Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
06-0431 (CSCS) Revision 1
Permit # 1.43\ ihojectAddress:• A. P. Number. Contractor. W L �f 1 er Address: City, ST, Zip: Telephone: State Lie. # Arch., Engr., Designer Address: City, ST, Zip: Telephone: State Lia #: Name of Contact Person:i11 Telephone # of Contact Person: 3 # Submittal p Plan Setsru Structural Calcs. Truss Cales. Energy Cale. Flood plain plan Grading. plan Subcontactor List . Grant Deed S.O.A. Approval IN HOUSE:= Planning Approval Pub. Wks. Appr School Fees 3�2 0� mrd City of La Quinta Rev, shbu Building U Safety Division P.O. BOx 1504 78-495 Cali T e arnpico La Quinta, CA 92253 - (760) 777-7012 Building Permit Application and Tracking Sheet cK S/ Owner's Name: (/ Address: City, ST, Zip: Telephone: Project Description: City Lic. #: �TotalPcrmltt 411 -YD 5 2 /0% E5GI L 1gPP1?0VEp f l5 wf om Construction Type: Occupancy: j?_)6 ProJ� type (circle one): New Add'n Alter Repair eP Dario Sq. Ft : # Stories: # Units: Estimated Value of Project: APPLICANT: DO NOT W BELOW THIS UNE Rec.'d TRACI�iG PERMIT FEES Plaa Check submitted p Item Amount . Reviewed, ready for corrections p Plan Check Deposit Called Contact Person Plan Check Balance Plans Picked.ap Construction Plain resubmitted Mechanical 2'' Review, ready for eorrec ' sae lectrical Called .Contact person Plumbing Plans picked up SALL Plans resubmitted Grading Review, ready for.corr"dons/issue Developer Impact Fee Catled Contact Person A.LP.P. Date of permit issue �TotalPcrmltt 411 -YD 5 2 /0% E5GI L 1gPP1?0VEp f l5 wf om TITLE 24 REPORT Title 24 Report for: Washington Park- Shops 4 46-660 Washington Street La Quinta, CA 92253 Project Designer: KKE Architects, Inc 525 East Colorado Boulevard (Fourth Floor) Pasadena ..CA 91101 (626) 796-8230 f Report Prepared' By: SIA GARESTANI, P.E. SPEC Engineering 6800 Owensmouth Ave. #140 Woodland Hills, CA 91303 '(818) 592-6643 i. CITY OF LAQUINTA Job Number: BUILDING & SAFETY DEPT. 06-002 APPROVED FOR CONSTRUCTION Date: MAR 02 2007 1/30/2007 By The EnergyPro ram computer r has been P program used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.enerdysoft.com. EnergyPro 4.3 by EnergySoft• Job Number: 06-002 User Number: 3358 - _� I TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -MM Envelope, Mandatory Measures_ 19 Form MECH-MM Mechanical Mandatory Measures 20 HVAC System Heating and Cooling Loads Summary 22 4 EnergyPro 4.3 by EnergySoft Job Number: 06-002 User Number: 3358 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the DATE Washington Park - Shops 4 DOCUMENTATION AUTHOR 1/30/2007 PROJECT ADDRESS BUILDING CONDITIONED FLOOR AREA 15, 900 sq.Ft. 46-660 Washington Street La Quinta MATE ZONE CLI15 BUILDING TYPE PRINCIPAL DESIGNER - ENVELOPE TELEPHONE Building Permit # KKE Architects, Inc (626) 796-8230 NEW CONSTRUCTION ADDITION DOCUMENTATION AUTHOR SPEC Engineering TELEPHONE 818 592-6643 Checked by/Date 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions 1 Enforcement Agency Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance complian approach. The documentation preparer hereby certifies that the documentation is accurate and compOe. DOCUMENTATION AUTHOR DATE OF PLANS OS -08-06 BUILDING CONDITIONED FLOOR AREA 15, 900 sq.Ft. 02-01-07 MATE ZONE CLI15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ADDITION ❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance complian approach. The documentation preparer hereby certifies that the documentation is accurate and compOe. DOCUMENTATION AUTHOR SIGNATURE DATE SIA GARESTANI P.E. 1 02-01-07 The Principal Designer hereby certifys that the proposed buildinge ' repres nted in this set of construction documents is consistent with the other compliance forms and worksheets, with specifications, and with any other calculations submitted with thi permit application. The proposed building as designed meets Ke energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. ❑ ❑ ® 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, or I am a licensed architect. ❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Required Forms ENV -1 PRINCIPAL ENVELOPE DESIGNER - NAME SIG LIC. NO.DATE KKE Architects Inc cTr�e OZ ': LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of Required Forms PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Required Forms H- ECH-2 MECH-3 MECH-5 PRINCIPAL MECHANICAL DESIGNER - NAME SIGNATURE LIC. NO DATE SIA GARESTANI P.E. 02-01-07 I EnergyPro 4.3 by EnergySoft User Number: 33501"Job Number: 06-002 Page:3 of 31 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r . ...,Standard' Proposed : ENERGY COMPONENT Design " Design Space Heating' ~.`. 1.os 0.80 ' Space Cooling 322.63 307.71 Indoor Fans: 38.55 43.55 Heat Rejection - 0.00 0.00 Pumps & Misc. 0.00 O,00 .Domestic Hot Water 58.85 . `55.79 Lihtin 9 9 165:26 1s5zs"0.00 Receptacle '82 .18 -Process o.00 o:oo - - . `.. TOTALS: ` .668.53 65529 Percent better than Standard.' 12.0%, ,2.0%0 Compliance -Margin 'Orientation ' (p sre�daa x : ®�r,,opo5ea • 0.27 �� NMI - 0 20 4080 801007207401801 20022020280000320 kaiwsgn-y. e 'process)� , Front Elevation' ;,� '� 5A0 o.00 0.00 3.06 o.00�: ''o.00P� •.: 13.25 excluding BUILDING. COMPLIES GENERAL INFORMATION , ' Left Elevation Building Orientation - NumberofStories Number of Systems Number of Zones .w 270 d' Conditioned Floor A. rea �' 15;900 sgft. j 1 l'1ncondltloned FIOorArea o sgft. ` 10 C6nditioned Footprint Area _ o sgft. 10 Fuel Type Natural Gas 'Orientation ' Gross Area'- Glazing Area 'Glazing Ratio Front Elevation' ;,� w .,2,379 sgft 1;108 sgft. 46:6% ' Left Elevation N857 sgft o Sett; o:o°io - RearElevationE 2,720 sgft. 118 sgft. `4`3% Right Elevation` s Total" •(s) 4- 1,023 6,979sgft.. sqft -416 1,642 sgft: sgft: 40.7% '23.5% R00f 15 900 sgft. I01 sgII 0.0% ,, �•- � Standard Proposedn.N Cv 2'cne gy'8 Atmocnhere Credit Lighting Power Density 1.500 w/sgft5 1.500 } w/sg8. Savings vs. Title 24 `'1.98% Prescriptive'Env.' Heat LOSS 2,662 M6/h •` 2,978 Btu/h EAc1 Credit: 0 Points Prescriptive. Env. -Heat Gain228,341 Btu/h=F ` ; 317,645 slum -F -Remarks: i ..Run Initiation Time- 01/30/07 13:'57:40.- .' ^ -Run-Code- 117n1:9A9an' > 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME Washington Park - Shops 4 DATE 1/30/2007 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sqft.) Inst rl' LPD `Credit's . °Area. (W/sf)1 %(W/sf)2 roc:-" ' Tailored Loads.` W/sf $ . W/sf 4I (W/sf),= RTU -1 Suite 1 Comp Bldg Retail and Wholesale 1,495 '1.50 RTU -2 Suite 2 Comp Bldg Retail and Wholesale 1,495 '1.50 RTU -3 Suite 3 Comp Bldg Retail and Wholesale 1,495 '1.50 RTU -4 Suite 4 y Comp Bldg Retail and Wholesale 1,495 *1.50(.—,,: RTU -5 Suite'5 - Comp Bldg Retail and Wholesale 1,495 1.50 RTU -6 Suite 6 ComD Bldq Retail and Wholesale 1,495 1.50' RTU -7 Suite 7 Comp Bldg Retail and Wholesale 1,914 1.50 RTU -8 Future Suite 8 Future Comp Bldg Retail and Wholesale 1,554 '1.50 RTU -9 Future Suite 9 Future Comp Bldg Retail and Wholesale 1,554 RTU -10 Suite 10' Comp Blda Retail and Wholesale 1,908 "1.50 ' . 