Loading...
BCOM2019-003678-495 CALLE TAMPICO Ct�ilt.�/ Vu,�IJ LA QUINTA, CALIFORNIA 92253 DESIGN & DEVELOPMENT DEPARTMENT BUILDING PERMIT Permit Type/Subtype: BUILDING COMMERCIAL/REMODEL Application Number: BCOM2019-0036 Property Address: 60750 TRILOGY PKY PKY APN: 764390021 Application Description: TRILOGY / SANTA ROSA CLUBHOUSE REMODEL Property Zoning: Application Valuation: $102,488.00 Applicant: L & L GENERAL CONTRACTING INC DBA L & L D 77670 SPRINGFIELD LANE SUITE Al A I If_+ ' 6 201A PALM DESERT, CA 92211 MVl7 L J CITY OF [A OUINTA DESIGN & DEVELOPMENT DEPARTMENT LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 {commencing with Section 70001 of Division 3 of the Business and Professions Code, and my License is in full force and effect. License Class: B License No.: 1001G3GG fi �b�► OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: (_) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). (_) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). (_) I am exempt under Sec. B.&P.C. for this reason Date; Owner: VOICE (760) 777-7125 FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Date: 8/16/2019 Owner: TRIOLOGY AT LA QUINTA MAINTE 60311 TRILOGY PKWY LA QUINTA, CA 92253 Contractor: L & L GENERAL CONTRACTING INC DBA L & L 77670 SPRINGFIELD LANE SUITE Al PALM DESERT, CA 92211 (760)345-8089 Llc. No.: 1001638 WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of. a for which this permit is issued. have and will maintain workers' compensation insurance, as required by 5A 0 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier: STATE CoMPENSATIDN INSURANCE FUND Policy Number: 9223905 I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those 1 rovisions. A WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT: Application is hereby made to the Building Official for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application , the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. CONSTRUCTION LENDING AGENCY I certify that I have read this application and state that the above information is correct. I hereby affirm under penalty of perjury that there is a construction lending agency for I agree to comply with all city and county ordinances and state laws relating to building the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). construction, and hereby authorize representatives of this city to enter u an the abo.U.ve-d property for inspection purposes. j Lender's Name: 11�r Applicant or Agen Lender's Address: DESCRIPTION ACCOUNT CITY AMOUNT BSAS SB1473 FEE 101-0000-20306 0 $5.00 Total Paid for BUILDING STANDARDS ADMINISTRATION BSA: $5.00 DESCRIPTION ACCOUNT CITY AMOUNT Credit Card Fee 101-0000-43505 0 j $2.25 Total Paid for Credit Card Fee: $2.25 DESCRIPTION ACCOUNT CITY AMOUNT DEVICES, FIRST 20 101-0000-42403 0 $26.68 DESCRIPTION ACCOUNT CITY AMOUNT DEVICES, FIRST 20 PC 101-0000-42600 0 $26.68 1 Total Paid for ELECTRICAL: 553.36 DESCRIPTION ACCOUNT CITY AMOUNT PERMIT ISSUANCE 101-0000-42404 0 $101.40 Total Paid for PERMIT ISSUANCE: $101.40 DESCRIPTION ACCOUNT CITY AMOUNT PLAN CHECK DEPOSIT - ADDITION/REMODEL 101-0000-42600 1 $125.00 Total Paid for PLAN CHECK DEPOSIT - ADDITION/REMODEL: $125.00 DESCRIPTION ACCOUNT CITY AMOUNT RECORDS MANAGEMENT FEE - MAJOR 101-0000-42416 0 $21.00 Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $21.00 DESCRIPTION ACCOUNT CITY AMOUNT SMI - COMMERCIAL 101-0000-20308 0 $28.70 Total Paid for STRONG MOTION INSTRUMENTATION SMI: $28.70 DESCRIPTION ACCOUNT CITY AMOUNT TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 PERMIT # 9 PLAN LOCATION:Project Address: 6075© ri l og Pox"w Project Description: Pool, Remodel, Add't, Elect, Plumb, Mech APN#: —9-7 - 0 d� S +o R.00f, a oLkWOM- Ll�y�y i t C ,lam 11,t•�, �Jitiamr: 1 IQ Q•i La au( 1 (10, ` 1 `C� 1C% IL �s xC�l V 1 l l Address: W 7S0 vnl ( O r K-W Q. f� j f 1plboo�� � ro u �y 2 City, ST, Zip: ��u\ CTl c7oeo�. 3 Telephone: Valuation of Project $ Contractor Name: LL CO ��G� ��G C New SFD Construction: Address:b7� �i1� ��U _ S Conditioned Space SF City, St, Zip M ��— i Garage SF Telephone: ?� U�O 1 Patio/Porch SF Email:k1tcj'a o Lar7dt Conf=JmS Inc, co Fire Sprinklers SF State Lie: 1601693 City Bus Lie: Arch/Eng Name: ah V- V a1 rr-n- Ro Construction Type: Occupancy: Address:"� I CI�e63 Grading: c;ry, St, Zip a[r✓(� Cfq qaa Telephone: �� •_ 2� .