BRES2018-0016 Revision 3c4a Qw�&(v
CALIFORNIA
PERMIT #
PLAN LOCATION:
r-CY
Project Address: v(!;at b 7
Project Description:
APN #:
Arc
12\� t
Applicant Name:
Address:
City, ST, Zip:
Telephone:
Email:
Valuation of Project $
Contractor Name: (
New SFD Construction:
Address: 5-3
Conditioned Space _ _SF
City, St, Zip
Garage _SF
Telephone.
Patio/Porch SF
Email:�� r=
Fire Sprinklers SF
State Lic: City Bus Lic:
Architect/Engineer Name:
Construction Occupancy:
Address:
Grading:
City, St, Zip
Telephone:
Bedrooms:
Stories:
# Units:
Email:
State Lic: City Bus Lic:
Property Owner's Name:
New Commercial / Tenant Improvements:
Address:
Total Building _ _ SF
City, ST, Zip
Construction Type: Occupancy:
Telephone:
Email:
78495 CALLE TAMPICO
LA QUINTA, CA 92253
760-777-7000
L_ BUILDING ENERGY ANALYSIS REPORT I
PROJECT:
MacDonald Residence
80-875 Via Portofino
La Quinta, CA 92253
Project Designer:
Brock J. Payton, Inc.
8391 Beverly Blvd., Suite 482
Los Angeles, CA 90048
((310) 720-6589
Report Prepared by:
Tim Scott
Scott Design and Title 24, Inc,
> 3 - p,p c- 201a 74-818 Velie Way, Suite #8
CITY OF LA QUI�V Desert, CA 92260
BUILDING DIVISION 760) 200-4780
REVIEWED FOR
CODE
COMPLIANCE
DATE 3*u'Zd9
�sE - - e,L�► I
Job Number:
Date: fvtAR 15 2019
LA
CDl4lMt1Nl�y �urN�4
12/20/2018 EVELppML,,N,r,
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the Califomia Energy Commission for use with both the Residential and Nonresidential 2016 Building Energy Efficiency Standards.
This program developed by EnergySoft Software — www.energysoft.com.
kv?
I TABLE OF CONTENTS I
Cover Page 1
Table of Contents 2
Form CF-1 R-PRF-01 -E Certificate of Compliance 3
Form RMS-1 Residential Measures Summary 19
Form MF-1 R Mandatory Measures Summary 22
HVAC System Heating and Cooling Loads Summary 26
E
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x
GENERAL
INFORMATION
01
Project Name
lot 151 and 152
02
Calculation Description
Title 24 Analysis
03
Project Location
80-875 Via Portofino
04
City
La Quinta
06
Zip Code
92253
08
Climate Zone
CZ15
10
Building Type
Single Family
12
Project Scope
Newly Constructed
14
Total Cond. Floor Area (ft2)
8959
16
Slab Area (ft2)
7937
18
Addition Cond. Floor Area(ft2)
n/a
20
Addition Slab Area (ft2)
n/a
CF1 R-PRF-01
Page 1 of 16
05
Standards Version
Compliance 2017
07
Compliance Manager Version
BEMCmpMgr 2016.3.1 (1149)
09
Software Version
EnergyPro 7.2
11
Front Orientation (deg/Cardinal)
20
13
Number of Dwelling Units
1
15
Number of Zones
8
17
Number of Stories
2
19
Natural Gas Available
yes
21
Glazing Percentage (%)
1 33.0%
COMPLIANCE RESULTS
01 Building Complies with Computer Performance
02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03 This building incorporates one or more Special Features shown below
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 2 of 16
Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x
ENERGY DESIGN RATING
Energy Design Rating (EDR) is an alternate way to express the energy performance of a building using a scoring system where 100 represents the energy performance of the Residential
Energy Services (RESNET) reference home characterization of the 2006 International Energy Conservation Code (IECC) with California modeling assumptions. A score of zero represents
the energy performance of a building that combines high levels of energy efficiency with renewable generation to"zero out' its TDV energy. Because EDR includes consideration of
components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics), it is not used to show compliance with Part 6 but may instead be used by local
jurisdictions pursuing local ordinances under Title 24, Part 11 (CALGreen).
As a Standard Design building under the 2016 Building Energy Efficiency Standards is significantly more efficient than the baseline EDR building, the EDR of the Standard Design building
is provided for Information. Similarly, the EDR score of the Proposed Design is provided separately from the EDR value of installed PV so that the effects of efficiency and renewable
energy can both be seen
EDR of Standard Efficiency
45.2
EDR of Proposed Efficiency
45.1
❑ Design meets Tier 1 requirement of 15% or greater code compliance margin
❑ Design meets Tier 2 requirement of 30% or greater code compliance margin
0
EDR Value of Proposed PV + Battery Final Proposed EDR
0.0 45.1
A4.203.1.2.1) and QII verification prerequisite.
A4.203.1.2.2) and QII verification prerequisite.
Design meets Zero Net Energy (ZNE) Design Designation requirement for Single. Family in climate zone CZ15 (CALGreen A4.203.1.2.3) including on -site photovoltaic (PV)
renewable energy generation sufficient to achieve a Final Energy Design Rating (EDR) of zero or less. The PV System and QII must be verified.
Notes:
• Excess PV
EDR
REQUIRED SPECIAL FEATURES
PV
rules
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
• Cool roof
• Window overhangs and/or fins
HERS FEATURE SUMMARY
The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is
provided in the building components tables below.
Building -level Verifications:
• High quality insulation installation (QII)
• IAQ mechanical ventilation
• High R-value Spray Foam Insulation
Cooling System Verifications:
• Minimum Airflow
• Verified EER
• Verified SEER
• Verified Refrigerant Charge
• Fan Efficacy Watts/CFM
HVAC Distribution System Verifications:
• Duct Sealing
• Low -leakage Air Handling Unit
Domestic Hot Water System Verifications:
• Pipe Insulation, All Lines
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
CF1R-PRF-01
Project Name: lot 151 and 152
Calculation Date/Time:
09:52, Thu, Dec
20, 2018
Page 3 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribdl6x
BUILDING - FEATURES INFORMATION
01
02
03
04
05
06
07
Project Name
Conditioned Floor Area (ft2)
Number of Dwelling
Units
Number of Bedrooms
Number of Zones
Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
lot 151 and 152
8959
1
5
8
0
1
ZONE INFORMATION
01
02
03
04
05
06
07
Zone Floor Area
Avg. Ceiling
Zone Name
Zone Type
HVAC System Name
(ft2)
Height
Water Heating System 1
Water Heating System 2
Small Master Suite
Conditioned
HVAC-Masterl
630
10.3
DHW Sys 1
n/a
Master Suite
Conditioned
HVAC-Masterl
1350
9.1
DHW Sys 1
n/a
Lounge -Game Room -Office
Conditioned
HVAC-Lounge-Game RoomQf
1279
9.8
DHW Sys 1
n/a
Great Room -Dining
Conditioned
HVAC-Great Room-Dining3
1408
13.7
DHW Sys 1
n/a
Morning Room -Office -Hall-
Conditioned
HVAC-Morning Room-Office-4
1037
12.8
DHW Sys 1
n/a
Casita
Conditioned
HVAC-Casita5
1088
8
DHW Sys 1
n/a
Casita 2nd Floor
Conditioned
HVAC 2nd casita6
1022
8
DHW Sys 1
n/a
Garage
Conditioned
HVAC7G0rage7
1145
8
DHW Sys 1
n/a
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: tot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribdl6x
CFI R-PRF-01
Page 4 of 16
OPAQUE SURFACES
01
02
03
04
05
06
07
08
Name
Zone
Construction
Azimuth
Orientation
Gross Area (ftz)
Window & Door Area (ft)
Tilt (deg)
20d Wall
Small Master Suite
R-21 Wall
20
Front
154
101.972
90
200d Wall
Small Master Suite
R-21 Wall
200
Back
88
37.1
90
290d Wall
Small Master Suite
R-21 Wall
290
Right
242
6
90
Interior Surface
Small Master Suite»Master Suite
R-13 Wall
n/a
n/a
200
0
n/a
Roof
Small Master Suite
R-38 Roof Attic R19 High
n/a
n/a
630
n/a
n/a
20d Wall 2
Master Suite
R-21 Wall
20
Front
154
0
90
110d Wall
Master Suite
R-21 Wall
110
Left
88
0
90
200d Wall 2
Master Suite
R-21 Wall
200
Back
435
188.448
90
290d Wall 2
Master Suite
R-21 Wall
290
Right
869
132.2
90
Interior Surface 2
Master Suite»Lounge-Game
R-13 Wall
n/a
n/a
500
0
Room -Office
n/a
Interior Surface 3
Master Suite»Small Master Suite
R-13 Wall
n/a
n/a
200
0
n/a
Roof 2
Master Suite
R-38 Roof Attic R19 High
n/a
n/a
1350
n/a
n/a
20d Wall 3
Lounge -Game Room -Office
R-21 Wall
20
Front
396
139.6
90
110d Wall 2
Lounge -Game Room -Office
R-21 Wall
110
Left
583
256
90
200d Wall 3
Lounge -Game Room -Office
R-21 Wall
200
Back
187
156.04
90
290d Wall 3
Lounge -Game Room -Office
R-21 Wall
290
Right
77
0
90
Interior Surface 4
Lounge -Game RopSuie-Office»Mster
R-13 Wall
n/a
n/a
500
0
n/a
Interior Surface 5
Lounge -Game Room -Office —Great
R-13 Wall
n/a
n/a
500
Room -Dining
0
n/a
Roof 3
Lounge -Game Room -Office
R-38 Roof Attic R19 High
n/a
n/a
1279
n/a
n/a
20d Wall 4
Great Room -Dining
R-21 Wall
20
Front
770
250
90
200d Wall 4
Great Rooth-Dining
R-21 Wall
200
Back
490
377.978
90
290d Wall 4
Great R6om-Dining
R-21 Wall
290
Right
364
121.94
90
Roof 4
Great Room -Dining
R-38 Roof Attic R19 High
n/a
n/a
1408
n/a
n/a
20d Wall 5
MoMing Room -Office -Hall-
R-21 Wall
20
Front
220
69
90
110d Wall 3
Morning Room -Office -Hall-
R-21 Wall
110
Left
804
232.36
90
200d Wall 5
Morning Room -Office -Hall-
R-21 Wall
200
Back
420
240.36
90
290d Wall 5
Morning Room -Office -Hall-
R-21 Wall
290
Right
312
21
90
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
CF1R-PRF-01
Project Name: lot 151 and 152
Calculation
Date/Time: 09:52, Thu, Dec
20, 2018
Page 5 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald
Residence-18.ribdl6x
Interior Surface 6
Morning Room -Office -Hall -»Great
R-13 Wall
Room -Dining
n/a
n/a
500
p
n/a
Morning
Interior Surface 7
Room -Office -Hall -»Lounge -Game
R-13 Wall
n/a
n/a
500
0
n/a
Room -Office
Roof 5
Morning Room -Office -Hall-
R-38 Roof Attic R19 High
n/a
n/a
1037
n/a
n/a
20d Wall 6
Casita
R-21 Wall
20
Front
320
54
90
110d Wall
Casita
R-21 Wall
0iio
Left
460
24.5
90
200d Wall 6
Casita
R-21 Wall
200
Back
320
31
90
290d Wall 6
Casita
R-21 Wall
290
Right
460
179.5
90
Interior Surface 8
Casita»Morning Room -Office -Hall-
R-13 Wall ba
n/a
n/a
500
0
n/a
Interior Surface 9
Casita»Casita 2nd Floor
R-13 Wall
n/a
n/a
511
0
n/a
Roof 6
Casita
R-38 Roof Attic R19 High
n/a
n/a
577
n/a
n/a
20d Wall 7
Casita 2nd Floor
R-21 Walt
20
Front
216
26.4
90
110d Wall 5
Casita 2nd Floor
R-21 Wall
110
Left
224
26.4
90
200d Wall 7
Casita 2nd Floor
.R-21 Wall
200
Back
216
32.8
90
290d Wall 7
Casita 2nd Floor
sR-21 Wall
290
Right
224
83
90
Interior Surface 10
Casita 2nd Floor»Casita
R-13 Wall
n/a
n/a
511
0
n/a
Roof 7
Casita 2nd Floor
R- 38 Roof Attic R19 High
n/a
n/a
511
n/a
n/a
20d Wall 8
Garage
R-21 Wall
20
Front
400
76.2
90
110d Wall 6
Garage
R-21 Wall
110
Left
500
25.5
90
200d Wall 8
Garage
R-21 Wall
200
Back
400
89.01
90
290d Wall 8
Garage
R-21 Wall
290
Right
500
224
90
Interior Surface 11
Garage»Casita
R-13 Wall
n/a
100
n/a
0
n/a
Roof 8
Garage
R-38 Roof Attic R19 High
n/a
n/a
1145
n/a
n/a
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
CF1 R-PRF-01
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribd16x
Page 6 of 16
ATTIC
01
02
03
04
05
06
07
08
Name
Construction
Type
Roof Rise
Roof Reflectance
Roof Emittance
Radiant Barrier
Cool Roof
Attic Small Master Suite
Attic RoofSmall Master Suite
Unventilated
3
0.61
0.86
Yes
Yes
Attic Master Suite
Attic RoofMaster Suite
Unventilated
3
0.61
0.86
Yes
Yes
Attic Lounge -Game
Attic_RoofLounge-Game
Room -Office
Room -Office
Unventilated
3
0.61
0.86
Yes
Yes
Attic Great Room -Dining
Attic RoofGreat Room -Dining
Unventilated
3
0.61
0.86
Yes
Yes
Attic Morning
Attic RoofMorning
Room -Office -Hall -Unventilated
Room -Office -Hall -
3
0.61
0.86
Yes
Yes
Attic Casita
Attic RoofCasita
Unventilated
3
0.61
0.86
Yes
Yes
Attic Casita 2nd Floor
Attic RoofCasita 2nd Floor
Unventilated
3
0.61
0.86
Yes
Yes
Attic Garage
Attic RoofGarage
Unventilated
3
0.61
0.86
Yes
Yes
�v
V�
«S
44�
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 7 of 16
Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x
FENESTRATION I GLAZING
01
02
03
04
05
06
07
08
09
10
Height
Area
Name
Type
Surface (Orientation -Azimuth)
Width (ft)
(ft)
Multiplier
(ft2)
U-factor
SHGC
Exterior Shading
DOB
Window
20d Wall (Front-20)
10.6
10.0
0.962
102.0
0.41
0.21
Insect Screen (default)
W04
Window
200d Wall (Back-200)
---
-
1
37.1
0.30
0.17
Insect Screen (default)
W05
Window
290d Wall (Right-290)
-
-
1
6.0
0.30
0.17
Insect Screen (default)
D10
Window
200d Wall 2 (Back-200)
14.8
10.0
0.926
137.0
0.40
0.21
Insect Screen (default)
WOB
Window
200d Wall 2 (Back-200)
-
1
51.4
0.30
0.17
Insect Screen (default)
W06
Window
290d Wall 2 (Right-290 Ri
( 9 )
"---
1
21.2
0.30
0.17
Insect Screen (default)
W07
Window
290d Wall 2 (Right-290)
-
1
51.4
0.30
0.17
Insect Screen (default)
W09
Window
290d Wall 2 (Right-290)
-
1
29.8
0.30
0.17
Insect Screen (default)
W10
Window
290d Wall 2 (Right-290)
-
--
1
29.8
0.30
0.17
Insect Screen (default)
W01
Window
20d Wall 3 (Front-20)
-
-
1
19.1
0.30
0.17
Insect Screen (default)
W02
Window
20d Wall 3 (Front-20)
-
-
1
19.1
0.30
0.17
Insect Screen (default)
W03
Window
20d Wall 3 (Fronts
-
-
1
19.1
0.30
0.17
Insect Screen (default)
W18A
Window
20d Wall 3 (Front-20)
-
-
1
82.3
0.30
0.17
Insect Screen (default)
D06
Window
11 Od Wall 2 (Left-110)
--
1
160.0
0.40
0.21
Insect Screen (default)
D07
Window
11 Od Wall 2 (theft-110)
1
96.0
0.41
0.21
Insect Screen (default)
D11
Window
200d Wall 3 (Back-200)
16.6
10.0
0.94
156.0
0.40
0.21
Insect Screen (default)
D01
Window
20d Wall 4 (Front-20)
5.0
10.0
1
50.0
0.30
0.17
Insect Screen (default)
D02
Window
20d Wall 4 (Front-20)
&0
10.0
1
%0
0.30
0.17
Insect Screen (default)
D03
Window
20d Wall 4 (Front-20)
5.0
10.0
1
50.0
0.30
0.17
Insect Screen (default)
D04
Window
20d Wall 4 (Front-20)
5.0
10.0
1
50.0
0.30
0.17
Insect Screen (default)
D05
Window
20d Wall 4 (Front-20)
5.0
10.0
1
50.0
0.30
0.17
Insect Screen (default)
D12
Window
; 200d Wall 4 (Back-200)
34.2
12.0
0.921
378.0
0.40
0.21
Insect Screen (default)
D17
Window
290d Wall 4 (Right-290)
13.0
10.0
0.938
121.9
0.40
0.21
Insect Screen (default)
D16
Window
20d Wall 5 (Front-20)
---
---
1
24.0
0.30
0.17
Insect Screen (default)
W17
Window
20d Wall 5 (Front-20)
-
1
45.0
0.30
0.17
Insect Screen (default)
W14
Window
11 Od Wall 3 (Left-110)
--
-
1
61.0
0.30
0.17
Insect Screen (default)
W12
Window
110d Wall 3 (Left-110)
-
-
1
42.8
0.30
0.17
Insect Screen (default)
D15
Window
110d Wall 3 (Left-110)
11.2
10.0
1
0.955
107.0
0.41
0.21
Insect Screen (default)
D13
Window
200d Wall 5 (Back-200)
21.5
10.0
0.925
198.9 1
0.40
0.21
Insect Screen (default)
Registration Number:
Registration Date/Time:
HERS
Provider:
CA Building Energy Efficiency Standards
- 2016 Residential
Compliance Report Version - CF1 R-11302018-1149
Report
Generated
at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE
- RESIDENTIAL
PERFORMANCE COMPLIANCE METHOD
CF1R-PRF-01
Project Name: lot 151 and 152
Calculation
Date/Time:
09:52,
Thu, Dec
20, 2018
Page 8 of 16
Calculation Description: Title
24 Analysis
Input
File Name:
Macdonald
Residence-18.ribdl6x
W13
Window
200d Wall 5 (Back-200)
6.4
7.0
0.926
41.5
0.30
0.17
Insect Screen (default)
W18
Window
290d Wall 5 (Right-290)
----
---
1
21.0
0.30
0.17
Insect Screen (default)
W21
Window
20d Wall 6 (Front-20)
---
1
18.0
0.30
0.17
Insect Screen (default)
W20
Window
20d Wall 6 (Front-20)
-
1
18.0
0.30
0.17
Insect Screen (default)
W19
Window
20d Wall 6 (Front-20)
--
1
18.0
0.30
0.17
Insect Screen (default)
W27
Window
110d Wall 4 (Left-110)
1
5.0
0.30
0.17
Insect Screen (default)
W26
Window
110d Wall 4 (Left-110)
-
1
9.5
0.30
0.17
Insect Screen (default)
W25
Window
110d Wall 4 (Left-110)
--
1
5.0
0.30
0.17
Insect Screen (default)
W24
Window
110d Wall 4 (Left-110)
1
5.0
0.30
0.17
Insect Screen (default)
W23A
Window
200d Wall 6 (Back-200)
---
--
1
7.0
0.30
0.17
Insect Screen (default)
D20
Window
200d Wall 6 (Back-200)
-
1
24.0
0.30
0.17
Insect Screen (default)
D19
Window
290d Wall 6 (Right-290) 416
-
-
1
143.5
0.41
0.21
Insect Screen (default)
W22
Window
290d Wall 6 (Right-290)
--
--
1
18.0
0.30
0.17
Insect Screen (default)
W23
Window
290d Wall 6 (Right-290)
1
18.0
0.30
0.17
Insect Screen (default)
W32
Window
20d Wall 7 (Front-20)
-
-
1
8.8
0.30
0.17
Insect Screen (default)
W31
Window
20d Wall 7 (Front- 9,)
-
1
8.8
0.30
0.17
Insect Screen (default)
W30
Window
20d Wall 7 (Front-20)
-
1
8.8
0.30
0.17
Insect Screen (default)
W32 2
Window
110d Wall 5 (Left-110)
-
-
1
8.8
0.30
0.17
Insect Screen (default)
W33
Window
110d Wall 5 (Left-110)
-
1
8.8
0.30
0.17
Insect Screen (default)
W30 2
Window
110d Walft (Left-110)
--
-
1
8.8
0.30
0.17
Insect Screen (default)
W30 3
Window
200d Wall 7 (Back-200)
---
1
8.8
0.30
0.17
Insect Screen (default)
W29
Window
20DdWall 7 (Back-200)
-
1
24.0
0.30
0.17
Insect Screen (default)
W28
Window
290d Wall 7 (Right-290)
4.0
10.0
1
40.0
0.30
0.17
Insect Screen (default)
D27
Window
%?- `290d Wall 7 (Right-290)
4.3
10.0
1
43.0
0.30
0.17 1
Insect Screen (default)
W36
Window
20d Wall 8 (Front-20)
----
--
1
15.8
0.30
0.17
Insect Screen (default)
W37
Window
20d Wall 8 (Front-20)
-
1
15.8
0.30
0.17
Insect Screen (default)
W38
Window
20d Wall 8 (Front-20)
1
15.8
0.30
0.17
Insect Screen (default)
W39
Window
20d Wall 8 (Front-20)
-
1
9.6
0.30
0.17
Insect Screen (default)
W40
Window
20d Wall 8 (Front-20)
-
-
1
9.6
0.30
0.17
Insect Screen (default)
W41
Window
20d Wall 8 (Front-20)
-
-
1
9.6
0.30
0.17
Insect Screen (default)
W42
Andow
110d Wall 6 (Left-110)
-
1
5.1
0.30
0.17
Insect Screen (default)
W43
Window
110d Wall 6 (Left-110)
--
-
1
5.1
0.30
0.17
Insect Screen (default)
W44
Window
110d Wall 6 (Left-110)
-
-
1
5.1
0.30
0.17
Insect Screen (default)
Registration Number:
Registration Date/Time:
HERS
Provider:
CA Building Energy Efficiency Standards
- 2016 Residential
Compliance Report Version - CF1 R-11302018-1149
Report
Generated
at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
CFIR-PRF-01
Project Name: lot 151 and 152
Calculation Date/Time: 09:52, Thu, Dec 20, 2018
Page 9 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribdl6x
W46 Window
110d Wall 6 (Left-110)1
5.1
0.30
0.17 Insect Screen (default)
W47 Window
110d Wall 6 (Left-110)----
---- 1 5.1
0.30
0.17 Insect Screen (default)
D22
Window
200d Wall 8 (Back-200)
6.6
10.0
0.985
65.0
0.30
0.17
Insect Screen (default)
D25
Window
200d Wall 8 (Back-200)
3.0
8.0
1
24.0
0.30
0.17
Insect Screen (default)
OVERHANGS AND FINS
01
02
03
04 05 46
07
08
09
10
11
12
13
14
Overhang
Left Fin
Right Fin
Left Right
Window
Depth
Dist Up
Extent Extent Flap Ht.