4 Notes: 1. See LTG -2-C (items marked with asterisk, see LTG -2 -C by others) 2. See LTG -4-C 3. See LTG -5-C (by others) 4. See LTG -6 -C Items alr documentatiori` EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based ori the adequacy of the special justification and documentation submitted - The HVAC System "CARRIER 50HJQ008" includes Demand Control Ventilation per Standards Section 121. The Zone "Suite 1" has a North/East/South Display Perimeter Credit of 12 ft. The Zone "Suite 2" has a North/East/South Display Perimeter Credit of 12 ft. The Zone "Suite 3" has a North/East/South Display Perimeter Credit of 12 ft. _ The Zone "Suite 4" has a North/East/South Display Perimeter Credit of 12 ft. The Zone "Suite 5" has a North/East/South Display Perimeter Credit of 12 ft. The Zone "Suite 6" has a North/East/South Display Perimeter Credit of 12 ft. The Zone "Suite T' has a North/East/South Dis W Perimeter Credit of 31 ft. The Zone "Suite 8 (Future)" has a North/East/South Display Perimeter Credit of 28 ft. The Zone "Suite 9 (Future)" has a North/East/South Display Perimeter Credit of 12 ft. ' The Zone "Suite 10" has a North/East/South Display Perimeter Credit of 12 ft. The excentinnal faatim— licta.i i. •i,i, ---------------rr•-_-••-rr••�a••w•1 >1a v OPwO 111 GGlly ween reviewed. Adequate written justification and. documentation for their use have been provided by the applicant. Authorized Signature or Stamp iergyPro 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 of 31 11 CERTIFICATE OF COMPLIANCE ENV -1 -CI (PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 OPAQUE SURFACES # Surface T Type Area U -Fac. Insulation Cay. Cont. Act. zm A. Tilt Cond. Status Joint Appendix IV Reference Location / Comments SHGC Act. 06 R-0.0 90 90 New 09-A7 Suite 1 2 Wall 12 0.065 R-19 R-0.0 270 90 New 09-A7 Suite 1 3 Roof 1.49 0.034 R-30 R-0.0 0 0 New 02-A26 Suite 1 4 Wall 27E 0.065 R-19 R-0.0 90 90 New 09-A7 Suite 2 5 Wall 155 0.065 R-19 R-0.01 270 90 1 New 09-A7 Suite 6 Roof 1.494 0.034 R-30 R-0.01 0 0 New 02-A26 Suite 2 7 Wall 270 0.065 R-19 R-0.01 90 90 New 09-A7 Suite 3 8 Wall 151 0.065 R-19 R-0.01 270 90 New 09-A7 Suite 3 9 Roof 1,49 0.034 R-30 R-0.01 0 0 New 02-A26 Suite 3 10 Wall 270 0.065 R-19 R-0.0 90 90 New 09-A7 Suite 11 Wall 154 0.065 R-19 R-0.0 270 90 1 New 09-A7 Suite 12 lRoof 1,491 0.034 R-30 R-0.0 0 0 New 02-A26 Suite 4 13 Wall 270 0.065 R-19 R-0.0 90 90 New 09-A7 Suite 5 14 Wall 15 0.065 R-19 R-0.0 270 90 New 09-A7 Suite 5 15 Roof 1,49 0.034 R-30 R-0.01 0 0 New 02-A26 Suite 16 Wall 27 0.065 R-19 R-0.0 90 90 New 09-A7 Suite 6 17 Wall 15 0.065 R-19 R-0.0 270 90 New 09-A7 Suite 6 18 Roof 1,49 0.034 R-30 R-0.0 0 0 New 02-A26 Suite 19 Wall 11 0.065 R-19 R -n nl 225 90 New 09-A7 Suite 20 Wall ' N. E. A. R (New. Eedstinn. 281 0.065 Altor-d P-mnv-A1 R-19 R-0.0 90 1 90 New 09-A7 Suite 7 FENESTRATION SURFACES More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from StandaMe T.W. 11n -e --A is „ .._-. ..o -o uerawt lapis from Standards. COG Center of Glass, NFRC Labeled Value--� EXTERIOR SHADING - - -- ---- - - - -- ---•-•-.•-,��• �• •••� .••.• y •..-•a., u,,u�n -nv .n ,nn uummng managers oniee aner construction # Exterior Shade Type SHGC Act. Cond. Location/ # Type Len. Area U -Fac.' SHGC2 Am. Stat. Glazing Type Comments 1 Window Front W 38 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 1 2 Window Front W 17 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 1 3 Window Front W 28 1.250 NFRC 0.82 NFRC 270 New Sin le Clear Default NM Suite 1 4 Window Front W 38 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 1 5 Window Front W 38 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 2 6 Window Front W 17 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 2 7 Window Front W 28 1.250 NFRC 0.82 NFRC 270 New -Single Clear Default NM Suite 2 8 Window Front W 38 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 2 9 Window Front W 38 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 3 10 Window Front W 17 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 3 Window Front W 28 1.250 NFRC 0.82 NFRC 270 New Single Clear Default NM Suite 3 M11 12 Window Front W 38 1.280 116-A 0.72 NFRC 270 New I Double Clear Default NM Suite 3 13 JW indow Front W 381 1.2801116 -Al 0.72 INFIRCI 270 New I Double Clear Default NM IS--it-4 (1) U -factor Type: 116-A Default Table from Standards Tnhi- nit -t n -f -,m T -h.- f...,...._ -. ..__.._, .____.,-- --,.. ..o -o uerawt lapis from Standards. COG Center of Glass, NFRC Labeled Value--� EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin None Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 1 0.76 12.3 3.2 4.0 0.1 4.0 4.0 2 None 0.76 2.8 6.0 4.0 0.1 4.0 4.0 3 None 0.76 6.3 4.5 4.0 0.1 4.0 4.0 4 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 5 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 6 None 0.76 2.8 6.0 4.0 0.1 4.0 4.0 7 None 0.76 6.3 4.5 4.0 0.1 4.0 4.0 8 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 9 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 10 None 0.76 2.8 6.0 4.0 0.1 4.0 4.0 11 None 0.76 6.3 4.5 4.0 0.1 4.0 4.0 12 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 13 1 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES 1:1The proposed building Is In climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 ft2, a ceiling height greater than 15 fent- and an i cn f-...-..-.-. Iluhtlnn of at inset d 5 wtfn c-- e.,..u.... . -,-,iuur. wen suomtgmg under the Prescriptive Compliance Approach. Run Initation Time• 01/30/07 13.57.40 Run Code: 1170194260 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 Pape:6 of 31 CERTIFICATE OF COMPLIANCE ENV -1 -CI (PROJECT NAME DATE L Washington Park - Shops 4 1/30/2007 OPAQUE SURFACES # Surface Type Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt Cond. Status Joint Appendix IV Reference Location / Comments SHGC 0.76 Act. Cond. 15 R-0.0 270 90 New 09-A7 Suite 7 22 lRoof 1.91 0.034 R-30 R-0.0 0 0 New 02-A26 Suite 7 23 Wall 24 Wall 184 30 0.065 0.065 R-19 R-19 R-0.0 R-0.01 225 45 90 90 New New 09-A7 09-A7 Suite 8 Future Suite 8 Future 25 Wall 12 0.065 R-19 R-0.0 270 90 New 09-A7 Suite 8 Future 26 Roof 1 554 0.034 R-30 R-0.0 0 0 New 02-A26 Suite 8 Future 27 Wall 27 0.065 R-19 R-0.0 45 90 New 09-A7 Suite 9 Future 28 Wall 15 0.065 R-19 R-0.0 225 90 New 09-A7 Suite 9 Future 29 Roof 1,554 0.034 R-30 R-0.0 0 0 New 02-A26 Suite 9 Future 30 Wall 68 0.065 R-19 R-0.0 135 90 New 09-A7 Suite 10 31 Wall 27 0.065 R-19 R-0.0 45 90 New 09-A7 Suite 10 32 Wall 15 0.065 R-19 R-0.0 225 90 New 09-A7 Suite 10 33 Roof 1.90E 0.034 R-30 R-0.0 0 0 New 02-A26 Suite 10 Double Clear Default NM Suite 7 26 Window Right SW 171.280 116-A 0.72 INFRICI 225 New Double Clear Default NM Suite 7 (1) U -factor Type: 116-A Default Table from Standards Tahle NLt n f„d. -- s...