Loading...
Project 2016-02 HSIP Interconnect Improvements (06/26/2019 & 07/03/2019)ANk mediagroup PART OF THE USA TODAY NETWORK PROOF OF PUBLICATION STATE OF CALIFORNIA SS. COUNTY OF RIVERSIDE CITY OF LA QUINTA 78495 CALLE TAMPICO LA QUINTA CA 92253 I am over the age of 18 years old, a citizen of the United States and not a party to, or have interest in this matter. I hereby certify that the attached advertisement appeared in said newspaper (set in type not smaller than non pariel) in each and entire issue of said newspaper and not in any supplement thereof on the following dates, to wit: 06/26/19. 07103/19 I acknowledge that i am a principal clerk of the printer of The Desert Sun; printed and published weekly in the City of Palm Springs, County of Riverside, State of California. The Desert Sun was adjudicated a Newspaper of general circulation on March 24, 1988 by the Superior Court of the County of Riverside, State of California Case No. 191236. 1 certify under penalty of perjury, under the laws of the State of California, that the foregoing is true and correct.. Executed on this 3rd of July 2019 in Green Bay, Wl. County of Brown. DECLARANT Ad#:0003645010 P O : 2016-02 # of Affidavits :1 PO Box 23430 Green Bay, WI 54305-3430 Tel: 760-778-4578 I Fax 760-778-4731 Email: legals@thedeserisun.com SECTION lino r INVITATION TO BID j City Project No. 2016-82 Federaf Project No. HSIPL-$433(017) HSIP SEALED BIDS will be reCLiVed bR thhe Cityff IMPROVEMENTS City Clerk located at 78-495 Ca11e laIto, taQulnta (City) at the Office of the ntil 14:00 A.M. on Thursday, July 25. 2019 at whithr tfrreathieyrnwill be publicly opened and read for performing work as follows: The proposed improvnrade the Fits will upgCity of La Q6intb,s eYlstlnq signal interconnect networkemeto fiber optic _communications citywide. The project will Include replacing existing signal rntermrrnect cable with fifacr optic [able inside exiAlrsg conduit;. installing new fiber optic cable and u1ment pnggduit to till cnmmunica- imersgect ono, and Install ng new communication hub abinetsra �t All prt 52 njecnYalwcrk and incidental items to complett the prolact shall be performed in aomrdaoce with the plans,. spedllcatlom and other.provisiom of fife contract. All of the entire Proabove jectinan neat and p es ntablare to be etcondit in en Refer t Sectionsmanilke leaving the and 4000 for more irdarmallon. Tills project shall be completed wlthin 90 working days From the date speclfied in the Notice to Proceed. Time (OF the commencement and completion of the work Is important, and is to be of the essence of the Contract The successful bidder should plan to order any long lead time equipment items immediately followinngg "Notice of Award". A pre -Lid conference is scheduled for 1D.00 A.M. on Thursday, July 11. 2019 in the Puhlic.Works conference room at Cittyy of La Quirda, City Hall located at M 495 Celle Tampon, Ili guinea, California 92i53, Complete sets of the bidding documents may be purchased online at: www.planitplanroom.com IMPORTANT, if yyoou are not on the plan holders list through Planit Planroom you will not receive addendums. It is the responsibility of the bidder to ensure that they are placed an the plan holders list. Bidding procedures are prescribed in the Project 5pirciflcations. Bids shall be executed upon the forms bound and made a part Or said Specifications. Bid se- curity in an amount not less than ten percent (10%) OF the total bid dollar amount and cotlformingg to the prescribed bldding procedures is required to be submitted with each bid, as a guaranty to be forfeited should the bidder, If awarded the contract,.fall to enter Into the same, or faits to furnish in a timely manner the bonds andlor proof of insurance. The City reserves the right to re- ed any or all bids, and to waive any irregularities in the bids. Bid log sheets can found at €tttp:tlwww.te-quinta.orglyour-govemmenttpublic-workslbld-on-jo Pursuant to the provisions of California Labor Code Section 6707, each bid sub- mitted in response to this fnvitation to Rid shall contain, as a bld Item, adequate andIleI,r g in r_,lng and bracing, or equivafent method, for the protecttlon of life safety tr eyycl"tinghes ndthissum,en %the bidderNwarrrantslthat Its action doesanot convey tart (lability to the C11% Its consultants, and their employees, agents, and ?ub-consultants. Pursuant W Section 1770, ot, sect., of the California Labor Cade,. the successful bidder shall pay not less than the prevailing rate at per diem wades as deur- mined by the Director of"the California Department of Ind ustnaI Relations. These wage rates are available from the California Department of Industrial Re- lations' lmernetvv b, ite at httpVmww.dir.ca.gov, Pursuant to Section 172S.5 of the Califomia Labor Lode. no contractor or sub- comractor may be awarded a cvrrtracr for puhllc work on a public works project unless registered with the Department of ,nduseriaf Relations at the time the contract is awarded. Contractors and subcontractors may find additional infor- mation for registering at the Department of Industrial Relations welesite at http :iAvww,d f r:ea. gavlPubl I* WarkVPubilc W orks.ht mi. Pursuant to Labor Code section 1771.1, no contractor or Subcontractor may be listed on a hid proposal for a pubic works project submitted en or after March 1, 2015 unless registered with the Oeppaartment of Industrial