- S099 Bedrooms: Stories: # Units: Email: ' .i TU ao I • CO H State Lie: City Bus Lie: Property Owner's Name: New Commercial / Tenant Improvements: Address: Total Building W,r7S6 SF Construction Type: Occupancy: A ?j City, ST, Zip Telephone: Email: 78495 CALLE TAMPICO LA QUINTA, CA 92253 760-777-7000 3. Tim* for Compietion. Paragraphs 4b and 4d of the Original Agreement are hereby deleted in their entirety and replaced with the following: b. Contractorshell commence endcomplate the Work underthrsAgreementin accordance with the schedule set forth in Paragraph 3d. below, as completion Is defined In Paragraph 4. e. below. Upon commencement of the Project, the Contractor shall diligently and continuously pursue the Project until completion. Contractor shag maintain a full and completely supervised work force for the entire duration of the Project. A reduction in work force and/or time allocated to work on the Project, based upon Contractor's assertion that the Work is proceeding ahead of the anticipated schedule, will not be permitted in that the Association would, in such an event, desire an eadler date of completion. d. Contractor shall complete the Work under this Agreement in a timely fashion and prosecute the work diligently to completion and /n all events shall complete the Work, as follows {"Phase Completion Deadline'): I. Phase Is Work — Construction Documents for the Great Room and The Retreat: Contractor shall complete the Phase la Work by July 8, 2019. It. Phase 1b Work —Construction Documents for the Oasis Cafbr Contractorshall complete the Phase lb Work by July 22, 2019. Ili. Phase 2a Work — Mobilization / Construction / Demobilization for the Great Room and The RetreatContrectorshell complete the Phase 2e Work by October 15, 2019, IV. Phase 2b Work — Mobilization / Construction / Demobilization for the Oasis Cafd: Contractor shall complete the Phase 2b Work by November 15, 2019. 4. Unit Price Itemization 1 Payment Schedule. The Exhibit C — unit Price itemization / Payment Schedule contained within the Original Agreement Is hereby deleted In its entirety and replaced with the amended and restated Exhibit C, attached hereto and made a part hereof by this reference. 5. Entire Agreement. Except as indicated in this First Amendment, all other provisions within the Original Agreement shall remain in full force and effect. If there are any inconsistencies with the provisions of this First Amendment and the Original Agreement, the provisions of this First Amendment shall supersede and prevail over any such Inconsistent provisions. IN WITNESS WHEREOF, this First Amendment is executed as of the date hereunder written. Association -- Dated: Le 1 2'7/ 14t Contractor — Dated: 'C L s q TRILOGY AT LA QUINTA MAINTENANCE ASSOCIATION A Celifo nia Nonprofit Mut al Benefit Corporation By: Gary T I er, President L & L GENERAL CONTRACTING INC. A California Nonprofit Mutual Benefit Corporation doing bu ' ss as L & L DOOR AND WINDOW ly: e�6m" M Jo nce organ, President C nt ctor's License No.1001 4; 04.170,IWAddendum.SRClubhouseREnov.2o19.Wod 3 T4t!t 4 4 " DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 (760) 777-7125 FAX (760) 777-7011 NON—RESIDENTIAL PLAN CHECK CORRECTION LIST (os) DATE: 8/6/2019 STATUS: FIRST REVIEW PLAN CHECKED BY: JAKE FUSON TELEPHONE NUMBER: (760) 777-7081 ADDRESS: 60-750 TRILOGY PKWY. DESCRIPTION: CLUBHOUSE REMODEL APPLICANT: L&L GENERAL CONTRACTING PLAN CHECK #: BCOM2019-0036 This submittal has been checked for compliance with the 2016 California Building, Mechanical, Electrical, Plumbing, Energy, and Green Building Codes, and the City of La Quints Municipal Code. APPLICANT: The following items are being returned to you for correction: (3) - SETS OF PLANS THIS CORRECTION LIST BUILDING DEPARTMENT STAFF: DO NOT accept any resubmittal unless ALL of the following items are included: (1) - SET OF 1ST REVIEW PLANS (REDLINED SET) (2) - SETS OF REVISED PLANS (1) - COPY OF SITE & FLOOR PLANS FOR COUNTY ASSESSOR USE (2) - SETS OF ENERGY COMPLIANCE DOCUMENTS (IF APPLICABLE) THIS CORRECTION LIST W/RESPONSES INSTRUCTIONS TO APPLICANT: 1) Provide a written response to each comment on the following pages, noting specifically where the correction can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-3" are appropriate and will help expedite your back check. 2) Corrections may not be made by handwriting on existing drawings. Revise originals and reprint Plans and/or Calculations as necessary. 3) Return all red -marked Plans and/or Calculations with your resubmittal. 4) Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall be wet -signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section 5536. Resubmittals will not be accepted with signatures missing. 5) Return this list, your written responses, and all documents listed above with your resubmittal. Non Residential Plan Check Correction List (as) Page 1 of 3 4 a" SECTION A - PRECISE / SITE PLAN / ZONING Update the Assessor's Parcel Number (APN) on the first sheet of plans. 