-, a- .- •....... -- �.. ..�..... ' N. E. A. R (New. EAstirm Altered Ramnvadt FENESTRATION SURFACES E Standards Table 1 irrA and B. Certificate shall he More than or equal to 10,000 sq.ft. of site -built fenestra ion ennn area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default Ll -factors from filed in tha lr.-O...r - ..fe-- -..:-_ _ _ _ _ __.__... __.., .. •,......., ...,...,unua„y p -vu, rvr- �eouiea valve. SHGC Type: 1168 Default Table from Standards, COG Center of Glass, NFRC Labeled Vatue EXTERIOR SHADING - - -- ----- - --- -- ---•-• •• r•-i��• �•• �o ..,.,,,y vv.au u,.uvn anv ,, u,e vu -,ng managers OmCe atter construction # Type # 14 Exterior Shade Type None SHGC 0.76 Act. Cond. 15 Location/ 0.76 6.3 4.5 4.0 Area U -Fac' SHGC2 Am. Stat. Glazing Type Comments 14 W indow Front W 17 1.280 116-A 0.7Y NFRC 270 New Double Clear Default NM Suite 4 15 Window Front W 28 1.250 NFRC 0.82 NFRC 270 New Sin Ie Clear Default NM Suite 16 Window Front W 38 1.280 116-A 0.72 NFRC-270 0.76 New Double Clear Default NM Suite 4 17 Window Front W 38 1.280 116-A 0.72 NFRC 270 New I Double Clear Default NM Suite 5 18 Window Front W 17 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 5 19 Window Front W 28 1.250 NFRC 0.82 NFRC 270 New Single Clear Default NM Suite 5 20 Window Front W 38 1.280 116 A 0.72 NFRC 270 New Double Clear Default NM Suite 5 21 Window Front W 38 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 6 22 Window Front W 17 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 6 23 Window Front W 28 1.250 NFRC 0.82 NFRC 270 New Single Clear Default NM Suite 6 24 Window Front W 38 1.280 116-A -9-72]NFRCI 270 New Double Clear Default NM Suite 6 25 Window Right SW 21 1.280 116-A 0.72 NFRC 225 New Double Clear Default NM Suite 7 26 Window Right SW 171.280 116-A 0.72 INFRICI 225 New Double Clear Default NM Suite 7 (1) U -factor Type: 116-A Default Table from Standards Tahle NLt n f„d. -- s...-, a- .- •....... -- �.. ..�..... _ _ _ _ __.__... __.., .. •,......., ...,...,unua„y p -vu, rvr- �eouiea valve. SHGC Type: 1168 Default Table from Standards, COG Center of Glass, NFRC Labeled Vatue EXTERIOR SHADING # 14 Exterior Shade Type None SHGC 0.76 Window Hgt. Wd. 2.8 6.0 Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 4.0 0.1 4.0 4.0 15 None 0.76 6.3 4.5 4.0 0.1 4.0 4.0 16 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 17 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 18 None 0.76 2.8 6.0 4.0 0.1 4.0 4.0 19 None 0.76 6.3 4.5 4.0 0.1 4.0 4.0 20' None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 21 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 22 None 0.76 2.8 6.0 4.0 0.1 4.0 4.0 23 None 0.76 6.3 4.5 4.0 0.1 4.0 4.0 24 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 25 None 0.76 12.3 1.7 7.0 0.1 7.0 7.0 26 1 None 0.76 2.8 6.0 1 7.0 0.1 7.0 7.0 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES 1:1The proposed building Is In climate zones 2 through 15 and contains an enclosed space with Floor area greater than 25,000 ft2, a calling height greater than 15 feet. and an Lpn fnr.... . i lighting of at least o s wit- C-- c--«-- . ....t.y... ugo wa is cnecueo, env -a -C must be filled out. when submitting under the Prescriptive Compliance Approach. Run Initiation Time: 01/30/07 13.57.40 Run Code: 1170194260 EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 Page:7 of 31 t ' CERTIFICATE OF COMPLIANCE ENV -1-C PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 OPAQUE SURFACES IV Reference .. Mi�i��■i�i�i����� FItMore than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from I Rtarvtarda T.M. t12e - o rew:r....,... .. - ueraun i aoie from Standards, COG Center of Glass, NFRC Labeled Value - EXTERIOR SHADING - _.. _ _ ___ ... -.-_ __....__._. _ ,..,.,,... ,,..,,,,, ,.u,,,,a •,,,,,,,, u,,.,,,,, a„� ,n u.e uuuumg managers once aver construction # 27 I I SHGC 0.76 Act. Cond. 28 Location/ # Type 12.3 1.7 7.0 Area U -Fac.' SHGC2 Am. Stat. Glazing Type Comments 27 Window Right SW 28 1.250 NFRC 0.82 INFRC 225 New Sin le Clear Default NM Suite 7 28 Window Right SW 2 1.280 116-A 0.72 INFRC 225 New Double Clear Default NM Suite 7 29 Window Ric ht SW 2 1.280 116-A 0.72 INFRC 225 New Double Clear Default NM Suite 7 30 Window Right SW 11 1.280 116-A 0.72 NFRC 225 New Double Clear Default NM Suite 7 31 Window Right SW 28 1.250 NFRC 0.82 NFRC 225 New Sin le Clear Default NM Suite 7 32 Window Right SW 2 1.280 116-A 0.72 NFRC1 225 New Double Clear Default NM Suite 7 33 Window Front W 38 1.280 116-A 0.72 NFRCI 270 New Double Clear Default NM Suite 7 34 W indow Front W 17 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 7 35 Window Front W 28 1.250 NFRC 0.82 NFRC 270 New Single Clear Default NM Suite 7 36 Window Front W 38 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 7 37 Window Front W 21 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 8 Future 38 Window Front W 17 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 8 Future 39 Window Front W 281 1.250 NFRC 0.82 NFRC 270 New Sin le Clear Default I NM Suite 8 Future (1) Udactor Type: 116-A Default Table from Standarrle T.W. wn n-r�,.n ��u., r..,_ .�_ ...•.. ..__.. _, .__ __,....�.._ . - ueraun i aoie from Standards, COG Center of Glass, NFRC Labeled Value - EXTERIOR SHADING # 27 Exterior Shade Type None SHGC 0.76 Window Hgt. Wd. 6.3 4.5 Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 7.0 0.1 7.0 7.0 28 None 0.76 12.3 1.7 7.0 0.1 7.0 7.0 29 None 0.76 12.3 1.7 7.0 0.1 7.0 7.0 30 None 0.76 2.8 6.0 7.0 0.1 7.0 7.0 31 None 0.76 6.3 4.5 7.0 0.1 7.0 7.0 32 None 0.76 12.3 1.7 7.0 0.1 7.0 7.0 33 None0.76 12.3 3.2 4.0 0.1 4.0 4.0 34 None 0.76 2.8 6.0 4.0 0.1 4.0 4.0 35 None 0.76 6.3 4.5 4.0 0.1 4.0 4.0 36 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 37 None 0.76 12.3 1.7 7.0 0.1 7.0 7.0 38 None 0.76 2.8 6.0 7.0 0.1 7.0 7.0 39 None 0.76 6.3 4.5 7.0 0.1 7.0 7.0 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES 1:1The proposed building Is In climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 U, a ceiling height greater than 15 feet. and an LPn f- �a -1 Ilohtlna of at taaet e 5 u ins _.. - --- ---------• - -- - - •••••�• •••• ••••oma ..,,�., --Bung unser the rresenpuve compliance Approach. Run Initiation Time: 01/30/07 13.57.40 Run Code: 1170194260 EnergyPro 4.3 by EnergySoft User Number. 3358 Job Number: 06-002 Paae:8 of 11 CERTIFICATE OF COMPLIANCE ENV -1 -CI (PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 OPAQUE SURFACES am®IV Reference FENESTRATION SURFACES More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from Standards Table 116-A and B. Certificate shall be filed in the contractors project office d do t f -.._-.-.-_. __, .