Depth
Top Up
Dist L
Bot Up Depth
Top Up Dist R
Bot Up
D08
6
0.1
6 fi 0
0
0
0
0
0
0
0
0
D10
6
0.1
6 6 0
0
0
0
0
0
0
0
0
D11
10
0.1
10 10 0
0
0
0
0
0
0
0
0
D01
14
0.1
14._ = 14 0
0
0
0
0
0
0
0
0
D02
14
0.1
1.4` 14 0
0
0
0
0
0
0
0
1 0
D03
14
0.1
F i 4 14 0
0
0
0
0
0
0
0
0
D04
14
0.1
v 14 14 0
0
0
0
0
0
0
0
0
D05
14
0.1 i,
14 14 0
0
0
0
0
0
0
0
0
D12
18
18 18 0
0
0
0
0
0
0
0
0
D17
10
a.1
10 10 0
0
0
0
0
0
0
0
0
D15
6
(€' 0.1
6 6 0
0
0
0
0
0
0
0
0
D13
10
0.1
10 10 0
0
0
0
0
0
0
0
0
W13
0.1
6 6 0
0
0
0
0
0
0
0
0
W28
6
0.1
6 6 0
0
0
0
0
0
0
0
0
D27
6
0.1
6 6 0
0
0
0
0
0
0
0
0
D22
0.1
4 4 0
0
0
0
0
0
0
0
0
D25
4
0.1
4 4 0
0
0
0
0
0
0
0
0
Registration Number:
Registration Date/Time:
HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance
Report Version - CF1 R-11302018-1149
Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
CFI R-PRF-01
Page 10 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribd16x
OPAQUE SURFACE CONSTRUCTIONS
01
02
03
04
05
06
07
Total Cavity
Winter Design
Construction Name
Surface Type
Construction Type
Framing
R-value
U-factor
Assembly Layers
• Around Roof Joists: R-6.0 insul.
• Cavity / Frame: R-13.0 / 2x4 Top Chrd
2x4 Top Chord of Roof Truss @ 24
• Roof Deck. Wood Siding/sheathing/decking
Attic RoofSmall Master Suite
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
Roofing: Light Roof (Asphalt Shingle)
• Inside Finish: Gypsum Board
Ceilings (below
• Cavity/Frame: R-9.1 /2x4
R-38 Roof Attic R19 High
attic)
Wood Framed Ceiling
2x4 @ 16 in O.0
R 38
0.025
• Over Ceiling Joists: R-28.9 insul.
• Inside Finish: Gypsum Board
• Cavity/Frame: R-21 /2x6
R-21 Wall
Exterior Walls
Wood Framed Wall
2x6 @ 16 in- O.C.
R 21
0.069
• Exterior Finish: 3 Coat Stucco
• Inside Finish: Gypsum Board
• Cavity/Frame: R-13/2x4
R-13 Wall
Interior Walls
Wood Framed Wall
2x4 @ 16 in. O.C.
R 13
0.092
• Other Side Finish: Gypsum Board
• Around Roof Joists: R-6.0 insul.
• Cavity/ Frame: R-13.0 / 2x4 Top Chrd
2x4 Tap Chord of Roof Truss @ 24
• Roof Deck. Wood Siding/sheathing/decking
Attic RoofMaster Suite
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
• Roofing. Light Roof (Asphalt Shingle)
• Around Roof Joists: R-6.0 insul.
• Cavity / Frame: R-13.0 / 2x4 Top Chrd
Attic RoofLounge-Game
"2x4 Top Chord of Roof Truss @ 24
• Roof Deck: Wood Siding/sheathing/decking
Room -Office
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
• Roofing: Light Roof (Asphalt Shingle)
• Around Roof Joists: R-6.0 insul.
• Cavity/Frame: R-13.0/2x4 Top Chrd
2x4 Top Chord of Roof Truss @ 24
• Roof Deck: Wood Siding/sheathing/decking
Attic RoofGreat Room -Dining
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
• Roofing: Light Roof (Asphalt Shingle)
• Around Roof Joists: R-6.0 insul.
• Cavity / Frame: R-13.0 / 2x4 Top Chrd
Attic RoofMorning
2x4 Top Chord of Roof Truss @ 24
Roof Deck: Wood Siding/sheathing/decking
Room -Office -Hall-
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
Roofing: Light Roof (Asphalt Shingle)
• Around Roof Joists: R-6.0 insul.
• Cavity / Frame: R-13.0 / 2x4 Top Chrd
2x4 Top Chord of Roof Truss @ 24
Roof Deck: Wood Siding/sheathing/decking
Attic RoofCasita
Attic Roofs
Wood Framed Ceiling
in. O.0
R 19
0.059
Roofing: Light Roof (Asphalt Shingle)
• Around Roof Joists: R-6.0 insul.
• Cavity/Frame: R-13.0/2x4 Top Chrd
2x4 Top Chord of Roof Truss @ 24
Roof Deck: Wood Siding/sheathing/decking
Attic RoofCasita 2nd Floor
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
Roofing: Light Roof (Asphalt Shingle)
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
CF1R-PRF-01
Project Name: lot 151 and 152
Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 11 of 16
Calculation Description: Title 24 Analysis
Input File Name:
Macdonald Residence-18.ribd16x
• Around Roof Joists: R-6.0 insul.
• Cavity/Frame: R-13.0/2x4 Top Chrd
Attic RoofGarage
Attic Roofs
Wood Framed Ceiling
2x4 Top Chord of Roof Truss @ 24
in. O.C.
R 19
Roof Deck: Wood Siding/sheathing/decking
0.059
Roofing: Light Roof (Asphalt Shingle)
SLAB FLOORS
01
02
03
04
05
06
07
Name
Zone
Area (ft)
Perimeter
(ft)
Edge Insul. R-value & Depth
Carpeted Fraction
Heated
Slab -on -Grade
Small Master Suite
630
94
None
0.8
No
Slab -on -Grade 2
Master Suite
1350
94
None
0.8
No
Slab -on -Grade 3
Lounge -Game Room -Office
1279
94
None
0.8
No
Slab -on -Grade 4
Great Room -Dining
1408
94
None
0.8
No
Slab -on -Grade 5
Morning Room -Office -Hall-
1037
94
None
0.8
No
Slab -on -Grade 6
Casita
1088
94
None
0.8
No
Slab -on -Grade 7
Garage
1145
94
None
0.8
No
BUILDING ENVELOPE - HERS VERIFICATION
01
02
03
04
Quality Insulation Installation (QII)
Quality Installation of Spray Foam Insulation
Building Envelope Air Leakage
CFM50
Required
Rpqulred
Not Required
n/a
WATER HEATING SYSTEMS
01
02
03
04
05
06
Name
System Type
Distribution Type
Water Heater
Number of Heaters
Solar Fraction (%)
DHW Sys 1
DHW
(HERS req'd) Pipe Insulation, All
DHW Heater 1 (3)
3
p%
Lines
WATER HEATERS
01
02
03
04
05
06
07
08
09
10
11
12
Input Rating /
Tank
Standby
Heater
Element
Tank
Uniform Energy
Pilot /
Insulation
Loss /
First Hour
NEEA Heat Pump
Tank Location
Name
Type
Tank Type
Number
of Units
Volume
(gal)
Factor / Energy
Factor / Efficiency
Thermal
Efficiency
R-value
Recovery
Rating /
Brand / Model /
or Ambient
(Int/Ext)
Eff
Flow Rate
Other
Condition
DHW Heater 1
Gas
Small Storage
3
r 40
0.63 EF
<= 75 kBtu/hr
R-0/R-0
0
n/a
n/a
n/a
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
CF1R-PRF-01
Project Name: lot 151 and 152
Calculation Date/Time: 09:52, Thu, Dec 20, 2018
Page 12 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-1 8.ribd 1 6x
WATER HEATING - HERS VERIFICATION
01
02
03
04
05
06
07
Name
Pipe Insulation
Parallel Piping
Compact Distribution
Point -of Use
Recirculation
Control
Central DHW
Distribution
DHW Sys 1 - 1/3
Pipe Insulation, All Lines
n/a
n/a
n/a
n/a
n/a
SPACE CONDITIONING SYSTEMS
01
02
03
04
05
06
SC Sys Name
System Type
Heating Unit Name
Cooling Unit Name
Fan Name
Distribution Name
HVAC-Masterl
Other He S tinsg and Cooling
Y
Heating Component 1
Cooling Component 1
HVAC Fan 1
Air Distribution System 1
HVAC-Lounge-Game Room-Off2
g
Other Heating and Cooling
System
Heating Component 2
Cooling Component 2
HVAC Fan 2
Air Distribution System 2
HVAC-Great Room-Dinin 3
g
Other Heating and Cooling
System
Heating Coponent 3
Cooling Component 3
HVAC Fan 3
Air Distribution System 3
HVAC-Morning Room-Office-4
Other Heatingand Cooling
System
Hewing Component 4
Cooling Component 4
HVAC Fan 4
Air Distribution System 4
HVAC-Casita5
Other Heatingand Cooling
System
s, Heating Component 5
Cooling Component 5
HVAC Fan 5
Air Distribution System 5
HVAC 2nd casita6
Heat Pump Heating and Cooling System
..
Heat Pump System 6
Heat Pump System 6
None
- none -
HVAC-Garage?
Heat Pump Heating arid
Cooling System
Heat Pump System 7
Heat Pump System 7
None
- none -
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x
CFI R-PRF-01
Page 13 of 16
HVAC - HEAT PUMPS
01
02
03
04
05
06
07
08
09
10
11
Name
System
Type
Number of
Units
Heating
Cooling
Zonally
Controlled
Compressor
Type
HERS
Verification
HSPF/COP
Cap 47
Cap 17
SEER
EER
Heat Pump System 6
DuctlessMiniSplitHeatPump
1
10.5
12000
9000
22
13
Not Zonal
Single Speed
Heat Pump System
6-hers-cool
Heat Pump System 7
DuctlessMiniSplitHeatPump
1
10.5
12000
9000
22
13
Not Zonal
Single Speed
Heat Pump System
7-hers-cool
HVAC - COOLING UNIT TYPES
01
02
03
04
05
06
07
08
Name
System Type
Number of Units
Efficiency
EER SEER
Zonally Controlled
Compressor Type
HERS Verification
Cooling Component 1
SplitAirCond
1
13
16
Not Zonal
Single Speed
Cooling Component
1-hers-cool
Cooling Component 2
SplitAirCond
1
13
16
Not Zonal
Single Speed
Cooling Component
2-hers-cool
Cooling Component 3
SplitAirCond
1
13
16
Not Zonal
Single Speed
Cooling Component
3-hers-cool
Cooling Component 4
SplitAirCond
1
13
16
Not Zonal
Single Speed
Cooling Component
4-hers-cool
Cooling Component 5
SplitAirCond
1
13
16
Not Zonal
Single Speed
Cooling Component
5-hers-cool
HVAC COOLING - HERS VERIFICATION
01
02
03
04
05
06
Name
Verified Airflow
Airflow Target
Verified EER
Verified SEER
Verified Refrigerant
Charge
Cooling Component 1-hers-cool
Regtliired
350
Required
Required
Required
Cooling Component 2-hers-cool
Required
350
Required
Required
Required
Cooling Component 3-hers-cool
'Required
350
Required
Required
Required
Cooling Component 4-hers-cool
Required
350
Required
Required
Required
Cooling Component 5-hers-cool
Required
350
Required
Required
Required
Heat Pump System 6-hers-cool
Not Required
n/a
Not Required
Not Required
Required
Heat Pump System 7-hers-cool
Not Required
n/a
Not Required
Not Required
Required
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1 R-PRF-01
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 14 of 16
Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribdl6x
HVAC - DISTRIBUTION SYSTEMS
01
02
03
04
05
06
07
Name
Type
Duct Leakage
Insulation R-value
Duct Location
Bypass Duct
HERS Verification
Air Distribution System 1
DuctsAttic
Specified Lower Leakage
8
Attic
None
Air Distribution System
Target
1-hers-dist
Air Distribution System 2
DuctsAttic
Specified Lower Leakage
8
Attic
None
Air Distribution System
Target
2-hers-dist
Air Distribution System 3
DuctsAttic
Specified Lower Leakage
8
Attic
None
Air Distribution System
Target
3-hers-dist
Air Distribution System 4
DuctsAttic
Specified Lower Leakage
8
Attic
None
Air Distribution System
Target
4-hers-dist
Air Distribution System 5
DuctsAttic
Specified Lower Leakage
8
Attic _T
None
Air Distribution System
Target
5-hers-list
HVAC DISTRIBUTION - HERS
VERIFICATION
01
02
03
04
05
06
07
08
Duct Leakage
Duct Leakage _
Verified Duct
Verified Duct
Buried
Deeply Buried
Low -leakage
Name
Verification
Target (%)
Location
Design
Ducts
Ducts
Air Handler
Air Distribution System 1-hers-dist
Required
5.0
Not Required
Not Required
Not Required
Not Required
Required
Air Distribution System 2-hers-dist
Required
5.0
Not Required
Not Required
Not Required
Not Required
Required
Air Distribution System 3-hers-dist
Required
5.0
Not Required
Not Required
Not Required
Not Required
Required
Air Distribution System 4-hers-dist
Required
5.0
Not Required
Not Required
Not Required
Not Required
Required
Air Distribution System 5-hers-dist
Required
5.0
Not Required
Not Required
Not Required
Not Required
Required
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CFI R-PRF-01
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation DateMme: 09:52, Thu, Dec 20, 2018
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribd16x
Page 15 of 16
HVAC FAN SYSTEMS - HERS VERIFICATION
01
02
03
Name
Verified Fan Watt Draw
Required Fan Efficiency (Watts/CFM)
HVAC Fan 1-hers-fan
Required
0.50
HVAC Fan 2-hers-fan
Required
0.50
HVAC Fan 3-hers-fan
Required
0.50
HVAC Fan 4-hers-fan
Required
0.50
HVAC Fan 5-hers-fan
Required
0.50
IAQ (Indoor Air Quality) FANS
01
02 03
04
05
06
Dwelling Unit
IAQ CFM IAQ WattsICFM
IAQ Fan Type
IAQ Recovery
Effectiveness(%)
HERS Verification
SFam IAQVentRpt
135 0.25
Default
0
Required
��
f
W*
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x
DOCUMENTATION! AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:
Tim Scott
Company:
Scott Design and Title 24, Inc,
Address:
74-818 Velie Way, Suite #8
ciry/statFd1m Desert, CA 92260
RESPONSIBLE PERSON'S DECLARATION STATEMENT
Documentation Author Signature:
Signature Date:
12/20/2018
CEA/HERS`.Certification Identification (If applicable):
Phone:
(760) 200-4780
CF1 R-PRF-01
Page 16 of 16
I certify the following under penalty of perjury, under the laws or the State of California:
1. 1 am efigible under Division 3 of the Business and Professions Code to accept responsjbility for the building design identified on this Certificate of Compliance.
2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
3. The building design features or system design features identified on this Certificate'af Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name:
Brack J. Payton
Company:
Brock J. Payton, Inc.
Address:
8391 Beverly Blvd., Suite 482
City/StaterZip:
Los Angeles, CA 90048
Responsible Designer Signature:
I Date Signed:
License:
Phone:
((310) 720-6589
Registration Number: Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
RESIDENTIAL MEASURES SUMMARY
RMS-1
Project Name
MacDonald Residence
Building Type m Single Family ❑ Addition Alone
❑ Multi Family ❑ Existing+ Addition/Alteration
California Energy Climate Zone Total Cond. Floor Area Addition
CA Climate Zone 15 8,959
Date
11212012018
# of Units
Project Address 4
80-875 Via Portofino La Quinta
INSULATION
Construction Type
Cavity
Area
(ft) Special Features
Status
Roof Wood Framed Attic R 38
8,448 Add=R-19.0 Cool Roof
New
Wall Wood Framed R 21
8,402
New
Slab Unheated Slab -on -Grade -
no insulation
7,937 Perim = 658'
New
Demising Wood Framed R 13
5,033
New
Door Opaque Door no insulation
22
New
Door Opaque Door - no insulation
224 Add=R-12.0
New
FENESTRATION
Orientation Area(ft2)
Total Area: 3.12-51 Glazing Percentage: 34.9 %
U-Fac SHGC Overhang Sidefins
New/Altered Average U-Factor.
