2019 07 16 Council
CITY COUNCIL AGENDA 1 JULY 16, 2019
CITY COUNCIL
AGENDA
CITY HALL COUNCIL CHAMBER
78495 Calle Tampico, La Quinta
REGULAR MEETING ON TUESDAY, JULY 16, 2019
3:00 P.M. CLOSED SESSION | 4:00 P.M. OPEN SESSION
CALL TO ORDER
ROLL CALL: Councilmembers: Fitzpatrick, Peña, Radi, Sanchez, Mayor Evans
PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA
At this time, members of the public may address the City Council on any matter not
listed on the agenda. Please complete a "Request to Speak" form and limit your
comments to three minutes. The City Council values your comments; however in
accordance with State law, no action shall be taken on any item not appearing on the
agenda unless it is an emergency item authorized by GC 54954.2(b).
CONFIRMATION OF AGENDA
CLOSED SESSION
1. PUBLIC EMPLOYEE DISCIPLINE / DISMISSAL / RELEASE PURSUANT TO
GOVERNMENT CODE SECTION 54957
2. CONFERENCE WITH LABOR NEGOTIATORS PURSUANT TO GOVERNMENT
CODE SECTION 54957.6; CITY DESIGNATED REPRESENTATIVE: CHRIS
ESCOBEDO, COMMUNITY RESOURCES DIRECTOR; AND EMPLOYEE
ORGANIZATION: LA QUINTA CITY EMPLOYEES ASSOCIATION
3. CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION
SIGNIFICANT EXPOSURE TO LITIGATION PURSUANT TO PARAGRAPH (2)
OR (3) OF SUBDIVISION (d) OF GOVERNMENT CODE SECTION 54956.9
(NUMBER OF POTENTIAL CASES: 1)
City Council agendas and staff reports
are available on the City’s
web page: www.LaQuintaCA.gov
CITY COUNCIL AGENDA 2 JULY 16, 2019
RECESS TO CLOSED SESSION
RECONVENE AT 4:00 P.M.
REPORT ON ACTIONS(S) TAKEN IN CLOSED SESSION
PLEDGE OF ALLEGIANCE
PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA
At this time, members of the public may address the City Council on any matter not
listed on the agenda. Please complete a "Request to Speak" form and limit your
comments to three minutes. The City Council values your comments; however in
accordance with State law, no action shall be taken on any item not appearing on the
agenda unless it is an emergency item authorized by GC 54954.2(b).
ANNOUNCEMENTS, PRESENTATIONS, AND WRITTEN COMMUNICATIONS
1. INTRODUCE SPECIAL ENFORCEMENT TEAM SERGEANT DAVID ALDRICH
2. PROCLAMATIONS – RECOGNITION OF SERVICE FOR OUTGOING
COMMISSIONERS
3. CITY OF LA QUINTA’S GENERAL FUND BALANCE AND RESERVE POLICY
AWARD FOR EXCELLENCE BY THE GOVERNMENT FINANCE OFFICERS
ASSOCIATION
CONSENT CALENDAR
NOTE: Consent Calendar items are routine in nature and can be approved by one
motion.
PAGE
1. APPROVE MINUTES OF JULY 2, 2019
9
2. RECEIVE AND FILE REVENUE AND EXPENDITURE REPORT DATED MAY
31, 2019
19
3. APPROVE DEMAND REGISTERS DATED JUNE 28 AND JULY 5, 2019
23
4. ADOPT RESOLUTION TO APPROVE THE 2019/20 SALARY SCHEDULE
AND AMENDMENT NO. 2 TO MEMORANDUM OF UNDERSTANDING
BETWEEN THE CITY OF LA QUINTA AND THE LA QUINTA CITY
EMPLOYEES’ ASSOCIATION REAFFIRMING THE HEALTH BENEFIT CAP
OF $1,709 PER EMPLOYEE PER MONTH [RESOLUTION NO. 2019-028]
41
5. ADOPT RESOLUTION TO APPROVE THE 2019/20 SALARY SCHEDULE,
AND REAFFIRM THE HEALTH BENEFIT CAP OF $1,709 PER EMPLOYEE
49
CITY COUNCIL AGENDA 3 JULY 16, 2019
PER MONTH, FOR NON-REPRESENTED MANAGEMENT, CONTRACT,
AND CONFIDENTIAL EMPLOYEES [RESOLUTION NO. 2019-029]
6. APPROVE PLANS, SPECIFICATIONS, ENGINEER’S ESTIMATE, AND
ADVERTISE FOR BID THE SILVERROCK WAY INFRASTRUCTURE
STREET IMPROVEMENTS (PROJECT NO. 2014-13)
55
BUSINESS SESSION
PAGE
1. APPROPRIATE $39,600 AND AUTHORIZE CALLE TAMPICO AND PARK
AVENUE GUARD RAIL BARRIER IMPROVEMENTS
59
STUDY SESSION - NONE
PUBLIC HEARINGS – after 5:00 p.m.
For all Public Hearings on the agenda, a completed “Request to Speak” form
must be filed with the City Clerk prior to consideration of that item.
A person may submit written comments to City Council before a public hearing
or appear in support or opposition to the approval of a project(s). If you
challenge a project(s) in court, you may be limited to raising only those issues
you or someone else raised at the public hearing or in written correspondence
delivered to the City at, or prior to the public hearing.
PAGE
1. ADOPT RESOLUTION TO APPROVE UPDATES TO THE CITY’S USER AND
REGULATORY MASTER FEE SCHEDULE [RESOLUTION NO. 2019-030]
69
2. ADOPT RESOLUTION TO DENY APPEAL 2019-0002 AND SUSTAIN
PLANNING COMMISSION APPROVAL OF CONDITIONAL USE PERMIT
2018-0005 AND SITE DEVELOPMENT PERMIT 2018-0004 FOR A 16-
UNIT APARTMENT PROJECT LOCATED AT 51-480 DESERT CLUB
DRIVE; PROJECT: DESERT CLUB APARTMENTS; CEQA: EXEMPT FROM
ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15332, INFILL
DEVELOPMENT [RESOLUTION NO. 2019-031]
307
DEPARTMENTAL REPORTS
1. CITY MANAGER – COACHELLA VALLEY ASSOCIATION OF
GOVERNMENTS INTENT TO EXERCISE ITS EMINENT DOMAIN POWERS
OVER OBTAINING PROPERTY FOR THE CV LINK MULTI-MODAL
TRANSPORTATION CORRIDOR PROJECT
367
2. CITY ATTORNEY
CITY COUNCIL AGENDA 4 JULY 16, 2019
3. CITY CLERK
4. COMMUNITY RESOURCES
5. DESIGN AND DEVELOPMENT – MONTHLY DEPARTMENT REPORT –
JUNE 2019
373
6. FACILITIES – MONTHLY DEPARTMENT REPORT – JUNE 2019 377
7. FINANCE
MAYOR’S AND COUNCIL MEMBERS’ ITEMS
REPORTS AND INFORMATIONAL ITEMS
1. CVAG COACHELLA VALLEY CONSERVATION COMMISSION (Evans)
2. CVAG ENERGY AND ENVIRONMENTAL RESOURCES COMMITTEE (Evans)
3. CVAG EXECUTIVE COMMITTEE (Evans)
4. GREATER PALM SPRINGS CONVENTION AND VISITORS BUREAU (Evans)
5. LEAGUE OF CALIFORNIA CITIES DELEGATE (Evans)
6. COACHELLA VALLEY WATER DISTRICT JOINT POLICY COMMITTEE (Evans)
7. SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS (Evans)
8. ECONOMIC DEVELOPMENT SUBCOMMITTEE (Evans & Radi)
9. COACHELLA VALLEY MOUNTAINS CONSERVANCY (Fitzpatrick)
10. DESERT RECREATION DISTRICT COMMITTEE (Fitzpatrick and Radi)
11. COACHELLA VALLEY UNIFIED SCHOOL DISTRICT COMMITTEE (Fitzpatrick & Peña)
12. RIVERSIDE COUNTY TRANSPORTATION COMMISSION (Fitzpatrick)
13. SILVERROCK EVENT SITE AD HOC COMMITTEE (Fitzpatrick)
14. CANNABIS AD HOC COMMITTEE (Peña and Sanchez)
15. CVAG PUBLIC SAFETY COMMITTEE (Peña)
16. EAST VALLEY COALITION (Peña)
17. CVAG VALLEY-WIDE HOMELESSNESS COMMITTEE (Peña)
18. LEAGUE OF CALIFORNIA CITIES – PUBLIC SAFETY POLICY COMMITTEE (Peña)
19. CHAMBER OF COMMERCE INFO EXCHANGE COMMITTEE (Peña)
20. CVAG TRANSPORTATION COMMITTEE (Radi)
21. SUNLINE TRANSIT AGENCY (Radi)
22. CITYWIDE SECURITY CAMERAS AD HOC COMMITTEE (Radi)
23. DESERT SANDS UNIFIED SCHOOL DISTRICT COMMITTEE (Radi and Sanchez)
24. ANIMAL CAMPUS COMMISSION (Sanchez)
25. COACHELLA VALLEY ECONOMIC PARTNERSHIP (Sanchez)
26. LEAGUE OF CALIFORNIA CITIES – GOVERNANCE, TRANSPARENCY AND LABOR
POLICY COMMITTEE (Sanchez)
27. RIVERSIDE LOCAL AGENCY FORMATION COMMISSION (Sanchez)
28. FINANCING AUTHORITY SPECIAL MEETING MINUTES DATED JUNE 18, 2019 409
29. HOUSING AUTHORITY SPECIAL MEETING MINUTES DATED JULY 2, 2019 411
ADJOURNMENT
CITY COUNCIL AGENDA 5 JULY 16, 2019
*********************************
The next regular meeting of the City Council will be held on August 6, 2019 at
4:00 p.m. at the City Hall Council Chambers, 78495 Calle Tampico, La Quinta,
CA 92253.
DECLARATION OF POSTING
I, Monika Radeva, City Clerk, of the City of La Quinta, do hereby declare that
the foregoing Agenda for the La Quinta City Council meeting was posted on the
City’s website, near the entrance to the Council Chambers at 78495 Calle
Tampico, and the bulletin boards at the Stater Brothers Supermarket at 78630
Highway 111, and the La Quinta Cove Post Office at 51321 Avenida Bermudas,
on July 12, 2019.
DATED: July 12, 2019
MONIKA RADEVA, City Clerk
City of La Quinta, California
Public Notices
The La Quinta City Council Chamber is handicapped accessible. If special
equipment is needed for the hearing impaired, please call the City Clerk’s office at
(760) 777-7092, twenty-four (24) hours in advance of the meeting and
accommodations will be made.
If special electronic equipment is needed to make presentations to the City Council,
arrangements should be made in advance by contacting the City Clerk’s office at
(760) 777-7092. A one (1) week notice is required.
If background material is to be presented to the Councilmembers during a City
Council meeting, please be advised that eight (8) copies of all documents, exhibits,
etc., must be supplied to the City Clerk for distribution. It is requested that this
take place prior to the beginning of the meeting.
Any writings or documents provided to a majority of the City Council regarding any
item(s) on this agenda will be made available for public inspection at the
Community Development counter at City Hall located at 78495 Calle Tampico, La
Quinta, California, 92253, during normal business hours.
Government Finance Officers Association’s (GFOA) Awards for Excellence
in Government Finance recognize innovative programs and contributions
to the practice of government finance that exemplify outstanding financial
management. The awards stress practical, documented work that offers
leadership to the profession and promotes improved public finance.
2019 Winner for Exceptionally Well Implemented
GFOA Best Practice:
The City of La Quinta embarked on a nine-month journey to study its financial
situation and create policy recommendations for its reserve levels. After several
months of research and soliciting input from stakeholders, city staff created a long-
range outlook of the city’s financial stability.
La Quinta is in a resort area and relies heavily on discretionary income spending
at its hotels, restaurants, and shops. The city is also near a large fault line, and the
threat of a major earthquake is always a worry. Rapidly rising pension costs are
another concern. The new reserves policy addresses all of these factors, improving
the city’s ability to face the future.
To create its general fund balance and reserves policy, La Quinta benchmarked
its policies against those of other cities and performed a historical analysis of its
current reserve amounts. The city also worked with the city clerk’s risk management
office, which conducted a full analysis of city assets and insurance coverage to
determine natural disaster needs. City staff also used resources including GFOA
publications and best practices.
GFOA recommends that governments establish a formal policy for the level of
unrestricted fund balance that should be maintained in the general fund for
generally accepted accounting practice and budgetary purposes. The guideline
should articulate a framework and process for how the government would
increase or decrease the level of unrestricted fund balance over a specific time
period. In particular, governments should provide broad guidance in the policy
for how resources will be directed to replenish the fund balance if it falls below
the prescribed level.
See www.gfoa.org/
awardsforexcellence
for more information
on the award and
other winners
GFOA BEST PRACTICE:
Fund Balance Guidelines for the General Fund
CITY OF LA QUINTA, CALIFORNIA
GENERAL FUND BALANCE AND RESERVES POLICY
PRESENTATION ITEM NO. 3
7
8
CITY COUNCIL MINUTES Page 1 of 9 JULY 2, 2019
CITY COUNCIL
MINUTES
TUESDAY, JULY 2, 2019
CALL TO ORDER
A regular meeting of the La Quinta City Council was called to order at 3:00
p.m. by Mayor Evans.
PRESENT: Councilmembers Fitzpatrick, Peña, Radi, Sanchez, Mayor Evans
ABSENT: None
PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA – None
CONFIRMATION OF AGENDA – Confirmed
CLOSED SESSION
1. PUBLIC EMPLOYEE DISCIPLINE / DISMISSAL / RELEASE
PURSUANT TO GOVERNMENT CODE SECTION 54957
2. CONFERENCE WITH LABOR NEGOTIATORS PURSUANT TO
GOVERNMENT CODE SECTION 54957.6; CITY DESIGNATED
REPRESENTATIVE: CHRIS ESCOBEDO, COMMUNITY RESOURCES
DIRECTOR; AND EMPLOYEE ORGANIZATION: LA QUINTA CITY
EMPLOYEES ASSOCIATION
3.Continued from June 18, 2019 Council Meeting >>> ANNUAL
PERFORMANCE EVALUATION PURSUANT TO GOVERNMENT CODE
SECTION 54957, COUNCIL APPOINTED POSITION – CITY
ATTORNEY
COUNCIL RECESSED THE OPEN SESSION PORTION OF THE MEETING
AND MOVED INTO CLOSED SESSION AT 3:01 P.M.
MAYOR EVANS RECONVENED THE OPEN SESSION PORTION OF THE
CITY COUNCIL MEETING AT 4:00 P.M. WITH ALL MEMBERS PRESENT
REPORT ON ACTION(S) TAKEN IN CLOSED SESSION:
City Attorney Ihrke reported the following pursuant to Government Code
section 54957.1 (Brown Act).
Closed Session Item No. 1 – there were no actions taken that require
reporting;
CONSENT CALENDAR ITEM NO. 1
9
CITY COUNCIL MINUTES Page 2 of 9 JULY 2, 2019
Closed Session Item No. 2 – there were no actions taken that require
reporting; and
Closed Session Item No. 3 – Council completed the City Attorney’s
annual performance evaluation and reaffirmed his appointment.
PLEDGE OF ALLEGIANCE
Councilmember Sanchez led the audience in the Pledge of Allegiance.
PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA
PUBLIC SPEAKER: Steve Cherry, La Quinta – provided photos of the Highway
111 Corridor commercial signage, which were made available to the public
and incorporated into the agenda packet; stated the signage as it exists does
not efficiently and clearly advertise the businesses in each commercial center;
recommended that signage be improved as part of the City’s Corridor redesign
efforts currently underway; and noted he is interested in the hop-on-hop-off
bus route previously discussed as a partnership between the City and SunLine
Transit Agency, and would like to see that come to fruition.
ANNOUNCEMENTS, PRESENTATIONS AND WRITTEN COMMUNICATIONS
1. COACHELLA VALLEY MOSQUITO AND VECTOR CONTROL
DISTRICT (DISTRICT) WEST NILE RESPONSE AND PROGRAM
UPDATE – PRESENTATION BY LABORATORY MANAGER JENNIFER
HENKE
District Board President and City representative Doug Hassett introduced
Laboratory Manager Jennifer Henke who gave a presentation on the influx of
West Nile mosquito epidemic in the valley, the District’s efforts to control the
spreading and treat affected areas, mosquito’s lifecycle, symptoms people
would experience if infected, available prevention measures, and best
practices.
2. INTRODUCE GARRETT BEHRENS, RIVERSIDE COUNTY DISTRICT
ATTORNEY’S OFFICE LIAISON FOR COMMUNITY ACTION TEAMS
(CAT) PROGRAM
City Attorney Ihrke said the Riverside County District Attorney’s Office has put
together a liaison program, called Community Actions Team, and per Council’s
request invited the City’s local representative Deputy District Attorney Garrett
Behrens to introduce himself and give more information about the program.
Mr. Behrens said he is a prosecutor at the Riverside County District Attorney’s
Office, currently assigned to the Special Victims Unit and specializes in
10
CITY COUNCIL MINUTES Page 3 of 9 JULY 2, 2019
eastern valley elder abuse; resides in La Quinta; the program’s objective is to
implement a way for prosecutors to get more closely involved with the cities,
in terms of listening to citizens’ and Council’s comments and needs, and help
address matters that the District Attorney’s Office can assist the community
with.
CONSENT CALENDAR
1. APPROVE SPECIAL JOINT CITY COUNCIL AND PLANNING
COMMISSION MEETING MINUTES OF JUNE 11, 2019
2. APPROVE JOINT CITY COUNCIL AND HOUSING AUTHORITY
MEETING MINUTES OF JUNE 18, 2019
3. AUTHORIZE OVERNIGHT TRAVEL FOR SENIOR AND JUNIOR
ACCOUNTANTS TO ATTEND THE CALPERS EDUCATIONAL FORUM
IN OAKLAND, CALIFORNIA, OCTOBER 27-30, 2019
4. AUTHORIZE OVERNIGHT TRAVEL FOR DEPUTY CITY CLERK AND
MANAGEMENT ASSISTANT TO ATTEND CITY CLERKS’
ASSOCIATION OF CALIFORNIA TECHNICAL TRAINING FOR
CLERKS SERIES 200 IN RIVERSIDE, CALIFORNIA, SEPTEMBER
10-13, 2019
5. AUTHORIZE OVERNIGHT TRAVEL FOR DESIGN AND
DEVELOPMENT DIRECTOR, PLANNING MANAGER, AND SENIOR
PLANNER TO ATTEND AMERICAN PLANNING ASSOCIATION
CALIFORNIA CHAPTER’S ANNUAL CONFERENCE IN SANTA
BARBARA, CALIFORNIA, SEPTEMBER 15-18, 2019
6. APPROVE DEMAND REGISTERS DATED JUNE 14 AND 21, 2019
7. ADOPT RESOLUTION TO AMEND THE CITY’S RECORDS
RETENTION SCHEDULE [RESOLUTION NO. 2019-025]
8. APPROVE CONTRACT SERVICES AGREEMENTS WITH NV5, INC
AND THE ALTUM GROUP FOR ON-CALL CONSTRUCTION
SURVEYING SERVICES
9. APPROVE CONTRACT SERVICES AGREEMENTS WITH HR GREEN
PACIFIC AND WILLDAN ENGINEERING FOR ON-CALL PUBLIC
WORKS DEVELOPMENT PLAN CHECK SERVICES
11
CITY COUNCIL MINUTES Page 4 of 9 JULY 2, 2019
10. APPROVE CONTRACT SERVICES AGREEMENTS WITH EARTH
SYSTEMS, INC. AND CONVERSE CONSULTANTS FOR ON-CALL
MATERIALS TESTING SERVICES
11. REAFFIRM LEASES AND APPROVE ANNUAL PRINTING COSTS
ASSOCIATED WITH COPIER LEASES
CONSENT CALENDAR ITEM NOS. 8, 9, AND 10
Mayor Evans said Consent Calendar Item Nos. 8, 9, and 10 approve
agreements with multiple vendors at certain amounts; however, the amount
budgeted is less than the aggregate cost of all agreements combined; the
purpose is to ensure professional services are available to Staff; and it is the
responsibility of Staff and the City Manager to monitor and manage the
expenses.
MOTION – A motion was made and seconded by Councilmembers
Radi/Sanchez to approve the Consent Calendar as recommended, with Item
No. 7 adopting Resolution No. 2019-025 respectively. Motion passed
unanimously.
BUSINESS SESSION
1. APPROVE MEMORANDUM OF UNDERSTANDING WITH GREATER
COACHELLA VALLEY CHAMBER OF COMMERCE (GCVCC)
Marketing Manager Graham presented the staff report, which is on file in the
Clerk’s Office.
Council discussed the services included in the agreement, including the State
of the City event; and The Gem is evolving in the right direction and possible
expansion into Indian Wells.
PUBLIC SPEAKER: Joshua Bonner, President and CEO of GCVCC – thanked
Council for their proactive open communications; spoke about the events the
GCVCC offers; and commended the La Quinta business community, Staff, and
Council for their support.
MOTION – A motion was made and seconded by Councilmembers
Radi/Fitzpatrick to approve a Memorandum of Understanding with the Greater
Coachella Valley Chamber of Commerce, for a total not to exceed amount of
$100,250; and authorize the City Manager to execute it as recommended.
Motion passed unanimously.
12
CITY COUNCIL MINUTES Page 5 of 9 JULY 2, 2019
2. APPROVE CONTRACT SERVICES AGREEMENT WITH JNS NEXT
FOR DIGITAL MARKETING AND PUBLIC RELATIONS SERVICES
Marketing Manager Graham presented the staff report, which is on file in the
Clerk’s Office.
Council discussed the agreement terms allow flexibility of the not to exceed
amount for the entire term to be based on scope of services needed, such as
additional outreach for events; there is an overall decrease of marketing
related contract services due to the move of television, radio, and print
marketing services in-house; JNS is extremely dedicated to the community
and does a stellar job at promoting the City’s events; , boosting services are
included in the agreement, and the City receives metrics report showing the
number of people it reached and percentage that opened it; importance to
ensure that press releases are always deliverable.
MOTION – A motion was made and seconded by Councilmembers
Fitzpatrick/Peña to approve a three-year Contract Services Agreement with
JNS Next for digital marketing and public relations services, at estimated base
cost of $103,500 per fiscal year, for a total not to exceed amount of $500,000
for the agreement term; and authorize the City Manager to execute the
agreement as recommended. Motion passed unanimously.
3. APPROVE CONTRACT SERVICES AGREEMENT WITH ACORN
TECHNOLOGY FOR INFORMATION TECHNOLOGY SERVICES
Assistant to the City Manager Villalpando presented the staff report, which is
on file in the Clerk’s Office.
PUBLIC SPEAKER: Mickey McGuire, CEO of Acorn Technology – said ensuring
IT safety is a priority an d a constant ongoing risk; Acorn will conduct an initial
assessment of the City’s IT needs and a vulnerability network scan within 60
days, and based on the collected data, Acorn will make recommendations on
addressing security concerns should they exist; the intent is to ensure the City
is protected in the best way technology allows; providing periodic trainings to
Staff as a preventative measure to cyber security; the transition period; and
the importance of institutional knowledge.
Council discussed the importance of providing annual training to Staff to
ensure they have the knowledge on what to look out for to protect the City’s
network security.
MOTION – A motion was made and seconded by Councilmembers Radi/Peña
to approve Contract Services Agreement with Acorn Technology for
information technology services in an amount not to exceed $330,000
13
CITY COUNCIL MINUTES Page 6 of 9 JULY 2, 2019
annually for the first three years; add training; and authorize the City Manager
to execute the agreement as recommended. Motion passed unanimously.
4. ADOPT RESOLUTIONS TO APPROVE PERSONNEL POLICIES FOR
ELECTED AND APPOINTED OFFICIALS
[RESOLUTION NOS. 2019-026 AND 2019-027]
Community Resources Director Escobedo presented the staff report, which is
on file in the Clerk’s Office.
Mayor Evans noted Staff provided a revised resolution of the Personnel Policy
for Elected Officials to include specific language that it would also apply to
“persons who are appointed to an Elected Official position by the City Council,”
which was made available to the public and incorporated into the agenda
packet.
Council thanked Staff and the City Attorney for drafting the different policies
to ensure the City’s compliance with current laws and requirements.
MOTION – A motion was made and seconded by Councilmembers Peña/Radi
to adopt Resolution No. 2019-026 approving Personnel Policy for Elected
Officials as amended including the additional language listed above:
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA,
CALIFORNIA, ADOPTING PERSONNEL POLICY FOR ELECTED OFFICIALS
And Resolution No. 2019-27 approving Personnel Policy for Appointed
Officials as presented
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA,
CALIFORNIA, ADOPTING PERSONNEL POLICY FOR APPOINTED
OFFICIALS
Motion passed unanimously.
5. APPROVE CANCELLING THE REGULAR CITY COUNCIL
MEETINGS OF AUGUST 20 AND SEPTEMBER 3, 2019
Council waived presentation of the staff report, which is on file in the Clerk’s
Office.
MOTION – A motion was made and seconded by Councilmembers
Radi/Sanchez to approve cancelling the regular City Council Meetings of
August 20 and September 3, 2019 as recommended. Motion passed
unanimously.
14
CITY COUNCIL MINUTES Page 7 of 9 JULY 2, 2019
STUDY SESSION
1. DISCUSS FUTURE ART EVENTS IN LA QUINTA
Community Resources Director Escobedo presented the staff report, which is
on file in the Clerk’s Office.
Council discussed the scope of the Request for Proposals (RFP) slated to
publish on July 11, 2019, following the scheduled July 10, 2019, Council
Special Meeting – Community Workshop (Community Workshop) to discuss
and receive community input regarding future art events in La Quinta; the
City’s first priority is that the RFP is specific to the March 5-8, 2019 art event
promoter, if the proposals include additional art events, they would certainly
be entertained, but the focus is on the main art event.
PUBLIC SPEAKER: Gary Heath, La Quinta – presented the research and
analysis he conducted on “What to Name an Art Event” and distributed a
report containing his findings for Council’s consideration, which was made
available to the public, and incorporated in the agenda packet; and noted an
art show name needs to serve as an easily recognizable description of the type
of event it is and where it is located, it should be easy to say or pronounce,
and be visually easy to read in its printed form.
Council commended Mr. Heath for his engagement, effort, and valuable
research regarding the art event name; noted the report will be made
available to the attendees of the July 10, 2019, Community Workshop.
Council discussed it was most appropriate that the first public comments are
with regards to the name of the art event because the name sets the mission
and vision for the event; and importance that the City trademarks the new art
event name, thus, going forward, regardless of who the promoter might be,
the event name is owned by the City and it stays consistent.
Council encouraged attendance at the scheduled Community Workshop for
July 10, 2019, at 5:30 p.m. at La Quinta City Hall Lobby to provide ideas,
comments, and preferences regarding future art events in La Quinta; noted
the City will not produce the art event, but is looking to procure a producer to
organize and hold the event during the set March 5 – 8, 2019, dates due to
the popularity of the former La Quinta Arts Festival; and the City will consider
providing both, the Civic Center Park or the SilverRock Event Site, as options
to hold the event.
Council discussed this is a wonderful opportunity; importance to reach out not
only to the artists, but also to the many volunteers who helped organize the
previous events.
15
CITY COUNCIL MINUTES Page 8 of 9 JULY 2, 2019
PUBLIC SPEAKER: Brian Hanrahan, La Quinta – inquired about the La Quinta
Arts Foundation trademark on the La Quinta Arts Festival name; City Attorney
Ihrke explained the applicable legal restrictions due to the trademark.
Council noted this Study Session item and the following Community Workshop
are kick-off discussions and indicators of the City’s strong commitment to the
legacy of the La Quinta Arts Festival; art is an authentic and indivisible
component of the La Quinta brand; and the cancellation of the La Quinta Arts
Festival presents an opportunity to create an event that is even more dynamic,
legalities will be worked out, but most important is to continue the art legacy
of the City, and produce an event that honors the hard work and efforts of the
many artists and volunteers who built the reputation of the event over the
years; the positive feedback being received by the City, not only from the local
community, but from artists all over the country; and the SilverRock Event
Site provides an opportunity to grow the event, and hold many other types of
art events as well, such as digital art, performance art, etc. that will
complement the main art event.
Council discussed a similar change of events occurred about three years ago
when Art Under the Umbrellas event was cancelled, which triggered the launch
of the Art on Main Street event which has been extremely successful.
Council encouraged peoples to provide written comments should they be
unavailable to attend the Community Workshop next week.
PUBLIC HEARINGS – None
DEPARTMENTAL REPORTS
All reports are on file in the City Clerk’s Office.
City Attorney Ihrke said he was asked by the League of California Cities
General Council Patrick Whitnell to have Rutan and Tucker, LLP and Mr. Ihrke
present at the League’s Annual Conference, scheduled to be held in October
2019 in Long Beach, providing a land use and California Environmental Quality
Act litigation update.
MAYOR’S AND COUNCIL MEMBERS’ ITEMS
Mayor Evans stated that the Council attended the Greater Coachella Valley
Chamber of Commerce Annual Business Awards in Rancho Mirage on Tuesday,
June 25 in Rancho Mirage – the event was well attended.
16
CITY COUNCIL MINUTES Page 9 of 9 JULY 2, 2019
Mayor Evans recommended that the flag ordinance be revisited to address
restrictions to place flags in side- and back-yards, and direct Staff to amend
the code and schedule it for Council consideration. Council concurred.
REPORTS AND INFORMATIONAL ITEMS
La Quinta’s representative for 2019, Mayor Evans reported on her participation
in the following organizations’ meeting:
CVAG EXECUTIVE COMMITTEE
GREATER PALM SPRINGS CONVENTION AND VISITORS BUREAU
La Quinta’s representative for 2019, Councilmember Peña reported on his
participation in the following organizations’ meeting:
CVAG VALLEY-WIDE HOMELESSNESS COMMITTEE
LEAGUE OF CALIFORNIA CITIES MAYOR AND COUNCILMEMBERS
EXECUTIVE FORUM
La Quinta’s representative for 2019, Councilmember Radi reported on his
participation in the following organization’s meeting:
SUNLINE TRANSIT AGENCY
La Quinta’s representative for 2019, Councilmember Sanchez reported on his
participation in the following organization’s meeting:
LEAGUE OF CALIFORNIA CITIES MAYOR AND COUNCILMEMBERS
EXECUTIVE FORUM
ADJOURNMENT
There being no further business, a motion was made and seconded by
Councilmembers Fitzpatrick/Radi to adjourn at 5:40 p.m. Motion passed
unanimously.
Respectfully submitted,
MONIKA RADEVA, City Clerk
City of La Quinta, California
17
18
City of La Quinta
CITY COUNCIL MEETING: July 16, 2019
STAFF REPORT
AGENDA TITLE: RECEIVE AND FILE REVENUE AND EXPENDITURE REPORT
DATED MAY 31, 2019
RECOMMENDATION
Receive and file revenue and expenditure report dated May 31, 2019.
EXECUTIVE SUMMARY
•The report summarizes the City’s year-to-date (YTD) revenues and
period expenditures for May 2019 (Attachment 1).
•These reports are also reviewed by the Financial Advisory Commission.
FISCAL IMPACT - None
BACKGROUND/ANALYSIS
Below is a summary of the column headers used on the Revenue and
Expenditure Summary Reports:
Original Total Budget – represents revenue and expenditure budgets the
Council adopted in June 2018 for fiscal year 2018/19.
Current Total Budget – represents original adopted budgets plus any
carryovers (typically associated with long-term Capital Improvement
Projects (CIP) from the prior fiscal year) and any Council approved
budget amendments from throughout the year.
Period Activity – represents actual revenues received and expenditures
outlaid in the reporting month.
Fiscal Activity – represents actual revenues received and expenditures
outlaid YTD.
Variance Favorable/(Unfavorable) - represents the dollar difference
between YTD collections/expenditures and the current budgeted
amount.
Percent Used – represents the percentage activity as compared to
budget YTD.
CONSENT CALENDAR ITEM NO. 2
19
The revenue report includes revenues and transfers into funds from other
funds (income items). Revenues are not received uniformly throughout the
year, resulting in peaks and valleys. For example, large property tax
payments are usually received in December and May. Similarly,
Redevelopment Property Tax Trust Fund payments are typically received in
January and June. Any timing imbalance of revenue receipts versus
expenditures is funded from the City’s cash flow reserve.
The expenditure report includes expenditures and transfers out to other funds.
Unlike revenues, expenditures are more likely to be consistent from month to
month. However, large debt service payments or CIP expenditures can cause
swings.
Prepared by: Rosemary Hallick, Financial Services Analyst
Approved by: Karla Romero, Finance Director
Attachment: 1. Revenue and Expenditure Report for May 31, 2019
MTD YTD
YTD Percent
of Budget
General Fund 6,233,352$ 44,429,887$ 79.58%
All Funds 7,544,357$ 72,792,915$ 44.94%
MTD YTD
YTD Percent
of Budget
General Fund 3,843,420$ 33,384,640$ 48.59%
Payroll - General Fund 897,800$ 8,219,097$ 49.11%
All Funds 5,305,864$ 78,735,846$ 43.29%
May Expenditures
May Revenues
General Fund Non-General Fund
Property Tax 2,197,220$ Lighting and Landscape District Assessments 423,926$
Transient Occupancy (Hotel) Tax 1,906,965$ SilverRock Greens Fees 297,422$
Measure G Sales Tax 792,386$ Gas Tax 123,059$
Sales Tax 753,047$ Interest Earned on Investments 98,701$
Franchise Fees- Cable TV (Charter)180,740$ Transportation Development Impact Fees 69,553$
General Fund Non-General Fund
Sheriff Contract (February and March)2,290,676$ Capital Improvement Program (CIP)- Construction(2)294,405$
Professional Services- Planning Division (1)68,429$ Homelessness Assistance (Martha's and CVRM)166,666$
Marketing and Tourism Promotions 59,672$ SilverRock Maintenance 127,890$
Contract Traffic Engineer 57,609$ Lighting and Landscape District Maintenance 87,493$
Contract Legal Services 36,690$ CIP- Design(3)65,380$
Top Five Revenue/Income Sources for May
Top Five Expenditures/Outlays for May
(1)Consulting services paid to Rangwala Associates related to the Highway 111 Corridor Plan study, community outreach, and
planning.
(2) CIP Construction: Expenses associated with Highway Safety Improvement Program (HSIP) intersection improvements, Jefferson
Street sidewalk gap closure project and Cove restroom.
(3) CIP Design: Multiple CIP projects including SilverRock Event Site and infrastructure; Dune Palms Road widening and bridge; Cove
restroom; and Eisenhower retention basin.
20
Page 1 of 2
Revenue Summary
Fiscal
Activity
Variance
Favorable
(Unfavorable)Fund
Period
Activity
Current
Total Budget
Original
Total Budget
Percent
Used
101 - GENERAL FUND 44,429,8876,233,35252,297,400 55,831,050 -11,401,163 79.58 %
201 - GAS TAX FUND 1,645,032123,0591,965,500 1,965,500 -320,468 83.70 %
202 - LIBRARY & MUSEUM FUND 2,220,3781882,333,000 2,313,000 -92,622 96.00 %
203 - PUBLIC SAFETY FUND (MEASURE G)204,7930200,000 853,000 -648,207 24.01 %
210 - FEDERAL ASSISTANCE FUND 0072,000 66,226 -66,226 0.00 %
212 - SLESA (COPS) FUND 116,9338,333100,100 100,100 16,833 116.82 %
213 - JAG FUND 26800213 55 125.88 %
215 - LIGHTING & LANDSCAPING FUND 1,562,324423,9261,586,100 1,586,100 -23,776 98.50 %
217 - DEVELOPMENT AGREEMENT 1560030,800 -30,644 0.51 %
220 - QUIMBY FUND 50,7380367,000 383,000 -332,262 13.25 %
221 - AB 939 - CALRECYCLE FUND 45,780063,700 66,200 -20,420 69.15 %
223 - MEASURE A FUND 632,60165,804971,708 974,708 -342,107 64.90 %
224 - TUMF FUND 278000 278 0.00 %
225 - INFRASTRUCTURE FUND 2780100100 178 277.70 %
226 - EMERGENCY MANAGEMENT PERFORMANCE GRANT (EMPG)-10,417-10,500012,000 -22,417 86.81 %
227 - STATE HOMELAND SECURITY PROGRAMS (SHSP)0006,000 -6,000 0.00 %
230 - CASp FUND, AB 1379 18,9601,1214,000 10,000 8,960 189.60 %
231 - SUCCESSOR AGCY PA 1 RORF 7,568,9142020,482,627 -12,913,713 36.95 %
235 - SO COAST AIR QUALITY FUND 14,272051,500 51,500 -37,228 27.71 %
237 - SUCCESSOR AGCY PA 1 ADMIN 3,9290012,005 -8,076 32.73 %
241 - HOUSING AUTHORITY 640,07824,083315,000 543,000 97,078 117.88 %
243 - RDA LOW-MOD HOUSING FUND 18,68208,000 18,000 682 103.79 %
247 - ECONOMIC DEVELOPMENT FUND 0002,981,600 -2,981,600 0.00 %
248 - SA 2004 LO/MOD BOND FUND (Refinanced in 2014)00010,000 -10,000 0.00 %
249 - SA 2011 LOW/MOD BOND FUND (Refinanced in 2016)310,534030,000 170,000 140,534 182.67 %
250 - TRANSPORTATION DIF FUND 461,69469,553369,000 379,000 82,694 121.82 %
251 - PARKS & REC DIF FUND 326,99334,816508,200 512,200 -185,207 63.84 %
252 - CIVIC CENTER DIF FUND 123,74616,387110,000 110,000 13,746 112.50 %
253 - LIBRARY DEVELOPMENT DIF 52,6325,84830,000 30,000 22,632 175.44 %
254 - COMMUNITY CENTER DIF 21,5632,19315,400 15,400 6,163 140.02 %
255 - STREET FACILITY DIF FUND 21,3052,84015,000 15,000 6,305 142.04 %
256 - PARK FACILITY DIF FUND 6,1216804,000 4,000 2,121 153.03 %
257 - FIRE PROTECTION DIF 56,9067,53540,000 40,000 16,906 142.26 %
270 - ART IN PUBLIC PLACES FUND 78,21720,45488,500 88,500 -10,283 88.38 %
275 - LQ PUBLIC SAFETY OFFICER 2,49402,100 2,100 394 118.75 %
299 - INTEREST ALLOCATION FUND 580,34598,70100 580,345 0.00 %
310 - LQ FINANCE AUTHORITY DEBT SERVICE 668,8610671,600 671,600 -2,739 99.59 %
401 - CAPITAL IMPROVEMENT PROGRAMS 4,131,45640,09611,955,941 56,663,794 -52,532,337 7.29 %
405 - SA PA 1 CAPITAL IMPRV FUND 77,103000 77,103 0.00 %
501 - FACILITY & FLEET REPLACEMENT 741,2930923,700 1,088,700 -347,407 68.09 %
502 - INFORMATION TECHNOLOGY 842,7191,5421,189,800 1,496,800 -654,081 56.30 %
503 - PARK EQUIP & FACILITY FUND 529,3760675,000 690,000 -160,624 76.72 %
504 - INSURANCE FUND 691,1720923,600 923,600 -232,428 74.83 %
601 - SILVERROCK RESORT 3,698,914374,3444,092,800 4,147,800 -448,886 89.18 %
602 - SILVERROCK GOLF RESERVE 6,156070,000 70,000 -63,844 8.79 %
735 - 97-1 AGENCY REDEMPTION FUND 339000 339 0.00 %
740 - 2000-1 AGENCY REDEMPTION 144,348000 144,348 0.00 %
760 - SUPPLEMENTAL PENSION PLAN 1,20400800 404 150.47 %
761 - CERBT OPEB TRUST 53,5610020,000 33,561 267.81 %
762 - PARS PENSION TRUST 0006,540,000 -6,540,000 0.00 %
Report Total:7,544,357 72,792,91582,049,749 161,976,023 -89,183,108 44.94 %
Accounts are subject to adjusting entries and audit. The City's Comprehensive Annual Financial Report (CAFR), published annually in December, is the best resource for all final audited
numbers.
ATTACHMENT 1
For Fiscal: 2018/19 Period Ending: 05/31/2019
21
For Fiscal: 2018/19 Period Ending: 05/31/2019
Page 2 of 2
Expenditure Summary
Fiscal
Activity
Variance
Favorable
(Unfavorable)Fund
Period
Activity
Current
Total Budget
Original
Total Budget
Percent
Used
101 - GENERAL FUND 33,384,6403,843,42051,153,413 68,707,441 35,322,801 48.59 %
201 - GAS TAX FUND 1,385,39688,4031,959,900 2,010,829 625,433 68.90 %
202 - LIBRARY & MUSEUM FUND 1,125,84633,0781,628,200 1,793,400 667,554 62.78 %
210 - FEDERAL ASSISTANCE FUND 0072,000 66,226 66,226 0.00 %
212 - SLESA (COPS) FUND 53,82721,612100,000 100,000 46,173 53.83 %
215 - LIGHTING & LANDSCAPING FUND 1,251,591151,2101,582,700 1,785,400 533,809 70.10 %
217 - DEVELOPMENT AGREEMENT 77,741067,000 97,000 19,259 80.15 %
220 - QUIMBY FUND 615,08503,956,000 5,748,488 5,133,403 10.70 %
221 - AB 939 - CALRECYCLE FUND 68,77218,59135,000 95,000 26,228 72.39 %
223 - MEASURE A FUND 312,9190961,708 4,733,403 4,420,484 6.61 %
225 - INFRASTRUCTURE FUND 2,7330028,571 25,838 9.56 %
226 - EMERGENCY MANAGEMENT PERFORMANCE GRANT (EMPG)00012,000 12,000 0.00 %
227 - STATE HOMELAND SECURITY PROGRAMS (SHSP)3,013006,000 2,987 50.22 %
230 - CASp FUND, AB 1379 1,26804,000 5,500 4,232 23.06 %
231 - SUCCESSOR AGCY PA 1 RORF 17,368,060009,339,728 -8,028,332 185.96 %
235 - SO COAST AIR QUALITY FUND 21,49455154,000 54,000 32,506 39.80 %
237 - SUCCESSOR AGCY PA 1 ADMIN 25,2318,050012,005 -13,226 210.17 %
241 - HOUSING AUTHORITY 476,05455,887604,000 602,500 126,446 79.01 %
243 - RDA LOW-MOD HOUSING FUND 166,666166,666250,000 267,667 101,001 62.27 %
248 - SA 2004 LO/MOD BOND FUND (Refinanced in 2014)1,021,71158,53701,451,947 430,236 70.37 %
249 - SA 2011 LOW/MOD BOND FUND (Refinanced in 2016)7,376,024007,416,000 39,976 99.46 %
250 - TRANSPORTATION DIF FUND 412,8900400,000 2,557,460 2,144,571 16.14 %
251 - PARKS & REC DIF FUND 2,732002,405,952 2,403,220 0.11 %
252 - CIVIC CENTER DIF FUND 99,4280110,000 115,952 16,524 85.75 %
253 - LIBRARY DEVELOPMENT DIF 24,101030,000 35,952 11,851 67.04 %
254 - COMMUNITY CENTER DIF 2,73200107,591 104,859 2.54 %
255 - STREET FACILITY DIF FUND 28,638015,000 20,952 -7,686 136.68 %
256 - PARK FACILITY DIF FUND 6,69804,000 9,952 3,254 67.30 %
257 - FIRE PROTECTION DIF 9,233040,000 45,952 36,719 20.09 %
270 - ART IN PUBLIC PLACES FUND 73,9241,000322,000 722,000 648,076 10.24 %
310 - LQ FINANCE AUTHORITY DEBT SERVICE 669,0380671,600 671,600 2,563 99.62 %
401 - CAPITAL IMPROVEMENT PROGRAMS 6,018,005425,55411,955,941 56,674,801 50,656,796 10.62 %
405 - SA PA 1 CAPITAL IMPRV FUND 9,016005,343,052 5,334,037 0.17 %
501 - FACILITY & FLEET REPLACEMENT 768,69627,957923,700 1,155,784 387,088 66.51 %
502 - INFORMATION TECHNOLOGY 839,49881,0641,090,700 1,574,200 734,702 53.33 %
503 - PARK EQUIP & FACILITY FUND 203,4897,733705,000 775,000 571,511 26.26 %
504 - INSURANCE FUND 799,9805,648921,100 918,500 118,520 87.10 %
601 - SILVERROCK RESORT 3,822,335310,9044,090,800 4,146,000 323,665 92.19 %
602 - SILVERROCK GOLF RESERVE 50,200050,200 105,200 55,000 47.72 %
740 - 2000-1 AGENCY REDEMPTION 144,30800144,309 1 100.00 %
760 - SUPPLEMENTAL PENSION PLAN 12,8330012,850 17 99.87 %
Report Total:5,305,864 78,735,84683,757,962 181,876,165 103,140,319 43.29 %
Accounts are subject to adjusting entries and audit. The City's Comprehensive Annual Financial Report (CAFR), published annually in December, is the best resource for all final audited
numbers.
22
City of La Quinta
CITY COUNCIL MEETING: July 16, 2019
STAFF REPORT
AGENDA TITLE: APPROVE DEMAND REGISTERS DATED JUNE 28 AND JULY 5,
2019
RECOMMENDATION
Approve demand registers dated June 28 and July 5, 2019.
EXECUTIVE SUMMARY – None
FISCAL IMPACT
Demand of Cash:
City 5,119,071.78$
Successor Agency of RDA 885.93$
Housing Authority 16,879.12$
5,136,836.83$
BACKGROUND/ANALYSIS
Routine bills and payroll must be paid between Council meetings. Attachment 1
details the weekly demand registers for June 28 and July 5, 2019.
Warrants Issued:
122911-123003 4,190,164.77$
123004-123093 366,045.97$
Wire Transfers 317,541.91$
AP Void (9,327.39)$
Payroll Tax Transfers 44,584.62$
Payroll Direct Dep & Chks #37429-37432 227,826.95$
5,136,836.83$
In the amounts listed above, one check was voided and reissued as the vendor
never received the check.
CONSENT CALENDAR ITEM NO. 3
23
The most significant expenditures on the demand register are:
Account Name Amount
City of Indio Contributions 1,491,698.23$ Madison Improvements
LQ Share Payment #1
Burrtec Waste Due To Waste 1,485,438.67$ Pass through
& Recycling Svcs Management Property Tax Payment
for Waste Removal
United Paving Co Various 413,531.97$ Ave 52 Rehabilitation
and Misc Striping
Modifications
Riverside County Sheriff 385,462.71$ July 2018 - June 2019
Sheriff Dept Facility Fee
Economic Various 90,047.50$ April - June Museum,
Development Agency Library, & Makerspace
Operations
PurposeVendor
Wire Transfers: Six transfers totaled $317,542. Of this amount, $161,970 was
for PERS and $149,187 was for Landmark. (See Attachment 2 for a full listing).
Investment Transactions: Full details of investment transactions as well as
total holdings are reported quarterly in the Treasurer’s Report.
Transaction Issuer Type Par Value
Settlement
Date
Coupon
Rate
Purchase Toyota Motor Credit Corp Corp 500,000$ 6/24/19 1.900%
Purchase Revere Bank CD 247,000$ 6/28/19 2.300%
Purchase America's Credit Union CD 248,000$ 6/28/19 2.300%
Purchase Sterling Bank CD 245,000$ 6/28/19 2.150%
Purchase Communitywide CU CD 248,000$ 6/28/19 2.250%
ALTERNATIVES
Council may approve, partially approve, or reject the demand registers.
Prepared by: Bernice Choo, Account Technician
Approved by: Rosemary Hallick, Financial Services Analyst
Attachments:1. Demand Registers
2.Wire Transfers
24
6/27/2019 7:41:09 PM Page 1 of 7
Demand Register
City of La Quinta Packet: APPKT02040 - BC 06/28/19
AmountVendor Name Payable Number Description (Item)Account Name Account Number
Fund: 101 - GENERAL FUND
200.00Garnishments PayableGARNISHMENT0001947RIVERSIDE DEPARTMENT OF C…101-0000-20985
196.05LT Care Insurance PayLONG TERM CARE0001949CALPERS LONG-TERM CARE P…101-0000-20949
92.00United Way DeductionsCONTRIBUTION0001950UNITED WAY OF THE DESERT 101-0000-20981
162.00Garnishments PayableGARNISHMENT0001951RIVERSIDE COUNTY SHERIFF'S …101-0000-20985
682.85Garnishments PayableGARNISHMENT0001952RIVERSIDE COUNTY SHERIFF'S …101-0000-20985
212.80Instructors06/14/19 - TAI CHI CHUAN061419MEDEIROS, JOYCELEEN 101-3002-60107
408.80Instructors06/14/19 - EVENING & GENTLE YOGA061419WILSON, ALBA 101-3002-60107
192.50Instructors06/14/19 - SUNSET YOGA061419TRUE, ARTHUR ALLEN 101-3002-60107
485.10Instructors06/14/19 - BALLROOM DANCING061419SHIRY, TERESA 101-3002-60107
735.00Instructors06/14/19 - TAEKWONDO061419ROJAS, MIGUEL ANGEL 101-3002-60107
183.40Instructors06/14/19 - ZUMBA061419MISELL, STACY 101-3002-60107
442.40Instructors06/14/19 - CARDIO & SUN STYLE TAI CHI061419COHEN, ANN MARIE 101-3002-60107
200.00Instructors06/14/19 - STRETCH & RESTORE061419JOHNSON, KAREN T. PAYNE 101-3002-60107
1,660,820.71Due to Waste Management06/06/19 - FY 18-19 PROPERTY TAX PYMN…062519BURRTEC WASTE & RECYCLING…101-0000-20307
192.97Election Deposit06/25/19 - 2018 ELECTIONS DEPOSIT REF…062519RADI, ROBERT 101-0000-22835
193.22Election Deposit06/25/19 - 2018 ELECTIONS DEPOSIT REF…062519PENA, JOHN 101-0000-22835
194.47Election Deposit06/25/19 - 2018 ELECTIONS DEPOSIT REF…062519EVANS, LINDA 101-0000-22835
192.97Election Deposit06/25/19 - 2018 ELECTIONS DEPOSIT REF…062519GOMEZ, DANTE 101-0000-22835
-164,859.12Franchise Taxes - Burrtec06/06/19 - FY 18-19 PROPERTY TAX PYMN…062519BURRTEC WASTE & RECYCLING…101-0000-41505
1,681.77Vision Insurance PayJUN'19 VSP VIA THE STANDARD062619STANDARD INSURANCE COMP…101-0000-20945
13.04Office Supplies06/26/19 - REIMB BATTERIES062619APETERS, JAMES 101-6001-60400
95.00Travel & Training06/26/19 - REIMB TRAINING QSP CERTIFI…062619BPETERS, JAMES 101-7006-60320
80.00Membership Dues06/26/19 - REIMB RENEWAL FEES CERT IN…062619CPETERS, JAMES 101-7006-60351
207.04Travel & Training05/21-05/23/19 - REIMB CRIME PREVENT …062719PEREZ, STEFFANIE 101-2001-60320
80.00Membership Dues06/28/19 - RENEWAL FEES CERT L SAUVER062719CISEC, INC.101-7006-60351
738.44Administrative Citation Services05/2019 - POLICE CITATION PROCESSING101586DATA TICKET, INC.101-6004-60111
8,517.50Land Acquisition09/30-10/27/18 FY18-19 ON-CALL CONST…106999NV5 101-1007-74010
1,294.35Telephone - Utilities05/23-06/22/19 - EOC116933987-0TPx COMMUNICATIONS 101-2002-61300
715.84Civic Center Lake Maintenance06/2019 FY 18-19 CIVIC CENTER PARK LAK…11776ALL VALLEY BBQ, SPA & PATIO…101-3005-60117
2,925.00Plan Checks05/2019 ON CALL BUILDING PLAN CHECK …127102HR GREEN PACIFIC INC 101-6003-60118
4,893.75Operating SuppliesFITNESS APPS MYWELLNESS CLOUD BUND…13651781TECHNOGYM USA CORP 101-3002-60420
192.85Operating Supplies06/06-06/20/19 - WC JANITORIAL SUPPLIES1402131358AMERIPRIDE SERVICES INC 101-3002-60420
983.41Professional Services05/01-06/30/19 - STVRP HOTLINE14-189-791CENTRAL COMMUNICATIONS 101-6004-60103
629.56Lot Cleaning/Gravel Program06/20/19 - CODE GRAVEL144909SOUTHWEST BOULDER & STO…101-6004-60120
-24.22Sales Taxes PayableCUSTOM POLICE TROUSERS (4) SALES TAX147513MOTOPORT USA 101-0000-20304
2,688.93Special Enforcement FundsCUSTOM POLICE TROUSERS (4)147513MOTOPORT USA 101-2001-60175
102.60Citywide Conf Room Supplies06/14/19 - CITY WIDE DRINKING WATER15369616061419SPARKLETTS 101-1007-60403
16.01Supplies - Field06/10/19 - CODE KEYS153707VALLEY LOCK & SAFE 101-6004-60425
4,773.90Contract Services - Administrat…05/31/19 SERVICES PERFORMED SHUMW…1905.24STUDIO E ARCHITECTS 101-1002-60101
564.10Operating Supplies06/20/19 - FALSE ALARM NOTICES190977BPRINTING PLACE, THE 101-2001-60420
197.27Operating Supplies04/23/19 - OPERATING SUPPLIES2018-4175MCDOWELL AWARDS 101-3002-60420
100.00Membership Dues06/05/19 - MEMBERSHIP DUES226DAIGLE, RICHARD 101-7003-60351
1,128.46Community Experiences04/2019 FY1819 ART ON MAIN & 1ST THU…2443261DESERT SUN PUBLISHING, LLC 101-3003-60149
8,660.41Dental Insurance Pay07/2019 - DENTAL INSURANCE2489489CIGNA HEALTH CARE 101-0000-20943
319.00Advertising05/2019 - COMMISSION VAC AD #35289702520730DESERT SUN PUBLISHING, LLC 101-1005-60450
402.60Advertising05/2019 - PC PHN SDP 2018-0004 AD #35…2520730DESERT SUN PUBLISHING, LLC 101-6002-60450
415.80Advertising05/2019 - PC PHN CUP 2018-0005 AD #35…2520730DESERT SUN PUBLISHING, LLC 101-6002-60450
380.60Advertising05/2019 - DH PHN 2018-0002 AD #35716…2520730DESERT SUN PUBLISHING, LLC 101-6002-60450
-26.53Sales Taxes Payable06/20/19 - WC GYM WIPES SALES TAX2531012XL CORPORATION 101-0000-20304
438.72Operating Supplies06/20/19 - WC GYM WIPES2531012XL CORPORATION 101-3002-60420
1,216.00Landscape Contract06/2019 CITYWIDE LANDSCAPE SVCS FOR …25904CONSERVE LANDCARE 101-2002-60112
300.00Consultants06/10/19 - 2ND QTR SALES (TRANS) TAX S…31588-INHINDERLITER DE LLAMAS & AS…101-1006-60104
153.01Forms, Copier Paper06/04/19 - CITY WIDE 11 X 17 PAPER324014138001OFFICE DEPOT 101-1007-60402
ATTACHMENT 1
25
Demand Register Packet: APPKT02040 - BC 06/28/19
6/27/2019 7:41:09 PM Page 2 of 7
AmountVendor Name Payable Number Description (Item)Account Name Account Number
1,500.00Veterinary Service06/15/19 - SNIP CLINIC3258SPAY NEUTER IMPERATIVE PR…101-6004-60194
26.46Office Supplies06/20/19 - OFFICE SUPPLIES332240538001OFFICE DEPOT 101-1006-60400
723.75Forms, Copier Paper06/20/19 - CITY WIDE 8 1/2 X 11 & 11 X 17…332355913001OFFICE DEPOT 101-1007-60402
621.83Office Supplies06/06/19 - CODE OFFICE SUPPLIES3416077520STAPLES ADVANTAGE 101-6004-60400
178.98Operating Supplies06/14/19 - OFFICE CHAIR RUBEN3416651708STAPLES ADVANTAGE 101-7003-60420
140.00Blood/Alcohol Testing06/06/19 - BLOOD ALCOHOL TESTING381576DEPARTMENT OF JUSTICE 101-2001-60174
1,250.00Community Experiences04/2019 FY1819 ART ON MAIN & 1ST THU…437409-6KPSP 101-3003-60149
825.00Advertising06/12/19 - LQHS SPONSORSHIP44777COMMUNITY ALL-STARS, LLC 101-3007-60450
1,400.00Plan Checks04/2019 ON CALL BUILDING PLAN CHECK …49653INTERWEST CONSULTING GR…101-6003-60118
500.00Contract Services - Administrat…05/2019 - SHUMWAY REIMB REQUEST4SHUTALL MAN GROUP INC 101-1002-60101
210.00Map/Plan Checking06/08/19 LINE LOT ADJ 2019-00015286RASA/ERIC NELSON 101-7002-60183
616.00Map/Plan Checking06/08/19 AMEND #4 TR 31681-3 FTM 201…5287RASA/ERIC NELSON 101-7002-60183
1,209.05Temporary Agency Services06/07/19 - HUB TEMP SVCS M GONZALEZ53626948ROBERT HALF TECHNOLOGY 101-6006-60125
952.80Temporary Agency Services06/07/19 - CODE TEMP SVCS C HARGENS53632165OFFICE TEAM 101-6004-60125
3,800.00Maintenance/Services06/11/2019 - WOOD CHIPS PLAYGROUND61119DPP2PACIFIC PLAY SYSTEMS, INC.101-3005-60691
44.24Postage06/14/19 - OVERNIGHT MAIL6-582-59536FEDEX 101-1007-60470
61.00Pest Control05/22/19 - LQ PARK PEST CONTROL660206046TRULY NOLEN INC 101-3008-60116
150.00Maintenance/Services05/22/19 - BEE HIVE REMOVAL660207616TRULY NOLEN INC 101-3005-60691
900.00Marketing & Tourism Promoti…06/18/19 - ART DISTRICT MICROSITE PILQ.…6920JNS MEDIA SPECIALISTS 101-3007-60461
3,000.00Professional Services05/2019 SVCS FOR STR PROGRAM746VACATION RENTAL COMPLIAN…101-6004-60103
196.85Citywide Conf Room Supplies06/20/19 - CITY WIDE COFFEE951317DAIOHS FIRST CHOICE SERVICES 101-1007-60403
189.55Citywide Conf Room Supplies06/25/19 - CITY WIDE COFFEE951335DAIOHS FIRST CHOICE SERVICES 101-1007-60403
341.92Administrative Citation Services01/2019 - POLICE CITATION PROCESSING97446DATA TICKET, INC.101-6004-60111
11,659.27Animal Shelter Contract Service05/2019 - ANIMAL SERVICESAN0000001668DEPARTMENT OF ANIMAL SER…101-6004-60197
-164.00Animal Shelter Contract Service04/2019 - ANIMAL SERVICES CREDITAN0000001675DEPARTMENT OF ANIMAL SER…101-6004-60197
146.00Annual Permits/Inspections06/12/19 - LQ PARK SNACK BAR PERMITIN0354457COUNTY OF RIVERSIDE DEPAR…101-3008-60196
146.00Annual Permits/Inspections06/12/19 - SPORTS COMPLEX SNACK BAR …IN0354466COUNTY OF RIVERSIDE DEPAR…101-3008-60196
63.52Subscriptions & Publications07/2019 - CITY HALL NEWSPAPERJUL'19DS0155030DESERT SUN, THE 101-3001-60352
32.80Subscriptions & Publications07/2019 - NEWSPAPER WCJUL'19DS0464815DESERT SUN, THE 101-3002-60352
88.51Telephone - Utilities06/2019 - LQ PARK PHONE INCL JAN 2019JUN'193452951FRONTIER COMMUNICATIONS…101-3005-61300
158.00Sales Taxes Payable05/2019 SALES/USE TAXMAY'19SILVERROCK RESORT 101-0000-20304
80.03Operating Supplies05/21-05/29/19 - OPERATING SUPPLIESMAY'194593WALMART COMMUNITY 101-3002-60420
86.86Community Experiences05/21-05/29/19 - GOLF TOUR GIFT BAGSMAY'194593WALMART COMMUNITY 101-3003-60149
-47.98Fire Station04/29-05/26/19 - FS #93 RETURN ITEMSMAY'198768HOME DEPOT CREDIT SERVICES 101-2002-60670
25.83Fire Station04/29-05/26/19 - WATER FILTERS FS #70MAY'198768HOME DEPOT CREDIT SERVICES 101-2002-60670
78.97Maintenance/Services04/29-05/26/19 - FS #32 MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 101-2002-60691
27.08Maintenance/Services04/29-05/26/19 - FS #32 MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 101-2002-60691
39.59Maintenance/Services04/29-05/26/19 - FS #32 MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 101-2002-60691
31.77Materials/Supplies04/29-05/26/19 - SEASONS RETENTION B…MAY'198768HOME DEPOT CREDIT SERVICES 101-3005-60431
187.57Materials/Supplies04/29-05/26/19 - CITY HALL MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 101-3008-60431
27.15Materials/Supplies04/29-05/26/19 - CITY HALL MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 101-3008-60431
23.33Materials/Supplies04/29-05/26/19 - CITY HALL MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 101-3008-60431
208.77Materials/Supplies04/29-05/26/19 - CITY HALL MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 101-3008-60431
70.42Materials/Supplies04/29-05/26/19 - CITY HALL MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 101-3008-60431
115.46Materials/Supplies04/29-05/26/19 - CITY HALL MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 101-3008-60431
114.12Materials/Supplies04/29-05/26/19 - CITY HALL MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 101-3008-60431
216.41Materials/Supplies04/29-05/26/19 - CITY HALL MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 101-3008-60431
32.36Materials/Supplies04/29-05/26/19 - CITY HALL MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 101-3008-60431
46.11Tools/Equipment04/29-05/26/19 - TOOLSMAY'198768HOME DEPOT CREDIT SERVICES 101-3008-60432
203.22Tools/Equipment04/29-05/26/19 - TOOLSMAY'198768HOME DEPOT CREDIT SERVICES 101-3008-60432
65.08Operating Supplies04/29-05/26/19 - MAINT OPERATIONSMAY'198768HOME DEPOT CREDIT SERVICES 101-7003-60420
36.93Operating Supplies04/29-05/26/19 - BROOMMAY'198768HOME DEPOT CREDIT SERVICES 101-7003-60420
102.16Operating Supplies04/29-05/26/19 - HEAVY DUTY TARPSMAY'198768HOME DEPOT CREDIT SERVICES 101-7003-60420
60.86Tools/Equipment04/29-05/26/19 - WORK TABLEMAY'198768HOME DEPOT CREDIT SERVICES 101-7003-60432
176.34Mobile/Cell Phones/Satellites06/23-07/22/19 - EOC SATELLITE PHONESRU08198586ROADPOST USA INC.101-2002-61304
385,462.71Sheriff - Other07/01/18-06/30/19 - FACILITY FEESH0000035230RIVERSIDE COUNTY SHERIFF D…101-2001-60176
Fund 101 - GENERAL FUND Total:1,964,221.01
Fund: 201 - GAS TAX FUND
940.00Asphalt06/17/19 CONCRETE REPAIR2177KRIBBS, BRUCE 201-7003-60430
69.67Materials/Supplies04/29-05/26/19 - OBELISK REPAIRMAY'198768HOME DEPOT CREDIT SERVICES 201-7003-60431
26
Demand Register Packet: APPKT02040 - BC 06/28/19
6/27/2019 7:41:09 PM Page 3 of 7
AmountVendor Name Payable Number Description (Item)Account Name Account Number
172.41Materials/Supplies04/29-05/26/19 - OBELISK REPAIR MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 201-7003-60431
Fund 201 - GAS TAX FUND Total:1,182.08
Fund: 202 - LIBRARY & MUSEUM FUND
41,297.50Makerspace Operations04/19-06/19 MAKERSPACE OPS QTR 42019-27ECONOMIC DEVELOPMENT A…202-3004-60105
48,750.00Museum Operations04/19-06/19 MUSEUM & LIBRARY MGMT …2019-28ECONOMIC DEVELOPMENT A…202-3006-60105
35.17HVAC04/29-05/26/19 - LIBRARY MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 202-3004-60667
264.22Maintenance/Services04/29-05/26/19 - LIBRARY MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 202-3004-60691
10.83Maintenance/Services04/29-05/26/19 - MUSEUM MAT'LSMAY'198768HOME DEPOT CREDIT SERVICES 202-3006-60691
Fund 202 - LIBRARY & MUSEUM FUND Total:90,357.72
Fund: 215 - LIGHTING & LANDSCAPING FUND
6,434.69Consultants04/2019 CITYWIDE LANDSCAPE LIGHTING…184050HORIZON LIGHTING 215-7004-60104
200.00Maintenance/Services06/23/19 TROUBLE SHOOT ELECTRICAL2178KRIBBS, BRUCE 215-7004-60691
41,838.76Landscape ContractFY18/19 CITYWIDE LANSCAPE L&L MAINT.…25904CONSERVE LANDCARE 215-7004-60112
6,028.00SilverRock Way Landscape05/2019 FY 18/19 SRR PERIMETER LANDS…53119-01LANDMARK GOLF MANAGEM…215-7004-60143
48.94Supplies-Graffiti and Vandalism04/29-05/26/19 - GRAFFITI REMOVALMAY'198768HOME DEPOT CREDIT SERVICES 215-7004-60423
30.17Supplies-Graffiti and Vandalism04/29-05/26/19 - GRAFFITI PAINTMAY'198768HOME DEPOT CREDIT SERVICES 215-7004-60423
57.74Materials/Supplies04/29-05/26/19 - MAT'LS L&LMAY'198768HOME DEPOT CREDIT SERVICES 215-7004-60431
616.29Materials/Supplies04/29-05/26/19 - ELECTRICAL WIRE ADA…MAY'198768HOME DEPOT CREDIT SERVICES 215-7004-60431
87.98Materials/Supplies04/29-05/26/19 - MAINT OPERATIONSMAY'198768HOME DEPOT CREDIT SERVICES 215-7004-60431
46.68Materials/Supplies04/29-05/26/19 - CONCRETE REPAIRMAY'198768HOME DEPOT CREDIT SERVICES 215-7004-60431
1.63Materials/Supplies04/29-05/26/19 - MAINT OPERATIONSMAY'198768HOME DEPOT CREDIT SERVICES 215-7004-60431
13.02Materials/Supplies04/29-05/26/19 - MAT'LS OCOTILLO SIGNMAY'198768HOME DEPOT CREDIT SERVICES 215-7004-60431
Fund 215 - LIGHTING & LANDSCAPING FUND Total:55,403.90
Fund: 221 - AB 939 - CALRECYCLE FUND
-10,522.92Burrtec AB 939 Fee06/06/19 - FY 18-19 PROPERTY TAX PYMN…062519BURRTEC WASTE & RECYCLING…221-0000-41506
22,496.05AB 939 Recycling Solutions05/02/19 LQ MIDDLE SCHOOL RECYCLE BI…697598MAX-R 221-0000-60127
Fund 221 - AB 939 - CALRECYCLE FUND Total:11,973.13
Fund: 235 - SO COAST AIR QUALITY FUND
10,453.31CVAG01/01-03/31/19 - 3RD QTR VEHICLE REG …CV19202-19COACHELLA VALLEY ASSOC OF…235-0000-60186
Fund 235 - SO COAST AIR QUALITY FUND Total:10,453.31
Fund: 241 - HOUSING AUTHORITY
240.52Operating Supplies06/11/19 - OFFICE SUPPLIES327999993001OFFICE DEPOT 241-9101-60420
26.51Operating Supplies06/11/19 - KEYBOARD COMBO SET328000521001OFFICE DEPOT 241-9101-60420
Fund 241 - HOUSING AUTHORITY Total:267.03
Fund: 248 - SA 2004 LO/MOD BOND FUND (Refinanced in 2014)
721.00Prepaid Items07/01-07/10/19 - RENT & UTIL WSA 248-9…062619MEDITERRA APARTMENT HO…248-0000-13600
Fund 248 - SA 2004 LO/MOD BOND FUND (Refinanced in 2014) Total:721.00
Fund: 270 - ART IN PUBLIC PLACES FUND
1,500.00Art Purchases06/26/19 LQ LIBRARY ART MURAL FINAL P…062619SANCHEZ, CHRISTOPHER A 270-0000-74800
Fund 270 - ART IN PUBLIC PLACES FUND Total:1,500.00
Fund: 401 - CAPITAL IMPROVEMENT PROGRAMS
18,737.76Design05/18/19 GHD VILLAGE COMPLETE STREE…120953GHD INC.401-0000-60185
1,025.20Design05/31/19 - ON CALL SVC NO LQ PKWY TU…19060409HERMANN DESIGN GROUP INC 401-0000-60185
1,800.00Design06/04/19 - COVE PUBLIC RESTROOM & TR…19060410HERMANN DESIGN GROUP INC 401-0000-60185
1,491,698.23Contributions to Other Agenci…05/30/19 - PROGRESS PMT 1 2009-021-ST503CITY OF INDIO 401-0000-60480
1,432.20Construction05/2019 - 2016-03 BID AD #35191972520730DESERT SUN PUBLISHING, LLC 401-0000-60188
1,370.60Construction05/2019 - 2016-03D BID AD #35150262520730DESERT SUN PUBLISHING, LLC 401-0000-60188
-21,764.84Retention PayablePO 1819-0138 RETENTION29964UNITED PAVING CO.401-0000-20600
435,296.81Construction06/30/19 AVE 52 REHAB AND MISC STRIP…29964UNITED PAVING CO.401-0000-60188
Fund 401 - CAPITAL IMPROVEMENT PROGRAMS Total:1,929,595.96
Fund: 501 - FACILITY & FLEET REPLACEMENT
217.11Motorcycle Repair & Mainten…06/12/19 - ST1300 PA OIL MAINT152492HONDA YAMAHA OF REDLAN…501-0000-60679
477.00Car Washes06/07-06/08/19 VEHICLE WASHES249RAN AUTO DETAIL 501-0000-60148
Fund 501 - FACILITY & FLEET REPLACEMENT Total:694.11
Fund: 502 - INFORMATION TECHNOLOGY
2,483.72Telephone - Utilities05/23-06/22/19 - PHONE LINE SVC116933987-0TPx COMMUNICATIONS 502-0000-61300
4,663.09Copiers05/2019 CONTRACT 04/2019 USAGE20098258CANON FINANCIAL SERVICES, …502-0000-60662
27
Demand Register Packet: APPKT02040 - BC 06/28/19
6/27/2019 7:41:09 PM Page 4 of 7
AmountVendor Name Payable Number Description (Item)Account Name Account Number
1,383.60Software Licenses06/25/19 NEW LF REPOSITORY FOR HR (1)2912COMPLETE PAPERLESS SOLUTI…502-0000-60301
2,079.00Cable - Utilities06/10-07/09/19 - CITY HALL FIBER (2546)452546061019TIME WARNER CABLE 502-0000-61400
76.86Cable - Utilities06/12-07/11/19 - CITY YARD CABLE (4080)504080061219TIME WARNER CABLE 502-0000-61400
987.32Technical04/04/19 - SHORTEL IP PHONE80218INTELESYSONE 502-0000-60108
128.32Telephone - Utilities04/13-05/12/19 - MUSEUM PHONEAPR'197710105FRONTIER COMMUNICATIONS…502-0000-61300
95.98Cable - Utilities06/10-07/09/19 - CITY HALL INTERNETJUN'191712626FRONTIER COMMUNICATIONS…502-0000-61400
260.00Consultants06/18/19 - COUNCIL MTG VIDEOPR637-0619DESERT C.A.M INC 502-0000-60104
477.63Computers06/17/19 - DOCKING STATIONS (2)SRT9615CDW GOVERNMENT INC 502-0000-80103
Fund 502 - INFORMATION TECHNOLOGY Total:12,635.52
Fund: 503 - PARK EQUIP & FACILITY FUND
61,758.00ParksMONTICELLO PARK PLAYGROUND46902DAVE BANG, INC.503-0000-71060
39,950.00ParksPACIFIC PLAY SYSTEMS, INC.61119DPPPACIFIC PLAY SYSTEMS, INC.503-0000-71060
Fund 503 - PARK EQUIP & FACILITY FUND Total:101,708.00
Fund: 504 - INSURANCE FUND
9,452.00Claims06/18/19 - CLAIMS062519PUBLIC ENTITY RISK MANAGE…504-1010-60442
Fund 504 - INSURANCE FUND Total:9,452.00
Grand Total:4,190,164.77
28
Demand Register Packet: APPKT02040 - BC 06/28/19
6/27/2019 7:41:09 PM Page 5 of 7
Fund Summary
Fund Expense Amount
101 - GENERAL FUND 1,964,221.01
201 - GAS TAX FUND 1,182.08
202 - LIBRARY & MUSEUM FUND 90,357.72
215 - LIGHTING & LANDSCAPING FUND 55,403.90
221 - AB 939 - CALRECYCLE FUND 11,973.13
235 - SO COAST AIR QUALITY FUND 10,453.31
241 - HOUSING AUTHORITY 267.03
248 - SA 2004 LO/MOD BOND FUND (Refinanced in 2014)721.00
270 - ART IN PUBLIC PLACES FUND 1,500.00
401 - CAPITAL IMPROVEMENT PROGRAMS 1,929,595.96
501 - FACILITY & FLEET REPLACEMENT 694.11
502 - INFORMATION TECHNOLOGY 12,635.52
503 - PARK EQUIP & FACILITY FUND 101,708.00
504 - INSURANCE FUND 9,452.00
Grand Total:4,190,164.77
Account Summary
Account Number Account Name Expense Amount
101-0000-20304 Sales Taxes Payable 107.25
101-0000-20307 Due to Waste Manageme…1,660,820.71
101-0000-20943 Dental Insurance Pay 8,660.41
101-0000-20945 Vision Insurance Pay 1,681.77
101-0000-20949 LT Care Insurance Pay 196.05
101-0000-20981 United Way Deductions 92.00
101-0000-20985 Garnishments Payable 1,044.85
101-0000-22835 Election Deposit 773.63
101-0000-41505 Franchise Taxes - Burrtec -164,859.12
101-1002-60101 Contract Services - Admini…5,273.90
101-1005-60450 Advertising 319.00
101-1006-60104 Consultants 300.00
101-1006-60400 Office Supplies 26.46
101-1007-60402 Forms, Copier Paper 876.76
