PC Resolution 2019-011 StarbucksPLANNING COMMISSION RESOLUTION 2019-011
A RESOLUTION OF THE PLANNING
COMMISSION OF THE CITY OF LA QUINTA,
CALIFORNIA, RECOMMENDING CITY COUNCIL
APPROVE A SITE DEVELOPMENT PERMIT, ZONE
CHANGE, AND VARIANCE FOR A NEW 21790
SQUARE FOOT DRIVE -THROUGH STARBUCKS
AND FIND THE PROJECT CONSISTENT WITH A
PREVIOUSLY APPROVED ENVIRONMENTAL
ASSESSMENT
CASE NUMBERS: SITE DEVELOPMENT PERMIT 2019-0002, ZONE
CHANGE 2019-0002, VARIANCE 2019-0001, ENVIRONMENTAL
ASSESSMENT 2019-0002
APPLICANT: KAIDENCE GROUP
WHEREAS, the Planning Commission of the City of La Quinta, California
did, on the 12th day of November, 2019, hold a duly noticed Public Hearing,
to consider a request by Kaidence Group for recommendation of approval of
a site development permit, zone change, and variance, to allow for a new
drive -through Starbucks coffee shop located at the northwest corner of
Washington Street and Calle Tampico, more particularly described as:
APN: 770-020-015 through 770-020-021
WHEREAS, the Design and Development Department published a
public hearing notice in The Desert Sun newspaper on November 1, 2019 as
prescribed by the Municipal Code. Public hearing notices were also mailed to
all property owners within 500 feet of the site; and,
Site Development_ Permit 2019-0002
WHEREAS, at said Public Hearing, upon hearing and considering all
testimony and arguments, if any, of all interested persons desiring to be
heard, said Planning Commission did make the following mandatory findings
pursuant to Section 9.210.010 of the La Quinta Municipal Code to justify
approval of said Site Development Permit:
1. Consistency with General Plan
The proposed development is consistent with the General Plan land
use designation of General Commercial. The City's General Plan
policies relating to General Commercial encourage a full range of
Planning Commission Resolution 2019-011
Site Development Permit 2019-0002, Zone Change 2019-0002, Variance 2019-0001, and Environmental
Assessment 2019-0002
Starbucks
Adopted: November 12, 2019
Page 2of11
commercial uses within the City, and the proposed use maintains
those policies. The proposed project is consistent with the following
Goals, Programs, and Policies:
■ Goal LU-6 and ED-1 as it will contribute to a balanced and
varied economic base which provides fiscal stability to the
City and provide a broad range of goods and services to its
residents and region.
■ Goal LU-2 as the project consists of high quality design that
complements and enhances the City. The design of the
project incorporates the existing architectural style within
commercial center but enhances it with modern architectural
elements.
• Program CIR-1.12.a: Locate land uses that provide jobs and
housing near each other to allow the use of alternative modes
of travel and produce shorter work commutes. The project
will be developed with access to existing Villa Cortina
Apartments and Seasons residential development, providing
an opportunity for jobs and housing near each other. The
project is also located in close proximity to existing residential
developments to the north, south, and east.
■ Policy CIR-1.16 which states to continue to implement the
Image Corridor treatments throughout the City. This project
maintains a height under 22 feet within the first 150 feet from
Washington Street, an image corridor, which is consistent
with the Image Corridor standards.
• Policy ED-1.2 as it will support and assist in the retention of
existing businesses and the recruitment of new businesses.
This proposal is for the retention of an existing Starbucks to
construct a new building within the same shopping center.
Drive-throughs are an attractive use in facilitating the
recruitment of new businesses.
• Policy ED-1.5 which states projects proposed on commercial
land shall be evaluated for their job creating and revenue
generating potential. This project's scope and operations will
create jobs and lead to annual sales tax and generate transit
occupancy tax revenue for the City.
Planning Commission Resolution 2019-011
Site Development Permit 2019-0002, Zone Change 2019-0002, Variance 2019-0001, and Environmental
Assessment 2019-0002
Starbucks
Adopted: November 12, 2019
Page 3 of 11
2. Consistency with Zoning Code
The proposed development, as conditioned, is consistent with the
development standards of the City's Zoning Code and the purpose
and intent of the Community Commercial District. The Community
Commercial district is intended to meet the needs of a multi -
neighborhood area. The project site is located in an area that does
serve multiple neighborhoods as it abuts existing apartment
developments, is in close proximity to the Cove, residential homes
east of Washington Street, residential communities on the
intersection of Washington Street and Avenue 50, and residential
communities north and south of Avenue 521 including future
residential community at SilverRock.
3. Compliance with CE A
The Design and Development Department has determined that the
proposed project is consistent with the mitigated negative
declaration approved for Plot Plan 91-456 and Environmental
Assessment 91-187 and approved on April 16, 1991. As
mentioned, the original approval approved a shopping center under
a 116,600 square foot of commercial space build out. Subsequent
amendments lowered this to 79,333 square feet, which is how it
currently exists. This proposal increases the square footage to
82,823, which is still well under the original 116,600 square feet
analyzed by the original environmental assessment.
