Loading...
BRES2015-0086 Geotechnical Investigation ReportGEOTECHNICAL INVESTIGATION PROPOSED MADISON CLUB GOLF CI. 8 AND RES.YDENTIAI. DEVELOPMENT NEC AVENUE 54 AND MADISON STREET LA QI.IINTA, CALIFORNIA -Prepared By- Sladden Engineering 39-725 Garand Lane, Suite G Palm Desert, California 92211 (760)772-3893 (K. Sladden Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 January 28, 2005 East of Madison, LLC 81-100 Avenue 53 La Quinta, California 92253 Attention: Mr, John Gamlin Project: Madison Club Tentative Tract Map 33076 NEC Avenue 54 and. Madison Street La Quinta, California Subject: Geotechnical Investigation Project No. 5444810 05-01-101 Presented herewith is the report of our Geotechnical Investigation conducted for the construction of the proposed golf club and residential development to be located on the northeast corner of Avenue 54 and Madison Street in the City of La Quinta, California. The investigation was performed in order to provide recommendations for site preparation and to assist in foundation design for the proposed residential structures and the related site improvements. This report presents the results of our field investigation and laboratory testing along with conclusions and recommendations for foundation design and site preparation. This report completes our original scope of services as outlined within our proposal dated December 13, 2004. We appreciate the opportunity to provide service to you on this project. If you have any questions regarding this report, please contact the undersigned Respectfully submitted, $LADDE ENGINEERING Brett -L. Anderson Principal Engineer SER/pc Copies: 6/East of Madison, LLC W'0�1 c-PsLU -'XP.9 30 06 x z GEOTECHNICAL INVESTIGATION PROPOSED MADISON CLUB NEC AVENUE 54 & MADISON STREET LA QUINTA, CALIFORNIA January 28, 2005 TABLE OF CONTENTS INTRODucMoN................................................................................................................................ SCOPEOF WORK............................................................................................................................. 1 PROJECT DESCRIPTION..................................................................................................................... 1 GEOLOGYAND SEISMICITY............................................................................................................ 2 SUBSURFACE CONDITIONS........................................................................................................... 3 LIQUEFACTION................................................................................................................................ 3 CONCLUSIONS AND RECOMMENDATIONS................................................................................ 3 FoundationDesign....................................................................................................................... 4 Settlements..................................................................................................................................... 5 LateralDesign.................................................................................................................................. 5 RetainingWalls............................................................................................................................. S ExpansiveSoil............................................................................................................................... 5 ConcreteSlabs-on-Grade............................................................................................................. 5 SolubleSulfates............................................................................................................................. 6 TentativePavement Design.......................................................................................................... 6 Shrinkageand Subsidence...................................................................................................... 6 GeneralSite Grading..................................................................................................................... 6 1. Site Clearing........................................................................................................................ 6 2. Preparation of.Building and Foundation Areas............................................................... 7 3. Placement of Compacted Fill........................................................................................... 7 4. Preparation of Slab and Pavement Areas......................................................................... 7 5. Testing and Inspection.......................................................................................... ....... 7 GENERAL.......................................................................................................................................... 8 REFERENCES.................................................................... APPENDIX A - Site Plan and Boring Logs Field Exploration APPENDDC B - Laboratory Testing 'Laboratory Test Results ....................................................... 9 APPENDIX C - 2001 California Building Code with 1997 UBC Seismic Design Criteria January 28, 2005 -1- Project No. 544-4810 05-01-101 INTRODUCTION This report presents the results of our Geotechnical Investigation performed in order to provide recommendations for site preparation and to assist in the design and construction of the foundations for the single-family residences proposed for the Madison Club golf course and residential development. The project site is located 'on the northeast comer of Avenue 54 and Madison Street in the City of La Quinta, California. The preliminary plans indicate that the proposed project will include an 18 -hole golf course, clubhouse, and approximately 200 single-family residences along with various associated site improvements. The associated site improvements are expected to include paved roadways, concrete driveways and patios, underground utilities, and landscape areas. SCOPE OF WORK The purpose of our investigation was to determine certain engineering characteristics of the near surface soil on the site in order to develop recommendations for foundation design and site preparation. Our investigation included field exploration, laboratory testing, literature review, engineering analysis and the preparation of this report. Evaluation of hazardous materials or other environmental concerns was not within the scope of services provided. Our investigation was performed in accordance with contemporary geotechnical engineering principles and practice. We do not make other warranty, either express or implied. PROJECT DESCRIPTION The project site is located on the northeast corner of Avenue 54 and Madison Street in the City of La Quinta, California. It is our understanding that the project will consist of an 18 -hole golf course, clubhouse, and approximately 200 single-family residences along with various associated site improvements, it is our understanding that the proposed residences and clubhouse will be of relatively lightweight wood -frame construction and will be supported by conventional shallow spread footings and concrete slabs on grade. The associated improvements will include paved roadways, concrete walkways, patios, driveways, landscape areas and various underground utilities. The majority of the subject site is presently vacant. The site includes several agricultural parcels as well as undeveloped desert land. Large tamarisk trees exist along the majority of the property lines within the southeastern portion of the site. The majority of the eastern portions of the property have been previously used for agricultural purposes. The property is level throughout and is near the elevation of the adjacent properties and roadways. A horse ranch occupies the southeast corner of the site. The ranch contains several residential structures and various outbuildings. Fenced pastures occupy most of the ranch. Several other residences and structures exist at locations throughout the site. Avenue 54 forms the southern site boundary, Monroe Street forms the eastern site boundary, and Madison Street forms the western site boundary. The Hideaway development is located just west of the site. Sladden Engineering January 28, 2005 -2- Project No. 5444810 05-01-101 Based upon our previous experience with lightweight residential structures, we expect that isolated column loads will be less than 30 kips and wall loading will be less than to 2.0 kips per linear foot. Grading is expected to include minor cuts and fills to match the nearby elevations and to construct slightly elevated building pads to accommodate site drainage. Extensive cuts are proposed for several of the golf holes with the preliminary plans indicating cuts in excess of 40 feet within some of the golf holes. This does not include removal and recompaction of the bearing soil within the building areas. If the anticipated foundation loading or site grading varies substantially from that assumed the recommendations included in this report should be reevaluated. GEOLOGY AND SEISMICITY The project site is located within the central Coachella Valley that is part of the broader Salton Trough geomorphic province. The Salton Trough is a northwest trending depression that extends from the Gulf of California to the Banning Pass. Structurally the Salton Trough is dominated by several northwest trending faults, most notable of that is the San Andreas system. . A relatively thick sequence of sedimentary rocks have been deposited in the Coachella Valley portion of the Salton Trough from Miocene to present times. These sediments are predominately terrestrial in nature with some lacustrian and minor marine deposits. The mountains surrounding the Coachella Valley are composed primarily of Precambrian'metamorphic and Mesozoic granitic rock. The Coachella Valley is situated in one of the more seismically active areas of California. The San Andreas fault zone is considered capable of generating a maximum credible earthquake of magnitude 8.0 and because of its proximity to the project site the distance of approximately 9.2 kilometers should_ be considered in design fault for the project. Seismic activity along the nearby faults continues to affect the area and the Coachella Valley is considered . one of the more seismically active regions in California. A computer program and pertinent geologic literature were utilized to compile data related to earthquake fault zones in the region and previous seismic activity that may have affected the site. E.Q. Fault Version 3.00 (Blake) provides a compilation of data related to earthquake faults in the region. The program searches available databases and provides both distances to causitive faults and the corresponding accelerations that may be experienced on the site because of earthquake activity along these faults. The attenuation relationship utilized for this project was based upon Joyner & Boore (2001) attenuation curves. The information generated was utilized in our liquefaction evaluation The site is not located in any Earthquake Fault zones as designated by the State but is mapped in the County's Liquefaction and Ground Shaking .Hazard Zone V. Several significant seismic events have occurred within the Coachella Valley during the past 50 years. The events include Desert Hot Springs - 1948 (6.5 Magnitude), -Palm Springs - 1986 (5.9 Magnitude), Desert Hot Springs - 1992 (6.1 Magnitude), Landers - 1992 (7.5 Magnitude) and Big Bear -1992 (6.6 Magnitude). Sladden Engineering January 28, 2005 -3- Project No. 544-4810 05-01.-101 SUBSURFACE CONDITIONS The soil underlying the site consists primarily of fine-grained silty sands with scattered prominent sandy clay and sandy silt layers. As is typical for the area, the silty sand and sandy silt layers are inconsistently interbedded and vary in thickness. Silty sands were the most prominent soil within our exploratory borings but several prominent sandy silt and clayey silt layers were also encountered. The silty sands encountered near the existing ground surface appeared somewhat loose but the deeper silty sand and sandy silt layers appeared relatively firm. Relatively undisturbed samples indicated dry density varying from 84 to 121 pcf. Sampler penetration resistance (as measured by field blowcounts) indicates that density generally increases with depth. The site soil was dry on the surface and moist below a depth of approximately 5 feet but some silty layers were typically wet. laboratory testing indicated moisture content varying from 1 to 33 percent. Laboratory testing indicates that the surface soil within the upper 5 feet consist primarily of silty sands. Expansion testing indicates that the surface silty sands are generally non -expansive and are classified as ,'very low" expansion category soil in accordance with Table 1.8-1-B of. the 1997 Uniform Building Code. Groundwater was encountered within our borings at depths of approximately 51 to 79 feet below the existing ground surface. Groundwater should be considered in design and construction. LIQUEFACTION Liquefaction occurs with sudden loss of soil strength because of rapid increases in pore pressures within cohesionless soil as a result of repeated cyclic loading during seismic events. Several conditions must be present for liquefaction to occur including; the presence of relatively shallow groundwater, generally loose soil conditions, the susceptibility of soil to liquefaction based upon grain -size characteristics and the generation of significant and repeated seismically induced ground accelerations. Liquefaction affects primarily loose, uniform grained cohesionless sands with low relative densities. In the case of this project site, several of the factors required for liquefaction to occur are not present. As previously indicated, groundwater was encountered within our borings at depths of approximately 51 to 79 feet below the existing ground surface on the site. Because of the depth to groundwater, the potential for liquefaction affecting the site is considered negligible. CONCLUSIONS AND RECOMMENDATIONS Based upon our field investigation and laboratory testing, it is our opinion that the proposed golf course, clubhouse, and residential development is feasible from a soil mechanic's standpoint provided that the recommendations included in this report are considered in building foundation design and site preparation. Because of the somewhat loose condition of the near surface soil, remedial grading is recommended for the building areas. We recommend that remedial grading within the proposed building areas include the overexcavation and recompaction of the primary foundation bearing soil. Specific recommendations for site preparation are presented in the Site Grading section of this report. Sladuden ,E'ngineenng January 28, 2005 4- Project No. 544-4810 05-01-101 Based upon the depth to groundwater and the generally firm condition of the deeper sand layers, it is our opinion that the potential for liquefaction affecting the site is negligible. The remedial grading recommended for building areas will result in the construction of a uniform compacted soil mat beneath all footings. In our opinion, liquefaction related mitigation measures in addition to the site grading and foundation design recommendations included in this report should not be necessary. The site is located in one of the more seismically active areas in California. Design professionals should be aware of the site setting and the potential for earthquake activity during the anticipated life of the structure should be acknowledged. The accelerations that may be experienced on the site (as previously discussed) should be considered in design. The seismic provisions included in the Uniform Building Code for Seismic Zone 4. should be considered the minimum design criteria. Pertinent 1997 UBC Seismic Design Criteria is summarized in Appendix C. Caving did occur within our borings and the potential for caving should be expected within deeper excavations. All excavations should be constructed in accordance with the normal CalOSHA excavation criteria. On the basis of our observations of the materials encountered, we anticipate that the near surface silty sands will be classified by CalOSHA as Type C. Soil conditions should be verified in the field by a "Competent person" employed by the Contractor. The near surface soil encountered during our investigation was found to be non -expansive. Laboratory testing indicated an Expansion Index of 0 for the surface silty sands that corresponds with the "very low" expansion category in accordance with UBC Table 18 -I -B. The following recommendations present more detailed design criteria which have been developed on the basis of our field and laboratory investigation. The recommendations are based upon non -expansive soil criteria. Foundation Design: The results of our investigation indicate that either conventional shallow continuous footings or isolated pad footings that are supported upon properly compacted soil, may be expected to provide adequate support for the proposed structure foundations. Building pad grading should be performed as described in the Site Grading Section of this report to provide for uniform and firm bearing conditions for the structure foundations. Footings should extend at least 12 inches beneath lowest adjacent grade, Isolated square or rectangular footings should be at least two feet square and continuous footings should be at least 12 inches wide. Continuous footings may be designed using an allowable bearing value of 1500 pounds per square foot (psf) and isolated pad footings may be designed using an allowable bearing pressure of 1800 psf. Allowable increases of 250 psf for each additional 1 foot of width and 250 psf for each additional 6 inches of depth may be utilized if desired. The maximum allowable bearing pressure should be 2500 psf. The allowable bearing pressures are applicable to dead and frequently applied live loads. The allowable bearing pressures may be increased by 1/3 to resist wind and seismic loading. Care should be taken to see that bearing or subgrade soil is not allowed to become saturated from the ponding of rainwater or irrigation. Drainage from the building area should be rapid and complete. Sladden Engineering January 28, 2005 -5- Project No. 544-4.810 05-01-101 The recommendations provided in the preceding paragraph are based on the assumption that all footings will be supported upon properly compacted engineered fill soil. All grading 'should be performed under the testing and inspection of the Soil Engineer or his representative. Prior to the placement of concrete, we recommend that the footing excavations be inspected in order to verify that they extend into compacted soil and are free of loose and disturbed materials. Settlements: Settlements resulting from the anticipated foundation loads should be minimal provided that the recommendations included in this report are considered in foundation design and construction. The estimated ultimate settlements are calculated to be approximately one inch when using the recommended bearing values. As a practical matter, differential settlements between footings can be assumed as one-half of the total settlement. Lateral Design: Resistance to lateral loads can be provided by a combination of friction acting at the base of the slabs or foundations and passive earth pressure along the sides of the foundations. A coefficient of friction of 0.40 between soil and concrete may be used with consideration to dead load forces only. A passive earth pressure of. 250 pounds per square foot, per foot of depth, may be used for the sides of footings that are poured against properly compacted native or approved non -expansive import soil. Passive earth pressure should be ignored within the upper 1 foot except where confined (such as beneath a floor slab). Retaining Walls: Retaining walls may be necessary to accomplish the proposed construction. Lateral pressures for use in retaining wall design can be estimated using an equivalent fluid weight of 35 pcf for level free -draining native backfill conditions. For walls that are to be restrained at the top, the equivalent fluid weight should be increased to 55 pcf for level free - draining native backfill conditions. Backdrains should be provided for the full height of the walls. Expansive Soil: Because of the prominence of "very low" expansion category soil near the surface, the expansion potential of the foundation bearing soil should not be a controlling factor in foundation or floor slab design. Expansion potential should be reevaluated subsequent to grading. Concrete Slabs -on -Grade: All surfaces to receive concrete slabs -on -grade should be underlain by a minimum compacted non -expansive fill thickness of 24 inches, placed as described in the Site Grading Section of this report. Where slabs are to receive moisture sensitive floor coverings or where dampness of the floor slab is not desired, we recommend the use of an appropriate vapor barrier or an adequate capillary break. Vapor barriers should be protected by sand in order to reduce the possibility of puncture and to aid in obtaining uniform concrete curing. Reinforcement of slabs -on -grade in order to resist expansive soil pressures should not be necessary, However, reinforcement will have a beneficial effect in containing cracking because of concrete shrinkage. Temperature and shrinkage related cracking should be anticipated in all concrete slabs -on -grade. Slab reinforcement and the spacing of control joints should be determined by the Structural Engineer. Sladden Engineering January 28, 2005 -6- Project No. 5444810 05-01-101 Soluble Sulfates: The soluble sulfate concentrations of the surface soil have not yet been determined but native soil in the area has been known to be potentially corrosive with respect to concrete. The use of Type V cement and specialized sulfate resistant concrete mix designs may be necessary for concrete in contact with the native soil. Tentative Pavement Design: All paving should be underlain by a minimum compacted fill thickness of 1.2 inches (excluding aggregate base). This may be performed as described in the Site Grading Section of this report: ft -Value testing was not conducted during our investigation but based upon the sandy nature of the surface soil, an R -Value of approximately 50 appears appropriate for preliminary pavement design. The following preliminary onsite pavement section is based upon a design R -Value of 50. Onsite Pavement (Traffic Index = 5.0) Use 3.0 inches of asphalt on 4.5 inches of Class 2 base material Aggregate base should conform to the requirements for Class 2 Aggregate base in Section 26 of CalTrans Standard Specifications, January 1992. Asphaltic concrete should conform to Section 39 of the CalTrans Standard Specifications. The recommended sections should be provided with a uniformly compacted subgrade and precise control of thickness and elevations during placement. Pavement and slab designs are tentative and should be confirmed at the completion of site grading when the subgrade soil is in-place. This will include sampling and testing of the actual subgrade soil and an analysis based upon the specific traffic information Shrinkage and Subsidence: Volumetric shrinkage of the material that is excavated and replaced as controlled compacted fill should be anticipated. We estimate that this shrinkage could vary from 20 to 25 percent. Subsidence of the surfaces that are scarified and compacted should be between 1 and 3 tenths of a foot. This will vary depending upon the type of equipment used, the moisture content of the soil at the time of grading and the actual degree of compaction attained. These values for shrinkage and subsidence are exclusive of losses that will occur because of the stripping of the organic material from the site and the removal of oversize material. The shrinkage losses are suspected to be somewhat less within areas where deeper cuts (more than 20 feet in depth) are planned. General Site Grading: All grading should be performed in accordance with the grading ordinance of the City of La Quinta, California. The following recommendations have been developed on the basis of our field and laboratory testing and are intended to provide a uniform compacted mat of soil beneath the building slabs and foundations. 1. Site Clearing: Proper site clearing will be very important. Any existing vegetation, slabs, foundations, abandoned underground utilities or irrigation lines should be removed from the proposed building areas and the resulting excavations should be properly backfilled. Soil that is disturbed during site clearing should be removed and replaced as controlled compacted lilt under the direction of the Soil Engineer. Sladden Engineering January 28, 2005 -7- Project No. 544-4810 05-01-101 Z Preparation of Building and Foundation Areas: In order to provide adequate and uniform bearing conditions, we recommend overexcavation throughout the proposed residential building areas. The building areas should be overexcavated to a depth of at least 3 feet below existing grade or 3 feet below the bottom of the footings, whichever is deeper. The exposed soil should then be scarified to a depth of 1 -foot, moisture conditioned and recompacted to at least 90 percent relative compaction: The excavated material may then be replaced as engineered fill material as recommended below. 3. Placement of Compacted Fill: Within the building pad areas, fill materials should be spread in thin lifts, and compacted at near optimum moisture content to a minimum of 90 percent relative compaction. Imported fill material shall have an Expansion Index not exceeding 20. The contractor shall notify the Soil Engineer at least 48 hours in advance of importing soil in order to provide sufficient time for the evaluation of proposed import materials. The contractor shall be responsible for delivering material to the site that complies with the project specifications. Approval by the Soil Engineer will be based upon material delivered to the site and not the preliminary evaluation of import sources. Our observations of the materials encountered during our investigation indicate that compaction within the native soil will be most readily obtained by means of heavy rubber tired equipment and/or sheepsfoot compactors. The moisture content of the near surface soils was somewhat inconsistent within our borings. In general, the sandy soils are dry and well below optimum moisture content but some of the deeper silt layers were wet. It is likely that wet silt/clay layers will be encountered during grading particularly in irrigated areas where deep cuts are planned. A uniform and near optimum moisture content should be maintained during fill placement and compaction. 