101-1007-60403 Citywide Conf Room Suppl…489.00
101-1007-60470 Postage 44.24
101-1007-74010 Land Acquisition 8,517.50
101-2001-60174 Blood/Alcohol Testing 140.00
101-2001-60175 Special Enforcement Funds 2,688.93
101-2001-60176 Sheriff - Other 385,462.71
101-2001-60320 Travel & Training 207.04
101-2001-60420 Operating Supplies 564.10
101-2002-60112 Landscape Contract 1,216.00
101-2002-60670 Fire Station -22.15
101-2002-60691 Maintenance/Services 145.64
101-2002-61300 Telephone - Utilities 1,294.35
101-2002-61304 Mobile/Cell Phones/Satell…176.34
101-3001-60352 Subscriptions & Publicati…63.52
101-3002-60107 Instructors 2,860.00
101-3002-60352 Subscriptions & Publicati…32.80
101-3002-60420 Operating Supplies 5,802.62
101-3003-60149 Community Experiences 2,465.32
101-3005-60117 Civic Center Lake Mainten…715.84
101-3005-60431 Materials/Supplies 31.77
101-3005-60691 Maintenance/Services 3,950.00
101-3005-61300 Telephone - Utilities 88.51
101-3007-60450 Advertising 825.00
101-3007-60461 Marketing & Tourism Pro…900.00
101-3008-60116 Pest Control 61.00
101-3008-60196 Annual Permits/Inspectio…292.00
101-3008-60431 Materials/Supplies 995.59
29
Demand Register Packet: APPKT02040 - BC 06/28/19
6/27/2019 7:41:09 PM Page 6 of 7
Account Summary
Account Number Account Name Expense Amount
101-3008-60432 Tools/Equipment 249.33
101-6001-60400 Office Supplies 13.04
101-6002-60450 Advertising 1,199.00
101-6003-60118 Plan Checks 4,325.00
101-6004-60103 Professional Services 3,983.41
101-6004-60111 Administrative Citation Se…1,080.36
101-6004-60120 Lot Cleaning/Gravel Progr…629.56
101-6004-60125 Temporary Agency Servic…952.80
101-6004-60194 Veterinary Service 1,500.00
101-6004-60197 Animal Shelter Contract S…11,495.27
101-6004-60400 Office Supplies 621.83
101-6004-60425 Supplies - Field 16.01
101-6006-60125 Temporary Agency Servic…1,209.05
101-7002-60183 Map/Plan Checking 826.00
101-7003-60351 Membership Dues 100.00
101-7003-60420 Operating Supplies 383.15
101-7003-60432 Tools/Equipment 60.86
101-7006-60320 Travel & Training 95.00
101-7006-60351 Membership Dues 160.00
201-7003-60430 Asphalt 940.00
201-7003-60431 Materials/Supplies 242.08
202-3004-60105 Makerspace Operations 41,297.50
202-3004-60667 HVAC 35.17
202-3004-60691 Maintenance/Services 264.22
202-3006-60105 Museum Operations 48,750.00
202-3006-60691 Maintenance/Services 10.83
215-7004-60104 Consultants 6,434.69
215-7004-60112 Landscape Contract 41,838.76
215-7004-60143 SilverRock Way Landscape 6,028.00
215-7004-60423 Supplies-Graffiti and Van…79.11
215-7004-60431 Materials/Supplies 823.34
215-7004-60691 Maintenance/Services 200.00
221-0000-41506 Burrtec AB 939 Fee -10,522.92
221-0000-60127 AB 939 Recycling Solutions 22,496.05
235-0000-60186 CVAG 10,453.31
241-9101-60420 Operating Supplies 267.03
248-0000-13600 Prepaid Items 721.00
270-0000-74800 Art Purchases 1,500.00
401-0000-20600 Retention Payable -21,764.84
401-0000-60185 Design 21,562.96
401-0000-60188 Construction 438,099.61
401-0000-60480 Contributions to Other Ag…1,491,698.23
501-0000-60148 Car Washes 477.00
501-0000-60679 Motorcycle Repair & Main…217.11
502-0000-60104 Consultants 260.00
502-0000-60108 Technical 987.32
502-0000-60301 Software Licenses 1,383.60
502-0000-60662 Copiers 4,663.09
502-0000-61300 Telephone - Utilities 2,612.04
502-0000-61400 Cable - Utilities 2,251.84
502-0000-80103 Computers 477.63
503-0000-71060 Parks 101,708.00
504-1010-60442 Claims 9,452.00
Grand Total:4,190,164.77
Project Account Summary
Project Account Key Expense Amount
**None**2,117,221.45
30
Demand Register Packet: APPKT02040 - BC 06/28/19
6/27/2019 7:41:09 PM Page 7 of 7
Project Account Summary
Project Account Key Expense Amount
091002CB 1,491,698.23
151603CT 1,432.20
151603D 18,737.76
1819PMPCT 435,296.81
1819PMPRP -21,764.84
201603CT 1,370.60
201603D 1,025.20
201801D 1,800.00
201828E 61,758.00
201829E 39,950.00
CSA152E 255.00
GOLFE 86.86
MAKERE 41,297.50
Grand Total:4,190,164.77
31
7/5/2019 5:36:41 PM Page 1 of 8
Demand Register
City of La Quinta Packet: APPKT02047 - BC 07/05/19
AmountVendor Name Payable Number Description (Item)Account Name Account Number
Fund: 101 - GENERAL FUND
42.50Community Experiences01/01-05/31/20 - MUSICAL LICENSE REN…05/20/19ASCAP 101-3003-60149
55.84LQ Police Volunteers06/26/19 - REIMB C.O.P. TRAINING FOOD062619FOSTER, ROCIO 101-2001-60109
998.31Training & Education/MOU06/27/19 - TUITION REIMB062719FUSON, JACOB 101-1004-60322
33.60Instructors06/27/19 - ZUMBA062719MISELL, STACY 101-3002-60107
81.20Instructors06/27/19 - CARDIO & SUN STYLE TAI CHI062719COHEN, ANN MARIE 101-3002-60107
280.00Instructors06/27/19 - TAEKWONDO062719ROJAS, MIGUEL ANGEL 101-3002-60107
28.00Instructors06/27/19 - SUNSET YOGA062719TRUE, ARTHUR ALLEN 101-3002-60107
214.20Instructors06/27/19 - BALLROOM DANCING062719SHIRY, TERESA 101-3002-60107
92.40Instructors06/27/19 - EVENING & GENTLE YOGA062719WILSON, ALBA 101-3002-60107
22.40Instructors06/27/19 - TAI CHI CHUAN062719MEDEIROS, JOYCELEEN 101-3002-60107
264.62Cash Over/Short06/28/19 - LIC-763722 REFUND OVERPYM…062819TESTA DURA PIC LLC 101-0000-42300
250.10Travel & Training06/19-06/20/19 - TRAVEL LEAGUE EXEC F…062819SANCHEZ, STEVE 101-1001-60320
13,893.56Sales Tax Reimbursements062819 - SALES TAX REIMB QTR END 03/3…062819ONE ELEVEN LA QUINTA LLC 101-1007-60535
301.53Community Special Events06/17/19 - REIMB STVR WORKSHOP FOOD062819SANCHEZ, TOMMI 101-6006-60137
5,800.00Building Improvements06/29/19 - COUNTER TOPS062919BELTRAN CONSTRUCTION 101-2002-72110
25.00Travel & Training07/05/19 - APPLICATION INVESTMENT PO…070519CALIFORNIA MUNICIPAL TREA…101-1006-60320
175.00Subscriptions & Publications07/05/19 - APPLICATION INVESTMENT PO…070519CALIFORNIA MUNICIPAL TREA…101-1006-60352
300.00Fire Service Costs07/05/19 - FS #70 PER DIEM (2 DAYS)070519ARALPHS 101-2002-60139
450.00Fire Service Costs07/05/19 - FS #70 PER DIEM (3 DAYS)070519BRALPHS 101-2002-60139
195.00Membership Dues04/1/19-03/31/20 - CALBO MEMBER J WI…12341CALIFORNIA BUILDING OFFICI…101-6003-60351
221.39Operating Supplies06/14/19 - DRINKING WATER12852924061419SPARKLETTS 101-7003-60420
28.16Operating Supplies06/18/19 - NEW CM NAMEPLATE144199POWERS AWARDS INC 101-1002-60420
404.00Consultants06/2019 WELLNESS WRKS EMPLOYEE ASSI…18-081WELLNESS WORKS 101-1004-60104
15,382.10Operating Supplies06/26/19 NEW FITNESS EQUIPMENT19006244TECHNOGYM USA CORP 101-3002-60420
454.66Tools/Equipment06/20/19 - CHAIN SAW/PRUNER190463MOWERS PLUS INC 101-3005-60432
387.88Tools/Equipment06/26/19 - BLOWERS190757MOWERS PLUS INC 101-3005-60432
32.31Tools/Equipment06/26/19 - SAW BLADE190758MOWERS PLUS INC 101-3005-60432
61.07Operating Supplies05/15/19 - OPERATING SUPPLIES2018-4313MCDOWELL AWARDS 101-1005-60420
4,218.50Professional Services03/01/19-02/29/20 - LQ MC CODIFICATIO…2019-217QUALITY CODE PUBLISHING 101-1005-60103
80.09Cable - Utilities06/16-07/15/19 - FS #32 CABLE (8152)218152061619TIME WARNER CABLE 101-2002-61400
9,327.39Professional ServicesQTR 4 STVR COMPLIANCE VENDORS SERV…255-004XALTAS TECHNOLOGIES INC 101-6001-60103
41.69Cable - Utilities06/16-07/15/19 - FS #70 CABLE (1860)31860061619TIME WARNER CABLE 101-2002-61400
276.46Operating Supplies06/20/19 - OPERATING SUPPLIES331987856001OFFICE DEPOT 101-1005-60420
32.71Operating Supplies06/20/19 - OPERATING SUPPLIES331995413001OFFICE DEPOT 101-1005-60420
73.00Office Supplies06/14/19 - OFFICE SUPPLIES3416651709STAPLES ADVANTAGE 101-3008-60481
106.55Citywide Conf Room Supplies06/15/19 - CITY WIDE SUPPLIES COFFEE3416915098STAPLES ADVANTAGE 101-1007-60403
144.83Office Supplies06/22/19 - OFFICE SUPPLIES3417411177STAPLES ADVANTAGE 101-3002-60400
93.51Office Supplies06/26/19 - INK FOR D&D PLOTTER MATTE…3417626064STAPLES ADVANTAGE 101-6001-60400
185.72Office Supplies06/26/19 - INK FOR D&D PLOTTER YELLOW3417626065STAPLES ADVANTAGE 101-6001-60400
92.86Office Supplies06/26/19 - INK FOR D&D PLOTTER CYAN3417626066STAPLES ADVANTAGE 101-6001-60400
93.51Office Supplies06/26/19 - INK FOR D&D PLOTTER MAGE…3417626067STAPLES ADVANTAGE 101-6001-60400
220.73Office Supplies06/26/19 - OFFICE SUPPLIES3417626068STAPLES ADVANTAGE 101-6001-60400
151.15Office Supplies06/27/19 - OFFICE SUPPLIES3417691434STAPLES ADVANTAGE 101-6001-60400
281.00Blood/Alcohol Testing06/14/19 - BLOOD ALCOHOL TESTING38177BIO-TOX LABORATORIES 101-2001-60174
511.00Blood/Alcohol Testing06/14/19 - BLOOD ALCOHOL TESTING38178BIO-TOX LABORATORIES 101-2001-60174
38.01Fire Extinguisher/First Aid Serv…06/26/19 - FIRST AID KIT POOL5014010346CINTAS FIRST AID & SAFETY 101-3008-60664
38.01Fire Extinguisher/First Aid Serv…06/26/19 - FIRST AID KIT PW OFFICE5014010347CINTAS FIRST AID & SAFETY 101-3008-60664
231.94Fire Extinguisher/First Aid Serv…06/26/19 - FIRST AID KIT PW SHOP5014010348CINTAS FIRST AID & SAFETY 101-3008-60664
160.17Fire Extinguisher/First Aid Serv…06/26/19 - FIRST AID KIT WC5014010349CINTAS FIRST AID & SAFETY 101-3008-60664
48.15Fire Extinguisher/First Aid Serv…06/26/19 - FIRST AID KIT LIBRARY5014010351CINTAS FIRST AID & SAFETY 101-3008-60664
38.01Fire Extinguisher/First Aid Serv…06/26/19 - FIRST AID KIT MUSEUM5014010352CINTAS FIRST AID & SAFETY 101-3008-60664
9.30Fire Extinguisher/First Aid Serv…06/26/19 - FIRST AID KIT PW RR5014010353CINTAS FIRST AID & SAFETY 101-3008-60664
246.05Fire Extinguisher/First Aid Serv…06/26/19 - FIRST AID KIT CITY HALL5014010354CINTAS FIRST AID & SAFETY 101-3008-60664
32
Demand Register Packet: APPKT02047 - BC 07/05/19
7/5/2019 5:36:41 PM Page 2 of 8
AmountVendor Name Payable Number Description (Item)Account Name Account Number
462.00Map/Plan Checking06/27/19 FINAL TRACT MAP AMEND FTM…5292RASA/ERIC NELSON 101-7002-60183
10,081.20Janitorial06/2019 JANITORIAL SERVICES531478MERCHANTS BUILDING MAINT…101-3008-60115
1,248.50Temporary Agency Services06/14/19 - HUB TEMP SVCS M GONZALEZ53674910ROBERT HALF TECHNOLOGY 101-6006-60125
952.80Temporary Agency Services06/21/19 - CODE TEMP SVCS C HARGENS53728824OFFICE TEAM 101-6004-60125
1,192.65Temporary Agency Services06/21/19 - HUB TEMP SVCS M GONZALEZ53736333ROBERT HALF TECHNOLOGY 101-6006-60125
193.34Tools/Equipment06/21/19 - TOOLS591332HIGH TECH IRRIGATION INC 101-3005-60432
351.00Contract Traffic Engineer5/31/19 BLACKHAWK ST LIGHT DESIGN617682WILLDAN 101-7006-60144
21,656.00Contract Traffic Engineer04/27-05/31/19 ON-CALL TRAFFIC ENGIN…617683WILLDAN 101-7006-60144
70.00Pest Control06/12/19 - WC PEST CONTROL660208016TRULY NOLEN INC 101-3008-60116
78.00Pest Control06/19/19 - CITY HALL PEST CONTROL660208105TRULY NOLEN INC 101-3008-60116
47.00Pest Control06/19/19 - PW YARD PEST CONTROL660208174TRULY NOLEN INC 101-3008-60116
60.00Pest Control06/21/19 - FRITZ POOL PEST CONTROL660210841TRULY NOLEN INC 101-3008-60116
385.00Blood/Alcohol Testing05/31/19 - BLOOD/ALCOHOL ANALYSIS72211AMERICAN FORENSIC NURSES …101-2001-60174
295.00Maintenance/Services01/08/19 - FS #93 ELECTRICAL72857VINTAGE E & S INC 101-2002-60691
142.50Maintenance/Services01/26/19 - CITY HALL LED LIGHT FIXTURES72873VINTAGE E & S INC 101-3008-60691
3,537.50Maintenance/Services01/31/19 - CITY HALL TRANSFORMER72876VINTAGE E & S INC 101-3008-60691
250.00Maintenance/Services04/12/19 - FS #32 ELECTRICAL PLANS72953VINTAGE E & S INC 101-2002-60691
319.73Materials/Supplies06/26/19 - PARK SIGNS7569TOP OF THE LINE SIGNS 101-3005-60431
220.26Materials/Supplies06/12/19 - COL MITCH PAIGE MAT'LS7622170FERGUSON ENTERPRISES, INC 101-3008-60431
199.51Citywide Conf Room Supplies06/25/19 - WC COFFEE SUPPLIES951334DAIOHS FIRST CHOICE SERVICES 101-1007-60403
44.36Telephone - Utilities05/11-06/10/19 - LQ TICKET WRITERS (59…9831849576VERIZON WIRELESS 101-2001-61300
16.53Mobile/Cell Phones/Satellites05/14-06/13/19 - EOC CELL PHONES (7813)9832111713VERIZON WIRELESS 101-2002-61304
239.72Maintenance/Services06/25/19 - CITY HALL KEYSAA00058693LOCK SHOP INC, THE 101-3008-60691
147.65Maintenance/Services06/26/19 - CITY HALL KEYSAA00058700LOCK SHOP INC, THE 101-3008-60691
1,500.00Membership Dues04/11/19 - UCLA ECONOMIC FORECASTS …BFI19-43UC REGENTS 101-1006-60351
1,147.26Electricity - Utilities06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 101-2002-61101
13.48Electric - Monticello Park - Utili…06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 101-3005-61102
2,005.39Electric - Civic Center Park - Uti…06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 101-3005-61103
1,080.28Electric - Fritz Burns Park - Utili…06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 101-3005-61105
1,952.61Electric - Sports Complex - Utili…06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 101-3005-61106
139.38Electric - Colonel Paige - Utiliti…06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 101-3005-61108
3,259.60Electric - Community Park - Util…06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 101-3005-61109
38.90Electric - Adams Park - Utilities06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 101-3005-61110
13.48Electric - Velasco Park - Utilities06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 101-3005-61111
22.74Electric - Eisenhower Park - Util…06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 101-3005-61113
13.38Electric - Desert Pride - Utilities06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 101-3005-61114
12,403.22Electricity - Utilities06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 101-3008-61101
3,972.96Water - Civic Center Park - Utili…06/25/19 - WATER SERVICECSW214COACHELLA VALLEY WATER DI…101-3005-61202
7,377.28Water -Community Park - Utilit…06/25/19 - WATER SERVICECSW214COACHELLA VALLEY WATER DI…101-3005-61209
19.40PM 10 - Dust Control06/25/19 - WATER SERVICECSW214COACHELLA VALLEY WATER DI…101-7006-60146
946.97Water -Pioneer Park - Utilities07/02/19 - WATER SERVICECSW215COACHELLA VALLEY WATER DI…101-3005-61207
797.19HVAC01/31/19 - CITY HALL HVAC SVCI30125PACIFIC WEST AIR CONDITION…101-3008-60667
745.00HVAC06/19/19 - CITY HALL HVAC SVCI30825PACIFIC WEST AIR CONDITION…101-3008-60667
1,192.00HVAC05/31/19 - CITY HALL HVAC SVCI30834PACIFIC WEST AIR CONDITION…101-3008-60667
1,584.61HVAC05/30/19 - CITY HALL HVAC SVCI30970PACIFIC WEST AIR CONDITION…101-3008-60667
1,094.00Annual Permits/Inspections06/11/19 - HEALTH PERMIT FA0024205IN0353418COUNTY OF RIVERSIDE DEPAR…101-3008-60196
1,178.50Due to SunLine06/2019 - SUNLINE BUS PASSESINV03432SUNLINE TRANSIT AGENCY 101-0000-20305
-61.25Miscellaneous Revenue05/2019 - SUNLINE BUS PASSESINV03432SUNLINE TRANSIT AGENCY 101-0000-42301
257.26Gas - Utilities05/21-06/20/19 - CITY HALL GAS SVCJUN'192692565001GAS COMPANY, THE 101-3008-61100
16.00Technical05/2019 - RECORD FEES CODE NOTICE REL…MAY'19RIVERSIDE ASSESSOR 101-6004-60108
2,000.00Blood/Alcohol Testing05/20/19 - LA191400030 05/22/19 - LA19…MAY'19700000132EISENHOWER MEDICAL CENTER 101-2001-60174
125.00Building Plan Check Fees06/18/19 - BCOM2019-0020 REF PLAN CK…MR739CCK BUILDERS INC 101-0000-42600
1,116.00Professional Services06/28/19 DOCUMENT SCANNING & QUAL…PJ7278-01VIATRON SYSTEMS INC 101-1005-60103
1,953.00Professional Services06/28/19 DOCUMENT SCANNING & QUAL…PJ7367-01VIATRON SYSTEMS INC 101-1005-60103
235.49Water - Utilities06/25/19 - WATER SERVICEPWW195COACHELLA VALLEY WATER DI…101-2002-61200
126.82Water -Eisenhower Park - Utilit…06/25/19 - WATER SERVICEPWW195COACHELLA VALLEY WATER DI…101-3005-61203
70.06Water -Velasco Park - Utilities06/25/19 - WATER SERVICEPWW195COACHELLA VALLEY WATER DI…101-3005-61205
2,508.61Water -Fritz Burns Park - Utiliti…07/02/19 - WATER SERVICEPWW196COACHELLA VALLEY WATER DI…101-3005-61204
636.43Water - Utilities07/02/19 - WATER SERVICEPWW196COACHELLA VALLEY WATER DI…101-3008-61200
108.00Cash Over/Short06/18/19 - LIC765753 REFUND OVERPYMTR33580LUXURY LEASING INC 101-0000-42300
33
Demand Register Packet: APPKT02047 - BC 07/05/19
7/5/2019 5:36:41 PM Page 3 of 8
AmountVendor Name Payable Number Description (Item)Account Name Account Number
50.00Cash Over/Short06/19/19 - LIC-0110037 REFUND OVERPY…R50456M & J GARDING SERVICES, INC.101-0000-42300
121.98Cash Over/Short06/19/19 - LIC-766695 REFUND OVERPYM…R50474GREENWAY, BEN AND KARINA 101-0000-42300
19.45Cash Over/Short06/21/19 - LIC-765968 REFUND OVERPYM…R50562SCHREIBER, ANDREW O 101-0000-42300
88.10Cash Over/Short06/21/19 - LIC-0105314 REFUND OVERPY…R50604MCGOWAN, JOSEPH J 101-0000-42300
121.34Cash Over/Short06/21/19 - LIC-766691 REFUND OVERPYM…R50636HOME TIME LLC 101-0000-42300
262.79Materials/Supplies04/17/19 - CITY HALL MATERIALSS2626893.001DESERT ELECTRIC SUPPLY 101-3008-60431
997.55Community Experiences05/19/19 - POLICE SVCS TEQ/TACOSSH0000035534RIVERSIDE COUNTY SHERIFF D…101-3003-60149
54,579.00Sheriff - Other07/2018-06/30/2019 - CLETS SERVICESH0000035547RIVERSIDE COUNTY SHERIFF 101-2001-60176
Fund 101 - GENERAL FUND Total:207,234.68
Fund: 201 - GAS TAX FUND
812.02Equipment Rental06/06/19 - EQPT RENTAL10663101QUINN COMPANY 201-7003-61701
619.88Traffic Control Signs05/29/19 - TRAFFIC CONTROL SIGNS1075308TOPS'N BARRICADES INC 201-7003-60429
232.78Traffic Control Signs06/10/19 - TRAFFIC CONTROL SIGNS1075567TOPS'N BARRICADES INC 201-7003-60429
296.78Traffic Control Signs06/18/19 - TRAFFIC CONTROL SIGNS1075718TOPS'N BARRICADES INC 201-7003-60429
930.46Electricity - Utilities06/28/19 - ELECTRICITY SERVICEPW213IMPERIAL IRRIGATION DIST 201-7003-61101
Fund 201 - GAS TAX FUND Total:2,891.92
Fund: 202 - LIBRARY & MUSEUM FUND
88.78Maintenance/Services06/05/19 - LIBRARY SAFETY MIRROR109306327ULINE 202-3004-60691
2,470.30Janitorial06/2019 JANITORIAL SERVICES531478MERCHANTS BUILDING MAINT…202-3004-60115
659.25Janitorial06/2019 JANITORIAL SERVICES531478MERCHANTS BUILDING MAINT…202-3006-60115
74.00Pest Control06/19/19 - LIBRARY PEST CONTROL660208017TRULY NOLEN INC 202-3004-60116
49.00Pest Control06/19/19 - MUSEUM PEST CONTROL660208063TRULY NOLEN INC 202-3006-60116
437.50Maintenance/Services03/22/19 - LIBRARY BALLASTS72921VINTAGE E & S INC 202-3004-60691
150.08Maintenance/Services06/26/19 - LIBRARY SIGNS7568TOP OF THE LINE SIGNS 202-3004-60691
29.00Maintenance/Services06/11/19 - LIBRARY MATERIALS7597308-1FERGUSON ENTERPRISES, INC 202-3004-60691
117.68Maintenance/Services06/19/19 - LIBRARY KEYSBB00532805LOCK SHOP INC, THE 202-3004-60691
4,502.67Electricity - Utilities06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 202-3004-61101
1,158.03Electricity - Utilities06/28/19 - ELECTRICITY SERVICECSE157IMPERIAL IRRIGATION DIST 202-3006-61101
225.00Maintenance/Services06/12/19 - MUSEUM INSPECTIONE 1656427 SBSTATE OF CALIFORNIA DEPAR…202-3006-60691
250.00HVAC06/2019 - LIBRARY HVAC SVCI30842PACIFIC WEST AIR CONDITION…202-3004-60667
2,340.00HVAC06/21/19 - MUSEUM REPLACE CANISTERSI30968PACIFIC WEST AIR CONDITION…202-3006-60667
15.78Gas - Utilities05/21-06/20/19 - LIBRARY GAS SVCJUN'19152944404…GAS COMPANY, THE 202-3004-61100
128.32Telephone - Utilities06/13-07/12/19 - MUSEUM PHONEJUN'197710105FRONTIER COMMUNICATIONS…202-3006-61300
217.50Maintenance/Services04/17/19 - MUSEUM MATERIALSS2604184.002DESERT ELECTRIC SUPPLY 202-3006-60691
Fund 202 - LIBRARY & MUSEUM FUND Total:12,912.89
Fund: 215 - LIGHTING & LANDSCAPING FUND
473.48Materials/Supplies06/20/19 - L&L AND PARKS MAP876032PLANIT REPROGRAPHICS SYST…215-7004-60431
4,425.00Maintenance/Services06/22/19 - WEED ABATEMENT91502PWLC II, INC 215-7004-60691
100.73Electric - Utilities06/07-07/06/19 - PHONE SERVICEJUN'193453493FRONTIER COMMUNICATIONS…215-7004-61116
39.37Electric - Utilities06/10-07/09/19 - PHONE SERVICEJUN'195646974FRONTIER COMMUNICATIONS…215-7004-61116
552.11Electric - Utilities06/18/19 - ELECTRICITY SERVICEPW212IMPERIAL IRRIGATION DIST 215-7004-61116
49.82Electric - Medians - Utilities06/18/19 - ELECTRICITY SERVICEPW212IMPERIAL IRRIGATION DIST 215-7004-61117
4,621.20Electric - Utilities06/28/19 - ELECTRICITY SERVICEPW213IMPERIAL IRRIGATION DIST 215-7004-61116
2,390.57Electric - Medians - Utilities06/28/19 - ELECTRICITY SERVICEPW213IMPERIAL IRRIGATION DIST 215-7004-61117
226.12Water - Medians - Utilities06/18/19 - WATER SERVICEPWW194COACHELLA VALLEY WATER DI…215-7004-61211
5,799.39Water - Medians - Utilities06/25/19 - WATER SERVICEPWW195COACHELLA VALLEY WATER DI…215-7004-61211
12,855.99Water - Medians - Utilities07/02/19 - WATER SERVICEPWW196COACHELLA VALLEY WATER DI…215-7004-61211
Fund 215 - LIGHTING & LANDSCAPING FUND Total:31,533.78
Fund: 221 - AB 939 - CALRECYCLE FUND
546.92AB 939 Recycling Solutions06/15/19 - SHREDDING CITY CLERK8127489671SHRED-IT USA - SAN BERNADI…221-0000-60127
Fund 221 - AB 939 - CALRECYCLE FUND Total:546.92
Fund: 224 - TUMF FUND
22,477.40TUMF Payable to CVAG06/28/19 - REFUND TUMF FEE BCOM2019…062819HAYHOE CONSTRUCTION COR…224-0000-20320
Fund 224 - TUMF FUND Total:22,477.40
Fund: 225 - INFRASTRUCTURE FUND
666.64Consultants, Fee Study04/2019 NBS DEVELOPMENT IMPACT FEE …4190000086NBS 225-0000-60104
1,143.50Consultants, Fee Study05/2019 NBS DEVELOPMENT IMPACT FEE …519000120NBS 225-0000-60104
Fund 225 - INFRASTRUCTURE FUND Total:1,810.14
34
Demand Register Packet: APPKT02047 - BC 07/05/19
7/5/2019 5:36:41 PM Page 4 of 8
AmountVendor Name Payable Number Description (Item)Account Name Account Number
Fund: 235 - SO COAST AIR QUALITY FUND
231.77Electricity - Utilities06/28/19 - ELECTRICITY SERVICEPW213IMPERIAL IRRIGATION DIST 235-0000-61101
Fund 235 - SO COAST AIR QUALITY FUND Total:231.77
Fund: 241 - HOUSING AUTHORITY
5,081.25Professional Services06/2019 HOUSING COMPLIANCE & MONI…90CAHA, BECKY 241-9101-60103
Fund 241 - HOUSING AUTHORITY Total:5,081.25
Fund: 248 - SA 2004 LO/MOD BOND FUND (Refinanced in 2014)
164.93Relocation Benefits05/21-06/19/19 - WSA RELOCJUN'1950744515IMPERIAL IRRIGATION DIST 248-9102-60159
Fund 248 - SA 2004 LO/MOD BOND FUND (Refinanced in 2014) Total:164.93
Fund: 250 - TRANSPORTATION DIF FUND
666.61Consultants, Fee Study04/2019 NBS DEVELOPMENT IMPACT FEE …4190000086NBS 250-0000-60104
1,143.48Consultants, Fee Study05/2019 NBS DEVELOPMENT IMPACT FEE …519000120NBS 250-0000-60104
Fund 250 - TRANSPORTATION DIF FUND Total:1,810.09
Fund: 251 - PARKS & REC DIF FUND
666.50Consultants, Fee Study04/2019 NBS DEVELOPMENT IMPACT FEE …4190000086NBS 251-0000-60104
1,143.29Consultants, Fee Study05/2019 NBS DEVELOPMENT IMPACT FEE …519000120NBS 251-0000-60104
Fund 251 - PARKS & REC DIF FUND Total:1,809.79
Fund: 252 - CIVIC CENTER DIF FUND
666.50Consultants, Fee Study04/2019 NBS DEVELOPMENT IMPACT FEE …4190000086NBS 252-0000-60104
1,143.29Consultants, Fee Study05/2019 NBS DEVELOPMENT IMPACT FEE …519000120NBS 252-0000-60104
Fund 252 - CIVIC CENTER DIF FUND Total:1,809.79
Fund: 253 - LIBRARY DEVELOPMENT DIF
666.50Consultants, Fee Study04/2019 NBS DEVELOPMENT IMPACT FEE …4190000086NBS 253-0000-60104
1,143.29Consultants, Fee Study05/2019 NBS DEVELOPMENT IMPACT FEE …519000120NBS 253-0000-60104
Fund 253 - LIBRARY DEVELOPMENT DIF Total:1,809.79
Fund: 254 - COMMUNITY CENTER DIF
666.50Consultants, Fee Study04/2019 NBS DEVELOPMENT IMPACT FEE …4190000086NBS 254-0000-60104
1,143.29Consultants, Fee Study05/2019 NBS DEVELOPMENT IMPACT FEE …519000120NBS 254-0000-60104
Fund 254 - COMMUNITY CENTER DIF Total:1,809.79
Fund: 255 - STREET FACILITY DIF FUND
666.50Consultants, Fee Study04/2019 NBS DEVELOPMENT IMPACT FEE …4190000086NBS 255-0000-60104
1,143.29Consultants, Fee Study05/2019 NBS DEVELOPMENT IMPACT FEE …519000120NBS 255-0000-60104
Fund 255 - STREET FACILITY DIF FUND Total:1,809.79
Fund: 256 - PARK FACILITY DIF FUND
666.50Consultants, Fee Study04/2019 NBS DEVELOPMENT IMPACT FEE …4190000086NBS 256-0000-60104
1,143.29Consultants, Fee Study05/2019 NBS DEVELOPMENT IMPACT FEE …519000120NBS 256-0000-60104
Fund 256 - PARK FACILITY DIF FUND Total:1,809.79
Fund: 257 - FIRE PROTECTION DIF
666.50Consultants, Fee Study04/2019 NBS DEVELOPMENT IMPACT FEE …4190000086NBS 257-0000-60104
1,143.29Consultants, Fee Study05/2019 NBS DEVELOPMENT IMPACT FEE …519000120NBS 257-0000-60104
Fund 257 - FIRE PROTECTION DIF Total:1,809.79
Fund: 401 - CAPITAL IMPROVEMENT PROGRAMS
50.00Design06/27/19 - FILING FEE NOTICE EXEMPT 20…062719COUNTY OF RIVERSIDE 401-0000-60185
4,873.00Technical07/02/19 - CVWD RIGHT OF USE SRR 2014…070219DEPARTMENT OF THE INTERIO…401-0000-60108
2,266.89Design05/2019 EISENHOWER DRAINAGE PRJ 201…1052005MICHAEL BAKER INTERNATIO…401-0000-60185
4,630.98Design05/2019 SRR PHASE II INFRASTRUCTURE P…1052038MICHAEL BAKER INTERNATIO…401-0000-60185
2,084.65Design05/31/19 SYSTEMIC SAFETY ANALYSIS RE…13418172KIMLEY-HORN AND ASSOCIAT…401-0000-60185
3,500.00Construction06/07/19 - SRR FENCE REPAIR17673SAM'S FENCE COMPANY 401-0000-60188
900.00Design06/10/19 - CVWD PLAN CHECK FEE 2011-…19-10051COACHELLA VALLEY WATER DI…401-0000-60185
4,400.00Technical05/05-05/31/19 ON-CALL SURVEY STAKIN…2219.013-01MSA CONSULTING INC 401-0000-60108
14,421.35DesignAPR 2019 DUNE PALMS BRIDGE LOW WA…3726BENGAL ENGINEERING INC 401-0000-60185
10,305.75DesignMAY 2019 DUNE PALMS BRIDGE LOW WA…3751BENGAL ENGINEERING INC 401-0000-60185
9,435.00Construction06/17/19 - BBS CABINETS6433DDL TRAFFIC INC.401-0000-60188
613.29Construction06/17/19 - 2009-04 CONST SET875824PLANIT REPROGRAPHICS SYST…401-0000-60188
360.31Construction06/20/19 - 2015-12B CONST SET875944PLANIT REPROGRAPHICS SYST…401-0000-60188
35
Demand Register Packet: APPKT02047 - BC 07/05/19
7/5/2019 5:36:41 PM Page 5 of 8
AmountVendor Name Payable Number Description (Item)Account Name Account Number
1,600.00Construction12/28/18 - ASBESTOS SURVEY&RPTS MOB…A/L25000T & T ENVIORMENTAL, LLC 401-0000-60188
Fund 401 - CAPITAL IMPROVEMENT PROGRAMS Total:59,441.22
Fund: 501 - FACILITY & FLEET REPLACEMENT
2,397.54Fuel & Oil06/01-06/15/19 - VEHICLE FUEL1316TOWER ENERGY GROUP 501-0000-60674
40.07Street Sweeper05/2019 - SWEEPER FUELMAY'199603120297GAS COMPANY, THE 501-0000-60678
54.96Parts & Maintenance Supplies06/07/19 - SERVICE/PARTSPCK30000391QUINN COMPANY 501-0000-60675
Fund 501 - FACILITY & FLEET REPLACEMENT Total:2,492.57
Fund: 502 - INFORMATION TECHNOLOGY
3,786.88Software Licenses05/10-06/09/19 - MS AZURE ONLINE SVCSE03008ENGNMICROSOFT CORPORATION 502-0000-60301
Fund 502 - INFORMATION TECHNOLOGY Total:3,786.88
Fund: 503 - PARK EQUIP & FACILITY FUND
1.00Parks06/16/19-06/15/20 - PIONEER DOG PARK …15541COACHELLA VALLEY WATER DI…503-0000-71060
Fund 503 - PARK EQUIP & FACILITY FUND Total:1.00
Fund: 601 - SILVERROCK RESORT
750.00Repair & Maintenance03/19/19 - SILVERROCK PUMP REPAIR31930488MULTI W SYSTEMS INC 601-0000-60660
210.00Repair & Maintenance02/20/19 - SRR CONNECT AIR COMPRESS…72894VINTAGE E & S INC 601-0000-60660
Fund 601 - SILVERROCK RESORT Total:960.00
Grand Total:366,045.97
36
Demand Register Packet: APPKT02047 - BC 07/05/19
7/5/2019 5:36:41 PM Page 6 of 8
Fund Summary
Fund Expense Amount
101 - GENERAL FUND 207,234.68
201 - GAS TAX FUND 2,891.92
202 - LIBRARY & MUSEUM FUND 12,912.89
215 - LIGHTING & LANDSCAPING FUND 31,533.78
221 - AB 939 - CALRECYCLE FUND 546.92
224 - TUMF FUND 22,477.40
225 - INFRASTRUCTURE FUND 1,810.14
235 - SO COAST AIR QUALITY FUND 231.77
241 - HOUSING AUTHORITY 5,081.25
248 - SA 2004 LO/MOD BOND FUND (Refinanced in 2014)164.93
250 - TRANSPORTATION DIF FUND 1,810.09
251 - PARKS & REC DIF FUND 1,809.79
252 - CIVIC CENTER DIF FUND 1,809.79
253 - LIBRARY DEVELOPMENT DIF 1,809.79
254 - COMMUNITY CENTER DIF 1,809.79
255 - STREET FACILITY DIF FUND 1,809.79
256 - PARK FACILITY DIF FUND 1,809.79
257 - FIRE PROTECTION DIF 1,809.79
401 - CAPITAL IMPROVEMENT PROGRAMS 59,441.22
501 - FACILITY & FLEET REPLACEMENT 2,492.57
502 - INFORMATION TECHNOLOGY 3,786.88
503 - PARK EQUIP & FACILITY FUND 1.00
601 - SILVERROCK RESORT 960.00
Grand Total:366,045.97
Account Summary
Account Number Account Name Expense Amount
101-0000-20305 Due to SunLine 1,178.50
101-0000-42300 Cash Over/Short 773.49
101-0000-42301 Miscellaneous Revenue -61.25
101-0000-42600 Building Plan Check Fees 125.00
101-1001-60320 Travel & Training 250.10
101-1002-60420 Operating Supplies 28.16
101-1004-60104 Consultants 404.00
101-1004-60322 Training & Education/MOU 998.31
101-1005-60103 Professional Services 7,287.50
101-1005-60420 Operating Supplies 370.24
101-1006-60320 Travel & Training 25.00
101-1006-60351 Membership Dues 1,500.00
101-1006-60352 Subscriptions & Publicati…175.00
101-1007-60403 Citywide Conf Room Suppl…306.06
101-1007-60535 Sales Tax Reimbursements 13,893.56
101-2001-60109 LQ Police Volunteers 55.84
101-2001-60174 Blood/Alcohol Testing 3,177.00
101-2001-60176 Sheriff - Other 54,579.00
101-2001-61300 Telephone - Utilities 44.36
101-2002-60139 Fire Service Costs 750.00
101-2002-60691 Maintenance/Services 545.00
101-2002-61101 Electricity - Utilities 1,147.26
101-2002-61200 Water - Utilities 235.49
101-2002-61304 Mobile/Cell Phones/Satell…16.53
101-2002-61400 Cable - Utilities 121.78
101-2002-72110 Building Improvements 5,800.00
101-3002-60107 Instructors 751.80
101-3002-60400 Office Supplies 144.83
101-3002-60420 Operating Supplies 15,382.10
101-3003-60149 Community Experiences 1,040.05
101-3005-60431 Materials/Supplies 319.73
101-3005-60432 Tools/Equipment 1,068.19
37
Demand Register Packet: APPKT02047 - BC 07/05/19
7/5/2019 5:36:41 PM Page 7 of 8
Account Summary
Account Number Account Name Expense Amount
101-3005-61102 Electric - Monticello Park -…13.48
101-3005-61103 Electric - Civic Center Park…2,005.39
101-3005-61105 Electric - Fritz Burns Park -…1,080.28
101-3005-61106 Electric - Sports Complex -…1,952.61
101-3005-61108 Electric - Colonel Paige - U…139.38
101-3005-61109 Electric - Community Park …3,259.60
101-3005-61110 Electric - Adams Park - Util…38.90
101-3005-61111 Electric - Velasco Park - Uti…13.48
101-3005-61113 Electric - Eisenhower Park …22.74
101-3005-61114 Electric - Desert Pride - Uti…13.38
101-3005-61202 Water - Civic Center Park -…3,972.96
101-3005-61203 Water -Eisenhower Park -…126.82
101-3005-61204 Water -Fritz Burns Park - …2,508.61
101-3005-61205 Water -Velasco Park - Utili…70.06
101-3005-61207 Water -Pioneer Park - Utili…946.97
101-3005-61209 Water -Community Park -…7,377.28
101-3008-60115 Janitorial 10,081.20
101-3008-60116 Pest Control 255.00
101-3008-60196 Annual Permits/Inspectio…1,094.00
101-3008-60431 Materials/Supplies 483.05
101-3008-60481 Office Supplies 73.00
101-3008-60664 Fire Extinguisher/First Aid…809.64
101-3008-60667 HVAC 4,318.80
101-3008-60691 Maintenance/Services 4,067.37
101-3008-61100 Gas - Utilities 257.26
101-3008-61101 Electricity - Utilities 12,403.22
101-3008-61200 Water - Utilities 636.43
101-6001-60103 Professional Services 9,327.39
101-6001-60400 Office Supplies 837.48
101-6003-60351 Membership Dues 195.00
101-6004-60108 Technical 16.00
101-6004-60125 Temporary Agency Servic…952.80
101-6006-60125 Temporary Agency Servic…2,441.15
101-6006-60137 Community Special Events 301.53
101-7002-60183 Map/Plan Checking 462.00
101-7003-60420 Operating Supplies 221.39
101-7006-60144 Contract Traffic Engineer 22,007.00
101-7006-60146 PM 10 - Dust Control 19.40
201-7003-60429 Traffic Control Signs 1,149.44
201-7003-61101 Electricity - Utilities 930.46
201-7003-61701 Equipment Rental 812.02
202-3004-60115 Janitorial 2,470.30
202-3004-60116 Pest Control 74.00
202-3004-60667 HVAC 250.00
202-3004-60691 Maintenance/Services 823.04
202-3004-61100 Gas - Utilities 15.78
202-3004-61101 Electricity - Utilities 4,502.67
202-3006-60115 Janitorial 659.25
202-3006-60116 Pest Control 49.00
202-3006-60667 HVAC 2,340.00
202-3006-60691 Maintenance/Services 442.50
202-3006-61101 Electricity - Utilities 1,158.03
202-3006-61300 Telephone - Utilities 128.32
215-7004-60431 Materials/Supplies 473.48
215-7004-60691 Maintenance/Services 4,425.00
215-7004-61116 Electric - Utilities 5,313.41
215-7004-61117 Electric - Medians - Utiliti…2,440.39
215-7004-61211 Water - Medians - Utilities 18,881.50
38
Demand Register Packet: APPKT02047 - BC 07/05/19
7/5/2019 5:36:41 PM Page 8 of 8
Account Summary
Account Number Account Name Expense Amount
221-0000-60127 AB 939 Recycling Solutions 546.92
224-0000-20320 TUMF Payable to CVAG 22,477.40
225-0000-60104 Consultants, Fee Study 1,810.14
235-0000-61101 Electricity - Utilities 231.77
241-9101-60103 Professional Services 5,081.25
248-9102-60159 Relocation Benefits 164.93
250-0000-60104 Consultants, Fee Study 1,810.09
251-0000-60104 Consultants, Fee Study 1,809.79
252-0000-60104 Consultants, Fee Study 1,809.79
253-0000-60104 Consultants, Fee Study 1,809.79
254-0000-60104 Consultants, Fee Study 1,809.79
255-0000-60104 Consultants, Fee Study 1,809.79
256-0000-60104 Consultants, Fee Study 1,809.79
257-0000-60104 Consultants, Fee Study 1,809.79
401-0000-60108 Technical 9,273.00
401-0000-60185 Design 34,659.62
401-0000-60188 Construction 15,508.60
501-0000-60674 Fuel & Oil 2,397.54
501-0000-60675 Parts & Maintenance Supp…54.96
501-0000-60678 Street Sweeper 40.07
502-0000-60301 Software Licenses 3,786.88
503-0000-71060 Parks 1.00
601-0000-60660 Repair & Maintenance 960.00
Grand Total:366,045.97
Project Account Summary
Project Account Key Expense Amount
**None**299,057.20
091004CT 2,213.29
111205D 25,627.10
141517D 4,630.98
151612CT 360.31
151612D 2,266.89
1819PMPT 4,400.00
1819TMICT 9,435.00
201608CT 3,500.00
201706T 4,873.00
201708D 2,084.65
201803D 50.00
201835E 6,550.00
TACOE 997.55
Grand Total:366,045.97
39
City of La Quinta
Bank Transactions 06/22/19 – 07/05/19
Wire Transaction
Listed below are the wire transfers from 06/22/19 – 07/05/19
Wire Transfers:
06/25/2019 - WIRE TRANSFER - LANDMARK 149,187.24$
06/28/2019 - WIRE TRANSFER - ICMA 4,106.39$
06/28/2019 - WIRE TRANSFER - LQCEA 495.00$
06/28/2019 - WIRE TRANSFER - PERS 41,379.67$
07/02/2019 - WIRE TRANSFER - PERS 120,590.62$
07/02/2019 - WIRE TRANSFER - TASC FLEX CLAIM 1,782.99$
TOTAL WIRE TRANSFERS OUT 317,541.91$
ATTACHMENT 2
40
City of La Quinta
CITY COUNCIL MEETING: July 16, 2019
STAFF REPORT
AGENDA TITLE: ADOPT RESOLUTION TO APPROVE THE 2019/20 SALARY
SCHEDULE AND AMENDMENT NO. 2 TO THE MEMORANDUM OF
UNDERSTANDING BETWEEN THE CITY OF LA QUINTA AND THE LA QUINTA
CITY EMPLOYEES’ ASSOCIATION REAFFIRMING THE HEALTH BENEFIT CAP OF
$1,709 PER EMPLOYEE PER MONTH
RECOMMENDATION
Adopt a Resolution to approve the 2019/20 Salary Schedule, and Amendment
No. 2 to the Memorandum of Understanding between the City and the La Quinta
City Employees’ Association reaffirming the health benefit cap of $1,709 per
employee per month, effective June 22, 2019.
EXECUTIVE SUMMARY
The current Memorandum of Understanding (MOU) with the La Quinta
City Employees’ Association (LQCEA) provides for a meet and confer
reopener to review insurance coverage for the next calendar year.
The City and LQCEA met and considered the 2019 Health Premium
adjustments which shows a decrease for employees.
The recommended Amendment No. 2 is the result of the reopener, which
includes a salary schedule increase of 0.30% and continuation of the
health benefit cap at $1,709 per month per employee.
A summary of the economic benefits consisting of the 2019/20 salary
schedule and health benefits will be verbally announced in accordance
with Government Code Section 54953(c)(3) prior to Council taking any
action, for the City’s executives as defined by State law [subdivision (d)
of Section 3511.1].
FISCAL IMPACT
The 2019/20 cost to implement the 0.30% salary schedule adjustment for
represented membership would be approximately $10,000. The cost to
implement this same adjustment for non-represented management, contract,
and confidential employees would be approximately $10,000. Funds are
available in the Contingency for Staffing account (101-1007-50115).
CONSENT CALENDAR ITEM NO. 4
41
BACKGROUND/ANALYSIS
LQCEA and the City entered into a three-year MOU in June 2018. Section 2 of
that MOU provides for an annual meet and confer reopener to determine an
appropriate salary schedule increase based on the World at Work (WOW) Salary
Budget Survey. The survey for 2018 identifies an increase of 2.0%. During the
last market survey performed by Gallagher & Associates, a projected increase
of 1.7% was applied to the City’s salary schedule. In order for the City to be
current with the WOW survey, a 0.30% increase to the current salary schedule
is required.
Since 1984, the City has provided a health benefit amount to employees to
cover medical, dental, and vision insurance. The board of directors for CalPERS
sets the medical rates each year for all California cities. In June 2019, Staff
received the new medical insurance rates, which become effective January 1,
2020. The cost for the City sponsored family plan, Anthem HMO Select, has
decreased for 2020. On July 3, 2019, the LQCEA’s negotiating team agreed to
continue the current health cap of $1,709 per month per employee for 2020.
Except as modified by this Amendment No. 2, the MOU remains in full force and
effect according to its terms.
ALTERNATIVES
The LQCEA and City have worked in the true spirit of cooperation to equitably
serve the needs of both parties. Approval of Amendment No. 2 will conclude a
successful labor negotiation process. Staff does not recommend any
alternatives.
Prepared by: Angela Scott, Human Resources/Risk Manager
Approved by: Chris Escobedo, Director of Community Resources
42
RESOLUTION NO. 2019 -
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF LA QUINTA, CALIFORNIA, APPROVING
THE 2019/20 SALARY SCHEDULE AND
AMENDMENT NO. 2 TO THE MEMORANDUM OF
UNDERSTANDING REAFFIRMING THE HEALTH
BENEFIT CAP OF $1,709 PER MONTH PER
EMPLOYEE
WHEREAS, the City of La Quinta, hereinafter referred to as “City” and
the La Quinta City Employees’ Association, the recognized organization
representing its members, hereinafter referred to as “Association,” have met
and conferred over wages, hours, terms, and conditions of employment
pursuant to Government Code 3500, as amended; and
WHEREAS, the Council adopted Resolution No. 2018-034, at the June
19, 2018 meeting, approving the Memorandum of Understanding (MOU)
between the City and Association, expiring on June 30, 2021, which provides
for a meet and confer reopener; and
WHEREAS, the City and the Association have negotiated and agreed
upon a salary schedule increase of 0.30% effective June 22, 2019 and
continuation of the $1,709 health benefit cap.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City
of La Quinta, California, as follows:
SECTION 1. The City Council hereby approves the 2019/20 Salary
Schedule, attached hereto as Exhibit A, and incorporated by this reference.
SECTION 2. The City Council hereby reaffirms the health benefit cap of
$1,709, per month per employee, as set forth in Amendment No. 2 of the
MOU between the City and the Association, attached hereto as Exhibit B and
incorporated by this reference, to the extent the City may legally do so in
accordance with the time constraints of said MOU.
PASSED, APPROVED and ADOPTED at a regular meeting of the La
Quinta City Council held on this 16th day of July 2019, by the following vote:
43
Resolution No. 2019-
LQCEA Amendment No. 2 to MOU & 2019/20 Salary Schedule
Adopted: July 16, 2019
Page 2 of 2
AYES:
NOES:
ABSENT:
ABSTAIN:
_______________________
LINDA EVANS, Mayor
City of La Quinta, California
ATTEST:
__________________________
MONIKA RADEVA, City Clerk
City of La Quinta, California
(CITY SEAL)
APPROVED AS TO FORM:
___________________________
WILLIAM H. IHRKE, City Attorney
City of La Quinta, California
44
2019/20 Salary ScheduleWORKING TITLEDBMSTEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 STEP 9 STEP 10Administrative AssistantMaintenance Worker IA11 Annually 38,741.77$ 40,678.86$ 42,615.94$ 44,553.03$ 46,490.12$ 48,067.64$ 49,645.16$ 51,222.68$ 52,800.20$ 54,377.72$ Maintenance Worker IIA12 Annually42,624.17$ 44,755.38$ 46,886.59$ 49,017.80$ 51,149.00$ 52,884.59$ 54,620.18$ 56,355.77$ 58,091.36$ 59,826.95$ Administrative TechnicianCommunity Resources CoordinatorManagement AssistantTraffic Signal TechnicianB21 Annually 50,400.62$ 52,920.65$ 55,440.68$ 57,960.71$ 60,480.74$ 62,533.09$ 64,585.44$ 66,637.79$ 68,690.14$ 70,742.49$ Account TechnicianBuilding Inspector ICode Compliance Officer IExecutive AssistantManagement AssistantPermit TechnicianB22 Annually 54,283.01$ 56,997.16$ 59,711.31$ 62,425.46$ 65,139.61$ 67,350.03$ 69,560.45$ 71,770.87$ 73,981.29$ 76,191.71$ Building Inspector IICode Compliance Officer IIConstruction InspectorMaintenance & Operations TechnicianB23 Annually 58,165.41$ 61,073.69$ 63,981.96$ 66,890.23$ 69,798.50$ 72,166.99$ 74,535.48$ 76,903.97$ 79,272.46$ 81,640.94$ Deputy City ClerkJunior AccountantMaintenance ForemanManagement SpecialistParks/L&L ForemanPlans ExaminerB24 Annually 63,517.31$ 66,693.18$ 69,869.04$ 73,044.91$ 76,220.77$ 78,807.14$ 81,393.51$ 83,979.88$ 86,566.25$ 89,152.63$ AccountantManagement SpecialistB25 Annually 70,103.01$ 73,608.16$ 77,113.31$ 80,618.46$ 84,123.61$ 86,978.27$ 89,832.93$ 92,687.59$ 95,542.25$ 98,396.92$ Animal/Code Officer SupervisorMaintenance & Operations SuperintendentPlans Examiner/Inspector SupervisorB32 Annually 70,103.01$ 73,608.16$ 77,113.31$ 80,618.46$ 84,123.61$ 86,978.27$ 89,832.93$ 92,687.59$ 95,542.25$ 98,396.92$ WORKING TITLE DBM STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 STEP 9 STEP 10 STEP 11 STEP 12 STEP 13 STEP 14Assistant Construction ManagerAssociate PlannerCommunity Resources AnalystSr. Emergency Management CoordinatorFinancial Services AnalystHuman Resources AnalystManagement AnalystPublic Safety AnalystSenior AccountantTraffic Operations AnalystC42 Annually 76,782.29$ 79,981.81$ 83,181.32$ 86,380.84$ 89,580.36$ 92,776.04$ 95,977.86$ 98,761.22$ 101,544.58$ 104,327.94$ 107,111.30$ 109,894.66$ 112,678.02$ 115,461.35$ Associate EngineerConstruction Manager/Inspection SupervisorC43 Annually 80,992.91$ 84,367.89$ 87,742.86$ 91,117.84$ 94,492.81$ 97,863.74$ 101,241.14$ 104,177.13$ 107,113.12$ 110,049.11$ 112,985.10$ 115,921.09$ 118,857.08$ 121,793.08$ Senior PlannerC44 Annually86,265.68$ 89,860.37$ 93,455.06$ 97,049.76$ 100,644.45$ 104,234.82$ 107,832.10$ 110,959.23$ 114,086.36$ 117,213.49$ 120,340.62$ 123,467.75$ 126,594.88$ 129,722.00$ Assistant to the City ManagerBuilding OfficialCommunity Resources ManagerHub ManagerHuman Resources ManagerMarketing ManagerPlanning ManagerPublic Safety ManagerD61 Annually 97,860.71$ 101,938.57$ 106,016.43$ 110,094.28$ 114,172.14$ 118,245.10$ 122,325.89$ 125,873.34$ 129,420.79$ 132,968.24$ 136,515.69$ 140,063.14$ 143,610.59$ 147,158.03$ City Clerk D62 Annually102,753.75$ 107,035.50$ 111,317.25$ 115,599.00$ 119,880.74$ 124,157.36$ 128,442.19$ 132,167.01$ 135,891.83$ 139,616.65$ 143,341.47$ 147,066.29$ 150,791.11$ 154,515.95$ City Engineer D65 Annually117,877.00$ 122,788.94$ 127,700.87$ 132,612.81$ 137,524.74$ 142,430.78$ 147,346.25$ 151,619.29$ 155,892.33$ 160,165.37$ 164,438.41$ 168,711.45$ 172,984.49$ 177,257.53$ Community Resources DirectorDesign & Development DirectorFacilities DirectorFinance Director/City TreasurerE82 Annually 129,959.40$ 135,374.81$ 140,790.22$ 146,205.63$ 151,621.04$ 157,029.95$ 162,449.25$ 167,160.27$ 171,871.29$ 176,582.31$ 181,293.33$ 186,004.35$ 190,715.37$ 195,426.42$ City ManagerF101*Annually 176,822.32$ 184,190.51$ 191,558.69$ 198,926.88$ 206,295.06$ 213,654.41$ 221,027.90$ 227,437.70$ 233,847.50$ 240,257.30$ 246,667.10$ 253,076.90$ 259,486.70$ 265,896.53$ Part-Time EmployeesRecreation Leader A01 Hourly $12.04 $12.64 $13.24 $13.84 $14.44Senior Recreation Leader A02 Hourly$16.05 $16.85 $17.65 $18.46 $19.26Administrative Technician B21 Hourly$24.23 $25.44 $26.65 $27.87 $29.08Software Program Report WriterB24 Hourly$30.54 $32.06 $33.59 $35.12 $36.64NON-DISCRETIONARY STEPSDISCRETIONARY STEPS (PERFORMANCE BASED)NON-DISCRETIONARY STEPSDISCRETIONARY STEPS (PERFORMANCE BASED)City Council Approval - July 16, 2019(IIHFWLYH-XQHRESOLUTION NO. 2019-XXXEXHIBIT ARESOLUTION NO. 2019-XXXEXHIBIT AHAND-OUT BY STAFF REVISED "EXHIBIT A"
46
AMENDMENT NO. 2
TO MEMORANDUM OF UNDERSTANDING
This AMENDMENT NO. 2 ("Amendment") is made by and between the CITY OF LA
QUINTA ("City") and the LA QUINTA CITY EMPLOYEES' ASSOCIATION ("Association")
as of July 16, 2019.
RECITALS
WHEREAS, Association and City entered into a Memorandum of
Understanding (MOU) on July 1, 2018 which covers the period of July 1, 2018 through
June 30, 2021; and
WHEREAS, Section 2 of the MOU provides for an annual meet and confer
reopener to determine an appropriate salary range increase based on the World at
Work (“WOW”); and
WHEREAS, Section 4 of the MOU provides for a meet and confer reopener to
determine amounts paid by the City and employees for insurance coverage for the
next calendar year; and
WHEREAS, City and Association have met and considered the 2020 Health
Premium adjustments.
NOW THEREFORE, it is agreed by and among the parties as follows:
1. The foregoing Recitals are true and correct and incorporated in full as
part of this Amendment.
2. Effective June 22, 2019, the Salary Schedule will increase by 0.30%.
3. The health benefit cap will continue at $1,709 per month per employee.
3. The reopener referenced in Sections 2 and 4 of the MOU are
concluded/closed for purposes of the 2019/20 Salary Schedule and the 2020
insurance coverage premiums.
4. Except as modified by this Agreement, the MOU remains in full force and
effect according to its terms.
CITY OF LA QUINTA LA QUINTA CITY EMPLOYEES'
ASSOCIATION
By: By:
Its Mayor Its President
RESOLUTION NO. 2019-XXX
EXHIBIT B
47
48
City of La Quinta
CITY COUNCIL MEETING: July 16, 2019
STAFF REPORT
AGENDA TITLE: ADOPT RESOLUTION TO APPROVE THE 2019/20 SALARY
SCHEDULE, AND REAFFIRM THE HEALTH BENEFIT CAP OF $1,709 PER EMPLOYEE
PER MONTH, FOR NON-REPRESENTED MANAGEMENT, CONTRACT, AND
CONFIDENTIAL EMPLOYEES
RECOMMENDATION
Adopt a Resolution to approve the 2019/20 Salary Schedule, and reaffirm the
health benefit cap of $1,709 per employee per month, for non-represented
management, contract, and confidential employees effective June 22, 2019.
EXECUTIVE SUMMARY
The City and La Quinta City Employees Association (LQCEA) met and
conferred on matters relating to employment conditions and
employee/employer relations, which includes compensation and benefits.
Both parties agreed to a 0.30% salary schedule increase. Salary adjustments
also affect non-represented management, contract, and confidential
employees.
LQCEA has accepted to continue the current health benefit cap of $1,709 per
month per employee. This benefit also affects non-represented
management, contract, and confidential employees.
A summary of the economic benefits consisting of the 2019/20 salary
schedule and health benefits will be verbally announced in accordance with
Government Code Section 54953(c)(3) prior to Council taking any action, for
the City’s executives as defined by State law [subdivision (d) of Section
3511.1].
FISCAL IMPACT
The 2019/20 cost to implement the 0.30% salary schedule adjustment to non-
represented management, contract, and confidential employees would be
approximately $10,000. Funds are available in the Contingency for Staffing account
(101-1007-50115).
CONSENT CALENDAR ITEM NO. 5
49
BACKGROUND/ANALYSIS
When the City elects to change benefits for the LQCEA, it also provides non-
represented management, contract, and confidential employees the same benefit
adjustments. Staff recommends that the 0.30% salary schedule increase be
provided to non-represented management, contract, and confidential employees.
ALTERNATIVES
The Council may elect to not provide the same benefit adjustment changes to the
unrepresented employees.
Prepared by: Angela Scott, Human Resources/Risk Manager
Approved by: Chris Escobedo, Community Resources Director
50
RESOLUTION NO. 2019 -
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF LA QUINTA, CALIFORNIA, APPROVING
THE 2019/20 SALARY SCHEDULE AND
REAFFIRMING THE HEALTH BENEFIT CAP OF
$1,709 PER EMPLOYEE PER MONTH, FOR NON-
REPRESENTED MANAGEMENT, CONTRACT, AND
CONFIDENTIAL EMPLOYEES
WHEREAS, the City of La Quinta, hereinafter referred to as “City”
desires to implement a 0.30% salary schedule increase for non-represented
management, contract, and confidential employees effective June 22, 2019;
and
WHEREAS, the City desires to continue benefit adjustments for non-
represented management, contract, and confidential employees.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City
of La Quinta, California, as follows:
SECTION 1. The City Council hereby approves to implement the
2019/20 Salary Schedule, attached hereto as Exhibit A, and incorporated by
this reference, for non-represented management, contract, and confidential
employees.
SECTION 2. The City Council hereby reaffirms the health benefit cap of
$1,709, per month per employee, for non-represented management,
contract, and confidential employees.
SECTION 3. The City Council recognizes contract positions as the,
City Manager, Community Resources Director, Facilities Director,
Finance Director, City Engineer, and Design and Development Director.
PASSED, APPROVED and ADOPTED at a regular meeting of the La
Quinta City Council held on this 16h day of July 2019, by the following vote:
AYES:
NOES:
ABSENT:
51
Resolution No. 2019-
2019/20 Salary Schedule and Benefit Adjustments for Non-Represented Employees
Adopted: July 16, 2019
Page 2 of 2
ABSTAIN:
_______________________
LINDA EVANS, Mayor
City of La Quinta, California
ATTEST:
__________________________
MONIKA RADEVA, City Clerk
City of La Quinta, California
(CITY SEAL)
APPROVED AS TO FORM:
___________________________
WILLIAM H. IHRKE, City Attorney
City of La Quinta, California
52
2019/20 Salary ScheduleWORKING TITLEDBMSTEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 STEP 9 STEP 10Administrative AssistantMaintenance Worker IA11 Annually 38,741.77$ 40,678.86$ 42,615.94$ 44,553.03$ 46,490.12$ 48,067.64$ 49,645.16$ 51,222.68$ 52,800.20$ 54,377.72$ Maintenance Worker IIA12 Annually42,624.17$ 44,755.38$ 46,886.59$ 49,017.80$ 51,149.00$ 52,884.59$ 54,620.18$ 56,355.77$ 58,091.36$ 59,826.95$ Administrative TechnicianCommunity Resources CoordinatorManagement AssistantTraffic Signal TechnicianB21 Annually 50,400.62$ 52,920.65$ 55,440.68$ 57,960.71$ 60,480.74$ 62,533.09$ 64,585.44$ 66,637.79$ 68,690.14$ 70,742.49$ Account TechnicianBuilding Inspector ICode Compliance Officer IExecutive AssistantManagement AssistantPermit TechnicianB22 Annually 54,283.01$ 56,997.16$ 59,711.31$ 62,425.46$ 65,139.61$ 67,350.03$ 69,560.45$ 71,770.87$ 73,981.29$ 76,191.71$ Building Inspector IICode Compliance Officer IIConstruction InspectorMaintenance & Operations TechnicianB23 Annually 58,165.41$ 61,073.69$ 63,981.96$ 66,890.23$ 69,798.50$ 72,166.99$ 74,535.48$ 76,903.97$ 79,272.46$ 81,640.94$ Deputy City ClerkJunior AccountantMaintenance ForemanManagement SpecialistParks/L&L ForemanPlans ExaminerB24 Annually 63,517.31$ 66,693.18$ 69,869.04$ 73,044.91$ 76,220.77$ 78,807.14$ 81,393.51$ 83,979.88$ 86,566.25$ 89,152.63$ AccountantManagement SpecialistB25 Annually 70,103.01$ 73,608.16$ 77,113.31$ 80,618.46$ 84,123.61$ 86,978.27$ 89,832.93$ 92,687.59$ 95,542.25$ 98,396.92$ Animal/Code Officer SupervisorMaintenance & Operations SuperintendentPlans Examiner/Inspector SupervisorB32 Annually 70,103.01$ 73,608.16$ 77,113.31$ 80,618.46$ 84,123.61$ 86,978.27$ 89,832.93$ 92,687.59$ 95,542.25$ 98,396.92$ WORKING TITLE DBM STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 STEP 9 STEP 10 STEP 11 STEP 12 STEP 13 STEP 14Assistant Construction ManagerAssociate PlannerCommunity Resources AnalystSr. Emergency Management CoordinatorFinancial Services AnalystHuman Resources AnalystManagement AnalystPublic Safety AnalystSenior AccountantTraffic Operations AnalystC42 Annually 76,782.29$ 79,981.81$ 83,181.32$ 86,380.84$ 89,580.36$ 92,776.04$ 95,977.86$ 98,761.22$ 101,544.58$ 104,327.94$ 107,111.30$ 109,894.66$ 112,678.02$ 115,461.35$ Associate EngineerConstruction Manager/Inspection SupervisorC43 Annually 80,992.91$ 84,367.89$ 87,742.86$ 91,117.84$ 94,492.81$ 97,863.74$ 101,241.14$ 104,177.13$ 107,113.12$ 110,049.11$ 112,985.10$ 115,921.09$ 118,857.08$ 121,793.08$ Senior PlannerC44 Annually86,265.68$ 89,860.37$ 93,455.06$ 97,049.76$ 100,644.45$ 104,234.82$ 107,832.10$ 110,959.23$ 114,086.36$ 117,213.49$ 120,340.62$ 123,467.75$ 126,594.88$ 129,722.00$ Assistant to the City ManagerBuilding OfficialCommunity Resources ManagerHub ManagerHuman Resources ManagerMarketing ManagerPlanning ManagerPublic Safety ManagerD61 Annually 97,860.71$ 101,938.57$ 106,016.43$ 110,094.28$ 114,172.14$ 118,245.10$ 122,325.89$ 125,873.34$ 129,420.79$ 132,968.24$ 136,515.69$ 140,063.14$ 143,610.59$ 147,158.03$ City Clerk D62 Annually102,753.75$ 107,035.50$ 111,317.25$ 115,599.00$ 119,880.74$ 124,157.36$ 128,442.19$ 132,167.01$ 135,891.83$ 139,616.65$ 143,341.47$ 147,066.29$ 150,791.11$ 154,515.95$ City Engineer D65 Annually117,877.00$ 122,788.94$ 127,700.87$ 132,612.81$ 137,524.74$ 142,430.78$ 147,346.25$ 151,619.29$ 155,892.33$ 160,165.37$ 164,438.41$ 168,711.45$ 172,984.49$ 177,257.53$ Community Resources DirectorDesign & Development DirectorFacilities DirectorFinance Director/City TreasurerE82 Annually 129,959.40$ 135,374.81$ 140,790.22$ 146,205.63$ 151,621.04$ 157,029.95$ 162,449.25$ 167,160.27$ 171,871.29$ 176,582.31$ 181,293.33$ 186,004.35$ 190,715.37$ 195,426.42$ City ManagerF101*Annually 176,822.32$ 184,190.51$ 191,558.69$ 198,926.88$ 206,295.06$ 213,654.41$ 221,027.90$ 227,437.70$ 233,847.50$ 240,257.30$ 246,667.10$ 253,076.90$ 259,486.70$ 265,896.53$ Part-Time EmployeesRecreation Leader A01 Hourly $12.04 $12.64 $13.24 $13.84 $14.44Senior Recreation Leader A02 Hourly$16.05 $16.85 $17.65 $18.46 $19.26Administrative Technician B21 Hourly$24.23 $25.44 $26.65 $27.87 $29.08Software Program Report WriterB24 Hourly$30.54 $32.06 $33.59 $35.12 $36.64NON-DISCRETIONARY STEPSDISCRETIONARY STEPS (PERFORMANCE BASED)NON-DISCRETIONARY STEPSDISCRETIONARY STEPS (PERFORMANCE BASED)City Council Approval - July 16, 2019(IIHFWLYH-XQHRESOLUTION NO. 2019-XXXEXHIBIT ARESOLUTION NO. 2019-XXXEXHIBIT AHAND-OUT BY STAFF REVISED "EXHIBIT A"
54
City of La Quinta
CITY COUNCIL MEETING: July 16, 2019
STAFF REPORT
AGENDA TITLE: APPROVE PLANS, SPECIFICATIONS, ENGINEER’S ESTIMATE,
AND ADVERTISE FOR BID THE SILVERROCK WAY INFRASTRUCTURE STREET
IMPROVEMENTS (PROJECT NO. 2014-13)
RECOMMENDATION
Approve plans, specifications, engineer’s estimate, and authorize staff to bid
the SilverRock Way Infrastructure Street Improvements Project between
Avenue 52 at SilverRock Way and Jefferson Street at Avenue 53.
EXECUTIVE SUMMARY
•In August 2006, the La Quinta Redevelopment Agency (RDA) contracted
with RBF Consulting, now Michael Baker International (Consultant), to
design the SilverRock Phase II Infrastructure Improvements.
•Improvements will provide access to the proposed SilverRock Resort by
constructing a through street from Avenue 52 to Jefferson Street.
(Attachment 1).
•The project includes:
o Constructing an approximately 5,800 foot-long and 30-foot-wide
road
o Completing roadway over the box culvert canal crossing Coachella
Valley Water District (CVWD) will construct
o Constructing sewer and water lines
FISCAL IMPACT
The 2014/15 Capital Improvement Program (CIP) allocates $5,733,021 of
bonds proceeds and $520,679 in interest for total available proceeds of
$6,253,700. The remaining contribution will be provided by SilverRock
Development Company (Developer). The following is the amended project
budget:
Anticipated
Total Budget
City Contribution
(Bonds)
Developer
Contribution
Professional: $ 35,000 $ 35,000 $ 0
Design: $ 480,570 $ 480,570 $ 0
Inspection/Testing/
Survey:
$ 526,500 $ 526,500 $ 0
CONSENT CALENDAR ITEM NO. 6
55
Construction: $ 5,500,000 $ 4,000,000 $ 1,500,000
CVWD Constructed
Canal Crossing
$ 1,200,000 $ 1,200,000 $ 0
Contingency: $ 650,000 $ 11,630 $ 638,370
Total Budget: $ 8,392,070 $ 6,253,700 $ 2,138,370
BACKGROUND/ANALYSIS
The RDA entered into a Professional Services Agreement (PSA) with RBF
Consulting in July 2006 to design Phase II infrastructure improvements for
SilverRock. In 2014, Council approved an agreement with SilverRock
Development Company, which necessitates the design and construction of
SilverRock Way, a public roadway that will be owned and maintained by the
City. In August 2016, the City entered into an agreement with Consultant to
finish designing these improvements.
Construction is tentatively planned to begin in the Fall of 2019 to correspond
with the Developer and CVWD’s schedules.
The following is the project schedule:
Council Bid Authorization July 16, 2019
Bid Period July 17, 2019 to August 29, 2019
Council Considers Project Award September 17, 2019
Execute Contract and Mobilize September 18, 2019 to October 8, 2019
Construction (160 Working Days) October 2019 to May 2020
Accept Improvements June 2020
ALTERNATIVES
Staff does not recommend an alternative.
Prepared by: Julie Mignogna, Management Analyst
Approved by: Bryan McKinney, City Engineer
Attachments: 1. Vicinity Map
56
Vicinity Map
SilverRock Way Infrastructure Street
Improvements (Project No. 2014-13)
ATTACHMENT 1
57
58
City of La Quinta
CITY COUNCIL MEETING: July 16, 2019
STAFF REPORT
AGENDA TITLE: APPROPRIATE $39,600 AND AUTHORIZE CALLE TAMPICO
AND PARK AVENUE GUARD RAIL BARRIER IMPROVEMENTS
RECOMMENDATION
Appropriate $39,600 and authorize Calle Tampico and Park Avenue guard rail
barrier improvements.
EXECUTIVE SUMMARY
•Calle Tampico and Park Avenue intersection has experienced several
vehicles leaving the roadway and impacting the Citrus Community
Association (HOA) wall.
•At the June 18 Council meeting, Staff presented several options which
included a guard rail (Option C) to prevent vehicles from hitting the HOA
wall. The HOA representatives prefer a guard rail.
•Council directed Staff to review the guard rail design with the HOA
representatives and return to the Council for project approval.
FISCAL IMPACT
The cost of the guard rail improvements is estimated to be $39,600. Funds
will be appropriated to 201-7003-60431 (Materials/Supplies) from Unassigned
Savings in the Gas Tax Fund (currently $300,000) to design, purchase and
install the guard rail improvements.
BACKGROUND/ANALYSIS
Recently, Council and staff heard from several citizens expressing concerns
about the intersection of Calle Tampico and Park Avenue. Specifically, this
intersection has experienced several vehicles leaving the roadway and
crashing into or through the HOA wall just east of the sidewalk. The citizens
have requested the City provide some type of barrier to prevent vehicles from
hitting the HOA wall.
Calle Tampico is a local east-west collector roadway with a posted speed limit
of 35 mph. The intersection of Park Avenue forms a “L” shaped 90-degree
curve to the left when traveling eastbound on Calle Tampico. There are
currently warning signs posted in advance of the curve which indicate a “left
BUSINESS SESSION ITEM NO. 1
59
curve” is approaching and advisory 10 mph speed warning signs. At the curve
itself, there are several “chevron” signs and a “left arrow” sign to guide
motorists around the curve. The street has a painted centerline and raised
reflective pavement markers to provide additional positive guidance, along
with striped bike/golf cart lanes. There is a 5-foot wide sidewalk located behind
the curb with a landscape area between the sidewalk and the HOA’s wall. The
distance between the sidewalk and HOA wall is approximately 8 feet.
At the June 18th Council meeting, staff presented options to improve the
situation in the intersection, with each designed to assist in reducing the
chances of the HOA wall being struck. The options included installation of all-
way stop signs (Option A), concrete K railing (Option B), guard rail (Option
C), safety and landscape lighting (Option D), palm trees (Option E), or large
rocks or boulders (Option F). Bill Jones, Citrus HOA President, and Robert
Kroll, Citrus resident, attended the meeting and both expressed that Option C
is the preferred option. No action was taken at the meeting. Council directed
staff and Citrus HOA representatives to meet, review the guard rail option,
and return to the Council with additional information.
Staff, in consultation with the City’s consultant traffic engineer Steve Libring,
met with HOA representatives and provided more specifics on the design of
the guard rail. It would be 228 feet in length, 36-38 inches in height, and
placed on the top of the existing street curb and span along the curve and
entirely on the public right-of-way (Attachment 1). Placement of the guard
rail on top of the street curb is the best location as it would reduce the chances
of vehicles striking the sidewalk, landscaping (trees), and the HOA wall.
Reflectors would be placed on the guard rail to help guide vehicles during the
night time along the street curve. Photo-simulations of the guard rail at day
time and at night time are provided as Attachment 2 and Attachment 3.
The estimated project cost is as follows:
Guard rail $30,000
Contingency $3,000
Subtotal $33,000
Design (10%) $3,300
Inspection (10%) $3,300
Total Project Cost $39,600
The HOA representatives agreed the guard rail was the preferred option to
improve the intersection situation and reduce the chances of the HOA wall
being struck. Citrus HOA President Bill Jones did not indicate that the HOA
would contribute to a share of the cost for installation of the guard rail.
60
ALTERNATIVES
Council could choose to install a different option or not make improvements
at this time.
