4.'"�"yw - ENCROACHMENT PERMIT
Me PUBLIC WORKS CONSTRUCTION
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public
works improvements in connection with MINOR IMPROVEMENTS and, APPROVED SUBDIVISIONS.
Subdivision Improvement Permit - Class III
Minor Improvement Permit - Class IV
DATE: 3/21/2008
LOCATION OF CONSTRUCTION:. Rancho La Quinta C.C.; TM 29457; Ave 50 From Park Ave To Orchard Lane Northside
PURPOSE OF CONSTRUCTION: Traffic Control for Landscape Maintenance (Adding D.G. To Perimeter Landscape)
DESCRIPTION OF CONSTRUCTION: N/A ,
DIMENSION OF INSTALLATION OR REMOVAL: N/A
APPROXIMATE TIME WHEN WORK WILL BEGIN: 3/24/2008 TIME OF COMPLETION: 4/4/2008 CARED
ESTIMATED CONSTRUCTION COST: N/A .(Including removal of all obstruction, materials, and debris, backfilling, compaction and placing
.permanent resurfacing and/or replacing improvements)
COMMENTS
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any
` and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or
` property happening or occuring as a'proximate. result -of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777-
7097. To submit an inspection request, leave a message on the Inspection Request Hotline at 0) 777-7097 prior to 4:00 P.M. at
least twenty-four (24) hours prior to the anticipated inspection.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all app i ble rules and regulations of the City
of La Quinta and to pay for any additional replacement necessary as the result of this work.
.r -
t LPC Landscape & Irrigation Management P.O. Box 1745, La Quinta, CA 92247
Name of Applicant Busin ss Add
ress•
LPC Landscape &;Irrigation Management P. x 1 La Quinta, CA 92247
Name of Contractor and Job Foreman rA-
ddre�
GG�V
716185
Contractor's
License Number
Golden Eagle Insurance
,Applicant's Insurance Company
FEES Subdivision Improvement Permit -Class II
Minor Improvement Permit - Class I
��OFAT r\
Finance Revenue Code
Inspection Fee
E_1 $0.00
Permit Fee
E_1 $100.00 r
-As-Built Deposit
EE=A 0.00 -
Cash Deposit -Surety Bond,
EE=B $0.00
if required
TOTAL
$100.00
of Applicant or Agent '
(760)360-6867
Telephone No
(760)366-6867
Telephone No. '
0003768
City Business License No
CBP9775449
Policy Number
.Public Improvements: 3% of estimated construction costs
Private Improvements: 3% of estimated construction costs
PERMIT NUMBER: 8026
DATE APPROVED: Alarck 2VO8
EXPIRATION DATE: Muffli aS; 2P09
BY:
Administrative Auttf ity
G
T
CITY OF LA QUINTA
# CUSTOMER RECEIPT*
Date: 3/25/08 01 Receipt no: 13104
Description Quantity_Amount
El Pw ENCROACHMENT PERMIT
1.00 $100.00
Trans number: 93384
ENC PRMT 8026/LPC LANDSCAPE
Tender detail
CA CASH 1100.60
Total tendered $100.00
Total payment $100.00
Trans date: 3/25/08 Time: 12:49:56
THANK YOU FOR YOUR PAYMENT
bM1b4NW4
FOR QUESTIONS PLEASE CALL 760-777-7150
PUBLIC WORKS DEPARTMENT , e �p
APPLICATION FOR PERMIT ' -
Date: - 3 - 2. / - U
I Tract No: `I'WL `L%q5? Project Name: KrNCl-', -�c
/-I
Vicinity: ,iP S? ) �- - t2s f j< •1-D U,r ctic. , d A IVPr fk Vc 0
Purpose of Construction (i.e.: Rough Grading, Offsite Street, etc.)