__._.... ,.,,,,.,.., ,-,,,�,,,,,,, ,,,o .,.nv, nia, ival Rppunum, lvrrn, Labeled value. SHGC Type: 1168 Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING u g cons ruc on and in the building managers office after construction # Type ## 40 Exterior Shade Type None SHGC 0.76 Window Hgt. Wd. 12.3 1.7 Act. Cond. None Location/ 12.3 1.7 7.0 0.1 Area U -Fac' SHGC2 Am. Stat. Glazing Type Comments 40 Window Front W 6-A 2 1.280 11 0.72 NFRC 270 New Double Clear Default NM Suite 8 Future 41 Window Front W 2 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 8 Future 42 Window Front W 17 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 8 Future 43 Window Front W 28 1.250 NFRC 0.82 NFRC 270 New Single Clear Default NM Suite 8 Future 44 Window Front W 2 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 8 Future 45 Window Front W 2 1.280 116-A 0.72 NFRC 270 New Double Clear Default(NM)Suite 8 Future 46 Window Front W 17 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 8 Future 47 Window Front W 28 1.250 NFRC 0.82 NFRC 270 New Single Clear Default NM Suite 8 Future 48 Window Front W 21 1.280 116-A 0.72 NFRC 270 New Double Clear Default NM Suite 8 Future 49 Window Right SW 38 1.280 116-A 0.72 NFRC 225 New Double Clear Default NM Suite 9 Future 50 Window Right SW 17 1.280 116-A 0.72 NFRC 225 New Double Clear Default NM Suite 9 Future 51 Window Right (SWI 28 1250 NFRC 0.82 NFRC 225 New Single Clear Default NM Suite 9 Future 52 Window Right SW 38 1!2801116 -Al A 0.72 NFRC 225 New Double Clear Default NM Suite 9 Future (1) U.factor Type: 116A Default Table from Staodarrts T.W. MLI r1n1 II Tau.. b..... - wn.. ..____..__ __ - ..___ . -.._-.-.-_. __, .__._.... ,.,,,,.,.., ,-,,,�,,,,,,, ,,,o .,.nv, nia, ival Rppunum, lvrrn, Labeled value. SHGC Type: 1168 Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING ## 40 Exterior Shade Type None SHGC 0.76 Window Hgt. Wd. 12.3 1.7 _ Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. HQ -t- Dist. Len. H t. 7.0 0.1 7.0 7.0 41 None 0.76 12.3 1.7 7.0 0.1 7.0 7.0 42 None 0.76 2.8 6.0 7.0 0.1 7.0 7.0 43 None 0.76 6.3 4.5 7.0 0.1 7.0 7.0 44 None 0.76 12.3 1.7 7.0 0.1 7.0 7.0 45 None 0.76 12.3 1.7 7.0 0.1 7.0 7.0 46 None 0.76 2.8 6.0 7.0 0.1 7.0 7.0 47 None 0.76 6.3 4.5 7.0 0.1 7.0 7.0 48 49 50 None None None 0.76 0.76 0.76 12.3 1.7 12.3 3.2 2.8 6.0 7.0 4.0 4.0 0.1 0.1 0.1 7.0 4.0 4.0 7.0 4.0 4.0 51 1 None 0.76 6.3 4.5 4.0 0.1 4.0 4.0 52 I None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES ❑ Thelighproposed The proposed building Is In climate zones 2 through 15 and contains an enclosed space with Floor area greater than 25,000 U, a ceiling height greater than 15 feet. and an L for na.. i of a building n s Is I climate e., zoo . ..+r%cl. „ tills uua Is checkeo. env -a -c; must be filled out. when submitting under the Prescriptive Compliance Approach. Run Initiation Time: 01/30/07 13.57.40 Run Code: 1170194260 EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 Paae:9 of 31 CERTIFICATE OF COMPLIANCE ENV -1 -Cl PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 OPAQUE SURFACES # Surface Insulation Act. Cond. Joint Appendix T e Area U -Fac. Cay. Cont. Azm. Tilt Status IV Reference Location / Comments I I I N. E. A. R (New. Esistlnn Altarad F'j More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from IStandaMe Taw, 11r a and n reNm..., w., r,...:_ .,._ ---- - _. . . . _. # Type 53 Window 54 Window 55 Window 56 Window 57 Window 58 Window 59 Window Rear Rear Rear Right Ri ht Right Right SE SE SE SW SW SW SW Y.' -'i Quite aver conslructlon Act. Cond. Area U -Fac' SHGC2 Azm. Stat. Glazing Type 2 1.280 116-A 0.72 NFRC 135 New Double Clear Default NM 76 1.280 116-A 0.72 NFRC 135 New Double Clear Default NM 2 1.280 116-A 0.72 NFRC 135 New Double Clear Default NM 38 1.280 116-A 0.72 NFRC 225 New Double Clear Default NM 17 1.280 116-A 0.72 NFRC 225 New Double Clear Default NM 28 1.250 NFRC 0.82 NFRC 225 New Sin le Clear Default NM 38 1.280 116-A 0.72 NFRC 225 New Double Clear Default NM Location/ Comments Suite 10 Suite 10 Suite 10 Suite 10 Suite 10 Suite 10 Suite 10 Exterior Shade Type 533 None SHGC 0.76 Window Hgt. Wd. 12.3 1.7 Overhang Left Fin Right Fin Len. Wit. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 4.0 0.1 4.0 4.0 54 None 0.76 12.3 6.0 4.0 0.1 4.0 4.0 55 None 0.76 12.3 1.7 4.0 0.1 4.0 4.0 56 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 57 None 0.76 2.8 6.0 4.0 0.1 4.0 4.0 58 None 0.76 6.3 4.5 4.0 0.1 4.0 4.0 59 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 (1) U -factor TVoe: 116-A Default T.N. frrm, RlandaMd Tau- -1 n -r....,. r..,.,,. .-__ ,�_ ........... .... .. ..___ . ueyaun lanle from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING Exterior Shade Type 533 None SHGC 0.76 Window Hgt. Wd. 12.3 1.7 Overhang Left Fin Right Fin Len. Wit. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 4.0 0.1 4.0 4.0 54 None 0.76 12.3 6.0 4.0 0.1 4.0 4.0 55 None 0.76 12.3 1.7 4.0 0.1 4.0 4.0 56 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 57 None 0.76 2.8 6.0 4.0 0.1 4.0 4.0 58 None 0.76 6.3 4.5 4.0 0.1 4.0 4.0 59 None 0.76 12.3 3.2 4.0 0.1 4.0 4.0 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES ❑The proposed building Is In climate zones 2 through 15 and contains an enclosed Ilahtinn of at Iaaet n 5 wrni c-- e-...,..- ..e,_, space with Floor area greater than 25,000 U, a telling height greater than 15 feet. and an LPD for annnral suomnung unser me rrescnpuve Compliance I EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number 06-002 Page: 10 of 31 0. CERTIFICATE OF COMPLIANCE, MECH-1-C I PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: ' SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates, and ooeratina and maintenance infnrrrintinn meat the rnnidremc fc s co,.,;,,., ,n_, nllim —A T: 1 __.._..--- -- ----._.....__- -.._ ... ............ .., .........,.,,, ,..-,vv .• anu info —reit v. STATEMENT OF COMPLIANCE ® MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance By the general -Constant Air Volume Systems Outdoor Air Acceptance RTU -1 THRU RTU -6 & RTU -10 contractor Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrorit. ® MECH-3-A: Packaged HVAC Systems Acceptance Document RTU -1 THRU RTU -6 &RTU -10 Equipment requiring acceptance testing B the general y • contractor Test required on all New systems both New Construction and Retrofit. ❑ MECH-4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the commission do not require equipment testing but do require construction inspection. ® MECH-5-A: Air Distribution Acceptance Document RTU -1 THRU RTU -6 &RTU -10 By the general Equipment requiring acceptance testing Contractor This test required 11 the unit serves 5,000 k2 o/ space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. , ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VAV /an volume controls Installed on new or existing systems must be tested - ❑ MECH-8-A:-Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Btuihr. -Water-loop