4. Architectural ❑esign
The architecture and layout of the project is compatible with, and
not detrimental to, the existing surrounding commercial land uses,
the existing commercial buildings within the shopping center, and is
consistent with the development standards in the Municipal Code.
5. Site Design
The site design of the project is compatible with surrounding
development and with the quality of design prevalent in the City.
6. Landscape Design
The proposed project is consistent with the landscaping standards
and plant palette and implements the standards for landscaping and
aesthetics established in the General Plan and Zoning Code.
Planning Commission Resolution 2019-011
Site Development Permit 2019-0002, Zone Change 2019-0002, Variance 2019-0001, and Environmental
Assessment 2019-0002
Starbucks
Adopted: November 12, 2019
Page 4 of 11
Landscape improvements are designed and sized to provide visual
appeal. The permanent overall site landscaping utilizes various tree
and shrub species to enhance the building architecture, be
compatible with existing landscaping surrounding the building, and
helps provide adequate screening for the drive -through.
Zone Change 2019-0002
WHEREAS, at said Public Hearing, upon hearing and considering all
testimony and arguments, if any, of all interested persons desiring to be
heard, said Planning Commission did make the following mandatory findings
pursuant to Section 9.220.010 of the La Quinta Municipal Code to justify
approval of said Zone Change from Neighborhood Commercial to Community
Commercial:
7. Consistency with General Plan
The proposed development is consistent with the General Plan land
use designation of General Commercial. The City's General Plan
policies relating to General Commercial encourage a full range of
commercial uses within the City, and the proposed use maintains
those policies. The proposed project is consistent with the following
Goals, Programs, and Policies:
• Goal LU-6 and ED-1 as it will contribute to a balanced and
varied economic base which provides fiscal stability to the
City and provide a broad range of goods and services to its
residents and region. The Zone Change will allow for more
options for the subject site to provide broader range of goods
and services.
■ Program CIR-1.12.a: Locate land uses that provide jobs and
housing near each other to allow the use of alternative modes
of travel and produce shorter work commutes. The project
will have access to existing adjacent Villa Cortina Apartments
and Seasons residential development, providing an
opportunity for jobs and housing near each other. Housing
developments are also to the south, west and east of the
project site.
• Policy ED-1.2 as it will support and assist in the retention of
existing businesses and the recruitment of new businesses.
This proposal is for the retention of an existing Starbucks to
Planning Commission Resolution 2019-011
Site Development Permit 2019-0002, Zone Change 2019-0002, Variance 2019-0001, and Environmental
Assessment 2019-0002
Starbucks
Adopted: November 12, 2019
Page 5 of 11
construct a new building within the same shopping center.
The Zone Change will allow for more uses within the center,
opening up new opportunities for recruitment of new
businesses. Drive-throughs are an attractive use in
facilitating the recruitment of new businesses.
• Policy ED-1.3 as it will encourage the expansion of the Village
as a specialty retail, dining and residential destination. The
project site is located within the Village Build Out Plan, and
the zone change allows the subject site to have more uses
consistent with Village Commercial district, enhancing the
Village area as a specialty retail, dining and residential
destination.
• Policy ED-1.5 which states projects proposed on commercial
land shall be evaluated for their job creating and revenue
generating potential. This project will allow for more options
for the subject site to allow for more job and revenue
opportunities.
8. Public Welfare
Approval of the zone map change will not create conditions materially
detrimental to the public health, safety and general welfare.
9, Land Use Compatibility
The new zoning is compatible with the zoning on adjacent properties.
The project site is located within the Village Build Out Plan, and the
zone change allows the subject site to have more uses consistent with
the surrounding Village Commercial district. The new zoning district is
intended to meet the needs of a multi -neighborhood area. The project
site is located in an area that does serve multiple neighborhoods as it
abuts existing apartment developments, is in close proximity to the
Cove, residential homes east of Washington Street, residential
communities on the intersection of Washington Street and Avenue 50,
and residential communities north and south of Avenue 52, including
future residential community at SilverRock. The property would be
similar in purpose and size to other Community Commercial sites
throughout the City.
Planning Commission Resolution 2019-011
Site Development Permit 2019-0002, Zone Change 2019-0002, Variance 2019-0001, and Environmental
Assessment 2019-0002
Starbucks
Adopted: November 12, 2019
Page 6of11
10. Property Suitability
The new zoning is suitable and appropriate for the subject property.
The project site is located within the Village Build Out Plan, and the
zone change allows the subject site to have more uses consistent with
the surrounding Village Commercial district. The new zoning district is
intended to meet the needs of a multi -neighborhood area. The project
site is located in an area that does serve multiple neighborhoods as it
abuts existing apartment developments, is in close proximity to the
Cove, residential homes east of Washington Street, residential
communities on the intersection of Washington Street and Avenue 50,
and residential communities north and south of Avenue 52, including
future residential community at SilverRock. The property would be
similar in purpose and size to other Community Commercial sites
throughout the City.