ClLitl.c y9' IYl.�7_ aye.: P" e 4.— ta,;—d r c
Description of Construction (i.e.: See Plan Set No. 01234) W
RFcF��
�2 O
1 11008
ntse,"'ce
s
IDimension of Installation or Removal: I
Approximate Construction Start Date:. 3- Z c/-o
Approximate Construction Completion Date:
Estimated Construction Cost: $ _Lf
.Estimated Construction Cost shall include the removal of all obstructions, materials, and debris, back -filling; compaction and.
placing permanent resurfacing and or replacing improvements
Contact Name: L f'( Phone Number: OW 3 6 o-G t%6
Name .of Applicaiit/Ownen. JP.55t W q a'> * ,
Applicant Address: ..p. n . t3 0�/-� c� l- a Qu i/t% . C q as-4--7
Applicant Telephone Number: -Z (Qp _ 3 & p 6 8'6 -7
Applicant E-mail Address:
Name of Contractor: qc4ion 11 jgr7A22 r 14
Contractor Address: Pip 13 C, 4 1-7 y S L G o ;� 1-o � (� , � z z
Contractor Telephone Number: 3 Lo o - t, % l? 7 `
Contractor State License Number:. -Y& 61 Y
Contractor City Business License Number: 0003 1'!08
Contractor E-mail Address: Je rse sec LPc , c��-,
►A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED A
Applicant or Co tractor General Liability Insurance Company:
cam_
Applicant or Contractor Ge ral Liability Insurance Policy Number:
C bp q
Office.Use.Only: Office Use Only:
Inspection Fee: Assigned Permit Number. �6 Z 6
Permit Fee: r Q Approval Date:-
As -Built 1 Expiration
Deposit: 0 Date:
Dust Control 0 Issue
Deposit: Date:
Credit
Amount: G�0 Administrative Authority:
TOTAL FEE DUE: C U
T:\Administrative Services Division\Fomu\APPLICATION FOR PERMrr.doc
landscape & IrrigaCianManagemenc
ISPERTIS,E•IITIERITY•IXCEE{ENCE
Name: RLQ
LPC
Location: Ave 50 perimeter'
Landscape Mgmt Team
Contact: _
PO box 1745
Phone:
La Quinta, Ca. 92247
Date: 8.29.07
760.360.6867, v
Material Material Material
Material Price', -
Quantity Size Description
Price, Extension .
- 285 tons Southwest brown fines DG
84.00 23940.00.
r
13 Deliveries 22 tons per truck
90.00 . 1170.00
1 Tractor rental
1210.00 1210.00 f
0.00 0.00
0.00 0.00
0.00 ' 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
• 0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
-
0.00 0.00
26320.00 ,
Labor Labor
Labor' Labor
Hours 'Class
Price Extension
supervisor 0 . `
38.00 0.00
irrigation 0
28.00 . 0.00
labor 285 Spread DG
24.65 7025.25
Labor Sub Total
.. 7025.25
Equipment Equipment
Equipment Equipmert
• Hours Class _
Price Extension
0.00 0.00
0.00 0.00
•
0.00 0.00
0.00 0.00
Equipment Sub Total
0.00
r Total
$33,345.25
Accepted: Date:
Accepted: (Lundeen) Date:."
♦ 1
'
`
City of La Quinta
The'foilowing General and Special Provisions are attached to and made a part of
Permit Number 8026
The following shall always apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right,of way
ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission
from abutting property'owners. Such authorization must be secured by the permittee prior to starting work.
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved
surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these'portions of road be resurfaced
over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe; concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or
cut existing drainage structures, City of La'Quinta shall be, notified prior to commencement of this work. Drainage structures and open drains
shall be kept free of debris at all times for proper drainage.
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for
the adjoining property owners and emergency vehicles. In the event it is felt by"the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
® R1 NOTIFICATION: Permittee shall be notified the City at.(760) 777 - 7097 at least forty-eight hours (48) in advance of starting
construction.
® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by permit, the permittee shall -contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
permittee.
® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with ( " N/A " ) inches of A.C. paving placed on ( " N/A " ) inches of ( " N/A " ) aggregate sub -base course having an
"R" value of not less than (" N/A'") and in conformance with the City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461..
® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
one-fourth inch ('W) to one foot (1').
❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A ") feet shall
be removed. Curb and/or curb and'guttershall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
❑ R8 DRIVEWAYS: A.C. driveways shall be'constructed as -not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2 %z") of A.C. paving on (" N/A ") of class_( " N/A " )
aggregate base.
® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all
times.
❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the
manufacturers specifications.
City of La Quinta
® R11
COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State or City of La Quinta projects.
® R12
SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon completion or replacement of all survey monuments for proper clearance.
❑ R13
PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be
used to excavate prior to cutting. or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
❑ R14
LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the
protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
❑ R15
BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
❑ R16
BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than
three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any
case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.
❑ R17
BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the
trench before flooding or a maximum of five feet (5) lifts where trenches are of excessive depths. Care is to be exercised
that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be.continuos. -
❑ R18
COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one -
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
❑ R19
COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent -repairs.
Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
® R20
TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC-800 shall be placed,on a prepared sub -grade. The SC-800 temporary paving shall be placed after
a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5) day limit.
® R21
PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC-800 shall be placed immediately. A permanent patch of ( 4 ) inches'of A.0 surfacing placed on a ( 6 )
inch (,crushed ) aggregate base shall be placed no later than ( 3 ) days after completion of temporary road repair.
❑ R22
FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the. City Engineer.
® R23
STREET RESTRIPING: Where street striping is still visible on street to be excavated, such, striping shall be replaced upon
completion of permanent repairs.
® R24
TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished
by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The
entire width rof the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The
stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method.
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.
` PERMIT NO.8026 -
LPC Landscape "& Irrigation Management / Temporary Traffic Control for
Landscape Maintenance / Ave 50 btw Park Ave and Orchard Ln
In addition to the standard permit conditions, the following shall apply:
f
L. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications for Public
Works Construction.(SSPWC) and as directed by and -to the satisfaction of the City Engineer.
2.' This permit or copy of it shall be on the work site (usually the job trailer) for inspection during -the
Actual work performed.
3. LPC Landscape& lrripation Manap_ement (Jesse Magana) , hereinafter referred to as "Permittee",
shall be responsible for providing continuous dust and erosion control.
4. The permittee must maintain proper stopping and sight distances for the vehicular traffic users using the
public right of way. Also, existing pedestrian and bicycle traffic shall. not be impeded in anyway.
5. Streets shall be kept clean. They shall be completely cleaned'at'the end of each working day and more
frequently, if required.
6. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the
work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October 1 st to April 30: Monday -Friday " 7:00 a.m. to 5:30 p.m. `
Saturday 8:00 a.m. to 5:00 p.m.
a.
May 1 st to September 30: ' Monday -Friday 6:00 a.m. to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
Note: Construction work (including setting up traffic control' devices) is not permitted on any Arterial
street,(ie any 4 lane street) neither before 8:30 a.m. nor after 4:30 p.m.
7. Work within 500 feet of a signalized intersection shall be performed.between the hours of 9 a.m. - 3
p.m. Traffic control shall be setup after 9 a.m. and removed before 3 p.m. The Permittee shall contact
the Riverside Country.Traffic Signal Maintenance Department at (951) 955-6894 if signal operation at
the intersection is to be altered in any way.
8. " Pursuant to Section 14'.16.110 of the La Quinta Municipal Code (Ordinance 10 § l (part),. 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private street
and for any damage to other City -streets or facilities as a result of work perforrried.under this permit.
Special Conditions' Page I of 3
PERMIT NO.8026
LPC Landscape & Irrigation Management / Temporary Traffic Control for
Landscape Maintenance / Ave 50 btw Park Ave. and Orchard Ln
9. Pursuant to Section 14.16.250 of the La.Quinta Municipal Code (Ordinance 10 § I (part), 1982), at
residential. streets, 'advance warning signs and traffic control shall be installed and maintained in
accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual).