Exterior Shades
0.35
Status
Front (N)
102.0
0.410
0.21 6.0
none
Bug Screen
New
Rear (S)
185.1
0.300
0.17 none
none
Bug Screen
New
Right (lM
195.2
0.300
0.17 none
none
Bug Screen
New
Rear (S)
137.0
0.400
0.21 6.0
none
Bug Screen
New
Front (N)
391.6
0.300
0.17 none
none
Bug Screen
New
Left (E)
160.0
0.400
0.21 none
none
Bug Screen
New
Left (E)
96.0
0.410
0.21 none
none
Bug Screen
New
Rear (S)
354.8
0.400
0.21 10.0
none
Bug Screen
New
Front (N)
250.0
0.300
0.17 14.0
none
Bug Screen
New
Rear (S)
378.0
0.400
0.21 18.0
none
Bug Screen
New
Right (W)
122.0
0.400
0.21 10.0
none
Bug Screen
New
Left (E)
206.6
0.300
0.17 none
none
Bug Screen
New
Left (E)
107.0
0.410
0.21 6.0
none
Bug Screen
New
Rear (S)
41.5
0.300
0.17 6.0
none
Bug Screen
New
HVAC SYSTEMS
Qty. Heating
Min. Eff
Cooling
Min. Eff
Thermostat
Status
1 Central Furnace
80% AFUE
Split Air Conditioner
16.0 SEER
Setback
New
1 Central Furnace
80% AFUE
Split Air Conditioner
16.0 SEER
Setback
New
1 Central Furnace
80% AFUE
Split Air Conditioner
16.0 SEER
Setback
New
HVAC DISTRIBUTION
Location Heating
Cooling Duct Location
Duct
R-Value
Status
HVAC-Master
Ducted
Ducted Attic
8.0
New
HVAC-Lounge-Game Roon
Ducted
Ducted Attic
8.0
New
HVAC-Great Room -Dining
Ducted
Ducted Attic
8.0
New
'WATER HEATING
Qty.
Type
Gallons
Min. Eff Distribution
Status
3
Small Storage Gas
40
0.63 All Pipes Ins (HERS)
New
EnergyPro
7.2 by EnergySoft
User Number., 6712
ID:
Paae 19 of 65
RESIDENTIAL MEASURES SUMMARY RMS-1
Project Name Building Type m Single Family ❑ Addition Alone Date
_MacDonald Residence ❑ Multi Family ❑ Existing+ Addition/Alteration 1212012018
Flom Project Address California Energy Climate Zone Total Cond. FloArea Addition 1# of Units
80-875 Via Portofino La Quinta CA Climate Zone 15 8,959 n/a 1
INSULATION Area
Construction Type Cavity (ft) Special Features Status
FENESTRATION
Orientation Area(ft2)
I Total Area:
U-Fac
3.1251
SHGC
Glazing Percentage: 34.9 %
Overhang Sidefins
I New/Altered Average U-Factor;
Exterior Shades
0.35
Status
Right (W 143.5
0.410
0.21
none none
Bug Screen
New
Right (V19 166.0
0.300
0.17
6.0 none
Bug Screen
New
Rear (S) 89.0
0.300
0.17
4.0 none
Bug Screen
New
HVAC SYSTEMS
Qty. Heating
Min. Eff
Cooling
Min. Eff
Thermostat
Status
1 Central Furnace
80% AFUE
Split Air Conditioner
16.0 SEER
Setback
New
1 Central Furnace
80% AFUE
Split Air Conditioner
16.0 SEER
Setback
New
1 Split Heat Pump
10.50 HSPF
Split Heat Pump
22.0 SEER
Setback
New
HVAC DISTRIBUTION
Location Heating
Cooling Duct Location
Duct
R-Value
Status
HVAC-Morning Room-Offic
Ducted
Ducted Attic
8.0
New
HVAC-Casita
Ducted
Ducted Attic
8.0
New
HVAC 2nd casita
Ductless / with Fan
Ductless n/a
n/a
New
WATER HEATING
Qty. Type Gallons Min. Eff Distribution
Status
I ErrergyPro 7.2 by Eawng §QR User Number: 6712 ID: Psoe 20 of 65 1
RESIDENTIAL MEASURES SUMMARY RMS-1
Project Name Building Type m Single Family ❑ Addition Alone Date
MacDonald Residence ❑ Multi Family ❑ Existing+ Addition/Alteration 1212012018
Project Address California Energy Climate Zone Total Cond. Floor Area Addition # of Units
80-875 Via Portofino La Quinta CA Climate Zone 15 8,959 n/a 1
INSULATION Area
Construction Type Cavity (ft) Special Features Status
FENESTRATION 1 Total Area: 3,1251 Gazing Percentage: 34.9 %1 New/Altered Average U-Factor: 0.35 I
Orientation Area(ft2) U-Fac SHGC Overhang Sidefins Exterior Shades Status
HVAC SYSTEMS
Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status
1 Split Heat Pump 10.50 HSPF Split Heat Pump 22.0 SEER Setback New
HVAC DISTRIBUTION Duct
Location Heating Cooling Duct Location R-Value Status
HVAC-Garage Ductless / with Fan Ductless n/a n/a New
WATER HEATING
Gallons Min. Eff Distribution
Status
)I EnergyPro 7.2 by EneraySoft User Number: 6712 _ ID: Peae 21 of 65
0
1 2016 Low -Rise Residential Mandatory Measures Summary
NOTE: Low-rise residential buildings subject to the Energy Standards must comply with all applicable mandatory measures, regardless of the compliance approach
used. Review the respective section for more information. *Exceptions may apply.
Revised 0412017
Building Envelope Measures:
§ 110.6(a)l: Air Leakage. Manufactured fenestration, exterior doors, and exterior pet doors must limit air leakage to 0.3 cfm/ft2 or less when tested per
NFRC-400 orASTM E283 orAAMAIWDMA/CSA 101/I.S.2/A440-2011:
§ 110.6(a)5: Labeling. Fenestration products must have a label meeting the requirements of § 10-111(a).
§ 110.6(b): Field fabricated exterior doors and fenestration products must use U-factors and solar heat gain coefficient (SHGC) values from TABLES
110.6-A and 110.6-13 for compliance and must be caulked and/or weatherstripped.'
§ 110.7: Air Leakage. All joints, penetrations, and other openings in the building envelope that are potential sources of air leakage must be caulked,
asketed, or weather stripped,
§ 110.8(a): Insulation Certification by Manufacturers. Insulation specified or installed must meet Standards for Insulating Material.
§ 110.8(g): Insulation Requirements for Heated Slab Floors. Heated slab floors must be insulated per the requirements of § 110.8(g).
§ 110.8(i): Roofing Products Solar Reflectance and Thermal Emittance. The thermal emittance and aged solar reflectance values of the roofing
material must meet the requirements of § 110.8(i) when the installation of a cool roof is specified on the CF1 R.
§ 110.80): Radiant Barrier. A radiant barrier must have an emittance of 0.05 or less and be certified to the Department of Consumer Affairs.
Ceiling and Rafter Roof Insulation. Minimum R-22 insulation in wood -frame ceiling; or the weighted average U-factor must not exceed 0.043.
Minimum R-19 or weighted average U-factor of 0.054 or less in a rafter roof alteration. Attic access doors must have permanently attached
§ 150.0(a): insulation using adhesive or mechanical fasteners. The attic access must be gasketed to prevent air leakage. Insulation must be installed in
direct contact with a continuous roof or ceiling which is sealed to limit infiltration and exfiltration as specified in § 110.7, including but not limited
to placing insulation either above or below the roof deck or on top of a dD2all ceiling.'
§ 150.0(b): Loose -fill Insulation. Loose fill insulation must meet the manufacturer's required density for the labeled R-value.
Above Grade Wall Insulation. Minimum R-13 insulation in 2x4 inch wood framing wall or have a U-factor of 0.102 or less (R-19 in 2x6 or U-
§ 150.0(c): factor of 0.074 or less). Opaque non -framed assemblies must have an overall assembly U-factor not exceeding 0.102, equivalent to an installed
value of R-13 in a wood framed assembly.*
§ 150.0(d): Raised -floor Insulation. Minimum R-19 insulation in raised wood framed floor or 0.037 maximum U-factor.'
§ 150.0(f): Slab Edge Insulation. Slab edge insulation must meet all of the following: have a water absorption rate, for the insulation material alone without
facings, no greater than 0.3%; have a water vapor permeance no greater than 2.0 perm/inch; be protected from physical damage and UV light
deterioration; and, when installed as part of a heated slab floor, meet the requirements of § 110.8(g).
§ 150.0(g)1: Vapor Retarder. In Climate Zones 1-16, the earth floor of unvented crawl space must be covered with a Class I or Class II vapor retarder. This
re uirement also applies to controlled ventilation crawl space for buildings complying with the exception to § 150.0(d).
§ 150.0(g)2: Vapor Retarder. In Climate Zones 14 and 16, a Class I or Class II vapor retarder muss be installed on the conditioned space side of all
insulation in all exterior wails, vented attics, and unvented attics with air -permeable insulation.
150.0 Fenestration Products. Fenestration, including skylights, separating conditioned space from unconditioned space or outdoors must have a
§ (q)' maximum U-factor of 0.58; or the weighted average U-factor of all fenestration must not exceed 0.58.'
Fireplaces, Decorative Gas Appliances, and Gas Log Measures:
§ 150.0(e)lA: Closable Doors. Masonry or factory -built fireplaces must have a closable metal or glass door covering the entire opening of the firebox.
§ 150.0(e)l B: Combustion Intake. Masonry or factory -built fireplaces must have a combustion outside air intake, which is at least six square inches in area
and is equipped with a readily accessible, operable, and tight -fitting damper or combustion -air control device.*
§ 150.0(e)lC: Flue Damper. Masonry or factory -built fireplaces must have a flue damper with a readily accessible control:
§ 150 0(e)2: Pilot Light. Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of
the building, are prohibited.
Space Conditioning, Water Heating, and Plumbing System Measures:
§ 110.0-§ 110.3: Certification. Heating, ventilation and air conditioning (HVAC) equipment, water heaters, showerheads, faucets, and all other regulated
appliances must be certified by the manufacturer to the Ener v Commission.'
§ 110.2(a): HVAC Efficiency. Equipment must meet the applicable efficiency requirements in TABLE 110.2-A through TABLE 110.2-K.'
Controls for Heat Pumps with Supplementary Electric Resistance Heaters. Heat pumps with supplementary electric resistance heaters
§ 110.2(b): must have controls that prevent supplementary heater operation when the heating load can be met by the heat pump alone; and in which the
cut -on temperature for compression heating is higher than the cut -on temperature for supplementary heating, and the cut-off temperature for
compression heating is higher than the cut-off temperature for supplementary heating.*
§ 110.2(c): Thermostats. All unitary heating or cooling systems not controlled by a central energy management control system (EMCS) must have a
setback thermostat.'
Water Heating Recirculation Loops Serving Multiple Dwelling Units. Water heating recirculation loops serving multiple dwelling units must
§ 110.3(c)5: meet the air release valve, backflow prevention, pump priming, pump isolation valve, and recirculation loop connection requirements of §
110.3(c)5.
§ 110.3(c)7: Isolation Valves. Instantaneous water heaters with an input rating greater than 6.8 kBTU/hr (2 kW) must have isolation valves with hose bibbs
or other fittings on both cold water and hot water lines of water heating systems to allow for water tank Pushing when the valves are closed.
§ 110.5: Pilot Lights. Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces; household cooking appliances (appli-
ances without an electrical supply voltage connection with pilot lights that consume less than 150 Btuihr are exempt); and pool and spa heaters.*
Building Cooling and Heating Loads. Heating and/or cooling loads are calculated in accordance with ASHRAE Handbook, Equipment
§ 150.0(h)l: Volume, Applications Volume, and Fundamentals Volume; SMACNA Residential Comfort System Installation Standards Manual; or ACCA
Manual J using design conditions specified in § 150.0(h)2.
z 2016 Low -Rise Residential Mandatory Measures Summary _
§ 150.0(h)3A: Clearances. Installed air conditioner and heat pump outdoor condensing units must have a clearance of at least 5 feet from the outlet of any
dryer vent.
§ 150.0(h)3B: Liquid Line Drier. Installed air conditioner and heat pump systems must be equipped with liquid line filter driers if required, as specified by
manufacturer's instructions.
§ 150.00)1: Storage Tank Insulation. Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water -heating systems, must have
R-12 external insulation or R-16 internal insulation where the internal insulation R-value is indicated on the exterior of the tank.
Water piping and cooling system line insulation. For domestic hot water system piping, whether buried or unburied, all of the following must
be insulated according to the requirements of TABLE 120.3-A: the first 5 feet of hot and cold water pipes from the storage tank; all piping with a
§ 150.00)2A: nominal diameter of 3/4 inch or larger; all piping associated with a domestic hot water recirculation system regardless of the pipe diameter;
piping from the heating source to storage tank or between tanks; piping buried below grade; and all hot water pipes from the heating source to
kitchen fixtures:
§ 150.00)2B: Water piping and cooling system line insulation. All domestic hot water pipes that are buried below grade must be installed in a water proof
and non -crushable casing or sleeve."
§ 150.00)2C: Water piping and cooling system line insulation. Pipe for cooling system lines must be insulated as specified in § 150.0(j)2A. Distribution
piping for steam and h dronic heatIng systems or hot waters stems must meet the requirements in TABLE 120.3-A.'
§ 150.00)3: Insulation Protection. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind.
Insulation Protection. Insulation exposed to weather must be installed with a cover suitable for outdoor service. For example, protected by
§ 150.00)3A: aluminum, sheet metal, painted canvas, or plastic cover. The cover must be water retardant and provide shielding from solar radiation that can
cause degradation of the material.
§ 150.00)3B: Insulation Protection. Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space must have a
Class I or Class II vapor retarder.
Gas or Propane Systems. Systems using gas or propane water heaters to serve individual dwelling units must include all of the following: a
§ 150.0(n)1: 120V electrical receptacle within 3 feet of the water heater; a Category III or IV vent, or a Type B vent with straight pipe between the outside
termination and the space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the
water heater, and allows natural drafning without pump assistance; and a gas supplympply line with a capacity of at least 200,000 Btulhr.
§ 150.0(n)2: Recirculating Loops. Recirculating loops serving multiple dwelling units must meet the requirements of § 110.3(c)5.
§ 150.0(n)3: Solar Water -heating Systems. Solar water -heating systems and collectors must be certified and rated by the Solar Rating and Certification
Coloration SRCC or by a listing a enc that is approved by the Executive Director.
Ducts and Fans Measures:
§ 110.8(d)3: Ducts. Insulation installed on an existing space -conditioning duct must comply with § 604.0 of the California Mechanical Code (CMC). If a
contractor installs the insulation, the contractor must certify to the customer, in writing, that the insulation meets this re uirement_
CMC Compliance. All air -distribution system ducts and plenums must be installed, sealed, and insulated to meet the requirements of CMC
§§ 601.0, 602.0, 603.0, 604.0, 605.0 and ANSIISMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition. Portions
of supply -air and return -air ducts and plenums must be insulated to a minimum installed level of R-6.0 (or higher if required by CMC § 605.0) or
a minimum installed level of R-4.2 when entirely in conditioned space as confirmed through field verification and diagnostic testing
§ 150.0(m)1: (RA3.1.4.3.8). Connections of metal ducts and inner core of flexible ducts must be mechanically fastened. Openings must be sealed with
mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, UL 181 A, or UL 181 B or aerosol sealant that
meets the requirements of UL 723. If mastic or tape is used to seal openings greater than inch, the combination of mastic and either mesh or
tape must be used. Building cavities, support platforms for air handlers, and plenums designed or constructed with materials other than sealed
sheet metal, duct board or flexible duct must not be used for conveying conditioned air. Building cavities and support platforms may contain
ducts. Ducts installed in cavities and suppart platforms must not be compressed to cause reductions in the cross -sectional area of the ducts.'
Factory -Fabricated Duct Systems. Factory -fabricated duct systems must comply with applicable requirements for duct construction,
§ 150.0(m)2: connections, and closures; joints and seams of duct systems and their components must not be sealed with cloth back rubber adhesive duct
tapes unless such toe is used in combination with mastic and draw bands.
§ 150.0(m)3: Field -Fabricated Duct Systems. Field -fabricated duct systems must comply with applicable requirements for: pressure -sensitive tapes,
mastics, sealants, and other requirements. s ecifed for duct construction.
§ 150.0(m)7: Backdraft Dampers. All fan systems that exchange air between the conditioned space and the outside of the building must have backdraft or
automatic dampers.
§ 150.0(m)8: Gravity Ventilation Dampers. Gravity ventilating systems serving conditioned space must have either automatic or readily accessible,
manually operated dampers in all openings to the outside, except combustion inlet and outlet air o enin s and elevator shaft vents.
Protection of Insulation. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and
§ 150.0(m)9: wind. Insulation exposed to weather must be suitable for outdoor service. For example, protected by aluminum, sheet metal, painted canvas, or
plastic cover. Cellular foam insulation must be protected as above or painted with a coating that is water retardant and provides shielding from
solar radiation.
§ 150.0(m)10: Porous Inner Core Flex Duct. Porous inner core flex duct must have a non -porous layer between the inner core and outer vapor barrier.
Duct System Sealing and Leakage Test. When space conditioning systems use forced air duct systems to supply conditioned air to an
§ 150.0(m)11: occupiable space, the ducts must be sealed and duct leakage tested, as confirmed through field verification and diagnostic testing, in
accordance with § 150.E m 11and Reference Residential Appendix RA3.
Air Filtration. Mechanical systems that supply air to an occupiable space through ductwork exceeding IQ feet in length and through a thermal
§ 150.0(m)12: conditioning component, except evaporative coolers, must be provided with air filter devices that meet the design, installation, efficiency,
pressure drop, and labeling requirements of 150.0 m 12.
00�11
2016 Low -Rise Residential Mandatory Measures Summary_ _
Duct System Sizing and Air Filter Grille Sizing. Space conditioning systems that use forced air ducts to supply cooling to an occupiable
space must have a hole for the placement of a static pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the
§ 150:0(m)13: supply plenum. The space conditioning system must also demonstrate airflow> 350 CFM per ton of nominal cooling capacity through the return
grilles, and an air -handling unit fan efficacy < 0.58 WICFM as confirmed by field verification and diagnostic testing, in accordance with
Reference Residential Appendix RA3.3. This applies to both single zone central forced air systems and every zone for zonally controlled central
forced air systems.'
Ventilation for Indoor Air Quality. All dwelling units must meet the requirements of ASHRAE Standard 62.2. Neither window operation nor
§150.0(o): continuous operation of central forced air system air handlers used in central fan integrated ventilation systems are permissible methods of
providing whole -building ventilation.
§ 150.0(o)11A Field Verification and Diagnostic Testing. Whole -building ventilation airflow must be confirmed through field verification and diagnostic
testing, in accordance with Reference Residential Appendix RA3.7.
Pool and Spa Systems and Equipment Measures:
Certification by Manufacturers. Any pool or spa heating system or equipment must be certified to have all of the following: a thermal efficiency
§ 110.4(a): that complies with the Appliance Efficiency Regulations; an on -off switch mounted outside of the heater that allows shutting off the heater
without adjusting the thermostat setting; a permanent weatherproof plate or card with operating instructions; and must not use electric
resistance heating.*
§ 110.4(b)1_ Piping. Any pool or spa heating equipment must be installed with at least 36 inches of pipe between the filter and the heater, or dedicated
suction and return lines, or built-in or built-up connections to allow for future solar heatino.
§ 110.4(b)2: Covers. Outdoor pools or spas that have a heat pump or gas heater must have a cover.