11. Chanoe in Circumstances.
Approval of the zone map change is warranted because the situation
and the general conditions of the property have substantially changed
since the existing zoning was imposed. The existing zoning was
imposed in 1991. Since that time, the areas surrounding the subject
site have developed into multiple residential neighborhoods and the
nearby Village Commercial district has developed. The project site is
located within the Village Build Out Plan, and the zone change allows
the subject site to have more uses consistent with the surrounding
Village Commercial district. The new zoning district is intended to
meet the needs of a multi -neighborhood area, whereas the current
zoning district is intended to serve a singular neighborhood area. The
project site is located in an area that does serve multiple
neighborhoods as it is in close proximity to the Cove, residential
homes east of Washington Street, residential communities on the
intersection of Washington Street and Avenue 50, and residential
communities north and south of Avenue 52, including future residential
community at SilverRock. The property would be similar in purpose
and size to other Community Commercial sites throughout the City.
Variance 2019-0001
WHEREAS, at said Public Hearing, upon hearing and considering all
testimony and arguments, if any, of all interested persons desiring to be
Planning Commission Resolution 2019-011
Site Development Permit 2019-0002, Zone Change 2019-0002, Variance 2019-0001, and Environmental
Assessment 2019-0002
Starbucks
Adopted: November 12, 2019
Page 7 of 11
heard, said Planning Commission did make the following mandatory findings
pursuant to Section 9.210.030 of the La Quinta Municipal Code to justify
approval of said Variance
12. Consistency with General Plan
The proposed development is consistent with the General Plan land
use designation of General Commercial. The City's General Plan
policies relating to General Commercial encourage a full range of
commercial uses within the City, and the proposed use maintains
those policies. The proposed project is consistent with the following
Goals, Programs, and Policies:
■ Goal LU-6 and ED-1 as it will contribute to a balanced and
varied economic base which provides fiscal stability to the
City and provide a broad range of goods and services to its
residents and region.
• Goal LU-2 as the project consists of high quality design that
complements and enhances the City. The design of project
incorporates existing architectural style within commercial
center but enhances it with modern architectural elements as
well as stone veneer and wooden trellis.
• Program CIR-1.12.a: Locate land uses that provide jobs and
housing near each other to allow the use of alternative modes
of travel and produce shorter work commutes. The project
will be developed with access to existing Villa Cortina
Apartments and Seasons residential development, providing
an opportunity for jobs and housing near each other. Housing
developments are also to the south, west and east of the
project site.
• Policy CIR-1.16 which states to continue to implement the
Image Corridor treatments throughout the City. This project
maintains a height under 22 feet within the first 150 feet from
Washington Street, an image corridor, which is consistent
with the Image Corridor standards.
• Policy ED-1.2 as it will support and assist in the retention of
existing businesses and the recruitment of new businesses.
This proposal is for the retention of an existing Starbucks to
construct a new building within the same shopping center.
• Policy ED-1.5 which states projects proposed on commercial
land shall be evaluated for their job creating and revenue
generating potential. This project's scope and operations will
Planning Commission Resolution 2019-011
Site Development Permit 2019-0002, Zone Change 2019-0002, Variance 2019-0001, and Environmental
Assessment 2019-0002
Starbucks
Adopted: November 12, 2019
Page 8 of 11
create jobs and lead to annual sales tax and generate transit
occupancy tax revenue for the City.
13. Consistency with Zoning Code
The proposed development, as conditioned, is consistent with the
development standards of the City's Zoning Code and the purpose and
intent of the Community Commercial District. The Community
Commercial district is intended to meet the needs of a multi -
neighborhood area. The project site is located in an area that does
serve multiple neighborhoods as it abuts existing apartment
developments, is in close proximity to the Cove, residential homes
east of Washington Street, residential communities on the intersection
of Washington Street and Avenue 50, and residential communities
north and south of Avenue 52, including future residential community
at SilverRock.
14. Coml2liance with California Environmental Quality Act CE A
The Design and Development Department has determined that the
proposed project is consistent with the mitigated negative declaration
approved for Plot Plan 91-456 and Environmental Assessment 91-187
and approved on April 16, 1991. As mentioned, the original approval
approved a shopping center under a 116,600 square foot of
commercial space build out. Subsequent amendments lowered this to
79,333 square feet, which is how it currently exists. This proposal
increases the square footage to 82,823, which is still well under the
original 116,600 square feet analyzed by the original environmental
assessment.
15. Surrounding Uses
As conditioned, approval of the application will not create conditions
materially detrimental to the public health, safety and general welfare
or injurious to or incompatible with other properties or land uses in the
vicinity.
16. Special Circumstances
There are special circumstances applicable to the subject property,
including size, shape, location and surrounding, which, when the
zoning regulations are strictly applied, deprive the property of
privileges enjoyed by other properties in the vicinity subject to the
Planning Commission Resolution 2019-011
Site Development Permit 2019-0002, Zone Change 2019-0002, Variance 2019-0001, and Environmental
Assessment 2019-0002
Starbucks
Adopted: November 12, 2019
Page 9of11
same zoning regulated. Special circumstances exist with the parcel
and building shape, location, and surrounding existing building and
facilities that require the proposed location to be the most feasible.