Prepared by: Danny Castro, Design and Development Director
Approved by: Jon McMillen, City Manager
Attachments: 1.Guard Rail Design
2. Daytime Photo Simulation
3. Night Photo Simulation
61
62
Guard Rail Design
ATTACHMENT 1
63
64
Daytime Guard Rail Simulation
ATTACHMENT 2
65
66
Night Guard Rail Simulation
ATTACHMENT 3
67
68
City of La Quinta
CITY COUNCIL MEETING: July 16, 2019
STAFF REPORT
AGENDA TITLE: ADOPT RESOLUTION TO APPROVE UPDATES TO THE CITY’S
USER AND REGULATORY MASTER FEE SCHEDULE
RECOMMENDATION
Adopt a Resolution to approve updates to the City’s User and Regulatory Master
Fee Schedule.
EXECUTIVE SUMMARY
Since 2013, the City annually reviews user and regulatory fees and adjusts
them based on cost of service findings and to reflect annual Consumer Price
Index (CPI) increases.
Most fees in the proposed Master Fee Schedule (MFS) are proposed to
increase by 1%. Approximately 97% of the fees in the City’s fee schedule
are proposed to remain unchanged or increase by 1%.
Other refinements were made to the fee schedule to improve the correlation
between the cost of providing services and the fees imposed to recover
those costs. These refinements are summarized in the Background/Analysis
section of this report and detailed in Attachment 1.
The City retained ClearSource Financial Consulting (ClearSource) for this
update. ClearSource has assisted the City with fee updates since 2013.
If adopted, the proposed MFS would take effect September 16, 2019.
FISCAL IMPACT
Based on historical revenues and permit volume, the new fee schedule may
generate an additional $250,000 in annual revenue.
PUBLIC HEARING ITEM NO. 1
69
BACKGROUND/ANALYSIS
Since 2013, the City annually reviews and adjusts fees to reflect annual CPI
increases, and every five years conducts a comprehensive fee study.
ClearSource was hired to conduct the analysis of the MFS, which formally
documents charges for various user and regulatory services provided by the City.
The services for which the City imposes a user or regulatory fee typically derive
from an individual person or entity’s action, request, or behavior. Therefore,
except in cases where there is an overwhelming public benefit generated by the
City’s involvement in the individual action, a fee for service ensures that the
individual bears most, if not all, of the cost incurred by the City to provide that
service. When a fee targets “100% or full cost recovery,” the individual is bearing
the entirety of the cost. When a fee targets less than full cost recovery, another
City revenue source – in most cases, the General Fund – subsidizes the
individualized activity.
Development Fees
The City currently uses a uniform hourly rate to set all development related fees.
The uniform rate is tied to the Building Division’s calculated rate of $161 per
hour. The existing rate is $160. This means that the majority of fees are
proposed to increase by 1% (the difference between $160 and $161). The chart
below illustrates the relationship between the various disciplines and the uniform
hourly rate.
Functional Unit
Current
Hourly Rate
Used for Fee
Setting
Fully-
Burdened
Hourly Rate
Calculated in
Fee Study
Target
Hourly Rate
Using
Historical
Pattern
Cost
Recovery
Using Target
Hourly Rate
Building $160 $161 $161 100%
Fire Prevention $160 $171 $161 94%
Public Works $160 $179 $161 90%
Planning $160 $203 $161 79%
In addition to the change in the hourly rate, service time estimates were
reviewed to ensure time estimates correlate to the services provided (i.e. more
intensive services require more service time than less intensive services). Based
on this analysis, adjustments to several fee categories are proposed to enhance
the nexus between service provided and fees collected. Recalibrating the hourly
rate for service and adjusting service times results in the following revenue and
cost recovery changes.
70
Functional
Unit
Estimated
Revenue
Change
Cost
Recovery
After Add’l
Subsidies
for Minor
Permits
Notes
Building 6% Increase 100% Fees for new construction permit fees
have been recalibrated
Fire Prevention 1% Increase 94%
Public Works 16%
Increase 90% Fees for permit inspection have been
recalibrated
Planning 6% Increase 32% Subsidies of minor use permits reduce
divisional cost recovery levels
Aggregate
All Units
8%
Increase 77%
City provides subsidy via use of
uniform hourly rate and additional
subsidies for minor permits
Fees remain in line with similar fees collected by neighboring agencies in the
region.
71
The proposed fee schedule continues to subsidize various permit types:
Standard - Minor Temporary Use Permits – proposed fee is $400 (20%
cost recovery)
Sign Permit – proposed fee is $355 (50% cost recovery)
Director’s Determination – proposed fee is $405 (50% cost recovery)
Certificate of Compliance – proposed fee is $505 (50% cost recovery)
Zoning Letter (Basic Property Information) – Proposed fee is $263 (52%
cost recovery)
Historical Landmark Designation or Certificate of Appropriateness –
proposed fee is $1,320 (50% cost recovery)
PM10 Plan Review – proposed cost recovery is 35%
Residential Driveway Encroachment – proposed fee is $175 (33% cost
recovery)
Traffic Control Review for Project Up to 10 Days (approximately 50% cost
recovery)
New fees are recommended to recover the City’s cost of:
Zoning conformance review at the building permit stage (Planning plan
check)
Pre-application review (50% of pre-application fee will be credited toward
entitlement application fee)
Expedited review fee for various planning applications
Short-Term Rental Permit Fees
The current annual fee for permit issuance is $105 per year. The proposed
annual fee is $200 per year. The proposed fee represents recovery of 25% of
the current estimated costs of providing these services, and is in-line with fees
collected by other agencies for similar permits:
72
Facility Rental Fee for the SilverRock Resort Event Site
Proposed rental fees range from $250 per hour for non-profit organizations to
$300 per hour for all other renters with a four-hour minimum rental period.
AGENCY AND PUBLIC REVIEW
Notice regarding the proposed fee changes was provided in accordance with
Government Code Sections 66016 and 6062(a). Interested stakeholders, the
Building Industry Association of Southern California – Riverside County Chapter
(BIA), Desert Valleys Builders Association (DVBA), and the Southern California
Gas Company (SC Gas) received notice of these recommendations on July 1,
2019. Public Hearing notices were published in The Desert Sun on July 5 and
July 12, 2019.
On July 11, 2019, the DVBA and SC Gas confirmed their attendance at the July
16, 2019 Council meeting, and stated they are still reviewing the documents and
will provide comments at the meeting; the BIA submitted a comment letter,
included as Attachment 2, and Staff will reach out to BIA representatives to
discuss and comment on their analysis.
ALTERNATIVES
Council may elect not to adjust fees or to adopt a higher or lower percentage of
cost recovery for fees.
Prepared by: Monika Radeva, City Clerk
Approved by: Jon McMillen, City Manager
Attachments: 1. User and Regulatory Fee Study and Cost of Service Analysis
2. BIA Comment Letter Dated July 10, 2019
73
74
RESOLUTION NO. 2019 - xxx
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF LA QUINTA, CALIFORNIA, ADOPTING A
REVISED MASTER FEE SCHEDULE OF VARIOUS
USER AND REGULATORY FEES
WHEREAS, this action is exempt under the California Environmental
Quality Act (CEQA), Article 18, Statutory Exemptions, Section 15273(a)
Rates Tolls Fares and Charges; and
WHEREAS, this hearing to set fees was duly noticed pursuant to
Government Code Sections 6062(a) – Manner of Publication, and 66016,
Local agency fees; new fees and increases; procedures; and
WHEREAS, on August 7, 2018, the City Council adopted Resolution
No. 2018-046 updating the City’s Master Fee Schedule of various user and
regulatory fees; and
WHEREAS, the City Council desires that annually the fees be
increased based on the all-urban consumers Consumer Price Index (CPI) for
Riverside-San Bernardino-Ontario; and
WHEREAS, the City would like to establish set fees for Bingo Permit,
Film/Photography Permit, and Code Compliance Inspection for Short-Term
Vacation Rental Permit; and
WHEREAS, the City commissioned ClearSource Financial Consulting to
conduct a comprehensive fee study to determine the user and regulatory fee
update, which is included in the staff report and available for public review;
and
WHEREAS, the City Council hereby finds that the supporting
documents provide adequate evidence to conclude that the fees added to
the Master Fee Schedule or modified by an amount other than the increase
in the CPI are set at amounts that do not exceed the estimated cost to
provide the service.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City
of La Quinta, California, as follows:
SECTION 1. Each WHEREAS paragraph, set forth above, is hereby adopted
as a specific finding of this City Council.
75
Resolution No. 2019 – xxx
Master Fee Schedule – Update of User and Regulatory Fees
Adopted:
Page 2 of 3
SECTION 2. Resolution Nos. 2018-046 is hereby superseded, and revised
fees as listed in the Master Fee Schedule attached hereto as “Exhibit A,” and
incorporated herewith by this reference, are hereby adopted.
SECTION 3. The revisions to the Master Fee Schedule are intended to
enhance fee schedule clarity or improve the correlation between the cost of
providing services and the fees imposed to recover those costs.
SECTION 4. Annually on July 1 the City Manager or his/her designee shall
update and promulgate a new fee schedule whereby all fees are increased
based on the all-urban consumers CPI for Riverside – San Bernardino –
Ontario computed from April of the previous year to April of the current
year. If the CPI does not change or goes down in a given year, no change
shall be made to the Master Fee Schedule that year.
SECTION 5. This Resolution shall become effective upon adoption. The fees
imposed by this Resolution shall go into effect after 60 days.
PASSED, APPROVED, and ADOPTED at a regular meeting of the La
Quinta City Council held on this ___ day of July, 2019, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
________________________
LINDA EVANS, Mayor
City of La Quinta, California
76
Resolution No. 2019 – xxx
Master Fee Schedule – Update of User and Regulatory Fees
Adopted:
Page 3 of 3
ATTEST:
_________________________
MONIKA REDEVA, City Clerk
City of La Quinta, California
(CITY SEAL)
APPROVED AS TO FORM:
___________________________
WILLIAM H. IHRKE, City Attorney
City of La Quinta, California
77
78
COUNCIL RESOLUTION NO. 2019-XXX
EXHIBIT A
MASTER FEE SCHEDULE
Adopted July 16, 2019
79
Table of Contents
Contents Page
1 Building Fees - Mechanical, Plumbing, and Electrical 1
2 Building Fees - Miscellaneous Items 4
3 Building Fees - New Construction 7
4 Building Fees - Other Fees 8
5 Planning Fees 9
6 Public Works Fees 12
7 Fire Fees 17
8 NPDES Ongoing Inspection Fees 19
9 Short-Term Vacation Rental Permit Fees 20
10 Medical Cannabis Delivery Application Fees 21
11 False Alarm Response Fees 22
12 Vehicle Impound Cost Recovery Fees 23
13 Code Enforcement Hourly Rate for Services 24
14 Pool Drain and Golf Cart Permit Fees 25
15 Home Occupation Permit Fees 26
16 Film/Photography Permit Fees 27
17 Bingo Permit Fees 28
18 Administrative Fees 29
19 Appeal Fees 30
20 Facility Use Fees 31
21 SilverRock Event Site Facility Rental Fees 33
80
Fee *
Fee Description Permit
Plan
Check Total Notes
Fee DescriptionPermit Issuance
1 Permit Issuance (Mechanical, Plumbing, Electrical)$101.97 $101.97
Mechanical
2 Installation or relocation of each forced-air or gravity-type furnace or burner,
including ducts and vents attached to such appliance
$40.25 $26.83 $67.08
3 Installation or relocation of each suspended heater, recessed wall heater, or
floor-mounted unit heater
$26.83 $13.42 $40.25
4 Repair of, alteration of, or addition to each heating appliance, refrigeration
unit, cooling unit, absorption unit, or each heating, cooling, absorption, or
evaporative cooling system, including installation of controls regulated by the
UMC
$13.42 $5.37 $18.78
5 Installation or relocation of each boiler, condenser, compressor, or each
absorption system
$40.25 $26.83 $67.08
6 Air-handling unit, including attached ducts $40.25 $13.42 $53.67
7 Evaporative cooler, other than portable-type $13.42 $13.42 $26.83
8 Ventilation fan connected to a single-duct $13.42 $5.37 $18.78
9 Installation of each hood which is served by mechanical exhaust, including the
ducts for such hood
$13.42 $5.37 $18.78
10 Each appliance or piece of equipment not classified in other appliance
categories, or for which no other fee is listed
$40.25 $40.25 $80.50
Mechanical Change-Out
11 Condenser Only $40.25 $26.83 $67.08
12 Furnace Only $40.25 $26.83 $67.08
13 Other Equipment $40.25 $40.25 $80.50
14 Packaged Unit $40.25 $26.83 $67.08
15 Repair / Alteration $13.42 $5.37 $18.78
16 Split-System $40.25 $80.50 $120.75
Plumbing
17 Each plumbing fixture or trap or set of fixtures on one trap (including water,
drainage piping, and backflow protection)
$13.42 $13.42 $26.83
18 Sewer Connection / Septic Abandonment $26.83 $18.78 $45.62
19 Rainwater systems, per drain (inside building)$13.42 $13.42 $26.83
20 Water heater and/or vent $13.42 $8.05 $21.47
21 Industrial waste pretreatment interceptor including its trap and vent,
excepting kitchen-type grease interceptors functioning as fixture traps
$40.25 $13.42 $53.67
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical
181
Fee *
Fee Description Permit
Plan
Check Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical
22 Installation, alteration, or repair of water piping and/or water-treating
equipment, drainage or vent piping, each fixture
$13.42 $13.42 $26.83
23 Backflow protective device other than atmospheric-type vacuum breakers $13.42 $5.37 $18.78
24 Gas piping system - 1 to 4 outlets $13.42 $26.83 $40.25
25 Gas piping system - 5 or more outlets $40.25 $26.83 $67.08
26 Solar (Thermal)$26.83 $26.83 $53.67
Electrical
New Construction
27 Residential - First 1,000 SF
(includes livable and non-livable SF)
$161.00 $53.13 $214.13
28 Residential - Each Additional 1,000 SF
(includes livable and non-livable SF)
$13.69 $5.64 $19.32
29 Non-Residential - First 2,000 SF $120.75 $93.38 $214.13
30 Non-Residential - Each Additional 2,000 SF $40.25 $10.73 $50.98
Solar (Photovoltaic)
31 Solar (PV) Less than 10kW $26.83 $26.83 $53.67
32 Solar (PV) Greater than 10kW $40.25 $40.25 $80.50
33 Each Additional String (<20)$2.68 $0.67 $3.35
Receptacle, Switch, and Lighting Outlets
34 Receptacle, switch, lighting, or other outlets at which current is used or
controlled, except services, feeders, and meters - first 20
$26.83 $26.83 $53.67
35 Receptacle, switch, lighting, or other outlets at which current is used or
controlled, except services, feeders, and meters - each additional
$2.68 $0.67 $3.35
Lighting Fixtures
36 Lighting fixtures, sockets, or other lamp-holding devices - first 20 $26.83 $26.83 $53.67
37 Lighting fixtures, sockets, or other lamp-holding devices - each add'l $2.68 $0.67 $3.35
38 Pole or platform-mounted light replacement, repair or alteration - first 10 $26.83 $26.83 $53.67
39 Pole or platform-mounted light replacement, repair or alteration - each
additional
$2.68 $0.67 $3.35
Residential Appliances
40 Fixed residential appliances or receptacle outlets for same, including wall-
mounted electric ovens; counter-mounted cooking tops; electric ranges; self-
contained room, console, or through-wall air conditioners; space heaters;
food waste grinders; dishwashers; washing machines; water heaters; clothes
dryers; or other motor-operated appliances not exceeding one horsepower
(HP) in rating, each
$13.42 $13.42 $26.83
282
Fee *
Fee Description Permit
Plan
Check Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical
Non-Residential Appliances
41 Residential appliances and self-contained, factory-wired, non-residential
appliances not exceeding one horsepower (HP), kilowatt (KW) , or kilovolt
ampere (KVA) in rating, including medical and dental devices; food, beverage,
and ice cream cabinets; illuminated show cases; drinking fountains; vending
machines; laundry machines; or other similar types of equipment, each
$26.83 $26.83 $53.67
Power Apparatus
42 Motors, generators, transformers, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking or
baking equipment, and other apparatus, each
$26.83 $26.83 $53.67
Signs, Outline Lighting, and Marquees
43 Signs, outline lighting systems, or marquees, each $40.25 $53.67 $93.92
Services
44 Services, each $26.83 $13.42 $40.25
Temporary Power Services
45 Temporary service power pole or pedestal, including all pole or pedestal-
mounted receptacle outlets and appurtenances, each
$26.83 $18.78 $45.62
Miscellaneous Apparatus, Conduits, and Conductors
46 Electrical apparatus, conduits, and conductors for which a permit is required,
but for which no fee is identified
$26.83 $26.83 $53.67
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific application.
383
Fee *
Fee Description Permit
Plan
Check Total Notes
Addition
1 Residential Addition
a) Residential Addition - Up to 100 SF $135.24 $189.98 $325.22 [a]
b) Residential Addition - Each Additional 500 SF $69.23 $19.32 $88.55 [a]
c) Structural Review bill hourly (1 hour min.)[a]
2 Non-Residential Addition
a) Non-Residential Addition - Up to 100 SF $155.53 $218.48 $374.00 [a]
b) Non-Residential Addition - Each Additional 500 SF $79.61 $22.22 $101.83 [a]
c) Structural Review bill hourly (1 hour min.)[a]
Antenna
3 Dish > 2 Ft $40.25 $148.12 $188.37
4 Cellular/Mobile Phone $161.00 $228.62 $389.62
5 Equipment Shelter $40.25 $107.87 $148.12
Appeal
6 Appeal bill hourly (1 hour min.)
Awning/Canopy (Supported by Building)
7 Awning/Canopy $16.10 $228.62 $244.72
Balcony Addition
8 Balcony Addition $161.00 $188.37 $349.37
Block Wall
9 Block Wall - First 100 LF $53.67 $67.08 $120.75
10 Block Wall - Each Addt'l 50 LF $16.10 $16.10
11 Retaining / Combination Wall - Each 50 LF $16.10 $16.10
Carport
12 Carport - First $80.50 $107.87 $188.37
13 Carport - Each Additional $80.50 $42.93 $123.43
Compliance Survey/Special Inspection
14 Compliance Survey/Special Inspection $80.50 $201.25 $281.75
Demolition
15 Demolition $27.37 $96.60 $123.97
16 Demolition - Interior $40.25 $107.87 $148.12
17 Demolition - Exterior $40.25 $120.75 $161.00
Fence
18 Fence - First 100 LF $53.13 $67.62 $120.75
19 Fence - Each Additional 50 LF $16.10 $16.10
Fireplace
20 Fireplace $161.00 $241.50 $402.50
Flag/Lighting Pole
21 Flag/Lighting Pole - First $40.25 $107.87 $148.12
22 Flag/Lighting Pole - Each Additional $16.10 $4.83 $20.93
Grading
23 Residential Precise Grading (Tract Homes) - Per Home $148.12 see note $148.12 [b]
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
484
Fee *
Fee Description Permit
Plan
Check Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
24 Residential Precise Grading (Custom Home) - Lot <= 7,000 SF $40.25 $40.25 $80.50
25 Residential Precise Grading (Custom Home) - Lot > 7,000 SF $40.25 $201.25 $241.50
Partition
26 Partition $80.50 $148.12 $228.62
Patio Cover / Covered Porch / Lattice
27 Standard, Open, Pre-Engineered (First)$107.87 $106.26 $214.13
28 Standard, Enclosed, Pre-Engineered (First)$107.87 $146.51 $254.38
29 Special Design (First)$148.12 $186.76 $334.88
30 Each Additional $53.67 $40.25 $93.92
Pool / Spa
31 Swimming Pool / Spa $201.25 $109.48 $310.73
32 Detached Spa / Water Feature $201.25 $201.25
33 Gunite Alteration / Resurfacing $201.25 $109.48 $310.73
34 Equipment Change-out Alone $26.83 $101.97 $128.80
Remodel
35 Non-Structural Review - Up to 100 SF $54.74 $149.73 $204.47 [a]
36 Non-Structural Review - Each Additional 500 SF $24.15 $19.32 $43.47 [a]
37 Structural Review bill hourly (1 hour min.)[a]
Replacement of Plans/Job Card
38 Replacement of Job Copy of Approved Plans $228.62 $228.62
39 Replacement of Inspection Record Card $40.25 $40.25
Re-Roof
40 Re-Roof - Up to 2,000 SF $54.74 $109.48 $164.22
41 Re-Roof - Each Additional 1,000 SF $12.88 $12.88
Sign
42 Monument Sign - First $80.50 $148.12 $228.62
43 Monument Sign - Each Additional $27.37 $27.37
44 Wall/Awning Sign - First $27.37 $96.60 $123.97
45 Wall/Awning Sign - Each Additional $27.37 $27.37 $54.74
Storage Racks
46 Storage Racks - First 100 LF $27.37 $106.26 $133.63
47 Storage Racks - Each Additional 100 LF $12.88 $12.88
Stucco Application
48 Stucco Application - First 500 SF $27.37 $82.11 $109.48
49 Stucco Application - Each Additional 500 SF $8.05 $8.05
Temporary Trailer
50 Temporary Trailer $161.00 $161.00 $322.00
Utility Release
51 Electrical Utility Release $80.50 $80.50
Window / Sliding Glass Door / Other Fenestration
52 Retrofit/Repair - Up to 7 $67.62 $66.01 $133.63
53 Retrofit/Repair - Each Additional 5 $11.27 $11.27
585
Fee *
Fee Description Permit
Plan
Check Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
54 New/Alteration - First $107.33 $122.36 $229.69
55 New/Alteration - Each Additional $11.27 $12.88 $24.15
Administrative
Plan Check Initial Deposit - For Various Non-OTC Items
56 a) Miscellaneous Items $161.00 $161.00 [c]
57 b) New Construction varies [c] [d]
58 Plan Check / Permit Extension Processing $107.87 $107.87
59 Change of Contractor, Architect, Owner Processing $107.87 $107.87
60 Request/Research for Alternative Methods/Product Review bill hourly (1 hour min.)
61 Temporary Certificate of Occupancy $483.00 $483.00
62 Disabled Access Compliance Inspection $161.00 $161.00
63 Partial Inspection Fee $80.50 $80.50 [e]
64 Re-inspection Fee $80.50 $80.50 [e]
65 Excess Plan Check Fee bill hourly [f]
66 Investigation Fee for Work Commenced Without a Permit equal to permit fee
[d] Initial deposit varies depending on project details.
[c] Non-Refundable Initial Deposit. For projects that request permit issuance the intitial deposit amount will be credited against
total fees.
[e] The permit fees identified in this fee schedule include initial inspection and one re-inspection. Additional fees will be collected
for the provision of all subsequent permit inspection services. See re-inspection fee and partial inspection fee for applicable fees.
[f] The base plan check fees identified in this fee schedule include initial check and one re-check. Additional fees will be collected
for the provision of all subsequent re-check services.
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific application, including the
cost of structural engineering review services.
[a] Fee is intended to capture structural and non-structural reviews. Mechanical, Electrical, and Plumbing review and inspection fees
are collected separately.
[b] Plan review fees for Residential Precise Grading (Tract Homes) are identified as part of the Public Works fee schedule and based
on the number of sheets submitted for plan review. See Public Works fee schedule.
686
Fee Description Fee - Permit *
New Construction
1 $1 - $10,000 $161.00 for the first $5,000, plus $48.30 for each additional $1,000 or fraction
thereof, to and including $10,000
2 $10,001 - $25,000 $402.50 for the first $10,000, plus $10.73 for each additional $1,000 or fraction
thereof, to and including $25,000
3 $25,001 - $200,000 $563.50 for the first $25,000, plus $8.28 for each additional $1,000 or fraction
thereof, to and including $200,000
4 $200,000 and Up $2,012.50 for the first $200,000, plus $4.14 for each additional $1,000 or fraction
thereof
Fee Description Fee - Plan Check *
(Project Valuation)
5 $1 - $10,000 $161.00 for the first $5,000, plus $80.50 for each additional $1,000 or fraction
thereof, to and including $10,000
6 $10,001 - $25,000 $563.50 for the first $10,000, plus $18.78 for each additional $1,000 or fraction
thereof, to and including $25,000
7 $25,001 - $200,000 $845.25 for the first $25,000, plus $2.99 for each additional $1,000 or fraction
thereof, to and including $200,000
8 $200,000 and Up $1,368.50 for the first $200,000, plus $2.39 for each additional $1,000 or fraction
thereof
Fee Description Fee - Plan Check for Multiple Structures - Each Additional **
(Project Valuation)
9 All Valuations $53.67
Fee Description Fee
10 Building Department Staff $161 per hour
11 City Attorney or Other Legal Review 100%of actual costs
12 Outside Service Providers 100%of actual costs
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the
appropriate fee based on the following hourly rates for staff time involved in the service or activity.
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - New Construction
* The new construction fees identified in this fee schedule include the cost of structural engineering review services currently
conducted by outside service providers. Additional fees will be collected for the provision of all plan review services beyond second
review.
* The permit fees identified in this fee schedule include initial inspection and one re-inspection. Additional fees will be collected for
the provision of all subsequent permit inspection services. See re-inspection fee and partial inspection fee for applicable fees.
* The base plan check fees identified in this fee schedule include initial check and one re-check. Additional fees will be collected for
the provision of all subsequent re-check services.
** Fee applies when multiple identical units are submitted for review and permitted at the same time.
787
Fee Description Fee Notes
Strong Motion Instrumentation (SMI)
Fee Calculation
1 Residential $0.50 or valuation x .00013
2 Commercial $0.50 or valuation x .00028
Art In Public Places (AIPP) Fee Calculation [a]
3 Residential $20.00 or 1/4 of 1% of value exceeding $200,000
4 Commercial $20.00 or 1/2 of 1% of value
Building Standards Administration Special Revolving
Fund (SB 1473) Fee Calculation
[b]
5 Valuation:
a) $1 - $25,000 $1
b) $25,001 - $50,000 $2
c) $50,001 - $75,000 $3
d) $75,001 - $100,000 $4
e) Every $25,000 or fraction thereof above
$100,000
Add $1
Technology Enhancement Fee
6 Technology Enhancement Fee (per permit)$5
Digital Archiving and Records Management Fee
7 Digital Archiving and Records Management Fee
a) OTC Permit/Application $10
b) All Others $21
[a] Source: La Quinta Municipal Code 2.65.060.
[b] Source: California Health and Safety Code Section 18931.6
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Other Fees
888
Fee Description Fee * Notes
Temporary Use
1 Temporary Use Permit - Minor (Standard)$400
2 Temporary Use Permit - Minor
(Requests Requiring Additional Effort)
bill per hour, with $400 base fee
3 Temporary Use Permit - Major (Standard)$2,093
4 Temporary Use Permit - Major
(Requests Requiring Additional Effort)
bill per hour, with $2,093 base fee
Minor Use
5 Minor Use Permit bill per hour, with $400 base fee
6 Minor Use Permit - Amendment bill per hour, with $400 base fee
Conditional Use
7 Conditional Use Permit bill per hour, with $6,413 base fee
8 Conditional Use Permit - Planned Unit Dev.bill per hour, with $6,413 base fee
9 Conditional Use Permit - Amendment bill per hour, with $3,126 base fee
10 Conditional Use Permit - Time Extension $1,691
Expedited Review Fee
11 Expedited Review Fee 1.5x
standard
fee
[a]
Site Development
12 Development Agreement bill per hour, with $3,327 base fee [b]
13 Site Development Permit - Planning Commission bill per hour, with $8,909 base fee
14 Site Development Permit - Administrative bill per hour, with $7,621 base fee
15 Site Development Permit - Amendment bill per hour, with $4,669 base fee
16 Site Development Permit - Time Extension $1,691
17 Modification by Applicant bill per hour, with $400 base fee
18 Minor Adjustment bill per hour, with $400 base fee
19 Variance bill per hour, with $2,415 base fee
Landscape Plan
20 Final Landscape Plan $1,771
Pre-Application Review Fee
21 Pre-Application Review Fee $2,254 [c]
Signs
22 A-Frame Sign Permit $0
23 Sign Permit $355
24 Sign Program bill per hour, with $2,844 base fee
25 Sign Program Amendment $966
Zoning
26 Zone Change bill per hour, with $9,392 base fee
27 Director's Determination $405
28 Certificate of Compliance $505
29 Zoning Letter - Basic Property Information $263
City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
989
Fee Description Fee * Notes
City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
30 Zoning Letter - Basic Property Information with Additional
Research Required
$1,369
31 Zoning Text Amendment bill per hour, with $9,445 base fee
Street Name Change
32 Street Name Change $1,852
Historical Structures
33 Landmark Designation/Cert of Appropriateness $1,320
Environmental Review
34 Environmental Assessment $483
35 Recordation of Exemption $161
36 Initial Study (ND/MND)bill per hour, with $3,220 base fee
37 Environmental Impact Report bill per hour, with $8,855 base fee
General/Specific Plan
38 Specific Plan bill per hour, with $10,680 base fee
39 Specific Plan - Amendment bill per hour, with $4,776 base fee
40 General Plan Amendment bill per hour, with $10,465 base fee
Map
41 Tentative Parcel Map bill per hour, with $5,045 base fee
42 Tentative Parcel Map - Waiver $1,369
43 Tentative Parcel Map - Amendment bill per hour, with $3,005 base fee
44 Tentative Parcel Map - Revision bill per hour, with $3,005 base fee
45 Tentative Parcel Map - Time Extension $966
46 Tentative Tract Map bill per hour, with $8,372 base fee
47 Tentative Tract Map - Amendment bill per hour, with $3,971 base fee
48 Tentative Tract Map - Revision bill per hour, with $3,971 base fee
49 Tentative Tract Map - Time Extension (CC or PC)$1,852
50 Tentative Tract Map - Time Extension (Admin)$1,047
51 Tentative Condominium Map bill per hour, with $8,372 base fee
52 Amended Final Parcel Map (Entitlement Support)bill per hour, with $4,025 base fee
53 Amended Final Tract Map (Entitlement Support)bill per hour, with $6,440 base fee
Zoning Clearance - Planning Plan Check
54 Zoning Clearance - Planning Plan Check
a) Alterations/Additions - Residential $81
b) New Construction - Single Family Residential $161
c) New Construction - 2-4 Residential Units $242
d) New Construction - 5+ Residential Units $644
e) New Construction - Non-Residential $322
f) Alterations/Additions - Non-Residential $161
Scanning
55 Scanning Fee $161
Technology Enhancement Fee
56 Technology Enhancement Fee $5
1090
Fee Description Fee * Notes
City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
Digital Archiving and Records Management Fee
57 Digital Archiving and Records Management Fee
a) OTC Permit/Application $10
b) All Others $21
Appeal
58 Appeal $1,500
Fee Description Fee * Notes
59 Planning Department Staff $161 per hour
60 City Attorney or Other Legal Review pass-through of 100%of actual costs
61 Outside Service Providers pass-through of 100%of actual costs
[b] In addition to the fee shown for Development Agreement, the City shall collect a $2,000 initial deposit to offset City Attorney costs.
[c] 50% of fee may be credited toward entitlement application submittal.
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific application.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the
appropriate fee based on the following hourly rates for staff time involved in the service or activity.
[a] Request for expedited service is subject to Design & Development Department Director approval. It is dependent on staff availability and
workload.
1191
Fee Description Fee *Unit Notes
Land Subdivision
1 Parcel Map:
a) Final Parcel Map
i) Initial Sheet $2,496 per sheet
ii) Each Additional Sheet $725 per sheet
b) Final Parcel Map - Amendment
i) Initial Sheet $2,496 per sheet
ii) Each Additional Sheet $725 per sheet
c) Substantial Conformance Review
i) Initial Sheet $2,938 per sheet
ii) Each Additional Sheet $1,288 per sheet
2 Tract Map:
a) Final Tract Map
i) Initial Sheet $2,657 per sheet
ii) Each Additional Sheet $805 per sheet
b) Final Tract Map - Amendment
i) Initial Sheet $2,657 per sheet
ii) Each Additional Sheet $805 per sheet
c) Substantial Conformance Review
i) Initial Sheet $2,938 per sheet
ii) Each Additional Sheet $1,288 per sheet
3 Reversion to Acreage:
a) Initial Sheet $2,737 per sheet
b) Each Additional Sheet $725 per sheet
4 Lot Line Adjustment/Parcel Merger
a) Lot Line Adjustment $1,932 per request
b) Parcel Merger $1,932 per request
5 Street Dedication/Vacation
a) Land Action Documents
(ROW/Easements/Grant Deeds)
$1,972 per request
b) Vacation of Street/Public ROW $2,415 per request
6 Land Survey
a) Record of Survey $523 per request
b) Certificate of Correction $684 per request
Grading / Project Improvements
7 Plan Review (First 3 Reviews):
a) Rough Grading
i) Initial Sheet $1,489 per sheet
ii) Each Additional Sheet $805 per sheet
iii) Revisions - Initial Sheet $1,148 per sheet
iv) Revisions - Each Additional Sheet $805 per sheet
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
1292
Fee Description Fee *Unit Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
b) Precise Grading - Commercial
i) Initial Sheet $1,811 per sheet
ii) Each Additional Sheet $1,127 per sheet
iii) Revisions - Initial Sheet $1,470 per sheet
iv) Revisions - Each Additional Sheet $1,127 per sheet
c) Precise Grading - Tract Homes
i) Initial Sheet $1,047 per sheet
ii) Each Additional Sheet $201 per sheet
iii) Revisions - Initial Sheet $625 per sheet
iv) Revisions - Each Additional Sheet $201 per sheet
d) Precise Grading - Custom Home [a]
e) PM10
i) Initial Sheet $585 per sheet
ii) Each Additional Sheet $0 per sheet
iii) Revisions - Initial Sheet $450 per sheet
iv) Revisions - Each Additional Sheet $0 per sheet
f) Street Improvements
i) Initial Sheet $1,650 per sheet
ii) Each Additional Sheet $966 per sheet
iii) Revisions - Initial Sheet $1,309 per sheet
iv) Revisions - Each Additional Sheet $966 per sheet
g) Storm Drain
i) Initial Sheet $1,650 per sheet
ii) Each Additional Sheet $966 per sheet
iii) Revisions - Initial Sheet $1,309 per sheet
iv) Revisions - Each Additional Sheet $966 per sheet
h) Signing and Striping
i) Initial Sheet $1,489 per sheet
ii) Each Additional Sheet $805 per sheet
iii) Revisions - Initial Sheet $1,148 per sheet
iv) Revisions - Each Additional Sheet $805 per sheet
i) Traffic Signal
i) Initial Sheet $1,328 per sheet
ii) Each Additional Sheet $644 per sheet
iii) Revisions - Initial Sheet $987 per sheet
iv) Revisions - Each Additional Sheet $644 per sheet
j) Sidewalk
i) Initial Sheet $1,167 per sheet
ii) Each Additional Sheet $483 per sheet
iii) Revisions - Initial Sheet $826 per sheet
iv) Revisions - Each Additional Sheet $483 per sheet
k) Traffic Control Plan $81 per sheet
1393
Fee Description Fee *Unit Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
l) Record Drawings Review
i) Initial Sheet $845 per sheet
ii) Each Additional Sheet $161 per sheet
m) Hydrology Report $1,731 per report
i) Revisions $805 per report
n) Traffic Study $1,328 per study
o) WQMP Report
i) With Prior Entitlement $1,570 per report
ii) Without Prior Entitlement $1,892 per report
iii) Revisions $805 per report
p) SWPPP $1,811 per plan
i) Revisions $644 per plan
q) Sewer and Water
i) Initial Sheet $1,127 per sheet
ii) Each Additional Sheet $483 per sheet
iii) Revisions - Initial Sheet $805 per sheet
iv) Revisions - Each Additional Sheet $483 per sheet
8 Plan Review (>3 Reviews)$161 per hour
9 Expedited Plan Review Fee 1.5x standard fee [b]
10 Permit Inspection
a) Rough Grading
i) First 3 Acres $3,220
ii) Each Additional Acre $805
iii) Last One Acre $403
b) Precise Grading
i) First 3 Acres $3,220
ii) Each Additional Acre $805
iii) Last One Acre $403
c) Precise Grading - Tract Homes $148 [c]
d) Precise Grading - Custom Homes $81 [c]
e) PM10
i) < 10 Acres $3,864 [d]
ii) 10 - 50 Acres $5,796 [d]
iii) 51 - 200 Acres $7,728 [d]
iv) > 200 Acres $11,592 [d]
f) Street Improvements - Off-Site
i) First 1,000 LF $5,152
ii) Each Additional 1,000 LF $4,508
iii) Last 1,000 LF $2,898
1494
Fee Description Fee *Unit Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
g) Street Improvements - On-Site
i) First 1,000 LF $3,542
ii) Each Additional 1,000 LF $2,898
iii) Last 1,000 LF $1,932
h) Storm Drain
i) First 1,000 LF $3,059
ii) Each Additional 1,000 LF $2,415
iii) Last 1,000 LF $1,610
i) Signing and Striping
i) First 1,000 LF $1,610
ii) Each Additional 1,000 LF $966
iii) Last 1,000 LF $483
j) Traffic Signal $4,347
k) NPDES $1,932
l) Bond Reduction Request $2,174
m) Final Inspection/Acceptance $2,898
n) Traffic Control Only
i) One Day $325
ii) Two - Five Days $650
iii) Each Additional Day (Up to 10 Days)$325
iv) 11+ Days $3,784
o) Cut/Bore $725
p) Driveway
i) Residential $175
ii) Commercial $1,047
q) Excavation / Trenching
i) First 100 LF $725
ii) Each Additional 100 LF $322
iii) Last 100 LF $161
r) Sidewalk
i) First 100 Lineal Feet $1,369
ii) Each Additional 100 Lineal Feet $966
iii) Last 100 Lineal Feet $322
s) Sewer and Water $1,288
t) Night Work $403
11 Research/Administrative
a) Subdiv'n Improvement Agreem't (SIA)$1,932 per request
b) SIA - Time Extension $1,127 per request
c) Assignment & Assumptions Agreement $2,093 per request
1595
Fee Description Fee *Unit Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
d) Flood Plain Research/FEMA App $966 per request
e) Bid Protest Review $725
12 Reactivation of Permit
a) Reactivation of an Expired Permit 10% of original permit fee each
13 Technology Enhancement Fee
Technology Enhancement Fee $5
Digital Archiving and Records Management Fee
14 Digital Archiving and Records Management Fee
a) OTC Permit/Application $10
b) All Others $21
15 Transportation Permits
a) Annual $90 each
b) Single Event $16 each
Fee Description Fee Unit Notes
16 Public Works Personnel $161 per hour
17 City Attorney or Other Legal Review 100%pass-through of actual cost
18 Outside Service Providers 100%pass-through of actual cost
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any discrete costs incurred from the
use of outside service providers required to process the specific application. Exception for contract traffic engineering and plan
review consulting costs, which are included in the fees listed above.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine
the appropriate fee based on the following hourly rates for staff time involved in the service or activity.
[a] Plan review fees for Precise Grading - Custom Home are identified as part of the Building fee schedule and are based on the lot
size of the custom home. See Building fee schedule, Grading section.
[b] Expedited Plan Review request is subject to City Engineer approval. It is dependent on staff availability and workload.
[c] Inspection fees for Precise Grading - Custom Homes and Tract Homes are identified as part of the Building fee schedule. See
Building fee schedule, Grading section.
[d] For PM10 annual permit. For permits required for less than one year, or portion of year, fees will be pro-rated based on the
number of months permitted.
1696
Fee *
Fee Description Plan Review
Permit /
Inspection Total Notes
Construction-Related Fire Review and Inspection Fees
1 New Multi-Residential (Hotel, Motel, Apartments, Condominiums)$483 $322 $805
2 New Commercial / Industrial $483 $403 $886
3 Residential Addition / Remodel $161 $161 $322 [a]
4 Commercial Tenant Improvement $242 $161 $403
5 Commercial / Industrial Addition or Remodel $242 $242 $483
6 Commercial Cooking Hood and Duct Systems $242 $161 $403
7 Water Systems (Fire Hydrants, Water Mains, Sprinkler Risers)$403 $483 $886
8 Pre-Engineered Fire Suppression Systems (Halon, Dry-Chemical, etc.)$483 $322 $805
9 Fire Alarm Systems $564 $483 $1,047
10 Fire Sprinkler Systems - Single Family Detached [a]
a) 1-50 Sprinkler Heads $242 $161 $403 [a]
b) 51-100 Sprinkler Heads $242 $242 $483 [a]
c) Over 100 Sprinkler Heads $242 $322 $564 [a]
11 Fire Sprinkler Systems - Multi-Family 3 or more units $322 $242 $564
12 Fire Sprinkler Systems - Commercial / Industrial 0 - 35,000 SF $403 $242 $644
13 Fire Sprinkler Systems - Commercial / Industrial 35,001 - 75,000 SF $483 $282 $765
14 Fire Sprinkler Systems - Commercial / Industrial 75,001 - 120,000 SF $564 $403 $966
15 Fire Sprinkler Systems - Commercial / Industrial > 120,000 SF $644 $564 $1,208
16 Fire Sprinkler Systems - Tenant Improvement > 10 Heads $242 $161 $403
17 Fire Pumps $322 $322 $644
18 Fire Standpipe Systems $242 $322 $564
19 Fire Sprinkler Systems Supervision & Alarms $242 $161 $403
20 Smoke Controls (Smoke & Heat Vents, Barriers, Enclosures, etc.)$564 $483 $1,047
21 Fire Water Tanks $242 $161 $403
22 Underground Water Supply to Sprinkler Riser (per riser)$322 $322 $644
23 Egress Analysis $161 $161 $322
24 Occupancy Load / Seating Capacity Determinations $0 $161 $161
25 Fire Compliance Release/Final $0 $161 $161
26 Plan Revision Submittals - each $161 $0 $161
27 Plan Resubmittals (in Excess of 3 Reviews) - each $161 $0 $161
28 Failed or Additional Field Inspections (Excessive) - each $0 $161 $161
Operational Permit
29 Fire Operational Permit (per hour)bill hourly bill hourly per hour
Other
30 Master Plan bill hourly bill hourly per hour
31 Tract access/Hydrant inspection $0 $201 $201
City of La Quinta
Master Fee Schedule
Schedule of Fire Fees
1797
Fee *
Fee Description Plan Review
Permit /
Inspection Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Fire Fees
32 Special Event Permit $161 $242 $403
33 Pyrotechnic Permit $403 $322 $725
34 Pyrotechnic Event Standby (per hour)bill hourly bill hourly per hour
35 Fire Miscellaneous (per hour)bill hourly bill hourly per hour
Technology Enhancement Fee
36 Technology Enhancement Fee n/a n/a $5
Digital Archiving and Records Management Fee
37 Digital Archiving and Records Management Fee
a) OTC Permit / Application n/a n/a $10
b) All Others n/a n/a $21
Fee Description Fee * Notes
38 City Assigned Fire Safety Specialist $161 per hour
39 Other County Fire Services See County Fees
40 City Attorney or other legal review 100%of actual costs
41 Outside Service Providers 100%of actual costs
[a] Fee will not apply for all submittals. Before applying fees, Fire Department will review project submittal to determine if review is
necessary or if review fees have been collected as part of the development planning process.
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and
any discrete costs incurred from the use of outside service providers required to process the specific application, including but not
limited to legal review.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the
appropriate fee based on the following hourly rates for staff time involved in the service or activity.
1898
Fee Description Fee Unit Notes
NPDES Ongoing Inspection Fee
1 Food Establishment Facilities $47 per year
2 Hazardous Waste/Materials Facilities - 3Yr $98 per year
3 Hazardous Waste/Materials Facilities - 1Yr $260 per year
Code Compliance
4 Code Compliance Follow-Up, If Required $118 per hour
City of La Quinta
Master Fee Schedule
Schedule of NPDES Ongoing Inspection Fees
1999
Fee Description Fee Unit Notes
Short-Term Vacation Rental Permit Fee
1 Annual Permit Fee $200 per year
2 Code Compliance Inspection Fee (if applicable)$325 per unit
3 Technology Enhancement Fee $5 per year
City of La Quinta
Master Fee Schedule
Schedule of Short-Term Vacation Rental Permit Fees
20100
Fee Description Fee Unit Notes
Medical Cannabis Delivery Services Application
1 Medical Cannabis Delivery Service Application
a) Delivery Service Application - New $468 per year
b) Delivery Service Application - Renewal $468 per year
2 Technology Enhancement Fee $5 per year
City of La Quinta
Master Fee Schedule
Schedule of Medical Cannabis Delivery Application Fees
21101
Fee Description Fee Unit Notes
False Alarm Response
1 Police False Alarm Response [a]
a) 1st False Alarm Response No Charge each
b) 2nd False Alarm Response No Charge each
c) 3rd False Alarm Response $60 each
d) 4th False Alarm Response $105 each
e) 5th and Each Additional False Alarm Response $120 each
2 Fire False Alarm Response [a]
a) 1st False Alarm Response No Charge each
b) 2nd False Alarm Response No Charge each
c) 3rd False Alarm Response $60 each
d) 4th False Alarm Response $275 each
e) 5th and Each Additional False Alarm Response $605 each
[a] Based on number of false alarms in a 365 day period.
City of La Quinta
Master Fee Schedule
Schedule of False Alarm Response Fees
22102
Fee Description Fee Unit Notes
1 Vehicle Impound Cost Recovery Fee $228 each
City of La Quinta
Master Fee Schedule
Schedule of Vehicle Impound Cost Recovery Fees
23103
Fee Description Fee Unit Notes
1 Code Enforcement Hourly Rate
a) Code Enforcement Hourly Rate $118 per hour [a]
b) Code Enforcement Hourly Rate - For Outside
Agency Reimbursement Request
$109 per hour [b]
City of La Quinta
Master Fee Schedule
Schedule of Code Enforcement Hourly Rate for Services
[a] Hourly rate for Code Compliance inspections required or requested for which no other fees are listed, requests for special event
support, etc.
[b] Hourly rate for outside agency reimbursement request is a reduced rate because the City may request direct reimbursement of
various fleet and technology related costs.
24104
Fee Description Fee Unit Notes
1 Pool Drain Permit $25 per permit
2 Golf Cart Permit
a) New $50 per permit
b) Renewal $25 per permit
City of La Quinta
Master Fee Schedule
Schedule of Pool Drain and Golf Cart Permit Fees
25105
Fee Description Fee Unit Notes
1 Home Occupation Permit $100 per permit
2 Home Occupation Permit - Address Change $50 per permit
City of La Quinta
Master Fee Schedule
Schedule of Home Occupation Permit Fees
26106
Fee Description Fee Unit Notes
Film/Photography Permit
1 Cast and Crew Totaling One to Three Persons:
a) Permit Issuance Fee
i) Private Property $89 per permit
ii) Private Property with Staging in Public Right of Way $118 per permit
iii) Public Property $118 per permit
b) Location Use Fee
i) Private Property $0 per day
ii) Private Property with Staging in Public Right of Way $100 per day [a]
iii) Public Property $150 per day [a];[b]
2 Cast and Crew Totaling Four or More Persons:
a) Permit Issuance Fee
i) Private Property $207 per permit
ii) Private Property with Staging in Public Right of Way $325 per permit
iii) Public Property $384 per permit
b) Location Use Fee
i) Private Property $0 per day
ii) Private Property with Staging in Public Right of Way $250 per day [a]
iii) Public Property $500 per day [a];[b]
Other Fees, If Applicable
3 Pre-Application Meeting (upon request)$236 per meeting
4 City Film Monitor (as needed)$118 per hour
5 Violations:
a) Filming/Photography without a Permit 2 times applicable fees
b) Violation of Permit $350 per violation, per day
[a] Proposed fee is a market-based rate for exclusive private use of public space/facilities.
[b] Does not include any applicable facility rental fees that may apply.
City of La Quinta
Master Fee Schedule
Schedule of Film/Photography Permit Fees
Note: The City Manager may waive fees for bona fide student film/photography projects and projects with 501(c)(3) Federal Income Tax Status;
however, the permitting process for filming/photography is still required for these projects.
27107
Fee Description Fee Unit Notes
1 Bingo Permit
a) Initial $50 per permit
b) Renewal $50 per permit
City of La Quinta
Master Fee Schedule
Schedule of Bingo Permit Fees
28108
Fee Description Fee *Unit Notes
1 Black and White Copy - up to 8.5 x 14 $0.15 per single-sided page
2 Black and White Copy - 11 x 17 $0.20 per single-sided page
3 Color Copy - up to 8.5 x 14 $0.25 per single-sided page
4 Color Copy - 11 x 17 $0.50 per single-sided page
5 Oversized Sheets (Plans/Maps)$3.00 per sheet [a]
6 CD/DVD/Flash Drive $5.00 per CD or DVD
7 Agency Credit Card Service Fee 1.8%% of fees paid [b]
8 Processing Fee for Receipt of Non-Sufficient Funds
a) First from Payee $25.00 per occurence [c]
b) Each Subsequent from Payee $35.00 per occurence [c]
[a] If more than two sheets are requested, the City will typically process the request using an outside vendor service.
[b] Fee is intended to function as a pass-through of credit card transaction vendor charge. Annual updates should be based on vendor charge.
[c] Set by State (Civil Code Section 1719).
City of La Quinta
Master Fee Schedule
Schedule of Administrative Fees
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific request for
information/service.
* In addition to the fees identified in this schedule, if a request for electronic records either (1) is for a record normally issued only
periodically, or (2) requires data compilation, extraction, or programming, costs will include the cost of producing the copy,
including construction, programming and computer services.
29109
Fee Description Fee Unit Notes
1 Appeal to Hearing Officer of Administrative Citation $25 per appeal [a]
2 Appeal of an Administrative Decision to City Manager $250 per appeal [a]
3 Appeal to Construction Board of Appeals $1,500 per appeal [a]
4 Appeal to Planning Commission $1,500 per appeal [a]
5 Appeal to City Council $1,500 per appeal [a]
City of La Quinta
Master Fee Schedule
Schedule of Appeal Fees
[a] Depending on the subject of the appeal, specialized expertise may be solicited, at the expense of the applicant, for the purpose
of providing input to the City Manager, Construction Board of Appeals, Planning Commission or City Council.
30110
Fee Description
Class I
(per season) Class II Class III Class IV
SPORTS FACILITIES
1 Sports Complex Baseball Diamonds/ Football Field or La
Quinta Park Baseball Diamonds (with or without field lights)
$10 per
resident/
$15 per non-
resident
$25/hour
(per field)
N/A N/A
2 La Quinta Park or Colonel Mitchell Paige Soccer Fields (with
or without field lights)
$10 per
resident/
$15 per non-
resident
$25/hour
(per field)
N/A N/A
3 Sports Complex, La Quinta Park, and Colonel Mitchell Paige
Sports Fields (per field)
N/A N/A $25/hour
($40/hour with
lights)
$35/hour
($55/hour
with lights)
4 Sports Complex or La Quinta Park Snack Bar Use $200.00 N/A N/A N/A
5 La Quinta Boys & Girls Club Gymnasium N/A $25/hour $35/hour $45/hour
6 Tennis Courts/Pickleball Courts (per court)N/A $5/hour $5/hour $10/hour
PARKS
7 Civic Center Campus, Gazebo, Amphitheater (50 people or
less)
N/A $75/hour $125/hour $175/hour
8 Civic Center Campus (Non-profit events with 100 people or
more; TUP required)
N/A $150/hour N/A N/A
9 Cove Oasis Trailhead (50 people or less)N/A $75/hour $125/hour $175/hour
10 Fritz Burns or La Quinta Park Party (50 people or less)N/A $50 (4 hours)$65 (4 hours)$90 (4 hours)
11 Fritz Burns or La Quinta Park (Non-profit events with 100
people or more; TUP required)
N/A $50/hour N/A N/A
BUILDINGS
12 Wellness Center Multi-Purpose Room (max capacity is 200)$55/hour $75/hour $125/hour $175/hour
13 Museum Meeting Room (Meetings only; max capacity is 65)N/A $50/hour $50/hour $50/hour
14 Museum Meeting Room & Courtyard (max capacity is 150)N/A $75/hour $125/hour $175/hour
15 Museum Meeting Room, Courtyard, & Upstairs Patio
(max capacity is 175)
N/A $100/hour $150/hour $200/hour
16 Library Community Room (Small events/meetings with 60
people or less)
N/A $50/hour $50/hour $50/hour
17 Library Classroom (Meetings only; max capacity is 60)N/A $50/hour $50/hour $50/hour
18 Wellness Center, Library Community Room, and Museum
Kitchen
$10/hour $20/hour $25/hour $30/hour
City of La Quinta
Master Fee Schedule
Schedule of Facility Use Fees
31111
Fee Description
Class I
(per season) Class II Class III Class IV
City of La Quinta
Master Fee Schedule
Schedule of Facility Use Fees
19 Wellness Center Multi-Purpose Room
Museum Meeting Room & Courtyard
Museum Meeting Room & Courtyard w/Upstairs Patio
$500.00
20 La Quinta Park & Sports Complex snack bars $350.00
21 $200.00
22 Museum Meeting Room
Library Community Room
Fritz Burns Tennis Courts (per court)
Fritz Burns or La Quinta Park (Non-profit events w/ 100+
people)
$100.00
23 Fritz Burns or La Quinta Park Party $50.00
CLASSIFICATIONS
Class I: 501(c) 3 recreation organizations serving LQ youth (18 and under)
Class II: LQ non-profit organizations, community-based organizations, competitive youth sports leagues
(DSUSD - Sports Complex Use Only)
Class III: LQ residents (DSUSD - for all other facilities other than the Sports Complex)
Class IV: LQ business and profit organizations; non-city residents, organizations, and businesses
Library Classroom
Cove Oasis Trailhead
Civic Center Campus, Gazebo, Amphitheater
(50 people or less)
SECURITY DEPOSITS (Refundable upon post conditions after use)
Sports Fields
Boys & Girls Club Gym
Civic Center Campus (Non-profit events with 100 people or more)
32112
Fee Description Non-Profit All Others
SILVERROCK EVENT SITE (4-Hour Minimum Rental)
1 Permit Processing Fee (per application)$118 $118
2 Facility Rental Fee (per hour)$250 $300
3 Security Deposit
a) One Day Event $500 $500
b) Event Lasting Two or More Days $1,000 $1,000
CLASSIFICATION
Non-Profit: 501(c)3 tax organization.
City of La Quinta
Master Fee Schedule
Schedule of SilverRock Event Site Facility Rental Fees
33113
114
User and Regulatory Fee Study
CITY OF LA QUINTA
JUNE 24, 2019
TERRY MADSEN | PRINCIPAL CONSULTANT
tmadsen@clearsourcefinancial.com | 831.288.0608
7960 B Soquel Drive, Suite 363 | Aptos, California 95003
www.clearsourcefinancial.com
DRAFT
ATTACHMENT 1
115
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA
CONTENTS
REPORTING
1 TRANSMITTAL
2 EXECUTIVE SUMMARY | Overall Findings
6 PROJECT ORIENTATION | Scope, Guidance, Methods
10 BUILDING FEES | Project Findings and Outcomes
11 PLANNING FEES | Project Findings and Outcomes
12 PUBLIC WORKS FEES | Project Findings and Outcomes
13 SHORT TERM RENTAL PERMIT FEES | Project Findings and Outcomes
14 IMPLEMENTATION | Guidance
APPENDIX
COST OF SERVICE ANALYSIS AND FEE SCHEDULES
116
7960 B SOQUEL DRIVE, SUITE 363 | APTOS, CALIFORNIA 95003
831.288.0608 | WWW.CLEARSOURCEFINANCIAL.COM
June 24, 2019
CITY OF LA QUINTA
Attn: Monika Radeva, City Clerk
78-495 Calle Tampico
La Quinta, California 92253
User and Regulatory Fee Study
Dear Monika:
ClearSource Financial Consulting submits the following report describing the findings of our preparation
of a User and Regulatory Fee Study for the City of La Quinta.
Please refer to the Executive Summary for the key findings of the analysis, proposed changes to City fees
to be implemented in Fiscal Year 2019-2020, and estimated impacts to City funds. The balance of the
report and its appendices provide the necessary documentation to support those outcomes.
Thank you for the opportunity to serve the City on this topic. We are happy to continue discussion on
the fee study as the need arises or consult with you on additional topics.
Sincerely,
TERRY MADSEN, PRESIDENT | CLEARSOURCE FINANCIAL CONSULTING
PHONE NUMBER: 831.288.0608
EMAIL ADDRESS: tmadsen@clearsourcefinancial.com
117
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 2
EXECUTIVE SUMMARY
STUDY OVERVIEW
The City of La Quinta has completed a User and Regulatory Fee Study. California cities regularly conduct
these studies to justify fee amounts imposed and to optimize the overall portfolio of revenues available
to the municipality to fund its services.
Industry practice and fiscal conditions in the state have led most cities to link cost recovery for services
of individual action, cause, or benefit to that same individual through user fee revenue, relieving the
agency’s general revenues as much as possible for use toward services of broader community benefit.
Recovering the costs of providing fee-related services directly influences the City’s fiscal health and
increases the City’s ability to meet the service level expectations of fee payers.
The services for which the City imposes a user or regulatory fee typically derive from an individual
person or entity’s action, request, or behavior. Therefore, except in cases where there is an
overwhelming public benefit generated by the City’s involvement in the individual action, a fee for
service ensures that the individual bears most, if not all, of the cost incurred by the City to provide
that service. When a fee targets “100% or full cost recovery,” the individual is bearing the entirety of the
cost. When a fee targets less than full cost recovery, another City revenue source – in most cases, the
General Fund – subsidizes the individualized activity.
USER AND REGULATORY FEES
The City derives its annual revenue from a number of sources. These include, but are not limited to,
property taxes, transient occupancy taxes, sales taxes, franchise fees, fines, rents, and user and
regulatory fees. User and regulatory fees are intended to cover all, or a portion of, the costs incurred
by the City for providing fee-related services and activities that are not otherwise provided to those
not paying the fee.
California law provides guidance regarding the amounts the City may charge for fee-related services and
activities. Specifically, in order to avoid being considered taxes, the fees charged shall not exceed the
estimated reasonable cost of providing the services, activities, or materials for which fees are charged.
At its conclusion, this User and Regulatory Fee Study proposes for City Council review and consideration
at public hearing a new Master Fee Schedule for application in Fiscal Year 2019-2020 and continued
update in subsequent years.
SCOPE OF STUDY
Key tasks expected by the City of this Comprehensive User Fee Study included the following:
Identify the full cost of providing fee-related services
Determine current cost recovery levels
118
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 3
EXECUTIVE SUMMARY
Examine existing fee calculation methodologies and modify, if necessary, to more closely align
calculation methodology to the cost of services being provided
Provide an updated schedule of fees for City Council consideration
Compare current and proposed fees to those imposed by neighboring communities
Estimate anticipated revenue impacts of modifying fees
Deliver an updated schedule of fees after Council review and adoption of any fee modifications
KEY FINDINGS
Development Services Fees Cost Recovery Policy and Practice
Since 2013 the City has used a uniform hourly rate for calculating development services fees. The
following table identifies the fully-burdened hourly rates calculated as part of the study, and targeted
hourly rates for service that assume continued use of the City’s policy of setting fees using a uniform
hourly rate.
EXHIBIT 1 | UNIFORM HOURLY RATE AND FULLY-BURDENED HOURLY RATES
If the City continues its policy of setting fees using a uniform hourly rate, most of the fees examined in
this study will increase by 1%.
EXHIBIT 2 | CURRENT AND PROPOSED HOURLY RATES
119
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 4
EXECUTIVE SUMMARY
Examples of benefits and drawbacks of continuing the City’s current fee setting policy
Benefits:
•Ease of administering deposits that involve review from multiple departments
•Ease of explaining fee calculations to interested parties
•Uniform pattern of fee increases provides consistency to the development community
Drawbacks:
•Planning fees, Public Works fees, and Fire Prevention fees are set to recover less than the full
costs of service. Since fees do not recover costs, other City resources are required to fund these
services. Typically, any shortfalls are covered by the General Fund.
•Use of General Fund resources to cover services that provide specific benefits
•Inconsistent treatment of differing development service categories (e.g. recover 100% of costs of
building services and less than 100% of costs of planning services).
Revenue Impacts of Proposed Fee Changes
Forecasting revenue impacts from proposed fee changes is a challenging and subjective exercise, due to
annual changes in development volume and project types. However, the table below provides a rough
estimate of anticipated revenue impacts of the fee changes proposed assuming continued use of the
City’s policy of setting fees using a uniform hourly rate. The estimates assume similar development
patterns as those experienced over the previous two years at the City.
EXHIBIT 3 | REVENUE IMPACT OF FEE CHANGES
120
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 5
EXECUTIVE SUMMARY
Overview of Significant Modifications Proposed
The following list highlights significant modifications proposed to enhance cost recovery levels for
various services. The proposed changes are based on a combination of updated service time estimates
and/or increases in proposed cost recovery levels. The proposed changes have been reviewed against
neighboring communities. If the changes are implemented, the City’s development fees for new
construction projects and short-term vacation rental permit application fees will remain in-line with
regional neighbors
EXHIBIT 4 | OVERVIEW OF SIGNIFICANT MODIFICATIONS PROPOSED
121
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 6
PROJECT ORIENTATION
SCOPE OF STUDY
The City of La Quinta has completed a User and Regulatory Fee Study, which represents an external
review of prevailing practices and development of a new Master Fee Schedule. ClearSource Financial
Consulting has prepared this analysis during Fiscal Year 2018-2019 and will be available to answer
questions as the City proceeds in implementing findings as it chooses.
Key tasks expected by the City for this study included the following:
Identify the full cost of providing fee-related services
Determine current cost recovery levels
Examine existing fee calculation methodologies and modify, if necessary, to more closely align
calculation methodology to the cost of services being provided
Provide an updated schedule of fees for City Council consideration
Compare current and proposed fees to those imposed by neighboring communities
Estimate anticipated revenue impacts of modifying fees
Deliver an updated schedule of fees after Council review and adoption of any fee modifications
DIRECT SERVICES UNDER REVIEW
Primary Fee Categories
City fees under review in this project focused on direct services eligible for user fee methodology, as
listed in the City’s published fee schedules. Current services shown in the City’s various prevailing fee
schedules and addressed in this study, included but were not limited to, the following:
Building – Services include building permits for construction and sub-trades
Planning – Services include development review/current planning, use permits, other community
permitting, and miscellaneous labor
Public Works – Services include engineering/land development plan review and inspection, and
encroachment permitting
Fire Prevention - Services include plan review and inspection of construction for compliance with
the Fire Code
Short-term Vacation Rental Permit Fees
False Alarm Response Fees
122
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 7
PROJECT ORIENTATION
REASON FOR STUDY
Cities derive annual revenue from a number of sources. These include, but are not limited to, property
taxes, transient occupancy taxes, sales taxes, franchise fees, fines, rents, and user and regulatory fees.
User and regulatory fees are intended to cover all, or a portion of, the costs incurred by a city for
providing fee-related services and activities that are not otherwise provided to those not paying the fee.
California cities regularly conduct comprehensive fee studies to justify fee amounts imposed and to
optimize the overall body of revenues available to the municipality to fund its services. Widespread
industry practice and fiscal conditions in the state have led most cities to link cost recovery for services
of individual action, cause, or benefit to that individual through user fee revenue, relieving the agency’s
general revenues for services of broader community benefit.
PREVAILING GUIDANCE
The objectives of this study, the methodology used to complete the study, and the formulation of
outcomes and recommendations for future consideration were significantly influenced by Article 13C of
the California Constitution and Section 66014 of the California Government Code.
Article 13C states that the local government bears the burden of proving by a preponderance of the
evidence that a levy, charge, or other exaction is not a tax, that the amount is no more than necessary to
cover the reasonable costs of the governmental activity, and that the manner in which those costs are
allocated to a payer bear a fair or reasonable relationship to the payer’s burdens on, or benefits
received from, the governmental activity. Additionally, Article 13C identifies the following as items that
are not defined as taxes:
A charge imposed for a specific benefit conferred or privilege granted directly to the payer that is
not provided to those not charged, and which does not exceed the reasonable costs to the local
government of conferring the benefit or granting the privilege.
A charge imposed for a specific government service or product provided directly to the payer that is
not provided to those not charged, and which does not exceed the reasonable costs to the local
government of providing the service or product.
A charge imposed for the reasonable regulatory costs to a local government for issuing licenses and
permits, performing investigations, inspections, and audits, enforcing agricultural marketing orders,
and the administrative enforcement and adjudication thereof.
A charge imposed for entrance to or use of local government property, or the purchase, rental, or
lease of local government property.
A fine, penalty, or other monetary charge imposed by the judicial branch of government or a local
government, as a result of a violation of law.
A charge imposed as a condition of property development.
Assessments and property-related fees imposed in accordance with the provisions of Article XIII D.
123
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 8
PROJECT ORIENTATION
Section 66014(a) of the California Government Code includes the following, “Notwithstanding any other
provision of law, when a local agency charges fees for zoning variances; zoning changes; use permits;
building inspections; building permits; …the processing of maps under the provisions of the Subdivision
Map Act…; or planning services…; those fees may not exceed the estimated reasonable cost of providing
the service for which the fee is charged, unless a question regarding the amount of the fee charged in
excess of the estimated reasonable cost of providing the services or materials is submitted to, and
approved by, a popular vote of two-thirds of those electors voting on the issue.
The outcomes and recommendations of the study are intended to comply with applicable federal, state,
and local laws including providing confirmation that the proposed fees (“charges”) recommended as a
result of this study are not taxes as defined in Article 13C of the California Constitution and that the
proposed fees are no more than necessary to the cover the reasonable costs of the City’s activities and
services addressed in the fees. Additionally, this report is intended to show that the manner in which
the costs are allocated to a payer bear a fair and reasonable relationship to the payer’s burdens on, or
benefits received from the activities and services provided by the City.
METHODOLOGY AND DATA SOURCES
This study calculated the estimated reasonable cost of providing various fee-related services across the
City organization. Generally, the estimated reasonable cost of providing the fee-related services and
activities examined in this study can be calculated as the product of the composite fully-burdened
hourly labor rate of the division responsible for providing services and the estimated labor time required
to process a typical request for service.
The composite fully-burdened hourly rates calculated in this study are based on the estimated annual
hours spent providing fee related services, and estimated labor, services and supplies, and citywide
overhead expenditures, sourced as follows:
Estimated annual hours spent providing fee related services were developed based on responses
received from multiple interviews and targeted questionnaires.
Labor expenditures for in-house personnel were based on budgeted salary and benefits
expenditures.
All other services and supplies expenditures were based on budgeted expenditures.
For purposes of estimating the full cost of service, a reasonable, conservative, allocation of central
service costs to direct service departments was developed that yields Citywide indirect rates to
inform this analysis.
Estimated labor times were developed based on responses received from multiple interviews and
targeted questionnaires of the staff primarily responsible for the provision of services examined in
the study. Commonly used industry data also aided in the development of time estimates and
proposed fee structures.
124
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 9
PROJECT ORIENTATION
Once cost of service levels are identified, the City may use this information to inform targeted cost
recovery from fees. Fees set at the cost of service target full cost recovery. Fees set at any amount less
than the cost of service target less than full cost recovery.
An illustration of the methods used in this analysis is shown below.
EXHIBIT 4 | STEPS IN ANALYZING COSTS OF SERVICE AND USER FEES
125
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 10
BUILDING FEES
BUILDING FEES
Building Division staff provide plan check and inspection services for all new construction, remodels, and
additions throughout La Quinta, enforcing the provisions of the California Building Standards Code.
Additionally, the Division serves as a primary building code resource to contractors, architects,
engineers, developers, business owners, and homeowners in La Quinta.
Roughly 125 individual building fee categories were examined. Significant findings include:
•Current cost recovery is roughly 100% for the majority of fees examined. However, the City’s
current fees for new construction projects recover less than the City’s full cost of service.
•The calculated fully-burdened rate for fee-related building services is $161 per hour.
•Proposed fees target recovery of 100% of the estimated cost of service.
•Permit fees for new construction projects have been recalibrated to reflect the City’s cost of
performing required inspections. Fees remain in line with similar fees collected by neighboring
agencies in the region.1
•The fee schedule has been updated to reflect applicable fees for partial inspection requests and
excess plan reviews.
1 See Desert Valleys Builders Association Regional Fee Study for additional details.
126
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 11
BUILDING FEES
•If the proposed fees are adopted, the estimated revenue impact of the proposed changes is
roughly $55,000. This change is the result of increasing most fees by 1% and increasing new
construction fees to reflect the City’s cost of service.
PLANNING FEES
The Planning Division leads the City’s current and long-range planning efforts, including processing and
review of applications for development within the City of La Quinta. The Division provides staff support
to the Planning Commission and City Council through the processing of development permits, zoning
text amendments, use permits, and other land division entitlements.
Roughly 60 individual planning fee categories were examined as part of the study. Significant findings
include:
•The cost of service analysis showed the City’s current fees recover less than the estimated cost of
service for fee-related planning services. The causes of the under-recovery are two-fold. They
are identified below:
o The use of a uniform hourly rate across all development units results in under-recovery
of the costs of providing Planning services
o Proposed fees for certain project types are set at fixed levels that result in reduced cost
recovery levels
•The calculated fully-burdened rate for fee-related planning services is $203 per hour. The
targeted rate used for fee setting purposes is $161 per hour.
•The majority of proposed fees target recovery of 79% of the estimated cost of service.
•Proposed fees for certain project types are set at fixed levels that result in cost recovery levels
less than 79%. The services are:
o Standard-type Minor Temporary Use Permits – Proposed fee is $400 (20% cost recovery)
o Sign Permit – Proposed fee is $355 (50% cost recovery)
o Director’s Determination – Proposed fee is $405 (50% cost recovery)
o Certificate of Compliance – Proposed fee is $505 (50% cost recovery)
o Zoning Letter (Basic Property Information) – Proposed fee is $263 (52% cost recovery)
o Historical Landmark Designation or Certificate of Appropriateness – Proposed fee is
$1,320 (50% cost recovery)
127
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 12
PLANNING FEES
•New fees are recommended to recover the City’s cost of:
o Zoning conformance review at the building permit stage (Planning Plan Check)
o Pre-application review (50% of pre-application fee will be credited toward entitlement
application fee).
PUBLIC WORKS FEES
The Public Works Department provides numerous fee-related private development services. The broad
categories of these services include, but are not limited to, improvement plan check, map check, permits
(grading, encroachment, and driveway), and land action review (i.e. dedications, parcel mergers).
More than 50 individual public works fee categories were examined. Significant findings include:
•Current cost recovery is roughly 89% for the majority of fees examined. This under-recovery is
primarily the result of setting fees using a uniform hourly rate for all development functions rather
than the fully-burdened hourly rate for public works fee-related services.
•The calculated fully-burdened rate for fee-related planning services is $179 per hour. The
targeted rate used for fee setting purposes is $161 per hour.
•The majority of proposed fees target recovery of 90% of the estimated cost of service.
•Inspection fees for grading, improvement review, and various encroachment permits have been
recalibrated to reflect current service levels. Fees remain in line with similar fees collected by
neighboring agencies in the region.2
2 ibid.
128
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 13
SHORT TERM RENTAL
SHORT TERM RENTAL PERMIT FEES
The City regulates short-term vacation rentals of private residences within the City. Although short-
term rentals are subject to payment of transient occupancy taxes, the only costs considered in this study
are the regulatory costs associated with the short-term vacation rental program, including, but not
limited to, assisting short-term renters with the vacation rental registration process and minimizing the
negative secondary effects of such use on surrounding residential neighborhoods through active
education and code enforcement efforts. The City’s program continues to evolve. It has experienced
tremendous growth over the last several years and significant resources are required to regulate and
administer the program.
The current annual fee for permit issuance is $105 per year. The proposed annual fee is $200 per year.
The proposed fee represents recovery of 25% of the current estimated costs of providing these services.
The proposed fee is in-line with fees collected by other agencies for similar permits:
129
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 14
IMPLEMENTATION
CONSIDERATIONS FOR IMPLEMENTATION
If the City decides to adopt or otherwise utilize outcomes generated through this study, it should:
Update Systems for Fee Outcomes – Ensure that City staff begin using updated fees and associated
outcomes once the Master Fee Schedule becomes effective. Values should be included in all official
fee schedules used throughout the City (e.g., departmental pamphlets, counter schedules, and
online information). Additionally, ensure collections processes are updated, which may include
coding in billing systems and training for personnel who handle fees directly with the public.
Actively Monitor the Use of Fees – In order to recover accurate and eligible amounts expected, the
City should be diligent about tracking time to projects and ensuring fees are applied in the correct
amount and using the correct and intended basis.
Monitor Feedback and Permit Statistics – Monitor permit and application volume and applicant
feedback to determine if fee modifications are resulting in any unanticipated changes in project
frequency and to increase the level of detail available for revenue forecasting.
Annually Review and Adjust Fee Values – In order to generally maintain pace with regional cost
inflation and/or the City’s salary cost inflation, the City should review and potentially adjust its fees
on an annual basis. A commonly used, reasonable inflation index is the annual change in the all-
urban Consumer Price Index (CPI) for the region.
Periodically Perform Comprehensive Analysis – A comprehensive fee study should be conducted
every three to five years to ensure fee levels remain at or below legal limits and are consistent with
evolving service practices and local conditions.
130
CLEARSOURCE REPORT TO THE CITY OF LA QUINTA 15
APPENDIX
COST OF SERVICE ANALYSIS AND FEE SCHEDULES
The appendix provides detailed analytical findings from the study, including the amount of cost, or
estimated cost, required to provide the services for which the fee or service charge is levied, and the
revenue sources anticipated to provide the service, including General Fund revenues. For any fees
targeted to recover less than 100% of the estimated reasonable cost of service, it is anticipated that
General Fund revenues of the City will fund the difference between the targeted recovery level and
100% recovery of the estimated cost of service. These amounts are identified in the Working Version of
the Master Fee Schedule included in this appendix. Additionally, the appendix includes the Master Fee
Schedule proposed for adoption by the City Council.
131
Contents Page
Calculation of Fully-Burdened Hourly Rates
Hourly Rate Summary 4
Planning 6
Public Works 11
Building 17
Fire Prevention 22
Code Enforcement 27
Design & Development Department Administration and The Hub Allocation of Divisional Costs to Functional Units Served 32
Calculation of the Costs of Providing Fee Related Services
Building 40
Planning 57
Public Works 64
Fire Prevention 71
NPDES Ongoing Inspections 74
Short-Term Vacation Rental 76
False Alarm Response 79
Vehicle Impound Cost Recovery 83
Film / Photography Permit Fees 85
Appeals 87
Working Version of the Schedule of Fees
Building Fees 90
Planning Fees 95
Public Works Fees 98
Fire 103
NPDES Ongoing Inspection Fees 105
Short-Term Vacation Rental Permit Fees 106
False Alarm Response Fees 107
Vehicle Impound Cost Recovery Fee 108
Code Enforcement Hourly Rate 109
Pool Drain and Golf Cart Permit 110
Home Occupation Permit 111
Film / Photography Permit Fees 112
Bingo Permit 113
Administrative Fees 114
Appeal Fees 115
Appendix
Table of Contents
132
Contents Page
Appendix
Table of Contents
Proposed Schedule of Fees
Building Fees 117
Planning Fees 125
Public Works Fees 128
Fire 133
NPDES Ongoing Inspection Fees 135
Short-Term Vacation Rental Permit Fees 136
Medical Cannabis Delivery Application Fees 137
False Alarm Response Fees 138
Vehicle Impound Cost Recovery Fee 139
Code Enforcement Hourly Rate 140
Pool Drain and Golf Cart Permit 141
Home Occupation Permit 142
Film / Photography Permit Fees 143
Bingo Permit 144
Administrative Fees 145
Appeal Fees 146
Facility Rental Fees 147
SilverRock Event Site Rental Fees 149
133
Calculation of Fully-Burdened Hourly Rates
3134
Hourly Rate Summary
4135
City of La Quinta
User and Regulatory Fee Study
Summary of Calculated and Targeted Hourly Rates - Development Services Divisions
Hourly Rate Summary
Department/Division
Current Targeted Hourly
Rate for Fee Setting
Purposes
Fully-Burdened
Hourly Rate Notes
Planning $160 $203 [a]
Public Works $160 $179 [a]
Building $160 $161 [a]
Fire Prevention $160 $171 [a]
Department/Division
Fully-Burdened
Hourly Rate
Targeted Rate
Maintaining Current
Practice of Calculating All
Fees Using Common
Hourly Rate
Hourly Rate
Targeting Full Cost
Recovery
% Change if the City
Maintains its Current
Practice of Setting Fees
Using a Common Hourly
Rate
Targeted Rate
Percentage of Fully-
Burdened Hourly Rate
% Change if the City
Adopts Updated Fees
Targeting Full Cost
Recovery Notes
Planning $203 $161 $203 1%79%27%[a]
Public Works $179 $161 $179 1%90%12%[a]
Building $161 $161 $161 1%100%1%[a]
Fire Prevention $171 $161 $171 1%94%7%[a]
[a] The City has adopted a targeted development services hourly rate set at lowest fully-burdened hourly rate of the four functional divisions that provide development review and inspection, rounded down to the
nearest dollar.