§ 110.4(b)3: Directional inlets and time switches for pools. Pools must have directional inlets that adequately mix the pool water, and a time switch that
will allow all pumps to be set or programmed to run only durin off- eak electric demand periods.
§ 110.5: Pilot Light. Natural gas pool and spa heaters must not have a continuously burning pilot light.
150.0 Pool Systems and Equipment Installation. Residential pool systems or equipment must meet the specified requirements for pump sizing, flow
§ (p)' rate, pipin4, filters. and valves.'
Lighting Measures:
§ 110.9: Lighting Controls and Components. All lighting control devices and systems, ballasts, and luminaires must meet the applicable requirements
of § 110.9.,
JA8 High Efficacy Light Sources. To qualify as a JA8 high efficacy light source for compliance with § 150.0(k), a residential light source must
§ 110.9(e). be certified to the Energy Commission according to Reference Joint Appendix JA8. _
§ 150.0(k)1A: Luminatre Efficacy. All installed luminaires must be high efficacy in accordance with TABLE 150.0-A.
Blank Electrical Boxes. The number of electrical boxes that are more than 5 feet above the finished floor and do not contain a luminaire or
§ 150.0(k)1 B: other device must be no greater than the number of bedrooms. These electrical boxes must be served by a dimmer, vacancy sensor control, or
fan speed control. _
Recessed Downlight Luminaires in Ceilings. Luminaires recessed into ceilings must meet all of the requirements for: insulation contact (IC)
§ 150.0(k)1C: labeling; air leakage; sealing; maintenance; and socket and light source as described in § 150.0(k)1C. A JA8-2016-E light source rated for
elevated tern ermure must be installed by final inspection in all recessed down€i ht luminaires in ceilings.
§ 150.0(k)1 D: Electronic Ballasts. Ballasts for fluorescent lamps rated 13 watts or greater must be electronic and must have an output frequency no less than
20 kHz.
Night Lights. Permanently installed night lights and night lights integral to installed luminaires or exhaust fans must be rated to consume no
§ 150.0(k)1 E: more than 5 watts of power per luminaire or exhaust fan as determined in accordance with § 130.0(c). Night lights do not need to be controlled
by vacancy sensors.
§ 150.0(k)1 F: Lighting Integral to Exhaust Fans. Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods)
must meet the applicable requirements of § 150.0(k).'
Screw based luminaires. Screw based luminaires must not be recessed downlight luminaires in ceilings and must contain lamps that comply
§ 150.0(k)1 G: with Reference Joint Appendix JA8. Installed lamps must be marked with "JA8-2016" or "JA8-2016-E" as specified in Reference Joint Appendix
JA8.'
§ 150.0(k)1 H: Enclosed Luminaires. Light sources installed in enclosed luminaires must be JA8 compliant and must be marked with "JA8-2016-E."
§ 150.0(k)2A: Interior Switches and Controls. All forward phase cut dimmers used with LED light sources must comply with NEMA SSL 7A.
§ 150.0(k)2B: Interior Switches and Controls. Exhaust fans must be switched separately from lighting systems.'
§ 150.0(k)2C: Interior Switches and Controls. Luminaires must be switched with readily accessible controls that permit the luminaires to be manually
switched ON and OFF.
§ 150.0(k)2D: Interior Switches and Controls. Controls and equipment must be installed in accordance with manufacturer's instructions.
§ 150.0(k)2E: Interior Switches and Controls. No control must bypass a dimmer or vacancy sensor function if the control is installed to comply with
4rn MIA
§ 150.0(k)2F: Interior Switches and Controls. Lighting controls must comply with the applicable requirements of § 110.9.
Interior Switches and Controls. An energy management control system (EMCS) may be used to comply with dimmer requirements if it:
§ 150.0(k)2G. functions as a dimmer according to § 110.9; meets the Installation Certificate requirements of § 130.4; meets the EMCS requirements of §
130.5 and meets all other requirements in § 150.0(k)2.
Interior Switches and Controls. An EMCS may be used to comply with vacancy sensor requirements in § 150.0(k) if it meets all of the
§ 150.0(k)2H: following: it functions as a vacancy sensor according to § 110.9; the Installation Certificate requirements of § 130.4; the EMCS requirements of §
130.5 ; and all other re uirements in 150.0 k 2.
§ 150.0(k)21: Interior Switches and Controls. A multiscene programmable controller may be used to comply with dimmer requirements in § 150.0(k) if it
provides the functionality of a dimmeraccording to 110.9, and complies with all other applicable requirements in § 150.0(k)2.
2016 Low -Rise Residential Mandatory Measures Summary
§ 150.0(k)2J: Interior Switches and Controls. In bathrooms, garages, laundry rooms, and utility rooms, at least one luminaire in each of these spaces must
be controlled by a vacancy sensor.
§ 150.0(k)2K: Interior Switches and Controls. Dimmers or vacancy sensors must control all luminaires required to have light sources compliant with
Reference Joint Appendix JA8, except luminaires in closets less than 70 square feet and luminaires in hallways.
§ 150.0(k)2L: Interior Switches and Controls. Undercabinet lighting must be switched separately from other lighting systems.
Residential Outdoor Lighting. For single-family residential buildings, outdoor lighting permanently mounted to a residential building, or to other
§ 150.0(k)3A: buildings on the same lot, must meet the requirement in item § 150.0(k)3Ai (ON and OFF switch) and the requirements in either item
§ 150.0(k)3Aii (photocell and motion sensor) or item § 150.0(k)3Aiii (photo control and automatic time switch control, astronomical time clock, or
EMCS). _
Residential Outdoor Lighting. For low-rise multifamily residential buildings, outdoor lighting for private patios, entrances, balconies,
§ 150.0(k)3B: and porches; and outdoor lighting for residential parking lots and residential carports with less than eight vehicles per site must comply with
either § 150.0 k 3A or with the applicable requirements in 110.9. 130.0, 130.2. 130.4, 140.7 and 141.0.
§ 150.0(k)3C: Residential Outdoor Lighting. For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by
150.0 k 3B or § 150.0k 3D must comply with the applicable requirements in §§ 110.9, 130.0, 130.2,130A, 140.7 and 141.0.
§ 150.0(k)3D: Residential Outdoor Lighting. Outdoor lighting for residential parking lots and residential carports with a total of eight or more
vehicles per site must comply with the applicable requirements in 110.9, 130.0, 130.2, 130.4, 140.7, and 141.0.
§ 150.0(k)4: Internally illuminated address signs. Internally illuminated address signs must comply with § 140.8; or must consume no more than 5 watts of
-_power as determined according to § 130.0(c).
§ 150.0(k)5: Residential Garages for Eight or More Vehicles. Lighting for residential parking garages for eight or more vehicles must comply with the
applicable requirements for nonresidential garages in 110.9, 130.0, 130.1, 130.4,140.6, and 141.0.
Interior Common Areas of Low-rise Multi -Family Residential Buildings. In a low-rise multifamily residential building where the total interior
§ 150.0(k)6A: common area in a single building equals 20 percent or less of the floor area, permanently installed lighting for the interior common areas in that
buildin2 must be high efficacy luminaires and controlled by an occupant sensor.
Interior Common Areas of Low-rise Multi -Family Residential Buildings. In a low-rise multifamily residential building where the total interior
common area in a single building equals more than 20 percent of the floor area, permanently installed lighting in that building must:
§ 150.0(k)6B: I. Comply with the applicable requirements in §§ 110.9, 130.0, 130.1, 140.6 and 141.0; and
ii. Lighting installed in corridors and stairwells must be controlled by occupant sensors that reduce the lighting power in each space by at least
50 percent. The occupant sensors must be capable of turning the light fully on and off from all desiqned paths of ingress and earess.
Solar Ready Buildings:
Single Family Residences. Single family residences located in subdivisions with ten or more single family residences and where the
§ 110.10(a)1: application for a tentative subdivision map for the residences has been deemed complete by the enforcement agency must comply with the
re uirements of § 110.10 b through § 110.10(e).
§ 110.10(a)2: Low-rise Multi -family Buildings. Low-rise multi -family buildings must comply with the requirements of § 110.10(b) through § 110.10(d).
Minimum Area. The solar zone must have a minimum total area as described below. The solar zone must comply with access, pathway, smoke
ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local
jurisdiction. The solar zone total area must be comprised of areas that have no dimension less than 5 feet and are no less than 80 square feet
each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for buildings with roof areas
§ 110.10(b)1: greater than 10,000 square feet.
For single family residences the solar zone must be located on the roof or overhang of the building and have a total area no less than 250
square feet. For low-rise multi -family buildings the solar zone must be located on the roof or overhang of the building, or on the roof or overhang
of another structure located within 250 feet of the building, or on covered parking installed with the building project, and have a total area no less
than 15 percent of the total roof area of the building excludina anv skvliaht area!
§ 110.10(b)2: Orientation. All sections of the solar zone located on steep -sloped roofs must be oriented between 110 degrees and 270 degrees of true north.
§ 110.10(b)3A: Shading. The solar zone must not contain any obstructions, including but not limited to: vents, chimneys, architectural features, and roof
mounted equipment.'
Shading. Any obstruction located on the roof or any other part of the building that projects above a solar zone must be located at least twice the
§ 110.10(b)36: distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the horizontal projection of
the nearest point of the solar zone, measured in the vertical plane."
§ 110.10(b)4: Structural Design Loads on Construction Documents. For areas of the roof designated as solar zone, the structural design loads for roof
dead load and roof live load must be clean indicated on the construction documents.
Interconnection Pathways. The construction documents must indicate: a location tar inverters and metering equipment and a pathway for
§ 110.10(c): routing of conduit from the solar zone to the point of interconnection with the electrical service (for single family residences the point of
interconnection will be the main service panel); and a pathway for routing of plumbing from the solar zone to the water-heatin system.
§ 110.10(d): Documentation. A copy of the construction documents or a comparable document indicating the information from § 110.10(b) through
1 10.10c must be provided to the occupant.
§ 110.10(e)1: Main Electrical Service Panel. The main electrical service panel must have a minimum busbar rating of 200 amps.
Main Electrical Service Panel. The main electrical service panel must have a reserved space to allow for the installation of a double pole circuit
§ 110.10(e)2: breaker for a future solar electric installation. The reserved space must be: positioned at the opposite (load) end from the input feeder location or
main circuit location; and permanently marked as "For Future Solar Electric".
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
MacDonald Residence
Date
12/20/2018
System Name
HVAC-Master
Floor Area
1,980
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 1,213
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 0
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING PEAK
COIL HTG.
PEAK
Heating System
Sensible
Latent
CFM
Sensible
Output perSystem
89,000
23,366
3.278
685
26,167
Total Output (Btuh)
89,000
0
Output Btuh/s ft
44.9
1,101
999
Cooling System
0
0
Output perSystem
57,500
0
OF
0 0
Total Output (Btuh)
57,500
2,943
1,101
28,512 3,278
-2,943
Total Output (Tons)
4.8
999
Total Output Btuh/s ft
29.0
Total Output s ft/Ton
413.2
25,222
Air System
CFM perSystem
2,000
HVAC EQUIPMENT SELECTION
Airflow (cfm)
2,000
Carrier 24ACP760/58PH**l 10
42,354
6.456
89,000
Airflow cfm/s ft
1.01
Airflow (cfm/Ton)
417.4
Outside Air (%)
0•0 %
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
42,354
6,456
89,000
F Jan 1 AM
Outside Air (cfm/sqft)
0.00
Note: values above given at ARI conditions
Aug 3 MI
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating Peak
26 OF
70 OF 105 OF
106 OF
Pk
Outside Air
1
0 cfm
Heating Coil
Supply Fan
2,000 cfm
70 OF
a -dll�
H I
I ■
106 OF
ROOM
70 OF
COOLING SYSTEM PSYCHROMETRICS Airstream Tem eratures at Time of Cooling Peak
112/78OF 76/62OF 55/54OF 56154OF
a
Outside Air Ar D
T
0 cfm Cooling Coil Supply Fan 57 / 55 OF
2,000 cfm
48.0 % ROw
76/62OF 75/62°F
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
MacDonald Residence
Date
12/20/2018
System Name
HVAC-Lounge-Game Room -Office
Floor Area
1,279
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems 1
COIL
CFM
Total Room Loads 1.009
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 0
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK
COIL
HTG. PEAK
Heating System
Sensible
Latent
CFM
Sensible
Output per Stem
51,000
20,657
2,117
533
19,510
Total Output (Btuh)
51,000
0
Output (Btuh/sgft)
39.9
973
745
Cooling System
0
0
Output per System
36,000
0
0
0 0
Total Output (Btuh)
36,000
0
2,117
0
Total Output (Tons)
3.0
973
745
Total Output Btuh/s ft
28.1
Total Output s ft/Ton
426.3
1 22,604
20,999
Air System
CFM per System
1,200
HVAC EQUIPMENT SELECTION
Airflow cfm
1,200
Carrier 24ANB736/58CVX070
26,236
4,379
51,000
Airflow (cfm/sgft)
0.94
Airflow (cfm/Ton)
400.0
Outside Air (%)
0.0%1
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
26,236
4,379
51,000
Jan 1 AM
Outside Air (cfm/s ft)
0.00
1
Note: values above given at ARI conditions
Aug 3 PM
HEATING SYSTEM PSYCHROMETRICS (Airstream
Temperatures at Time of Heatin Peak
26 OF 69 OF 105 OF 105 OF
® U T T
Outside Air 0 cfm Heating Coil Supply Fan 1,200 cfm 104 OF
ROOM
69 OF 70 OF
COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak
112/78OF 76/62°F 55/54°F
55154°F
Outside Air
0 cfm Cooling Coil
Supply Fan
56 / 54 OF
1,200 cfm-Z
a8.2 % ROOM
76/62°F
75/62°F
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
MacDonald Residence
Date
12/20/2018
System Name
HVAC-Great Room -Dining
Floor Area
1,408
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 1,389
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 0
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK
COIL HTG.
PEAK
Heating System
Sensible
Latent
CFM
Sensible
Output per System
89,000
26,655
2,331
616
23,558
Total Output Btuh
89,000
0
Output Btuh/s ft)
63.2
1,256
899
Cooling System
0
0
Output per System
57,500
0
0
0
0
Total Output (Btuh)
57,500
2,943
2,331
-2,943
Total Output Tons
4.8
1,256
899
Total Output Btuh/s ft)
40.8
Total Output s ft1Ton
293.8
32,110
22,413
Air System
CFM per System
2,000
HVAC EQUIPMENT SELECTION
Airflow(cfm)_2,000
Carrier 24ACP760/58PH**l 10
42,790
5.905
89,000
Airflow cfm/sgft
1.42
Airflow cfm/Ton
417.4
Outside Air (%)
0.0 %
Total Adjusted System Output 42,790
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
5,905
Aug 3 PM
89,000
Jan 1 AM
Outside Air cfm/sgft)
0.00
Note: values above given at ARI conditions I
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time .of Heating Peak
26 OF
Outside Air
0 cfm
70 OF
if
70 OF 105 OF 106 °F
-
Heating Coil Supply Fan
2,000 cfm
106 OF
ROOM
70 OF
COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak
112/78OF
Outside Air
0 cfm
AL
76/62°F
76/62OF 55/54OF 56/54OF�j
I
Cooling Coil Supply Fan 57 / 55 OF
2,000 cfm
47.4 % ROOM
75/62OF
FrHVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
ject Name Date
MacDonald Residence + 1212o/2n1S
System Name
HVAC-Morning Room -Office -Hall -Laundry
Floor Area
1,037
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems 1
COIL
CFM
Total Room Loads 960
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 0
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK
COIL
HTG. PEAK
Heating System
Sensible
Latent
CFM
Sensible
Output per System
89,000
18,595
1,717
519
19,91$
Total Output Btuh
89,000
0
Output Btuh/s ft
85.8
876
760
Cooling System
0
0
Output per System
57,500
0
0
0 0
Total Output Btuh)
57,500
2,943
1,717
-2,943
Total Output (Tons)
4.8
876
760
Total Output (Btuh/sgft)
55.4
Total Output s ft/Ton
216.4
23,290
18,490
Air System
CFM per System
2,000
HVAC EQUIPMENT SELECTION
Airflow cfm
2,000
Carrier 24ACP760/58PH**l 10
42,767
5,805
89,000
Airflow (cfm/s ft)
1.93
Airflow (cfm/Ton)
417.4
Outside Air %) 1
0.0 %
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
42,767 5,805 89,000
Aug 3 PM Jan 1 AM
Outside Air cfm/s ft)
0.00
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRIC$
Airstream Tem eratures at Time of HeatingPeak
26 OF
70 OF 105 °F
106 OF
Outside Air
0 cfm
Heating Coil
Supply Fan
106 ° F
2,000 cfm
ROM
70 OF
70 OF
COOLING SYSTEM PSYCHROMETRIC$ Airstream Temperatures at Time of Coolin Peak
112/78°F
75/62°F 55/54OF 56154OF
Outside Air
0 cfm
Cooling Coil Supply Fan
57 / 55 OF
2.000 cfm
47.1
R00
75 / 62 OF
75,162 °F
WEI
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
MacDonald Residence
Date
12/20/2018
System Name
HVAC-Casita
Floor Area
1,088
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 765
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 0
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK
COIL
HTG. PEAK
Heating S tem
Sensible
I Latent
CFM
Sensible
Output perSystem
89,000
14,890
1,801
403
15,467
Total Output Btuh
89,000
0
Output Btuh/s ft
81.8
702
590
Cooling System
0
0
Output per System
46,500
0
0
0 0
Total Output Btuh
46,500
2,943
1,801
-2.943
Total Output (Tons)
3•9
702
590
Total Output (Btuh/sgft)
42.7
Total Output s ft/Ton
280.8
1 19,236
13,704
Air System
CFM perSystem
2,000
HVAC EQUIPMENT SELECTION
Airflow cfm
2,000
Carrier 24ACP748/58PH**l 10
32,759
6,515
89,000
Airflow (cfm/sgft)
1.84
Airflow cfmrron
516.1
Outside Air (%)
0.0 %
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
32,759
6,515
89,000
Jan 1 AM
Outside Air cfm/sqft)
0.00
Note: values above given at ARI conditions
Aug 3 PM
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating Peak
26 OF
70 OF 105 T
106 OF
M
a.,-
■
U
jH
Outside Air
__H I
Ar
0 cfm
Heating Coil
Supply Fan
106 a F
2,000 cfm
ROOM R
70 OF
70 OF
I COOLING SYSTEM PSYCHROMETRICS (Airstream Temneratures at Time of Cooling Peak1
112 / 78 OF
75 / 62 OF
75/62OF 55/54OF 56/54OF
10- a 10 0 rl
Cooling Coil Supply Fan
2,000 cfm
HT-1 1 11
47.2 % : ROOM
57/55OF
11�.
75 ,162 OF
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name Date
I MacDonald Residence 1 12/20/2018
System Name
HVAC 2nd casita
Floor Area
1,022
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 701
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 0
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK
COIL HTG.
