Loading...
HR GreenSUBMITTED BY 1260 Corona Pointe Court | Suite 305 Corona, CA 92879 Direct 855.900.4742 gwentz@hrgreen.com JUNE 13, 2019 ONCALL ENGINEERING PLAN CHECK SERVICES June 13, 2019 Bryan McKinney, PE City Engineer City of La Quinta 78-495 Calle Tampico La Quinta, CA 92253 Re: On-Call Engineering Plan Check Services Dear Mr. McKinney, Since 2013 HR Green Pacific, Inc. has provided on-call engineering plan check services to the City of La Quinta. When we started working with the City 6 years ago, TRAKiT was primarily used by the City as a tracking software, but throughout our partnership we have expanded our utilization of the software to include plan mark-ups and corrections. We are proud of the relationship we have built with the La Quinta and look forward to the opportunity to continue our partnership with the City. Throughout our tenure the City and HR Green have shared a seemless, complimentary approach to plan check services. If chosen, we will continue to offer technical expertise and best management practices to ensure that the review of residential improvements, commercial developments, and infrastructure improvements are in accordance with applicable standards and requirements. Our Differentiators / Why We Are Best Suited to Deliver These Services: Z Continuity by assigning same staff who have delivered La Quinta’s plan check services (past 6 years) Z For La Quinta have reviewed 90+ plan check projects (past 6 years) and coordinated with developers’ engineers to monitor that applicable City, Caltrans, CVWD and regulatory agency standards and requirements are met Z Proficiency using City of La Quinta’s TRAKiT system and Bluebeam Revu software interface Z Staff have supported 30+ California agencies providing plan and map check services Z Riverside County-based staff ensures rapid response Z Successful track record consistently meeting or beating turnaround review schedules, including expedited requests Z Exclusively serve public agencies / No conflict of interest HR Green’s Authorized Official: George Wentz, PE | Vice President | HR Green Pacific, Inc. gwentz@hrgreen.com | Office: 855.900.4742 This proposal is valid for 180 days. Sincerely, HR GREEN PACIFIC, INC George A. Wentz, PE Vice President ZHRGREEN.COMZ1260 Corona Pointe Court | Suite 305 | Corona, CA 92879 Main 855.900.4742 + Fax 855.641.5877 Cover Letter.........................................Precedes This Page Qualifications....................................................................1 Related Experience.......................................................2 References....................................................................1 Proposed Staffing and Project Organization.....................3 Work Plan / Technical Approach........................................4 Cost and Price...................................................................9 Appendices........................................................................i Non Collusion Affidavit.......................................................i Insurance Acknowledgement............................................ii Staff Resumes..................................................................vii Contract Exceptions...........................................................x TABLE OF CONTENTS On-Call Engineering Plan Check Services Z City of La Quinta PAGE 1 Qualifications Founded in 1913, HR Green, Inc. ranks among ENR’s Top 500 Design Firms and Top 100 Construction Management Firms in the United States. The firm is a corporation with 500+ employees and 16 offices throughout the United States. HR Green Pacific, Inc., our California operation, is headquartered in Corona. We have 70+ staff assigned in Southern California, many of whom have a broad range of public works, engineering, and construction expertise delivering complex, high-profile projects, such as plan reviews, major linear projects, downtown revitalization, and citywide infrastructure improvements. Our office is open Monday through Friday 8AM - 5PM. HR Green Pacific, Inc. has never been involved in any bankrupcy, litigation, or mergers and is not anticipating any office closures. We exclusively serve public agencies, so there is no conflict of interest. Qualifications, Related Experience, and References Since 2013, HR Green has provided the City of La Quinta with continuous, as-needed plan check services for land development projects involving coordination with CVWD requirements. Over the course of our partnership, HR Green has assisted the City in expanding the use of TRAKiT software, and reviewed the design of retention basins and water quality and air quality management plans for The Trilogy (500+ acres). For the high profile project, Silver Rock Resort, HR Green staff was responsible for providing plan check, preparing Requests for Proposals for design professionals and construction management services, marketing, and golf course operations. Our staff participated in the project