764-390-021 Where existing elements or spaces are altered, each altered element or space shall comply with the applicable accessibility requirements of Chapter 11B - Division 2 - Section 11B-202.4 of the 2016 California Building Code. It is the design professional's responsibility to verify the existing path of travel is in compliance with current standards. The path of travel includes parking areas, accessible path to the building entrance and other parts of the facility. When alterations are made to existing facilities, the term "path of travel" also includes the toilet and bathing facilities, telephones, drinking fountains and signs serving the area of work. Please complete the Path of Travel Upgrade Determination at the end of this document. If path of travel upgrades are required, update plans accordingly to define any necessary upgrades. If no upgrades are required, provide a statement of compliance with all applicable CBC 11B accessibility requirements on the cover sheet. Riverside County Health Department and/or Coachella Valley Water District approval may be required based on the scope of work at the prep area, please see comment below regarding a clarification of the scope of r' work at this area. SECTION B - ARCHITECTURAL / STRUCTURAL 11 } Clarify the use of the piano bar countertop. Where food or drink is served for consumption at a counter exceeding 34 inches in height, a portion of the main counter 60 inches minimum in length shall be provided in compliance with Section 11B-902.3. %Ly Clarify the scope of work at the prep area. It appears new walls are shown at this area but various fixtures ! are shown as existing. Please provide notes, detailing, or an "existing floor plan" to clarify what is being proposed. d Please provide typical detailing for all partition walls. Include member sizes and spacing, slab/foundation anchorage, attachment to the roof/ceiling members, and any required bracing. SECTION C - PLUMBING Clarify which, if any, plumbing fixtures/equipment are proposed as new at the "prep area." If new or relocated fixtures are proposed, please provide an isometric piping diagram for the DWV system. SECTION D - ELECTRICAL / ENERGY EFFICIENCY If new circuits are proposed, please include qn updated panel schedule and indicate on plans the circuit identification for these new outlets. j� (,iMi- was fkfc, Please provide an electrical legend to clarify what is being shown on E1. If these are the lighting fixtures proposed for replacement, please include the efficiency ratings, wattage, product info for these fixtures. Also, if this scope of work does not meet an exception from the 2016 California Energy Standards per CEnC §141.0(2)(I) please provide the appropriate non-residential energy compliance documents and indicate the method of lighting control/switching. PATH OF TRAVEL UPGRADE DETERMINATION In accordance with the 2016 California Building Code (CBC) Section 11B-202.4, exception 8, the cost of compliance with Section 11B-202.4 is allowed to be limited to 20% of the adjusted construction cost of the alterations, structural repairs or additions when the adjusted construction cost does not exceed the current valuation threshold. Non Residential Plan Check Correction List Page 2 of 3 Tar 44a" Construction cost for proposed project (not including costs of improvements to the path of travel to the area of alteration): $ (A) Cost of alterations to areas on this path of travel undertaken during the preceding three-year period which did not provide an accessible path of travel to the area of alteration (as applicable): $ (B) Adjusted construction cost (C) _ (A) + (B) $ (C) PATH OF TRAVEL CONSTRUCTION COSTS: Elements serving the area of Is element in If not, will element Proposed cost of alteration based on priority compliance with be upgraded to compliance with current Chapter current Chapter current 11B? (Y/N) 1113? (YIN) Chapter 11B 1. An accessible entrance $ 2. An accessible route (interior and $ exterior) to the altered area 3. At least one accessible restroom $ for each gender or a single accessible unisex, single user or family restroom 4. Accessible public telephones $ 5. Accessible drinking fountains $ 6. When possible, additional accessible elements such as: a. Parking $ b. Stora e $ c. Signs $ d. Alarms $ e. Other $ Total cost of providing compliant $ (D) path of travel elements: COST OF PATH OF TRAVEL UPGRADES AS PERCENTAGE OF ADJUSTED CONSTRUCTION COST: Compliance of path of travel upgrades as % of adjusted construction % (E)- cost, (E)% _ (D) / (C) I Note: This may not be less than 20% END CORRECTION LIST As further information is provided and reviewed, additional corrections may be required. Non Residential Plan Check Correction List Page 3 of 3