PEAK
Heating System
Sensible
Latent
CFM
Sensible
Output per System
12,000
14,920
1,692
348
12,970
Total Output (Btuh)
12,000
0
Output Btuh/s ft
11.7
0
0
Cooling System
0
0
Output per System
12,200
0
0
0
0
Total Output (Btuh)
12,200
0
1,692
0
Total Output (Tons)
1.0
0
0
Total Output (Btuh/sqft)
11.9
Total Output (s ftrron)
1,005.2
1 14,920
12,970
Air System
CFM per System
640
HVAC EQUIPMENT SELECTION
Airflow cfm
640
FUJITSU Ductless Split
7,653
2,739
7,495
Airflow (cfm/s ft)
0.63
Airflow (cfm/Ton)
629.5
Outside Air (%)
0•0 %
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
7,653 2,739 7,495
Aug 3 PM Jan 1 AM
Outside Air cfm/sgft) 1
0.00
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating Peak
26 OF 70 OF
Outside Air
0 cfm Supply Fan
640 cfm
70 OF
70 OF 105 "F
Heating Coil 105 OF
ROOM
70 °F
LL L I
f
COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures
at Time of Cooling Peak
112178 °F
75 / 62 OF 75 / 62 OF 55154 OF
Outside Air
0 cfm
Supply Fan Cooling Coil
55 / 54 OF
640 cfm
49.4 % R60M
75/62OF
75/62OF
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name Date
MacDonald Residence 12/20/2018
System Name
HVAC-Garage
Floor Area
1,145
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 1,073
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 0
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK
COIL
HTG. PEAK
Heating System
Sensible
I Latent
CFM
Sensible
Output per System
12,000
22,828
1,895
772
28,738
Total Output Btuh
12,000
0
Output Btuh/s ft
10.5
0
0
Cooling System
0
0
Output per System
12,200
0
0
0
0
Total Output (Btuh)
12,200
1.895I
0
Total Output (Tons)
1.0
0
�
0
Total Output (Btuh/s ft)
10.7
Total Output (s ft/Ton
1,126.2
22,828
28,738
Air System
CFM per System
640
HVAC EQUIPMENT SELECTION
Airflow (cfm)
640
FUJITSU Ductless Split
7,605
2,805
7,495
Airflow cfm/s ft
0.56
Airflow (cfm/Ton)
629.5
Outside Air (%)
0•0 %
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
7,605 2,805 1 7,495
Aug 3 PMJ Jan 1 AM
Outside Air (cfm/s ft)
0.00
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating Peak)
26 OF
70 OF 70 OF 105 OF
Outside Air
0 cfm
Supply Fan Heating Coil
105 OF
640 cfm
ROOM
70 OF
_L
70 OF
CCC777 Tr
{
COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak
112 / 78 OF
75 / 62 OF 75 / 62 OF 55 / 54 OF
TTI
Outside Air1
0 cfm
Supply Fan Cooling Coil
55 / 54 OF
640 cfm
49.8
I-
% I ROOM
I
75 / 62 OF
75,162 OF
ZONE LOAD SUMMARY
Project Name
MacDonald Residence
Date
1212012018
System Name
H VA C-Master
Floor Area
1,980
ZONE LOAD SUMMARY
ZONAL SYSTEM
COOLING
PEAK
HEATING PEAK
ZONE NAME
SYSTEM NAME
Mult.
CFM
Sensible
Latent
Heating
OA CFM
Peak Hr
CFM
Sensible I
Latent
CFM
Sensible
Small Master Suite
1.0
0
Aug 3 PM
368
7,088
1,043
237
9,046
Master Suite
1.0
0
Aug 3 PM
845
16,278
Z235
448
17,121
TOTALS
0
0
0
0
Aug 3 PM
23,366
3,278
26,167
(BLOCK LOAD
ZONE LOAD SUMMARY
Project Name
Elate
MacDonald Residence 1212012018
System Name Floor Area
HVAC-Lounge-Game Room -Office 1,279
ZONE LOAD SUMMARY
ZONAL SYSTEM COOLING PEAK HEATING PEAK
ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Healing OA CFM Peak Hr "FMSensible Latent CFM Sensible
Lounge -Game Room -Office 1.0 0 Aug 3 PM 20,6571 2,117 533 19,510
TOTALS 0 0 0 0 Aug 3 PM 20,657 2,117 19,510
(BLOCK LOAD)
ZONE LOAD SUMMARY
Project Name
MacDonald Residence
Date
12/20/2018
System Name
HVAC-Great Room -Dining
Floor Area
1.408
ZONE LOAD SUMMARY
ZONAL
SYSTEM
COOLING PEAK
HEATING PEAK
ZONE NAME
SYSTEM NAME
Mult.
CFM
Sensible
Latent
Heating
OA CFM
Peak Hr
CFM
Sensible
Latent
CFM
Sensible
Great Room -Dining
1.0
0
Aug 3 PM
1,3891
26,655
Z331
616
23,558
TOTALS
0
0
0
0
Aug 3 PM
26.655
2,331
23,558
(BLOCK LOAD)
ZONE LOAD SUMMARY
Project Name
MacDonald Residence
Date
1212012018
System Name
HVAC-Morning Room -Office -Hall -Laundry
Floor Area
1,037
ZONE LOAD SUMMARY -
ZONAL SYSTEM
COOLING PEAK
HEATING PEAK
ZONE NAME
SYSTEM NAME
Mult.
CFM
Sensible
Latent
Heating
OA CFM
Peak Hr
CFM
I Sensible
Latent
CFM
I Sensible
Moming Room -Office -Hall -Laundry
1.0
0
Aug 3 PM
960
18,595
1.717
519
19,913
TOTALSI
0
0
0
0
Aug 3 PM
18,595
1,7171
19,913
(BLOCK LOAD)
ZONE LOAD SUMMARY
Project Name bate
MacDonald Residence 1212012018
System Name Floor Area
HVAC-Casita 1,088
ZONE LOAD SUMMARY
ZONAL SYSTEM COOLING PEAK HEATING PEAK
ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heatin OA CFM Peak Hr CFM Sensible Latent CFM Sensible
Casita 1.0 0 Aug 3 PM 765 14,890 1,801 403 15,467
TOTALS 0 0 0 0 Aug 3 PM 14,890 1,801 15,467
(BLOCK LOAD)
ZONE LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
System Name Floor Area
HVAC 2nd casita 1,022
ZONE LOAD SUMMARY
ZONAL SYSTEM COOLING PEAK HEATING PEAK
ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OA CFM Peak Hr CFM Sensible I Latent CFM Sensible
Casita 2nd Floor 2.0 0 Aug 3 PM 701 14,9201 1,692 348 12, 970
TOTALS 0 0 0 0 Aug 3 PM 14,920 1,692 12,970
(BLOCK LOAD)
ZONE LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
System Name Floor Area
HVAC-Garage 1,145
ZONE LOAD SUMMARY
ZONAL SYSTEM COOLING PEAK HEATING PEAK
ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heatinq OA CFM Peak Hr CFM Sensible Latent CFM Sensible
Garage 1.0 0 Aug 3 PM 1,073 22,828 1,895 772 28,738
TOTALS 0 0 0 0 Aug 3 PM 22,828 1,895 28,738
BLOCK LOAD)
ROOM LOAD -SUMMARY
Project Name Date
MacDonald Residence 1212012018
System Name Floor Area
HVAC-Master 1,980
ROOM LOAD SUMMARY
ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK
Zone Name Room Name Mult. CFM Sensible Latent CFM I Sensible Latent CFM Sensible
Small Master Suite Small Master Suite 1 368 7,088 1,043 368 7,088 1,043 237 9,046
Master Suite Master 1 8451 16,278 2,2351 8451 16,278 2,235 448 17,121
PAGE TOTAL
TOTAL#
. Total includes ventilation load for zonal
1,2131
23,366 3,27,91
665
26,167
1,213
23,366 3,2781
665
26,167
ROOM LOAD SUMMARY
Date
MacDonald Residence 1212012018
System Name Floor Area
HVAC-Lounge-Game Room -Office 1,279
ROOM LOAD SUMMARY
ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK
Zone Name Room Name I Mult. CFM I Sensible Latent CFM Sensible j Latent CFM I Sensible
Lounge -Game Room-OffrceLounge-Game Room-Offi 1 1 1,0091 20,657 2,1171 1,0091 20,6571 Z117 5331 19,510
PAGE TOTAL
TOTAL*
Total includes ventilation bad for zonal
1,009
20,6571
2,117
533
19,510
1,009
20,657
2,117
533
19,510
ROOM LOAD SUMMARY
Project Name
MacDonald Residence
Date
1212012018
System Name
HVAC-Great Room -Dining
Floor
Area
1,408
ROOM LOAD SUMMARY
ROOM
COOLING PEAK
COIL COOLING PEAK
COIL HTG. PEAK
Zone Name Room Name
Mult.
CFM
Sensible Latent
CFM
Sensible Latent
CFM Sensible
Great Room -Dining Great Room -Dining
1
1,389
26,655 Z331
1,389
26,655
Z331
616 23,558
Total includes ventilation load for zonal systems.
PAGE TOTAL
TOTAL *
1, 389
i,389
26,655 2, 331
26,655 Z331
616 23.555
616 23,558
ROOM LOAD SUMMARY
Project Name
MacDonald Residence
Date
1212012018
System Name
HVAC-Morning Room -Office -Hall -Laundry
Floor Area
1,037
ROOM LOAD SUMMARY
ROOM
COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK
Zone Name
Room Name
Mult.
CFM
Sensible
Latent CFM Sensible Latent CFM
Sensible
Morning Room-Office-Halk
Morning Room -Office -Hai
1
960
18,595
1,717 960 18,595 1,717 519
19,913
PAGE TOTAL 960 18,595 1,717 519 19.913
TOTAL * 960 18,51951 1.717 519 19,913
' Total includes ventilalion load for zonal systems.
ROOM LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
System Name Floor Area
HVAC-Casita 1, 088
ROOM LOAD SUMMARY
ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK
Zone Name Room Name Mult, I CFM I Sensible I Latent I CFM I Sensible I Latent CFM I Sensible
Casita I Casita I 1 1 7651 14,8901 1,8011 7651 14,8901 1,801 4031 15,467
PAGE TOTAL
TOTAL*
* Total includes ventilation load for zonal
765
14,890
1,801
403
15,467
765
14,8901
1,8011
403
15,467
ROOM LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
System Name Floor Area
HVAC 2nd casita 1,022
ROOM LOAD SUMMARY
ROOM COOLING PEAK COIL COOLING;PEAK COIL HTG. PEAK
Zone Name Room Name Mult. CFM Sensible Latent CFM Sensiblent CFM Sensible
Casita 2nd Floor Casita 2nd Floor 2 701 14,920 1,692 701 14,92092 3481 12,970
PAGE TOTAL
TOTAL*
Total includes ventilation load for zonal
701
14,920 1,692
348
12,970
701
14,920 1.692
348
IZ970
ROOM LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
System Name Floor Area
HVAC-Garage 1,145
ROOM LOAD SUMMARY
ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK
Zone Name I Room Name I Mult. I CFM Sensible I Latent CFM I Sensible Latent CFM I Sensible
Garage I Garage I 1 1 1,0731 22,8281 1,8951 1,0731 22,8281 1, 895 7721 28, 738
PAGE TOTAL
TOTAL*
. Total includes ventilation load for zonal
1,073
2Z828
1,895
772
28,738
1,0731
22,8281
1, 895
772
28,736
ROOM HEATING PEAK LOADS
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION
DESIGN CONDITIONS
Room Name Small Master Suite
Floor Area 630.00 ft2
Indoor Dry Bulb Temperature 70 OF
Time of Peak Jan 1 AM
Outdoor Dry Bulb Temperature 26 OF
Conduction
Area
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
to
Ceiling
U-Value
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AT *F
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
44
Btu/hr
R-38 Roof Attic R19 High Performance
630.0
0.0174
44
482
R-21 Wall
338.9
0.0690
44
1,029
Patio Door .411,21
102.0
0.4100
44
1,640
.301.17 Window
43.1
0.3000
44
569
Slab -On -Grade
pedrn = 94.0
0.7300
44
3.019
"R-13 Wall
200.0
0.1020
0
0
Items shown with an asterisk (") denote conduction
Infiltration:[ i.00 X 1.064
Schedule Air Sensible
Fraction
through an interior surface
X 630 X
Area
another room
10.30 X 0.416
Height AGM
Page Total
/ 60 ] X
AT
6,940
= 2,106
TOTAL HOURLY HEAT LOSS FOR ROOM 9,046
ROOM HEATING PEAK LOADS
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION
DESIGN CONDITIONS
Room Name Master
Floor Area 1,350.00 ft2
Indoor Dry Bulb Temperature 70 OF
Time of Peak Jan 1 AM
Outdoor Dry Bulb Temperature 26 OF
Conduction
Area
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
to
Ceiling
U-Value
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AT OF
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
44
Btu/hr
R-38 RoofAtfic R19 High Perfammance
1,350.0
0.0174
44
1,034
R-21 Wall
1,225.4
0.0690
44
3,720
Patio Door .401.21
137.0
0.4000
44
2, 411
.30% 17 Window
183.6
0.3000
44
2,424
slab -On -Grade
perim = 94.0
0.7300
44
3,019
'R-13 Wall
700.0
0.1020
0
0
Items shown with an asterisk (') denote conduction
Infiltration:[ 1.00 X 1.064
Schedule Air Sensible
Fraction
through an interior surface
X 1,350 X
Area
another room
9.10 X 0.471
Height ACH
Page Total
/ 60 ] X
AT
12,608
= 4,513
TOTAL HOURLY HEAT LOSS FOR ROOM 17.121
ROOM HEATING PEAK LOADS
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
Room Name Lounge -Game Room -Office Time of Peak Jan 1 AM
Floor Area 1,279.00 ft2 Outdoor Dry Bulb Temperature 26 OF
Indoor Dry Bulb Temperature 70 °F
Conduction
R-38 Roof Attic R19 High Performance
R-21 Wall
.301.17 Window
Patio Door .401.21
Patio Door .411..21
Slab -On -Grade
"R-13 Wall
Area
1,279.0
691.4
139.6
316.0
96.0
perim = 94.0
1,000.0
U-Value AT °F
Btu/hr
979
2, 099
1,843
5,562
1,732
3,019
0
Items shown with an asterisk (') denote conduction through an interior surface to another room Page Total 15,234
Infiltration:[ 1.00 X 1.064 X 1,279 X 9.80 X 0.43T / 60 ] X 44 = 4,276
Schedule Air Sensible Area Ceiling Heigh[ ACM AT
Fraction
TOTAL HOURLY HEAT LOSS FOR ROOM 19,510
ROOM HEATING PEAK LOADS
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
Room Name Great Room -Dining Time of Peak Jan 1 AM
Floor Area 1,408.00 ftz Outdoor Dry Bulb Temperature 26 OF
Indoor Dry Bulb Temperature 70 OF
Conduction
R-38 Roof Attic R19 High Performance
R-21 Wall
.30% 17 Window
Patio Door .401.21
Slab -On -Grade
Area U-Value AT °F
Btu/hr
1,078
2, 653
3,300
8,800
3,019
Items shown with an asterisk (*) denote conduction through an interior surface to another room Page Total 18,851
Infiltration:[ i.00 X 1.064 X 1,408 X 13.70 X 0.313 / 60 ] X 44 = 4,707
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction.,
TOTAL HOURLY HEAT LOSS FOR ROOM 23.558
ROOM HEATING PEAK LOADS
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
Room Name Morning Room -Office -Hall -Laundry Time of Peak Jan 1 AM
Floor Area 1,037.00 ft2 Outdoor Dry Bulb Temperature 26 OF
Indoor Dry Bulb Temperature 70 OF
Conduction
R-38 Roof Attic R19 High Performance
R-21 Wall
.301.17 Window
Wood Door
Patio Door .41121
Patio Door .401.21
Slab -On -Grade
"R-13 Wall
Area
U-Value
AT °F
Btu/hr
794
3,623
3,106
475
1,930
3,499
3,019
0
Items shown with an asterisk (') denote conduction through an interior surface to another room Page Total 16,447
Infiltration•[ 1.00 X 1.064 X 1,037 X 12.80 X 0.335 / 60 ] X 44 = 3,467
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction
TOTAL HOURLY HEAT LOSS FOR ROOM 19,913
ROOM HEATING PEAK LOADS
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
Room Name Casita Time of Peak Jan 1 AM
Floor Area 1,088.00 ft2 Outdoor Dry Bulb Temperature 26 OF
Indoor Dry Bulb Temperature 70 OF
Conduction Area U-Value
R-38 Roof Attic R19 High Performance 577.0 X 0.0174 X 44 =
R-21 Wall 1,271.0 X 0.0690 X 44 c -
.301.17Window 145.5 X 0.3000 X 44 c
Patio Door .41121 143.5 X 0.4100 X 44
Slab -On -Grade perim = 94.0 X 0.7300 X 44
*R-13 Wall 1,011.0 X 0.1020 X 0
X X =
X X
X X =
X X
X X =
X X =
X X =
X X =
X X
X X
X X =
X X =
X X =
X X =
X X =
X X =
X X =
X X =
x x =
x x =
x x =
x x =
x x
x x =
x x =
Items shown with an asterisk (*) denote conduction through an interior surface to another room Page Total
Infiltration:[ 1.00 X 1.064 X 1,088 X 8.00 X 0.535 / 60 ] X a4
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction,
AT °F
Btu/hr
442
3,859
1,921
2,589
3,019
0
11,829
J 3,6371
TOTAL HOURLY HEAT LOSS FOR ROOM_ 15.4671
ROOM HEATING PEAK LOADS
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
Room Name Casita 2nd Floor Time of Peak Jan 1 AM
Floor Area 511.00 ftZ Outdoor Dry Bulb Temperature
Indoor Dry Bulb Temperature 70 OF
Conduction
R-38 Roof Attic R19 High Performance
R-21 Wall
.301.17 Window
*R-13 Wall
Area U-Value
AT OF
Btu/hr
X 44 =
391
X 44 =
2,160
X 44 c
2,226
X 0 =
0
X =
X =
X =
X =
X =
X =
X =
X
X =
X =
X =
X =
X =
X =
X
X =
X =
X
X =
X =
X
X
X =
X =
X
X
X =
Items shown with an asterisk (*) denote conduction through an interior surface to another room Page Total 4,777
Infiltration-[ 1.00 X 1.064 X 511 X 8.00 X 0.535 / 60 J X 44 = 1,708
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction-.
TOTAL HOURLY HEAT LOSS FOR ROOM 6.485
ROOK! HEATING PEAK LOADS
Project Name
MacDonald Residence
Date
1212012018
ROOM INFORMATION
DESIGN CONDITIONS
Room Name Garage
Floor Area 1,145.00 ft2
Indoor Dry Bulb Temperature 70 °F
Time of Peak Jan 1 AM
Outdoor Dry Bulb Temperature 26 OF
Conduction Area
R-38 Roof Attic R19 High Performance 1,145.0
R-21 Wall 1,385.3
.301.17 Window 190.7
Insulated Garage Door 224.0
Slab -On -Grade perim = 94.0
'R-13 Wall 100.0
Items shown with an asterisk () denote conduction through an interior surface
Infiltration:[ 1.00 X 1.064 X 1,145 X
Schedule Air Sensible Area
Fraction
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
to
Ceiling
0-Value
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
x
X
X
X
X
X
AT °F
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
_
=
=
=
44
Btu/hr
0.0174
44
877
0.0690
44
4,206
0.3000
44
2,517
1.4500
44
14,291
0.7300
44
3,019
0.1020
0
0
another room
8.00 X 0.535
Height ACH
Page Total
/ 60 ] X
AT
24,910
= 3,828
TOTAL HOURLY HEAT LOSS FOR ROOM 28,738
RESIDENTIAL ROOM COOLING LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
Room Name
Small Master Suite
Outdoor Dry Bulb Temperature
112 OF
Floor Area
630.00 ft2
Outdoor Wet Bulb Temperature
78 OF
Indoor Dry Bulb Temperature
75 °F
Outdoor Daily Ranqe:
34 OF
Opaque Surfaces
R-38 Roof Attic R19 High Performa
R-21 Wall
R-21 Wall
R-21 Wall
*R-13 Wall I
Orientation
Area
X
X
X
X
X
X
X
X
X
U-Factor
X
X
X
X
X
X
X
X
X
CLTD'
=
=
=
=
=
=
=
=
=
630.0
0.0174
56.0
52.0
0.0690
25.7
50.9
0.0690
28.2
236.0
0.0690
31.8
200.0
0.1020
0.0
Page Total
Items shown with an asterisk (*) denote conduction through an interior surface to another room.