4. Preparation of Slab and Paving Areas: All surfaces to receive asphalt concrete paving or exterior concrete slabs -on -grade, should be underlain by a minimum compacted fill thickness of 12 inches. This may be accomplished by a combination of overexcavation, scarification and recompaction of the surface, and replacement of the excavated material as controlled compacted fill. Compaction of the slab and pavement areas should be to a minimum of 90 percent relative compaction. 5. Testing and Inspection: 'During grading tests and observations should be performed by the Soil Engineer or his representative in order to verify that the grading is being performed in accordance with the project specifications, Field density testing shall be performed in accordance with applicable ASTM test standards. The minimum acceptable degree of compaction shall be 90 percent of the maximum dry density as obtained by the ASTM D1557-91 test method. Where testing indicates insufficient density, additional compactive effort shall be applied until retesting indicates satisfactory compaction. Sladden Engineering January 28, 2005 -8- Project No. 54.4-4810 05-01-101 GENERAL The findings and recommendations presented in this report are based upon an interpolation of the soil conditions between boring locations and extrapolation of these conditions throughout the proposed building area. Should conditions encountered during grading appear different than those indicated in this report, this office should be notified. This report is considered to be applicable for use by East of Madison, LLC, for the specific site and project described herein. The use of this report by other parties or for other projects is not authorized. The recommendations of this report are contingent upon monitoring of the grading operations by a representative of Sladden Engineering. All recommendations are considered to be tentative pending our review of the grading operations and additional testing, if indicated. If others are employed to perform any soil testing, this office should be notified prior to such testing in order to coordinate any required site visits by our representative and to assure indemnification of Sladden Engineering. We recommend that a pre -job conference be held on the site prior to the initiation of site grading. The purpose of this meeting will be to assure a complete understanding of the recommendations presented in this report as they apply to the actual grading performed. Sladden .Engineering January 28, 2005 -9- Project No. 5444810 05-01-101 REFERENCES ASCE journal of Geotechnical Engineering Division, April 1974. 800re, Joyner and Fumal (1994) Estimation of Response Spectra mid Peak Accelerations from North American Earthquakes, U. S. Geological Survey, Open File Reports 94-127 and 93-509. Finn, W. E. Liam, (1996) Evaluation of Liquefaction Potential for Different Earthquake Magnitudes and Site Conditions, National Center for Earthquake Engineering Research Committee. Joyner and Boore, (1988) Measurements, Characterization and Prediction of Strong Ground Motion, ASCE Journal of Geotechnical Engineering, Special 'Publication No. 20. Lee & Albaisa (1974) "Earthquake Induced Settlements in Saturated Sands". Seed and 1driss (1982) Ground Motions and Soil Liquefaction During Earthquakes, Earthquake Engineering Research Institute Monograph. Seed, Tokimatsu, Harder and Chung, (1985), Influence of SPT Procedures in Soil Liquefaction Resistance Evaluations, ASCE Journal of Geotechnical Engineering, Volume 111, No. 12, December, Rogers, Thomas H., Geologic Map of. California, Santa Ana Map Sheet. Riverside County, 1984, Seismic Safety Element of the Riverside County General Platt Sladden Engineering APPENDDC A Site Plan Boring Logs APPENDIX A FIELD EXPLORATION For our field investigation, 29 exploratory borings were excavated between December 13 and December 23, 2004 using a truck mounted hollow stem auger rig (Mobile B-61) in the approximate locations indicated on the site plan included in this appendix. Continuous log of the materials encountered were prepared on the site by a representative of Sladden Engineering. Boring logs are included in this appendix. Representative undisturbed samples were obtained within our boring by driving a thin-walled steel penetration sampler (California split spoon sampler) or a Standard Penetration Test (SPT), sampler with a 140 pound hammer dropping approximately 30 inches (ASTM D1586), The number of blows required to drive the samplers 18 inches was recorded (generally in 6 inch increments). Blowcounts are indicated on the boring log. The California samplers are 3.0 inches in diameter, carrying brass sample rings having inner diameters of 2.5 inches. The standard penetration samplers are 2.0 inches in diameter with an inner diameter of 1.5 inches. Undisturbed samples were removed from the sampler and placed in moisture scaled containers in order to preserve the natural soil moisture content. Bulk samples were obtained from the excavation spoils and samples were then transported to our laboratory for further observations and testing. Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/13/2004 Boring No. 1 Job Number: 544-010 i; u', U Description ri, o ,Remarks pNative Soil 5 10 15 20 25 = 6/4/6 Sand: Fine to Medium Grained and Sandy Silt Layer — 2" SP Grey in color 30 516/7 Clayey Silt ML 6 64 Grey in color 35 9/13/10 Sand: Fine to Mcdium Grained Layer ^-9" and Sandy Silt SP 2 10 GTry in Color 40 - 10/10/8 Silty Sand: Fine Grained SM 2 14 j Grey in color 45 8/10/8 Silt and Clay: Interbedded Thin Lenses ML 6 Grey in color SO 11/16/21 Sand: Finc to Medium Grained SP 3 8 Grey in color Sladden Engineering 55 8/9/11 Sand: Fine to Medium Grained and Sandy Silt Layer — 2" SP 4 (i Brownish Grcy in color 60 3/3/4 Clayey Silt ML 27 77 Grey in color 65 10/7/8 Sand: Fine to Medium Grained Layer -9" and Sandy Silt SP 23 — Grey in color 70 11/13116 Silty Sand: Fine Grained SM 26 22 Dark Grcy in color 75 -v 719112 Silt and Clay: Interbedded Thin Lenses ML 33 72 Dark Grcy in color Groundwater C3a — 78 Feet 80 85 90 5/7/8 6/10/10 Claycy Silt ML 32 70 Brownish Grey in color Sample Not Recovered -Note.- _ 95 _gradual. -Total 100 The stratirrcation lines repms4wt the approximate boundwics botween the soil the transition may be Dcpth = 90 Foot Groundwater encountered ck not encountered Sladden Engineering Madison Club -The Hideawny NEC Avenue 54 & Madison Street, La Quinta Date: 12/18/2004 Baring No. 2 Job Number: 544-4810 p W � N � ir r - a -r a rnDescription Remarks 0 ative Soil 5 3/3/3 Silty Sand: Fine Grained $M 2 Light Grey in color 10 5/6/7 Silty Sand: Fine Grained SM I Light Brown in color 15 3/4/6 Silt ML 9 97 Tan in color 20 4/5/7 Sandy Silt and Silt Laytas ML 11 81 Tan in color 25 5/6/7 Silty Sand: Fine Grained SM 2 24 Greyish Brown in color 30 JL 3/5/9 Sandy Silt and Silt Layers ML 5 64 Light Brown at color 35 4/5/7 Sandy Silt ML 6 56 Greyish Brown in color 40 618/13 Silty Sand: Fine Grained SM 2 -•• BTOWnigh Grey in atlor 45 5/7/7 Sandy Silt ML 10 51 BrownishGrey in color 50 8/10/11 Silty Sand: Fine Grained and Silt Layer --1" SM 3 LS rownish Grcy in color Sladden Engineering Sladden Engineering 55 4/6/8 Clayey Silt ML 22 77 Brown in color 60 4/7/8 Sandy Silt with Truro of Clay ML 17 67 Brown in color 65 5/8/9 Sandy Silt ML 22 77 Brown in color 70 7/8/18 Sand and Silt Lay= SM 12 34 Brown in color 75 3/3/6 Clayey Silt ML 31 83 Brown in color - Groundwater Q 79 Feet RO 41617 Clayey Silt ML 27 88 Brown in color 85 6/14/17 Clayey Silt ML 26 63 i Brown in color 90 1/3/5 Silty Sand; Fine Grained SM 28 10 Brown in w1or ote: The stratification lines - represent the approximate 95 1/7/16 Silty Sand: Fine Grained SM 28 16 boundarics between the soil _types; the transition may be gmdual. -Total Depth = 101.5 Fcd 100 5/6/12 Clayey Sand SM 19 47 Groundwater encountered -Bedrock not encountered Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quiuta Date: 12/18/2004 Boring No. 3 Job Number: 544-4810 a 0 0 ^.• ;ti p r„ v pq Description Remarks 0 atiVe Soil 5 10 15 20 25 519112 Silty Sand: Fine Graincd and Silt Lays —3" SM 5 20 Greyish Brown in calor 30 416/8 Silty Sand: Fine Grained and Silt Laycr—l" SM 3 21 Greyish Brown in color 35 8/11/16 Silty Sand: Finc Graincd SM 2 14 Brownish Grey in color 40 619/14 Silty Sand: Fine Grained SM 3 lb[Brownish Grey in color 45 5/5/7 Sandy Silt ML 25 84 Brown in color 50 31418 Silt ML 22 56 Brown in color Sladden Engineering Sladden Engineering 55 9/10/17 Sand: Fine to Medium Grained SP 26 9 Brownish Grcy in color Groundwater Q 56 Feet 60 4/6/7 Silt ML 27 66 grown in color 65 6/13/10 Silty Sand: Fine Grained SM 24 14 Brownish Grey in color 70 2/5/14 Sandy Silt ML 24 52 Brown in color 75 80 5/12/22 6/21/34 Silty Sand: Fine Grained Clayey Sand SM SM 27 16 30 26 Brown in color Brown in color 85 is 90 ' - 11/20/26 10/16/31 Sand: Finc to Medium Grained Sand: Coarse Grainod and Sandy Silt SP SP LS 28 5 --- Brown in color Brown in color ote: The stratification lints I tht; approximate bctwom the soil types; the transition may be gradual. otul Depth =101.5 Feet round encountered edrock not encountered 95 _ _ 7/15/21 Silty Sand: Fine Grained SM 19 __boundarics 100: 5/8/l7 Sand: Coarse Grained I SP I[ 17 — Sladden Engineering Madison Club -'the Hideaway NEC Avenue 54 & Madison StrpA La Quinta Date: 12/20/2004 Boring No. 4 Job Number; 544-4810 E Description rnn -. Remarks 0 - 5 10 IS 20 Silty San& Fine to Medium Grained Native Soil 25 AL 214/6 Clayey Silt ML 11 78 Grey in color 30 5/8/9 Silty Sand: Fine Grained and Clay Layer ^-5" SM 6 --- Grey in color 35 40 ' 7/8/12 5/8/13 Sand: Fine Grained Sand: Fine Grainai SP 2 9 in color Grey in color 45JL 2/3/6 Clayey Silt Layer — 8" and Silty Clay Layer — 8" ML 31 87 Grcy in color 50 5/6/11 Silty Sand: Finc Grained SM 22 19 ronndwater ®--51 Feet Sladden Engineering Sladden Engineering 559/18/31 Sand: Fine Grained SP 22 11 ark Grcy in color 60 6/8/16 Sandy Silt ML 24 61 Dark Grcy in color 65 314/7 Clay CI.. 23 91 Bruwniuh Gmy in wlor 70 75 ':. 80 85 90 • 95 _tyM -Total l 00. - 9/13/16 9/15/17 12/16/23 6/9113 6/10!1 S 17/26/29 8/17/29 Sand: Finc to Coarnc Grained Sand: Finc to CoarseGrainod Sand: Fine to Coarse Grained and Gravel Sand: Fine to Coarse Grained and Silty Clay Layer ^- 4" Sand: Fine to Coarse Grained Sand: Fine to Coarse Grained Sand: Fine to Coarsc Grainat SP SP SP SP SP SP Sl' 25 23 23 23 28 27 30 10 11 8 11 7 8 Grcy in color' Grey in color Grey in color Grey in color rey in color Now The stratification lines cprcmt the approximate boundaries between the soil ; the transition may be graduial. Dcpth = 101.5 Feet roundwattr encountered edroek not encountered Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/20/2004 Boring No. 5 Job Number: 544810 0 pq Descri tion r° a Remarks p Nativc Soil 5 S/7/10 Sandy Silt ML 46 14 77 Greyish Brown in color 10 315/9 5ilrySand: Finc Grainod SM 110 5 16 Grey in color 15 5!7/10 Clayey Silt and Sandy Silt ML 108 3 74 Brownish Grey in color 20 418/13 Sand: Fine Grained SP 114 1 11 rey in color 25 30 California Split -spoon Samplc Total Depth =-21' Iedrock not atvountcrcd - Unrecovcmd Samplc Groundwatur not encountered - Standard Penetration Test Samplc 35 40 Now The stratification lines represent the approximate _ boundaries between the soil types; the transition may be gradual. 45 50 Siadden Engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/20/2004 Boring No. 6 Job Number: 544-4810 CPo 5 cn V pq Dcscri tion W Remarks QNative Soil 5 := 5/9/11. Sand: Fine Grained and Clayey Silt SP 114 2 --- Orcy in ColoT 10 9/10/10 Sand: Fine Grained and Silty Sand: Fine Grained SP 107 2 11 Grey in color 15 4/6/10 Sand: Fine Grained and Sandy Silt Sp 101 23 Grey in color 20 5/10/17 Sand: Fine Grained SP 91 20 7 Grcy in color 25 30California Split -spoon Sample Total Depth —21' - IBedrock not enwuntcrod - Unrcoovcred Sample I roundwatcr not cncountcrad _ - Standard Penetration Tcst Sample 35 40 Notc: The stratification lines represent the approximate boundaries between the soil types; the transition may be gradual. 45 50 Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Stree La Quinta Date: 12/20/2004 Boring No. 7 Job Number: 544-4810 Q Cn U Description o � aRcrnarks 0 Native Soil ' 5 4/5/8 Silty Sand: Fine Grained SM 102 3 21 rownish Grey in color 10 4/4/8 Clay and Silty Sand: Fine Grained SM 84 22 16 Brownish Grey in color I S 4/6/11 Sand: Fine to Coarse Grained and Sandy Silt Sp 103 5 10 Grey in color 20' Sandy SiltML .-T-- 110 6 77 Grey in color 95/9/13 25 30 California SI lit -spoon Sample Total Depth --2 P Bedrock not encountered - Unrec.overod Sample Groundwater not encountered - Standard Penetration Test Sample 35 40 Note: The stratification lines represent the appnmximatc boundaries between the soil types; the transition may be _ gradual. 45 50 Sladden Engineering Madison Club-The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/20/2004 Boring No. 8 Job Number: 544-4810 c« On M V pq tion rn Q O Remarks 0 ative Soil 5 4/7/11 Sandy Silt and Silty Clay ML 104 2 67 Grey in color 10 7/9/9 Silty Clay and Silty Band: Finc Grained ML 107 8 80 Grcy in color 15 10/16/24 Sand: Fine Grained SP 118 6 9 Grey in color 20 8/12/1.8 Silty Sand: Finc Grained and Sandy Silt SM 111 7 15 Grey in color 25 30 Califomia Split-spoon Sample Total Dcpth x-2 P - ' Bedrock not encountered - Unrecovered`` Samplc Groundwater not encountered - Standard Penetration Test Sample 35 40 Now The stratification lines represcnt the approximate boundaries between.the soil types: the trtlnFitinn may be gradual. 45 SQ Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta. Date: 12/20/2004 Boring No. 9 Job Number: 544-4810 C) Desori tion e Rmmrks p ative Soil 5 4/5/9 Sand: Fine Grained SP 101 3 7 Grey in color 10 5/9/15 Sandy Silt ML 90 22 75 Grvy in color 15 419/15 Silty Sand: Fine Graincd SM 102 14 1'5 Grey in color 208/1620 Sand: Fine Graintxl SP 98 !8 11 Grey in color 25 30 California Split -spoon Sample Total Dcpth —2 V - I Bedrock not encountered - Unreoovered Sample Groundwater not encountered - Standard Penetration Test Sample 35 40 Note: The stratification lines represent the approximate - boundaries between the soil types; tho transition may be . gradual. 45 50 Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/21/2004 Bering No. 10 Job Number: 544-4810 o U A Description m D Remarks UNative Soil 5 12/15/23 Sand: Fine Grained and Sandy Silt SP 100 2 9 Grey in color 10 23/35/31 Sand: Fine Grained and Clayey Silt SP 108 3 9 Brownish Grey in color 15 16/21/38 Sand: Fine Grained SP 99 6 7 Brownish Grey in color 20 23/50-5 Sand: Fine Grained SP 106 3 7 Greyish Brown in color 25 30 California Split -spoon Sample Total Depth o --2r Iedrock not encountered Unrecovered Sample I Groundwater not encountered _ Standard Penetration Test Sample 35 40 Notes The stratification lines represent the approximate _ t*undaries between the soil types; the transition may be gradual. 45 SO Sladden Engineering Madison Club-Thc Hidcaway NEC Avenue 54 & Madison Street, La QuInta Date: 12/21/2004 Boring No. 11 dab Number: 5444910 \ o N � 3 Q 12 o o Description tn°I marks 0 alive Soil 5 10/14/19 Sande Fine Grained SP 114 2 12 Grty in Color 10 8/11/15 Sand: Fine Graincd SP 115 3 11 Brownish Grey ui color 15 9/13/16 Sandy Silt and Sand: Fine Grained ML 121 2 72 Greyish Brown in COIOr 20 s 8/11/15 Sand: FincGrainod SP 113 2 12 Grey in color 25 30 California Split -spoon Sample Total Dcpth—21' - I alroek not eneountcrod - Vnrwovered Sample I Groundwater not encountered _ - Standard Penetration Test Sample 35 40 Note: The stratification lines rcpreKcnt the approximate _ boundaries between the soil types; the transition may be _ gradual. 45 50 Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La QuInta Date: 12/21/2004 Boring No. 12 Job Number: 544-4810 ❑ A v Description U3o a a � CA 0 0 N emuks 0 Wive Soil 5 8/11/13 Sand: Fine Grained SP 1 t 3 2 8 Brownish Grey in color 10 6/9/13 Sand: Fine Grained SP 109 1 " 9 Lrcy in color ]20 9/12114 Silty Sand: Fine Grained SM 1l4 2 17 Grey in color 9/12/22 ' Silty Sand: Eine Grained SM 112 4 l6 Grey Lt calor 25 30California Split -spoon Sample Total Depth —21' _ I edrock not enoounte rW - Unrccovaai Sample I roundwatcr not encountered - _ Standard Penetration Tcst Sample 35 40 Note: Tho s'tbatification lines represent the approximate boundaries between the soil types; the transition may be _ �radu0l. 45 50 Sladden Engineering Madison Club -The Hidcaway NEC Avenue 54 & Madison Street, Le Quints Date: 12/21n004 Boring No. 13 Job Number: S44-4810 N 4k c U Description •p rn 7L. •p �e \ Remarks 0 Native Soil 5 4/6/6 Sand: Fine Grained SP 115 1 10 Grey in color 10 6h/1 I Sand: Fine Grained SP 103 1 8 Grey in color - 15 9/14/15 Silly Sand: Fine Grained SM Ito 1 18 rey in calor - California Split -spoon Sample TOW Depth x-16 -I Bedrock not encountered 20 Unrecovered Sample I Groundwater not encountcrod - Standard Pen ft tion Tcst Sample 25 - Note; The stratification lines represent the approximate boundaries between the soil types; the transition may be - gradual. 30 35 40 4s 50 Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quints Date: 12/21/2004 Boring No. 14 Job Number: 5444810 O (� � Dcscri tion r° 4p, P o c Rcmarks 0 Nativc Soil . 5 7/10/14 Clayey Silt and Silty Sand: Fine Grained ML 104, 11 77 Grey in color to 8/12/16 Sand: Fine Grainod SP 99 6 8 Brownish Grey in color I S 6/10/11 Clayey Silt ML 93 24 83 Brownish Grey in color 20 5/8/11 Clayey Silt and Sandy Silt ML 93 27 80 Grey in color 25 30 California Split -spoon Samplc Total Depth w2 P IBedrock not cnwuntcmd Unrecovered Sample Groundwater not encountered Standard Pcnctration Tcst Sample 35 40 Note: The stratification lincs rq=cnt the approximate boundarics bctwmn the soil types; the transition may be _ gradual_ 45 50 Sladden Enginccring Madison Club -The Hideaway NEC Avenue 54 & Madison Street. La Ouinta Date: 12/21/2004 Bering No. 15 Job Number: 544-4810 R 0 N _ En U° Description rA° Remarks 0 .: ative Soil 5 3/2/2 Sand: Fine Grained SP 3 10 Greyincolor IU 212/3 Silty Sand: Fine Grainod SM 8 13 my in color 15 315n. Silty Sand: Fine Graincd SM 3 15 Brown in color 20 6/7n Silty Sand: Finc Grained and Clay Layer -Y SM 6 16 Brown in ailor . 25 313/4 Clay Layer •-7" and Claycy Silt Layer -,4" town in color 30 Califomia Split -spawn Sample TOO Depth —26' IBedrock not encountered - Unrwovcred Sample Groundwater not cnrountcrcd - Standard Penetration Tcst Sample 35 40 Note: The stratification lines rcpnxmt the approximate - boundaries between the soil types; the transition may be gradual. 45 50 Sladdcn Engineering Madison Club-The Hideaway NTC Avenue 54 & Madison Street La Quints Date: 12/21/2004 Boring No. 16 Job Number: $44-4810 rA U pq Description w o c o etnarks 0 Native Soil 5 10/11/14 6/9/13 Silty Sand: Fine Grained and Clayey Silt Sand: Finc Gtaiaed SM SP 103 110 6 2 16 7 rey in color 10 Grcy in color 15 ' 7/11/12 Sand: Fine Grained SP 109 2 6 Grey in color 20 7/13120 1 Sandy Silt and Silty Sand: Fine Grained ML 99 7 60 rey in color n 25 30 Califomia Split-spoon Samplc Total Doth x-21' cdrock not encounteral - Unrecovered Sample Groundwater not cncountcred Standard Penetration Test Sample '35 40 Now The stratification lints Tcprescnt the approximate boundaries bctwoen the soil types; the transition may be _ gradual, 45 50 S ladder Engineering, Madison Club -The. Hideaway NEC Avenue 54 & Madison Street, La uinta Date: 12/21/2004 Boring No. 17 Job Number; 5444810 u Description rn a cmark9 0 ative Soil 5 6/10/16 Clayey Silt ML 109 1 76 rey in color 10 12/14/22 Clayey Silt ML 108 8 71 Grey in color 15 6/9/12 Silty Sand: Fine Grained SM 107 2 16 Grey in color - California Split -spoon Sample Total Depth, -16' _ 1 Bedrock not encountered 20 Unrecovered Samplc Groundwater not encountered _ - I Standard Penetration Test Sample 25 - Note: The stratification lines represent the approximate _ boundaries between the soil types; the transition may be gradual. 30 35 40 45 50 Sladden Engineering Madison Club-The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/21/x004 Boring No. 18 Job Number: 544-4810 o � en U i im Descri tion IRcrnarks p ativc Soil 5 6/8/15 Silty Sand: Finc Grained SM 103 1 17 Grey in color 10 12/14/19 Sand: Fine Grained SP 112 0 7 Brownish Grvy in color 15 9/10/13 Sand: Fine Grained SP 104 1 5 Brownish Grey in color - California Split-spoon Samplc otal Depth —16' cdrock not chcountmed 20 Unrecovexcd Sampic Groundwater not cncountavd - Standard Penetration Test Samplc 25 - Note: The stratification lines represent the approximate boundaries between the soil types; the transition may be gradual. 30 3s 40 4s 50 Sladden Engineering 0 5 10 15 20 25 30 35 40 45 50 12/21/2004 Madison Club -The Hideaway NEC Avenue 54 & Madison Stree La Quinta Bering No. 19 Job Number: 5444810 CD 10/14/18 Silty Sand: Fine Grained 4/7/9 Sand: Fine Grained 5I9/10 Silty Sand: Finc Grained 7111/20 Sand: Fine Grained California Split -spoon Samplc Unrecovacd Sample Standard Penetration Test Sample ' Nota The utratification lines represent the approximate boundaries between the soil types; the transition may be gradual. Sladden Engineering alive Soil SM 1 103 1 14 rey in color SP 104 2 10 Grey in color SM 111 4 18 Grey in color SP 109 4 8 my in color Total Depth —21' edrock not encountered Groundwatcr not encountered Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/21/2004 Bering No. 20 Job Number: 5444810 w o c LL � Sladden Engineering v� U Desmi tion rn C Renmrks . 0" ativo Soil 5 8/9/12' Sand: Finc Grained SP 113 1 8 Grey in color 10 9/13/14 Sand: Fine Grained, SP 109 5 Grey in color 15 6/9/13 Sand: Finc Grained SP 109 1 8 Grey in calor 20 ' 8/14/27 Sand: Fine GrainaJ SP 112 4 l0 Grey in color 25 30California Split -spoon Sample Total Depth x-21' edrock not encountered - Unrccovecd Sample I Groundwater not encountered - Standard Penetration Test Sample 35 40 Nate: The stratification lines represent the approximate boundaries between the soil types; the transition may be _ gradual. 45 50 Sladden Engineering Madison Club-The Hideaway NEC Avenue 54 & Madison Street, La Quints Date: 12/23/2004 Boring No. 21 Job Number: 544-4810 Ov'i U o Description Remarks pIN alive Soil 5 5/10/21 Sand: Finc Grained Sr 1 9 rcy in color lU 8/10/10 Sand: Finc Grained SP 5 10 Grey in color 15 3/4/8 Silty Clay and Clay Layer —3" ML 11 75 Brownish Grey in color 20 3/6/11 Silt and Clay: Thin Interbedded Leases CL 10 9513m.i5h Gny in color 25 30 California Split-spoon Sample Total Depth x-21' - Bedrock not encountowl - Unrocoveredff Sample Groundwater not encountered _ - f Standard Penetration Test Sample 35 40 Note: The stratification lines represent the approximate boundaries bctwonn the soil types; the transition may he _ gradual. 45 50 Sladdcn Engineering Madison Club-The Hideaway NEC Avenue 54 & Madison Street La Quinta Date, 12/23/2014 Boring No. 22 Job Number: $444810 44 a, o e) Q rn V Descrition CI)o Remarks p Native Soil 5 4/4/10 Clay and Sandy Silt Layer--6" ML 7 57 Brownish Grey in color l0 5/8/11 Silty Clay and Silty Sand: Fine Grained Layer ^-2" Cl. 13 86 Grey in color l5 6/9/14 Silty Sand: Fine Grained and Silty Clay Layer--7" SM 18 --- Grey in calor 20 518111 Sand: Fine Grained SP 1 14 Brownish Grey in color 25 3/1/10 jClayeySilt ML 3 81 rownish Grey in calor 30 California Split-spoon Sample Total Depth =^-25.5' - I Bedrock not encountered - Unnaoovcred Sample I Groundwater not encountered - Standard Penetration Test Sample 35 40 Notc: The Spatificatiun lines represent the approximate boundaries betwom the soil types; the transition may be gradual. 45 50 Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Stree4 La Quints Date: 12/23/2004 Boring No. 23 Job Numbet: 5444810 ti Gg o Description 0 � � � emarks 0 rass Pasture 5 4/6/9 Sand: Pine Grained SP 1 10 Grey in color 10 3/5/11 Sand: Fine Grained SP 7 10 Groy in color 15 3/6/8 Clayey Silt and Sandy Silt Layer –7" ML 8 68 Brownish Grey in Color 20 313/5 Clay and Sandy Silty Layer --6" ML 20 71 Brownish Grey in color 25 30 California Split -spoon Sampic Total Depth —20.5' ISedrock not rnwunlered Unrecovered Sample I Groundwater not encountered _ Standard penetration Test Sample 35 40 Notw-The stratification lines rcpmsmt the approximate boundarics between the soil types; the transition may be _ gradual. 45 50 Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/23/2004 Boring No. 24 Job Number: 544-4810 Ve v � tj o Gq Dmcri tion � ° o \' Remarks 0 Native Soil 5 5/20/20 Claycy Silt ML 1 Light Grey 10 617/10 Sand: Fine Graincd SP 2 9 Grey in color 15 5/6/10 Silty Sand: Finc Grained SM 2 12 Grey in color 20 5ni8 Silty Sand: Finc Graincd SM 1 12 rey in color 25 30 Califomia Split spoon Sample Total Depth —20.5' Iodrock not cn ountcrod . - Unrecovered Sample GroundwaturTiot mcountered - Standard Penetration Test Sample 35 •40 Note: The stratification lines rcprescnt the approximate boundaries between the soil types; the transition may be gradual. 45 50 Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 &. Madison Street, La Quinta Date; 12/23/2004 Bering No. 25 Job Number. $44-4810 �.r Y r„ U 00 Description � v, M :Z) \° o N � y emarks 0Native Soil 5 10/20/20 Sand: Fine Grained SP 1 4 Grey in color 10 6/9/18 Sand: Finc Grained SP 1 1 I Grey in color 15 6/10/15 Clayey Silt ML 3 77 Brown in color 20 8/10/I4 Sandy Silt and Clayey Silt Laycr–3" ML 3 72 Brown in color 25 30 California Split -spoon Su mple Total Depth —20.5' - IBedrock not encountered - Unrocovcrod Sample Groundwater not encountered Standard Penetration Test Samplc 35 40 Note: The stratification lines reprewni the approximate boundaries between the soil types; the transition may be _ gradual. 45 50 Sladden )engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Strect, La uinta Date: 12/23/2004 Boring No. 26 Job Number. 