5136
Calculation of Fully-Burdened Hourly Rates
Planning Fees
6137
City of La Quinta
User and Regulatory Fee Study
Allocation of Annual Labor Effort - Planning
Name
Planning
Manager Senior Planner Associate Planner
Indirect
Planning 45%18%18%
Direct
Planning 55%82%82%
Total [must equal 100%]100%100%100%
Description
Planning
Manager Senior Planner Associate Planner Total
Annual Salary & Wages 116,094$ 86,087$ 80,464$ 282,645$
Annual Benefits 34,467$ 28,178$ 27,712$ 90,357$
Total 150,561$ 114,265$ 108,176$ 373,002$
Name
Planning
Manager Senior Planner Associate Planner Total
Indirect
Planning 67,752$ 20,568$ 19,472$ 107,792$
Direct
Planning 82,809$ 93,697$ 88,704$ 265,210$
Total [must equal wages and benefits]150,561$ 114,265$ 108,176$ 373,002$
Description
Planning
Manager Senior Planner Associate Planner
Add: Allocation
of Hub and Design
Add: Contract
Current Planning Total
FTE 1.00 1.00 1.00
Annual Hours 2,080 2,080 2,080
Productive Hours 1,800 1,800 1,800 2,311 250 7,961
7138
User and Regulatory Fee Study
Allocation of Annual Labor Effort - Planning
Name
Planning
Manager Senior Planner Associate Planner
Add: Allocation
of Hub and Design
Add: Contract
Current Planning Total
Indirect
General Administration and Management 30%10%10%40%0%18%
Certification and Training 2%2%2%0%0%1%
Code, Policies, and Procedures Update 8%1%1%0%0%2%
Public Info - Non-Dev Related 0%0%0%5%0%1%
Public Info - Dev Related w/out active app 5%5%5%25%0%8%
Direct Hours
Long-range Planning 20%10%10%0%0%8%
City Projects (non-fee related) 28%5%5%0%0%8%
Code Enforcement and Compliance 2%2%2%0%0%1%
Private Development Review 5%65%65%30%100%53%
Total [must equal 100%]100%100%100%100%100%100%
Name
Planning
Manager Senior Planner Associate Planner
Add: Allocation
of Hub and Design
Add: Contract
Current Planning
Weighted
Total
Indirect Hours
General Administration and Management 540 180 180 924 - 1,824
Certification and Training 36 36 36 - - 108
Code, Policies, and Procedures Update 144 18 18 - - 180
Public Info - Non-Dev Related - - - 116 - 116
Public Info - Dev Related w/out active app 90 90 90 578 - 848
Direct Hours
Long-range Planning 360 180 180 - - 720
City Projects (non-fee related) 504 90 90 - - 684
Code Enforcement and Compliance 36 36 36 - - 108
Private Development Review 90 1,170 1,170 693 250 3,373
Total [must equal 100%]1,800 1,800 1,800 2,311 250 7,961
8139
City of La Quinta
User and Regulatory Fee Study
Calculation of Fully-Burdened Hourly Rate - Planning
Labor Expenditures
Description Planning Notes
Salary, Wages, and Benefits (Planning) 373,002$
Salary, Wages, and Benefits (D&D Admin and Hub) 176,463$
Contract Services 37,500$
Total 586,965$
Divisional Budget
Description
FY 18/19
Budget Adjustment Total
Planning
50 - Salaries and Benefits
Salaries and Benefits - Roll-Up 393,400$ (393,400)$ -$
60 - Contract Services
Professional Services 313,000$ (313,000)$ -$
62 - Maintenance & Operations
Travel & Training 14,500$ -$ 14,500$
Membership Dues 1,300$ -$ 1,300$
Subscriptions & Publications 500$ -$ 500$
Office Supplies -$ -$ -$
Printing 2,000$ -$ 2,000$
Advertising 11,000$ (11,000)$ -$
69 - Internal Service Charges
Information Tech Charges 35,000$ -$ 35,000$
Facility & Fleet Maintenance -$ -$ -$
Subtotal 770,700$ (717,400)$ 53,300$
Allocation of Central Services
Description
Total Unbilled
Central Svc
Allocated to
Division
Allocated
Overhead
Estimated Citywide Overhead 6,076,350$ 3.1%190,075$
Indirect Support Costs Allocated from Hub and Design and Development Admin
Description Total
Non-Labor Hub and Design & Development Admin 55,063$
9140
City of La Quinta
User and Regulatory Fee Study
Calculation of Fully-Burdened Hourly Rate - Planning
Total Initial Allocation
Description Total
Allocation
Share
Labor Expenditures & Contract Svc Support (Incl'dg Hub and DD Admin) 586,965$ 66%
Recurring Non-Labor (Including Hub and DD Admin) 108,363$ 12%
Citywide Overhead 190,075$ 21%
Total 885,402$ 100%
Calculation of Fully-Burdened Hourly Rate
Description Allocation Labor Non-Labor
C'wide
Overhead Total
Targeted
Recovery from
Fees
Amount
Recoverable
from Fees
Targeted
Hourly Rate
Indirect
General Administration and Management 18%105,654$ 19,505$ 34,213$ 159,372$ 77%123,372$ 37$
Certification and Training 1%7,044$ 1,300$ 2,281$ 10,625$ 77%8,225$ 2$
Code, Policies, and Procedures Update 2%11,739$ 2,167$ 3,801$ 17,708$ 77%13,708$ 4$
Public Info - Non-Dev Related 1%5,870$ 1,084$ 1,901$ 8,854$ 0%-$ -$
Public Info - Dev Related w/out active app 8%46,957$ 8,669$ 15,206$ 70,832$ 100%70,832$ 21$
Direct Hours
Long-range Planning 8%46,957$ 8,669$ 15,206$ 70,832$ 0%-$ -$
City Projects (Non-Fee Related) 8%44,609$ 8,236$ 14,446$ 67,291$ 0%-$ -$
Code Enforcement and Compliance 1%7,044$ 1,300$ 2,281$ 10,625$ 0%-$ -$
Private Development Review 53%311,091$ 57,432$ 100,740$ 469,263$ 100%469,263$ 139$
Total 100%586,965$ 108,363$ 190,075$ 885,402$ 77%685,400$ 203$
Direct Hours 3,373
Multi-Year Revenue Average
Description 14/15 Actual 15/16 Actual 16/17 Actual 17/18 Actual
Multi-Year
Average 18/19 Budget
Total 185,432$ 181,929$ 203,116$ 248,393$ 204,718$ 157,400$
Cost Recovery Analysis
Description
Total at Full
Cost Recovery
Using Uniform
Hourly Dev
Rate
Average Revenue 204,718$ 204,718$
Targeted Amount Recoverable from Fees 685,400$ 539,718$
Total 30%38%
Audit / Hourly Rate Adjustment
Description Total
Calculated Hourly Rate 203$
Current Hourly Rate $160
10141
Calculation of Fully-Burdened Hourly Rates
Public Works Fees
11142
City of La Quinta
User and Regulatory Fee Study
Allocation of Annual Labor Effort - Public Works
Name City Engineer
Associate
Engineer Analyst
Traffic
Operations
Traffic Signal
Technician
Construction
Manager/Ins
Traffic Signal
Technician
Construction
Inspector
Construction
Inspector
Senior Civil
Engineer
Indirect
Public Works 65%25%25%40%15%30%15%15%15%30%
Direct
Public Works 35%75%75%60%85%70%85%85%85%70%
Total [must equal 100%]100%100%100%100%100%100%100%100%100%100%
Description City Engineer
Associate
Engineer
Associate
Engineer
Traffic
Operations
Traffic Signal
Technician
Construction
Manager/Ins
Traffic Signal
Technician
Construction
Inspector
Construction
Inspector
Senior Civil
Engineer Total
Annual Salary & Wages 141,114$ 84,489$ 97,487$ 83,559$ 52,762$ 97,487$ 55,275$ 63,791$ 63,791$ 100,616$ 840,372$
Annual Benefits 40,937$ 27,959$ 32,849$ 40,632$ 30,131$ 32,849$ 30,435$ 30,804$ 30,779$ 33,654$ 331,027$
Total 182,051$ 112,448$ 130,336$ 124,190$ 82,893$ 130,336$ 85,710$ 94,594$ 94,569$ 134,270$ 1,171,399$
Name City Engineer
Associate
Engineer
Associate
Engineer
Traffic
Operations
Traffic Signal
Technician
Construction
Manager/Ins
Traffic Signal
Technician
Construction
Inspector
Construction
Inspector
Senior Civil
Engineer Total
Indirect
Public Works 118,333$ 28,112$ 32,584$ 49,676$ 12,434$ 39,101$ 12,857$ 14,189$ 14,185$ 40,281$ 361,752$
Direct
Public Works 63,718$ 84,336$ 97,752$ 74,514$ 70,459$ 91,235$ 72,854$ 80,405$ 80,384$ 93,989$ 809,647$
Total [must equal wages and benefits]182,051$ 112,448$ 130,336$ 124,190$ 82,893$ 130,336$ 85,710$ 94,594$ 94,569$ 134,270$ 1,171,399$
Description City Engineer
Associate
Engineer Analyst
Traffic
Operations
Traffic Signal
Technician
Construction
Manager/Ins
Traffic Signal
Technician
Construction
Inspector
Construction
Inspector
Senior Civil
Engineer
Add:
Allocation of
Add:
Contract PC Total
FTE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Annual Hours 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080
Productive Hours 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,097 3,646 22,743
12143
User and Regulatory Fee Study
Allocation of Annual Labor Effort - Public Works
Name City Engineer
Associate
Engineer Analyst
Traffic
Operations
Traffic Signal
Technician
Construction
Manager/Ins
Traffic Signal
Technician
Construction
Inspector
Construction
Inspector
Senior Civil
Engineer
Add:
Allocation of
Add:
Contract PC
Weighted
Total
Indirect
General Administration and Management 55%12%12%20%12%20%12%10%10%20%50%0%19%
Certification and Training 2%2%1%2%2%2%2%2%2%2%0%0%2%
Code, Policies, and Procedures Update 5%2%2%2%1%1%1%0%0%3%0%0%1%
Public Info - Non-Dev Related 0%0%5%15%0%5%0%2%2%5%0%0%3%
Public Info - Dev Related w/out active app 3%9%5%1%0%2%0%1%1%0%0%0%2%
Direct Hours
Capital Projects / City Projects (non-fee)27%8%64%54%77%63%77%60%60%70%16%64%53%
Private Development Review 8%68%11%6%9%7%9%26%26%0%34%36%20%
Total [must equal 100%]100%100%100%100%100%100%100%100%100%100%100%100%100%
Name City Engineer
Associate
Engineer Analyst
Traffic
Operations
Traffic Signal
Technician
Construction
Manager/Ins
Traffic Signal
Technician
Construction
Inspector
Construction
Inspector
Senior Civil
Engineer
Add:
Allocation of
Add:
Contract PC Total
Indirect Hours
General Administration and Management 990 216 216 360 216 360 216 180 180 360 549 - 3,843
Certification and Training 36 36 18 36 36 36 36 36 36 36 - - 342
Code, Policies, and Procedures Update 90 36 36 36 18 18 18 - - 54 - - 306
Public Info - Non-Dev Related - - 90 270 - 90 - 36 36 90 - - 612
Public Info - Dev Related w/out active app 54 162 90 18 - 36 - 18 18 - - - 396
Direct Hours
Capital Projects / City Projects (non-fee)484 135 1,148 972 1,377 1,134 1,377 1,071 1,071 1,260 180 2,331 12,540
Private Development Review 146 1,215 203 108 153 126 153 459 459 - 369 1,314 4,704
Total [must equal 100%]1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,097 3,646 22,743
13144
City of La Quinta
User and Regulatory Fee Study
Calculation of Fully-Burdened Hourly Rate - Public Works
Labor Expenditures
Description
PW Eng &
Dev Svcs Notes
Salary, Wages, and Benefits (PW Dev Svcs & Engineering Svcs) 1,171,399$
Salary, Wages, and Benefits (D&D Admin and Hub) 337,569$
Contract Services 638,000$
Total 2,146,968$
Divisional Budget
Description
FY 18/19
Budget Adjustment Total
PW Development Services
50 - Salaries and Benefits
Salaries and Benefits - Roll-Up 448,400$ (448,400)$ -$
60 - Contract Services
Subscriptions & Publications -$ -$ -$
Professional Services 75,000$ (75,000)$ -$
Consultants 5,000$ (5,000)$ -$
Temporary Agency Services -$ -$ -$
Map/Plan Checking 150,000$ (150,000)$ -$
62 - Maintenance & Operations
Travel & Training 4,000$ -$ 4,000$
Membership Dues 700$ -$ 700$
Subscriptions & Publications 500$ -$ 500$
Printing 500$ -$ 500$
Operating Supplies 1,000$ -$ 1,000$
69 - Internal Service Charges
Information Tech Charges 35,000$ -$ 35,000$
Facility & Fleet Maintenance 32,600$ -$ 32,600$
Subtotal 752,700$ (678,400)$ 74,300$
14145
City of La Quinta
User and Regulatory Fee Study
Calculation of Fully-Burdened Hourly Rate - Public Works
Description
FY 18/19
Budget Adjustment Total
PW Engineering Services
50 - Salaries and Benefits
Salaries and Benefits - Roll-Up 767,000$ (767,000)$ -$
60 - Contract Services
Subscriptions & Publications -$ -$ -$
Consultants 20,000$ (20,000)$ -$
Temporary Agency Services -$ -$ -$
Contract Traffic Engineer 220,000$ (220,000)$ -$
Traffic Counts/Studies 70,000$ (70,000)$ -$
PM 10 - Dust Control 98,000$ (98,000)$ -$
Rental Expense - SRR Fence -$
62 - Maintenance & Operations
Vacant Land Dust Control -$ -$ -$
Travel & Training 6,500$ -$ 6,500$
Mileage Reimbursement -$ -$ -$
Membership Dues 1,100$ -$ 1,100$
Subscriptions & Publications 500$ -$ 500$
Office Supplies 1,000$ -$ 1,000$
Operating Supplies 4,000$ -$ 4,000$
Supplies - Software 1,000$ -$ 1,000$
Safety Gear 2,900$ -$ 2,900$
69 - Internal Service Charges
Information Tech Charges 81,500$ -$ 81,500$
Facility & Fleet Maintenance -$ -$ -$
Subtotal 1,273,500$ (1,175,000)$ 98,500$
Allocation of Central Services
Description
Total Unbilled
Central Svc
Allocated to
Division
Allocated
Overhead
Estimated Citywide Overhead - Development Services 6,076,350$ 3.5%209,636$
Estimated Citywide Overhead - Engineering Services 6,076,350$ 6.2%379,113$
Allocation of Hub and Design and Development Admin
Description Total
Non-Labor Hub and Design & Development Admin 105,333$
15146
City of La Quinta
User and Regulatory Fee Study
Calculation of Fully-Burdened Hourly Rate - Public Works
Total Initial Allocation
Description Total
Allocation
Share
Labor Expenditures & Contract Svc Support (Incl'dg Hub and DD Admin) 2,146,968$ 71%
Recurring Non-Labor (Including Hub and DD Admin) 278,133$ 9%
Citywide Overhead 588,749$ 20%
Total 3,013,851$ 100%
Calculation of Fully-Burdened Hourly Rate
Description Allocation Labor Non-Labor
C'wide
Overhead Total
Targeted
Recovery from
Fees
Amount
Recoverable
from Fees
Targeted
Hourly Rate
Indirect
General Administration and Management 19%416,870$ 54,004$ 114,315$ 585,189$ 28%163,108$ 35$
Certification and Training 2%33,994$ 4,404$ 9,322$ 47,719$ 28%13,301$ 3$
Code, Policies, and Procedures Update 1%30,415$ 3,940$ 8,341$ 42,696$ 28%11,901$ 3$
Public Info - Non-Dev Related 3%60,831$ 7,880$ 16,681$ 85,392$ 0%-$ -$
Public Info - Dev Related w/out active app 2%39,361$ 5,099$ 10,794$ 55,254$ 100%55,254$ 12$
Direct Hours
Capital Projects / City Projects (non-fee) 53%1,140,586$ 147,760$ 312,775$ 1,601,121$ 0%-$ -$
Private Development Review 20%424,912$ 55,046$ 116,521$ 596,479$ 100%596,479$ 127$
Total 100%2,146,968$ 278,133$ 588,749$ 3,013,851$ 28%840,042$ 179$
Direct Hours 4,704
Multi-Year Revenue Average
Description 14/15 Actual 15/16 Actual 16/17 Actual 17/18 Actual
Multi-Year
Average 18/19 Budget
Total 644,000$ 531,000$ 254,000$ 352,000$ 445,250$ 352,000$
Cost Recovery Analysis
Description Total
Average Revenue 445,250$
Targeted Amount Recoverable from Fees 840,042$
Total 53%
16147
Calculation of Fully-Burdened Hourly Rates
Building Fees
17148
City of La Quinta
User and Regulatory Fee Study
Allocation of Annual Labor Effort - Building
Name Building Official
Plans Examiner /
Insp Supervisor
Plans Examiner /
Insp Supervisor
Building
Inspector II
Building
Inspector II
Building
Inspector I
Indirect
Building 95%33%20%20%20%20%
Direct
Building 5%67%80%80%80%80%
Total [must equal 100%]100%100%100%100%100%100%
Description Building Official
Plans Examiner /
Insp Supervisor
Plans Examiner /
Insp Supervisor
Building
Inspector II
Building
Inspector II
Building
Inspector I Total
Annual Salary & Wages 100,616$ 82,381$ 74,143$ 69,590$ 63,791$ 56,827$ 447,347$
Annual Benefits 29,863$ 31,344$ 28,210$ 27,042$ 26,499$ 25,846$ 168,804$
Total 130,480$ 113,725$ 102,352$ 96,632$ 90,289$ 82,673$ 616,151$
Name Building Official
Plans Examiner /
Insp Supervisor
Plans Examiner /
Insp Supervisor
Building
Inspector II
Building
Inspector II
Building
Inspector I Total
Indirect
Building 123,956$ 37,908$ 20,470$ 19,326$ 18,058$ 16,535$ 236,253$
Direct
Building 6,524$ 75,817$ 81,882$ 77,305$ 72,231$ 66,138$ 379,898$
Total [must equal wages and benefits]130,480$ 113,725$ 102,352$ 96,632$ 90,289$ 82,673$ 616,151$
Description Building Official
Plans Examiner /
Insp Supervisor
Plans Examiner /
Insp Supervisor
Building
Inspector II
Building
Inspector II
Building
Inspector I
Add: Allocation
of Hub and Design
Add: Contract
Plan Check Total
FTE 1.00 1.00 1.00 1.00 1.00 1.00
Annual Hours 2,080 2,080 2,080 2,080 2,080 2,080
Productive Hours 1,800 1,800 1,800 1,800 1,800 1,800 1,817 1,481 14,098
18149
User and Regulatory Fee Study
Allocation of Annual Labor Effort - Building
Name Building Official
Plans Examiner /
Insp Supervisor
Plans Examiner /
Insp Supervisor
Building
Inspector II
Building
Inspector II
Building
Inspector I
Add: Allocation
of Hub and Design
Add: Contract
Plan Check Weighted Total
Indirect
General Administration and Management 70%23%10%10%10%10%45%0%22%
Certification and Training 2%2%2%2%2%2%0%0%2%
Code, Policies, and Procedures Update 15%2%1%1%1%1%0%0%3%
Public Info - Non-Dev Related 0%0%2%2%2%2%5%0%2%
Public Info - Dev Related w/out active app 8%6%5%5%5%5%20%0%7%
Direct Hours
Long-range Planning 0%0%0%0%0%0%0%0%0%
Capital Projects / City Projects (non-fee)0%0%0%0%0%0%0%0%0%
Code Enforcement and Compliance 0%2%1%1%1%1%2%0%1%
Building Prmt, Plan Rvw, Inspection 5%65%79%79%79%79%28%100%64%
Total [must equal 100%]100%100%100%100%100%100%100%100%100%
Name Building Official
Plans Examiner /
Insp Supervisor
Plans Examiner /
Insp Supervisor
Building
Inspector II
Building
Inspector II
Building
Inspector I
Add: Allocation
of Hub and Design
Add: Contract
Plan Check Total
Indirect Hours
General Administration and Management 1,260 414 180 180 180 180 818 - 3,212
Certification and Training 36 36 36 36 36 36 - - 216
Code, Policies, and Procedures Update 270 36 18 18 18 18 - - 378
Public Info - Non-Dev Related - - 36 36 36 36 91 - 235
Public Info - Dev Related w/out active app 144 108 90 90 90 90 363 - 975
Direct Hours
Long-range Planning - - - - - - - - -
Capital Projects / City Projects (non-fee)- - - - - - - - -
Code Enforcement and Compliance - 36 18 18 18 18 36 - 144
Building Prmt, Plan Rvw, Inspection 90 1,170 1,422 1,422 1,422 1,422 509 1,481 8,938
Total [must equal 100%]1,800 1,800 1,800 1,800 1,800 1,800 1,817 1,481 14,098
19150
City of La Quinta
User and Regulatory Fee Study
Calculation of Fully-Burdened Hourly Rate - Building
Labor Expenditures
Description Building Notes
Salary, Wages, and Benefits (Building) 616,151$
Salary, Wages, and Benefits (D&D Admin and Hub) 261,391$
Contract Services 200,000$
Total 1,077,541$
Divisional Budget
Description
FY 18/19
Budget Adjustment Total
Building
50 - Salaries and Benefits
Salaries and Benefits - Roll-Up 535,300$ (535,300)$ -$
60 - Contract Services
Plan Checks 324,000$ (324,000)$ -$
62 - Maintenance & Operations
Travel & Training 4,000$ -$ 4,000$
Membership Dues 700$ -$ 700$
Subscriptions & Publications 1,000$ -$ 1,000$
Operating Supplies 1,800$ -$ 1,800$
Supplies - Field 1,000$ -$ 1,000$
69 - Internal Service Charges
Information Tech Charges 58,200$ -$ 58,200$
Facility & Fleet Maintenance 48,900$ -$ 48,900$
Subtotal 974,900$ (859,300)$ 115,600$
Allocation of Unbilled Central Services
Description
Total Unbilled
Central Svc
Allocated to
Division
Allocated
Overhead
Estimated Citywide Overhead 6,076,350$ 3.6%217,615$
Indirect Support Costs Allocated from Hub and Design and Development Admin
Description Total
Non-Labor Hub and Design & Development Admin 81,563$
20151
City of La Quinta
User and Regulatory Fee Study
Calculation of Fully-Burdened Hourly Rate - Building
Total Initial Allocation
Description Total
Allocation
Share
Labor Expenditures & Contract Svc Support (Incl'dg Hub and DD Admin) 1,077,541$ 72%
Recurring Non-Labor (Including Hub and DD Admin) 197,163$ 13%
Citywide Overhead 217,615$ 15%
Total 1,492,319$ 100%
Calculation of Fully-Burdened Hourly Rate
Description Allocation Labor Non-Labor
C'wide
Overhead Total
Targeted
Recovery from
Fees
Amount
Recoverable
from Fees
Targeted
Hourly Rate
Indirect
General Administration and Management 22%239,753$ 43,869$ 48,419$ 332,041$ 96%320,203$ 36$
Certification and Training 2%16,163$ 2,957$ 3,264$ 22,385$ 96%21,587$ 2$
Code, Policies, and Procedures Update 3%28,285$ 5,176$ 5,712$ 39,173$ 96%37,777$ 4$
Public Info - Non-Dev Related 2%17,510$ 3,204$ 3,536$ 24,250$ 0%-$ -$
Public Info - Dev Related w/out active app 7%72,734$ 13,309$ 14,689$ 100,732$ 100%100,732$ 11$
Direct Hours
Long-range Planning 0%-$ -$ -$ -$ 0%-$ -$
Capital Projects 0%-$ -$ -$ -$ 0%-$ -$
Code Enforcement and Compliance 1%10,775$ 1,972$ 2,176$ 14,923$ 0%-$ -$
Building Prmt, Plan Rvw, Inspection 64%692,320$ 126,677$ 139,818$ 958,815$ 100%958,815$ 107$
Total 100%1,077,541$ 197,163$ 217,615$ 1,492,319$ 96%1,439,113$ 161$
Direct Hours 8,938
Multi-Year Revenue Average
Description 14/15 Actual 15/16 Actual 16/17 Actual 17/18 Actual
Multi-Year
Average 18/19 Budget
Total 1,184,771$ 922,960$ 874,586$ 1,113,596$ 1,023,978$ 860,000$
Cost Recovery Analysis
Description Total
Average Revenue 1,023,978$
Targeted Amount Recoverable from Fees 1,439,113$
Total 71%
21152
Calculation of Fully-Burdened Hourly Rates
Fire Prevention
22153
City of La Quinta
User and Regulatory Fee Study
Allocation of Annual Labor Effort - Fire Prevention
Name
Fire Safety
Specialist Admin Tech
Indirect
Fire 32%100%
Direct
Fire 68%0%
Total [must equal 100%]100%100%
Description
Fire Safety
Specialist Admin Tech Total
Annual Salary & Wages -$ 14,447$ 14,447$
Annual Benefits -$ 6,364$ 6,364$
Contract Svcs 153,265$ -$ 153,265$
Total 153,265$ 20,811$ 174,076$
Name
Fire Safety
Specialist Admin Tech Total
IndirectIndirect
Fire 49,045$ 20,811$ 69,856$
Direct
Fire 104,220$ -$ 104,220$
Total [must equal wages and benefits]153,265$ 20,811$ 174,076$
Description
Fire Safety
Specialist Admin Tech
Add:
Allocation of Total
FTE 1.00 0.25
Annual Hours 2,080 520
Productive Hours 1,800 450 360 2,610
23154
User and Regulatory Fee Study
Allocation of Annual Labor Effort - Fire Prevention
Name
Fire Safety
Specialist Admin Tech
Add:
Allocation of
Weighted
Total
Indirect
General Administration and Management 14%100%0%38%
Certification and Training 0%0%0%0%
Code Enforcement and Compliance (Punitive)2%0%0%1%
Code, Policies, and Procedures Update 2%0%0%1%
Public Info and Education - Non-Construction 9%0%0%3%
Public Info - Construction Related w/out active app 3%0%0%1%
Direct Hours
Construction and Occ. Related Activities 70%0%100%57%
Total [must equal 100%]100%100%100%100%
Name
Fire Safety
Specialist Admin Tech
Add:
Allocation of Total
Indirect Hours
General Administration and Management 252 450 - 702
Certification and Training - - - -
Code Enforcement and Compliance (Punitive)36 - - 36
Code, Policies, and Procedures Update 36 - - 36
Public Info and Education - Non-Construction 162 - - 162
Public Info - Construction Related w/out active app 54 - - 54
Direct Hours
Construction and Occ. Related Activities 1,260 - 360 1,620
Total [must equal 100%]1,800 450 360 2,610
24155
City of La Quinta
User and Regulatory Fee Study
Calculation of Fully-Burdened Hourly Rate - Fire Prevention
Labor Expenditures and Professional Services Expenditures
Description Fire Notes
Salary, Wages, and Benefits (Fire) 20,811$
Salary, Wages, and Benefits (D&D Admin and Hub) 35,367$
Contract Services 153,265$
Total 209,443$
Recurring Non-Labor Expenditures [c]
Description Total Adjustment Subtotal Notes
Fire
Riv Co Dept Overhead 21,457$ -$ 21,457$
Total 21,457$ -$ 21,457$
Estimated Citywide Overhead
Description Total Exp
Est. In-House
Fire Svcs Rate Total Notes
Estimated Citywide Overhead 209,443$ 17.05%35,710$
Indirect Support Costs Allocated from Hub and Design and Development Admin
Description Total
Non-Labor Hub and Design & Development Admin 11,036$
Allocation of Community Resource Admin
Description Total Alloc Share Initial Alloc OH Adjust Total Alloc
Labor 549,200$ 3%13,730$ 3,570$ 17,300$
All Other 252,400$ 0%-$ -$ -$
Total 801,600$ 13,730$ 3,570$ 17,300$
Total Initial Allocation
Description Total Allocation Share Labor Expenditures & Contract Svc Support (Incl'dg Hub and DD
Admin) 209,443$ 71%
Recurring Non-Labor (Including Hub and DD Admin) 32,493$ 11%
Citywide and Departmental Overhead 53,010$ 18%
Total 294,945$ 100%
25156
City of La Quinta
User and Regulatory Fee Study
Calculation of Fully-Burdened Hourly Rate - Fire Prevention
Calculation of Fully-Burdened Hourly Rate
Description
Allocation
[a] Labor Non-Labor C'wide Overhead Total
Targeted
Recovery from
Fees
Amount
Recoverable
from Fees
Targeted
Hourly Rate
General Administration and Management 38%79,588$ 12,347$ 20,144$ 112,079$ 94%105,451$ 65$
Certification and Training 0%-$ -$ -$ -$ 100%-$ -$
Code Enforcement and Compliance (Punitive) 1%1,396$ 217$ 353$ 1,966$ 0%-$ -$
Code, Policies, and Procedures Update 1%1,396$ 217$ 353$ 1,966$ 100%1,966$ 1$
Public Info and Education - Non-Construction 3%6,283$ 975$ 1,590$ 8,848$ 0%-$ -$
Public Info - Construction Related w/out active app 1%2,094$ 325$ 530$ 2,949$ 100%2,949$ 2$
Construction and Occ. Related Activities 57%118,684$ 18,413$ 30,039$ 167,136$ 100%167,136$ 103$
Total 100%209,443$ 32,493$ 53,010$ 294,945$ 94%277,502$ 171$
Direct Hours 1,620
Multi-Year Revenue Average
Description 17/18 Actual 18/19 Budget
Total 73,000$ 42,000$
Cost Recovery 26%15%
26157
Calculation of Fully-Burdened Hourly Rates
Code Enforcement
27158
City of La Quinta
User and Regulatory Fee Study
Calculation of Fully-Burdened Hourly Rate - Code Enforcement
Labor Expenditures
Description
Code
Enforcement Notes
Salary and Wages 478,592$
Benefits 204,590$
Total 683,182$
Divisional Budget
Description
FY 18/19
Budget Adjustment Total
Code Enforcement
50 - Salaries and Benefits
Salaries and Benefits - Roll-Up 734,000$ (734,000)$ -$
60 - Contract Services
Admin Citation Services -$ -$ -$
Veterinary Service -$ -$ -$
Professional Services 25,000$ (25,000)$ -$
Technical 2,000$ -$ 2,000$
Administrative Citation Services 30,000$ (30,000)$ -$
Vehicle Abatement 1,000$ (1,000)$ -$
Lot Cleaning 12,000$ (12,000)$ -$
Temporary Agency Services 10,000$ -$ 10,000$
Veterinary Service 15,000$ (15,000)$ -$
Animal Shelter Contract Service 190,000$ (190,000)$ -$
Admin Citation Services -$ -$ -$
62 - Maintenance & Operations
Animal Shelter -$ -$ -$
Low-Income Housing Grants 12,500$ (12,500)$ -$
Resident Assistance Program 2,000$ (2,000)$ -$
Travel & Training 3,000$ -$ 3,000$
Membership Dues 700$ -$ 700$
Office Supplies 2,000$ -$ 2,000$
Printing 10,000$ -$ 10,000$
Supplies - Field 3,000$ -$ 3,000$
Uniforms 5,000$ -$ 5,000$
69 - Internal Service Charges
Information Tech Charges 81,500$ (81,500)$ -$
Facility & Fleet Maintenance 81,500$ (81,500)$ -$
Subtotal 1,220,200$ (1,184,500)$ 35,700$
28159
City of La Quinta
User and Regulatory Fee Study
Calculation of Fully-Burdened Hourly Rate - Code Enforcement
Allocation of Central Services
Description Indirect Rate
Base
(Modified
Allocated
Overhead
Estimated Citywide Overhead 26%718,882$ 185,975$
Allocation of Community Resource Admin
Description Total Alloc Share Initial Alloc OH Adjust Total Alloc
Labor 549,200$ 20%109,840$ 28,416$ 138,256$
All Other 252,400$ 0%-$ -$ -$
Total 801,600$ 109,840$ 28,416$ 138,256$
Total Costs for Hourly Rate
Description Total
Allocation
Share
Labor 683,182$ 65%
Recurring Non-Labor 35,700$ 3%
Departmental Overhead 138,256$ 13%
Citywide Overhead 185,975$ 18%
Total 1,043,112$ 100%
Calculation of Total Productive Hours
Description
FTEs 7.00
Annual Hours Per FTE 2,080
Estimated Productive Hours Per FTE 1,800
Total Productive Hours 12,600
Calculation of Direct Hours
Description Total Costs
Total Productive Hours 12,600
Estimated Direct Hours Ratio 70%
Total Direct Hours 8,820
Calculation of Fully-Burdened Hourly Rate
Description Total Costs
Total Costs 1,043,112$
Total Direct Hours 8,820
Total 118$
29160
City of La Quinta
User and Regulatory Fee Study
Calculation of Hourly Rate - Code Enforcement: (Hourly Rate Excluding Services and Supplies and Billed ISFs: Technology and Fleet)
Labor Expenditures
Description
Code
Enforcement Notes
Salary and Wages 478,592$
Benefits 204,590$
Total 683,182$
Divisional Budget
Description
FY 18/19
Budget Adjustment Total
Code Enforcement
50 - Salaries and Benefits
Salaries and Benefits - Roll-Up 734,000$ (734,000)$ -$
60 - Contract Services
Admin Citation Services -$ -$ -$
Veterinary Service -$ -$ -$
Professional Services 25,000$ (25,000)$ -$
Technical 2,000$ (2,000)$ -$
Administrative Citation Services 30,000$ (30,000)$ -$
Vehicle Abatement 1,000$ (1,000)$ -$
Lot Cleaning 12,000$ (12,000)$ -$
Temporary Agency Services 10,000$ (10,000)$ -$
Veterinary Service 15,000$ (15,000)$ -$
Animal Shelter Contract Service 190,000$ (190,000)$ -$
Admin Citation Services -$ -$ -$
62 - Maintenance & Operations
Animal Shelter -$ -$ -$
Low-Income Housing Grants 12,500$ (12,500)$ -$
Resident Assistance Program 2,000$ (2,000)$ -$
Travel & Training 3,000$ (3,000)$ -$
Membership Dues 700$ (700)$ -$
Office Supplies 2,000$ (2,000)$ -$
Printing 10,000$ (10,000)$ -$
Supplies - Field 3,000$ (3,000)$ -$
Uniforms 5,000$ (5,000)$ -$
69 - Internal Service Charges
Information Tech Charges 81,500$ (81,500)$ -$
Facility & Fleet Maintenance 81,500$ (81,500)$ -$
Subtotal 1,220,200$ (1,220,200)$ -$
30161
City of La Quinta
User and Regulatory Fee Study
Calculation of Hourly Rate - Code Enforcement: (Hourly Rate Excluding Services and Supplies and Billed ISFs: Technology and Fleet)
Allocation of Central Services
Description Indirect Rate
Base
(Modified
Allocated
Overhead
Estimated Citywide Overhead 21%683,182$ 141,760$
Allocation of Community Resource Admin
Description Total Alloc Share Initial Alloc OH Adjust Total Alloc
Labor 549,200$ 20%109,840$ 22,792$ 132,632$
All Other 252,400$ 0%-$ -$ -$
Total 801,600$ 109,840$ 22,792$ 132,632$
Total Costs for Hourly Rate
Description Total
Allocation
Share
Labor 683,182$ 71%
Recurring Non-Labor -$ 0%
Departmental Overhead 132,632$ 14%
Citywide Overhead 141,760$ 15%
Total 957,574$ 100%
Calculation of Total Productive Hours
Description
FTEs 7.00
Annual Hours Per FTE 2,080
Estimated Productive Hours Per FTE 1,800
Total Productive Hours 12,600
Calculation of Direct Hours
Description Total Costs
Total Productive Hours 12,600
Estimated Direct Hours Ratio 70%
Total Direct Hours 8,820
Calculation of Fully-Burdened Hourly Rate
Description Total Costs
Total Costs 957,574$
Total Direct Hours 8,820
Total 109$
31162
Allocation of Labor and Costs
Design & Development Administration and The Hub
32163
City of La Quinta
User and Regulatory Fee Study
Allocation of Annual Labor Effort - Design and Development Administration and Hub Personnel
Name Director
Permit
Tech
Permit
Tech
Permit
Tech
Permit
Tech VR Lic Asst
Permit
Tech Admin Asst
Sequel
Writer Admin Asst Mgmt Asst
Mgmt
Analyst Admin Asst Mgmt Spec Exec Asst
Permit Ops
Sup
Direct Support
Building 60%25%20%
Planning 60%10%20%20%20%
Public Works - Permits and Development 25%20%
Public Works - CIP Support 20%
Fire 20%
Business License 10%5%90%
Short-Term Rentals (inc'ld license)35%95%80%
General City Hall Support 15%100%80%
Indirect Support
Building 25%32%32%32%32%10%20%13%
Planning 25%4%4%4%4%13%
Public Works - Permits and Development 25%4%4%4%4%100%60%13%
Public Works - CIP Support 25%20%13%
Fire 13%
Business License 10%10%13%
Short-Term Rentals (inc'ld license)10%10%13%
General City Hall Support 80%80%13%
Total [must equal 100%]100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
33164
User and Regulatory Fee Study
Allocation of Annual Labor Effort - Design and Development Administration and Hub Personnel
Description Director
Permit
Tech
Permit
Tech
Permit
Tech
Permit
Tech VR Lic Asst
Permit
Tech Admin Asst
Sequel
Writer Admin Asst Mgmt Asst
Mgmt
Analyst Admin Asst Mgmt Spec Exec Asst
Permit Ops
Sup Total
Annual Salary & Wages 134,835$ 59,533$ 56,827$ 38,258$ 64,945$ 65,465$ 64,945$ 40,557$ 54,665$ 46,871$ 52,762$ 77,369$ 46,351$ 75,926$ 70,582$ $ 86,654 $ 1,036,545
Annual Benefits 32,701$ 25,620$ 25,366$ 555$ 26,127$ 28,573$ 28,573$ 23,841$ 4,533$ 26,130$ 24,985$ 27,291$ 24,384$ 27,107$ 29,314$ $ 31,426 $ 386,526
Total 167,536$ 85,152$ 82,193$ 38,813$ 91,072$ 94,038$ 93,518$ 64,398$ 59,198$ 73,001$ 77,747$ 104,660$ 70,735$ 103,034$ 99,896$ 118,079$ 1,423,070$
Name Director
Permit
Tech
Permit
Tech
Permit
Tech
Permit
Tech VR Lic Asst
Permit
Tech Admin Asst
Sequel
Writer Admin Asst Mgmt Asst
Mgmt
Analyst Admin Asst Mgmt Spec Exec Asst
Permit Ops
Sup Total
Direct Support
Building -$ 51,091$ -$ 9,703$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 20,607$ -$ $ - $ 81,401
Planning -$ -$ 49,316$ 3,881$ -$ -$ -$ -$ -$ -$ -$ -$ 14,147$ 20,607$ 19,979$ $ - $ 107,930
Public Works - Permits and Development -$ -$ -$ 9,703$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 20,607$ -$ $ - $ 30,310
Public Works - CIP Support -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 20,607$ -$ $ - $ 20,607
Fire -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 20,607$ -$ $ - $ 20,607
Business License -$ -$ -$ -$ 9,107$ 4,702$ 84,166$ -$ -$ -$ -$ -$ -$ -$ -$ $ - $ 97,975
Short-Term Rentals (inc'ld license)-$ -$ -$ -$ 31,875$ 89,336$ -$ 51,519$ -$ -$ -$ -$ -$ -$ -$ $ - $ 172,730
General City Hall Support -$ -$ -$ -$ 13,661$ -$ -$ -$ 59,198$ 58,401$ -$ -$ -$ -$ -$ $ - $ 131,260
Indirect Support
Building 41,884$ 27,249$ 26,302$ 12,420$ 29,143$ -$ -$ -$ -$ 7,300$ -$ 20,932$ -$ -$ -$ 14,760$ $ 179,989
Planning 41,884$ 3,406$ 3,288$ 1,553$ 3,643$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 14,760$ $ 68,533
Public Works - Permits and Development 41,884$ 3,406$ 3,288$ 1,553$ 3,643$ -$ -$ -$ -$ -$ 77,747$ 62,796$ -$ -$ -$ 14,760$ $ 209,077
Public Works - CIP Support 41,884$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 20,932$ -$ -$ -$ 14,760$ $ 77,576
Fire -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 14,760$ $ 14,760
Business License -$ -$ -$ -$ -$ -$ -$ 6,440$ -$ 7,300$ -$ -$ -$ -$ -$ 14,760$ $ 28,500
Short-Term Rentals (inc'ld license)-$ -$ -$ -$ -$ -$ 9,352$ 6,440$ -$ -$ -$ -$ -$ -$ -$ 14,760$ $ 30,552
General City Hall Support -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 56,588$ -$ 79,916$ 14,760$ $ 151,265
Total [must equal wages and benefits]167,536$ 85,152$ 82,193$ 38,813$ 91,072$ 94,038$ 93,518$ 64,398$ 59,198$ 73,001$ 77,747$ 104,660$ 70,735$ 103,034$ 99,896$ 118,079$ 1,423,070$
34165
User and Regulatory Fee Study
Allocation of Annual Labor Effort - Design and Development Administration and Hub Personnel
Description Director
Permit
Tech
Permit
Tech
Permit
Tech
Permit
Tech VR Lic Asst
Permit
Tech Admin Asst
Sequel
Writer Admin Asst Mgmt Asst
Mgmt
Analyst Admin Asst Mgmt Spec Exec Asst
Permit Ops
Sup
FTE 1.00 1.00 1.00 0.73 1.00 1.00 1.00 1.00 0.73 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Annual Hours 2,080 2,080 2,080 1,508 2,080 2,080 2,080 2,080 1,508 2,080 2,080 2,080 2,080 2,080 2,080 2,080
Productive Hours 1,800 1,800 1,800 1,508 1,800 1,800 1,800 1,800 1,508 1,800 1,800 1,800 1,800 1,800 1,800 1,800
Name Director
Permit
Tech
Permit
Tech
Permit
Tech
Permit
Tech VR Lic Asst
Permit
Tech Admin Asst
Sequel
Writer Admin Asst Mgmt Asst
Mgmt
Analyst Admin Asst Mgmt Spec Exec Asst
Permit Ops
Sup Total
Direct Support
Building - 1,080 - 377 - - - - - - - - - 360 - - 1,817
Planning - - 1,080 151 - - - - - - - - 360 360 360 - 2,311
Public Works - Permits and Development - - - 377 - - - - - - - - - 360 - - 737
Public Works - CIP Support - - - - - - - - - - - - - 360 - - 360
Fire - - - - - - - - - - - - - 360 - - 360
Business License - - - - 180 90 1,620 - - - - - - - - - 1,890
Short-Term Rentals (inc'ld license)- - - - 630 1,710 - 1,440 - - - - - - - - 3,780
General City Hall Support - - - - 270 - - - 1,508 1,440 - - - - - - 3,218
Indirect Support
Building 450 576 576 483 576 - - - - 180 - 360 - - - 225 3,426
Planning 450 72 72 60 72 - - - - - - - - - - 225 951
Public Works - Permits and Development 450 72 72 60 72 - - - - - 1,800 1,080 - - - 225 3,831
Public Works - CIP Support 450 - - - - - - - - - - 360 - - - 225 1,035
Fire - - - - - - - - - - - - - - - 225 225
Business License - - - - - - - 180 - 180 - - - - - 225 585
Short-Term Rentals (inc'ld license)- - - - - - 180 180 - - - - - - - 225 585
General City Hall Support - - - - - - - - - - - - 1,440 - 1,440 225 3,105
Total [must equal productive hours]1,800 1,800 1,800 1,508 1,800 1,800 1,800 1,800 1,508 1,800 1,800 1,800 1,800 1,800 1,800 1,800 28,216
35166
City of La Quinta
User and Regulatory Fee Study
Allocation of Divisional Costs - Design and Development Administration and Hub
Labor Expenditures
Description Bldg Notes
Salary and Wages 1,036,545$
Benefits 386,526$
Total 1,423,070$
Divisional Budget
Description
FY 18/19
Budget Adjustment Total
The Hub
50 - Salaries and Benefits
Salaries and Benefits - Roll-Up 644,800 (644,800) -
60 - Contract Services
Professional Services 5,000 (5,000) -
Consultants 10,000 (10,000) -
Temporary Agency Services 5,700 (5,700) -
62 - Maintenance & Operations
Community Special Events 1,000 (1,000) -
Travel & Training 9,600 - 9,600
Membership Dues 500 - 500
Subscriptions & Publications 1,000 - 1,000
Operating Supplies 7,000 - 7,000
69 - Internal Service Charges
Information Tech Charges 64,100 (64,100) -
Facility & Fleet Maintenance - - -
Subtotal 748,700 (730,600) 18,100
36167
City of La Quinta
User and Regulatory Fee Study
Allocation of Divisional Costs - Design and Development Administration and Hub
Divisional Budget
Description
FY 18/19
Budget Adjustment Total
Design & Development Administration
50 - Salaries and Benefits
Salaries and Benefits - Roll-Up 861,900 (861,900) -
60 - Contract Services
Subscriptions & Publications - - -
Professional Services 125,000 (125,000) -
Consultants 65,000 (65,000) -
Temporary Agency Services - - -
62 - Maintenance & Operations
Administration 15,300 - 15,300
Travel & Training 6,600 - 6,600
Membership Dues 1,000 - 1,000
Subscriptions & Publications 500 - 500
Office Supplies 11,000 - 11,000
Printing 1,000 - 1,000
Operating Supplies - - -
Advertising 6,800 - 6,800
69 - Internal Service Charges
Information Tech Charges 99,000 (99,000) -
Facility & Fleet Maintenance 65,200 (65,200) -
Subtotal 1,258,300 (1,216,100) 42,200
Allocation of Central Services
Description Indirect Rate
Base
(Modified
Direct Costs)
Allocated
Overhead
Estimated Citywide Overhead 26%1,483,370$ 383,748$
Total Initial Allocation
Description Total
Allocation
Share
Labor Expenditures 1,423,070$ 76%
Recurring Non-Labor 60,300$ 3%
Citywide Overhead 383,748$ 21%
Total 1,867,118$ 100%
37168
City of La Quinta
User and Regulatory Fee Study
Allocation of Costs - Design and Development Administration and Hub Personnel
Name Labor
Recurring Svcs
& Supplies
Allocation of
Central Svcs Total
Direct Support
Building 81,401$ 3,449$ 21,951$ 106,801$
Planning 107,930$ 4,573$ 29,105$ 141,608$
Public Works - Permits and Development 30,310$ 1,284$ 8,173$ 39,768$
Public Works - CIP Support 20,607$ 873$ 5,557$ 27,037$
Fire 20,607$ 873$ 5,557$ 27,037$
Business License 97,975$ 4,152$ 26,420$ 128,547$
Short-Term Rentals (inc'ld license)172,730$ 7,319$ 46,579$ 226,628$
General City Hall Support 131,260$ 5,562$ 35,396$ 172,217$
Indirect Support
Building 179,989$ 7,627$ 48,536$ 236,153$
Planning 68,533$ 2,904$ 18,481$ 89,918$
Public Works - Permits and Development 209,077$ 8,859$ 56,380$ 274,316$
Public Works - CIP Support 77,576$ 3,287$ 20,919$ 101,782$
Fire 14,760$ 625$ 3,980$ 19,366$
Business License 28,500$ 1,208$ 7,685$ 37,393$
Short-Term Rentals (inc'ld license)30,552$ 1,295$ 8,239$ 40,085$
General City Hall Support 151,265$ 6,410$ 40,790$ 198,464$
Total 1,423,070$ 60,300$ 383,748$ 1,867,118$
38169
Calculation of the Costs of Providing Fee Related Services
39170
Calculation of the Costs of Providing Fee Related Services
Building
40171
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - Mechanical, Plumbing, and Electrical Permits
Cost of Service Calculation - At Fully-Burdened Hourly Rate
Labor Time (Minutes)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Fully-
Burdened
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit Issuance
1 Permit Issuance (Mechanical, Plumbing, Electrical)38 38 x 161$ =101.97$ -$ 101.97$ 101.40$ -$ 101.40$ 99%99%
Mechanical
2 Installation or relocation of each forced-air or gravity-type furnace or burner,
including ducts and vents attached to such appliance
15 10 25 x 161$ =40.25$ 26.83$ 67.09$ 40.02$ 26.68$ 66.71$ 99%99%99%
3 Installation or relocation of each suspended heater, recessed wall heater, or
floor-mounted unit heater
10 5 15 x 161$ =26.83$ 13.42$ 40.25$ 26.68$ 13.34$ 40.02$ 99%99%99%
4 Repair of, alteration of, or addition to each heating appliance, refrigeration
unit, cooling unit, absorption unit, or each heating, cooling, absorption, or
evaporative cooling system, including installation of controls regulated by the
UMC
5 2 7 x 161$ =13.42$ 5.37$ 18.78$ 13.34$ 5.34$ 18.68$ 99%99%99%
5 Installation or relocation of each boiler, condenser, compressor, or each
absorption system
15 10 25 x 161$ =40.25$ 26.83$ 67.09$ 40.02$ 26.68$ 66.71$ 99%99%99%
6 Air-handling unit, including attached ducts 15 5 20 x 161$ =40.25$ 13.42$ 53.67$ 40.02$ 13.34$ 53.37$ 99%99%99%
7 Evaporative cooler, other than portable-type 5 5 10 x 161$ =13.42$ 13.42$ 26.83$ 13.34$ 13.34$ 26.68$ 99%99%99%
8 Ventilation fan connected to a single-duct 5 2 7 x 161$ =13.42$ 5.37$ 18.78$ 13.34$ 5.34$ 18.68$ 99%99%99%
9 Installation of each hood which is served by mechanical exhaust, including the
ducts for such hood
5 2 7 x 161$ =13.42$ 5.37$ 18.78$ 13.34$ 5.34$ 18.68$ 99%99%99%
10 Each appliance or piece of equipment not classified in other appliance
categories, or for which no other fee is listed
15 15 30 x 161$ =40.25$ 40.25$ 80.50$ 40.02$ 40.02$ 80.05$ 99%99%99%
Mechanical Change-Out
11 Condenser Only 15 10 25 x 161$ =40.25$ 26.83$ 67.09$ 40.02$ 26.68$ 66.71$ 99%99%99%
12 Furnace Only 15 10 25 x 161$ =40.25$ 26.83$ 67.09$ 40.02$ 26.68$ 66.71$ 99%99%99%
13 Other Equipment 15 15 30 x 161$ =40.25$ 40.25$ 80.50$ 40.02$ 40.02$ 80.05$ 99%99%99%
14 Packaged Unit 15 10 25 x 161$ =40.25$ 26.83$ 67.09$ 40.02$ 26.68$ 66.71$ 99%99%99%
15 Repair / Alteration 5 2 7 x 161$ =13.42$ 5.37$ 18.78$ 13.34$ 5.34$ 18.68$ 99%99%99%
16 Split-System 15 30 45 x 161$ =40.25$ 80.50$ 120.75$ 40.02$ 80.05$ 120.07$ 99%99%99%
Plumbing
17 Each plumbing fixture or trap or set of fixtures on one trap (including water,
drainage piping, and backflow protection)
5 5 10 x 161$ =13.42$ 13.42$ 26.83$ 13.34$ 13.34$ 26.68$ 99%99%99%
18 Sewer Connection / Septic Abandonment 10 7 17 x 161$ =26.83$ 18.78$ 45.62$ 26.68$ 18.68$ 45.36$ 99%99%99%
19 Rainwater systems, per drain (inside building)5 5 10 x 161$ =13.42$ 13.42$ 26.83$ 13.34$ 13.34$ 26.68$ 99%99%99%
20 Water heater and/or vent 5 3 8 x 161$ =13.42$ 8.05$ 21.47$ 13.34$ 8.00$ 21.35$ 99%99%99%
21 Industrial waste pretreatment interceptor including its trap and vent, excepting
kitchen-type grease interceptors functioning as fixture traps
15 5 20 x 161$ =40.25$ 13.42$ 53.67$ 40.02$ 13.34$ 53.37$ 99%99%99%
22 Installation, alteration, or repair of water piping and/or water-treating
equipment, drainage or vent piping, each fixture
5 5 10 x 161 =13.42$ 13.42$ 26.83$ 13.34$ 13.34$ 26.68$ 99%99%99%
41172
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - Mechanical, Plumbing, and Electrical Permits
Cost of Service Calculation - At Fully-Burdened Hourly Rate
Labor Time (Minutes)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Fully-
Burdened
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
23 Backflow protective device other than atmospheric-type vacuum breakers 5 2 7 x 161$ =13.42$ 5.37$ 18.78$ 13.34$ 5.34$ 18.68$ 99%99%99%
24 Gas piping system - 1 to 4 outlets 5 10 15 x 161$ =13.42$ 26.83$ 40.25$ 13.34$ 26.68$ 40.02$ 99%99%99%
25 Gas piping system - 5 or more outlets 15 10 25 x 161$ =40.25$ 26.83$ 67.09$ 40.02$ 26.68$ 66.71$ 99%99%99%
26 Solar (Thermal)10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
Electrical
New Construction
27 Residential - First 1,000 SF
(includes livable and non-livable SF)
60 20 80 x 161$ =161.01$ 53.13$ 214.14$ $ 160.10 52.83$ 212.93$ 99%99%99%
28 Residential - Each Additional 1,000 SF
(includes livable and non-livable SF)
5 2 7 x 161$ =13.69$ 5.64$ 19.32$ $ 13.61 5.60$ 19.21$ 99%99%99%
29 Non-Residential - First 2,000 SF 45 35 80 x 161$ =120.75$ 93.38$ 214.14$ $ 120.07 92.86$ 212.93$ 99%99%99%
30 Non-Residential - Each Additional 2,000 SF 15 4 19 x 161$ =40.25$ 10.73$ 50.99$ $ 40.02 10.67$ 50.70$ 99%99%99%
Solar (Photovoltaic)
31 Solar (PV) Less than 10kW 10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
32 Solar (PV) Greater than 10kW 15 15 30 x 161$ =40.25$ 40.25$ 80.50$ 40.02$ 40.02$ 80.05$ 99%99%99%
33 Each Additional String (<20)1 0.25 1 x 161$ =2.68$ 0.67$ 3.35$ 2.67$ 0.67$ 3.34$ 99%99%99%
Receptacle, Switch, and Lighting Outlets
34 Receptacle, switch, lighting, or other outlets at which current is used or
controlled, except services, feeders, and meters - first 20
10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
35 Receptacle, switch, lighting, or other outlets at which current is used or
controlled, except services, feeders, and meters - each additional
1 0.25 1 x 161$ =2.68$ 0.67$ 3.35$ 2.67$ 0.67$ 3.34$ 99%99%99%
Lighting Fixtures
36 Lighting fixtures, sockets, or other lamp-holding devices - first 20 10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
37 Lighting fixtures, sockets, or other lamp-holding devices - each add'l 1 0 1 x 161$ =2.68$ 0.67$ 3.35$ 2.67$ 0.67$ 3.34$ 99%99%99%
38 Pole or platform-mounted light replacement, repair or alteration - first 10 10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
39 Pole or platform-mounted light replacement, repair or alteration - each
additional
1 0.25 1 x 161$ =2.68$ 0.67$ 3.35$ 2.67$ 0.67$ 3.34$ 99%99%99%
Residential Appliances
40 Fixed residential appliances or receptacle outlets for same, including wall-
mounted electric ovens; counter-mounted cooking tops; electric ranges; self-
contained room, console, or through-wall air conditioners; space heaters; food
waste grinders; dishwashers; washing machines; water heaters; clothes dryers;
or other motor-operated appliances not exceeding one horsepower (HP) in
rating, each
5 5 10 x 161 =13.42$ 13.42$ 26.83$ 13.34$ 13.34$ 26.68$ 99%99%99%
42173
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - Mechanical, Plumbing, and Electrical Permits
Cost of Service Calculation - At Fully-Burdened Hourly Rate
Labor Time (Minutes)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Fully-
Burdened
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Non-Residential Appliances
41 Residential appliances and self-contained, factory-wired, non-residential
appliances not exceeding one horsepower (HP), kilowatt (KW) , or kilovolt
ampere (KVA) in rating, including medical and dental devices; food, beverage,
and ice cream cabinets; illuminated show cases; drinking fountains; vending
machines; laundry machines; or other similar types of equipment, each
10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
Power Apparatus
42 Motors, generators, transformers, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking or
baking equipment, and other apparatus, each
10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
Signs, Outline Lighting, and Marquees
43 Signs, outline lighting systems, or marquees, each 15 20 35 x 161$ =40.25$ 53.67$ 93.92$ 40.02$ 53.37$ 93.39$ 99%99%99%
Services
44 Services, each 10 5 15 x 161$ =26.83$ 13.42$ 40.25$ 26.68$ 13.34$ 40.02$ 99%99%99%
Temporary Power Services
45 Temporary service power pole or pedestal, including all pole or pedestal-
mounted receptacle outlets and appurtenances, each
10 7 17 x 161$ =26.83$ 18.78$ 45.62$ 26.68$ 18.68$ 45.36$ 99%99%99%
Miscellaneous Apparatus, Conduits, and Conductors
46 Electrical apparatus, conduits, and conductors for which a permit is required,
but for which no fee is identified
10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
43174
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - Mechanical, Plumbing, and Electrical Permits
Cost of Service Calculation - At Targeted Hourly Rate
Labor Time (Minutes)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Targeted
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit Issuance
1 Permit Issuance (Mechanical, Plumbing, Electrical)38 38 x 161$ =101.97$ -$ 101.97$ 101.40$ -$ 101.40$ 99%99%
Mechanical
2 Installation or relocation of each forced-air or gravity-type furnace or burner,
including ducts and vents attached to such appliance
15 10 25 x 161$ =40.25$ 26.83$ 67.08$ 40.02$ 26.68$ 66.71$ 99%99%99%
3 Installation or relocation of each suspended heater, recessed wall heater, or
floor-mounted unit heater
10 5 15 x 161$ =26.83$ 13.42$ 40.25$ 26.68$ 13.34$ 40.02$ 99%99%99%
4 Repair of, alteration of, or addition to each heating appliance, refrigeration
unit, cooling unit, absorption unit, or each heating, cooling, absorption, or
evaporative cooling system, including installation of controls regulated by the
UMC
5 2 7 x 161$ =13.42$ 5.37$ 18.78$ 13.34$ 5.34$ 18.68$ 99%99%99%
5 Installation or relocation of each boiler, condenser, compressor, or each
absorption system
15 10 25 x 161$ =40.25$ 26.83$ 67.08$ 40.02$ 26.68$ 66.71$ 99%99%99%
6 Air-handling unit, including attached ducts 15 5 20 x 161$ =40.25$ 13.42$ 53.67$ 40.02$ 13.34$ 53.37$ 99%99%99%
7 Evaporative cooler, other than portable-type 5 5 10 x 161$ =13.42$ 13.42$ 26.83$ 13.34$ 13.34$ 26.68$ 99%99%99%
8 Ventilation fan connected to a single-duct 5 2 7 x 161$ =13.42$ 5.37$ 18.78$ 13.34$ 5.34$ 18.68$ 99%99%99%
9 Installation of each hood which is served by mechanical exhaust, including the
ducts for such hood
5 2 7 x 161$ =13.42$ 5.37$ 18.78$ 13.34$ 5.34$ 18.68$ 99%99%99%
10 Each appliance or piece of equipment not classified in other appliance
categories, or for which no other fee is listed
15 15 30 x 161$ =40.25$ 40.25$ 80.50$ 40.02$ 40.02$ 80.05$ 99%99%99%
Mechanical Change-Out
11 Condenser Only 15 10 25 x 161$ =40.25$ 26.83$ 67.08$ 40.02$ 26.68$ 66.71$ 99%99%99%
12 Furnace Only 15 10 25 x 161$ =40.25$ 26.83$ 67.08$ 40.02$ 26.68$ 66.71$ 99%99%99%
13 Other Equipment 15 15 30 x 161$ =40.25$ 40.25$ 80.50$ 40.02$ 40.02$ 80.05$ 99%99%99%
14 Packaged Unit 15 10 25 x 161$ =40.25$ 26.83$ 67.08$ 40.02$ 26.68$ 66.71$ 99%99%99%
15 Repair / Alteration 5 2 7 x 161$ =13.42$ 5.37$ 18.78$ 13.34$ 5.34$ 18.68$ 99%99%99%
16 Split-System 15 30 45 x 161$ =40.25$ 80.50$ 120.75$ 40.02$ 80.05$ 120.07$ 99%99%99%
Plumbing
17 Each plumbing fixture or trap or set of fixtures on one trap (including water,
drainage piping, and backflow protection)
5 5 10 x 161$ =13.42$ 13.42$ 26.83$ 13.34$ 13.34$ 26.68$ 99%99%99%
18 Sewer Connection / Septic Abandonment 10 7 17 x 161$ =26.83$ 18.78$ 45.62$ 26.68$ 18.68$ 45.36$ 48%68%56%
19 Rainwater systems, per drain (inside building)5 5 10 x 161$ =13.42$ 13.42$ 26.83$ 13.34$ 13.34$ 26.68$ 99%99%99%
20 Water heater and/or vent 5 3 8 x 161$ =13.42$ 8.05$ 21.47$ 13.34$ 8.00$ 21.35$ 99%99%99%
21 Industrial waste pretreatment interceptor including its trap and vent, excepting
kitchen-type grease interceptors functioning as fixture traps
15 5 20 x 161$ =40.25$ 13.42$ 53.67$ 40.02$ 13.34$ 53.37$ 99%99%99%
22 Installation, alteration, or repair of water piping and/or water-treating
equipment, drainage or vent piping, each fixture
5 5 10 x 161$ =13.42$ 13.42$ 26.83$ 13.34$ 13.34$ 26.68$ 99%99%99%
44175
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - Mechanical, Plumbing, and Electrical Permits
Cost of Service Calculation - At Targeted Hourly Rate
Labor Time (Minutes)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Targeted
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
23 Backflow protective device other than atmospheric-type vacuum breakers 5 2 7 x 161$ =13.42$ 5.37$ 18.78$ 13.34$ 5.34$ 18.68$ 99%99%99%
24 Gas piping system - 1 to 4 outlets 5 10 15 x 161$ =13.42$ 26.83$ 40.25$ 13.34$ 26.68$ 40.02$ 99%99%99%
25 Gas piping system - 5 or more outlets 15 10 25 x 161$ =40.25$ 26.83$ 67.08$ 40.02$ 26.68$ 66.71$ 99%99%99%
26 Solar (Thermal)10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
Electrical
New Construction
27 Residential - First 1,000 SF
(includes livable and non-livable SF)
60 20 80 x 161$ =161.00$ 53.13$ 214.13$ $ 160.10 52.83$ 212.93$ 99%99%99%
28 Residential - Each Additional 1,000 SF
(includes livable and non-livable SF)
5 2 7 x 161$ =13.69$ 5.64$ 19.32$ $ 13.61 5.60$ 19.21$ 99%99%99%
29 Non-Residential - First 2,000 SF 45 35 80 x 161$ =120.75$ 93.38$ 214.13$ $ 120.07 92.86$ 212.93$ 99%99%99%
30 Non-Residential - Each Additional 2,000 SF 15 4 19 x 161$ =40.25$ 10.73$ 50.98$ $ 40.02 10.67$ 50.70$ 99%99%99%
Solar (Photovoltaic)
31 Solar (PV) Less than 10kW 10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
32 Solar (PV) Greater than 10kW 15 15 30 x 161$ =40.25$ 40.25$ 80.50$ 40.02$ 40.02$ 80.05$ 99%99%99%
33 Each Additional String (<20)1 0.25 1 x 161$ =2.68$ 0.67$ 3.35$ 2.67$ 0.67$ 3.34$ 99%99%99%
Receptacle, Switch, and Lighting Outlets
34 Receptacle, switch, lighting, or other outlets at which current is used or
controlled, except services, feeders, and meters - first 20
10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
35 Receptacle, switch, lighting, or other outlets at which current is used or
controlled, except services, feeders, and meters - each additional
1 0.25 1 x 161$ =2.68$ 0.67$ 3.35$ 2.67$ 0.67$ 3.34$ 99%99%99%
Lighting Fixtures
36 Lighting fixtures, sockets, or other lamp-holding devices - first 20 10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
37 Lighting fixtures, sockets, or other lamp-holding devices - each add'l 1 0 1 x 161$ =2.68$ 0.67$ 3.35$ 2.67$ 0.67$ 3.34$ 99%99%99%
38 Pole or platform-mounted light replacement, repair or alteration - first 10 10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
39 Pole or platform-mounted light replacement, repair or alteration - each
additional
1 0.25 1.25 x 161$ =2.68$ 0.67$ 3.35$ 2.67$ 0.67$ 3.34$ 99%99%99%
Residential Appliances
40 Fixed residential appliances or receptacle outlets for same, including wall-
mounted electric ovens; counter-mounted cooking tops; electric ranges; self-
contained room, console, or through-wall air conditioners; space heaters; food
waste grinders; dishwashers; washing machines; water heaters; clothes dryers;
or other motor-operated appliances not exceeding one horsepower (HP) in
rating, each
5 5 10 x 161$ =13.42$ 13.42$ 26.83$ 13.34$ 13.34$ 26.68$ 99%99%99%
45176
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - Mechanical, Plumbing, and Electrical Permits
Cost of Service Calculation - At Targeted Hourly Rate
Labor Time (Minutes)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Targeted
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Non-Residential Appliances
41 Residential appliances and self-contained, factory-wired, non-residential
appliances not exceeding one horsepower (HP), kilowatt (KW) , or kilovolt
ampere (KVA) in rating, including medical and dental devices; food, beverage,
and ice cream cabinets; illuminated show cases; drinking fountains; vending
machines; laundry machines; or other similar types of equipment, each
10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
Power Apparatus
42 Motors, generators, transformers, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking or
baking equipment, and other apparatus, each
10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
Signs, Outline Lighting, and Marquees
43 Signs, outline lighting systems, or marquees, each 15 20 35 x 161$ =40.25$ 53.67$ 93.92$ 40.02$ 53.37$ 93.39$ 99%99%99%
Services
44 Services, each 10 5 15 x 161$ =26.83$ 13.42$ 40.25$ 26.68$ 13.34$ 40.02$ 99%99%99%
Temporary Power Services
45 Temporary service power pole or pedestal, including all pole or pedestal-
mounted receptacle outlets and appurtenances, each
10 7 17 x 161$ =26.83$ 18.78$ 45.62$ 26.68$ 18.68$ 45.36$ 99%99%99%
Miscellaneous Apparatus, Conduits, and Conductors
46 Electrical apparatus, conduits, and conductors for which a permit is required,
but for which no fee is identified
10 10 20 x 161$ =26.83$ 26.83$ 53.67$ 26.68$ 26.68$ 53.37$ 99%99%99%
46177
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - Miscellaneous Items
Cost of Service Calculation - At Fully-Burdened Hourly Rate
Labor Time (Minutes)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Fully-
Burdened
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Addition
1 Residential Addition
a) Residential Addition - Up to 100 SF 50 71 121 x 161$ =135.25$ 189.99$ 325.23$ 134.48$ 188.92$ 323.40$ 99%99%99%
b) Residential Addition - Each Additional 500 SF 26 7 33 x 161$ =69.23$ 19.32$ 88.55$ 68.84$ 19.21$ 88.05$ 99%99%99%
c) Structural Review varies varies varies x 161$ =bill hourly (1 hour min.)varies varies varies
2 Non-Residential Addition
a) Non-Residential Addition - Up to 100 SF 58 81 139 x 161$ =155.53$ 218.49$ 374.02$ 134.48$ 188.92$ 323.40$ 86%86%86%
b) Non-Residential Addition - Each Additional 500 SF 30 8 38 x 161$ =79.62$ 22.22$ 101.84$ 68.84$ 19.21$ 88.05$ 86%86%86%
c) Structural Review varies varies varies x 161$ =bill hourly (1 hour min.)varies varies varies
Antenna
3 Dish > 2 Ft 15 55 70 x 161$ =40.25$ 148.13$ 188.38$ 40.02$ 147.29$ 187.31$ 99%99%99%
4 Cellular/Mobile Phone 60 85 145 x 161$ =161.01$ 228.63$ 389.64$ 160.10$ 227.34$ 387.44$ 99%99%99%
5 Equipment Shelter 15 40 55 x 161$ =40.25$ 107.87$ 148.13$ 40.02$ 107.27$ 147.29$ 99%99%99%
Appeal
6 Appeal varies varies - x 161$ =bill hourly (1 hour min.)Bill Hourly 99%
Awning/Canopy (Supported by Building)
7 Awning/Canopy 6 85 91 x 161$ =16.10$ 228.63$ 244.73$ 16.01$ 227.34$ 243.35$ 99%99%99%
Balcony Addition
8 Balcony Addition 60 70 130 x 161$ =161.01$ 188.38$ 349.38$ 160.10$ 187.31$ 347.41$ 99%99%99%
Block Wall
9 Block Wall - First 100 LF 20 25 45 x 161$ =53.67$ 67.09$ 120.75$ 53.37$ 66.71$ 120.07$ 99%99%99%
10 Block Wall - Each Addt'l 50 LF 6 6 x 161$ =16.10$ -$ 16.10$ 16.01$ -$ 16.01$ 99%99%
11 Retaining / Combination Wall - Each 50 LF 6 6 x 161$ =16.10$ -$ 16.10$ 16.01$ -$ 16.01$ 99%99%
Carport
12 Carport - First 30 40 70 x 161$ =80.50$ 107.87$ 188.38$ 80.05$ 107.27$ 187.31$ 99%99%99%
13 Carport - Each Additional 30 16 46 x 161$ =80.50$ 42.94$ 123.44$ 80.05$ 42.69$ 122.74$ 99%99%99%
Compliance Survey/Special Inspection
14 Compliance Survey/Special Inspection 30 75 105 x 161$ =80.50$ 201.26$ 281.76$ 80.05$ 200.12$ 280.17$ 99%99%99%
Demolition
15 Demolition 10 36 46 x 161$ =27.37$ 96.60$ 123.97$ 27.22$ 96.06$ 123.28$ 99%99%99%
16 Demolition - Interior 15 40 55 x 161$ =40.25$ 107.87$ 148.13$ 40.02$ 107.27$ 147.29$ 99%99%99%
17 Demolition - Exterior 15 45 60 x 161$ =40.25$ 120.75$ 161.01$ 40.02$ 120.07$ 160.10$ 99%99%99%
Fence
18 Fence - First 100 LF 20 25 45 x 161$ =53.13$ 67.62$ 120.75$ 52.83$ 67.24$ 120.07$ 99%99%99%
19 Fence - Each Additional 50 LF 6 6 x 161$ =16.10$ -$ 16.10$ 16.01$ -$ 16.01$ 99%99%
Fireplace
20 Fireplace 60 90 150 x 161$ =161.01$ 241.51$ 402.52$ 160.10$ 240.15$ 400.25$ 99%99%99%
Flag/Lighting Pole
21 Flag/Lighting Pole - First 15 40 55 x 161$ =40.25$ 107.87$ 148.13$ 40.02$ 107.27$ 147.29$ 99%99%99%
22 Flag/Lighting Pole - Each Additional 6 2 8 x 161$ =16.10$ 4.83$ 20.93$ 16.01$ 4.80$ 20.81$ 99%99%99%
47178
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - Miscellaneous Items
Cost of Service Calculation - At Fully-Burdened Hourly Rate
Labor Time (Minutes)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Fully-
Burdened
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Grading
23 Residential Precise Grading (Tract Homes) - Per Home 55 see note 55 x varies 159.90$ see note 159.90$ 147.29$ see note 147.29$ 92%see note varies
24 Residential Precise Grading (Custom Home) - Lot <= 7,000 SF 15 15 30 x 161$ 40.25$ 40.25$ 80.50$ 40.02$ 40.02$ 80.05$ 99%99%99%
25 Residential Precise Grading (Custom Home) - Lot > 7,000 SF 15 75 90 x varies =40.25$ 218.83$ 259.08$ 40.02$ 200.12$ 240.15$ 99%91%93%
Partition
26 Partition 30 55 85 x 161$ =80.50$ 148.13$ 228.63$ 80.05$ 147.29$ 227.34$ 99%99%99%
Patio Cover / Covered Porch / Lattice
27 Standard, Open, Pre-Engineered (First)40 40 80 x 161$ =107.87$ 106.26$ 214.14$ 107.27$ 105.66$ 212.93$ 99%99%99%
28 Standard, Enclosed, Pre-Engineered (First)40 55 95 x 161$ =107.87$ 146.52$ 254.39$ 107.27$ 145.69$ 252.95$ 99%99%99%
29 Special Design (First)55 70 125 x 161$ =148.13$ 186.77$ 334.89$ 147.29$ 185.71$ 333.00$ 99%99%99%
30 Each Additional 20 15 35 x 161$ =53.67$ 40.25$ 93.92$ 53.37$ 40.02$ 93.39$ 99%99%99%
Pool / Spa
31 Swimming Pool / Spa 75 41 116 x 161$ =201.26$ 109.48$ 310.74$ 200.12$ 108.87$ 308.99$ 99%99%99%
32 Detached Spa / Water Feature 75 75 x 161$ =201.26$ -$ 201.26$ 200.12$ -$ 200.12$ 99%99%
33 Gunite Alteration / Resurfacing 75 41 116 x 161$ =201.26$ 109.48$ 310.74$ 200.12$ 108.87$ 308.99$ 99%99%99%
34 Equipment Change-out Alone 10 38 48 x 161$ =26.83$ 101.97$ 128.81$ 26.68$ 101.40$ 128.08$ 99%99%99%
Remodel
35 Non-Structural Review - Up to 100 SF 20 56 76 x 161$ =54.74$ 149.74$ 204.48$ 54.43$ 148.89$ 203.32$ 99%99%99%
36 Non-Structural Review - Each Additional 500 SF 9 7 16 x 161$ =24.15$ 19.32$ 43.47$ 24.01$ 19.21$ 43.23$ 99%99%99%
37 Structural Review varies varies varies x 161$ =bill hourly (1 hour min.)varies varies varies
Replacement of Plans/Job Card
38 Replacement of Job Copy of Approved Plans 85 85 x 161$ =-$ 228.63$ 228.63$ -$ 227.34$ 227.34$ 99%99%
39 Replacement of Inspection Record Card 15 15 x 161$ =-$ 40.25$ 40.25$ -$ 40.02$ 40.02$ 99%99%
Re-Roof
40 Re-Roof - Up to 2,000 SF 20 41 61 x 161$ =54.74$ 109.48$ 164.23$ 54.43$ 108.87$ 163.30$ 99%99%99%
41 Re-Roof - Each Additional 1,000 SF 5 5 x 161$ =12.88$ -$ 12.88$ 12.81$ -$ 12.81$ 99%99%
Sign
42 Monument Sign - First 30 55 85 x 161$ =80.50$ 148.13$ 228.63$ 80.05$ 147.29$ 227.34$ 99%99%99%
43 Monument Sign - Each Additional 10 10 x 161$ =27.37$ -$ 27.37$ 27.22$ -$ 27.22$ 99%99%
44 Wall/Awning Sign - First 10 36 46 x 161$ =27.37$ 96.60$ 123.97$ 27.22$ 96.06$ 123.28$ 99%99%99%
45 Wall/Awning Sign - Each Additional 10 10 20 x 161$ =27.37$ 27.37$ 54.74$ 27.22$ 27.22$ 54.43$ 99%99%99%
Storage Racks
46 Storage Racks - First 100 LF 10 40 50 x 161$ =27.37$ 106.26$ 133.64$ 27.22$ 105.66$ 132.88$ 99%99%99%
47 Storage Racks - Each Additional 100 LF 5 5 x 161$ =12.88$ -$ 12.88$ 12.81$ -$ 12.81$ 99%99%
Stucco Application
48 Stucco Application - First 500 SF 10 31 41 x 161$ =27.37$ 82.11$ 109.48$ 27.22$ 81.65$ 108.87$ 99%99%99%
49 Stucco Application - Each Additional 500 SF 3 3 x 161$ =8.05$ -$ 8.05$ 8.00$ -$ 8.00$ 99%99%
Temporary Trailer
50 Temporary Trailer 60 60 120 x 161$ =161.01$ 161.01$ 322.01$ 80.05$ -$ 80.05$ 50%0%25%
48179
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - Miscellaneous Items
Cost of Service Calculation - At Fully-Burdened Hourly Rate
Labor Time (Minutes)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Fully-
Burdened
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Utility Release
51 Electrical Utility Release 30 - 30 x 161$ =80.50$ -$ 80.50$ 80.05$ -$ 80.05$ 99%99%
Window / Sliding Glass Door / Other Fenestration
52 Retrofit/Repair - Up to 7 25 25 50 x 161$ =67.62$ 66.01$ 133.64$ 67.24$ 65.64$ 132.88$ 99%99%99%
53 Retrofit/Repair - Each Additional 5 4 4 x 161$ =11.27$ -$ 11.27$ 11.21$ -$ 11.21$ 99%99%
54 New/Alteration - First 40 46 86 x 161$ =107.34$ 122.36$ 229.70$ 106.73$ 121.67$ 228.41$ 99%99%99%
55 New/Alteration - Each Additional 4 5 9 x 161$ =11.27$ 12.88$ 24.15$ 11.21$ 12.81$ 24.01$ 99%99%99%
Administrative
Plan Check Initial Deposit - For Various Non-OTC Items
56 a) Miscellaneous Items 60 60 x 161$ =-$ 161.01$ 161.01$ -$ 160.10$ 160.10$ 99%99%
57 b) New Construction varies varies - x 161$ =varies varies varies varies
58 Plan Check / Permit Extension Processing 40 40 x 161$ =-$ 107.87$ 107.87$ -$ 107.27$ 107.27$ 99%99%
59 Change of Contractor, Architect, Owner Processing 40 40 x 161$ =-$ 107.87$ 107.87$ -$ 107.27$ 107.27$ 99%99%
60 Request/Research for Alternative Methods/Product Review varies varies - x 161$ =bill hourly (1 hour min.)Bill Hourly - 1 Hour Minimum
61 Temporary Certificate of Occupancy 180 - 180 x 161$ =483.02$ -$ 483.02$ 147.29$ -$ 147.29$ 30%30%
62 Disabled Access Compliance Inspection 60 60 x 161$ =-$ 161.01$ 161.01$ -$ 160.10$ 160.10$ 99%99%
63 Partial Inspection Fee 30 30 x 161$ =80.50$ -$ 80.50$ n/a - new
64 Re-inspection Fee 30 30 x 161$ =80.50$ -$ 80.50$ 80.05$ -$ 80.05$ 99%99%
65 Excess Plan Check Fee varies varies x 161$ =bill hourly varies varies varies
66 Investigation Fee for Work Commenced Without a Permit varies varies - x 161$ =equal to permit fee equal to permit fee varies
Note: Plan review fees for Residential Precise Grading (Tract Homes) are identified as part of the Public Works fee schedule and based on the number of sheets submitted for plan review. See Public Works fee schedule
49180
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - Miscellaneous Items
Cost of Service Calculation - At Targeted Hourly Rate
Labor Time (Minutes)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Targeted
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Addition
1 Residential Addition
a) Residential Addition - Up to 100 SF 50 71 121 x 161$ =135.24$ 189.98$ 325.22$ 134.48$ 188.92$ 323.40$ 99%99%99%
b) Residential Addition - Each Additional 500 SF 26 7 33 x 161$ =69.23$ 19.32$ 88.55$ 68.84$ 19.21$ 88.05$ 99%99%99%
c) Structural Review varies varies varies x 161$ =bill hourly (1 hour min.)varies varies varies
2 Non-Residential Addition
a) Non-Residential Addition - Up to 100 SF 58 81 139 x 161$ =155.53$ 218.48$ 374.00$ 134.48$ 188.92$ 323.40$ 86%86%86%
b) Non-Residential Addition - Each Additional 500 SF 30 8 38 x 161$ =79.61$ 22.22$ 101.83$ 68.84$ 19.21$ 88.05$ 86%86%86%
c) Structural Review varies varies varies x 161$ =bill hourly (1 hour min.)varies varies varies
Antenna
3 Dish > 2 Ft 15 55 70 x 161$ =40.25$ 148.12$ 188.37$ 40.02$ 147.29$ 187.31$ 99%99%99%
4 Cellular/Mobile Phone 60 85 145 x 161$ =161.00$ 228.62$ 389.62$ 160.10$ 227.34$ 387.44$ 99%99%99%
5 Equipment Shelter 15 40 55 x 161$ =40.25$ 107.87$ 148.12$ 40.02$ 107.27$ 147.29$ 99%99%99%
Appeal
6 Appeal varies varies - x 161$ =bill hourly (1 hour min.)Bill Hourly 99%
Awning/Canopy (Supported by Building)
7 Awning/Canopy 6 85 91 x 161$ =16.10$ 228.62$ 244.72$ 16.01$ 227.34$ 243.35$ 99%99%99%
Balcony Addition
8 Balcony Addition 60 70 130 x 161$ =161.00$ 188.37$ 349.37$ 160.10$ 187.31$ 347.41$ 99%99%99%
Block Wall
9 Block Wall - First 100 LF 20 25 45 x 161$ =53.67$ 67.08$ 120.75$ 53.37$ 66.71$ n/a 99%99%
10 Block Wall - Each Addt'l 50 LF 6 6 x 161$ =16.10$ -$ 16.10$ 16.01$ -$ n/a 99%
11 Retaining / Combination Wall - Each 50 LF 6 6 x 161$ =16.10$ -$ 16.10$ 16.01$ -$ n/a 99%
Carport
12 Carport - First 30 40 70 x 161$ =80.50$ 107.87$ 188.37$ 80.05$ 107.27$ 187.31$ 99%99%99%
13 Carport - Each Additional 30 16 46 x 161$ =80.50$ 42.93$ 123.43$ 80.05$ 42.69$ 122.74$ 99%99%99%
Compliance Survey/Special Inspection
14 Compliance Survey/Special Inspection 30 75 105 x 161$ =80.50$ 201.25$ 281.75$ 80.05$ 200.12$ 280.17$ 99%99%99%
Demolition
15 Demolition 10 36 46 x 161$ =27.37$ 96.60$ 123.97$ 27.22$ 96.06$ 123.28$ 99%99%99%
16 Demolition - Interior 15 40 55 x 161$ =40.25$ 107.87$ 148.12$ 40.02$ 107.27$ 147.29$ 99%99%99%
17 Demolition - Exterior 15 45 60 x 161$ =40.25$ 120.75$ 161.00$ 40.02$ 120.07$ 160.10$ 99%99%99%
Fence
18 Fence - First 100 LF 20 25 45 x 161$ =53.13$ 67.62$ 120.75$ 52.83$ 67.24$ 120.07$ 99%99%99%
19 Fence - Each Additional 50 LF 6 6 x 161$ =16.10$ -$ 16.10$ 16.01$ -$ 16.01$ 99%99%
Fireplace
20 Fireplace 60 90 150 x 161$ =161.00$ 241.50$ 402.50$ 160.10$ 240.15$ 400.25$ 99%99%99%
Flag/Lighting Pole
21 Flag/Lighting Pole - First 15 40 55 x 161$ =40.25$ 107.87$ 148.12$ 40.02$ 107.27$ 147.29$ 99%99%99%
22 Flag/Lighting Pole - Each Additional 6 2 8 x $161 =16.10$ 4.83$ 20.93$ 16.01$ 4.80$ 20.81$ 99%99%99%
50181
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - Miscellaneous Items
Cost of Service Calculation - At Targeted Hourly Rate
Labor Time (Minutes)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Targeted
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Grading
23 Residential Precise Grading (Tract Homes) - Per Home 55 see note 55 x varies 148.12$ see note 148.12$ 147.29$ see note varies 99%see note varies
24 Residential Precise Grading (Custom Home) - Lot <= 7,000 SF 15 15 30 x 161$ 40.25$ 40.25$ 80.50$ 40.02$ 40.02$ 80.05$ 99%99%99%
25 Residential Precise Grading (Custom Home) - Lot > 7,000 SF 15 75 90 x varies =40.25$ 201.25$ 241.50$ 40.02$ 200.12$ 240.15$ 99%99%99%
Partition
26 Partition 30 55 85 x 161$ =80.50$ 148.12$ 228.62$ 80.05$ 147.29$ 227.34$ 99%99%99%
Patio Cover / Covered Porch / Lattice
27 Standard, Open, Pre-Engineered (First)40 40 80 x 161$ =107.87$ 106.26$ 214.13$ 107.27$ 105.66$ 212.93$ 99%99%99%
28 Standard, Enclosed, Pre-Engineered (First)40 55 95 x 161$ =107.87$ 146.51$ 254.38$ 107.27$ 145.69$ 252.95$ 99%99%99%
29 Special Design (First)55 70 125 x 161$ =148.12$ 186.76$ 334.88$ 147.29$ 185.71$ 333.00$ 99%99%99%
30 Each Additional 20 15 35 x 161$ =53.67$ 40.25$ 93.92$ 53.37$ 40.02$ n/a 99%99%
Pool / Spa
31 Swimming Pool / Spa 75 41 116 x 161$ =201.25$ 109.48$ 310.73$ 200.12$ 108.87$ 308.99$ 99%99%99%
32 Detached Spa / Water Feature 75 75 x 161$ =201.25$ -$ 201.25$ 200.12$ -$ n/a 99%
33 Gunite Alteration / Resurfacing 75 41 116 x 161$ =201.25$ 109.48$ 310.73$ 200.12$ 108.87$ n/a 99%99%
34 Equipment Changeout Alone 10 38 48 x 161$ =26.83$ 101.97$ 128.80$ 26.68$ 101.40$ n/a 99%99%
Remodel
35 Non-Structural Review - Up to 100 SF 20 56 76 x 161$ =54.74$ 149.73$ 204.47$ 54.43$ 148.89$ 203.32$ 99%99%99%
36 Non-Structural Review - Each Additional 500 SF 9 7 16 x 161$ =24.15$ 19.32$ 43.47$ 24.01$ 19.21$ 43.23$ 99%99%99%
37 Structural Review varies varies varies x 161$ =bill hourly (1 hour min.)varies varies varies
Replacement of Plans/Job Card
38 Replacement of Job Copy of Approved Plans 85 85 x 161$ =-$ 228.62$ 228.62$ -$ 227.34$ 227.34$ 99%99%
39 Replacement of Inspection Record Card 15 15 x 161$ =-$ 40.25$ 40.25$ -$ 40.02$ 40.02$ 99%99%
Re-Roof
40 Re-Roof - Up to 2,000 SF 20 41 61 x 161$ =54.74$ 109.48$ 164.22$ 54.43$ 108.87$ 163.30$ 99%99%99%
41 Re-Roof - Each Additional 1,000 SF 5 5 x 161$ =12.88$ -$ 12.88$ 12.81$ -$ 12.81$ 99%99%
Sign
42 Monument Sign - First 30 55 85 x 161$ =80.50$ 148.12$ 228.62$ 80.05$ 147.29$ 227.34$ 99%99%99%
43 Monument Sign - Each Additional 10 10 x 161$ =27.37$ -$ 27.37$ 27.22$ -$ 27.22$ 99%99%
44 Wall/Awning Sign - First 10 36 46 x 161$ =27.37$ 96.60$ 123.97$ 27.22$ 96.06$ 123.28$ 99%99%99%
45 Wall/Awning Sign - Each Additional 10 10 20 x 161$ =27.37$ 27.37$ 54.74$ 27.22$ 27.22$ 54.43$ 99%99%99%
Storage Racks
46 Storage Racks - First 100 LF 10 40 50 x 161$ =27.37$ 106.26$ 133.63$ 27.22$ 105.66$ 132.88$ 99%99%99%
47 Storage Racks - Each Additional 100 LF 5 5 x 161$ =12.88$ -$ 12.88$ 12.81$ -$ 12.81$ 99%99%
Stucco Application
48 Stucco Application - First 500 SF 10 31 41 x 161$ =27.37$ 82.11$ 109.48$ 27.22$ 81.65$ 108.87$ 99%99%99%
49 Stucco Application - Each Additional 500 SF 3 3 x 161$ =8.05$ -$ 8.05$ 8.00$ -$ 8.00$ 99%99%
Temporary Trailer
50 Temporary Trailer 60 60 120 x 161$ =161.00$ 161.00$ 322.00$ 80.05$ -$ 80.05$ 50%0%25%
51182
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - Miscellaneous Items
Cost of Service Calculation - At Targeted Hourly Rate
Labor Time (Minutes)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Targeted
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Utility Release
51 Electrical Utility Release 30 - 30 x 161$ =80.50$ -$ 80.50$ 80.05$ -$ n/a 99%
Window / Sliding Glass Door / Other Fenestration
52 Retrofit/Repair - Up to 7 25 25 50 x 161$ =67.62$ 66.01$ 133.63$ 67.24$ 65.64$ 132.88$ 99%99%99%
53 Retrofit/Repair - Each Additional 5 4 4 x 161$ =11.27$ -$ 11.27$ 11.21$ -$ 11.21$ 99%99%
54 New/Alteration - First 40 46 86 x 161$ =107.33$ 122.36$ 229.69$ 106.73$ 121.67$ 228.41$ 99%99%99%
55 New/Alteration - Each Additional 4 5 9 x 161$ =11.27$ 12.88$ 24.15$ 11.21$ 12.81$ 24.01$ 99%99%99%
Administrative
Plan Check Initial Deposit - For Various Non-OTC Items
56 a) Miscellaneous Items 60 60 x 161$ =-$ 161.00$ 161.00$ -$ 160.10$ n/a 99%
57 b) New Construction varies varies - x 161$ =varies varies varies n/a
58 Plan Check / Permit Extension Processing 40 40 x 161$ =-$ 107.87$ 107.87$ -$ 107.27$ 107.27$ 99%99%
59 Change of Contractor, Architect, Owner Processing 40 40 x 161$ =-$ 107.87$ 107.87$ -$ 107.27$ 107.27$ 99%99%
60 Request/Research for Alternative Methods/Product Review varies varies - x 161$ =bill hourly (1 hour min.)Bill Hourly - 1 Hour Minimum
61 Temporary Certificate of Occupancy 180 180 x 161$ =483.00$ -$ 483.00$ 147.29$ -$ 147.29$ 30%30%
62 Disabled Access Compliance Inspection 60 60 x 161$ =-$ 161.00$ 161.00$ -$ 160.10$ 160.10$ 99%99%
63 Partial Inspection Fee 30 30 x 161$ =80.50$ -$ 80.50$ n/a - new
64 Re-inspection Fee 30 30 x 161$ =80.50$ -$ 80.50$ 80.05$ -$ 80.05$ 99%99%
65 Excess Plan Check Fee varies varies x 161$ =bill hourly varies varies varies
66 Investigation Fee for Work Commenced Without a Permit varies varies - x 161$ =equal to permit fee equal to permit fee varies
Note: Plan review fees for Residential Precise Grading (Tract Homes) are identified as part of the Public Works fee schedule and based on the number of sheets submitted for plan review. See Public Works fee schedule
52183
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - New Construction
Cost of Service Calculation - At Fully-Burdened Hourly Rate
Labor Time (Hours)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Fully-
Burdened
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
New Construction
1 Valuation - Up to $5,000 1.00 1.00 2.00 x 161$ =161.01$ 161.01$ 322.01$ $28 - $344 $39 - $560 $67 - $904 varies varies varies
2 Valuation - $10,000 2.50 3.50 6.00 x 161$ =402.52$ 563.52$ 966.04$ 344.21$ 560.34$ 904.55$ 86%99%94%
3 Valuation - $25,000 3.50 5.25 8.75 x 161$ =563.52$ 845.28$ 1,408.80$ 483.50$ 840.51$ 1,324.01$ 86%99%94%
4 Valuation - $200,000 12.50 8.50 21.00 x 161$ =2,012.58$ 1,368.55$ 3,381.13$ 641.99$ 1,360.83$ 2,002.83$ 32%99%59%
Plan Check - Multiple Structures - Each Add'l *
5 Valuation - All Valuations see above 0.33 0.33 x 161$ =see above 53.67$ 53.67$ varies 53.37$ 53.37$ 99%99%
* When multiple identical units are submitted for review and permitted at the same time, the plan check time for the first unit shall be based on the new construction times above. Assume 20 minutes of plan check time for each additional unit.
