Loading...
Project 2019-10 Slurry Seal & Calle Tecate Striping (09/27/2019 & 10/02/2019)PO Box 23430 *rty ed iagrou p Green Bay, WI 54305-3430 ll �� !! Tel: 760-778-4578 I Fax 760-778-4731 PART OF THE USATODAY NETWORK Email: legals@thedesertsun.com PROOF OF PUBLICATION SECTION 1100 INVITATION TO BID PROJECT NO.2019-10 FY 19/20 — SLURRY SEAL IMPROVEMENTS STATE OF CALIFORNIA SS. AND CALLE TECATE STRIPING IMPROVEMENTS COUNTY OF RIVERSIDE SEALS. SECTION 1100 INVITATION TO BID 1e 70 00 l til ly opened Fy 19/20-PSLURR`Y SNFOAL IMPROVEMENTS AND CALLE TECATE STRIPING imPRDVEMENTs and sl t- and ig SEALED BIDS will be received by the City of La Cyuinta (City) at the Office of the 11 CITY OF LA QUINTA slurry City Clerk located at 78495 Calle Tampico, La Quinta, Callfornja 92253, until 9a;00 A.M. on Wednesday. Octoher 9, 2019 at which time they wltl be publicly 0- 78495 CALLS TAMPICO nue 58 on Av lions opened and read for performing work as follows: 19 Work Is located on five (5) separate corridors: crack fill, slurry seal, and signing 3- and striping on Avenue 54 from Jefferson Street to Monroe Street: Tiff. ry seal, A crack slurry seat, and signing and striping an Madison Street from Avenue 54 to Ave- r- 58; LA QUINTA CA 92253 formed nue crack fill, s€urry seal, pavement rehabilitation, and signing and striping e conlraC manna on Avenue s8 from feffm10'rr street to Monroe Street; and striping modifica• dons on Calla Tecate with Additive Alternate to provide crack fill and slurry seal. Flit project work and inddental items to the 0 $ectio complete project shall he per- formed in accordance with the plans, specifications, and other provisions of the gills prf contract All the above improvements are to he constructed In a workmanlike is with tH manner, leaving the entire project in a neat and presentable condition. Refer to 15 I a1n over the age of 18 years old, a citizen of the working commel Sections 3030 and 40M for more Informatltm This project shall be completed within 30 workin days for all improvements e with the excepdan of Background Ire s- United States and not a party to, or have interest in sence o green which shall completed within 45 working days from the date specrfled in the Notice to Proceed. Tlme for the .d this matter. I hereby certify that the attached time eqqi A pre-h commencement and completion of the work is important and is to he of the es'. serice of the Contract. Thesuccessful bidden should plan to order any long lead 19 in the F time 8 A pre-Wdi confment etems rence Ismmediat for schedule fwl lfi ip0 A tyt Manda'Notica of WyaSeptemtxer advertisement appeared in said newspaper (set in 495 Cal Ci 30, 2019 In the Public Works conference room at city of 1a Quinta, CRy Hall located at 78- 495 Ca Tampico, La type not smaller than non pariel) in each and entire Ire Quinta, California 92253. Complete sets of the bidding documents may be purchased online at: issue of said newspaper and not in an supplement y PP i M PO R you will www.planitplanroom.com n IMPORTANT: If you are not on the plan holders.11st through Plan it Planronm re that the of the Bidder to ensure I Ery are plans diers thereof on the following dates, to wit: Bidding execute that placed ondthe h to list.responsibility 9idding dures are prescribed in the Project Specifications. u Bids shall be le e:tecuted n the for" and and Specifications. Bid Sec made a part of said aid secvrity In an amount not less than ten percent (10%) of the total bid dollar 'tr 04127119, 1(#102119 amount SUbmltti amount and conforming lathe prescribed bidding Arocedures is required to he )e submitted with each bid, .as a•guaranty to be for cited should the bidder, if if awarde manner awarded the contract, fail to enter into the same, or fails to furnish in a timely y manner the bonds and/or proof of Insurance. The City reserves the right to n - act any or all bids and 10 waive any irreeggularities In bids. e- ject an the Bid log sheets tan found at http:ilwww.taquintaca;gov/btWnessldesigrt-and-devetopmentlbid• an I acknowledge that i am a principal clerk of the be foul on -jobs. on -job • Pursuant to the pmvis€ons of California Labor Code Section G707, each bid sub- printer of The Desert Sun, printed and published Pursu Milled mitted in response to this Invitation to Bid she€I contain, as a bid item, adequate lb - sheedngg, shoring, and bracing, or equivalent method, far the protection of life and llmh in trenches to weekly in the City of Palm Springs, County of sheen lir and open excavation, which shall conforrrl to appllcable safety orders. By listingthis sum, the bidder warrants that its action does not Ire convey tort liability to the City, its.ronsultan% and their le Riverside, State of California. The Desert Sun was and saleLy employees, agents, and sub-consultants. jot cony Pursuant to Section .1770. et. seq., of the California Labor Code, the