5444810 pp e � ,� U pq Description rn :5 Remarks 0 Nativo Soil 5 3/6/10 Silty Clay Laycr-6" and Sand: Fine Grained ML 18 81 Orey in color 10 ; 5/6/8 Sand: Fine Grained SP S l U rey in color 15 3/416 Sand: Fine Grained Layer --3" and Clayey Silt SP 8 --- Gray in color - California Split -spoon Samplc Total Depth —15.5' Bedrock not cnoountamd 20 Unrecovered Samplc Groundwater not eneountcrod - Standard Penetration Test Samplc . 25 Now The stratification link represent the approximate boundaries between the soil types; the transition may be gradual. 30 35 40 45 50 Sladdcn Engineering Madison Club -The hideaway NEC Avenue 54 & Madison Street, La Y..1. XT _t. Cdd-AA1 (Date• 12/Z3/2UU4 jmUrIJUK 11 U. F. - --- � \ o e � Description ri a e 1 Remarks 0 ativc Soil 5 6n19 Sand: Fine Grained SP 4 9 Grey bt color 10 JL 3/4/5 Clayey Silt ML 2 84 Brownish Grey in color 15 4/5/5 Sandy Silt and Clayey Silt --3" 1v1L 12 71 Brownisb Grey in color 20 ; 5/5/8 Sand: Nine to Medium Grained SP G 10 Brownincolor 25 30California Split -spoon Sample Total Depth —20.5' Iedrock not encountered - Unrecovarad Sample I roundwater not encountcrod - - Standard Penetration Test Sample 35 40 Nota The stratification lutes toprc"mt the approximate - boundaries between the soil types; the transition may be gradual, 45 50 Sladden Engineering Madison Ciub-The Hideaway NEC Avenue 54 & Madison Street lea Quinta Date: 12/23/2004 Bo!No. 28 Job Number: 5444810 q v'i U m Descri tion -r Remarks 0 ativc Soil 5 4x7/9 Sandy Silt ML 3 61 Grey in color 10 3/3/6 Clay Laycr –7" and Sandy Silt ML 10 74 Grey in color 15 2577 CL 12 90 rrownish Grey in color - California Split-spoon Sample Total Depth —15.5' _ I Bedrock not encountcrod 20 Unrecovered Sample QTOundwater not encountered I Standard Pcnctration TvA Sample 25 - Note: The stratification lines represent the approximate _ boundaries between the soil typos; tho transition may be . gradual. 30 4 35 40 45 50 Sladden Engineering Madison Club -The Hideaway NEC Avenue 54 & Madison Stree La Quinta Date: 12/23/2004 Bering No. 29 Job Number. 544-4810 U CQ Description a � Rcmar6 alive Soil 5 619114 Silty.Sand: FincGraincd SM 1 17 Orey in color 10 6/7/8 Sand: Pinc Graincxl SP 2 11 Grey in Color 15 ' 3/4/7 Sand: Fine Grained SP 4 10 Grey, in Color - California S lit -spoon Sample Total Dcptb —15.5' i Bedrock not encountered 20 Un=ovcred Samplc Groundwater not cncountered Standard Penetration Test Sample 25 - Note: The stratification lines represent the approximate boundaries between the Soil types; die transition may be _ gradual. 30 35 40 45 50 Sladden Engineering APPENDIX B Laboratory Testing Laboratory Test Results APPENDIX B LABORATORY TESTING Representative bulk and relatively undisturbed soil samples were obtained in the field and returned to our laboratory for additional observations and testing. Laboratory testing was generally performed in two phases. The first phase consisted of testing in order to determine the compaction of the existing natural soil and the general engineering classifications of the soil underlying the site. This testing was performed in order to estimate the engineering characteristics of the soil and to serve as a basis for selecting samples for the second phase of testing. The second phase consisted of soil mechanics testing. This testing including consolidation, shear strength and expansion testing was performed in order to provide a means of developing specific design recommendations based on the mechanical properties of the soil. CLASSIFICATION AND COMPACTION TESTING Unit Weight and Moisture Content Determinations: Each undisturbed sample was weighed and measured in order to determine its unit weight. A small portion of each sample was then subjected to testing in order to determine its moisture content_ This was used in order to determine the dry density of the soil in its natural condition. The results of this testing are shown on the Boring Log. Maximum Density -Optimum Moisture Determinations: Representative soil types were selected for maximum density determinations. This testing was performed in accordance with the ASTM Standard D1557-91, Test Method A. The results of this testing are presented graphically in this appendix. The maximum densities are compared to the field densities of the soil in order to determine the existing relative compaction to the soil. This is shown on the Boring Log, and is useful in estimating the strength and compressibility of the soil. Classification Testing: Soil samples were selected for classification testing. This testing consists of mechanical grain size analyses and Atterberg Limits determinations. These provide information for developing classifications for the soil in accordance with the Unified Classification System. This classification system categorizes the soil into groups having similar engineering characteristics. The results of this test are very useful for detecting variations in the soil and in selecting samples for further testing. SOIL MECHANIC'S TESTING Direct Shear Testing: One bulk sample was selected for Direct Shear Testing. This testing measures the shear strength of the soil under various normal pressures and is used in developing parameters for foundation design and lateral design. Testing was performed using recompacted test specimens, which were saturated prior to testing. Testing was performed using a strain controlled test apparatus -with normal pressures ranging from 800 to 2300 pounds per square foot. Expansion Testing: One bulk sample was selected for Expansion testing. Expansion testing was performed in accordance with the UBC Standard 18-2. This testing consists of remolding 4 -inch diameter by 1 -inch thick test specimens to a moisture content and dry density corresponding to approximately 50 percent saturation. The samples are subjected to a surcharge of 144 pounds per square foot and allowed to reach equilibrium. At that point the specimens are inundated with distilled water. The linear expansion is then measured until complete. Consolidation Testing: F119* relatively undisturbed samples were selected for consolidation testing. For this testing one -inch thick test specim s are subjected to vertical loads varying from 575 psf to 11520 psf applied progressively. The consolidation at each oad increment was recorded prior to placement of each subsequent load_ The specimens were saturated at the 575 sf or 720 psf load increment. APPENDIX C 2001 California Building Code with T997 U13C Seismic Design Criteria January 28, 2005 -15- Project No. 544-4810 05-01-101 2001 CALIFORNIA BUILDING CODE SEISMIC DESIGN INFORMATION The California Code of Regulations, Title 24 (2001 California Building Code) and 1997 Uniform Building Code, Chapter 16 of this code, contain substantial revisions and additions to earthquake engineering design criteria. Concepts contained in the code that will be relevant to construction of the proposed structures are summarized below. Ground shaking is expected to be the primary hazard most likely to affect the site, based upon proximity to significant faults capable of generating large earthquakes. Major fault zones considered to be most likely to create strong ground shaking at the site are listed below. , Fault Zone Approximate Distance From Site Fault Type (1997 UBC) San Andreas 8.9 km A San Jacinto 30.9 km I A Based on our field observations and understanding of local geologic conditions, the soil profile type judged applicable to this site is Su, generally described as stiff or dense soil. The site is located within UBC Seismic Zone 4. The following table presents additional coefficients and factors relevant to seismic mitigation for new construction upon adoption of the 1997 code. Sladden Engineering Near -Source Near -Source Seismic Seismic Seismic Acceleration Velocity Coefficient Coefficient Source Factor, Na Factor, NX Ca C� San Andreas 1.04 1.29 0.44Na 0.64N„ San Jacinto 1.0 1.0 0.44N. 0.64NV Sladden Engineering ` 1 Sladden Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 80621 (714) 523.0952 Fax (714) 423-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-893 Fax (760)772-M95 March 2, 2006 Project.No. 5224810 06-02-120 East of Madison, LLC RECI-11 �`� 80-349 Via Missal 11 c La Quinta, California 92253 Project: Madison Club - Tract 33076 ` MAR 13 2015 NWC Avenue 54 and Monroe Street CITY CF LA QUINTA La Quinta, California COMMUNITY DEVELOPMENT Subject: Report of Observations and Testing During Rough Grading Ref: Geotechnical investigation Report prepared by Sladden Engineering dated January 28, 2005, Project No. 5444810; Report No. 05-01-101 Summarized -in this report are the results of in-place density tests performed at the subject site during the rough grading of the building pads along with pertinent observations. The subject site is located on the northwest corner of Avenue 54 and Monroe Street in the City of La Quinta, California. Rough grading was performed by Nuevo Engineering using conven3onal heavy w ' equipment. The building pad areas were overexcavated to a depth of at least 3 feet below existing grade or 4 feet below pad grade, whichever was deeper. Deep removals up to 10 feet in depth were performed in areas where substantial roots were encountered. The previously removed native soils and native soils obtained from cut areas of the site were placed in thin lifts at near optimum moisture content and compacted to at least 90 percent relative oompaction, The overexcavation generally extended laterally at least 5 feet beyond the previously approved building setbacks as indicated on the rough grading plans prepared by RCE. The remedial grading including ova -excavation of the surface soil was performed as recommended within the abova referenced Geotechnical investigation report. Observations and field testing was performed from April 22, 2005 through January 4, 2006. Testing indicates that after reworking areas of low d a minimum of 90 percent relative compaction was attained in the areas tested, The as, ' r ce with the project specifications at the tested locations and d ptB Dirtt(�r n of the contractors work. UILDING & SAFE t V E®Pr. APPROVED OR COtvc-m, DATE March 2, 2006 2- Project No. 5224810 06-02-120 Field Tests: In-place moisture/density tests. were performed using a nuclear density gauge in accordance with test methods ASTM D 2922 and ASTM D 3017. A total of 2355 density tests were performed by Sladden Engineering personnel during rough grading. The approximate test locations are indicated by lot number and on the attached plans and test results are summarized on the attached data sheets. Laboratory Tests: The moisture -density relationships for the tested materials were determined in the laboratory in accordance with test method ASTM D 1557-91. Allowable Bearing Pressures: The structural values recommended in the referenced Geotechnical investigation report prepared by Sladden Engineering remain applicable for use in foundation design. Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent grade. Continuous footings should be at least 12 inches wide and isolated pad footings should be at feria 2 feet wide. Continuous footings and isolated pad footings should be designed utilizing allowable bearing pressures of 1.500 psf and 1800 psf, respectively. The allowable bearing pressures are for dead and frequently applied live loads and may be increased by 1/3 to resist wind, seismic or other transient loading. The recommended allowable bearing pressures may be increased by one- third for wind and seismic loading. The bearing soils are nom -expansive and fall within the "very low" expansion category in accordance with Uniform Building Code (UBC) classification criteria. If there are any questions regarding this report or the testing summarized herein, please contact the undersigned. Respectfully submitted SLADDEN ENGINERI l AN&) c� Brett L. n 40 m too. C 45389 Principal Engineer a Exp. 913oloG ;0 Grading/lh sp CIV%V Q��P OF CA4�F0 Copies 4/East of Madison, LLC TEST RESULTS PROJECT NAME; Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. l Date Testcd I Location ElcvationI Dry Density I % Moisture I Relative I Maximum In Place In Place Compaction Densitv 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-22.05 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 DATE: March 2, 2006 Building Pads Lot 8A back half Lot 8A back half Lot 8A front half Lot SA front half Lot 9A back half Lot 9A back half Lot 9A front half Lot 9A front half Lot 10A back half Lot 10A back half Lot 10A front half Lot 10A front half Lot 14A front half Lot 14A front half Lot 14A back half Lot 14A back half Lot 12A back half Lot 12A back half Lot 12A front half Lot 12A front half Lot 11A back half Lot 11A back half Lot 11A front half Lot 11A front half Lot 15A back half Lot 15A back half Lot 15A front half Lot 15A front half Lot 13A back Half Lot 13A back half Lot 13A front half Lot 13A front half Lot 12A front half Lot 12A front half 992 994 992 994 992 994 992 994 991 992 993 99S 988 990 995 993 996 998 1000.5 98.5 991 993 991 993 991 993 992 994 996 998 992 994 1002.5 1004.5 109.2 104.4 106.6 105.6 109.2 101.7 109.0 104.1 100.1 106.6 106.3 98.7 105.4 106.1 106.3 103.4 98.9 107.9 101.6 108.9 98.6 100.0 103.6 98A 105.3 109.1 104.2 104.0 109.6 103.9 109.9 107.2 109.7 98.9 10.2 8.0 9.7 12.4 11.0 8.5 10.3 10.6 19.3 13.2 15.0 12.0 10.4 8.6 9.4 12.0 10.3 13.0 12.0 11.3 8.0 12.3 10.1 8.2 9.6 8.9 9.7 7.6 7.3 7.6 12.2 13.7 12.5 8.9 99 95 97 96 99 92 99 95 91. 97 97 90 96 96 92 94 90 98 92 99 90 91 94 90 96 99 95 95 99 94 99 98 99 90 110.0 110.0 1.1.0.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 120.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 11.0.0 110.0 110.0 Sladden Enj►lneerinx if TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density I % MoistureRelative Ma�timum I_ _ In Place In Place I Comnaction I Densitv DATE: March 2.12006 995 109.7 Over -excavation 35 04-26-05 Lot 15A back half 36 04-26-05 Lot 15A back half 37 04-26-05 Lot 14A back half 38 04-26-05 Lot 14A back half 39 04-26-M Lot 13A back half 40 04-26-05 Lot 13A back half 41. 04-26-05 Lot 12A back half 42 04-26-05 Lot 12A back half 43 04-26-05 Lot 11A back half 44 04-26-05 Lot 11A back half 45 04-26-05 Lot 10A back half 46 f 04-26-0.5 Lot 10A back half 47 i 04-26-05 Lot 9A back half 48 04-26-05 Lot 9A back half 49 04-26-05 Lot 8A back half 50 04-26-05 Lot 8A back half 51 04-26-05 Lot 8 B 52 04-26-05 Lot 8 a 53 04-26.05 Lot 6 B 54 04-26-05 Lot 6 B 55 I 04-26-05 Lot 6 B 56 + 04-26-05 Lot 6 B 57 04-26-05 I Lot 4 B 58 04-26-05 Lot 4 B 59 04-26-05 ! Lot 5 B 60 04-26-05 i. Lot B 61 04-26-05 i Lot 8 A front half 62 04-26-05 Lot 8 A front half 63 04-26-05 Lot 9 A front half 64 I 04-26-05 Lot 9 A front half 65 04-27-05 Lot 13 A front half 66 04-27-05 Lot 13 A front half 67. ! I 04-27-05 Lot 13 A front half 68 04-27-05 Lot 13 A front half 69 04-27-05 Lot 13 A front half 70 04-27-05 Lot 13 A front half 71 04-27-05 Lot 13 A front half 72 04-27-05 Lot 13 A front half 73 04-27-05 Lot 13 A front half 74 04-27-05 Lot 13 A front half DATE: March 2.12006 995 109.7 11.1 99 110.0 997 109.4 4.8 99 110.0 999 109.4 11.9 99 110.0 1001 105.8 12.0 96 110.0 1000 107.3 13.5 97 110.0 1002 103.3 7.6 94 110.0 1000 109.5 7.3 99 110.0 1000 109.6 6.1 99 110.0 995 104.7 9.6 95 1100 997 108.9 9.3 99 110.0 995 109.6 13.0 99 110.0 997 107.5 14.4 98 110.0 996 109.1 9.4 99 11010 998 108.9 7.8 1 99 110.0 996 109.9 13.8 I 99 11.0.0 998 106.9 11.7 97 110.0 993.3 99.0 21.2 90 1.10.0 994.3 103.6 10.9 94 110.0 994.6 99.9 14.3 91 110.0 996.6 108.0 9.5 98 ; 110.0 994.0 99.2 12.9 90 110.0 996.0 103.9 13.7 1 94 110.0 995.3 90.3 9.3 82* 110.0 995.3 103.4 11..3 94 110.0 996.3 99.2 I 15.8 90 110.0 994.0 105.3 12.0 96 110.0 996 109.6 8.2 99 110.0 998 109.3 8.6 99 110.0 996 107.7 I 9.7 97 110.0 998 102.1 8.4 93 110.0 994 103,9 8.8 94 110.0 996 105.4 10.1 96 t 1.10.0 990 101.8 9.3 93 j 110.0 992 106.9 11.4 97 110.0 994 104.5 8.3 95 110.0 996 105.8 13.1 96 110.0 997 108.1 11.4 98 110.0 998 106.8 10.9 97 110.0 994 106.1. 9.8 96 120.0 995 103.8 8.6 94 110.0 Sladden Engineering �; PROJECT NAME: Madison Club LOCATION: La Quinta, California TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. I Date Tested Location Elcvation Dry Dcrtsity In Place % Moisturc In Place Rclativc Compaction Maximum Density 75 04-27-05 lot 17 A front half 993.5 106.1 9.8 % 110.0 76 04-27-05 Lot 26 A front half 988 103.0 6.9 94 110.0 77 04-27-05 Lot 26 A front half 990 105.6 7.2 96 110.0 78 04-27-05 Lot 25 A front half 988 1015 8.1 92 110.0 79 04-27-05 Lot 25 A front half 990 102.8 7.9 93 110.0 80 04-27-05 Lot 24 A front half 988 100.3 9.1 91 110.0 81 04-27-05 Lot 24 A front half 990 102.5 8.0 93 110.0 82 04-27-05 Lot 8 A Back half 994.5 106.9 10.5 97 110.0 83 04-27-05 Lot 8 A Back half 9965 104.7 12.5 95 I 110.0 84 04-27-05 Lot 9 A Back half 994 107.0 11.6 97 110.0 85 04-27-05 Lot 9 A Back half 996 105.3 13.4 i 96 110.0 86 04-28-05 Lot 24 A back half 989 103.0 I 9.6 ' 94 110.0 87 04-28-05 Lot 24 A back half 991 104.4 12.9 95 110.0 88 04-28-05 Lot 25 A back half 993 99.6 10.3 91 110.0 89 04-28-05 Lot 25 A back half 995 I 105.3 7.4 96 110.0 90 04-28-05 Lot 26 A back half I 993 98.7 I 6.7 i 90 110.0 91 04-28-05 Lot 26 A back half 995 106.6 11.6 97 110.0 92 04-28-05 Lot 24 A front half 992 102.5 13.3 93 110.0 93 04-28-05 Lot 24 A front half 994 110.3 10.8 91 110.0 94 04-28-05 Lot 25 A front half 992 ; 103.6 11.5 94 110.0 95 04-28-05 Got 25 A front half 994 i 100.5 10.3 92 110.0 96 04-28-05 Lot 20 A front half 992 { 108.6 9.1 99 110.0 97 04-28.05 Got 20 A front half 994 i 109.6 6.4 99 110.0 98 04-28-05 Lot 21 A front half 992 108.7 7.1 I 99 110.0 99 04-28-05 Lot 21 A front half 994 i 102.8 5.5 I 93 110.0 100 04-28-05 Lot 22 A front half 992 107.2 5.1 I 97 110.0 101 04-28-05 Lot 22 A front half 994 I 100.6 I 11.5 I 91 110.0 102 04-28.05 Lot 26 A front half 992 109.1 9.5 99 110.0 103 04-28-05 ! Lot 26 A front half 994 I 107.7 ! 7.8 ! 98 I 110.0 104 , 04-28-05 Lot 24 A Back half 993 101.7 9.8 97 110.0 105 04-28-05 Lot 24 A Back half 995 105A 9.8 j 96 110.0 106 ' 0428-05 Lot 25 A Back half. 996 106.8 11.3 97 i 110.0 107 04-28-05 Lot 25 A Back half 998 101.3 6.7 92 1 110.0 108 0428-05 Lot 26 A Back half 996 105.5 6.3 96 110.0 109 I 04-28-05 Lot 26 A Back half 998 100.9 7.3 92 110.0 110 04-29-05 Lot 16 A Back half 994.5 102.4 8.3 93 110.0 11.1. 04-29-05 Lot 16 A Back half 996 100.1 7.6 91 110.0 112 04-29-05 Lot 15 A Back half 996 97.0 10.8 88'° 110.0 113 04-29-05 Lot 14 A Back half 999 104.5 12.9 95 110.0 114 04-29.05 Lot 13 A Back half 999 101.8 9.0 1 93 110.0 DATE: March 2, 2006 Sladden Engineering T PROJECT NAME: Madison Club LOCATION: La Quinta, California TEST RESULTS PROJECT NO: 522AS 10 REPORT NO: 06-02-120 Test No, I Date Tested I Location Elevation I Dry Density I % Moisture I Relative Maximum In Place In Place I Co=action I Densitv 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 04-29-05 04-29-05 04-29-05 04-29-05 04-29-05 04-29-05 04-29-05 Lot 21 A Back half 992.2 Lot 21 A Back half 994 Lot 20 A Back half 993.2 Lot 20 A Back half 994.5 Lot 1.8 A Back half 995.6 Retest 157 Lot 21 A Front Half Lot 4 B Back half 997 05-02-05 Lot 21 A Back Half 05-02-05 I Lot 21 A Back Half 05-02-05 Lot 23 A Back Half 05-02-05 Lot 23 A Back Half 05-02-05 Lot 21 A Front Half 05-02-05 Lot 21 A Front Half 05-02-05 Lot 24 A Back Half 05-02-05 Lot 24 A Back Half 05-02-05 Lot 24 A Back Half 05-02-05 Lot 24 A Back Half 05-02-05. Lot 24 A Center 05-02-05 Lot 25 A Ccntcr 05-02-05 Lot 26 A Center 05-02-05 Lot 24 A Front Half 05-02-05 I Lot 25 A Front Half 05-02-05 Lot 26 A Front Half 05-02-05 I Lot 23 A Front Half 05-02-05 i Trot 23 A front Half 05-02-05 Lot 22 A Front Half 05-02-05 I Lot 22 A Front Half 995 996.5 993 995 996 997.5 996 997.5 998.5 999.5 994 993 994 995.5 995.5 996 994 996 995,5 996.5 142 05-03-05 Lot 20 A Front Half 996 143 05.03-05 Lot 20 A Back Half 996 144. ! 05-03-05 Lot 20 A Back Half 997.5 145 05-03-05 Lot 25 A Back Half 999 146 I 05-03-05 Lot 25 A Back Half 1000 147 05-03-05 Lot 25 A Front Half 997 148 05-03.05 Lot 25 A Front Half 999 149 05-03-05 Lot 24 A Front Half 997 150 N 05-03-05 Lot 24 A Front Half 999 151 I 05-01-05 Lot 23 A Front Half 998 152 I 05-03-05 Lot 23 A Front Half 1000 153 05-03-05 Lot 22 A Back Half 997 154 05-03-05 Trot 22 A Back Half 999 DATE: March 2, 2006 99.6 99.1 103.2 102.4 94.1 106.0 107.5 102.9 101.5 108.1 103.2 107.6 103.7 106.3 100.9 104.6 101.9 106.3 105.1 105.8 101.8 106.6 105.0 106.3 100.9 104.6 101.9 95.4 107.1 104.7 103.5 101.3 99.9 108,2 99.5 99.2 106.4 101.0 104.9 109.4 10.8 11.1 8.8 10.1 12.8 9.1 12.2 17.4 9,8 7.4 13.1 9.5 6.9 14.0 12.8 15.1 13.2 14.1 12.2 13.5 10.4 13.0 11.9 14.0 12.8 15.1. 13.2 25.1 8.8 11.4 16.9 17.4 17.1 7.7 16.0 20.1 14.6 15.2 14.9 11.7 91 110.0 90 110.0 94 110.0 93 110.0 86* 110.0 96*" 110.0 98 110.0 93 f 110.0 92 110.0 98 110.0 96 110.0 98 11.0.0 94 110.0 97 110.0 92 1 110.0 95 110.0 93 110.0 97 110.0 96 110.0 96 110.0 93 I 110.0 97 110.0 95 I 110.0 97 1 110.0 92 i 1.10.0 95 110.0 93 110.0 81'° I 110.0 97 i 110.0 95 I 110.0 94 I 110.0 92 110.0 90 110.0 98 110.0 90 110.0 90 110.0 97 i 110.0 92 110.0 95 110.0 99 110.0 Sladden Engineering , 1, PROJECT NAME: Madison Club TEST RESULTS PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No.I Date Toted Location Location Elevation I Dry Density I % Moisture I Relative I Maximum In Place In Place Compaction I Density 155 05-03-M Lot 23 A Back Half 156 05.03-05 Lot 23 A Back Half 157 05-03-05 Retest # 142 158 05-03-05 Lot 20 A Center 159 05-03-05 Trot 21 A Center 160 05-03-05 Lot 21 A Center 161 05-03-05 Lot 22 A Center 162 05-03.05 Lot 22 A Center 163 05-03-05 Lot 23 A Center 164 .I 05-03-05 Lot 24 A Center 165 05-04-05 Lot 54 A Center 166 05-04-05 Lot 54 A Center 167 05-04-05 Lot 53 A Center 168 ! 05-04-05 Lot 53 A Center 169 I 05-04-05 l of 54 A 'Front Half 170 05-04-05 Lot 54 A Front Half 171 05-04-05 Lot 53 A Front Half 172 05-04-05 Lot 2 A Back Half 173 I 05-04-05 Lot 1 A Back Half 174 i 05-04-05 I Lot 1 A Back Half 175 05-04-05 Lot 1 A Center 176 05-04-05 Lott A Center 177 i 05-04-05 Lot 2 A Center 178 05-04-05 Lot 2 A Center 1.79 i 05-04-05 ! Lot 2 A Front Half 180 ! 05-04-05 Lot 2 A Front Half 181 05-04-05 Lot 1. A front Half 182 1 1 05.04-05 I Lot 1 A Front Half 183 I 05.05-05- Lot 2 A Front Half 184 ; 05-05-05- Lot 2 A Front Half 185 05-05-05- Lot 1 A Front Half 186 05-05-05- I Lot 1 A Front Half 187 05-05-05- Lot 1 B Back Half 188 05-05-05- I Lot 1 B Back Half 189 05-05-05 i Lot 1 B Center 190 j 05-05-05 ; Lot 1 B Center 191 05-05-05 j Lot 2 B Center 192 05-05-05 Lot 2 B Center 193 05-05-05 3 8 Front Half 194 05-05-05 3 B Front Half DATE: March 2, 2006 996 102.9 16.8 93 110.0 998 100.6 12.9 91 110.0 101.4 9.5 92** 110.0 998 103.9 12.2 94 110.0 996 99.9 13.6 91 110.0 997.5 109.7 11.3 99 110.0 995 106.3 14.1 96 j 110.0 997 107.1 15.0 97 110.0 996 i 108.7 11.3 99 110.0 998 109.1 14.2 99 110.0 988.7 I 107.7 i 6.9 98 110.0 990 99.1 14.8 90 110.0 988.3 105.8 6.7 96 110.0 9905 I 102.5 I 7.8 1 93 110.0 990 I 105.4I 6.8 1 96 11.0.0 992 101.7 10.0 I 92 110.0 987.5 105.4 8.7 96 110.0 993 106.0 8.2 96 110.0 993.5 108.1 7.8 98 110.0 995 101.3 6.6 92 110.0 993.5 108.4 7.6 98 110.0 995 99.8 11.5 90 I 110.0 991 106.4 5.8 97 j 110.0 992.5 98.9. 9.4 90 110.0 992.5 109.68.3 99 I 110.0 994 104.0 6.1 94 ; 110.0 992 108.9 i 7.7 99 j 1.10.0 993.5 105.9 i 5.9 96 Ii 110.0 992.5 109.6 8.3 94 ! 110.0 994.5 104.0 4.3 94 110.0 992 108.0 7.7 99 110.0 994 105.9 4.4 96 I 110.0 999 104.6 13.6 I 95 110.0 1001 99.3 14.5 90 110.0 1000 101.9 11.1 93 110.0 1002 102.2 12.9 93 110.0 997 105.9 13.8 96 110.0 999 100.5 11.4 91 110.0 998 109.6 11.5 99 110.0 1000 107.2 5.9 97 i 110.0 Sladden Engineering E PROJECT NAME: Madison Club TEST RESULTS PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested( Location Elevation I Dry Density I % Moisture Relative Mimum In Place In Place Compaction Den.4ity 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 05-05-05 05.05-05 05-05-05 05-05-05 05-05-05 05-05-05 05-05-05 05-05-05 05-05-05 05-05-05 05-05-05 05-06-05 05-06.05 05-06-05 05-06-05 05-06-05 05-06-05 05-06-05 05-06-05 05-06-05 05-06-05 05.06-05 05-06-05 05-09-05 05-09-05 05-09-05 05-09-05 05-09-65 05-09-05 05-09-05 05-09-05 05-09-05 05-09-05 05-09-05 05.09-05 05-09-05 05-09-05 05-09-05 05-09.05 05-09-05 DATE: March 2, 2006 Lot 2 B •Front Half Lot 2 B Back Half Lot 2 B Back Half Lot 3 B Back Half Lot 2 A Back Half Lot 1. A Back Half Lot 1 A Back Half Lot 1 A Center Lot 1 A Center Lot 2 A Center Lot 2 A Center Lot 54 A Front Half Lot 53 A Front Half Lot 52 A Front Half Lot 51 A Front Half Lot 54 A Front Half Lot 54 A Back Half Lot 53 A Back Half Lot 53 A Back Half Lot 52 A Back Half Lot 52 A Back Half Lot 51 A Back i -calf Lot 51 A Back Half Lot 18 A Front Lot 18 A Front Retest l 119 Lot 18 A Back Lot 1.9 A Front Lot 19 A Front Lot 19 A Back Lot 19 A Back Lot 21 Front Lot 21. Front Lot 21 Back Lot 21 Back Lot 4 B Back Lot 4 B Back Lot 4 B Front Lot 4 B Front Lot 7 B Back 997 100.1 8.8 1000 103.1 11.4 1002 102.8 12.1 999 104.5 10.2 993 106.0 8.2 993.5 10911 7,8 995 101.3 5.4 993 108,4 7.6 995.2 99.8 11.52 991 106.4 4,5 993 98.9 9.4 993 .109.1 9.1 991.5 107.9 12.6 992 100.9 17.4 991 i 103.5 8.8 991 104.9 13.6 992.5 98.6 12.0 988.5 104.3 1.3.6 990 1.01.0 15.8 988.5 105.3 16.1 990 107.5 1.0:0 990.5 105.9 I 17:1 992 107.6 16.9 994 108.9 16.1 996 106.1 12.5 109.7. 11.5 999 107.9 13.8 996.5 106.1 8.5 997.5 102.8 8.6 991 104.9 14.1 997 106.4 14.8 998.5 106.1 13.3 999.5 105.7 12.9 998 99.1 6.1 1000 98.8 5.2 997 99.0 9.7 999 104.5 5.6 997 105.6 7.7 999 705.1 7.8 996 104.1 i 9.0 91. 110.0 99 110.0 93 110.0 95 1.1.0.0 96' 110.0 99 110.0 92 110.0 98 110.0 90 110.0 97 110.0 90 ! 110.0 99 i 110.0 98 110.0 92 110.0 94 110.0 95 I 110.0 90 110.0. 95 110.0 92 110.0 96 110.0 98 A 110,0 96 110.0 98 110.0 99 110.0 96 110.0 99"" 110.0 98 110.0 96 110.0 93 110.0 95 i 110.0 97 ;. 110.0 96 ! 