development team weekly meetings, sat on the consultant selection committee, negotiated professional service contracts, and maintained the projects implementation schedule and facilitated the award of it’s first golf course construction contract. The construction bid for the grading contract came in approximately 18% under the engineer’s estimate. OUR LA QUINTA EXPERINCE References Agency Duration Name title Contact City of Victorville 2015 - Ongoing Brian Gengler City Engineer 760.955.5000 City of Jurupa Valley 2011 - Ongoing Gary Thompson Former City Manager 949.433.3253 City of Moreno Valley 2014 - Ongoing Michael Lloyd Engineering Division Manager / Assistant City Engineer 951.413.3146 City of Lancaster 2016 - Ongoing Marissa Diaz, PE Capital Program Manager 661.945.6869 Imperial County 2014 - Ongoing Carlos Yee Assistant Director of Public Works 760.391.4018 City of Menifee 2018 - Ongoing Jonathan Smith, PE Director of Public Works 951.672.6777 City of Anaheim 2013 - Ongoing Rudi Emami, PE Director of Public Works 714.765.5156 City of Pomona 2014 - Ongoing Matt Pilarz Senior Engineer 909.602.3652 City of Placentia 2012 - Ongoing Masoud Sepahi, PE City Engineer 714.993.8148 County of Orange 2013 - Ongoing Bea Bea Jimenez Division Manager 714.667.8852 On-Call Engineering Plan Check Services Z City of La Quinta PAGE 2 City of Victorville HR Green currently provides on-call civil plan and map check services for land development projects, including Parcel Maps, Final Tract Maps, Street Improvements Plans, Mass Grading Plans, Rough Grading Plans, Precise Grading Plans, Storm Drain Plans, Erosion Control Plans, Street Light Plans, Signing and Striping Plans, Water Plans, Sewer Plans, Recycled Water Plans, Hydrology Reports, WQMP Reports, Traffic Control Plans, Traffic Signal Plans. Plans have included grading of raw land and land development plan check. Major projects include TR17046, a 174 lot subdivision on 44 acres of raw land, and TR16894-1, a 79 lot in-fill subdivision started over 10 years ago. Other projects include the review of a hotel site and an auto dealership site which required the demolition of existing facilities. City of Jurupa Valley Since incorporation, the City has more than 2,000 new residential units in development, an additional 3,000+ in planning, as well as a variety of industrial and commercial facilities. HR Green has played a key role in introducing successful processes to improve the quality of life and enhance safety. This includes providing workshops with developers early and often to ensure a common understanding of project goals, the entitlement process, and city expectations to efficiently process their projects through to construction. Moreover, we hold internal Development Review Committee meetings between HR Green and the Planning Department consultant to streamline project entitlements, and offer electronic plan checking to save time and money. We use an electronic plan check platform and paperless process to review 1,500 civil plan sheets annually and have a 99% turnaround review success rate. From a plan check perspective, we created the development review and approval process, and customized checklists/ forms. Related to civil engineering, we manage the CIP, design infrastructure improvements, serve as the City’s Stormwater Compliance Manager, and have coordinated the delivery of major projects (e.g., award-winning $17 million Clay Street Grade Separation, $100+ million I-15/Limonite Avenue interchange improvements, $60 million water and sewer improvements). City of Moreno Valley HR Green currently provides the City with on-call civil engineering plan check and WQMP review services. We perform on-site staff augmentation, handling a variety of entitlement reviews, traffic engineering and transportation planning tasks including survey and map reviews and PS&E peer review for infrastructure projects designed by other consultants. Our experience with the City also includes on-site CIP project management staff augmentation experience inolving capital project identification, involvine the review of progress submittals of improvement plans, and value engineering; processing CEQA and NEPA environmental documentation; utility coordination; plan check; and bid processing. Related Experience On-Call Engineering Plan Check Services Z City of La Quinta PAGE 3 Proposed Staffing and Project Organization HR Green understands the City of La Quinta desires to work with a designated plan check consultant to provide these ser- vices. Our proposed Plan Check Engineer, Tina York, PE, has provided these services to the City for the past 6 years and will provide the requisite continuity to deliver projects in a timely, efficient, and accurate manner. Tina brings 30 years of experience focusing on civil plan review, project management, and civil engineering. She has man- aged plan check services for 30+ agencies, including La Quinta, Indio, Cathedral City, Victorville, Moreno