Loading...
BRES2018-0016 Revision 3c4a Qw�&(v CALIFORNIA PERMIT # PLAN LOCATION: r-CY Project Address: v(!;at b 7 Project Description: APN #: Arc 12\� t Applicant Name: Address: City, ST, Zip: Telephone: Email: Valuation of Project $ Contractor Name: ( New SFD Construction: Address: 5-3 Conditioned Space _ _SF City, St, Zip Garage _SF Telephone. Patio/Porch SF Email:�� r= Fire Sprinklers SF State Lic: City Bus Lic: Architect/Engineer Name: Construction Occupancy: Address: Grading: City, St, Zip Telephone: Bedrooms: Stories: # Units: Email: State Lic: City Bus Lic: Property Owner's Name: New Commercial / Tenant Improvements: Address: Total Building _ _ SF City, ST, Zip Construction Type: Occupancy: Telephone: Email: 78495 CALLE TAMPICO LA QUINTA, CA 92253 760-777-7000 L_ BUILDING ENERGY ANALYSIS REPORT I PROJECT: MacDonald Residence 80-875 Via Portofino La Quinta, CA 92253 Project Designer: Brock J. Payton, Inc. 8391 Beverly Blvd., Suite 482 Los Angeles, CA 90048 ((310) 720-6589 Report Prepared by: Tim Scott Scott Design and Title 24, Inc, > 3 - p,p c- 201a 74-818 Velie Way, Suite #8 CITY OF LA QUI�V Desert, CA 92260 BUILDING DIVISION 760) 200-4780 REVIEWED FOR CODE COMPLIANCE DATE 3*u'Zd9 �sE - - e,L�► I Job Number: Date: fvtAR 15 2019 LA CDl4lMt1Nl�y �urN�4 12/20/2018 EVELppML,,N,r, The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the Califomia Energy Commission for use with both the Residential and Nonresidential 2016 Building Energy Efficiency Standards. This program developed by EnergySoft Software — www.energysoft.com. kv? I TABLE OF CONTENTS I Cover Page 1 Table of Contents 2 Form CF-1 R-PRF-01 -E Certificate of Compliance 3 Form RMS-1 Residential Measures Summary 19 Form MF-1 R Mandatory Measures Summary 22 HVAC System Heating and Cooling Loads Summary 26 E CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x GENERAL INFORMATION 01 Project Name lot 151 and 152 02 Calculation Description Title 24 Analysis 03 Project Location 80-875 Via Portofino 04 City La Quinta 06 Zip Code 92253 08 Climate Zone CZ15 10 Building Type Single Family 12 Project Scope Newly Constructed 14 Total Cond. Floor Area (ft2) 8959 16 Slab Area (ft2) 7937 18 Addition Cond. Floor Area(ft2) n/a 20 Addition Slab Area (ft2) n/a CF1 R-PRF-01 Page 1 of 16 05 Standards Version Compliance 2017 07 Compliance Manager Version BEMCmpMgr 2016.3.1 (1149) 09 Software Version EnergyPro 7.2 11 Front Orientation (deg/Cardinal) 20 13 Number of Dwelling Units 1 15 Number of Zones 8 17 Number of Stories 2 19 Natural Gas Available yes 21 Glazing Percentage (%) 1 33.0% COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 This building incorporates one or more Special Features shown below Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 2 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x ENERGY DESIGN RATING Energy Design Rating (EDR) is an alternate way to express the energy performance of a building using a scoring system where 100 represents the energy performance of the Residential Energy Services (RESNET) reference home characterization of the 2006 International Energy Conservation Code (IECC) with California modeling assumptions. A score of zero represents the energy performance of a building that combines high levels of energy efficiency with renewable generation to"zero out' its TDV energy. Because EDR includes consideration of components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics), it is not used to show compliance with Part 6 but may instead be used by local jurisdictions pursuing local ordinances under Title 24, Part 11 (CALGreen). As a Standard Design building under the 2016 Building Energy Efficiency Standards is significantly more efficient than the baseline EDR building, the EDR of the Standard Design building is provided for Information. Similarly, the EDR score of the Proposed Design is provided separately from the EDR value of installed PV so that the effects of efficiency and renewable energy can both be seen EDR of Standard Efficiency 45.2 EDR of Proposed Efficiency 45.1 ❑ Design meets Tier 1 requirement of 15% or greater code compliance margin ❑ Design meets Tier 2 requirement of 30% or greater code compliance margin 0 EDR Value of Proposed PV + Battery Final Proposed EDR 0.0 45.1 A4.203.1.2.1) and QII verification prerequisite. A4.203.1.2.2) and QII verification prerequisite. Design meets Zero Net Energy (ZNE) Design Designation requirement for Single. Family in climate zone CZ15 (CALGreen A4.203.1.2.3) including on -site photovoltaic (PV) renewable energy generation sufficient to achieve a Final Energy Design Rating (EDR) of zero or less. The PV System and QII must be verified. Notes: • Excess PV EDR REQUIRED SPECIAL FEATURES PV rules The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. • Cool roof • Window overhangs and/or fins HERS FEATURE SUMMARY The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the building components tables below. Building -level Verifications: • High quality insulation installation (QII) • IAQ mechanical ventilation • High R-value Spray Foam Insulation Cooling System Verifications: • Minimum Airflow • Verified EER • Verified SEER • Verified Refrigerant Charge • Fan Efficacy Watts/CFM HVAC Distribution System Verifications: • Duct Sealing • Low -leakage Air Handling Unit Domestic Hot Water System Verifications: • Pipe Insulation, All Lines Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 3 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribdl6x BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (ft2) Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems lot 151 and 152 8959 1 5 8 0 1 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Floor Area Avg. Ceiling Zone Name Zone Type HVAC System Name (ft2) Height Water Heating System 1 Water Heating System 2 Small Master Suite Conditioned HVAC-Masterl 630 10.3 DHW Sys 1 n/a Master Suite Conditioned HVAC-Masterl 1350 9.1 DHW Sys 1 n/a Lounge -Game Room -Office Conditioned HVAC-Lounge-Game RoomQf 1279 9.8 DHW Sys 1 n/a Great Room -Dining Conditioned HVAC-Great Room-Dining3 1408 13.7 DHW Sys 1 n/a Morning Room -Office -Hall- Conditioned HVAC-Morning Room-Office-4 1037 12.8 DHW Sys 1 n/a Casita Conditioned HVAC-Casita5 1088 8 DHW Sys 1 n/a Casita 2nd Floor Conditioned HVAC 2nd casita6 1022 8 DHW Sys 1 n/a Garage Conditioned HVAC7G0rage7 1145 8 DHW Sys 1 n/a Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: tot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribdl6x CFI R-PRF-01 Page 4 of 16 OPAQUE SURFACES 01 02 03 04 05 06 07 08 Name Zone Construction Azimuth Orientation Gross Area (ftz) Window & Door Area (ft) Tilt (deg) 20d Wall Small Master Suite R-21 Wall 20 Front 154 101.972 90 200d Wall Small Master Suite R-21 Wall 200 Back 88 37.1 90 290d Wall Small Master Suite R-21 Wall 290 Right 242 6 90 Interior Surface Small Master Suite»Master Suite R-13 Wall n/a n/a 200 0 n/a Roof Small Master Suite R-38 Roof Attic R19 High n/a n/a 630 n/a n/a 20d Wall 2 Master Suite R-21 Wall 20 Front 154 0 90 110d Wall Master Suite R-21 Wall 110 Left 88 0 90 200d Wall 2 Master Suite R-21 Wall 200 Back 435 188.448 90 290d Wall 2 Master Suite R-21 Wall 290 Right 869 132.2 90 Interior Surface 2 Master Suite»Lounge-Game R-13 Wall n/a n/a 500 0 Room -Office n/a Interior Surface 3 Master Suite»Small Master Suite R-13 Wall n/a n/a 200 0 n/a Roof 2 Master Suite R-38 Roof Attic R19 High n/a n/a 1350 n/a n/a 20d Wall 3 Lounge -Game Room -Office R-21 Wall 20 Front 396 139.6 90 110d Wall 2 Lounge -Game Room -Office R-21 Wall 110 Left 583 256 90 200d Wall 3 Lounge -Game Room -Office R-21 Wall 200 Back 187 156.04 90 290d Wall 3 Lounge -Game Room -Office R-21 Wall 290 Right 77 0 90 Interior Surface 4 Lounge -Game RopSuie-Office»Mster R-13 Wall n/a n/a 500 0 n/a Interior Surface 5 Lounge -Game Room -Office —Great R-13 Wall n/a n/a 500 Room -Dining 0 n/a Roof 3 Lounge -Game Room -Office R-38 Roof Attic R19 High n/a n/a 1279 n/a n/a 20d Wall 4 Great Room -Dining R-21 Wall 20 Front 770 250 90 200d Wall 4 Great Rooth-Dining R-21 Wall 200 Back 490 377.978 90 290d Wall 4 Great R6om-Dining R-21 Wall 290 Right 364 121.94 90 Roof 4 Great Room -Dining R-38 Roof Attic R19 High n/a n/a 1408 n/a n/a 20d Wall 5 MoMing Room -Office -Hall- R-21 Wall 20 Front 220 69 90 110d Wall 3 Morning Room -Office -Hall- R-21 Wall 110 Left 804 232.36 90 200d Wall 5 Morning Room -Office -Hall- R-21 Wall 200 Back 420 240.36 90 290d Wall 5 Morning Room -Office -Hall- R-21 Wall 290 Right 312 21 90 Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 5 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribdl6x Interior Surface 6 Morning Room -Office -Hall -»Great R-13 Wall Room -Dining n/a n/a 500 p n/a Morning Interior Surface 7 Room -Office -Hall -»Lounge -Game R-13 Wall n/a n/a 500 0 n/a Room -Office Roof 5 Morning Room -Office -Hall- R-38 Roof Attic R19 High n/a n/a 1037 n/a n/a 20d Wall 6 Casita R-21 Wall 20 Front 320 54 90 110d Wall Casita R-21 Wall 0iio Left 460 24.5 90 200d Wall 6 Casita R-21 Wall 200 Back 320 31 90 290d Wall 6 Casita R-21 Wall 290 Right 460 179.5 90 Interior Surface 8 Casita»Morning Room -Office -Hall- R-13 Wall ba n/a n/a 500 0 n/a Interior Surface 9 Casita»Casita 2nd Floor R-13 Wall n/a n/a 511 0 n/a Roof 6 Casita R-38 Roof Attic R19 High n/a n/a 577 n/a n/a 20d Wall 7 Casita 2nd Floor R-21 Walt 20 Front 216 26.4 90 110d Wall 5 Casita 2nd Floor R-21 Wall 110 Left 224 26.4 90 200d Wall 7 Casita 2nd Floor .R-21 Wall 200 Back 216 32.8 90 290d Wall 7 Casita 2nd Floor sR-21 Wall 290 Right 224 83 90 Interior Surface 10 Casita 2nd Floor»Casita R-13 Wall n/a n/a 511 0 n/a Roof 7 Casita 2nd Floor R- 38 Roof Attic R19 High n/a n/a 511 n/a n/a 20d Wall 8 Garage R-21 Wall 20 Front 400 76.2 90 110d Wall 6 Garage R-21 Wall 110 Left 500 25.5 90 200d Wall 8 Garage R-21 Wall 200 Back 400 89.01 90 290d Wall 8 Garage R-21 Wall 290 Right 500 224 90 Interior Surface 11 Garage»Casita R-13 Wall n/a 100 n/a 0 n/a Roof 8 Garage R-38 Roof Attic R19 High n/a n/a 1145 n/a n/a Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 CF1 R-PRF-01 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x Page 6 of 16 ATTIC 01 02 03 04 05 06 07 08 Name Construction Type Roof Rise Roof Reflectance Roof Emittance Radiant Barrier Cool Roof Attic Small Master Suite Attic RoofSmall Master Suite Unventilated 3 0.61 0.86 Yes Yes Attic Master Suite Attic RoofMaster Suite Unventilated 3 0.61 0.86 Yes Yes Attic Lounge -Game Attic_RoofLounge-Game Room -Office Room -Office Unventilated 3 0.61 0.86 Yes Yes Attic Great Room -Dining Attic RoofGreat Room -Dining Unventilated 3 0.61 0.86 Yes Yes Attic Morning Attic RoofMorning Room -Office -Hall -Unventilated Room -Office -Hall - 3 0.61 0.86 Yes Yes Attic Casita Attic RoofCasita Unventilated 3 0.61 0.86 Yes Yes Attic Casita 2nd Floor Attic RoofCasita 2nd Floor Unventilated 3 0.61 0.86 Yes Yes Attic Garage Attic RoofGarage Unventilated 3 0.61 0.86 Yes Yes �v V� «S 44� Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 7 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x FENESTRATION I GLAZING 01 02 03 04 05 06 07 08 09 10 Height Area Name Type Surface (Orientation -Azimuth) Width (ft) (ft) Multiplier (ft2) U-factor SHGC Exterior Shading DOB Window 20d Wall (Front-20) 10.6 10.0 0.962 102.0 0.41 0.21 Insect Screen (default) W04 Window 200d Wall (Back-200) --- - 1 37.1 0.30 0.17 Insect Screen (default) W05 Window 290d Wall (Right-290) - - 1 6.0 0.30 0.17 Insect Screen (default) D10 Window 200d Wall 2 (Back-200) 14.8 10.0 0.926 137.0 0.40 0.21 Insect Screen (default) WOB Window 200d Wall 2 (Back-200) - 1 51.4 0.30 0.17 Insect Screen (default) W06 Window 290d Wall 2 (Right-290 Ri ( 9 ) "--- 1 21.2 0.30 0.17 Insect Screen (default) W07 Window 290d Wall 2 (Right-290) - 1 51.4 0.30 0.17 Insect Screen (default) W09 Window 290d Wall 2 (Right-290) - 1 29.8 0.30 0.17 Insect Screen (default) W10 Window 290d Wall 2 (Right-290) - -- 1 29.8 0.30 0.17 Insect Screen (default) W01 Window 20d Wall 3 (Front-20) - - 1 19.1 0.30 0.17 Insect Screen (default) W02 Window 20d Wall 3 (Front-20) - - 1 19.1 0.30 0.17 Insect Screen (default) W03 Window 20d Wall 3 (Fronts - - 1 19.1 0.30 0.17 Insect Screen (default) W18A Window 20d Wall 3 (Front-20) - - 1 82.3 0.30 0.17 Insect Screen (default) D06 Window 11 Od Wall 2 (Left-110) -- 1 160.0 0.40 0.21 Insect Screen (default) D07 Window 11 Od Wall 2 (theft-110) 1 96.0 0.41 0.21 Insect Screen (default) D11 Window 200d Wall 3 (Back-200) 16.6 10.0 0.94 156.0 0.40 0.21 Insect Screen (default) D01 Window 20d Wall 4 (Front-20) 5.0 10.0 1 50.0 0.30 0.17 Insect Screen (default) D02 Window 20d Wall 4 (Front-20) &0 10.0 1 %0 0.30 0.17 Insect Screen (default) D03 Window 20d Wall 4 (Front-20) 5.0 10.0 1 50.0 0.30 0.17 Insect Screen (default) D04 Window 20d Wall 4 (Front-20) 5.0 10.0 1 50.0 0.30 0.17 Insect Screen (default) D05 Window 20d Wall 4 (Front-20) 5.0 10.0 1 50.0 0.30 0.17 Insect Screen (default) D12 Window ; 200d Wall 4 (Back-200) 34.2 12.0 0.921 378.0 0.40 0.21 Insect Screen (default) D17 Window 290d Wall 4 (Right-290) 13.0 10.0 0.938 121.9 0.40 0.21 Insect Screen (default) D16 Window 20d Wall 5 (Front-20) --- --- 1 24.0 0.30 0.17 Insect Screen (default) W17 Window 20d Wall 5 (Front-20) - 1 45.0 0.30 0.17 Insect Screen (default) W14 Window 11 Od Wall 3 (Left-110) -- - 1 61.0 0.30 0.17 Insect Screen (default) W12 Window 110d Wall 3 (Left-110) - - 1 42.8 0.30 0.17 Insect Screen (default) D15 Window 110d Wall 3 (Left-110) 11.2 10.0 1 0.955 107.0 0.41 0.21 Insect Screen (default) D13 Window 200d Wall 5 (Back-200) 21.5 10.0 0.925 198.9 1 0.40 0.21 Insect Screen (default) Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 8 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribdl6x W13 Window 200d Wall 5 (Back-200) 6.4 7.0 0.926 41.5 0.30 0.17 Insect Screen (default) W18 Window 290d Wall 5 (Right-290) ---- --- 1 21.0 0.30 0.17 Insect Screen (default) W21 Window 20d Wall 6 (Front-20) --- 1 18.0 0.30 0.17 Insect Screen (default) W20 Window 20d Wall 6 (Front-20) - 1 18.0 0.30 0.17 Insect Screen (default) W19 Window 20d Wall 6 (Front-20) -- 1 18.0 0.30 0.17 Insect Screen (default) W27 Window 110d Wall 4 (Left-110) 1 5.0 0.30 0.17 Insect Screen (default) W26 Window 110d Wall 4 (Left-110) - 1 9.5 0.30 0.17 Insect Screen (default) W25 Window 110d Wall 4 (Left-110) -- 1 5.0 0.30 0.17 Insect Screen (default) W24 Window 110d Wall 4 (Left-110) 1 5.0 0.30 0.17 Insect Screen (default) W23A Window 200d Wall 6 (Back-200) --- -- 1 7.0 0.30 0.17 Insect Screen (default) D20 Window 200d Wall 6 (Back-200) - 1 24.0 0.30 0.17 Insect Screen (default) D19 Window 290d Wall 6 (Right-290) 416 - - 1 143.5 0.41 0.21 Insect Screen (default) W22 Window 290d Wall 6 (Right-290) -- -- 1 18.0 0.30 0.17 Insect Screen (default) W23 Window 290d Wall 6 (Right-290) 1 18.0 0.30 0.17 Insect Screen (default) W32 Window 20d Wall 7 (Front-20) - - 1 8.8 0.30 0.17 Insect Screen (default) W31 Window 20d Wall 7 (Front- 9,) - 1 8.8 0.30 0.17 Insect Screen (default) W30 Window 20d Wall 7 (Front-20) - 1 8.8 0.30 0.17 Insect Screen (default) W32 2 Window 110d Wall 5 (Left-110) - - 1 8.8 0.30 0.17 Insect Screen (default) W33 Window 110d Wall 5 (Left-110) - 1 8.8 0.30 0.17 Insect Screen (default) W30 2 Window 110d Walft (Left-110) -- - 1 8.8 0.30 0.17 Insect Screen (default) W30 3 Window 200d Wall 7 (Back-200) --- 1 8.8 0.30 0.17 Insect Screen (default) W29 Window 20DdWall 7 (Back-200) - 1 24.0 0.30 0.17 Insect Screen (default) W28 Window 290d Wall 7 (Right-290) 4.0 10.0 1 40.0 0.30 0.17 Insect Screen (default) D27 Window %?