Loading...
MTGLSteven Koch, Senior Vice President                                                                                                           Bruce Hick, P.E., G.E., Principal and Geotechnical Engineer  MTGL, INC. | 14467 MERIDIAN PARKWAY, BUILDING 2A, RIVERSIDE, CALIFORNIA 92518                       P:  951.653.4999 | F: 951.653.4666 | WWW.MTGLINC.COM  ON‐CALL MATERIALS TESTING SERVICES  CITY OF LA QUINTA                                                                   RESPONSE TO REQUEST FOR PROPOSALS       “Providing Value in Quality Services”  Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    June 11, 2019      Mr. Bryan McKinney, P.E., City Engineer  City of La Quinta  78‐495 Calle Tampico  La Quinta, California 92253    Subject:  Response to Request for Proposals (RFP)     On‐Call Materials Testing Services    MTGL, Inc. (MTGL) appreciates the opportunity to submit our response to the subject mentioned. We would like  to be part of your team, helping to ensure your construction quality goals are met.      The California State Architect, and Office of State Health and Planning Department have certified MTGL as a  qualified ISO 17025 approved testing laboratory. MTGL has been providing CBC Inspection services for more than  25 years and qualify as Small Business Enterprise  (SBE), Disadvantaged Business Enterprise (DBE), Woman Owned  (WBE), (MBE) Minority Business Enterprise. MTGL currently has over 55 full‐time employees including  Geotechnical Engineers, Deputy Inspectors, and Soils Technicians experienced in inspection.    MTGL can provide value‐driven and comprehensive quality services on this project. MTGL and its staff have the  experience and capability to perform the project scope of services described in the RFP in‐house. We have the  ability and willingness to comply with all provisions stated herein.     Company’s Full Legal Name, Address,  Phone, Fax, Website:  MTGL, Inc.  14467 Meridian Parkway, Building 2A | Riverside, California 92518  P: 951.653.4999 | F: 951.653.4666 | Website:  WWW.MTGLINC.COM  Proposed Engineer and Project  Manager  Bruce Hick, P.E., G.E.  bhick@mtglinc.com  Primary Contact During the RFP  Review and Authority to bind MTGL:  Steven Koch  skoch@mtglinc.com   Authority signatory for all  contractual Terms and Conditions:  Michael J. Landon  mlandon@mtglinc.com     MTGL is committed to a team approach, thereby ensuring the success of each project. MTGL offers the full  commitment of our staff with the support of a project management team. We work as a team from the point of  estimation through completion of the project.     We have reviewed thoroughly all the contents in the RFP, and fully understand its intent. We are willing to enter  into an agreement under the terms and conditions for the City of La Quinta Agreement for Contract Services  without exceptions. We acknowledged that we have received Addendum No. 1 dated June 5, 2019.     It is MTGL’s goal to meet the quality and value expectations for the City of La Quinta with efficiency and cost  savings effectiveness, a greater value for quality oversight in overlapping disciplines, and continuity needed to  successfully execute the various projects. We thank you for reviewing our proposal. Should you have any  questions, or require additional information, please do not hesitate to contact us.    Respectfully Submitted,  MTGL, Inc.      Steven Koch     Bruce Hick, P.E., G.E.  Senior Vice President    Principal and Geotechnical Engineer               14467 Meridian Parkway, Building 2A, Riverside, California 92518 P: 951.653.4999 | F: 951.653.4666 | www.mtglinc.com Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    TABLE OF CONTENTS      SECTION 1 .......................................................................................................................... Cover Letter    SECTION 2 ................................................................................................................. Table of Contents    SECTION 3 ............................................................. Qualifications, Related Experience and References    SECTION 4 ........................................................................ Proposed Staffing and Project Organization    SECTION 5 ............................................................................................ Work Plan/Technical Approach    SECTION 6 ....................................................................................................................... Cost and Price    SECTION 7 ................................................................ Appendix – Signed Non‐Collusion Affidavit Form    SECTION 8 ............................................................................ Appendix – Insurance Acknowledgement    SECTION 9 .......................................................................................... Appendix – Contract Exceptions     SECTION 10 .................................................................................................. Appendix – Staff Resumes     Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    QUALIFICATIONS, RELATED EXPERIENCE AND REFERENCES    QUALIFICATIONS  MTGL established in 1993, and is certified as a W/MBE, SBE and DBE firm  under CUCP 33843, and registered as a public works contractor with the State  of California under DIR 1000006646. MTGL has a clear understanding of  Safety Compliance on all projects, with policies in place that provide a  desirable EMR Rating of 0.68.     We are locally based and aided by our other Southern California offices  (Riverside, Anaheim, El Segundo, and San Diego).     Since our inception, we have operated on the simple philosophy of delivering  what is expected – Quality Service. Our facilities have been structured and  professionally staffed to provide our clients with comprehensive services in  the field of Geotechnical Engineering, Materials Testing a, Special Inspection  and Environmental Services. Our professional staff is committed to the  cohesive management of assignments from start to finish.    OUR LABORATORY   MTGL is fully certified by numerous agencies to provide Materials Testing, Inspection, and Geotechnical  Engineering services. Our certifications include:   LABORATORY CERTIFICATIONS  Agency Expiration Date  ISO/IEC 17025 and AASHTO R 18 Annually  Cement and Concrete Reference Laboratory (CCRL) Inspection No. U1178 02/01/2021  Caltrans Accreditation Laboratory (1 of 15 Laboratories in California; Caltrans DBE  Superpave Certified for Hot Mix Asphalt)  02/08/2020  Department of Army – US Army Corps of Engineers (USACE) 03/01/2020  Division of the State Architect LEA #044 04/06/2020  Los Angeles Department of Building & Safety (LADBS) Approval No. TA24780 05/01/2020  BUSINESS STATUS CERTIFICATIONS  Company Certification # Expiration Date  Women/Minority Business Enterprise Supplier Clearinghouse 93KS0069 10/25/2019  Department of Industrial Relations (DIR) 1000006646 06/30/2019  DGS Small Business 1758925 10/31/2019  LACMTA Metro DBE CUCP 33843 01/02/2023  LACMTA Metro SBE  1199 01/02/2023  Coalition of Southern California SBE (Metropolitan Water District of  Southern California, Port of Long Beach, San Diego County Water  Authority, Los Angeles Unified School District, Los Angeles Community  College District)  169124 07/12/2019  Los Angeles County Consumer & Business Affairs CBE 50206 07/18/2019  City of Long Beach SBE 189282 09/11/2021  Port of Long Beach SBE 261346 04/10/2021  Omnitrans SBE 281747 10/31/2021    SAFETY   MTGL has a clear understanding of Safety Compliance on all projects, with policies in place that provide a desirable  EMR Rating of 0.68.       Established Year:  1993  Number of Employees: 55  Number of Years in Business: 25  Type of Company: Corporation  Owner: Marianne Sierra  President: Michael Landon  Senior Vice President: Steven Koch  Business Status:  M/WBE | SBE | DBE | CBE | DIR    www.mtglinc.com    Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    LIST OF SERVICES  Environmental Consulting: MTGL provides  environmental services including in all phases of  environmental site assessments, preliminary  endangerment assessments and Title 5 compliance  reports. MTGL’s objective to be thorough during the  investigation. If anomalies are found, MTGL’s team  will recommend solutions to resolve them so that  other issues may be avoided during demolition and  construction.   Geotechnical Engineering: MTGL has been active in  all phases of geotechnical engineering, construction  inspection and materials testing for all aspects of  commercial, industrial, municipal and residential  developments since its formation. As such MTGL  can assist the design team in identifying potential  seismic hazards and provide recommendations for  site preparation, grading and foundation types.  During construction, MTGL can assist in ensuring  that all soils used in construction are correctly  compacted and meet project plans, specifications  and soils report.    