Val- ley, RCTD, RCFC&WCD, County of Imperial, Hesperia, military housing at Ft. Irwin, and numerous other cities, water districts/de- partments, and counties. Tina is proficient with the City of La Quinta’s TRAKiT system and HR Green has also utilized Bluebeam Revu software. She has customized plan review reports and tracking logs, checklists, and budgetary worksheets for tracking all project costs including inspection services. Tina has also managed a web-based plan check tracking system to give agency staff 24/7 project status and implemented electronic plan checking to enhance communication, reduce review times, and save money. Tina will be the City’s Point of Contact, Primary Reviewer, and Quality Reviewer. In her role as Project Manager, Tina will track, assign (when appropriate based on qualifications), review,, and provide QA/AC on reviews performed by others and will touch every review that enters the City’s TRACKiT system. While Tina will be your designated plan reviewer, HR Green has extensive depth of resources should you require additional assistance or alternate plan reviewers. This includes, Steve Loriso, PE, QSD/QSP, and Marla Doyle, PE, James Xiong, PE and Selena Jong. Combined, they bring more than 60+ years of engineering plan review experience. These staff members have provided plan review services to various agencies within Riverside County, and have worked on-site as an extension of public agency staff. For additional stormwater compliance expertise and WQMP reviews, we can assign Bob Ma- kowski, QSP, CPESC, CESSWI and Mohamed Worayeth, PE. Resumes of these individuals are located in the Appendix.. Project Manager Tina York, PE Principal in Charge George A. Wentz, PE Supporting Staff Steve Loriso, PE, QSD/QSP Mohamed Worayeth, PE Marla Doyle, PE Bob Makowski, QSP, CPESC, CESSWI Selena Jong James Xiong, PE On-Call Engineering Plan Check Services Z City of La Quinta PAGE 4 Work Plan / Technical Approach Understanding of the City’s Objectives The City maintains a diverse and distinctive position in the Valley: Santa Rosa Mountains bordering on the west and south, natural desert environment, geographic features, sandy dunes, and bluffs serve as a backdrop for some of the most beautiful private and commercial developments in the Coachella Valley. Moreover, since 2007, the City has implemented the Coachella Valley Multi- Species Habitat Conservation Plan (CVMSHCP). Certain areas within La Quinta have been identified in the Plan as Conservation Areas (e.g., mostly hillsides and open desert). Development in Conservation Areas is subject to additional review, and limits on the amount and location of development apply. All of the above components directly impact how development related improvements are planned, approved and constructed in order to maintain the quality of life in the city and the adjacent region. We Know Your City and the Desert HR Green staff members have provided a variety of plan check, building safety, engineering, and/or inspection services to desert cities and Coachella Valley agencies. Desert agencies served include the Cities of La Quinta, Palm Desert, Rancho Mirage, Coachella, Indio, Desert Hot Springs, Victorville, Apple Valley, Lancaster; Ft. Irwin; Indian Tribes; HOAs; and the Counties of Riverside and Imperial. Projects Reviewed and Processed for La Quinta by HR Green Staff: SilverRock RABO Bank Washington Street Apartments The Signature Watermark Walmart Bollard Residence Washington Park Retail Center Palizada Plaza La Quinta Shopping Center In-N-Out (La Quinta Square) The Clubhouse at Anadalusia Estates at Griffin Lake El Pollo Loco ALDI (La Quinta Square) La Quinta Retirement Community La Quinta Square PGA West Sports Club The Chateau at Lake La Quinta The Orchard Multi-Agency/Jurisdictional Coordination and/or Approval Coordination and/or approval will be required among City departments and diverse agencies, including, but not limited to the County of Riverside, Riverside Flood Control and Water Conservation District, Coachella Valley Water District (CVWD), the Bureau of Land Management, the Federal Emergency Management Agency (FEMA), the State and Regional Water Quality Control Boards, the South Coast Air Quality Management District (SCAQMD), Caltrans, and related permitting agencies encountered during the CEQA and NEPA review process included in the entitlement conditions for project mitigation, implementation, and monitoring. Dust control (PM10)/air quality and regional/site-specific water quality management requirements must also be reviewed along with specific-specific Conditions of Approval to conform to SQAQMD, Santa Ana RWQCB, and applicable City requirements. Our plan check staff has approved, processed, and/or inspected projects for cities throughout the Coachella Valley including La Quinta, Palm Desert, Indio, Indian Wells, Coachella, and Cathedral City. HR Green Requirements of City Staff In order to complete the work described in this RFP, HR Green