Relations. further- more, all bidden and contractors are hereby notlfied that no rontractor or sub- writractof may be awarded, on or gfter April 1, 2015, a contract for public work on a. public works Project unless rEghtered with the Department of Industrial Relations. Pursuant to Latest Code section 1771.4, all bidders are herehy notified that this project Is subject to compliance monitoring and enforcement by the Depart- ment of Industrial Relations. Pursuant to 58854, all contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka olvision of La- ro- videor sa py and tandards nproof to the City ofronllne submittal withinr2 days ofso forceent), All contactors and stibcorltracta5 must aloli e submission. The project is partially funded with federal Highway Safety Improvement Pro- gram funds. As such, the Contractor and Sub ontrattors shall comply with the Davis -Baron Fair Labor Standards Act.(40 USC a-276 a-5), and the Implementa- tion regulations Issued pursuant thereto {29 CFR Section 1, 5) and any amend- ments thereof. Pursuant to the said regulations, the Federal Prevailing Wage General DecWcin CA19002S Modification No. 3, dated May 3, 2019 herewith at- tached In Appendlx R_ However, the most recent Federal Prevailing wage Qeci- sion in effect for Riverside County within 10 days .of the bid opening shall be used. Bidders shall promptly notify the City. In writing, about all the classifications of labor not listed in the prevailing wage determinations but necessary for the performance of the Work, before bids are submitted. Bidders are advised that, as required by federal law, the City of La Qu,nta is 1m- piementing Disadvantagged Business Enterprise requlremenb for Disadvantaged Business Enterprises (DH0. Section ZO(J0. 'General Prajeet Requirements, un- der subsection titled "Disetivantaged BvsinexE`nterpr,ses tpBE)" and subsection fitied 'PeNomunrn nf. c„N� ...,..... __.. _ SECTION 1100 INVITATION TO BID City Project No. 2016-02 Federal Project No. H51PL-5433(017) HSIP INTERCONNECT IMPROVEMENTS SEALED BIDS will be received by the City of La QUlnta (City) at the Office of the City Clerk located at 78.495 Calle Tampico, La Quinta, California, 92253, until 1D:00 A.M. an Thursday. July 25, 2019 at which time they will be publicly opened and read for performing work as follows: The proposed improvements will upgrade the Clt)i of La Quinta's existing signal Interconnect network to fiber Dptic.communlcatiom eltyvnde. The pro ect will include replacing existing signal interconnect cable with fiber optic cab�e inside existing conduil; installing new fiber optic cable and conduit to fill communica- tion gaps: providing new communication equipment upgrades at 52 signalized IrnterseCnons; and installing new communication hub cabinets. All project work and incidental items to complete the project shall be performed in accordance With the plans, specifications, and other provisions of the contract. All of the above improvements are to be constructed in workmanlike manner leaving the entire project in a neat and presentable condition. Refer to Sections 3D00 and 4000 for more information. This project shall be completed within 90 working days from the date specified In the NDtice to Procecd. Time for the commencement and completion of the work is important, and is to be of the essence of the Contract. The successful bidder should plan to order any long lead time equipment items immediately following "Notice of Award". A pre-hld conference is scheduled for 10:00 A-M, on Thursday. July 11. 2019 in the Public Works conference room at City of La Quinta, City Hall located at 78- 495 Calle Tampico, La Quinta, California 92253. Complete sets of the bidding documents may be purchased online at: www. p Ian itp lam ro o m.co m IMPORTANT: If you are not on the plan holders list through Planit Planroom you will not receive addendums. It is the responsibility of the bidder to ensure that they are placed on the plan holders list. Bidding procedures are prescribed in the Project Specifications. Bids shall be executed upon the forms bound and made a part of said Specifications. Bid se- curity in an.amount not less than ten peecent.(1D".k) of the total bid dollar amount and cenformincd to the prescribed bidding procedures is required to be submitted with each hid, as a guaranty to be forfeited should the bidder, if awarded the contract, fail to enter Into the same, or falls to furnish in a timely manner the bonds andlor proof of insurance. The City reserves the right to re- Vct any or all bids, and to waive any irregularities in the bids. Bid log sheets can e found at http;llvuww.la•qufnta.orglyour-governmenlipublic-works/bid-on-jo bs-. Pursuant to the provisions of California Labor Code Section 6707, each bid sub- mitted in response to this Invitation to Bid Shall contain, as a bid Item, adequate sheeting sharing, and bracing. or equivalent method, for the protection of life and limb in trenches and open excavation, which shall conform to applicable safety orders. By listingg this sum, the bidder mrrants that its action hoes not convey tars liability totHe City, its consultants, and their employees, agents, and sub -consultants - Pursuant to Section 1770, et. seq., of the California Labor Code, the successful bidder shall pay not less than the prevailing rate of per diem wages as deter- mined by the Director of the California Department