Special circumstances exist with the parcel shape, location, and
surrounding existing buildings and infrastructure that make it difficult
to orient the building to meet distance and exit queuing standards.
The building site is located within a narrow portion of a larger parcel
and other orientations of the building were not feasible. This
proposal is for an existing Starbucks within the Center to now open a
new building within same shopping center but not adhere to the
following drive -through standards:
- No drive -through facility shall be permitted within two
hundred feet of any residentially zoned or used property.
The applicant proposes to be 170 feet away.
- Exits from drive -through facilities shall be at least three
vehicles in length. The applicant proposes to be one vehicle
in length
All other La Quinta Municipal Code development standards were met.
Other orientations of the building were attempted but made quite
difficult due to the limited configuration of the project parcel and
location of existing buildings and infrastructure within the shopping
center. The building site is located within a narrow portion of a larger
parcel and other orientations of the building were not feasible.
17. Preservation of Property Rights
The granting of the variance is necessary for the preservation of a
substantial property right possessed by other property in the same
vicinity and zoning district and otherwise denied to the subject
property.
18. No Special Privileges
The conditions of approval assure that the adjustment authorized will
not constitute a grant of special privileges which are inconsistent with
the limitations placed upon other properties in the vicinity subject to
the same zoning regulations.
19. No Land Use Variance
The approval does not authorize a land use or activity which is not
permitted in the applicable zoning district. The applicant is proposing
Planning Commission Resolution 2019-011
Site Development Permit 2019-0002, Zone Change 2019-0002, Variance 2019-0001, and Environmental
Assessment 2019-0002
Starbucks
Adopted: November 12, 2019
Page 10 of 11
a zone change to Community Commercial which allows for drive
through facility.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission
of the City of La Quinta, California, as follows:
SECTION 1. That the above recitations are true and constitute the Findings
of the Planning Commission in this case.
SECTION 2. That the above project be determined to be consistent with
Environmental Assessment 91-187.
SECTION 3. That it does hereby approve of Site Development Permit 2019-
0002, for the reasons set forth in this Resolution and subject to the attached
Conditions of Approval.
SECTION 4. That it does hereby approve of Zone Change 2019-0002, for the
reasons set forth in this Resolution.
SECTION 5. That it does hereby approve of Variance 2019-0001, for the
reasons set forth in this Resolution.
PASSED, APPROVED, and ADOPTED at a regular meeting of the
City of La Quinta Planning Commission, held on this the 12th day of
November, 2019, by the following vote:
AYES: COMMISSIONERS BETTENCOURT, CURRIE, LIBOLT
VARNER, MCCUNE, NIETO, PROCTOR AND
CHAIRPERSON CALDWELL
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE
MARY CALDWELL, Chairperson
City of La Quinta, California
Planning Commission Resolution 2019-011
Site Development Permit 2019-0002, Zone Change 2019-0002, Variance 2019-0001, and Environmental
Assessment 2019-0002
Starbucks
Adopted: November 12, 2019
Page 11of11
AT EST:
DANNY CASTRQ, Design and Development Director
City of La Quinta, California
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 1 of 14
GENERAL
1. The applicant agrees to defend, indemnify and hold harmless the City of La
Quinta ("City"), its agents, officers and employees from any claim, action or
proceeding to attack, set aside, void, or annul the approval of this Site
Development Permit. The City shall have sole discretion in selecting its
defense counsel.
The City shall promptly notify the applicant of any claim, action or proceeding
and shall cooperate fully in the defense.
2. Site Development Permit 2019-0002 shall comply with all applicable conditions
and/or mitigation measures for the following related approvals:
Environmental Assessment 2019-0002
Variance 2019-0001
Zone Change 2019-0002
Plot Plan 91-456, Amendments 1 and 2
Environmental Assessment 91-187
In the event of any conflict(s) between approval conditions and/or provisions
of these approvals, the Design and Development Director shall adjudicate the
conflict by determining the precedence.
3. Prior to the issuance of any grading, construction, or building permit by the
City, the applicant shall obtain any necessary clearances and/or permits from
the following agencies, if required:
• Riverside County Fire Marshal
La Quinta Development Division (Grading Permit, Green Sheet (Public
Works Clearance) for Building Permits, Water Quality Management Plan
(WQMP) Exemption Form - Whitewater River Region, Improvement
Permit)
• La Quinta Planning Division
• Riverside Co. Environmental Health Department
• Desert Sands Unified School District (DSUSD)
■ Coachella Valley Water District (CVWD)
• Imperial Irrigation District (IID)
• California Regional Water Quality Control Board (CRWQCB)
• State Water Resources Control Board
• SunLine Transit Agency (SunLine)
■ South Coast Air Quality Management District Coachella Valley (SCAQMD)
Page 1of14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 2 of 14
The applicant is responsible for all requirements of the permits and/or
clearances from the above listed agencies. When these requirements include
approval of improvement plans, the applicant shall furnish proof of such
approvals when submitting those improvements plans for City approval.