110.0 96 i 110.0 90 ' 110.0 90 110.0 90 110.0 95 110.0 96 110.0 95 110.0 95 110.0 Sladden Englneering 1 PROJECT NAME: Madison Club LOCATION: La Quinta, California TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture Relative Maximum In Place I In Place I Compaction I ' Density 235 I 05-09-05 236 05-09-05 237 05-09-05 238 I 05-09-05 239 05-09-05 Lot 7 B Back Lot 7 B Front Lot 7 B Front Lot 8 8 Front Lot 8 B Front 240 1 05-10-05 Lot 44 A Front 241 05-10-05 Lut-45 A Front 242 05-10-05 Lot 46 A Front 243 05-10-05 Lot 51 A Front 244 05-10-05 Lot 51 A Front 245 05-10-05 Lot 52 A Front 246 05-10-05 Lot 52 A Front 247 05-10-05 Lot 53 A Front 248 1 05-10-05 1 Lot 53 A Front 249 i 05-10-05 ; Lot 54 A Front 250 05-10-05 Lot 54 A Front 251 05-10-05 Lot 54 A Back 252 05-10-05 Lot 54 A Back 253 05.10-05 Lot 53 A Back 254 05-10-05 ' Lot 53 A Back 255 05-10-05 Lot 52 A Back 256 1 05-10-05 Lot 52 A Back 257 05-10-05 Lot 89 B Back 258 05-10-05 Lot 89 8 Rack 259 05-10-05 Lot 90 B Back 260 05-10-05 Lot 9013 Back 261 05-10-05 Lot 91 B Back 262 05-10-05 Lot 91 B Back 263 05-10-05 Lot 4 B Back 264 i 05-10-05 Lot 3 B Front 265 05-11-05 266 I 05-11-05 267.105-11-05 13.7 268 { 05-11-05 269. 05-11-05 270 i 05-11-05 271 ! 05-11-05- 272 05-11-05 273 05-11-05 274 05-11-05 DATE: March 2, 2006 Lot 4 B Front Lot 4 B Front Lot 4 B Front Lot 3 B Front Lot 3 B Front Lot 3 B Front Lot 4 B Back Lot 4 B Back Lot 4 B Back Lot 3 B [lack 994 103.9 8.6 996 107.7 13.7 994 103.2 5.3 994 98.9 7.6 996 1.03.6 8.3 991 104.6 11.9 991.5 I 100.5 I 13.8 991.5 94.1 1.3.5 993 i 101.1 16.9 995 99.6 11.2 994 104.5 16.5 996 103.5 10.6 993.5 108.8 14.8 995 108.0 13.3 993.5 109.2 I 17.0 995 108.9 13.0 993.5 108.7 17.2 995 108.4 16.0 993 102.7 11.9 995 I 99.1 8.5 994 I 108.0 13.2 995.5 108.1 11.3 984.5 100.5 14.3 986 104.4 I 13.1 985 1.04.5 14.8 987 109.7 6.3 982 104.6 12.8 984 108.1 i 11.3 1003 98.9 12.7 1001 107.3 i 6.8 1003 104.3 j 9.9 1004 109.5 ; 4.0 1005 103.2 i 13.9 1003.5 Ii 106.5 16.1 1004.2 + 109.5 11.6 1005.5 108.0 7.0 1004 107.7 7.3 1005.5 109.8 5.4 1007 104.4 5.8 1003 106.6 11.4 94 110.0 98 110.0 99 ( 110.0 91 110.0 94 110.0 95 110.0 91 110.0 86* 110.0 92 110.0 90 110.0 95 110.0 94 110.0 99 11.0.0 98 110.0 99 110.0 99 110.0 99 110.0 99 1 110.0 93 110.0 90 110.0 98 110.0 98 110.0 91. 110.0 95 110.0 95 110.0 99 110.0 95 110.0 98 110.0 90 110.0 97 110.0 95 110.0 99 110.0 96 110.0 97 11.0.0 98 110.0 96 110.0 98 110.0 99 110.0 95 110.0 97 110.0 Sladden Engineering TEST RESULTS PROJECT NAME; Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No.I Date Tested I Location Elevation Dry Density % Moisture Relative I Maximum In Place in Place C ommaction Density 275 05-11-05 Lot 3 B Back 1004 108.3 9.1 98 110:0 276 05-11-05 Lot 3 B Back 1005.5 107.9 7.0 98 110.0 277 05-11-05 Lot 46 A Front 993 100.9 6.3 92 110.0 278 05.11-05 Lot 49 A Back 898 107.1 10.2 97 110.0 279 05-11-05 Lot 49 A Back 991 108.1 8.5 1 98 j 110.0 280 05-11-05 Lot 50 A. Back 989.5 1.01..5 16.3 ' 92 110.0 281 i 05-11-05 Lot 50 A Back 991 107.4 7.4 98 110.0 282 1 05-11-05 Lot5l A Back 991 1.09.6 9.8 99 110.0 283 05-11-05 Lot 51 A Back 993 101.6 9.3 92 110.0 284 05-11-05 Lot 44 A Back 991 103.9 13.0 94 110.0 285 05-11-05 Lot 48 A Front 991 105.1 11.4 96 110.0 286 05-11-05 Lot 48 A Front 992 100.9 10.2 92 110.0 287 05-11-05 Lot 49 A Front 991 102.8 9.9 93 110.0 288 05-11-05 Lot 49 A Front 992 101.0 10.4 92 110.0 289 05-11-05 Lot 50 A Front 992 I 101.8 11.0 93 110.0 290 05-11-05 i Lot 50 A Front 993 j 100.5 8.7 91 110.0 291 05-11-05 1 Retest # 242 991.5 1 101.4 9.0 92"" 110.0 292 05-1.2-05 Lot 50 A Back 993 107.6 12.5 98 110.0 293 05-12-05 Lot 50 A Back 994.5 109.2 9.1 ! 99 I 110.0 294 05-12-05 1 Lot 49 A Back 991 105.1 13.1 95 110.0 295 I 05-12-05 i Lot 49 A Back 993 104.4 13.9 95 I 110.0 296 05-12-05 Lot 51 A Front 997 108.9 10.5 j 99 1.10.0 297 05.12-05 Lot 51 A Front 999 105.9 1.0.6 96 i 110.0 298 05-12-05 Lot 54 A Front 997.5 104.0 i 14.1 95 110.0 299 05-12-05 1 Lot 54 A Front 999.5 100.5 I 5.1 92 110.0 300 05-12-05 Lot 53 A Front 997 106.4 14.8 j 97 110.0 301 05-12-05 ' Lot 53 A Front 999 98.9 11.2 I 90 110.0 302 I 05-12-05 ' Lot 53 A Back 994.5 107.6 12.7 98 110.0 303 ! 05-12-05 Lot 53 A Back 996.5 106.5 1 13.4 97 110.0 304 05-12-05 Lot 54 A Back 997 108.3 8.7 98 110.0 305 05-12-05 Lot 54 A Back 998.5 I 99.3 12.5 90 110.0 306 1 05-12-05 Lot 1 A Back 996 100.8 1 10.4 92 110.0 307 05-12-05 Lot 2 A Back 995 101.3 i 11.2 92 110.0 308 05-12-05 Lot 2 A Front 996 99.5 9.0 99 110.0 309 1 05-12-05 Lot 52 A Front 996 . 106.1 14.3 96 110.0 310 I 05-12-05 Lot 49•A Front 992.5 I 105.3 12.5 96 110.0 311 05-12-05 Lot 50 A Front 994 103.8 10.9 94 110.0 312 05-12-05 Lot 31 A Front 991.5 I 100.3 10.6 91. 110.0 313 05-12-05 Lot 31 A Front 9925 103.5 10.4 94 110.0 314 05-12-05 Lot 30 A Front 991 102.1 8.7 93 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture Relative Maximum In Place In Plaec I Comoacdon Density 315 05-13-05 316 05-13-05 317 05-13-05 318 05-13-05 319 05-13-05 320 05-13-05 321 05-1.3-05 322 05-13-05 323 05-13-05 324 05-13-05 325 05-13.05 326 05-13-05 327 I 05-13-05 328 05-13-05 329 I 05-13-05 330 I 05-13-05 331 I 05-13-05 332 I 05-13-05 333 05-13-05 334 ; 05-13-05 I 335: 05-16-05 336 05-16-05 337 05-16-05 338 05-16-05 339 05-16-05 340 ; 05-16-05 341 05-16-05 342 05-16-05 343 05-16-05 344 05-16.05 345 i 05-16-05 346 s 05-16-05 347 i 05-16-05 348 ' 05-16-05 349 I ' 05-16.05 350 05-16-05 351 05-16-05 352 353 354 05-17-05 05-17-05 05-17-05 DATE: March 2, 2006 Lot 2 B Front Lot 2 B Center Lot 2 B Front Lot 1 B Front Lot 18 Front Lot 1 B Center :Lot 1 B Back Lot 1 B Back Lot 1 8 Center Lot 2 B Back Lot 2 8 Back Lot 2 B Center Lot 17 A Back Lot 17 A Back Lot 17 A Center Lot 33 A Front Lot 32 A Center Lot 32 A Center Lot 14 A Back Lot 13 A Back Retest # 112 Lot 15 A Back Retest # 333 Lot 14 A Back Lot 14 A Center Lot 13 A Back Lot 13 A Back Lot 13 A Center Lot 15 A Front Lot 15 A Front Lot 15 A Ccntcr. Lot 14 A Front Lot 14 A Front Lot 15 A Center Lot 13 A Front Lot 13 A Front Lot 13 A Front Lot 17 A Center Lot 16 A Back Lot 15 A Back 1001 ! 1001 1003 1001.5 1003 1001 1003.5 1005 1003 1002 ! 1003.5 1003 998 1000 998 999 i i 990 i 990 I 998 998 998.5 1002.5 1001 1001 1003 1001.5 998 1000 99&5 1001.5 1003.5 1001 1000 1002 1000 999 1002 1000 100.4 104.5 100.0 105.9 101,5 103.2 101.5 99.2 104.5 102.0 104.6 104.1 103.7 98.7 1.06.5 101.8 108.6 100.8 95.1 104.4 109.5 106.8 99.2 102.3 104.6 104.1 100.4 103.1 108.7 99.3 106.0 103.8 101.9 104.4 101.0 104.9 106.8 109.1. 107.5 103.0 14.6 12.1 13.2 16.4 11.2 13.0 14.3 12.9 11.3 11.6 8.1 9.5 7.7 9.4 10.1. 14.3 8.9 10.5 18.1 11.0 10.9 10.3 17.4 11.9 10.2 17.9 8.5 10.5 13.2 9.4 10.1 18.0 15.4 11.3 16.7 12.1 10.9 10.9 12.0 10.6 91 95 91 96 92 94 92 90 95 93 95 95 94 90 97 93 99 92 86w 95 99** 97 90** 93 95 95 91 94 99 90 96 94 93 95 92 95 97 99 98 94 110.0 110.0 110.0 110.0 110.0' 110.0 110.0 110.0 1.1.0.0 110.0 11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 U0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. I Date Tested j Location Elevation I Dry Density I % MoistureI Relative I Maximum f In Place In Place Compaction Density 355 05-17-05 Lot 15 A Front 3% 05-17-05 Lot 16 A Front 357 05-17-05 Lot 10 A Back 358 05-17-05 Lot 10 A Back 359 05-17-05 Lot11 A Back 360 05-17-05 Lot 11 A Back 361 05-17-05 Lot 9 A Front 362 05-17-05 Lot 10 A Front 363 05-17-05 Lot 37 A Back 364 05-17-05 I Lot 37 A Front 365 05-17-05 Lot 37 A front 366 i 05-17-05 Lot A Back 367 j 05-17-05 i Lot A Back 368 i 05-17-05 I Lot A Back 369 1 05-17-05 Lot 9 A Back 370 ! 05-17-05 Lot 36 A Front 371 05-17-05 Lot 36 A Front 372 05-17-05 Lot 35 A Front 373 05-17-05 Lot 35 A Front 374 05-17.05 Lot 16 A Center 375 05-17-05 Lot 15 A Center 376 05-17-05 Lot 17 A Center 377 05-18-05 Lot 18 A Center 378 ': 05-18-05 Lot 18 A Center 379 05-18.05 Lot 19 A Front 380 I 05-18-05 Lot 19 A Front 381 05-18-05 Lot 20 A Front 382 05-18.05 Lot 20 A Front 383 05-18-05 I Lot 14 A Front 384 05-18-05 1 Lot 14 A Front 385 05-18-05 Lot 1.1 A Front 386 05-18-05 Lot 11 A Front 387 05-18-05 1 Lot 17 A Back 388 05-18-05 j Lot 17 A Back 389 05-18-05 ; Lot 18 A Back 390 05-18-05 ! Lot18 A Back 391 05-18-05 Lot 19 A Back 392 05-18-05 Lot 19 A Back 393 05-1805 Lot 20 A Back 394 05-18-05 Lot 20 A Back 395 05-18-05 Lot 17 A Front DATE: March 2, 2006 1000 106.4 9.5 97 110.0 999 105,3 1.1,7 96 110.0 999 108.1 12.4 98 110,0 1001 I 106.7 13.0 97 i 110.0 999 ' 105.9 7.1 96 110.0 1001 107.8 11.4 98 110.0 999 107.7 8,1 98 110.0 998.5 105.7 13.4 96 110.0 990 102,3 14.3 _ 93 110.0 990 103.3 11.6 94 1 110.0 992 104,1.. 1.0.9 95 i 110.0 998.5 104.7 15.8 95 110.0 1000.5 106.5 11.3 97 110.0 998 104.1 13.8 I 95 110.0 .1000 102.0 12,0 ' 93 110.0 990.5 100.6 12,1 91 110.0 9915 I 101.4 11.3 92 110.0 990 102.5 10.6 93 110.0 991 103.8 10.4 94 , 110.0 1000 105.0 125 95 110.0 999.5 104.4 13,2 95 110.0 1000 106.3 13.8 97 110.0 99.5 1.07.9 I 8.0 98 110.0 1000 98.5 12.7 ': 90 110.0 998.5 108.7 9.7 90 110.0 1000 I 105.3 13.1 96 110.0 998 I 103.6 9.3 j 96 110.0 1000 106.6 10.8 96 110.0 999 107.2 14.6 97 110.0 1001 109.0 10.6 99 110.0 997.5 105.6 11.3 96 110.0 999 107.0 10.6 97 110,0 998.5 104.06 9.9 95 110.0 1000.5 104.4 16.3 95 110.0 999.0 106.6 8.0 97 110.0 999.5 100,6 16.4 94 110.0 997.5 103.6 .15.3 94 110.0 999.5 101.1 15.0 92 110.0 998.0 107.2 1.1.9 97 110.0 1000 107.5 9.7 98 110.0 997.5 ].06.4 14.4 97 1 110.0 Sladden Engineering TEST RESULTS PROJECT NAME, Madison Club LOCATION: U Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Tact No. Date Tcsted Location Elevation Dry Denmily % Moisture I Relative[Maximum In Place In Place Compaction Density 396 05-18-05 397 05-18-05 398 05-18-05 399 05-19-05 400 05-19-05 401 ' 05-19-05 402 05-19-05 403 05-19-05 404 05-19-05 405 05-19-05 406 i 05-19-05 407 05-19-05 408 I 05-19-05 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 DATE: 05-20-05 05-20-05 05-20-05 05-20-05 05-20-05 05-20-05 05-20-05 05-20-05 05-20-05 05-20-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 March 2, 200( Lot 17 A Front Lot 8 A Front Lot 8 A Front Lot 1 A Front Lot 1 A Front Lot 105 Back Lot 104 Back Lot 103 Back Lot 105 Center Lot 104 Center Lot 103 Center Lott A Front Lot 2 A Front I,ot 22 A Back Lot 23 A Back Lot 18 A Front Lot 22 A Front Lot 22 A Front Lot 23 A Front Lot 25 A Back Lot 26 A. Back Lot 22 Center Lot 23 Center Lot 102 B Back Lot 103 B Back Lot 104 B Back Lot 105 B.Back Lot 54 A Front Lot 54 A Front Lot 54 A Back Lot 54 A Back Lot 53 A Back Lot 53 A Back Lot 54 A Front Lot 54 A Front Lot 53 A Front Lot 53 A Front Lot 52 A Front Lot 52 A Front 999.5 997 998.5 996 998 983 982 982 983 982 982 997 9985 1001 1001 998 998.5 1001 1001 1001 1001.5 995.5 1000 983 984 984 984 1001 1002 1000.5 1001.5 998.5 1000.5 1000 1001.5 1000 1001.5 998 1000 102.4 105.4 103.9 104.7 1.04.8 104.1 105.0 105.7 103.2 102.9 104.1 105.4 104.0 106.8 105.1 107.7 104.5 94.1 95.3 97.2 965 102A 103.6 11.8 14.0 13.3 15.9 11.6 16.9 8.9 13.0 11.8 10.1 10.8 16.9 14.2 15.2 13.7 9.6 14.5 20.1 I 19.4 j 21.4 18.4 106.2 I 15.6 1015 105.6 106.1 i 102.7 108.1 104.0 103.3 104.5 104.1 102.9 109.7 101.9 102.5 101.0 108.1 100.3 14.8 13.4 12.3 20.4 13.9 12.8 14.1 13.2 11.6 12.0 7.5 11.0 16.6 12.9 13.2 11.6 93 96 94 95 95 95 95 95 95 94 95 96 95 97 95 98 95 86"' 87* 88" 80* 93 94 92 96 96 93 98 94 94 95 95 93 93 91 91 90 96 90 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 112.0 112.0 110.0 112.0 112.0 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROTECT NO: 522-4$10 REPORT NO: 06-02-120 Tcst No. Date Tested Location Elevation I Dry Density I I % Moisture Relative I Maximum In Place In Place Compaction Density, 435 05-23-05 Retest # 413 104.7 14.2 93** 112.0 436 05-23-05 Lot 22 A front 1003 106.3 14.0 95 112.0 437 05-23-05 Retest # 414 101.9 17.2 91** 112.0 438 05-23-05 Lot 23 A Front 1003 103.9 18.0 93 112.0 439 05-23-05 Retest # 415 108.5 7.8 1 97** 112.0 440 05-23-05 Lot 25 A back 1001 ! i 100.9 22.1 I 90 112.0 441 05-24-05 Lot 52 A Back 997-9 109.3 9.5 98 112.0 442 05-24-05 Lot 51 A Back 995 108.7 8.8 97 112.0 443 05-24-05 Lot 52 A Center 997 105.1 1 9.9 94 112.0 444 05-24-05 J Lot 51 A Center 995 103.8 10.6 93 112.0 445 05-24-05 I Lot 104 B Front 983 103.9 11.4 93 112.0 446 05-24-05 j Lot 103 B Front 983 106.2 r . 8.1 96 i 110.0 447 05-24-05 ; Lot 103 B Front 984.5 108.3 7.7 97 112.0 448 05-24-05 Lot 102 B Front 982 100.8. 11.9 92 ( 110.0 449 05-24.05 Lot 102 B Front 983.5 101.9 13.1 93 i 110.0 450 05-24-05 I Lot 10113 Front 981.5 99.9 16.5 91 110.0 451 05-24-05 Lot 101 B Front 983 106.1 8.1 95 112,0 452 05-24-05 Lot 103 B Center 984 103.3 9.4 92 I 112.0 453 05-24-05 Lot 102 8 Center 984 105.8 10.1 94 ( 112.0 454 05-24-05 Lot 101 B Center 982.5 102.4 8.8 93 110.0 455 05-25-05 I Lot 50 A Front 996 i 100.4 16.8 91 110.0 456 05-25-05 i Lot 50 A Front 997 102.5 13.3 93 110.0 457 05-25-05 i Lot 51 A Front 1000 104.4 1.4.8 95 110.0 458 t 05-25-05 j Lot 51 A Front 1000.5 106.1 12.9 96 I 110.0 459 i 05-25-05 Retest # 416 I I 94.3 22.1* 1 86** 110.0 .460 1 05-25-05 Lot 26 A Front 999.5 95.6 18.4* ! 82* 110.0 461 1 05-25-05 Lot 27 A Front 996 � 101.3 16.6 1 92 110.0 462 05-25-05 Lot 27 A Front 998 103.1 14.0 94 110.0 463 05-25-05. ; Lot 1 B Back 1005 ' 106.2 1.0.9 {' 95 ' 112.0 464 ! 05-25-05 1 Lot 1 8 Back 1007 I 107.6 7.0 1 96 ; 112.0 465 j 05-25-05 I Lot 1 B Front 1.005 i 105.1 13.4 I 94 I 112.0 466 i 05-25-05 1 Lot 2 B Front 1005.5 105.9 16.9 I 95 112.0 467 05-25-05 1 Lot 2 B Back 1005 102.0 17.1 93 110.0 468 05-25-05 Lot 51 A Front 1001 100.2 1.6.3 91 ! 110.0 469 05-25-05 Lot 51 A Center 1001.5 108.7 6.4 97 112.0 470 05-25-05 Lot 50 A Front 996 107.8 9.7 98 110.0 471 05-25-05 Lot 50 A Front 998 103.2 13.0 94 110.0 472 05-25-05 Lot 49 A Front 994.5 105.1 13.2 , 95 110.0 473 05-25-05 Lot 49 A Front 996.5 104.5 12.1 95 110.0 474 05-25-05 Lot 51 A Back 997 101.0 15.1 92 110.0 DATE: March 2, 2006 Sladden .Enzineerinz TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested I Location Elevation I Dry Density % Moisture I Relative I Maximum In Place In Place I Compaction Dcnsity 475 05-25-05 Lot 51 A Back 999 102.6 12.1 93 110.0 476 05-25-05 Lot 27 A Back 9985 107,1 6.8 96 112,0 477 05-25-05 Lot 27 A Back 990 102.1 11.9 93 110.0 478 05-25-05 Lot 28 A Back 988 106,9 7.1 95 112.0 479 05-25-05 Lot 28 A Front 992 100.1 7.4 91 110.0 480 05-26-05 Lot 2 A Back 997 106.5 16.4 95 112,0 481 05-26.05 Lott 2 A Back 999 101.3 i 12.4 90 112.0 482 05-26-05 Lot -1 A Back 998 109.1 9.8 97 1012.0 483 05-26-05 Lot 1 A Back 1000 104,2 12.1 93 112.0 484 05-26-05 Lot 47 A Back 991.5 104.0 10.6 93 112.0 485 '05-26-05 i Lot 48 A Back 995 106.2 6.3 95 112.0 486 05-26-05 I Lot 49 A Back 995 108.9 13.0 97 1.12.0 487 05-26-05 Lot 50 A Back 996.5 109.4 12.3 98 112.0 488 05-26.05 Lot 47 Center 992 1 103.7 11,2 93 112.0 489 05-26-05 ' Lot 48 Center 994.5 1 102.9 8.9 92 112.0 490 05-26.05 ' Lot 49 Center 994 106.1. 10.1 95 112.0 491 05-26-05 j Lot 50 Center 995.5 104.0 9.3 93 112.0 492 05-27-05 i Lot 31 A Back 994 100.7 10.0 i 90 j 1.12.0 493 05-27-05 ; Lot 34 A Front 993 109.4 6.2 98 112,0 494 05-27-05 Lot 33 A Front 993 107.6 11.8 96 112.0 495 05-27-05 Lot 32 A Front 992.5 103.9 8.3 93 112,0 496 05-27-05 Lot 31 A Front 994.5 101.3 9.1 90 112.0 497 05-27-05 Lot 31 A Center 992.5 102A 7.9 91 1.12.0 498 05-27-05 Lot 32 A Center 992 105.5 10.3 i 94 I 112,0 499 05-27-05 Lot 33 A Ccntcr 993 107.2 I 9.0 1 96 112.0 500 05-27-05 Lot 34 A Center 993 104A 11.4 93 I 112.0 501 i I 05-31-05 Lot 34 A Back 995 108.3 8.9 97 i 112.0 502 1 05-31-05 Lot 34 A Back 997 104.1 9.3 ; 93 I 112.0 503 1 05-31-05 Lot 32 A Back 994.5 103.6 8.4 1 93 112,0 504 I 05-31-05 Lot 32 A Back 996.5 101.9 10.1. 91 112.0 505 05-31-05 Lot 31 A Back 996 104.1 9.0 93 112.0 506 05-31-05 Lot31 A Back 997 105.3 11,1 94 112,0 507 05-31-05 Lot 29 A Back 996 104.9 10.5 94 112.0 508 05-31-05 Lot 29 A Back 997 103.0 8.7 92 112.0 509 05-31-05 Lot 10 Front 1007 105.4 13.3 94 112.0 510 05.31-05 Lot 1 B Back 1007 102.1 16.5 91 112.0 511 05-31-05 Lot 5 B Back 997.5 104.8 14.1 94 112,0 512 05-31-05 Lot 5 B Back 999 101.6 10.9 93 I 112.0 513 05-31-05 Lot 33 A Center 994.5 108.4 8.6 97 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California. PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture I Relative Maximum In Place I In Place Compaction Dcnsity 514 $15 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531: 532 533 534 535 536 537 538 i 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 05.31-05 05-31-05 05-31-05 05-31-05 05-31-05 05-31-05 05-31-05 05-31-05 05-31-05 05-31-05 05-31-05 06-01-05 06-01-05 06-01-05 06-01-05 06-01.-05 06-01-05 06-01-05 06-01-05 , 06-01-05 06-01-05 06-01-05 06-01-05 06-01-05 06-01-05 06-01-05 06-01-05 Lot 33 A Center Lot 32 A Center Lot 32 A Center Lot 33 A Hack Lot 30 A Back Lot 30 A Back Lot 31 Center Lot 2 B Back Lot 2 B Front Lot 6 B Back Lot 6 B Back Lot 34 A Back Lot 33 A Back Lot 32 A Back Lot 34 A Back Lot 34 A Hack Lot 33 A Back Lot 33 A Back Lot 32 A Back Lot 32 A Back Lot 48 A Back Lot 48 A Hack Lot 48 A Front Lot 50 A Front Lot 33 A Center I..ot 31 A Center Lot 34 A Center 06-02-05 Lot 34 A Front 06-02-05 I Lot 34 A Front 06-02-05 I Lot 31 A Front 06.02-05 i Lot 31 A Front 06-02-05 i Lot 33 A Back 06-02-05 Lot 33 A Back 06-02-05 i Lot 31 A Back 06-02-05 Lot 31 A Back 06-02-05 I Lot 33 A Front 06-02-05 Lot 33 A Front 06-02-05 Lot 32 A Front 06-02-05 Lot 32 A Front 06-02-05 Lot 32 A back DATE: March 2, 2006 996 994 996 992 994 996 994.5 1007 1007 998 1000 991 991 990.5 993 994 993.5 994.5 993 994.5 997 . 999 992 994 993.5 994 994 995 996.5 996.5 998 996.5 998 998 999.5 993 995 994 996 997.5 105.5 7.1 94 106.2 8.5 95 106.6 9.0 95 107.2 6.7 96 107.5 1 11.2 96 107.0 ( 14,4 96 103.8 10.5 93 100.1 1.6.8 91 105.7 13.7 94 107.6 5.3 96 105.9 8.7. 95 103.3 8.5 92 102.4 8.1 ! 91 104.1 9.0 93 100.6 9.1 90 1.02.1. .83 91 103.7 10.6 93 101.0 8.8 90 101.9 ' 10.1 91 106.8 9.0 90 106.5 I 7.4 95 105.6 5.9 94 108.5 8.1 I . 97 102,5 8.7 92 102.9 9.9 1 92 104.6 11.4 I 93 103.3 10.0 92 108.1 i 14.8 97 108.4 12.7 97 105.1 I 12.0 I 94 101.1 13.2 90 106.3 I 11.5 95 102.8 13.1 92 107.6 I 12.8 96 108.2 j 13.0 97 109.9 ! 10.7 98 103.3 I 11.4 92 101.4 j 15.7 91 106.5 6.8 95 106.0 j 12.2 95 112,0 112.0 112.0 112.0 112.0 112.0 112.0 110.0 1.1.2.0 112.0 1.12.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112,0 112.0 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. j Date Tested Location Elevation I Dry Density I % Moisture I Relative I Maximum In Place In Place Compaction Density 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 06-02-05 06.02-05 06-02-05 Lot 32 A Back Lot 34 A Back Lot 34 A Back 06-03-05 Lot 47 A Back 06-03-05 ' Lot 47 A Front 06-03-05 I Lot 46 A Front 06-03-05 Lot 46 A Back 06-03-05 ! Lot 45 A Back 06-03-05 I Lot 45 A Front 06-03-05 Lot 42 A Front 06-03-05 Lot 42 A Front 06-03-05 ► Lot 41 A Front 06-03.05 Lot 42 A Back 06-03-05 Lot 43 Back 06-03-05 Lot 44 A Back 06.03-05 Lot 44 A Front 06-03-05 Lot 41 A Front 06-03-05 Lot 42 A Front 06-03705 Lot 41 A Back 06-03-05 Lot 42 A Back 06-03-05 Lot 43 A Back 06-03-05 Lot 44 A Back 06-03-05 I Lot 44 A Front 577 I 06-06-05 578 06.06-05 579 06-06-05 580 06-06-05 581 06-06-05 582 i 06-06-05 583 ! 06-06-05 584 06-06-05 585 06-06.05 586: 06-06-05 587 i 06-06-05 588 1 06-06-05 589 ' 06-06-05 590 06-06-05 591 06-06-05 592 06-06-05 593 06-06-05 DATE: March 2, 200 Lot 41 Front Lot 41 Front Lot 41 Center Lot 43 Front Lot 43 Front Lot 43 Center Lot 44 Front Lot 44 Front Lot 44 Center Lot 43 Back Lot 43 Center Lot 41 Back Lot 41 Back Lot 41 Center Lot 42 A Front Lot 42 A Front Lot 42 A Center 999 997 998 991 991 9915 992 991.5 991.5 992 993 989 991 992 993 992 991 994 992 993 993.5 994 993.5 107.3 106.5 104.0 106.6 104.5 103.8 101.6 105.1 102.6 106.6 103.0 102.2 108.4 101.6 106.3 108.0 101.3 102.1 105.1 100.5 104.5 103.8 106.0 993 105.1 995 , 107.1 992.5 103.5 991. J 103.6 993 101.0 991.5 106.3 995 101.3 996 j 105.9 994 104.0 995 1.05.2 994.5 107.2 994 109.0 996 101.5 994 103.3 993.5 108.4 994.5 103.0 994 101.4 10.6 13.6 10.5 9.9 11.3 10.1 13.9 8.3 12.2 10.5 9.1 6.3 9.7 16.5 6.7 6.0 17.0 14.8 14.5 16.0 17.1 15.9 15.3 14,9 12.6 11.8 17.6 17.2 12.7 18.3 14.2 13.1 1.5.5 12.6 13.9 14.2 10.9 15.8 14.4 16.6 96 95 93 95 93 93 91 94 92 95 92 91 97 91 95 96 90 91 94 90 93 93 95 94 96 92 93 90 95 90 95 93 94 96 97 91 92 97 92 91 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 i 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 1..12.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 1.12.0 112.0 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club - The Hideaway PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation f Dry Density % Moisture I Relative I Maximum In Place In Place I Compaction 1 Densitv 594 06.06.05 trot 44 A Back 994.5 101.8 595 06-06-05 Lot 44 A Back 995.5 103.7 596 06-06-05 Lot 44 A Center 995 106.6 597 06-06.05q Lot 42 A Back 993.5 106.3 598 06-06-05 Lot 42 A Back 994.5 102.7 599 I 06-06-05 Lot 42 A Center 994 104.6 600 I 06-07.05 Lot 38 A Front 991 103.4 601 I 06-07-05 Lot 39 A Back 991 105.3 602 06-07-05 Lot 39 A Front 990.5 101.4 603 06-07-05 Lot 39 A Back 991 I 104.0 604 06-07-05 Lot 40 A Front, '991 106.7 605 06-07-05 Lot 40 A Back 9905 ; 102.2 606 06-07-05 Lot 40 A Front 992.5 105.4- 607 06-07-05 Lot 40 A Back 992 105.1 608 06-07-05 i No Test 609 06-07-05 No Test 610 06-07-05 I Lot 40 A Back 994 109.4 611 I 06-07-05 Lot 40 A Back 995 94.8 612 I 06.07-05 Lot 39 A Back 993.5 106.9 613 06-07-05 i Lot 39 A Back 994.5 98.0 614 I 06-07-()5 Lot 38 A Back 993. 97.6 615 06-07-05 Lot 38 A Back 994 96.2 616 06-07-05 I Lot 37 A Back 993 98.4 617 06-07-05 ' Lot 37 A Back 994 95.0 618 06-07-05 j Lot 36 A Back 993.5 93.2 619 06-07-05 Lot 36 A Back 994.5 96.7 620 I 06-07-05 Lot 36 A Front 993.5 965 621 06-07-05 Lot 36 A Front 995 96.1 622 ' 06-07-05 Lot 36 A Center 993.5 102.4 623 06-07-05 Lot 37 A Front 994 90.8 624 06-07-05 j Lot 37 A Center 993' 94.0 625 06-07-05 Lot 38 A Front 992.5 104.8 626 06-07-05 Lot 38 A Front 994 106.1 627 06-07-05 Lot 38 A Center 994 102.9 628 06-07-05 I Lot 39 A Front 993 95.1 629 06-07-05 Lot 39 A Front 994.5 94.3 630 06-07-05 Lot 39 A Center 994 83.7 631 06-07-05 Lot 40 Front 994 97.8 632 f 06-08-05 Retest # 611 103.1 633 06-08-05 Retest # 631 105.3 DATE: March 2, 2006 15.3 10.9 11.7 14.5 10.9 11.3 11.1 10.6 12.9 11.8 13.1 10.2 9.3 10.0 11.4 15.2 13.8 16.0 20.1 18.9 21.9 22.6 215 20.3 23.2 21.3 16.6 24.7 21.8 15.5 14.0 16.2 19.9 22.0 21.2 20.5 17.5 14.0 91 112.0 93 112.0 95 112.0 95 112.0 92 112.0 93 112.0 92 1.12.0 94 112.0 91 112,0 93 112.0 95 112.0 91 112.0 94 112.0 94 112.0 98 112.0 85* 112.0 90 112.0 88" 112.0 80* 112.0 86* 112.0 88" 85* 112.0 83" 112.0 86* 11.2.0 86* I 112.0 86* 112.0 91 112.0 .81" 112.0 84* 112.0 94 112.0 95 11.2.0 92 112.0 85* 112.0 84* 112.0 84* 112.0 87* 112.0 92'* 112.0 94" i 112.0 Sladden Engineering TEST RESULTS PROJECT NAME; Madison Club PROJECT NO: 522-4$10 LOCATION: La Quinta, California REPORT N006-02-120 Test No.I Date Tested Location Elevation Dry Density % Moisture I Relative Maximum In Place I In Place Compaction I Densitv 634 06-08-05 Retest 0 613 101.2 16.9 90** 112.0 635 06-08-05 Retest # 628 104.1 15.3 93"" 112.0 636 06-08-05 Retest # 629 103.3 12.9 92*¢ 112.0 637 06-08-05 Retest # 630 106.0 14.8 950* 112.0 638 06.08-05 Retest # 614 i 107.1 14.2 96*." 112.0 639 06.08-05 Retest # 615 , 103.6 13.9 93** 112.0 640 06.08-05 Retest # 616. 105.2 16.2 94'x' 112.0 641 06-08-05 Retest # 617 97.6 18.6 87* 112.0 642 06-08-05 Retest # 618 101.4 17.2 91 M9° 112.0 643 06.08-05 Retest # 619 97.0 24.2 87* 112.0 644 06-08-05 Retest # 623 103.4 16.8 92Ma° 112.0 645 06-08-05 I Retest # 624 102.2 18.0 ' 91** 11.2.0 646 06-08-05 Retest # 620 100.9 17.0 1 90"* 112.0 647 I 06-08-05 Retest # 621 101.6 16.5 91** 112.0 648 i 06-08.05 Lot 7 B A Front 998 1.09.1 13.5 97 112.0 649 ! 06-08-05 I Lot 7 B A Front 1000 102.0 18.1 91 I 112.0 650 06-08-05 Lot 6 B Back 998 103.2 14.4 92 112.0 651 06-08-05 j Lot 6 B Back 1000 100.8 12.1 90 I 112.0 652 I 06-08-05 Lot 5 B Front 1001 99.6 12.7 91 110.0 653 I 06-08-05 1 Lot 5 B Front 1003 99.8 17.6 91 110.0 654 06-08-05 Lot 6 B Front 1002 101.3 11.0 90' 112.0 655 ( 06-08=05 Lot 6 B Front 1003 104.9 13.1 94 112.0 656 ! 06.08-05 ` Lot 7 B Back 998 I 102.2 16.0 91 112.0 657 i 06.08-05 i Lot 7 B Back 999 i 102.8 14.7 92 112.0 658 06-08-05 ! Lot 5 B Back 999.5 101.4 12.9 91 I 112.0 659 i I 06-08.05 � Lot 5 B Back 1000.5 ; I 100.1. 14A 91. 110.0 660 j i 06-09-05 Lot 35 A Front ! 993 ! 99.0 10.9 90 110.0 661 i 06-09-05 Lot 35 A Front 995 � 102.9 15.1 92 112.0 662 06-09-05 Lot 33 A Front 997 108.7 13.2 97 112.0 663 ! 06-09-05 Lot 32 A Front 998 i 107.3 10.3 96 112.0 664: 06-09-05 Lot 30 A Front 993 i 1.01.2 15.2 92 110.0 665 06-09-05 Lot 30 A Front 995 i 102.7 16.6 92 j 112.0 666 i 06-09-05 Lot 30 A Front 997 102.8 18.2 92 112.0 667 06-09-05 Lot 35 A Back 990 103.4 9.6 92 112.0 668 06-09-05 Lot 35 A Back 992 108.9 11.7 97 669 j 06-09-05 Lot 35 A Back 994 106.3 114.4 95 112.0 670 06-09-05 Lot 45 A Back 993.5 1 1 109.6 16.3 98 112.0 671 I 06-09-05 Lot 45 A Back 995.5 102.8 13.8 92 112.0 67206-09-05 Lot 46 A Back 995 ( 105.4 6.9 94 112.0 673 06-09-05 I Lot 46 A Back 997 101.6 14.1 91 112.0 674 06-09-05 Lot 47 A Back 993 I 103.5 9.1 92 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 . LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location ElevationI Dry Density l in Placc % Moisture I In Placc Relative Compaction Maximum I Density 675 06-09-05 Lot 47 A Back 995 101.8 11.6 91 112.0 676 06-09-05 Lot 47 A Back 997 99.0 13.6 90 110.0 677 06.09-05 Lot 31 A Front 999 104.5 13.8 93 112.0 678 j 06-09-05 Lot 30 A Back 998 108.0 12.9 96 112.0 679 06-09-05 Lot 30 A Back 1000 105.5 13.1 94 112.0 680 06-09-05 Lot 50 A Back PC 106.1 13.4 95 112.0 681 06-09-05 Lot 50'A Back PG 102.9 11.3 94 110.0 682 06-10-05 Lot 44 A Back 996.5 ! 102.3 9.9 93 110.0 683 06-10-05 Lot 45 A Back 993.5 101.6 12.6 92 110.0 684 i 06-10-05 Lot 45 A Hack 995.5 109.3 i 17.9 94 110.0 685 06-10-05 Lot 46 A Back .995 107.4 14.6. I 97 110.0 686 06-10-05 trot 46 A Back 997 104.2 15.3 94 110.0 687 06-10-05 Lot 47 A Back 993 105.1 13.7 95 110.0 688 06-10.05 Lot 47 A Back 995 1.03.6 15.6 94 110.0 689 I 06-10-05 Lot 47 A Back 997 102.4 16.2 93 � 110.0 690 06-10-05 Lot 49 A Back 997 103.9 8.6 94 110.0 691 06-10-05 Lot 49 A Back 999 107.7 13.7 98 110.0 692 06-10-05 Lot 51 A Back 1001 109.2 9.2 99 110.0 693 06-10-05 Lot 52 A Back 999 105.6 11.9 96 110.0 694 06-10-05 Tot 52 A Back 1001 104.7 I 13.3 95 110.0 695 ; 06-10-05 Lot 53 A Back 1002.5 109.3 12.9 99 110.0 696 06-10-05 Lot 54 A Back 1003.5 103.6 I 14.8 94 110.0 697 06-10-05 I Lot 3 A.Back 998 I 107.9 I 13.1 98 110.0 698 06-10-05 Lot 36 A Back 996 103.2 8.9 , 93 110.0 699 06-10-05 Lot 45 A Front 993.5 99S 1 14.9 i 90 110.0 700 i 06-10-05 1 Lot 45 A Front 995.5 105.7 j 20.0 96 110.0 701 1 06-10-05 Lot 46 A Front 993.5 1.02.3 11.4 93 110.0 702 : 06-10-05 Lot 46 A Front 996.5 i 99.5 i 19.3 90 110.0 703 06-10-05: Lot 47 A Front 993 j 105.4 12.9 j 95 110.0 70.4: 06-10-05 Lot 47 A Front 995 i 107.1 14.6 97 110.0 705 06-10-05 ; Lot 47 A Front 997101.6 ! 