53184
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Building Fees - New Construction
Cost of Service Calculation - At Targeted Hourly Rate
Labor Time (Hours)Rate Cost of Service Current Fee Current Cost Recovery
Fee Description
Permit /
Inspection Plan Check Total
Targeted
Hourly
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
Permit /
Inspection Plan Check Total
New Construction
1 Valuation - Up to $5,000 1.00 1.00 2.00 x 161$ =161.00$ 161.00$ 322.00$ $28 - $344 $39 - $560 $67 - $904 varies varies varies
2 Valuation - $10,000 2.50 3.50 6.00 x 161$ =402.50$ 563.50$ 966.00$ 344.21$ 560.34$ 904.55$ 86%99%94%
3 Valuation - $25,000 3.50 5.25 8.75 x 161$ =563.50$ 845.25$ 1,408.75$ 483.50$ 840.51$ 1,324.01$ 86%99%94%
4 Valuation - $200,000 12.50 8.50 21.00 x 161$ =2,012.50$ 1,368.50$ 3,381.00$ 641.99$ 1,360.83$ 2,002.83$ 32%99%59%
Plan Check - Multiple Structures - Each Add'l *
5 Valuation - All Valuations see above 0.33 0.33 x 161$ =see above 53.67$ 53.67$ varies 53.37$ 53.37$ 99%99%
* When multiple identical units are submitted for review and permitted at the same time, the plan check time for the first unit shall be based on the new construction times above. Assume 20 minutes of plan check time for each additional unit.
54185
Calculation of the Costs of Providing Fee Related Services
Planning
55186
City of La Quinta
User and Regulatory Fee Study
Planning Fees
Cost of Service Calculation
Labor Time Hourly Rates Cost of Service
Fee Description
Avg.
Planning
Hours
Avg.
Fire Hours
FBHR
Planning
FBHR
Fire
Target
Hourly Rate
Cost of Svc
at FBHR
Cost of Svc
at Target
Hrly Rate
Current
Fee Fee Type
Current
Cost
Recovery
Proposed
Fee Fee Type
Proposed
Cost Recov
Temporary Use
1 Temporary Use Permit - Minor (Standard)10.00 bill hrly 203$ 171$ 161$ 2,030$ 1,610$ $263 flat 13%400$ flat 20%
2 Temporary Use Permit - Minor
(Requests Requiring Additional Effort)
varies bill hrly 203$ 171$ 161$ varies varies $263 hrly w/ min 79%400$ hrly w/ min 79%
3 Temporary Use Permit - Major (Standard)13.00 bill hrly 203$ 171$ 161$ 2,639$ 2,093$ $2,081 flat 79%2,093$ flat 79%
4 Temporary Use Permit - Major
(Requests Requiring Additional Effort)
varies bill hrly 203$ 171$ 161$ varies varies $2,081 hrly w/ min 79%2,093$ hrly w/ min 79%
Minor Use
5 Minor Use Permit 10.00 bill hrly 203$ 171$ 161$ 2,030$ 1,610$ $263 hrly w/ min 13%400$ hrly w/ min 79%
6 Minor Use Permit - Amendment 5.00 bill hrly 203$ 171$ 161$ 1,015$ 805$ $237 hrly w/ min 23%400$ hrly w/ min 79%
Conditional Use
7 Conditional Use Permit 38.33 1.50 203$ 171$ 161$ 8,038$ 6,413$ $6,377 hrly w/ min 79%6,413$ hrly w/ min 79%
8 Conditional Use Permit - Planned Unit Dev.38.33 1.50 203$ 171$ 161$ 8,038$ 6,413$ $6,377 hrly w/ min 79%6,413$ hrly w/ min 79%
9 Conditional Use Permit - Amendment 18.67 0.75 203$ 171$ 161$ 3,918$ 3,126$ $3,109 hrly w/ min 79%3,126$ hrly w/ min 79%
10 Conditional Use Permit - Time Extension 10.50 203$ 171$ 161$ 2,132$ 1,691$ $1,681 flat 79%1,691$ flat 79%
Expedited Review Fee
11 Expedited Review Fee n/a - new 1.5x
standard fee
flat
Site Development
12 Development Agreement 18.67 2.00 203$ 171$ 161$ 4,131$ 3,327$ $3,309 hrly w/ min 79%3,327$ hrly w/ min 79%
13 Site Development Permit - Planning Commission 53.33 2.00 203$ 171$ 161$ 11,169$ 8,909$ $8,859 hrly w/ min 79%8,909$ hrly w/ min 79%
14 Site Development Permit - Administrative 45.33 2.00 203$ 171$ 161$ 9,545$ 7,621$ $7,578 hrly w/ min 79%7,621$ hrly w/ min 79%
15 Site Development Permit - Amendment 28.00 1.00 203$ 171$ 161$ 5,855$ 4,669$ $4,643 hrly w/ min 79%4,669$ hrly w/ min 79%
16 Site Development Permit - Time Extension 10.50 203$ 171$ 161$ 2,132$ 1,691$ $1,681 flat 79%1,691$ flat 79%
17 Modification by Applicant 10.67 203$ 171$ 161$ 2,165$ 1,717$ $320 hrly w/ min 79%400$ hrly w/ min 79%
18 Minor Adjustment 7.33 203$ 171$ 161$ 1,489$ 1,181$ $320 hrly w/ min 79%400$ hrly w/ min 79%
19 Variance 14.00 1.00 203$ 171$ 161$ 3,013$ 2,415$ $2,401 hrly w/ min 79%2,415$ hrly w/ min 79%
Landscape Plan
20 Final Landscape Plan 11.00 203$ 171$ 161$ 2,233$ 1,771$ $1,761 flat 79%1,771$ flat 79%
Pre-Application Review Fee
21 Pre-Application Review Fee 14.00 203$ 171$ 161$ 2,842$ 2,254$ n/a - new 2,254$ flat 79%
Cost Recovery
56187
City of La Quinta
User and Regulatory Fee Study
Planning Fees
Cost of Service Calculation
Labor Time
Fee Description
Temporary Use
1 Temporary Use Permit - Minor (Standard)
2 Temporary Use Permit - Minor
(Requests Requiring Additional Effort)
3 Temporary Use Permit - Major (Standard)
4 Temporary Use Permit - Major
(Requests Requiring Additional Effort)
Minor Use
5 Minor Use Permit
6 Minor Use Permit - Amendment
Conditional Use
7 Conditional Use Permit
8 Conditional Use Permit - Planned Unit Dev.
9 Conditional Use Permit - Amendment
10 Conditional Use Permit - Time Extension
Expedited Review Fee
11 Expedited Review Fee
Site Development
12 Development Agreement
13 Site Development Permit - Planning Commission
14 Site Development Permit - Administrative
15 Site Development Permit - Amendment
16 Site Development Permit - Time Extension
17 Modification by Applicant
18 Minor Adjustment
19 Variance
Landscape Plan
20 Final Landscape Plan
Pre-Application Review Fee
21 Pre-Application Review Fee
Input cells shaded in gray
Est.
Yrly
Vol.
Revenue at
Current Fee
Revenue at
Proposed Fee
Fee
Incr /
(Decr)
% Incr /
(Decr) Note
40 10,520$ 16,000$ 137$ 52%
- -$ 137$ 52%
4 8,324$ 8,372$ 12$ 1%
- -$ 12$ 1%
30 7,890$ 12,000$ 137$ 52%
- -$ 163$ 69%
6 38,262$ 38,479$ 36$ 1%
- -$ 36$ 1%
- -$ 17$ 1%
- -$ 10$ 1%
[a]
1 3,309$ 3,327$ 18$ 1%[b]
8 70,872$ 71,269$ 50$ 1%
2 15,156$ 15,241$ 43$ 1%
- -$ 26$ 1%
2 3,362$ 3,381$ 9$ 1%
13 4,163$ 5,200$ 80$ 25%
13 4,163$ 5,200$ 80$ 25%
- -$ 14$ 1%
8 14,089$ 14,168$ 10$ 1%
- [c]
Volume and Revenue Statistics
57188
City of La Quinta
User and Regulatory Fee Study
Planning Fees
Cost of Service Calculation
Labor Time Hourly Rates Cost of Service
Fee Description
Avg.
Planning
Hours
Avg.
Fire Hours
FBHR
Planning
FBHR
Fire
Target
Hourly Rate
Cost of Svc
at FBHR
Cost of Svc
at Target
Hrly Rate
Current
Fee Fee Type
Current
Cost
Recovery
Proposed
Fee Fee Type
Proposed
Cost Recov
Cost Recovery
Signs
22 A-Frame Sign Permit n/a 203$ 171$ 161$ n/a n/a $0 flat n/a -$ flat 0%
23 Sign Permit 3.50 203$ 171$ 161$ 711$ 564$ $263 flat 37%355$ flat 50%
24 Sign Program 17.67 203$ 171$ 161$ 3,586$ 2,844$ $2,828 hrly w/ min 79%2,844$ hrly w/ min 79%
25 Sign Program Amendment 6.00 203$ 171$ 161$ 1,218$ 966$ $961 flat 79%966$ flat 79%
Zoning
26 Zone Change 57.33 1.00 203$ 171$ 161$ 11,810$ 9,392$ $9,339 hrly w/ min 79%9,392$ hrly w/ min 79%
27 Director's Determination 4.00 203$ 171$ 161$ 812$ 644$ $263 flat 32%405$ flat 50%
28 Certificate of Compliance 5.00 203$ 171$ 161$ 1,015$ 805$ $263 flat 26%505$ flat 50%
29 Zoning Letter - Basic Property Information 2.50 203$ 171$ 161$ 508$ 403$ $263 flat 52%263$ flat 52%
30 Zoning Letter - Basic Property Information with
Additional Research Required
8.50 203$ 171$ 161$ 1,726$ 1,369$ $1,361 n/a n/a 1,369$ flat 79%
31 Zoning Text Amendment 58.67 203$ 171$ 161$ 11,909$ 9,445$ $9,392 hrly w/ min 79%9,445$ hrly w/ min 79%
Street Name Change
32 Street Name Change 11.50 203$ 171$ 161$ 2,335$ 1,852$ $1,841 flat 79%1,852$ flat 79%
Historical Structures
33 Landmark Designation/Cert of Appropriateness 13.00 203$ 171$ 161$ 2,639$ 2,093$ $1,317 flat 50%1,320$ flat 50%
Environmental Review
34 Environmental Assessment 3.00 203$ 171$ 161$ 609$ 483$ $480 flat 79%483$ flat 79%
35 Recordation of Exemption 1.00 203$ 171$ 161$ 203$ 161$ $160 flat 79%161$ flat 79%
36 Initial Study (ND/MND)20.00 203$ 171$ 161$ 4,060$ 3,220$ $3,202 hrly w/ min 79%3,220$ hrly w/ min 79%
37 Environmental Impact Report 55.00 203$ 171$ 161$ 11,165$ 8,855$ $8,805 hrly w/ min 79%8,855$ hrly w/ min 79%
General/Specific Plan
38 Specific Plan 65.33 1.00 203$ 171$ 161$ 13,434$ 10,680$ $10,620 hrly w/ min 79%10,680$ hrly w/ min 79%
39 Specific Plan - Amendment 28.67 1.00 203$ 171$ 161$ 5,990$ 4,776$ $4,750 hrly w/ min 79%4,776$ hrly w/ min 79%
40 General Plan Amendment 64.00 1.00 203$ 171$ 161$ 13,163$ 10,465$ $10,406 hrly w/ min 79%10,465$ hrly w/ min 79%
Map
41 Tentative Parcel Map 29.33 2.00 203$ 171$ 161$ 6,297$ 5,045$ $5,016 hrly w/ min 79%5,045$ hrly w/ min 79%
42 Tentative Parcel Map - Waiver 7.50 1.00 203$ 171$ 161$ 1,694$ 1,369$ $1,361 flat 80%1,369$ flat 81%
43 Tentative Parcel Map - Amendment 17.67 1.00 203$ 171$ 161$ 3,757$ 3,005$ $2,988 hrly w/ min 80%3,005$ hrly w/ min 79%
44 Tentative Parcel Map - Revision 17.67 1.00 203$ 171$ 161$ 3,757$ 3,005$ $2,988 hrly w/ min 80%3,005$ hrly w/ min 79%
45 Tentative Parcel Map - Time Extension 6.00 203$ 171$ 161$ 1,218$ 966$ $961 flat 79%966$ flat 79%
58189
City of La Quinta
User and Regulatory Fee Study
Planning Fees
Cost of Service Calculation
Labor Time
Fee Description
Signs
22 A-Frame Sign Permit
23 Sign Permit
24 Sign Program
25 Sign Program Amendment
Zoning
26 Zone Change
27 Director's Determination
28 Certificate of Compliance
29 Zoning Letter - Basic Property Information
30 Zoning Letter - Basic Property Information with
Additional Research Required
31 Zoning Text Amendment
Street Name Change
32 Street Name Change
Historical Structures
33 Landmark Designation/Cert of Appropriateness
Environmental Review
34 Environmental Assessment
35 Recordation of Exemption
36 Initial Study (ND/MND)
37 Environmental Impact Report
General/Specific Plan
38 Specific Plan
39 Specific Plan - Amendment
40 General Plan Amendment
Map
41 Tentative Parcel Map
42 Tentative Parcel Map - Waiver
43 Tentative Parcel Map - Amendment
44 Tentative Parcel Map - Revision
45 Tentative Parcel Map - Time Extension
Input cells shaded in gray
Est.
Yrly
Vol.
Revenue at
Current Fee
Revenue at
Proposed Fee
Fee
Incr /
(Decr)
% Incr /
(Decr) Note
Volume and Revenue Statistics
- -$ n/a n/a n/a
76 20,012$ 26,980$ 92$ 35%
2 5,657$ 5,689$ 16$ 1%
3 2,882$ 2,898$ 5$ 1%
3 28,017$ 28,175$ 53$ 1%
- -$ 142$ 54%
- -$ 242$ 92%
8 2,107$ 2,104$ (0)$ 0%
2 n/a 2,737$ n/a n/a
1 9,392$ 9,445$ 53$ 1%
- -$ 10$ 1%
- -$ 3$ 0%
9 4,323$ 4,347$ 3$ 1%
9 1,441$ 1,449$ 1$ 1%
6 19,212$ 19,320$ 18$ 1%
- -$ 50$ 1%
- -$ 60$ 1%
4 18,998$ 19,105$ 27$ 1%
1 10,406$ 10,465$ 59$ 1%
9 45,148$ 45,402$ 28$ 1%
- -$ 8$ 1%
- -$ 17$ 1%
- -$ 17$ 1%
- -$ 5$ 1%
59190
City of La Quinta
User and Regulatory Fee Study
Planning Fees
Cost of Service Calculation
Labor Time Hourly Rates Cost of Service
Fee Description
Avg.
Planning
Hours
Avg.
Fire Hours
FBHR
Planning
FBHR
Fire
Target
Hourly Rate
Cost of Svc
at FBHR
Cost of Svc
at Target
Hrly Rate
Current
Fee Fee Type
Current
Cost
Recovery
Proposed
Fee Fee Type
Proposed
Cost Recov
Cost Recovery
46 Tentative Tract Map 50.00 2.00 203$ 171$ 161$ 10,492$ 8,372$ $8,325 hrly w/ min 79%8,372$ hrly w/ min 79%
47 Tentative Tract Map - Amendment 23.67 1.00 203$ 171$ 161$ 4,975$ 3,971$ $3,949 hrly w/ min 79%3,971$ hrly w/ min 79%
48 Tentative Tract Map - Revision 23.67 1.00 203$ 171$ 161$ 4,975$ 3,971$ $3,949 hrly w/ min 79%3,971$ hrly w/ min 79%
49 Tentative Tract Map - Time Extension (CC or PC)11.50 203$ 171$ 161$ 2,335$ 1,852$ $1,841 flat 79%1,852$ flat 79%
50 Tentative Tract Map - Time Extension (Admin)6.50 203$ 171$ 161$ 1,320$ 1,047$ $1,041 flat 79%1,047$ flat 79%
51 Tentative Condominium Map 50.00 2.00 203$ 171$ 161$ 10,492$ 8,372$ $8,325 hrly w/ min 79%8,372$ hrly w/ min 79%
52 Amended Final Parcel Map (Entitlement Support)25.00 203$ 171$ 161$ 5,075$ 4,025$ $4,002 hrly w/ min 79%4,025$ hrly w/ min 79%
53 Amended Final Tract Map (Entitlement Support)40.00 203$ 171$ 161$ 8,120$ 6,440$ $6,404 hrly w/ min 79%6,440$ hrly w/ min 79%
Zoning Clearance - Planning Plan Check
54 Zoning Clearance - Planning Plan Check
a) Alterations/Additions - Residential 0.50 203$ 171$ 161$ 102$ 81$ n/a - new flat 81$ flat 79%
b) New Construction - Single Family Residential 1.00 203$ 171$ 161$ 203$ 161$ n/a - new flat 161$ flat 79%
c) New Construction - 2-4 Residential Units 1.50 203$ 171$ 161$ 305$ 242$ n/a - new flat 242$ flat 79%
d) New Construction - 5+ Residential Units 4.00 203$ 171$ 161$ 812$ 644$ n/a - new flat 644$ flat 79%
e) New Construction - Non-Residential 2.00 203$ 171$ 161$ 406$ 322$ n/a - new flat 322$ flat 79%
f) Alterations/Additions - Non-Residential 1.00 203$ 171$ 161$ 203$ 161$ n/a - new flat 161$ flat 79%
Scanning
55 Scanning Fee 1.00 203$ 171$ 161$ 203$ 161$ $160 flat 79%161$ flat 79%
Technology Enhancement Fee
56 Technology Enhancement Fee $5 per permit 5$ flat
Digital Archiving and Records Management Fee
57 Digital Archiving and Records Management Fee
a) OTC Permit/Application $10 10$ flat
b) All Others $21 21$ flat
Appeal
58 Appeal 12.00 203$ 171$ 161$ 2,436$ 1,932$ $1,500 flat 62%1,500$ flat 62%
[a] Request for expedited service is subject to Design &
Development Department Director approval. It is dependent on
staff availability and workload.
[b] In addition to the fee shown for Development Agreement, the
City shall collect a $2,000 initial deposit to offset City Attorney
costs.
[c] 50% of fee may be credited toward entitlement application
submittal.
60191
City of La Quinta
User and Regulatory Fee Study
Planning Fees
Cost of Service Calculation
Labor Time
Fee Description
46 Tentative Tract Map
47 Tentative Tract Map - Amendment
48 Tentative Tract Map - Revision
49 Tentative Tract Map - Time Extension (CC or PC)
50 Tentative Tract Map - Time Extension (Admin)
51 Tentative Condominium Map
52 Amended Final Parcel Map (Entitlement Support)
53 Amended Final Tract Map (Entitlement Support)
Zoning Clearance - Planning Plan Check
54 Zoning Clearance - Planning Plan Check
a) Alterations/Additions - Residential
b) New Construction - Single Family Residential
c) New Construction - 2-4 Residential Units
d) New Construction - 5+ Residential Units
e) New Construction - Non-Residential
f) Alterations/Additions - Non-Residential
Scanning
55 Scanning Fee
Technology Enhancement Fee
56 Technology Enhancement Fee
Digital Archiving and Records Management Fee
57 Digital Archiving and Records Management Fee
a) OTC Permit/Application
b) All Others
Appeal
58 Appeal
[a] Request for expedited service is subject to Design &
Development Department Director approval. It is dependent on
staff availability and workload.
[b] In addition to the fee shown for Development Agreement, the
City shall collect a $2,000 initial deposit to offset City Attorney
costs.
[c] 50% of fee may be credited toward entitlement application
submittal.
Input cells shaded in gray
Est.
Yrly
Vol.
Revenue at
Current Fee
Revenue at
Proposed Fee
Fee
Incr /
(Decr)
% Incr /
(Decr) Note
Volume and Revenue Statistics
4 33,300$ 33,488$ 47$ 1%
- -$ 22$ 1%
- -$ 22$ 1%
3 5,523$ 5,555$ 10$ 1%
4 4,163$ 4,186$ 6$ 1%
- -$ 47$ 1%
- -$ 23$ 1%
- -$ 36$ 1%
-
-
-
-
-
-
- -$ 1$ 1%
- -$ -$ 0%
-$ -$ 0%
-$ -$ 0%
- -$ -$ 0%
61192
Calculation of the Costs of Providing Fee Related Services
Public Works
62193
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Public Works Fees
Cost of Service Calculation
Labor Time Hourly Rates Cost of Service Current Cost Recov.Proposed Recovery Volume and Revenue Statistics
Fee Description
Estimated
Labor Time
(Hours)
Fully-
Burd'nd
Hrly Rate
Targ'td Hrly
Rate
At Fully-
Burd'nd Rate
At Targ'td
Hourly Rate Current Fee
Current Cost
Recovery
Proposed
Fee
Proposed
Cost
Recovery
Annual
Volume
Estimate
Revenue at
Current Fee
Revenue at
100%
Recovery
Revenue at
Proposed
Fee
Fee
Increase or
Decrease
Percent
Increase or
Decrease Notes
Land Subdivision
1 Parcel Map:
a) Final Parcel Map
i) Initial Sheet 15.50 179$ 161$ 2,775$ 2,496$ 2,480$ 89%2,496$ 90%4 9,920$ 11,098$ 9,982$ 16$ 1%
ii) Each Additional Sheet 4.50 179$ 161$ 806$ 725$ 720$ 89%725$ 90%6 4,320$ 4,833$ 4,347$ 5$ 1%
b) Final Parcel Map - Amendment
i) Initial Sheet 15.50 179$ 161$ 2,775$ 2,496$ 2,480$ 89%2,496$ 90%1 2,480$ 2,775$ 2,496$ 16$ 1%
ii) Each Additional Sheet 4.50 179$ 161$ 806$ 725$ 720$ 89%725$ 90%1 720$ 806$ 725$ 5$ 1%
c) Substantial Conformance Review
i) Initial Sheet 18.25 179$ 161$ 3,267$ 2,938$ 2,922$ 89%2,938$ 90%1 2,922$ 3,267$ 2,938$ 16$ 1%
ii) Each Additional Sheet 8.00 179$ 161$ 1,432$ 1,288$ 1,281$ 89%1,288$ 90%- 7$ 1%
2 Tract Map:
a) Final Tract Map
i) Initial Sheet 16.50 179$ 161$ 2,954$ 2,657$ 2,640$ 89%2,657$ 90%3 7,920$ 8,861$ 7,970$ 17$ 1%
ii) Each Additional Sheet 5.00 179$ 161$ 895$ 805$ 800$ 89%805$ 90%8 6,400$ 7,160$ 6,440$ 5$ 1%
b) Final Tract Map - Amendment
i) Initial Sheet 16.50 179$ 161$ 2,954$ 2,657$ 2,640$ 89%2,657$ 90%1 2,640$ 2,954$ 2,657$ 17$ 1%
ii) Each Additional Sheet 5.00 179$ 161$ 895$ 805$ 800$ 89%805$ 90%1 800$ 895$ 805$ 5$ 1%
c) Substantial Conformance Review
i) Initial Sheet 18.25 179$ 161$ 3,267$ 2,938$ 2,922$ 89%2,938$ 90%1 2,922$ 3,267$ 2,938$ 16$ 1%
ii) Each Additional Sheet 8.00 179$ 161$ 1,432$ 1,288$ 1,281$ 89%1,288$ 90%- 7$ 1%
3 Reversion to Acreage:
a) Initial Sheet 17.00 179$ 161$ 3,043$ 2,737$ 2,720$ 89%2,737$ 90%- 17$ 1%
b) Each Additional Sheet 4.50 179$ 161$ 806$ 725$ 720$ 89%725$ 90%- 5$ 1%
4 Lot Line Adjustment/Parcel Merger
a) Lot Line Adjustment 12.00 179$ 161$ 2,148$ 1,932$ 1,920$ 89%1,932$ 90%6 11,520$ 12,888$ 11,592$ 12$ 1%
b) Parcel Merger 12.00 179$ 161$ 2,148$ 1,932$ 1,920$ 89%1,932$ 90%6 11,520$ 12,888$ 11,592$ 12$ 1%
5 Street Dedication/Vacation
a) Land Action Documents
(ROW/Easements/Grant Deeds)
12.25 179$ 161$ 2,193$ 1,972$ 1,960$ 89%1,972$ 90%3 5,880$ 6,578$ 5,917$ 12$ 1%
b) Vacation of Street/Public ROW 15.00 179$ 161$ 2,685$ 2,415$ 2,400$ 89%2,415$ 90%1 2,400$ 2,685$ 2,415$ 15$ 1%
6 Land Survey
a) Record of Survey 3.25 179$ 161$ 582$ 523$ 520$ 89%523$ 90%- 3$ 1%
b) Certificate of Correction 4.25 179$ 161$ 761$ 684$ 680$ 89%684$ 90%1 680$ 761$ 684$ 4$ 1%
63194
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Public Works Fees
Cost of Service Calculation
Labor Time Hourly Rates Cost of Service Current Cost Recov.Proposed Recovery Volume and Revenue Statistics
Fee Description
Estimated
Labor Time
(Hours)
Fully-
Burd'nd
Hrly Rate
Targ'td Hrly
Rate
At Fully-
Burd'nd Rate
At Targ'td
Hourly Rate Current Fee
Current Cost
Recovery
Proposed
Fee
Proposed
Cost
Recovery
Annual
Volume
Estimate
Revenue at
Current Fee
Revenue at
100%
Recovery
Revenue at
Proposed
Fee
Fee
Increase or
Decrease
Percent
Increase or
Decrease Notes
Grading / Project Improvements
7 Plan Review (First 3 Reviews):
a) Rough Grading
i) Initial Sheet 9.25 179$ 161$ 1,656$ 1,489$ $ 1,481 89%1,489$ 90%5 7,405$ 8,279$ 7,446$ 8$ 1%
ii) Each Additional Sheet 5.00 179$ 161$ 895$ 805$ $ 800 89%805$ 90%15 12,007$ 13,425$ 12,075$ 5$ 1%
iii) Revisions - Initial Sheet 7.13 179$ 161$ 1,276$ 1,148$ $ 1,141 89%1,148$ 90%2 2,283$ 2,553$ 2,296$ 6$ 1%
iv) Revisions - Each Additional Sheet 5.00 179$ 161$ 895$ 805$ $ 800 89%805$ 90%2 1,601$ 1,790$ 1,610$ 5$ 1%
b) Precise Grading - Commercial
i) Initial Sheet 11.25 179$ 161$ 2,014$ 1,811$ $ 1,801 89%1,811$ 90%8 14,409$ 16,110$ 14,490$ 10$ 1%
ii) Each Additional Sheet 7.00 179$ 161$ 1,253$ 1,127$ $ 1,121 89%1,127$ 90%20 22,414$ 25,060$ 22,540$ 6$ 1%
iii) Revisions - Initial Sheet 9.13 179$ 161$ 1,634$ 1,470$ $ 1,462 89%1,470$ 90%2 2,923$ 3,269$ 2,940$ 8$ 1%
iv) Revisions - Each Additional Sheet 7.00 179$ 161$ 1,253$ 1,127$ $ 1,121 89%1,127$ 90%2 2,241$ 2,506$ 2,254$ 6$ 1%
c) Precise Grading - Tract Homes
i) Initial Sheet 6.50 179$ 161$ 1,164$ 1,047$ $ 1,041 89%1,047$ 90%16 16,650$ 18,616$ 16,744$ 6$ 1%
ii) Each Additional Sheet 1.25 179$ 161$ 224$ 201$ $ 200 89%201$ 90%20 4,002$ 4,475$ 4,025$ 1$ 1%
iii) Revisions - Initial Sheet 3.88 179$ 161$ 695$ 625$ $ 621 89%625$ 90%5 3,106$ 3,473$ 3,123$ 3$ 1%
iv) Revisions - Each Additional Sheet 1.25 179$ 161$ 224$ 201$ $ 200 89%201$ 90%5 1,001$ 1,119$ 1,006$ 1$ 1%
d) Precise Grading - Custom Home 1.25 179$ 161$ 224$ 201$ [a] 40 8,950$ [a]
e) PM10
i) Initial Sheet 9.25 179$ 161$ 1,656$ 1,489$ $ 579 35%585$ 35%8 4,634$ 13,246$ 4,680$ 6$ 1%
ii) Each Additional Sheet 5.00 179$ 161$ 895$ 805$ $ - -$ 8 7,160$
iii) Revisions - Initial Sheet 7.13 179$ 161$ 1,276$ 1,148$ $ 448 35%450$ 35%2 895$ 2,553$ 900$ 2$ 1%
iv) Revisions - Each Additional Sheet 5.00 179$ 161$ 895$ 805$ $ - -$ 2 1,790$
f) Street Improvements
i) Initial Sheet 10.25 179$ 161$ 1,835$ 1,650$ $ 1,641 89%1,650$ 90%6 9,846$ 11,009$ 9,902$ 9$ 1%
ii) Each Additional Sheet 6.00 179$ 161$ 1,074$ 966$ $ 961 89%966$ 90%18 17,291$ 19,332$ 17,388$ 5$ 1%
iii) Revisions - Initial Sheet 8.13 179$ 161$ 1,455$ 1,309$ $ 1,302 89%1,309$ 90%2 2,603$ 2,911$ 2,618$ 7$ 1%
iv) Revisions - Each Additional Sheet 6.00 179$ 161$ 1,074$ 966$ $ 961 89%966$ 90%2 1,921$ 2,148$ 1,932$ 5$ 1%
g) Storm Drain
i) Initial Sheet 10.25 179$ 161$ 1,835$ 1,650$ $ 1,641 89%1,650$ 90%4 6,564$ 7,339$ 6,601$ 9$ 1%
ii) Each Additional Sheet 6.00 179$ 161$ 1,074$ 966$ $ 961 89%966$ 90%12 11,527$ 12,888$ 11,592$ 5$ 1%
iii) Revisions - Initial Sheet 8.13 179$ 161$ 1,455$ 1,309$ $ 1,302 89%1,309$ 90%1 1,302$ 1,455$ 1,309$ 7$ 1%
iv) Revisions - Each Additional Sheet 6.00 179$ 161$ 1,074$ 966$ $ 961 89%966$ 90%1 961$ 1,074$ 966$ 5$ 1%
64195
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Public Works Fees
Cost of Service Calculation
Labor Time Hourly Rates Cost of Service Current Cost Recov.Proposed Recovery Volume and Revenue Statistics
Fee Description
Estimated
Labor Time
(Hours)
Fully-
Burd'nd
Hrly Rate
Targ'td Hrly
Rate
At Fully-
Burd'nd Rate
At Targ'td
Hourly Rate Current Fee
Current Cost
Recovery
Proposed
Fee
Proposed
Cost
Recovery
Annual
Volume
Estimate
Revenue at
Current Fee
Revenue at
100%
Recovery
Revenue at
Proposed
Fee
Fee
Increase or
Decrease
Percent
Increase or
Decrease Notes
h) Signing and Striping
i) Initial Sheet 9.25 179$ 161$ 1,656$ 1,489$ $ 1,481 89%1,489$ 90%6 8,885$ 9,935$ 8,936$ 8$ 1%
ii) Each Additional Sheet 5.00 179$ 161$ 895$ 805$ $ 800 89%805$ 90%6 4,803$ 5,370$ 4,830$ 5$ 1%
iii) Revisions - Initial Sheet 7.13 179$ 161$ 1,276$ 1,148$ $ 1,141 89%1,148$ 90%- 6$ 1%
iv) Revisions - Each Additional Sheet 5.00 179$ 161$ 895$ 805$ $ 800 89%805$ 90%- 5$ 1%
i) Traffic Signal
i) Initial Sheet 8.25 179$ 161$ 1,477$ 1,328$ $ 1,321 89%1,328$ 90%- 7$ 1%
ii) Each Additional Sheet 4.00 179$ 161$ 716$ 644$ $ 640 89%644$ 90%- 4$ 1%
iii) Revisions - Initial Sheet 6.13 179$ 161$ 1,097$ 987$ $ 981 89%987$ 90%- 6$ 1%
iv) Revisions - Each Additional Sheet 4.00 179$ 161$ 716$ 644$ $ 640 89%644$ 90%- 4$ 1%
j) Sidewalk
i) Initial Sheet 7.25 179$ 161$ 1,298$ 1,167$ $ 1,161 89%1,167$ 90%1 1,161$ 1,298$ 1,167$ 7$ 1%
ii) Each Additional Sheet 3.00 179$ 161$ 537$ 483$ $ 480 89%483$ 90%1 480$ 537$ 483$ 3$ 1%
iii) Revisions - Initial Sheet 5.13 179$ 161$ 918$ 826$ $ 821 89%826$ 90%- 5$ 1%
iv) Revisions - Each Additional Sheet 3.00 179$ 161$ 537$ 483$ $ 480 89%483$ 90%- 3$ 1%
k) Traffic Control Plan 0.50 179$ 161$ 90$ 81$ $ 80 89%81$ 90%50 4,002$ 4,475$ 4,025$ 0$ 1%
l) Record Drawings Review
i) Initial Sheet 5.25 179$ 161$ 940$ 845$ $ 841 89%845$ 90%3 2,522$ 2,819$ 2,536$ 5$ 1%
ii) Each Additional Sheet 1.00 179$ 161$ 179$ 161$ $ 160 89%161$ 90%3 480$ 537$ 483$ 1$ 1%
m) Hydrology Report 10.75 179$ 161$ 1,924$ 1,731$ $ 1,721 89%1,731$ 90%8 13,768$ 15,394$ 13,846$ 10$ 1%
i) Revisions 5.00 179$ 161$ 895$ 805$ $ 800 89%805$ 90%- 5$ 1%
n) Traffic Study 8.25 179$ 161$ 1,477$ 1,328$ $ 1,321 89%1,328$ 90%1 1,321$ 1,477$ 1,328$ 7$ 1%
o) WQMP Report
i) With Prior Entitlement 9.75 179$ 161$ 1,745$ 1,570$ $ 1,561 89%1,570$ 90%6 9,366$ 10,472$ 9,419$ 9$ 1%
ii) Without Prior Entitlement 11.75 179$ 161$ 2,103$ 1,892$ $ 1,881 89%1,892$ 90%- 11$ 1%
iii) Revisions 5.00 179$ 161$ 895$ 805$ $ 800 89%805$ 90%1 800$ 895$ 805$ 5$ 1%
p) SWPPP 11.25 179$ 161$ 2,014$ 1,811$ $ 1,801 89%1,811$ 90%8 14,409$ 16,110$ 14,490$ 10$ 1%
i) Revisions 4.00 179$ 161$ 716$ 644$ $ 640 89%644$ 90%- 4$ 1%
q) Sewer and Water
i) Initial Sheet 7.00 179$ 161$ 1,253$ 1,127$ $ 1,121 89%1,127$ 90%3 3,362$ 3,759$ 3,381$ 6$ 1%
ii) Each Additional Sheet 3.00 179$ 161$ 537$ 483$ $ 480 89%483$ 90%8 3,842$ 4,296$ 3,864$ 3$ 1%
iii) Revisions - Initial Sheet 5.00 179$ 161$ 895$ 805$ $ 800 89%805$ 90%1 800$ 895$ 805$ 5$ 1%
iv) Revisions - Each Additional Sheet 3.00 179$ 161$ 537$ 483$ $ 480 89%483$ 90%1 480$ 537$ 483$ 3$ 1%
8 Plan Review (>3 Reviews)1.00 179$ 161$ 179$ 161$ $ 160 89%161$ 90%5 800$ 895$ 805$ 1$ 1%
9 Expedited Plan Review Fee varies 179$ 161$ varies varies 1.5x
standard fee
n/a 1.5x
standard fee
varies - -$ -$ -$ n/a n/a [b]
65196
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Public Works Fees
Cost of Service Calculation
Labor Time Hourly Rates Cost of Service Current Cost Recov.Proposed Recovery Volume and Revenue Statistics
Fee Description
Estimated
Labor Time
(Hours)
Fully-
Burd'nd
Hrly Rate
Targ'td Hrly
Rate
At Fully-
Burd'nd Rate
At Targ'td
Hourly Rate Current Fee
Current Cost
Recovery
Proposed
Fee
Proposed
Cost
Recovery
Annual
Volume
Estimate
Revenue at
Current Fee
Revenue at
100%
Recovery
Revenue at
Proposed
Fee
Fee
Increase or
Decrease
Percent
Increase or
Decrease Notes
10 Permit Inspection
a) Rough Grading
i) First 3 Acres 20.00 179$ 161$ 3,580$ 3,220$ $ 3,202 89%3,220$ 90%5 16,010$ 17,900$ 16,100$ 18$ 1%
ii) Each Additional Acre 5.00 179$ 161$ 895$ 805$ $ 400 45%805$ 90%190 76,047$ 170,050$ 152,950$ 405$ 101%
iii) Last One Acre 2.50 179$ 161$ 448$ 403$ $ 400 89%403$ 90%5 2,001$ 2,238$ 2,013$ 2$ 1%
b) Precise Grading
i) First 3 Acres 20.00 179$ 161$ 3,580$ 3,220$ $ 3,202 89%3,220$ 90%8 25,616$ 28,640$ 25,760$ 18$ 1%
ii) Each Additional Acre 5.00 179$ 161$ 895$ 805$ $ 400 45%805$ 90%2 800$ 1,790$ 1,610$ 405$ 101%
iii) Last One Acre 2.50 179$ 161$ 448$ 403$ $ 400 89%403$ 90%8 3,202$ 3,580$ 3,220$ 2$ 1%
c) Precise Grading - Tract Homes 0.92 179$ 161$ 165$ 148$ [c] 148$ 90%- [c]
d) Precise Grading - Custom Homes 0.50 179$ 161$ 90$ 81$ [c] 81$ 90%- [c]
e) PM10
i) < 10 Acres 24.00 179$ 161$ 4,296$ 3,864$ $ 3,842 89%3,864$ 90%7 26,896$ 30,072$ 27,048$ 22$ 1%[d]
ii) 10 - 50 Acres 36.00 179$ 161$ 6,444$ 5,796$ $ 5,764 89%5,796$ 90%- 32$ 1%[d]
iii) 51 - 200 Acres 48.00 179$ 161$ 8,592$ 7,728$ $ 7,685 89%7,728$ 90%1 7,685$ 8,592$ 7,728$ 43$ 1%[d]
iv) > 200 Acres 72.00 179$ 161$ 12,888$ 11,592$ $ 11,527 89%11,592$ 90%- 65$ 1%[d]
f) Street Improvements - Off-Site
i) First 1,000 LF 32.00 179$ 161$ 5,728$ 5,152$ $ 5,123 89%5,152$ 90%5 25,616$ 28,640$ 25,760$ 29$ 1%
ii) Each Additional 1,000 LF 28.00 179$ 161$ 5,012$ 4,508$ $ 2,882 57%4,508$ 90%- 1,626$ 56%
iii) Last 1,000 LF 18.00 179$ 161$ 3,222$ 2,898$ $ 2,882 89%2,898$ 90%5 14,409$ 16,110$ 14,490$ 16$ 1%
g) Street Improvements - On-Site
i) First 1,000 LF 22.00 179$ 161$ 3,938$ 3,542$ $ 3,522 89%3,542$ 90%3 10,566$ 11,814$ 10,626$ 20$ 1%
ii) Each Additional 1,000 LF 18.00 179$ 161$ 3,222$ 2,898$ $ 1,921 60%2,898$ 90%- 977$ 51%
iii) Last 1,000 LF 12.00 179$ 161$ 2,148$ 1,932$ $ 1,921 89%1,932$ 90%3 5,764$ 6,444$ 5,796$ 11$ 1%
h) Storm Drain
i) First 1,000 LF 19.00 179$ 161$ 3,401$ 3,059$ $ 1,921 56%3,059$ 90%8 15,369$ 27,208$ 24,472$ 1,138$ 59%
ii) Each Additional 1,000 LF 15.00 179$ 161$ 2,685$ 2,415$ $ 961 36%2,415$ 90%1 961$ 2,685$ 2,415$ 1,454$ 151%
iii) Last 1,000 LF 10.00 179$ 161$ 1,790$ 1,610$ $ 961 54%1,610$ 90%- 649$ 68%
i) Signing and Striping
i) First 1,000 LF 10.00 179$ 161$ 1,790$ 1,610$ $ 1,601 89%1,610$ 90%8 12,808$ 14,320$ 12,880$ 9$ 1%
ii) Each Additional 1,000 LF 6.00 179$ 161$ 1,074$ 966$ $ 480 45%966$ 90%3 1,441$ 3,222$ 2,898$ 486$ 101%
iii) Last 1,000 LF 3.00 179$ 161$ 537$ 483$ $ 480 89%483$ 90%1 480$ 537$ 483$ 3$ 1%
j) Traffic Signal 27.00 179$ 161$ 4,833$ 4,347$ $ 3,522 73%4,347$ 90%- 825$ 23%
k) NPDES 12.00 179$ 161$ 2,148$ 1,932$ $ 1,921 89%1,932$ 90%8 15,369$ 17,184$ 15,456$ 11$ 1%
l) Bond Reduction Request 13.50 179$ 161$ 2,417$ 2,174$ $ 2,161 89%2,174$ 90%2 4,323$ 4,833$ 4,347$ 12$ 1%
m) Final Inspection/Acceptance 18.00 179$ 161$ 3,222$ 2,898$ $ 2,882 89%2,898$ 90%2 5,764$ 6,444$ 5,796$ 16$ 1%
66197
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Public Works Fees
Cost of Service Calculation
Labor Time Hourly Rates Cost of Service Current Cost Recov.Proposed Recovery Volume and Revenue Statistics
Fee Description
Estimated
Labor Time
(Hours)
Fully-
Burd'nd
Hrly Rate
Targ'td Hrly
Rate
At Fully-
Burd'nd Rate
At Targ'td
Hourly Rate Current Fee
Current Cost
Recovery
Proposed
Fee
Proposed
Cost
Recovery
Annual
Volume
Estimate
Revenue at
Current Fee
Revenue at
100%
Recovery
Revenue at
Proposed
Fee
Fee
Increase or
Decrease
Percent
Increase or
Decrease Notes
n) Traffic Control Only
i) One Day 3.50 179$ 161$ 627$ 564$ $ 320 51%325$ 52%40 12,808$ 25,060$ 13,000$ 5$ 2%
ii) Two - Five Days 6.50 179$ 161$ 1,164$ 1,047$ $ 640 55%650$ 56%40 25,616$ 46,540$ 26,000$ 10$ 2%
iii) Each Additional Day (Up to 10 Days)3.50 179$ 161$ 627$ 564$ $ 320 51%325$ 52%1 320$ 627$ 325$ 5$ 2%
iv) 11+ Days 23.50 179$ 161$ 4,207$ 3,784$ $ 2,962 70%3,784$ 90%1 2,962$ 4,207$ 3,784$ 822$ 28%
o) Cut/Bore 4.50 179$ 161$ 806$ 725$ $ 720 89%725$ 90%5 3,602$ 4,028$ 3,623$ 4$ 1%
p) Driveway
i) Residential 3.00 179$ 161$ 537$ 483$ $ 160 30%175$ 33%25 4,002$ 13,425$ 4,375$ 15$ 9%
ii) Commercial 6.50 179$ 161$ 1,164$ 1,047$ $ 1,041 89%1,047$ 90%1 1,041$ 1,164$ 1,047$ 6$ 1%
q) Excavation / Trenching
i) First 100 LF 4.50 179$ 161$ 806$ 725$ $ 720 89%725$ 90%5 3,602$ 4,028$ 3,623$ 4$ 1%
ii) Each Additional 100 LF 2.00 179$ 161$ 358$ 322$ $ 160 45%322$ 90%2 320$ 716$ 644$ 162$ 101%
iii) Last 100 LF 1.00 179$ 161$ 179$ 161$ $ 160 89%161$ 90%2 320$ 358$ 322$ 1$ 1%
r) Sidewalk
i) First 100 Lineal Feet 8.50 179$ 161$ 1,522$ 1,369$ $ 1,041 68%1,369$ 90%10 10,406$ 15,215$ 13,685$ 328$ 32%
ii) Each Additional 100 Lineal Feet 6.00 179$ 161$ 1,074$ 966$ $ 320 30%966$ 90%20 6,404$ 21,480$ 19,320$ 646$ 202%
iii) Last 100 Lineal Feet 2.00 179$ 161$ 358$ 322$ $ 320 89%322$ 90%10 3,202$ 3,580$ 3,220$ 2$ 1%
s) Sewer and Water 8.00 179$ 161$ 1,432$ 1,288$ $ 1,281 89%1,288$ 90%6 7,685$ 8,592$ 7,728$ 7$ 1%
t) Night Work 2.50 179$ 161$ 448$ 403$ $ 400 89%403$ 90%3 1,201$ 1,343$ 1,208$ 2$ 1%
11 Research/Administrative
a) Subdiv'n Improvement Agreem't (SIA)12.00 179$ 161$ 2,148$ 1,932$ $ 1,921 89%1,932$ 90%4 7,685$ 8,592$ 7,728$ 11$ 1%
b) SIA - Time Extension 7.00 179$ 161$ 1,253$ 1,127$ $ 1,121 89%1,127$ 90%4 4,483$ 5,012$ 4,508$ 6$ 1%
c) Assignment & Assumptions Agreement 13.00 179$ 161$ 2,327$ 2,093$ $ 2,081 89%2,093$ 90%1 2,081$ 2,327$ 2,093$ 12$ 1%
d) Flood Plain Research/FEMA App 6.00 179$ 161$ 1,074$ 966$ 961$ 89%966$ 90%- 5$ 1%
e) Bid Protest Review 8.00 179$ 161$ 1,432$ 1,288$ 721$ 50%725$ 51%- 4$ 1%
12 Reactivation of Permit
a) Reactivation of an Expired Permit varies 179$ 161$ $ 480 10% of
original
permit fee
5 2,401$
13 Technology Enhancement Fee
Technology Enhancement Fee $ 5 $ 5
Digital Archiving and Records Management Fee
14 Digital Archiving and Records Management Fee
a) OTC Permit/Application $ 10 $ 10
b) All Others $ 21 $ 21
67198
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Public Works Fees
Cost of Service Calculation
Labor Time Hourly Rates Cost of Service Current Cost Recov.Proposed Recovery Volume and Revenue Statistics
Fee Description
Estimated
Labor Time
(Hours)
Fully-
Burd'nd
Hrly Rate
Targ'td Hrly
Rate
At Fully-
Burd'nd Rate
At Targ'td
Hourly Rate Current Fee
Current Cost
Recovery
Proposed
Fee
Proposed
Cost
Recovery
Annual
Volume
Estimate
Revenue at
Current Fee
Revenue at
100%
Recovery
Revenue at
Proposed
Fee
Fee
Increase or
Decrease
Percent
Increase or
Decrease Notes
15 Transportation Permits
a) Annual 2.50 179$ 161$ 448$ 403$ 90$ 20%90$ 20%10 900$ 4,475$ 900$ -$ 0%
b) Single Event 1.50 179$ 161$ 269$ 242$ 16$ 6%16$ 6%40 640$ 10,740$ 640$ -$ 0%
[a] Plan review fees for Precise Grading - Custom Home are identified as part of the Building fee schedule and are based on the lot size of the custom home. See Building fee schedule, Grading section.
[c] Inspection fees for Precise Grading - Custom Homes and Tract Homes are identified as part of the Building fee schedule. See Building fee schedule, Grading section.
[d] For PM10 annual permit. For permits required for less than one year, or portion of year, fees will be pro-rated based on the number of months permitted.
[b] Expedited Plan Review request is subject to City Engineer approval. It is dependent on staff availability and workload.
68199
Calculation of the Costs of Providing Fee Related Services
Fire Prevention
69200
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Fire Prevention Fees
Cost of Service Calculation - At Fully-Burdened Hourly Rate
Labor Time (Hours)Rate Cost of Service Current Fee / Current Cost Recovery
Fee Description
Plan
Review
Permit /
Inspection Total
Fully-
Burdened
Hourly Plan Review
Permit /
Inspection Total Plan Review
Permit /
Inspection Total
Current Cost
Recovery
Construction-Related Fire Review and Inspection Fees
1 New Multi-Residential (Hotel, Motel, Apartments, Condominiums)3.00 2.00 5.00 x $171 =$513 $342 $855 $480 $320 $801 94%
2 New Commercial / Industrial 3.00 2.50 5.50 x $171 =$513 $428 $941 $480 $400 $881 94%
3 Residential Addition / Remodel 1.00 1.00 2.00 x $171 =$171 $171 $342 $160 $160 $320 94%
4 Commercial Tenant Improvement 1.50 1.00 2.50 x $171 =$257 $171 $428 $240 $160 $400 94%
5 Commercial / Industrial Addition or Remodel 1.50 1.50 3.00 x $171 =$257 $257 $513 $240 $240 $480 94%
6 Commercial Cooking Hood and Duct Systems 1.50 1.00 2.50 x $171 =$257 $171 $428 $240 $160 $400 94%
7 Water Systems (Fire Hydrants, Water Mains, Sprinkler Risers)2.50 3.00 5.50 x $171 =$428 $513 $941 $400 $480 $881 94%
8 Pre-Engineered Fire Suppression Systems (Halon, Dry-Chemical, etc.)3.00 2.00 5.00 x $171 =$513 $342 $855 $480 $320 $801 94%
9 Fire Alarm Systems 3.50 3.00 6.50 x $171 =$599 $513 $1,112 $560 $480 $1,041 94%
10 Fire Sprinkler Systems - Single Family Detached
a) 1-50 Sprinkler Heads 1.50 1.00 2.50 x $171 =$257 $171 $428 $240 $160 $400 94%
b) 51-100 Sprinkler Heads 1.50 1.50 3.00 x $171 =$257 $257 $513 $240 $160 $400 78%
c) Over 100 Sprinkler Heads 1.50 2.00 3.50 x $171 =$257 $342 $599 $240 $160 $400 67%
11 Fire Sprinkler Systems - Multi-Family 3 or more units 2.00 1.50 3.50 x $171 =$342 $257 $599 $320 $240 $560 94%
12 Fire Sprinkler Systems - Commercial / Industrial 0 - 35,000 SF 2.50 1.50 4.00 x $171 =$428 $257 $684 $400 $240 $640 94%
13 Fire Sprinkler Systems - Commercial / Industrial 35,001 - 75,000 SF 3.00 1.75 4.75 x $171 =$513 $299 $812 $480 $280 $760 94%
14 Fire Sprinkler Systems - Commercial / Industrial 75,001 - 120,000 SF 3.50 2.50 6.00 x $171 =$599 $428 $1,026 $560 $400 $961 94%
15 Fire Sprinkler Systems - Commercial / Industrial > 120,000 SF 4.00 3.50 7.50 x $171 =$684 $599 $1,283 $640 $560 $1,201 94%
16 Fire Sprinkler Systems - Tenant Improvement > 10 Heads 1.50 1.00 2.50 x $171 =$257 $171 $428 $240 $160 $400 94%
17 Fire Pumps 2.00 2.00 4.00 x $171 =$342 $342 $684 $320 $320 $640 94%
18 Fire Standpipe Systems 1.50 2.00 3.50 x $171 =$257 $342 $599 $240 $320 $560 94%
19 Fire Sprinkler Systems Supervision & Alarms 1.50 1.00 2.50 x $171 =$257 $171 $428 $240 $160 $400 94%
20 Smoke Controls (Smoke & Heat Vents, Barriers, Enclosures, etc.)3.50 3.00 6.50 x $171 =$599 $513 $1,112 $560 $480 $1,041 94%
21 Fire Water Tanks 1.50 1.00 2.50 x $171 =$257 $171 $428 $240 $160 $400 94%
22 Underground Water Supply to Sprinkler Riser (per riser)2.00 2.00 4.00 x $171 =$342 $342 $684 $320 $320 $640 94%
23 Egress Analysis 1.00 1.00 2.00 x $171 =$171 $171 $342 $160 $160 $320 94%
24 Occupancy Load / Seating Capacity Determinations 1.00 1.00 x $171 =$0 $171 $171 $0 $160 $160 94%
25 Fire Compliance Release/Final 1.00 1.00 x $171 =$0 $171 $171 $0 $160 $160 94%
26 Plan Revision Submittals - each 1.00 - 1.00 x $171 =$171 $0 $171
27 Plan Resubmittals (in Excess of 3 Reviews) - each 1.00 1.00 x $171 =$171 $0 $171 $160 $0 $160 94%
28 Failed or Additional Field Inspections (Excessive) - each 1.00 1.00 x $171 =$0 $171 $171 $0 $160 $160
Operational Permit
29 Fire Operational Permit (per hour)bill hourly - x $171 =n/a - new
Other
30 Master Plan bill hourly - x $171 =
31 Tract access/Hydrant inspection 1.25 1.25 x $171 =$0 $214 $214 n/a - new
32 Special Event Permit 1.00 1.50 2.50 x $171 =$171 $257 $428 $160 $240 $400 94%
33 Pyrotechnic Permit 2.50 2.00 4.50 x $171 =$428 $342 $770 $400 $320 $720 94%
34 Pyrotechnic Event Standby (per hour)bill hourly - x $171 =bill hourly per hour 100%
35 Fire Miscellaneous (per hour)bill hourly - x $171 =bill hourly per hour 100%
70201
City of La Quinta
User and Regulatory Fee Study
Fire Prevention Fees
Cost of Service Calculation - At Fully-Burdened Hourly Rate
Labor Time (Hours)
Fee Description
Construction-Related Fire Review and Inspection Fees
1 New Multi-Residential (Hotel, Motel, Apartments, Condominiums)
2 New Commercial / Industrial
3 Residential Addition / Remodel
4 Commercial Tenant Improvement
5 Commercial / Industrial Addition or Remodel
6 Commercial Cooking Hood and Duct Systems
7 Water Systems (Fire Hydrants, Water Mains, Sprinkler Risers)
8 Pre-Engineered Fire Suppression Systems (Halon, Dry-Chemical, etc.)
9 Fire Alarm Systems
10 Fire Sprinkler Systems - Single Family Detached
a) 1-50 Sprinkler Heads
b) 51-100 Sprinkler Heads
c) Over 100 Sprinkler Heads
11 Fire Sprinkler Systems - Multi-Family 3 or more units
12 Fire Sprinkler Systems - Commercial / Industrial 0 - 35,000 SF
13 Fire Sprinkler Systems - Commercial / Industrial 35,001 - 75,000 SF
14 Fire Sprinkler Systems - Commercial / Industrial 75,001 - 120,000 SF
15 Fire Sprinkler Systems - Commercial / Industrial > 120,000 SF
16 Fire Sprinkler Systems - Tenant Improvement > 10 Heads
17 Fire Pumps
18 Fire Standpipe Systems
19 Fire Sprinkler Systems Supervision & Alarms
20 Smoke Controls (Smoke & Heat Vents, Barriers, Enclosures, etc.)
21 Fire Water Tanks
22 Underground Water Supply to Sprinkler Riser (per riser)
23 Egress Analysis
24 Occupancy Load / Seating Capacity Determinations
25 Fire Compliance Release/Final
26 Plan Revision Submittals - each
27 Plan Resubmittals (in Excess of 3 Reviews) - each
28 Failed or Additional Field Inspections (Excessive) - each
Operational Permit
29 Fire Operational Permit (per hour)bill hourly
Other
30 Master Plan bill hourly
31 Tract access/Hydrant inspection
32 Special Event Permit
33 Pyrotechnic Permit
34 Pyrotechnic Event Standby (per hour)bill hourly
35 Fire Miscellaneous (per hour)bill hourly
Input cells shaded in gray Input cells shaded in gray
Rate Proposed Fee Recovery Change
Target
Hourly Rate Plan Review
Permit /
Inspection Total
Target Cost
Recovery Fee Percent
$161 $483 $322 $805 94%$4 1%
$161 $483 $403 $886 94%$5 1%
$161 $161 $161 $322 94%$2 1%
$161 $242 $161 $403 94%$2 1%
$161 $242 $242 $483 94%$3 1%
$161 $242 $161 $403 94%$2 1%
$161 $403 $483 $886 94%$5 1%
$161 $483 $322 $805 94%$4 1%
$161 $564 $483 $1,047 94%$6 1%
$161 $242 $161 $403 94%$2 1%
$161 $242 $242 $483 94%$83 21%
$161 $242 $322 $564 94%$163 41%
$161 $322 $242 $564 94%$3 1%
$161 $403 $242 $644 94%$4 1%
$161 $483 $282 $765 94%$4 1%
$161 $564 $403 $966 94%$5 1%
$161 $644 $564 $1,208 94%$7 1%
$161 $242 $161 $403 94%$2 1%
$161 $322 $322 $644 94%$4 1%
$161 $242 $322 $564 94%$3 1%
$161 $242 $161 $403 94%$2 1%
$161 $564 $483 $1,047 94%$6 1%
$161 $242 $161 $403 94%$2 1%
$161 $322 $322 $644 94%$4 1%
$161 $161 $161 $322 94%$2 1%
$161 $0 $161 $161 94%$1 1%
$161 $0 $161 $161 94%$1 1%
$161 $161 $0 $161 94%$161 1%
$161 $161 $0 $161 94%$1 1%
$161 $0 $161 $161 94%$1 1%
$161 bill hourly bill hourly per hour 94%
$161 bill hourly bill hourly per hour 94%$1 1%
$161 $0 $201 $201 94%$201 n/a
$161 $161 $242 $403 94%$2 1%
$161 $403 $322 $725 94%$4 1%
$161 bill hourly bill hourly per hour 94%$1 1%
$161 bill hourly bill hourly per hour 94%$1 1%
71202
Calculation of the Costs of Providing Fee Related Services
NPDES Ongoing Inspections
72203
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Calculation of Estimated Cost of Service and Cost Recovery Analysis - NPDES Inspections
Contract Service Cost
Description
Contract
Fee
Hazardous Waste/Materials Facilities $243
Food Establishment Facilities $145
In-House Staff Time (Per Year)
Description Total
Hours Per Year 24
Target Hourly Rate $161
Total Yearly Cost $3,864
Number of Facilities 221
Estimated Cost Per Facility $17
Estimated Cost of Service and Revenue Analysis at Full Cost Recovery (Part 1)
Facility Type
Estimated Facility
Count
Estimated
Inspection Fee
Inspection
Frequency (Yrly, 3-
Yrs, 5-Yrs, etc.)
