Wimmer Cc: Amy Yu Subject: RE: 1538 Trilogy at La Quinta Monroe Street Temporary Parking Exhibit Good Afternoon All, Normally we would request Routine Structural BMPs (Supplement A) of the NPDES Permit be in place for containment of pollutants. In this case it would be impractical and can use the Maximum Extent Practicable clause of our permit. The BMPs listed are part of Section 4.1 of the permit, Non-structural BMPs, and shall include: N8. Spill Contingency Plan — A spill contingency plan (Business Plan/Hazardous Materials Management Plan) shall be prepared by the owner/operator in accordance with Section 6.95 of the California Health and Safety Code. The Environmental Health Department ... shall be responsible for enforcement. Spills will be immediately cleaned up according to the Spill Contingency Plan. i Additionally, if there are storm drains out there, the existing SWPPP should have BMPs for preventing pollutants from getting into the catch basins. I believe the NPDES requirements are sufficient per the existing permit. We are still obligated to report spills to the Water Board per the current permit. Brian A. Ching Associate Engineer Public Works Department. City of La Quintd Phone: (760) 777-7044 Fax: (760) 777-7155 email: bching@la-quinta.org -----Original Message ----- From: Ed Wimmer Sent: Friday, August 17, 2007 4:50 PM To: Brian Ching Cc: Amy Yu Subject: FW: 1538 Trilogy at La Quinta Monroe Street Temporary Parking Exhibit Hi Brian, Are you ok with their NPDES comments? Thanks, 19'. - Ed Wimmer, P.E. Principal Engineer City of La Quinta Public Works 8/20/2007 PUBLIC WORKS DEPARTMENT APPLICATION FOR PERMIT Date: g 11-4101 Tract No: 3002 3— Project NameT01" 6"4 k4 eyit iNT?i Vicinity: M nn ro L P ose of Construction (Ex: Rough Grading, Offsite Street etc,)TeF ✓�%%crrc�n� Description of Construction (Ex: See Plan Set No. 01234)T-�y O . pa ✓%c ►!�l Di nsion of stallatioQ or R . oval: ri 0,-1 wdor rO, -. cS� VV Approximate Construction Start Date: ! S 2 0 a 7 Approximate Construction Completion} pate: Ge+ Y+ b�✓ / a u7 Estimated Construction Cost: $ • N Btitnated Consftuction Cost Shall include the-mmoval•of all obstrudions; materials; end. debris, back -filling, compaction and placing pei TUrient.eesutfacing ardor mplaoing1rupmvemcats Contact Name: 1 1/1 eS Phone Number: Name of Applicant/Owner: 1�2a a v�.eS C. Applicant Address: (V O t7 / sr ; a Q r w Applicant Telephone Number.: 7 7 2 — q7 9 Name of Contractor: cS h ,eGr 0 meS - hC Contractor Address: O— 10 6 / n az W Contractor Telephone Number: ?!12 — q'i Contractor State License Number: 66722S Contractor City Business License Number: &S 76 1 A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED t plicant or Contract r General Liability Insurance Co}p y: / wt8r1 tlin ✓vtu �,oA l iCv[i t u /1 46 �? . pplicant or Contractor General Liability In urance Policy umber: Office Use Only: Wpcction.Fec: Permit Fee: As -Built Deposit: Dust Control Deposit: Credit Amount: — ------ TOTAL FEE DUE: Office Use Only: Assigned PwWt Number: —7160 Approval Dale: Expiration Date: Issue Date: --AdministrativcAulhorily: •- ENCROACHMENT PERMITS BEING REQUESTED Pagel of 2 Amy Yu From: Ed Wimmer Sent: Wednesday, August 15, 2007 2:58 PM To: Tony Colarossi; Amy Yu; Brian Ching; Bryan McKinney; Leonard StSauver; Hector Guzman; Daniel Valenzuela Subject: RE: Encroachment Request 7160.doc I talked to Tim about this one. The work they will be doing is on Monroe, so it is appropriate to allow them to parkmon the street to construct Monroe improvements. Ed Wimmer, P.E. Principal Engineer City of La Quinta Public Works Development Services Division Telephone: (760) 777-7088 Fax: (760) 777-7155 From: Tony Colarossi Sent: Wednesday, August 15, 2007 10:34 AM To: Amy Yu; Brian Ching; Bryan McKinney; Leonard St Sauver; Hector Guzman; Daniel Valenzuela; Ed Wimmer Subject: RE: Encroachment Request 7160.doc From: Amy Yu Sent: Wednesday, August 15, 2007 9:53 AM To: Brian Ching; Bryan McKinney; Leonard St Sauver; Tony Colarossi; Hector Guzman; Daniel Valenzuela; Ed Wimmer Subject: FW: Encroachment Request 7160.doc Good morning, Everyone, Please review the requested permit shown below and the attached parking exhibit and let me know your comments. Thanks, Amy Yu Assistant Engineer II City of La Quinta - Public Works (760) 777-7047 ENCROACHMENT PERMITS BEING REQUESTED rmit Plan Development General # Set Imp. Type Name Developer Contractor Location Comments of Work Temporary Trilogy Shea. Shea Monroe Tony spoke with Parking Homes. Homes north of Ed yesterday along Avenue and he said that Tim may be 8/20/2007 PERMIT NO.7160 Trilogy / Temporary Parking Along Monroe Street North of Avenue 62 from August 20, 2007 to December 15, 2007 / Tract No. 30023 In addition to the standard permit conditions,.the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance'10 § 1 (part), 19.82), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. This permit or copy of it shall be on the work site (usually the job trailer) for inspection.during the actual work performed. 3. Shea Homes, Inc. — Jeff Davies, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. 4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. 5. Existing catch basins shall be protected from damage by parked vehicles. 6. A sight distance of fifty (50) feet in both directions shall be required at the intersection of Monroe Street and Chenille Lane as shown on the Temporary Parking Exhibit. The designated parking area is restricted to be 1200 feet north of Chenille Lane and 500 feet south of Chenille Lane. There shall be no parking within the area 10 feet north from the edge of pavement. (See Temporary Parking Exhibit) 7. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May l st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) neither before 8:30 a.m. nor after 4:30 p.m. 8. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. PERMIT NO. 7160 Trilogy / Temporary Parking Along Monroe Street North of Avenue 62 from August 20, 2007 to December 15, 2007 / Tract No. 30023 9. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 10. Access and egress to all local properties shall be maintained at all times. 11. Permittee shall permanently stabilize any and all soil that was disturbed as,a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 12. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 13. The pen- ittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work.under this permit.