1. Cooling Load Temperature Difference (CLTD)
Fenestration
D08
W04
W05
Orientation
(N)
(S)
(W)
Shaded Unshaded
Btu/hr
614
1 1,3231
Area
X
X
X
X
X
X
X
X
GLF
+
+
+
+
+
+
+
+
+
Area
X
X
X
X
X
X
X
X
GLF
=
=
=
=
-
=
=
-
0.0x
16.0
102.0X
19.0=
0.0
12.3
37.1
14.1
0.0
12.3
6.0
20.3
Page Total
Internal Gain Btu/hr
Occupants 1.9 Occupants X 245 Btuh/occ. _
Equipment 630 Floor Area X 0.50 w/sgft
Infiltration: 1.064 X 1.44 X 28.98 X 37 =IJ
Air Sensible CFM ELA AT
ITOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 7.088
Latent Gain Btu/hr
Occupants 1.8 Occupants X 155 Btuh/occ. = C
Infiltration: 4,771 X 1.44 X 28.98 x 0.00376 =
Air Latent CFM ELA AW
I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 90.-41
RESIDENTIAL ROOM COOLING LOAD SUMMARY
Project Name
Date
MacDonald Residence
1 1212012018
ROOM INFORMATION
DESIGN CONDITIONS
Room Name
Master
Outdoor Dry Bulb Temperature
112 OF
Floor Area
1,350.00 ft2
Outdoor Wet Bulb Temperature
78 OF
Indoor Dry Bulb Temperature 75 OF
I Outdoor Daily Range:
34 OF
Opaque Surfaces
Orientation Area U-Factor
CLTD'
Btu/hr
R-38 Roof Attic R19 High Periorma (N) 1,350.0 X 0.0174
X
56.0 =
1,316
R-21 Wall
(N) 154.0 X 0.0690
X
25.7 =
273
R-21 Wall
(E) 88.0 X 0.0690
X
32.1 =
195
R-21 Wall
(S) 246.6 X 0.0690
X
28.2 =
480
R-21 Wall
(W) 736.8 X 0.0690
X
31.8 =
1,615
"R-13 Wall
700.0 X 0.1020
X
0.0 =
0
X
X
=
X
X
=
X
X
=
Page Total
3,879
Items shown with an asterisk (")
denote conduction through an interior surface to another room.
1. Cooling Load Temperature
Difference (CLTD)
Shaded
Unshaded
Fenestration
Orientation Area GLF Area
GLF
Btu/hr
Di0
(S) 137.0 X 15.8 +
0.0
X 18.0 =
2,164
W08
(S) 0.0 X 12.3 +
51.4
X 14.1 =
723
W06
(W) 0.0 X 12.3 +
21.2
X 20.3 =
431
W07
(W) 0.0 X 12.3 +
51.4
X 20.3 =
1,046
W09
(W) 0.0 X 12.3 +
29.8
X 20.3 =
606
W10
(W) 0.0 X 12.3 +
29.8
X 20.3 =
606
X +
X =
X +
X =
X +
X =
Page Total
5,57
Internal Gain
Btu/hr
Occupants
41 Occupants X 245
Btuh/occ.
=
993
Equipment
1,350 Floor Area X 0.50
w/sgft
=
2,3N
Infiltration: 1.064
X 1.44 X 62.09 X s7 =
3,526
Air Sensible
CFM ELA AT
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
16,278
Latent Gain
Btu/hr
Occupants
41 Occupants X 155
Btuh/occ.
=
628
Infiltration: 4,771
X 1.44 X 62.09 X 0.00376 =
1,606
Air Latent
CFM ELA AW
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
628
RESIDENTIAL ROOM COOLING LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
LRoomme Lounge -Game Room -Office Outdoor Dry Bulb Temperature 112 °F
a 1,279.00 ft2 Outdoor Wet Bulb Temperature 78 °F
y Bulb Temperature 75 °F Outdoor Daily Ranee: 34 OF
Opaque Surfaces
R-38 Roof Attic R19 High Performs
R-21 Wall
R-21 Wall
R-21 Wall
R-21 Wall
"R-13 Wall
Orientation
(N)
(E)
(S)
(W)
Area
X
X
X
X
X
X
X
X
X
U-Factor
X
X
X
X
X
X
X
X
X
CLTD'
=
=
=
=
=
=
=
=
=
1,279.0
0.0174
56.0
256.4
0.0690
25.7
327.0
0.0690
32.1
31.0
0.0690
28.2
77.0
0.0690
31.8
1,000.0
0.1020
0.0
Page Total
Items shown with an asterisk (`) denote conduction through an interior surface to another room.
1. Cooling Load Temperature Difference (CLTD)
Fenestration
W01
W02
W03
W18A
D06
D07
D11
Orientation
(N)
(N)
(N)
(N)
(E)
(E)
(S)
Shaded Unshaded
Area
X
X
X
X
X
X
X
X
GLF
+
+
+
+
+
+
+
+
Area
X
X
X
X
X
X
X
X
GLF
=
=
=
=
=
=
=
=
0.0
12.3
19.1
14.7
0.0
12.3
19.1
14.7
0.0
12.3
19.1
14.7
0.0
12.3
82.3
14.7
0.0X
15.8+
160.0X
27.3=
0.0
16.0
96.0
27.5
156.0
15.8
0.0
18.0
Page Total
Btu/hr
1, 246
2, 6541
Btu/hr
281
281
281
1,213
4,374
2, 644
2, 464
11
Internal Gain Btu/hr
Occupants 3.8 Occupants X 245 Btuh/occ. = 941
Equipment 1,279 Floor Area X 0.50 w/sgft = 2,183
Infiltration: 1.064 X 1.44 X 58.82 X 37 = 3,341
AirSenslble CFM ELA AT
I TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 2n 8�7
Latent Gain Btu/hr
occupants 3 8 Occupants X 155� Btuh/occ. = 5.9
Infiltration: 4,771 X 1.44 X 58.82 X 0.00376 = 1,522
Air Latent CFM FI.A pW
I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM ;;+as
RESIDENTIAL ROOM COOLING LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
Room Name Great Room -Dining Outdoor Dry Bulb Temperature 112 OF
Floor Area 1,408.00 ft2 Outdoor Wet Bulb Temperature 78 OF
Indoor Dry Bulb Temperature 75 OF I Outdoor DaiIV Ranee: 34 OF
Opaque Surfaces
R-38 Roof Attic R19 Nigh Performa
R-21 Wall
R-21 Wall
R-21 Wall I
Orientation
(N)
(N)
(S)
(W)
Area
X
X
X
X
X
X
X
X
X
U-Factor
X
X
X
X
X
X
X
X
X
CLTD'
=
=
=
=
=
=
=
=
=
1,408.0
0.0174
77.0
520.0
0.0690
32.3
112.0
0.0690
44.2
242.0
0.0690
51.9
Page Total
Items shown with an asterisk (") denote conduction through an interior surface to another room.
1. Cooling Load Temperature Difference (CLTD)
Fenestration
D01
D02
D03
D04
D05
D12
D17
Orientation
(N)
(N)
(N)
(N)
(N)
(S)
(►M
Shaded Unshaded
Btu/hr
1,887
1,160
342
867
1 4,2561
Area
X
X
X
X
X
X
X
X
GLF
+
+
+
+
+
+
+
+
+
Area
X
X
X
X
X
X
X
X
GLF
=
=
=
=
=
=
=
=
0.0x
14.4
50.0X
17.2=
0.0
14.4
50.0
17.2
0.0
14.4
50.0
17.2
0.0
14.4
50.0
17.2
0.0
14.4
50.0
17.2
378.0
18.4
0.0
28.5
53.0
18.4
69.0
44.2
Page Total
Btu/hr
861
861
861
861
861
6,9511
Internal Gain Btu/hr
Occupants 4 2 Occupants X 245 Btuh/occ. = 1't
Equipment 1,408 Floor Area X 0.50 w/sgft = 2,
Infiltration: 1.064 X 1.44 X 64.76 X 37 = C
Air Sensible CFM ELA AT
I TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 26,655
Latent Gain Btu/hr
Occupants 4•2 Occupants X 155 Btuh/occ. = C
Infiltration:, 4, 771 X 1.44 X 64.76 X 0.00376 = 1.6
Air Latent CFM ELA ❑W
I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 6551
RESIDENTIAL ROOM COOLING LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
Room Name Morning Room -Office -Hall -Laundry Outdoor Dry Bulb Temperature 112 or
Floor Area 1,037.00 ft2 Outdoor Wet Bulb Temperature 78 OF
Indoor Dry Bulb Temperature 75 OF1 Outdoor Dailv Ranae: 34 OF
Opaque Surfaces
R-38 Roof Attic R19 High Performa
R-21 Wall
R-21 Wall
Wood Door I
R-21 Wall
R-21 Wall
*R-13 Wall
Orientation
(N)
(E)
(E)
(S)
(M
Area
X
X
X
X
X
X
X
X
X
U-Factor
X
X
X
X
X
X
X
X
X
CLTD'
=
=
=
=
=
=
=
=
=
1,037.0
0.0174
56.0
151.0
0.0690
25.7
571.6
0.0690
32.1
21.6
0.5000
32.1
179.7
0.0690
28.2
291.0
0.0690
31.8
1,000.0
0.1020
0.0
Page Total
Items shown with an asterisk (*) denote conduction through an interior surface to another room.
1. Cooling Load Temperature Difference (CLTD)
Fenestration
D16
W17
W14
W12
D15
D13
W13
W18
Orientation
(N)
(N)
(E)
(E)
(E)
(S)
(S)
(W)
Shaded Unshaded
Area
X
X
X
X
X
X
X
X
GLF
+
+
+
+
+
+
+
+
+
Area
X
X
X
X
X
X
X
X
X
GLF
=
-
=
=
=
=
=
0.0
12.3
24.0
14.7
0.0x
12.3
45.0
14.7-
0.0
12.3
61.0
21.7
0.0
12.3
42.8
21.7
70.5
16.0
36.5
27.5
198.8
15.8
0.0
18.0
41.5
12.3
0.0
14.1
0.0
12.3
21.0
Page Total
Btu/hr
1, 011
1,266
347
9
Btu/hr
9,4
Internal Gain l Btu/hr
Occupants 3 1 + Occupants X 245 Btuh/occ. _
Equipment 1,037 Floor Area X 0.50 w/sgft = 1•
Infiltration: 1.064 X 1.44 X 47.69 X
Air 5ensibte CFM ELA AT
I TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 1R A0RN
Latent Gain Btu/hr
Occupants 3.1 Occupants X 155 Btuh/occ. = 483
Infiltration:, 4,771 X 1.44 X 47.69 X 0.00376 m 1,234
Air Latent CFM I;LA OW
I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4R�
RESIDENTIAL ROOM COOLING LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
Room Name
Casita IOutdoor
Dry Bulb Temperature
112 OF
Floor Area
1,088.00 ft2
Outdoor Wet Bulb Temperature
78 OF
Indoor Dry Bulb Temperature
75 of
Outdoor Daly Rancie:
34 OF
-Opaque Surfaces
R-38 Roof Attic R19 High Performa
R-21 Wall
R-21 Wall
R-21 Wall
II R-21 Wall I
*R-13 Wall I
Orientation
(N)
(E)
(S)
(W)
Area
X
X
X
X
X
X
X
X
X
U-Factor
X
X
X
X
X
X
X
X
X
CLTD'
=
=
=
=
=
=
=
=
=
577.0
0.0174
56.0
266.0
0.0690
25.7
435.5
0.0690
32.1
289.0
0.0690
28.2
280.5
0.0690
31.8
1,011.0
0.1020
0.0
Page Total
Items shown with an asterisk (*) denote conduction through an interior surface to another room.
1. Cooling Load Temperature Difference (CLTD)
Fenestration
W21
W20
W19
W27
W26
W25
W24
W23A
D20
Orientation
(N)
(N)
(N)
(E)
(E)
(E)
(E)
(S)
(S)
Shaded Unshaded
Area
X
X
X
X
X
X
X
X
X
GLF
+
+
+
+
+
+
+
+
+
Area
X
X
X
X
X
X
X
X
X
GLF
=
-
=
=
=
=
=
=
=
0.0
12.3
18.0
14.7
0.0
12.3
18.0
14.7
0.0
12.3
18.0
14.7
0.0
12.3
5.0
21.7
0.0
12.3
9.5
21.7
0.0
12.3
5.0
21.7
0.0
12.3
5.0
21.7
0.01
12.3
7.0
14.1
0.0
12.3
24.0
14.1
Page Total
Btu/hr
562
61
3,1
Btu/hr
1,
Internal Gain Btu/hr
Occupants 3 3 Occupants X 245 Btuh/occ. _
Equipment 1,088 Floor Area X 0.50 w/sgft
Infiltration: Sensible
X 1.44 X 50.04 X 3T =
Air Sensible CFM ELA AT ,.
98
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 14 Stan
Latent Gain Btu/hr
Occupants 3 3 Occupants X 155 Btuh/occ. = 508
Infiltration:, 4,771 X 1.44 X 50.04 X 0.00376 = 1,295
Air Latent CFM ELR OW
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 5ns
RESIDENTIAL ROOM COOLING LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
Room Name
Casita IOutdoor
Dry Bulb Temperature
112 OF
Floor Area
1,088.00 ft2
Outdoor Wet Bulb Temperature
78 OF
Indoor Dry Bulb Temperature
75 °F
Outdoor Daiiv Ranae:
34 OF
Surfaces
Orientation
Area
X
X
X
X
X
X
X
X
X
U-Factor
X
X
X
X
X
X
X
X
X
CLTD'
=
=
=
=
=
=
=
=
=
Page Total
Items shown with an asterisk (") denote conduction through an interior surface to another room.
1. Cooling Load Temperature Difference (CLTD)
Fenestration
D19
W22
W23
Orientation
Shaded Unshaded
Btu/hr
Area
X
X
X
X
X
X
X
X
X
GLF
+
+
+
+
+
+
+
+
+
Area
X
X
X
X
X
X
X
X
X
GLF
=
=
=
=
=
=
=
=
=
Btu/hr
0.0
16.0
143.5
25.9
3,720
0.0
12.3
18.0
20.3
366
0.0
12.3
18.0
20.3
366
Page Total
4,452
Internal Gain Btu/hr
Occupants 3 3 Occupants X 245 Btuh/occ.
Equipment 1,088 Floor Area X 0.50 w/sgft
Infiltration: 1.064 X 1.44 X 50.04 X 37 = C
Air Sensible CFM ELA AT
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 14,890
Latent Gain Btu/hr
Occupants 3 3 Occupants X 155 Btuh/occ. _
Infiltration: 4,771 x 1.44 X � 50.04 X 0.00376 = 7,2
Air Latent CFM ELA ❑W
I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 506
RESIDENTIAL ROOM COOLING LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
Room Name Casita 2nd Floor Outdoor Dry Bulb Temperature 112 OF
Floor Area 511.00 ft2 Outdoor Wet Bulb Temperature 78 OF
Indoor Dry Bulb Temperature 75 °F Outdoor Daily Range: 34 OF
Opaque Surfaces
R-38 Roof Attic R19 High Performa
R-21 Wall
R-21 Wall
R-21 Wall
R-21 Wall
"R-13 Wall
Orientation
(N)
(E)
(S)
Area
X
X
X
X
X
X
X
X
X
U-Factor
X
X
X
X
X
X
X
X
X
CLTD'
=
=
=
=
=
=
=
=
=
511.0
0.0174
56.0
189.6
0.0690
25.7
197.6
0.0690
32.1
183.2
0.0690
28.2
141.0
0.0690
31.8
511.0
0.1020
0.6
Page Total
Items shown with an asterisk (`) denote conduction through an interior surface to another room.
1. Cooling Load Temperature Difference (CLTD)
Fenestration
W32
W31
W30
W32
W33
W30
W30
W29
W28
Orientation
(N)
(N)
(N)
(E)
(E)
(E)
(S)
(S)
(IM
Shaded Unshaded
Area
X
X
X
X
X
X
X
X
GLF
+
+
+
+
+
+
+
+
Area
X
X
X
X
X
X
X
X
GLF
-
=
=
=
=
=
=
=
0.0
12.3
8.8
14.7
0.0
12.3
8.8
14.7
0.0
12.3
8.8
14.7
0.0
12.3
8.8
21.7
0.0
12.3
8.6
21.7
0.0
12.3
8.8
21.7
0.0
12.3
8.8
14.1
0.0
12.3
24.0
14.1
10.3X
12.3+
29.7X
20.3=
Page Total
Btu/hr
1
Btu/hr
130
130
130
191
191
191
124
338
731
2,154
Internal Gain Btu/hr
Occupants 1.5 Occupants X 245 Btuh/occ. _
Equipment 511 Floor Area X 0.50 w/sgft =
Infiltration: 1.064 X 1.44 X 23.50 X
Air Sensible CFM ELA AT
I TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 7.460
Latent Gain Btu/hr
Occupants 15 Occupants X 155 Btuh/occ. = 238
Infiltration: 4, 771 Air LateX 1.44 X 23.50 X 0.00376 � 608
nt CFiN ELA AW
I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM ��t3
RESIDENTIAL ROOM COOLING LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION I DESIGN CONDITIONS
Room Name
Casita 2nd Floor
Outdoor Dry Bulb Temperature
112 OF
Floor Area
511.00 ft2
Outdoor Wet Bulb Temperature
78 OF
Indoor Dry Bulb Temperature
75 °F
Outdoor Dailv Ranne:
34 OF
Surfaces
Orientation
Area
X
X
X
X
X
X
X
X
X
U-Factor
X
X
X
X
X
X
X
X
X
CLTD'
=
=
=
=
=
=
=
=
=
Page Total
Items shown with an asterisk (*) denote conduction through an interior surface to another room-
1 . Cooling Load Temperature Difference (CLTD)
Fenestration
D27
Orientation
(W)
Shaded Unshaded
Area GLF Area GLF
11.0 X 12.3 + 32.0 X 20.3 =
X + X =
X + X =
X + X =
X + X
X + X =
X + X =
X + X =
X + X =
Page Total
Btu/hr
Btu/hr
786
Internal Gain Btu/hr
Occupants 1.5 Occupants X 245 Btuh/occ. _
Equipment 511 Floor Area X 0.50 w/sgft = 2
Infiltration: 1.064 X 1.44 X 23.50 X 37 =
Air Sensible CFM ELA AT
I TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 7.460
Latent Gain Btu/hr
Occupants 15 Occupants X 155 Btuh/occ. = 2
Infiltration: 4,771 X 1.44 X 23.50 X 0.00376 = 6
Air Latent CFM ELA IVV
I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 238
RESIDENTIAL ROOM COOLING LOAD SUMMARY
Project Name Date
MacDonald Residence 1212012018
ROOM INFORMATION DESIGN CONDITIONS
Room Name Garage Outdoor Dry Bulb Temperature 112 OF
Floor Area 1,145.00 ft2 Outdoor Wet Bulb Temperature 78 OF
Indoor Dry Bulb Temperature 75 OF Outdoor Daily Ranqe: 34 OF
Opaque Surfaces
R-38 Roof Attic R19 High Periorma
R-21 Wall
R-21 Warr
R-21 Wall I
R-21 Wall I
Insulated Garage Door
-R-13 Wall
Orientation
(N)
(N)
(E)
(S)
Area
X
X
X
X
X
X
X
X
X
U-Factor
X
X
X
X
X
X
X
X
X
CLTD'
=
=
=
=
=
=
=
=
=
1,145.0
0.0174
56.0
323.8
0.0690
25.7
474.5
0.0690
32.1
311.0
0.0690
28.2
276.0
0.0690
31.8
224.0
1.4500
31.8
100.0
0.1020
0.0
Page Total
Items shown with an asterisk (*) denote conduction through an interior surface to another room.