Annual Contract
Cost Per Facility
Annual In-House
Cost Per Facility
Total Annual Cost
Per Facility
Annual Revenue
@ Full Cost
Recovery
Food Establishment Facilities 124 $145 5 $29 $17 $47 $5,769
Hazardous Waste/Materials Facilities - 3Yr 87 $243 3 $81 $17 $98 $8,561
Hazardous Waste/Materials Facilities - 1Yr 10 $243 1 $243 $17 $260 $2,602
Total 221 $16,932
Estimated Cost of Service and Revenue Analysis at Full Cost Recovery (Part 2)
Facility Type
Estimated Facility
Count
Total Annual
Costs
Annual Fee Per
Business @ Full
Cost Recovery
Food Establishment Facilities 124 $5,769 $47
Hazardous Waste/Materials Facilities - 3Yr 87 $8,561 $98
Hazardous Waste/Materials Facilities - 1Yr 10 $2,602 $260
Total 221 $16,932 $77
Cost Recovery Analysis
Facility Type
Current Annual
Fee
Estimated Cost of
Service
Current Cost
Recovery Proposed Fee
Proposed Cost
Recovery
Food Establishment Facilities $46 $47 99%$47 100%
Hazardous Waste/Materials Facilities - 3Yr $98 $98 100%$98 100%
Hazardous Waste/Materials Facilities - 1Yr $259 $260 100%$260 100%
Revenue Analysis
Facility Type
Estimated Facility
Count Current Fee Current Revenue Proposed Fee
Estimated
Revenue
Food Establishment Facilities 124 $46 $5,704 $47 $5,769
Hazardous Waste/Materials Facilities - 3Yr 87 $98 $8,526 $98 $8,561
Hazardous Waste/Materials Facilities - 1Yr 10 $259 $2,590 $260 $2,602
Total 221 $16,820 $16,932
Cost Recovery Analysis - Code Compliance Follow-Up, If Required
Description Current Fee
Estimated Cost of
Service
Current Cost
Recovery Proposed Fee
Proposed Cost
Recovery
Code Compliance Follow-Up, If Required $109 $118 92%$118 100%
73204
Calculation of Cost of Service
Short-Term Rental Permit
74205
City of La Quinta
User and Regulatory Fee Study
Calculation of Estimated Regulatory Costs of Administering the City's Short-Term Rental Program
Estimated Labor Costs
Description Total
Hub $266,712
Code Enforcement $393,828
Total $660,541
Estimated Direct Non-Labor Costs Associated with Regulation of the STVR Program
Description Total
Short-Term Rental Prof Services / Supplies $200,000
Total $200,000
Total Estimated Annual Regulatory Costs
Description Total
Hub / Code Enforcement $660,541
Prof Services and Supplies $200,000
Total $860,541
Total Estimated Cost of Service for STVR Regulatory Efforts Associated with Registration and Monitoring (Assuming Varying Number of Registered Units)
Description Est. Annual Cost
Est. No. of
Registered Units
Total Annual Cost
Per Unit Current Fee
Current Cost
Recovery
Cost at 1,100 Units $860,541 1,100 $782 $105 13%
Cost at 2,500 Units $860,541 2,500 $344 $105 31%
Cost at 5,000 Units $860,541 5,000 $172 $105 61%
Estimated Revenue Impact Assuming Various Fee Scenarios (Assuming 1,100 Registrations)
Description Count Current Fee Proposed Fee Current Revenue
Proposed
Revenue Difference
1,100 Registrations (No Fee Change)1,100 $105 $105 $115,500 $115,500 $0
1,100 Registrations (@ 25% Cost Recovery)1,100 $105 $200 $115,500 $220,000 $104,500
1,100 Registrations (@ 33% Cost Recovery)1,100 $105 $250 $115,500 $275,000 $159,500
1,100 Registrations (@ 50% Cost Recovery)1,100 $105 $391 $115,500 $430,270 $314,770
1,100 Registrations (@ 75% Cost Recovery)1,100 $105 $587 $115,500 $645,405 $529,905
1,100 Registrations (@ 100% Cost Recovery)1,100 $105 $782 $115,500 $860,541 $745,041
75206
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Short-Term Vacation Rental Program
Cost of Service Calculation
Fee Description
Est Labor
Time
Fully-
Burdened
Hourly
Svc Cost at
FBHR Current Fee
Current Cost
Recovery
Proposed
Fee
Proposed
Cost
Recovery
1 Short-Term Vacation Rental Permit Code Compliance Inspection Fee 3.00 x 118$ =355$ 325$ 92%325$ 92%
76207
False Alarm Response - Police Department
Calculation of Cost of Service
77208
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
False Alarm Response - Police Department
Calculation of Estimated Cost of Service and Cost Recovery Analysis
Cost of Service Calculation - Police Response
Personnel
Estimated Labor
Time (Hours) x
Hourly Contract
Rate = Cost of Service Note
Deputy 0.50 x $168 =$84 [a]
ISB Operator 0.08 x $38 =$3 [a]
PSO 0.33 x $55 =$18 [a]
Total 0.92 x varies =$106
Cost of Service Calculation - City Administration
Personnel
Estimated Labor
Time (Hours) x Hourly Rate = Cost of Service
Est. Number of
False Alarms
Cost Per False
Alarm Note
False Alarm Monitoring, Collections, Follow-up 416.00 x $118 =$49,199 3,560 $14 [b];[c]
Cost Recovery Analysis
Fee
Current
Fee /
Estimated Cost
of Service =
Current
Cost
Recovery Proposed Fee
Proposed
Cost
Recovery
Proposed Fee
Increase
Proposed Fee
Increase
Police False Alarm Response
a) 1st False Alarm Response No Charge /$120 =0%No Charge 0%$0 0%
b) 2nd False Alarm Response No Charge /$120 =0%No Charge 0%$0 0%
c) 3rd False Alarm Response $51 /$120 =43%$60 50%$9 18%
d) 4th False Alarm Response $103 /$120 =86%$105 88%$2 2%
e) 5th and Each Additional False Alarm Response $109 /$120 =91%$120 100%$11 10%
[a] Labor time and hourly rate information provided by Riverside County Sheriff's Office (contract services for City of La Quinta).
[b] Based on 0.5 Finance hours per week, 1.5 hours of Code Enforcement Supervisor per week, and 6 hours of Administrative Technician hours per week.
[c] False alarm count based on one year of false alarm responses.
78209
False Alarm Response - Fire Department
Calculation of Cost of Service
79210
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
False Alarm Response - Fire Department
Calculation of Estimated Cost of Service and Cost Recovery Analysis
Statistical Information
Description Total Note
Riverside County Engine Rate (per hour)$394 [a]
Calculation of Estimated Cost of Service
Description
Estimated Labor
Time (Hours) x
Est. Number of
Engines =
Estimated Labor
Time x Engine Rate =
Estimated Cost
of Service
False Alarm Response 0.75 x 2 =1.50 x $394 =$591
Cost of Service Calculation - City Administration
Personnel
Estimated Labor
Time (Hours) x Hourly Rate = Cost of Service
Est. Number of
False Alarms
Cost Per False
Alarm Note
False Alarm Monitoring, Collections, Follow-up 416.00 x $118 =$49,199 3,560 $14 [b];[c]
Cost Recovery Analysis
Fee
Current
Fee /
Estimated Cost
of Service =
Current
Cost
Recovery Proposed Fee
Proposed
Cost
Recovery
Proposed Fee
Increase
Proposed Fee
Increase
Fire False Alarm Response
a) 1st False Alarm Response No Charge /$605 =0%No Charge 0%$0 0%
b) 2nd False Alarm Response No Charge /$605 =0%No Charge 0%$0 0%
c) 3rd False Alarm Response $51 /$605 =8%$60 10%$9 18%
d) 4th False Alarm Response $257 /$605 =43%$275 45%$18 7%
e) 5th and Each Additional False Alarm Response $600 /$605 =99%$605 100%$5 1%
[a] Labor time and hourly rate information provided by Riverside County Fire Department (contract services for City of La Quinta). Assumes 1% cost inflation for engine rate.
[b] Based on 0.5 Finance hours per week, 1.5 hours of Code Enforcement Supervisor per week, and 6 hours of Administrative Technician hours per week.
[c] False alarm count based on one year of false alarm responses.
80211
Calculation of the Costs of Providing Fee Related Services
Vehicle Impound Cost Recovery (VICR)
81212
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Vehicle Impound Cost Recovery Fee
Calculation of Estimated Cost of Service and Cost Recovery Analysis
Cost of Service Calculation
Personnel
Estimated Labor
Time (Hours) x
Hourly Contract
Rate = Cost of Service
Deputy 1.00 x $168 =$168
Office Assistant 0.50 x $32 =$16
Sergeant 0.25 x $98 =$24
ISB Operator 0.25 x $38 =$9
Accounting Technician 0.25 x $36 =$9
Total 2.25 x varies =$228
Source: Labor time and hourly rate information provided by City of La Quinta Police Department.
Cost Recovery Analysis
Fee
Current
Fee /
Estimated Cost
of Service =
Current
Cost
Recovery Proposed Fee
Proposed
Cost
Recovery
Proposed Fee
Increase
Proposed Fee
Increase
Vehicle Impound Fee $219 /$228 =96%$228 100%$9 4%
82213
Calculation of the Costs of Providing Fee Related Services
Film / Photography Permit Fees
83214
City of La Quinta
User and Regulatory Fee Study
Film / Photography Permitting
Cost of Service Calculation - Film/Photography Permitting
Fee Description Est. Labor Hours
Fully-
Burdened
Hourly Rate
Est. Cost of
Service Current Fee
Current Cost
Recovery
Proposed Fee
[a]
Proposed Cost
Recovery
Proposed Fee
Change Note
Film/Photography Permit
1 Cast and Crew Totaling One to Three Persons:
a) Permit Issuance Fee
i) Private Property 0.75 x $118 =$89 $100 varies $89 100%new
ii) Private Property with Staging in Public Right of Way 1.00 x $118 =$118 $100 varies $118 100%new
iii) Public Property 1.00 x $118 =$118 $100 varies $118 100%new
b) Location Use Fee
i) Private Property varies + marked-based x $118 =n/a n/a $0 n/a new
ii) Private Property with Staging in Public Right of Way varies + marked-based x $118 =n/a n/a $100 n/a new [a]
iii) Public Property varies + marked-based x $118 =n/a n/a $150 n/a new [a];[b]
2 Cast and Crew Totaling Four or More Persons:
a) Permit Issuance Fee
i) Private Property 1.75 x $118 =$207 $400 varies $207 100%new
ii) Private Property with Staging in Public Right of Way 2.75 x $118 =$325 $400 varies $325 100%new
iii) Public Property 3.25 x $118 =$384 $400 varies $384 100%new
b) Location Use Fee
i) Private Property varies + marked-based x $118 =n/a n/a $0 n/a new
ii) Private Property with Staging in Public Right of Way varies + marked-based x $118 =n/a n/a $250 n/a new [a]
iii) Public Property varies + marked-based x $118 =n/a n/a $500 n/a new [a];[b]
Other Fees, If Applicable
3 Pre-Application Meeting (upon request)2.00 x $118 =$236 n/a n/a $236 100%new
4 City Film Monitor (as needed)1.00 x $118 =$118 n/a n/a $118 100%new
5 Violations:
a) Filming/Photography without a Permit 0.00 x $118 =n/a n/a n/a 2 times
applicable fees
n/a new
b) Violation of Permit 3.00 x $118 =$354 n/a n/a $350 99%new
Note: The City Manager may waive fees for bona fide student film/photography projects and projects with 501(c)(3) Federal Income Tax Status; however, the permitting process for filming/photography is still required for these projects.
[a] Proposed fee is a market-based rate for exclusive private use of public space/facilities.
[b] Does not include any applicable facility rental fees that may apply.
84215
Calculation of the Costs of Providing Fee Related Services
Appeals Processing
85216
City of La Quinta Input cells shaded in gray
User and Regulatory Fee Study
Cost of Service Analysis
Appeals
Targeted Hourly Rate for Fee Setting
Hearing
Officer
Code
Enf'rcmt Bldg Plan'g
Gen
Direct Svc
Div City Mgr
125$ 118$ $161 $161 $161 $161
Estimated Labor Time (Hours)Estimated Cost of Service Cost Recovery Information
Fee Description
Hearing
Officer
Code
Enf'rcmt Bldg Plan'g
Gen
Direct
Svc Div City Mgr
Hearing
Officer
Code
Enf'rcmt Bldg Plan'g
Gen
Direct Svc
Div City Mgr Total
Current
Fee
Current
Cost
Recovery
Proposed
Fee
Proposed
Cost
Recovery Notes
1 Appeal to Hearing Officer of Administrative Citation 1.50 1.50 188$ 177$ -$ -$ -$ -$ 365$ 25$ 7%25$ 7%
2 Appeal of an Administrative Decision to City Manager 1.50 1.00 -$ 177$ -$ -$ -$ 161$ 338$ 250$ 74%250$ 74%[a]
3 Appeal to Construction Board of Appeals 12.00 -$ -$ 1,932$ -$ -$ -$ 1,932$ 1,500$ 78%1,500$ 78%[a]
4 Appeal to Planning Commission 12.00 -$ -$ -$ 1,932$ -$ -$ 1,932$ 1,500$ 78%1,500$ 78%[a]
5 Appeal to City Council 12.00 -$ -$ -$ 1,932$ -$ -$ 1,932$ 1,500$ 78%1,500$ 78%[a]
[a] Depending on the subject of the appeal, specialized expertise may be solicited, at the expense of the applicant, for the purpose of providing input to the City Manager, Construction Board of Appeals, Planning Commission or City Council.
86217
Working Version of the Master Fee Schedule
87218
City of La Quinta
User and Regulatory Fee Study
Building Fees - Mechanical, Plumbing, and Electrical Permits
Working Version of the Master Fee Schedule
Current Fee Current Cost Recovery Proposed Fee Proposed Cost Recovery Increase or (Decrease)
Fee Description Permit PC Total Permit PC Total Permit PC Total Permit PC Total Fee Percent
Permit Issuance
1 Permit Issuance (Mechanical, Plumbing, Electrical) $ 101.40 $ 101.40 99%99% $ 101.97 $ 101.97 100%100% $ 0.57 1%
Mechanical
2 Installation or relocation of each forced-air or gravity-type furnace or
burner, including ducts and vents attached to such appliance
$ 40.02 $ 26.68 $ 66.71 99%99%99% $ 40.25 $ 26.83 $ 67.08 100%100%100% $ 0.38 1%
3 Installation or relocation of each suspended heater, recessed wall
heater, or floor-mounted unit heater
$ 26.68 $ 13.34 $ 40.02 99%99%99% $ 26.83 $ 13.42 $ 40.25 100%100%100% $ 0.23 1%
4 Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating,
cooling, absorption, or evaporative cooling system, including
installation of controls regulated by the UMC
$ 13.34 $ 5.34 $ 18.68 99%99%99% $ 13.42 $ 5.37 $ 18.78 100%100%100% $ 0.11 1%
5 Installation or relocation of each boiler, condenser, compressor, or
each absorption system
$ 40.02 $ 26.68 $ 66.71 99%99%99% $ 40.25 $ 26.83 $ 67.08 100%100%100% $ 0.38 1%
6 Air-handling unit, including attached ducts $ 40.02 $ 13.34 $ 53.37 99%99%99% $ 40.25 $ 13.42 $ 53.67 100%100%100% $ 0.30 1%
7 Evaporative cooler, other than portable-type $ 13.34 $ 13.34 $ 26.68 99%99%99% $ 13.42 $ 13.42 $ 26.83 100%100%100% $ 0.15 1%
8 Ventilation fan connected to a single-duct $ 13.34 $ 5.34 $ 18.68 99%99%99% $ 13.42 $ 5.37 $ 18.78 100%100%100% $ 0.11 1%
9 Installation of each hood which is served by mechanical exhaust,
including the ducts for such hood
$ 13.34 $ 5.34 $ 18.68 99%99%99% $ 13.42 $ 5.37 $ 18.78 100%100%100% $ 0.11 1%
10 Each appliance or piece of equipment not classified in other appliance
categories, or for which no other fee is listed
$ 40.02 $ 40.02 $ 80.05 99%99%99% $ 40.25 $ 40.25 $ 80.50 100%100%100% $ 0.45 1%
Mechanical Change-Out
11 Condenser Only $ 40.02 $ 26.68 $ 66.71 99%99%99% $ 40.25 $ 26.83 $ 67.08 100%100%100% $ 0.38 1%
12 Furnace Only $ 40.02 $ 26.68 $ 66.71 99%99%99% $ 40.25 $ 26.83 $ 67.08 100%100%100% $ 0.38 1%
13 Other Equipment $ 40.02 $ 40.02 $ 80.05 99%99%99% $ 40.25 $ 40.25 $ 80.50 100%100%100% $ 0.45 1%
14 Packaged Unit $ 40.02 $ 26.68 $ 66.71 99%99%99% $ 40.25 $ 26.83 $ 67.08 100%100%100% $ 0.38 1%
15 Repair / Alteration $ 13.34 $ 5.34 $ 18.68 99%99%99% $ 13.42 $ 5.37 $ 18.78 100%100%100% $ 0.11 1%
16 Split-System $ 40.02 $ 80.05 $ 120.07 99%99%99% $ 40.25 $ 80.50 $ 120.75 100%100%100% $ 0.68 1%
Plumbing
17 Each plumbing fixture or trap or set of fixtures on one trap (including
water, drainage piping, and backflow protection)
$ 13.34 $ 13.34 $ 26.68 99%99%99% $ 13.42 $ 13.42 $ 26.83 100%100%100% $ 0.15 1%
18 Sewer Connection / Septic Abandonment $ 26.68 $ 18.68 $ 45.36 99%99%99% $ 26.83 $ 18.78 $ 45.62 100%100%100% $ 0.26 1%
19 Rainwater systems, per drain (inside building) $ 13.34 $ 13.34 $ 26.68 99%99%99% $ 13.42 $ 13.42 $ 26.83 100%100%100% $ 0.15 1%
20 Water heater and/or vent $ 13.34 $ 8.00 $ 21.35 99%99%99% $ 13.42 $ 8.05 $ 21.47 100%100%100% $ 0.12 1%
21 Industrial waste pretreatment interceptor including its trap and vent,
excepting kitchen-type grease interceptors functioning as fixture traps
$ 40.02 $ 13.34 $ 53.37 99%99%99% $ 40.25 $ 13.42 $ 53.67 100%100%100% $ 0.30 1%
22 Installation, alteration, or repair of water piping and/or water-treating
equipment, drainage or vent piping, each fixture
$ 13.34 $ 13.34 $ 26.68 99%99%99% $ 13.42 $ 13.42 $ 26.83 100%100%100% $ 0.15 1%
88219
City of La Quinta
User and Regulatory Fee Study
Building Fees - Mechanical, Plumbing, and Electrical Permits
Working Version of the Master Fee Schedule
Current Fee Current Cost Recovery Proposed Fee Proposed Cost Recovery Increase or (Decrease)
Fee Description Permit PC Total Permit PC Total Permit PC Total Permit PC Total Fee Percent
23 Backflow protective device other than atmospheric-type vacuum
breakers
$ 13.34 $ 5.34 $ 18.68 99%99%99% $ 13.42 $ 5.37 $ 18.78 100%100%100% $ 0.11 1%
24 Gas piping system - 1 to 4 outlets $ 13.34 $ 26.68 $ 40.02 99%99%99% $ 13.42 $ 26.83 $ 40.25 100%100%100% $ 0.23 1%
25 Gas piping system - 5 or more outlets $ 40.02 $ 26.68 $ 66.71 99%99%99% $ 40.25 $ 26.83 $ 67.08 100%100%100% $ 0.38 1%
26 Solar (Thermal) $ 26.68 $ 26.68 $ 53.37 99%99%99% $ 26.83 $ 26.83 $ 53.67 100%100%100% $ 0.30 1%
Electrical
New Construction
27 Residential - First 1,000 SF
(includes livable and non-livable SF)
$ 160.10 $ 52.83 $ 212.93 99%99%99% $ 161.00 $ 53.13 $ 214.13 100%100%100% $ 1.20 1%
28 Residential - Each Additional 1,000 SF
(includes livable and non-livable SF)
$ 13.61 $ 5.60 $ 19.21 99%99%99% $ 13.69 $ 5.64 $ 19.32 100%100%100% $ 0.11 1%
29 Non-Residential - First 2,000 SF $ 120.07 $ 92.86 $ 212.93 99%99%99% $ 120.75 $ 93.38 $ 214.13 100%100%100% $ 1.20 1%
30 Non-Residential - Each Additional 2,000 SF $ 40.02 $ 10.67 $ 50.70 99%99%99% $ 40.25 $ 10.73 $ 50.98 100%100%100% $ 0.29 1%
Solar (Photovoltaic)
31 Solar (PV) Less than 10kW $ 26.68 $ 26.68 $ 53.37 99%99%99% $ 26.83 $ 26.83 $ 53.67 100%100%100% $ 0.30 1%
32 Solar (PV) Greater than 10kW $ 40.02 $ 40.02 $ 80.05 99%99%99% $ 40.25 $ 40.25 $ 80.50 100%100%100% $ 0.45 1%
33 Each Additional String (<20) $ 2.67 $ 0.67 $ 3.34 99%99%99% $ 2.68 $ 0.67 $ 3.35 100%100%100% $ 0.02 1%
Receptacle, Switch, and Lighting Outlets
34 Receptacle, switch, lighting, or other outlets at which current is used
or controlled, except services, feeders, and meters - first 20
$ 26.68 $ 26.68 $ 53.37 99%99%99% $ 26.83 $ 26.83 $ 53.67 100%100%100% $ 0.30 1%
35 Receptacle, switch, lighting, or other outlets at which current is used
or controlled, except services, feeders, and meters - each additional
$ 2.67 $ 0.67 $ 3.34 99%99%99% $ 2.68 $ 0.67 $ 3.35 100%100%100% $ 0.02 1%
Lighting Fixtures
36 Lighting fixtures, sockets, or other lamp-holding devices - first 20 $ 26.68 $ 26.68 $ 53.37 99%99%99% $ 26.83 $ 26.83 $ 53.67 100%100%100% $ 0.30 1%
37 Lighting fixtures, sockets, or other lamp-holding devices - each add'l $ 2.67 $ 0.67 $ 3.34 99%99%99% $ 2.68 $ 0.67 $ 3.35 100%100%100% $ 0.02 1%
38 Pole or platform-mounted light replacement, repair or alteration - first
10
$ 26.68 $ 26.68 $ 53.37 99%99%99% $ 26.83 $ 26.83 $ 53.67 100%100%100% $ 0.30 1%
39 Pole or platform-mounted light replacement, repair or alteration -
each additional
$ 2.67 $ 0.67 $ 3.34 99%99%99% $ 2.68 $ 0.67 $ 3.35 100%100%100% $ 0.02 1%
Residential Appliances
40 Fixed residential appliances or receptacle outlets for same, including
wall-mounted electric ovens; counter-mounted cooking tops; electric
ranges; self-contained room, console, or through-wall air conditioners;
space heaters; food waste grinders; dishwashers; washing machines;
water heaters; clothes dryers; or other motor-operated appliances not
exceeding one horsepower (HP) in rating, each
$ 13.34 $ 13.34 $ 26.68 99%99%99% $ 13.42 $ 13.42 $ 26.83 100%100%100% $ 0.15 1%
89220
City of La Quinta
User and Regulatory Fee Study
Building Fees - Mechanical, Plumbing, and Electrical Permits
Working Version of the Master Fee Schedule
Current Fee Current Cost Recovery Proposed Fee Proposed Cost Recovery Increase or (Decrease)
Fee Description Permit PC Total Permit PC Total Permit PC Total Permit PC Total Fee Percent
Non-Residential Appliances
41 Residential appliances and self-contained, factory-wired, non-
residential appliances not exceeding one horsepower (HP), kilowatt
(KW) , or kilovolt ampere (KVA) in rating, including medical and dental
devices; food, beverage, and ice cream cabinets; illuminated show
cases; drinking fountains; vending machines; laundry machines; or
other similar types of equipment, each
$ 26.68 $ 26.68 $ 53.37 99%99%99% $ 26.83 $ 26.83 $ 53.67 100%100%100% $ 0.30 1%
Power Apparatus
42 Motors, generators, transformers, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps,
cooking or baking equipment, and other apparatus, each
$ 26.68 $ 26.68 $ 53.37 99%99%99% $ 26.83 $ 26.83 $ 53.67 100%100%100% $ 0.30 1%
Signs, Outline Lighting, and Marquees
43 Signs, outline lighting systems, or marquees, each $ 40.02 $ 53.37 $ 93.39 99%99%99% $ 40.25 $ 53.67 $ 93.92 100%100%100% $ 0.53 1%
Services
44 Services, each $ 26.68 $ 13.34 $ 40.02 99%99%99% $ 26.83 $ 13.42 $ 40.25 100%100%100% $ 0.23 1%
Temporary Power Services
45 Temporary service power pole or pedestal, including all pole or
pedestal-mounted receptacle outlets and appurtenances, each
$ 26.68 $ 18.68 $ 45.36 99%99%99% $ 26.83 $ 18.78 $ 45.62 100%100%100% $ 0.26 1%
Miscellaneous Apparatus, Conduits, and Conductors
46 Electrical apparatus, conduits, and conductors for which a permit is
required, but for which no fee is identified
$ 26.68 $ 26.68 $ 53.37 99%99%99% $ 26.83 $ 26.83 $ 53.67 100%100%100% $ 0.30 1%
90221
City of La Quinta
User and Regulatory Fee Study
Building Fees - Miscellaneous Items
Working Version of the Master Fee Schedule
Current Fee Current Cost Recovery Proposed Fee Proposed Cost Recovery Increase or (Decrease)
Fee Description Permit PC Total Permit PC Total Permit PC Total Permit PC Total Fee Percent
Addition
1 Residential Addition
a) Residential Addition - Up to 100 SF $ 134 $ 189 $ 323 99%99%99% $ 135 $ 190 $ 325 100%100%100% $ 2 1%
b) Residential Addition - Each Additional 500 SF $ 69 $ 19 $ 88 99%99%99% $ 69 $ 19 $ 89 100%100%100% $ 0 1%
c) Structural Review varies varies varies bill hourly (1 hour min.)
2 Non-Residential Addition
a) Non-Residential Addition - Up to 100 SF $ 134 $ 189 $ 323 86%86%86% $ 156 $ 218 $ 374 100%100%100% $ 51 16%
b) Non-Residential Addition - Each Additional 500 SF $ 69 $ 19 $ 88 86%86%86% $ 80 $ 22 $ 102 100%100%100% $ 14 16%
c) Structural Review varies varies varies bill hourly
(1 hour
Antenna
3 Dish > 2 Ft $ 40 $ 147 $ 187 99%99%99% $ 40 $ 148 $ 188 100%100%100% $ 1 1%
4 Cellular/Mobile Phone $ 160 $ 227 $ 387 99%99%99% $ 161 $ 229 $ 390 100%100%100% $ 2 1%
5 Equipment Shelter $ 40 $ 107 $ 147 99%99%99% $ 40 $ 108 $ 148 100%100%100% $ 1 1%
Appeal
6 Appeal Bill Hourly 99% bill hourly (1 hour min.)
Awning/Canopy (Supported by Building)
7 Awning/Canopy $ 16 $ 227 $ 243 99%99%99% $ 16 $ 229 $ 245 100%100%100% $ 1 1%
Balcony Addition
8 Balcony Addition $ 160 $ 187 $ 347 99%99%99% $ 161 $ 188 $ 349 100%100%100% $ 2 1%
Block Wall
9 Block Wall - First 100 LF $ 53 $ 67 $ 120 99%99%99% $ 54 $ 67 $ 121 100%100%100%
10 Block Wall - Each Addt'l 50 LF $ 16 $ 16 99%99% $ 16 $ 16 100%100%
11 Retaining / Combination Wall - Each 50 LF $ 16 $ 16 99%99% $ 16 $ 16 100%100%
Carport
12 Carport - First $ 80 $ 107 $ 187 99%99%99% $ 81 $ 108 $ 188 100%100%100% $ 1 1%
13 Carport - Each Additional $ 80 $ 43 $ 123 99%99%99% $ 81 $ 43 $ 123 100%100%100% $ 1 1%
Compliance Survey/Special Inspection
14 Compliance Survey/Special Inspection $ 80 $ 200 $ 280 99%99%99% $ 81 $ 201 $ 282 100%100%100% $ 2 1%
Demolition
15 Demolition $ 27 $ 96 $ 123 99%99%99% $ 27 $ 97 $ 124 100%100%100% $ 1 1%
16 Demolition - Interior $ 40 $ 107 $ 147 99%99%99% $ 40 $ 108 $ 148 100%100%100% $ 1 1%
17 Demolition - Exterior $ 40 $ 120 $ 160 99%99%99% $ 40 $ 121 $ 161 100%100%100% $ 1 1%
Fence
18 Fence - First 100 LF $ 53 $ 67 $ 120 99%99%99% $ 53 $ 68 $ 121 100%100%100% $ 1 1%
19 Fence - Each Additional 50 LF $ 16 $ 16 99%99% $ 16 $ 16 100%100% $ 0 1%
Fireplace
20 Fireplace $ 160 $ 240 $ 400 99%99%99% $ 161 $ 242 $ 403 100%100%100% $ 2 1%
Flag/Lighting Pole
21 Flag/Lighting Pole - First $ 40 $ 107 $ 147 99%99%99% $ 40 $ 108 $ 148 100%100%100% $ 1 1%
22 Flag/Lighting Pole - Each Additional $ 16 $ 5 $ 21 99%99%99% $ 16 $ 5 $ 21 100%100%100% $ 0 1%
Grading
23 Residential Precise Grading (Tract Homes) - Per Home $ 147 see note $ 147 92%see note varies $ 148 see note $ 148 93%93%
24 Residential Precise Grading (Custom Home) - Lot <= 7,000 SF $ 40 $ 40 $ 80 99%99%99% $ 40 $ 40 $ 81 100%100%100% $ 0 1%
25 Residential Precise Grading (Custom Home) - Lot > 7,000 SF $ 40 $ 200 $ 240 99%91%93% $ 40 $ 201 $ 242 100%92%93% $ 1 1%
91222
City of La Quinta
User and Regulatory Fee Study
Building Fees - Miscellaneous Items
Working Version of the Master Fee Schedule
Current Fee Current Cost Recovery Proposed Fee Proposed Cost Recovery Increase or (Decrease)
Fee Description Permit PC Total Permit PC Total Permit PC Total Permit PC Total Fee Percent
Partition
26 Partition $ 80 $ 147 $ 227 99%99%99% $ 81 $ 148 $ 229 100%100%100% $ 1 1%
Patio Cover / Covered Porch / Lattice
27 Standard, Open, Pre-Engineered (First) $ 107 $ 106 $ 213 99%99%99% $ 108 $ 106 $ 214 100%100%100% $ 1 1%
28 Standard, Enclosed, Pre-Engineered (First) $ 107 $ 146 $ 253 99%99%99% $ 108 $ 147 $ 254 100%100%100% $ 1 1%
29 Special Design (First) $ 147 $ 186 $ 333 99%99%99% $ 148 $ 187 $ 335 100%100%100% $ 2 1%
30 Each Additional $ 53 $ 40 $ 93 99%99%99% $ 54 $ 40 $ 94 100%100%100%
Pool / Spa
31 Swimming Pool / Spa $ 200 $ 109 $ 309 99%99%99% $ 201 $ 109 $ 311 100%100%100% $ 2 1%
32 Detached Spa / Water Feature $ 200 $ 200 99%99% $ 201 $ 201 100%100%
33 Gunite Alteration / Resurfacing $ 200 $ 109 $ 309 99%99%99% $ 201 $ 109 $ 311 100%100%100%
34 Equipment Change-out Alone $ 27 $ 101 $ 128 99%99%99% $ 27 $ 102 $ 129 100%100%100%
Remodel
35 Non-Structural Review - Up to 100 SF $ 54 $ 149 $ 203 99%99%99% $ 55 $ 150 $ 204 100%100%100% $ 1 1%
36 Non-Structural Review - Each Additional 500 SF $ 24 $ 19 $ 43 99%99%99% $ 24 $ 19 $ 43 100%100%100% $ 0 1%
37 Structural Review varies varies varies bill hourly (1 hour min.)
Replacement of Plans/Job Card
38 Replacement of Job Copy of Approved Plans $ 227 $ 227 99%99% $ 229 $ 229 100%100% $ 1 1%
39 Replacement of Inspection Record Card $ 40 $ 40 99%99% $ 40 $ 40 100%100% $ 0 1%
Re-Roof
40 Re-Roof - Up to 2,000 SF $ 54 $ 109 $ 163 99%99%99% $ 55 $ 109 $ 164 100%100%100% $ 1 1%
41 Re-Roof - Each Additional 1,000 SF $ 13 $ 13 99%99% $ 13 $ 13 100%100% $ 0 1%
Sign
42 Monument Sign - First $ 80 $ 147 $ 227 99%99%99% $ 81 $ 148 $ 229 100%100%100% $ 1 1%
43 Monument Sign - Each Additional $ 27 $ 27 99%99% $ 27 $ 27 100%100% $ 0 1%
44 Wall/Awning Sign - First $ 27 $ 96 $ 123 99%99%99% $ 27 $ 97 $ 124 100%100%100% $ 1 1%
45 Wall/Awning Sign - Each Additional $ 27 $ 27 $ 54 99%99%99% $ 27 $ 27 $ 55 100%100%100% $ 0 1%
Storage Racks
46 Storage Racks - First 100 LF $ 27 $ 106 $ 133 99%99%99% $ 27 $ 106 $ 134 100%100%100% $ 1 1%
47 Storage Racks - Each Additional 100 LF $ 13 $ 13 99%99% $ 13 $ 13 100%100% $ 0 1%
Stucco Application
48 Stucco Application - First 500 SF $ 27 $ 82 $ 109 99%99%99% $ 27 $ 82 $ 109 100%100%100% $ 1 1%
49 Stucco Application - Each Additional 500 SF $ 8 $ 8 99%99% $ 8 $ 8 100%100% $ 0 1%
Temporary Trailer
50 Temporary Trailer $ 80 $ 80 50%25% $ 161 $ 161 $ 322 100%100%100% $ 242 302%
Utility Release
51 Electrical Utility Release $ 80 $ 80 99%99% $ 81 $ 81 100%100%
Window / Sliding Glass Door / Other Fenestration
52 Retrofit/Repair - Up to 7 $ 67 $ 66 $ 133 99%99%99% $ 68 $ 66 $ 134 100%100%100% $ 1 1%
53 Retrofit/Repair - Each Additional 5 $ 11 $ 11 99%99% $ 11 $ 11 100%100% $ 0 1%
54 New/Alteration - First $ 107 $ 122 $ 228 99%99%99% $ 107 $ 122 $ 230 100%100%100% $ 1 1%
55 New/Alteration - Each Additional $ 11 $ 13 $ 24 99%99%99% $ 11 $ 13 $ 24 100%100%100% $ 0 1%
92223
City of La Quinta
User and Regulatory Fee Study
Building Fees - Miscellaneous Items
Working Version of the Master Fee Schedule
Current Fee Current Cost Recovery Proposed Fee Proposed Cost Recovery Increase or (Decrease)
Fee Description Permit PC Total Permit PC Total Permit PC Total Permit PC Total Fee Percent
Administrative
Plan Check Initial Deposit - For Various Non-OTC Items
56 a) Miscellaneous Items $ 160 $ 160 99%99% $ 161 $ 161 100%100%
57 b) New Construction varies varies varies varies
58 Plan Check / Permit Extension Processing $ 107 $ 107 99%99% $ 108 $ 108 100%100% $ 1 1%
59 Change of Contractor, Architect, Owner Processing $ 107 $ 107 99%99% $ 108 $ 108 100%100% $ 1 1%
60 Request/Research for Alternative Methods/Product Review Bill Hourly - 1 Hour Minimum bill hourly (1 hour min.)
61 Temporary Certificate of Occupancy $ 147 $ 147 30%30% $ 483 $ 483 100%100% $ 336 228%
62 Disabled Access Compliance Inspection $ 160 $ 160 99%99% $ 161 $ 161 100%100% $ 1 1%
63 Partial Inspection Fee n/a - new $ 81 $ 81 100%100%
64 Re-inspection Fee $ 80 $ 80 99%99% $ 81 $ 81 100%100% $ 0 1%
65 Excess Plan Check Fee varies varies varies bill hourly 100%
66 Investigation Fee for Work Commenced Without a Permit equal to permit fee varies equal to permit fee
93224
City of La Quinta
User and Regulatory Fee Study
Building Fees - New Construction Fees
Working Version of the Master Fee Schedule
Current Fee Current Cost Recovery Proposed Fee Proposed Cost Recovery Increase or (Decrease)
Fee Description Permit PC Total Permit PC Total Permit PC Total Permit PC Total Fee Percent
New Construction
1 $1 - $10,000 $28 - $344 $39 - $560 $67 - $904 varies varies varies 161$ 161$ 322$ 100%100%100% varies varies
4 $10,001 - $25,000 344$ 560$ 905$ 86%99%94%403$ 564$ 966$ 100%100%100% $ 61 7%
5 $25,001 - $200,000 483$ 841$ 1,324$ 86%99%94%564$ 845$ 1,409$ 100%100%100% $ 85 6%
6 $200,000 and Up 642$ 1,361$ 2,003$ 32%99%59%2,013$ 1,369$ 3,381$ 100%100%100% $ 1,378 69%
Plan Check - Multiple Structures - Each Add'l *
8 Valuation - All Valuations varies 53$ 53$ 99%99%see above 54$ 54$ 100%100% $ 0 1%
* When multiple identical units are submitted for review and permitted at the same time, the plan check time for the first unit shall be based on the new construction times above. Assume 20 minutes of plan check time for each additional unit.
94225
City of La Quinta
User and Regulatory Fee Study
Planning Fees
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee
Current Cost
Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
Temporary Use
1 Temporary Use Permit - Minor (Standard) flat fee $ 263 13% $ 400 20% $ 137 52%
2 Temporary Use Permit - Minor
(Requests Requiring Additional Effort)
bill per hour, with base fee $ 263 79% $ 400 79% $ 137 52%
3 Temporary Use Permit - Major (Standard) flat fee $ 2,081 79% $ 2,093 79% $ 12 1%
4 Temporary Use Permit - Major
(Requests Requiring Additional Effort)
bill per hour, with base fee $ 2,081 79% $ 2,093 79% $ 12 1%
Minor Use
5 Minor Use Permit bill per hour, with base fee $ 263 13% $ 400 79% $ 137 52%
6 Minor Use Permit - Amendment bill per hour, with base fee $ 237 23% $ 400 79% $ 163 69%
Conditional Use
7 Conditional Use Permit bill per hour, with base fee $ 6,377 79% $ 6,413 79% $ 36 1%
8 Conditional Use Permit - Planned Unit Dev. bill per hour, with base fee $ 6,377 79% $ 6,413 79% $ 36 1%
9 Conditional Use Permit - Amendment bill per hour, with base fee $ 3,109 79% $ 3,126 79% $ 17 1%
10 Conditional Use Permit - Time Extension flat fee $ 1,681 79% $ 1,691 79% $ 10 1%
Expedited Review Fee
11 Expedited Review Fee flat fee n/a - new 1.5x standard fee [a]
Site Development
12 Development Agreement bill per hour, with base fee $ 3,309 79% $ 3,327 79% $ 18 1%[b]
13 Site Development Permit - Planning Commission bill per hour, with base fee $ 8,859 79% $ 8,909 79% $ 50 1%
14 Site Development Permit - Administrative bill per hour, with base fee $ 7,578 79% $ 7,621 79% $ 43 1%
15 Site Development Permit - Amendment bill per hour, with base fee $ 4,643 79% $ 4,669 79% $ 26 1%
16 Site Development Permit - Time Extension flat fee $ 1,681 79% $ 1,691 79% $ 9 1%
17 Modification by Applicant bill per hour, with base fee $ 320 79% $ 400 79% $ 80 25%
18 Minor Adjustment bill per hour, with base fee $ 320 79% $ 400 79% $ 80 25%
19 Variance bill per hour, with base fee $ 2,401 79% $ 2,415 79% $ 14 1%
Landscape Plan
20 Final Landscape Plan flat fee $ 1,761 79% $ 1,771 79% $ 10 1%
Pre-Application Review Fee
21 Pre-Application Review Fee flat fee n/a - new $ 2,254 79% [c]
Signs
22 A-Frame Sign Permit flat fee n/a n/a n/a
23 Sign Permit flat fee $ 263 37% $ 355 50% $ 92 35%
24 Sign Program bill per hour, with base fee $ 2,828 79% $ 2,844 79% $ 16 1%
25 Sign Program Amendment flat fee $ 961 79% $ 966 79% $ 5 1%
Zoning
26 Zone Change bill per hour, with base fee $ 9,339 79% $ 9,392 79% $ 53 1%
27 Director's Determination flat fee $ 263 32% $ 405 50% $ 142 54%
28 Certificate of Compliance flat fee $ 263 26% $ 505 50% $ 242 92%
29 Zoning Letter - Basic Property Information flat fee $ 263 52% $ 263 52% $ (0)0%
30 Zoning Letter - Basic Property Information with Additional Research
Required
flat fee $ 1,361 n/a $ 1,369 79% n/a n/a
31 Zoning Text Amendment bill per hour, with base fee $ 9,392 79% $ 9,445 79% $ 53 1%
95226
City of La Quinta
User and Regulatory Fee Study
Planning Fees
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee
Current Cost
Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
Street Name Change
32 Street Name Change flat fee $ 1,841 79% $ 1,852 79% $ 10 1%
Historical Structures
33 Landmark Designation/Cert of Appropriateness flat fee $ 1,317 50% $ 1,320 50% $ 3 0%
Environmental Review
34 Environmental Assessment flat fee $ 480 79% $ 483 79% $ 3 1%
35 Recordation of Exemption flat fee $ 160 79% $ 161 79% $ 1 1%
36 Initial Study (ND/MND) bill per hour, with base fee $ 3,202 79% $ 3,220 79% $ 18 1%
37 Environmental Impact Report bill per hour, with base fee $ 8,805 79% $ 8,855 79% $ 50 1%
General/Specific Plan
38 Specific Plan bill per hour, with base fee $ 10,620 79% $ 10,680 79% $ 60 1%
39 Specific Plan - Amendment bill per hour, with base fee $ 4,750 79% $ 4,776 79% $ 27 1%
40 General Plan Amendment bill per hour, with base fee $ 10,406 79% $ 10,465 79% $ 59 1%
Map
41 Tentative Parcel Map bill per hour, with base fee $ 5,016 79% $ 5,045 79% $ 28 1%
42 Tentative Parcel Map - Waiver flat fee $ 1,361 80% $ 1,369 81% $ 8 1%
43 Tentative Parcel Map - Amendment bill per hour, with base fee $ 2,988 80% $ 3,005 79% $ 17 1%
44 Tentative Parcel Map - Revision bill per hour, with base fee $ 2,988 80% $ 3,005 79% $ 17 1%
45 Tentative Parcel Map - Time Extension flat fee $ 961 79% $ 966 79% $ 5 1%
46 Tentative Tract Map bill per hour, with base fee $ 8,325 79% $ 8,372 79% $ 47 1%
47 Tentative Tract Map - Amendment bill per hour, with base fee $ 3,949 79% $ 3,971 79% $ 22 1%
48 Tentative Tract Map - Revision bill per hour, with base fee $ 3,949 79% $ 3,971 79% $ 22 1%
49 Tentative Tract Map - Time Extension (CC or PC) flat fee $ 1,841 79% $ 1,852 79% $ 10 1%
50 Tentative Tract Map - Time Extension (Admin) flat fee $ 1,041 79% $ 1,047 79% $ 6 1%
51 Tentative Condominium Map bill per hour, with base fee $ 8,325 79% $ 8,372 79% $ 47 1%
52 Amended Final Parcel Map (Entitlement Support) bill per hour, with base fee $ 4,002 79% $ 4,025 79% $ 23 1%
53 Amended Final Tract Map (Entitlement Support) bill per hour, with base fee $ 6,404 79% $ 6,440 79% $ 36 1%
Zoning Clearance - Planning Plan Check
54 Zoning Clearance - Planning Plan Check
a) Alterations/Additions - Residential flat fee n/a - new $ 81 79%
b) New Construction - Single Family Residential flat fee n/a - new $ 161 79%
c) New Construction - 2-4 Residential Units flat fee n/a - new $ 242 79%
d) New Construction - 5+ Residential Units flat fee n/a - new $ 644 79%
e) New Construction - Non-Residential flat fee n/a - new $ 322 79%
f) Alterations/Additions - Non-Residential flat fee n/a - new $ 161 79%
Scanning
55 Scanning Fee flat fee $ 160 79% $ 161 79% $ 1 1%
Technology Enhancement Fee
56 Technology Enhancement Fee flat fee $ 5 $ 5 $ - 0%
Digital Archiving and Records Management Fee
57 Digital Archiving and Records Management Fee
a) OTC Permit/Application flat fee $ 10 $ 10 $ - 0%
b) All Others flat fee $ 21 $ 21 $ - 0%
96227
City of La Quinta
User and Regulatory Fee Study
Planning Fees
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee
Current Cost
Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
Appeal
58 Appeal flat fee $ 1,500 62% $ 1,500 62% $ - 0%
[b] In addition to the fee shown for Development Agreement, the City shall collect a $2,000 initial deposit to offset City Attorney costs.
[c] 50% of fee may be credited toward entitlement application submittal.
[a] Request for expedited service is subject to Design & Development Department Director approval. It is dependent on staff availability and workload.
97228
City of La Quinta
User and Regulatory Fee Study
Public Works Fees
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee Current Cost Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
Land Subdivision
1 Parcel Map:
a) Final Parcel Map
i) Initial Sheet per sheet 2,480$ 89%2,496$ 90%16$ 1%
ii) Each Additional Sheet per sheet 720$ 89%725$ 90%5$ 1%
b) Final Parcel Map - Amendment
i) Initial Sheet per sheet 2,480$ 89%2,496$ 90%16$ 1%
ii) Each Additional Sheet per sheet 720$ 89%725$ 90%5$ 1%
c) Substantial Conformance Review
i) Initial Sheet per sheet 2,922$ 89%2,938$ 90%16$ 1%
ii) Each Additional Sheet per sheet 1,281$ 89%1,288$ 90%7$ 1%
2 Tract Map:
a) Final Tract Map
i) Initial Sheet per sheet 2,640$ 89%2,657$ 90%17$ 1%
ii) Each Additional Sheet per sheet 800$ 89%805$ 90%5$ 1%
b) Final Tract Map - Amendment
i) Initial Sheet per sheet 2,640$ 89%2,657$ 90%17$ 1%
ii) Each Additional Sheet per sheet 800$ 89%805$ 90%5$ 1%
c) Substantial Conformance Review
i) Initial Sheet per sheet 2,922$ 89%2,938$ 90%16$ 1%
ii) Each Additional Sheet per sheet 1,281$ 89%1,288$ 90%7$ 1%
3 Reversion to Acreage:
a) Initial Sheet per sheet 2,720$ 89%2,737$ 90%17$ 1%
b) Each Additional Sheet per sheet 720$ 89%725$ 90%5$ 1%
4 Lot Line Adjustment/Parcel Merger
a) Lot Line Adjustment per request 1,920$ 89%1,932$ 90%12$ 1%
b) Parcel Merger per request 1,920$ 89%1,932$ 90%12$ 1%
5 Street Dedication/Vacation
a) Land Action Documents
(ROW/Easements/Grant Deeds)
per request 1,960$ 89%1,972$ 90%12$ 1%
b) Vacation of Street/Public ROW per request 2,400$ 89%2,415$ 90%15$ 1%
6 Land Survey
a) Record of Survey per request 520$ 89%523$ 90%3$ 1%
b) Certificate of Correction per request 680$ 89%684$ 90%4$ 1%
Grading / Project Improvements
7 Plan Review (First 3 Reviews):
a) Rough Grading
i) Initial Sheet per sheet 1,481$ 89%1,489$ 90%8$ 1%
ii) Each Additional Sheet per sheet 800$ 89%805$ 90%5$ 1%
iii) Revisions - Initial Sheet per sheet 1,141$ 89%1,148$ 90%6$ 1%
iv) Revisions - Each Additional Sheet per sheet 800$ 89%805$ 90%5$ 1%
b) Precise Grading - Commercial
i) Initial Sheet per sheet 1,801$ 89%1,811$ 90%10$ 1%
ii) Each Additional Sheet per sheet 1,121$ 89%1,127$ 90%6$ 1%
98229
City of La Quinta
User and Regulatory Fee Study
Public Works Fees
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee Current Cost Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
iii) Revisions - Initial Sheet per sheet 1,462$ 89%1,470$ 90%8$ 1%
iv) Revisions - Each Additional Sheet per sheet 1,121$ 89%1,127$ 90%6$ 1%
c) Precise Grading - Tract Homes
i) Initial Sheet per sheet 1,041$ 89%1,047$ 90%6$ 1%
ii) Each Additional Sheet per sheet 200$ 89%201$ 90%1$ 1%
iii) Revisions - Initial Sheet per sheet 621$ 89%625$ 90%3$ 1%
iv) Revisions - Each Additional Sheet per sheet 200$ 89%201$ 90%1$ 1%
d) Precise Grading - Custom Home [a][a]
e) PM10
i) Initial Sheet per sheet 579$ 35%585$ 35%6$ 1%
ii) Each Additional Sheet per sheet
iii) Revisions - Initial Sheet per sheet 448$ 35%450$ 35%2$ 1%
iv) Revisions - Each Additional Sheet per sheet
f) Street Improvements
i) Initial Sheet per sheet 1,641$ 89%1,650$ 90%9$ 1%
ii) Each Additional Sheet per sheet 961$ 89%966$ 90%5$ 1%
iii) Revisions - Initial Sheet per sheet 1,302$ 89%1,309$ 90%7$ 1%
iv) Revisions - Each Additional Sheet per sheet 961$ 89%966$ 90%5$ 1%
g) Storm Drain
i) Initial Sheet per sheet 1,641$ 89%1,650$ 90%9$ 1%
ii) Each Additional Sheet per sheet 961$ 89%966$ 90%5$ 1%
iii) Revisions - Initial Sheet per sheet 1,302$ 89%1,309$ 90%7$ 1%
iv) Revisions - Each Additional Sheet per sheet 961$ 89%966$ 90%5$ 1%
h) Signing and Striping
i) Initial Sheet per sheet 1,481$ 89%1,489$ 90%8$ 1%
ii) Each Additional Sheet per sheet 800$ 89%805$ 90%5$ 1%
iii) Revisions - Initial Sheet per sheet 1,141$ 89%1,148$ 90%6$ 1%
iv) Revisions - Each Additional Sheet per sheet 800$ 89%805$ 90%5$ 1%
i) Traffic Signal
i) Initial Sheet per sheet 1,321$ 89%1,328$ 90%7$ 1%
ii) Each Additional Sheet per sheet 640$ 89%644$ 90%4$ 1%
iii) Revisions - Initial Sheet per sheet 981$ 89%987$ 90%6$ 1%
iv) Revisions - Each Additional Sheet per sheet 640$ 89%644$ 90%4$ 1%
j) Sidewalk
i) Initial Sheet per sheet 1,161$ 89%1,167$ 90%7$ 1%
ii) Each Additional Sheet per sheet 480$ 89%483$ 90%3$ 1%
iii) Revisions - Initial Sheet per sheet 821$ 89%826$ 90%5$ 1%
iv) Revisions - Each Additional Sheet per sheet 480$ 89%483$ 90%3$ 1%
k) Traffic Control Plan per sheet 80$ 89%81$ 90%0$ 1%
l) Record Drawings Review
i) Initial Sheet per sheet 841$ 89%845$ 90%5$ 1%
ii) Each Additional Sheet per sheet 160$ 89%161$ 90%1$ 1%
99230
City of La Quinta
User and Regulatory Fee Study
Public Works Fees
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee Current Cost Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
m) Hydrology Report per report 1,721$ 89%1,731$ 90%10$ 1%
i) Revisions per report 800$ 89%805$ 90%5$ 1%
n) Traffic Study per study 1,321$ 89%1,328$ 90%7$ 1%
o) WQMP Report
i) With Prior Entitlement per report 1,561$ 89%1,570$ 90%9$ 1%
ii) Without Prior Entitlement per report 1,881$ 89%1,892$ 90%11$ 1%
iii) Revisions per report 800$ 89%805$ 90%5$ 1%
p) SWPPP per plan 1,801$ 89%1,811$ 90%10$ 1%
i) Revisions per plan 640$ 89%644$ 90%4$ 1%
q) Sewer and Water
i) Initial Sheet per sheet 1,121$ 89%1,127$ 90%6$ 1%
ii) Each Additional Sheet per sheet 480$ 89%483$ 90%3$ 1%
iii) Revisions - Initial Sheet per sheet 800$ 89%805$ 90%5$ 1%
iv) Revisions - Each Additional Sheet per sheet 480$ 89%483$ 90%3$ 1%
8 Plan Review (>3 Reviews)per hour 160$ 89%161$ 90%1$ 1%
9 Expedited Plan Review Fee 1.5x standard fee n/a 1.5x standard fee varies n/a n/a [b]
10 Permit Inspection
a) Rough Grading
i) First 3 Acres 3,202$ 89%3,220$ 90%18$ 1%
ii) Each Additional Acre 400$ 45%805$ 90%405$ 101%
iii) Last One Acre 400$ 89%403$ 90%2$ 1%
b) Precise Grading
i) First 3 Acres 3,202$ 89%3,220$ 90%18$ 1%
ii) Each Additional Acre 400$ 45%805$ 90%405$ 101%
iii) Last One Acre 400$ 89%403$ 90%2$ 1%
c) Precise Grading - Tract Homes [c]148$ 90%[c]
d) Precise Grading - Custom Homes [c]81$ 90%[c]
e) PM10
i) < 10 Acres 3,842$ 89%3,864$ 90%22$ 1%[d]
ii) 10 - 50 Acres 5,764$ 89%5,796$ 90%32$ 1%[d]
iii) 51 - 200 Acres 7,685$ 89%7,728$ 90%43$ 1%[d]
iv) > 200 Acres 11,527$ 89%11,592$ 90%65$ 1%[d]
f) Street Improvements - Off-Site
i) First 1,000 LF 5,123$ 89%5,152$ 90%29$ 1%
ii) Each Additional 1,000 LF 2,882$ 57%4,508$ 90%1,626$ 56%
iii) Last 1,000 LF 2,882$ 89%2,898$ 90%16$ 1%
g) Street Improvements - On-Site
i) First 1,000 LF 3,522$ 89%3,542$ 90%20$ 1%
ii) Each Additional 1,000 LF 1,921$ 60%2,898$ 90%977$ 51%
iii) Last 1,000 LF 1,921$ 89%1,932$ 90%11$ 1%
100231
City of La Quinta
User and Regulatory Fee Study
Public Works Fees
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee Current Cost Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
h) Storm Drain
i) First 1,000 LF 1,921$ 56%3,059$ 90%1,138$ 59%
ii) Each Additional 1,000 LF 961$ 36%2,415$ 90%1,454$ 151%
iii) Last 1,000 LF 961$ 54%1,610$ 90%649$ 68%
i) Signing and Striping
i) First 1,000 LF 1,601$ 89%1,610$ 90%9$ 1%
ii) Each Additional 1,000 LF 480$ 45%966$ 90%486$ 101%
iii) Last 1,000 LF 480$ 89%483$ 90%3$ 1%
j) Traffic Signal 3,522$ 73%4,347$ 90%825$ 23%
k) NPDES 1,921$ 89%1,932$ 90%11$ 1%
l) Bond Reduction Request 2,161$ 89%2,174$ 90%12$ 1%
m) Final Inspection/Acceptance 2,882$ 89%2,898$ 90%16$ 1%
n) Traffic Control Only
i) One Day 320$ 51%325$ 52%5$ 2%
ii) Two - Five Days 640$ 55%650$ 56%10$ 2%
iii) Each Additional Day (Up to 10 Days)320$ 51%325$ 52%5$ 2%
iv) 11+ Days 2,962$ 70%3,784$ 90%822$ 28%
o) Cut/Bore 720$ 89%725$ 90%4$ 1%
p) Driveway
i) Residential 160$ 30%175$ 33%15$ 9%
ii) Commercial 1,041$ 89%1,047$ 90%6$ 1%
q) Excavation / Trenching
i) First 100 LF 720$ 89%725$ 90%4$ 1%
ii) Each Additional 100 LF 160$ 45%322$ 90%162$ 101%
iii) Last 100 LF 160$ 89%161$ 90%1$ 1%
r) Sidewalk
i) First 100 Lineal Feet 1,041$ 68%1,369$ 90%328$ 32%
ii) Each Additional 100 Lineal Feet 320$ 30%966$ 90%646$ 202%
iii) Last 100 Lineal Feet 320$ 89%322$ 90%2$ 1%
s) Sewer and Water 1,281$ 89%1,288$ 90%7$ 1%
t) Night Work 400$ 89%403$ 90%2$ 1%
11 Research/Administrative
a) Subdiv'n Improvement Agreem't (SIA)per request 1,921$ 89%1,932$ 90%11$ 1%
b) SIA - Time Extension per request 1,121$ 89%1,127$ 90%6$ 1%
c) Assignment & Assumptions Agreement per request 2,081$ 89%2,093$ 90%12$ 1%
d) Flood Plain Research/FEMA App per request 961$ 89%966$ 90%5$ 1%
e) Bid Protest Review 721$ 50%725$ 51%4$ 1%
12 Reactivation of Permit
a) Reactivation of an Expired Permit each 480$ 10% of original permit
fee
101232
City of La Quinta
User and Regulatory Fee Study
Public Works Fees
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee Current Cost Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
13 Technology Enhancement Fee
Technology Enhancement Fee 5$ $ 5
Digital Archiving and Records Management Fee
14 Digital Archiving and Records Management Fee
a) OTC Permit/Application 10$ $ 10
b) All Others 21$ $ 21
15 Transportation Permits
a) Annual each 90$ 20%90$ 20%
b) Single Event each 16$ 6%16$ 6%
[a] Plan review fees for Precise Grading - Custom Home are identified as part of the Building fee schedule and are based on the lot size of the custom home. See Building fee schedule, Grading section.
[c] Inspection fees for Precise Grading - Custom Homes and Tract Homes are identified as part of the Building fee schedule. See Building fee schedule, Grading section.
[d] For PM10 annual permit. For permits required for less than one year, or portion of year, fees will be pro-rated based on the number of months permitted.
[b] Expedited Plan Review request is subject to City Engineer approval. It is dependent on staff availability and workload.
102233
City of La Quinta
User and Regulatory Fee Study
Fire Fees
Working Version of the Master Fee Schedule
Current Fee Proposed Fee
Fee Description Plan Check Permit Total Plan Check Permit Total
Current
Cost
Recovery
Proposed
Cost
Recovery Fee Change
Percent
Change Notes
Construction-Related Fire Review and Inspection Fees
1 New Multi-Residential (Hotel, Motel, Apartments, Condominiums)$480 $320 $801 $483 $322 $805 94%94%$4 1%
2 New Commercial / Industrial $480 $400 $881 $483 $403 $886 94%94%$5 1%
3 Residential Addition / Remodel $160 $160 $320 $161 $161 $322 94%94%$2 1%[a]
4 Commercial Tenant Improvement $240 $160 $400 $242 $161 $403 94%94%$2 1%
5 Commercial / Industrial Addition or Remodel $240 $240 $480 $242 $242 $483 94%94%$3 1%
6 Commercial Cooking Hood and Duct Systems $240 $160 $400 $242 $161 $403 94%94%$2 1%
7 Water Systems (Fire Hydrants, Water Mains, Sprinkler Risers)$400 $480 $881 $403 $483 $886 94%94%$5 1%
8 Pre-Engineered Fire Suppression Systems (Halon, Dry-Chemical, etc.)$480 $320 $801 $483 $322 $805 94%94%$4 1%
9 Fire Alarm Systems $560 $480 $1,041 $564 $483 $1,047 94%94%$6 1%
10 Fire Sprinkler Systems - Single Family Detached
a) 1-50 Sprinkler Heads $240 $160 $400 $242 $161 $403 94%94%$2 1%
b) 51-100 Sprinkler Heads $240 $160 $400 $242 $242 $483 78%94%$83 21%
c) Over 100 Sprinkler Heads $240 $160 $400 $242 $322 $564 67%94%$163 41%
11 Fire Sprinkler Systems - Multi-Family 3 or more units $320 $240 $560 $322 $242 $564 94%94%$3 1%
12 Fire Sprinkler Systems - Commercial / Industrial 0 - 35,000 SF $400 $240 $640 $403 $242 $644 94%94%$4 1%
13 Fire Sprinkler Systems - Commercial / Industrial 35,001 - 75,000 SF $480 $280 $760 $483 $282 $765 94%94%$4 1%
14 Fire Sprinkler Systems - Commercial / Industrial 75,001 - 120,000 SF $560 $400 $961 $564 $403 $966 94%94%$5 1%
15 Fire Sprinkler Systems - Commercial / Industrial > 120,000 SF $640 $560 $1,201 $644 $564 $1,208 94%94%$7 1%
16 Fire Sprinkler Systems - Tenant Improvement > 10 Heads $240 $160 $400 $242 $161 $403 94%94%$2 1%
17 Fire Pumps $320 $320 $640 $322 $322 $644 94%94%$4 1%
18 Fire Standpipe Systems $240 $320 $560 $242 $322 $564 94%94%$3 1%
19 Fire Sprinkler Systems Supervision & Alarms $240 $160 $400 $242 $161 $403 94%94%$2 1%
20 Smoke Controls (Smoke & Heat Vents, Barriers, Enclosures, etc.)$560 $480 $1,041 $564 $483 $1,047 94%94%$6 1%
21 Fire Water Tanks $240 $160 $400 $242 $161 $403 94%94%$2 1%
22 Underground Water Supply to Sprinkler Riser (per riser)$320 $320 $640 $322 $322 $644 94%94%$4 1%
23 Egress Analysis $160 $160 $320 $161 $161 $322 94%94%$2 1%
24 Occupancy Load / Seating Capacity Determinations $160 $160 $0 $161 $161 94%94%$1 1%
25 Fire Compliance Release/Final $160 $160 $0 $161 $161 94%94%$1 1%
26 Plan Revision Submittals - each $161 $0 $161 94%$161 1%
27 Plan Resubmittals (in Excess of 3 Reviews) - each $160 $160 $161 $0 $161 94%94%$1 1%
28 Failed or Additional Field Inspections (Excessive) - each $160 $160 $0 $161 $161 94%$1 1%
Operational Permit
29 Fire Operational Permit (per hour)n/a - new bill hourly bill hourly per hour 94%$0 0%
Other
30 Master Plan bill hourly bill hourly per hour 94%$1 1%
31 Tract access/Hydrant inspection $0 $201 $201 94%$201 n/a
32 Special Event Permit $160 $240 $400 $161 $242 $403 94%94%$2 1%
33 Pyrotechnic Permit $400 $320 $720 $403 $322 $725 94%94%$4 1%
34 Pyrotechnic Event Standby (per hour)bill hourly per hour bill hourly bill hourly per hour 94%94%$1 1%
35 Fire Miscellaneous (per hour)bill hourly per hour bill hourly bill hourly per hour 94%94%$1 1%
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application,
including but not limited to legal review.
103234
City of La Quinta
User and Regulatory Fee Study
Fire Fees
Working Version of the Master Fee Schedule
Current Fee Proposed Fee
Fee Description Plan Check Permit Total Plan Check Permit Total
Current
Cost
Recovery
Proposed
Cost
Recovery Fee Change
Percent
Change Notes
Fee Description Current Fee Proposed Fee
Current
Cost
Recovery
Proposed
Cost
Recovery Fee Change
Percent
Change Notes
36 City Assigned Fire Safety Specialist $160 per hour $161 per hour 93%94%$1 1%
37 Other County Fire Services
38 City Attorney or other legal review 100%of actual costs 100%of actual costs
39 Outside Service Providers 100%of actual costs 100%of actual costs
[a] Fee will not apply for all submittals. Before applying fees, Fire Department will review project submittal to determine if review is necessary or if review fees have been collected as part of the development planning process.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity.
See County Fees See County Fees
104235
City of La Quinta
User and Regulatory Fee Study
NPDES Ongoing Inspection Fees
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee Current Cost Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change
NPDES Ongoing Inspection Fee
1 Food Establishment Facilities per year 46$ 99%47$ 100%1$ 1%
2 Hazardous Waste/Materials Facilities - 3Yr per year 98$ 100%98$ 100%0$ 0%
3 Hazardous Waste/Materials Facilities - 1Yr per year 259$ 100%260$ 100%1$ 0%
Code Compliance
4 Code Compliance Follow-Up, If Required per hour 109$ 92%118$ 100%9$ 9%
105236
City of La Quinta
User and Regulatory Fee Study
Short-Term Vacation Rental Permit Fees
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee Current Cost Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change
Short-Term Vacation Rental Permit Fee
1 Annual Permit Fee per year 105$ 13%200$ 26%95$ 90%
2 Code Compliance Inspection Fee (if applicable)per unit 325$ 92%325$ 92%-$ 0%
3 Technology Enhancement Fee per year 5$ 100%5$ 100%-$ 0%
106237
City of La Quinta
User and Regulatory Fee Study
False Alarm Response Fees
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee Current Cost Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change
False Alarm Response
1 Police False Alarm Response
a) 1st False Alarm Response each No Charge 0%No Charge 0%$0 0%
b) 2nd False Alarm Response each No Charge 0%No Charge 0%$0 0%
c) 3rd False Alarm Response each $51 43%$60 50%$9 18%
d) 4th False Alarm Response each $103 86%$105 88%$2 2%
e) 5th and Each Additional False Alarm Response each $109 91%$120 100%$11 10%
2 Fire False Alarm Response
a) 1st False Alarm Response each No Charge 0%No Charge 0%$0 0%
b) 2nd False Alarm Response each No Charge 0%No Charge 0%$0 0%
c) 3rd False Alarm Response each $51 8%$60 10%$9 18%
d) 4th False Alarm Response each $257 43%$275 45%$18 7%
e) 5th and Each Additional False Alarm Response each $600 99%$605 100%$5 1%
107238
City of La Quinta
User and Regulatory Fee Study
Vehicle Impound Cost Recovery Fee (VICR)
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee Current Cost Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change
1 Vehicle Impound Cost Recovery each $219 96%$228 100%9$ 4%
108239
City of La Quinta
User and Regulatory Fee Study
Code Enforcement Hourly Rate for Services
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee
Current Cost
Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
1 Code Enforcement Hourly Rate
a) Code Enforcement Hourly Rate per hour $109 92%$118 100%$9 9%[a]
b) Code Enforcement Hourly Rate - For Outside Agency Reimbursement Request per hour $109 100%$109 100%($0)0%[b]
[a] Hourly rate for Code Compliance inspections required or requested for which no other fees are listed, requests for special event support, etc.
[b] Hourly rate for outside agency reimbursement request is a reduced rate because the City may request direct reimbursement of various fleet and technology related costs.
109240
City of La Quinta
User and Regulatory Fee Study
Pool Drain and Golf Cart Permit Fee
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee
Current Cost
Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
1 Pool Drain Permit per permit $25 31%$25 31%$0 0%
2 Golf Cart Permit
a) New per permit $50 46%$50 46%$0 0%
b) Renewal per permit $25 46%$25 46%$0 0%
110241
City of La Quinta
User and Regulatory Fee Study
Home Occupation Permit Fee
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee
Current Cost
Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
1 Home Occupation Permit per permit $100 74%$100 74%$0 0%
2 Home Occupation Permit - Address Change per permit $50 37%$50 37%$0 0%
111242
City of La Quinta
User and Regulatory Fee Study
Film / Photography Permit Fees
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee
Current Cost
Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
Film/Photography Permit
1 Cast and Crew Totaling One to Three Persons:
a) Permit Issuance Fee
i) Private Property per permit $100 varies $89 100%($12)-12%
ii) Private Property with Staging in Public Right of Way per permit $100 varies $118 100%$18 18%
iii) Public Property per permit $100 varies $118 100%$18 18%
b) Location Use Fee
i) Private Property per day n/a n/a $0 n/a
ii) Private Property with Staging in Public Right of Way per day n/a n/a $100 n/a [a]
iii) Public Property per day n/a n/a $150 n/a [a];[b]
2 Cast and Crew Totaling Four or More Persons:
a) Permit Issuance Fee
i) Private Property per permit $400 varies $207 100%($194)-48%
ii) Private Property with Staging in Public Right of Way per permit $400 varies $325 100%($76)-19%
iii) Public Property per permit $400 varies $384 100%($17)-4%
b) Location Use Fee
i) Private Property per day n/a n/a $0 n/a
ii) Private Property with Staging in Public Right of Way per day n/a n/a $250 n/a [a]
iii) Public Property per day n/a n/a $500 n/a [a];[b]
Other Fees, If Applicable
3 Pre-Application Meeting (upon request)per meeting n/a n/a $236 100%
4 City Film Monitor (as needed)per hour n/a n/a $118 100%
5 Violations:
a) Filming/Photography without a Permit n/a n/a 2 times applicable
fees
n/a
b) Violation of Permit per violation,
per day
n/a n/a $350 99%
Note: The City Manager may waive fees for bona fide student film/photography projects and projects with 501(c)(3) Federal Income Tax Status; however, the permitting process for filming/photography is still required for these projects.
[a] Proposed fee is a market-based rate for exclusive private use of public space/facilities.
[b] Does not include any applicable facility rental fees that may apply.
112243
City of La Quinta
User and Regulatory Fee Study
Bingo Permit Fee
Working Version of the Master Fee Schedule
Fee Description Unit Current Fee
Current Cost
Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
1 Bingo Permit
a) Initial per permit $50 61%$50 61%$0 0%
b) Renewal per permit $50 61%$50 61%$0 0%
113244
City of La Quinta
User and Regulatory Fee Study
Administrative Fees
Working Version of the Master Fee Schedule
Fee Description Current Fee Current Cost Recovery
Proposed
Fee *
Recommended
Cost Recovery
[a]
Fee Increase /
(Decrease)
Percent Increase /
(Decrease)
1 Black and White Copy - 8.5 x 11
a) First Page 0.15$ n/a 0.15$ n/a -$ 0%
b) Each Additional Page 0.15$ n/a 0.15$ n/a -$ 0%
2 Black and White Copy - 11 x 17
a) First Page 0.20$ n/a 0.20$ n/a -$ 0%
b) Each Additional Page 0.20$ n/a 0.20$ n/a -$ 0%
3 Color Copy - 8.5 x 11 0.25$ n/a 0.25$ n/a -$ 0%
4 Color Copy - 11 x 17 0.50$ n/a 0.50$ n/a -$ 0%
5 Oversized Sheets (Plans/Maps)3.00$ n/a 3.00$ n/a -$ 0%
6 CD/DVD/Flash Drive 5.05$ n/a 5.00$ n/a (0.05)$ -1%
7 Agency Credit Card Service Fee 1.8%n/a 1.8%n/a -$ 0%
8 Processing Fee for Receipt of Non-Sufficient Funds
a) First from Payee 25.00$ n/a 25.00$ n/a -$ 0%
b) Each Subsequent from Payee 35.00$ n/a 35.00$ n/a -$ 0%
** The costs of providing these fee related administrative services were not calculated as part of this study.
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to
process the specific request for information/service.
114245
City of La Quinta
User and Regulatory Fee Study
Appeal Fees
Working Version of the Master Fee Schedule
Fee Description Current Fee Current Cost Recovery Proposed Fee
Proposed Cost
Recovery Fee Change Percent Change Note
1 Appeal to Hearing Officer of Administrative Citation 25$ 7%25$ 7%$0 0%[a]
2 Appeal of an Administrative Decision to City Manager 250$ 74%250$ 74%$0 0%[a]
3 Appeal to Construction Board of Appeals 1,500$ 78%1,500$ 78%$0 0%[a]
4 Appeal to Planning Commission 1,500$ 78%1,500$ 78%$0 0%[a]
5 Appeal to City Council 1,500$ 78%1,500$ 78%$0 0%[a]
[a] Depending on the subject of the appeal, specialized expertise may be solicited, at the expense of the applicant, for the purpose of providing input to the City Manager, Construction Board of Appeals, Planning Commission or City
Council.