will require the following from City staff; Specific Plans, Conditions of Approval, or Items Not Listed in TRAKiT Software. Outside of these items, HR Green will require no assistance from the City. On-Call Engineering Plan Check Services Z City of La Quinta PAGE 5 There must be a coordinated effort and responsibility to review, track, and coordinate all applications and requests received in the City. To help assure that submittals from any applicant are properly handled, HR Green has a proven internal plan review coordi- nation process, GreenTREx, to make certain that each plan received is properly processed and returned on time. The status of any plan can be easily determined at any point in time. HR Green’s GreenTREx development review process/pro- gram allows us to efficiently complete plan tasks concurrently. This is a formalized and integrated process whereby Technician data input and processing, Review, and Experienced professional staff manage quality control functions that are consistently implemented on each and every project. &LW\ Receives Plans From Applicant & Assigns Project Electronically Log Out Project Quality Reviews Finalize Correction/ Approval Letter 7LQDReceives PDF of Plan Submittal & Enters Information Into Tracking Log Submittal Intake Checklist Discuss Key Issues with &LW\ Title Sheet & Bond Estimate Review Distribute Plans To Appropriate Plan Review Team Member Storm Drain Plan Reviews Traffic Signal Signing and Striping SWPPP & WQMP Report Reviews T R Ex Hydrology & Hydraulic Calculations & Report Reviews Map Reviews Water and Sewer Plan & Study Reviews Right-of-Way Document Reviews Rough & Precise Grading Plan Reviews Street Lighting- Plan Reviews Prepare Corrections Memo Resubmittal Technician Reviewer Experienced Professional Street Improvement Plan Reviews Plan Check Process )LQDOL]HLQ 75$.L7 Summary of Proposed Services HR Green’s plan review services are not dependent upon one particular person, but rather built on a proven pro- cess we have effectively utilized for nearly 50 federal, state, regional, and municipal clients. To help assure that submittals from any applicant are properly handled and work hours are not lost, HR Green has a proven internal plan review coordination process, GreenTREx, to make certain that each plan received is properly processed and returned on time. The status of any plan can be easily determined at any point in time. HR Green’s GreenTREx development review process/program allows us to efficiently complete plan tasks concurrently. This is a formalized and integrated process whereby Technician data input and processing, Review, and Experienced professional staff manage quality control functions that are consistently implemented on each and every project. This allows multiple HR Green staff to assist at any phase of the processing, review, and approval phase. On-Call Engineering Plan Check Services Z City of La Quinta PAGE 6 This is a formalized process where Project Manager, Tina York, PE, will function in all roles; Step 1 - Initial Review Once we receive a complete set of plan documents, we will perform our plan review in the agreed-upon timeframe, reviewing for compliance to all standards and checklists. All corrections are identified based on compliance with specified standards, ordi- nances, and regulations and clearly identify the areas requiring corrections or revisions. Generally, corrections are provided in two ways: 1. Redlines made on the plans; 2. Additional comments/direction added to TRACKiT as necessary Step 2 – Transmittal of Plans and Comment Lists for Plan Review At the heart of our approach in delivering our services to you is the recognition that there must be a coordinated effort to track and coordinate all submittals and requests received. In addition to TRACKiT, we have established an internal plan review coordination process in which each plan received for review is properly handled, processed, and returned on time. Step 3 - Rechecks Once we have verified that the resubmittal package is complete, we perform a recheck in the agreed-upon timeframe. This pro- cess is repeated until the project plan documents are ready to be recommended for approval. Step 4 – Plan Approval Upon plan approval, Tina will update the status in TRACKiT. On-Call Engineering Plan Check Services Z City of La Quinta PAGE 7 Project Phase HR Green Responsibilities Management/ Administrative 1. Maintain a Project Log 2. Meet with City regularly to: Z Discuss consultant performance Z Inquire about revisions or updates to City policies and procedures Z Discuss ideas to improve efficiency of comprehensive review process Before Review Verify the necessary items for project review are submitted If complete: Z budget hours and determine due date Z Commence project review If incomplete or deemed to be not ready for review, discuss next actions with the City During Review 1. Check for conformance with the Conditions of Approval (COA) Z Check off each