4. Coverage under the State of California Construction General Permit must be
obtained by the applicant; who then shall submit a copy of the Regional Water
Quality Control Board's ("RWQCB") acknowledgment of the applicant's Notice
of Intent ("NOI") and Waste Discharger Identification (WDID) number to the
City prior to the issuance of a grading or building permit.
5. The applicant shall comply with applicable provisions of the City's NPDES
stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater
Management and Discharge Controls), and 13.24.170 (Clean Air/Clean
Water); Riverside County Ordinance No. 457; the California Regional Water
Quality Control Board — Colorado River Basin Region Board Order No. R7-
2013-0011 and the State Water Resources Control Board's Order No. 2012-
0006-DWQ.
A. For construction activities including clearing, grading or excavation of
land that disturbs one (1) acre or more of land, or that disturbs less
than one (1) acre of land, but which is a part of a construction project
that encompasses more than one (1) acre of land, the Permitee shall be
required to submit a Storm Water Pollution Protection Plan ("SWPPP") to
the State Water Resources Control Board.
The applicant or design professional can obtain the California
Stormwater Quality Association SWPPP template at
www.cabmphandbooks.com for use in their SWPPP preparation.
B. The applicant shall ensure that the required SWPPP is available for
inspection at the project site at all times through and including
acceptance of all improvements by the City.
C. The applicant's SWPPP shall include provisions for all of the following
Best Management Practices ("BMPs") (LQMC Section 8.70.020
(Definitions)) :
1) Temporary Soil Stabilization (erosion control).
2) Temporary Sediment Control.
3) Wind Erosion Control.
4) Tracking Control.
5) Non -Storm Water Management.
Page 2 of 14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 3 of 14
6) Waste Management and Materials Pollution Control.
D. All erosion and sediment control BMPs proposed by the applicant shall
be approved by the City Engineer prior to any onsite or offsite grading,
pursuant to this project.
E. The SWPPP and BMPs shall remain in effect for the entire duration of
project construction until all improvements are completed and accepted
by the City Council.
F. The provision for the funding and perpetual maintenance and operation
of all post -construction BMPs as required.
6. Developer shall reimburse the City, within thirty (30) days of presentment of
the invoice, all costs and actual attorney's fees incurred by the City Attorney
to review, negotiate and/or modify any documents or instruments required by
these conditions, if Developer requests that the City modify or revise any
documents or instruments prepared initially by the City to effect these
conditions. This obligation shall be paid in the time noted above without
deduction or offset and Developer's failure to make such payment shall be a
material breach of the Conditions of Approval.
7. Developer shall reimburse the City, within thirty (30) days of presentment of
the invoice, all costs and actual consultant's fees incurred by the City for
engineering and/or surveying consultants to review and/or modify any
documents or instruments required by this project. This obligation shall be
paid in the time noted above without deduction or offset and Developer's
failure to make such payment shall be a material breach of the Conditions of
Approval.
PROPERTY RIGHTS
8. Prior to issuance of any permit(s), the applicant shall acquire or confer
easements and other property rights necessary for the construction or proper
functioning of the proposed development. Conferred rights shall include
irrevocable offers to dedicate or grant access easements to the City for
emergency services and for maintenance, construction and reconstruction of
essential improvements. Said conferred rights shall also include grant of
access easement to the City of La Quinta for the purpose of graffiti removal by
City staff or assigned agent in perpetuity and agreement to the method to
remove graffiti and to paint over to best match existing.
9. Pursuant to the aforementioned condition, conferred rights shall include
property rights necessary for construction and proper functioning of the
Page 3 of 14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 4 of 14
proposed development not limited to access rights over proposed and/or
existing parking lot that access public streets and open space/drainage
facilities.
10. Direct vehicular access to Washington Street and Calle Tampico is restricted,
except for those access points identified on the Site Development Permit, or as
otherwise conditioned in these conditions of approval.
11. The applicant shall furnish proof of easements, or written permission, as
appropriate, from those owners of all abutting properties on which grading,
retaining wall construction, permanent slopes, or other encroachments will
occu r.
12. The applicant shall cause no easement to be granted, or recorded, over any
portion of the subject property unless such easement is approved by the City
Engineer.
PARKING LOTS and ACCESS POINTS
13. The design of parking facilities shall conform to LQMC Chapter 9.150 and in
particular the following:
A. The parking stall and aisle widths and the double hairpin stripe parking
space design shall conform to LQMC Chapter 9.150.
B. Cross slopes should be a maximum of 2% where ADA accessibility is
required including accessibility routes between buildings.
C. Building access points shall be shown on the Precise Grading Plans to
evaluate ADA accessibility issues.
D. Accessibility routes to public streets and adjacent development shall be
shown on the Precise Grading Plan.
E. Parking space lengths shall be according to LQMC Chapter 9.150 and be
a minimum of 18 feet in length with a 2-foot overhang for all parking
spaces or as approved by the City Engineer. One van accessible parking
space is required per 6 accessible parking spaces.