Heat Pump Controls Applies to all new waterioop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. - Equipment re uirin acceptance testing Page:11 of 31 EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 11AIR SYSTEM REQUIREMENt§". Part 1 of'2 MECH-2-C r PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems , AIR SYSTEMS, Central or Single Zone ' RTU -1 RTU -2 RTU -3 1 1 1 T-24 MANDATORY MEASURES Section Reference on Plans or Specification " Heating Equipment Efficiency Cooling Equipmerit Efficiency Heat Pump,Thermostat 9 Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control ' Outdoor Damper Control Isolation Zones Pipe Insulation ' Duct Insulation , 112(a) 7.70 HSPF 7.70 HSPF 7.70 HSPF 112(a) 13.0 SEER / 13.0 EER 13.0 SEER / 13.0 EER 13.0 SEER 113.0 EER 112(b) Yes Yes- Yes 112(c), 115(a) n/a n/a n/a 121(b) No No No 121 b 510 cfm 510 cfm 510 cfm 121 c No 4 No No 121(c) No No No 121 c 122 Ue Pro rammable Switch 'Programmable Switch ' Pro rammable Switch 122(e)' Heatin & Cooling Required Heatin & Coolinq'Required Heatin & Cooling Required 122 Auto Auto Auto 122 n/a n/a n/a 123 124 R-8.0 _ R-8.0 R-8.0 PRESCRIPTIVE MEASURES a Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x'1.212 Proposed Sensible Cooling Capacity. 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 144 a & b n/a n/a n/a 144 a & b 34,352 btuh 34,352 btuh 34,352 btuh 144 a & b)' n/a n/a n/a 144 a & b)_ 52,644 btuh 52,648 btuh 52,648 btuh 144 c Constant Volume - Constant Volume Constant Volume 144 (c)} 144 c Yes Yes Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 f Constant Temp Constant TempConstant Tem 144 (f) �. Constant Temp Constant Temp Constant Tem 144 k No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. a FIELDOTES TO Build' e ent Use Only v�2;��,�a'i 'ia s < ^~ `,r''�' S"4 "a'v : fir`;#''i$,2 w,c°'"r ,,; 'F.�.u, .a''..* ,"',v,i w 4 # .z'4. .aK c! 3°"4d:'. #'� s� a. ".r ' .'"�.xyi,a� ,t•,% a r cr ke Run Initiation Time: 01/30/07 13:57:40 Run Code: 1170194260 EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 Page: 12 of 31 [AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C PROJECT NAME DATE• Washington Park - Shops 4 1/30/2007' SYSTEM FEATURES j ITEM OR SYSTEM TAG(S) Number of Systems AIR SYSTEMS, Central or Single Zone RTU -4 RTU -5 RTU -6 112(a) 13.0 SEER / 13.0 EER 13.0 SEER / 13.0 EER T-24 MANDATORY MEASURES ` . 'Section Reference on Plans or Specification t ' Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation , Duct Insulation 112(a) 7.70 HSPF ~ 7.70 HSPF 7.70 HSPF 112(a) 13.0 SEER / 13.0 EER 13.0 SEER / 13.0 EER 13.0 SEER / 13.0 EER 112(b) - Yes Yes Yes 112(c), 115(a) n/a n/a. n/a 121(b) No No No 121 b 510 cfm 510 cfm 510 cfm 121 c . No No No 121 c No No No 121 c 122 a Proarammable Switch Proarammable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heat6q & Cooling Required 122(f) Auto Auto Auto 122 n/a n/a n/a 123 124 J R-8.0 R-8.0` R-8.0 PRESCRIPTIVE MEASURES ` Calculated Heating Capacity x 1.43 2 - Proposed Heating Capacity 2 - Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 144 a & b _ �n/a n/a n/a 144 a & b 34,352 btuh 34,352 btuh 34,352 btuh 144 a & b f n/a n/a n/a 144 a & b 52,648 btuh - 52,648 btuh 52,648 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c ' 144 c Yes %' w Yes Yes 144 d No No No 144 e • No Economizer No Economizer No Economizer 144 f Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and "specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. [AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C PROJECT NAME DATE Washington Park - Shops' 4 •1/30/2007 . SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems AIR SYSTEMS, Central or Single Zone " • RTU -7 RTU -8 (Future) RTU -9 (Future) - .1 1 •. 1 T-24 MANDATORY MEASURES Section s ' Reference on Plans or Specification Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation 'VAV Minimum Position Control Demand Control Ventilation - Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(a) _ 3.40 COP 3.30 COP 3.30 COP 112 a '10.5 EER 43'E6 10.3 EER "112 b Yes Yes Yes 112(c), 115 a n/a `l n/a n/a 121(b) No No ' No 121 b '. 652 cfm 530 cfm 530 cfm 121 c No No No a 121 c No Yes Yes 121 c 122(e) Programmable Switch Programmable Switch Pr rammable Switch 122(e) Heating & Cooling Required Heating & Cooling Required' Heating & Cooling Required 122(f) Auto Auto Auto 122 n/a n/a n/a 123 124 R-8.0 R-8.0 R40 PRESCRIPTIVE MEASURES ; Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity. x 1.212 Proposed Sensible Cooling Capacity. 2 'H Fan Control DP Sensor Location Supply Pressure Reset (DDC only Simultaneous Heat/cool Economizer 'Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 144 a & b n/a n/a n/a 144 a & b 43,096 btuh 53 089 btuh 53,089 btuh 144 a & b n/a n/a n/a " 144 a & b 65,487 btuh - 73,639 btuh •- - 74,005 btuh 144 c Constant Volume Constant Volume % Constant Volume 144 c 144 c Yes Yes Yes 144 d No No No 144 a No Economizer , Fixed Temp, (Non-IntegFixed Tem Non -Int S 144 f Constant Temp Constant Tem 'Constant Tem 144 (f) Constant Temp - Constant Temp Constant Temp 144 k No No ' No - - 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERFA for performance method duct sealing requirements. I nr4° R, F •,<,'.a { `-y a3 :^'�' L �, fl - rcun mttiatlon i Ime: U7 3u UI 13:57:40 Run Code: 1170194260 EnergyPro 4.3 by EnergySoft User Number: 3358 ' Job Number: 06-002 Page: 14 o 31 e IR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C PROJECT NAME DATE - Washington Park = Shops 4 1/30/2007 SYSTEM FEATURES AIR SYSTEMS, Central or Single Zone ITEM OR SYSTEM TAGS) RTU -10 , Number of Systems • . 1 - T-24 , MANDATORY MEASURES Section Reference on Plans or Specification Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation . Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity .2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset, Duct Sealing for Prescriptive Compliance 112(a) 3.40 COP 112(a) 10.5 EER 112(b) •' Yes 112(c), 115(a n/a ` 121(b) No ' 121 b 650 cfm 121 c No 121 c No ~ 121 c 122(e) Programmable Switch 122(e) Heating & Cooling Required 122(f) Auto . - 122 n/a 123 � • ' 124 - R-8.0 ' 144 a & b n/a 144 a & b 43,096 btuh ' 144 a & b n/a 144 a & b 65 668 btuh 144 c Constant Volume • r 144 c 144 c y Yes 144 d No 144 a No Economizer' 144 f Constant Tem 144 (f) Constant Temp 144 k No 1. For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft;' Has > 25% duct in unconditioned space. Dud sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. 'r r N TES TO FIELD - For Buildina Dwartment Use Only o y 1.f sp -:?; S� �... [ '� -�5 } Cy. '4 'y..5�• 3., 3' # ,. �y, �.(� y.v r Y k 3 ,•'= � 7 ' a +�"�`'�i 'a'�.�a lc y �.� �. ,;: v ^",;,H+•> ='Jr C�S„�� '�. ,R's�sr4 v. ,.fi�` c•}'� � ,,t � y�l S •;'-' a '' �, r} ,c �' � ::af-£� ><�"` �> �✓ F ":' � :#� � n'� r17 �'"� � j`� - � a+-*,�� r �� ti.- R.k ry a, � wi .