applicable COA as it is satisfied Z Identify outstanding COAs in the corrections memo 2. Perform conformity review of each submittal with: Z General Plan, Amendments, and City Ordinances Z Applicable Design Guidelines Z Specific Plans Z Tentative Map Z Conditions of Approval Z Resolutions Z Building Codes Z Subdivision Map Act Z Land Surveyor Act Z Survey Documentation Z Standards Z Bond Unit Price List Z Checklists Z Current NPDES Stormwater Permits and Statewide General Permit 3. Perform conflict check of each submittal with provided: Z Existing plans Z Structural Plans Z Grading and Street Improvement Plans Z Water, Sewer, Strom Drain, Lanscape, Traffic Signal/Lighting, and Utility Plans Z Final Map Z Easements Z Reports Z Water Quality Management Plan (WQMP) After Review 1. Quality review check by Project Manager 2. Finalize review in TRACKiT and update Project Log 3. Provide City with the following deliverables: Z Redlined plans, studies, estimates Z Redlined WQMP Z Copy of checklists Other Perform other review services as authorized by City staff On-Call Engineering Plan Check Services Z City of La Quinta PAGE 8 Electronic Plan Review / Tracking of Review Comments HR Green utilizes proven electronic plan processes that save time and costs of printing, delivering, handling and storing copies of plans for review. Our plan check leaders are industry-recognized thought leaders in advancing the robustness of paperless plan review and inspection solutions. Our Project Manager, Tina York, PE, and other HR Green plan check professionals are serving as technical advisors to ePlanSoft to incorporate new tools and refine the forthcoming release of their integrated electronic plan check solution. We are proficient in using TRACKIT and other electronic plan review and inspection systems and are constantly working with agencies and applicants to move exclusively to a paperless environment. This is critical on larger, multi-disciplined projects where there may be overlap between design disciplines. Comments from each review are summarized electronically by our staff. Design responses are added and included with the next submittal to verify that all comments have been addressed. This approach has been effective in resolving comments at early stages, avoiding repeat comments by reviewers, and coordinating responses among disciplines. We also update a detailed tracking log whereby the agency can identify the status of any project through the review lifecycle process in real time. Benefits of Paperless Review Process; • It is an inexpensive, off-the-shelf solution. • All PDF documents are readable with free Adobe Reader software. • It enables “intelligent” data recordation - Optical Character Recognition (OCR). • It is word-searchable. • Users can compare changes between documents. • Comments are digital and easy to read and track. • It provides a means for secure digital signature validation and recordation. • It provides a good “chain of custody” accountability, and all actions can be time and date stamped. On-Call Engineering Plan Check Services Z City of La Quinta | 9 On-Call Engineering Plan Check Services Z City of La Quinta | 10 On-Call Engineering Plan Check Services Z City of La Quinta | 11 On-Call Engineering Plan Check Services Z City of La Quinta | 12 On-Call Engineering Plan Check Services Z City of La Quinta | I On-Call Engineering Plan Check Services Z City of La Quinta | I* On-Call Engineering Plan Check Services Z City of La Quinta | III On-Call Engineering Plan Check Services Z City of La Quinta | IV On-Call Engineering Plan Check Services Z City of La Quinta | V On-Call Engineering Plan Check Services Z City of La Quinta PAGE VI Tina has 25+ years of development plan review management experience for 30+ agencies. Over the past 15+ years she has been at the forefront of electronic plan review services to federal, state, regional, and local agencies. Tina has customized plan review reports and tracking logs, checklists, and budgetary worksheets for tracking inspection costs. She has also managed a web-based plan check tracking system to give agency staff 24/7 project status and implemented electronic plan checking to enhance communication, reduce review times, and save money. Tina currently manages our existing development plan check contract with cities throughout Riverside County. Moreover, Tina has managed the plan review under expedited schedules for some of the region’s largest development projects with some of the nation’s largest developers. On-Call Engineering Plan Review, City of La Quinta, CA. Project Engineer/Manager responsible for overseeing the development review and processing of citywide projects. Has reviewed 90+ projects the past 6 years, including Silver Rock Resort, Palizada development, Watermarke, Estates at Griffin Lake, and La Quinta Square. Maintained a 98% success rate meeting City’s turnaround review schedule. On-Call Consultant Plan Review Services, City of