F. Drive aisles between parking spaces shall be a minimum of 26 feet with
access drive aisles to Public Streets a minimum of 28 feet as shown on
the Preliminary Precise Grading Plan or as approved by the City
Engineer.
Page 4 of 14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 5 of 14
Entry drives, main interior circulation routes, corner cutbacks, bus turnouts,
dedicated turn lanes, ADA accessibility route to public streets and other
features shown on the approved construction plans, may require additional
street widths and other improvements as may be determined by the City
Engineer.
14. The applicant shall design street pavement sections using CalTrans' design
procedure for 20-year life pavement, and the site -specific data for soil
strength and anticipated traffic loading (including construction traffic).
Minimum structural sections shall be as follows:
Parking Lot & Aisles (Low Traffic) 3.0" a.c./4.5" c.a.b.
Parking Lot & Aisles (High Traffic) 4.5" a.c./5.5" c.a.b.
Loading Areas 6" P.C.C./V c.a.b.
or the approved equivalents of alternate materials.
15. The applicant shall submit current mix designs (less than two years old at the
time of construction) for base, asphalt concrete and Portland cement concrete.
The submittal shall include test results for all specimens used in the mix
design procedure. For mix designs over six months old, the submittal shall
include recent (less than six months old at the time of construction) aggregate
gradation test results confirming that design gradations can be achieved in
current production. The applicant shall not schedule construction operations
until mix designs are approved.
16. Improvements shall include appurtenances such as traffic control signs,
markings and other devices, raised medians if required, street name signs and
sidewalks.
17. Improvements shall be designed and constructed in accordance with City
adopted standards, supplemental drawings and specifications, or as approved
by the City Engineer. Improvement plans for streets, access gates and
parking areas shall be stamped and signed by engineers registered in
California.
IMPROVEMENT PLANS
As used throughout these Conditions of Approval, professional titles such as
Axengineer," "surveyor," and "architect," refer to persons currently certified or
licensed to practice their respective professions in the State of California.
Page 5 of 14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 6 of 14
18. Improvement plans shall be prepared by or under the direct supervision of
qualified engineers and/or architects, as appropriate, and shall comply with
the provisions of LQMC Section 13.24.040 (Improvement Plans).
19. The following improvement plans shall be prepared and submitted for review
and approval by the Design and Development Department. A separate set of
plans for each line item specified below shall be prepared. The plans shall
utilize the minimum scale specified, unless otherwise authorized by the City
Engineer in writing. Plans may be prepared at a larger scale if additional detail
or plan clarity is desired. Note, the applicant may be required to prepare
other improvement plans not listed here pursuant to improvements required
by other agencies and utility purveyors.
A. Final WQMP
(Plan submitted in Report Form)
B. On -Site Precise Grading Plan 1" = 20' Horizontal
NOTE: A through B to be submitted concurrently.
(Separate Storm Drain Plans if applicable)
Other engineered improvement plans prepared for City approval that are not
listed above shall be prepared in formats approved by the City Engineer prior
to commencing plan preparation.
"On -Site Precise Grading" plan is required to be submitted for approval by the
Building Official, Design and Development Director, and the City Engineer.
"On -Site Precise Grading" plans shall normally include all on -site surface
improvements including but not necessarily limited to finish grades for curbs &
gutters, building floor elevations, parking lot improvements and accessibility
requirements.
All On -Site Signing & Striping Plans shall show, at a minimum; Stop Signs,
Limit Lines and Legends, No Parking Signs, Raised Pavement Markers
(including Blue RPMs at fire hydrants) and Street Name Signs per Public Works
Standard Plans and/or as approved by the City Engineer.
20. The City maintains standard plans, detail sheets and/or construction notes for
elements of construction which can be accessed via the Public Works
Development "Plans, Notes and Design Guidance" section of the City website
(www.laquintaca.gov). Please navigate to the Design and Development
Department home page and look for the Standard Drawings hyperlink.
Page 6 of 14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 7 of 14
21. The applicant shall furnish a complete set of all approved improvement plans
on a storage media acceptable to the City Engineer.
22. Upon completion of construction, and prior to final acceptance of the
improvements by the City, the applicant shall furnish the City with
reproducible record drawings of all improvement plans which were approved
by the City. Each sheet shall be clearly marked "Record Drawing" and shall be
stamped and signed by the engineer or surveyor certifying to the accuracy and
completeness of the drawings. The applicant shall have all approved mylars
previously submitted to the City, revised to reflect the as -built conditions. The
applicant shall employ or retain the Engineer of Record during the construction
phase of the project so that the FOR can make site visits in support of
preparing "Record Drawing". However, if subsequent approved revisions have
been approved by the City Engineer and reflect said "Record Drawing"
conditions, the Engineer of Record may submit a letter attesting to said fact to
the City Engineer in lieu of mylar submittal.
GRADING
23. The applicant shall comply with the provisions of LQMC Section 13.24.050
(Grading Improvements).
24. Prior to occupancy of the project site for any construction, or other purposes,
the applicant shall obtain a grading permit approved by the City Engineer.