�;'. Run Initiation Time: 01130/07 13:57:40 Run Code: 1170194260 . EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 Page: 15 of 31 WATER SIDE SYSTEM. REQUIREMENTS Part 2 -of 2 MECH-2-C PROJECT NAME - . � . ' . •` DATE Washington Park Shops 4 1/30/2007 SYSTEM FEATURES } - , s WATER SIDE SYSTEMS: Chillers, Towers, Boilers, Hydro ic Loops ITEM OR SYSTEM TAG(S)' Number of Systems y , T'241 _ MANDATORY MEASURES Section Reference on Plans or Specification'. , Equipment Efficiency - 112(a) Pipe Insulation 123 y - PRESCRIPTIVE MEASURES s ' Calculated Capacity Proposed Capacity Tower Fan Controls Tower Flow Controls Variable Flow System Design Chiller and Boiler Isolation CHW and HHW Reset Controls WLHP Isolation Valves . VSD on CHW, CW & WLHP Pumps > 5 HP DP Sensor Location 1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put %/A" in the column. , s 2: Water side system_ s include wet side system using other liquids such as glycol or brine. " Service Hot Water, Pool Heating 'ITEM OR'SYSTEM TAG(S) _ - DHW Heater Number of Systems g J MANDATORY MEASURES , ' ;,: ! - ' 'Reference on Plans or Specification' ' Water Heater Certification s.. 113 a ` Water Heater Efficiency 113 (b). Service Water Heating Installation . 113 c Pool and Spa Efficiency and Control 114 a Pool and Spa Installation 114 b Pool Heater- No Pilot Light - 115 (c) Spa Heater - No Pilot Light 115 d 1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and + paragraph number where the required features are documented. If a requirement is not applicable, put "N/X ins the column. rx� Building De se Only U y�ak R" T Kun initiation 1 ime: 01/30107 13:57:40 - Run Code: 1170194260 rgyPro 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 Page 16 of 31 1. I MECHANICAL VENTILATION MECH-3-CI (PROJECT NAME DATE Washington Park - Shoos 4 1 1 nni9007 PRESCRIPTIVE REHEAT LIMITATION Section 144(d)) MECHANICAL VENTILATION Section 121 b 2 AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N oc fn T ° xD0f c 3 0 n � Q � '� m -am � x G �<ZONEISYSTEM < n D�N �-n A x �n O 7 Kqn Om O y »DT . •>3O 0O� d>-Nw D Suite 1 1,49E 0.22 329 34.0 15.0 510 510 510 RTU -1 Total 510 510 Suite 1,495 0.22 329 34.0 15.0 510 510 510 RTU -2 Total 510 510 Suite 11,499Z 0.22 329 34.0 15.0 510 510 510 RTU -3 Total 510 510 Suite 1,495 0.22 329 34.0 15.0 510 510 510 RTU 4 Total 510 510 Suite 1,49E 0.22 329 34.0 15.0 510 510 510 RTU -5 Total 510 510 Suite 1,495 0.22 329 34.0 15.0 510 510 510 RTU -6 Total 510 510 Suite 7 1,914 0.22 421 43.5 15.0 652 652 652 RTU -7 Total 652 652 Suite 8 (Future) 1,554 0.22 342 35.3 15.0 530 530 530 RTU -8 (Future) Total 530 530 Suite 9 (Future) 1,554 0.22 342 35.3 15.0 530 530 530 RTU -9 (Future) Total 530 530 Suite 10 1,90E 0.22 420 43.4 15.0 650 650 650 RTU -10 Total 650 650 C Minimum ventilation rata per Section 121, Table 121-A E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air (REO'D V.A.) is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS (column D or G). 1 Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply dm (Fan CFM) x 30%; or K Condition area (ff. sq.) x 04 cfm/fl. sq.; or L Maximum of columns H, J, K. or 300 dm M This must be less than orequal to Column L and greater that orequal to the sum of Columns H * N. N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M. EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 Page: 17 of 31 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-C PROJECT NAME Washington Park - Shops 4 - •^ DATE 1/30/20 CHILLER AND TOWER SUMMARY Condition Status Energy Factor or RE Standby Loss or I Pilot TANK INSUL. Ext. R -Val. CHRONOMITE S-30 LP Instant Elec Efficiency Tons PUMPS 0 Equipment Name Equipment Type Qty. Tot. Qty JGPM I BHP Motor Eff. Drive Eff. Pump Control DHW BOILER SUMMARY System Name System Type Distribution Type Qty Rated Input Vol. (Gals.) Condition Status Energy Factor or RE Standby Loss or I Pilot TANK INSUL. Ext. R -Val. CHRONOMITE S-30 LP Instant Elec No Pipe Insulation 8 9,429 0 New 0.98 n/a n/a Hot Water Pump i Hot Water Pi Control # HP Type In Plenum OutsideBuried Insulation ENVELOPE MANDATORY MEASURES, NAME Washington Park - Shops 4 ENV -MM DATE 1/30/2007 DESCRIPTION Designer Enforcement ❑X § 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. FX] § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. § 117(,) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. § 118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have Insulation with an installed R -value of no less than R-13 between framing members. EnergyPro By EnergySoft User Number: User Job Number: 06-002 ?age:19 of 31 [MECHANICAL MANDATORY MEASURES NAME Washington Park - Shops 4 Part 1 of 2 MECH-MM DATE 1/30/2007 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies FRI §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. § 115(a) Fan type central furnaces shall not have a pilot light. RX § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. X § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards. Controls § 122(e) Each spaceconditioning system shall be installed with one of the following: § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or a § 122(e)l B An occupancy sensor to control the operating period of the system; or FXJ• § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. a§ 122(.)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. F] § 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. § 122(a8,b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower: For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. X❑ § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. § 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro By EnergySoft User Number: User Job Number: 06-002 Page:20 of 31 [MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME DATE _ Washington Park - Shops 4 1/30/2007 Description Designer Enforcement Ventilation F§ 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. R§ 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. D § 122(fi All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. ❑ § 121(01 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or X❑ § 121(02 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or F] § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous , basis and displaying that quantity on a readily accessible display divice; or § 121(f)4 Another method approved by the Commission. Service Water Heating Systems X❑ § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. RX § 113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. EnergyPro By EnergySoft User Number: User Job Number: 06-002 _ Page: 21 of 31 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park - Shops 4 1/30/201 SYSTEM NAME FLOOR AREA RTU -1 1,495 (ENGINEERING CHECKS IISYSTEM LOAD Number of Systems 1 Heating System Output per System 55,000 Total Output (Btuh) 55,000 Output (Btuh/sqft) 36.8 Cooling System Output per