A traffic control plan shall be prepared in.accordahce with the WATCH Manual.
On Collector to Major Arterial Streets, the permittee must submit a traffic control plan which shall be
prepared under the guidance of the Manual of Uniform Traffic Control Devices (MUTCD) 2003 Edition
with°Revision No. 1 Incorporated, dated. November 2004.(HTML) and the California_ Supplement... As
,of October of 2006, these documents can be observed at '
http://mutcd.fhwa.dot.;?ov/HTM/2003r1 /part6/part6-toc.htm and
http://www.dot.ca. og v/hq/traffops/si�uitech/mutcdsupp/pdf/CA-Chap6A-Chap6F.pdf,respectively. It
shall be the Permittee's responsibility to appropriately detour and barricade all construction sites.
Pursuant to Section 14'16.290 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982),
street•closures shall not be permitted.. A minimum of two (2) travel lanes of paved surface shall
be maintained at all times.
10. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It'shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but riot limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
11. Should additional work, materials, or modifications -of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Pennittee"as directed by and to the satisfaction of the City Engineer at no cost to
the City of La Quinta.
12. The issuance of this permit and the City approval of the related construction improvement plans do not
provide a vested entitlement for all design parameters that may have been utilized for the plans. As
such, plans approved for this permit may be "at risk" for further modifications as it relates to any follow
up improvement plan requirements as required by the city or existing errors & omissions by the
architect or engineer of record.
13. The permittee shall not encroach upon private. property without prior written approval (submit to the
Public Works Department, attention to the Assistant Engineer I1) of the private land owner whom is
being encroached upon. ;
14. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the
Public Works. Department, an approved traffic control plan at least 2 weeks prior to start of construction
or parking on the paved R/W.
Special Conditions ` Page 2 of 3
0
PERMIT NO.8026
LPC Landscape & Irrigation• Management- [Temporary Traffic Control for ,
• ' Landscape Maintenance / Ave-50 btw Park Ave and Orchard Ln , r
15:; All•landscaping, irrigation; decorative rock, decorative,concrete, lighting, etc., shall be replaced to -its
original condition.
16: Access and egress to all local properties shall be' maintained at all times.
17. Permittee shall permanently stabilize•any and all soil'ihat was disturbed as a result of work'perf6rmed
�under-this permit with an approved dust -control treatment: Soil stabilization shall be done immediately ,
after completing the operation.
18.. ` Pursuant to,Chapter 1'2.56 of the La Quinta Municipal Code (Ordinance 10 1 (part); 1982) the City `
has designatedcertain city streets as Truck Routes: The weight limit for restricted streets (i.e.,'streets
not part of the Truck Route network) 'is' three (3) tons; trucks exceeding the weight limit- may use a
restricted street if making'a deliyery..or pickup on the subject, street, or if this permit specifically grants
permission to use 'thestreet to deliver -street construction materials and/or equipment. '
19. The City.of La Quinta reserves the right to revoke,suspend orvoid-this permit'at any time.
.. . Jam: .• J � 1 ! ..
20. The permittee shall indemnify; hold harmless and.assume the defense of the City from all,damages,
delay, costs, costs 6fexpenses. in law or equity that may arise out of work under this permit.
Special Conditions 4e Page 3 of 3 .
r
i Y '
: y .y a - - } fit' - , • i� r
. l:tir _. - - ' � - z- •. •..ram �. ' _ f:- ' .. `-'sEr_ �GI,,_I `1� * '.i� r a
- . N -x : � ,. . r ..y r � L - - . s • i " " - -{' br a'-;t,..'.,3.• . a` ` - �; to
NO SCALE �' .. , _ , • , �° t k' '
J'dti W4-2
-.. i, .. ..y �, :. ., _ ..:i,•, '_< E. - 7. YY- R1-1--``T. .. r• - e� _ '* .�.
.. R9-Z pia W2at_ '.3
'SCHOOL r' -� � :. RIeXT1Al1
�^ - - MUST
'.