- `290d Wall 7 (Right-290) 4.3 10.0 1 43.0 0.30 0.17 1 Insect Screen (default) W36 Window 20d Wall 8 (Front-20) ---- -- 1 15.8 0.30 0.17 Insect Screen (default) W37 Window 20d Wall 8 (Front-20) - 1 15.8 0.30 0.17 Insect Screen (default) W38 Window 20d Wall 8 (Front-20) 1 15.8 0.30 0.17 Insect Screen (default) W39 Window 20d Wall 8 (Front-20) - 1 9.6 0.30 0.17 Insect Screen (default) W40 Window 20d Wall 8 (Front-20) - - 1 9.6 0.30 0.17 Insect Screen (default) W41 Window 20d Wall 8 (Front-20) - - 1 9.6 0.30 0.17 Insect Screen (default) W42 Andow 110d Wall 6 (Left-110) - 1 5.1 0.30 0.17 Insect Screen (default) W43 Window 110d Wall 6 (Left-110) -- - 1 5.1 0.30 0.17 Insect Screen (default) W44 Window 110d Wall 6 (Left-110) - - 1 5.1 0.30 0.17 Insect Screen (default) Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CFIR-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 9 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribdl6x W46 Window 110d Wall 6 (Left-110)1 5.1 0.30 0.17 Insect Screen (default) W47 Window 110d Wall 6 (Left-110)---- ---- 1 5.1 0.30 0.17 Insect Screen (default) D22 Window 200d Wall 8 (Back-200) 6.6 10.0 0.985 65.0 0.30 0.17 Insect Screen (default) D25 Window 200d Wall 8 (Back-200) 3.0 8.0 1 24.0 0.30 0.17 Insect Screen (default) OVERHANGS AND FINS 01 02 03 04 05 46 07 08 09 10 11 12 13 14 Overhang Left Fin Right Fin Left Right Window Depth Dist Up Extent Extent Flap Ht. Depth Top Up Dist L Bot Up Depth Top Up Dist R Bot Up D08 6 0.1 6 fi 0 0 0 0 0 0 0 0 0 D10 6 0.1 6 6 0 0 0 0 0 0 0 0 0 D11 10 0.1 10 10 0 0 0 0 0 0 0 0 0 D01 14 0.1 14._ = 14 0 0 0 0 0 0 0 0 0 D02 14 0.1 1.4` 14 0 0 0 0 0 0 0 0 1 0 D03 14 0.1 F i 4 14 0 0 0 0 0 0 0 0 0 D04 14 0.1 v 14 14 0 0 0 0 0 0 0 0 0 D05 14 0.1 i, 14 14 0 0 0 0 0 0 0 0 0 D12 18 18 18 0 0 0 0 0 0 0 0 0 D17 10 a.1 10 10 0 0 0 0 0 0 0 0 0 D15 6 (€' 0.1 6 6 0 0 0 0 0 0 0 0 0 D13 10 0.1 10 10 0 0 0 0 0 0 0 0 0 W13 0.1 6 6 0 0 0 0 0 0 0 0 0 W28 6 0.1 6 6 0 0 0 0 0 0 0 0 0 D27 6 0.1 6 6 0 0 0 0 0 0 0 0 0 D22 0.1 4 4 0 0 0 0 0 0 0 0 0 D25 4 0.1 4 4 0 0 0 0 0 0 0 0 0 Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 CFI R-PRF-01 Page 10 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 Total Cavity Winter Design Construction Name Surface Type Construction Type Framing R-value U-factor Assembly Layers • Around Roof Joists: R-6.0 insul. • Cavity / Frame: R-13.0 / 2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 • Roof Deck. Wood Siding/sheathing/decking Attic RoofSmall Master Suite Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 Roofing: Light Roof (Asphalt Shingle) • Inside Finish: Gypsum Board Ceilings (below • Cavity/Frame: R-9.1 /2x4 R-38 Roof Attic R19 High attic) Wood Framed Ceiling 2x4 @ 16 in O.0 R 38 0.025 • Over Ceiling Joists: R-28.9 insul. • Inside Finish: Gypsum Board • Cavity/Frame: R-21 /2x6 R-21 Wall Exterior Walls Wood Framed Wall 2x6 @ 16 in- O.C. R 21 0.069 • Exterior Finish: 3 Coat Stucco • Inside Finish: Gypsum Board • Cavity/Frame: R-13/2x4 R-13 Wall Interior Walls Wood Framed Wall 2x4 @ 16 in. O.C. R 13 0.092 • Other Side Finish: Gypsum Board • Around Roof Joists: R-6.0 insul. • Cavity/ Frame: R-13.0 / 2x4 Top Chrd 2x4 Tap Chord of Roof Truss @ 24 • Roof Deck. Wood Siding/sheathing/decking Attic RoofMaster Suite Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 • Roofing. Light Roof (Asphalt Shingle) • Around Roof Joists: R-6.0 insul. • Cavity / Frame: R-13.0 / 2x4 Top Chrd Attic RoofLounge-Game "2x4 Top Chord of Roof Truss @ 24 • Roof Deck: Wood Siding/sheathing/decking Room -Office Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 • Roofing: Light Roof (Asphalt Shingle) • Around Roof Joists: R-6.0 insul. • Cavity/Frame: R-13.0/2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 • Roof Deck: Wood Siding/sheathing/decking Attic RoofGreat Room -Dining Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 • Roofing: Light Roof (Asphalt Shingle) • Around Roof Joists: R-6.0 insul. • Cavity / Frame: R-13.0 / 2x4 Top Chrd Attic RoofMorning 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Room -Office -Hall- Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 Roofing: Light Roof (Asphalt Shingle) • Around Roof Joists: R-6.0 insul. • Cavity / Frame: R-13.0 / 2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Attic RoofCasita Attic Roofs Wood Framed Ceiling in. O.0 R 19 0.059 Roofing: Light Roof (Asphalt Shingle) • Around Roof Joists: R-6.0 insul. • Cavity/Frame: R-13.0/2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Attic RoofCasita 2nd Floor Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 Roofing: Light Roof (Asphalt Shingle) Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 11 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x • Around Roof Joists: R-6.0 insul. • Cavity/Frame: R-13.0/2x4 Top Chrd Attic RoofGarage Attic Roofs Wood Framed Ceiling 2x4 Top Chord of Roof Truss @ 24 in. O.C. R 19 Roof Deck: Wood Siding/sheathing/decking 0.059 Roofing: Light Roof (Asphalt Shingle) SLAB FLOORS 01 02 03 04 05 06 07 Name Zone Area (ft) Perimeter (ft) Edge Insul. R-value & Depth Carpeted Fraction Heated Slab -on -Grade Small Master Suite 630 94 None 0.8 No Slab -on -Grade 2 Master Suite 1350 94 None 0.8 No Slab -on -Grade 3 Lounge -Game Room -Office 1279 94 None 0.8 No Slab -on -Grade 4 Great Room -Dining 1408 94 None 0.8 No Slab -on -Grade 5 Morning Room -Office -Hall- 1037 94 None 0.8 No Slab -on -Grade 6 Casita 1088 94 None 0.8 No Slab -on -Grade 7 Garage 1145 94 None 0.8 No BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 Quality Insulation Installation (QII) Quality Installation of Spray Foam Insulation Building Envelope Air Leakage CFM50 Required Rpqulred Not Required n/a WATER HEATING SYSTEMS 01 02 03 04 05 06 Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction (%) DHW Sys 1 DHW (HERS req'd) Pipe Insulation, All DHW Heater 1 (3) 3 p% Lines WATER HEATERS 01 02 03 04 05 06 07 08 09 10 11 12 Input Rating / Tank Standby Heater Element Tank Uniform Energy Pilot / Insulation Loss / First Hour NEEA Heat Pump Tank Location Name Type Tank Type Number of Units Volume (gal) Factor / Energy Factor / Efficiency Thermal Efficiency R-value Recovery Rating / Brand / Model / or Ambient (Int/Ext) Eff Flow Rate Other Condition DHW Heater 1 Gas Small Storage 3 r 40 0.63 EF <= 75 kBtu/hr R-0/R-0 0 n/a n/a n/a Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 12 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-1 8.ribd 1 6x WATER HEATING - HERS VERIFICATION 01 02 03 04 05 06 07 Name Pipe Insulation Parallel Piping Compact Distribution Point -of Use Recirculation Control Central DHW Distribution DHW Sys 1 - 1/3 Pipe Insulation, All Lines n/a n/a n/a n/a n/a SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 SC Sys Name System Type Heating Unit Name Cooling Unit Name Fan Name Distribution Name HVAC-Masterl Other He S tinsg and Cooling Y Heating Component 1 Cooling Component 1 HVAC Fan 1 Air Distribution System 1 HVAC-Lounge-Game Room-Off2 g Other Heating and Cooling System Heating Component 2 Cooling Component 2 HVAC Fan 2 Air Distribution System 2 HVAC-Great Room-Dinin 3 g Other Heating and Cooling System Heating Coponent 3 Cooling Component 3 HVAC Fan 3 Air Distribution System 3 HVAC-Morning Room-Office-4 Other Heatingand Cooling System Hewing Component 4 Cooling Component 4 HVAC Fan 4 Air Distribution System 4 HVAC-Casita5 Other Heatingand Cooling System s, Heating Component 5 Cooling Component 5 HVAC Fan 5 Air Distribution System 5 HVAC 2nd casita6 Heat Pump Heating and Cooling System .. Heat Pump System 6 Heat Pump System 6 None - none - HVAC-Garage? Heat Pump Heating arid Cooling System Heat Pump System 7 Heat Pump System 7 None - none - Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x CFI R-PRF-01 Page 13 of 16 HVAC - HEAT PUMPS 01 02 03 04 05 06 07 08 09 10 11 Name System Type Number of Units Heating Cooling Zonally Controlled Compressor Type HERS Verification HSPF/COP Cap 47 Cap 17 SEER EER Heat Pump System 6 DuctlessMiniSplitHeatPump 1 10.5 12000 9000 22 13 Not Zonal Single Speed Heat Pump System 6-hers-cool Heat Pump System 7 DuctlessMiniSplitHeatPump 1 10.5 12000 9000 22 13 Not Zonal Single Speed Heat Pump System 7-hers-cool HVAC - COOLING UNIT TYPES 01 02 03 04 05 06 07 08 Name System Type Number of Units Efficiency EER SEER Zonally Controlled Compressor Type HERS Verification Cooling Component 1 SplitAirCond 1 13 16 Not Zonal Single Speed Cooling Component 1-hers-cool Cooling Component 2 SplitAirCond 1 13 16 Not Zonal Single Speed Cooling Component 2-hers-cool Cooling Component 3 SplitAirCond 1 13 16 Not Zonal Single Speed Cooling Component 3-hers-cool Cooling Component 4 SplitAirCond 1 13 16 Not Zonal Single Speed Cooling Component 4-hers-cool Cooling Component 5 SplitAirCond 1 13 16 Not Zonal Single Speed Cooling Component 5-hers-cool HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target Verified EER Verified SEER Verified Refrigerant Charge Cooling Component 1-hers-cool Regtliired 350 Required Required Required Cooling Component 2-hers-cool Required 350 Required Required Required Cooling Component 3-hers-cool 'Required 350 Required Required Required Cooling Component 4-hers-cool Required 350 Required Required Required Cooling Component 5-hers-cool Required 350 Required Required Required Heat Pump System 6-hers-cool Not Required n/a Not Required Not Required Required Heat Pump System 7-hers-cool Not Required n/a Not Required Not Required Required Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1 R-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 14 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribdl6x HVAC - DISTRIBUTION SYSTEMS 01 02 03 04 05 06 07 Name Type Duct Leakage Insulation R-value Duct Location Bypass Duct HERS Verification Air Distribution System 1 DuctsAttic Specified Lower Leakage 8 Attic None Air Distribution System Target 1-hers-dist Air Distribution System 2 DuctsAttic Specified Lower Leakage 8 Attic None Air Distribution System Target 2-hers-dist Air Distribution System 3 DuctsAttic Specified Lower Leakage 8 Attic None Air Distribution System Target 3-hers-dist Air Distribution System 4 DuctsAttic Specified Lower Leakage 8 Attic None Air Distribution System Target 4-hers-dist Air Distribution System 5 DuctsAttic Specified Lower Leakage 8 Attic _T None Air Distribution System Target 5-hers-list HVAC DISTRIBUTION - HERS VERIFICATION 01 02 03 04 05 06 07 08 Duct Leakage Duct Leakage _ Verified Duct Verified Duct Buried Deeply Buried Low -leakage Name Verification Target (%) Location Design Ducts Ducts Air Handler Air Distribution System 1-hers-dist Required 5.0 Not Required Not Required Not Required Not Required Required Air Distribution System 2-hers-dist Required 5.0 Not Required Not Required Not Required Not Required Required Air Distribution System 3-hers-dist Required 5.0 Not Required Not Required Not Required Not Required Required Air Distribution System 4-hers-dist Required 5.0 Not Required Not Required Not Required Not Required Required Air Distribution System 5-hers-dist Required 5.0 Not Required Not Required Not Required Not Required Required Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CFI R-PRF-01 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation DateMme: 09:52, Thu, Dec 20, 2018 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x Page 15 of 16 HVAC FAN SYSTEMS - HERS VERIFICATION 01 02 03 Name Verified Fan Watt Draw Required Fan Efficiency (Watts/CFM) HVAC Fan 1-hers-fan Required 0.50 HVAC Fan 2-hers-fan Required 0.50 HVAC Fan 3-hers-fan Required 0.50 HVAC Fan 4-hers-fan Required 0.50 HVAC Fan 5-hers-fan Required 0.50 IAQ (Indoor Air Quality) FANS 01 02 03 04 05 06 Dwelling Unit IAQ CFM IAQ WattsICFM IAQ Fan Type IAQ Recovery Effectiveness(%) HERS Verification SFam IAQVentRpt 135 0.25 Default 0 Required �� f W* Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x DOCUMENTATION! AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Tim Scott Company: Scott Design and Title 24, Inc, Address: 74-818 Velie Way, Suite #8 ciry/statFd1m Desert, CA 92260 RESPONSIBLE PERSON'S DECLARATION STATEMENT Documentation Author Signature: Signature Date: 12/20/2018 CEA/HERS`.Certification Identification (If applicable): Phone: (760) 200-4780 CF1 R-PRF-01 Page 16 of 16 I certify the following under penalty of perjury, under the laws or the State of California: 1. 1 am efigible under Division 3 of the Business and Professions Code to accept responsjbility for the building design identified on this Certificate of Compliance. 2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3. The building design features or system design features identified on this Certificate'af Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name: Brack J. Payton Company: Brock J. Payton, Inc. Address: 8391 Beverly Blvd., Suite 482 City/StaterZip: Los Angeles, CA 90048 Responsible Designer Signature: I Date Signed: License: Phone: ((310) 720-6589 Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 RESIDENTIAL MEASURES SUMMARY RMS-1 Project Name MacDonald Residence Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration California Energy Climate Zone Total Cond. Floor Area Addition CA Climate Zone 15 8,959 Date 11212012018 # of Units Project Address 4 80-875 Via Portofino La Quinta INSULATION Construction Type Cavity Area (ft) Special Features Status Roof Wood Framed Attic R 38 8,448 Add=R-19.0 Cool Roof New Wall Wood Framed R 21 8,402 New Slab Unheated Slab -on -Grade - no insulation 7,937 Perim = 658' New Demising Wood Framed R 13 5,033 New Door Opaque Door no insulation 22 New Door Opaque Door - no insulation 224 Add=R-12.0 New FENESTRATION Orientation Area(ft2) Total Area: 3.12-51 Glazing Percentage: 34.9 % U-Fac SHGC Overhang Sidefins New/Altered Average U-Factor. Exterior Shades 0.35 Status Front (N) 102.0 0.410 0.21 6.0 none Bug Screen New Rear (S) 185.1 0.300 0.17 none none Bug Screen New Right (lM 195.2 0.300 0.17 none none Bug Screen New Rear (S) 137.0 0.400 0.21 6.0 none Bug Screen New Front (N) 391.6 0.300 0.17 none none Bug Screen New Left (E) 160.0 0.400 0.21 none none Bug Screen New Left (E) 96.0 0.410 0.21 none none Bug Screen New Rear (S) 354.8 0.400 0.21 10.0 none Bug Screen New Front (N) 250.0 0.300 0.17 14.0 none Bug Screen New Rear (S) 378.0 0.400 0.21 18.0 none Bug Screen New Right (W) 122.0 0.400 0.21 10.0 none Bug Screen New Left (E) 206.6 0.300 0.17 none none Bug Screen New Left (E) 107.0 0.410 0.21 6.0 none Bug Screen New Rear (S) 41.5 0.300 0.17 6.0 none Bug Screen New HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Central Furnace 80% AFUE Split Air Conditioner 16.0 SEER Setback New 1 Central Furnace 80% AFUE Split Air Conditioner 16.0 SEER Setback New 1 Central Furnace 80% AFUE Split Air Conditioner 16.0 SEER Setback New HVAC DISTRIBUTION Location Heating Cooling Duct Location Duct R-Value Status HVAC-Master Ducted Ducted Attic 8.0 New HVAC-Lounge-Game Roon Ducted Ducted Attic 8.0 New HVAC-Great Room -Dining Ducted Ducted Attic 8.0 New 'WATER HEATING Qty. Type Gallons Min. Eff Distribution Status 3 Small Storage Gas 40 0.63 All Pipes Ins (HERS) New EnergyPro 7.2 by EnergySoft User Number., 6712 ID: Paae 19 of 65 RESIDENTIAL MEASURES SUMMARY RMS-1 Project Name Building Type m Single Family ❑ Addition Alone Date _MacDonald Residence ❑ Multi Family ❑ Existing+ Addition/Alteration 1212012018 Flom Project Address California Energy Climate Zone Total Cond. FloArea Addition 1# of Units 80-875 Via Portofino La Quinta CA Climate Zone 15 8,959 n/a 1 INSULATION Area Construction Type Cavity (ft) Special Features Status FENESTRATION Orientation Area(ft2) I Total Area: U-Fac 3.1251 SHGC Glazing Percentage: 34.9 % Overhang Sidefins I New/Altered Average