of Industrial Relations. These wage rates are available from the California Department of Industrial Rie- lations' Internet wehsite at bt[p:ilwww:dir.ca.gov. Pursuant to Section 1725.5 of the California Labor Code, no contractor or sub- contractor may be awarded a contract for public work on apublic works project unless registered with the Department of Industrial Relations at the time the contract is awarded. Contractors and subcontractors may find additional infor- Matlon for registering at the Department of Industrial Relations website at http :11 www,d i r.ca.g ovlPu b li:c- WorkslPu b li c W orks.htm I. Pursuant to Labor Cade section 1771.1, no contractor or subcontractor may be listed on a bid proposal For a public Works project submitted an or after March 1 2015 unless registered with the De artment of Industrial Relations. Further- more, all bidders and contractors are hereby notified that no contractor or sub- contractor may be awarded, on or after April 1, 2015, a contract for public work on a public works project unless registered with the Department of Industrial Relations. Nrsuant to Labor Code section 1771.4, all bidders are hereby notified that this praj.ct is subject to compliance monitoring and enforcement by the Depart- ment of Industrial Relation5- Pursuant to SB854, all contractors and subcontractors must furnish electronic certified payroll retards directly to the Labor ComniRsfoner (aka Division of La- hor Standards Enforcement). All contractors and subcontractors must also pro- vide a copy and proof to she City of online submittal within 2 days of online submission. The project is partially funded with federal Highway Safety Improvement Pro- gram funds. As such, the Contractor and Sub -Contractors shall comply with the Davis•8acon Fair Labor Standards Act (40 Ll5C a-276 a-5), and the Implementa- tion regulations issued pursuant thereto (29 CFR Section 1, S1 and any amend- ments thereof. Pursuant to the said regulations, the Federal Prevailing Wage General Decision CA190025 Modification No. 3, dated May 3, 2019 herewith at- tached in Appendix B. However, the most recent Federal Prevailing Wage Decl- slon In effect for Riverside County within 10 days of the bid opening shall be used Bidders shall promptly notify the City, in writing, about all the classifications of labor not listed In the prevailing wage determinations but necessary for the performance of the Work, before bids aresubmltted. Bidders are advised that, as required by federal law, the City of La Quinta is im- plementing Disadvantaged Business Enterprise requirements for Disadvantaged Business Enterprises (DRE). Section 2000, "General Project Requirements," un- der subsection titled "Disadvantaged Business Enterprises (DEE)" and subsection titled "Performance of Subcontractors" of these special provisions cover the DBE requirements. The DBE Contract goal is two percent (2%). Pursuant to Public Contract Code Section 223A0, for monies earned by the Con- tractor and withheld by the City to ensure the performance of the Contract, the Contractor may, at its option, choose to substitute securities meeting the re- quire menls of said Public Contract Code Section 223Do. Affirmative action to ensure against discrimination in employment ppractices on the basis of race, religion, sex, color, national origin, age, or disability will also be required. The City hereby affirmatively ensures that minority business enter- prlses will be afforded full opportunity to submit bids In respanse to this notice and will not be discriminated against on the basis of race, religion, sex, color, national origin, age, or disability in any consideration leading to the award of contract. The Contractor and Sub -Contractors shall comply with "Buy America" require - menu (23 USC 313), and the implementing regulations issued pursuant xhereto (23 CFR 5ection 635,410) and any amendments thereof. All bidders shall be licensed under the provlslons of Chapter 9, ❑Ivlsion 3 of the Bus]rness and Professions Code of the State of California SO do the tyype of work contemplated in the project. In accordance with provislons of Cailfornia Public Contract Code Section 3300. the City has determined that the General Contrac- tor shall possess a Valid Class A (Genera$ Contractor) andlur C-10 (Electrical Con- tractor). at the time that the bid Is submitted. Subcontractors shall possess val- Id, suitable licenses for the work they will perform, all electrical work shall be performed by a licensed C-10 (Electrical Contractor). Fallure to possess the specified license(s) shall render the bid as non -responsive. The successful bidder will be required to furnish a Labor and Materials bond in the amount equal to, one hundred percent (11JU%) of the Contract price, as well as a Falthful Performance Bond, in the amount equal to one hundred percent (100%k) of the Contract price. Each bidder shall submit with its bid a statement setting forth its experience on the forms included in the Bid Proposal. Telephones will not be available to bidders. Bid forms received after the desig- nated time will not be accepted. Bidders and their authorized agents are invit- ed to attend. No bidder may withdraw its bid for a period of sixty (60) days after the date set for the opening of bids. Approved By: Bryan McKinney, P.E. Date: City Engineer Published By: Morlika Radeva Date: City Clerk Pub: 6/26, 713/19