25. To obtain an approved grading permit, the applicant shall submit and obtain
approval of all of the following:
A. A grading plan prepared by a civil engineer registered in the State of
California,
B. A preliminary geotechnical ("soils") report prepared by an engineer
registered in the State of California,
C. A Fugitive Dust Control Plan prepared in accordance with LQMC Chapter
6.16, (Fugitive Dust Control), and
D. A Best Management Practices report prepared in accordance with LQMC
Sections 8.70.010 and 13.24.170 (NPDES Stormwater Discharge Permit
and Storm Management and Discharge Controls).
E. A WQMP prepared by an appropriate professional registered in the State
of California.
Page 7 of 14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 8 of 14
All grading shall conform with the recommendations contained in the
Preliminary Soils Report, and shall be certified as being adequate by soils
engineer, or engineering geologist registered in the State of California.
The applicant shall furnish security, in a form acceptable to the City, and in an
amount sufficient to guarantee compliance with the approved Fugitive Dust
Control Plan provisions as submitted with its application for a grading permit.
Additionally, the applicant shall replenish said security if expended by the City
of La Quinta to comply with the Plan as required by the City Engineer.
26. The applicant shall maintain all open graded, undeveloped land in order to
prevent wind and/or water erosion of such land. All open graded,
undeveloped land shall either be planted with interim landscaping, or stabilized
with such other erosion control measures, as were approved in the Fugitive
Dust Control Plan.
27. Grading within the perimeter setback and parkway areas shall have undulating
terrain and shall conform with the requirements of LQMC Section 9.60.240(F)
except as otherwise modified by this condition. The maximum slope shall not
exceed 3:1 anywhere in the landscape setback area, except for the backslope
(i.e. the slope at the back of the landscape lot) which shall not exceed 2:1 if
fully planted with ground cover. The maximum slope in the first six (6) feet
adjacent to the curb shall not exceed 4:1 when the nearest edge of sidewalk is
within six feet (6') of the curb, otherwise the maximum slope within the right
of way shall not exceed 3:1. All unpaved parkway areas adjacent to the curb
shall be depressed one and one-half inches (1.5") in the first eighteen inches
(18") behind the curb.
28. Building pad elevations on the grading plan submitted for City Engineer's
approval shall conform with pad elevations shown on the Site Development
Permit preliminary plan, unless the pad elevations have other requirements
imposed elsewhere in these Conditions of Approval, or as approved by the City
Engineer.
29. Building pad elevations of perimeter lots shall not differ by more that one foot
higher from the building pads in adjacent developments.
30. Prior to any site grading or regrading that will raise or lower any portion of the
site by more than plus or minus half of a foot (0.5') from the elevations shown
on the approved Site Development Permit, the applicant shall submit the
proposed grading changes to the City Engineer for a substantial conformance
review.
Page 8 of 14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 9 of 14
31. Prior to the issuance of a building permit for any building lot, the applicant
shall provide a lot pad certification stamped and signed by a qualified engineer
or surveyor with applicable compaction tests and over excavation
documentation.
Each pad certification shall list the pad elevation as shown on the approved
grading plan, the actual pad elevation and the difference between the two, if
any. Such pad certification shall also list the relative compaction of the pad
soil.
DRAINAGE
32. Stormwater handling shall conform with the approved hydrology and drainage
reports for the La Quinta Starbucks (SDP2019-0002), or as approved by the
City Engineer.
Nuisance water shall be retained onsite and disposed of via an underground
percolation improvement approved by the City Engineer.
33. The applicant shall comply with the provisions of LQMC Section 13.24.120
(Drainage), Retention Basin Design Criteria, Engineering Bulletin No. 06-16 -
Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain
Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin
Design Requirements. More specifically, stormwater failing on site during the
100-year storm shall be retained within the development, unless otherwise
approved by the City Engineer. The design storm shall be either the 1-hour, 3-
hour, 6-hour or 24-hour event producing the greatest total run off.
34. Nuisance water shall be retained on site. Nuisance water shall be disposed of
per approved methods contained in Engineering Bulletin No. 06-16 -
Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain
Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin
Design Requirements.
35. In design of retention facilities, the maximum percolation rate shall be two
inches per hour. The percolation rate will be considered to be zero unless the
applicant provides site specific data indicating otherwise and as approved by
the City Engineer.
36. The project shall be designed to accommodate purging and blowoff water
(through underground piping and/or retention facilities) from any on -site or
adjacent well sites granted or dedicated to the local water utility authority as a
requirement for development of this property.
Page 9 of 14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 10 of 14
37. No fence or wall shall be constructed around any retention basin unless
approved by the Planning Director and the City Engineer.
38. For on -site above ground common retention basins, retention depth shall be
according to Engineering Bulletin No. 06-16 - Hydrology Report with
Preliminary Hydraulic Report Criteria for Storm Drain Systems. Side slopes
shall not exceed 3:1 and shall be planted with maintenance free ground cover.
Additionally, retention basin widths shall be not less than 20 feet at the
bottom of the basin.