Construction Inspection/Testing: MTGL provides  complete materials testing, inspection and quality  control services to all facets of the construction  industry. Our services are performed in our  laboratory, at fabrication plants and at construction  sites. We verify compliance with municipal, state  and national building codes and standards as well as  project plans and specifications.  Materials Engineering/Construction Consulting: Our  firm has expertise with the properties of concrete,  asphalt, masonry, steel and other materials, as well as  the full range of construction practices. MTGL’s  personnel are skilled at determining or investigating  construction problems and providing our clients with  economical solutions. If structural materials perform  inadequately, or if uncertainties exist about their  quality, MTGL can quantify unknown properties,  investigate, and report how and why these conditions  exist. When requested, we will recommend acceptable  alternatives.    Pavement Consulting: MTGL’s engineers and  professional staff are specially trained to provide our  clients with practical and cost‐effective solutions or any  pavement challenge or design.    Non‐Destructive Examination (NDE): NDE is an  effective way of evaluating materials without  destroying their usefulness. MTGL provides NDE  services at the project site, at the fabrication facility, or  in our laboratory. MTGL technicians are highly trained  and experienced in the use of these techniques and  equipment, including ultrasonic inspection, magnetic  particle inspection, and dye penetrant inspection,  ensuring an accurate and thorough analysis.      TEAM   With over 55 employees, field technicians and inspectors daily servicing our projects, we are capable to provide  you the experienced personnel necessary to service your project. Engineering Technicians experienced in  performing construction observation and materials/soils sampling and testing. MTGL is poised to provide  Materials Testing and Inspection Services.     Our engineers (Bruce Hick, P.E., G.E., Pablo Naranjo, P.E., G.E., and Stephen Coover, P.E., G.E.) are registered in  the State of California. Our inspectors and technicians are certified with ICC, AWS/CWI, ACI, DSA, Caltrans, Nuclear  Gauge Safety, and NICET. They all perform Material Testing and Geotechnical Services/Core Sample Services in  accordance with Caltrans and/or City Greenbook specifications, City’s adopted Quality Assurance Program (QAP),  and The Standard Specifications for Public Works Construction (“Latest Edition”).     Bruce Hick, P.E., G.E.,  CE #45784, exp: 12/31/2020; GE #2284, exp: 12/31/2020  Pablo Naranjo, P.E., G.E.  CE #69499, exp: 06/30/2020; GE #2961, exp: 06/30/2020  Stephen Coover, P.E., G.E. CE #41404, exp: 09/30/2019; GE #2057, exp: 09/30/2019    LITIGATION   MTGL does not have any contract terminations for default in the past five years.    MTGL has not filed bankruptcy in the past five years.   Neither MTGL nor its officers have had any convictions or debarments for filing false claims within the past five  years.    MTGL has never been the sole defendant in any construction related litigation.    Currently MTGL is named in litigation with Los Angeles Community College District. Construction defect case at  Mission College in Sylmar, California. Previous General Contractor, SMC, filed bankruptcy and MTGL completed  this project under a different General Contractor, Kemp Brothers.  Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    RELATED EXPERIENCE AND REFERENCES  MTGL has extensive experience with municipalities, city and county government agencies. MTGL’s 25 proven years  of experience has provided us attributes and skills that few other providers can provide.     MTGL wide range of services helps provide verification of contract compliance with the approved set of plans and  specifications, the Standard Specifications for Public Works Construction (Greenbook); Caltrans Standard Plans  and Specifications, City codes, ordinances and standards, California Occupational Safety and Health Administration  (OSHA) Construction Safety Orders, and conformance with Federal/State/Local applicable code requirements. We  work closely and communicate with the city, client owner, construction management, general contractor,  architect, structural engineer to ensure the project is on budget and on time schedule.     MTGL has performed environmental consulting, geotechnical engineering, material testing, special inspection, and  quality assurance services to many clients in the Riverside County, San Bernardino County, Orange County, Los  Angeles County, San Diego County, Metropolitan Transportation Authority (METRO), Caltrans, US Army Corps,  Riverside County Transportation Department (RCTD), Orange County Transportation Authority (OCTA), SANBAG,  to few a name.    We have provided Geotechnical Engineering, Inspection and Material Services on some of the premier  construction projects in Southern California. These include the $5.2 Million City of Anaheim Residential Street  Improvements Group 6, $1.675 Million City of Brea Lagos De Moreno Park, $1.3 Million City of Brea Glenbrook  Tract Waterline and Street Rehabilitation, $970 Million Interstate 405 (SR73 to I‐605) Design Build, and Inglewood  Street Resurfacing, $200 Million Riverside Regional Water Quality Control Plant Expansion Project, and Southern  California Edison Various Projects, to name a few. Currently, we are providing testing and inspection services as a  third party to Hensel Phelps for the California Air Resource Board (CARB) project located in Riverside, California.    The following lists are some of our similar related projects for your references. Our references are also listed  included in our project references.       CITY OF ANAHEIM  RESIDENTIAL STREET  IMPROVEMENT GROUP 6    Owner/Client:  City of Anaheim  Department of Public Works  200 S Anaheim Boulevard  Anaheim, CA 92805  Contact:    Ed Fernandez, PE  714.864.0247  Duration:  January 2016 through  September 2016        With over 50,000 tons of Asphalt Concrete, the Residential Street  Improvements project was the largest street rehabilitation for any City  Government in Southern California for 2016.    MTGL provided comprehensive Quality Assurance Materials Testing and  Inspection services to aid in the construction of the Residential Street  Improvements Group 6 project. In accordance with the City of Anaheim  Quality Assurance Program (QAP), MTGL provided testing and inspection in  accordance with the Caltrans Local Assistance Manual Exhibit 16‐R and  additional quality assurance measures adopted by the by the City of  Anaheim. MTGL provided full suite testing for every 1,000 tons of asphalt,  per the City’s QAP.     MTGL also provided full services source inspection and verification testing  of quality control testing provided by the producer. A portion of this project  also consisted of pavement rehabilitation with Type II REAS (Rubberized  Emulsion Aggregate Slurry), which MTGL was also able to provide  comprehensive testing and consulting services.    MTGL also provided: Specialty mix design review and suitability analysis,  failure investigation services, mix design verification services, qualitative  verification of mixture design portions, and supplemental roadway  inspection.       Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental      CITY OF MENIFEE  SLURRY TESTING    Owner/Client:  City of Menifee  Capital Improvement Projects  29714 Haun Road  Menifee, CA 92586  Contact:  Carlos E. Geronimo  P: 951.723.3722  Duration:  September 2018 through  October 2018  MTGL provided slurry seal testing includes wet abrasion, binder content,  sand equivalent and gradation for the City of Menifee – Resurfacing  Number of Streets project.     MTGL provided field sampling and placement inspection of slurry over 12  consecutive work shifts and tested more than 30 REAS Type II Slurry  samples for quality assurance conformance via the Wet Track Abrasion test.  All testing of slurry and slurry components with does in‐houses without the  use of a specialty subconsultant. Our findings were reported directly to the  City Engineer in a comprehensive Final Report.     CITY OF VERNON  DOWNEY ROAD STREET AND  TRAFFIC IMPROVEMENTS  PROJECT NO. CS‐0940    Owner/Client:  City of Vernon  4305 Santa Fe Avenue  Vernon, CA 90058  Contact:  Felix Velasco  P: 323.583.8811 x318  Duration:  June 2018 through July 2018  MTGL provided Acceptance Testing (AT) services for the City of Vernon –  Downey Road Improvements Project No. CS‐0940 included field subgrade  compaction testing, field sub‐base compaction testing, final asphalt overlay  compaction with nuclear gauge, asphalt concrete batch plant, cold central  plant recycling asphalt concrete density testing and monitoring, and  laboratory testing.     The project consisted of 6” deep removal and replacement of the existing  asphalt pavement, adjusting to grade manholes and valves and  rejuvenation by mixing the removed asphalt with new emulsified recycling  agents, water and additives Cold Central Plant Recycling process. In  addition, removal, and replacement of damaged curb, gutter, sidewalk,  driveways, and the installation of handicap access ramps will be completed  per the plans.     