Victorville, CA. Project Manager/Civil Plan Review Technical Expert for review of grading plans, improvement plans, sewer and water studies, hydrology/hydraulic studies, and bond estimates on an as-needed basis. Plans ranged from minor to major residential subdivisions and commercial/ industrial sites. Tracked projects from first submittal to agency approval via web-based system and used electronic plan reviewing/digital commenting. On-Site Development Services Management, City of Jurupa Valley, CA. Consultant Development Services Manager, overseeing full range of development services for the recently incorporated City, a diverse community of about 45 square miles and population of 100,000+ citizens. Coordinates all plan and map check intake, established and updates plan review tracking logs, customized submittal checklists, oversees encroachment permitting, established fee schedule, handles entitlement services and plan review, writes Conditions of Approval. Has achieved 99% turnaround review schedule success of 1,500+ plan sheets annually. Engineering Plan Review, Moreno Valley, CA. Project Manager for review of grading plans, improvement plans, sewer and water studies, hydrology/hydraulic studies, bond estimates, and/or WQMPs on an as-needed basis. Plans ranged from minor to major residential subdivisions and commercial/industrial sites. Tracked projects from first submittal to agency acceptance via web-based system and uses electronic plan reviewing. Development Plan Review, Lancaster, CA. Project Manager providing oversight to infrastructure improvement plan review and map check for private development projects. Duties include NPDES compliance, infrastructure improvement plan check, and plan checking per Federal codes and standarards including review of plans for streets, sewer, storm drains, water mains, streetlights, and traffic control. Tina also attends mothly meetings with staff and provides detailed daily updates on status of all plan checks received and processed. TINA YORK, PE PROJECT MANAGER EXPERIENCE 25+ Years EDUCATION B.S., Civil Engineering REGISTRATION / LICENSE Registered Civil Engineer, CA #46367 Z Plan Check Manager, 20+ years Z On-Call Plan Review, 30+ Public Agencies Z Customization of Plan Review Processes Z Development and Update of Plan Review Checklists Z Electronic Plan Review / Web-Based Tracking On-Call Engineering Plan Check Services Z City of La Quinta PAGE VII Steve Loriso, PE, QSD/QSP Alternate Plan Reviewer EXPERIENCE 20+ Years / 4 Years with the Firm EDUCATION B.S., Civil Engineering REGISTRATION / LICENSE Registered Civil Engineer, CA #64701 Qualified SWPPP Developer/Practitioner (QSD/QSP), CA# 00503 Steve has 20 years of plan review, design, CIP program management, design management, NPDES/water quality compliance, and construction management experience of municipal public improvement projects. He has served 20+ cities, including Pomona, Corona, Norco, Monrovia, Walnut, San Gabriel, Claremont, Chino, and Indio. Steve has managed the implementation of the MS4 Permit for the Cities of Jurupa Valley, Walnut, Monrovia, San Gabriel, and Bradbury and overseen plan review services for the Cities of Jurupa Valley, Pomona, Lake Elsinore, Walnut, Chino, San Gabriel, Monrovia, Bradbury, and Claremont. He has also served as Deputy Project Manager for the provision of plan check services to the County of Orange. Marla Doyle, PE Alternate Plan Reviewer EXPERIENCE 30+ Years / 4 Years with the Firm EDUCATION M.S., Transportation Engineering B.S., Civil Engineering REGISTRATION Registered Civil Engineer, CA #35086 Marla has more than 30 years of plan review, public works administration, city engineering, civil engineering, infrastructure design, water quality, grant funding administration, and construction management experience throughout California. For HR Green she has reviewed plans for the County of Orange as well as the Cities of Victorville, Placentia, Lake Elsinore, Pomona, and Jurupa Valley. Her expertise involves plan review; land development; defining, programming, and managing municipal CIP projects; water quality; pavement and asset management; design; and construction management. This experience includes road, bridge, water, open space, trail, grade separation, water quality, drainage, building, traffic, coastal, and utility projects. She has also been involved with development processing of projects in Pomona and Oceanside. Bob Makowski, PE Water Quality Reviewer EXPERIENCE 10+ Years / 4 Years with the Firm CERTIFICATIONS Certified Qualified SWPPP Practitioner, CA #24743 NPDES, AQMD and OSHA Trained Certified Erosion, Sediment, and Storm Water Inspector (CESSWI), #0242, EnviroCert International Certified Professional in Erosion and Sediment Control #5450, EnviroCert International Bob brings more than 10 years of comprehensive water quality and environmental management experience. This has included overseeing all facets of citywide environmental and water quality compliance. He