13.9 i 92 110.0 706 06-10-05 Lot 48 A Front 994 ; 109.3 ; 15.0 99 110.0 707 ! 06-10-05 I Lot 48 A Front 996 1 105.4 11.4 96 17.0.0 708 06-10-05 , Lot 48 A Front 998 101.6 I 10.2 92 110.0 709 i 06-10-05 i Lot 49 A Front 998.5 .103.0 16.1 j 93 110.0 710 06-10-05 , Lot 50 A Front 996 106.9 14.0 i 97 110.0 711 06-10-05 Lot 50 A Front 998 106.1 13.5 1 96 110.0 712 06-10=05 1 Lot 50 A Front 1000 103.7 15.1 1 94 110.0 713 06-10-05 Lot 52 A Front 1002 106.3 15.3 96 110.0 714 06-10-05 j Lot 53 A Front 1003.5 109.4. 16.3 99 110.0 715 06-10-05 Lot 41 Front PG 103.3 I 9.9 92 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 T.cat No. 1 { Date 'Tested Location Elevation Dry � Densi In Place % Moisture to Place Relative Compaction I Maximum I Density 716 I 06-10-05 Lot 41 Center PG 102.7 9.1 93 110.0 717 06-10.05 Lot 41 Back PG 104.5 16.5 95 110.0 718. ' 06-10-05 Lot 42 Front PG 105.3 16.1 95 110.0 719 I 06.10-05 Lot 42 Center PG 104.3 16.6 94 110.0 720 06-10-05 Lot 42 Back PG 103.4 11.1 94 110.0 721 06-10-05 Lot 43 Front PG 106.6 14.1 97 110.0 722 06-10-05 Lot 43 Center PG 103.0 12.5 93 110.0 723 I 06-10-05 Lot 43 Back PG 107.9 10.9 98 110.0 724 06-10-05 Lot 44 Front PG 103.1 13.3 93 110.0 725 I 06-10-05 Lot 44 Center PG 104.7 16.1 95 110.0 726 06-10.05 Lot 44. Back PG 101.3 10.7 92 110.0 727 06-13-05 Lot 21. A Front 1001.5 107.9 13.2 98 110.0 728 06-13-05 Lot 24 A Front 1001 104.0 17.0 94 110.0 729 06-13-05 Lot 24. A Front 1003 104.8 14.1 95 110.0 730 06-13.05 Lot 25 A Front 1001 106.9 11.3 97 110,0 731 06-13-05 Lot 25 A Front 1003 105.3 16.1 95 110.0 732 06-13-05 Lot 26 A Front 1001 108.0 15.5 98 110.0 733 06-13-05 Lot 26 A Front 1003 109.7 16.0 99 110.0 734: 06-13-05 Lot 27 A Front 1000 109.0 13.8 99 110.0 735 06-13-05 Lot 27 A Front 1002 108.6 15.1 99 110,0 736 06-13-05 Lot 28 A Front 994 102.0 12.0 ' 93 110.0 737 06-13-05 Lot 28 A Front 996 106.8 18.3 97 110.0 738 06-13.05 Lot 29 A Front 998 1 103.0 16.0 94 110.0 739 06- 13-05 Lot 38 A Front 993 107.1 I 9.6 I 97 110.0 740 06-13-05 Lot 38 A Front 995 106.3 15.7 96 110.0 741 I 06-13-05 ( Lot 40 A Front 996 108.6 17.1 99 110.0 742 06-13-05 Lot 43 A Front 995 103.0 I 9.5. I 94 110.0 743 06-13-05 I Lot 54 A Front 1003.5 100.6 18.8 91 110.0 744 06-13-05 Lot 49 A Center 998.5 101.0 ! 14.7 92 ! 1.10.0 745 i 06-13-05 I Lot 23 A Back 1003 104.6 14.6 95 ; 110.0 746 i 06-13-05 Lot 24 A Back 999.3 109.3 15.4 99 110.0 747 06-13-05 Lot 24 A Back 1001.5 108.1 9.3 98 1 1.10.0 748 06-13-05 Lot 24 A Back 1003.5 101.4 I 9.9 i 92 I 110.0 749 06-13-05 Lot 25 A Back. 1003 109.7 14.1 1 99 110.0 ' 750 06-13-05 Lot 26 A Back 1003 107.8 17.7 I 98 110.0 751 06-13-05 Lot 27 A Back 992 102.7 11.8 ( 93 110.0 752 06-13-05 Lot 27 A Back 994 107.0 11.3. 97 110.0 753 06-13-05 Lot 27 A Back 996 106.1 .13.6 96 110.0 754 06-13-05 Lot 28 A Back 990 102.5 13.3 93 11.0.0 755 06-13-05 Lot 28 A Back 992 106.6 11.2 97 1.10.0 756 j 06-13-05 . Lot 28 A Back 994 , 103.6 12.8 94 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME:. Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density I % Moisture I Relative Maximum In Place in Place Compaction I Density 757 06-13-05 Lot 29 A Back 999 758 06-13-05 Lot 29 A Back 1001 759 06-14-05- Lot 50 A Back 998.5 760 06-14-05 Lot 50 A Back 100.0 761 06-14-05 Lot 27 A Back 99$ 762 06.1.4-05 Lot 27 A Back 100.0 763 06-14-05 Lot 28 A Back 996 764 06-14-05 Lot 28 A Back 998 765 06-14-05 I Lot 28 A Back 1000 766 06-14.-05 { Lot 28 A Front 998 767 06-14-05 Lot 30 A Front 999 768 06-14-05 Lot 54 A Front PG 769 06-14-05 Lot 54 A Center .PC 770 06-14-05 Lot 54 A Back PG 771 i 06-14-05 Lot 53 A Front PG 772 i 06-14-05 Lot 53 A Center PG 773 06-14.05 Lot 53 A Back PG 774 06-14-05 Lot 52 A Front PC 775 06-14-05 Lot 52 A Center PC 776 06-14.05 Lot 52 A Back PG 777 06-14-05 Lot 51 A Front PC 778: 06-14-05 Lot 51 A Center PG 779 06-14-05 Lot 51 A Back PG 780 06-14-05 Lot 50 A Front PC 781 06-14-05 Lot 50 A Center PG 782 06-14-05 i Lot 50 A Back PC 783 06-14-05 Lot 99 A Front PG 784 06-14-05 Lot 99 A Back PG 785 06-14-05 Lot 99 A Center PC 786 06-14-05 Lot 98 A Front PG 787 06-14-05 Lot 98 A Back PG 788 06-14-05 Lot 98 A Center PC I 789 ! 06-15-05 Retest # 780 790 ' 06-15-05 Pctcst # 782 791 i 06-15-05 Retest # 781 792 ' 06-15-05 Lot 47 A Front PG 793 06-15-05 Lot 47 A Back PG 794 06-15-05 Lot 47 A Center PC 795 06-15-05 I Lot 46 A Front PG 796 j 06-15-05 Lot 46 A Back PC 102.5 9.7 108.3 14.8 104.4 13.3 102.8 12.6 105.0 20.0 104.2 16.7 101.5 11.2 108.7 15.0 105.4 14.2 105.3 17.1 102.1 13.3 99.2. 11.5 100.5 8.3 105.9 9.4 105.5 10.3 106.1 7.7 99.1 9.3 103.0 13.7 1.09.3 12.8 104.4 11.1 101.4 12.3 100.2 9.5 101.6 10.3 91.4 10.2 92.8 9.5 94.4 8.8 101.2 9.3 103.3 12.2 102.6 11.6 99.6 8.6- 103.1 11.2 107.0 f 10.5 98.9 12.9 100.2 12.5 101.9 10.4 102.1 9.1 99.7 8.8 103.6 9.2 100.0 9.1 102.8 10.7 93 110.0 98 110.0 94 110.0 97 110.0 95 110.0 95 110.0 92 110.0 99 110.0 96 110.0 95 110.0 93 1.10.0 90 110.0 91 7.10.0 96 110.0 96 110.0 96 110.0 90 110.0 94 110.0 99 110.0 95 110.0 92 110.0 91 110,0 92 110.0 83* 110.0 84* 110.0 86* 110.0 92 110.0 94 110.0 93 110.0 90 110.0 93 110.0 97 110.0 90** 110.0 91** 110.0 920* 110.0 93 110.0 91 110.0 94 110.0 91 110,0 93 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Test No. i Date Tested I Location Elevation ( Dry Density In Place % Moisture in Place Relative Com ction Maximum sity 797 06-15-05 Lot 46 A Center PG 105.4 8.9 96 110.0 798 06-15-05 Lot 45 A Front PC 109.2 12.2 99 110.0 799 06-15-05 Lot 45 A Back PG 104.1 11.1 95 170.0 800 06-15-05 Lot 45 A Center PC 106.8 11.3 97 110.0 801. 06-15-05 Lot 41 A Front PG 101.3 12.1 92 110.0 802 06-15-05 Lot 41 A Back PG 106.2 13.3 96 110.0 803 06-15-05 Lot 41 A Center PG ' 102.9 17.1 93 110.0 804 06-16-05 Lot 25 A Front PG 107.9 13.4 98 110.0 805 06-16-05 Lot 25 A Center PC 102.8 11.5 93 110.0 806 06-16-05 Lot 25 A Back PC 107.1 13.2 97 110.0 807 06-,16-05 Lot 26 A Front PG 100.3 18.1 91 110.0 808 06-16-05 Lot 26 A Center PC 100.4 12.4 91 110.0 809 06-16-05 Lot 26 A Back PG 108.3 12.5 I 98 110.0 810 06-16-05 i Lot 27 A Front PC 106.4 16.9 97 110.0 811 06-16-05 1 Lot 27 A Center PG 101.2 13.9 92 110. 812 I 06-16-05 Lot 27 A Back PG 99.4 1 11.2 90 110.0 813 06-17-05 Lot 28 A Front PG 103.3 I 13.7 94 110.0 814 06-17-05 ' Lot 28 A Center PC 1 103.7 18.1 94 110.0 815 06-17-05 Lot 28 A Back PG i 102.5 12.9 93 i 110.0 816 06-17-05 Lot 29 A Front PG 103.7 10.4 94 110.0 817 06-17-05 Lot 29'A Center PC I 104.2 15.1 t `' 95 i 110.0 818 06-17-05 Lot 29 A Back PG 100.0 10.9 91 ! 110.0 819 06-17-05 ! Lot 30 A Front PG 107.2 13.9 I 97 i 110.0 820 ; 06-1.7-05 trot 30 A Center PC 109.9 10.7 99 110.0 821 06-17-05 Lot 30 A Back PG 108.5 12.1 98 110.0 822 I 06-17-05 i Lot 31 A Front PG 106.4 11.1 96 110.0 823 , 06-17-05 Lot 31 A Center PC 109.31 15.0 99 I 110. 824 ! 06-17-05 Lot 31 A Back PC 106.9 9.1 97 i 110.0 825 06-17-05 Lot 55 A Back 989 100.1 8.8 91 i 110.0 826 i 06-17-05 Lot 56 A Back 988 99.5 9.0 90 110.0 827 06-17-05 Lot 57 A Back 989 99.0 11.2 90 I 110.0 828 06-17-05 Lot 58 ,A Back 989.5 102.8 7.9 93 ' 110.0 829 i 06-17-05 Lot 55 A Front 989 103.0 17.1 94 110.0 830, j 06-17-05 Lot 56 A Front 988 104.1 9.4 95 110. 821 06-17-05 Lot 57 A Front 989 94.1 12.9 85" 110.0 832 I 06-17-05 Lot 58 A Front 989.5 105.6 7.8 96 110.0 833 06-17-05 Lot 59 A Front 990 93.1 11.5 85* 110.0 834 06-20-05 Lot 55 A Front 991 102.8 13.1 92 112.0 835 06-20-05 . Lot 55 A Front 993 103.9 8.6 93 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Teat No.I Date Tested Location Elewation I Dry Dcmity I I % Moisture Relative Maximum In Place In Place Compaction I Density 836 06-20-05 Lot 56 A Front 837 06-20.05 Lot 56 A Front 838 06-20-05 Retest # 821 & 833 839 06-20-05 Lot 57 A Front 840 06-20-05 1 Lot 55 A Back 841 06.20-05 I Lot 55 A Back 842 06-20-05 Lot 56 A Back 843 06.20-05 j Lot 56 A Back 844 06-20-05 Lot 57 A Back 845 06-20-05 Lot 57 A Back 846 06-20-05 i Lot 32 A Front 847 06-20-05 Lot 32 A Center 848 06-20.05 Lot 32 A Back 849 06-20-05 Lot 33 A Front 850 06-20.05 I Lot 33 A Center 851 i 06-20-05 Lot 33 A Back 852 06-20-05 Lot 55 A Center 853 i 06-20-05 Lot 56 A Center 854 I 06-20-05 Lot 57 A Center 855 06-21-05 Lot 13 A Front 856 I 06-21-05 i Lot 13 A Front 857I 06-21-05 Lot13 A Back 858. 06-21-05 Lot 13 A Back 859 i 06-21-05 I Lot 13 A Center 860 06-21-05 Lot 13 A Center 861 06-21-05 Lot 12 A Front 862 i 06-21-05 1,ot12 A Front 863 06-21-05 Lot 12 A Back 864 06-21-05 Lot 12 A Back 865 06-21-05 I Lot 56 A Back 866 r 06-21-05 Lot 58 A Back 867 ! 06-21-05 I Lot 34 A Front 868 ; 06-21.-05 Lot 34 A Center 869 I 06-21-05 Lot 34 A Back 870 i 06-21.05 Lot 35 A Front 871 06-21-05 Lot 35 A Back 872 06-21-05 Lot 35 A Center 873 j 06-21-05 Lot 36 A Front 874 06-21-05 Lot 36 A Back 875 I 06-21-05 ' I,ot 36 A Center 876 06-21-05 Lot 55 A Back DATE: March 2, 2006 990 101.4 9.3 91 1.1.2.0 991.5 100.8 10.3 90 112.0 104.3 14.1 93** 112.0 992.5 101.5 11.0 91 112.0- 991 104.3 10.9 93 112.0 992 105.1 8.8 94 112.0 990 103.0 15.0 92 112.0 991.5 102.4 9.8 ; 91 112,0 991 105.3 11.4 94 112:0 992.5 102.2 9.2 91 112.0 PG 103.8 8.8 93 112.0 PG 109.3 10.0 98 112.0 PC 106.3 11.2 95 112.0 PG 107.8 11.5 96 112.0 PG 108.6 12.0 97 i 112.0 PG 107.1 9.8 96 112.0 991 104.4 10.9 93 112.0 990 102.0 11.5 91 112.0 991 105.1 9.4 94' 112,0 1004.5 100.9 12.1 92 110.0 1006 104.3 1 10.9 95 j 110.0 1004.5 102.8 11.0 93 110.0 1006 103.4 I 9,1 1 94 110.0 1004.5 105.9 f 9.3 ' 96 110.0 1006 101.4 12.5 f 92 110.0 1006.5 101.1 7.6 92 110.0 1008 94.4. 9.9 86* 110.0 1006.5 100.1 10.2 91 110.0 1008 103.3 8.7 94 110.0 993.5 104.7 15.2 93 112.0 991.5 106.4 14.4 95. 112.0 PG 107.0 8.5 96 112.0 PC 105.3 9.6 94 112.0 PG 108.4 8.9 97 112.0 PG 99.8 10.7 91 110.0 PG 106.7 9.0 95 112.0 PG 104.5 9.9 93 112.0 PG 100.6 9.1 91 110.0 PG 105.3 10.7 94 112.0 PG 102.4 8.0 91 112.0 994 103.5 13.3 92 .117.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. J I Date Tested I Location Elevation Dry Density % Moisture Relative I Maximum In Placc I In Place Comnaction Densitv 877 878 879 06-21-05 06-21-05 06-21-05 880 06-22-05 881 06-22-05 $82 06-22-05 883 06-22-05 884 06-22-05 885 , 06-22-05 886 06-22-05 887 ! 06-22-05 888 06-22-05 889 06-22-05 890 06-23-05 891 06-23-05 892 1 06-23-05 893 I 06-23-05 894 1 06-23-05 895 06-23-05 896 06-23-05 897 06-23-05 898 1 06-23-05 899 06-23-05 900 I 06-23-05 901 I 06-23-05 902 06-23-05 903 06-23-05 904 06-23-05 905 06-23-05 906 06-23-05 907 06-23-05 908 I 06-23-05 909 06-23-05 910 06-23-05 911 06-23-05 Lot 57 A Back Lot 55 A Center Lot 57 A Center Lot 60 A Front Lot 60 A Front Lot 59 A Front Lot 58 A Front Lot 57 A Front Lot 57 A Front Lot 56 A Front Lot 56 A Front Lot 55 A Front Lot 55 A Front Lot 60 A Center Lot 59 A Center Lot 57 A Center Lot 56 A Front Lot 56 A Front Lot 55 A Front Lot 55 A Front Lot 55 A Back Lot 55 A Back Lot 56 A Back Lot 56 A Back Lot 56 A Center Lot 55 A Center Lot 37 A Front Lot 37 A Back Lot 37 A Center Lot 38 A Front Lot 38 A Back Lot 38 A Center Lot 39 A Front Lot 39 A Back Lot 39 A Center 912 06-24-05 Lot 30 B Ccnter 913 06-24-05 Lot 30 B Center 914 06-24-05 Lot 31 B Front 915 06-24-05 Lot 31 B Front DATE: March 2, 2006 994.5 993.5 994 101.4 105.0 103.1 990.5 93.7 992 103.1. 990.5 102.1 991.5 100.6 994 104.5 995 104.1 990 106.2 991.5 102,7 991 103.8 992.5 103.1. 993 104.1 991.5 106.9 994 103.0 993 101.8 994.5 101.4 994 104.8 995 102.0 995 107.1 996 I 104.4 994.5 1 106.0 996 I 103.2 994 107.3 995 I 1045 PG 105.1 PG 102.2 PC 103.6 PG 103.9 PG 106.5 PC 104.7 PG 101..9 PC 105.3 PG , 104.0 989.5 991 989.5 991 102.6 101.41 94.9 103.5 10.9 92 110.0 8.7 94 112.0 7.9 92 112.0 8.4 85* 110.0 10.6 94 110.0 11.3 93 110.0 7.1 91 110.0 8.8 95 110.0 8.2 , 95 110.0 10.1 97 110.0 7.9 93 110.0 9.0 94 110.0 7.8 94 110.0 13.4 I 93 112.0 11.8 95 112.0 14.0 92 112.0 1:0.5 91 112.0 10.1 i 91 ! 110.0 14.0 94 j 112.0 11.9 91 112.0 10.4 96 112.0 8.7 1 93 112.0 11.5 95 112.0 11.1 92 112.0 8.8 96 112.0 9.0 93 112.0 8.3 94. 112.0 9.4 91 112.0 9.1 93 112.0 8.5 93 112.0 10.4 95 112.0 9.9 93 112.0 10.6 91 112.0 10.2 94 112.0 7.9 93 112.0 8.3 93 110.0 9.9 92 110.0 10.1 93 102.0 11.3 j 94 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION- La Quinta, California IMPORT NO: 06-02-120 Test No. Date Tested Location Elevation I Dry Density % MoistureRelative 1 Maximm in Place In Place I u Commotion I Density 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 06-24-05 06-24-05 06-24-05 06-24-05 06-24-05 06-24-05 06-24-05 06-24-05 06-24-05 06-24-05 06-24-05 06-24-05 06-24-05 06-24-05 06-24-05 06-24-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27,05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 06-27-05 DATE: March 2, 2006 Lot 32 8 Front Lot 32 B Front Lot 33 B Front Lot 33 B Front Lot 34 B Front Lot 34 B Front Lot 30 B Back Lot 30 B Back Lot 31 B Back Lot 32 8 Back Lot 33 B Back Lot 30 13 Center Lot 31 B Center Lot 32 B Center Lot 33 B Center Lot 34 B Center Lot 33 B Back Lot 33 B Back Lot 55 A Front Lot 55 A Front Lot 56 A Front Lot 56 A Front Lot 57 A Front Lot 57 A Front Lot 58 A Front Lot 59 A Front Lot 55 A Back Lot 55 A Back Lot 56 A Back Lot 57 A Back Lot 57 A Back Lot 59 A Back Lot 59 A Back Lot 31 B Back Lot 31 B Back Lot 32 8 Back Lot 32 B Back Retest k 880 Lot 60 A Front Lot 58 A Back Lot 58 A Back 990 %.2 8.3 991.5 104.1 10.6 989 101.8 12.1 991 104,7 9.0 .988 100.8 10.3. 989 105,1 8.1 990 100.5 9.5 991 101.6 8.3 990 97.3 10.1 990 101.4- 11.5 990 96.2 8.9 991.5 103.6 10.4 990.5 106.7 12.9 991.5 104.4 I 113 992 107.1 9.9 991 103.3 10.4 991.5 I 100.2 11.2 993 93.1 12.8 997 106.2 16.7 999 99.2 13.9 997 1.02.4 1.0.5 999 102.0 13.7 995 100.9 15.3 996 99.2 1 9.6 991 i 105.5 I 10.1 991.5 106,1 11.3 997 99.6 16.8 999 99.2 9.3 997 1.06.4 11.7 992 109.5 15.8 994 104.8 16.0 991.5 103.0 9.7 993.5 102.4 15.9 991.5 106.3 11.4 993 102.9 9.9 991.5 96.8 12.8 993 99.2 8,7 101.5 7.6 990.5 101.0 8.3 992.5 104.8 13.1 994 106.1 11.6 94 102.0 95 110.0 93 110.0 95 110.0 92 910,0 96 110.0 91 110,0 92 110.0 95 102.0 92 110.0 94 102.0 94 110.0 97 .110.0 95 110.0 97 110.0 97 110.0 91 110.0 91 102.0 95 112.0 90 11.0,0 93 110.0 93 110.0 92 110.0 90 110.0 94 i 112.0 95 1 112.0 91 I 110.0 90 1.1.0.0 95 112.0 98 .112.0 94 11.2.0 94 110.0 93 110.0 97 110.0 92 112.0 95 102.0 90 110.0 92" 110.0 92 110.0 94 112.0 95 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date TestedI Location Elevation I Dry Density I % Moisture I RelativeI Maximum In Place In Place Comnaction Density 957 06-27-05 958 i 06-27-05 959 06-28-05 960 06-28-05 %1 06-28-05 962 I 06-28-05 963 06-28-05 964 06-28-05 965 i 06-28-05 966 06-28-05 967 06-28-05 968 06-28-05 969 I 06-28-05 970 06-28-05 971 06-28-05 972 06-28-05 973 06-28-05 974 I 06-28-05 975 06-28-05 976 06-28-05 977 06-28-05 978 ! 06-28-05 979 06-28-05 980 I 06-28-05 981 06-28-05 982 I 06-28-05 983 06-28-05 984 06-28-05 985': 06-29-05 986 06-29.05 987: 06-29-05 988 I 06-29-05 989 06-29-05 990 06-29-05 991 06-29-05 992 06-29-05 993 06-29-05 994 06-29-05 995 06-29-05 DATE: March 2, 2006 Lot 60 A Back 990 103.4 9.9 92 112.0 Lot 60 A Back 992 102.2 10.4 91 112.0 Lot 58 A Front 993 103.7 15.1 94 110.0 Lot 58 A Front 994.5 102.6 12.3 93 110.0 Lot 55 A Back 1001, 100.9 9.3 1 92 110.0 Lot 55 A Back 1002 ; 101.5 10.6 93 110.0 Lot 55 A Front 1000 i 104.7 13.8 95 110.0 Lot 55 A Front 1001 104.1 12.7 95 110.0 Lot 56 A Front 1000 106.8 1.4.5 97 110.0 Lot 56 A Front 1001 103.4 11.9 94 110.0 Lot 56 A Hack 999 105.5 15.3 96 110.0 Lot 56 A Back 1000.5 102.9 13.1 94 110.0 Rctest # 862 103.4 i 9.8 94** 110.0 Lot 15 A Front 1002 106.1 1.0.5 96 i 110.0 Lot 15 A Back 1002 104.3 11.6 95 j 110.0 Lot 16 A Front 1001 105.5 8.3 96 I 110.0 Lot 57 A Front 998 101.9 13.1 95 jj 110.0 Lot 57 A Front 999.5 103.0 10.2 94 I 110.0 Lot 57 A Back 996 103.9 1.1..4 94 1 110.0 Lot 57 A Back 997.5 105.4 I 9.9 96 I 110.0 Lot 58 A Front 993 106.6 10.7 97 I 110.0 I,ot 58 A Front 995 104.0 8.4 95 110.0 Lot 58 A Back 996 101.3 9.9 92 110.0 Lot 58 A Back 997.5 100.9 10.3 92 1.10.0 Lot 59 A Front 993.5 107.1 10.5 96 -112.0 Lot 59 A Front 995 105.6 8.8 94 ! 112.0 Lot 59 A Back 995 102:2 I 13.1 93 ' 110.0 Lot 59 A Back 996.5 103.4 11.4 94 I 110.0 Lot 55 A Front 1002 102.0 16.3 93 1 110.0 Lot 55 A Front 1003.5 I 101.2 16.5 92 110.0 Lot 56 A Front 1001.5 103.1 11.9 94 110.0 Lot 56 A Front 10025 104.4 11.4 95 110.0 Lot 55 A Rack 1002.5 106.1 10.2 95 112.0 Lot 55 A Back 1003.5 103.4 I 1.3.4 94 110.0 Lot 56 A Back 1001.5 103.6 9.1 94 110.0 Lot 56 A Back 1002.5 105.5 1 8.4 96 110.0 Lot 57 A Front 1000.5 107.4 `' 13.4 96 112.0 Lot 57 A Front 1001.5 106.2 14.5 95 112.0 Lot 57 A hack 999 99.1 17.1 90 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density In Place % Moisture In Place Relative Compaction' Maximum Density 996 06-29-05 Lot 57 A Back 1.000.5 101.3 11.8 92 110.0 997 06-29-05 Lot 58 A Front 996.5 105.2 13.4 96 110.0 998 06-29-05 Lot 58 A Front 998 106.6 10.8 97 110.0 999 06-29-05 Lot 58 A Back 998.5 107.3 12.5 98 110.0 1000 06-29-05 Lot 58 A Back 999.5 104.2 14.0 95 110.0 1001 06-29-05 Lot 59 A Front 996 104.1 11.6 95 110.0 1002. 06-29-05 Lot 60 A Front 992.5 105.5 8.0 96 110.0 1003 06-29-05 Lot 60 A Font 994.5 99.8 12.1 91 110.0 1004 06.29-05 Lot 61 Front 992.5 108.4 10.9 99 110.0 1005 06-29-05 Lot 61 Front 994.5 103.1 10.3 94 1.10.0 1006 06-29-05 Lot 12 A Front PC 99.2 10.6 90 110.0 1007 06-29-05 Lot 12 A Center PG 99.8 8.3 91. 110.0 1008 06-29-05 Lot 12 A Back PG 102.4 9.6 93 110.0 1009 06-29-05 Lot 13 A Front PG 101.1 15.4. 92 110.0 1010 06-29-05 Lot 13 A Center PG 103.5 9.9 94 110.0 1011 06-29-05 Lot 13 A Back PG 100.4 12.1 94 ! 110.0 1012 06-29-05 Lot 14 A Front PG 99.0 9.2 90 110.0 1013 06-29-05 Lot 14 A Back PC 101.4 8.3 92 110.0 1014 06-29-05 Lot 14 A Center PG 102.4 10A 93 110.0 1015 06-29-05 Lot 15 A Front PG 102.0 16.1 93 110.0 1016 06-29-05 Lot 15 A Center PG 100.6 15.8 91 110.0 . 1.017 06-29-05 Lot 15 A Back PG 106.3 16.4 97 110.0 1018 06-30-05 +i Lot 68 Front 989 ; 100.6 15.5 91 110.0 1.019. 06-30-05 Lot 68 Front 991 102.2 10.2 93 110.0 1020! 06-30-05 Lot 67 Front 989 101.0 13.4 I 92 110.0 1021: 06-30-05 Lot 67 Front 991 1.03.1 11.1 1 94 110.0 1022; 06-30-05 Lot 66 Front 989 104.5 I 14.2 95 110.0 1023 06-30-05 Lot 66 Front 991 j I 102.5 i 12.3 i 93 110.0 1024 06-30-05 Lot 65 Front 990 102.3 1 10.8 93 110.0 1025 06-30-05 Lot 64 Front 990 I 104.1 11.4 I 95 110.0 1026 06-30-05 , Lot 69 Front 993 106.3 ; 9.0 97 I 110.0 1027 06-30-05 Lot 69 Front 994.5 I 103.9 10.1 94 110.0 1028 06-30-05 I Lot 62 Front 990.5 105.4 8.8 96 110.0 1029 06-30-05 Lot 62 Front 992.5 102.9 11.4 94 110.0 1030 06-30-05 `` Lot 63 Back 990.5 i 104.4 11.8 95 110.0 1031 06.30-05 Lot 63 Back 992.3 104.1 10.2 95 110.0 1032 06-00-05 Lot 62 Back 990 10118 13.1 93 110.0 1033 06-30-05 Lot 62 Back 992 I 106.3 9.9 97 110.0 1034 06-30-05 Lot 63 Front 990 103.4 12.7 94 110.0 10351 06-30-05 Lot 63 Front 992 100.8 11.0 92 110.0 10361 06-30-05 Lot 69 Front 989 103.3 11.8 94 I 110.0 DATE: March 2, 2006 Sadden Engineering TEST RESULTS PROJECT NAME; Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.I Date Tested I Location Elevation f Dry Density I % Moisture I Relative j Maximum In Place In Place Comnaction I Densitv 1037 06-30-05 Lot 69 Front 991 105.0 10.1 1038 06-30-052 Lot 68 Front 993 101.6 9.9 1039 06-30-05 Lot 68 Front 994.5 104.5 11.3 1040 06-30-05 Lot 67 Front 993 I 103.3 1 14.4 1041 06-30-052 Lot 67 Front 995 105.0 10.6 1042 06.30-05 Lot 66 Front 993 100.8 13.5 1043 06-30-05 Lot 66 Front 994.5 101.5 11.7 1044 0605 1 Lot 65 Front 992 104.7 8.3 1045 06-30-05 1 Lot 65 Front 994' 107.1 8.9 1046 06-30-05. Lot 64 Front 992 102.2 12.4 1047 07-01-05 I Lot 69 A Front 996 101.4 11.3 1048 07-01-05 Lot 69 A Front 997.5 101.6 10.7 1049 07-01-05 Lot 68 A Front 996 104.3 9.8 1050 07-01-05 Lot 68 A Front 997.5 102.6 12.5 1051 107-01-05 I Lot 67 A Front 996 103.4 10.0 1052, 07-01-05 Lot 67 A Front 997.5 100.8 I 11.3 10531 07-01.05 Lot 62 A Front 993 105.1 I 14.1 1054 07-01-05 Lot 62 A Front 994.5 104.6 13.2 1055 07-01-05 i Lot 63 A Front 993 102.5 12.9 1056 07-01-05 Lot 63 A Front 994.5 101.4 14.6 10571 07-01-05 i Lot 66 A Front 996 103.4 12.6 10581 07-01-05 Lot 66 A Front 997 103.0 11.8 10591 07-01-05 Lot 65 A Front 995 101.4 13.5 10601 07-01-05 Lot 65 A Front 996.5 100.8 12.0 1061. 07-01-05 I Lot 64 A Front 994 106.0 10.7 10621 07-01-05 1 Lot 64 A Front 995.5 104.2 11.9 10631 07-01-05 Lot 24 A Front PC 104.6 11.1 1064; 07-01-05 I Lot 24 A Center PC 104.2 15.6 1065.! 07-01-05 Lot 24 A Back PC 107.8 8.4 1066; 07-01-05 Lot 23 A Front PG 99.1 10.0 1067; 07-01-05 Lot 23 A Center PC 106.9 9.3 10681 07-01-0.5 Lot 23 A Back PG 107.4 8.4 106911 07-01-05 Lot 22 A Front PC 106.5 11.1 10701 07-01-05 Lot 22 A Center PG 104.6 7.7 10711 07-01-05 Lot 22 A !lack PG 107.1 8.6 1072 07-01-05 Lot 21 A Front PG 105.9 6.8 1073 I 07-01-05 Lot 21 A Center PG 100.5 7.7 10741 07-01-05 Lot 21 A Back PG 103.7 6.5 i 10751 07-05-05 Lot 69 A Front 998.5 102.4 9.9 '1076 j 07-05-05 Lot 69 A Front 1000 104.0 113 DATE: March 2, 2006 95 170.0 920 110.0 95 110.0 94 110.0 95 1.0.0 92 110.0 92 110.0 95 110.0 97 110.0 93 110.0 92 110.0 92 110.0 95 110.0 93 110.0 94 110.0 92 110.0 96 110.0 95 110.0 93 110.0 92 '110.0 94 110.0 94 110.0 92 I 110.0 92 110.0 96 110.0 95 110.0 95 110.0 95 110.0 98 110.0 90 110.0 95 112.0 96 112.0 95 112.0 93 112.0 96 112.0 96 112.0 91 110.0 94 110.0 91 112.0 93 112.0 Sladden Enzineerinp TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation I Dry Density In Place I % Moisture I In Place RelativeMaximum Compaction I Density 1.077 07-05-05 Lot 68 A Front 998.5 104.5 10.7 93 112.0 1078 074)5-05 Lot 68 A Front 1000.5 101.3 8.6 90 112.0 1.079 07-05-05 Lot 67 A Front 998.5 106.1 12,4 95 112.0 1080 07-05-05 Lot 67 A Front 1000 102.7 9.0 92 112.0 1081 07-05-05 Lot 62 A Front 995.5 100.8 12.8 J 90 112.0 10821 07-05-05 Lot 62 A Front 997 103.4 10.2 i . 94 1.1.0.0 1083 07-05-05 Lot 63 A Front 995.5 1.05.7 I 11A I 94 112.0 1084 07-05-05 Lot 63 A Front 997 102.0 9.1 91 1 112.0 1085 07-05-05 Lot 60 A Front 996 i 107.1 9.3 96 112.0 1086 07-05-05 Lot 60 A Front 997 104.4 13.5 93 112.0 1087 07-05-05 Lot 61 A Front 995.5 103.8 13.1 93 112.0 1088 07-05.05 Lot 61 A Front 997 105.1 14.3 94 112.0 1089 07-05-05 Lot 60 A Back 994 101..8 11.4 ' 91 112.0 1090 07-05-M Lot 60 A Back 995.5 100.6 14.1 91. 110.0 1091 07-05-05 Lot 61 A Back 994 104.8 10.3 94 112.0 1092 07-05-05 Lot 61 A Back 916 1.02.6 8.4 I 93 1 710.0 1093 07-05-05 Lot 63 A Back 994 1 101.1 10.5 1 92 ' 110.0 1094! 07-05-05 Lot 63 A Back 996 101.5 8.4. 92 110.0 1095 07-05-05 Tot 62 A Back 994 103.0 12.9 94 110.0 10961 07-05-05 Lot 62 A Back 996 102.4 10.8 93 110.0 1097' 07-06-05 Lot 44 B Front 984 102.2 + 9.5 93 110.0 1098 07-06-05 Lot 45 B Front 984 100.4 15.6 91 110.0 1.099 07-06-05 I Lot 45 B Front 986 102.5 15.3 1 93 110.0 1100 07-06-05 Lot 45 B Back 985 104.6 9.0 95 110.0 .1101' 07.06-05 ! Lot 45 B Back 987 ! 105.9 13.3 96 ! 110.0 110"21 07-06-05 Lot 1.06 B Back 980.5 100.7 17.2 90 112.0 11031 0746-05 1 Lot 107 B Back 979.5 101.4 16.9 92 112.0 1104' 07-06-05 i Lot 106 B Back 982 96.4 5.1* 86* 112.0 7705 07-06-05 Lot 107 8 Back 981.5 94.2 3.8* 84* 112.0 1106 07-06-05 Lot 108 B Front 978 99.8 8.7 I 91 110.0 1107 07-06-05 ! Lot 108.6 Back 978 101A 9.2 ! 92 110.0 1.1.08 07-06-05 Lot 44 B Back 985 105.1 + 9.8 ; 94 112.0 1109 07-06-05 Lot 44 8 Back 987 102.4 i 10.3 91 112.0 1110 07-06-05 Lot 46 B Back 985 101.3 i 11.4 90 112.0 1111 07-06-05 Lot 46 B Back 987 103.0 8.6 92 112.0 1112 07-06-15 Lot 106 6 Front 981 , 106.3 10.4 95 112.0 1113 07-06-05 Lot 106 B Front 982.5 102.5 8.1 92 112.0 1114 07-06-05 Lot 107 B Front 979.5 I 104.4 11.6 931 112.0 1115 07-06-05, Lot 107 B Front 981.5 96.0 5.3* 86* 1 112.0 11161 07-07-05 Lot 45 B Back 989 107.1 12.8 96 112.0 DATE: March 2, 2006 Sadden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.I Date Tested I location Elevation .I Dry Density I % Moisture I Relative I Maximum In Place In Place Conmaction Dcnsity 1117 07-07-05 Lot 45 B Back 991 108:3 1.4.1 1118 07-07-05 Lot 44 B Back 989 101.9 10.4 1119 07-07-05 Lot 44 B Back 991 101.1 14.5 1120 07-07-05 Lot 43 B Back 984 100.8 -8.2 11211 07-07-05 Lot 43 B back 986 101.8 11.0 1122 07-07-05 Lot 45 B Front 988 109.5 14.8 11231 07-07-05 Lot 45 8 Front 990 104.6 9.1 1124 07-07-05 Lot 44 B Front -986 103.4. 10.7 1125i 07-07-05 Lot" B Front 988 102.3 11.5 1126 1 07-07-05 Lot 43 B Front 984 10.3 16.6 1127 I 07.07-05 Lot 43 8 Front 986 104.0 12.7 1128 07-07-05 Lot 42 B Front 984.5 108.7 10.5 11291 07-07-05 Lot 42 B Front 986.5 100.6 15.2 1130 07-07-05 . Lot 41 B Front 984.5 101.4 , 11.5 11.31.1 07-07-05 1 Lot 41 B Front 986.5 105.5 9.0 11321 07-07-05 ! Lot 43 B Center 986 106.8 11.3 11331 07-07-05 Lot 42 B Center 985.5 1 103.6 9.4 1134 ! 07-07-05 I Lot 41 B Center 986 102.0 13.2 1135;. 07-08-05 Lot 46 B Front 985 103.6 8.8 1136 . 07-08-05 � Lot 46 B Front 987 101.9 8.2 11371 07-08-05 I Lot 45 B Front 992 1055 10.7 1138. 07-08-05 Lot 45 B Front 993.5 104.0 ! 11.5 1139 07-08-05 Lot 44 B Front 990 101..4. 1 9.9 1140! 07-08-05 Lot 44 B Front 991.5 105.7 13.4 1141 07-08-05 Lot 43 B Front 988 106.2 12.6 1142 07-08-05 Lot 43 B Front 989.5 102.8 11.3 1.143 07-08-05 Lot 42 B Front 988.5 i 104.1 8.7 1144 07-08-05 Lot 42 B Front 990 101.3 10.5 1145 07-08-05 Lot 41 B Front 988.5 101.4 11.5 1146I 07.08-05 I Lot 41 B Front 990 1.05.0 9.0 17.471 07-08-05 ' Lot 46 B Back 989 102.8 10.6 1148 07-08-05 1 Lot 46 B Back 991 106.3 8.8 11491 07-08-05 Lot 45 B Back 992 104.0 12.4 11501 07-08-05 Lot 45 B Back 993.5 103.3 11.1 11511 07-08-05 Lot 44 B Back 992 101.4 9.3 10521 07-08-05 Lot 44 B Back 993 101.8 10.2 1153 07-08-05 Lot 43 8 Back 988 107.3 , 8.6 11541 07-08-05 Lot 43 B Back 989.5 103.1 9.9 11551 07-08-05 Lot 42 B Back 985 102.4 10.5 1156! 07-08-05 Lot 4213 Back 986.5 100.6 13.4 11571 07-08-05 Lot 41 B Back 984.5 104.4 9.2 DATE: March 2, 2006 97 112.0 91 1.12.0 90 112.0 90 112.0 91 112.0 98 112.0 93 i 112.0 92 ; 112.0 91 112.0 92 112.0 93 112.0 97 112.0 90 112.0 91 112.0 94 1.12.0 90 112.0 93 112.0 91 112.0 93 112.0 91 112.0 94 112.0 93 112.0 92 110.0 94 112.0 95 112.0 93 110.0 93 112.0 92 110.0 91 112.0 94 112.0 92 112.0 95 I 112.0 93 112.0 92 112.0 91 112.0 91 112.0 96 112.0 92 112.0 91 112.0 90 112.0 93 112.0 Sladden ,Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation I Dry Density % Moisturse Relative I Maximum In Place In Place Compaction Densis 11581 07-08-05 Lot 41 B Back 986.5 104.1 11.3 I 93 I 112.0 11591 07.11-05 Lot 109 B Back 11601 07-11-05 Lot 109 B back 11611 07-11-05 Lot 110 B Back 11621 07-11-05 Lot 110 8 Back 1163, 07-11-05 Lot 110 B Front 1164; 07-11-05 I Lot 110 B Front 11651 07-11-05 Lot 109 B Front 11661 07-11-05 Lot 109 B Front 1167 07-11-05 Lot 70 A Back 11681 .07-11-05 Lot 70 A Back 1169 07-11-05 Lot 69 A Back 11.701 07-11.