September 10, 2018 Project No. 544-18331 '
Mr. & Mrs. Jay & Cindy Ihlenfeld
81 Wildwood Beach Road
Mahtomedi, Minnesota 55115
Project: Proposed Custom Re;
55705 Cherry Hills Di
PGA West Stadium C
La Quinta, California
Subject: Geotechnical Update
r
RECEIVED �
MAY 2 3 2019
INTERVJCST
CONSULTING GROUP
18-09-451
RECEIVED
MAY 19 ma
BUILDING DIVISI I CITY OF LAQUINTA
REV@FWED FOR DESIGN ND DEVELOPMENT DEPARTMENT
r,0DF 2�SZ�19-o16z
,CQMPLIpN(',E f .
Ref: Geotechnical Investigat i�ft,=7"1d �y'Sladd rnFlE.nh ing dated Ma�y��
2014; Project No. 544-14102, Report No. 14-04-
In accordance with your request, we have reviewed the above referenced geotechnical report
prepared for a nearby project site as it relates to the design and construction of the proposed
custom residence. The project site is located at 55705 Cherry Hills Drive within the PGA West
Stadium Course development in the City of La Quinta, California. It is our understanding that
the proposed residence will be of relatively lightweight wood -frame construction supported
upon conventional shallow spread footings and a concrete slab on grade.
The referenced report includes recommendations pertaining to the design of the residential
foundations and for remedial grading. Based upon our review of the referenced report and our
previous experience in the site vicinity, it is our opinion that the structural values provided in the
referenced report should be applicable for the design and construction of the proposed
residential foundations.
Because the lot has been previously rough graded, the remedial grading required at this time
should be minimal provided that the building area that falls within the previously assumed
building envelope. The building areas should be cleared of surface vegetation, scarified and
moisture conditioned prior to precise grading. The exposed surface should be compacted to a
minimum of 90 percent relative compaction prior to fill placement. The previously removed soil
and any fill material should be placed in thin lifts at near optimum moisture content and
compacted to at least 90 percent relative compaction.
Sladden Engineering
www.Sladdenengineering.com
September 10, 2018 -2- Project No. 544-18331
18-09-451
Load bearing walls may be supported on continuous spread footings and interior columns may
be supported on isolated pad footings. All footings should be founded upon properly compacted
engineered fill soil and should have a minimum embedment depth of 12 inches measured from
the lowest adjacent finished grade. Continuous and isolated footings should have a minimum
width of 12 inches and 24 inches, respectively. Continuous and isolated footings placed on such
materials may be designed using an allowable (net) bearing pressures of 1500 and 1800 pounds
per square foot (psf), respectively. Allowable increases of 250' psf for each additional 1 foot in
width and 250 psf for each additional 6 inches in depth may be utilized, if desired. The maximum
allowable bearing pressure should be 2,500 psf. The maximum bearing pressure applies to
combined dead and sustained live loads. The allowable bearing pressure may be increased by
one-third when considering transient live loads, including seismic and wind forces. All footings
should be reinforced in accordance with the project structural engineer's recommendations.
Based on the allowable bearing pressures recommended above, total settlement of the shallow
footings are anticipated to be less than one -inch, provided foundation preparations conform to
the recommendations described in this report. Differential settlement is anticipated to be
approximately half the total settlement for similarly loaded footings spaced up to approximately
40 feet apart,
Lateral load resistance for the spread footings will be developed by passive soil pressure against
the sides of the footings below grade and by friction acting at the base of the concrete footings
bearing on compacted fill. An allowable passive pressure of 250 psf per foot of depth may be
used for design purposes. An allowable coefficient of friction 0.40 may be used for dead and
sustained live loads to compute the frictional resistance of the footing placed directly on
compacted fill. Under seismic and wind loading conditions, the passive pressure and frictional
resistance may be increased by one-third.
The bearing soil is non -expansive and falls within the "very low" expansion category in
accordance with California Building Code (CBC) classification criteria.
The seismic design category for a structure may be determined in accordance with Section 1613
of the 2016 CBC or ASCE7. According to the 2016 CBC, Site Class D may be used to estimate
design seismic loading for the proposed structures. The 2016 CBC Seismic Design Parameters are
summarized below.