U-Factor; Exterior Shades 0.35 Status Right (W 143.5 0.410 0.21 none none Bug Screen New Right (V19 166.0 0.300 0.17 6.0 none Bug Screen New Rear (S) 89.0 0.300 0.17 4.0 none Bug Screen New HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Central Furnace 80% AFUE Split Air Conditioner 16.0 SEER Setback New 1 Central Furnace 80% AFUE Split Air Conditioner 16.0 SEER Setback New 1 Split Heat Pump 10.50 HSPF Split Heat Pump 22.0 SEER Setback New HVAC DISTRIBUTION Location Heating Cooling Duct Location Duct R-Value Status HVAC-Morning Room-Offic Ducted Ducted Attic 8.0 New HVAC-Casita Ducted Ducted Attic 8.0 New HVAC 2nd casita Ductless / with Fan Ductless n/a n/a New WATER HEATING Qty. Type Gallons Min. Eff Distribution Status I ErrergyPro 7.2 by Eawng §QR User Number: 6712 ID: Psoe 20 of 65 1 RESIDENTIAL MEASURES SUMMARY RMS-1 Project Name Building Type m Single Family ❑ Addition Alone Date MacDonald Residence ❑ Multi Family ❑ Existing+ Addition/Alteration 1212012018 Project Address California Energy Climate Zone Total Cond. Floor Area Addition # of Units 80-875 Via Portofino La Quinta CA Climate Zone 15 8,959 n/a 1 INSULATION Area Construction Type Cavity (ft) Special Features Status FENESTRATION 1 Total Area: 3,1251 Gazing Percentage: 34.9 %1 New/Altered Average U-Factor: 0.35 I Orientation Area(ft2) U-Fac SHGC Overhang Sidefins Exterior Shades Status HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Split Heat Pump 10.50 HSPF Split Heat Pump 22.0 SEER Setback New HVAC DISTRIBUTION Duct Location Heating Cooling Duct Location R-Value Status HVAC-Garage Ductless / with Fan Ductless n/a n/a New WATER HEATING Gallons Min. Eff Distribution Status )I EnergyPro 7.2 by EneraySoft User Number: 6712 _ ID: Peae 21 of 65 0 1 2016 Low -Rise Residential Mandatory Measures Summary NOTE: Low-rise residential buildings subject to the Energy Standards must comply with all applicable mandatory measures, regardless of the compliance approach used. Review the respective section for more information. *Exceptions may apply. Revised 0412017 Building Envelope Measures: § 110.6(a)l: Air Leakage. Manufactured fenestration, exterior doors, and exterior pet doors must limit air leakage to 0.3 cfm/ft2 or less when tested per NFRC-400 orASTM E283 orAAMAIWDMA/CSA 101/I.S.2/A440-2011: § 110.6(a)5: Labeling. Fenestration products must have a label meeting the requirements of § 10-111(a). § 110.6(b): Field fabricated exterior doors and fenestration products must use U-factors and solar heat gain coefficient (SHGC) values from TABLES 110.6-A and 110.6-13 for compliance and must be caulked and/or weatherstripped.' § 110.7: Air Leakage. All joints, penetrations, and other openings in the building envelope that are potential sources of air leakage must be caulked, asketed, or weather stripped, § 110.8(a): Insulation Certification by Manufacturers. Insulation specified or installed must meet Standards for Insulating Material. § 110.8(g): Insulation Requirements for Heated Slab Floors. Heated slab floors must be insulated per the requirements of § 110.8(g). § 110.8(i): Roofing Products Solar Reflectance and Thermal Emittance. The thermal emittance and aged solar reflectance values of the roofing material must meet the requirements of § 110.8(i) when the installation of a cool roof is specified on the CF1 R. § 110.80): Radiant Barrier. A radiant barrier must have an emittance of 0.05 or less and be certified to the Department of Consumer Affairs. Ceiling and Rafter Roof Insulation. Minimum R-22 insulation in wood -frame ceiling; or the weighted average U-factor must not exceed 0.043. Minimum R-19 or weighted average U-factor of 0.054 or less in a rafter roof alteration. Attic access doors must have permanently attached § 150.0(a): insulation using adhesive or mechanical fasteners. The attic access must be gasketed to prevent air leakage. Insulation must be installed in direct contact with a continuous roof or ceiling which is sealed to limit infiltration and exfiltration as specified in § 110.7, including but not limited to placing insulation either above or below the roof deck or on top of a dD2all ceiling.' § 150.0(b): Loose -fill Insulation. Loose fill insulation must meet the manufacturer's required density for the labeled R-value. Above Grade Wall Insulation. Minimum R-13 insulation in 2x4 inch wood framing wall or have a U-factor of 0.102 or less (R-19 in 2x6 or U- § 150.0(c): factor of 0.074 or less). Opaque non -framed assemblies must have an overall assembly U-factor not exceeding 0.102, equivalent to an installed value of R-13 in a wood framed assembly.* § 150.0(d): Raised -floor Insulation. Minimum R-19 insulation in raised wood framed floor or 0.037 maximum U-factor.' § 150.0(f): Slab Edge Insulation. Slab edge insulation must meet all of the following: have a water absorption rate, for the insulation material alone without facings, no greater than 0.3%; have a water vapor permeance no greater than 2.0 perm/inch; be protected from physical damage and UV light deterioration; and, when installed as part of a heated slab floor, meet the requirements of § 110.8(g). § 150.0(g)1: Vapor Retarder. In Climate Zones 1-16, the earth floor of unvented crawl space must be covered with a Class I or Class II vapor retarder. This re uirement also applies to controlled ventilation crawl space for buildings complying with the exception to § 150.0(d). § 150.0(g)2: Vapor Retarder. In Climate Zones 14 and 16, a Class I or Class II vapor retarder muss be installed on the conditioned space side of all insulation in all exterior wails, vented attics, and unvented attics with air -permeable insulation. 150.0 Fenestration Products. Fenestration, including skylights, separating conditioned space from unconditioned space or outdoors must have a § (q)' maximum U-factor of 0.58; or the weighted average U-factor of all fenestration must not exceed 0.58.' Fireplaces, Decorative Gas Appliances, and Gas Log Measures: § 150.0(e)lA: Closable Doors. Masonry or factory -built fireplaces must have a closable metal or glass door covering the entire opening of the firebox. § 150.0(e)l B: Combustion Intake. Masonry or factory -built fireplaces must have a combustion outside air intake, which is at least six square inches in area and is equipped with a readily accessible, operable, and tight -fitting damper or combustion -air control device.* § 150.0(e)lC: Flue Damper. Masonry or factory -built fireplaces must have a flue damper with a readily accessible control: § 150 0(e)2: Pilot Light. Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of the building, are prohibited. Space Conditioning, Water Heating, and Plumbing System Measures: § 110.0-§ 110.3: Certification. Heating, ventilation and air conditioning (HVAC) equipment, water heaters, showerheads, faucets, and all other regulated appliances must be certified by the manufacturer to the Ener v Commission.' § 110.2(a): HVAC Efficiency. Equipment must meet the applicable efficiency requirements in TABLE 110.2-A through TABLE 110.2-K.' Controls for Heat Pumps with Supplementary Electric Resistance Heaters. Heat pumps with supplementary electric resistance heaters § 110.2(b): must have controls that prevent supplementary heater operation when the heating load can be met by the heat pump alone; and in which the cut -on temperature for compression heating is higher than the cut -on temperature for supplementary heating, and the cut-off temperature for compression heating is higher than the cut-off temperature for supplementary heating.* § 110.2(c): Thermostats. All unitary heating or cooling systems not controlled by a central energy management control system (EMCS) must have a setback thermostat.' Water Heating Recirculation Loops Serving Multiple Dwelling Units. Water heating recirculation loops serving multiple dwelling units must § 110.3(c)5: meet the air release valve, backflow prevention, pump priming, pump isolation valve, and recirculation loop connection requirements of § 110.3(c)5. § 110.3(c)7: Isolation Valves. Instantaneous water heaters with an input rating greater than 6.8 kBTU/hr (2 kW) must have isolation valves with hose bibbs or other fittings on both cold water and hot water lines of water heating systems to allow for water tank Pushing when the valves are closed. § 110.5: Pilot Lights. Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces; household cooking appliances (appli- ances without an electrical supply voltage connection with pilot lights that consume less than 150 Btuihr are exempt); and pool and spa heaters.* Building Cooling and Heating Loads. Heating and/or cooling loads are calculated in accordance with ASHRAE Handbook, Equipment § 150.0(h)l: Volume, Applications Volume, and Fundamentals Volume; SMACNA Residential Comfort System Installation Standards Manual; or ACCA Manual J using design conditions specified in § 150.0(h)2. z 2016 Low -Rise Residential Mandatory Measures Summary _ § 150.0(h)3A: Clearances. Installed air conditioner and heat pump outdoor condensing units must have a clearance of at least 5 feet from the outlet of any dryer vent. § 150.0(h)3B: Liquid Line Drier. Installed air conditioner and heat pump systems must be equipped with liquid line filter driers if required, as specified by manufacturer's instructions. § 150.00)1: Storage Tank Insulation. Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water -heating systems, must have R-12 external insulation or R-16 internal insulation where the internal insulation R-value is indicated on the exterior of the tank. Water piping and cooling system line insulation. For domestic hot water system piping, whether buried or unburied, all of the following must be insulated according to the requirements of TABLE 120.3-A: the first 5 feet of hot and cold water pipes from the storage tank; all piping with a § 150.00)2A: nominal diameter of 3/4 inch or larger; all piping associated with a domestic hot water recirculation system regardless of the pipe diameter; piping from the heating source to storage tank or between tanks; piping buried below grade; and all hot water pipes from the heating source to kitchen fixtures: § 150.00)2B: Water piping and cooling system line insulation. All domestic hot water pipes that are buried below grade must be installed in a water proof and non -crushable casing or sleeve." § 150.00)2C: Water piping and cooling system line insulation. Pipe for cooling system lines must be insulated as specified in § 150.0(j)2A. Distribution piping for steam and h dronic heatIng systems or hot waters stems must meet the requirements in TABLE 120.3-A.' § 150.00)3: Insulation Protection. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation Protection. Insulation exposed to weather must be installed with a cover suitable for outdoor service. For example, protected by § 150.00)3A: aluminum, sheet metal, painted canvas, or plastic cover. The cover must be water retardant and provide shielding from solar radiation that can cause degradation of the material. § 150.00)3B: Insulation Protection. Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space must have a Class I or Class II vapor retarder. Gas or Propane Systems. Systems using gas or propane water heaters to serve individual dwelling units must include all of the following: a § 150.0(n)1: 120V electrical receptacle within 3 feet of the water heater; a Category III or IV vent, or a Type B vent with straight pipe between the outside termination and the space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the water heater, and allows natural drafning without pump assistance; and a gas supplympply line with a capacity of at least 200,000 Btulhr. § 150.0(n)2: Recirculating Loops. Recirculating loops serving multiple dwelling units must meet the requirements of § 110.3(c)5. § 150.0(n)3: Solar Water -heating Systems. Solar water -heating systems and collectors must be certified and rated by the Solar Rating and Certification Coloration SRCC or by a listing a enc that is approved by the Executive Director. Ducts and Fans Measures: § 110.8(d)3: Ducts. Insulation installed on an existing space -conditioning duct must comply with § 604.0 of the California Mechanical Code (CMC). If a contractor installs the insulation, the contractor must certify to the customer, in writing, that the insulation meets this re uirement_ CMC Compliance. All air -distribution system ducts and plenums must be installed, sealed, and insulated to meet the requirements of CMC §§ 601.0, 602.0, 603.0, 604.0, 605.0 and ANSIISMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition. Portions of supply -air and return -air ducts and plenums must be insulated to a minimum installed level of R-6.0 (or higher if required by CMC § 605.0) or a minimum installed level of R-4.2 when entirely in conditioned space as confirmed through field verification and diagnostic testing § 150.0(m)1: (RA3.1.4.3.8). Connections of metal ducts and inner core of flexible ducts must be mechanically fastened. Openings must be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, UL 181 A, or UL 181 B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than inch, the combination of mastic and either mesh or tape must be used. Building cavities, support platforms for air handlers, and plenums designed or constructed with materials other than sealed sheet metal, duct board or flexible duct must not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and suppart platforms must not be compressed to cause reductions in the cross -sectional area of the ducts.' Factory -Fabricated Duct Systems. Factory -fabricated duct systems must comply with applicable requirements for duct construction, § 150.0(m)2: connections, and closures; joints and seams of duct systems and their components must not be sealed with cloth back rubber adhesive duct tapes unless such toe is used in combination with mastic and draw bands. § 150.0(m)3: Field -Fabricated Duct Systems. Field -fabricated duct systems must comply with applicable requirements for: pressure -sensitive tapes, mastics, sealants, and other requirements. s ecifed for duct construction. § 150.0(m)7: Backdraft Dampers. All fan systems that exchange air between the conditioned space and the outside of the building must have backdraft or automatic dampers. § 150.0(m)8: Gravity Ventilation Dampers. Gravity ventilating systems serving conditioned space must have either automatic or readily accessible, manually operated dampers in all openings to the outside, except combustion inlet and outlet air o enin s and elevator shaft vents. Protection of Insulation. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and § 150.0(m)9: wind. Insulation exposed to weather must be suitable for outdoor service. For example, protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation must be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation. § 150.0(m)10: Porous Inner Core Flex Duct. Porous inner core flex duct must have a non -porous layer between the inner core and outer vapor barrier. Duct System Sealing and Leakage Test. When space conditioning systems use forced air duct systems to supply conditioned air to an § 150.0(m)11: occupiable space, the ducts must be sealed and duct leakage tested, as confirmed through field verification and diagnostic testing, in accordance with § 150.E m 11and Reference Residential Appendix RA3. Air Filtration. Mechanical systems that supply air to an occupiable space through ductwork exceeding IQ feet in length and through a thermal § 150.0(m)12: conditioning component, except evaporative coolers, must be provided with air filter devices that meet the design, installation, efficiency, pressure drop, and labeling requirements of 150.0 m 12. 