CITY OF BREA  GLENBROOK TRACT  WATERLINE AND STREET  REHABILITATION    Owner/Client:   City of Brea  Public Work Department  1 Civic Center Circle  Brea, CA 92821  Contact:   Craig L. Harris  949.533.6011  Raymond Contreras  714.990.7763  Duration:  May 2016 through September  2016    Construction of the Glenbrook Tract Waterline and Street Rehabilitation  project consisted of installation of over 13,000 Lineal Feet of Waterline in a  high‐density neighborhood of the City of Brea.    MTGL provided comprehensive Quality Assurance Materials Testing and  Inspection services to aid in the construction of the project. MTGL  customized a Quality Assurance Plan (QAP) that met the City’s funding  criteria as well as satisfied quality assurance requirements to ensure long  terms serviceability for the project.    MTGL provided Source Inspection of Roadway, Drainage, and Pipeline  related materials.  MTGL also provided compaction testing of subbase and  roadway materials in accordance with the Standard Specifications for  Public Works Construction (Greenbook). MTGL was instrumental in  ensuring quality requirements were met during paving operations.  Miscellaneous items of work consisted of installation of fire hydrants and  water mains, reconstruction of curb and gutters, manhole adjustments, and  reconstruction of sidewalks.     MTGL also aided and provided: Civil inspection of waterline installation,  roadway inspection, materials quantity verification, assistance with “red  line” drawing fabrication, and full‐service laboratory testing.      Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental      CITY OF BREA   LAGOS DE MORENO PARK    Client:   City of Brea  Public Work Department  Client Contact:   Raymond Contreras  P: 714.990.7763  Duration:   2017 ‐ Current  Construction Cost:  $1.675 Million  This project is a joint‐use agreement between the City of Brea and the Brea  Olinda Unified School District for the renovation of an existing school play yard  located in the north end of the campus. This area is also referred to as “Lagos  De Moreno Park” and is currently used as a City park after normal school hours.    The work on this project includes CMU restroom building, DSA fabric shade  shelters, playground equipment, 3 handball CMU walls, CMU retaining walls,  three (3) A.D.A. ramps, site furnishings, PCC and asphalt paving, and a storm  water detention and filtration system.     MTGL provided soils, materials testing and inspection services including soils,  concrete, masonry, structural steel (field and shop).    DEPARTMENT OF GENERAL  SERVICES  CALIFORNIA AIR  RESOURCES BOARD (CARB),  RIVERSIDE    Client:  Hensel Phelps  2415 Campus Drive, Suite 100  Irvine, California 92612  Contact:  Robert Cruz   P: 714.673.1003  Duration:  2018 ‐ Current    MTGL is providing a 3rd party testing and inspection services to a Southern  California Consolidation Project (SCCP) landmark project for the California Air  Resources Board (CARB), located in Riverside, California. CARB, 380,000 square  foot building, is a new state‐of‐the art Southern California headquarters and  one of largest and most advance vehicle emissions testing and research  facilities in the world.    MTGL testing and inspection services includes structural (field and shop), non‐ shrink grout, concrete (batch plant, aggregate), rebar and coupler testing,  masonry, fire‐resistant and fireproofing inspections.          MTA WILLOWBROOK ROSA  PARK STATION    Owner  METRO  Client:   Icon West, Inc.  P: 213.385.0027  Contact:  Ed Chammaha  Project Manager  P: 310.415.3002  E: ed@icon‐west.com  Manolo Gonzalez  QA‐QC Project Manager  P: 310.702.1882  E: manolo@icon‐west.com  Construction Value:  $109 Million  Duration:  2018 ‐ 2020      The Willowbrook/Rosa Parks Improvement Project will provide significant  upgrades to this busy station, expanding its multi‐modal capacity and role as a  quality community resource, and ushering it into a new era of Metro Rail.    The Willowbrook Rosa Parks Station Improvement scope of work includes but  is not limited to construction of a pedestrian crossing, Blue Line platform  improvements, a new pedestrian entry pathway, and station mezzanine.    The project will extend the Blue Line platform south of I‐105. A new pedestrian  will provide a safe connection across Metro and Union Pacific. Improved  pedestrian connection will provide safe and more direct walking paths to  destinations surrounding the station. Expanding the mezzanine to connect the  Blue and Green Lines with new elevators and stairs.     MTGL is providing Soils, Materials Testing and Inspection Services on this  project.        Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    BRUCE HICK, P.E., G.E.  PRINCIPAL AND GEOTECHNICAL   ENGINEER    SPECIAL INSPECTORS /   FIELD TECHNICIANS    CHRISTOPHER BUNKER  RALPH WILLIAMS     CHARLES FERGUSON  LABORATORY MANAGER  CITY OF LA QUINTA  ON‐CALL MATERIALS TESTING SERVICES    DISPATCH 800.491.2990   REPORT DISTRIBUTION  LISA SCHNIEDER  STEVEN KOCH  SENIOR VICE PRESIDENT  PROJECT ADMINISTRATOR  PROPOSED STAFFING AND PROJECT ORGANIZATION    MTGL has a qualified team of professionals, technicians, inspectors, and support personnel for supporting the City  of La Quinta with value driven quality services. MTGL has the experience, capabilities, and staff resources to fulfill  all the requirements to provide On‐Call Materials Testing Services.    MTGL’s project team are full‐time employees and they will be available through the extent proposed for the  duration of the project. They will not be allowed to be removed or replaced without the prior written concurrence  of the City of La Quinta. They have the ability and willingness to comply with all provisions stated herein.        O R G A N I Z A T I O N    C H A R T  Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    Listed below are MTGL’s proposed personnel that will be assigned to the City of La Quinta:  Steven Koch |Senior Vice President – P: 714.632.2999  Steven Koch, Senior Vice President, will be the Account Manager. He will coordinate and communicate with the  City Representatives regarding progress and overall MTGL team activities to ensure and verify the implementation  of the plan. He will oversee all the contracts, MTGL’s accounting and billing procedures for accuracy and  completeness. Mr. Koch is the primary contact during the review process for the City RFP and authorized signatory  to bind the MTGL.  Bruce Hick, P.E., G.E. |Principal/Geotechnical Engineer and Project Manager – P: 951.653.4999; C: 661.233.5229  Bruce Hick will be the  Principal, Geotechnical Engineer, and Project Manager, will be responsible and overseeing  all material testing services. He has over 31 years of experience in providing services across the entire spectrum  of Geotechnical Engineering. He will be the primary main contact for the technical questions for this contract and  overseeing all technical and/or testing issues. He is the authority signatory for all the reports and to provide all  final reports performed to the City.  Christopher Bunker and Ralph Williams |Special Inspectors and Field Technician   To conduct soil analysis to determine soil properties (moisture/density tests on subgrade, aggregate base,  asphalt concrete, slope fill and trench backfill placement as required). The tests will be performed with a  nuclear densometer in accordance with ASTM 6938‐10 or sand cone in accordance with ASTM D1556.  Maximum density curves (ASTM D1557) will be performed on various material types as they are  encountered.    Inspection and materials sampling at the asphalt concrete batch plant during asphalt concrete production.    To make sets of concrete cylinders as needed and perform slump tests for the curb, gutter, concrete  drainage devices, channel slope paving and other minor concrete.    Perform soil boring with the guidance of MTGL’s Engineer, Mr. Bruce Hick.    Prepare reports of all on‐site activities on the daily basis.  Subconsultants  MTGL has the capabilities and staff resources to fulfill all the requirements in‐house, with no need for  subconsultants. If needed, MTGL will provide a subconsultants if the project requires related services that are  outside of our fee schedule, with all subconsultants being pre‐approved.    Resumes can be found in the Appendix – Staff Resumes.       Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    WORK PLAN / TECHNICAL APPROACH    MTGL strives to maintain a level of high‐quality services through appropriate documentation and workflow  methodology in the most cost‐effective manner possible. MTGL wide range of services is verification of contract  compliance with the approved set of plans and specifications, and the conformance with Federal/State/Local  applicable code requirements and regulations.     MTGL has a qualified team of professionals, technicians, inspectors, and support personnel looking to support the  City of La Quinta with value driven quality services. MTGL has the experience, capabilities, and staff resources to  fulfill all the requirements to provide third party inspection services.     