-05 Lot 69 A Back 11711 07-11-05 I Lot 68 A Back 1172 07-11-05 Lot 68 A Back 1173 07-11-05 Lot 67 A Back 1174 07-11-05 Lot 67 A Back 1175 07-11-05 Lot 66 A Back 1176.' 07-11-05 Lot 66 A Back 1177 07-11-05 Lot 65 A Back 1178 07-11-05 Lot 65 A Back 1179 07-11-05 Wt 70 A Back 1180 07-11-05 Lot 69 A Back 1181 07-1.1-05 Lot 68 A Back 1182 07-11-05 i Lot 67 A Back 1183, 07-11.-05 , Lot 66 A Back 1184 1185 1186 1187 1188 1189 1190 1191 1192 1193 1194 1195 1196 1197 DATE:1 977 978.5 997 979 977 978.5 977 978.5 990.5 9925 990 992 990 992 989 991 990. 992 990.5 992.5 994.5 994 994 993- 994. 07-12-05 Lot 7 B Back 1001 07-12-05 Lot 7 B Back 1003 07-12-05 Lot 8 B Back 1002.5 07-12-05 Lot 8 B Back 1004.5 07-12-052 Lot 8 B front 1.000.5 07-12-05 1 Lot 8 B Front 1002.5 07-12-05 I Lot 7 B ;Front 1002 07-12-05 JI Lot 7 B Front 1004 07-12-05 Lot A Front 1001 07-12-05 Lot 10 A Front 1000.5 07-12-05 Lot 10 A Front 1002.5 07-12-05 Lot 11 A Front 1001 07-12-05 Lot 11 A Front 1003 07-12-05 Lot 11 A Back 1003 &rch 2, 2006 99.3 106.2 102.2 101.4 99.8 99.3 106.7 102.8 103.5 100.8 102.0 108.5 100.0 105.9 108.5 107.0 102.2 107.3 104.4 105.3 101.1. 103.6 107.2 105.5 103.2 101.5 108.4 99.2 102.1 101.6 104.1 103.6 108.9 108.0 107.8 102.0 101.4 102.6 99.7 9.2 10.0 9.1 10.8 13.0 16.7 10.0 9.2 16.8 14.2 17.1 13.3 16.6 9.0 165 16.8 15.9 13.6 10.8 12.7 11.0 9.9 12.4 10.6 13.3 17.3 13.5 14.8 9.6 1.0.7 13.6 16.9 12.1 16.6 16.2 7.4 9.2 14.1 8.5 90 96 93 92 91 90 97 93 94 92 91 97 91 95 97 96 93 96 95 96 92 94 96 94 94. 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.1.2.0. 112.0 110.0 1.12.0 112.0 112.0 110.0 112.0 110.0 110.0 110.0 110.0 112.0 112.0 110.0 92 j 170.0 97 i 112.0 90 110.0 93 110.0 92 ; 110.0 95 i 110.0 94 110.0 99 110.0 96 110.0 96 112.0 93 110.0 92 110.0 93 110.0 91 110.0 Madden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO; 52211810 REPORT NO: 06-02-120 Test No.I Date Tested I Location Elevation I Dry Density % Moisture I Relative I Maximum In Place In Place Comnaction Density 1198 07-12-05 Lot 11 A Back 1005 104.5 7.0 1199 07-12-05 Lot 10 A Back 1003 1.03.0 14.5 1200 07-12-05 Lot 10 A Back 1005 109.1 9.4 1201 07-12-05 Lot 9 A Back 1002 106.3 10.7 1202! 07-13-05 Lot 111 B Front 987 j 1.02.4 8.6 1.203 07-1.3-05 Lot 111 B Front 980 I 104.5 12.1 1204 07-13-05 Lot 112 B Front 977.5 99.5 16.6 1205 07-1.3.05 Lot 112 B Front 979 102.2 17.4 1206 07-13-05 Lot 113 B Front 975 98.8 16.3 1207 07-13-05 Lot 113 B Front 977 98.9 15.4 1208 07-13-05 Lot 112 B Back 977.5 99.7 12.5 1209 07-13-05 Lot 112 B Back 979 103.1 i 14.6 1210 07-13705 Lot 1115 Back 978 104.7 14.3 1211 07-13-05 ' Lot III B Back 979.5 9911 13.3 1212, 07-13-05 I Lot 70 B Back 996.5 I 99.0 '17.0 1213! 0743.05 Lot 70 B Back 998.5 98.7 14.1 12141 07-13-05 Lot 69 B Back 996 104.0 17.3 1215' 07-13-05 Lot 69 B Back 998 105.0 14.2 12161 07-13-05 Lot 68 B back 996 1.025 11.5 1217. i 07-13-05 Lot 68 B Back 998 102.9 12.9 I 1218'; 07-14-05 Lot 57 A Front PG 108.3 10.5 1219! 07-14-05 Lot 57 A Center PC 1 108.6 9.3 1220' 07-14-05 Lot 57 A Back PC 106.7 12.6 1221 07-14-05 Lot 98 B Back 975 103.2 17.2 1222- 07-14-05 Lot 97 8 back 9765 104.8 11.2 1223 07-14-05 Lot 98 B Front 975 105.2 14.0 12241 07-14-05 Lot 98 B Front 977 99.7 1 19.9 12251 I07-14.05 07-14-05 Lot 97 B Front 976.5 91.0 I 20.5 1226 I Lot 97 B Front 978.5 94.3 18.8 1227 07-14-05 '. Lot 98 8 Center 975 104.1 16.5 1.2281 07-14-05 1 Lot 98 B Center 976 102.2 15.8 1229 07-14-05 Lot 97 B Center 976 101.3 16.7 1230. 07-14-05 Lot 97 8 Center 977 102.9 14.8 1231 07-18-05 Lot 90 B Back 978.5 108.1 13.9 1232 07-18-05 Lot 90 B Back '980 102A 8.9 1233 07-18-05 Lot 89 B Back .978 90.1 7.2 1234 07-18-05 Lot 90 B Front 978 103,5 j 1.0.6 1235 07-18-05 Lot 90 B Front 980 105.2 113.8 1236 07-18-05 Lot 91 B Pront 977 96.3 6.2 DATE: March 2, 2006 95 94 97 95 93 95 90 93 90 90 91 94 95 90 90 91 95 95 93 94 97 97 95 94 95 96 89* 83* 86* 95 93 92 94 97 91 80" 92 94 86* 116.0 110.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1 112.0 112.0 112.0 110.0 i 110.0 110.0 112.0 { 110.0 110.0 110.0 110.0 110.0 110.0 112.0 112.0 112.0 112.0 112.0 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elmition Dry Density I % Moisture I Relative I Maximum In Place I In Place I Compaction I Density 1237 07-18-05 Lot 92 B Front 1238 07-18.05 Retest # 1.236 1239 07.18.05 Lot 91 B Front 1240 07-18-05 ; Retest # 1.233 1241 07-18.05 Lot 89 B Back 1242 07-18-05 Lot 89 B Center 1243 07-18-05 Lot 89 B Center 12" 07-1.8-05 Lot 90 B Center 12451 07-18-05 Lot 90 B Center 12461 07-18-05 Lot 91 B Center 1247 07-18-05 Lot 90 B Center 1248 07-18-05 Lot 90 B Front 1249 07-18-05 Lot 89'B Front 1250I 07-18-05 Lot 90 B Back 251 I 125111 07-18-05 Lot 90 B Back 12521 07-19-05 Lot 84 B Front 1253 07-19-05 Lot 89 B Front 1254 07-19-05 Lot 89 B Back 12551 07-19-05 Lot 89 B Back 1256: 07-19-05 Lot 90 8 Front 1257; 07-19-05 Lot 90 B Front 1258! 07-19-05 Lot 91 8 Back 12591 07-19-05 Lot 91 B Back 1260; 07-19-05 Lot 92 B Back 1261 07-19-05 Lot 92 B Back 1262 07-19-05 Lot 91 B Front 1263 07-19-05 Lot 918 Front 1264. 07-19-05 Lot 92 B Front 1265 I 07-19-05 Lot 92 B Front 1266; 07-20-05 Lot 58 A Front 1267. 07-20-05 Lot 58 A Center 1268 07-20-05 Lot 58 A Back 1269 07-20-05 1 Lot 59 A Front 1270 '07-20-05 Lot 59 A Center 1271 07-20-05 Lot 59 A Back 1272 07-20-05 Lot 60 A Front 1273 07-20-05 Lot 60 A Center 1274 07-20-05 Lot 60 A Back 1275 07-20-05 Lot 64 A Back 1276 07-20-05 Lot 64 A Back DATE: March 2, 2006 l 977 101.4 8.3 91 112.0 977 103.0 9.9 92x* 112.0 979 104.5 11.4 93 112.0 102.2 10.3 91 "" 112.0 980 106.1 12.1 95 112.0 978 103.4 11.0 92 112.0 980 103.7 11.5 93 112.0 978.5 101.9 1.0.1 91 112.0 980.5 104.5 12.4 93 112:0 977.5 100.9 9.3 90 112.0 979.5 105.0 13.6 94 112.0 978.2 102.3 8.8 91 112.0 980.5 102.9 10.7 92 112.0 979 106.6 9.2 95 112.0 981 103.0 10.5 92 112.0 981.5 103.3 8.8. 92 112.0 982.5 104.6 9.3 93 112.0 981.5 99.8 16.8 91 110.0 982.5 101.3 11.6 92 110.0 981 105.4 7.1 94 112.0 982 101.4 9.7 192 110.0 977 99.3 11.2 90 110.0 979 107.2 i 12.7 96 112,0 979.5 105.9 13.6 95 1 112.0 981.5 108.0- 15.3 96 112.0 980 ! 104.4 9.9 93 + 112.0 981.5 102.9 8.7 92 112.0 979 106.1 11.5 95 J 112.0 981 101.1 10.8 90 i 112.0 PG 104.3 10.1 93 I 112.0 PG 109.8 7.7 98 I 112.0 PC 106.3 83 95 112.0 PG 103.9 9.2 93 112.0 PG 106.5 8.6 I 95 112.0 PC 105.1 9.1 94 112.0 PG 109.1 10.1 97 112.0 PC ! 108.7 11.3 97 112.0 PG 105.2 8.8 94 112.0 994 101.9 10.5 91 112.0 996 103.3 12.4 92 12.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.I Date Tested Location Elevation I Dry Density % Moisture Relative I Maximum !n Place In Placc Comnaction DenRiry 1277 07-20-05 Lot 65 A Back 1278 07-20-05 Lot 65 A Back 1279 07-20-025 Lot 66 A Back 1280 07-20-05 Lot 66 A Back 1281 07-20-05 Lot 67 A Back 1282 07-20-05 Lot 67 A Back 1283 07-20-05 Lot 64 A Back 1284 07-20.05. L,ot 65 A Back 1285 07-20-05 1 Lot 65 A Back 1286 07-20-05 Lot64 a Back 1287! 07-20.05 Lot 64 A Back 12881 07-20-05 1 Lot 66 A Back 12891 07-20-05 1 Lot .66 A Back 12901 07-20-05 I Lot 67 A Back 1291 i 07-20-05 Lot 67 A Back 1292 07-21-05 Lot 89 B Front 1293 07-21-05 Lot 89 B Front 1294 07-21-05 Lot 89 8 Back 12951 07-21-05 Lot 89 B Back 1296 07-21-05 Lot 90 B Front 1297 07-21-05 Lot 90 B Front 1298 07-21=05 1 Lot 90 B Back 1299 I 07-21.-05 Lot 90 B Back 1300; 07-21-05 Lot 91 B Front 13011 07-21-05. Lot 91 B Front 1302 07-21-05 I Lot 91 B Back 1303 07-21-05 Lot 91 B Back 1304 i 07-21-05 ! Lot 92 B Front 1305; 07-21-05 ' Lot 92 B Front 1306; 07-21-05 Lot 92 B Back 1307 07-21-05 Lot 92 B Back 1308; 07-21-05 Lot 93 B Front 13091 07-21-05 Lot 93 B Front 1310 07-21-05 Lot 93 B Back 1311 07-21-05 Lot 93 B Back 1312 07-21-05 Lot 93 B Front 1313 07-21-05 Lot 93 B Front 1314 07-21-05 Lot 93 B Back 1315 07-21-05 Lot 93 B Back DATE: March 2, 2006 994.5 107.2 9.1 96 11.2.0 996 104.3 13.4 93 112.0 995.5 101.8 11.3 91 112.0 996.5 105.0 i 12.0 94 112.0 995 106.9 8.5 95 112.0 996.5 103.3 10.2 92 112.0 997.5 1 100.9 14.0 90 I112.0 998 1 103.8 11.2 93 1.12.0 1000 - 100.4 14.3 90 112.0 999 101.6 15.1 91 112.0 1001 104.7 13.6 I 93 112.0 998 108.1 12.9 97 112.0 1000 109.01 i 14.5 , 97 112.0 998 105.8 13.2 94 112.0 1000 101.5 9.8 91 112.0 984.5 1 103.1 9.8 92 112.0 986.5 ! 99.2 14.8 90 110.0 984 105.3 11,9 94 i 112.0 986 102.8 13.0 92 112,0 984 106.6 9.8 95 112.0 985.5 100.3 1 15.7 91 110.0 983 104.7 12.5 93 112.0 985 101.8 12.7 ,` 91 112.0 984 , 105.1 13.5 f 94 112.0 986 1 105.3 11.6 94 112.0 981 103.1 9.9 92 112.0 983 107.2 14.0 96 112.0 983 104.6 13.4 93 112.0' 984.5 101.0 12.1 90 . 1.12.0 983 107.8 17.5 96 112.0 984.5 104.4 12,8 93 112.0 980 105.1 , 9.4 94 112.0 981.5 108.3 8.5 97 112.0 980 103.3 + 10.1 92 112.0 981.5 104.0 1 11.3 93 I 112.0 982.5 104.3 i 9.1 93 112.0 984 103.4 13.0 92 112.0 983 100.8 15.5 90 I 112.0 984 .102.4 10.8 91 I 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION; La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density I % Moisture I RelativeMaximum In Place In Place Comnaction I Density 13161 07-22-05 Lot 71 A Front 1317 -07-22-05 Lot 71 A Center 13181 -07-22-05 Lot 71 A Back 1319 07-22-05 Lot 70 A Front 1320 07-22-05 Lot 70 A Center 1321 07-22-05 Lot 70 A Back 1322 07-22-05 Lot 69 A Front 1323 07-22-05 Lot 69 A Center 1324. 07-22-05 Lot 69 A Back 1325; 07-22-05 Lot 68 A Front 1326 07-22-05 Lot 68 A Center 1327 07-22-05 Lot 68 A Back 1328 07-22-05 Lot 67 A Front 1329 07-22-05 Lot 67 A Center 13M 07-22-05 Lot 67 A Back 1331! 07-22-05 Lot 66 A Front 1332. 07-22-05 Lot 66 A Center 1333; 07-22-05 Lot 66 A Back 13M 07-22-05 Lot 65 A Front 1335 07-22-05 Lot 65 A Center 1336 07-22-05 Lot 65 A Back 1337107-22-05 105.0 I Lot 64 A Front 1338 07-22-05 I Lot 64 A Center 1339, 07-22-05 Lot 64 A Back 1340 07-22-05 Lot 63 A Front 13411. 07-22-05 I LOT 63 A Center 7342: 07-22-05 Lot 63 A Back 1343` 07-22-05 Lot 62 A Front 1344 07-22-05 Lot 62 A Center 1345 07-22-05 Lot 62 A Back 7346 07-22-052 Lot 61 A Front 13471 07-22-05 Lot 61 A Center 1348 j 07-22-05 Lot 61. A Back 1349 07-25-05 Retest 91224 1350 07-25-05 Lot 98 B Front 1351 07-25-05 Lot 98 B Back 1352 07-25.05 Lot 98 B Back 1353 07-25-05 Retest # 1225 1354 07.25-05 Retest # 1226 1355 07-25-05 Lot 97 B Back DATE: March 2, 2006 PG 102.9 11.8 PC 104.5' 11.9 PG 102.2 8.7 PG 101.4 9.1 PG 104.4 9.6 PC 106.9 10.1 PG 105.5 14.1 PG 99.7 15.2 PG 102.7 13.5 PG 104.6 8.2 PG 108.9 10.1 PG 107.6 9.5 PC 101.6 12.5 PG 102.1 8.4 PG 106.6 7.5 PC 105.4 10.3 PG 106.6 11.8 PC 107.2 8.3 PG 1.08.5 10.6 PG 104.1 1 9.5 PC 101.8 ` 7.7 PG 105.0 I 13.5 PC 107.5 11.0 PC 106.4 9.6 PG 107.6 9.2 PC 106.3 9.4 PG 103.2 10.1 PG 109.1 ' 7.8 PC 107.3 8.8 PC 108.6 9.2 PG 104.5 11.5 PC 109.3 10.4 PG 109.2 11.6 103.3 16.7 979 105.1 14.5 977 101.6 17.0 979 104.4 15.1 102.2 16.0 101.8 13.6 978.5 105.3 13.9 93 110.0 95. 110.0 93 110.0 91 112.0 93 112.0 95 112.0 94 112.0 91 110.0 93. 110.0 93 112.0 97 112.0 96 112.0 91 112.0 91 11.2.0 95 112.0 94 112.0 95 112.0 96 112.0 97 112.0 93 112.0 91 112.0 94 112.0 96 112.0 95 112.0 96 112.0 95 112.0 92 112.0 97 112.0 96 1.12.0 93 112.0 93 112.0 98 12.0 98 112.0 92** 112.0 94 112.0 91 112.0 93 112.0 91** 112.0 91 ** 112.0 94 112.0 Sladden Engineering► TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. I Date Tested Location Elevation Dry Density % Moishue Relative I Maximum In Place In Piece Compaction I Density 1356 07-25-05 Lot 97 B Back 1357 07-25-05 Lot 98 0 Front 1358 07-25-05 Lot 98 B Front 1359 07-25-05 Lot 98 8 Back 1360 07-25-05 Lot 98 B Back 1361 07-25-05 Lot 97 B Front 1362 07-25-05 Lot 97 B Front 1363 07-25-05 Lot 97 B Back 1364 07-25-05 Lot 97 B Back 1365 07-26.05 Lot 114 B. Front 1366 07-26-05 Lot 114 B. Front 1367 07-26-05 Lot 114 B Back 1368 07-26-05 Lot 114 B Back 1369 07-26-05 Lot 115 B Front 1370 07-26-05 Lot 115 8 Front 1371 07-26-05 Lot 115'B Back 1372 07-26-05 Lot 115 B Back 1373 07-26-05 Lot 116 B Front 1374 07-26-05 Lot 116 B Front 1375 07-26-05 Lot 1.16 B Back 13761 07-26-05 Lot 116 B Back 13771 07-26.05 I Lot 114 B Front 1378 07-26-05 14t 114 B Back 13791 07-26-05 Lot 115 B Front 13801 07-26-05 Lot 115 B Back 13811 07-27-05 Lot 39 B Front 13821 07-27-05 I Lot 39 B Front 13831 07-27-05 Lot 38 B Front 13841 07-27-05 Lot 38 B Front 1385 07-27-05 Lot 37 B Front 1386 07-27-05 Lot 37 B Front 1387 07-27-05 Lot 39 8 Front 1388 07-27-05 Lot 39 B Front 1389 07-27-05 Lot 38 B Front 1390 07-27-05 Lot 38 B Front 1391 07-27-05 Lot 37 B Front 1392 07-27-05 Lot 37 B Front 1393 07-27-05 Lot 39 B Back 13941 07-27-05 Lot 39 8 Back DATE: March 2, 2006 980.5 103.4 14.7 92 981 106.6 12.9 95 983 103.5 12.4 92 981 1 102.1 13.6 91 983 102.9 17.0 92 980.5 100.9 15.5 90 987.5 105.0 11.6 94 981.5 106.6 13.3 95 983 104.8 11.2 94 977.5 105.1 8.3 94 979.5 103.7 17.5 93 977.5 102.5 8.9 92 979.5 101.1 14.5 90 977 106.0 '9.6 95 978.5 105.1 12.4 94 977 100.8 10.0 90 978.5 107.1 17.2 96 975.5 103.8 10.3 93 977 1 103.6 I 11.2 93 975.5 , 105.3 15.7 94 977 104.0 16.9 93 981 1.03.1 10.0 92 981 106.3 11.4 95 980.5 107.0 16.8 96 980 106.7 17.1 95 984.5 101.4 9.3 91 986.5 105.0 10.8 94 984 3.06.8 1.2.5 95 986 104.3 11.1 93 984.5 103.1 8.8 92 986.5 103.9 10.4 93 988.5 107.5 11.3 96 990.5 105.6 13.3 94 788 101.8 14.8 91 989.5 100.9 12.2 90 988.5 108.1 13.5 97 990 106.3 12.6 95 984.5 103.9 14.4 93 986 103.2 12.0 92 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. I Date Tested Location Elevation Dry Density % Moisture RelativeMaximum In Place In Place Cottma'[it Demsity 1395 07-27-05 Lot 38 B Back 984 107.0- 9.9 96 112.0 1396 07-27-05 Lot 38 B Back 986 104.5 10.7 I 93 112.0 1397 07-27=05 Lot 37 B Back 984.5 102.9 15.1 92 112.0 1398 07-27-05 Lot 37 B Back 986.5 101.0 11.0 90 112.0 1399 07-27-05 Lot 39 B Back 988 108.0 12.2 96 ; 112.0 1400 07-27-05 Lot 39 B Back 989.5 105.1 15.1 94 I 11.2.0 14011 07-27-05 Lot 38 B Back 988 102.0 9.6 91 112.0 1402! 07-27-05 Lot 38 B Back 989.5 105.7 13.2 94 1.12.0 1403 07-27-05 Lot 37 B Back 988.5 101.5 11.3 91 112.0 1404 i 07-27-05 Lot 37 B Back 990 106.0 I 8.7 95 112.0 1405;; 07-28-05 Lot 39 B Back 991.5 I 1.08.4 14.1 97 112.0 1406: 07-28-05 i Lot 39 B Back 992.5 103.7 10.7 92. 112.0 1407: 07-28-05 j Lot 38 B Back 991 109.6 12.4 - 98 112.0 1408. I 07-28-05 Lot 38 B Back 992.5 103.7 12.6 93 j 112.0 1409 07-28-05 Lot 37 B Back 991 104.2 16.7 93 112.0 1.410 07-28-05 Lot 37 B Back 992.5 108.6 12.9 W 97 112.0 1411 07-28-05 Lot 39 B Front 991.5 102.5 12.4 92 112.0 1412 I 07-28-05 Lot 39 B Front 992.5 1.01.0 17.6 90 112.0 1413 i 07-28-05 Lot 38 B Front 991 102.9 12.1 92 112.0 14141 07-28-05 Lot 38 B Front 992.5 105.8 10.7 94 112.0 1415: 07-28-05 Lot 37 B Front 991 107.3 16.6 96 112.0 1416 ! 07-28-05 Lot 3713 Front 992.5 1 1085 1 15.1 97 I 112.0 1417! 07-29-05 I Lot 37 B Front 993.5 I 99.9 ! 15.6 j 91 110.0 14181 07-29-05 Lot 37 B Back 993.5 105.2 10.8 94 I 112.0 1419 07-29-05 Lot 38 B Front 993.5 j 99.7 10.8 91 110.0 1420 07-29-05 I Lot 38 B Back 993.5 1.01.5 11.2 91 112.0 1421; 07-29-05 Lot 39 B Front 994 1.03.3 I 16.3 � 92 112.0 1422 i 07-29-05 1 Lot 39 B Back 994 100.1 11.2 ` 91 1 110.0 14231 07-29-05 i Lot 9813 Front 985 93.1 7.1" 85" j 11.0.0 1424 07-29-05 Lot 98 B Front 986 92.4 6.6" ( 84" I 110.0 1425 07-29-05 Lot 98 B Back 985 102.8 10.9 I 93 110.0 1426 07-29-05 Tot 98 B Back 986 104.4 13.6 95 110.0 1.427 07-29-05 Lot 97 B Front 984 106.3 14.1 95 112.0 1428 07-29-05 Lot 97 B Front 985.5 105.8 12.9 94 112.0 1429 07-29-05 Lot 97 B Back 984.5 104.0 11.8 93 112.0 1430 07-29-05 Lot 97 B Back 9855 101.6 .10.7 91 112.0 1431. 07-29-05 Lot 88 B Front 976 107.6 14.5 96 112.0 1432 07-29-05 Lot 88 B Back 975.5 104.9 12.3 94 -112.0 ! DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO. 06-02-120 Tc st No. Datc Tcstcd Location Elevation I Dry Density I % Moisture I Relative I Maximum In Place In Place Compaction Dmwity 1433 0&01-05 I Lot 52 B Front 1434 08-01-05 ! Lot 52 B Back 1435 08-01-05 Lot 53 B Front 1436 08-01-05 Lot 53 8 Back 1437 08-01-05 Lot 54 B Front 1438 0$-01-05 Lot 54 B Back 1439 08-01-05 Lot 55 B Front 1440 08-01-05 Lot 55 B Back 1441 08-01-05 Lot 56 B Front 1442 08-01-05 Lot 56 B Back 144311 08-01-05 Lot 57 B Front 1444! 08.01-05 Lot 57 B Back 1A ; 08-01-05 Club House 2A 08-01-05 Club House 3A 08-01-05 Club House 4A I 08.01-05 I Club House 5A 08-01-05 i Club House 6A 08-01-05 Club House 7A 08-01.05 Club House 8A i 08-01-05 ` Club House 9A I 08-01-05 ! Club House 10A 0&02-05 Club House 11A ' 08-02-05 Club House 12A 08-02-05 Club House 13A 08-02-05 Club House 14A i 08.02-05 I Club House 1445 08-02-05 1446! 08-02-05 1447 08-02-05 14481 08-02-05 14491 08-02-05 14501 08-02-05 1451 08-02-05 1452 08-02-05 14,531 08-02-05 1454 08-02-05 1455 08-02-05 1456 08-02-05 DATE: March 2, 2006 Per Plan Per Plan Per Plan Per Plan Per Plan Per Plan Per Plan Per Plan Per Plan Per Pian Per Plan Per Plan 979 978.5 978 978.5 977.5 977 977.5 977.5 977 976.5 976.5 977 966.0 968.0 966.0 961.0 963.0 967.0 969.0 965.0 967.0 969.0 971.0 970.0 971.0 973.0 979.5 980.5 979.5 981. 978.5 979.5 979.5 981.5 980 981.5 980 981.5 104.1 .11.9 93 102.4 9.7 91 101.8 12.5 91 105.9 10.6 95 106.6 12.3 95 101.0 14.9 90 103.4 9.8 92 103.8 13.2 93 107.3 13.9 96 104.4 11.0 96 101.3 8.9 90 102.7 12.1 92 99.3 17.2 90 102.0 18.7 94 99.7 19.2 91 100.9 i 19.9 92 1.035 20.9 95 100.1 19.2 I 91 102.9 14.9 94 102.3 17.5 93 98.6 12.7 90 104.0 17.0 95 100.1 16.4 91 101.2 18.7 92 102.7 19.4 1 94 102.4 20.5 1 93 100.8 16.6 j 92 101.9 10.8 93 104.3 11.9 1 95 1.01..5 9.4 92 102.7 12.5 92 100.9 ! &8 92 104.8 10.2 94 104.6 10.9 93 108.1 13.3 97 105.4 11.6 94 106.3 11.0 95 103.9 12.5 93 112.0 112.0 112.0 112.0 1.12.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 110.0 '110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 1 110.0 110.0 110.0 110.0 110_q r 110.0 110.0 110.0 110.0 112.0 110.0 112.0 112.0 112.0 I 112.0 112.0 j 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture I Relative * 'Maximum In Place I In Place I Comflaction I Density 1457 08-03.05 Lot 89 B Front 9885 105.1 13.3 94 11.2.0 1458 I 08-03-05 Lot 89 B Front 990.5 104.2 11.6 93 112.0 1459 08-03-05 Lot 89 B Back 988, 1 107.9 9.9 96 112.0 1460. 08-03-05 Lot 89 B Back 990- 103.8 12.0 93 112.0 1.4611. 08-03-05 1 Lot 90 B Front 978.5 106.6 10.5 95 112.0 146211 08-03-05 Lot 90 B Front 98915 106.1 11.3 95 112.0 14631 08-03-05 I Lot 90 B Back 987 102.5 14.5 92 112.0' 1464 08-03-05 Lot 90 B Back 989 102.8 13.4 92 112.0 1465 08-03-05 Lot 91 B Front 988 108.1 10.7 97 112.0 1466 08-03-05 Lot 91 B Back 985 105.3 13.8 94 112.0 1467 08-03-05 Lot 91 B Back 987 101.6 10.0 91 112.0 1468 08-03-05 Lot 92 B Front 986.5 103.7 9.2 93. 112.0 1469 08-03-05 Lot 92 B Back 986.5 103.5 12.4 92 112.0 1470 08-03-05 Lot 93 B Front 985.5 107.8 11.0 96 112.0 1471 08-03-05 Lot 93 B Back 985 104.4 14.1 93 112.0 A 08-03-05 Lot 60 Front 975 102.4 1.6.0 93 110.0 B I 08-03.05 I Lot 60 Back 975 101.1 10.1. 92 110.0 C 08-03-05 i Lot 59 Back 975 103.7 19.3 95 110.0 D 08-03.05 Lot 59 Front 975 100.2 10.2 91 110.0 E I 08-03-05 Lot 58 Front 976 103.1 15.9 94 110.0 F 08-03-05 ; Lot 58 Back 976 101.8 17.5 93 110.0 1472! I 08-04-05 j Lot 94 B Front 980 101.8 10.9 91 1 112.0 1473. 08.04-05 Lot 94 B Back 979.5 103.3 13.5 ± 92 I 112.0 1474; 08-04-05 Lot 95 A Front 979 107.5 11.0 i' 96 112.0 14751 08-04-05 I Lot 95 B Back 797 104.4 8.8 93 1.12.0 14761 08-04-05 I Lot 46 B Front 978 102.9 12.6 92 112.0 1477 08-04-05 Lot 46 B Back 978.5 105.1 11.7 94 112.0 1478 08-04-05 Lot 94 B Front 982 I 108.2 14.1 I 97 112.0 1479 08-04-05 Lot 94 8 Front 983.5 106.1 12.5 95 112.0 1480 08-04.05 Lot 95 8 Front 981 I 104.5 10.8 93 112.0 1481 08-04-05 Lot 95 B Front 983 102.4 13.0 91 112,0 1482 08-04-05 Lot 96 B Front 980 103.9 11.4 93 112.0 1483 08-04-05 Lot 96 B Front 982 105.5 14.5 94 112.0 1484 08-04-05 Lot 94 B Back 981.5 101.2 9.6 90 112.0 1485 08-04-05 j Lot 94 B Back 983.5 103.1 10.3 92 112.0 1486 08-04-05 . I Lot 95 B Back 981 107.4 13.2 96 112.0 1487 08.04-05 I Lot 95 B Back 983 104.6 11.4 93 112.0 1488 08-04-05 Lot 96 B Back 980.5 104.8 10.2 94 112.0 1489 08.04-05 Lot 96 8 Back 982 101.6 12;7 91 112.0 1490 08-04-05 Retest # 1423 101.3 8.6 90"" 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Test No. l Date Tested Location Elevation Dry Density Place % MoistureI In Placc Relative Compaction I Maximum In Densi 1491 08-04-05 Retest # 1424 103.5 9.0 92** 17 2.0 1.492 08-04-05 Lot 98 B Back 986 104.4 8.5 93 112.0 1493 08-04-05 Lot 97 B Front 987.5 102.0 11.3 94 112.0 . 1494 08-04-05 Lot 97 B Back 987.5 105.1 10.5 94 112.0 1495 08-04-05 Lot 96 B Front 984 103.3 13.9 93 112.0 1496 08-04-05 Lot 96 B Back 984 107.6 12.7 96 112.0 1497 08-05-05 Lot 89 B Front PG 108.3 10.4 97 112.0 1498 08-05-05 Lot 89 B Center PG 1.05.5 11.6 94 { 112.0 1499 08.05-05 Lot 89 B Back PG 108.4 10.9 97 112.0 15M 08-05-05 Lot 90 B Front PC 103.8 13.8 93 ' 112.0 1501 08-05-05 Lot 90 B Back PG 105.9 12.1 95 112.0 1502 08-05-05 Lot 90 B Center PG 102.6 12.9 92 i 112.0 1503 08-05-05 Contour Between 981.I 104.7 14.8 j 93 I 112.0 1504 08-05-05 Meriwethcr & 981.5 102.0 13.2 91 112.0 1505 08-05-05 Humboldt 981 I 108.9 15.3 97 112.0 1506 08-05-05 Per Plan 982 106.1 12.8 95 112.0 1507 08-05-05 Per Plan 980.5 103.6 10.7 93 112.0 1508 08-05-05 Per Plan 980.5 105.5 15.5 94 112.0 1509 08-05-05 Per Plan 981 109.1 13.3 97 112.0 1510 08-05-05 Per Plan 982 106.4 11.8 95 112.0 1511 08-05-05 Per Plan 981.5 104.5 12.5 93 112.0 1B 08-05-05 , Club House 975.0 1.07..8 17.8 93 110.0 2B I 08-05-05 Club House 975.0 100.1 8.9 91 110.0 3B 08-05-05 Club House 975.0 104.0 15.8 96 110.0. 4B I 08-05-05 Club House 975.0 108.8 9.4 99 110.0 5B 08-05-05 Club House 975.0 99.2 10.1 90 110.0 6B 08-05-05 Club House 972.0 107.6 9.5 98 110.0 7B 08.05-05 Club House 974.0 100.4 9.7 91 110.0 8B 08-05-05 Club House 975.0 102.5 12.4 94 110.0 9Ii OM5-05 Club House 977.0 101.3 10.9 92 1.10.0 10B 08-05-05 Club House 977.0 105.2 8.9 95 110.0 11B -08-05-05 Club House 479.0 1.00.3 13.1 91 11.0.0. 126 08-05-05 Club House 975.0 103.2 10.8 94 110.0 13B . 08-05-05 Club House 977.0 101.4 10.1 92 110.0 14B 08-05-05 Club House 975.0 108.2 15.9 98 110.0. 15B 08-05-05 Club House 977.0 106.8 18.1 97 110.0 16B 08-05-05 Club House 977.0 105.6 16.2 96 { 770.0 17B I 08-05-05 Club House 977.0 101.0 13.9 ! 92 110.0 18B 08-05-05 Club House 977.0 104.4 19.2 I 95 110.0 DATE: March 2, 2006 Sladden i5ngineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Tcst No. I Datc Tc,4tcd Location Elevation I Dry Density In Place % Moimurc In Place Relative Com action Maximum Density 08-08-05 Lot 92 B Center 1517 08-08-05 Lot 92 B Back 1518 08-08-05 1 19B 08-05-05 Club House 977.0 105.6 10.2 95 110.0 20B 08.05-M Club House 977.0 106.3 12.8 96 110.0 15121 08-08-05 Lot 91 B Front 15131 08-08-05 Lot 91 B Center 15141 08.08.05 Lot 91 B Back 1515 08-08-05 Lot 92 B Front 1.516 08-08-05 Lot 92 B Center 1517 08-08-05 Lot 92 B Back 1518 08-08-05 1 Lot 93 B Front 1519 08-08-05 Lot 93 B Center 1520 08-08-05 Lot 93 B Back 1521 08-08-05 Lot 94 8 Front 1522 08-08-05 Lot 94 B Center 1523; 08-08-05 Lot 94 B Back 15241 0"8-05 Lot 95 0 Front 1525 08-08-05 Lot 95 B Center 1526 08-08-05 Lot 95 B Back 1527 08-08-05 Lot 88 8 Front 1528 08-08.5 Lot 88 B Back 15291 08-08-05 Lot 88 B Front 15301 08-08-05 i Lot 88 B Back 1531. 08-08-05 Lot 88 B Front 15321 08-08-05 Lot 88 B Back 1C I I 08-08-05 I Club House 2C j 08-08-05 I Club House 3C 08-08-05 Club House 4C 1 08-08-05 Club House 5C I 08.08-05 Club House 6C I 08-08-05 1 Club House 7C 08-08.05 1 Club House 8C 08-08-05 Club House 9C 08-08-15 ': Club House 10C 08-08-05 I Club House 11C' 08-08-05 Club House 12C 08-08-05 i Club House 1533 08-09-05 Lot 12 B Back 1534 08-09-05 Lot 12 B Back 1535 08-09-05 Lot 63 B Back DATE: March 2, 2006 PC PC PG PC PG PG PG PC PG PG PG PG PG PG PG 997.5 977.5 979.5 979:5 981 981 979.0 981.0 979.0 981.0 979.0 981.0 979.0 981.0 979.0 981.0 979.0 981.0 975.5 976.5 975 108.3 105.1 106.5 103.8 102.9 104.7 101.3 107.2 104.4 108.5 105.6 103.0 103.9 107.2 104.6 102.2 104.0 101.6 105.0 103.6 103.8 106.4 106.2 104.5 105.3 103.8 1.02.1 104.9 107.3 104.1 105.9 108.0 101.2 100.8 101.3 101.2 9.0 11.4 10.7 12.6 11.1 13.3 9.9 11.7 13.8 10.7 8.8 12.4 10.0 8.3 11.5 9.6 8.1 12.7 9.0 13.2 12.1 15.7 10.2 12.4 11.2 i 12.3 9.8 12.2 13.4. 13.9 12.6 15.8 16.2 22.4* 18.5* 12.7 97 94 95 93 92 93 90 96 93 97 94 92 93 96 93 91 93 91 94 93 93 96 96 95 95 95 93 95 97 95 96 98 92 85* 85* 90 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 119.0 119.0 1.12.0 . Sladden Ungineenng TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density + % Moisture I Reletivc I Maximum In Place I In Place I ComDaction I Densitv 1536 1537 1538 1539 1540 1541 1542 08-09-05 Lot 63 B Back 08-09-05 , Lot 64 B Back 08-09-05 Lot 64 B Back 08-09-05 Lot 65 B Back 08-09-05 Lot 65 B Back 08.09-05 Lot 66 B Back 08-09-05 Lot 66 8 Back 1D 08-09-05 Club House 2D 08-09-05 CIub House 3D 08-09-05 Club House 41) 08-09-05 Club House 5D 08-09-05 ! Club House 6D 08-09-05 Club House 7D 08-09-05 Club House 8D 08-09-05 Club House 9D 1 08-09-05 Club House 10D 08-09-05 Club House 11D ; 08.09-05 Club House 12D ; 08-09-05 Club House 1543 _ 08-10-05 i 62 B Front 15441 08-10-05 .Lot Lot 62 B Tront 1545! 08-10-05 ! Lot 63 8 Front 1546 08-10-05 Lot 64 B Front 1547 06-10-05 Lot 65 B Front 1548 08-10-05 Lot 66 B Front 1549; 08-10-05 1 Lot 67 B Front 15501 08-10-05 I Retest # 1533 & 1534. 1551 08-10-05 Lot 63 B Back 1552 08-10-05 Lot 64 B Back 1553 08-10-05 Retest # 1538 1554 08-10-05 Retest # 1539 & 1540 1555 08-10-05 Retest # 1541 15561 08-10-05 I Lot 67 B Back A B C D 08-10-05 08-10-05 08.10-05 08-10-05 DATE: March 2, 2006 Lot 47 Lot 47 Lot 48 Lot 48 976 974.5 9755 975 976 976 977 983.0 985.0 983.0 985.0 983.0 985.0 983.0 985.0 983.0 ' 985.0 983.6 985.0 975.5 9763.5 976.5 978 975 977 973 976 974.5 975 976 972 983 985 983 985 103.6 106.4 102.3 97.1 95.6 99.5 103.4 103.6 100.1 105.4 101.5 102.5 100.7 108.1 103.4 103.8 101.7 107.2 105,1 109.4 108.3 104.5 106.6 103.9 105.5 104.1 104.5 101.3 103.4 105.3 103.1 104.7 100.8 104.1 102.9 105.2 101.4 17.8* 19.4* 20.2* 14.3 13.1 20.1" 18.2* 13.8 10.3 14.7 15.3 14.5 12:4 13.6 10.5 17.9 18.6 16.8 15.2 16.5 13.7 11.0 14.8 16.2 15.3 13.0 14.8 17.1 16.0 15.6 14.0 16.3 11.4 13.9 12.7 14.6 113.4 93 90 86* 87* 85* 89* 92 95 91 95 -93 94 92 98 94 95 93 97 95 92 91 93 95 93 94 93 93** 90 92 94 92** 93** 90 95 94 94 92 112.0 112.0 1.19.0 112.0 112.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 119.0 119.0 112.0 112.0 112.0 112.0 112.0 112 112.0 112,0 112.0 11.2.0 112.0 112.0 110.0 110.0 110.0 110.0 Sladden Engineering TEST RESULTS PROJECT NAM: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06.02-120 Test No. Date Tested Location Elevation DryDensity %Molstulfej Relative Maximum In P1acc in Place I Compaction I Densitv 1E 08-10-05 Club House 987.0 101..9 14.8 93 110.0 2E 08-10.05 Club House 989.0 104.8 13.9 95 110.0 3E 08-10-05 i- Club House 987.0 100.2 i 18.1. 