115246
Master Fee Schedule
116247
Fee *
Fee Description Permit
Plan
Check Total Notes
Fee DescriptionPermit Issuance
1 Permit Issuance (Mechanical, Plumbing, Electrical)$101.97 $101.97
Mechanical
2 Installation or relocation of each forced-air or gravity-type furnace or burner,
including ducts and vents attached to such appliance
$40.25 $26.83 $67.08
3 Installation or relocation of each suspended heater, recessed wall heater, or
floor-mounted unit heater
$26.83 $13.42 $40.25
4 Repair of, alteration of, or addition to each heating appliance, refrigeration
unit, cooling unit, absorption unit, or each heating, cooling, absorption, or
evaporative cooling system, including installation of controls regulated by the
UMC
$13.42 $5.37 $18.78
5 Installation or relocation of each boiler, condenser, compressor, or each
absorption system
$40.25 $26.83 $67.08
6 Air-handling unit, including attached ducts $40.25 $13.42 $53.67
7 Evaporative cooler, other than portable-type $13.42 $13.42 $26.83
8 Ventilation fan connected to a single-duct $13.42 $5.37 $18.78
9 Installation of each hood which is served by mechanical exhaust, including the
ducts for such hood
$13.42 $5.37 $18.78
10 Each appliance or piece of equipment not classified in other appliance
categories, or for which no other fee is listed
$40.25 $40.25 $80.50
Mechanical Change-Out
11 Condenser Only $40.25 $26.83 $67.08
12 Furnace Only $40.25 $26.83 $67.08
13 Other Equipment $40.25 $40.25 $80.50
14 Packaged Unit $40.25 $26.83 $67.08
15 Repair / Alteration $13.42 $5.37 $18.78
16 Split-System $40.25 $80.50 $120.75
Plumbing
17 Each plumbing fixture or trap or set of fixtures on one trap (including water,
drainage piping, and backflow protection)
$13.42 $13.42 $26.83
18 Sewer Connection / Septic Abandonment $26.83 $18.78 $45.62
19 Rainwater systems, per drain (inside building)$13.42 $13.42 $26.83
20 Water heater and/or vent $13.42 $8.05 $21.47
21 Industrial waste pretreatment interceptor including its trap and vent,
excepting kitchen-type grease interceptors functioning as fixture traps
$40.25 $13.42 $53.67
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical
117248
Fee *
Fee Description Permit
Plan
Check Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical
22 Installation, alteration, or repair of water piping and/or water-treating
equipment, drainage or vent piping, each fixture
$13.42 $13.42 $26.83
23 Backflow protective device other than atmospheric-type vacuum breakers $13.42 $5.37 $18.78
24 Gas piping system - 1 to 4 outlets $13.42 $26.83 $40.25
25 Gas piping system - 5 or more outlets $40.25 $26.83 $67.08
26 Solar (Thermal)$26.83 $26.83 $53.67
Electrical
New Construction
27 Residential - First 1,000 SF
(includes livable and non-livable SF)
$161.00 $53.13 $214.13
28 Residential - Each Additional 1,000 SF
(includes livable and non-livable SF)
$13.69 $5.64 $19.32
29 Non-Residential - First 2,000 SF $120.75 $93.38 $214.13
30 Non-Residential - Each Additional 2,000 SF $40.25 $10.73 $50.98
Solar (Photovoltaic)
31 Solar (PV) Less than 10kW $26.83 $26.83 $53.67
32 Solar (PV) Greater than 10kW $40.25 $40.25 $80.50
33 Each Additional String (<20)$2.68 $0.67 $3.35
Receptacle, Switch, and Lighting Outlets
34 Receptacle, switch, lighting, or other outlets at which current is used or
controlled, except services, feeders, and meters - first 20
$26.83 $26.83 $53.67
35 Receptacle, switch, lighting, or other outlets at which current is used or
controlled, except services, feeders, and meters - each additional
$2.68 $0.67 $3.35
Lighting Fixtures
36 Lighting fixtures, sockets, or other lamp-holding devices - first 20 $26.83 $26.83 $53.67
37 Lighting fixtures, sockets, or other lamp-holding devices - each add'l $2.68 $0.67 $3.35
38 Pole or platform-mounted light replacement, repair or alteration - first 10 $26.83 $26.83 $53.67
39 Pole or platform-mounted light replacement, repair or alteration - each
additional
$2.68 $0.67 $3.35
Residential Appliances
40 Fixed residential appliances or receptacle outlets for same, including wall-
mounted electric ovens; counter-mounted cooking tops; electric ranges; self-
contained room, console, or through-wall air conditioners; space heaters;
food waste grinders; dishwashers; washing machines; water heaters; clothes
dryers; or other motor-operated appliances not exceeding one horsepower
(HP) in rating, each
$13.42 $13.42 $26.83
118249
Fee *
Fee Description Permit
Plan
Check Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical
Non-Residential Appliances
41 Residential appliances and self-contained, factory-wired, non-residential
appliances not exceeding one horsepower (HP), kilowatt (KW) , or kilovolt
ampere (KVA) in rating, including medical and dental devices; food, beverage,
and ice cream cabinets; illuminated show cases; drinking fountains; vending
machines; laundry machines; or other similar types of equipment, each
$26.83 $26.83 $53.67
Power Apparatus
42 Motors, generators, transformers, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking or
baking equipment, and other apparatus, each
$26.83 $26.83 $53.67
Signs, Outline Lighting, and Marquees
43 Signs, outline lighting systems, or marquees, each $40.25 $53.67 $93.92
Services
44 Services, each $26.83 $13.42 $40.25
Temporary Power Services
45 Temporary service power pole or pedestal, including all pole or pedestal-
mounted receptacle outlets and appurtenances, each
$26.83 $18.78 $45.62
Miscellaneous Apparatus, Conduits, and Conductors
46 Electrical apparatus, conduits, and conductors for which a permit is required,
but for which no fee is identified
$26.83 $26.83 $53.67
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific application.
119250
Fee *
Fee Description Permit
Plan
Check Total Notes
Addition
1 Residential Addition
a) Residential Addition - Up to 100 SF $135.24 $189.98 $325.22 [a]
b) Residential Addition - Each Additional 500 SF $69.23 $19.32 $88.55 [a]
c) Structural Review bill hourly (1 hour min.)[a]
2 Non-Residential Addition
a) Non-Residential Addition - Up to 100 SF $155.53 $218.48 $374.00 [a]
b) Non-Residential Addition - Each Additional 500 SF $79.61 $22.22 $101.83 [a]
c) Structural Review bill hourly (1 hour min.)[a]
Antenna
3 Dish > 2 Ft $40.25 $148.12 $188.37
4 Cellular/Mobile Phone $161.00 $228.62 $389.62
5 Equipment Shelter $40.25 $107.87 $148.12
Appeal
6 Appeal bill hourly (1 hour min.)
Awning/Canopy (Supported by Building)
7 Awning/Canopy $16.10 $228.62 $244.72
Balcony Addition
8 Balcony Addition $161.00 $188.37 $349.37
Block Wall
9 Block Wall - First 100 LF $53.67 $67.08 $120.75
10 Block Wall - Each Addt'l 50 LF $16.10 $16.10
11 Retaining / Combination Wall - Each 50 LF $16.10 $16.10
Carport
12 Carport - First $80.50 $107.87 $188.37
13 Carport - Each Additional $80.50 $42.93 $123.43
Compliance Survey/Special Inspection
14 Compliance Survey/Special Inspection $80.50 $201.25 $281.75
Demolition
15 Demolition $27.37 $96.60 $123.97
16 Demolition - Interior $40.25 $107.87 $148.12
17 Demolition - Exterior $40.25 $120.75 $161.00
Fence
18 Fence - First 100 LF $53.13 $67.62 $120.75
19 Fence - Each Additional 50 LF $16.10 $16.10
Fireplace
20 Fireplace $161.00 $241.50 $402.50
Flag/Lighting Pole
21 Flag/Lighting Pole - First $40.25 $107.87 $148.12
22 Flag/Lighting Pole - Each Additional $16.10 $4.83 $20.93
Grading
23 Residential Precise Grading (Tract Homes) - Per Home $148.12 see note $148.12 [b]
24 Residential Precise Grading (Custom Home) - Lot <= 7,000 SF $40.25 $40.25 $80.50
25 Residential Precise Grading (Custom Home) - Lot > 7,000 SF $40.25 $201.25 $241.50
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
120251
Fee *
Fee Description Permit
Plan
Check Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
Partition
26 Partition $80.50 $148.12 $228.62
Patio Cover / Covered Porch / Lattice
27 Standard, Open, Pre-Engineered (First)$107.87 $106.26 $214.13
28 Standard, Enclosed, Pre-Engineered (First)$107.87 $146.51 $254.38
29 Special Design (First)$148.12 $186.76 $334.88
30 Each Additional $53.67 $40.25 $93.92
Pool / Spa
31 Swimming Pool / Spa $201.25 $109.48 $310.73
32 Detached Spa / Water Feature $201.25 $201.25
33 Gunite Alteration / Resurfacing $201.25 $109.48 $310.73
34 Equipment Change-out Alone $26.83 $101.97 $128.80
Remodel
35 Non-Structural Review - Up to 100 SF $54.74 $149.73 $204.47 [a]
36 Non-Structural Review - Each Additional 500 SF $24.15 $19.32 $43.47 [a]
37 Structural Review bill hourly (1 hour min.)[a]
Replacement of Plans/Job Card
38 Replacement of Job Copy of Approved Plans $228.62 $228.62
39 Replacement of Inspection Record Card $40.25 $40.25
Re-Roof
40 Re-Roof - Up to 2,000 SF $54.74 $109.48 $164.22
41 Re-Roof - Each Additional 1,000 SF $12.88 $12.88
Sign
42 Monument Sign - First $80.50 $148.12 $228.62
43 Monument Sign - Each Additional $27.37 $27.37
44 Wall/Awning Sign - First $27.37 $96.60 $123.97
45 Wall/Awning Sign - Each Additional $27.37 $27.37 $54.74
Storage Racks
46 Storage Racks - First 100 LF $27.37 $106.26 $133.63
47 Storage Racks - Each Additional 100 LF $12.88 $12.88
Stucco Application
48 Stucco Application - First 500 SF $27.37 $82.11 $109.48
49 Stucco Application - Each Additional 500 SF $8.05 $8.05
Temporary Trailer
50 Temporary Trailer $161.00 $161.00 $322.00
Utility Release
51 Electrical Utility Release $80.50 $80.50
Window / Sliding Glass Door / Other Fenestration
52 Retrofit/Repair - Up to 7 $67.62 $66.01 $133.63
53 Retrofit/Repair - Each Additional 5 $11.27 $11.27
54 New/Alteration - First $107.33 $122.36 $229.69
55 New/Alteration - Each Additional $11.27 $12.88 $24.15
121252
Fee *
Fee Description Permit
Plan
Check Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
Administrative
Plan Check Initial Deposit - For Various Non-OTC Items
56 a) Miscellaneous Items $161.00 $161.00 [c]
57 b) New Construction varies [c] [d]
58 Plan Check / Permit Extension Processing $107.87 $107.87
59 Change of Contractor, Architect, Owner Processing $107.87 $107.87
60 Request/Research for Alternative Methods/Product Review bill hourly (1 hour min.)
61 Temporary Certificate of Occupancy $483.00 $483.00
62 Disabled Access Compliance Inspection $161.00 $161.00
63 Partial Inspection Fee $80.50 $80.50 [e]
64 Re-inspection Fee $80.50 $80.50 [e]
65 Excess Plan Check Fee bill hourly [f]
66 Investigation Fee for Work Commenced Without a Permit equal to permit fee
[d] Initial deposit varies depending on project details.
[e] The permit fees identified in this fee schedule include initial inspection and one re-inspection. Additional fees will be collected
for the provision of all subsequent permit inspection services. See re-inspection fee and partial inspection fee for applicable fees.
[f] The base plan check fees identified in this fee schedule include initial check and one re-check. Additional fees will be collected
for the provision of all subsequent re-check services.
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific application, including the
cost of structural engineering review services.
[c] Non-Refundable Initial Deposit. For projects that request permit issuance the intitial deposit amount will be credited against
total fees.
[a] Fee is intended to capture structural and non-structural reviews. Mechanical, Electrical, and Plumbing review and inspection
fees are collected separately.
[b] Plan review fees for Residential Precise Grading (Tract Homes) are identified as part of the Public Works fee schedule and based
on the number of sheets submitted for plan review. See Public Works fee schedule.
122253
Fee Description Fee - Permit *
New Construction
1 $1 - $10,000 $161.00 for the first $5,000, plus $48.30 for each additional $1,000 or fraction
thereof, to and including $10,000
2 $10,001 - $25,000 $402.50 for the first $10,000, plus $10.73 for each additional $1,000 or fraction
thereof, to and including $25,000
3 $25,001 - $200,000 $563.50 for the first $25,000, plus $8.28 for each additional $1,000 or fraction
thereof, to and including $200,000
4 $200,000 and Up $2,012.50 for the first $200,000, plus $4.14 for each additional $1,000 or fraction
thereof
Fee Description Fee - Plan Check *
(Project Valuation)
5 $1 - $10,000 $161.00 for the first $5,000, plus $80.50 for each additional $1,000 or fraction
thereof, to and including $10,000
6 $10,001 - $25,000 $563.50 for the first $10,000, plus $18.78 for each additional $1,000 or fraction
thereof, to and including $25,000
7 $25,001 - $200,000 $845.25 for the first $25,000, plus $2.99 for each additional $1,000 or fraction
thereof, to and including $200,000
8 $200,000 and Up $1,368.50 for the first $200,000, plus $2.39 for each additional $1,000 or fraction
thereof
Fee Description Fee - Plan Check for Multiple Structures - Each Additional **
(Project Valuation)
9 All Valuations $53.67
Fee Description Fee
10 Building Department Staff $161 per hour
11 City Attorney or Other Legal Review 100%of actual costs
12 Outside Service Providers 100%of actual costs
* The permit fees identified in this fee schedule include initial inspection and one re-inspection. Additional fees will be collected for
the provision of all subsequent permit inspection services. See re-inspection fee and partial inspection fee for applicable fees.
* The base plan check fees identified in this fee schedule include initial check and one re-check. Additional fees will be collected for
the provision of all subsequent re-check services.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the
appropriate fee based on the following hourly rates for staff time involved in the service or activity.
** Fee applies when multiple identical units are submitted for review and permitted at the same time.
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - New Construction
* The new construction fees identified in this fee schedule include the cost of structural engineering review services currently
conducted by outside service providers. Additional fees will be collected for the provision of all plan review services beyond second
review.
123254
Fee Description Fee Notes
Strong Motion Instrumentation (SMI)
Fee Calculation
1 Residential $0.50 or valuation x .00013
2 Commercial $0.50 or valuation x .00028
Art In Public Places (AIPP) Fee Calculation [a]
3 Residential $20.00 or 1/4 of 1% of value exceeding $200,000
4 Commercial $20.00 or 1/2 of 1% of value
Building Standards Administration Special Revolving
Fund (SB 1473) Fee Calculation
[b]
5 Valuation:
a) $1 - $25,000 $1
b) $25,001 - $50,000 $2
c) $50,001 - $75,000 $3
d) $75,001 - $100,000 $4
e) Every $25,000 or fraction thereof above
$100,000
Add $1
Technology Enhancement Fee
6 Technology Enhancement Fee (per permit)$5
Digital Archiving and Records Management Fee
7 Digital Archiving and Records Management Fee
a) OTC Permit/Application $10
b) All Others $21
[a] Source: La Quinta Municipal Code 2.65.060.
[b] Source: California Health and Safety Code Section 18931.6
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Other Fees
124255
Fee Description Fee * Notes
Temporary Use
1 Temporary Use Permit - Minor (Standard)$400
2 Temporary Use Permit - Minor
(Requests Requiring Additional Effort)
bill per hour, with $400 base fee
3 Temporary Use Permit - Major (Standard)$2,093
4 Temporary Use Permit - Major
(Requests Requiring Additional Effort)
bill per hour, with $2,093 base fee
Minor Use
5 Minor Use Permit bill per hour, with $400 base fee
6 Minor Use Permit - Amendment bill per hour, with $400 base fee
Conditional Use
7 Conditional Use Permit bill per hour, with $6,413 base fee
8 Conditional Use Permit - Planned Unit Dev.bill per hour, with $6,413 base fee
9 Conditional Use Permit - Amendment bill per hour, with $3,126 base fee
10 Conditional Use Permit - Time Extension $1,691
Expedited Review Fee
11 Expedited Review Fee 1.5x
standard
fee
[a]
Site Development
12 Development Agreement bill per hour, with $3,327 base fee [b]
13 Site Development Permit - Planning Commission bill per hour, with $8,909 base fee
14 Site Development Permit - Administrative bill per hour, with $7,621 base fee
15 Site Development Permit - Amendment bill per hour, with $4,669 base fee
16 Site Development Permit - Time Extension $1,691
17 Modification by Applicant bill per hour, with $400 base fee
18 Minor Adjustment bill per hour, with $400 base fee
19 Variance bill per hour, with $2,415 base fee
Landscape Plan
20 Final Landscape Plan $1,771
Pre-Application Review Fee
21 Pre-Application Review Fee $2,254 [c]
Signs
22 A-Frame Sign Permit $0
23 Sign Permit $355
24 Sign Program bill per hour, with $2,844 base fee
25 Sign Program Amendment $966
Zoning
26 Zone Change bill per hour, with $9,392 base fee
27 Director's Determination $405
28 Certificate of Compliance $505
29 Zoning Letter - Basic Property Information $263
City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
125256
Fee Description Fee * Notes
City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
30 Zoning Letter - Basic Property Information with Additional
Research Required
$1,369
31 Zoning Text Amendment bill per hour, with $9,445 base fee
Street Name Change
32 Street Name Change $1,852
Historical Structures
33 Landmark Designation/Cert of Appropriateness $1,320
Environmental Review
34 Environmental Assessment $483
35 Recordation of Exemption $161
36 Initial Study (ND/MND)bill per hour, with $3,220 base fee
37 Environmental Impact Report bill per hour, with $8,855 base fee
General/Specific Plan
38 Specific Plan bill per hour, with $10,680 base fee
39 Specific Plan - Amendment bill per hour, with $4,776 base fee
40 General Plan Amendment bill per hour, with $10,465 base fee
Map
41 Tentative Parcel Map bill per hour, with $5,045 base fee
42 Tentative Parcel Map - Waiver $1,369
43 Tentative Parcel Map - Amendment bill per hour, with $3,005 base fee
44 Tentative Parcel Map - Revision bill per hour, with $3,005 base fee
45 Tentative Parcel Map - Time Extension $966
46 Tentative Tract Map bill per hour, with $8,372 base fee
47 Tentative Tract Map - Amendment bill per hour, with $3,971 base fee
48 Tentative Tract Map - Revision bill per hour, with $3,971 base fee
49 Tentative Tract Map - Time Extension (CC or PC)$1,852
50 Tentative Tract Map - Time Extension (Admin)$1,047
51 Tentative Condominium Map bill per hour, with $8,372 base fee
52 Amended Final Parcel Map (Entitlement Support)bill per hour, with $4,025 base fee
53 Amended Final Tract Map (Entitlement Support)bill per hour, with $6,440 base fee
Zoning Clearance - Planning Plan Check
54 Zoning Clearance - Planning Plan Check
a) Alterations/Additions - Residential $81
b) New Construction - Single Family Residential $161
c) New Construction - 2-4 Residential Units $242
d) New Construction - 5+ Residential Units $644
e) New Construction - Non-Residential $322
f) Alterations/Additions - Non-Residential $161
Scanning
55 Scanning Fee $161
Technology Enhancement Fee
56 Technology Enhancement Fee $5
126257
Fee Description Fee * Notes
City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
Digital Archiving and Records Management Fee
57 Digital Archiving and Records Management Fee
a) OTC Permit/Application $10
b) All Others $21
Appeal
58 Appeal $1,500
Fee Description Fee * Notes
59 Planning Department Staff $161 per hour
60 City Attorney or Other Legal Review pass-through of 100%of actual costs
61 Outside Service Providers pass-through of 100%of actual costs
[b] In addition to the fee shown for Development Agreement, the City shall collect a $2,000 initial deposit to offset City Attorney costs.
[c] 50% of fee may be credited toward entitlement application submittal.
[a] Request for expedited service is subject to Design & Development Department Director approval. It is dependent on staff availability and
workload.
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific application.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the
appropriate fee based on the following hourly rates for staff time involved in the service or activity.
127258
Fee Description Fee *Unit Notes
Land Subdivision
1 Parcel Map:
a) Final Parcel Map
i) Initial Sheet $2,496 per sheet
ii) Each Additional Sheet $725 per sheet
b) Final Parcel Map - Amendment
i) Initial Sheet $2,496 per sheet
ii) Each Additional Sheet $725 per sheet
c) Substantial Conformance Review
i) Initial Sheet $2,938 per sheet
ii) Each Additional Sheet $1,288 per sheet
2 Tract Map:
a) Final Tract Map
i) Initial Sheet $2,657 per sheet
ii) Each Additional Sheet $805 per sheet
b) Final Tract Map - Amendment
i) Initial Sheet $2,657 per sheet
ii) Each Additional Sheet $805 per sheet
c) Substantial Conformance Review
i) Initial Sheet $2,938 per sheet
ii) Each Additional Sheet $1,288 per sheet
3 Reversion to Acreage:
a) Initial Sheet $2,737 per sheet
b) Each Additional Sheet $725 per sheet
4 Lot Line Adjustment/Parcel Merger
a) Lot Line Adjustment $1,932 per request
b) Parcel Merger $1,932 per request
5 Street Dedication/Vacation
a) Land Action Documents
(ROW/Easements/Grant Deeds)
$1,972 per request
b) Vacation of Street/Public ROW $2,415 per request
6 Land Survey
a) Record of Survey $523 per request
b) Certificate of Correction $684 per request
Grading / Project Improvements
7 Plan Review (First 3 Reviews):
a) Rough Grading
i) Initial Sheet $1,489 per sheet
ii) Each Additional Sheet $805 per sheet
iii) Revisions - Initial Sheet $1,148 per sheet
iv) Revisions - Each Additional Sheet $805 per sheet
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
128259
Fee Description Fee *Unit Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
b) Precise Grading - Commercial
i) Initial Sheet $1,811 per sheet
ii) Each Additional Sheet $1,127 per sheet
iii) Revisions - Initial Sheet $1,470 per sheet
iv) Revisions - Each Additional Sheet $1,127 per sheet
c) Precise Grading - Tract Homes
i) Initial Sheet $1,047 per sheet
ii) Each Additional Sheet $201 per sheet
iii) Revisions - Initial Sheet $625 per sheet
iv) Revisions - Each Additional Sheet $201 per sheet
d) Precise Grading - Custom Home [a]
e) PM10
i) Initial Sheet $585 per sheet
ii) Each Additional Sheet $0 per sheet
iii) Revisions - Initial Sheet $450 per sheet
iv) Revisions - Each Additional Sheet $0 per sheet
f) Street Improvements
i) Initial Sheet $1,650 per sheet
ii) Each Additional Sheet $966 per sheet
iii) Revisions - Initial Sheet $1,309 per sheet
iv) Revisions - Each Additional Sheet $966 per sheet
g) Storm Drain
i) Initial Sheet $1,650 per sheet
ii) Each Additional Sheet $966 per sheet
iii) Revisions - Initial Sheet $1,309 per sheet
iv) Revisions - Each Additional Sheet $966 per sheet
h) Signing and Striping
i) Initial Sheet $1,489 per sheet
ii) Each Additional Sheet $805 per sheet
iii) Revisions - Initial Sheet $1,148 per sheet
iv) Revisions - Each Additional Sheet $805 per sheet
i) Traffic Signal
i) Initial Sheet $1,328 per sheet
ii) Each Additional Sheet $644 per sheet
iii) Revisions - Initial Sheet $987 per sheet
iv) Revisions - Each Additional Sheet $644 per sheet
j) Sidewalk
i) Initial Sheet $1,167 per sheet
ii) Each Additional Sheet $483 per sheet
iii) Revisions - Initial Sheet $826 per sheet
iv) Revisions - Each Additional Sheet $483 per sheet
k) Traffic Control Plan $81 per sheet
129260
Fee Description Fee *Unit Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
l) Record Drawings Review
i) Initial Sheet $845 per sheet
ii) Each Additional Sheet $161 per sheet
m) Hydrology Report $1,731 per report
i) Revisions $805 per report
n) Traffic Study $1,328 per study
o) WQMP Report
i) With Prior Entitlement $1,570 per report
ii) Without Prior Entitlement $1,892 per report
iii) Revisions $805 per report
p) SWPPP $1,811 per plan
i) Revisions $644 per plan
q) Sewer and Water
i) Initial Sheet $1,127 per sheet
ii) Each Additional Sheet $483 per sheet
iii) Revisions - Initial Sheet $805 per sheet
iv) Revisions - Each Additional Sheet $483 per sheet
8 Plan Review (>3 Reviews)$161 per hour
9 Expedited Plan Review Fee 1.5x standard fee [b]
10 Permit Inspection
a) Rough Grading
i) First 3 Acres $3,220
ii) Each Additional Acre $805
iii) Last One Acre $403
b) Precise Grading
i) First 3 Acres $3,220
ii) Each Additional Acre $805
iii) Last One Acre $403
c) Precise Grading - Tract Homes $148 [c]
d) Precise Grading - Custom Homes $81 [c]
e) PM10
i) < 10 Acres $3,864 [d]
ii) 10 - 50 Acres $5,796 [d]
iii) 51 - 200 Acres $7,728 [d]
iv) > 200 Acres $11,592 [d]
f) Street Improvements - Off-Site
i) First 1,000 LF $5,152
ii) Each Additional 1,000 LF $4,508
iii) Last 1,000 LF $2,898
130261
Fee Description Fee *Unit Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
g) Street Improvements - On-Site
i) First 1,000 LF $3,542
ii) Each Additional 1,000 LF $2,898
iii) Last 1,000 LF $1,932
h) Storm Drain
i) First 1,000 LF $3,059
ii) Each Additional 1,000 LF $2,415
iii) Last 1,000 LF $1,610
i) Signing and Striping
i) First 1,000 LF $1,610
ii) Each Additional 1,000 LF $966
iii) Last 1,000 LF $483
j) Traffic Signal $4,347
k) NPDES $1,932
l) Bond Reduction Request $2,174
m) Final Inspection/Acceptance $2,898
n) Traffic Control Only
i) One Day $325
ii) Two - Five Days $650
iii) Each Additional Day (Up to 10 Days)$325
iv) 11+ Days $3,784
o) Cut/Bore $725
p) Driveway
i) Residential $175
ii) Commercial $1,047
q) Excavation / Trenching
i) First 100 LF $725
ii) Each Additional 100 LF $322
iii) Last 100 LF $161
r) Sidewalk
i) First 100 Lineal Feet $1,369
ii) Each Additional 100 Lineal Feet $966
iii) Last 100 Lineal Feet $322
s) Sewer and Water $1,288
t) Night Work $403
11 Research/Administrative
a) Subdiv'n Improvement Agreem't (SIA)$1,932 per request
b) SIA - Time Extension $1,127 per request
c) Assignment & Assumptions Agreement $2,093 per request
131262
Fee Description Fee *Unit Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
d) Flood Plain Research/FEMA App $966 per request
e) Bid Protest Review $725
12 Reactivation of Permit
a) Reactivation of an Expired Permit 10% of original permit fee each
13 Technology Enhancement Fee
Technology Enhancement Fee $5
Digital Archiving and Records Management Fee
14 Digital Archiving and Records Management Fee
a) OTC Permit/Application $10
b) All Others $21
15 Transportation Permits
a) Annual $90 each
b) Single Event $16 each
Fee Description Fee Unit Notes
16 Public Works Personnel $161 per hour
17 City Attorney or Other Legal Review 100%pass-through of actual cost
18 Outside Service Providers 100%pass-through of actual cost
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any discrete costs incurred from the
use of outside service providers required to process the specific application. Exception for contract traffic engineering and plan
review consulting costs, which are included in the fees listed above.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine
the appropriate fee based on the following hourly rates for staff time involved in the service or activity.
[a] Plan review fees for Precise Grading - Custom Home are identified as part of the Building fee schedule and are based on the lot
size of the custom home. See Building fee schedule, Grading section.
[c] Inspection fees for Precise Grading - Custom Homes and Tract Homes are identified as part of the Building fee schedule. See
Building fee schedule, Grading section.
[d] For PM10 annual permit. For permits required for less than one year, or portion of year, fees will be pro-rated based on the
number of months permitted.
[b] Expedited Plan Review request is subject to City Engineer approval. It is dependent on staff availability and workload.
132263
Fee *
Fee Description Plan Review
Permit /
Inspection Total Notes
Construction-Related Fire Review and Inspection Fees
1 New Multi-Residential (Hotel, Motel, Apartments, Condominiums)$483 $322 $805
2 New Commercial / Industrial $483 $403 $886
3 Residential Addition / Remodel $161 $161 $322 [a]
4 Commercial Tenant Improvement $242 $161 $403
5 Commercial / Industrial Addition or Remodel $242 $242 $483
6 Commercial Cooking Hood and Duct Systems $242 $161 $403
7 Water Systems (Fire Hydrants, Water Mains, Sprinkler Risers)$403 $483 $886
8 Pre-Engineered Fire Suppression Systems (Halon, Dry-Chemical, etc.)$483 $322 $805
9 Fire Alarm Systems $564 $483 $1,047
10 Fire Sprinkler Systems - Single Family Detached [a]
a) 1-50 Sprinkler Heads $242 $161 $403 [a]
b) 51-100 Sprinkler Heads $242 $242 $483 [a]
c) Over 100 Sprinkler Heads $242 $322 $564 [a]
11 Fire Sprinkler Systems - Multi-Family 3 or more units $322 $242 $564
12 Fire Sprinkler Systems - Commercial / Industrial 0 - 35,000 SF $403 $242 $644
13 Fire Sprinkler Systems - Commercial / Industrial 35,001 - 75,000 SF $483 $282 $765
14 Fire Sprinkler Systems - Commercial / Industrial 75,001 - 120,000 SF $564 $403 $966
15 Fire Sprinkler Systems - Commercial / Industrial > 120,000 SF $644 $564 $1,208
16 Fire Sprinkler Systems - Tenant Improvement > 10 Heads $242 $161 $403
17 Fire Pumps $322 $322 $644
18 Fire Standpipe Systems $242 $322 $564
19 Fire Sprinkler Systems Supervision & Alarms $242 $161 $403
20 Smoke Controls (Smoke & Heat Vents, Barriers, Enclosures, etc.)$564 $483 $1,047
21 Fire Water Tanks $242 $161 $403
22 Underground Water Supply to Sprinkler Riser (per riser)$322 $322 $644
23 Egress Analysis $161 $161 $322
24 Occupancy Load / Seating Capacity Determinations $0 $161 $161
25 Fire Compliance Release/Final $0 $161 $161
26 Plan Revision Submittals - each $161 $0 $161
27 Plan Resubmittals (in Excess of 3 Reviews) - each $161 $0 $161
28 Failed or Additional Field Inspections (Excessive) - each $0 $161 $161
Operational Permit
29 Fire Operational Permit (per hour)bill hourly bill hourly per hour
Other
30 Master Plan bill hourly bill hourly per hour
31 Tract access/Hydrant inspection $0 $201 $201
City of La Quinta
Master Fee Schedule
Schedule of Fire Fees
133264
Fee *
Fee Description Plan Review
Permit /
Inspection Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Fire Fees
32 Special Event Permit $161 $242 $403
33 Pyrotechnic Permit $403 $322 $725
34 Pyrotechnic Event Standby (per hour)bill hourly bill hourly per hour
35 Fire Miscellaneous (per hour)bill hourly bill hourly per hour
Technology Enhancement Fee
36 Technology Enhancement Fee n/a n/a $5
Digital Archiving and Records Management Fee
37 Digital Archiving and Records Management Fee
a) OTC Permit / Application n/a n/a $10
b) All Others n/a n/a $21
Fee Description Fee * Notes
38 City Assigned Fire Safety Specialist $161 per hour
39 Other County Fire Services See County Fees
40 City Attorney or other legal review 100%of actual costs
41 Outside Service Providers 100%of actual costs
[a] Fee will not apply for all submittals. Before applying fees, Fire Department will review project submittal to determine if review is
necessary or if review fees have been collected as part of the development planning process.
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific application, including but
not limited to legal review.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the
appropriate fee based on the following hourly rates for staff time involved in the service or activity.
134265
Fee Description Fee Unit Notes
NPDES Ongoing Inspection Fee
1 Food Establishment Facilities $47 per year
2 Hazardous Waste/Materials Facilities - 3Yr $98 per year
3 Hazardous Waste/Materials Facilities - 1Yr $260 per year
Code Compliance
4 Code Compliance Follow-Up, If Required $118 per hour
City of La Quinta
Master Fee Schedule
Schedule of NPDES Ongoing Inspection Fees
135266
Fee Description Fee Unit Notes
Short-Term Vacation Rental Permit Fee
1 Annual Permit Fee $200 per year
2 Code Compliance Inspection Fee (if applicable)$325 per unit
3 Technology Enhancement Fee $5 per year
City of La Quinta
Master Fee Schedule
Schedule of Short-Term Vacation Rental Permit Fees
136267
Fee Description Fee Unit Notes
Medical Cannabis Delivery Services Application
1 Medical Cannabis Delivery Service Application
a) Delivery Service Application - New $468 per year
b) Delivery Service Application - Renewal $468 per year
2 Technology Enhancement Fee $5 per year
City of La Quinta
Master Fee Schedule
Schedule of Medical Cannabis Delivery Application Fees
137268
Fee Description Fee Unit Notes
False Alarm Response
1 Police False Alarm Response [a]
a) 1st False Alarm Response No Charge each
b) 2nd False Alarm Response No Charge each
c) 3rd False Alarm Response $60 each
d) 4th False Alarm Response $105 each
e) 5th and Each Additional False Alarm Response $120 each
2 Fire False Alarm Response [a]
a) 1st False Alarm Response No Charge each
b) 2nd False Alarm Response No Charge each
c) 3rd False Alarm Response $60 each
d) 4th False Alarm Response $275 each
e) 5th and Each Additional False Alarm Response $605 each
[a] Based on number of false alarms in a 365 day period.
City of La Quinta
Master Fee Schedule
Schedule of False Alarm Response Fees
138269
Fee Description Fee Unit Notes
1 Vehicle Impound Cost Recovery Fee $228 each
City of La Quinta
Master Fee Schedule
Schedule of Vehicle Impound Cost Recovery Fees
139270
Fee Description Fee Unit Notes
1 Code Enforcement Hourly Rate
a) Code Enforcement Hourly Rate $118 per hour [a]
b) Code Enforcement Hourly Rate - For Outside
Agency Reimbursement Request
$109 per hour [b]
City of La Quinta
Master Fee Schedule
Schedule of Code Enforcement Hourly Rate for Services
[a] Hourly rate for Code Compliance inspections required or requested for which no other fees are listed, requests for special event
support, etc.
[b] Hourly rate for outside agency reimbursement request is a reduced rate because the City may request direct reimbursement of
various fleet and technology related costs.
140271
Fee Description Fee Unit Notes
1 Pool Drain Permit $25 per permit
2 Golf Cart Permit
a) New $50 per permit
b) Renewal $25 per permit
City of La Quinta
Master Fee Schedule
Schedule of Pool Drain and Golf Cart Permit Fees
141272
Fee Description Fee Unit Notes
1 Home Occupation Permit $100 per permit
2 Home Occupation Permit - Address Change $50 per permit
City of La Quinta
Master Fee Schedule
Schedule of Home Occupation Permit Fees
142273
Fee Description Fee Unit Notes
Film/Photography Permit
1 Cast and Crew Totaling One to Three Persons:
a) Permit Issuance Fee
i) Private Property $89 per permit
ii) Private Property with Staging in Public Right of Way $118 per permit
iii) Public Property $118 per permit
b) Location Use Fee
i) Private Property $0 per day
ii) Private Property with Staging in Public Right of Way $100 per day [a]
iii) Public Property $150 per day [a];[b]
2 Cast and Crew Totaling Four or More Persons:
a) Permit Issuance Fee
i) Private Property $207 per permit
ii) Private Property with Staging in Public Right of Way $325 per permit
iii) Public Property $384 per permit
b) Location Use Fee
i) Private Property $0 per day
ii) Private Property with Staging in Public Right of Way $250 per day [a]
iii) Public Property $500 per day [a];[b]
Other Fees, If Applicable
3 Pre-Application Meeting (upon request)$236 per meeting
4 City Film Monitor (as needed)$118 per hour
5 Violations:
a) Filming/Photography without a Permit 2 times applicable fees
b) Violation of Permit $350 per violation, per day
[a] Proposed fee is a market-based rate for exclusive private use of public space/facilities.
[b] Does not include any applicable facility rental fees that may apply.
City of La Quinta
Master Fee Schedule
Schedule of Film/Photography Permit Fees
Note: The City Manager may waive fees for bona fide student film/photography projects and projects with 501(c)(3) Federal Income Tax Status;
however, the permitting process for filming/photography is still required for these projects.
143274
Fee Description Fee Unit Notes
1 Bingo Permit
a) Initial $50 per permit
b) Renewal $50 per permit
City of La Quinta
Master Fee Schedule
Schedule of Bingo Permit Fees
144275
Fee Description Fee *Unit Notes
1 Black and White Copy - up to 8.5 x 14 $0.15 per single-sided page
2 Black and White Copy - 11 x 17 $0.20 per single-sided page
3 Color Copy - up to 8.5 x 14 $0.25 per single-sided page
4 Color Copy - 11 x 17 $0.50 per single-sided page
5 Oversized Sheets (Plans/Maps)$3.00 per sheet [a]
6 CD/DVD/Flash Drive $5.00 per CD or DVD
7 Agency Credit Card Service Fee 1.8%% of fees paid [b]
8 Processing Fee for Receipt of Non-Sufficient Funds
a) First from Payee $25.00 per occurence [c]
b) Each Subsequent from Payee $35.00 per occurence [c]
[a] If more than two sheets are requested, the City will typically process the request using an outside vendor service.
[b] Fee is intended to function as a pass-through of credit card transaction vendor charge. Annual updates should be based on vendor charge.
[c] Set by State (Civil Code Section 1719).
City of La Quinta
Master Fee Schedule
Schedule of Administrative Fees
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific request for
information/service.
* In addition to the fees identified in this schedule, if a request for electronic records either (1) is for a record normally issued only
periodically, or (2) requires data compilation, extraction, or programming, costs will include the cost of producing the copy,
including construction, programming and computer services.
145276
Fee Description Fee Unit Notes
1 Appeal to Hearing Officer of Administrative Citation $25 per appeal [a]
2 Appeal of an Administrative Decision to City Manager $250 per appeal [a]
3 Appeal to Construction Board of Appeals $1,500 per appeal [a]
4 Appeal to Planning Commission $1,500 per appeal [a]
5 Appeal to City Council $1,500 per appeal [a]
City of La Quinta
Master Fee Schedule
Schedule of Appeal Fees
[a] Depending on the subject of the appeal, specialized expertise may be solicited, at the expense of the applicant, for the purpose
of providing input to the City Manager, Construction Board of Appeals, Planning Commission or City Council.
146277
Fee Description
Class I
(per season) Class II Class III Class IV
SPORTS FACILITIES
1 Sports Complex Baseball Diamonds/ Football Field or La
Quinta Park Baseball Diamonds (with or without field lights)
$10 per
resident/
$15 per non-
resident
$25/hour
(per field)
N/A N/A
2 La Quinta Park or Colonel Mitchell Paige Soccer Fields (with
or without field lights)
$10 per
resident/
$15 per non-
resident
$25/hour
(per field)
N/A N/A
3 Sports Complex, La Quinta Park, and Colonel Mitchell Paige
Sports Fields (per field)
N/A N/A $25/hour
($40/hour with
lights)
$35/hour
($55/hour
with lights)
4 Sports Complex or La Quinta Park Snack Bar Use $200.00 N/A N/A N/A
5 La Quinta Boys & Girls Club Gymnasium N/A $25/hour $35/hour $45/hour
6 Tennis Courts/Pickleball Courts (per court)N/A $5/hour $5/hour $10/hour
PARKS
7 Civic Center Campus, Gazebo, Amphitheater (50 people or
less)
N/A $75/hour $125/hour $175/hour
8 Civic Center Campus (Non-profit events with 100 people or
more; TUP required)
N/A $150/hour N/A N/A
9 Cove Oasis Trailhead (50 people or less)N/A $75/hour $125/hour $175/hour
10 Fritz Burns or La Quinta Park Party (50 people or less)N/A $50 (4 hours)$65 (4 hours)$90 (4 hours)
11 Fritz Burns or La Quinta Park (Non-profit events with 100
people or more; TUP required)
N/A $50/hour N/A N/A
BUILDINGS
12 Wellness Center Multi-Purpose Room (max capacity is 200)$55/hour $75/hour $125/hour $175/hour
13 Museum Meeting Room (Meetings only; max capacity is 65)N/A $50/hour $50/hour $50/hour
14 Museum Meeting Room & Courtyard (max capacity is 150)N/A $75/hour $125/hour $175/hour
15 Museum Meeting Room, Courtyard, & Upstairs Patio
(max capacity is 175)
N/A $100/hour $150/hour $200/hour
16 Library Community Room (Small events/meetings with 60
people or less)
N/A $50/hour $50/hour $50/hour
17 Library Classroom (Meetings only; max capacity is 60)N/A $50/hour $50/hour $50/hour
18 Wellness Center, Library Community Room, and Museum
Kitchen
$10/hour $20/hour $25/hour $30/hour
City of La Quinta
Master Fee Schedule
Schedule of Facility Use Fees
147278
Fee Description
Class I
(per season) Class II Class III Class IV
City of La Quinta
Master Fee Schedule
Schedule of Facility Use Fees
19 Wellness Center Multi-Purpose Room
Museum Meeting Room & Courtyard
Museum Meeting Room & Courtyard w/Upstairs Patio
$500.00
20 La Quinta Park & Sports Complex snack bars $350.00
21 $200.00
22 Museum Meeting Room
Library Community Room
Fritz Burns Tennis Courts (per court)
Fritz Burns or La Quinta Park (Non-profit events w/ 100+
people)
$100.00
23 Fritz Burns or La Quinta Park Party $50.00
CLASSIFICATIONS
Class I: 501(c) 3 recreation organizations serving LQ youth (18 and under)
Class II: LQ non-profit organizations, community-based organizations, competitive youth sports leagues
(DSUSD - Sports Complex Use Only)
Class III: LQ residents (DSUSD - for all other facilities other than the Sports Complex)
Class IV: LQ business and profit organizations; non-city residents, organizations, and businesses
Library Classroom
Cove Oasis Trailhead
Civic Center Campus, Gazebo, Amphitheater
(50 people or less)
SECURITY DEPOSITS (Refundable upon post conditions after use)
Sports Fields
Boys & Girls Club Gym
Civic Center Campus (Non-profit events with 100 people or more)
148279
Fee Description Non-Profit All Others
SILVERROCK EVENT SITE (4-Hour Minimum Rental)
1 Permit Processing Fee (per application)$118 $118
2 Facility Rental Fee (per hour)$250 $300
3 Security Deposit
a) One Day Event $500 $500
b) Event Lasting Two or More Days $1,000 $1,000
CLASSIFICATION
Non-Profit: 501(c)3 tax organization.
City of La Quinta
Master Fee Schedule
Schedule of SilverRock Event Site Facility Rental Fees
149280
ATTACHMENT 2281
282
BIA Comments concerning The City of La Quinta:
Building Permit Valuation and MEP Issues
Part 1
July 11, 2019
Executive Summary
• BIA recommends that the City of La Quinta convert from a valuation-based fee
structure to a time-based fee structure designed for receiving consideration (fees)
based upon a fair amount of time spent servicing applications for building times for a
reasonable Fully Burdened Hourly Rate (FBHR).
• BIA recommends that the City of La Quinta adopt a fee schedule for new (Single
Family Dwelling (SFD) Residential based upon fixed rates determined by square
footage categories reflecting permit processing, plan check, and reasonable
inspection times multiplied by FBHR like many other cities rather than by building
permit square-foot multipliers and valuation-tables.
• BIA recommends that the City of La Quinta charge only a single building permit fee
(‘Rescombo’) and a separate plan check fee for Single Family Residential (SFR)
units and not charge separate plan check and permit fees for mechanical, electrical,
plumbing (MEP), and structural activities.
• BIA recommends that the City of La Quinta set up a revolving account for building
department service fees that carry balances from one fiscal year to the next since
many fees paid in one fiscal year need to cover services in the next.
The City of La Quinta and ClearSource’s 2019 User and Regulatory Fee Study
The City of La Quinta adopted Resolution No. 2017-041 on August 1, 2017, which
enables their Master Fee Schedule. ClearSource now proposes a revised Master Fee
Schedule. Both Master Fee Schedules provide a schedule of fees for building
department services such as plan check and inspection for a variety of occupancies,
including fees for new single-family detached residential dwellings. Resolution No.
2017-041 implements valuation as one of the procedures for calculating building plan
check and permit fees for new construction. Both Master Fee Schedules require tables
known as Building Valuation Data, which provides the square-foot multipliers for
determining valuation for buildings of different o ccupancies for conversion into the
valuation into a building permit fee and a plan check fee
The City’s current and proposed Master Fee Schedule for their Building Department’s
service fees continue with a table of miscellaneous fixed fees, and a list of mechanical,
electrical, and plumbing fees (MEP), mostly based upon the number of MEP
components.
283
The City of La Quinta: Building Permit Valuation and MEP Issues
2
For the purposes of this analysis BIA-Riverside opposes only those fees applicable to
new single-family detached residential dwellings that are imposed upon applications for
building plan check and building permits based upon valuation and separate MEP1
permits.
The Issue concerning Valuation as a Methodology for determining Building Plan Check
and Building Permit Fees
Willdan Financial Services provided the following statement in one of their user fee
studies for another local agency which explains the use of project valuation:
Exhibit A
“For the Building Permit fees, valuation is used as a proxy for measuring the
amount of effort needed to provide services on a case-by-case basis. This
method is an industry standard widely used by other jurisdictions to evaluate the
cost of providing service. It is generally understood that the larger and more
complex a project is, more time and effort that is required t o provide the service.
Project valuation also follows that trend, and so by using a combination of either
project valuation or historical revenue figures along with a multiplier or cost
recovery analysis for historical and anticipated future trends, current cost
recovery along with variability in charges due to project type and scale is
determined.”
However, BIA-Riverside has issues with the City of La Quinta’s use of the ‘Building
Permit Valuation’ schedule to determine Building Department service fees and the
simultaneous charge of MEP fees. Below, BIA will focus on this issue as applied to
Single-Family Detached residential units in order to narrow this review although the
concepts may apply to other occupancies.
Found in the City’s website the City provided a handout titled Building Valuation Data
dated March 5, 2009 under the web page that states that the information was
“[tr]anscribed from Building Standards, July-August 1994 and adapted to 2007 CBC
Types of Construction: http://www.laquintaca.gov/home/showdocument?id=6982
1 MEP – Mechanical, Electrical, and Plumbing.
284
The City of La Quinta: Building Permit Valuation and MEP Issues
3
Exhibit B
Although the City’s website provided the above Building Valuation Data which provides
the square-foot cost per occupancy, the adopted Master Fee Schedule and the MEP fee
tables, these tables were derived from the International Conference of Building Officials
(ICBO) and the Building International Code Council’s (ICC) publications. The Master
Fee Schedule was derived from Table 1-A which was initially published in the Uniform
Building Code (UBC) and lastly, in the 1997 Uniform Administrative Code (UAC) as
Table 3-A. Except for the added notation to multiply the total fees derived from the
Table 1-A by a defined percentage, the table printed in the fee schedule is identical to
Table No. 3-A published in the 1997 UAC. The MEP fee schedule also follows the
Tables Nos. 3-B through 3-D as printed in the 1997 UAC, except these tables are
printed with the City’s revised MEP fees.
The BIA-Riverside expresses its concern over the Building Department’s use of
valuation to determine their base building permit fees and MEP fees as per “Table Nos.
3-A through 3-D of the Uniform Administrative Codes published in the 1990s2. ICC
2 This table appears as Table 1-A in the Uniform Building Code.
285
The City of La Quinta: Building Permit Valuation and MEP Issues
4
continued printing these tables in their International Building Code, which is the model
code for the California Building Code. The City of La Quinta may have mistakenly
adopted modifications of these fee tables into their respective fee schedules when they
adopted Ordinances Nos. 517 and 551, which adopted the California Building
Standards Code, Title 24 CRR.
The City of La Quinta may have unintentionally adopted the administrative sections
printed in the California Building Code by ICC, but not adopted by the California Building
Standards Commission or the California Department of Housing and Community
Development. Subsequently, it appears that the City of La Quinta adopted the following
sections, Exhibits C and D, into their Municipal Code by reference since they are printed
as part of the 2016 California Building Code, Chapter 1, Division II:
Exhibit C
286
The City of La Quinta: Building Permit Valuation and MEP Issues
5
Exhibit D
However, the effective code section in the California Building Code concerning fees for
building department services appears in Section 1.8.4.2, below:
287
The City of La Quinta: Building Permit Valuation and MEP Issues
6
Exhibit E
Components of Valuation Methodology in determining building service fees
The City of La Quinta does not describe the methodology of how to the apply the use of
their ‘Building Permit Valuation Data’ square-foot modifiers into their valuation tables
provided in their Master Fee Schedule to determine SFR building plan check and
building permit fees. The Report by ClearSource does not provide ‘Building Permit
Valuation Data’ a description of occupancy types or any square-foot modifiers so a
reader may not determine the valuation of their building project.
Implementing ‘Valuation Methodology’ in California as per ICC in their Building
Valuation Data in determining building service (permit) fees involves numerous steps:
1. Determine ‘Occupancy and Type of Occupancy’ based upon the California
Building Standards Code (Title 24, California Code of Regulations) descriptions.
For the purpose of determining the SFR square foot construction cost, ICC
provides the option of R-3, VA or VB. In the Building Valuation Data published
288
The City of La Quinta: Building Permit Valuation and MEP Issues
7
by ICC, determine the ‘Cost per Square Foot, Average’ by ‘Occupancy and Type
of Occupancy’.3
For the purpose of determining the SFR square foot construction cost, ICC
provides the option of R-3, Residential One-and Two Family, Types V-A and V-
B.4 ‘Exhibit H’ below provides a description of the Types V-A and V-B. Most
SFRs in California are Type V-B.
Exhibit F
2. ICC describes the Permit Valuation Multiplier: 5
Exhibit G
3. ICC provides the formula for determining the ‘permit fee multiplier’. The
calculation and use of this definition of the ‘permit fee multiplier’ as applied in the
following formula.
Exhibit H
3 https://dps.mn.gov/divisions/sfm/programs-
services/Documents/Sprinkler%20Applications/ConstructionTypeDefinitions.pdf
4 ICC Building Valuation Data – August 2018
5 https://www.iccsafe.org/wp-content/uploads/BVD-BSJ-FEB19-converted.pdf
289
The City of La Quinta: Building Permit Valuation and MEP Issues
8
4. ICC explains the calculation of the permit fee by multiplying the building gross
area times the square foot construction cost times the permit fee multiplier.
Exhibit I
ICC provides the formula for determining the ‘permit fee multiplier’ as dividing the
building department’s revenue by the total annual construction value. The permit
fee is then calculated by multiplying the gross area times the square foot cost
divided by the permit fee multiplier. The building valuation data table provides
the square foot cost for various types of occupancies. Local agencies rarely use
the permit modifier as defined by ICC, rather they use square footage cost
provided by ICC in their Building Valuation Data table, as updated twice a year.
5. Multiply the square footage of the building project by the ‘Cost per Square Foot’
to arrive at the estimated valuation of the building project.
Note that the City of La Quinta’s 2019 User and Regulatory Fee Study does not
contain any square foot data relating to residential permit costs, nor does the
Study make any reference to the Building Valuation Data tables provided above
or published by ICC.
The ICC procedure above differs from those local agencies that adopt the UAC
Table 3-A or UBC valuation Table 1-A. Many building departments do not follow
the directive by the governing body when required to implement the Building
Valuation Data tables, but only partially follow the ICC methodology when they
apply the square footage of the building’s occupancy type to create valuation and
apply it to the valuation tables published by ICBO in their UAC and UBC , or ICC
in their IBC. This action creates an internal conflict or a duplication of processes
between the directive and the process, and thereby voids the calculations, and
possibly the permit(s) themselves. Use of these tables require that the building
department staff apply the ‘Total Valuation” to the corresponding categories on
the left side of the table and apply the formula on the right side to the valuation to
determine the building permit fee.
Some local agencies such as the City of La Quinta modify the fee amounts in the
two columns to reflect their current fees in their adopted Master Fee Schedule
and that schedule proposed by ClearSource.
290
The City of La Quinta: Building Permit Valuation and MEP Issues
9
Exhibit J
The ICC Building Valuation Data, February 2019, also states that permit valuation
contains the “average” cost that include mechanical, plumbing, and electrical (MEP)
along with other components. 6
Exhibit K
6 ibid. We find it interesting that ICC would include nonstructural components and interior finish materials
in the “average cost” associated with determining permit valuation. ICC seems to promulgate that cost
associated with the ‘quality’ of cabinets, plumbing and lighting fixtures, stone and tile work, floor covering
such as carpet and wood flooring, and other non-code, or non-health and safety related appointments
should be considered in determining valuation. Likewise, some the Building Departments of some local
agencies charge a separate processing, plan check, and permit fee for separate MEP permits for each of
the mechanical, electrical, and plumbing categories along with the structural category which is typicall y
the initial building permit for most ‘complete’ occupancy types, including SFR Type VB The consultant
has reviewed and determined that the local agency does charge separate permit processing, plan check,
and permit fees for the MEP according to their permit worksheet.
291
The City of La Quinta: Building Permit Valuation and MEP Issues
10
The City of La Quinta may have erroneously adopted their modification of valuation
schedules as created by ICBO and ICC which along with Section 109.3 Building
permit valuations from Chapter 1 of the IBC administrative rules, include MEP fees.
Exhibit L
The City of La Quinta requires all four permits7 per their fee schedule which
produces duplicate charges for the complete building permit when compared to the
directive of the ICC Building Valuation Data section above. BIA-Riverside
challenges the additional and duplicate MEP permits and fees when imposed by
local agencies such as the City of La Quinta because of the “duplicate” charges.
6. Valuation does not include the value of the land:
Exhibit M
7. The City of La Quinta requires application of the estimated total valuation of the
building project to the Uniform or ICC Building Code’s ‘Table 1-A—Building
Permit Fees’ to arrive at the building service (permit) cost.
7 Building, and MEP fees
292
The City of La Quinta: Building Permit Valuation and MEP Issues
11
8. Using the ICC and ICBO fee determination process, Plan Check Fees are
determined by a percentage of the Building Permit cost where the percentage is
65% for a building permit per Table No. 1-A and 25% for MEP fees per Tables
Nos. 3-B, 3-C, and 3-D).8
Did the City of La Quinta correctly modify the California Building Standards Code, Title
24 in their Municipal Code?
Earlier, we discussed the City of La Quinta’s ordinances9 which adopted the California
Building Standards Code, Title 24 CRR.10
The next issue continues the discussion of the City of La Quinta’s Ordinances adopting
the various parts of the California Building Standards Code (Title 24, CCR), more
specifically their adoption of the California Building Code (and the California Residential
Code), 2013 and 2016 editions. Subsequently, their ordinance may have adopted
Chapter 1, sections 105 Permits and 109.2 Schedule of Permit Fees of Part Two of the
California Building Code in error.
In summary, the City of La Quinta may have unintentionally applied some amendments
and deletions to the California Building Standards Code, Title 24 CRR when they are
printed in the ICC model codes and when they are administrative in nature. The
California Building Standards Commission did not adopt most of the administrative
sections of the printed in the California Building Code and the California Residential
Code. The local agency may not apply administrative sections printed in the California
Building Code that were not adopted by a state agency. The Office of the State Fire
Marshall and the Department of Housing and Community Development did not adopt
the administrative Sections 105 and 109 of the International Building Code or Section
R108 Fees of the International Residential Code for adoption into the California Codes.
The paper titled, A Guide to California Housing Construction Codes11 provides guidance
for local agencies:
Apply Only Adopted Model Code Language.
“Do not apply CCR, Title 24 provisions that are not adopted by the state agencies
in building occupancies subject to the jurisdiction of the state agencies. Not all
printed model code language in CCR, Title 24 is adopted for all building
occupancies. Sometimes only one or a few state agencies adopt a section of
model code language in a specific chapter. Sometimes an entire chapter is not
adopted by a state agency. The Matrix Adoption Tables help identify each
adopted section or subsection of the code and the adopting state agency, if any.”
8 See Section 304 (c) Plan Review Fees, 1997 Uniform Administrative Code.
9 Ordinances Nos. 517 and 551
10 See (Ordinances Nos. 517 and 551)
11 Ibid. A Guide to California Housing Construction Codes . Page 16
293
The City of La Quinta: Building Permit Valuation and MEP Issues
12
The Matrix Adoption Tables
“The Matrix Adoption Tables within CCR Title 24 identify adopted model code
text, and California Amendments and Standards. Matrix Adoption Tables are
provided in Parts 2, 2.5, 3, 4, 5, 9,10, and 11, at the beginning of each chapter
(or article) to identify the model code and or California Amendment or Standard
adoptions by each of the state agencies. A Matrix Adoption Table is provided for
only those adopted model code chapters. Thus, if there is no table for a model
code chapter, the chapter has not been adopted for application to a building
subject to the state agency jurisdiction.
“Exception: Occasionally the code publisher has provided a blank Matrix
Adoption Table at the beginning of a model code chapter that is not adopted.
Accordingly, if a Matrix Adoption Table is provided for a model code chapter but
is blank (showing no “Xs” for adoptions), then the chapter is not adopted.
Clarifying notes are sometimes provided a blank Matrix Adoption Table. Many
model code sections and California Amendments and Standards are only
adopted by specific state agencies and thus only apply to specific types of
buildings, occupancies, building features or equipment. Each Matrix Adoption
Table lists all the adopted sections. Not all adopted code provisions are
applicable to all buildings. There is also a Matrix Adoption Table for thos e
chapters in Title 24 that are California Amendments or Standards in their entirety,
such as Chapters 7A and 11A.12
Matrix Adoption Tables
A state agency’s adoption or non-adoption of model code language and/or
California amendments is identified in the Matrix Adoption Tables. The Matrix
Adoption Tables at the front of each chapter are an aid to the code users for
determining which chapter or sections within a chapter are applicable to HCD
SHL 600 (New 4/15) 15 buildings under the authority of a specific state agency;
however, they are for information only and are not considered regulatory.
Summary
The following may help when using CCR, Title 24:
1. Identify Jurisdiction: Identify the state agencies having
jurisdiction over the building occupancy or building feature in the
project. The jurisdiction of each state agency is explained in the
“application” section of each part. Learn each of the banners for these
state agencies. The banners are identified in the section “How to
Distinguish Between Model Code Language and California
Amendments” in each part.
12 Ibid. GUIDE TO TITLE 24. Page 11.
294
The City of La Quinta: Building Permit Valuation and MEP Issues
13
2. Matrix Adoption Tables: The Matrix Adoption Tables provide information
regarding which state agency adopts model code language or adds a
California Amendment. In some cases, only selected sections of a model
code chapter are adopted. An example from CBC, Part 2, Volume 2, is
Section 3109, which is not adopted by HCD.
Exhibit N
CHAPTER 31 — SPECIAL CONSTRUCTION
(Matrix Adoption Tables are non -regulatory, intended only as an aid to the user. See Chapter 1 for state
agency authority and building applications.)
Adopting Agency BSC SFM DSA HCD OSHPD
AC SS 1 2 1-AC 1 2 3 4
Adopt Entire Chapter X X X X X X
Adopt Entire Chapter as
amended (amended
sections listed below)
X X
Adopt only those sections
that are listed below X X
Chapter / Section 3104.2, Exception 2 X X 3109 t t The state agency does not adopt sections identified by the following symbol: t
3. California Amendments: Apply the California Amendments adopted
by the state agency having jurisdiction over the building occupancy
or building feature and marked for local enforcement.
“California amendments are identified by the use of italic print and are
usually accompanied by the banner of the adopting state agency. Text in
normal font is model code language with the exception of some model code
definitions being in italics. California amendments may be necessary to
amend or add to the model code language. California amendments may be
located within subsections, sections or may consist of entire chapters.”13
The State Housing Law
“The California Legislature has identified Health and Safety Code, Division 13,
Part 1.5, commencing with Section 17910, as the “State Housing Law”. The
State Housing Law charges the California Department of Housing and
Community Development with the responsibility to adopt administrative
regulations necessary to carry out its provisions, and for proposing building
standards to the CBSC for adoption and approval. These standards apply to the
construction of hotels, motels, lodging houses, apartments and dwellings.
Additionally, the State Housing Law mandates preemptive requirements
13 Ibid. A Guide to California Housing Construction Codes . Page 14.
295
The City of La Quinta: Building Permit Valuation and MEP Issues
14
applicable to such housing structures, including substandard abatement
proceedings for local government enforcement. As a result of the mandates in
the State Housing Law, the CBSC has adopted and published building standards
proposed by HCD in CCR, Title 24. This is done in coordination with the other
state adopting agencies that also have jurisdiction for portions of residential
occupancies, such as the Office of the State Fire Marshal for fire and panic
safety, and the Division of the State Architect for accessibility in public housing
and public use areas. In addition, HCD has adopted regulations in the California
Code of Regulations, Title 25, Division 1, Chapter 1, Subchapter 1 (CCR, Title
25), commencing with Section 1. CCR, Title 25 is discussed in more detail below
in “California Code of Regulations, Title 25”.”14
The Role of the Department of Housing and Community Development
“Prior to July 2013, the California Department of Housing and Community
Development (HCD) was a department within the Business, Transportation and
Housing Agency. Based on the Governor’s Reorganization Plan of 2012, HCD
was placed under the authority of the newly configured Business, Consumer
Services, and Housing Agency. HCD has many responsibilities mandated by
state law to meet the state’s housing needs. The Division of Codes and
Standards administers seven programs mandated by state law, including the
State Housing Law Program. The Program carries out the State Housing Law
with respect to housing construction and is responsible for the rulemaking
process related to the adoption of building standards and regulations.”15
“The adoptions in Title 24 that are to be enforced by local enforcement agencies
(generally the building department or fire official) include many of the adoptions
by the state agencies as identified in Sections 1.2 through 1.14 of the California
Building Code. An abbreviated listing of the state agencies with adoptions to be
enforced by local government follows.
• “HCD 1 for residential occupancies”16
California Code of Regulations, Title 25 (CCR, Title 25)
“CCR, Title 25, Division 1 is the segment of the CCR adopted by HCD to
implement, interpret, clarify or make specific the mandates of state law regarding
housing. The scope of CCR, Title 25 includes the administration of building
standards in CCR, Title 24, including the issuance of construction permits, use,
maintenance and occupancy, and substandard building abatement proceedings.
CCR, Title 25, Division 1, Chapter 1, Subchapter 1, commencing with Section 1,
is adopted by HCD’s Division of Codes and Standards. These regulations,
14 Ibid. A Guide to California Housing Construction Codes . Page 8.
15 Ibid. A Guide to California Housing Construction Codes . Page 9.
16 Ibid. GUIDE TO TITLE 24. Page 19.
296
The City of La Quinta: Building Permit Valuation and MEP Issues
15
adopted primarily under the authority of the State Housing Law, Health and
Safety Code, Division 13, Part 1.5, commencing with Section 17910, apply to
hotels, motels, apartments, lodging houses and dwellings, and are appli cable
throughout the state.”17
“Additionally, the Department of Housing and Community Development (HCD)
has adopted administrative regulations (not building standards) to implement the
State Housing Law, which are located in Title 25, Division 1, Chapter 1,
Subchapter 1, commencing with Section 1, of the California Code of
Regulations.”18
California Code of Regulations, (Vol. 33), Title 25, Housing and Community
Development
“Division 1. Housing and Community Development Chapter 1. State Housing Law
Regulations and Earthquake Protection Law Regulations Subchapter 1. State
Housing Law Regulations
”Article 3. Administration and Enforcement
§ 6. Local Regulations.
(a) Except as provided in subsection (b), the governing body of every city or
county shall adopt ordinances or regulations imposing the requirements
contained in this subchapter. These ordinances and regulations shall be adopted
pursuant to Sections 17958, 17958.5, 17958.7, 17958.8, 17958.9 and 17959 of
the Health and Safety Code.
(b) The regulations contained in Section 20 and Section 24 (f) through
(k) of this subchapter are intended to be enforced by the department. The
provisions of these sections need not be adopted by the governing body
of any city or county.
NOTE: Authority cited: Sections 17003.5, 17921, 50061 .5 and 50559, Health
and
Safety Code. Reference: Sections 17921, 17922, 17958, 17958.5, 17958.7,
17958.8, 17958.9 and 17959, Health and Safety Code.
History
1. Change without regulatory effect amending section filed 6 -23-2004 pursuant
to section 100, title 1, California Code of Regulations (Register 2004, No. 26). “
17 Ibid. A Guide to California Housing Construction Codes . Page 9.
18 California Building Standards Commission. Guide for Local Amendments of Building Standards.
https://www.documents.dgs.ca.gov/bsc/Title_24/Guide_for_Local_Amendments_of_Building_Standards_
2016-opt.pdf July 2016. Page 3.
297
The City of La Quinta: Building Permit Valuation and MEP Issues
16
25 CCR § 10, § 10. Enforcement.
Enforcement of the provisions of Division 13, Part 1.5 of the Health and Safety
Code and the provisions of this subchapter shall b e consistent with Sections
17952, 17960, 17961, 17962, 17964, 17965 and 17966 of the Health and Safety
Code.
Note: Authority cited: Sections 17003.5, 17921, 50061.5 and 50559, Health and
Safety Code. Reference: Sections 17952, 17960, 17961, 17962, 17964, 1 7965
and 17966, Health and Safety Code.
HISTORY
1. Change without regulatory effect amending section filed 6 -23-2004 pursuant
to section 100, title 1, California Code of Regulations (Register 2004, No. 26).
This database is current through 2/1/19 Register 201 9, No. 5
25 CCR § 10, 25 CA ADC § 10
25 CCR § 16, § 16. Permits to Construct.
No person shall erect, construct, enlarge, convert, alter, repair, move, remove, or
demolish any building or structure subject to the provisions of this subchapter
without first obtaining a written construction permit from the enforcing agency
unless such work is exempted, as specified in the California Building Standards
Code, California Code of Regulations Title 24, this subchapter, or the other rules
and regulations promulgated pursuant to Section 17921 of the California Health
and Safety Code. Exemption from permit requirements shall not be deemed to
grant authorization for any work to be done in violation of the provisions of the
California Building Standards Code, this subchapter, other state laws, or
ordinances lawfully enacted by the local enforcing agency.
Note: Authority cited: Sections 17003.5, 17921, 50061.5 and 50559, Health and
Safety Code. Reference: Sections 17921 and 17922, Health and Safety Code.
HISTORY
1. Amendment of section and Note filed 11-8-2006; operative 12-8-2006
(Register 2006, No. 45).
This database is current through 2/1/19 Register 2019, No. 5
25 CCR § 16, 25 CA ADC § 16
298
The City of La Quinta: Building Permit Valuation and MEP Issues
17
“Article 6. Actions and Proceedings
Ҥ 56. Revolving Fund. For the purpose of providing for the advancement of
costs in the enforcement of the provisions of this article, any city or county may
create revolving fund or funds from which may be paid the costs of enforcing the
provisions of this article and into which may be paid the receipts from the
collection of costs or fines imposed in the enforcement thereof.
Note: Authority cited: Sections 17003.5, 17921, 50061.5 and 50559, Health and
Safety Code. Reference: Section 17951, Health and Safety Code.
This database is current through 2/1/19 Register 2019, No. 5
25 CCR § 56, 25 CA ADC § 56
The California Residential Code
The local agency’s municipal code indicates that the governing body adopted the
California Residential Code with their passing of their fee Ordinance in 2016:
15.02.010 Codes of 2016 Edition of the California Building Standards Code adopted
without local amendments:
”Chapter 15.02 ADOPTED CALIFORNIA AND UNIFORM CODES
“The following codes of the 2016 Edition of the California Building Standards
Code shall be applicable within the city, without local amendments:
“E. 2016 California Residential Code as set forth in Part 2.5 of Title 24 of the
California Code of Regulations.”
California Residential Code (CRC) (CCR, Title 24, Part 2.5)
“The CRC was specifically developed for design and construction of detached
one- and two-family dwellings and townhouses not more than three stories above
grade and its accessory structures.”19
“Part 2.5. California Residential Code, [is] presently based on the most current
edition of the International Residential Code, published by the International Code
Council.”20
Local Administrative Ordinances
“Local ordinances and regulations necessary to carryout procedures by a city,
county, or city and county relating to civil, administrative, or criminal procedures
and remedies available for carrying out and enforcing building standards, and
19 Ibid. A Guide to California Housing Construction Codes . Page 19.
20 Ibid. A Guide to California Housing Construction Codes . Page 5.
299
The City of La Quinta: Building Permit Valuation and MEP Issues
18
that do not establish building standards may be enacted without meeting the
requirements of the state laws cited herein governing Title 24 building standards
amendments. Read HSC Section 18909 (c) regarding a regulation that is not a
building standard.”21
HSC Section 18909 (c)
”Building Standards: A legal definition of “building standard” is provided in Health
and Safety Code Section 18909. In short a building standard is a state regulation
placed in Title 24 of the California Code of Regulations when adopted or
approved by the California Building Standards Commission. Building standards
establish requirements for the design and construction of buildings and related
facilities and equipment.”22
Building Standard (Health and Safety Code Section 18909)
“(a) “Building standard” means any rule, regulation, order, or other requirement,
including any amendment or repeal of that requirement, that specifically
regulates, requires, or forbids the method of use, properties, performance, or
types of materials used in the construction, alteration, improvement, repair, or
rehabilitation of a building, structure, factory-built housing, or other improvement
to real property, including fixtures therein, and as determined by the commission.
“ (b) Except as provided in subdivision (d), “building standard” includes
architectural and design functions of a building or structure, including, but not
limited to, number and location of doors, windows, and other openings, stress or
loading characteristics of materials, and methods of fabrication, clearances, and
other functions.
“ (c) “Building standard” includes a regulation or rule relating to the
implementation or enforcement of a building standard not otherwise governed by
statute, but does not include the adoption of procedural ordinances by a local
agency or other public agency relating to civil, administrative, or criminal
procedures and remedies available for enforcing code violations.
“ (d) . . . . . “23
Application of Local Administrative Amendments not Adopted by CBC or CRC
The following page presents a copy of page 30 from the 2016 California Building Code
with the entire Section 109 printed which includes the subsections relating to payment
of fees, schedule of permit fees, building permit valuation, penalty fee for work without a
21 California Building Standards Commission. Guide for Local Amendments of Building Standards.
https://www.documents.dgs.ca.gov/bsc/Title_24/Guide_for_Local_Amendments_of_Building_Standards_
2016-opt.pdf July 2016. Page 16.
22 Ibid. GUIDE TO TITLE 24. Page 72.
23 Ibid. Ibid. A Guide to California Housing Construction Codes Page 26.
300
The City of La Quinta: Building Permit Valuation and MEP Issues
19
permit, related fees, and refunds. The subsequent page from the 2016 California
Building Code provides the Matrix Adoption Table for Chapter 1 – Scope and
Administration which indicates that neither the State Fire Marshall or HCD adopted any
part of Sections 105 and 109.
Exhibit O
Scroll down to Sections ‘105.1 – 105.2’ and ‘109’ and observe that neither the State Fire
Marshall or any of the HCD columns adopt “Section 105 Permits, 105.1 – 105.2’” or
“Section 109 Fees” of the International Building Code although they appear in print in
the California Building Code.
301
The City of La Quinta: Building Permit Valuation and MEP Issues
20
Exhibit P
Printed below, “Section 1.8.4.2 Fees”24, 2016 California Building Code preempts local
administrative amendments to “Section 109.2 Schedule of Fees” as presented by ICC.
24 See CRC Matrix Adoption Table for Chapter 1 – Scope and Administration, “Section 1.8.4.2 Fees”,
below.
302
The City of La Quinta: Building Permit Valuation and MEP Issues
21
Exhibit Q
Constraining this BIA report to Single-Family Residential and confirming that the local
agency made local amendments to 2016 edition of the California Residential Code
concerning administrative section, including fees, the following discussion addresses
section R108.2 Fees as related to SFR.
International Residential Code (IRC) published by the International Code Council, (ICC)
In the International Residential Code (IRC) the ICC published the following Section
R108 on fees which contain the following subsections:
Exhibit R
“Section R108 Fees
”R108.1 Payment of fees. A permit shall not be valid until the fees prescribed by
law have been paid, nor shall an amendment to a permit be released until the
additional fee, if any, has been paid.
303
The City of La Quinta: Building Permit Valuation and MEP Issues
22
“R108.2 Schedule of permit fees. On buildings, structures, electrical, gas,
mechanical and plumbing systems or alterations requiring a permit, a fee for each
permit shall be paid as required, in accordance with the schedule as established by
the applicable governing authority
“R108.3 Building permit valuation. Building permit valuation shall include total
value of the work for which a permit is being issued, such as electrical, gas,
mechanical, plumbing equipment and other permanent systems, including materials
and labor.
However, the State Fire Marshall (SFM) and the Department of Housing and Community
Development (HCD1) did not adopt Section R108.
The Matrix Adoption Table the California Residential Code (CRC)
The Matrix Adoption Table for Chapter 1 of the CRC does not reference Section R108
which signifies that SFM and HCD did not consider or adopt the text presented by ICC
concerning the adoption of fees for residential dwellings.
Exhibit S
CALIFORNIA RESIDENTIAL CODE — MATRIX ADOPTION TABLE 25
CHAPTER 1 — SCOPE AND APPLICATION
(Matrix Adoption Tables are non-regulatory, intended only as an aid to the user.
See Chapter 1 for state agency authority and building applications.)
Adopting agency SFM HCD 1 2 1/AC
Adopt entire chapter Adopt entire chapter
as amended (amended
sections listed below)
Adapt only those
sections that are listed
below
X X
Chapter 1 Section Division 1 California
Administration
1.1 through 1.1.12 X X 1.8 through 1.8.10.2 X 1.11 through 1.11.10 X Division 11
Administration
R104.2 – R10 4.4 X R104.9 – R104.9.1 X R105.1 X _._ R105.2
Building: items 1 – 10
X RI 105.2.1 – R105.2.2 X R105.3 – R105.3.1 X R105.4 X R105.6 X R105.7 X R106 – R106.5 X R106.1 X
25 California Residential Code, Part 2.5 - includes Supplement July 1, 2018 - 2018CHAPTER 1 - SCOPE
AND APPLICATION, https://codes.iccsafe.org/content/chapter/10549/
304
The City of La Quinta: Building Permit Valuation and MEP Issues
23
R06.1.1 X R106.1.3 X R106.1.4 X R106.2 X R107 – R107.4 X X R109.1 X R109.1.1 X R109.1.1.1 X R109.1.3 X R109.1.4 x X R109.1.4.1 X R109.1.4.2 X R109.1.5 X X R109.1.5.1 X X R109.1.5.2 X R109.1.6
X X R109.1.6.1 X R109.1.6.2 X R109.2 – R109.4 X R110 – R110.5 X R111 -R111.3 X R113 – R113.2 X R114 – R114.2 X
In summary, local agencies cannot lawfully adopt amendments to the California Building
Standards Code, Title 24 CRR that are printed in the ICC model codes and that are
administrative in nature and not adopted by HCD in the case of R-3 SFD residential
because the State Building Standards Commission did not adopt most of the
administrative sections of the California Building Code and the California Residential
Code. The Office of the State Fire Marshall and the Department of Housing and
Community Development did not adopt Section 109 of the International Building Code
and Section R108 Fees of the International Residential Code for adoption into the
California Codes.
California’s local agencies must follow the directive provided in “Section 1.8.4.2 Fees”
2016 California Residential Code when requiring fees for R-3 SFD residential
construction.
Exhibit T
“1.8.4.2 Fees
“Subject to other provisions of law, the governing body of any city, county, or city
and county may prescribe fees to defray the cost of enforcement of rules and
regulations promulgated by the Department of Housing and Community
Development. The amount of the fees shall not exceed the amount reasonably
necessary to administer or process permits, certificates, forms or other
documents, or to defray the costs of enforcement. For additional information, see
State Housing Law, Health and Safety Code, Division 13, Part 1.5, Section
17951 and California Code of Regulations, Title 25, Division 1, Chapter 1,
Subchapter 1, Article 3, commencing with Section 6.”
Recommended reading:
AN AUDIT OF THE LOCAL AGENCY OF SAN JOSE BUILDING DIVISION’S
BUILDING PERMIT FEE PROCESS – A Cost Of Service Effort Should Result In
305
The City of La Quinta: Building Permit Valuation and MEP Issues
24
Building Permit Fees That Are Able To Withstand Political And Public Scrutiny,
Report 00-04 June 2000
http://www.sanjoseca.gov/DocumentCenter/View/20866
Profiting from Building Permit Fees, March 20, 2001
https://www.marincounty.org/~/media/files/departments/gj/reports-
responses/2000/profiting_building_permit_fees_report.pdf
BIA-Riverside’s Recommendations
• BIA recommends that the City of La Quinta convert from a valuation-based fee
structure to a time-based fee structure designed for receiving a just consideration
(fees) based upon a fair amount of time spent servicing applications for building
times for a reasonable FBHR.