00�11 2016 Low -Rise Residential Mandatory Measures Summary_ _ Duct System Sizing and Air Filter Grille Sizing. Space conditioning systems that use forced air ducts to supply cooling to an occupiable space must have a hole for the placement of a static pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the § 150:0(m)13: supply plenum. The space conditioning system must also demonstrate airflow> 350 CFM per ton of nominal cooling capacity through the return grilles, and an air -handling unit fan efficacy < 0.58 WICFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3.3. This applies to both single zone central forced air systems and every zone for zonally controlled central forced air systems.' Ventilation for Indoor Air Quality. All dwelling units must meet the requirements of ASHRAE Standard 62.2. Neither window operation nor §150.0(o): continuous operation of central forced air system air handlers used in central fan integrated ventilation systems are permissible methods of providing whole -building ventilation. § 150.0(o)11A Field Verification and Diagnostic Testing. Whole -building ventilation airflow must be confirmed through field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3.7. Pool and Spa Systems and Equipment Measures: Certification by Manufacturers. Any pool or spa heating system or equipment must be certified to have all of the following: a thermal efficiency § 110.4(a): that complies with the Appliance Efficiency Regulations; an on -off switch mounted outside of the heater that allows shutting off the heater without adjusting the thermostat setting; a permanent weatherproof plate or card with operating instructions; and must not use electric resistance heating.* § 110.4(b)1_ Piping. Any pool or spa heating equipment must be installed with at least 36 inches of pipe between the filter and the heater, or dedicated suction and return lines, or built-in or built-up connections to allow for future solar heatino. § 110.4(b)2: Covers. Outdoor pools or spas that have a heat pump or gas heater must have a cover. § 110.4(b)3: Directional inlets and time switches for pools. Pools must have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or programmed to run only durin off- eak electric demand periods. § 110.5: Pilot Light. Natural gas pool and spa heaters must not have a continuously burning pilot light. 150.0 Pool Systems and Equipment Installation. Residential pool systems or equipment must meet the specified requirements for pump sizing, flow § (p)' rate, pipin4, filters. and valves.' Lighting Measures: § 110.9: Lighting Controls and Components. All lighting control devices and systems, ballasts, and luminaires must meet the applicable requirements of § 110.9., JA8 High Efficacy Light Sources. To qualify as a JA8 high efficacy light source for compliance with § 150.0(k), a residential light source must § 110.9(e). be certified to the Energy Commission according to Reference Joint Appendix JA8. _ § 150.0(k)1A: Luminatre Efficacy. All installed luminaires must be high efficacy in accordance with TABLE 150.0-A. Blank Electrical Boxes. The number of electrical boxes that are more than 5 feet above the finished floor and do not contain a luminaire or § 150.0(k)1 B: other device must be no greater than the number of bedrooms. These electrical boxes must be served by a dimmer, vacancy sensor control, or fan speed control. _ Recessed Downlight Luminaires in Ceilings. Luminaires recessed into ceilings must meet all of the requirements for: insulation contact (IC) § 150.0(k)1C: labeling; air leakage; sealing; maintenance; and socket and light source as described in § 150.0(k)1C. A JA8-2016-E light source rated for elevated tern ermure must be installed by final inspection in all recessed down€i ht luminaires in ceilings. § 150.0(k)1 D: Electronic Ballasts. Ballasts for fluorescent lamps rated 13 watts or greater must be electronic and must have an output frequency no less than 20 kHz. Night Lights. Permanently installed night lights and night lights integral to installed luminaires or exhaust fans must be rated to consume no § 150.0(k)1 E: more than 5 watts of power per luminaire or exhaust fan as determined in accordance with § 130.0(c). Night lights do not need to be controlled by vacancy sensors. § 150.0(k)1 F: Lighting Integral to Exhaust Fans. Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods) must meet the applicable requirements of § 150.0(k).' Screw based luminaires. Screw based luminaires must not be recessed downlight luminaires in ceilings and must contain lamps that comply § 150.0(k)1 G: with Reference Joint Appendix JA8. Installed lamps must be marked with "JA8-2016" or "JA8-2016-E" as specified in Reference Joint Appendix JA8.' § 150.0(k)1 H: Enclosed Luminaires. Light sources installed in enclosed luminaires must be JA8 compliant and must be marked with "JA8-2016-E." § 150.0(k)2A: Interior Switches and Controls. All forward phase cut dimmers used with LED light sources must comply with NEMA SSL 7A. § 150.0(k)2B: Interior Switches and Controls. Exhaust fans must be switched separately from lighting systems.' § 150.0(k)2C: Interior Switches and Controls. Luminaires must be switched with readily accessible controls that permit the luminaires to be manually switched ON and OFF. § 150.0(k)2D: Interior Switches and Controls. Controls and equipment must be installed in accordance with manufacturer's instructions. § 150.0(k)2E: Interior Switches and Controls. No control must bypass a dimmer or vacancy sensor function if the control is installed to comply with 4rn MIA § 150.0(k)2F: Interior Switches and Controls. Lighting controls must comply with the applicable requirements of § 110.9. Interior Switches and Controls. An energy management control system (EMCS) may be used to comply with dimmer requirements if it: § 150.0(k)2G. functions as a dimmer according to § 110.9; meets the Installation Certificate requirements of § 130.4; meets the EMCS requirements of § 130.5 and meets all other requirements in § 150.0(k)2. Interior Switches and Controls. An EMCS may be used to comply with vacancy sensor requirements in § 150.0(k) if it meets all of the § 150.0(k)2H: following: it functions as a vacancy sensor according to § 110.9; the Installation Certificate requirements of § 130.4; the EMCS requirements of § 130.5 ; and all other re uirements in 150.0 k 2. § 150.0(k)21: Interior Switches and Controls. A multiscene programmable controller may be used to comply with dimmer requirements in § 150.0(k) if it provides the functionality of a dimmeraccording to 110.9, and complies with all other applicable requirements in § 150.0(k)2. 2016 Low -Rise Residential Mandatory Measures Summary § 150.0(k)2J: Interior Switches and Controls. In bathrooms, garages, laundry rooms, and utility rooms, at least one luminaire in each of these spaces must be controlled by a vacancy sensor. § 150.0(k)2K: Interior Switches and Controls. Dimmers or vacancy sensors must control all luminaires required to have light sources compliant with Reference Joint Appendix JA8, except luminaires in closets less than 70 square feet and luminaires in hallways. § 150.0(k)2L: Interior Switches and Controls. Undercabinet lighting must be switched separately from other lighting systems. Residential Outdoor Lighting. For single-family residential buildings, outdoor lighting permanently mounted to a residential building, or to other § 150.0(k)3A: buildings on the same lot, must meet the requirement in item § 150.0(k)3Ai (ON and OFF switch) and the requirements in either item § 150.0(k)3Aii (photocell and motion sensor) or item § 150.0(k)3Aiii (photo control and automatic time switch control, astronomical time clock, or EMCS). _ Residential Outdoor Lighting. For low-rise multifamily residential buildings, outdoor lighting for private patios, entrances, balconies, § 150.0(k)3B: and porches; and outdoor lighting for residential parking lots and residential carports with less than eight vehicles per site must comply with either § 150.0 k 3A or with the applicable requirements in 110.9. 130.0, 130.2. 130.4, 140.7 and 141.0. § 150.0(k)3C: Residential Outdoor Lighting. For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by 150.0 k 3B or § 150.0k 3D must comply with the applicable requirements in §§ 110.9, 130.0, 130.2,130A, 140.7 and 141.0. § 150.0(k)3D: Residential Outdoor Lighting. Outdoor lighting for residential parking lots and residential carports with a total of eight or more vehicles per site must comply with the applicable requirements in 110.9, 130.0, 130.2, 130.4, 140.7, and 141.0. § 150.0(k)4: Internally illuminated address signs. Internally illuminated address signs must comply with § 140.8; or must consume no more than 5 watts of -_power as determined according to § 130.0(c). § 150.0(k)5: Residential Garages for Eight or More Vehicles. Lighting for residential parking garages for eight or more vehicles must comply with the applicable requirements for nonresidential garages in 110.9, 130.0, 130.1, 130.4,140.6, and 141.0. Interior Common Areas of Low-rise Multi -Family Residential Buildings. In a low-rise multifamily residential building where the total interior § 150.0(k)6A: common area in a single building equals 20 percent or less of the floor area, permanently installed lighting for the interior common areas in that buildin2 must be high efficacy luminaires and controlled by an occupant sensor. Interior Common Areas of Low-rise Multi -Family Residential Buildings. In a low-rise multifamily residential building where the total interior common area in a single building equals more than 20 percent of the floor area, permanently installed lighting in that building must: § 150.0(k)6B: I. Comply with the applicable requirements in §§ 110.9, 130.0, 130.1, 140.6 and 141.0; and ii. Lighting installed in corridors and stairwells must be controlled by occupant sensors that reduce the lighting power in each space by at least 50 percent. The occupant sensors must be capable of turning the light fully on and off from all desiqned paths of ingress and earess. Solar Ready Buildings: Single Family Residences. Single family residences located in subdivisions with ten or more single family residences and where the § 110.10(a)1: application for a tentative subdivision map for the residences has been deemed complete by the enforcement agency must comply with the re uirements of § 110.10 b through § 110.10(e). § 110.10(a)2: Low-rise Multi -family Buildings. Low-rise multi -family buildings must comply with the requirements of § 110.10(b) through § 110.10(d). Minimum Area. The solar zone must have a minimum total area as described below. The solar zone must comply with access, pathway, smoke ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local jurisdiction. The solar zone total area must be comprised of areas that have no dimension less than 5 feet and are no less than 80 square feet each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for buildings with roof areas § 110.10(b)1: greater than 10,000 square feet. For single family residences the solar zone must be located on the roof or overhang of the building and have a total area no less than 250 square feet. For low-rise multi -family buildings the solar zone must be located on the roof or overhang of the building, or on the roof or overhang of another structure located within 250 feet of the building, or on covered parking installed with the building project, and have a total area no less than 15 percent of the total roof area of the building excludina anv skvliaht area! § 110.10(b)2: Orientation. All sections of the solar zone located on steep -sloped roofs must be oriented between 110 degrees and 270 degrees of true north. § 110.10(b)3A: Shading. The solar zone must not contain any obstructions, including but not limited to: vents, chimneys, architectural features, and roof mounted equipment.' Shading. Any obstruction located on the roof or any other part of the building that projects above a solar zone must be located at least twice the § 110.10(b)36: distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the horizontal projection of the nearest point of the solar zone, measured in the vertical plane." § 110.10(b)4: Structural Design Loads on Construction Documents. For areas of the roof designated as solar zone, the structural design loads for roof dead load and roof live load must be clean indicated on the construction documents. Interconnection Pathways. The construction documents must indicate: a location tar inverters and metering equipment and a pathway for § 110.10(c): routing of conduit from the solar zone to the point of interconnection with the electrical service (for single family residences the point of interconnection will be the main service panel); and a pathway for routing of plumbing from the solar zone to the water-heatin system. § 110.10(d): Documentation. A copy of the construction documents or a comparable document indicating the information from § 110.10(b) through 1 10.10c must be provided to the occupant. § 110.10(e)1: Main Electrical Service Panel. The main electrical service panel must have a minimum busbar rating of 200 amps. Main Electrical Service Panel. The main electrical service panel must have a reserved space to allow for the installation of a double pole circuit § 110.10(e)2: breaker for a future solar electric installation. The reserved space must be: positioned at the opposite (load) end from the input feeder location or main circuit location; and permanently marked as "For Future Solar Electric". HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name MacDonald Residence Date 12/20/2018 System Name HVAC-Master Floor Area 1,980 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,213 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 89,000 23,366 3.278 685 26,167 Total Output (Btuh) 89,000 0 Output Btuh/s ft 44.9 1,101 999 Cooling System 0 0 Output perSystem 57,500 0 OF 0 0 Total Output (Btuh) 57,500 2,943 1,101 28,512 3,278 -2,943 Total Output (Tons) 4.8 999 Total Output Btuh/s ft 29.0 Total Output s ft/Ton 413.2 25,222 Air System CFM perSystem 2,000 HVAC EQUIPMENT SELECTION Airflow (cfm) 2,000 Carrier 24ACP760/58PH**l 10 42,354 6.456 89,000 Airflow cfm/s ft 1.01 Airflow (cfm/Ton) 417.4 Outside Air (%) 0•0 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 42,354 6,456 89,000 F Jan 1 AM Outside Air (cfm/sqft) 0.00 Note: values above given at ARI conditions Aug 3 MI HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 70 OF 105 OF 106 OF Pk Outside Air 1 0 cfm Heating Coil Supply Fan 2,000 cfm 70 OF a -dll� H I I ■ 106 OF ROOM 70 OF COOLING SYSTEM PSYCHROMETRICS Airstream Tem eratures at Time of Cooling Peak 112/78OF 76/62OF 55/54OF 56154OF a Outside Air Ar D T 0 cfm Cooling Coil Supply Fan 57 / 55 OF 2,000 cfm 48.0 % ROw 76/62OF 75/62°F HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name MacDonald Residence Date 12/20/2018 System Name HVAC-Lounge-Game Room -Office Floor Area 1,279 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1.009 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per Stem 51,000 20,657 2,117 533 19,510 Total Output (Btuh) 51,000 0 Output (Btuh/sgft) 39.9 973 745 Cooling System 0 0 Output per System 36,000 0 0 0 0 Total Output (Btuh) 36,000 0 2,117 0 Total Output (Tons) 3.0 973 745 Total Output Btuh/s ft 28.1 Total Output s ft/Ton 426.3 1 22,604 20,999 Air System CFM per System 1,200 HVAC