91 110.0 0 ; 08-10-05 `. Club House 989.0 100.3 14.4 92 710.0 5E 08-10-05 Club House 987.0 104.0 16.1 95 110.0 6E 08-10-05 Club House 989.0 101.4 13.2. 94. 110.0 7E 08-10-05 Club House .987.0 102.9 17.8 94 110.0 8E 08-10-05 Club House 989,0 100,2 1.6.5 91 110.0 96 08-10-05 Club House 987.0 101.8 18.2 93 I 110.0 10E 08-10-05 Club House 989.0 104.2 11.7 95 110.0 11E 08-10-05 Club House 987.0 103.1 15.1 94 110.0 12E 08-10.05 Club House 989.0 102.4 15.7 { 93 110.01 1557 08-11-05 Lot 88 B Front 982.5 103.9 1 10.6 93 112.0 1558 I 08-11-05 I Lot 88 B Back 983 101,6 11.5 91. 112.0 1559 08-11-05 Lot 88 8 Front 984 105.8 9.6 94 172.0 1.5601 08-11-05 Lot 88 B Back 984.5 107.7 9.2 96 112.0 15611 08-11-05 i Lot 96 B Front PG 106.0 8.8 95 1.12.0 15621 08-11-05 Lot 96 B Center PC 104.4 12.4 93 ; 112.0. 15631 08-11-05 Lot 96 B Back PG 108.1 9.2 97 112.0 1.564:08-11-05 i Lot 97 B Front PG 102.3 10.6 91 I 112.0 1565, 08-11-05 Lot 97 B Back PC 105.1 13.0 94 112.0 15661 08-11-05 Lot 97 B Center PG I 107.4 11.8 I 96 1.12.0 15671 08-11-05 Lot 98 B Front PG i 108.8 9.0 i 97 112.0 1568 08-11-05 Lot 98 B Center PG 105.3 13.1 94 112.0 1569 08-11-05 Lot 98 8 Back PC i 104.7 10.4 I 93 112.0 15701 08-11-05 Lot 68 B Front 971 .93.5 111 17.1 83" 112.0 1571 08-11-05 Lot 68 B Back 970.5 94.3 I 1.8.9 84" 112.0 15721 08-11-05 I..ot 69 B Front 972 96.5 j 19.4 86* 112.0 15731 08-11-05 Lot 69 B Back 971.5 95.1 i 18.5 1 85* 112.0 A 08-11-05 Lot 47 B Back 987,0 99.6 10.9 91 110.0 B ; 08-11-05 Lot 47 B Back 989.0 100.7 ' 13.1 i 92 170.0 C 08-11-05 j Lot 48 B Back 989.0 102.3 14.7 93 110.0 D 08-I1-05 1 Lot 48 B Back 989.0 105.1 12.8 95 110.0 1 F 08-11-05 Club mouse 991.0 105.3 13.7 95 110.0 2F 08-11-05 Club House 991.0 1.05.9 18.5 96 110:0 3F 08-11-05 Club House 991.0 104.5 13.5 95 110.0 4F 08-11-05 Club House 991.0 1.02.1 10.9 93 110.0 5F 08-11-05 Club House 991.0 103.4 11.7 94 110.0 6F 08-11-05 Club House 991.0 100.7 13.4 92 11.0.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No, Date Tested iocation Elevation Dry Density I % Moisture I Relative f Maximum In Place In Place Compaction I Density 1G I 08-12-05 Club House 993.0 105.3 14.0 95 110.0 2G 08-12-05I Club House 995.0 103.2 13.2 94 110.0 3C 08-12-05 Club House 993.0 103.9 13.8 95 110.0 4G 08-12-05 Club House 995.0 101.7 12.7 93 i110.0 5G 08-12-05 Club House 993.0 107.9 11.3 98 110.0 1H 08-13-05 Club House 993.0 103.1 I 10.2 94 110.0 2H 08-13.05 Club House 995.0 105.2 12.1 95 110.0 3T-1 08-13-05 Club Douse 993.0 105.4 13.8 95 110.0 4H 08-13-05 Club House 995.0 103.6 12.1 95 110.0 5H I 08-13-05 Club House 993.0 103.1 15.2 94 1.10.0 6H 08-1.3-05 Club House 995.0 101.9 13.7 93 110.0 7H 08-13-05 Club House 995.0 104.4 17.1 95 11.0.0 A 08-15-05 Lot 48 B Back 991.0 102.5 12.1 93 11010 B 08-15-05 Lot 48 B Back 993.0 104.6 11.9 95 110.0 C 08-15-05 Lot 47 B Back 991.0 106.2 15.2 96 110.0 D 08-15-05 Lot 47 B Back 993.0 105.9 14.6 95 I 1.10.0 E 08-15-05 Lot 72 .990.0 108.1 17.8 98 11.0.0 F. 08.15-05 Lot 72 972.0 105.2 15.1 95 1 110.0 G 08-15-05 I Lot 71 970.0 104.5 • 20.5 1 95 110.0 H I 08-15-05 I Lot 71 972.0 105.1 18.2 94 110.0 I 08-15-05 j Lot 70 970.0 100.4 .22.1 i 91 110.0 J 08-15-05 Lot 70 972.0 105.7 19.8 I 95 110.0 K 1 08-15-05 ! Lot 69 971.0 100.9 16.9 1 92 110.0 L I 08-15-05 Lot 69 973.0 102.3 17.2I 93 770.0 M I 08-15-05 Lot 68 971.0 108.2 20.1 1 98 110.0 N I 08-15-05 Lot 68 973.0 i 106.4 15.9 I I 96 I 110.0 AA 08-16-05 Lot 60 Front 977 99.6 I 15.7 I 91 110.0 138 I 08-16-05 Lot 59 Front 977 1.05.6 1.5.8 96 110.0 CC 08.16-05 Lot 58 Front 977 104.3 11.9 95 110.0 DD 08-16-05 Lot 57 Front 979 101.8 16.3 93 110.0 EE 08-16-05 Lot 56 Front 974 108.8 14.7 99 110.0 FF 08.16-05 I.ot 55 Front 979 152.4 20.1 93 1.10.0 GG 08-16-05 Lot 54 Front 979 102.9 17.2 94 110.0 HH 08-16-05 Ixt 54 Back 979 103.6 16.1 95 110.0 IT 08-16-05 of 54 Back 979 105.2 15.5 95 110.0 Jj 08-16-05 I Lot 56 Back 979 102.1 17.3 93 . 110.0 QIC 1 0 0 LLI 08-16-05 I of 58 Back 977 99 3 13.4 90 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Dmity % Moisturc Rclativc Maximum In Place In Place I Compaction Density MM NN 00 PP 08-16-05 08-16-05 08-16-05 08-16-05 Lot 59 Back Lot 60 Back Lot 47 Back Lot 48 Back QQ 08-17-05 Lot 68 Back RR 08-17-25 Lot 68 Back SS 08-17-05 Lot 70 Back TT 08-17-05 Lot 70 Back UU 08-17-05 Lot 72 Back VV 08-17-05 Lot 72 Back WW 08-17-05 Lot 74 Back XX 08-17-05 Lot 74 Back YY I 08-17-05 Lot 75 Back Z -G 08-17-05 Lot 75 Back AAAI 08-17-05 Lot 76 Back BBB 1 08-17-05 I Lot 76 Back I CCC 08-19-05 I Lot 83 Back DDD, 08-19-05 Lot 84 Back EEE 08-19-05 Lot 85 Back FFF i 08-19-05 Lot 86 Back GGG 08-19-05 Lot 87 Back HHH! 0&-19-05 Lot 75 A 01 08.19-05 Lot 75 A JJJ 08-19-05 Lot 75 A KKK; 08-19-05 Lot 75 A LLL I 08-19-05 Lot 80 B mmk 08-19-05 Lot 88 B NNN 08-19-05 Lot 81 B 0001 08-19-05 I Lot 810 PPPI 08-19-05 Lot 82 B QQQ , 08-19-05 Lot 82 B RRR 08-20-05 Lot 75 A SSS 08-20-05 Lot 75 A '111'C 08-20-05 Lot 75 A UUU 08-20-05 Lot 75 A A 08-22-05 Lot 83 B Back B 08-22-05 Lot 84 B Back DATE: Match 2, 2006 977 977 995 995 974 976 975 977 975 933 975 977 97.4. 976.0 973.0 975.0 971.0 972.0 972.0 972.0 973.0 965.0 %7.0 965.0 967.0 971.5 973.5 971.5 973.5 971.0 973.0 105.1 103.2 102.1 104.3 108.3 103.2 100.8 101.7 102.1 105.9 104.2 102.0 103.5 100.4 105.2 102.1 100.5 101.6 103.2 104.0 102.4 94.4 101.7 106.3 100.8 100.7 102.3 101.3 104.6 102.9 100.1 11.9 15.2 13.6 12.9 11.2 14.4 13.2 15.7 16.3 15.2 18.1 17.4 15.7 13.2 16.7 14.8 17.5 18.5 19.2 20.4 16.9 18.7 17.2 18.4 22.1. 1.9.5 19.2 20.1 17.8 19.2 20.4 969 102.6 I 7.4 969 104.0 i 7.7 PG 105.1 6.9 PG 102.8 7.3 973.0 108.2 13.2 974.0 104.3 19.3 95 94 93 95 98 94 92 93 93 96 95 93 95 91 95 93 92 93 94 95 93 90 93 96 92 92 93 92 95 94 91 93 95 96 93 98 95 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 I 710.0. 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 j 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture I Relative Maximum In Place I In Place Comflaction Density C D E 1574 1575 1576 1577 1578 1579 1580 1581 1582 1583 1584 1585 1586 1587 1588 1589 A B C D E F C H 08-22-052 08-22-05 08-22-05 08-23-05 08-23-05 08-23-05 08-23-05 08-23-05 08-23-05 09-23-05 08-23-05 08-23.05 08-23-05 08-23-05 08-23-05 08-23-05 08-23-05 08-23-05 08-23-05 08-23-05 08-23-05 08-23-05 08-23-05 08-23-05 08-23-05 08-23.05 08-23-05 Lot 85 B Back Lot 86 B Back Lot 87 B Back Lot 35 8 Front Lot 35 B Front Lot 36 B Front Lot 36 B Front Lot 35 B Back Lot 35 B Back Lot 36 B Back Lot 36 8 Back Lot 35 B Front Lot 3513 Front Lot 36 B Front Lot 36 B Front Lot 35 B Back. Lot 35 B Back Lot 36 B Back Lot 36 B Back Lot 77 B Back Lot 77 B Back Lot 75 B Back Lot 75 B Back Lot 76 B Back Lot 76 B Back Lot 77 B Back Lot 77 B Back 974.0 974.0 975.0 989 991 990 992 984 986 984 986 993 995 994 996 988 990 988 990 966.0 968.0 967.5 967.5 967.0 969.0 966.0 968.0 102.9 105.2 100.9 103A 101.5 101.4 105.0 104.3 102.2 100.8 104.5 106.7 103.3 101.0 105.4 104.6 100.9 102.3 101.7 107.1 105.4 98.1 98.1 107.8 101.2 105.9 103.1 17.7 16.9 18.2 8.8 9.9 12.5 10.7 10,2 11.7 9.1 8.4 8.9 10.4 7.9 9.2 11.8 10.6 10.4 9.0 12.6 16.2 22.9 22.9 18.2 16.7 17.2 15.1 94 95 92 94 92 92 95 95 93 92 95 97 94 92 96 95 93 93 92 97 95 89* 89" 97 92 95 94 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 15901 08-24-05 Lot 34 B Front 992 1 103.3 8.6 94 110.0 1591; 08-24-05 i Lot 34 8 Front 993.5 102.1 10.5 I 93 i 110.0 1592:1 08-24-05 Lot 34 B Back 985 106.0 9.4 96 I 110.0 1593108-24-05 Lot 34 B Back 987 103.9 8.8 94 f 110.0 1594 08-24-05 Lot 35 B Front 996 105.5 12.1 96 I 110.0 15951 08-24-05 Lot 35 B Front 997 104.4 11.3 95 I 110.0 15961 08-24-05 Lot 36 B Back 992 106.9 10.0 97 ! 110.0 3.597 08-24-05 Lot 36 B Back 994 102.8 13.5 93 110.0 1598 08-24-05 iLot 34 B Back 988.5 100.7 11.0 92 110.0 1599 08-24-05 Lot 34 B Back 990.5 102.5 9.5 93 110.0 1600 08-24-05 1 Lot 34 B Back 992 105.8 8.7 96 110.0 1601 08-24-05 Lot 34 B Back 993 104.0 10.4 95 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No.I Date Tested Location Elevation I Dry Density % Moisture I itelative I Maximum In Place in Place Compaction Density 1602 08-25-05 Lot 34 8 .Front 995 100.4. 9.1 1603 08-25-05 Lot 34 B Back 994.5 102.3 13.7 1604 08-25-052 Lot 35 B 'Front 998 105.1 11..0 1605 08.25-05 Lot 35 B Back 992 103.6 9.0 1606 08-25-05 Lot 36 B Front 997.5 107.1 I 8.6 1607 08-25-05 Lot 36 b Back 996 104.0 1 10.4 1608 08-25.05 Lot 35 B Back 994 105.5 12.6 A 08-25-05 Lot 66 B Back 997.0 104.1 13.2 B 08.25-05 Lot 66 B Back 999.0 1.01..2 14.9 C 08-25-05 Lot 64-B Back 978.0 106.3 15.6 0 08-25.05 Lot 64 B Back 980.0 102.9 12.9 E 08-25-05 Lot 65 B Back 977.0 103.7 13.9 F 08-25-05 lot 65 8 Back 979.0 104.2 15.2 G 08-25-05 Lot 64 B Back 978.0 109.0 , 13.9 H I 08-25-05 Lot 64 B Back 980.0 101.4 17.2 1 08-25-05 Lot 66 B Back 977.0 103.9 19.5 j 08-25-05 Lot 66 B Back 979.0 106.2 14.7 K 08-25-05 ! Lot 65 B Back 979.0 101.3 17.0 L 08-25-05 Lot 65 B Back 979.0 105.3 1.3.4 M. 08-25-05 Lot 67 B Back 976.0 105.1 13.9 N 08-25-05 tot 67 8 Back 978.0 102.4 13.0 O i 09-2-5-05 i Lot 67 B Back 976.0 104.7 ! 13.6 P I 08-25-05 Lot 67 B Back 978.0 101.8 11.9 16091 08-26-05 Lot 33 B Center 992 101.1 11.3 1610 08-26-05 ' Lot 34 8 Center 994 102.5 14.1 1611 08-26-05 Lot 35 B Center 994 105.3 12.4 1612: 08-26-05 I Lot 36 B Center 995 101.7 11.3 1613i 08-26-05 Lot 34 B Back 995.5 103.6 10.0 16141 08-26-05 Lot 35 B Back 995.5 100.1 8.3 16151 08-26-05 Lot 35 B Back 997 101.8 13.4 1616 08-26-05 Lot 36 B Front 998.5 106.1. 13.2. 1617! 08-26-05 Lot 36 B Back 997.5 104.0 12.5 1618 j 08-26-05 Lot 75 B Front 966 •101.3 16.9 16191 08-26.05 Lot 75 B Front 968 94.5 20.4 1620 08-26-05 Lot 76 B Front 966 103.3 15.5 1621 08-26-05 Lot 76 B Front 968 102.0 14.3 1622 08-29-05 bot 55 8 Back 981.0 108.2 15.5 1623 08-29-05 Lot 55 B Back 983 102.5 14.9 1624 i 08-29-05 Lot 58 B Back 979.5 105.4 19.2 DATE: Marcb 2, 2006 I 91 110.0 93 110.0 96 110.0 94 110.0 97 110.0 95 110,0 96 110.0 95 110.0 92 110.0 96 110.0 94 110.0 93 110.0 95 I 110.0 99 110.0 92 ! 110.0 95 110.0 96 110.0 92 110.0 95 110.0 95 110.0 93 110.0 95 110.0 93. I 110.0 92 110.0 93 110.0 96 110.0 92 110.0 94 110.0 91 110.0 93 I 1.10.0 96 110.0 95 110.0 90 I 112.0 84* 112.0 92 112.0 91 112.0 91 11.9.0 92 112.0 94 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density% in Place Moisture I in Place Relative C4mpaction I Maximum I Densi 1625 08-29-05 Lot 58 B Back 981.5 105.6 16.7 94 112.0 1626 08-29-05 Lot 54 B Back 981 103.8 16.0 93 112.0 16271 08-29-05 Lot 54 B Back 983 103.4 15.3 92 112.0 16281 08-29-05 Lot 5311 Front 980 106.5 14.7 95. 112.0 1629 08-29-05 Lot 53 Front 982.0 102.3 17.3 91 112.0 16301 08-29-05 Lot 56 B Front 981 108.9 7 6.5 92 119.0 1631; 08-29-05 Lot 56 B Front 983 107.6 13.2 I 96 112.0 1632; 08-29-05 Lot 57 B Front 981 104.8 15.1 94 112.0 1633 08-29.05 Lot 57 B Front 983 103.4 12.0 i 92 112.0 1634! 08.29-05 Lot 54 B Front 781 107.2 11.6 % 112.0 16351 08-29-05 Lot 54 B Front 983 105.6 13.1 I 94 112.0 1636 i 08-29.05 Lot 55 B Front 981. 104.0 13.8 93 112.0 16371 08-29-05 Lot 55 B Front 983 105.3 12.6 94 112.0 1638 08-29-05 i Lot 58 B Front 980 103.3 10.9 92 112.0 16391 08-29-05 Lot 58 B Front 982 1015 1.2.4 91 112.0 1.640; 08-29-05 I Lot 56 B Back 981 i 108.0 11.3 93 112.0 1641 08-29-05 Lot 56 B Back 983 106.1 15.0 95 112.0 1642 ` 08-29-05 ' Lot 57 B Back 980 1055 14.4 94 112.0 1643 08-29-05 Lot 57 B Back 982 104.7 11.9 93 i 112.0 1644 08-30-05 Lot 53 B Back 984 105.9 16.6 96 110.0 1645 08-30-05 Lot 54 B Back 985 1065 125 96 1 110.0 1646 08.30-05 Lot 55 8 Back 985 108.9 9.8 99 i 110.0 1647, 08-30-05 Lot 56 B Back 984.5 102.3 15.2 93 110.0 1648 08-30-05 Lot 57 8 Back 984.0 104.2 13.9 95 110.0 1649 08-30-05 Lot 58 B Back 983.0 107.3 17.1 97 ; 110.0 1650 08-30-05 Lot 59 B Back 979.0 i 103.1 16.4 94 110.0 1651; 08-30-05 Lot 59 B Back • 981.0 100.8 11.9 92 110.0. 1652 ! 08-30-05 Lot 60 B Back 979.0 105.2 13.7 95 110.0 1653; 08-30.05 Lot 60 B Back 981.0 , 103.4 15.5 94 110.0 1654 08-30-05 Lot 35 B Front 999 ( 104.1 14.3 93 112.0 1655 08-30-05 Lot 36 B Front 999.5 I 106.8 15.2 95 1.12.0 16561 08-30-05 Lot 35 B Back 998 I 102.2 13.1 91 112.0 1657 08-30-05 Lot 35 B Back 999 i 101.3 11.8 90 112.0 1658 08-30-05 Lot 36 B Back 998.5 105.1 13.3 I 91 112.0 1659 08-30-05 Lot 36 B Back 1000 103.0 14.7 92 112.0 1660 08-31-05 Lot 59 B Front 982.0 103.2 12.8 94 110.0 1661 08-31-05 Lot 59 B Front 984.0 102.3 15.5 93 110.0 1662 08-31-05 Lot 60•B Front 982.0 106.8 10.9 95 110.0 1663 08-31-05 Lot 60 B Front 984.0 102.4 11.2 93 i 110.0 DATE: March 2, 2006 Sladden Engineertag TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California - REPORT NO: 06-02-120 Test No. I Date Tested I Location Elevation I Dry Density I % Moisture I Relative I Maximum 1664 08-31-05 Lot 64 B Center 975.0 104.9 13.8 95 110.0 1665 08-31-05 Lot 61 B Center 977.0 103.2 15.2. 94 110.0 1666 08-31-05 Lot 61 B Center 979.0 106.4 14.7 96 110.0 1667 08-31-05 Lot 59 8 Back 982.0 102.2 15.8 93 1.10.0 1668 08-31-05 Lot 59 B Back 984.0 105.6 11.9 96 110.0 1669 08-31-05 Lot 60 8 Back 982.0 1043 14.3 95 10.0 1670 08-31-05 Lot 60 B Back 984.0 106.8 113.6 97 110.0 1671 08-31-05 Lot 31 8 Front 993 1013 8.1 92 110.0 1672 08-31-05 Lot 31 B Back 995 100.4 7.6 91 110.0 1673 08-31-05 .Lot 32 B Front 993.5 102.5 9.3 93 110.0 1674 08-31-05 Lot 32 B Back 995 101.8 8.4 93 I 110.0 1675 09-01-05 Lot 60 B Front 985.0 102.7 15.4 94 110.0 1676 09-01-05 Lot 61 B Front 981.0 99.1 17.7 90 i 110.0 1677 09-01-05 Lot 61 B Front 983.0 107.6 14.6 98 110.0 1678 09-01-05 Lot 62 B Front 978.0 100.4 12.8 91 110.0 1679 09-01-05 Lot 62 B Front 980.0 103.3 17.4 94 j 110.0 1680 09-01-05 Lot 63 B Front 979.0 100.2 13.7 91 110.0 1681 09-01-05 I Lot 63 B Front 981.0 104.2 13.3 I 95 110.0 1682 09-01-05 I Lot 64 B Front 981.0 165.4 15.2 95 110.0 16831 09-01-05 i Lot 64 B Front 983.0 (( 106.9 16.3 97 110.0 16841 09-01-05 I Lot 64 B Back 980.0 I 103.7 I 14.4 95 110.0 1685, 09-01-05 Lot 64 B Back 982 I 103.2 15.2 94 110.0 16861 09-01-05 Lot 63 B Back 979 I 101.4 13.9 92 110.0 1687; 09-01-05 Lot 63 B Back 981.0 107.2 16.3 97 110.0 1688 09-01-05 Lot 62 B Back 979.0 100.2 15.4 91 I 110.0 1689 09-01-05 Lot 62 B Back 981.0 I 105.8 14.6 96 110.0 1690 09-01-05 Lot 61 B Back 981.0 ; . 103.6 15.9 95 110.0 16911 09-01-05 Lot 61 B Back 985.0 102.9 15.3 94 110.0 1692 I 09-07-05 Lot 103 B Front PC , 107.1 8.8 96 i 112.0 1.693 09-07-05 Lot 103 B Center PC ' 105.4 10.2 94 112.0 1694 09-07-05 Lot 103 8 Back PG 104.3 9.7 93 112.0 1695 09-07-05 Lot 104 B Front PC 106.0 10.5 95 112.0 1696 09-07-05 Lot 104 8 Center PG 103.3 8.7 92 112.0 1697 09-07-05 Lot 104 B Back PG 104.5 8.1 93 112.0 16981 09-07-05 Lot 60 B Front 986 107.3 9.9 96 112.0 1699 I 09-07-05 Lot 60 B Back 985.5 1.035 12,5 I 92 112.0 1700 09-07-05 Lot 60 B Center 986 103.7 13.4 93 112.0 1701 09-07-05 I Lot 61 B Front 986 104.5 11.2 I 93 112.0 1702 09-07-05 Lot 61 B Back 985.5 101.3 1.4.1. 90 , 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO; 522-4810 LOCATION: La'Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location ElevationGDeni % Moisture Relative Maximum In Place I In Place Compaction I Densitv 1703 1704 1705 09-07-05 09-07-05 09-07-05 Lot 61 B Center Lot 62 B Front Lot 62 B Back 1706 09-08-05 Retest # 1104 1707 09-08-05 Retest # 1.115 1708 09-08-05 Retest a 1105 1709 09-08-05 Lot 108 5 Front 1710 09-08-05 Lot 108 B Back 1711! 09-08-05 Lot 112 B Front 983 104.1 979 1712! .09-08-05 Lot 112 B Back 1713; 09-08.05 Lot 113 B Front 17141 09-08-05 I Lot 113 8 Front 1715 09-08-05 Lot 113 B Back 1716 09-08-05 Lot 113 B Back 1717 09-08-05 Lot 114 B Front 1718 09-08-05 Lot 114 B Back 1719 09-08-05 Lot 116 B Front 1720 09-08-05 Lot 116 B Back 1721 09-08-05 Lot 106 B Front 1722 09.08-05 Lot 10613 Center 1723 09-08-05 Lot 106 B Back 1724. 09-08-05 Lot 107 B Front 1725! 09.08-05 Lot 107 B Back 1726; 09-08-05 Lot 108 B Front 1727! 09-08-05 Lot 108 B Back 1728 09-08-05 1 Lot 108 B Center 1729 09-08-05 i Lot 109 B Front 1730 09-08-05 ! Lot 109 B Back 1731 09-08.05 Lot 110 B Front 1732 09-08-05 Lot 110 B Back 1733 09-0$-05 S Lot 113 B Front 1734 09-08-05 i Lot 113 B Back 1735 I 09-08-05 Lot 113 6 Center I Contour Grading 17361 09-12-05 Per Plan 17371 09-12-05 Per Plan 17381 09-12-05 Per Plan 1739 09-12-05 Per Plan 1740 09-12-05 Per Plan DATE: March 2, 2006 985.5 983 983.5 103.5 105.5 101.0 103.4 104.6 101.9 980 100.8 980 102.6 981 105.5 981 105.2 979 104.3 981 103:1 979.5 100.6 981.5 106.1 983 104.3 983 104.1 979 96.3 979 95.1 PG I 107.2 PC I 105.3 PG 106.5 PG I 104.1 PC 102.6 PG 101.4 PC 105.5 PG 103,7 PG 103.4 PC 106.6 PG 107.7 PG 106.3 PC 108.5 PC 105.3 PG 106.9 980 980 979.5 980 979.5 100.4 108.1 95.7 96.3 103.5 12.6 11.2 10.7 9.0 10.3 8.7 8.5 10.6 1.1..3 9.4 12.2 11.0 13.3 8.3 12.7 1.0.9 5.4* 4.63* 8.1 114 9.9 8.8 7.9 10.7 13.0 11.8 10.9 9.4 7.8 8.4 8.9 10.5 9.8 12.3 9.6 10.3 12.8 11.1 92 94 90 92 93 91 90 92 94 94 93 92 90 95 93 93 86* 85* 96 94 95 93 92 91 94 93 92 95 96 95 97 94 95 90 97 85* 86* 93 112.0 112.0 1.12.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0- 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 Sladden Engineering I' PROJECT NAME: Madison Club TEST RESULTS PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested M Location Elevation Dry DensityI % Moisture I Relativc Maximum In Place In Place Compaction Density 1741 09-12-05 Per Plan 1742 09-12-05 Retest # 1719 1743 09-12-05 1 Retest # 1720 17441 09-12-05 Lot 116 B Front 1745 j 09-12-05 Lot 116 B Back 1746 09-72-05 Lot 116 B Center 1747 09-12-05 Lot 50 B Front 1748 09-13-05 Lot 50 B Front 1749 I 09-13-05 Lot 49 B Back 1750 09-13-05 Lot 49 6 Back 1751 09-1.3-05 Lot 50 B Back 1752 09-13-05 Lot 50 B Back 1753 09-13-05 Lot 49 B Front 1754 09-13-05 Lot 46 8 Front 11.3 % 112.0 987 17551 09-13-05 Lot 87 B Front 1756 09-13-05 Lot 87 B Back 1757. 09-13-05 Lot 86 8 Front 17581 09-13-05 Lot 86 B Back 1759 09-13-05 Lot 85 B Front 17601 09-13-05 i Lot 85 0 Back 1761 09-13-05. i Lot 84 B Front 1762 09-13-05 Lot 84 B Back 105.5 9.1 1 17631 09-13-05 I,ot 83 B Front 1764 09-13-05 j Lot 83 B Back 1765 09-13-05 I Lot 82 B Front 1766 09-13-05 Lot 81 B Front 1767 09-13-05 Lot 80 B Front 1768 09-14-05 Retest # 1738 17691 09-14-05 Retest A 1739 1770 i 09-14-05 Per Plan PG 96.5 12.2 17711, 09-14-05 Per Plan 17721 09-14-05 Per Plan 1773: 09-14-05 Per Plan 1774 09-14-05 Per Plan 1775 09-14-05 Per Plan 1776 09-14-05 Per Plan 1777 09-14-05 Per Plan 1778 09-14-05 Per Plan 1779 09-14-05 Per Plan DATE: March 2, 2006 980.5 104.0 10.2 93 1.12.0 103.2 8.4 92- 112.0 101.5 8.9 i 91 112.0 PC 106.3 1.1.4 95 112.0 PC 104.7 13.5 93 112.0 PC 104.1 12.6 93 112.0 985 104.6 9.8 93 112.0 987 104.8 12.3 94 112.0 986 1.06.3 10.5 95 112.0 988 1035 13.2 92 112.0 985 107.1 11.3 % 112.0 987 102.9 14.0 92 112.0 982.5 105.7 13.4 94 112.0 987.5 103.5 11.1 92 1 '12.0 PC .102.8 9.3 92 112.0 PC 104.0 8.8 93 112,0 PG 106.4 10.5 95 112.0 PC 105.5 9.1 94 112.0 PG 103.3 12.1 92 112.0 PC 107.1 8.7. 1 96 112.0 PG 101.8 8.5 1 91 112.30 PC 104.6 10.4 I 93 112.0 PC 100.8 9.3 i 90 112.0 PG 101..4 I 9.9 91 i 112.0 PG 96.5 12.2 i 83'P ! 112.0 PC 97.1 i 11.4 1 89. � 112.0 PG 95.4 1.0.2 85" 112.0 I 104.1 14.4 93 112.0 101.5 11.5 91 112.0 981.5 101.6 12.4 91 1.12.0 982 105.5 12.9 94 ' 112.0 982 103.7 10.7 93 i 112.0 983 100.9 I 15.1 I 90 I 112.0 983.5 105.4. 14.2 94 112.0 983.5 102.7 10.7 92 112.0 984 107.1 12.0 96 112.0 983.5 105.3 14.1 94 112.0 984 104.0 16.7 93 1.12.0 9835 102.3 12.5 91 112.0 Slodden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. I Date Tested Location Elevation Dry Density In Place % Moisture; In Place Relative Compaction Maximum Density 1780 09-15-05 Lot 77 B Front 969 103.4 11.5 92 112.0 1781 09-15-05 Lot 77 B Back 969 105.1 ( 9.6 94 112.0 1782 09-15-05 Lot 76 B Front 970 101.8 I 13.5 91 112.0 1783 09-15-05 Lot 76 B Sack _ %9.5 102,1 i 10.7 91 11.2.0 1784 09-15-05 Retest # 104.3 15.1 93 112.0 1785 09-15-05 Lot 75 B Front 970 100.9 I 14.0 90 112.0 1786 ; 09-15-05 Retest # D 8/23/05 103.3 12.8 92 112.0 17871 09-15-05 Retest.# D 8/23/05 1.05.5 I 16.5 94 112.0 17881 09-15-05 Lot 75 B Back 969.5 107.2 11.8 96 112.0 1789 09-15-05 Lot 74 B Front 970.5 1.03.4 14.9 92 112.0 1790:1 09-15-05 Lot 74 B Back 970.5 101.1 12.8 90 112.0 1791 i 09-15-05 Lot 73 B Front 971.5 106.6 13.3 95 112.0 1792; 09-15-05 Lot 73 8 Hack 971.5 104.0 10.6 93 112.0 17931 09-15-05 Lot 72 B Front 973.5 108.1 11.3 97 112.0 17941 09-15-05 Lot 72 B Back 973.5 106.2 9.7 95 112.0 1795 09-15-05 l,ot 77 B Front PG 10.8 125.0 93 112.0 1796 09-15-05 Lot 77 B Back PG 1.06.9 10.7 95 112.0 1797; 09-15-05 Lot 77 B Center PG 102.6 11.1 92 112,0 1798 I 09-16-05 Lot 70 B Back PG 11.3.0 11.5 95 119.0 1799 i 09-16-05 Lot 70 B Center PG 113.4 9.9 95 119.0 18M I 09-16-05 Lot 71 B Back PG 116.3 9.4 98 119.0 1801 09-16-05 Lot 71 Center PG 112.8 12.3 95 119.0 I 1802 09-16-05 Lot 71 B Front PG 116.1 10.2 98 119.0 18031 09-16-05 Lot 72 B Front PC 111.8 8.7 94 119.0 1&9! 09-16-05 Lot 722 B Center PG 107.1 10.6 90 112.0 19051 09-16-05 Lot 72 B Back PC 114.0 8.8 ; 96 I 119.0 1806!1 09-16-05 I Lot 73 B Back PC 106.3 1.3.4 95 112.0 .18071 09-16-05 Lot 73 8 Center PG 115.9 11.0 97 19.0 1808 09-16-05 Lot 73 B Front PG 11.7.3 12.7 99 119.0 1809 09-16-05 Lot 74 B PG 112.6 9.8 95 119.0 1810 09-16-05 Lot 74 B PC 11.2.2 14.0 94 I 119.0 1811 I 09-16-05 Lot 74 B PG 108.1 11.1 97 I 112.0 1812 09-16-05 Lot 75 B PG 107.2 8.4 96 112.0 1813 09-16-05 Lot 75 B PG 116.6 10.7 98 119.0 1814 09-16-05 Lot 75 6 PC 116.1. 12.4 98 119.0 1815 09-16-05 Lot 76 B PG 108.3 9.6 97 112.0 1816 09-16-05 Lot 76 B PG 117.7 8.3 99 119.0 1817 09-16-05 Lot 76 B PC 114.4 10.5 96 119.0 1818 09-16-05 1 Lot 21 B Front 990 100.8 11.0 90 112.0 1819 09-16-05 Lot 67 B Front PG 109.1 9.4 92 119.0 DATE: March 2, 2006 Sladden Engineering ' TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. ( Date Tested Location Elevation Dry Density In Place % Moisture In Place Relative Compaction Maximum Density 1820 09-164)5 Lot 67 B Back PG 108.4 10.1 97 112.0 1.827. 09-16-05 Lot 67 8 Center. PC 107.0 9.2 96 112.0 1822 09-16-05 Lot 68 B Front PG 111.5 10.9 , 94 1.1.9.0 1823 09-16-05 Lot 68 B Center PC 113.4 8.8 95 119.0 1824 09-16-05 Lot 68 B Back PG 110.9 8.5 93 119.0 1825 09-16-05 Lot 69 B Back PG 115.1 13.1 97 119.0 1826 09-16.05 Lot 69 B Center PG 116.3 11.5 98 119.0 1827 09-16-05 Lot 69 B Front PG 113.8 12.6 96 119.0 1828 09-16-05 Lot 70 B Front PG 114.3 10.0 % 119.0 1829 09-16-05 Lot 21 B Back 898.5 102.1 13.4 91 112.0 1830 i 09-16-05 rot 20 B Front 989 105.3 10.6 94 112.0 1831 09-16-05 Lot 20 B Back 989 l 101.5 11.3 91 1.12.0 1832 09-16-05 Lot 19 ON Front 988.5 100.9 9.3 90 112.0 1833 09-16-05 Lot 19 B Back 988.5 101.4 10.7 91 112.0 1834 09-16-05 Lot 18 B Front 989 103.3 11.8 92 112.0 1835 09-16.05 Lot 18 B Back 988.5 102.2 14.1 I 91 112.0 1836 09-19-05 Lot 21 B Front 991 103.1 10.0 92 112;0 1837 09-19-05 Lot 21 0 Back 991 101.6 9.6 91 i 112.0 1838 09-19-05 Lot 20 B Front 990.5 105.3 11.4 94 ; 1.12.0 1839 09-19-05 Lot 2013 Back 991 104.4 9.3 93 112.0 1840 09-19-05 Lot 19 B Front 990.5 101.3 12.4 90 ; 112.0 1841 09-1.9-05 Lot 19 B Back 990 102.7 11.8 92 i 112.0 1842 09-19-05 Lot 21 B Front 992.5 106.1 1.3.1 95 112.0 1843 09-19-05 I Lot 21 B Back 992 j 103.3 10.9 92 112.0 1844 09-19-05 Lot 20 B Front 992 I 104.4 8.8. .93 I 112.0 1845 09-19-05 I Lot 20 B Back 992.5 100.8 11.3 90 112.0 1846 09-19-05 Lot 19 B Front 9925 102.0 12.9 91 i 112.0 1847, 09-1905 Lot 19 B Back 992 I 104.1 12.5 93 112.0 18481 09-20-05 Lot 21 B Front 993.5 I 100.5 8.1 90 I 112,0 1849 09-20-05 I Lot 21 B Back 993 94.3 4.2* 84* 112.0 1850 09-20-05 Lot 20 B Front 993 I 93.6 3.3* 84* 112.0 1851 09.20-05 Lot 20 B Back 993.5 99.1 2.9* 88* 112.0 1852 09-20-05 Lot 19 B Front 994 95.3 4.0" 85* 112.0 1853 09-20-05 Lot 19 B Back 993.5 97.1 3.6* 87* 112.0 1854 09-20-05 Lot 22 B Front 990 101.4 9.1 92 j 110.0 1855 09-20-05 Lot 22 B Back 990 101.1 8.3 92 110.0 1856 09-20-05 Lot 23 B Front 986 103.3 10.0 94 ` 11010 1857 09-20-05 Lot 23 B Back 988 102.7 9.6 93 110.0 1858 09-20-05 Lot 22 8 Front 997.5 104.1 8.0 95 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-0810 REPORT NO: 06-02-120 Test No.I Date Tested I Location Elevation I Dry Density I % Moisture I Relative I Maximum In Place In Place ! Comnaction Density 1859 09-20-05 Lot 22 B Back 991 101.6 11.3 1860 I 09-20-05 Lot 23 B Front 987.5 94.0 4.5* 1861 09-20-05 Lot 23 B Back 989 94.1 3.3 1862 09-21-05 Retest # 102.6 12.5 1863 09-21-05 Retest # 105.3 14.8 1864 09-21-05 Retest # 104.7 15.7 1865 09-21-05 Retest # 100.8 11.3 1866 09-21-05 Retest # 103.0 9.9 1867 09-21-05 Lot 21 B Front 994.5 95.1 13.3 1868 09-21-05 I Lot 21 B Back 995 96.5 15.1 1869 09-21-05 Lot 20 B Front 995 94.1 12.4 1 1870 09-21-05 � Lot 20 B Back 994.5 97.2 11.8 18711 09-21-05 Lot 19 B Front 995 93.1 14.7 1872 i 09-21-05 Lot 19 B Back 995 97.3 10.9 1873 09-21-05 Lot 17 B Front 989 103.1 8.7 18741 09-21-05 Lot 17 B Back 9895 100.6 12.1 18751, 09-21-05 Lot 16 B Front 989.5 ii 101.5 9.6 1876: 09-21-05 Lot 16 B Back 990 I 102.0 13.4 1877, 09-22-05 Lot 30 B Front 993 101.4 10.3 1878 09-22-05 Lot 30 B Front 995 103.0 1.4.1. 1879. 09-22-05 Lot 30 B Back 990 104.5 13.6 1880 09-22-05 Lot 30 B Back 992 104.1 j 12.2 18811 09-22-05 i Lot 31 B Front 995 100.4 8.8 1882I 09-22-05 I Lot 31 B Front 996.5 106.3 11.4 1883, 09-22-05 Lot 31 B Back 997. 102.7 15.6 1884 I 09-22-05 Lot 31 B Back '998 1025 14.3 1885 ! 09-22-05 i I..ot 30 8 Back 994 105.25 1.2.1 1886; 09.22-05 Lot 30 B Back 996 106.8 16.3 18871 09-22-05 Lot 18 B Front 9905 I 100.3 9.2 18881 09-22-05 Lot 18 B Back 990 I 101.3 10.4 1889 09-22-05 Lot 17 B Front 990 I 102.5 8.7 1890 09-22-05 Lot 17 B Back 990.5 99.1 9S 1891 09-22-05 Lot 16 B Front 990.5 99.4 8.1 1892 09-22-05 Lot 16 B Back 991 101.0 10.7 1893 09-23-05 Lot 17 Front 989.6 99.9 13.6 1894 09-23-05 Lot 17 Front 990.0 99.2 14.74 1895 09-23-05 Lot 18 Front 991.5 101.2 12.9 1896 09-23-05 I Lot 18 Back 995.4 99.5 13.1 DATE: March 2, 2006 92 110.0 85* 110.0 86* 110.0 92 112.0 94 112.0 93 112.0 90 I 112.0 92 112.0 93 102.0 95 102.0 92 102.0 95 102.0 91 102.0 95 102.0 94 110.0 91 110.0 92 110.0 93 110.0 91 112.0 92 112.0 93 112.0 93 112.0 90 112.0 95 112.0 92 112.0 92 112.0 94 112.0 95 112.0 91 110.0 92 110.0 93 110.0 90 110.0 90 110.0 92 110.0 91 110.0 90 110.0 92 110.0 90 I 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Test No. Date Tested I Location Elevation I Dry Density I % Moisture I Relative I Maximum In Place In Place Compaction Densitv 1897 09-23-05 Lot 23 Front 996.5 99 i 18.1 90 110.0 1898 09-23-05 Lot 23 Back 989.5 101.7 13.2 II 92 110.0 1899 09-23-05 Lot 24 Front 989.5 99.6 12.1 91 1.10.0 1900 09-23-05 Lot 24 Back 986.5 49.9 15.6 r 91 i 110.0 1901 09-23-05 Lot 23 Front 989.5 100.4 15.9 j 91 110.0 1902 09-26-05 Lot 29 B Front 990.5 101.6 9.9 f 92 j 110.0 1903 09-26-05 Lot 29 B Front 992 103.8 11.1 94 I 110.0 1904 09-26-05 Lot 28 B Front 991 104.0 8.6 95 110.0 1905 09-26-05 Lot 28 B Front 992.5 100.8 10.7 92 110.0 1906 09-26-05 Lot 29 B Back 9905 1.00.4 1 12.5 91 110.0 1907 09-26-05 Lot 29 B Back 992.5 102.0 i 10.3 93 110.0 1908 09-26-05 Lot 28 B Back 990 104.3 9.5 95 110.0 1909 09-26-05 Lot 28 B Back 992 101.2 13.41 .92 110.0 1910 09-26-05 Lot 25 B Front 989 101.8 j 16.6 93 110.0 1911 09-26-05 Lot 25 8 front 991 1.03.4. 