has managed NPDES compliance programs for the Cities of Placentia and Jurupa Valley as well as water quality compliance for infrastructure projects. This experience involves overseeing the WQMP, WPCP, and SWPPP process from planning to final construction, including conditions of approval, plan check, and BMP inspection. He has provided WQMP review to the Cities of Lake Elsinore, Placentia, and Fontana and the County of Orange. Bob has also prepared the annual Local Implementation Plan and the inspection of permanent/temporary BMPs and industrial/commercial facilities. On-Call Engineering Plan Check Services Z City of La Quinta PAGE 7*** Selena Jong Alternate Plan Reviewer EXPERIENCE 10+ Years / 5 Years with the Firm EDUCATION B.S., Civil Engineering Selena has 10+ years of land development and plan check experience throughout Southern California. She has provided on-call plan review to nearly 10 Southern California public agencies. Selena is proficient with electronic plan check/digital commenting. She has served as a Civil Plan Checker of precise grading, rough grading, drainage, recycled water, potable water, and sewer/wastewater distribution systems (e.g., booster pump stations, sewer lift stations, PRV stations, and water storage tanks), and street improvement plans for the Cities of Moreno Valley, Jurupa Valley, and Palos Verdes Estates, as well as the County of Orange, Western Municipal Water District. James Xiong, PE Alternate Plan Reviewer EXPERIENCE 30+ Years / 3 Years with the Firm EDUCATION M.S., Transportation Engineering B.S., Civil Engineering REGISTRATION / TRAINING Registered Civil Engineer, CA #67998 IECA-Trained James brings 20 years of plan review, project management, design, hydrology, hydraulics, water quality, transportation engineering, office engineering, and construction management experience related to public works, infrastructure, drainage, rail facilities, bridge, highway, and utilities projects. He has handled plan review for 10+ agencies (e.g., Counties of Orange, San Diego, and Imperial, Cities of Lake Elsinore, Jurupa Valley, Murrieta, Carlsbad, Escondido, Indio, Hesperia, and San Bernardino; and Otay Water District). Also, for nearly two years he served on-site as a Project Engineer at San Diego Association of Governments (SANDAG) offices responsible for designing and managing infrastructure and other capital projects. Mohamed Worayeth, PE Alternate Plan Reviewer EXPERIENCE 30+ Years / 1 Year with the Firm EDUCATION M.S., Water Resources, Hydraulics B.S., Civil Engineering REGISTRATION Registered Professional Engineer, CO #23019 Mohamed is an engineering professional with more than 30 years of plan review, planning, design, nd construction management experience. He has provided review services of engineering plans and documents for land development, stormwater, water supply networks, storm drainage collection systems, and sanitary sewer gravity systems. He has provided civil and/or water quality reviews for the Cities of Banning, Jurupa Valley, Riverside, Victorville, Ontario, Hayward, and the Counties of Riverside and Imperial. He has also served as a NPDES Program Manager for Riverside County Transportation Department, responsible for the review of all SWPPPs and WQMPs prepared by other consultants. He has also prepared SWPPPs and WQMPs for roadway projects and overseen NPDES field inspection monitoring associated with operations and maintenance of access roads for a major, regional utility. On-Call Engineering Plan Check Services Z City of La Quinta | *X Contract Exceptions to Noted Requirements HR Green has reviewed the City’s model agreement. We request consideration of the following “proposed language modifica- tions” to the contract as items to discuss. In various areas the contract calls for the consultant to “warrant” or “represent” others or actions. Our insurance allows us to “represent” to the best of our ability, but not “warrant.” 1.1. Scope of Services Revise final sentence to: “For purposes of this Agreement, the phrase “professional standards” shall mean the standard of care consistent with the degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances at the same time and in the same or similar locality.” Rationale: This clarification will ensure our services are covered by our insurance. 1.3. Licenses, Permits, Fees, and Assessments Remove: “defend (with counsel selected by City)” on fourth line from bottom. Rationale: This clarification will ensure our services are covered by our insurance. 1.5. Standard of Care Remove words such as “heightened” and “quality” and add “to the extent caused by the negligent services of the consultant” after the word “property” on the fifth line from the bottom. Rationale: This clarification will ensure our services are covered by our insurance. 6.1. Indemnification Remove: “defend (with counsel selected by City)” on second line. Rationale: This clarification will ensure our services are covered by our insurance. 