BRES2018-0141�+
— GEM Jd. DESERT —
PERMIT #BQO 4*4"'f ^ O 14-1
PLAN LOCATION;
Project Address: 5 — 75,f
Project Description: Pool, Remodel, Add't, Elect, Plumb, Mech
APN #: —77 S C) �-?/
iro1,-(eL �
Applicant Name: Vc� V( CHF�`�,&V/
Address: 7
City, ST, Zip:4^7jf� 9 2ri( I
��'=G`
Telephone: ho 7 '� 0jc5 S'—
Email: VV,—P ( 1 �+�-�1 L�
,Valuation of Project S S
Contractor Name: �� ' '��[ ��
New SFD Construction:
Address:
Conditioned Space SF
City, St, Zip
Garage SF
Telephone: `76�(�z �j I
Patio/Porch SF
Email:
Fire Sprinklers SF
State Lic: City Bus Lic:
e: g
Construction Type: Occupancy:
Address: G 7-67Z
Grading:
City, St, Zip [ �(
Telephone: 760 C% 6
Bedrooms:
Stories: # Units:
Email:
State Lic: City Bus Lic:
Property Owner's Name: Q S '�{ s
New Commercial / Tenant Improvements:
Address: 75 �(`�{SS
Total Building SF
City, ST, Zip
Construction Type: Occupancy:
Telephone:
Email:
78495 CALLE TAMPICO
LA QUINTA, CA 92253
760-777-7000
Coachella Valley Unified School District
83-733 Avenue 55, Thermal, CA 92274
(760) 398-5909 — Fax (760) 398-1224
Project Name:
Owner's Name:
PGA West
Malinda Harris
This Box For District Use Only
DEVELOPER FEES PAID
AREA: AMOUNT
LEVEL ONE AMOUNT: I LEVEL TWO AMOUNT: I MITIGATION AMOUNT: I COMM/IND AMOUNT:
DATE: I RECEIPT:
CERTIFICATE OF COMPLIANCE
(California Education Code 17620)
Project Address: 54-754 Inverness, LaQuinta
Project Description: Addition
APN: 775-091-084
Tract #:
Type of Development: Residential XX
Commercial
Total Square Feet of Building Area: 51 sq. ft.
CHECK #:
Date: May 17, 2018
Phone No.
Lot #Is:
Industrial
INITIALS
Certification of Applicant/Owners: The person signing certifies that the above information is correct and makes this statement under
penalty of perjury and further represents that he/she is authorized to sigg,on behalf of the owner/developer.
Dated: May 17, 2018 Signature:
SCHOOL DISTRICT'S REQUIREMENTS FOR THE ABOVE PROJECT HAVE BEEN OR WILL BE SATISFIED IN
ACCORDANCE WITH ONE OF THE FOLLOWING: (CIRCLE ONE)
Education Code
17620
Number of Sq.Ft.
Amount per Sq.Ft.
Amount Collected
Gov. Code Project Agreement Existing Not Subject to Fee
65995 Approval Prior to 1/1/87 Requirement
Note:
51 Pursuant to AB 181 any room additions or enclosures of 500
sq. ft. or less are exempt from developer fees. Any mobile
$0.00 homes being relocated within the same school district's
$0.00 jurisdiction are exempt from developer fees.
Building Permit Application Completed: Yes/No
By: William A. Aguirre, Director, Facilities Dev. & Planning
Certificate issued by: Laurie Howard, Secretary Signature: _ acuien"y
NOTICE OF 90 DAY PERIOD FOR PROTEST OF FEES AND STATEMENT OF FEES
Section 66020 of the Government Code asserted by Assembly Bill 3081, effective January 1, 1997, requires that this District provide (1) a written notice to the
project appellant, at the time of payment of school fees, mitigation payment or other exactions ("Fees"), of the 90-day period to protest the imposition of these
Fees and (2) the amount of the fees. Therefore, in accordance with section 66020 of the Government code and other applicable law, this Notice shall serve to
advise you that the 90-day protest period in regard to such Fees or the validity thereof, commences with the payment of the fees or performance of any other
requirements as described in section 66020 of the Government code. Additionally, the amount of the fees imposed is as herein set forth, whether payable at this
time or in whole or in part prior to issuance of a Certificate of Occupancy. As in the latter, the 90 days starts on the date hereof. This Certificate of Compliance
is valid for thirty (30) days from the date of issuance. Extension will be granted only for good cause, as determined by the School District, and up to three (3)
such extensions may be granted.
P�iV. ,:nl cic�csrdevfee ccl'tilicat ofcr3mpkiinec form Iipdab d 3 20O7 11/2010
PGA WEST
RESIDENTIALASSOCIA7ION, INC.
THIS LETTER S A REVIEW AND COMMENTLETTER ."ER ONLY fog°
Preliminary Conce t Submittal
THE START OF THE PROJECT IS PENDING YOUR RECEIPT OF A `NOTICE TO PROCEED' LETTER
March 6, 2018
Ms. Ann Simmons Boutin
Ms. Malinda Harris
4067
54-754 Inverness- Architectural Variance Application February 15, 2018
Architectural Committee Meeting — February 26, 2018
Enclose Existing Covered Patio to Enlarge Existing Kitchen- PRELIMINARY CONCEPT SUBMITTAL
Dear Ms. Boutin and Ms. Harris,
The Architectural Committee, on February 26, 2018, reviewed your Architectural Variance Application, received February 15, 2018,
for the above listed variance per the submittal drawings received in the Association office on February 5, 2018. The proposed scope
of work is conceptually acceptable subject to providing all the required plans, specifications and all in accordance with the
Architectural Guidelines, Homeowner's Association CC&R's and Maintenance and Indemnity Agreement.
The following conditions and/or requirements are pertinent and applicable to the Committee's Review and Comments for a
conceptual submittal.
The Architectural Committee's Review is based on the l(one) plan sheet of the proposed interior and exterior
modifications. It is understood that all applicable submittals of Architectural and /or Engineering documents are
provided for another review prior to the Building Department plan check submission. All application requirements
to be processed while the working drawings are being prepared.
The Committee's review is only for the architectural implications of the project. All codes, legal and engineering are the
responsibility of the homeowner and contractor.
A Maintenance and IndemnityAAgreement shall be signed prior to the start of work and reviewed at the completion of the
project. Same shall delineate all applicable work, which current and future owners shall be compelled to solely maintain
and/or replace as needed and the document shall be recorded with the County of Riverside and runs with the land.
Thank you for your application and we look forward to your next request for our review of your information.
Cordially,
0 0�0 6 U&
Kelly McGalliard CCAM PCAM
Operations Manager
For the Architectural Committee
CC: Architectural Committee
RECEIVE,)
APR .10 2018
CM OF
C014MUIVIT . EV i PMENI'