MTGL’s project team are full‐time employees and they will be available through the extent proposed for the  duration of the project. They will review the project plans and specification to familiar with the work and testing  requirements. They will not be allowed to be removed or replaced without the prior written concurrence of the  City of La Quinta.    PROJECT MANAGEMENT  Our proposed engineer and project manager for this project will be Mr. Bruce Hick, P.E., G.E. He has over 31 years  of experience as a Geotechnical Engineer providing services across the entire spectrum of Geotechnical  Engineering and will be the main contact for all technical issues. Mr. Steven Koch, Senior Vice President, will be  primary contact during the RFQ review process and authority to bind MTGL to the terms of the contract. Mr.  Michael J. Landon, President, is the authority signatory for all contractual Terms and Conditions. Our inspectors  and technicians are multi‐certified to reduce cost and provide a greater value for quality oversight.     MANAGEMENT APPROACH  MTGL and its staff have read the RFP Section 4 requirements, and fully understand its intent. MTGL and its staff  have the ability and capability to perform the services stated described in the RFP Section 4 requirements.     MTGL is prepared to provide materials testing services to the City of La Quinta for all inspection and materials  tested during the entire course of the contract and advise and consult with the City as necessary. Below is our  general typical approach and scope of work:  Project Kickoff   Upon notice to proceed, our Project Manager will work with the client representative to gain a thorough  understanding of the project and our role. Our initial meeting will review the following:    Project schedule and budget constraints    Geological conditions of the project area, i.e. liquefaction potential, groundwater, proximity to faults and/or  AP Zone, soil type, etc.    Regulatory and jurisdiction approval requirements i.e., Division of State Architect, Caltrans, Municipal  Government, Federal Government, DTSC, etc.    Contact information for all involved parties including: architect, engineer, contractor, regulatory agencies,  suppliers, etc.  Staffing Plan  All requests for services and staffing assignments are coordinated through our central dispatch. Our dispatch,  accounting and laboratory results are compiled into the same database allowing for accurate scheduling and  billing. At the beginning of each project, we meet with the contractor, project manager and City to review all  project documents and the project schedule. Based on the schedule we can anticipate the need for testing and  inspection in advance. However, throughout the course of construction, the schedule often changes, with activities  being moved up or postponed. To keep track of any changes, our assigned project manager will follow up with the  City’s designated project manager and the contractor to determine if any changes to the schedule have been made  so that we may change our staffing plan to accommodate.            Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    In addition, we have assigned a back‐up technician/inspector to provide services if one of our designated  inspectors is unavailable due to unforeseen circumstances.    Ensuring Contract Requirements  MTGL is very aware of the requirements for project certification and closeout. Our role during construction will  incorporate daily review of the technicians and inspection activities to define areas that may need to be re‐tested.  In some cases, an RFI is issued to the architect for approval. Our corporate policy is to work with the associated  subcontractor to rectify the failing areas rapidly as to not interfere with the critical path of construction.    In the event the item is not cleared up by means of a re‐test or an RFI response within the first 72 hours, a  deficiency log will be created and circulated with each week’s reports until resolved. Our communications at this  point will be with the assigned Inspector who will aide in the required corrective actions with the general  contractor. We collect verified reports at the completion of each stage of construction while the work at hand is  within a short time of the inspector’s assigned duties. The project will ultimately end with an affidavit that all  materials and soil has met the approved project documents for certification.   Deficiency Log  MTGL will proactively work with all involved parties to ensure that all construction and materials conform to the  project plans and specifications. Any deficiency found will be immediately brought to the City’s Representative,  Construction Manager, the Contractor and if applicable, the sub‐contractor involved. If the deficiency is not  resolved within 72 hours, we will distribute a deficiency log to all parties involved. We will proactively work with  the party responsible for the deficiency to ensure that it is resolved.    Scheduling  MTGL DISPATCH:  800.491.2990   All requests for Materials Technicians, geotechnical staff, field technicians, and inspectors will be filled by the  following business day if notification is received by 3:00 PM the prior business day. MTGL understands that  projects may require last minute requests for testing and inspections. Should a last‐minute request be received,  MTGL will assign the next available technician, often the same business day.   Test Delivery Timeline  MTGL strives to provide test results in a timely manner. Final reports for typical tests are provided within seven  (7) calendar days. If requested, preliminary verbal results can be provided within one business day. In the event of  sample yields abnormal results or fails a test, we provide verbal notification within two (2) hours, with the final  written report delivered within 24 to 48 hours. After a failed test, we fast‐track reporting of subsequent re‐tests  and provide a final report within three (3) to four (4) calendar days, or sooner per client request. We monitor re‐ testing of any failed tests to assist the client in regaining costs for inspection of failing tests from the Contractor  and Subcontractors.  Invoicing/Accounting  MTGL can submit invoices to the City on a weekly/monthly basis that will itemize each task performed, the number  of hours worked per person/consultant, the rate per hour for each person/consultant, total contract amount,  percent complete for specified work items, and the remaining contract amount, along with labor compliance  reports. Billing is done on a weekly basis along with labor compliance reports. Daily reports are sent with each  billing as backup to our invoicing.   Project Closure  MTGL senior staff will review past and outstanding invoices. Invoices requiring clarification or closure will be  discussed with the project team members. When all technical and fiscal matters are resolved, the project will be  closed.     Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    SCOPE OF WORK  MTGL’s Scope of Work as follows, but are not limited to:  Grading Observation and Testing  The first responsibility will be to review the soil report utilized for the design and issue a DSA Form 109 for change  in Geotechnical Engineer responsibility. Our services will consist of rough grading operations, performing soils  tests, and submittal of a soil grading report. Our representative will observe rough grading operations on a full‐ time basis. Water content, in place density (compaction), maximum density and optimum moisture, expansion  index and soluble sulfate test will be performed at a frequency and at locations selected by the soils engineer. Our  laboratory can perform other soils test, if required at an additional charge. During the courses of construction, we  will notify the owner in writing, with a copy to the contractor, if at any time our opinion, the work is not in  conformity to the plans and specifications. Upon completion of the work we will prepare a final soil report for the  owner with relative to maximum density, and the plotting of all tests. The final report will contain the conformance  of the completed rough grading to the intent of the plans, soil engineering reports, and specifications. Technicians  are trained and certified under the written policies set forth by American Society of Civil Engineers, and California  Geological Survey.   Compaction Testing of On‐Site Improvements and Trench Backfill  Our services will consist of compaction testing of the utility trench backfills and paved areas on site and within the  street right of way. MTGL’s services would consist of performing in place density test by the sand cone method  (ASTM D1556) and nuclear gauge method (ASTM D2922), water content test, and maximum density optimum  moisture test per ASTM D1557 at locations selected by our representative. Compaction by the contractor which  has not been performed under observation would not be accepted for conformance to plan and specification.     