Risk Category (Table 1.5-1): I/11/111
Site Class (Table 1613.3.2): D
Ss (Figure 1613.3.1):1.500g
Si (Figure 1613.3.1): 0.633g
Fa (Table 1613.3.3(1)):1.0
Fv (Table 1613.5.3(2)):1.5
Sms (Equation 16-37 {Fa X Ss}): 1.500g
Sm1 (Equation 16-38 (Fv X Si)): 0.949g
SDS (Equation 16-39 12/3 X Sms)): 1.000g
SM (Equation 16-40 12/3 X Sml}): 0.633g
Seismic Design Category: D
September 10, 2018 -3- Project No. 544-18331
18-09-451
If you have questions regarding this letter or the referenced report, please contact the
undersigned.
Respectfully submitted,
SLADDEN ENGINEERING
Brett L. Anderson
Principal Engineer
SER/ra
Copies: Q Addressee
�G
nENGINEERING
2F CiNG
_ / 6 33 /
aq-N-Yl
Please verify that soils reports contain all of the above infomlation. In addition, to assure
continuity between the investigation/reporting stage and the execution stage, please use
the following checklist to verify that the conclusions and recommendations in the report
cover all the required elements. Only then can we be assured that the construction
documents address all of the site soil conditions.
La Quinta Geotechnical Repoi$ Checklist
Does the "Conclusions and Recommendations" section of the report address each of the
following criteria?
"Address" means:
(a) the criterion is considered significant and mitigation measure(s) no or,
(b) the criterion is considered insignificant and explicitly so stated.
Yes No CPiterion
❑ Foundation criteria based upon bearing capacity of natural or compacted soil.
Foundation criteria to mitigate the effects of expansive soils.
Foundation criteria based upon bearing capacity of natural or compacted soil.
Foundation criteria to mitigate the effects of liquefaction.
Foundation criteria to mitigate the effects of seismically- induced differential
settlement.
Foundation criteria to mitigate the effects of long-term differential settlement.
Foundation criteria to mitigate the effects of varying soil strength.
X ❑ Foundation criteria to mitigate expected total and differential settlement.
Any "No" answers to the above checklist should be noted as specific required
corrections.
Sladden Engineering
45090 Gulf Center Parkway, Suite F, India, CA 92201 (760)853-0713
6782 Stanton Avewc, Suile C. Buena Park, CA 90621 (714) 523-0952
450 Egan Avenue, 8eaun=4 CA 92223 (95 i) $45-77-13
800 E. Florida Awnue. Hemet CA 92543 (951) 766-8777
www.Sladdenengincering.com
June 27, 2019 Project No. 544-18331
19-06-308
Mr- & Mrs. Jay and Cindy Ihlenfeid �S -1 i
81 Wildwood Beach Road --. - DI
Ji
Mah tomedi, Minnesota 55115BUILDING��. 'r��.i!;�.+� •�
Project: Proposed Custom Residence F-Ivf� �
6J:_.d. r� !
55705 Cherry Hills Drive
PGA West Stadium Course
(�j%I��j'',
La Quinta, California
[DA'
Subject: Foundation Plan Review— -
Ref: Geoted-mical Update prepared by Sladden Engineering dated Septemb q 2018;
Project No. 544-18331, Report No.18-09-451
In accordance with your request, we have reviewed the Foundation Plans and Details prepared
by B.G. Structural Engineering, Inc. for the proposed custom residence to be constructed at 55705
Cherry Hills Drive within the PGA West development in the City of La Quinta, California. Based
on our review, it is our opinion that the recommendations provided in the above referenced
Geotechnical Update as well as the previous geotechnical reports have been properly
incorporated into these plans.
If you have questions regarding this memo or the referenced report, please contact the
undersigned.
Respectfully submitted,
SLADDEN ENGINEERING
�w
Brett L. AnAH ERso mderson � No. C45389
Principal Engineer CML
Letter/nh
CALlI
Copies: 4 / Addressee
Sladden Engineering
rvww.Sladdenengineering. cony
n
�NL