�« }. - f ar - ',., ri,: .:a• a "C30 CA) }. f'i. ilatll
•1.. •�--,T i •t, - , x - _ p 4i r_ EAD .. y M
tv
ir .A rr 020.2 x ••-F . f-r : . • E T.. • i - ) r.y - _ :-.,�, ,-as '-
_
.. - t • ra ..a .a .. ' b• •,i ' - _ +y t. j -^ tir-c . .i 1.. !
41
f 600 FT f' .'_ r ti
.
1 7
-�, AVE.
WORK AREA R : s
l - ae '+sA' ' g w a, •; .r T i �'
Wft
61
-
. Say'
r3 wi
T b
} r 11
Y r �.
•4t _ !• -.r.- L ,f:•• E'`�ik1+- .,f,� -E •y � s� .i tt rr, .. '"•t
t 2 . F.., itx' f ..s,. s- - `-♦ .5�. �. f OOSTNpr , .t . +% 'fi
,..1
TAA.may.,. ,_ ♦ R� -. !`. .. .x I. ✓ .-1 4` •1Ma i t'••.. - -� Y-�'..
s --•� PARK AVE -
;4 r
R REDUCED TO�FIT<1< ,' _
.. � .t• - ,... '. .' �4.• •. ..'..; - �/.. a `. - - ;: •ir
i �� `ORCHARD'LN. a Y*
r`• YIt 1. .- '{. - r+ ,1 4: - . -- -i f , •w a:':. "' .'-^ 6 ,t
' t.F .. ' Y' ;''j� eta... •; •
of
t - ti _ gy_ ^ :Date rySpeed lirtdt
NOTES1: ALL TRAFFIC CONITROL• DEVICES FOR THIS PROJECT SHALL`B,E IN ACCORDANCE WITH 2006 CALIFORNIA MANUAL ON UNIFORM TRAFFIC.CONTROL'DEVICES (RU,T.0 DQ
i.
TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM REQuRED.' ADDf i6NALiTRAFFIC CONTROL_MAY BE REQUIRED TO FACILITATE PUBLIC SAFETYAND TRAFFIC FLOW IF " rre c�l,aot w�+
EE DNECESSARYBYCITYOFLAQUINTA`REPRESENTATNE:• —., ,Landsca a Clean u for:Rdncho L-a inW
D ME . J: P 1, T r
' _
..
3.;T,HROUgiOUTEACHWORKPERIOD;COMRACTORSHAtGINSPECTTRAFFICCONTROL'(SICDVS,.BARPoCADESANDDELINEATORS)ANDMAINTAINSAME:IN'A000RDANCEWITH �.� Wine f' .�; �• -'~71
: s ' ��s = r
l�'; P:-C:" andscape CALTRANS.
TRAFFIC CONTROL' PLANS.
p 7 ' _ .t7.
4.. CONTRACTOR SHALL MAINTAIN AMINIMUM�IT TRAFFICtANEWIDTHATALLTIMES:` ' .. +' rlatfiecalgdoes��ny Sr' ? .� '
5. ACCESSTO PRIVATE PROPERTY., SHALL BE MAINTAINED•' To s N Barricades Inc: 800 852 TOPS Ron Ffield
6. THIS TRAFFIC CONTROL SHALL BE'IN`PLACE DURING:WORK HOURS `ONLY: AT.END OF, TH6WORK HOURS, THE ROADySHALL BE CLEAR,OF DEBRIS -AND RETURNED TO NORMAL ' i' c - Date', �,. r ,
p
'- 1, 3/21/08 To:46e Issued on Approval
..'-7.THISISATYPICALASTHECLOSUREMAY'NEEDTOMOVEFURTHERALONG'THEROAQOR;TOTHEOPPOSITESIDE :. ;. ,r ,: ,•__ _.
tea, • .. <� . �•Y' l . r' - ,4 ' - n
•Is' :. ' '4 ` }'- t -4