Trench backfill compaction test would be taken at locations and frequencies in accordance to guidelines provided  by the governing public agency. Test locations would be selected by our reprehensive at locations on a random  basis. Test locations on main trenches would be spaced no more than 300 linear feet apart and 20% of the lateral  trenches would be tested. Compaction test would be taken at each lift with a log of maximum to relative density.  If the backfill material contains too much oversize materials, (larger than 3‐inches) it may be permitted to place  larger material in the deeper fill areas. Sub‐grade compaction test of hardscape, and paved areas on site. Test  locations will be selected by our technician at locations that reprehensive the surface appearance of the sub grade  at the time of testing. Test locations will be spaced no more than 500 linear feet apart. A written report  summarizing the results of all test performed will be prepared upon completion of the work. The report will not  contain a rendering, opinion, certificate, or warranty of the compaction of the materials tested.  Asphaltic Concrete Lay Down Inspection  Our services will consist of inspection of the asphaltic concrete lay down and quality control during the lay down  operation for conformance to the job specification. The lay down inspection will consist of monitoring the  temperature and rolling procedure for the in‐place density of asphaltic concrete by nuclear method. The quality  control will consist of asphaltic concrete maximum density testing for conformance to the job specification. A  written report will be provided at the completion of the work.  Our services will also include laboratory testing of  aggregate base and asphaltic concrete. Services will include Hveem stabilometer, sieve analysis, sand equivalents,  and R‐Value testing of aggregate base. Test will be performed on materials sampled at random locations and at  frequencies based on project specifications. Testing requirements for Oil Content of asphalt can be met with our  Rapid Ignition Oven providing real time results to batch plants supplying asphalt.  Concrete Inspection and Testing   Our Services will consist of inspection of concrete, on a continuous basis during the placing of concrete, for  conformance to approved plans, specifications, and building codes. During placement of the concrete the  inspector will fabricate 4 compression test specimens for each 50 cubic yards of concrete placed.    Test cylinders will be cured in our laboratory until they are tested in accordance to ASTM C192. Compression test  would be performed in accordance to ASTM C39 at 7 and 28 days, respectively. Copies of the results of all  compression tests will be provided upon completion of the test.  Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    Concrete Mix Design Review  Our engineer would review the mix designs submitted by the contractor and the results of the test performed on  the aggregates. The results of our aggregate testing and mix design review would be reported upon the completion  of the work to the designated representative of the owner and contractor.   Asphaltic Concrete Lay Down Inspection  Geotechnical Reports: MTGL understands that often the project cannot proceed without the Geotechnical Report  or test data. Therefore, all services and results are provided as quickly as possible. Typically, Geotechnical Reports  are available within three (3) weeks of drilling, or four (4) week from notice to proceed. If needed initial soils results  can be made available within two (2) days of drilling. Should the Geotechnical Investigation fall behind schedule,  MTGL, at no additional charge to the City, will allocate additional resources and work outside of normal business  hours to ensure completion of the project within schedule.      Laboratory Tests: MTGL strives to provide test results in a timely manner. Final reports for typical tests are  provided within seven (7) calendar days. If requested, preliminary verbal results can be provided within one  business day. In the event of a sample yields abnormal results or fails a test, we provide verbal notification within  two (2) hours with the final report delivered within 24 to 48 hours. After a field test, we fast‐track reporting of  subsequent re‐tests and provide a final report within three (3) to four (4) business days or sooner per the City  request.    Masonry Inspection and Testing  Our services will consist of inspection of masonry construction, on a continuous basis during the construction of  masonry where special inspection is required. The inspector/technician will observe the placement of block,  reinforcement placement, the mixing and placement of mortar and grout.  Our inspector/technician shall fabricate  test specimens for mortar and grout in accordance to the approved specifications. The mortar and grout test  specimens will be tested in our laboratory and a written report presenting the applicable information will be  provided. Test core drilled samples will also be obtained, if required, and tested in our laboratory for compression  and shear. Our inspector/technician will also verify size, type, location, and condition of all dowels, anchors, and  reinforcements used during masonry construction. Post installed anchors will be inspected and tested to verify  conformance with the project specifications. Written reports of all inspections and testing presenting applicable  information would be prepared at the completion of inspection and testing.  Structural Steel   Our scope of work will include verifying structural steel materials are appropriately marked and comply with sizes,  types and grades. Copies of mill certificates will be obtained and checked for compliance with the project  specifications. Our inspector/technician will examine seam welds of structural tubes and pipes and verify member  locations, bracing, details constructed, stiffener locations, and connection tab locations. We will test any  unidentified materials in accordance with the standard test methods.  Welding Inspection  We would provide an inspector/technician that has been certified by AWS as a special inspector for welding. Our  inspector/technician work would consist of inspection of all welds made in the shop operations and/or during the  field erection for compliance of the approved plans and job specifications. Our inspector/technician shall make a  systematic record of all welds, including a list of defective welds and a manner of correction of defects. The  inspector would check the material, equipment, details of construction and procedures, as well as the welds. Our  inspector/technician would also check the ability of the welder. The inspector/technician may use gamma ray,  sonic or any other aid for visual inspection that he may deem necessary to assure the adequacy of the welding.    During the welding inspection, our inspector/technician would also inspect the installation of the high strength  bolts for conformance to the job specifications. Our inspector/technician would check the materials, equipment,  details of construction and installation procedure.    Daily reports of inspections will be provided to the owners designated representative and weekly summary reports  will be provided to the owner. A verified report that welding which has been inspected is proper and has been  done in accordance to the approved plans and specifications will be provided upon completion of the work.     Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    COST AND PRICE    CONSTRUCTION SERVICES  PROFESSIONAL SERVICES  Principal Engineer / Geologist ................. $ 125.00 Hour  Registered Civil Engineer / Geologist ...... $ 125.00 Hour  Staff Engineer / Geologist ....................... $ 95.00 Hour  Inspection / Laboratory Supervisor ........ $ 95.00 Hour  Project Manager ..................................... $ 80.00 Hour  Draftsperson ........................................... $ 70.00 Hour  Word Processing ..................................... $ 55.00 Hour  Review of files for processing affidavits and    certifications required by various    Governmental Agencies $ 95.00 Hour  Legal Consultation, Expert Witness and   Court Appearances   (Minimum 4 Hours) ............................. $ 325.00 Hour    ENVIRONMENTAL SERVICES  Certified Asbestos Consultant................. $ 85.00 Hour  Certified Asbestos Inspector ................... $ 65.00 Hour  Certified Asbestos Project Manager ....... $ 75.00 Hour  Certified Asbestos Project Designer ....... $ 75.00 Hour  Certified Site Surveillance Technician ..... $ 65.00 Hour  On‐Site 582 Certified Microscopist ......... $ 65.00 Hour  Certified Lead Inspector / Assessor ........ $ 65.00 Hour  Certified Lead Project Monitor ............... $ 65.00 Hour  Certified Industrial Hygienist .................. $ 180.00 Hour  Environmental Site Assessment    (Phase I) ............................................... $ 95.00 Hour  Environmental Site Assessment    (Phase II) .............................................. $ 95.00 Hour  Industrial Hygienist ................................. $ 100.00 Hour  (Prices based on 2 Hour Minimum &    Test Samples Additional)    PROJECT SERVICES  Special Inspection ................................... $   90.00 Hour  Batch Plant (Concrete or Asphalt) .......... $   90.00 Hour  Technician ‐ Laboratory and Field ........... $   90.00 Hour  Soils/Asphalt Technician ......................... $   90.00 Hour  M,E,P or Building Inspector $   98.00 Hour  Ultrasonic, Dye Penetrant, or Magnetic    Particle, Fabrication  Inspection .......... $   98.00 Hour  Pull‐Out Test on Embedded Bolts/   Anchors and Dowels ............................ $   98.00 Hour  Concrete, Masonry, Asphalt Coring or   Sawing ................................................. $ 160.00 Hour  Floor Flatness / Levelness     (Include Equipment) ............................ $1,200.00 day  Pick‐Up and Delivery –    Compression Testing ........................... $ 8.00 Each  Emissivity ................................................ $ 90.00 Hour  Ground Rod Test ..................................... $ 90.00 Hour              EQUIPMENT    Skidmore Bolt Cell w/ Torque Wrench ... $  65.00 Day  Skidmore‐Wilhelm Bolt Cell .................... $ 40.00 Day  Torque Wrench ....................................... $ 25.00 Day  Air Meter ................................................. $ 40.00 Day  Pachometer ............................................ $ 55.00 Day  Schmidt Hammer .................................... $ 40.00 Day  Ultrasonic Equipment ............................. $ 50.00 Day  Magnetic Particle Equipment ................. $ 50.00 Day  Dye Penetrant Equipment ...................... $ 40.00 Day  Jacking Assembly .................................... $ 60.00 Day  Nuclear Density Gauge ........................... $ 70.00 Day  Mobile Soils Laboratory .......................... $ 50.00 Day  Coring Equipment ................................... $ 100.00 Day  Emissivity Test Kit ................................... $ 40.00 Each  Ground Rod Equipment .......................... $ 40.00 Day    TESTING MACHINES  Testing Machine with Operator in Laboratory   0 ‐ 60,000 Pound Machine     . (Universal) .......................................... $ 155.00 Hour   800,000 Pound Machine     . (Universal) .......................................... $ 250.00 Hour    CONCRETE  STRENGTH CHARACTERISTICS  A.S.T.M.  C39 Concrete Cylinders (6” x 12”)       (4” x 8”), W/ Mold ............ $ 24.00 Each  C495 Lightweight Fill Concrete      (3” x 6”) ............................. $ 24.00 Each  C39 Concrete or Gunite Cores, 6" Maximum       Diameter, Including Trim .. $ 40.00 Each  C496 Splitting Tensile .................... $ 65.00 Each  C78 6” x 6” Beams, Modulus of       Rupture ............................. $ 65.00 Each    Handling Charge, Cylinders      Not Broken/Hold .............. $ 10.00 Each    Handling Charge, Beams      Not Broken/Hold .............. $ 40.00 Each  C469 Modulus of Elasticity ............ $ 125.00 Each    MIX DESIGN  A.S.T.M.  C192 Laboratory Trial Batch with Slump,      and 6 Cylinders, Unit Weight, Air      (Sampling Extra) ................ $ 350.00 Per Pt    Mix Design, Determination of      Proportions ....................... $ 175.00 Each    Review of Existing Mix       Design ............................... $ 225.00 Each                Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    MISCELLANEOUS TESTING   C567 Unit Weight of Hardened Light      Weight Concrete ............... $ 50.00 Each  C684 Rapid Cure Concrete Cylinders      (Boil Method) .................... $ 40.00 Each  C157 Drying Shrinkage (3 Bars ‐ Four    Readings, up to 90 Days) ...... $ 250.00 Set  C495 Lightweight Fill Concrete       Density .............................. $ 40.00 Each    MASONRY  STRENGTH CHARACTERISTICS    Mortar Cylinders (2” x 4”)       w/ mold ............................. $ 24.00 Each  C109 Mortar Cubes (2” x 2”)       w/ mold ............................. $ 24.00 Each  C1019 Grout (3” x 6”) ...................... $ 24.00 Each    Handling Charge, Mortar or      Grout Not Broken/Hold .... $ 10.00 Each  C140 Block Compression       8” x 8” x 16” ................... $ 45.00 Each  C140 Block Compression      > 8” x 8” x 16” ................... $ 55.00 Each  C1314 Grouted Masonry Prism Compression       Test  8” x 8” x 16” ........... $ 90.00 Each  C1314 Grouted Masonry Prism Compression       Test > 8” x 8” x 16” ........... Quotation    Handling Charge, Grouted Prisms      Not Broken/Hold ............... $ 75.00 Each    BLOCK  A.S.T.M.  C140 Moisture Content and       Absorption ........................ $ 60.00 Each  C140 Measurements ..................... $ 35.00 Each  C67 Masonry Efflorescence ......... $ 45.00 Each  C426 Linear Shrinkage      (CMA Method) .................. $ 125.00 Each    Rapid Linear Shrinkage      (British Modified Method)$ 100.00 Each    Block Conformance       Package .............................         Quotation  C952 Bond Strength ...................... $ 50.00 Each  UBC 21.6 Masonry Core –       Compression ..................... $ 40.00 Each  UBC 21.6 Masonry Core ‐ Shear ........... $ 65.00 Each    BRICK  A.S.T.M.  C67 Compression ........................ $ 40.00 Each  C67 Modulus of Rupture  ............ $ 40.00 Each  C67 Absorption, Soak  ................. $ 30.00 Each  C67 Absorption, Boil  ................... $ 30.00 Each  C67 Absorption, Saturation       Coefficient ......................... $ 40.00 Each  C67 Initial Rate of Absorption ..... $ 40.00 Each  C67 Efflorescence  ....................... $ 50.00 Each  C67 Efflorescence with Mortar ... $ 65.00 Each        STEEL  REINFORCEMENT  A.S.T.M.  A615/706 Tensile No. 11 Bar and       Smaller .............................. $ 45.00 Each  A615/706 Tensile No. 14 ....................... $ 100.00 Each  A615/706 Tensile No. 18……………. ........ $ 175.00 Each    Mech. Splice Tensile       Up to No. 11...................... $ 100.00 Each    Mech. Splice No. 14…… ........ $ 150.00 Each    Mech. Splice No. 18…… ........ $ 300.00 Each    Mech. Splice w/Slip……. ....... $ 250.00 Each  A615/706 Bend Test No. 11 Bar and      Smaller .............................. $ 35.00 Each  A615/706 Bend Test No. 14………. ......... $   50.00 Each  A615/706  Bend Test No. 18…………$ 100.00 Each    Processing Mill Certificates      (Per Size and Heat) ........... $ 20.00 Each    STRUCTURAL STEEL  A.S.T.M.  A370 Tensile Strength    Up to 100,000 lbs. ................ $ 75.00 Each    100,000 to 200,000 lbs. ........ $ 90.00 Each    Bend Test ............................. $ 35.00 Each    Pipe Flattening Test.............. $ 50.00 Each    Bolt Tensile Test ................... $ 45.00 Each    Bolt Proof Test ..................... $ 35.00 Each    Nut Proof Test ...................... $ 30.00 Each    Nelson Stud Tensile Test ...... $ 45.00 Each    Machining and Preparation      of Samples ........................ $ 35.00 Each    Brinell & Rockwell Hardness      Test ................................... $ 35.00 Each    Processing Mill Certificates      (Per Size and Heat) ........... $ 25.00 Each    Chemical Analysis ................. $ 75.00 Each    PRESTRESS  A.S.T.M.  A416 Prestress Cable, 7 Wire      (Yield/Tensile) ................... $ 150.00 Each  A416 Prestress Wire       (Yield/Tensile) ................... $ 140.00 Each    Sample Preparation ............. $   45.00 Hour    WELD PROCEDURE AND WELDER QUALIFICATIONS    Welder Certification (AWS)$ 75.00 Hour    STRUCTURAL STEEL COUPON    Weld Tensile Test ................. $ 50.00 Each    Weld Bend Test .................... $ 40.00 Each    Weld‐Macro Etch ................. $ 75.00 Each    Machining and Preparation      of Samples ........................ $ 35.00 Each    FIREPROOFING  UBC 7‐6 Unit Weight .......................... $ 35.00 Each  ASTM‐736 Adhesion/Cohesion .............. $ 45.00 Each      Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    ROOFING    Unit Weight .......................... $ 55.00 Each    Roof Cut Analysis………… ....... $ 500.00 Each  UBC 15‐5 Tile (Breaking Strength/Abs$ 75.00 Each    Mineral Shake ‐ Flexural ....... $ 60.00 Each    Mineral Shake ‐ Absorption$ 60.00 Each    SOIL AND AGGREGATE  CLASSIFICATION  A.S.T.M.  C136 Sieve Analysis ( Coarse) ........ $ 90.00 Each  C136 Sieve Analysis ( Fine) ............ $ 90.00 Each  C117 Sieve Analysis       (Fine, Washed) ............. $   95.00 Each  D1140 #200 Wash ...................... $   50.00 Each  C117 Sieve Analysis –          Combined ..................... $ 105.00 Each  D422/C136 Hydrometer with Sieve      Analysis ........................ $ 175.00 Each  D4318 Liquid and Plastic Limit ... $ 115.00 Each  CAL TM 217 Sand Equivalent       (Set of Three) ............... $ 80.00 Set  D2419  CAL TM 227 Cleanness Value .............. $ 230.00 Each  D2974 Organic Content……. ....... $ 75.00 Each    PHYSICAL CHARACTERISTICS  A.S.T.M.  C127 Specific Gravity and Absorption      (Fine) ............................ $ 125.00 Each  C128  Specific Gravity and Absorption      ( Coarse) ....................... $ 100.00 Each  C127 Specific Gravity       (Coarse)........................ $ 70.00 Each  C128/D854 Specific Gravity ( Fine)..... $ 70.00 Each  D2216 Moisture Content ............ $ 25.00 Each  D3080 Direct Shear Quick       Undisturbed ................. $ 150.00 Each      Direct Shear Slow         Undisturbed .................  Quotation  D3080 Direct Shear Quick       Remolded .................... $ 200.00 Each    Direct Shear Slow       Remolded ....................  Quotation  D2166 Unconfined       Compression ................ $   75.00 Each  D2435 Consolidation –       Time Rate ..................... $ 275.00 Each  D2435 Consolidation –       Without Time Rate ...... $ 225.00 Each  UBC 18‐2 Expansion Index .............. $ 125.00 Each  D4829  D2434 Permeability –       Undisturbed ................. $ 225.00 Each  D2434  Permeability –         Remolded .................... $ 250.00 Each            SUBGRADE SUPPORT QUALITY  A.S.T.M.  D1883 Bearing Ratio w/o M. D. Curve ‐      Per Point ...................... $ 125.00 Each  CAL TM 301  R‐Value (3 Points) .............. $ 225.00 Each  D2844  Lime, Cement or Bituminous Treatment available upon  request.    DENSITY CHARACTERISTICS  A.S.T.M.  D2937 Moisture / Density       (Ring) ........................... $ 25.00 Each  D1557‐A,B Maximum Density ........... $ 180.00 Each  D1557‐C Maximum Density ........... $ 180.00 Each  D698‐A,B Maximum Density ........... $ 180.00 Each  D698‐C Maximum Density ........... $ 180.00 Each    Check Point       (Maximum Density) ..... $   75.00 Each  C29 Unit Weight ‐ Loose ........ $   50.00 Each  C29 Unit Weight ‐ Rodded ..... $   75.00 Each  CAL TM 216 Maximum Density ........... $ 175.00 Each    Rock Correction………. ..... $ 75.00 Each    CHEMICAL PROPERTIES  CAL TMs  532/643 Resistivity ........................ $ 75.00 Each  532/643 pH .................................... $ 45.00 Each  CAL TM 417 Sulphate .......................... $ 55.00 Each  CAL TM 422 Chloride ........................... $ 55.00 Each    Corrosivity Series ............ $ 165.00 Each    Chemical Analysis ............ $ 75.00 Each    AGGREGATE PROPERTIES  A.S.T.M.  C131 LA Abrasion ..................... $ 150.00 Each  C535 LA Abrasion ..................... $ 175.00 Each  C88 Soundness ....................... $ 300.00 Each  C40 Organic Impurities .......... $ 75.00 Each  C142 Clay Lumps / Friable       Particles ....................... $ 100.00 Each  C123 Lt. Wt. Particles ............... $ 100.00 Each    Percent Elongation/Flats$175.00 Each  CAL TM 205 Percent Crushed .............. $ 150.00 Each  CAL TM 229 Durability ........................ $ 150.00 Each    ASPHALT CONCRETE  GENERAL TESTING  A.S.T.M.  D2172 Bitumen Content ............. $ 125.00 Each  D5444 Gradation of Extracted       Sample ......................... $ 90.00 Each  D1188 Unit Weight ‐ Molded       Specimen or Cores ....... $ 75.00 Each  D2041 Theoretical Maximum       Density ......................... $ 125.00 Each  CAL TM 304 Compacted Maximum   D1560/61  Density ‐ HVEEM .......... $ 150.00 Each  D6926 Compacted Maximum Density ‐      MARSHALL ................... $ 175.00 Each    Stripping .......................... $ 100.00 Each  Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    MIX DESIGN / CONTROL  A.S.T.M.  CAL TM 336 Mix Design ‐ HVEEM including  D1560/61 Aggregate Tests –       Per Design .................... $2,250.00  Each  D6926/27 Mix Design ‐ MARSHALL including      Aggregate Tests –       Per Design .................... $2,500.00  Each  CAL TM 336 Field Mix ‐ HVEEM  D1560/61  Stability Per Point ........ $   175.00  Each  D6926 Field Mix ‐ MARSHALL      Stability Per Point ........ $   200.00  Each                                              BASIS OF CHARGES  1. Services will be provided hourly as required with a half day  minimum.   2. Time and one‐half will be charged for any personnel services  from 4:00 PM – 6:30 AM and more than eight (8) hours up to  and including twelve hours per day.  Double time will be  charged for over twelve hours in any one day, Saturday and  Sunday. Holidays are New Year’s Day, Memorial Day, July 4th,  Labor Day, Veteran's Day, Thanksgiving Day and the Friday  after Thanksgiving Day, and Christmas Day and will be  assessed at triple time. High priority laboratory testing at the  Client’s request which requires unscheduled overtime is  subject to a 50% increase from the standard rates.  3. Engineering review time will be invoiced at two (2) hours per  week and weekly report distribution is one (1) hour per week.  4. There will be no charge for travel time for deputy inspection.  Services requiring specialized equipment or radiation will be  invoiced portal to portal. Combination of services will be billed  at the applicable higher hourly rate for the day.  5. Reimbursable expenses such as parking, air fare, car rental,  food and lodging will be charged at cost plus 15%, unless  provided.  Subsistence on remote jobs by quotation, unless  provided.  6. Outside services performed by others and direct costs  expended on the Client’s behalf are charged at cost plus 20%,  unless otherwise noted.  7. Certified Payrolls are supplied upon request at $75.00 per pay  period.  8. There will be a minimum project set‐up fee of $250 for  obtaining plans, specifications, accounting/distribution  information and filing of preliminary liens. Invoicing is  performed on a monthly basis.  Past due account will  accumulate interest charges at the rate of 1% per month.  9. Prices are based on current prevailing wage rates through July  1, 2019 at which time the hourly rates will increase $3.00 Per  Hour to compensate for mandatory increases as set forth by  DIR.       NON-COLLUSION AFFIDAVIT FORM Must be executed by proposer and submitted with the proposal I, __________________________________ (name) hereby declare as follows: I am ______________________________ of _________________________, (Title) (Company) the party making the foregoing proposal, that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the proposal is genuine and not collusive or sham; that the proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal, and has not directly or indirectly colluded, conspired, connived, or agreed with any proposer or anyone else to put in a sham proposal, or that anyone shall refrain from proposing; that the proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the proposer or any other proposer, or to fix any overhead, profit, or cost element of the proposal price, or of that of any other proposer, or to secure any advantage against the public body awarding the agreement of anyone interested in the proposed agreement; that tall statements contained in the proposal are true; and, further, that the proposer has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative hereto, or paid, and will not pay, any fee to any corporation, partnership, company, association, organization, proposal depository, or to any member or agent thereof to effectuate a collusive or sham proposal. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Proposer Signature: _______________________________________ Proposer Name: _______________________________________ Proposer Title: ______________________________________ Company Name: _______________________________________ Address: _______________________________________ ^ƚĞǀĞŶ<ŽĐŚ ^ĞŶŝŽƌsŝĐĞWƌĞƐŝĚĞŶƚ Dd'>͕/ŶĐ͘ ^ƚĞǀĞŶ<ŽĐŚ ^ĞŶŝŽƌsŝĐĞWƌĞƐŝĚĞŶƚ Dd'>͕/ŶĐ͘ ϭϰϰϲϳDĞƌŝĚŝĂŶWĂƌŬǁĂLJ͕ƵŝůĚŝŶŐϮ͕ZŝǀĞƌƐŝĚĞ͕ĂůŝĨŽƌŶŝĂϵϮϱϭϴ under the laws of the ______________________________________________________________________________________________________________________________________________________________________________________________________________ Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    APPENDIX – INSURANCE ACKNOWLEGEMENT    We have carefully reviewed the RFP – Exhibit E – Insurance Requirements, and fully understand its intents. MTGL  maintains a $10 Million insurance policy. We fully comply with all provisions of all applicable workers’  compensation insurance laws and will procure and maintain in full force and effect workers’ compensation  insurance covering its partners, employees and agents while said persons are performing services pursuant to the  Agreement. If selected awarded, we will provide certificate of insurance to the City of La Quinta as evidence of the  insurance coverage required herein, along with a waiver of subrogation endorsement for worker’ compensation.        Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    APPENDIX – CONTRACT EXCEPTIONS    We have carefully reviewed all the contents in the RFP – Attachment 1 – City of La Quinta Draft Agreement for  Contract Services, and fully understand its intent. We are willing to enter into an agreement under the terms and  conditions for the City of La Quinta Agreement for Contract Services without exceptions.       Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    BRUCE A. HICK, P.E., G.E.    