1. Cooling Load Temperature Difference (CLTD)
Fenestration
W36
W37
W38
W39
W40
W41
W42
W43
W44
Orientation
(N)
(N)
(N)
(N)
(N)
(N)
(E)
(E)
(E)
Shaded Unshaded
Area
X
X
X
X
X
X
X
X
X
GLF
+
+
+
+
+
+
+
+
+
Area
X
X
X
X
X
X
X
X
X
GLF
=
=
=
=
-
=
=
=
0.0
12.3
15.8
14.7
0.0
12.3
15.8
14.7
0.0
12.3
15.8
14.7
0.0
12.3
9.6
14.7
0.0
12.3
9.6
14.7
0.0
12.3
9.6
14.7
0.0
12.3
5.1
21.7
0.0
12.3
5.1
21.7
0.0
12.3
5.1
Page Total
Btu/hr
7.116
Btu/hr
233
233
233
141
141
141
110
110
Internal Gain Btu/hr
Occupants 3 4 Occupants X 245 Btuh/occ.
Equipment 1,145 Floor Area X 0.50 w/sgft
Infiltration: 1.064 X 1.44 X 52.66 X 37 = 2,991
Air Sensible CFM ELA AT
I TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 22,8281
Latent Gain Btulhr
Occupants 3 4 Occupants X 1551 Btuh/occ. =
Infiltration: 4,771 X 1.44 X 52.66 X 0.00376 = I
Air Latent CFM ELA AW
I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 5331
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1Fk-PRF-01
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 1 of 16
Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribdl6x
GENERAL
INFORMATION
01
Project Nanne
lot 151 and 152
02
Calculation Description
Title 24 Analysis
03
Project Location
80-875 Via Portofino
04
City
La Quinta 05 Standards Version Compliance 2017
06
Zip Code
92253 07 Compliance Manager Version BEMCmpMgr 2016.3.1 (1149)
- 08
Climate Zone
CZ15 09 Software Version EnergyPro 7.2
10
Building Type
Single Family 11 Front Orientation (deg/Cardinal) 20
12
Project Scope
Newly Constructed 13 Number of Dwelling Units 1
14
Total Cond. Floor Area (ftZ)
8959 15 Number of Zones 8
16
Slab Area (ftZ)
7937 17 Number of Stories 2
18
Addition Cond. Floor Area(ftZ)
n/a 19 Natural Gas Available Yes
20
Addition Slab Area (ftZ)
n/a 21 Glazing Percentage (%) 33.0%
COMPLIANCE RESULTS
01 Building Complies with Computer Performance
02 This building incorporates features that require field testing andlor verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03 This building incorporates one or more Special Features shown below
04
Energy Use (kTDV/ftZ-yr)
Space Heating
Space Cooling
IAQ Ventilation
REVIEWED FOR
CODE
COMPLIANCE
DATE 3� BY
ENERGY
USE SUMMARY
05
06
Standard Design
Proposed Design
3.53
7.64
80.83
74.17
0.69
0.69
1.83
4.25
----
0.00
86.88
86.75
Registration iVUrii�er; 2�g.pplppp 3Gp�fb tl{�p� � Registration Date/Time:
g 2018-12-20 11:00:19
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149
07
08
Compliance Margin
Percent Improvement
-4.11
-116.4%
6.66
8.2%
0.00
0.0%
-2.42
-132.2%
0.00
0.13 -
MA,� 15 2019
CITY OF LA QUINTA
COMMUNITY DEVELOPMENT
HERS Provider: CaICERTS
Report Generated at: 2018-12-20 09:54:13 Al�
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1k-PRF-01
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 2 of 16
Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x
ENERGY DESIGN RATING
Energy Design Rating (EDR) is an alternate way to express the energy performance of a building using a scoring system where 100 represents the energy performance of the Residential
Energy Services (RESNET) reference home characterization of the 2006 International Energy Conservation Code (IECC) with California modeling assumptions. A score of zero represents
the energy performance of a building that combines high levels of energy efficiency with renewable generation to"zero out' its TDV energy. Because EDR includes consideration of
components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics), it is not used to show compliance with Part 6 but may instead be used by local
jurisdictions pursuing local ordinances under Title 24, Part 11 (CALGreen).
As a Standard Design building under the 2016 Building Energy Efficiency Standards is significantly more efficient than the baseline EDR building, the EDR of the Standard Design building
is provided for Information. Similarly, the EDR score of the Proposed Design is provided separately from the EDR value of installed PV so that the effects of efficiency and renewable
energy can both be seen
EDR of Standard Efficiency
45.2
EDR of Proposed Efficiency EDR Value of Proposed PV + Battery Final Proposed EDR
45.1 0.0 45.1
❑ Design meets Tier 1 requirement of 15% or greater code compliance margin (CALGreen A4.203.1.2.1) and QII verification prerequisite.
❑ Design meets Tier 2 requirement of 30% or greater code compliance margin (CALGreen A4.203.1.2.2) and QII verification prerequisite.
Notes:
Design meets Zero Net Energy (ZNE) Design Designation requirement for Single Family in climate zone CZ15 (CALGreen A4.203.1.2.3) including on -site photovoltaic (PV)
renewable energy generation sufficient to achieve a Final Energy Design Rating (EDR) of zero or less. The PV System and QII must be verified.
PV Generation EDR Credit: Bypassing PV size limit
REQUIRED SPECIAL FEATURES
rules
The following are features that must be installed as condition for mehting the modeled energy performance for this computer analysis.
Cool roof
Window overhangs and/or fins
HERS FEATURE SUMMARY
The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is
provided in the building components tables below.
Building -level Verifications:
• High quality insulation installation (Qll)
• IAQ mechanical ventilation
• High R-value Spray Foam Insulation
Cooling System Verifications:
• Minimum Airflow
• Verified EER
• Verified SEER
• Verified Refrigerant Charge
• Fan Efficacy Watts/CFM
HVAC Distribution System Verifications:
• Duct Sealing
• Low -leakage Air Handling Unit
Domestic Hot Water System Verifications:
• Pipe Insulation, All Lines
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider:
CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
CFIR-PRF-01
Project Name: lot 151 and 152
Calculation
Date/Time:
09:52, Thu, Dec 20, 2018
Page 3 of 16
Calculation Description: Title 24 Analysis
Input,File
Name: Macdonald Residence-18.ribd16x
BUILDING - FEATURES INFORMATION
01
02
03
04
05
06
07
Project Name
Conditioned Floor Area (ft2)
Number of Dwelling
Units
Number of Bedrooms
Number of Zones
Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
lot 151 and 152
8959
1
5
8
0
1
ZONE INFORMATION
01
02
03
04
05
06
07
Zone Floor Area
Avg. Ceiling
Zone Name
Zone Type
HVAC System Name
(ft2)
Height
Water Heating System 1
Water Heating System 2
Small Master Suite
Conditioned
HVAC-Masterl
630
10.3
DHW Sys 1
n/a
Master Suite
Conditioned
HVAC-Masterl
1350
9.1
DHW Sys 1
n/a
Lounge -Game Room -Office
Conditioned
HVAC-Lounge-Game Room-Off2
1279
9.8
DHW Sys 1
n/a
Great Room -Dining
Conditioned
HVAC-Great Room-Dining3
1408
13.7
DHW Sys 1
n/a
Morning Room -Office -Hall-
Conditioned
HVAC-Morning Room-Office-4
1037
12.8
DHW Sys 1
n/a
Casita
Conditioned
HVAC-Casita5
1088
8
DHW Sys 1
n/a
Casita 2nd Floor
Conditioned
HVAC 2nd casita6
1022
8
DHW Sys 1
n/a
Garage
Conditioned
HVAC-Garage7
1145
8
DHW Sys 1
n/a
4A
b-da. ii -��
i lwmdpr
HERS
0V�uEr-i
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider:
CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
CF1 k-PRF-01
Page 4 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribdl6x
OPAQUE SURFACES
01
02
03
04
05
06
07
08
Name
Zone
Construction
Azimuth
Orientation
Gross Area (ft2)
Window 8: Door Area (ft2)
Tilt (deg)
20d Wall
Small Master Suite
R-21 Wall
20
Front
154
101.972
90
200d Wall
Small Master Suite
R-21 Wall
200
Back
88
37.1
90
290d Wall
Small Master Suite
R-21 Wall
290
Right
242
6
90
Interior Surface
Small Master Suite»Master Suite
R-13 Wall
n/a
n/a
200
0
n/a
Roof
Small Master Suite
R-38 Roof Attic R19 High
n/a
n/a
630
n/a
n/a
20d Wall 2
Master Suite
R-21 Wall
20
Front
154
0
90
110d Wall
Master Suite
R-21 Wall
110
Left
88
0
90
200d Wall 2
Master Suite
R-21 Wall
200
Back
435
188.448
90
290d Wall 2
Master Suite
R-21 Wall
290
Right
869
132.2
90
Interior Surface 2
Master Suite»Lounge-Game
R-13 Wall
n/a
n/a
500
0
Room -Office
n/a
Interior Surface 3
Master Suite —Small Master Suite
R-13 Wall
n/a
n/a
200
0
n/a
Roof 2
Master Suite
R-38 Roof Attic R19 Nigh
nla
n/a
1350
n/a
n/a
20d Wall 3
Lounge -Game Room -Office
R-21 Watl
20
Front
396
139.6
90
110d Wall 2
Lounge -Game Room -Office
R-21 Wall
110
Left
583
256
90
200d Wall 3
Lounge -Game Room -Office
R-21 Wall
200
Back
187
156.04
90
290d Wall 3
Lounge -Game Room -Office
R-21 Wall
290
Right
77
0
90
Interior Surface 4
Lounge -Game Room-Office»Master
R-13 Wall
n/a
n/a
500
Suite
0
n/a
Interior Surface 5
Lounge -Game Room-Office»Great
R-13 Wall
n/a
n/a
500
Room -Dining
0
n/a
Roof 3
Lounge -Game Room -Office
R-38 Roof Attic R19 High
n/a
n/a
1279
n/a
n/a
20d Wall 4
Great Room -Dining
R-21 Wall
20
Front
770
250
90
200d Wall 4
Great Room -Dining
R-21 Wall
200
Back
490
377.978
90
290d Wall 4
Great Room -Dining
R-21 Wall
290
Right
364
121.94
90
Roof 4
Great Room -Dining
R-38 Roof Attic R19 High
n/a
n/a
1408
n/a
n/a
20d Wall 5
Morning Room -Office -Hall-
R-21 Wall
20
Front
220
69
90
110d Wall 3
Morning Room -Office -Hall-
R-21 Wall
110
Left
804
232.36
90
200d Wall 5
Morning Room -Office -Hall-
R-21 Wall
200
Back
420
240.36
90
290d Wall 5
Morning Room -Office -Hall-
R-21 Wall
290
Right
312
21
90
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider:
CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
CF1R-PRF-01
Project Name: lot 151 and 152
Calculation Date/Time:
09:52, Thu, Dec
20, 2018
Page 5 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald
Residence-18.ribdl6x
Interior Surface 6
Morning Room -Office -Hall -»Great
R-13 Wall
n/a
n/a
500
0
Room -Dining
n/a
Morning
Interior Surface 7
Room -Office -Hall -»Lounge -Game
R-13 Wall
n/a
n/a
500
0
n/a
Room -Office
Roof 5
Morning Room -Office -Hall-
R-38 Roof Attic R19 High
n/a
n/a
1037
n/a
n/a
20d Wall 6
Casita
R-21 Wall
20
Front
320
54
90
110d Wall 4
Casita
R-21 Wall
110
Left
460
24.5
90
200d Wall 6
Casita
R-21 Wall
200
Back
320
31
90
290d Wall 6
Casita
R-21 Wall
290
Right
460
179.5
90
Interior Surface 8
Casita>>Moming Room -Office -Hall-
R-13 Wall
n/a
n/a
500
0
n/a
Interior Surface 9
Casita»Casita 2nd Floor
R-13 Wall
n/a
n/a
511
0
n/a
Roof 6
Casita
R-38 Roof Attic R19 High
n/a
n/a
577
n/a
n/a
20d Wall 7
Casita 2nd Floor
R-21 Wall
20
Front
216
26.4
90
110d Wall 5
Casita 2nd Floor
R-21 Wall
110
Left
224
26.4
90
200d Wall 7
Casita 2nd Floor
R-21 Wall
200
Back
216
32.8
90
290d Wall 7
Casita 2nd Floor
Right
224
83
90
Interior Surface 10
Casita 2nd FIgAr»Casita
R-13 Wall=
n!a
nla
511
0
n/a
Roof 7
to 2nd Floor
R-38 i=AtticRtg high
nla
n/a
511
n/a
n/a
20d Wall 8
Garage
R-21 Wall
20
Front
400
76.2
90
110d Wall 6
Garage
R-21 Wall
110
Left
500
25.5
90
200d Wall 8
Garage
R-21 Wall
200
Back
400
89.01
90
290d Wall 8
Garage
R-21 Wall
290
Right
500
224
90
Interior Surface 11
Garage»Casita
R-13 Wall
n/a
n/a
100
0
n/a
Roof 8
Garage
R-38 Roof Attic R19 High
n/a
n/a
1145
n/a
n/a
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider:
CaICERTS inc
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
CFI R-PRF-01
Page 6 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribd16x
ATTIC
01
02
03
04
05
06
07
08
Name
Construction
Type
Roof Rise
Roof Reflectance
Roof Emittance
Radiant Barrier
Cool Roof
Attic Small Master Suite
Attic RoofSmall Master Suite
Unventilated
3
0.61
0.86
Yes
Yes
Attic Master Suite
Attic RoofMaster Suite
Unventilated
3
0.61
0.86
Yes
Yes
Attic Lounge -Game
Room -Office
Attic RoofLounge-Game
Room -Office
Unventilated
3
0.61
0.86
Yes
Yes
Attic Great Room -Dining
Attic RoofGreat Room -Dining
Unventilated
3
0.61
0.86
Yes
Yes
Attic Morning
Room-Office=Hall-
Attic RoofMorning
Room -Office -Hall -
Unventilated
3
0.61
0.86
Yes
Yes
Attic Casita
Attic RoofCasita
Unventilated
3
0.61
0.86
Yes
Yes
Attic Casita 2nd Floor
Attic RoofCasita 2nd Floor
Unventilated
3
0.61
0.86
Yes
Yes
Attic Garage
Attic RoofGarage
Unventilated
3
0.61
0.86
Yes
Yes
� CaICERTS, Inc.
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
CFI R-PRF-01
Page 7of16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-1 8.ribd 1 6x
FENESTRATION 1 GLAZING
01
02
03
04
05
06
07
08
09
10
Name
Type
Surface (Orientation -Azimuth)
Width (ft)
Height
(ft)
Multiplier
Area
(ft2)
U-factor
SHGC
Exterior Shading
D08
Window
20d Wall (Front-20)
10.6
10.0
0.962
102.0
0.41
0.21
Insect Screen (default)
W04
Window
200d Wall (Back-200)
- -•
1
37.1
0.30
0.17
Insect Screen (default)
W05
Window
290d Wall (Right-290)
----
--
1
6.0
0.30
0.17
Insect Screen (default)
D10
Window
200d Wall 2 (Back-200)
14.8
10.0
0.926
137.0
0.40
0.21
Insect Screen (default)
W08
Window
200d Wall 2 (Back-200)
---
----
1
51.4
0.30
0.17
Insect Screen (default)
W06
Window
290d Wall 2 (Right-290)
- -
--
1
21.2
0.30
0.17
Insect Screen (default)
W07
Window
290d Wall 2 (Right-290)
--
1
51.4
0.30
0.17
Insect Screen (default)
W09
Window
290d Wall 2 (Right-290)
--
-
1
29.8
0.30
0.17
Insect Screen (default)
W10
Window
290d Wall 2 (Right-290)
-
--
1
29.8
0.30
0.17
Insect Screen (default)
W01
Window
20d Wall 3 (Front-20)
--
-
1
19.1
0.30
0.17
Insect Screen (default)
W02
Window
20d Wall 3 (Front-20)
--
--
1
19.1
0.30
0.17
Insect Screen (default)
W03
Window
20d Wall 3 (Front-20)
----
-
1
19.1
0.30
0.17
Insect Screen (default)
W18A
Window
IM-11 3 (Front-20)
-
--
1
82.3
0.30
0.17
Insect Screen (default)
D06
---
1
160.0
0.40
0.21
Insect Screen (default)
D07
Window
110d Wall 2 (Left-110)
----
----
1
96.0
0.41
0.21
Insect Screen (default)
D11
Window
200d Wall 3 (Back-200)
16.6
10.0
0.94
156.0
0.40
0.21
Insect screen (default)
D01
Window
20d Wall 4 (Front-20)
5.0
10.0
1
50.0
0.30
0.17
Insect Screen (default)
D02
Window
20d Wall 4 (Front-20)
5.0
10.0
1
50.0
0.30
0.17
Insect Screen (default)
D03
Window
20d Wall 4 (Front-20)
5-0
10.0
1
50.0
0.30
0.17
Insect Screen (default)
D04
Window
20d Wall 4 (Front-20)
5.0
10.0
1
50.0
0.30
0.17
Insect Screen (default)
D05
Window
20d Wall 4 (Front-20)
5.0
10.0
1
50.0
0.30
0.17
Insect Screen (default)
D12
Window
200d Wall 4 (Back-200)
34.2
12.0
0.921
378.0
0.40
0.21
Insect Screen (default)
D17
Window
290d Wall 4 (Right-290)
13.0
10.0
0.938
121.9
0.40
0.21
Insect Screen (default)
D16
Window
20d Wall 5 (Front-20)
--
----
1
24.0
0.30
0.17
Insect Screen (default)
W17
Window
20d Wall 5 (Front-20)
-
- -
1
45.0
0.30
0.17
Insect Screen (default)
W14
Window
110d Wall 3 (Left-110)
-
1
61.0
0.30
0.17
Insect Screen (default)
W12
Window
110d Wall 3 (Left-110)
-----
---
1
42.8
0.30
0.17
Insect Screen (default)
D15
Window
110d Wall 3 (Left-110)
11.2
10.0
0.955
107.0
0.41
0.21
Insect Screen (default)
D13
Window
200d Wall 5 (Back-200)
21.5
10.0
0.925
198.9
0.40
1 0.21
Insect Screen (default)
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
CFI R-PRF-01
Page 8 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribd16x
W13
Window
200d Wall 5 (Back-200)
6.4
7.0
0.926
41.5
0.30
0.17
Insect Screen (default)
W18
Window
290d Wall 5 (Right-290)
----
----
1
21.0
0.30
0.17
Insect Screen (default)
W21
Window
20d Wall 6 (Front-20)
-
1
18.0
0.30
0.17
Insect Screen (default)
W20
Window
20d Wall 6 (Front-20)
----
-
1
18.0
0.30
0.17
Insect Screen (default)
W19
Window
20d Wall 6 (Front-20)
----
1
18.0
0.30
0.17
Insect Screen (default)
W27
Window
110d Wall 4 (Left-110)
--
1
5.0
0.30
0.17
Insect Screen (default)
W26
Window
110d Wall 4 (Left-110)
-
-
1
9.5
0.30
0.17
Insect Screen (default)
W25
Window
110d Wall 4 (Left-110)
-
-
1
5.0
0.30
0.17
Insect Screen (default)
W24
Window
110d Wall 4 (Left-110)
-
1
5.0
0.30
0.17
Insect Screen (default)
W23A
Window
200d Wall 6 (Back-200)
-
---
1
7.0
0.30
0.17
Insect Screen (default)
D20
Window
200d Wall 6 (Back-200)
-
1
24.0
0.30
0.17
Insect Screen (default)
D19
Window
290d Wall 6 (Right-290)
-»
1
143.5
0.41
0.21
Insect Screen (default)
W22
Window
290d Wall 6 (Right-290)
-
-
1
18.0
0.30
0.17
Insect Screen (default)
W23
Window
290d Wall 6 (Right-290)
-
--
1
18.0
0.30
0.17
Insect Screen (default)
W32
Window
20d Wall 7 (Front-20)
-
1
8.8
0.30
0.17
Insect Screen (default)
W31
Window
2€ d Wall 7 (Front 2fl)
-
1
8.8
0.30
0.17
Insect Screen (default)
W30
Window
20d Wall,7„JFront-20)
-
-
1
8.8
0.30
0.17
Insect Screen (default)
W32 2
Window
110d Wall 5 (Left-110)
-
-
1
8.8
0.30
0.17
Insect Screen (default)
W33
Window
110d Wall 5 (Left-110)
--
1
8.8
0.30
0.17
Insect Screen (default)
W30 2
Window
110d Wall 5 (Left-110)
-
1
8.8
0.30
0.17
Insect Screen (default)
W30 3
Window
200d Wall 7 (Back-200)
-
1
8.8
0.30
0.17
Insect Screen (default)
W29
Window
200d Wall 7 (Back-200)
-
1
24.0
0.30
0.17
Insect Screen (default)
W28
Window
290d Wall 7 (Right-290)
4.0
10.0
1
40.0
0.30
0.17
Insect Screen (default)
D27
Window
290d Wall 7 (Right-290)
4.3
10.0
1
43.0
0.30
0.17
Insect Screen (default)
W36
Window
20d Wall 8 (Front-20)
----
-
1
15.8
0.30
0.17
Insect Screen (default)
W37
Window
20d Wall 8 (Front-20)
--
-
1
15.8
0.30
0.17
Insect Screen (default)
W38
Window
20d Wall 8 (Front-20)
--
-
1
15.8
0.30
0.17
Insect Screen (default)
W39
Window
20d Wall 8 (Front-20)
-
-
1
9.6
0.30
0.17
Insect Screen (default)
W40
Window
20d Wall 8 (Front-20)
-
-
1
9.6
0.30
0.17
Insect Screen (default)
W41
Window
20d Wall 8 (Front-20)
-
1
9.6
0.30
0.17
Insect Screen (default)
W42
Window
110d Wall 6 (Left-110)
-
1
5.1
0.30
0.17
In Screen (default)
W43
Window
110d Wall 6 (Left-110)
-
--
1
5.1
0.30
0.17
Insect Screen (default)
W44
Window
110d Wall 6 (Left-110)
-
1
5.1
0.30
0.17
Insect Screen (default)
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration DatefTime: 2018-12-20 11:00:19 HERS Provider:
CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
CFI R-PRF-01
Page 9 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribd16x
W46
Window
110d Wall 6 (Left-110)----
1
5.1
0.30
0.17
Insect Screen (default)
W47
Window
110d Wall 6 (Left-110)----
---
1
5.1
0.30
0.17
Insect Screen (default)
D22
Window
200d Wall 8 (Back-200)
6.6
10.0
0.985
65.0
0.30
0.17
Insect Screen (default)
D25
Window
200d Wall 8 (Back-200)
3.0
8.0
1
24.0
0.30
0.17
Insect Screen (default)
OPAQUE DOORS
01
02
03
04
Name
Side of Building
Area (ft2)
U-factor
D31
110d Wall 3
21.6
0.50
D23
290d Wall 8
160.0
1.00
D24
290d Wall 8
64.0
1.00
OVERHANGS AND FINS
01
02
03
04
05 06
07
08
09
10
11
12
13
14
Overhang
Left Fin
Right
Fin
Left
Right
Window
Depth
Dist Up
Extent
Extent Flap Ht.