System 63,800 Total Output (Btuh) 63,800 Total Output (Tons) 5.3 Total Output (Btuh/sqft) 42.7 Total Output (sgft/Ton) 281.2 Air System CFM per System 2,000 Alrflow (cfm) 2,000 Airflow (cfm/sgft) 1,34 Airflow (cfm/Ton) 376.2 Outside Air (%) 25.5 Outside Air (cfm/sgft) 0.34 Note: values above 26.0 OF —) 0 Outsid ir 510 cfm 69.8 OF 11.0 / 77.6 OF Outside Air 510 cfm 74.8/62.1 °F EnergyPro 4.3 at ARI conditions YCHROMETRICS 58.6 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK I COIL HTG. PEAK CFM Sensible Latent CFM Sensible 1,58 31,959 6,456 271 10,098 0 1,598 505 0 0 510 19,640 9,270 510 23,736 0 0 1,5981 505 54.8741 157261 34 844 HVAC EQUIPMENT SELECTION CARRIER 50HJ0006 52,644 5,812 34,352 Total Adjusted System Output 52,644 5,812 34,352 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 4 m an 12 am 105.0 OF Heating Coil s at Time ay: Supply Fan 2000 cfm 105.0 OF —��Supply Air Ducts 104.8 OF ROOMS 70.0 OF h Return Air Ducts Temperatures at Time of Ca 84.0 / 66.6 OF User Number: 3358 55.0 / 53.7 OF 55.0 / 53.7 OF Supply Air Ducts Supply Fan 55.8 / 54.0 OF 2000 cfm 50.7% R.H. ROOMS 74.0 / 61.9 OF Return Air Ducts Cooling Coil Job Number: 06-002 of 31 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 SYSTEM NAME FLOOR AREA RTU -2 1,495 Number of S stems 1 Heating System Output per System 55,000 Total Output (Btuh) 55,000 Output (Btuh/sgft) 36.8 Cooling System Output per System 63,800 Total Output (Btuh) 63,800 Total Output (Tons) 5.3 Total Output (Btuh/sgft) 42,7 Total Output (sgft/Ton) 281.2 Air System CFM per System 2,000 Alrflow (cfm) 2,000 Airflow (cfm/sgft) 1,34 Airflow (cfm/Ton) 376.2 Outside Air (%) 25.5 Outside Air (cfm/sgft) 0.34 Note: values above given at ARI conditions 26.0 of — �0 0 Outside Air 510 cfm 69.8 of 11.0 / 77.6 of Outside Air 510 cfm 74.8/62.1 of 58.6 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK ICOILHTG.PEAKI CFM I Sensiblel Latent 1CFM1 Sensible 1,589 32,130 6,456 275 10,247 0 1,607 512 0 0 510 19,638 9,27 510 23,735 0 0 1,6071 512 55,0591 15 726 35 006 CARRIER 50HJQ006 52,648 5,809 34,352 Total Adjusted System Output 52,648 5,809 34,352 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Jul 4 pmI Jan 12 am Heating Coil Supply Fan 2000 cfm 105.0 of -> Supply Air Ducts 104.8 of ROOMS 70.0 of h Return Air Ducts 4 airstream Temperatures at Time 84.0 / 66.6 of . 55.0 / 53.7 of Cooling Coil Supply Fan 2000 cfm 55.0 / 53.7 of -�j Supply Air Ducts 55.8 / 54.0 of 50.7% R.H. ROOMS 74.0 / 61.9 of h Return Air Ducts 4 I EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number 06-002 Page:23 of 31 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 SYSTEM NAME FLOOR AREA RTU -3 1,495 Number of Systems 1 Heating System Output per System 55,000 Total Output (Btuh) 55,000 Output (Btuh/sgft) 36.8 Cooling System Output per System 63,800 Total Output (Btuh) 63,800 Total Output (Tons) 5.3 Total Output (Btuh/sqft) 42.7 Total Output (sgft/Ton) 281.2 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1.34 Airflow (cfm/Ton) 376.2 Outside Air (%) 25.5 Outside Air (cfm/sgft) 0,34 Note: values above given at ARI conditions 26.0 OF — ) 0 Outside Air 510 cfm 69.8 OF COOLING E 111.0 / 77.6 OF — )0 v Outside Air 510 cfm 74.8/62.1 °F Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 1,589 32,130 6,456 275 10,247 0 1,607 512 0 0 510 19,638 9,27 .510 23,735 0 0 1,6071 512 55.0 15 726 35 006 CARRIER 50HJQ006 52,648 5,809 34,352 Total Adjusted System Output52,648 5,809 34,352 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Jul 4 m Jan 12 am KIGJ (Airstream l em 58.6°F ® 105.0°F Heating Coil Time Supply Fan 2000 cfm 105.0 OF -> Supply Air Ducts 104.8 OF ROOMS 70.0 OF h Return Air Ducts 4 of 84.0 / 66.6 OF 55.0 / 53.7 OF Cooling Coil Supply Fan 2000 cfm 55.0 / 53.7 of -�j Supply Air Ducts 55.8/54.0°F 50.7% R.H. ROOMS 74.0 / 61.9 OF h Return Air Ducts 4 EnergyPro 4.3 by EnergySoft User Number 3358 Job Number: 06-002 Page: 24 of 31 0 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 SYSTEM NAMEFLOOR AREA RTU -4 1,495 Number of S stems 1 Heating System Output per System 55,000 Total Output (Btuh) 55,000 Output (Btuh/sqft) 36.8 Cooling System Output per System 63,800 Total Output (Btuh) 63,800 Total Output (Tons) 5.3 Total Output (Btuh/sqft) 42,7 Total Output (sgft/Ton) 281.2 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1.34 Airflow (cfm/Ton) 376.2 Outside Air ('/u) 25.5 Outside Air (cfm/sqft) 0.34 Note: values above given at ARI conditions 26.0 of — )o y Outside Air 510 cfm 69.8 of 111.0 / 77.6 of — 311, 1 Outside Air 510 cfm 74.8/62.1 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 55.05 15 726 35,006 CARRIER 50HJQ006 52,648 5,809 34,352 Total Adjusted System Output 52,648 5,809 34,352 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 4 m Jan 12 am 'earn Temperatures at Time of Heatina Peak) 58.6 OF ® 105.0 OF Heating Coil 84.0 / 66.6 of 105.0 of Supply Air Ducts Supply Fan 104.8 of 2000 cfm ROOMS 70.0 of Return Air Ducts e 55.0 / 53.7 of ___9P Cooling Coil Supply Fan 2000 cfm 55.0 / 53.7 of -,j Supply Air Ducts 55.8 / 54.0 of 50.7% R.H. ROOMS 74.0 / 61.9 of h Return Air Ducts EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number 06-002 Page:25 of 31 1 i HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 SYSTEM NAME FLOOR AREA RTU -5 1,495 ENGINEERING CHECKS IISYSTFM t Aon Number of Systems 1 Heating System Output per System 55,000 Total Output (Btuh) 55,000 Output (Btuh/sqft) 36.8 Cooling System Output per System 63,800 Total Output (Btuh) 63,800 Total Output (Tons) 5.3 Total Output (Btuh/sgft) 42.7 Total Output (sgftlTon) 281.2 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1,34 Airflow (cfm/Ton) 376.2 Outside Air (°/,) 25.5 Outside Air (cfm/sqft) 0.34 Note: values above given at ARI conditions iEATING SYSTEM PSYCHROMETRI 26.0 of —) ;Out4 510 cfm 69.8 of 58 s of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM Sensible 1,589 32,130 6,456 275 10,247 0 1,607 512 0 0 510 19,638 9,27 510 23,735 0 0 1,6071 512 55.059:[:::;5 726 35 006 CARRIER 50HJ0006 52,648 5,809 34,352 Total Adjusted System Output 52,648 5,809 34,352 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 4 m Jan 12 am rstream Temperatures at Time of Heating Peak) 9= Heating Coil Supply Fan 2000 cfm 105.0 of —� Supply Air Ducts 104.8 of ROOMS 70.0 of I h Return Air Ducts voLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 111.0/77.6OF 84.0/66.6OF 55.0/53.7OF 55.0/53.7OF Outside Air O Supply Air Ducts 510 cfm Cooling Coil Supply Fan 55.8 / 54.0 of 2000 cfm 50.7% R.H. ROOMS 74.8/62.10F 74.0/61.9OF 19 .4 Co,.a.._.. n:_ n.._._ - I EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 Paoe:26 of 31 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 SYSTEM NAME FLOOR AREA RTU -6 1,495 KS Number of Systems 1 Heating System Output per System 55,000 Total Output (Btuh) 55,000 Output (Btuh/sgft) 36.8 Cooling System Output per