PRINCIPAL/GEOTECHNICAL ENGINEER AND PROJECT MANAGER    MTGL’S YEARS 3  EDUCATION    B.S. Civil Engineering, University of Cincinnati, Cincinnati, OH  M.S. Civil Engineering (Geotechnical Engineering), University of Cincinnati, Cincinnati, OH  CERTIFICATIONS /  REGISTRATIONS  State of California Registered Civil Engineer, CE #45784  State of California Registered Geotechnical Engineer, GE #2284  PROFESSIONAL  SUMMARY    Bruce A. Hick has over 31+ years of experience as a Geotechnical Engineer providing services  across the entire spectrum of Geotechnical Engineering. He has managed geotechnical  engineering and earthwork operations for a variety of projects. His extensive experience and  wide knowledge base include geotechnical investigations, specialty pile design, seismic  hazard mitigation, resource evaluation and characterization, slope stability analysis,  settlement analysis, seepage analysis, performance testing, post construction stability  analysis, distress mapping and characterization. His geotechnical construction experience  includes specification review and augmentation, earthwork related remediation, deep pile  inspection, CIDH inspection, observation of ground improvement construction, and  regulatory agency compliance.     He will be the  Principal and Geotechnical Engineer, will be responsible and overseeing:   He will be the primary main contact for all the technical questions for this contract.    Participate in pre‐construction meetings, field meetings, and construction progress  meetings, acceptance of work, final walk‐through meetings, as built plan completion  meetings, equal opportunity meetings and other administrative meetings as necessary.   Work closely, coordinate and communicate with the City Representatives related for  this awarded project.    Coordinate of overall MTGL team activities to ensure and verify the implementation of  the plan and safety.   He will be overseeing all technical and/or testing issues.    Responsible for to supervise and for management of all materials testing services as  required.   Responsible for the full‐time supervision and direction of the materials testing  laboratories.   Provide for any project related recommendations.   Review all laboratory testing procedures, test results, and daily reports prior to  distribution.    He is the authority signatory for all the reports and to provide all final reports  performed to the City.  PROJECT  EXPERIENCE     City of Riverside Harvey Lynn Substation Geotechnical Investigation  He provided a geotechnical investigation and report which addresses the geotechnical  conditions including a description of the site conditions, results of field exploration and  laboratory testing, and conclusions and recommendation.    City of Menifee – Slurry Seal Testing Project  He provided final report which addresses the field sampling and placement inspection, and  findings results.         Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    CHRISTOPHER “RICK” BUNKER    SPECIAL INSPECTOR / FIELD TECHNICIAN    MTGL’S YEARS 8  CERTIFICATIONS     DSA (Masonry #5461, Shotcrete #5952); ICC #1091733 (Soil, Reinforced Concrete, Prestressed  Concrete, Structural Masonry, Spray‐applied Fireproofing, Commercial Building); ACI  #00040566 (Grade I, Adhesive Anchor Installation); Caltrans Certified (CT 504, 518, 539, 540,  543, 556, 557); CPN Nuclear Gauge Safety    PROFESSIONAL  SUMMARY    Christopher Bunker has 15+ years of experience as a Special Inspector and Field Technician in  the construction industry. He is certified with ICC, ACI, DSA, Caltrans and Nuclear Gauge Safety.  He has an extensive working on public and private sectors projects ranging from small to large  facilities such in airports, municipalities, agencies, highways, school districts, hospitals and  commercials. He has knowledge in the governing building code, all applicable standard codes  and regulations as well as in compliance of DSA Title 24 compliance with construction  documents. He has an excellent documentation skills and communication.     Christopher is experienced in multiple aspects of performing mechanical, electrical, and  plumbing (MEP), roofing, shear wall diaphragm inspection as the Assistant Building Inspector  for the California State University, San Bernardino – Student Housing and Dining Project from  February 2017 through May 2018; and provided many services for Proposition 39 – Solar  Projects for school construction included caissons and piers which are similar foundation to  this project.     Due to his vast certifications, he provides consistency in section, communication while  observing multiple trades concurrently. He has been in essential part of project closeout  assuming “Red Lines” are maintained for the “As‐Built” during construction. He is a proven  material tester and pull tester on rebar, all threaded anchors and miscellaneous items that  require tensile testing, and additionally he is qualified for material sampling which include  soils, concrete, rebar, concrete block and other miscellaneous items.     PROJECT  EXPERIENCE      Los Angeles Community College District – East Los Angeles College; Monterey Park, CA   California State University, San Bernardino – Student Housing and Dining   University of California, Riverside – Commons and Physical Science Building; Riverside, CA   Southern California Edison (SCE) Various Projects   Lugo Substation   Covina Service Center, San Dimas   Devers Tenant Improvements   Red Bluff Desert Center   Substation Colorado River Phase 2   Substation Red Bluff   Valley Substation, Menifee   Vista Tenant Improvements   Riverside Downtown Station Operations   SBCTA Metrolink Active Transportation   California Air Resource Board; Riverside, CA   Bogert Trail Bridge Rehabilitation; Palm Springs, CA   OCTA Goldenwest Trans Center; Huntington Beach, CA   OCTA UST Tank Removal; Garden Grove, CA   Ben Clark Training Center; Riverside County, CA     John Wayne Airport Central Plant; Costa Mesa, CA    March Air Force Base Apron and Paving; Moreno Valley, CA   Edwards Air Force Base Runway Project; Edward Air Force Base   Blast Fence Ramp Rehabilitation at San Bernardino International Airport; San Bernardino   Chiriaco Summit Airport Exit Project; Indio, CA   Airport Fire Station #5; Riverside, CA   Azusa Intermodal Parking Facility; Azusa, CA  Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental    RALPH WILLIAMS    FIELD TECHNICIAN    MTGL’S YEARS 15  CERTIFICATIONS  ICC (Soils); ACI (Concrete Field‐Testing Technician Grade 1); Caltrans (CT 125AGG,  125HMA, 125PCC, 231, 375); Nuclear Gauge Safety    PROFESSIONAL  SUMMARY  Ralph Williams has over 13 years of experience as a Special Inspector and Field  Technician in the construction industry. He has extensive experience in all facets of  construction for various Caltrans projects, water reclamation plants, substations,  schools, industrial complexes, residential and office buildings.     His unique experience gives him a deep understanding of the construction process from  beginning to project completion; and the ability to work with numerous contractors,  sub‐contractors and client representatives. He understands City requirements  construction task and activity and he is capable to use this perspective to be the client’s  “eyes and ears” on the project.      PROJECT  EXPERIENCE    City of Menifee CIP 18‐08 Adams Avenue Street Improvements   City of Moreno Valley Street Improvement Program   City of Chino Fire Station #1 Asbestos and Training Center   City of Chino Fire Station No. 7    City of Brea Glenbrook Tract Waterline Improvement and Rehabilitation   City of Orange Streets Improvements 2012‐2013   City of Villa Park Sewer Rehabilitation   Pechanga Casino Hotel and Parking Structure; Temecula, CA   MTA Southwestern Yard    MTA Mid Coast Corridor North   I‐215 Central Widening – Scott Road and Nuevo Road   Caltrans District 07‐306204 Route 91 Rehabilitation Long Beach to Orange County   Twentynine Palms Air Grand Combat Center Private Wall Project   Aqua Mansa Street Improvement and Widening Phase 1   Bogart  Trail Bridge Rehabilitation   Azusa Intermodal Parking Facility   Covina Transit Center Park and Ride   Southern California Edison (SCE) Various Projects  • Lugo Substation  • Covina Service Center, San Dimas  • Devers Tenant Improvements  • Red Bluff Desert Center  • Substation Colorado River Phase 2  • Substation Red Bluff  • Valley Substation, Menifee  • Vista Tenant Improvements   Riverside Cemetery Expand Maintenance Yard/Storage   Riverside Downtown Station Operations   Riverside National Cemetery Columbarium Expansion   Riverside National Cemetery Phase 5   Riverside Regional Medical Center Education Building   Riverside Regional Water Quality   California Air Resource Board, Riverside   Coachella Valley Water District Dike 4 Pump Station   Coachella Valley Water District Drainage Relocation at Mecca Boys & Girls   Cycle 1 Citywide Pavement    Earth Work Observation 6th and Hermosa Avenue  Fontana F14 and F21 Water Plant, Fontana   South Bay Int'l Wastewater Treatment   Blythe Substation; Blythe, CA   Westside Roadway and Drainage; Victorville, CA   Vintage at Snowberry; Riverside, CA   Moreno Valley High School Gymnasium; Moreno Valley, CA    Geotechnical Engineering | Construction Inspection | Materials Testing | Environmental