Depth
Top Up
Dist L
Bot Up
Depth
Top Up
Dist R
Bot Up
D08
6
0.1
6
6 0
0
0
0
0
0
0
0
0
D10
6
0.1
6
6 0
0
0
0
0
0
0
0
0
D11
10
0.1
10
10 0
0
0
0
0
0
0
0
0
D01
14
0.1
14
14 0
0
0
0
0
0
0
0
0
D02
14
0.1
14
14 0
0
0
0
0
0
0
0
0
D03
14
0.1
14
14 0
0
0
0
0
0
0
0
0
D04
14
0.1
14
14 0
0
0
0
0
0
0
0
0
D05
14
0.1
14
14 0
0
0
0
0
0
0
0
0
D12
18
0.1
18
18 0
0
0
0
0
0
0
0
0
D17
10
0.1
10
10 0
0
0
0
0
0
0
0
0
D15
6
0.1
6
6 0
0
0
0
0
0
0
0
0
D13
10
0.1
10
10 0
0
0
0
0
0
0
0
0
W13
6
0.1
6
6 0
0
0
0
0
0
0
0
0
W28
6
0.1
6
6 0
0
0
0
0
0
0
0
0
D27
6
0.1
6
6 0
0
0
0
0
0
0
0
0
D22
4
0.1
4
4 0
0
0
0
0
0
0
0
0
D25
4
0.1
4
4 0
0
0
0
0
0
0
0
0
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider:
CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribd16x
CF1 R-PRF-01
Page 10 of 16
OPAQUE SURFACE CONSTRUCTIONS
01
02
03
04
05
06
07
Total Cavity
Winter Design
Construction Name
Surface Type
Construction Type
Framing
R-value
U-factor
Assembly Layers
• Around Roof Joists: R-6.0 insul.
• Cavity/Frame: R-13.0/2x4 Top Chrd
2x4 Top Chord of Roof Truss @ 24
Roof Deck: Wood Siding/sheathing/decking
Attic RoofSmall Master Suite
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
Roofing: Light Roof (Asphalt Shingle)
• Inside Finish: Gypsum Board
Ceilings (below
Cavity/Frame: R-9.1 /2x4
R-38 Roof Attic R19 High
attic)
Wood Framed Ceiling
2x4 @ 16 in. O.C.
R 38
0.025
Over Ceiling Joists: R-28.9 insul.
• Inside Finish: Gypsum Board
• Cavity/Frame: R-21 /2x6
R-21 Wall
Exterior Walls
Wood Framed Wall
2x6 @ 16 in. O.C.
R 21
0.069
Exterior Finish: 3 Coat Stucco
• Inside Finish: Gypsum Board
• Cavity/Frame: R-13/2x4
R-13 Wall
Interior Walls
Wood Framed Wall
2x4 @ 16 in. O.C.
R 13
0.092
Other Side Finish: Gypsum Board
• Around Roof Joists: R-6.0 insul.
• Cavity / Frame: R-13.0 / 2x4 Top Chrd
2x4 Top Chord of Roof Truss @ 24
Roof Deck., Wood Siding/sheathing/decking
Attic RoofMaster Suite
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
Roofing: Light Roof (Asphalt Shingle)
■ i
It
• Around Roof Joists: R-6.0 insul.
• Cavity / Frame: R-13.0 / 2x4 Top Chrd
Attic Rooft-ounge-Game
2x4„Top Chord of Roof: Truss '@,24
R
Roof Deck: Wood Siding/sheathing/decking
Room -Office
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
Roofing: Light Roof (Asphalt Shingle)
• Around Roof Joists: R-6.0 insul.
• Cavity / Frame: R-13.0 / 2x4 Top Chrd
2x4 Top Chord of Roof Truss @ 24
Roof Deck., Wood Siding/sheathing/decking
Attic RoofGreat Room -Dining
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
Roofing: Light Roof (Asphalt Shingle)
• Around Roof Joists: R-6.0 insul.
• Cavity / Frame: R-13.0 / 2x4 Top Chrd
Attic RoofMorning
2x4 Top Chord of Roof Truss @ 24
Roof Deck: Wood Siding/sheathing/decking
Room -Office -Hall-
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
Roofing: Light Roof (Asphalt Shingle)
• Around Roof Joists: R-6.0 insul.
• Cavity / Frame: R-13.0 / 2x4 Top Chrd
2x4 Top Chord of Roof Truss @ 24
Roof Deck: Wood Siding/sheathing/decking
Attic RoofCasita
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
Roofing: Light Roof (Asphalt Shingle)
• Around Roof Joists: R-6.0 insul.
• Cavity / Frame: R-13.0 / 2x4 Top Chrd
2x4 Top Chord of Roof Truss @ 24
• Roof Deck., Wood Siding/sheathing/decking
Attic RoofCasita 2nd Floor
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 19
0.059
• Roofing: Light Roof (Asphalt Shingle)
Registration Number; 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11;00:19 HERS Provider:
CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
CF1 R-PRF-01
Page 11 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribdl6x
Attic RoofGarage
Attic Roofs
Wood Framed Ceiling
2x4 Top Chord of Roof Truss @ 24
in. O.C.
R 19
0.059
• Around Roof Joists: R-6.0 insul.
• Cavity / Frame: R-13.0 / 2x4 Top Chrd
Roof Deck: Wood Siding/sheathing/decking
Roofing: Light Roof (Asphalt Shingle)
SLAB FLOORS
01
02
03
04
05
06
07
Name
Zone
Area (W)
Perimeter (ft)
Edge Insul. R-value & Depth
Carpeted Fraction
Heated
Slab -on -Grade
Small Master Suite
630
94
None
0.8
No
Slab -on -Grade 2
Master Suite
1350
94
None
0.8
No
Slab -on -Grade 3
Lounge -Game Room -Office
1279
94
None
0.8
No
Slab -on -Grade 4
Great Room -Dining
1408
94
None
0.8
No
Slab -on -Grade 5
Morning Room -Office -Hall-
1037
94
None
0.8
No
Slab -on -Grade 6
Casita
1088
94
None
0.8
No
Slab -on -Grade 7
Garage
1145
94
None
0.8
No
BUILDING ENVELOPE - HERS VERIFICATION
01
02
03
04
Quality Insulation Installation (QII)
Quality Installation of Spray Foam Insulation
Building/Envelope Air Leakage
CFM50
Required
Required
, Not Required
n/a
WATER HEATING SYSTEMS
01
02
03
04
05
06
Name
System Type
Distribution Type
Water Heater
Number of Heaters
Solar Fraction (%)
DHW Sys 1
DHW
(HERS req'd) Pipe Insulation, All
Lines
DHW Heater 1 (3)
3
.0%
WATER HEATERS
01
02
03
04
05
06
07
08
09
10
11
12
Input Rating /
Tank
Standby
Heater
Tank
Uniform Energy
Pilot /
Insulation
Loss /
First Hour
NEEA Heat Pump
Tank Location
Element
Number
Volume
Factor / Energy
Thermal
R-value
Recovery
Rating /
Brand / Model /
or Ambient
Name
Type
Tank Type
of Units
(gal)
Factor / Efficiency
Efficiency
(Int/Ext)
Eff
Flow Rate
Other
Condition
DHW Heater 1
Gas
Small Storage
3
40
0.63 EF
<= 75 kBtu/hr
R-0/R-0
0
n/a
n/a
j n/a
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider:
CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Na
CF1R-PRF-01
Project Name: lot 151 and 152
Calculation Date/Time: 09:52, Thu, Dec 20, 2018
Page 12 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribd16x
WATER HEATING - HERS VERIFICATION
01
02
03
04
05
06
07
Name
Pipe Insulation
Parallel Piping
Compact Distribution
Point -of Use
Recirculation
Control
Central DHW
Distribution
DHW Sys 1 - 1/3
Pipe Insulation, All Lines
n/a
n/a
n/a
n/a
n/a
SPACE CONDITIONING SYSTEMS
01
02
03
04
05
06
SC Sys Name
System Type
Heating Unit Name
Cooling Unit Name
Fan Name
Distribution Name
HVAC-Masterl
and Cooling
Other Heating System
Y
Heating Component 1
Cooling Component 1
HVAC Fan 1
Air Distribution System 1
HVAC-Lounge-Game Room-Off2
g
Other Heating and Cooling
System
Heating Component 2
Cooling Component 2
HVAC Fan 2
Air Distribution System 2
HVAC-Great Room-Dinin 3
g
Other Heating and Cooling
System
Heating Component 3
Cooling Component 3
HVAC Fan 3
Air Distribution System 3
HVAC-MorningRoom-Office-4
Other Heating and Cooling
System
Heating Component 4
Cooling Component 4
HVAC Fan 4
Air Distribution System 4
HVAC-Casita5
Other Heating a and Cooling
Y
Heating Component 5
Cooling Component 5
HVAC Fan 5
Air Distribution System 5
HVAC 2nd casita6
Heat Pump Heating and
Cooling System
Heat Pump System 6
Heat Pump System 6
None
-none -
HVAC-Gaya e7
g
Heat Pump Heating and
Cooling System
Heat Pump System 7
Heat Pump System 7
None
- none -
HVAC - HEATING UNIT TYPES
01
02
03
04
Name
System Type
Number of Units
Efficiency
Heating Component 1
CntrlFurnace
1
80 AFUE
Heating Component 2
CntrlFurnace
1
80 AFUE
Heating Component 3
CntrlFurnace
1
80 AFUE
Heating Component 4
CntrlFurnace
1
80 AFUE
Heating Component 5
CntrlFurnace
1
80 AFUE
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider:
CaI..ERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CFIR-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
CF1 R-PRF-01
Page 13 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribd16x
HVAC - HEAT PUMPS
01
02
03
04
05
06
07
08
09
10
11
Name
System
Type
Number of
Units
Heating
Cooling
Zonally
Controlled
Compressor
Type
HERS
Verification
HSPF/COP
Cap 47
Cap 17
SEER
EER
Heat Pump System 6
DuctlessMiniSplitHeatPump
1
10.5
12000
9000
22
13
Not Zonal
Single Speed
Heat Pump System
6-hers-cool
Heat Pump System 7
Heat Pump System 7
DuctlessMiniSplitHeatPump
DuctlessMiniSplitHeatPump
1
1 -F
10.5
12000
9000
22
13
Not Zonal
Single Speed
Heat Pump System
7-hers-cool
HVAC - COOLING UNIT TYPES
01
02
03
04
05
06
07
08
Name
System Type
Number of Units
Efficiency
EER SEER
Zonally Controlled
Compressor Type
HERS Verification
Cooling Component 1
SplitAirCond
1
13
16
Not Zonal
Single Speed
Cooling Component
1-hers-cool
Cooling Component 2
SplitAirCond
1
13
16
Not Zonal
Single Speed
Cooling Component
2-hers-cool
Cooling Component 3
d
1
13
16
Not Zonal
Single Speed
Cooling Component
3-hers-cool
Cooling Component 4
SplitAirCond
1
13
16
Not Zonal
Single Speed
Cooling Component
4-hers-cool
Cooling Component 5
SplitAirCond
1
13
16
Not Zonal
Single Speed
Cooling Component
5-hers-cool
HVAC COOLING - HERS VERIFICATION
01
02
03
04
05
06
Name
Verified Airflow
Airflow Target
Verified EER
Verified SEER
Verified RefrigerantCharge
Cooling Component 1-hers-cool
Required
350
Required
Required
Required
Cooling Component 2-hers-cool
Required
350
Required
Required
Required
Cooling Component 3-hers-cool
Required
350
Required
Required
Required
Cooling Component 4-hers-cool
Required
350
Required
Required
Required
Cooling Component 5-hers-cool
Required
350
Required
Required
Required
Heat Pump System 6-hers-cool
Not Required
n/a
Not Required
Not Required
Required
Heat Pump System 7-hers-cool
Not Required
n/a
Not Required
Not Required
Required
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider:
CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
CF1 R-PRF-01
Page 14 of 16
Calculation Description: Title 24 Analysis
Input File Name: Macdonald Residence-18.ribd16x
HVAC - DISTRIBUTION SYSTEMS
01
02
03
04
05
06
07
Name
Type
Duct Leakage
Insulation R-value
Duct Location
Bypass Duct
HERS Verification
Air Distribution System 1
DuctsAttic
Specified Lower Leakage
Target
8
Attic
None
Air Distribution System
1-hers-dist
Air Distribution System 2
y
DuctsAttic
Specified Lower Leakage
Target
9
8
Attic
None
Air Distribution System
2-hers-dist
Air Distribution System 3
DuctsAttic
Specified Lower Leakage
Target
8
Attic
None
Air Distribution System
3-hers-dist
Air Distribution System 4
y
DuctsAttic
Specified Lower Leakage
Target
9
8
Attic
None
Air Distribution System
4-hers-list
Air Distribution S stem 5
y
DuctsAttic
Specified Lower Leakage
Target
9
8
Attic
None
Air Distribution System
5-hers-list
HVAC DISTRIBUTION - HERS VERIFICATION
01
02
03
04
05
06
07
08
Name
Duct Leakage
Verification
Duct Leakage
Target (%)
Verified Duct
Location
Verified Duct
_ MDesign
Buried
Ducts
Deeply Buried
Ducts
Low -leakage
Air Handler
Air Distribution System 1-hers-dist
Require4;,
5.0
Not Required
"lqq Required
"` NotRequired
Not Required
Required
Air Distribution System 2-hers-dist
Required
5.0
:°Not R quiked
I NYt!3 Required
Not Required
Required
Air Distribution System 3-hers-dist
Required
5.0
Not Required
Not Required
NOLRequired
Not Required
Required
Air Distribution System 4-hers-list
Required
5.0
Not Required
Not Required
Not Required
Not Required
Required
Air Distribution System 5-hers-dist
Required
5.0
Not Required
Not Required
Not Required
Not Required
Required
HVAC -FAN SYSTEMS
01
02
03
04
Name
Type
Fan Power (Watts/CFM)
HERS Verification
HVAC Fan 1
Single Speed PSC Furnace Fan
0.5
HVAC Fan 1-hers-fan
HVAC Fan 2
Single Speed PSC Furnace Fan
0.5
HVAC Fan 2-hers-fan
HVAC Fan 3
Single Speed PSC Furnace Fan
0.5
HVAC Fan 3-hers-fan
HVAC Fan 4
Single Speed PSC Furnace Fan
0.5
HVAC Fan 4-hers-fan
HVAC Fan 5
Single Speed PSC Furnace Fan
0.5
HVAC Fan 5-hers-fan
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration DatelTime: 2018-12-20 11:00:19 HERS Provider:
CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018
Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x
CFI R-PRF-01
Page 15 of 16
IAQ (Indoor Air Quality) FANS
01 02 03 04 05 06
IAQ Recovery
Dwelling Unit IAQ CFM IAQ Watts/CFM IAQ Fan Type Effectiveness(%) HERS Verification
SFam IAQVentRpt 135 0.25 Default 0 Required
� CaICERTS, Inc.
HERS P'R0V10FR
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider:
CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: lot 151 and 152
Calculation Description: Title 24 Analysis
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:
Tim Scott
Company:
Scott Design and Title 24, Inc.
Address:
77085 Michigan Drive
City/State/Zip:
Palm Desert, CA 92211
RESPONSIBLE PERSON'S DECLARATION STATEMENT
Calculation Date/Time: 09:52, Thu, Dec 20, 2018
Input File Name: Macdonald Residence-18.ribdl6x
Documentation Author Signature:
Zw-Ve"wr
Signature Date:
2018-12-20 11:00:19
CEA/HERS Certification Identification (If applicable):
Phone:
760-200-4780
CFI R-PRF-01
Page 16 of 16
I certify the following under penalty of perjury, under the laws of the State of California:
1. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
3. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name: Responsible Designer Signature:
Tim Scott 7Nw,-5a' aer
Company: Date Signed:
Scott Design and Title 24, Inc. 2018-12-20 11:00:19
Address: License:
77085 Michigan Drive na
City/State/Zip: Phone:
Palm Desert, CA 92211 760-200-4780
Digitally signed by calcERTs. This digital signature is provided in order to secure the content of this registered document and in noway implies Registration
Provider responsibility for the accuracy of the information.
Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149
Easy to Verify
at CaICERTS.com
HERS Provider: CaICERTS inc.
Report Generated at: 2018-12-20 09:54:13