8.3. Retention of Funds Suggest removing this section Rationale: It is preferred that a court of law determine losses, costs, and liabilities. 8.7. Liquidated Damages Suggest removing this section Rationale: This section may be appropriate for a contractor, but not for professional services. Removal of this section will ensure our services ae covered by our insurance. EXHIBIT F Suggest following edits to this exhibit: “a. Indemnification for Professional Liability. When the law establishes a professional standard of care for Consultant’s Services, to the fullest extent permitted by law, Consultant shall indemnify, protect, and hold harmless City and any and all of its officials, employees, and agents (“Indemnified Parties”) from and against all claims, losses, liabilities, damages, injury (including, without limitation, injury to or death of an employee of Consultant or of any subcontractor), costs and expenses whether actual, alleged or threatened, including, without limitation, court costs, attorneys’ fees, litigation expenses, and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation, to the extent same are cause in whole or in part by any negligent or wrongful act, error or omission of Consultant, its officers, agents, employees or subcontractors (or any entity or individual that Consultant shall bear the legal liability thereof) in the performance of professional services under this agreement. With respect to the design of public improvements, the Consultant shall not be liable for any injuries or property damage resulting from the reuse of the design at a location other than that specified in Exhibit A without the written consent of the Consultant. On-Call Engineering Plan Check Services Z City of La Quinta | X b. Indemnification for Other Than Professional Liability. Other than in the performance of professional services and to the full extent permitted by law, Consultant shall indemnify, and hold harmless the Indemnified Parties from and against any liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including, without limitation, court costs, attorneys’ fees, litigation expenses, and fees of expert consultants or expert witnesses) incurred in connection therewith and costs of investiga- tion, where the same are a consequence of, or are in any way attributable to, in whole or in part, the performance of the services provided under this Agreement by Consultant or by any individual or entity for which Consultant is legally liable, including but not limited to officers, agents, employees, or subcontractors of Consultant. F.2 Standard Indemnification Provisions. Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth herein this section from each and every subcontractor or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. In the event Consultant fails to obtain such indemnity obligations from others as required herein, Consultant agrees to be fully responsible according to the terms of this Exhibit. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify City as set forth herein is binding on the successors, assigns or heirs of Consultant and shall survive the termination of this agreement or this section. a. Indemnity Provisions for Contracts Related to Construction. Without affecting the rights of City under any provision of this agreement, Consultant shall not be required to indemnify and hold harmless City for liability attributable to the negligence of City, provided such negligence is determined by agreement between the parties or by the findings of a court of competent ju- risdiction. In instances where City is shown to have been negligent and where City’s negligence accounts for only a percentage of the liability involved, the obligation of Consultant will be for that entire portion or percentage of liability not attributable to the negligence of City. Notwithstanding the foregoing, nothing in this instrument shall be construed to encompass (a) Indemnitees’ active negligence, sole negligence, reckless or willful misconduct to the limited extent that the underlying Agreement is subject to Civil Code 2782(a), or (b) the contracting public agency’s active negligence to the limited extent that the underlying Agreement is subject to Civil Code 2782(b). Nothwithstanding the aforementioned in this section, Consultant’s obligation, if any, to reimburse the City for any defense costs of any type or nature shall be determined by the percentage fault of Consultants negligence, omissions, or reckless conduct as determined by a trier of fact in a court of competent jurisdiction. Consultant’s obligation to defend City shall only arise after Consultants liability for any damages is established by a judgment entered by a court of competent jurisdiction and all appellate remedies have been exhausted. Rationale: These changes will ensure our services are covered by our insurance. Z HRGREEN.COM TRANSPORTATION + WATER + GOVERNMENTAL SERVICES + LAND DEVELOPMENT + ENVIRONMENTAL + CONSTRUCTION