EQUIPMENT SELECTION Airflow cfm 1,200 Carrier 24ANB736/58CVX070 26,236 4,379 51,000 Airflow (cfm/sgft) 0.94 Airflow (cfm/Ton) 400.0 Outside Air (%) 0.0%1 Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 26,236 4,379 51,000 Jan 1 AM Outside Air (cfm/s ft) 0.00 1 Note: values above given at ARI conditions Aug 3 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heatin Peak 26 OF 69 OF 105 OF 105 OF ® U T T Outside Air 0 cfm Heating Coil Supply Fan 1,200 cfm 104 OF ROOM 69 OF 70 OF COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112/78OF 76/62°F 55/54°F 55154°F Outside Air 0 cfm Cooling Coil Supply Fan 56 / 54 OF 1,200 cfm-Z a8.2 % ROOM 76/62°F 75/62°F HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name MacDonald Residence Date 12/20/2018 System Name HVAC-Great Room -Dining Floor Area 1,408 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,389 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 89,000 26,655 2,331 616 23,558 Total Output Btuh 89,000 0 Output Btuh/s ft) 63.2 1,256 899 Cooling System 0 0 Output per System 57,500 0 0 0 0 Total Output (Btuh) 57,500 2,943 2,331 -2,943 Total Output Tons 4.8 1,256 899 Total Output Btuh/s ft) 40.8 Total Output s ft1Ton 293.8 32,110 22,413 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow(cfm)_2,000 Carrier 24ACP760/58PH**l 10 42,790 5.905 89,000 Airflow cfm/sgft 1.42 Airflow cfm/Ton 417.4 Outside Air (%) 0.0 % Total Adjusted System Output 42,790 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 5,905 Aug 3 PM 89,000 Jan 1 AM Outside Air cfm/sgft) 0.00 Note: values above given at ARI conditions I HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time .of Heating Peak 26 OF Outside Air 0 cfm 70 OF if 70 OF 105 OF 106 °F - Heating Coil Supply Fan 2,000 cfm 106 OF ROOM 70 OF COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112/78OF Outside Air 0 cfm AL 76/62°F 76/62OF 55/54OF 56/54OF�j I Cooling Coil Supply Fan 57 / 55 OF 2,000 cfm 47.4 % ROOM 75/62OF FrHVAC SYSTEM HEATING AND COOLING LOADS SUMMARY ject Name Date MacDonald Residence + 1212o/2n1S System Name HVAC-Morning Room -Office -Hall -Laundry Floor Area 1,037 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 960 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 89,000 18,595 1,717 519 19,91$ Total Output Btuh 89,000 0 Output Btuh/s ft 85.8 876 760 Cooling System 0 0 Output per System 57,500 0 0 0 0 Total Output Btuh) 57,500 2,943 1,717 -2,943 Total Output (Tons) 4.8 876 760 Total Output (Btuh/sgft) 55.4 Total Output s ft/Ton 216.4 23,290 18,490 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow cfm 2,000 Carrier 24ACP760/58PH**l 10 42,767 5,805 89,000 Airflow (cfm/s ft) 1.93 Airflow (cfm/Ton) 417.4 Outside Air %) 1 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 42,767 5,805 89,000 Aug 3 PM Jan 1 AM Outside Air cfm/s ft) 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRIC$ Airstream Tem eratures at Time of HeatingPeak 26 OF 70 OF 105 °F 106 OF Outside Air 0 cfm Heating Coil Supply Fan 106 ° F 2,000 cfm ROM 70 OF 70 OF COOLING SYSTEM PSYCHROMETRIC$ Airstream Temperatures at Time of Coolin Peak 112/78°F 75/62°F 55/54OF 56154OF Outside Air 0 cfm Cooling Coil Supply Fan 57 / 55 OF 2.000 cfm 47.1 R00 75 / 62 OF 75,162 °F WEI HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name MacDonald Residence Date 12/20/2018 System Name HVAC-Casita Floor Area 1,088 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 765 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating S tem Sensible I Latent CFM Sensible Output perSystem 89,000 14,890 1,801 403 15,467 Total Output Btuh 89,000 0 Output Btuh/s ft 81.8 702 590 Cooling System 0 0 Output per System 46,500 0 0 0 0 Total Output Btuh 46,500 2,943 1,801 -2.943 Total Output (Tons) 3•9 702 590 Total Output (Btuh/sgft) 42.7 Total Output s ft/Ton 280.8 1 19,236 13,704 Air System CFM perSystem 2,000 HVAC EQUIPMENT SELECTION Airflow cfm 2,000 Carrier 24ACP748/58PH**l 10 32,759 6,515 89,000 Airflow (cfm/sgft) 1.84 Airflow cfmrron 516.1 Outside Air (%) 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 32,759 6,515 89,000 Jan 1 AM Outside Air cfm/sqft) 0.00 Note: values above given at ARI conditions Aug 3 PM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 70 OF 105 T 106 OF M a.,- ■ U jH Outside Air __H I Ar 0 cfm Heating Coil Supply Fan 106 a F 2,000 cfm ROOM R 70 OF 70 OF I COOLING SYSTEM PSYCHROMETRICS (Airstream Temneratures at Time of Cooling Peak1 112 / 78 OF 75 / 62 OF 75/62OF 55/54OF 56/54OF 10- a 10 0 rl Cooling Coil Supply Fan 2,000 cfm HT-1 1 11 47.2 % : ROOM 57/55OF 11�. 75 ,162 OF HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date I MacDonald Residence 1 12/20/2018 System Name HVAC 2nd casita Floor Area 1,022 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 701 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 12,000 14,920 1,692 348 12,970 Total Output (Btuh) 12,000 0 Output Btuh/s ft 11.7 0 0 Cooling System 0 0 Output per System 12,200 0 0 0 0 Total Output (Btuh) 12,200 0 1,692 0 Total Output (Tons) 1.0 0 0 Total Output (Btuh/sqft) 11.9 Total Output (s ftrron) 1,005.2 1 14,920 12,970 Air System CFM per System 640 HVAC EQUIPMENT SELECTION Airflow cfm 640 FUJITSU Ductless Split 7,653 2,739 7,495 Airflow (cfm/s ft) 0.63 Airflow (cfm/Ton) 629.5 Outside Air (%) 0•0 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 7,653 2,739 7,495 Aug 3 PM Jan 1 AM Outside Air cfm/sgft) 1 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 70 OF Outside Air 0 cfm Supply Fan 640 cfm 70 OF 70 OF 105 "F Heating Coil 105 OF ROOM 70 °F LL L I f COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak 112178 °F 75 / 62 OF 75 / 62 OF 55154 OF Outside Air 0 cfm Supply Fan Cooling Coil 55 / 54 OF 640 cfm 49.4 % R60M 75/62OF 75/62OF HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date MacDonald Residence 12/20/2018 System Name HVAC-Garage Floor Area 1,145 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,073 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible I Latent CFM Sensible Output per System 12,000 22,828 1,895 772 28,738 Total Output Btuh 12,000 0 Output Btuh/s ft 10.5 0 0 Cooling System 0 0 Output per System 12,200 0 0 0 0 Total Output (Btuh) 12,200 1.895I 0 Total Output (Tons) 1.0 0 � 0 Total Output (Btuh/s ft) 10.7 Total Output (s ft/Ton 1,126.2 22,828 28,738 Air System CFM per System 640 HVAC EQUIPMENT SELECTION Airflow (cfm) 640 FUJITSU Ductless Split 7,605 2,805 7,495 Airflow cfm/s ft 0.56 Airflow (cfm/Ton) 629.5 Outside Air (%) 0•0 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 7,605 2,805 1 7,495 Aug 3 PMJ Jan 1 AM Outside Air (cfm/s ft) 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 26 OF 70 OF 70 OF 105 OF Outside Air 0 cfm Supply Fan Heating Coil 105 OF 640 cfm ROOM 70 OF _L 70 OF CCC777 Tr { COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112 / 78 OF 75 / 62 OF 75 / 62 OF 55 / 54 OF TTI Outside Air1 0 cfm Supply Fan Cooling Coil 55 / 54 OF 640 cfm 49.8 I- % I ROOM I 75 / 62 OF 75,162 OF ZONE LOAD SUMMARY Project Name MacDonald Residence Date 1212012018 System Name H VA C-Master Floor Area 1,980 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OA CFM Peak Hr CFM Sensible I Latent CFM Sensible Small Master Suite 1.0 0 Aug 3 PM 368 7,088 1,043 237 9,046 Master Suite 1.0 0 Aug 3 PM 845 16,278 Z235 448 17,121 TOTALS 0 0 0 0 Aug 3 PM 23,366 3,278 26,167 (BLOCK LOAD ZONE LOAD SUMMARY Project Name Elate MacDonald Residence 1212012018 System Name Floor Area HVAC-Lounge-Game Room -Office 1,279 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Healing OA CFM Peak Hr "FMSensible Latent CFM Sensible Lounge -Game Room -Office 1.0 0 Aug 3 PM 20,6571 2,117 533 19,510 TOTALS 0 0 0 0 Aug 3 PM 20,657 2,117 19,510 (BLOCK LOAD) ZONE LOAD SUMMARY Project Name MacDonald Residence Date 12/20/2018 System Name HVAC-Great Room -Dining Floor Area 1.408 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OA CFM Peak Hr CFM Sensible Latent CFM Sensible Great Room -Dining 1.0 0 Aug 3 PM 1,3891 26,655 Z331 616 23,558 TOTALS 0 0 0 0 Aug 3 PM 26.655 2,331 23,558 (BLOCK LOAD) ZONE LOAD SUMMARY Project Name MacDonald Residence Date 1212012018 System Name HVAC-Morning Room -Office -Hall -Laundry Floor Area 1,037 ZONE LOAD SUMMARY - ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OA CFM Peak Hr CFM I Sensible Latent CFM I Sensible Moming Room -Office -Hall -Laundry 1.0 0 Aug 3 PM 960 18,595 1.717 519 19,913 TOTALSI 0 0 0 0 Aug 3 PM 18,595 1,7171 19,913 (BLOCK LOAD) ZONE LOAD SUMMARY Project Name bate MacDonald Residence 1212012018 System Name Floor Area HVAC-Casita 1,088 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heatin OA CFM Peak Hr CFM Sensible Latent CFM Sensible Casita 1.0 0 Aug 3 PM 765 14,890 1,801 403 15,467 TOTALS 0 0 0 0 Aug 3 PM 14,890 1,801 15,467 (BLOCK LOAD) ZONE LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 System Name Floor Area HVAC 2nd casita 1,022 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OA CFM Peak Hr CFM Sensible I Latent CFM Sensible Casita 2nd Floor 2.0 0 Aug 3 PM 701 14,9201 1,692 348 12, 970 TOTALS 0 0 0 0 Aug 3 PM 14,920 1,692 12,970 (BLOCK LOAD) ZONE LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 System Name Floor Area HVAC-Garage 1,145 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heatinq OA CFM Peak Hr CFM Sensible Latent CFM Sensible Garage 1.0 0 Aug 3 PM 1,073 22,828 1,895 772 28,738 TOTALS 0 0 0 0 Aug 3 PM 22,828 1,895 28,738 BLOCK LOAD) ROOM LOAD -SUMMARY Project Name Date MacDonald Residence 1212012018 System Name Floor Area HVAC-Master 1,980 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult. CFM Sensible Latent CFM I Sensible Latent CFM Sensible Small Master Suite Small Master Suite 1 368 7,088 1,043 368 7,088 1,043 237 9,046 Master Suite Master 1 8451 16,278 2,2351 8451 16,278 2,235 448 17,121 PAGE TOTAL TOTAL# . Total includes ventilation load for zonal 1,2131 23,366 3,27,91 665 26,167 1,213 23,366 3,2781 665 26,167 ROOM LOAD SUMMARY Date MacDonald Residence 1212012018 System Name Floor Area HVAC-Lounge-Game Room -Office 1,279 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name I Mult. CFM I Sensible Latent CFM Sensible j Latent CFM I Sensible Lounge -Game Room-OffrceLounge-Game Room-Offi 1 1 1,0091 20,657 2,1171 1,0091 20,6571 Z117 5331 19,510 PAGE TOTAL TOTAL* Total includes ventilation bad for zonal 1,009 20,6571 2,117 533 19,510 1,009 20,657 2,117 533 19,510 ROOM LOAD SUMMARY Project Name MacDonald Residence Date 1212012018 System Name HVAC-Great Room -Dining Floor Area 1,408 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult. CFM Sensible Latent CFM Sensible Latent CFM Sensible Great Room -Dining Great Room -Dining 1 1,389 26,655 Z331 1,389 26,655 Z331 616 23,558 Total includes ventilation load for zonal systems. PAGE TOTAL TOTAL * 1, 389 i,389 26,655 2, 331 26,655 Z331 616 23.555 616 23,558 ROOM LOAD SUMMARY Project Name MacDonald Residence Date 1212012018 System Name HVAC-Morning Room -Office -Hall -Laundry Floor Area 1,037 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult. CFM Sensible Latent CFM Sensible Latent CFM Sensible Morning Room-Office-Halk Morning Room -Office -Hai 1 960 18,595 1,717 960 18,595 1,717 519 19,913 PAGE TOTAL 960 18,595 1,717 519 19.913 TOTAL * 960 18,51951 1.717 519 19,913 ' Total includes ventilalion load for zonal systems. ROOM LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 System Name Floor Area HVAC-Casita 1, 088 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult, I CFM I Sensible I Latent I CFM I Sensible I Latent CFM I Sensible Casita I Casita I 1 1 7651 14,8901 1,8011 7651 14,8901 1,801 4031 15,467 PAGE TOTAL TOTAL* * Total includes ventilation load for zonal 765 14,890 1,801 403 15,467 765 14,8901 1,8011 403 15,467 ROOM LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 System Name Floor Area HVAC 2nd casita 1,022 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING;PEAK COIL HTG. PEAK Zone Name Room Name Mult. CFM Sensible Latent CFM Sensiblent CFM Sensible Casita 2nd Floor Casita 2nd Floor 2 701 14,920 1,692 701 14,92092 3481 12,970 PAGE TOTAL TOTAL* Total includes ventilation load for zonal 701 14,920 1,692 348 12,970 701 14,920 1.692 348 IZ970 ROOM LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 System Name Floor Area HVAC-Garage 1,145 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name I Room Name I Mult. I CFM Sensible I Latent CFM I Sensible Latent CFM I Sensible Garage I Garage I 1 1 1,0731 22,8281 1,8951 1,0731 22,8281 1, 895 7721 28, 738 PAGE TOTAL TOTAL* . Total includes ventilation load for zonal 1,073 2Z828 1,895 772 28,738 1,0731 22,8281 1, 895 772 28,736 ROOM HEATING PEAK LOADS Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Small Master Suite Floor Area 630.00 ft2 Indoor Dry Bulb Temperature 70 OF Time of Peak Jan 1 AM Outdoor Dry Bulb Temperature 26 OF Conduction Area X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X to Ceiling U-Value X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X AT *F = = = = = = = = = = = = = = = = = = = = = = = = = = 44 Btu/hr R-38 Roof Attic R19 High Performance 630.0 0.0174 44 482 R-21 Wall 338.9 0.0690 44 1,029 Patio Door .411,21 102.0 0.4100 44 1,640 .301.17 Window 43.1 0.3000 44 569 Slab -On -Grade pedrn = 94.0 0.7300 44 3.019 "R-13 Wall 200.0 0.1020 0 0 Items shown with an asterisk (") denote conduction Infiltration:[ i.00 X 1.064 Schedule Air Sensible Fraction through an interior surface X 630 X Area another room 10.30 X 0.416 Height AGM Page Total / 60 ] X AT 6,940 = 2,106 TOTAL HOURLY HEAT LOSS FOR ROOM 9,046 ROOM HEATING PEAK LOADS Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Master Floor Area 1,350.00 ft2 Indoor Dry Bulb Temperature 70 OF Time of Peak Jan 1 AM Outdoor Dry Bulb Temperature 26 OF Conduction Area X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X to Ceiling U-Value X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X AT OF = = = = = = = = = = = = = = = = = = = = = = = = = = 44 Btu/hr R-38 RoofAtfic R19 High Perfammance 1,350.0 0.0174 44 1,034 R-21 Wall 1,225.4 0.0690 44 3,720 Patio Door .401.21 137.0 0.4000 44 2, 411 .30% 17 Window 183.6 0.3000 44 2,424 slab -On -Grade perim = 94.0 0.7300 44 3,019 'R-13 Wall 700.0 0.1020 0 0 Items shown with an asterisk (') denote conduction Infiltration:[ 1.00 X 1.064 Schedule Air Sensible Fraction through an interior surface X 1,350 X Area another room 9.10 X 0.471 Height ACH Page Total / 60 ] X AT 12,608 = 4,513 TOTAL HOURLY HEAT LOSS FOR ROOM 17.121 ROOM HEATING PEAK LOADS Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Lounge -Game Room -Office Time of Peak Jan 1 AM Floor Area 1,279.00 ft2 Outdoor Dry Bulb Temperature 26 OF Indoor Dry Bulb Temperature 70 °F Conduction R-38 Roof Attic R19 High Performance R-21 Wall .301.17 Window Patio Door .401.21 Patio Door .411..21 Slab -On -Grade "R-13 Wall Area 1,279.0 691.4 139.6 316.0 96.0 perim = 94.0 1,000.0 U-Value AT °F Btu/hr 979 2, 099 1,843 5,562 1,732 3,019 0 Items shown with an asterisk (') denote conduction through an interior surface to another room Page Total 15,234 Infiltration:[ 1.00 X 1.064 X 1,279 X 9.80 X 0.43T / 60 ] X 44 = 4,276 Schedule Air Sensible Area Ceiling Heigh[ ACM AT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 19,510 ROOM HEATING PEAK LOADS Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Great Room -Dining Time of Peak Jan 1 AM Floor Area 1,408.00 ftz Outdoor Dry Bulb Temperature 26 OF Indoor Dry Bulb Temperature 70 OF Conduction R-38 Roof Attic R19 High Performance R-21 Wall .30% 17 Window Patio Door .401.21 Slab -On -Grade Area U-Value AT °F Btu/hr 1,078 2, 653 3,300 8,800 3,019 Items shown with an asterisk (*) denote conduction through an interior surface to another room Page Total 18,851 Infiltration:[ i.00 X 1.064 X 1,408 X 13.70 X 0.313 / 60 ] X 44 = 4,707 Schedule Air Sensible Area Ceiling Height ACH AT Fraction., TOTAL HOURLY HEAT LOSS FOR ROOM 23.558 ROOM HEATING PEAK LOADS Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Morning Room -Office -Hall -Laundry Time of Peak Jan 1 AM Floor Area 1,037.00 ft2 Outdoor Dry Bulb Temperature 26 OF Indoor Dry Bulb Temperature 70 OF Conduction R-38 Roof Attic R19 High Performance R-21 Wall .301.17 Window Wood Door Patio Door .41121 Patio Door .401.21 Slab -On -Grade "R-13 Wall Area U-Value AT °F Btu/hr 794 3,623 3,106 475 1,930 3,499 3,019 0 Items shown with an asterisk (') denote conduction through an interior surface to another room Page Total 16,447 Infiltration•[ 1.00 X 1.064 X 1,037 X 12.80 X 0.335 / 60 ] X 44 = 3,467 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 19,913 ROOM HEATING PEAK LOADS Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Casita Time of Peak Jan 1 AM Floor Area 1,088.00 ft2 Outdoor Dry Bulb Temperature 26 OF Indoor Dry Bulb Temperature 70 OF Conduction Area U-Value R-38 Roof Attic R19 High Performance 577.0 X 0.0174 X 44 = R-21 Wall 1,271.0 X 0.0690 X 44 c - .301.17Window 145.5 X 0.3000 X 44 c Patio Door .41121 143.5 X 0.4100 X 44 Slab -On -Grade perim = 94.0 X 0.7300 X 44 *R-13 Wall 1,011.0 X 0.1020 X 0 X X = X X X X = X X X X = X X = X X = X X = X X X X X X = X X = X X = X X = X X = X X = X X = X X = x x = x x = x x = x x = x x x x = x x = Items shown with an asterisk (*) denote conduction through an interior surface to another room Page Total Infiltration:[ 1.00 X 1.064 X 1,088 X 8.00 X 0.535 / 60 ] X a4 Schedule Air Sensible Area Ceiling Height ACH AT Fraction, AT °F Btu/hr 442 3,859 1,921 2,589 3,019 0 11,829 J 3,6371 TOTAL HOURLY HEAT LOSS FOR ROOM_ 15.4671 ROOM HEATING PEAK LOADS Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Casita 2nd Floor Time of Peak Jan 1 AM Floor Area 511.00 ftZ Outdoor Dry Bulb Temperature Indoor Dry Bulb Temperature 70 OF Conduction R-38 Roof Attic R19 High Performance R-21 Wall .301.17 Window *R-13 Wall Area U-Value AT OF Btu/hr X 44 = 391 X 44 = 2,160 X 44 c 2,226 X 0 = 0 X = X = X = X = X = X = X = X X = X = X = X = X = X = X X = X = X X = X = X X X = X = X X X = Items shown with an asterisk (*) denote conduction through an interior surface to another room Page Total 4,777 Infiltration-[ 1.00 X 1.064 X 511 X 8.00 X 0.535 / 60 J X 44 = 1,708 Schedule Air Sensible Area Ceiling Height ACH AT Fraction-. TOTAL HOURLY HEAT LOSS FOR ROOM 6.485 ROOK! HEATING PEAK LOADS Project Name MacDonald Residence Date 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Garage Floor Area 1,145.00 ft2 Indoor Dry Bulb Temperature 70 °F Time of Peak Jan 1 AM Outdoor Dry Bulb Temperature 26 OF Conduction Area R-38 Roof Attic R19 High Performance 1,145.0 R-21 Wall 1,385.3 .301.17 Window 190.7 Insulated Garage Door 224.0 Slab -On -Grade perim = 94.0 'R-13 Wall 100.0 Items shown with an asterisk () denote conduction through an interior surface Infiltration:[ 1.00 X 1.064 X 1,145 X Schedule Air Sensible Area Fraction X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X to Ceiling 0-Value X X X X X X X X X X X X X X X X X X X X X X X X X x X X X X X AT °F = = = = = = = = = = = = = = = = = = = = = _ = = = 44 Btu/hr 0.0174 44 877 0.0690 44 4,206 0.3000 44 2,517 1.4500 44 14,291 0.7300 44 3,019 0.1020 0 0 another room 8.00 X 0.535 Height ACH Page Total / 60 ] X AT 24,910 = 3,828 TOTAL HOURLY HEAT LOSS FOR ROOM 28,738 RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Small Master Suite Outdoor Dry Bulb Temperature 112 OF Floor Area 630.00 ft2 Outdoor Wet Bulb Temperature 78 OF Indoor Dry Bulb Temperature 75 °F Outdoor Daily Ranqe: 34 OF Opaque Surfaces R-38 Roof Attic R19 High Performa R-21 Wall R-21 Wall R-21 Wall *R-13 Wall I Orientation Area X X X X X X X X X U-Factor X X X X X X X X X CLTD' = = = = = = = = = 630.0 0.0174 56.0 52.0 0.0690 25.7 50.9 0.0690 28.2 236.0 0.0690 31.8 200.0 0.1020 0.0 Page Total Items shown with an asterisk (*) denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Fenestration D08 W04 W05 Orientation (N) (S) (W) Shaded Unshaded Btu/hr 614 1 1,3231 Area X X X X X X X X GLF + + + + + + + + + Area X X X X X X X X GLF = = = = - = = - 0.0x 16.0 102.0X 19.0= 0.0 12.3 37.1 14.1 0.0 12.3 6.0 20.3 Page Total Internal Gain Btu/hr Occupants 1.9 Occupants X 245 Btuh/occ. _ Equipment 630 Floor Area X 0.50 w/sgft Infiltration: 1.064 X 1.44 X 28.98 X 37 =IJ Air Sensible CFM ELA AT ITOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 7.088 Latent Gain Btu/hr Occupants 1.8 Occupants X 155 Btuh/occ. = C Infiltration: 4,771 X 1.44 X 28.98 x 0.00376 = Air Latent CFM ELA AW I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 90.-41 RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date MacDonald Residence 1 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Master Outdoor Dry Bulb Temperature 112 OF Floor Area 1,350.00 ft2 Outdoor Wet Bulb Temperature 78 OF Indoor Dry Bulb Temperature 75 OF I Outdoor Daily Range: 34 OF Opaque Surfaces Orientation Area U-Factor CLTD' Btu/hr R-38 Roof Attic R19 High Periorma (N) 1,350.0 X 0.0174 X 56.0 = 1,316 R-21 Wall (N) 154.0 X 0.0690 X 25.7 = 273 R-21 Wall (E) 88.0 X 0.0690 X 32.1 = 195 R-21 Wall (S) 246.6 X 0.0690 X 28.2 = 480 R-21 Wall (W) 736.8 X 0.0690 X 31.8 = 1,615 "R-13 Wall 700.0 X 0.1020 X 0.0 = 0 X X = X X = X X = Page Total 3,879 Items shown with an asterisk (") denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Shaded Unshaded Fenestration Orientation Area GLF Area GLF Btu/hr Di0 (S) 137.0 X 15.8 + 0.0 X 18.0 = 2,164 W08 (S) 0.0 X 12.3 + 51.4 X 14.1 = 723 W06 (W) 0.0 X 12.3 + 21.2 X 20.3 = 431 W07 (W) 0.0 X 12.3 + 51.4 X 20.3 = 1,046 W09 (W) 0.0 X 12.3 + 29.8 X 20.3 = 606 W10 (W) 0.0 X 12.3 + 29.8 X 20.3 = 606 X + X = X + X = X + X = Page Total 5,57 Internal Gain Btu/hr Occupants 41 Occupants X 245 Btuh/occ. = 993 Equipment 1,350 Floor Area X 0.50 w/sgft = 2,3N Infiltration: 1.064 X 1.44 X 62.09 X s7 = 3,526 Air Sensible CFM ELA AT TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 16,278 Latent Gain Btu/hr Occupants 41 Occupants X 155 Btuh/occ. = 628 Infiltration: 4,771 X 1.44 X 62.09 X 0.00376 = 1,606 Air Latent CFM ELA AW TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 628 RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS LRoomme Lounge -Game Room -Office Outdoor Dry Bulb Temperature 112 °F a 1,279.00 ft2 Outdoor Wet Bulb Temperature 78 °F y Bulb Temperature 75 °F Outdoor Daily Ranee: 34 OF Opaque Surfaces R-38 Roof Attic R19 High Performs R-21 Wall R-21 Wall R-21 Wall R-21 Wall "R-13 Wall Orientation (N) (E) (S) (W) Area X X X X X X X X X U-Factor X X X X X X X X X CLTD' = = = = = = = = = 1,279.0 0.0174 56.0 256.4 0.0690 25.7 327.0 0.0690 32.1 31.0 0.0690 28.2 77.0 0.0690 31.8 1,000.0 0.1020 0.0 Page Total Items shown with an asterisk (`) denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Fenestration W01 W02 W03 W18A D06 D07 D11 Orientation (N) (N) (N) (N) (E) (E) (S) Shaded Unshaded Area X X X X X X X X GLF + + + + + + + + Area X X X X X X X X GLF = = = = = = = = 0.0 12.3 19.1 14.7 0.0 12.3 19.1 14.7 0.0 12.3 19.1 14.7 0.0 12.3 82.3 14.7 0.0X 15.8+ 160.0X 27.3= 0.0 16.0 96.0 27.5 156.0 15.8 0.0 18.0 Page Total Btu/hr 1, 246 2, 6541 Btu/hr 281 281 281 1,213 4,374 2, 644 2, 464 11 Internal Gain Btu/hr Occupants 3.8 Occupants X 245 Btuh/occ. = 941 Equipment 1,279 Floor Area X 0.50 w/sgft = 2,183 Infiltration: 1.064 X 1.44 X 58.82 X 37 = 3,341 AirSenslble CFM ELA AT I TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 2n 8�7 Latent Gain Btu/hr occupants 3 8 Occupants X 155� Btuh/occ. = 5.9 Infiltration: 4,771 X 1.44 X 58.82 X 0.00376 = 1,522 Air Latent CFM FI.A pW I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM ;;+as RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Great Room -Dining Outdoor Dry Bulb Temperature 112 OF Floor Area 1,408.00 ft2 Outdoor Wet Bulb Temperature 78 OF Indoor Dry Bulb Temperature 75 OF I Outdoor DaiIV Ranee: 34 OF Opaque Surfaces R-38 Roof Attic R19 Nigh Performa R-21 Wall R-21 Wall R-21 Wall I Orientation (N) (N) (S) (W) Area X X X X X X X X X U-Factor X X X X X X X X X CLTD' = = = = = = = = = 1,408.0 0.0174 77.0 520.0 0.0690 32.3 112.0 0.0690 44.2 242.0 0.0690 51.9 Page Total Items shown with an asterisk (") denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Fenestration D01 D02 D03 D04 D05 D12 D17 Orientation (N) (N) (N) (N) (N) (S) (►M Shaded Unshaded Btu/hr 1,887 1,160 342 867 1 4,2561 Area X X X X X X X X GLF + + + + + + + + + Area X X X X X X X X GLF = = = = = = = = 0.0x 14.4 50.0X 17.2= 0.0 14.4 50.0 17.2 0.0 14.4 50.0 17.2 0.0 14.4 50.0 17.2 0.0 14.4 50.0 17.2 378.0 18.4 0.0 28.5 53.0 18.4 69.0 44.2 Page Total Btu/hr 861 861 861 861 861 6,9511 Internal Gain Btu/hr Occupants 4 2 Occupants X 245 Btuh/occ. = 1't Equipment 1,408 Floor Area X 0.50 w/sgft = 2, Infiltration: 1.064 X 1.44 X 64.76 X 37 = C Air Sensible CFM ELA AT I TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 26,655 Latent Gain Btu/hr Occupants 4•2 Occupants X 155 Btuh/occ. = C Infiltration:, 4, 771 X 1.44 X 64.76 X 0.00376 = 1.6 Air Latent CFM ELA ❑W I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 6551 RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Morning Room -Office -Hall -Laundry Outdoor Dry Bulb Temperature 112 or Floor Area 1,037.00 ft2 Outdoor Wet Bulb Temperature 78 OF Indoor Dry Bulb Temperature 75 OF1 Outdoor Dailv Ranae: 34 OF Opaque Surfaces R-38 Roof Attic R19 High Performa R-21 Wall R-21 Wall Wood Door I R-21 Wall R-21 Wall *R-13 Wall Orientation (N) (E) (E) (S) (M Area X X X X X X X X X U-Factor X X X X X X X X X CLTD' = = = = = = = = = 1,037.0 0.0174 56.0 151.0 0.0690 25.7 571.6 0.0690 32.1 21.6 0.5000 32.1 179.7 0.0690 28.2 291.0 0.0690 31.8 1,000.0 0.1020 0.0 Page Total Items shown with an asterisk (*) denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Fenestration D16 W17 W14 W12 D15 D13 W13 W18 Orientation (N) (N) (E) (E) (E) (S) (S) (W) Shaded Unshaded Area X X X X X X X X GLF + + + + + + + + + Area X X X X X X X X X GLF = - = = = = = 0.0 12.3 24.0 14.7 0.0x 12.3 45.0 14.7- 0.0 12.3 61.0 21.7 0.0 12.3 42.8 21.7 70.5 16.0 36.5 27.5 198.8 15.8 0.0 18.0 41.5 12.3 0.0 14.1 0.0 12.3 21.0 Page Total Btu/hr 1, 011 1,266 347 9 Btu/hr 9,4 Internal Gain l Btu/hr Occupants 3 1 + Occupants X 245 Btuh/occ. _ Equipment 1,037 Floor Area X 0.50 w/sgft = 1• Infiltration: 1.064 X 1.44 X 47.69 X Air 5ensibte CFM ELA AT I TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 1R A0RN Latent Gain Btu/hr Occupants 3.1 Occupants X 155 Btuh/occ. = 483 Infiltration:, 4,771 X 1.44 X 47.69 X 0.00376 m 1,234 Air Latent CFM I;LA OW I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4R� RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Casita IOutdoor Dry Bulb Temperature 112 OF Floor Area 1,088.00 ft2 Outdoor Wet Bulb Temperature 78 OF Indoor Dry Bulb Temperature 75 of Outdoor Daly Rancie: 34 OF -Opaque Surfaces R-38 Roof Attic R19 High Performa R-21 Wall R-21 Wall R-21 Wall II R-21 Wall I *R-13 Wall I Orientation (N) (E) (S) (W) Area X X X X X X X X X U-Factor X X X X X X X X X CLTD' = = = = = = = = = 577.0 0.0174 56.0 266.0 0.0690 25.7 435.5 0.0690 32.1 289.0 0.0690 28.2 280.5 0.0690 31.8 1,011.0 0.1020 0.0 Page Total Items shown with an asterisk (*) denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Fenestration W21 W20 W19 W27 W26 W25 W24 W23A D20 Orientation (N) (N) (N) (E) (E) (E) (E) (S) (S) Shaded Unshaded Area X X X X X X X X X GLF + + + + + + + + + Area X X X X X X X X X GLF = - = = = = = = = 0.0 12.3 18.0 14.7 0.0 12.3 18.0 14.7 0.0 12.3 18.0 14.7 0.0 12.3 5.0 21.7 0.0 12.3 9.5 21.7 0.0 12.3 5.0 21.7 0.0 12.3 5.0 21.7 0.01 12.3 7.0 14.1 0.0 12.3 24.0 14.1 Page Total Btu/hr 562 61 3,1 Btu/hr 1, Internal Gain Btu/hr Occupants 3 3 Occupants X 245 Btuh/occ. _ Equipment 1,088 Floor Area X 0.50 w/sgft Infiltration: Sensible X 1.44 X 50.04 X 3T = Air Sensible CFM ELA AT ,. 98 TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 14 Stan Latent Gain Btu/hr Occupants 3 3 Occupants X 155 Btuh/occ. = 508 Infiltration:, 4,771 X 1.44 X 50.04 X 0.00376 = 1,295 Air Latent CFM ELR OW TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 5ns RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Casita IOutdoor Dry Bulb Temperature 112 OF Floor Area 1,088.00 ft2 Outdoor Wet Bulb Temperature 78 OF Indoor Dry Bulb Temperature 75 °F Outdoor Daiiv Ranae: 34 OF Surfaces Orientation Area X X X X X X X X X U-Factor X X X X X X X X X CLTD' = = = = = = = = = Page Total Items shown with an asterisk (") denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Fenestration D19 W22 W23 Orientation Shaded Unshaded Btu/hr Area X X X X X X X X X GLF + + + + + + + + + Area X X X X X X X X X GLF = = = = = = = = = Btu/hr 0.0 16.0 143.5 25.9 3,720 0.0 12.3 18.0 20.3 366 0.0 12.3 18.0 20.3 366 Page Total 4,452 Internal Gain Btu/hr Occupants 3 3 Occupants X 245 Btuh/occ. Equipment 1,088 Floor Area X 0.50 w/sgft Infiltration: 1.064 X 1.44 X 50.04 X 37 = C Air Sensible CFM ELA AT TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 14,890 Latent Gain Btu/hr Occupants 3 3 Occupants X 155 Btuh/occ. _ Infiltration: 4,771 x 1.44 X � 50.04 X 0.00376 = 7,2 Air Latent CFM ELA ❑W I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 506 RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Casita 2nd Floor Outdoor Dry Bulb Temperature 112 OF Floor Area 511.00 ft2 Outdoor Wet Bulb Temperature 78 OF Indoor Dry Bulb Temperature 75 °F Outdoor Daily Range: 34 OF Opaque Surfaces R-38 Roof Attic R19 High Performa R-21 Wall R-21 Wall R-21 Wall R-21 Wall "R-13 Wall Orientation (N) (E) (S) Area X X X X X X X X X U-Factor X X X X X X X X X CLTD' = = = = = = = = = 511.0 0.0174 56.0 189.6 0.0690 25.7 197.6 0.0690 32.1 183.2 0.0690 28.2 141.0 0.0690 31.8 511.0 0.1020 0.6 Page Total Items shown with an asterisk (`) denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Fenestration W32 W31 W30 W32 W33 W30 W30 W29 W28 Orientation (N) (N) (N) (E) (E) (E) (S) (S) (IM Shaded Unshaded Area X X X X X X X X GLF + + + + + + + + Area X X X X X X X X GLF - = = = = = = = 0.0 12.3 8.8 14.7 0.0 12.3 8.8 14.7 0.0 12.3 8.8 14.7 0.0 12.3 8.8 21.7 0.0 12.3 8.6 21.7 0.0 12.3 8.8 21.7 0.0 12.3 8.8 14.1 0.0 12.3 24.0 14.1 10.3X 12.3+ 29.7X 20.3= Page Total Btu/hr 1 Btu/hr 130 130 130 191 191 191 124 338 731 2,154 Internal Gain Btu/hr Occupants 1.5 Occupants X 245 Btuh/occ. _ Equipment 511 Floor Area X 0.50 w/sgft = Infiltration: 1.064 X 1.44 X 23.50 X Air Sensible CFM ELA AT I TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 7.460 Latent Gain Btu/hr Occupants 15 Occupants X 155 Btuh/occ. = 238 Infiltration: 4, 771 Air LateX 1.44 X 23.50 X 0.00376 � 608 nt CFiN ELA AW I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM ��t3 RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION I DESIGN CONDITIONS Room Name Casita 2nd Floor Outdoor Dry Bulb Temperature 112 OF Floor Area 511.00 ft2 Outdoor Wet Bulb Temperature 78 OF Indoor Dry Bulb Temperature 75 °F Outdoor Dailv Ranne: 34 OF Surfaces Orientation Area X X X X X X X X X U-Factor X X X X X X X X X CLTD' = = = = = = = = = Page Total Items shown with an asterisk (*) denote conduction through an interior surface to another room- 1 . Cooling Load Temperature Difference (CLTD) Fenestration D27 Orientation (W) Shaded Unshaded Area GLF Area GLF 11.0 X 12.3 + 32.0 X 20.3 = X + X = X + X = X + X = X + X X + X = X + X = X + X = X + X = Page Total Btu/hr Btu/hr 786 Internal Gain Btu/hr Occupants 1.5 Occupants X 245 Btuh/occ. _ Equipment 511 Floor Area X 0.50 w/sgft = 2 Infiltration: 1.064 X 1.44 X 23.50 X 37 = Air Sensible CFM ELA AT I TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 7.460 Latent Gain Btu/hr Occupants 15 Occupants X 155 Btuh/occ. = 2 Infiltration: 4,771 X 1.44 X 23.50 X 0.00376 = 6 Air Latent CFM ELA IVV I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 238 RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date MacDonald Residence 1212012018 ROOM INFORMATION DESIGN CONDITIONS Room Name Garage Outdoor Dry Bulb Temperature 112 OF Floor Area 1,145.00 ft2 Outdoor Wet Bulb Temperature 78 OF Indoor Dry Bulb Temperature 75 OF Outdoor Daily Ranqe: 34 OF Opaque Surfaces R-38 Roof Attic R19 High Periorma R-21 Wall R-21 Warr R-21 Wall I R-21 Wall I Insulated Garage Door -R-13 Wall Orientation (N) (N) (E) (S) Area X X X X X X X X X U-Factor X X X X X X X X X CLTD' = = = = = = = = = 1,145.0 0.0174 56.0 323.8 0.0690 25.7 474.5 0.0690 32.1 311.0 0.0690 28.2 276.0 0.0690 31.8 224.0 1.4500 31.8 100.0 0.1020 0.0 Page Total Items shown with an asterisk (*) denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Fenestration W36 W37 W38 W39 W40 W41 W42 W43 W44 Orientation (N) (N) (N) (N) (N) (N) (E) (E) (E) Shaded Unshaded Area X X X X X X X X X GLF + + + + + + + + + Area X X X X X X X X X GLF = = = = - = = = 0.0 12.3 15.8 14.7 0.0 12.3 15.8 14.7 0.0 12.3 15.8 14.7 0.0 12.3 9.6 14.7 0.0 12.3 9.6 14.7 0.0 12.3 9.6 14.7 0.0 12.3 5.1 21.7 0.0 12.3 5.1 21.7 0.0 12.3 5.1 Page Total Btu/hr 7.116 Btu/hr 233 233 233 141 141 141 110 110 Internal Gain Btu/hr Occupants 3 4 Occupants X 245 Btuh/occ. Equipment 1,145 Floor Area X 0.50 w/sgft Infiltration: 1.064 X 1.44 X 52.66 X 37 = 2,991 Air Sensible CFM ELA AT I TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 22,8281 Latent Gain Btulhr Occupants 3 4 Occupants X 1551 Btuh/occ. = Infiltration: 4,771 X 1.44 X 52.66 X 0.00376 = I Air Latent CFM ELA AW I TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 5331 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1Fk-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 1 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribdl6x GENERAL INFORMATION 01 Project Nanne lot 151 and 152 02 Calculation Description Title 24 Analysis 03 Project Location 80-875 Via Portofino 04 City La Quinta 05 Standards Version Compliance 2017 06 Zip Code 92253 07 Compliance Manager Version BEMCmpMgr 2016.3.1 (1149) - 08 Climate Zone CZ15 09 Software Version EnergyPro 7.2 10 Building Type Single Family 11 Front Orientation (deg/Cardinal) 20 12 Project Scope Newly Constructed 13 Number of Dwelling Units 1 14 Total Cond. Floor Area (ftZ) 8959 15 Number of Zones 8 16 Slab Area (ftZ) 7937 17 Number of Stories 2 18 Addition Cond. Floor Area(ftZ) n/a 19 Natural Gas Available Yes 20 Addition Slab Area (ftZ) n/a 21 Glazing Percentage (%) 33.0% COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building incorporates features that require field testing andlor verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 This building incorporates one or more Special Features shown below 04 Energy Use (kTDV/ftZ-yr) Space Heating Space Cooling IAQ Ventilation REVIEWED FOR CODE COMPLIANCE DATE 3� BY ENERGY USE SUMMARY 05 06 Standard Design Proposed Design 3.53 7.64 80.83 74.17 0.69 0.69 1.83 4.25 ---- 0.00 86.88 86.75 Registration iVUrii�er; 2�g.pplppp 3Gp�fb tl{�p� � Registration Date/Time: g 2018-12-20 11:00:19 CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 07 08 Compliance Margin Percent Improvement -4.11 -116.4% 6.66 8.2% 0.00 0.0% -2.42 -132.2% 0.00 0.13 - MA,� 15 2019 CITY OF LA QUINTA COMMUNITY DEVELOPMENT HERS Provider: CaICERTS Report Generated at: 2018-12-20 09:54:13 Al� CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1k-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 2 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x ENERGY DESIGN RATING Energy Design Rating (EDR) is an alternate way to express the energy performance of a building using a scoring system where 100 represents the energy performance of the Residential Energy Services (RESNET) reference home characterization of the 2006 International Energy Conservation Code (IECC) with California modeling assumptions. A score of zero represents the energy performance of a building that combines high levels of energy efficiency with renewable generation to"zero out' its TDV energy. Because EDR includes consideration of components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics), it is not used to show compliance with Part 6 but may instead be used by local jurisdictions pursuing local ordinances under Title 24, Part 11 (CALGreen). As a Standard Design building under the 2016 Building Energy Efficiency Standards is significantly more efficient than the baseline EDR building, the EDR of the Standard Design building is provided for Information. Similarly, the EDR score of the Proposed Design is provided separately from the EDR value of installed PV so that the effects of efficiency and renewable energy can both be seen EDR of Standard Efficiency 45.2 EDR of Proposed Efficiency EDR Value of Proposed PV + Battery Final Proposed EDR 45.1 0.0 45.1 ❑ Design meets Tier 1 requirement of 15% or greater code compliance margin (CALGreen A4.203.1.2.1) and QII verification prerequisite. ❑ Design meets Tier 2 requirement of 30% or greater code compliance margin (CALGreen A4.203.1.2.2) and QII verification prerequisite. Notes: Design meets Zero Net Energy (ZNE) Design Designation requirement for Single Family in climate zone CZ15 (CALGreen A4.203.1.2.3) including on -site photovoltaic (PV) renewable energy generation sufficient to achieve a Final Energy Design Rating (EDR) of zero or less. The PV System and QII must be verified. PV Generation EDR Credit: Bypassing PV size limit REQUIRED SPECIAL FEATURES rules The following are features that must be installed as condition for mehting the modeled energy performance for this computer analysis. Cool roof Window overhangs and/or fins HERS FEATURE SUMMARY The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the building components tables below. Building -level Verifications: • High quality insulation installation (Qll) • IAQ mechanical ventilation • High R-value Spray Foam Insulation Cooling System Verifications: • Minimum Airflow • Verified EER • Verified SEER • Verified Refrigerant Charge • Fan Efficacy Watts/CFM HVAC Distribution System Verifications: • Duct Sealing • Low -leakage Air Handling Unit Domestic Hot Water System Verifications: • Pipe Insulation, All Lines Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CFIR-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 3 of 16 Calculation Description: Title 24 Analysis Input,File Name: Macdonald Residence-18.ribd16x BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (ft2) Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems lot 151 and 152 8959 1 5 8 0 1 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Floor Area Avg. Ceiling Zone Name Zone Type HVAC System Name (ft2) Height Water Heating System 1 Water Heating System 2 Small Master Suite Conditioned HVAC-Masterl 630 10.3 DHW Sys 1 n/a Master Suite Conditioned HVAC-Masterl 1350 9.1 DHW Sys 1 n/a Lounge -Game Room -Office Conditioned HVAC-Lounge-Game Room-Off2 1279 9.8 DHW Sys 1 n/a Great Room -Dining Conditioned HVAC-Great Room-Dining3 1408 13.7 DHW Sys 1 n/a Morning Room -Office -Hall- Conditioned HVAC-Morning Room-Office-4 1037 12.8 DHW Sys 1 n/a Casita Conditioned HVAC-Casita5 1088 8 DHW Sys 1 n/a Casita 2nd Floor Conditioned HVAC 2nd casita6 1022 8 DHW Sys 1 n/a Garage Conditioned HVAC-Garage7 1145 8 DHW Sys 1 n/a 4A b-da. ii -�� i lwmdpr HERS 0V�uEr-i Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 CF1 k-PRF-01 Page 4 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribdl6x OPAQUE SURFACES 01 02 03 04 05 06 07 08 Name Zone Construction Azimuth Orientation Gross Area (ft2) Window 8: Door Area (ft2) Tilt (deg) 20d Wall Small Master Suite R-21 Wall 20 Front 154 101.972 90 200d Wall Small Master Suite R-21 Wall 200 Back 88 37.1 90 290d Wall Small Master Suite R-21 Wall 290 Right 242 6 90 Interior Surface Small Master Suite»Master Suite R-13 Wall n/a n/a 200 0 n/a Roof Small Master Suite R-38 Roof Attic R19 High n/a n/a 630 n/a n/a 20d Wall 2 Master Suite R-21 Wall 20 Front 154 0 90 110d Wall Master Suite R-21 Wall 110 Left 88 0 90 200d Wall 2 Master Suite R-21 Wall 200 Back 435 188.448 90 290d Wall 2 Master Suite R-21 Wall 290 Right 869 132.2 90 Interior Surface 2 Master Suite»Lounge-Game R-13 Wall n/a n/a 500 0 Room -Office n/a Interior Surface 3 Master Suite —Small Master Suite R-13 Wall n/a n/a 200 0 n/a Roof 2 Master Suite R-38 Roof Attic R19 Nigh nla n/a 1350 n/a n/a 20d Wall 3 Lounge -Game Room -Office R-21 Watl 20 Front 396 139.6 90 110d Wall 2 Lounge -Game Room -Office R-21 Wall 110 Left 583 256 90 200d Wall 3 Lounge -Game Room -Office R-21 Wall 200 Back 187 156.04 90 290d Wall 3 Lounge -Game Room -Office R-21 Wall 290 Right 77 0 90 Interior Surface 4 Lounge -Game Room-Office»Master R-13 Wall n/a n/a 500 Suite 0 n/a Interior Surface 5 Lounge -Game Room-Office»Great R-13 Wall n/a n/a 500 Room -Dining 0 n/a Roof 3 Lounge -Game Room -Office R-38 Roof Attic R19 High n/a n/a 1279 n/a n/a 20d Wall 4 Great Room -Dining R-21 Wall 20 Front 770 250 90 200d Wall 4 Great Room -Dining R-21 Wall 200 Back 490 377.978 90 290d Wall 4 Great Room -Dining R-21 Wall 290 Right 364 121.94 90 Roof 4 Great Room -Dining R-38 Roof Attic R19 High n/a n/a 1408 n/a n/a 20d Wall 5 Morning Room -Office -Hall- R-21 Wall 20 Front 220 69 90 110d Wall 3 Morning Room -Office -Hall- R-21 Wall 110 Left 804 232.36 90 200d Wall 5 Morning Room -Office -Hall- R-21 Wall 200 Back 420 240.36 90 290d Wall 5 Morning Room -Office -Hall- R-21 Wall 290 Right 312 21 90 Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 5 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribdl6x Interior Surface 6 Morning Room -Office -Hall -»Great R-13 Wall n/a n/a 500 0 Room -Dining n/a Morning Interior Surface 7 Room -Office -Hall -»Lounge -Game R-13 Wall n/a n/a 500 0 n/a Room -Office Roof 5 Morning Room -Office -Hall- R-38 Roof Attic R19 High n/a n/a 1037 n/a n/a 20d Wall 6 Casita R-21 Wall 20 Front 320 54 90 110d Wall 4 Casita R-21 Wall 110 Left 460 24.5 90 200d Wall 6 Casita R-21 Wall 200 Back 320 31 90 290d Wall 6 Casita R-21 Wall 290 Right 460 179.5 90 Interior Surface 8 Casita>>Moming Room -Office -Hall- R-13 Wall n/a n/a 500 0 n/a Interior Surface 9 Casita»Casita 2nd Floor R-13 Wall n/a n/a 511 0 n/a Roof 6 Casita R-38 Roof Attic R19 High n/a n/a 577 n/a n/a 20d Wall 7 Casita 2nd Floor R-21 Wall 20 Front 216 26.4 90 110d Wall 5 Casita 2nd Floor R-21 Wall 110 Left 224 26.4 90 200d Wall 7 Casita 2nd Floor R-21 Wall 200 Back 216 32.8 90 290d Wall 7 Casita 2nd Floor Right 224 83 90 Interior Surface 10 Casita 2nd FIgAr»Casita R-13 Wall= n!a nla 511 0 n/a Roof 7 to 2nd Floor R-38 i=AtticRtg high nla n/a 511 n/a n/a 20d Wall 8 Garage R-21 Wall 20 Front 400 76.2 90 110d Wall 6 Garage R-21 Wall 110 Left 500 25.5 90 200d Wall 8 Garage R-21 Wall 200 Back 400 89.01 90 290d Wall 8 Garage R-21 Wall 290 Right 500 224 90 Interior Surface 11 Garage»Casita R-13 Wall n/a n/a 100 0 n/a Roof 8 Garage R-38 Roof Attic R19 High n/a n/a 1145 n/a n/a Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 CFI R-PRF-01 Page 6 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x ATTIC 01 02 03 04 05 06 07 08 Name Construction Type Roof Rise Roof Reflectance Roof Emittance Radiant Barrier Cool Roof Attic Small Master Suite Attic RoofSmall Master Suite Unventilated 3 0.61 0.86 Yes Yes Attic Master Suite Attic RoofMaster Suite Unventilated 3 0.61 0.86 Yes Yes Attic Lounge -Game Room -Office Attic RoofLounge-Game Room -Office Unventilated 3 0.61 0.86 Yes Yes Attic Great Room -Dining Attic RoofGreat Room -Dining Unventilated 3 0.61 0.86 Yes Yes Attic Morning Room-Office=Hall- Attic RoofMorning Room -Office -Hall - Unventilated 3 0.61 0.86 Yes Yes Attic Casita Attic RoofCasita Unventilated 3 0.61 0.86 Yes Yes Attic Casita 2nd Floor Attic RoofCasita 2nd Floor Unventilated 3 0.61 0.86 Yes Yes Attic Garage Attic RoofGarage Unventilated 3 0.61 0.86 Yes Yes � CaICERTS, Inc. Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 CFI R-PRF-01 Page 7of16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-1 8.ribd 1 6x FENESTRATION 1 GLAZING 01 02 03 04 05 06 07 08 09 10 Name Type Surface (Orientation -Azimuth) Width (ft) Height (ft) Multiplier Area (ft2) U-factor SHGC Exterior Shading D08 Window 20d Wall (Front-20) 10.6 10.0 0.962 102.0 0.41 0.21 Insect Screen (default) W04 Window 200d Wall (Back-200) - -• 1 37.1 0.30 0.17 Insect Screen (default) W05 Window 290d Wall (Right-290) ---- -- 1 6.0 0.30 0.17 Insect Screen (default) D10 Window 200d Wall 2 (Back-200) 14.8 10.0 0.926 137.0 0.40 0.21 Insect Screen (default) W08 Window 200d Wall 2 (Back-200) --- ---- 1 51.4 0.30 0.17 Insect Screen (default) W06 Window 290d Wall 2 (Right-290) - - -- 1 21.2 0.30 0.17 Insect Screen (default) W07 Window 290d Wall 2 (Right-290) -- 1 51.4 0.30 0.17 Insect Screen (default) W09 Window 290d Wall 2 (Right-290) -- - 1 29.8 0.30 0.17 Insect Screen (default) W10 Window 290d Wall 2 (Right-290) - -- 1 29.8 0.30 0.17 Insect Screen (default) W01 Window 20d Wall 3 (Front-20) -- - 1 19.1 0.30 0.17 Insect Screen (default) W02 Window 20d Wall 3 (Front-20) -- -- 1 19.1 0.30 0.17 Insect Screen (default) W03 Window 20d Wall 3 (Front-20) ---- - 1 19.1 0.30 0.17 Insect Screen (default) W18A Window IM-11 3 (Front-20) - -- 1 82.3 0.30 0.17 Insect Screen (default) D06 --- 1 160.0 0.40 0.21 Insect Screen (default) D07 Window 110d Wall 2 (Left-110) ---- ---- 1 96.0 0.41 0.21 Insect Screen (default) D11 Window 200d Wall 3 (Back-200) 16.6 10.0 0.94 156.0 0.40 0.21 Insect screen (default) D01 Window 20d Wall 4 (Front-20) 5.0 10.0 1 50.0 0.30 0.17 Insect Screen (default) D02 Window 20d Wall 4 (Front-20) 5.0 10.0 1 50.0 0.30 0.17 Insect Screen (default) D03 Window 20d Wall 4 (Front-20) 5-0 10.0 1 50.0 0.30 0.17 Insect Screen (default) D04 Window 20d Wall 4 (Front-20) 5.0 10.0 1 50.0 0.30 0.17 Insect Screen (default) D05 Window 20d Wall 4 (Front-20) 5.0 10.0 1 50.0 0.30 0.17 Insect Screen (default) D12 Window 200d Wall 4 (Back-200) 34.2 12.0 0.921 378.0 0.40 0.21 Insect Screen (default) D17 Window 290d Wall 4 (Right-290) 13.0 10.0 0.938 121.9 0.40 0.21 Insect Screen (default) D16 Window 20d Wall 5 (Front-20) -- ---- 1 24.0 0.30 0.17 Insect Screen (default) W17 Window 20d Wall 5 (Front-20) - - - 1 45.0 0.30 0.17 Insect Screen (default) W14 Window 110d Wall 3 (Left-110) - 1 61.0 0.30 0.17 Insect Screen (default) W12 Window 110d Wall 3 (Left-110) ----- --- 1 42.8 0.30 0.17 Insect Screen (default) D15 Window 110d Wall 3 (Left-110) 11.2 10.0 0.955 107.0 0.41 0.21 Insect Screen (default) D13 Window 200d Wall 5 (Back-200) 21.5 10.0 0.925 198.9 0.40 1 0.21 Insect Screen (default) Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 CFI R-PRF-01 Page 8 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x W13 Window 200d Wall 5 (Back-200) 6.4 7.0 0.926 41.5 0.30 0.17 Insect Screen (default) W18 Window 290d Wall 5 (Right-290) ---- ---- 1 21.0 0.30 0.17 Insect Screen (default) W21 Window 20d Wall 6 (Front-20) - 1 18.0 0.30 0.17 Insect Screen (default) W20 Window 20d Wall 6 (Front-20) ---- - 1 18.0 0.30 0.17 Insect Screen (default) W19 Window 20d Wall 6 (Front-20) ---- 1 18.0 0.30 0.17 Insect Screen (default) W27 Window 110d Wall 4 (Left-110) -- 1 5.0 0.30 0.17 Insect Screen (default) W26 Window 110d Wall 4 (Left-110) - - 1 9.5 0.30 0.17 Insect Screen (default) W25 Window 110d Wall 4 (Left-110) - - 1 5.0 0.30 0.17 Insect Screen (default) W24 Window 110d Wall 4 (Left-110) - 1 5.0 0.30 0.17 Insect Screen (default) W23A Window 200d Wall 6 (Back-200) - --- 1 7.0 0.30 0.17 Insect Screen (default) D20 Window 200d Wall 6 (Back-200) - 1 24.0 0.30 0.17 Insect Screen (default) D19 Window 290d Wall 6 (Right-290) -» 1 143.5 0.41 0.21 Insect Screen (default) W22 Window 290d Wall 6 (Right-290) - - 1 18.0 0.30 0.17 Insect Screen (default) W23 Window 290d Wall 6 (Right-290) - -- 1 18.0 0.30 0.17 Insect Screen (default) W32 Window 20d Wall 7 (Front-20) - 1 8.8 0.30 0.17 Insect Screen (default) W31 Window 2€ d Wall 7 (Front 2fl) - 1 8.8 0.30 0.17 Insect Screen (default) W30 Window 20d Wall,7„JFront-20) - - 1 8.8 0.30 0.17 Insect Screen (default) W32 2 Window 110d Wall 5 (Left-110) - - 1 8.8 0.30 0.17 Insect Screen (default) W33 Window 110d Wall 5 (Left-110) -- 1 8.8 0.30 0.17 Insect Screen (default) W30 2 Window 110d Wall 5 (Left-110) - 1 8.8 0.30 0.17 Insect Screen (default) W30 3 Window 200d Wall 7 (Back-200) - 1 8.8 0.30 0.17 Insect Screen (default) W29 Window 200d Wall 7 (Back-200) - 1 24.0 0.30 0.17 Insect Screen (default) W28 Window 290d Wall 7 (Right-290) 4.0 10.0 1 40.0 0.30 0.17 Insect Screen (default) D27 Window 290d Wall 7 (Right-290) 4.3 10.0 1 43.0 0.30 0.17 Insect Screen (default) W36 Window 20d Wall 8 (Front-20) ---- - 1 15.8 0.30 0.17 Insect Screen (default) W37 Window 20d Wall 8 (Front-20) -- - 1 15.8 0.30 0.17 Insect Screen (default) W38 Window 20d Wall 8 (Front-20) -- - 1 15.8 0.30 0.17 Insect Screen (default) W39 Window 20d Wall 8 (Front-20) - - 1 9.6 0.30 0.17 Insect Screen (default) W40 Window 20d Wall 8 (Front-20) - - 1 9.6 0.30 0.17 Insect Screen (default) W41 Window 20d Wall 8 (Front-20) - 1 9.6 0.30 0.17 Insect Screen (default) W42 Window 110d Wall 6 (Left-110) - 1 5.1 0.30 0.17 In Screen (default) W43 Window 110d Wall 6 (Left-110) - -- 1 5.1 0.30 0.17 Insect Screen (default) W44 Window 110d Wall 6 (Left-110) - 1 5.1 0.30 0.17 Insect Screen (default) Registration Number: 218-P010009413C-000-000-0000000-0000 Registration DatefTime: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 CFI R-PRF-01 Page 9 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x W46 Window 110d Wall 6 (Left-110)---- 1 5.1 0.30 0.17 Insect Screen (default) W47 Window 110d Wall 6 (Left-110)---- --- 1 5.1 0.30 0.17 Insect Screen (default) D22 Window 200d Wall 8 (Back-200) 6.6 10.0 0.985 65.0 0.30 0.17 Insect Screen (default) D25 Window 200d Wall 8 (Back-200) 3.0 8.0 1 24.0 0.30 0.17 Insect Screen (default) OPAQUE DOORS 01 02 03 04 Name Side of Building Area (ft2) U-factor D31 110d Wall 3 21.6 0.50 D23 290d Wall 8 160.0 1.00 D24 290d Wall 8 64.0 1.00 OVERHANGS AND FINS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Overhang Left Fin Right Fin Left Right Window Depth Dist Up Extent Extent Flap Ht. Depth Top Up Dist L Bot Up Depth Top Up Dist R Bot Up D08 6 0.1 6 6 0 0 0 0 0 0 0 0 0 D10 6 0.1 6 6 0 0 0 0 0 0 0 0 0 D11 10 0.1 10 10 0 0 0 0 0 0 0 0 0 D01 14 0.1 14 14 0 0 0 0 0 0 0 0 0 D02 14 0.1 14 14 0 0 0 0 0 0 0 0 0 D03 14 0.1 14 14 0 0 0 0 0 0 0 0 0 D04 14 0.1 14 14 0 0 0 0 0 0 0 0 0 D05 14 0.1 14 14 0 0 0 0 0 0 0 0 0 D12 18 0.1 18 18 0 0 0 0 0 0 0 0 0 D17 10 0.1 10 10 0 0 0 0 0 0 0 0 0 D15 6 0.1 6 6 0 0 0 0 0 0 0 0 0 D13 10 0.1 10 10 0 0 0 0 0 0 0 0 0 W13 6 0.1 6 6 0 0 0 0 0 0 0 0 0 W28 6 0.1 6 6 0 0 0 0 0 0 0 0 0 D27 6 0.1 6 6 0 0 0 0 0 0 0 0 0 D22 4 0.1 4 4 0 0 0 0 0 0 0 0 0 D25 4 0.1 4 4 0 0 0 0 0 0 0 0 0 Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x CF1 R-PRF-01 Page 10 of 16 OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 Total Cavity Winter Design Construction Name Surface Type Construction Type Framing R-value U-factor Assembly Layers • Around Roof Joists: R-6.0 insul. • Cavity/Frame: R-13.0/2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Attic RoofSmall Master Suite Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 Roofing: Light Roof (Asphalt Shingle) • Inside Finish: Gypsum Board Ceilings (below Cavity/Frame: R-9.1 /2x4 R-38 Roof Attic R19 High attic) Wood Framed Ceiling 2x4 @ 16 in. O.C. R 38 0.025 Over Ceiling Joists: R-28.9 insul. • Inside Finish: Gypsum Board • Cavity/Frame: R-21 /2x6 R-21 Wall Exterior Walls Wood Framed Wall 2x6 @ 16 in. O.C. R 21 0.069 Exterior Finish: 3 Coat Stucco • Inside Finish: Gypsum Board • Cavity/Frame: R-13/2x4 R-13 Wall Interior Walls Wood Framed Wall 2x4 @ 16 in. O.C. R 13 0.092 Other Side Finish: Gypsum Board • Around Roof Joists: R-6.0 insul. • Cavity / Frame: R-13.0 / 2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck., Wood Siding/sheathing/decking Attic RoofMaster Suite Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 Roofing: Light Roof (Asphalt Shingle) ■ i It • Around Roof Joists: R-6.0 insul. • Cavity / Frame: R-13.0 / 2x4 Top Chrd Attic Rooft-ounge-Game 2x4„Top Chord of Roof: Truss '@,24 R Roof Deck: Wood Siding/sheathing/decking Room -Office Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 Roofing: Light Roof (Asphalt Shingle) • Around Roof Joists: R-6.0 insul. • Cavity / Frame: R-13.0 / 2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck., Wood Siding/sheathing/decking Attic RoofGreat Room -Dining Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 Roofing: Light Roof (Asphalt Shingle) • Around Roof Joists: R-6.0 insul. • Cavity / Frame: R-13.0 / 2x4 Top Chrd Attic RoofMorning 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Room -Office -Hall- Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 Roofing: Light Roof (Asphalt Shingle) • Around Roof Joists: R-6.0 insul. • Cavity / Frame: R-13.0 / 2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Attic RoofCasita Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 Roofing: Light Roof (Asphalt Shingle) • Around Roof Joists: R-6.0 insul. • Cavity / Frame: R-13.0 / 2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 • Roof Deck., Wood Siding/sheathing/decking Attic RoofCasita 2nd Floor Attic Roofs Wood Framed Ceiling in. O.C. R 19 0.059 • Roofing: Light Roof (Asphalt Shingle) Registration Number; 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11;00:19 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 CF1 R-PRF-01 Page 11 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribdl6x Attic RoofGarage Attic Roofs Wood Framed Ceiling 2x4 Top Chord of Roof Truss @ 24 in. O.C. R 19 0.059 • Around Roof Joists: R-6.0 insul. • Cavity / Frame: R-13.0 / 2x4 Top Chrd Roof Deck: Wood Siding/sheathing/decking Roofing: Light Roof (Asphalt Shingle) SLAB FLOORS 01 02 03 04 05 06 07 Name Zone Area (W) Perimeter (ft) Edge Insul. R-value & Depth Carpeted Fraction Heated Slab -on -Grade Small Master Suite 630 94 None 0.8 No Slab -on -Grade 2 Master Suite 1350 94 None 0.8 No Slab -on -Grade 3 Lounge -Game Room -Office 1279 94 None 0.8 No Slab -on -Grade 4 Great Room -Dining 1408 94 None 0.8 No Slab -on -Grade 5 Morning Room -Office -Hall- 1037 94 None 0.8 No Slab -on -Grade 6 Casita 1088 94 None 0.8 No Slab -on -Grade 7 Garage 1145 94 None 0.8 No BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 Quality Insulation Installation (QII) Quality Installation of Spray Foam Insulation Building/Envelope Air Leakage CFM50 Required Required , Not Required n/a WATER HEATING SYSTEMS 01 02 03 04 05 06 Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction (%) DHW Sys 1 DHW (HERS req'd) Pipe Insulation, All Lines DHW Heater 1 (3) 3 .0% WATER HEATERS 01 02 03 04 05 06 07 08 09 10 11 12 Input Rating / Tank Standby Heater Tank Uniform Energy Pilot / Insulation Loss / First Hour NEEA Heat Pump Tank Location Element Number Volume Factor / Energy Thermal R-value Recovery Rating / Brand / Model / or Ambient Name Type Tank Type of Units (gal) Factor / Efficiency Efficiency (Int/Ext) Eff Flow Rate Other Condition DHW Heater 1 Gas Small Storage 3 40 0.63 EF <= 75 kBtu/hr R-0/R-0 0 n/a n/a j n/a Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Na CF1R-PRF-01 Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Page 12 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x WATER HEATING - HERS VERIFICATION 01 02 03 04 05 06 07 Name Pipe Insulation Parallel Piping Compact Distribution Point -of Use Recirculation Control Central DHW Distribution DHW Sys 1 - 1/3 Pipe Insulation, All Lines n/a n/a n/a n/a n/a SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 SC Sys Name System Type Heating Unit Name Cooling Unit Name Fan Name Distribution Name HVAC-Masterl and Cooling Other Heating System Y Heating Component 1 Cooling Component 1 HVAC Fan 1 Air Distribution System 1 HVAC-Lounge-Game Room-Off2 g Other Heating and Cooling System Heating Component 2 Cooling Component 2 HVAC Fan 2 Air Distribution System 2 HVAC-Great Room-Dinin 3 g Other Heating and Cooling System Heating Component 3 Cooling Component 3 HVAC Fan 3 Air Distribution System 3 HVAC-MorningRoom-Office-4 Other Heating and Cooling System Heating Component 4 Cooling Component 4 HVAC Fan 4 Air Distribution System 4 HVAC-Casita5 Other Heating a and Cooling Y Heating Component 5 Cooling Component 5 HVAC Fan 5 Air Distribution System 5 HVAC 2nd casita6 Heat Pump Heating and Cooling System Heat Pump System 6 Heat Pump System 6 None -none - HVAC-Gaya e7 g Heat Pump Heating and Cooling System Heat Pump System 7 Heat Pump System 7 None - none - HVAC - HEATING UNIT TYPES 01 02 03 04 Name System Type Number of Units Efficiency Heating Component 1 CntrlFurnace 1 80 AFUE Heating Component 2 CntrlFurnace 1 80 AFUE Heating Component 3 CntrlFurnace 1 80 AFUE Heating Component 4 CntrlFurnace 1 80 AFUE Heating Component 5 CntrlFurnace 1 80 AFUE Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaI..ERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CFIR-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 CF1 R-PRF-01 Page 13 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x HVAC - HEAT PUMPS 01 02 03 04 05 06 07 08 09 10 11 Name System Type Number of Units Heating Cooling Zonally Controlled Compressor Type HERS Verification HSPF/COP Cap 47 Cap 17 SEER EER Heat Pump System 6 DuctlessMiniSplitHeatPump 1 10.5 12000 9000 22 13 Not Zonal Single Speed Heat Pump System 6-hers-cool Heat Pump System 7 Heat Pump System 7 DuctlessMiniSplitHeatPump DuctlessMiniSplitHeatPump 1 1 -F 10.5 12000 9000 22 13 Not Zonal Single Speed Heat Pump System 7-hers-cool HVAC - COOLING UNIT TYPES 01 02 03 04 05 06 07 08 Name System Type Number of Units Efficiency EER SEER Zonally Controlled Compressor Type HERS Verification Cooling Component 1 SplitAirCond 1 13 16 Not Zonal Single Speed Cooling Component 1-hers-cool Cooling Component 2 SplitAirCond 1 13 16 Not Zonal Single Speed Cooling Component 2-hers-cool Cooling Component 3 d 1 13 16 Not Zonal Single Speed Cooling Component 3-hers-cool Cooling Component 4 SplitAirCond 1 13 16 Not Zonal Single Speed Cooling Component 4-hers-cool Cooling Component 5 SplitAirCond 1 13 16 Not Zonal Single Speed Cooling Component 5-hers-cool HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target Verified EER Verified SEER Verified RefrigerantCharge Cooling Component 1-hers-cool Required 350 Required Required Required Cooling Component 2-hers-cool Required 350 Required Required Required Cooling Component 3-hers-cool Required 350 Required Required Required Cooling Component 4-hers-cool Required 350 Required Required Required Cooling Component 5-hers-cool Required 350 Required Required Required Heat Pump System 6-hers-cool Not Required n/a Not Required Not Required Required Heat Pump System 7-hers-cool Not Required n/a Not Required Not Required Required Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 CF1 R-PRF-01 Page 14 of 16 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x HVAC - DISTRIBUTION SYSTEMS 01 02 03 04 05 06 07 Name Type Duct Leakage Insulation R-value Duct Location Bypass Duct HERS Verification Air Distribution System 1 DuctsAttic Specified Lower Leakage Target 8 Attic None Air Distribution System 1-hers-dist Air Distribution System 2 y DuctsAttic Specified Lower Leakage Target 9 8 Attic None Air Distribution System 2-hers-dist Air Distribution System 3 DuctsAttic Specified Lower Leakage Target 8 Attic None Air Distribution System 3-hers-dist Air Distribution System 4 y DuctsAttic Specified Lower Leakage Target 9 8 Attic None Air Distribution System 4-hers-list Air Distribution S stem 5 y DuctsAttic Specified Lower Leakage Target 9 8 Attic None Air Distribution System 5-hers-list HVAC DISTRIBUTION - HERS VERIFICATION 01 02 03 04 05 06 07 08 Name Duct Leakage Verification Duct Leakage Target (%) Verified Duct Location Verified Duct _ MDesign Buried Ducts Deeply Buried Ducts Low -leakage Air Handler Air Distribution System 1-hers-dist Require4;, 5.0 Not Required "lqq Required "` NotRequired Not Required Required Air Distribution System 2-hers-dist Required 5.0 :°Not R quiked I NYt!3 Required Not Required Required Air Distribution System 3-hers-dist Required 5.0 Not Required Not Required NOLRequired Not Required Required Air Distribution System 4-hers-list Required 5.0 Not Required Not Required Not Required Not Required Required Air Distribution System 5-hers-dist Required 5.0 Not Required Not Required Not Required Not Required Required HVAC -FAN SYSTEMS 01 02 03 04 Name Type Fan Power (Watts/CFM) HERS Verification HVAC Fan 1 Single Speed PSC Furnace Fan 0.5 HVAC Fan 1-hers-fan HVAC Fan 2 Single Speed PSC Furnace Fan 0.5 HVAC Fan 2-hers-fan HVAC Fan 3 Single Speed PSC Furnace Fan 0.5 HVAC Fan 3-hers-fan HVAC Fan 4 Single Speed PSC Furnace Fan 0.5 HVAC Fan 4-hers-fan HVAC Fan 5 Single Speed PSC Furnace Fan 0.5 HVAC Fan 5-hers-fan Registration Number: 218-P010009413C-000-000-0000000-0000 Registration DatelTime: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Calculation Description: Title 24 Analysis Input File Name: Macdonald Residence-18.ribd16x CFI R-PRF-01 Page 15 of 16 IAQ (Indoor Air Quality) FANS 01 02 03 04 05 06 IAQ Recovery Dwelling Unit IAQ CFM IAQ Watts/CFM IAQ Fan Type Effectiveness(%) HERS Verification SFam IAQVentRpt 135 0.25 Default 0 Required � CaICERTS, Inc. HERS P'R0V10FR Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Report Generated at: 2018-12-20 09:54:13 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: lot 151 and 152 Calculation Description: Title 24 Analysis DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Tim Scott Company: Scott Design and Title 24, Inc. Address: 77085 Michigan Drive City/State/Zip: Palm Desert, CA 92211 RESPONSIBLE PERSON'S DECLARATION STATEMENT Calculation Date/Time: 09:52, Thu, Dec 20, 2018 Input File Name: Macdonald Residence-18.ribdl6x Documentation Author Signature: Zw-Ve"wr Signature Date: 2018-12-20 11:00:19 CEA/HERS Certification Identification (If applicable): Phone: 760-200-4780 CFI R-PRF-01 Page 16 of 16 I certify the following under penalty of perjury, under the laws of the State of California: 1. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name: Responsible Designer Signature: Tim Scott 7Nw,-5a' aer Company: Date Signed: Scott Design and Title 24, Inc. 2018-12-20 11:00:19 Address: License: 77085 Michigan Drive na City/State/Zip: Phone: Palm Desert, CA 92211 760-200-4780 Digitally signed by calcERTs. This digital signature is provided in order to secure the content of this registered document and in noway implies Registration Provider responsibility for the accuracy of the information. Registration Number: 218-P010009413C-000-000-0000000-0000 Registration Date/Time: 2018-12-20 11:00:19 CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-11302018-1149 Easy to Verify at CaICERTS.com HERS Provider: CaICERTS inc. Report Generated at: 2018-12-20 09:54:13