System 63,800 Total Output (Btuh) 63,800 Total Output (Tons) 5.3 Total Output (Btuh/sqft) 42,7 F. Total Output (sgft/Ton) 281.2 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1.34 Airflow (cfm/Ton) 376.2 Outside Air (°/a) 25.5 Outside Air (cfm/sgft) 0.34 Note: values above given at ARI conditions iEATING SYSTEM PSYCHROMETR 26.0 of — ) ;I Outside Air 510 cfm 69.8 of 58 6 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 55.0591 15.7261 275 10,247 512 0 510 23,735 0 512 35 006 CARRIER 50HJQ006 52,648 5,809 34,352 Total Adjusted System Output 52,648 5,809 34,352 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 4 pml I an 12 am earn Temperatures at Time of Heating Peak) 105.0 of Heating Coil Supply Fan 2000 cfm 105.0 of —� Supply Air Ducts 104.8 of ROOMS 70.0 of h Return Air Ducts `i DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 111.0/77.6OF 84.0/66.6OF 55.0/53.7OF 55.0/53.7OF s� Supply Air Ducts Outside Air 510 cfm � ` Cooling Coil Supply Fan 55.8 / 54.0 of 2000 cfm 50.7% R.H. ROOMS 74.8/62.1 0 F 74.0161.9 OF Return Air Ducts EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 Page:27 of 31 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 SYSTEM NAME FLOOR AREA RTU -7 1.914 ENGINEERING CHECKS 11SYSTEM LOAD Number of Systems 1 Heating System Output per System 69,000 . Total Output (Btuh) 69,000 Output (Btuh/sgft) 36.1 Cooling System Output per System 76,000 Total Output (Btuh) 76,000 Total Output (Tons) 6.3 Total Output (Btuh/sqft) 39.7 Total Output (sgft/Ton) 302.2 Air System CFM per System 2,400 Airflow (cfm) 2,400 Airflow (cfm/sqft) 1.25 Airflow (cfm/ron) 378.9 Outside Air (%) 27.2 Outside Air (cfm/sgft) 0.34 Note: values above Given at ARI conditions 26.0 OF OutsAir 652 cfm 69.6 OF S7 7 OC Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM I Sensible 2,532 51,190 8,265 569 21,200 0 2,559 1,060 0 0 652 24,976 11,776 652 30,266 0 0 2,559 1,060 81.3351 20,04 53 586 HVAC EQUIPMENT SELECTION CARRIER 50HJ0007 65,487 4,561 43,096 Total Adjusted System Output ss,a87 x,561 a3,o96 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 4 m] Jan 12 am Cream Temperatures at Time of Heating Peak) 105.0 °F .105.00F ...................... & -� Supply Air Ducts Heating Coil Supply Fan 104.6 °F 2400 cfm ROOMS 70.0 OF Return Air Ducts TOOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 11.0/77.6°F 84.8/66.9°F 55.0/53.6°F 55.0/53.6°F Supply Air Ducts Outside Air U*: 652 cfm Cooling Coil Supply Fan 56.0 / 54.0 OF 2400 cfm 50.9% R.H. ROOMS 75.0/62.3°F 74.0!61.9°F Return Air Ducts I EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 Page:28 of 31 y HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 SYSTEM NAME FLOOR AREA RTU -8 Future 1.554 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Heating System Output per System 85,000 Total Output (Btuh) 85,000 Output (Btuh/sgft) 54.7 Cooling System Output per System 91,300 Total Output (Btuh) 91,300 Total Output (Tons) 7.6 Total Output (Btuh/sgft) 58.8 Total Output (sgftrron) 204.2 Air System CFM per System 3,000 Airflow (cfm) 3,000 Airflow (cfm/sqft) 1.93 Airflow (cfm/ron) 394.3 Outside Air (%) 17.7 Outside Air (cfm/sgft) 0.34 Note: values above given at ARI conditions 26.0 OF ')'0 Outside Air 530 cfm 69.7 OF a,? n 01: Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 2,219 44,869 6,710 501 18,672 0 2,243 934 0 0 530 19,111 10,05 530 24,642 2,418 -2,418 2,243 934 70,885 16,76 42 764 HVAC EQUIPMENT SELECTION CARRIER 50HJQ008 73,639 8,826 53,089 Total Adjusted System Output 73,639 8,826 53,089 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 5 m Jan 12 am tream Temperatures at Time of Heating Peak) 105.0 OF 105.8 OF © Supply Air Ducts k.� 0 Heating Coil Supply Fan 105.5 F 3000 cfm ROOMS 70.0 OF Return Air Ducts COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 108.6/77.0°F 80.7/64.9°F 55.0/53.8°F 55.8/54.1OF Supply Air Ducts Outside Air 530 cfm Cooling Coil Supply Fan 56.5 / 54.4 OF 3000 cfm LOOMS 49.9% R.H. 74.7/61.9 °F 74.0 61.6 OF Return Air Ducts EnergyPro 4.3 by EnergySoft User Number: 3358 ' Job Number: 06-002 Paoe:29 of 31 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 SYSTEM NAME FLOOR AREA RTU -9 Future 1,554 ENGINEERING CHECKS ISYSTEM LOAD Number of Systems 1 Heating System Output per System 85,000 Total Output (Btuh) -.85,000 Output (Btuh/sgft) 54.7 Cooling System Output per System 91,300 Total Output (Btuh) 91,300 Total Output (Tons) 7,6 Total Output (Btuh/sgft) 58.8 Total Output (sgftrron) 204.2 Air System CFM per System 3,000 Airflow (cfm) 3,000 Airflow (cfm/sgft) 1.93 Airflow (cfm/Ton) 394.3 Outside Air (%) 17.7 Outside Air (cfm/sgft) 0.34 ote: values above given at ARI conditions :ATING SYSTEM PSYCHROMETRICS 26.0 of 62.10F Outside Air 530 cfm 69.8 of 112.0 / 77.9 of Outside Air 530 cfm 74.5 / 61.8 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 1,548 31,307 6,710 277 10,335 0 1,565 517 0 0 530 21,140 10,03 530 24,716 2,418 -2,418 1,565 517 58,0881 167741 33 667 CARRIER 50HJQ008 74,005 7,196 53,089 Total Adjusted System Output 74,005 7,196 53,089 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK F7 Aug 3 prn Jan 12 am mm Temperatures at Time of Heating Peak) 10.5.0 of 105.8 of —�n Supply Air Ducts 105.6 of ROOMS 70.0 of Return Air Ducts Heating Coil Supply Fan 3000 cfm 81.1/65.10F M 55.0/53.70F Cooling Coil Supply Fan 3000 cfm 55.8 / 54.1 of Supply Air Ducts 56.3/54.3OF 49.8% R.H. ROOMS 74.0 / 61.6 °F EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number. 06.002 Page: 30 of 31 A�? Sn i HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park - Shops 4 1/30/2007 SYSTEM NAME FLOOR AREA RTU -10 1,908 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Heating System Output per System 69,000 Total Output (Btuh) 69,000 Output (Btuh/sgft) 36.2 Cooling System Output per System 76,000 Total Output (Btuh) 76,000 Total Output (Tons) 6.3 Total Output (Btuh/sqft) 39.8 Total Output (sgftrron) 301.3 Air System CFM per System 2,400 Airflow (cfm) 2,400 Airflow (cfm/sgft) 1.26 Airflow (cfmrron) 378.9 Outside Air (%) 27,1 Outside Air (cfm/sgft) 0.34 Note: values above given at ARI conditions 26.0 of — ?1 ;0 Outside Air 650 cfm 69.6 of 57.8 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 77 245 19.9841 51 611 CARRIER 50HJQ007 65,668 4,063 43,096 Total Adjusted System Output 65,668 4,063 43,096 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am mm Temperatures at Time of Heating Peak) 105.0 of 105.0 of Heating Coil O Supply Alr Ducts Supply Fan 104.6 of 2400 cfm ROOMS 70.0 of Return Air Ducts ;UULINU SYS I tM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 12.0 / 77.9 of 85.0 / 67.0 of 55.0 / 53.6 of 55.0 / 53.6 of e Supply Air Ducts Outside Air 650 cfm Cooling Coil Supply Fan 55.9 / 54.0 of 2400 cfm 50.8% R.H. ROOMS 74.9/62.20F 74.0/61.9OF Return Air Ducts EnergyPro 4.3 by EnergySoft User Number: 3358 Job Number: 06-002 Page:31 of 31