• BIA recommends that the City of La Quinta adopt a fee schedule for new SFD
Residential based upon fixed rates determined by square footage categories
reflecting permit processing, plan check, and reasonable inspection times multiplied
by FBHR like many other cities rather than by building permit square-foot multipliers
and valuation-tables.
• BIA recommends that the City of La Quinta charge only fees for SFR units
(‘Rescombo’ fee) and not charge separate plan check and permit fees for
mechanical, electrical, plumbing (MEP), and structural activities.
• BIA recommends that the City of La Quinta set up a revolving account for building
department service fees that carry balances from one fiscal year to the next since
many fees paid in one fiscal year need to cover services in the next.
306
City of La Quinta
CITY COUNCIL MEETING: July 16, 2019
STAFF REPORT
AGENDA TITLE: ADOPT RESOLUTION TO DENY APPEAL 2019-0002 AND
SUSTAIN PLANNING COMMISSION APPROVAL OF CONDITIONAL USE PERMIT
2018-0005 AND SITE DEVELOPMENT PERMIT 2018-0004 FOR A 16-UNIT
APARTMENT PROJECT LOCATED AT 51-480 DESERT CLUB DRIVE; PROJECT:
DESERT CLUB APARTMENTS; CEQA: EXEMPT FROM ENVIRONMENTAL REVIEW
PURSUANT TO SECTION 15332, INFILL DEVELOPMENT
RECOMMENDATION
Find the project exempt from environmental review under the California
Environmental Quality Act pursuant to Section 15332 as in-fill
development.
Adopt a Resolution to deny Appeal 2019-0002 and sustain Planning
Commission approval of Conditional Use Permit 2018-0005 and Site
Development Permit 2018-0004 for a 16-unit apartment project located
at 51-480 Desert Club Drive in the Village.
EXECUTIVE SUMMARY
On June 11, 2019, the Planning Commission (Commission) adopted
Resolution No. 2019-009 approving Conditional Use Permit (CUP) 2018-
0005 and Site Development Permit (SDP) 2018-0004 to allow the
development of 16 apartments in two buildings immediately north of
the existing Arnold Palmer’s restaurant (Applicant: Southwest Concepts
for Nispero Properties).
On June 26, 2019, Lawrence Marshall (Appellant) appealed the
Commission decision.
FISCAL IMPACT - None.
BACKGROUND
Southwest Concepts, on behalf of Nispero Properties, the property owner,
applied for a CUP and SDP to allow the development of 16 apartments on 1.3
acres (Attachment 1). The site is currently vacant and located immediately
north of the existing Arnold Palmer’s Restaurant driveway. The property
consists of two lots. One building will be located on each lot, and will be
PUBLIC HEARING ITEM NO. 2
307
accessed by a single central driveway. Parking will be provided on the rear
(east) side, and will include one garage space per unit as well as 22 open
parking spaces (Attachment 2, Sheet A1.1). At the June 11, 2019, public
hearing, the Commission added a condition of approval requiring that the
open parking spaces be covered by carports.
The project includes eight ground floor units and eight second-story units.
The ground floor units are to be located immediately adjacent to the sidewalk
along Desert Club, with gates in the low courtyard walls, to increase street
presence and encourage walkability. Second-story units will have balconies
overlooking the street and will be accessed by stairs on the ends of each
building, and a center staircase with a shared landing for the center two
apartments. A central breezeway provides access to the rear of each unit
from the garages, and abuts rear courtyards for the ground floor units.
The project’s location on Desert Club at Calle Barcelona allows walking or
biking distance access to shopping and job opportunities in the Village.
Environmental Review
The project was reviewed under the provisions of CEQA. Pursuant to CEQA
Section 15332, the Director determined the project is exempt as an Infill
project. The project qualifies for this exemption because it is consistent with
the General Plan and Zoning designation, is less than 5 acres in size, and is
located in an urbanized and mostly built-out area.
Public Notice
The Notice of Public Hearing for the project was published in the Desert Sun
newspaper on May 31, 2019, and sent to all property owners within 500 feet
of the project site on May 29, 2019.
Planning Commission Review
On June 11, 2019, the Commission held a public hearing for the project
(Attachment 3), and heard testimony from several homeowners on Calle
Cadiz, northeast of the project site, in opposition to the project. The Planning
Commission considered the matter and adopted Planning Commission
Resolution 2019-009 (Attachment 4), approving the CUP and SDP, with added
conditions of approval, by a 6-0 vote, with Chairman McCune having recused
himself. Conditions of approval added include a requirement for a reciprocal
access easement or other means to guarantee access from both lots to the
central driveway, and a requirement for the open parking spaces to be
covered by carports.
Appeal
On June 26, 2019, Mr. Lawrence Marshall, property owner of 78-175 Calle
Cadiz, the home closest to the proposed project to the northeast, filed Appeal
2019-0002 with the City. It is noted that although Mr. Marshall did not
provide testimony at the hearing, he expressed his opposition to the project
308
to Planning Division Staff the day of the hearing; and subsequently submitted
a letter to Planning Manager, Cheri Flores, who detailed the appeal process.
STAFF ANALYSIS OF APPEAL
Mr. Marshall cites six concerns in his appeal letter (Attachment 5). Each is
summarized below, with staff analysis provided.
1.The Commission’s hearing was scheduled when out of town property
owners had left for the summer.
Staff Analysis: The City makes every attempt to schedule applications in
a timely manner. Hearings are held year-round, and although the
Commission may occasionally cancel meetings, due to lack of items,
lack of quorum, or summer breaks, it generally holds at least one
hearing per month, even in the summer months, in order to meet the
requirements of the Permit Streamlining Act, and to assure timely
processing of applications.
2.The planning process did not allow sufficient time for Staff to explain
the strategic plan for the area “in an informative and transparent
manner.”
Staff Analysis: The Village Build-Out Plan was originally envisioned
when the General Plan was developed in 2009. Since that time, the City
has completed a Build-Out Plan for the Village, an Environmental
Impact Report (EIR) for the Plan, and a Zoning Ordinance Amendment
codifying the Plan. The Plan was developed to consider the types and
scale of future development in the Village, and included extensive
consideration of the options for Mixed Use development envisioned in
the General Plan. The Plan acknowledged that a mix of residential and
commercial uses, on a scale appropriate for the Village, was needed to
revitalize and provide economic viability for the Village. The Plan
focused on allowing and encouraging high density residential and a
broad mix of retail and office uses to create a compact neighborhood
that would allow people to work, play, and live within walking distance.
The apartment project approved by the Commission is consistent with
these General Plan and Build-Out Plan goals and vision.
Community outreach meetings for the Master Plan were held in 2015, in
conjunction with an online survey. Both were noticed in the newspaper,
and notices were sent to property owners throughout the Village. Forty-
eight (48) persons attended the community meetings, and 481 persons
responded to the online survey. Following the community meetings,
Staff prepared a land use analysis, and developed a build-out scenario.
This scenario focused on mixed use development throughout the
Village, and resulted in the codification of the build-out potential in
309
Municipal Code Section 9.70.110 (Village Build-Out Plan Area). The
Build-Out Plan was also studied in the Village Build-Out Plan EIR. A
Notice of Preparation inviting public comment occurred from October 5
to November 3, 2015. Public comment on the EIR was advertised and
circulated from August 9 to September 22, 2016. The City received four
comment letters on the EIR, from the Riverside County Airport Land Use
Commission, the Coachella Valley Water District, the Agua Caliente
Band of Cahuilla Indians, and the Imperial Irrigation District. On
December 6, 2016, the City Council held a Study Session to review the
Village Build-Out Plan, and on December 20, 2016, the City Council held
a public hearing and approved the Build-Out Plan and certified the EIR.
The City has made every effort to be informative and transparent with
the community regarding the future of the Village.
3.The residents have not been requested to provide input on what they
envision for the property.
Staff Analysis: Please see response to item 2, above. The community
has been extensively involved in developing the vision for the property.
4.Staff has not communicated the long term effect of the location of the
parking lot on the east side of the proposed project.
Staff Analysis: As Mr. Marshall does not identify what he feels is the
long term effect, it is difficult for Staff to address his concern. However,
the parking lot proposed on the east side of the property is designed to
include 16 garages and 22 parking spaces. The Commission required
that these parking spaces be covered by carport structure(s). The
project will generate trips that will travel into the site from a central
driveway on Desert Club, into and out of the parking lot. The primary
activity periods will be between 7 AM and 9 AM, and again between 4
PM and 6 PM, which are the City’s typical peak hours for vehicle trip
activity. The project will generate about 112 trips per day (7 trips per
unit). The Institute of Transportation Engineers (ITE) generally
estimates that 10 to 12% of total trips occur during the morning peak
hour and the evening peak hour. Therefore, the project could generate
up to 13 trips during the AM peak hour and 13 trips during the PM peak
hour. This does not represent a significant trip generation, particularly
since the parking lot abuts the existing Arnold Palmer’s Restaurant
parking lot. This does not represent a large number of trips, particularly
when distributed over an hour’s time. Further, the parking area does
not abut the single family homes, but rather the existing perimeter wall
and parking lot at Arnold Palmer’s Restaurant. The perimeter wall will
remain, and will block headlights to the east. In addition, the
Commission required the installation of carports on the open parking
spaces, which will act as a cap to on-site noise emanating from parked
310
cars. The parking area will not significantly impact the residences to the
northeast.
5.The character of the single family homes will be significantly changed.
Staff Analysis: The project site does not abut any of the single family
homes. A vacant lot occurs north of the site at the corner of Desert Club
and Calle Cadiz. To its east is a vacant residential lot, which could be
developed as a single family home. That lot’s southwest corner abuts
the northeast corner of the project. The project takes no access from
Calle Cadiz, and will have no presence on Calle Cadiz. The project is
purposely oriented to Desert Club, to encourage pedestrian activity
rather than vehicular activity. None of the ground floor units will have
views into the homes, because their rear patios and windows will be
blocked by the garages. The eight apartments located on the second
floor will have entries and a bedroom window that face easterly.
However, the extent to which these apartments will have views into the
homes or yards is limited by distance (the closest landing and bedroom
window will be 82 feet from the east property line) and the steep angle
from which most of these units would view the homes on Calle Cadiz.
6.Homeowners will stop investing and rehabilitating their properties due
to the significant change in character of the community.
Staff Analysis: Mr. Marshall’s opinion is noted; however, he does not
provide substantiation for this statement. The project is located in the
VC zone, which envisions a mix of high density residential and
commercial uses to sustain the Village’s economic viability and allow
people to work, play and live within walking distance.
Mr. Marshall described his concerns further on the second page of Attachment
5 and stated that a “less dense multi-family development” would be
preferred; he also requests that the process “slow down” for a period of 60
days.
The Commission heard public testimony from several homeowners on Calle
Cadiz, expressing their concerns (Attachment 6).
PUBLIC REVIEW
Public Notice
This appeal was advertised in The Desert Sun newspaper on July 5, 2019 and
mailed to all property owners within 500 feet of the site. To date no
comments have been received.
311
ALTERNATIVES
Council may continue this appeal for further consideration.
The Council may approve the appeal and reverse the Commission
decision.
The Council may remand the original application back to the
Commission for further discussion.
Prepared by: Cheri Flores, Planning Manager
Approved by: Danny Castro, Design and Development Director
Attachments: 1. Project Information Form
2. Plan Set
3. Planning Commission minutes of June 11, 2019
4. Planning Commission Resolution
5. Appeal Letter from Mr. Lawrence Marshall
6. Planning Commission June 11, 2019 Meeting - audio
recording of Desert Club Apartments Project
http://archive.la‐quinta.org/archived%20Meetings/audio/Planning_Commission_PH1_Desert_Club_Apts.mp3
312
RESOLUTION 2019 –
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF LA QUINTA, CALIFORNIA, DENYING
APPEAL 2019-0002, AND SUSTAINING THE
PLANNING COMMISSION’S APPROVAL OF
CONDITIONAL USE PERMIT 2018-0005 AND
SITE DEVELOPMENT PERMIT 2018-0004 TO
ALLOW THE DEVELOPMENT OF 16 APARTMENTS
LOCATED AT 51480 DESERT CLUB DRIVE
CASE NUMBERS:
APPEAL 2019-0002
CONDITIONAL USE PERMIT 2018-0005
SITE DEVELOPMENT PERMIT 2018-0004
PROJECT: DESERT CLUB APARTMENTS
APPELANT: LAWRENCE MARSHALL
WHEREAS, the Planning Commission of the City of La Quinta,
California did, on the 11th day of June, 2019, hold a duly noticed Public
Hearing to consider a request by Southwest Concepts for approval of
Conditional Use Permit and Site Development Permit for 16 apartments at
51-480 Desert Club Drive, more particularly described as:
APN 770-156-009 & -010
WHEREAS, the Design and Development Department published a
public hearing notice in The Desert Sun newspaper on July 5, 2019, as
prescribed by the Municipal Code. Public hearing notices were also mailed to
all property owners within 500 feet of the site; and,
WHEREAS, the City Council of the City of La Quinta, California did, on
the 16th day of July, 2019, hold a duly noticed Public Hearing to consider an
appeal by Lawrence Marshall of the Planning Commission’s approval of
Conditional Use Permit 2018-0005 and Site Development Permit 2018-0004.
Conditional Use Permit
WHEREAS, at said Public Hearing, upon hearing and considering all
testimony and arguments, if any, of all interested persons desiring to be
heard, said City Council did make the following mandatory findings pursuant
to Section 9.210.020 of the Municipal Code to justify approval of said
Conditional Use Permit:
313
Resolution No. 2019 -
Appeal 2019-0002 of Conditional Use Permit 2018-0005 and Site Development Permit 2018-0004
Adopted:
Page 2 of 4
1.Consistency with General Plan
The land use is consistent with the General Plan land use designation
of Village Commercial. The City’s General Plan policies relating to the
Village encourage the development of a mix of uses to create an
integrated, walkable community that blends residential and
commercial development.
2.Consistency with Zoning Code
The proposed use, as conditioned, is consistent with provisions of the
zoning code. The proposed project meets the development standards
of the Village Commercial zone, as conditioned.
3.Compliance with California Environmental Quality Act (CEQA)
The Design and Development Department has determined that this
project is exempt from environmental review pursuant to Section
15332 of CEQA. The project qualifies for this exemption because it is
consistent with the General Plan and Zoning designation, is less than 5
acres in size, and is located in an urbanized and mostly built-out area.
4.Surrounding Uses
As conditioned, approval of the application will not create conditions
materially detrimental to the public health, safety, and general welfare
or injurious to or incompatible with other properties or land uses in the
vicinity. The proposed apartments will add to the residential
opportunities in the Village, and create opportunities for workers who
already work in the area to find housing in close proximity.
Site Development Permit
WHEREAS, at said Public Hearing, upon hearing and considering all
testimony and arguments, if any, of all interested persons desiring to be
heard, said City Council did make the following mandatory findings pursuant
to Section 9.210.010 of the Municipal Code to justify approval of said Site
Development Permit:
1.Consistency with General Plan
The proposed development is consistent with the General Plan land
use designation of Village Commercial. The City’s General Plan policies
relating to the Village encourage the development of a mix of uses to
create an integrated, walkable community that blends residential and
commercial development.
314
Resolution No. 2019 -
Appeal 2019-0002 of Conditional Use Permit 2018-0005 and Site Development Permit 2018-0004
Adopted:
Page 3 of 4
2.Consistency with Zoning Code
The proposed development, as conditioned, is consistent with the
development standards of the City’s Zoning Code in terms of site plan
and landscaping. The site development permit has been conditioned
to ensure compliance with the Zoning Code’s development standards,
including standards for parking lot design.
3.Compliance with California Environmental Quality Act
The Design and Development Department has determined that this
project is exempt from environmental review pursuant to Section
15332 of CEQA. The project qualifies for this exemption because it is
consistent with the General Plan and Zoning designation, is less than 5
acres in size, and is located in an urbanized and mostly built-out area.
4.Architectural Design
The proposed apartments, as conditioned, are consistent with the
Zoning Ordinance, and with development in the Village area.
5.Site Design
The site design of the project, including project entries, circulation,
screening, exterior lighting, and other site design elements are
compatible with surrounding development and with the quality of
design prevalent in the Village.
6.Landscape Design
The proposed project is consistent with the landscaping standards and
plant palette and implements the standards for landscaping and
aesthetics established in the General Plan and Zoning Code.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City
of La Quinta, California, as follows:
SECTION 1. That the above recitations are true and constitute the findings of
the City Council in this case.
SECTION 2. That it does hereby sustain the Planning Commission’s
determination that Conditional Use Permit 2018-0005 and Site Development
Permit 2018-0004 are exempt from CEQA pursuant to Section 15332 of the
CEQA Guidelines.
SECTION 3. That it does hereby sustain Planning Commission Resolution No.
2019-009, adopted on June 11, 2019, approving Conditional Use Permit
2018-0005 and Site Development Permit 2018-0004, for the reasons set
315
Resolution No. 2019 -
Appeal 2019-0002 of Conditional Use Permit 2018-0005 and Site Development Permit 2018-0004
Adopted:
Page 4 of 4
forth in this Resolution and subject to the conditions of approval set forth in
Planning Commission Resolution 2019-009.
PASSED, APPROVED, and ADOPTED at a regular meeting of the
City of La Quinta City Council, held on this the 16th day of July, 2019, by the
following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
____________________
LINDA EVANS, Mayor
City of La Quinta, California
ATTEST:
__________________________
MONIKA RADEVA, City Clerk
City of La Quinta, California
(CITY SEAL)
APPROVED AS TO FORM:
___________________________
WILLIAM H. IHRKE, City Attorney
City of La Quinta, California
316
Project Information
CASE NUMBER: CONDITIONAL USE PERMIT 2018-0005
SITE DEVELOPMENT PERMIT 2018-0004
ENVIRONMENTAL ASSESSMENT 2018-0004
APPLICANT: SOUTHWEST CONCEPTS FOR NISPERO PROPERTIES INC.
PROPERTY OWNER: NISPERO PROPERTIES INC.
REQUEST: THE CONSTRUCTION OF 16 APARTMENTS IN TWO BUILDINGS ON
1.3 ACRES
LOCATION: 51-480 DESERT CLUB DRIVE; APN 770-156-009 & -010
GENERAL PLAN
DESIGNATION: VILLAGE COMMERCIAL
ZONING
DESIGNATION: VILLAGE COMMERCIAL
SURROUNDING
ZONING/LAND USES: NORTH: VILLAGE COMMERCIAL/VACANT PARCEL
SOUTH: VILLAGE COMMERCIAL/ARNOLD PALMER’S
EAST: VILLAGE COMMERCIAL & RL-10,000/ARNOLD
PALMER’S AND SINGLE-FAMILY HOMES
WEST: VILLAGE COMMERCIAL/VACANT AND OFFICE
ATTACHMENT 1
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
ATTACHMENT 3
337
338
339
340
common driveway, the applicant shall be required to assure the common use of the
driveway through any of the following actions: the preparation and recordation of a
reciprocal access easement agreement benefitting both parcels of the development,
a document evidencing the merger of the two parcels, or otherwise demonstrating
that both parcels will have the right to use the common driveway in perpetuity as
determined by the City Engineer or his properly designated representative."
Amendment to Condition of Approval No. 25 of Conditional Use Permit 2018-0005
and Site Development Permit 2018-0004 adding sub part G under the Parking and
Access Points heading to read, "All exterior parking spaces will be covered in a
manner reviewed and approved by the City Engineer or his properly designated
representative. "
AYES: Commissioners Bettencourt, Caldwell, Currie, Proctor, Quill, and Wright.
NOES: None. ABSENT: Chairperson McCune. ABSTAIN: None. Motion passed.
CHAIRPERSON MCCUNE RE -ASSUMED HIS CAPACITY OF PRESIDING OFFICER FOR
THE REMAINDER OF THE MEETING.
Commissioner Bettencourt shared his appreciation to those who participated in the
discussion.
REPORTS AND INFORMATIONAL ITEMS - None
COMMISSIONERS' ITEMS
Commissioner Bettencourt noted that Commissioner Quill had shared an article
from the San Diego Tribune regarding 5G cell facilities.
Commissioners Wright and Quill thanked the Planning Commission and staff for
their efforts over the years and extended their best wishes to the Planning
Commission and Staff.
On behalf of the Planning Commission, Chairperson McCune thanked
Commissioners Quill and Wright for their leadership, expertise and guidance during
their tenure on the Planning Commission.
Commissioner Proctor thanked Commission Secretary Wise -Latta for providing
information regarding the status of the La Quinta Cove entry sign in the roundabout
at Eisenhower Drive and Calle Sinaloa.
STAFF ITEM
1. HOME DEPOT CONDITIONAL USE PERMIT UPDATE
Senior Planner Flores presented the report that is on file in the Design and
Development Department. Mr. Flores stated that Home Depot is in compliance and
PLANNING COMMISSION MINUTES 5 JUNE 11, 2019
341
342
ATTACHMENT 4
343
344
345
Planning Commission Resolution 2019 -009
Conditional Use Permit 2018-0005
Site Development Permit 2018-0004
Desert Club Apartments
Adopted: June 11, 2019
Page 4 of 4
PASSED, APPROVED, and ADOPTED at a regular meeting of the City of
La Quinta Planning Commission, held on this the 11th day of June 2019, by the
following vote:
AYES: COMMISSIONERS BETTENCOURT, CALDWELL, CURRIE, PROCTOR,
QUILL, AND WRIGHT
NOES: NONE
ABSENT: CHAIRPERSON MCCUNE
ABSTAIN: NONE
ATTEST:
Mary Cald ell, Vice Chairperson
City of La Quinta, California
DANNY CASTRO, Design and Development Director
City of La Quinta, California
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
ATTACHMENT 5363
364
365
366
City of La Quinta
CITY COUNCIL MEETING
DEPARTMENT REPORT
TO: Madam Mayor and Members of the City Council
FROM: Jon McMillen, City Manager
DATE: July 16, 2019
SUBJECT: COACHELLA VALLEY ASSOCIATION OF GOVERNMENTS INTENT TO
EXERCISE ITS EMINENT DOMAIN POWERS OVER OBTAINING
PROPERTY FOR THE CV LINK MULTI-MODAL TRANSPORTATION
CORRIDOR PROJECT
On June 27, 2019 Coachella Valley Association of Governments (CVAG)
notified the City that certain real property within City boundaries has been
designated as necessary for the successful implementation of the CV Link
Multi-Modal Transportation Corridor Project (Project) (Attachment 1).
Attachment 2 depicts the real property identified as Assessor Parcel Numbers
600-090-004, 600-130-015, 600-010-021, 600-010-017, 600-010-022, 600-
390-008, and 604-050-037 (Property).
CVAG intends to consider exercising its eminent domain powers over the
Property. The Council may oppose CVAG’s exercise of eminent domain
powers, and if so, Council must adopt a Resolution to this effect within 60
days of receiving the notice, or by August 26, 2019. If the Council decides
not to take any action, CVAG may exercise its eminent domain powers over
the Property after the 60-day period.
Staff seeks Council direction on how to proceed.
Attachments: 1. CVAG’s Letter dated June 27, 2019
2. Site Map
DEPARTMENTAL REPORT ITEM NO. 1
367
368
ATTACHMENT 1
369
370
371
372
D E S I G N A N D D E V E L O P M E N T D E P A R T M E N T R E P O R T - J U N E 2 0 1 9
J U N E 2 0 1 9 R E P O R T
T H E D E S I G N A N D D E V E L O P M E N T D E P A R T M E N T R E P R E S E N T S O N E O F S I X C I T Y D E P A R T M E N T S , A N D
C O N S I S T S O F S I X D I V I S I O N S : T H E H U B , P L A N N I N G , B U I L D I N G , P U B L I C W O R K S D E V E L O P M E N T ,
E N G I N E E R I N G S E R V I C E S , A N D A D M I N I S T R A T I O N .
Design and Development Department
the HUB
The Hub serves as a one-stop shop for La Quinta patrons. It is the central location for obtaining
permits for planning, building, engineering, garage sales, and special events. The Hub assists
customers through the permitting process from initial questions and pre-application meetings
through inspections and final certificate of occupancy. Below are some June 2019 metrics:
CUSTOMER SATISFACTION
Permit and Project
Fees Collected
$964,453
$1,237,970
Active STVRP
Business Licenses
1,252
839
49 70
302
STVR Permits
Issued
Total Customers
Served
Total Issued
Permits
Total
E-TRAKiT
Permits
TOT Collected
In June 2016, The Hub launched
a survey to measure the satisfaction
of its customers. The survey uses a
one to five point rating system,
with five points being 100%
excellent. The Hub Customer
Satisfaction survey results for the
month of June 2019 averaged at
94.2%.
0
25
50
75
100
Wait TimeHelpfulnessQualityDaily Average Calls
Received
55
Weekly Average Calls
Received
414
DEPARTMENTAL REPORT ITEM NO. 5
DEPARTMENTAL REPORT ITEM NO. 5373
D E S I G N A N D D E V E L O P M E N T D E P A R T M E N T R E P O R T - J U N E 2 0 1 9
J U N E 2 0 1 9 R E P O R T
Design and Development Department
PLANNING
ACTIVITY
BUILDING
The Building Division administers all building permit
applications and plans for compliance with
requirements established in the entitlement process, La
Quinta Municipal Code, and all currently applicable
California Building Standards Codes.
Planning
Permits
The Planning Division works with residential and
commercial property/business owners and developers to
ensure development in the City is constructed consistent
with the City’s goals and policies.
Planning Permits
Includes sign applications, temporary use
permits, minor use permits, final landscaping
plans, etc.
374
D E S I G N A N D D E V E L O P M E N T D E P A R T M E N T R E P O R T - J U N E 2 0 1 9
J U N E 2 0 1 9 R E P O R T
Design and Development Department
TRAFFIC
& CIP
SHORT-TERM
VACATION RENTAL
THE
PROGRAM
Transient occupancy tax (TOT) is collected for
hotels, Bed and Breakfast (B&B) stays and for
short term vacation rentals (STVR). During
the month of June 2019, the following TOT
has been collected:
The Development Division provides
engineering assistance with a
variety of permits. During the
month of June 2019, the following
number of permits and applications
were processed:
The Engineering Services Division provides
engineering design and construction oversight
and traffic support on a variety of
infrastructure projects that help keep La
Quinta safe and beautiful. Highlighted below
are some activities for June 2019:
ENGINEERING SERVICES
PUBLIC WORKS
DEVELOPMENT
TRAFFIC
On-site construction continues at private development projects including
Andalusia, Griffin Ranch, Monterra, Codorniz, The Citrus, Floresta, and
Washington Street Apartments.
The contractor for the Eisenhower Drive Drainage Improvements project
continues to install storm drain and has begun excavating the retention
basin.
The contractor for the Dune Palms Road Widening project is locating the
existing utilities and installing survey stakes in preparation for the
widening of the east side of Dune Palms Road at Westward Ho.
The contractor for the La Quinta Landscape Renovation Improvements -
La Quinta Highlands project continues to remove shrubs and prepare for
turf removal.
28 requests for service were recorded in City’s GORequest system
in June 2019.
The Traffic Team responded to 11 repair requests and 17 preventative
maintenance work orders.
CIP Projects - In Progress
$0
$196,250
$392,500
$588,750
April 2019May 2019$785,000
June 2019STVR TOT Collected
CITY COUNCIL MEETING - JULY 16, 2019; REVISED PAGE 3 OF D&D JUNE REPORT
DEPARTMENTAL REPORT ITEM NO. 5
375
376
FACILITIES DEPARTMENT - June 2019
The Facilities Department is responsible for maintenance of City buildings, parks, and streets.
The Department is managed by three Divisions; Buildings, Parks, and Public Works
Maintenance.
FACILITES DEPARTMENT MONTHLY REPORT FOR JUNE 2019
BUILDINGS
TASKS 102
HOURS 352
EXPENDITURES $12,651
(Attachment 1)
PARKS
TASKS 77
HOURS 264
EXPENDITURES $9,950
(Attachment 2)
PUBLIC WORKS MAINTENANCE
TASKS 137
HOURS 924
EXPENDITURES $44,699
(Attachment 3)
TOTAL:
TASKS: 316
HOURS: 1,540
EXPENDITURES: $67,300
The Department utilizes Gorequest to track monthly maintenance requests by division received
from residents and staff, as well as the number of tasks, hours and expenditures.
SURVEY RESULTS (Attachment 4) POSITIVE FEEDBACK FROM RESIDENTS:
“It was done and completed almost immediately. I didn’t even know they were here, I checked
a little while later and it was done….bravo!”.
“Request was met in a timely fashion. I feel safer now crossing the street. Please keep
landscaping like this. Thank you”.
“Maintenance guys kept at it until the problem was resolved that day”.
Top Requests in June:
Buildings - Personnel Requests
Parks – Landscape Improvements
Public Works - Street Signs
Buildings - Fire Stations
Parks– Hardscape Maintenance
Public Works - Sidewalk Repair
PARKS AND LIGHTING & LANDSCAPE DISTRICT UPDATE:
New contracts for park maintenance, Lighting & Landscape District light, and landscape
maintenance began on July 1, 2019. Staff has met with each new contractor to review contract
requirements and set service level expectations.
DEPARTMENTAL REPORT ITEM NO. 6
377
378
Classes
$470
Plumbing
$751
Security/Alarms/Doors
$99
Facilities Maint
$1,649
Janitorial
$592
General Repairs
$1,629
Carpentry/Hardware
$132
HVAC
$634
Personnel Requests
$2,708
Meeting
$588
Electrical
$101
Library
$1,334
Museum
$197
Fire Stations
$1,768
Classes
Plumbing
Security/Alarms/Doors
Facilities Maint
Janitorial
General Repairs
Carpentry/Hardware
HVAC
Personnel Requests
Meeting
Electrical
Library
Museum
Fire Stations
Total Monthly Expenditures: $ 12,651
Buildings Maintenance Expenditures for the Month of June 2019
ATTACHMENT 1 ATTACHMENT 1379
380
BEFORE
AFTER
381
382
BEFORE AFTER
383
384
FB Pool Inspection
$133
Meeting
$977
Civic Center Lake Insp.
$201 Debris/Litter Removal
$253
Playground Inspection
$516
Insp. Maintenance
$341
Landscape Improvements
$1,505
Skate Park Maint
$66
Sign Maint
$490
Trail Maint
$99
Hardscape Maint
$1,244
Lighting/Electrical
$147
Painting
$518
Vandalism Repair
$150
Drinking Fountain Repair
$685
Irrigation Check/Repair
$330
Playground Equip Maint
$784
Gate/Fence Repair
$163
Graffiti
$1,348
FB Pool Inspection
Meeting
Civic Center Lake Insp.
Debris/Litter Removal
Playground Inspection
Insp. Maintenance
Landscape Improvements
Skate Park Maint
Sign Maint
Trail Maint
Hardscape Maint
Lighting/Electrical
Painting
Vandalism Repair
Drinking Fountain Repair
Irrigation Check/Repair
Playground Equip Maint
Gate/Fence Repair
Graffiti
Parks Monthly Maintenance Expenditures for the Month of June 2019
ATTACHMENT 2
Total Monthly Expenditures: $9,950 ATTACHMENT 2385
386
BEFORE
AFTER
387
388
BEFORE
AFTER AFTER
BEFORE
389
390
AFTER
BEFORE
391
392
Graffiti
$1,348
Gutter/Sand Removal
$465
Landscape Irrigation
$4,302
Street Sweeping
$82
Office Work
$2,028
Vandalism Repair
$378
Debris/Litter Removal
$2,330
Vehicle Equipment
$227
Tree Issues
$3,228
Lighting -Medians
$134
Concrete
Sidewalk Repairs
$11,583
Meeting
$1,281
Storm Drain Maint
$184
Seminars/Training
$633
Yard Maintenance
$480
Pothole or
Street Repair
$2,466
Street Signs
$12,563
Inspection
$989
Graffiti
Gutter/Sand Removal
Landscape Irrigation
Street Sweeping
Office Work
Vandalism Repair
Debris/Litter Removal
Vehicle Equipment
Tree Issues
Lighting - Medians
Concrete
Sidewalk Repairs
Meeting
Storm Drain Maint
Seminars/Training
Yard Maintenance
Pothole or
Street Repair
Street Signs
InspectionTotalMonthly Maintenance: $44,699
Public Works Monthly Maintenance Expenditures for the Month of June 2019
ATTACHMENT 3 ATTACHMENT 3393
394
BEFORE
BEFORE
AFTER
AFTER
395
396
BEFORE
AFTER
397
398
AFTER
BEFORE
399
400
BEFORE
AFTER
401
402
Customer Satisfaction Survey Details
06/01/2019 to 06/30/2019
Request: 38379 Survey Entered: 06-04-2019 Request Entered:
05/27/2019 Closed: 05/28/2019 Days Open: 1
Topic: Graffiti Removal (Right-of-Way) - 1071
Location:
Employee: James Lindsey Customer: Tokiyo Ochi
Description: Wash basin Desert Stream.
Reason Closed: Located both graffitis and painted over graffiti.
How pleased were you with the helpfulness of the city employee who initially took your service request?: Superior
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: No answer
In general, how pleased are you with the city services you received during the past year?: Met
Request: 38401 Survey Entered: 06-11-2019 Request Entered:
05/28/2019 Closed: 06/04/2019 Days Open: 7
Topic: Street Sign Repair & Maint
Location: 43675 Old Troon Ct Indio CA 92201
Employee: James Lindsey Customer: Greg Rowland
Description: With a large senior population in the valley, I am curious why
smaller lettering was used on the new street signs. It is more than
just a little smaller! Thanks, Greg R.
Reason Closed: Citizen contacted by Ubaldo Ayon.
How pleased were you with the helpfulness of the city employee who initially took your service request?: Good
Rate our knowledge and ability to process your request timely: Good
Were we courteous and professional?: Good
In general, how pleased are you with the city services you received during the past year?: Below
How can the City improve?: I complained about the new size of lettering on street signs. I
cannot understand why the lettering was made smaller and
harder to see. Greg
Request: 38420 Survey Entered: 06-04-2019 Request Entered:
05/29/2019 Closed: 06/03/2019 Days Open: 5
Topic: Library/Misc; General Repairs
Location: 78275 Calle Tampico La Quinta CA 92253
Employee: Alfred Berumen Customer: Minerva Ochoa
Description: Main courtyard door needs door stopper replaced.
Reason Closed: work done
How pleased were you with the helpfulness of the city employee who initially took your service request?: Superior
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: Superior
In general, how pleased are you with the city services you received during the past year?: Exceeded
How can the City improve?: Immediate response. Thank you!
ATTACHMENT 4 ATTACHMENT 4403
Request: 38421 Survey Entered: 06-04-2019 Request Entered:
05/29/2019 Closed: 06/03/2019 Days Open: 5
Topic: Library/Electical
Location: 78275 Calle Tampico La Quinta CA 92253
Employee: Alfred Berumen Customer: Minerva Ochoa
Description: Light switches in children's bathrooms broken.
Reason Closed: work done
How pleased were you with the helpfulness of the city employee who initially took your service request?: Superior
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: Superior
In general, how pleased are you with the city services you received during the past year?: Exceeded
How can the City improve?: Great job!
Request: 38430 Survey Entered: 06-06-2019 Request Entered:
05/30/2019 Closed: 05/30/2019 Days Open: 0
Topic: Lighting - Medians & Public Right-of-Way - 1083
Location:
Employee: James Lindsey Customer: Susan Provost
Description: I believe this cover has been off since Tuesday. I noticed it about
10:30 AM. It's on the left side of our driveway gated. 51380
avenida Rubio, our driveway faces Montezuma Susan Provost
Reason Closed: Put cover back
How pleased were you with the helpfulness of the city employee who initially took your service request?: Superior
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: No answer
In general, how pleased are you with the city services you received during the past year?: Exceeded
How can the City improve?: It was done and completed almost immediately. I didn’t even
know they were here, I checked a little while later and it was
done...bravo!
Request: 38450 Survey Entered: 06-25-2019 Request Entered:
06/01/2019 Closed: 06/18/2019 Days Open: 17
Topic: Lighting - Medians & Public Right-of-Way - 1083
Location: La Quinta ca 92253
Employee: James Lindsey Customer: juliana
Description: I live at intersection of Eisenhower and Temecula. the landscape
in median is overgrown, and makes it hard to see cars coming
uphill,and impossible for the drivers to see people trying to cross
the street. there are some bushes and low growing palm trees
that block the view. please get those cleared . there are children
crossing to go to school bus stop . thank you
Reason Closed: Palm trees were trimmed and plants lowered to clear view of
incoming traffic.
How pleased were you with the helpfulness of the city employee who initially took your service request?: Superior
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: Good
In general, how pleased are you with the city services you received during the past year?: Exceeded
404
How can the City improve?: Request was met in a timely fashion. I feel safer now crossing the
street. Please keep landscaping like this.Thank you
Request: 38462 Survey Entered: 06-10-2019 Request Entered:
06/03/2019 Closed: 06/03/2019 Days Open: 0
Topic: Park Maintenance
Location:
Employee: Robert Ambriz Jr. Customer: Vanessa Vanessa
Description: Park off Montezuma needs to get cleaned up. Debris, trash, dog
poop in play area by swings, play equipment is dirty....dirtier then
usual. I don't think the city maintains this park but if you can pass
this message onto the people that do. Thank you!
Reason Closed: City staff forwarded request for clean-up of La Quinta Community
Park to Desert Recreation District who owns and operates the
park. If you would like to follow up, please contact Nicole Fisher
at (760) 564-9921. She is the Community Services Coordinator
that oversees La Quinta Community Park.
How pleased were you with the helpfulness of the city employee who initially took your service request?: Superior
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: Superior
In general, how pleased are you with the city services you received during the past year?: Exceeded
Request: 38477 Survey Entered: 06-12-2019 Request Entered:
06/03/2019 Closed: 06/05/2019 Days Open: 2
Topic: Traffic Signals Repair & Maint
Location: 47865 Stillwater Drive La Quinta 92253
Employee: Kristopher Gunterson Customer: David Marzane
Description: The left turn arrows are individual sequences on each corner. It
would be much more efficient if opposing green arrows were
activitated at the same time if they are cars in queue.
Reason Closed: Spoke with resident, City can consider options if his HOA is
supportive of making changes, let us know by letter if that support
is there to proceed further.
How pleased were you with the helpfulness of the city employee who initially took your service request?: Poor
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: Superior
In general, how pleased are you with the city services you received during the past year?: Below
How can the City improve?: Simple request turned into a bureaucratic nightmare.
405
Request: 38485 Survey Entered: 06-18-2019 Request Entered:
06/04/2019 Closed: 06/11/2019 Days Open: 7
Topic: Library/Plumbing
Location: 78275 Calle Tampico La Quinta CA 92253
Employee: Alfred Berumen Customer: Minerva Ochoa
Description: Handicapped stall toilet in men's public restroom does not flush
properly. Water spins but does not go down bowl. There is very
little pressure.
Reason Closed: work done
How pleased were you with the helpfulness of the city employee who initially took your service request?: Superior
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: Superior
In general, how pleased are you with the city services you received during the past year?: Exceeded
How can the City improve?: Maintenance guys kept at it until problem was resolved that day.
Request: 38496 Survey Entered: 06-18-2019 Request Entered:
06/05/2019 Closed: 06/11/2019 Days Open: 6
Topic: Parks/Trail Maintenance
Location:
Employee: Robert Ambriz Jr. Customer: Bill Aitken
Description: No bags 3 day
Reason Closed: Dispenser has been filled.
How pleased were you with the helpfulness of the city employee who initially took your service request?: No answer
Rate our knowledge and ability to process your request timely: Good
Were we courteous and professional?: No answer
In general, how pleased are you with the city services you received during the past year?: Met
Request: 38514 Survey Entered: 06-27-2019 Request Entered:
06/06/2019 Closed: 06/20/2019 Days Open: 14
Topic: Sidewalk Repair/Concrete C&G- 1007
Location:
Employee: James Lindsey Customer: Beryl Sandor
Description: On going problem side walk in front of dog park rising up do to
heat expansion wife fell there 2 years ago did NOT bring
suite.Please address situation.(lack of proper expansion joint).
Reason Closed: we cut sidewalk and we got it to drop even. Work done
How pleased were you with the helpfulness of the city employee who initially took your service request?: Average
Rate our knowledge and ability to process your request timely: Below Average
Were we courteous and professional?: Good
In general, how pleased are you with the city services you received during the past year?: No answer
406
Request: 38515 Survey Entered: 06-10-2019 Request Entered:
06/06/2019 Closed: 06/10/2019 Days Open: 4
Topic: Library/Plumbing
Location: 78275 Calle Tampico La Quinta CA 92253
Employee: Alfred Berumen Customer: Minerva Ochoa
Description: 2 toilets in the women's public restroom do not flush.
Reason Closed: Work is done.
How pleased were you with the helpfulness of the city employee who initially took your service request?: Superior
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: Superior
In general, how pleased are you with the city services you received during the past year?: Exceeded
How can the City improve?: Excellent, response time was within 5 minutes. Staff kept at it
trouble shooting until problem was resolved.
Request: 38519 Survey Entered: 06-14-2019 Request Entered:
06/07/2019 Closed: 06/07/2019 Days Open: 0
Topic: Lighting - Medians & Public Right-of-Way - 1083
Location:
Employee: James Lindsey Customer: Tokiyo Ochi
Description: Wash basin Desert Stream. Panel wide open,no maintenance
crew around.
Reason Closed: Work done
How pleased were you with the helpfulness of the city employee who initially took your service request?: Good
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: No answer
In general, how pleased are you with the city services you received during the past year?: Exceeded
Request: 38520 Survey Entered: 06-17-2019 Request Entered:
06/07/2019 Closed: 06/10/2019 Days Open: 3
Topic: Trail Maintenance
Location:
Employee: Robert Ambriz Jr. Customer: Laura green
Description: Wishing you all a wonderful weekend ☀️🌵 It would be great if
local artist John Cuevas could paint 🎨 this Electrical Box with
Bighorn sheep 🐏 at the Top of the Cove. I just started following
him on Instagram and he is the artist that’s painting the mural art,
at the La Quinta library. @johncuevasstudios 🙏😊🙋🏻
Reason Closed: Please contact Jaime Torres, Management Analyst, to make this
request. He is the City staff member that oversees the Art in
Public Places program. He can be reached at
jtorres@laquintaca.gov or (760) 777-7014. The GO Request
system is not meant for public art requests. It's for City
maintenance issues only.
How pleased were you with the helpfulness of the city employee who initially took your service request?: Superior
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: Superior
In general, how pleased are you with the city services you received during the past year?: Met
407
Request: 38596 Survey Entered: 06-21-2019 Request Entered:
06/13/2019 Closed: 06/19/2019 Days Open: 6
Topic: Library/Janitorial
Location: 78275 Calle Tampico La Quinta CA 92253
Employee: Alfred Berumen Customer: Minerva Ochoa
Description: Large dried urine puddle on sidewalk going towards back door of
library. With a strong urine odor.
Reason Closed: work done.
How pleased were you with the helpfulness of the city employee who initially took your service request?: Superior
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: Superior
In general, how pleased are you with the city services you received during the past year?: Exceeded
Request: 38600 Survey Entered: 06-26-2019 Request Entered:
06/14/2019 Closed: 06/19/2019 Days Open: 5
Topic: Tree Issues
Location:
Employee: James Lindsey Customer: Irene
Description: Photo submitted
Reason Closed: Replaced broken emitter
How pleased were you with the helpfulness of the city employee who initially took your service request?: Superior
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: Superior
In general, how pleased are you with the city services you received during the past year?: Exceeded
Request: 38614 Survey Entered: 06-24-2019 Request Entered:
06/16/2019 Closed: 06/17/2019 Days Open: 1
Topic: Sidewalk Repair/Concrete C&G- 1007
Location:
Employee: James Lindsey Customer: Phil Cordova
Description: Photo submitted
Reason Closed: Fix it sidewalk work done
How pleased were you with the helpfulness of the city employee who initially took your service request?: Superior
Rate our knowledge and ability to process your request timely: Superior
Were we courteous and professional?: No answer
In general, how pleased are you with the city services you received during the past year?: Exceeded
408
FINANCING AUTHORITY MINUTES Page 1 of 2 JUNE 18, 2019
SPECIAL MEETING
FINANCING AUTHORITY
MINUTES
TUESDAY, JUNE 18, 2019
CALL TO ORDER
A special meeting of the La Quinta Financing Authority was called to order at
9:38 p.m. by Chairperson Evans.
PRESENT: Authority Members Fitzpatrick, Peña, Radi, Sanchez, Chairperson Evans
ABSENT: None
CLOSED SESSION – None
PUBLIC COMMENT – None
CONFIRMATION OF AGENDA – Confirmed
ANNOUNCEMENTS, PRESENTATIONS, AND WRITTEN COMMUNICATIONS
– None
CONSENT CALENDAR
1. APPROVE SPECIAL MEETING MINUTES DATED JUNE 19, 2018
MOTION – A motion was made and seconded by Authority Members
Radi/Fitzpatrick to approve the Consent Calendar as recommended. Motion
passed unanimously.
BUSINESS SESSION
1. ADOPT A RESOLUTION TO APPROVE FISCAL YEAR 2019/20
BUDGET [RESOLUTION NO. FA 2019-001]
Finance Authority waived presentation of the staff report, which is on file in
the Clerk’s Office.
MOTION – A motion was made and seconded by Authority Members
Fitzpatrick/Radi to adopt Resolution No. FA 2019-001 approving the La Quinta
Financing Authority Fiscal Year 2019/20 Budget, as recommended:
A RESOLUTION OF THE LA QUINTA FINANCING AUTHORITY APPROVING
A BUDGET FOR FISCAL YEAR 2019/20
Motion passed unanimously.
REPORTS AND INFORMATIONAL ITEM NO. 28
409
FINANCING AUTHORITY MINUTES Page 2 of 2 JUNE 18, 2019
SPECIAL MEETING
CHAIR AND AUTHORITY MEMBERS' ITEMS – None
ADJOURNMENT
There being no further business, it was moved and seconded by Authority
Members Fitzpatrick/Radi to adjourn at 9:39 p.m. Motion passed
unanimously.
Respectfully submitted,
MONIKA RADEVA, Authority Secretary
La Quinta Financing Authority
410
HOUSING AUTHORITY
SPECIAL MEETING MINUTES Page 1 of 2 JULY 2, 2019
HOUSING AUTHORITY
SPECIAL MEETING MINUTES
TUESDAY, JULY 2, 2019
CALL TO ORDER
A special meeting of the La Quinta Housing Authority was called to order at
5:40 p.m. by Chairperson Peña.
PRESENT: Authority Members: Evans, Fitzpatrick, Radi, Sanchez, Chairperson Peña
ABSENT: None
VERBAL ANNOUNCEMENT – AB 23 was made by the Authority Secretary
PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA – None
CONFIRMATION OF AGENDA – Confirmed
STUDY SESSION
1.DISCUSS AFFORDABLE HOUSING DEVELOPMENT OPTIONS
Assistant to the City Manager Villalpando and Management Analyst Ferreira
presented the staff report, which is on file in the Clerk’s office.
Authority discussed affordable housing development options - congregant
care, veteran housing, multi- and single-family housing; current inventory
includes seven single-family parcels in the Cove approximately 5,000 sq. ft.
each, and one larger parcel next to the future X-Park site approximately 2-3
acres in size that could accommodate a development of 15 studio and one-
bedroom apartment units ranging from 400 to 600 sq. ft. in size; Housing
Commission’s recommendations; retaining an affordable housing
developer/operator to build an affordable housing development of 15 units or
less on the site next to the X-Park; identifying future larger developments of
at least 70 units which may allow the Authority to purchase 10-15 units to be
designated as affordable housing.
Staff and the City Attorney explained the use restrictions on Housing Funds
per state law, regulations that may result in increased construction costs, and
prevailing wage exemptions.
REPORTS AND INFORMATIONAL ITEM NO. 29
411
HOUSING AUTHORITY
SPECIAL MEETING MINUTES Page 2 of 2 JULY 2, 2019
Council discussed mitigation measures stemming from the X-Park noise and
lighting should an affordable housing development be constructed on the
adjacent parcel; the City’s current affordable housing unit requirements per
the General Plan Housing Element; the state’s regional housing needs
assessment for Regional Housing Need Allocation unit requirements has been
initiated and the results will be finalized in a year and a half; and current
regional affordable housing unit requirements per the Southern California
Association of Governments to which the City is a member of.
The Authority reached a consensus and directed Staff to look into selling the
seven vacant parcels in the Cove and depositing the proceeds into the Housing
Fund to be used for future affordable housing options; explore retaining a
developer to design and build an affordable housing complex at the vacant
parcel next to the X-Park, and if not feasible, also explore selling the parcel;
consider veteran housing; and identify units the Authority can purchase from
larger unit future developments.
CHAIR AND BOARD MEMBERS' ITEMS – None
REPORTS AND INFORMATION ITEMS – None
ADJOURNMENT
There being no further business, it was moved and seconded by Authority
Members Radi/Evans to adjourn at 6:02 p.m. Motion passed unanimously.
Respectfully submitted,
MONIKA RADEVA, Authority Secretary
La Quinta Housing Authority
412
HAND OUTS
CITY COUNCIL
MEETING
JULY 16, 2019
2019/20Salary ScheduleWORKING TITLEDBMSTEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 STEP 9 STEP 10Administrative AssistantMaintenance Worker IA11 Annually 38,741.77$ 40,678.86$ 42,615.94$ 44,553.03$ 46,490.12$ 48,067.64$ 49,645.16$ 51,222.68$ 52,800.20$ 54,377.72$ Maintenance Worker IIA12 Annually42,624.17$ 44,755.38$ 46,886.59$ 49,017.80$ 51,149.00$ 52,884.59$ 54,620.18$ 56,355.77$ 58,091.36$ 59,826.95$ Administrative TechnicianCommunity Resources CoordinatorManagement AssistantTraffic Signal TechnicianB21 Annually 50,400.62$ 52,920.65$ 55,440.68$ 57,960.71$ 60,480.74$ 62,533.09$ 64,585.44$ 66,637.79$ 68,690.14$ 70,742.49$ Account TechnicianBuilding Inspector ICode Compliance Officer IExecutive AssistantManagement AssistantPermit TechnicianB22 Annually 54,283.01$ 56,997.16$ 59,711.31$ 62,425.46$ 65,139.61$ 67,350.03$ 69,560.45$ 71,770.87$ 73,981.29$ 76,191.71$ Building Inspector IICode Compliance Officer IIConstruction InspectorMaintenance & Operations TechnicianB23 Annually 58,165.41$ 61,073.69$ 63,981.96$ 66,890.23$ 69,798.50$ 72,166.99$ 74,535.48$ 76,903.97$ 79,272.46$ 81,640.94$ Deputy City ClerkJunior AccountantMaintenance ForemanManagement SpecialistParks/L&L ForemanPlans ExaminerB24 Annually 63,517.31$ 66,693.18$ 69,869.04$ 73,044.91$ 76,220.77$ 78,807.14$ 81,393.51$ 83,979.88$ 86,566.25$ 89,152.63$ AccountantManagement SpecialistB25 Annually 70,103.01$ 73,608.16$ 77,113.31$ 80,618.46$ 84,123.61$ 86,978.27$ 89,832.93$ 92,687.59$ 95,542.25$ 98,396.92$ Animal/Code Officer SupervisorMaintenance & Operations SuperintendentPlans Examiner/Inspector SupervisorB32 Annually 70,103.01$ 73,608.16$ 77,113.31$ 80,618.46$ 84,123.61$ 86,978.27$ 89,832.93$ 92,687.59$ 95,542.25$ 98,396.92$ WORKING TITLE DBM STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 STEP 9 STEP 10 STEP 11 STEP 12 STEP 13 STEP 14Assistant Construction ManagerAssociate PlannerCommunity Resources AnalystSr. Emergency Management CoordinatorFinancial Services AnalystHuman Resources AnalystManagement AnalystPublic Safety AnalystSenior AccountantTraffic Operations AnalystC42 Annually 76,782.29$ 79,981.81$ 83,181.32$ 86,380.84$ 89,580.36$ 92,776.04$ 95,977.86$ 98,761.22$ 101,544.58$ 104,327.94$ 107,111.30$ 109,894.66$ 112,678.02$ 115,461.35$ Associate EngineerConstruction Manager/Inspection SupervisorC43 Annually 80,992.91$ 84,367.89$ 87,742.86$ 91,117.84$ 94,492.81$ 97,863.74$ 101,241.14$ 104,177.13$ 107,113.12$ 110,049.11$ 112,985.10$ 115,921.09$ 118,857.08$ 121,793.08$ Senior PlannerC44 Annually86,265.68$ 89,860.37$ 93,455.06$ 97,049.76$ 100,644.45$ 104,234.82$ 107,832.10$ 110,959.23$ 114,086.36$ 117,213.49$ 120,340.62$ 123,467.75$ 126,594.88$ 129,722.00$ Assistant to the City ManagerBuilding OfficialCommunity Resources ManagerHub ManagerHuman Resources ManagerMarketing ManagerPlanning ManagerPublic Safety ManagerD61 Annually 97,860.71$ 101,938.57$ 106,016.43$ 110,094.28$ 114,172.14$ 118,245.10$ 122,325.89$ 125,873.34$ 129,420.79$ 132,968.24$ 136,515.69$ 140,063.14$ 143,610.59$ 147,158.03$ City Clerk D62 Annually102,753.75$ 107,035.50$ 111,317.25$ 115,599.00$ 119,880.74$ 124,157.36$ 128,442.19$ 132,167.01$ 135,891.83$ 139,616.65$ 143,341.47$ 147,066.29$ 150,791.11$ 154,515.95$ City Engineer D65 Annually117,877.00$ 122,788.94$ 127,700.87$ 132,612.81$ 137,524.74$ 142,430.78$ 147,346.25$ 151,619.29$ 155,892.33$ 160,165.37$ 164,438.41$ 168,711.45$ 172,984.49$ 177,257.53$ Community Resources DirectorDesign & Development DirectorFacilities DirectorFinance Director/City TreasurerE82 Annually 129,959.40$ 135,374.81$ 140,790.22$ 146,205.63$ 151,621.04$ 157,029.95$ 162,449.25$ 167,160.27$ 171,871.29$ 176,582.31$ 181,293.33$ 186,004.35$ 190,715.37$ 195,426.42$ City ManagerF101*Annually 176,822.32$ 184,190.51$ 191,558.69$ 198,926.88$ 206,295.06$ 213,654.41$ 221,027.90$ 227,437.70$ 233,847.50$ 240,257.30$ 246,667.10$ 253,076.90$ 259,486.70$ 265,896.53$ Part-Time EmployeesRecreation Leader A01 Hourly $12.04 $12.64 $13.24 $13.84 $14.44Senior Recreation Leader A02 Hourly$16.05 $16.85 $17.65 $18.46 $19.26Administrative Technician B21 Hourly$24.23 $25.44 $26.65 $27.87 $29.08Software Program Report WriterB24 Hourly$30.54 $32.06 $33.59 $35.12 $36.64NON-DISCRETIONARY STEPSDISCRETIONARY STEPS (PERFORMANCE BASED)NON-DISCRETIONARY STEPSDISCRETIONARY STEPS (PERFORMANCE BASED)City Council Approval - July 16, 2019Effective - June 22, 2019COUNCIL MEETING - JULY 16, 2019;HAND-OUT BY STAFF - REVISED SALARY SCHEDULECONSENT CALENDAR ITEM NOS. 4 & 5
•
,(
2019 BOA.RD oi DJRECTORSPRESIDENT,,
Deborah McGarrey
Southern California Gas Company
I" VICE PRESIDENT
Tom Dubose
Dubose Design Group, Inc. SECRETARY/l'RE.4SURER
Joe Hayes First Bank VICE PRESIDENT OF ASSOCIATES
Allan Levin
Allan Levin & Associates PAST PRESIDENT
Fred Bell Nobel! Energy Solutions
CHTEF EXECUTIVE OFFICER
Gretchen Gutierrez
DIRECTORS
Brian Benedetti
Brian Benedetti Construction
Mark Benedetti
BMC Select Build
Dede Callanan
North American Title
Margaret Drury
Margaret Dnny Construction
Mario Gonzales
GHA Companies
Todd Hooks
Agua Caliente Band of Cahuilla Indians
Trevor Kempton
Audio Visions
Taylor Libolt-Varner
MSA Consulting
Dave Lippert Lippert Construction, Inc
Paul Mahoney
PMA Advertising
Bruce Maize
Rilington Group
Russ Martin
Mission Springs Water District
Jim Murdock
PIRCH
Dan Olivier Nethery Mueller Olivier
Alan Pace
Petra Geotechnical John Powell. Jr.
Coachella Valley Water District
Pedro Rincon
Osborne Rincon
Jeff Wattenbarger
Wattenbarger Construction
desert valleys builders association
July 16, 2019
City of La Quinta
Jon McMillen, City Manager
78-495 Calle Tampico
La Quinta, CA 92253
Dear Mr. McMillen,
The Desert Valleys Builders Association (DVBA) appreciates the
opportunities for our organization to review, comment and further
discussions on the City of La Quinta's User and Regulatory Fee Study,
dated June 24, 2019. We also appreciate that the City has adopted a
policy of reviewing User and Regulatory Fees on an annual basis. In
between the years of a "full study" review, the City has adopted nominal
cost of living (CPI) increases.
While no one likes seeing their costs increase, it is just a fact of life, and
business. In this fashion, we as an industry can anticipate an annual
nominal increase. The shock of a few years with a flat rate then a sudden
increase of 30% or more has a dramatic effect on production of any
project.
In this "Study", we see a cost correction in several sections which relate
to time in processing necessary services. But, overall, most of these
services only reflect a 1 percent increase in costs. We also recognize
the City's policy of collecting less than 100 percent off ull service costs.
This helps the City of La Quinta maintain a competitive edge in bringing
in desirable development and business to this City. It also establishes a
shared responsibility of the existing population to the desire of quality
growth and planning.
The only issue that we have today is the limited time with which we had
to process this study. As you are aware, DVBA staff reviews these
studies line-by-line so that we may better inform our members the
legitimacy of these fees and rates. While the City allotted the legal
mjnimum time required for notice and access to the study, this period of
time included a major holiday disrupting employee hours and access to
further information.
75100 Mediterranean • Palm Desert • CA 92211
(7 60) 776-7001 office • (7 60) 77 6-7002 fax
www.thedvba.org
COUNCIL MEETING JULY 16, 2019 - HANDOUT BY GRETCHEN GUTIERREZ, CEO, DVBA
PUBLIC HEARING ITEM NO. 1 - USER & REGULATORY FEE UPDATE
2019 BOARD oj·oIRECTORS
PRESTDENTf Deborah McGnn-cy
Southern California Gas Company JS' VICE PRESIDENT
Tom Dubose
Dubose Design Group, Inc. SECRET..JRYITREASURER
Joe Hayes
First Bank VICE PRESIDENT OF ASSOCL-4 TES
Allan Levin
Allan Levin & Associates PAST PRESIDENT
Fred Bell
Nobel! Energy Solutions
CHTEF EXECUTfVE OFFICER
Gretchen Gutierrez
DlRECTORS
Brian Benedetti
Brian Benedetti Construction
Mark Benedetti
BMC Select Build
Dede Callanan
North American Title
Margaret Drury
Margaret Drury Construction
Mario Gonzales
GHA Companies
Todd Hooks
Agua Caliente Band of
Cahuilla Indians
Trevor Kempton
Audio Visions
Taylor Libolt-Varner
MSA Consulting
Dave Lippert
Lippert Construction, Inc
Paul Mahoney
PMA Advertising
Bruce Maize
Rilington Group
Russ Martin
Mission Springs Water
District
Jim Murdock
PTRCH
Dan Olivier
Nethery Mueller Olivier
Alan Pace
Petra Geotechnical
John Powell. Jr.
Coachella Valley Water District
Pedro Rincon
Osborne Rincon
Jeff Wattenbarger
\Vattenbarger Construction
desert valleys builders association
That being said, DVBA has been able to work with Terry Madison of
ClearSource Financial Consulting on three separate occasions this week,
including a phone conversation he�d earlier this afternoon, to better
understand the processes within this study and effectively support the
conclusions.
Again, the Desert Valleys Builders Association appreciates this
opportunity to review, question and comment on this User and
Regulatory Fee Study. We support its adoption and the implementation
of its fees rates as meeting the requirements of the Mitigation Fee Act
and Proposition 26.
75100 Mediterranean • Palm Desert • CA 92211
(7 60) 776-7001 office • (7 60) 77 6-7002 fax
www.thedvba.org
COUNCIL MEETING JULY 16, 2019 - HANDOUT BY GRETCHEN GUTIERREZ, CEO, DVBA
PUBLIC HEARING ITEM NO. 1 - USER & REGULATORY FEE UPDATE
1
Monika Radeva
From:Cheri Flores
Sent:Friday, July 12, 2019 8:40 AM
To:Monika Radeva
Cc:Wanda Wise-Latta
Subject:FW: Appeal of La Quinta Project - SDP 2018-004 and CUP 2018-005 / 51480 Deseret Club Drive La
Quinta CA
Attachments:SDP 2018-004 and CUP 2018-005.pdf
Monika
Here is a correspondence from the appellant for the Desert Club Apartments appeal, PH3 on the
July 16 agenda. Can you make copies to handout at the meeting? Thank you
Cheri L. Flores | Planning Manager
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
Ph. 760-777-7067
Website | Map
hwy111LQ.com
From: Larry P. Marshall <lpmarshall@lmarshallroofing.com>
Sent: Wednesday, July 10, 2019 3:00 PM
To: Cheri Flores <clflores@laquintaca.gov>
Subject: Appeal of La Quinta Project ‐ SDP 2018‐004 and CUP 2018‐005 / 51480 Deseret Club Drive La Quinta CA
** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when opening
attachments, clicking links or responding to requests for information. **
Ms. Cheri L. Flores, Planning Manager,
City of La Quinta
78495 Calle Tampico
La Quinta, CA 92253
Dear Ms. Flores,
Please Review the attached concept drawing for Six Spanish Colonial Traditional Design Townhomes that I would like the
Property Owner/Developer to consider for the 51‐480 Desert Club Drive in lieu of the currently proposed Sixteen unit
apartment complex.
Call me if you wish to discuss this matter prior to the July 16th meeting.
I will be in attendance at the appeal meeting on July 16th at 5pm.
Best Regards,
Larry Marshall
CITY COUNCIL MEETING - JULY 16, 2019; HAND-OUT BY LAWRENCE MARSHALL, APPELLANT
PUBLIC HEARING ITEM NO. 2 - APPEAL 2019-0002 OF DESERT CLUB APARTMENTS PROJECT
CASA MENDOZA
July 11, 2019
City of La Quinta
78-495 Calle Tampico
La Quinta, CA 92253
Mexican Grill and Bar
Re: 51-480 Desert Club, Desert Club Apartments
My familytand I own the Casa Mendoza restaurant and we are in favor of the
above-mentioned Apartments being built down the street from us. We feel strongly
that the addition of the multi-family dwellings will add a missing piece to the
downtown Village area of La Quinta. The residences will provide additional
people to support all local business.
Thank you for your consideration of my letter.
Ramiro Mendoza, Owner
Casa Mendoza
78110 Calle Estado, La Quinta, CA 92253
(760)564-1463
CITY COUNCIL MEETING - JULY 16, 2019; HANDOUT BY RAMIRO MENDOZA, CASA MENDOZAPUBLIC HEARING ITEM NO. 2 - APPEAL 2019-0002 OF DESERT CLUB APARTMENTS PROJECT
SM'ART STUDIO & GALLERY
July 15, 2019
City of La Quinta
78-495 Calle Tampico
La Quinta, CA 92253
Re: 51-480 Desert Club, Desert Club Apartments
South West Concepts, Inc. has shown me plans for Desert Club Apartments being built
down the street from our business establishment. We are in favor and feel strongly that
the addition of the multi-family dwellings will add a missing piece to the downtown
Village area of La Quinta. The residences will provide additional people to support all
local businesses.
Thank you for your consideration of my letter.
78-115 Calle Estado, Ste 101 La Quinta, CA 92253
760-902-7985
CITY COUNCIL MEETING - JULY 16, 2019; HANDOUT BY ALANA MARSTON, SM'ART STUDIO & GALLERY
PUBLIC HEARING ITEM NO. 2 - APPEAL 2019-0002 OF DESERT CLUB APARTMENTS PROJECT
CITY COUNCIL MEETING - JULY 16, 2019; HANDOUT BY TADROS TADROS
PUBLIC HEARING ITEM NO. 2 - APPEAL 2019-0002 OF DESERT CLUB APARTMENTS PROJECT
CITY COUNCIL MEETING - JULY 16, 2019; HANDOUT BY TADROS TADROS
PUBLIC HEARING ITEM NO. 2 - APPEAL 2019-0002 OF DESERT CLUB APARTMENTS PROJECT
CITY COUNCIL MEETING - JULY 16, 2019; HANDOUT BY TADROS TADROS
PUBLIC HEARING ITEM NO. 2 - APPEAL 2019-0002 OF DESERT CLUB APARTMENTS PROJECT
CITY COUNCIL MEETING - JULY 16, 2019; HANDOUT BY TADROS TADROS
PUBLIC HEARING ITEM NO. 2 - APPEAL 2019-0002 OF DESERT CLUB APARTMENTS PROJECT
CITY COUNCIL MEETING - JULY 16, 2019; HANDOUT BY TADROS TADROS
PUBLIC HEARING ITEM NO. 2 - APPEAL 2019-0002 OF DESERT CLUB APARTMENTS PROJECT
D E S I G N A N D D E V E L O P M E N T D E P A R T M E N T R E P O R T - J U N E 2 0 1 9
J U N E 2 0 1 9 R E P O R T
Design and Development Department
TRAFFIC
& CIP
SHORT-TERM
VACATION RENTAL
THE
PROGRAM
Transient occupancy tax (TOT) is collected for
hotels, Bed and Breakfast (B&B) stays and for
short term vacation rentals (STVR). During
the month of June 2019, the following TOT
has been collected:
The Development Division provides
engineering assistance with a
variety of permits. During the
month of June 2019, the following
number of permits and applications
were processed:
The Engineering Services Division provides
engineering design and construction oversight
and traffic support on a variety of
infrastructure projects that help keep La
Quinta safe and beautiful. Highlighted below
are some activities for June 2019:
ENGINEERING SERVICES
PUBLIC WORKS
DEVELOPMENT
TRAFFIC
On-site construction continues at private development projects including
Andalusia, Griffin Ranch, Monterra, Codorniz, The Citrus, Floresta, and
Washington Street Apartments.
The contractor for the Eisenhower Drive Drainage Improvements project
continues to install storm drain and has begun excavating the retention
basin.
The contractor for the Dune Palms Road Widening project is locating the
existing utilities and installing survey stakes in preparation for the
widening of the east side of Dune Palms Road at Westward Ho.
The contractor for the La Quinta Landscape Renovation Improvements -
La Quinta Highlands project continues to remove shrubs and prepare for
turf removal.
28 requests for service were recorded in City’s GORequest system
in June 2019.
The Traffic Team responded to 11 repair requests and 17 preventative
maintenance work orders.
CIP Projects - In Progress
$0
$196,250
$392,500
$588,750
April 2019May 2019$785,000
June 2019STVR TOT Collected
CITY COUNCIL MEETING - JULY 16, 2019; REVISED PAGE 3 OF D&D JUNE REPORT
DEPARTMENTAL REPORT ITEM NO. 5
375
POWER POINTS
CITY COUNCIL
MEETING
JULY 16, 2019
1
City Council Meeting
July 16, 2019
City Council Meeting
July 16, 2019
B1 - Calle Tampico/Park Avenue
Intersection
1
2
CITY COUNCIL MEETING - JULY 16, 2019
2
Options Overview
•Option A: All-way stop
•Option B: Concrete K-rail
•Option C: Guardrail
•Option D: Roadway & landscape lighting
•Option E: Additional palm trees
•Option F: Large rocks or boulders
•Option G: Concrete bollards
Preferred Option
•Option C: Guardrail
–June 18, 2019 Council meeting - residents spoke
in favor of guardrail placement
–Council directed staff to meet with Citrus HOA
–Staff developed guardrail option / probable
costs, met with HOA, and developed proposed
schedule to implement
3
4
CITY COUNCIL MEETING - JULY 16, 2019
3
Guardrail Design
Guardrail In Place (Day)
5
6
CITY COUNCIL MEETING - JULY 16, 2019
4
Guardrail In Place (Night)
Guardrail Benefits
•Reduces chances of vehicles striking sidewalk,
landscaping ( trees ), and / or HOA wall
•Reduces future repair costs; HOA wall and
landscaping
•Reduces potential future liability
7
8
CITY COUNCIL MEETING - JULY 16, 2019
5
Guardrail Cost
Project estimated costs:
•Guardrail ………………………..
•Contingency …………………….
•Sub total …………………….
•Design (10%) ………………….
•Inspection (10%) …………….
•Total Project Cost ……..
$30,000
$3,000
$33,000
$3,300
$3,300
$39,600
Guardrail
Design/Installation
From start to finish: 3.5 months
Estimated schedule:
•Design/Utilities …………..… 4 weeks
•Bid/Award/Contracts ….….4 weeks
•Custom Order ………….…….6 weeks
•Construction ……………..……1 week
•Final/Inspect ……………..……1 day
9
10
CITY COUNCIL MEETING - JULY 16, 2019
6
Recommendation
•Approve installation of guardrail at intersection
11
12
CITY COUNCIL MEETING - JULY 16, 2019
7
City Council Meeting
July 16, 2019
PH1 – Fee Update
Fees Included in Study
14
•Building
•Planning
•Fire Prevention
•Public Works
•Short-Term Rental
•False Alarm Response
•Others: Facility Rental,
Admin, etc.
13
14
CITY COUNCIL MEETING - JULY 16, 2019
8
Current Cost Recovery
15
Proposed
77%
Cost
Recovery
Revenue
from Current
Fee ($)
33%
Subsidized
by Other City
Resources Proposed Level
of Cost Recovery
(77%)
Maximum Level of
Targeted Cost
Recovery (100%)
Minimum Level
of Targeted Cost
Recovery (0%)
Hourly Rates for Service
16
Fee Service Area Current Proposed Full Cost
Building $160 $161 $161
Fire Prevention $160 $161 $171
Public Works $160 $161 $179
Planning $160 $161 $203
15
16
CITY COUNCIL MEETING - JULY 16, 2019
9
Primary Fee Changes
•97% remain unchanged or
increase by 1%
Fee Comparison - Building
Building Permit & Plan Check Fees
Production Phase Tract Home
17
18
CITY COUNCIL MEETING - JULY 16, 2019
10
Fee Comparison – Public Works
PW Fees for Subdivision Project
(60 Tract Homes) Per Home
Fee Comparison - STVR
Short-Term Vacation Rental Permit
19
20
CITY COUNCIL MEETING - JULY 16, 2019
11
Other Changes
•Adopt Fee for Expedited Review of
Planning Applications
•Adopt Facility Rental Rates for
SilverRock Event Site
Notice and Outreach
21
22
CITY COUNCIL MEETING - JULY 16, 2019
12
If adopted, updated fees will go
into effect September 16, 2019
Effective Date
23
24
CITY COUNCIL MEETING - JULY 16, 2019
13
City Council Meeting
July 16, 2019
PH2 - Appeal of Planning Commission
Approval CUP 2018-0005 & SDP 2018-0004
Project Location
•1.3 acre site
•Desert Club, south of
Calle Cadiz
•Village Commercial
•Abuts Arnold Palmer’s
Restaurant parking lot
•Lots on Calle Cadiz
designated Low Density
Residential
25
26
CITY COUNCIL MEETING - JULY 16, 2019
14
Village
Commercial
Area
Proposal
•16 two-bedroom apartments
•2 stories, 27 ft. in height
•2 buildings, 8 apartments in each
27
28
CITY COUNCIL MEETING - JULY 16, 2019
15
Rendering
Rendering
29
30
CITY COUNCIL MEETING - JULY 16, 2019
16
Site Plan
Landscaping
31
32
CITY COUNCIL MEETING - JULY 16, 2019
17
Planning Commission Action
•Public hearing June 11, 2019
•Calle Cadiz residents spoke in opposition
•Commission unanimously approved, with
added conditions:
–All open parking spaces on east property line
must have carports
–Reciprocal easement or lot merger to assure
driveway access
Appeal Point 1
•Public hearing scheduled when property
owners left for summer
–Staff is sensitive to seasonal nature of the area
–Must consider Permit Streamlining Act
33
34
CITY COUNCIL MEETING - JULY 16, 2019
18
Appeal Points 2 & 3
•Planning process did not allow time for Staff
to explain the strategic plan for the area
•The residents have not been requested to
provide input on what they envision for the
property
Village Evolution
•Specific Plan adopted
1988
•Amended in 1989
•Added area north of LQ
Park
•Specific Plan repealed
1998
•Village Commercial zone
established
35
36
CITY COUNCIL MEETING - JULY 16, 2019
19
Build-Out Plan
•Envisioned in 2009 as part of
General Plan Update
•Community Outreach in 2015
•Environmental Process
•NOP public review 2015
•Draft EIR public review 2016
•Plan adopted in 2016
Appeal Point 4
•Staff have not communicated the long term
effect of the location of the project’s parking
lot
–16 garages, 22 parking space
–Covered with carports
–Abuts Arnold Palmer’s parking lot
–Headlights blocked by perimeter wall
37
38
CITY COUNCIL MEETING - JULY 16, 2019
20
Appeal Points 5 & 6
•Character of single family homes will be
significantly changed
•Homeowners will stop rehabilitating their
properties due to change in character of the
community
–Oriented to Desert Club
–No presence on Cadiz
–Views to homes on Cadiz are limited by distance and angle
Other Concerns
•Views impacted, building height
•Privacy and security
•Less dense multi-family development
•Noise from parking lots
•No apartments in original Village area
39
40
CITY COUNCIL MEETING - JULY 16, 2019
21
Presentation by Mr. Nieto, Applicant
41
42
CITY COUNCIL MEETING - JULY 16, 2019
22
Presentation by Mr. Nieto, Applicant
Presentation by Mr. Nieto, Applicant
43
44
CITY COUNCIL MEETING - JULY 16, 2019
23
Presentation by Mr. Nieto, Applicant
Presentation by Mr. Nieto, Applicant
45
46
CITY COUNCIL MEETING - JULY 16, 2019
24
Presentation by Mr. Nieto, Applicant
Presentation by
Mr. Marshall,
Appellant
47
48
CITY COUNCIL MEETING - JULY 16, 2019
25
Conditional Use Permit
–Project designed to High Density Standard (12
units per acre).
–Project provides residential opportunities near
jobs and shopping.
–Project designed with street presence to
encourage interaction with the street.
Site Development Permit
–16 units on two floors and in two buildings connected
by a central driveway.
–Spanish architectural style, with recessed windows,
wrought iron and wood accents, and tile roof.
–Downstairs units have patios connected to Desert
Club by a gate. Upstairs units have balconies
overlooking Desert Club.
–Rear courtyards on breezeway.
–Each 2-bedroom unit is 920 square feet.
49
50
CITY COUNCIL MEETING - JULY 16, 2019
26
Site Development Permit
–Drought tolerant landscaping plan, includes
breezeway landscaping to soften hardscape.
–Parking provided:
•2.3 spaces per unit
•1 garage per unit
•Shaded parking along east boundary.
Elevations
51
52
CITY COUNCIL MEETING - JULY 16, 2019
27
Materials
53
CITY COUNCIL MEETING - JULY 16, 2019