17.1 92 .112.0 7972 09-26-05 Lot 25 B Back 990 105.5 13.6 96 130.0 1913 09-26-05 Lot 25 B Back 992 102.7 14.8 93 110.0 1914 09-26-05 Lot 26 B Front 989.5 101.0 12.6 92 .110.0 1915 09-26-05 Lot 26 B Front 991.5 106.3 10.8 97 110.0 1916 09-26-05 Lot 26 B Back 991 100.4 16.0 91 110.0 1917 09-26-05 Lot 27 B Front 991.5 103.3 12.9 94 110.0 1918 09-26-05 Lot 27 B Back 991 102.5 11.1 93 110.0 19191 09-27-05 Lot 9 B Front 995 101.3 8.4 1 92 110.0 1920 09-27-05 Lot 9 B Front 997 100.9 9.1 92 110.0 1921 09-27-05 Lot 9 B Back 995 102.04 � 11.8 93 110.0 19221 09-27-05 I Lot 9 B Back 997 102.6 10.7 93 110.0 1923 09-27-05. Lot 1.0 B front 994.5 103.5 8.1 94 110.0 1924 09-27-05 Lot 10 B Front 996.5 100.3 12.6 91 110.0 1925 09-27-05 Lot 10 B Back 994.5 99.4 11.0 90 110.0 1926 09-27-05 Lot 10 B Back 996 104.1 8.9 95 110.0 1927 09-27-05 Lot 11 B Front 994.5 101.8 10.5 93 110.0 1928 09-27-05 Lot 11 B Front 996 100.6 13.1 91 110.0 1929 09-27-05 Lot 11 B Back 994 103.9 11.4 94 110.0 1930 09-27-05 Lot 11 B Back 996 103.5 14.3 94 110.0 1931 09-27-05 Lot 12 B Front 9945 100.4 10.7 91 110.0 1932 09-27-05 Lot 12 B Front 996.5 99.3 101.1 90 110.0 1933 09-27-05 Lot 12 B Back 994.5 104.4 9.2 95 110.0 1934 09-27-05 Lot 12 B Back 996 102.7 12.1 93 1.10.0 DATE: March 21) 2006 Sladden Engineering . i: PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Date Tested I Location TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 !Elevation I Dry Density I % Moisture I Relative I Maximum 1935 09-28.05 Lot 9 8 Front 999 100.2 8.1 1936 09-28-05 Lot 9 B Back 999 100.6 11.6 1937 09-28-05 ; Lot 10 B Front 998 104.1 10.5 1938 09-28-05 Lot 10 B Back 998.5 102.0 14.1 1939 09-28-05 Lot 11 B Front 998 102.8 12.7 1940 09-28-05 Lot 11 B Back 997.5 105.1 1.1.0 19.4.1. 09-28-05 Lot 12 B Front 998 103.3 9.7 1942 09-28-05 Lot 12 B Back 998.5 101.4 1.2.5 1943: 09-28-05 Lot 25 0 Front 993 104.3 10.6 1944!: 09-28-05 Lot 25 B Back 994 103.0 14.4 1945! 09-28-05 Lot 26B•Front 993.5 ! 100.6 12.7 [946' 09-28-05 Lot 26 B Back 993 ! 1.01.1. 11.1 19471 09-28.05 Lot 27 B Front 993.5 105.6 13.6 19481 09-28-05 Lot 27 B Back 993 102.5 15.1 19491 09-28-05 Lot 23 B Front 990.5 1.02.8 13.8 1950 09-28-05 Lot 23 B Back 991.5 100.5 10.9 1951 09-28-05 Lot 24 B Front 989.5 104.4 13.6 1952 09-28-05 ' Lot 24 B Back 988.5 101.5 11.3 1953 09-28-05 Lot 23 B Front 992.5 106.1 14.5 1954. 09-28-05 Lot 23 B Back 993.5 105.6 12.7 1955 09-28-05 I.At 24 6 Front 991.5 i 102.9 11.8 1956 09-28-05 I Lot 24 B Back 990.5 104.1 12.8 1957 I 09-28-05 Lot 24 B Front 993.5 I 100.5 I 10.0 1958; 09-28-05 i Lot 24 B Back 992.5 102.6 11.9 1959 09-29-05 Lot 9 B Front 1000.5 105.3 13.1 19601 09-29-05 Lot 9 B Back 1000.5 1.02.6 15.7 1961 09-29-05 Lot 10 B Front, 1.000 100.3 15.4 1962 09-29-05 Lot 10 B Back 1000 103.1 I 12.8 19631 09-29-05 1 Lot 11 B Front 999.5 101.5 16.3 1964: 09-29-05 I Lot 11 B Clack 999 101.8 � 14.0 19651 09-29-05 Lot 12 0 Front 1000 1005 16.8 1966' 09-29-05 Lot 12 B Back 999.5 ` 106.6 I 13.0 1967 09-29-05 Lot 13 B Front 995 103.9 1.1.7 1968 09-29-05 Lot 13 B Back 994.5 ' 99.4 15.9 1969 10-03-05 Lot 9 B Front 1002.5 1 106.1 11.0 1970 10-13-05 + Lot 9 B [lack 1002.5 � 108.2 9.8 1971 10-03-05 Lot 10 B Front 1002 104.7 10.6 1972 10-03-05 ; Lot 10 B Back 1001.5 104.3 10.4 1973 10-03-05 ; Lot 116 Front 1001 ' 107.5 95 DATE: March 2, 2006 91 91 95 93 93 96 94 92 95 94 91 92 96 93 93 91 95 92 96 96 94 95 91 93 96 93 91 94 92 93 91 97 94 90 95 97 93 93 96 110.0 110.0. 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110; 0 110.0 110.0 110.0 110.0 110.0 110.0 112.0 112.0 112.0 112.0 112.0 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Dace Tested I Location 1974 1975 1976 1977 1978 1979 1980 1981 1982 19831 1984, 1985! 19861 19871 1988! 1989i 19901 19911 1992 19931 19941 1995 19961 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 10-03-05 10-03.05 10.03-05 10-03.05 10-03.05 10-03.05 10-03-05 10-03-05 10-03-05 10-04-05 10-04-05 10.04-05 10-04-05 10-04-05 10-04-05 10-04-M 10-04-05 10-04-05 10-04-05 10-04-05 10-04-05 10-04-05 10-04-05 10-05-05 10-05-05 10-05-05 10-05-05 10-05-05 10-05-05 10-05-05 10-05-05 10.05-05 10-05-05 10-05-05 10-05-05 10-05-05 10-05-05 10-05-05 10-05-05 DATE: March 2, 2006 Lot 11 B Back Lot 13 B Front Lot 13 B Back Lot 23 B Front Lot 23 B Back Lot 24 B Front Lot 24 B Back Lot 25 B Front Lot 25 B Back Lot 3 A Back Lot A Back Lot A Back Lot A Back Lot A Back Lot 5 A Back Lot A Back Lot A Back Lot 17 B Front Lot 17 B Back Lot 16 B Front Lot 16 B Back Lot 15 B Front Lot 15 B Back Lot 3 A Back Lot3 A Back Retest # 1985 Retest # 1986 Retest as 1987 Lot 5 A Back Loth A Back Lot 6 A Back Lot A Front Lot 6 A Front Lot 7 A Front Lot? A Front Lot 3 A Front Lot 3 A Front Lot 4 A Front Lot 4 A Front TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation I Dry Density I % Moisture I Relative { Maximum 1001.5 996 996 994,5 995.5 995.5 994.5 995 996 993 994,5 993 995 995 996 993.5 995.5 991.5 992 992.5 993 990 990 996 997 996 996.5 997.5 994 996 1 i 994 996 994 996 993.5 995.5 103.4 13.1 92 101.8 12.3 91 103.9 11.2 93 100.3 8.8 91 102.7 11.5 93 103,8 13.7 94 100.4 12.6 91 99.5 14.1 90 104.4 10.2 95 104.3 17.1 95 100,4 12.6 91 96.1 21.3* 87* 98.4 15.1 89* 98.1 Me 88- 101.3 14.4 92 101.6 9.1 92 102.9 13.4 94 103.6 1.05 94 103,8 12.7 94 19.5* 87* 110.0 101.3 13.3 92 100.4 11.2 91 104.1 1 12.3 1 95 96.1 23.4 871 97,4 1 11.8 84* 100,2 I 20.1 91 102.3 ! 12.9 93 95.2 20.7' I 87- 96.9 13.5 I 88* 102.4 15.2 ; 93 103.5 14.3 i 94 101.1 10,6 92 104.5 9.3 95 100.8 11.4 92 96.2 9.3 87" 104.4 14.4 95 103.8 13.0 94 102.7 15.3 93 98.1 11.6 89* 1.10.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.1.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 Sladden Engineering - .: PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. ! Date Tested I Location 2013 10-05-05 Lot A Front 2014 10-05-05 Lot A Front 2015 10.06-05 Retest# 1997 2016 10-06-05 Retest # 1998 2017 10-06-05 Lot 4 A Back 2018 10-06-05 Lot 4 A Back 2019 10-06-05 Retest # 2001 2020 10-06-05 Retest # 2002 2021 10-06-05 Lot A Back 2022 10-06.05 Lot6 A Back 2023 10-06-05 Lot 7 A Back 2024 10.06-05 Lot 7 A Back 2025 10-06-05 Retest # 2012 2026 10-06-05 Lot 4 A Front 2027 10-06-05 Lot 5 A Front 2028 10-06.05 Lot 5 A Front 2029 10-06-05 1 Lot•6 A Front 2030 10-06-05 Lot 6 A Front 2031 10-06-05 i Retest # 2008 2032 1.0-06-05 Lot 7 A Front 2033 10-07-05 • : Lot 3 A Back 2034 10-07-05 I Lot 3 A Back, 1000 99.3 10.0 2035 10-07-05 Lot 4 A Back 2036 10-07-05 Lot 4 A Back 2037 10-07-05 1 Lot 5 A Back 2038 10-07-05 I Lot 5 A Back 20391 10-07-05 i Lot 6 A Back 2040 10-07.05 Lot 6 A tack 2041 10-07-05 Lot 7 A Back 2042 10-07-05 Lot 7 A Back 2043 10-07-05 Lot 4 A Front 2044 10-07-05 Lot 4 A Front 2045 10-07-05 Lot A Front 2046 10-07-05 Lot 5 A Front 2047 10-07-05 Lot 6 A Front 2048 10-07-05 Lot A Front 2049 1.0-07-05 Lot 7 A Front 2050 10-07-05 Lot 7 A Front DATE: March 2, 2006 TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture 1 Relative Maximum In Place In Place I Compaction I Density 994.5 104.4 14.8 996.5 101.0 12.3 101.8 10.3 108.3 14.6 996.5 101.4 15.1 998.5 102.8 14.0 99.5 16.1 100.3 14.3 998.5 103.1 10.4 1000 102.0 11.6 996 104.4 13.1 998 101.7 9.6 106.9 8.8 997.5 103.7 12.6 997.5 103.5 11.3 998 100.1 15.4 997.5 105.2 10.7 999 101.6 14.4 99.6 13.3 998 100.8 16.0 999 101.3 8.6 1001 102.4 11.5 1000 99.3 10.0 1001.5 I 99.2 9.1 998 103.6 8.9 1000 102.8 10.7 1001.5 102.5 12.8 1003 104.1 1110 1.000 100.6 9.9 1002 103.4 13.0 999.5 106.5 8.4 1001 1 104.0 12.5 1000 104.8 11.3 ! 1001.5 I 101.5 13.4 1000.5 102.6 9.7 1002 100.2 9.5 1000 ! 102.4 11.1 1001.5 I 99.6 10.3 95 110.0 92 110.0 93*" 110.0 98*' 110.0 92 110.0 93 110.0 90** I 110.0 91w* 110.0 94 110.0 93 110.0 95 110,0 92 110.0 97'* 110.0 94 110.0 94 110.0 91 110.0 96 10.0 92 110.0 91** 110.0 92 110.0 92 I 110.0 93 110.0 90 110.0 90 7.1.0.0 94 110.0 93 110.0 93 110.0 95 110.0 91 110.0 94 110.0 97 110.0 95 110.0 95 110.0 92 110.0 93 110.0 91 110.0 93 110,0 91 11.0.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California. PROJECT NO: 5224810 REPORT NO; 06-02-120 Test No.I Date Tested Location Elevation I Dry Donsity I % Moisture Relative I Maximum In Place In Place I Commaction j D=ity 2051 10-10-05 Lot 3 A Back 1002 104.5 11.9 2052 10-10-05 I Lot 4 A Back 1002.5 101.6 14.8 2053 10-10-05 Lot 5 A Back 1001.5 101.8 15.3 2054 10-10-05 Lot 117 8 Front 974 92.3 17.1* 2055 10-10-05 Lot 117 B Back 974 93.4 18.9" 2056, 10-10.05 Lot 11.8 8 Front 973.5 91.8 20.4* 2057 10-10-05 Lot 118 B Back 973 i 95.0 21.3* 2058 10-11-05 Lot 3 A Back 1004 115.9 12.0 2059 10-11-05 Lot 4 A Back 1004.5 103.8 13.1 20601 10-11-05 Lot 5 A Back 1005 101.4 14.6 20611 10-11-05 Lot 4 A Front 1004.5 100.1 11.8 2062! 10-11-05 Lot 3 A Front 1004 106.0 11.4 2063 10-11-05 Lot 6 A Back 1005.2 109.7 8.8 2064! 10-11-05 Lot 7 A Back 1004.5 104.1 12.9 2065; 10-11-05 Lot 5 A Front 1005 105.3 10.6 2066! 10-11-05 Lot 6 A Front 10055 j 103.4 14.1 2067: 10-11-05 Lot 7 A Front 1004.5 103.8 13.5 2068' 10-11-05 Lot 3 A Front 1002.5 1 105.4 , 13.5 2069' 10-11-05 Lot 4 A Front 1003 102.6 ' 11.8 2070 10-11-05 I Lot 5 A Front 1003 106.3 14.1 20711 10-11-05 Lot 6 A Front 1004 100.2 12.0 20721 10-11-05 ! Lot A Front 1003 99.4 10.7 2073 , 10-11-05 ': Lot 3 A Back 1002.5 103.5 12.8 2074 10-11-05 Lot 4 A Back 1003.5 101.4 15.6 2075 10-11-05 Lot 5 A Back 1002 104.0 11.1 20761 10-11-05 Lot 6 A Back 1004 101.8 9.9 2077! 10-11-05 Lot 7 A Back 1003 102.5 13.3 2078' 10-12-05 Parking Lot 988 101.3 9.1 2079; 10-12-05 Parking Lot 988 103.6 8.2 2080 10-12-05 Parking Lot 989 99.3 10.3 20811 10-12.05 Parking Lot 988.5 I 105.4 13.1 2082 10-12-05 Parking Lot 990 1 102.0 11.8 20831: 10-12-05 I Parking Lot 990 I 101.3 12.9 2084 10-12-05 Parking Lot 991 104.1 10.7 2085 10-12-05 Parking Lot 990.5 102.8 13.5 i 20861 10-13-052 Lot A 982.5 102.1 11.4 20871 10-13-05 Lot B 983 105.4 10.0 2088 10-13.05 Lot C 985 , 100.3 13.5 DATE: March 21 2006 95 110.0 92 110.0 93 110.0 84* 110.0 85° 110.0 83* 110.0 86* 110.0 97 119.0 94 110.0 92 110.0 91 110.0 96 + 110.0 92 1 119.0 95 11.0.0 96 110.0 94 110.0 94 .110.0 96 110.0 93 110.0 97 110.0 91 I 110.0 90 110.0 94 110.0 92 I 110.0 95 1 110.0 93 i 110.0 93 I 110.0 92 I 110.0 94 I 100.0 90 110.0 96 110.0 93 110.0 92 110.0 95 110.0 93 110.0 93 110.0 % 110.0 91 110.0 SYadden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture Relative I Maximum In Place in Place I Compaction Dcnsity 2089 2090 2091 2092 2093 2094 2095 2096 2097 2098 2099 2100 2101 27.02 2103 2104 2105 2106 2107 2108 2109 2110 2111 2112 2113 2114 2115 2116 2117 2118 2119 2120 2121 2122 2123 2124 2125 2126 DATE: 1.0-13-05 Lot D 10-13-05 Lot E 10-13-05 Lot F 10-13-05 Lot G 1.0-13-05 Lot 1.1 10-13-05 Lot I 10-13-05 Lot] 10-14-05 Lot A 10-14-05 Lot B 10-14-05 Lot C 10-14-05 Lot D 10-14-05 Lot E 10-14-05 Lot F 10-14-05 i Lot G 10-14-05 Lot H 10-14-05 Lot I 10-14-05 Lot 10-26-05 10-26-05 10-26-05 10-26-05 10-26-05 10-26-05 10-26-05 March 2, 20C Lot 17 B Front Lot 1713 Front Lot 18 B Front Lot 18 B front Lot 19 B Front Lot 20 B Front Lot 20 B Front 985.5 985 987 987.5 987 988 988.5 987 987.5 989.5 990 989.5 991.5 991 989.5 991 992 1000.5 1002.5 1003 1005 1002.5 1004.5 1005 1006 1002.5 1004.5 1004 1005.5 1006 1006.5 993.5 995.5 993.5 995.5 997 997 999 106.1 103.5 101.6 101.2 104.3 107.1 103.1 101.1 101.6 103.9 102.8 99.3 104.5 100.8 104.1 103.9 102.5 102.9 105.8 103.5 1.01.4 100.8 104.7 99.5 103.0 106.1 105.3 101.9 103A 103.9 101.3 104.5 102.6 100.3 101.6 105.4 101.8 101.3 9.6 8.9 12.4 12.9 14.1 8.9 10.2 9.3 11.8 12.4 10.2 9.6 11.2 13.8 11.0 10.7 12.4 13.2 11.0 14.5 12.6 10.7 10.4 14.1 12.7 11.0 15.1 13.4 10.5 10.7 1.2.1. 9.9 11..4 8.6 10.0 102.8 11.1 8.7 96 94 92 92 95 97 94 92 92 94 93 90 95 92 95 94 93 94 96 94 92 92 95 90 94 96 96 93 94 94 92 95 93 91 92 96 93 92 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 .110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 Sladden Engineering 10-24-05 Lot 8 A Front 10-24-05 Lot A Front 10-24-05 Lot A Front 10-24-05 Lot 9 A Front 10-24-05 Lot 10 A Front 10-24-05 i Lot 10 A Front 10-24-05 Lot 1.1. A Front j 10-24-05 Lot 11 A Front 10-24-05 Lot 8 A Back. 10-24-05 Lot8 A Back 10-24-05 Lot 9 A Back 10-24-05 Lot 9 A Back 10-24-05 Lot 10 A Back 10.24-05 Lot 11 A Back 10-26-05 10-26-05 10-26-05 10-26-05 10-26-05 10-26-05 10-26-05 March 2, 20C Lot 17 B Front Lot 1713 Front Lot 18 B Front Lot 18 B front Lot 19 B Front Lot 20 B Front Lot 20 B Front 985.5 985 987 987.5 987 988 988.5 987 987.5 989.5 990 989.5 991.5 991 989.5 991 992 1000.5 1002.5 1003 1005 1002.5 1004.5 1005 1006 1002.5 1004.5 1004 1005.5 1006 1006.5 993.5 995.5 993.5 995.5 997 997 999 106.1 103.5 101.6 101.2 104.3 107.1 103.1 101.1 101.6 103.9 102.8 99.3 104.5 100.8 104.1 103.9 102.5 102.9 105.8 103.5 1.01.4 100.8 104.7 99.5 103.0 106.1 105.3 101.9 103A 103.9 101.3 104.5 102.6 100.3 101.6 105.4 101.8 101.3 9.6 8.9 12.4 12.9 14.1 8.9 10.2 9.3 11.8 12.4 10.2 9.6 11.2 13.8 11.0 10.7 12.4 13.2 11.0 14.5 12.6 10.7 10.4 14.1 12.7 11.0 15.1 13.4 10.5 10.7 1.2.1. 9.9 11..4 8.6 10.0 102.8 11.1 8.7 96 94 92 92 95 97 94 92 92 94 93 90 95 92 95 94 93 94 96 94 92 92 95 90 94 96 96 93 94 94 92 95 93 91 92 96 93 92 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 .110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Twt No. I Date Teated I Location Elevation Dry Density I % MoistureRelative I Maximmn in Place I in Place Corm action I Densitv 2127 10-26-05 2128 1046-05 2129 10-26-05 2130 10-26-05. 2131 10-26-05 2132 10-26-05 2133 10-26-05 2134 10-26-05 2135 10-26-205 2136 10-26-05 2137 10-27-05 2138 10-27-05 2139 10-27-05 2140 -10-27-05 2141 10-27-05 2142 10-27-05 2143 10-27-05 2144 10-27-05 2145 10-27-05 2146: 10-27-05 21471 10-27-05 2148 10-27-05 21491 10-27-05 2150: 10-27-05 2151 10-28-05 2152; 10-28-05 2153: 10-28-05 21541 10-28-05 2155; 10-28-05 2156; 10-28-05 21571 10-28-05 2158, 10.28-05 2159'. 10-28-05 21601 10-28-05 2161 10-28-05 2162 10-28-05 2163 10-28-05 2164 10-28-05 2165 10-28-05 2166; 10-28-05 Lot 21 B Front 998.5 106.6 13.4 Lot 21 B Front 1000 103.9 13.0 Lot 22 B Front 9935 100.6 10.1 Lot 22 B Front 995.5 102.2 14.3 Lot 23 B Front 996.5 102.9 12.6 Lot 23 B Front 998.5 1 105.3 11.8 Lot 22 B Front 997.5 1 103.0 13.2 Lot 22 B Front 999 ' 106.1 10.7 Sales Center 989.5 103.9 12.5 Sales Center 989.5 101.1 10.6 Lot 17 B Back 994 102.2 8.8 Lot 17 B Back 996 I 1.00.4 10.9 Lot 18 B Back 997.5 104.1 I i 11.6 Lot 19 B Back 997 I 103.0 1 9.3 Lot 20 B Back 996.5 106.1 13.2 Lot 20 B Back 998 104.5 12.1 Lot 21 H Back 997 101.1 14.0 Lot 21 B Back 999 100.3 I 11.4 Lot 22 B Back 993 105.1 I 13.2 Lot 22 B Back 995 102.8 13.2 Wt 2213 Back 997 101.5 I 10.3 Lot 22 B Back 999 101.9 1 14.1 Cate House 992 99.1 7.1 Gate House 994 100.6 I 8.3 Lot 1 A Front 996 I 101.6 1 13.1 Lot 1 A Front 998 101.9 11.5 Lot 2 A Front 998 1.04.7 14.3 Lot 2 A Front 1000 102.8 1 12.6 Lot 1 A Front 1000. 103.4 1 12.1 Lot 1 A Front 1002 100.2 1 15.1 Lot 2 A Front 1002 105.3 13.0 Lot 2 A Front 1003.5 101.2 I 11.6 Lot 2 A Back 1003.5 103.1 10.7 Lot 11 A Front PG 107.2 9.6 Lot 11 A Back PG 103.8 11.1 Lot 11 A Center PG 104.3 10.8 Lot 10 A Front PG ' 101.5 12.6 Lot 10 A Back PG 100.1 8.7 Lot 10 A Center PG 1102.6 11.0 Lot 9 A Front PG 105.4 9.3 DATE: March 2, 2006 i i I 97 110.0 94 110.0 91 110.0 93 110.0 96 110.0 96 110. 94 110.0 96 110.0 94 110.0 92 1.10.0 93 110.0 91 110.0 95 110.0 94 110.0 96 110.0 95 110.0 92 110.0 91 110.0 96 110.0 93 110.0 92 110.0 93 110.0 90 110.0 91 110.0 92 110.0 93 110.0 95 11.0.0 93 110.0 94 110.0 91 110.0 96 110.0 92 110.0 94 110.0 97 110.0 94 110.0 f 95 i 110.0 92 110.0 I 91 110.0 93 110.0 j 96 110.0 Sladden Engineering TEST RESULTS PROJECT NAME; Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.Date Tested 1 Location Elevation DryDensity%Moisturel Relative I Maximum I . , In Place I In Place I Compaction I Density 2167 21.68 21691 2170; 2171 21721 2173' 2174, 2175 2176 2177 2178 2179 2180 2181 2182 2183 2184 2185 2186 2187 2188 2189 21901 2191 21921 2193 2194 2195 21961 2197 21981 21991 22001 2201 2202 2203 2204 22M 10.28.05 10-28-05 10-28-05 10-28-05 10-28-05 ! 10-28-05 10-28-05 10-28-05. , 10-28-05 1 10-2&05 j 10-28-05 10-28-05 , 10-28-05 10-28-05 10-2&05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 11-01-05 11-01-05 11-01-05 11-01.05 11-01-05 11-01-05 11-01-05 11-01-05 11-01-05 11-01-05 11-01.-05 11-01-05 11-01-05 11-01-05 11-01-05 11-02-05 11-02-05 11-02-05 11-02-05 DATE: March 2, 2006 Lot 9 A Back Lot 9 A Center Lot A Front Lot 8 A Back Lot? A Front Lot.7 A Back - Lot 6 A Front Lot 6 A Back Lot 6 A Center Lot 5 A Front Lot 5 A Back l.ot 4 A Front Lot 4 A Back Lot 4 A Center I..ot 3 A Front Lot 3 A Back Lott A Front Lot 2 A Back Lotl A Front Lot 1 A Back Lot 10 B Back Lot 10 B Front Lot 13 B Front Lot 13 B Back Lot 14 B Front Lot 14 6 Back Lot 15 B Front Lot 15 B Front Lot 15 B Back Lot 15 B Back Retest # Lot 16 B Front Lot 16 B Back I,ot 15 B Front Lot 15 B Back Lot 23 8 Back Lot 23 B Back Lot 24 B Front Lot 24 B Front PG 103.7 11.0 PG 106.6 9.2 PG 102.4 12.5 PG 102.7 13.0 PG 104.7 13.1 PG 108.1 11.0 PC 106.3 11.4 PG 103.4 14.1 PG 105.3 10.9 PG I 100.9 14.5 PG 102.6 12.0 PG 104.4 9.8 PC 107.1 1.1.0 PG 105.4 12.6 PG I 103.2 8.8 PC I 103.5 10.4 PG 106.6 11.8 PG I�I 102.4 12.4 PC I 99.3 9.1 PG i 100.7 I 9.6 1003 104.0 j 9.3 1002 1 102.0 10.7 998 100.4 11.6 998 103.3 13.1 997 105.1 9.8 997 101.4 11.0 992 100.1 10.7 994 100.6 10.2 992 103.7 12.6 994 104.8 10.1 99.3 8.7 994.5 102.5 12.3 995 105.6 13.4 996 103.4 10.8 996 106.8 9.5 997.5 104.9 1.1..8 999.5 102.6 10.1 997.5 106.7 13.4 9995 103.5 9.6 94 97 93 93 95 98 97 94 96 92 93 95 97 96 94 94 97 93 90 92 95 93 91 94 96 92 91 91 94 95 90 95 96 94 97 95 93 97 94 110.0 110.0 910,0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 Sladden Engineering. TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.I Date Tested I Location Elevation Dry Density % Moisture I Relative I Maximum In Ptacc In Place comnactioe Dcnxity 2206 11-02-05 Lot 24 B Back 2207 11-02-05 Lot 24 B Back 2208 11-02-05 Lot 25 B Front 2209 11-02-05 Lot 25 B Front 2210 11.02-05 Lot 25 B Back 2211 11-02-05 Lot 25 B Back 2212 11-02-05 Lot 26 B Front 221.3 11-02-05 Lot 26 8 Front 2214 11-02-05 Lot 26 B Back 2215, 11-02-05 i Lot 26 8 Back 2216 2217 22181 22191 2220 2221 2222 2223 22241 22251 22261 2227! 2228; 22291 22301 2231 I 2232 2233 2234 2235 2236 22371 2238 2239 2240 2241 2242 2243 11-03-05 Lot 9 B Front 11-03-05 Lot B Back 11-03-05 Lot 10 B Front 11-03-05 ; Lot 10 B Back 11-03-05 Lot 11 B Front 11-03-05 Lot 11 B Back 11-03-05 Lot 12 B Front 1.1-03-05 Lot 12 B Back 11-03-05 Lot 13 B Front 11-03-05 Lot 13 B Back 11-03.05 i Lot 14.0 Front 11-03-05 Lot 14 B Back 11-03-05 i Lot 15 B Front 11-03-05 I Lot 15 B Back 11-03-05 Lot 16 B Front 11-03-05 1 Lot 16 B Back 11-04-05 11-04-05 11.04-05 11-04-05 11-04-05 1.1-04-05 11-04-05 11-04-05 11-04-05 11-04-05 11-04-05 11-07-05 Lot 17 B Front Lot 17 B Back Lot 18 B Front Lot 18 B Back Lot 19 B Front Lot 19 B Back Lot 20 B Back Lot 21 B Front Lot 21 B Back Lot 22 B Front Lot 22 B Back Lot 17 B Front 996.5 9985 997 999 998 1000 995.5 997.5 995 997 PG PG PG PG PG PG PG PG PG PC PG C PG PG PG PG 997.5 998 997.5 998 999 999 1000 1001.5 1001 1001 1001 PC 100.3 104.1 101,1 101.4 1.04.4 103.6 106.0 102.5 101.8 103.7 105.1 102.8 102.5 104.0 1005 100.8 103.1 105.7 106.9 104.4 101.7 1.02.1 105.5 103.3 107.1 104.2 103.6 105.4 101.0 100.6 104.3 104.1 1.02.8 107.3 1.05.0 103.3 104.6 103.3 11.1 91 10.0 95 12.4 92 14.1 92 9.7 95 8.8 94 11.4 96 9.9 93 12.9 93 13.4 94 9.5 96 11.0 93 10.4 93 12.3 95 11.1 91 9.3 92 12.8 94 12.1 96 9.7 97 9.2 95 1.0.0 93 10.5 93 12.6 96 13.1 94q 8.8 97 10.7 95 10.1 94 11.5 96 12.5 92 9.8 91 14.6 95 12.9 95 13.6 93 11.4 98 11.9 95 15.1 94 13.0 95 9.0 1 94 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 DATE: March 2, 2006 gladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. I Date Tested I Location Elevation I Dry Density % Moisture I Relative I Maximum In Placc In Place I Compaction Densitv 2244 2245 2246 2247 2248 2249 2250 2251 2252 2253 2254 2255 2256 2257 2258 2259 2260 2261 2262 2263 2264 2265 2266 2267 2268 2269 2270 2271 2272 2273 2274 2275 2276 2277 2278 2279 2280 2281 11.07-05 11-07-05 11-07-05 11-07-05 11-07-05 11-07-05 11-07-05 11-07-05 11-07-05 11-07-05 11-07-05 11-08-05 11-08-05 11-08-05 11-08-05 11-08-05 11-09-05 11-09-05 11-09.05 11-09-05 1.1-09-05 11-09-05 11-09-05 11-09-05 11-09-05 11-09-05 11-09-05 1.1-09.05 11-09-05 11-09-05 I1-09-05 11-09-05 11-09-05 11-09-05 11-09-05 11-09-05 I1-09-05 11-10-05 Lot 1.7 B Back Lot 17 B Center Lot 18 B Front Lot 18 B Back Lot 18 B Center Lot 19 a Front Lot 19 B Back Lot 19 B Center Lot 20 B Front Lot 20 B Back Lot 20 B Center Lot 118 B Lot 119 B Lot 120 B Lot 121 B Lot 122 B Lot 25 B Trot 25 B Lot 25 B Lot 26 B Lot 26 B Lot 26 B Lot 27 B Lot 27 B Lot 27 B Lot 21 B Lot 21 B Lot 21 B Lot 22 B Lot 22 B Lot 22 B Lot 23 B Lot 23 B Lot 23 B Lot 24 B Lot 24 B Lot 24 B Lot 117 B PG PG PC PG PG PG PC PG PG PG PG 3.0 BPG 3.0 BPC 3.0 BPC 3.0 BPG 3.0 BPG 101.4 104.6 100.5 102.8 104.9 106.1 103.5 105.3 101.8 101,4 104.0 110.2 110.2 104.3 104.9 101.8 PG j 106.5 PG 99.9 PG I 104.4 I'G i 106.8 PG 101.2 PG 102.7 PG ( 101.8 PG 103.2 PG 104.1 PG 99.6 PC 99.9 PG 108.5 PG 99.0 PG 107.5 PG 103.8 PC 101.0 PG 104.6 PG 104.6 PG 101.0 PC 103.7 PG 100.5 PG 103.4 8.1 11.5 7.9 10.7 9.3 11.4 8.8 12.4 11.0 9.9 10.7 92' 110.0 95 110.0 91 110.0 93 110.0 95 110.0 96 1.1.0.0 94 I 110.0 96 110.0 93 I 110.0 92 110.0 95 110.0 8.4 98 112.0 12.5 98 112.0 14.7 93 ! 112.0 14.7 94 1 112.0 11.8 91 i i 112.0 13.2 97 110.0 7.1 j 91 I 110.0 6.8 ! 95 ; 110.0 12.2 97 I 110.0 5.0 92 110.0 7.0 93 I 110.0 7.9 4 92 11.0.0 9.2 94 I 110.0 11.6 I 95 110.0 11.1 91 110.0 1.1.6 91 I 110.0 9.5 99 110.0 5.9 90 110.0 8.4 98 110.0 15.1 94 110.0 9.6 92 1.10.0 5.7 95 110.0 10.4 95 110.0 9.9 92 110.0 12.8 94 110.0 10.4 91 110.0 9.2 94 110.0 DATE: March 2, 2006 Sladden Engineering V A PROJECT NAME: Madison Club LOCATION: La Quinta, California TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Tewt No. Date Tested Location Elevation I Dry Density I % Moist= I !Relative I Maximum In Place I In Place I Compaction I Dcwity 2282 2283 2284 22851 2286 2287 2288 2289 2290 2291 2292 2293 2294 2295; 2296 2297 2298 2299 2300 2301 23021 2303 2304: 2305! 23061 23071 2308 23091 23101 231" 231, 231, 231 231; 2311 231; 2311 23]S 2321 11-10.05 11-10-05 11.-10-05 i 11-10-05 1110-05 11-10-05 11-10-05 11-10.05 11-10-05 11-10-05 11-10-05 11-10-05 11-10-05 11-10-05 11-10-05 11-10-05 11-10-05 11-10-05 11-.10-05 11-10-05 11-10-05 11-14-05 11-14-05 11-14-05 11-14-05 11-14-05 11-14-05 11-14-05 11.-1.4-05 11-15-05 11-15-05 11-15-05 11-15-05 11-15-05 11-15-05 11-15-05 11-15.05 11-15-05 11-15-05 DATE: March 2,2006' Lot 117 B Lot 118 B Lot 118 B Lot 119 B Lot 119 B Lot 4.0 8 Lot 40 B Lot 118 5 Lot 119 B Lot 120 8 Lot 121 B Lot 1.22 B Lot 29 B Lot 29 B Lot 29 H Lot 28 B Lot 28 B Lot 28 B Lot 30 B Lot 30 B Lot 30 B 1,ot 31 B Lot 31 B Lot 32 B Lot 32 B Lot 36 B Lot 36 B Lot 35 B Lot 35 B Lot 39 B Lot 3913 Lot 38 B Lot 38 8 Lot 37 B Lot 37 B Lot 33 B Lot 33 B Lot 34 B Lot 34 B PG PG PG PC PG PC PG 1.0 BPC 1,0 BPG 1.0 BPC 1,0 BPG 1.0 BPC PG PC PG PG PG PG PG PC PG PC PG PG PG PG PC PG 1'G PG PC PG PC PG PG PC PG PC PG 105.3 108.8 103.4 105.3 109.1 108.3 109.1 99.9 100.6 100.0 . 99.8 102.0 109.2 107.9 108.2 108.9 108.9 109.1 105.0 104.0 105.9 108.5 108.0 108.8 104.5 107.5 100.4 102.5 103.3 109.0 108.7 103.1 108.6 108.4 104.7 108.2 101.7 103.1 100.1 11.8 9.8 9.6 10.2 11.7 9.8 11.5 12.2 11.9 12.6 14.4 1.1..4 9.5 7.7 13.1. 14.6 8.3 11.4 15.1 15.2 14.2 7.5 6.2 7.1 7.4 11.7 6.4 11.2 15.1 8.1 6,0 15.1 9.5 11.9 7.3 7.5 10.8 8.3 6.1 96 110.0 99 110.0 93 1.10.0 96 110.0 99 110.0 98 110.0 99 110.0 91 110.0 92 110.0 91 110.0 91 110.0 93 110.0 99 110.0 98 116.0 99 '110.0 99 110.0 99 110.0 99 110.0 95 110.0 95 110.0 96 ` 110.0 99 110.0 98 110.0 99 I 110.0 93 110.0 98 110.0 91 110.0 93 110.0 94 4 1.10.0 1 99 I 1.10.0 99 110.0 94 110.0 99 110.0 98 110.0 95 110.0 98 110.0 93 1.10.0 94 110.0 92 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Tcst No. Date Tested Location Elevation Dry Density I % Moisture Relative Maximum In Place In Place Compaction Density 2321 2322 2323 2324 2325 2326 2327 2328 2329 2330 2331 2332. 11-17-05 11-17-05 11-17-05 11-17-05 11-17-05 11-17-05 11-17-05 11-17-05 11-17-05 11-17-05 11-17-05 11-17-05 2333 11-21-05 2334 11-21-05 2335 11-21-05 2336 11-21-05 2337 11-21-05 2338 11-21-05 2339, 11-21-05 , 2340; 11.-21-05 2341 11-21-05 2342: 11-21-05 23431 11-21-05 23441 11-21-05 2345 11-21.-05 2346 11-21-05 2347 11-21-05 2348 11-21-05 2349' 11.28-05 2350 11-28-05 1 2351 01.-04-06 2352 01404-06 2353 01-04-06 2354 01-04-06 23551 01-04-06 Lot 120 B Lot 120 B Lot 121 B Lot 121 B Lot 122 B Lot 122 B trot 82 8 Lot 82 B Lot 81 B Lot 81 B Lot 80 8 Lot 80 B Lot 43 B Lot 43 B Lot 42 8 Lot 42 B Lot 4113 Lot 41 8 Lot 48 B Lot 48 B Lot 47 B Lot 47 B Lot 46 B Lot 46 B Lot 45 B Lot 45 B Lot 44 B Lot 44 B Lot 63 B Lot 63 B Sales Office Sales Office Sales Office Sales Office Sales Office PG PG PG PG PC PG PC PG PG PG PC PG 109.1 1.03.5 105.2 109.0 105.1 106.7 103.1 108.1 104.4 105.9 103.1 99.9 PG 109.1 1'G 108.1 PG 109.1 PG i 1.08.9 PG 106.8 PC 109.1 PG 107.3 PG 108.7 PG 106.7 PG 105.9 PG 108.8 PG j 109.1 PC 108.7 PG 107.7 PG 107.8 PG 106.7 PG 107.9 PC 106.2 5.0 BSG 101.9 4.0 BSG 99.9 2.0 8SG 99.8 5.0 BSC 98.1 3.0 BSG 99.9 9.9 16.5 11.1 13.7 11.4 13.3 8.9 8.9 13.6 12.8 11.9 10.6 11.4 13.1 12.4 11.9 13.1 11.6 7.4 7.0 6.1 7.1 6.5 6.1 7.1 6.5 10.2 9.4 99 94 96 99 96 97 94 94 95 96 94 91 99 98 99 99 97 99 97 99 97 96 99 99 99 98 98 97 10.2 98 10.4 97. 9.7 93 8.3 92 9.6 92 10.6 90 15.4 92 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0. 110.0 110.0 109.0 109.0 109.0 109.0 109.0 DATE: March 2, 2006 Sladden Engineering