successful nd adjudicated a Newspaper of general circulation on Jg a bidder shall pay not less than the prevailingrate of per client Wages as deter- mined bgthe Dlrectar of the California Pepbrtmentt of Industrial Relations March 24, 1988 by the Superior Court of the Pursu bidder These war rates are available from the California Department of industrial Re ;fug lotions' Internet wehsite at http:IWvw%v.dlr,ca:gov. !r- mined Pursuant to Section 1725.5. of the California Labor Code, no oorstractor or sub- s. Count of Riverside, State of California Case No. y These contractor may be awarded a contract for public work on a public works project le- Ial tins unless registered with the Department of Industrlat Relations at the time the 191236. Pursu contract us awarded. Contractors and subcontractors may find additional infor- matlonfor reghterIn at the Department of Industrial RDlations wehsite at http ,b- A Cenira urlleS9 :Ilwv w,dir.ca.govlPubJic•warkVPublicWorks.htmI . Pursuant to Labor Code section 1771.1, no contractor or subcontractor may he ie corill'al listed on a bid proposal for a public works project submitted on or after Match -- i certifyunder penalty of er u under the laws of P Y P J Mallon 1, 2015 unless registered with the Department of Industrial Relations. Further- more, all bidders and contractors are hereby Hied that no p the State of California, that the foregoing is true and 'l1HnNwcontractor Pursue notcontractor or sub- may be awarded, on a after April 1, 2015, a contract for public work an a public works project unless registered with the Department of Industrial re correct.. Executed on this 2nd of October 2019 in listed 11 PQ1 Relations. ;h Pursuant to Labor Code section 1771.4, all bidders are hereby notified .that this r- more. project is subject to compliance monitoring and enforcement by the Depart- to - Green Bay, Wi, County of Brown.nt COMM,Contra, of Industrial Relations. Pursuant to 50854, all contractors and subcontractors must furnish electronic k On a t certified payroll records directly to the Labor Commissioner (aka Division of La- Relallc bor Standards Enforcement). All contractors and subcontractors must also pro- pursuE vide a copy and proof to the City of online submittal within 2 days of online 11s project ment of submission, rt- Pursuant to Public Contract Cade Section 72i00,. for monies earned by the Con- PursuE tractor and withheld by the City to ensure the performance of the Contract, the Contractor may, at its option, choose to substitute securitles meeting the re- nic certifiE quirements of said Public Contract Code Section 22300. - La- I bor St All bidders shall be licensed under the provisions of Chapter 9, Division 3 of the ro- g vide a, Business and Professions Code of the state of Californla to do the type of work ne submi; contemplated in the projjject. in accordance with provlsians of California PlAlic Contract Code Section DECLARANT Pursua tractor: 3300, the City has determined that the General ContraC- for shall passes a valid Class A {General Contractor} and/or a C32 (Parking and )n Highway Improvement Contractor]. at the time that the bid is submitted. Suit he Contra contractors shall possess valid, suitable licenses for the work they will perform. re- quirern Failura to possess the specified Ilcense(s) shall render the bid as non -responsive. The successful bidder will be required to fumish a Labor and Materlals bond in All bid, Busine he the amount. equal to one hundred -percent 000%) of the Contract price, as well irk Bustard as a Fallftfu! Performance Bond, In the amount equal to one hundred percent t c Ad#:0003812539 0DD%) of the Contract price. P O : 2019-10 Contra) for shE Each bidder shall submit with its bid a statement setting forth its experience on 3C- the forms Induded in the Bid Proposal, nd # of Affidavits :1 Highw TelePhones will not be available to bidders. Rid forms received after the des)gg- ub- hated time will not be accepted. Bidders and thelr authorized agents arr- molt- contrar Failure r ad to end' No bidder may withdraw its bid for a period of sixty (60) days after the date set The st for the opening of bids. in the art Approved By: Bryan McKinney, P.E. Date: ell as a F City En ineer ant Published By. Monika Radava Date: City Clerk A Published; 9127. 10/21;*19 (luu%) of the Uonlraci puce. Each bidder shall submit with its bid a statement setting forth its experience on the farms included in the Bid PrOposal. Telephones will nol be available to bidders. Bid forms received after the desig- nated time will not be accepted. Bidders and their ,authorized agents are invit- ed to attend. No bidder may withdraw its bid for a 'period of sixty (60) .days after the date set for the open[ng of bids. Approved By: Bryan McKinney. P.E. date: Cily Enggineer Published By, Monika Aadeva Date: City Clerk Published: 9/27, 10./2/2019