39. Stormwater may not be retained in landscaped parkways or landscaped
setback lots. Only incidental storm water (precipitation which directly falls onto
the setback) will be permitted to be retained in the landscape setback areas.
The perimeter setback and parkway areas in the street right-of-way shall be
shaped with berms and mounds, pursuant to LQMC Section 9.100.040(B)(7).
40. The design of the development shall not cause any increase in flood
boundaries and levels in any area outside the development.
41. The development shall be graded to permit storm flow in excess of retention
capacity to flow out of the development through a designated overflow and
into the historic drainage relief route.
42. Storm drainage historically received from adjoining property shall be received
and retained or passed through into the historic downstream drainage relief
route.
43. The applicant shall comply with applicable provisions for post construction
runoff per the City's NPDES stormwater discharge permit, LQMC Sections
8.70.010 et seq. (Stormwater Management and Discharge Controls), and
13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; and
the California Regional Water Quality Control Board - Colorado River Basin
(CRWQCB-CRB) Region Board Order No. R7-2013-0011.
A. For post -construction urban runoff from New Development and
Redevelopments Projects, the applicant shall implement requirements of
the NPDES permit for the design, construction and perpetual operation
and maintenance of BMPs per the approved Water Quality Management
Plan (WQMP) for the project as required by the California Regional
Water Quality Control Board - Colorado River Basin (CRWQCB-CRB)
Region Board Order No. R7-2013-0011.
B. The applicant shall implement the WQMP Design Standards per
(CRWQCB-CRB) Region Board Order No. R7-2013-0011 utilizing BMPs
Page 10 of 14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 11 of 14
approved by the City Engineer. A project specific WQMP shall be
provided which incorporates Site Design and Treatment BMPs utilizing
first flush infiltration as a preferred method of NPDES Permit Compliance
for Whitewater River receiving water, as applicable.
C. The developer shall execute and record a Stormwater Management/BMP
Facilities Agreement that provides for the perpetual maintenance and
operation of all post -construction stormwater BMPs.
UTILITIES
44. The applicant shall comply with the provisions of LQMC Section 13.24.110
(Utilities).
45. The applicant shall obtain the approval of the City Engineer for the location of
all utility lines within any right-of-way, and all above -ground utility structures
including, but not limited to, traffic signal cabinets, electric vaults, water
valves, and telephone stands, to ensure optimum placement for practical and
aesthetic purposes.
46. Underground utilities shall be installed prior to overlying hardscape. For
installation of utilities in existing improved streets, the applicant shall comply
with trench restoration requirements maintained, or required by the City
Engineer.
The applicant shall provide certified reports of all utility trench compaction for
approval by the City Engineer. Additionally, grease traps and the maintenance
thereof shall be located as to not conflict with access aisles/entrances.
RIVERSIDE COUNTY FIRE MARSHAL
47. A set of building plans shall be submitted to the Fire Marshal's office for review
48. A fire flow letter will need to be submitted no or before building plan submittal.
A minimum of 1,750 gpm for a 2-hour duration at 20 psi residual is required.
49. A water review will need to be assessed to dictate the need to ad an additional
fire hydrant to protect new proposed structure.
CONSTRUCTION
50. Project address location shall be updated to 50951 Washington Street as
assigned by the Building Division. If alternate address is requested, please
provide formal request to the City's Building Official.
Page 11 of 14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 12 of 14
51. Plans shall be prepared to the applicable code at the time of submittal for the
building permit, currently the 2016 California Building Standards, but will
change to the 2019 California Building standards as of January 2020.
52. Any building, structure, facility, complex or improved area, or portions thereof,
which are used by the general public shall be provided barrier free design to
ensure that these improvements are accessible to and usable by persons with
disabilities. Plans shall fully detail how the proposed facility complies with the
California Accessibility Standards defined in Title 24 Chapter 11B and Federal
ADA Regulations. More information is available through the States website as
part of AB 3002 here: https://www.dgs.ca.gov/DSA/Resources/Page-
Content/Resources-List-Folder/AB-3002
53. The City will conduct final inspections of habitable buildings only when the
buildings have improved street and (if required) sidewalk access to publicly -
maintained streets. The improvements shall include required traffic control
devices, pavement markings and street name signs.
LANDSCAPE AND IRRIGATION
54. The applicant shall comply with LQMC Sections 13.24.130 (Landscaping
Setbacks) & 13.24.140 (Landscaping Plans).
55. Landscape and irrigation plans for landscaped lots and setbacks, medians,
retention basins, and parks shall be signed and stamped by a licensed
landscape architect.
56. All new and modified landscape areas shall have landscaping and permanent
irrigation improvements in compliance with the City's Water Efficient
Landscape regulations contained in LQMC Section 8.13 (Water Efficient
Landscape).
57. Lighting plans shall be submitted with the final landscaping plans for a
recommendation to the Design and Development Director for his approval.
Exterior lighting shall be consistent with LQMC Section 9.100.150 (Outdoor
Lighting). All freestanding lighting shall not exceed 18 feet in height, and shall
be fitted with a visor if deemed necessary by staff to minimize trespass of light
off the property. The illuminated carports shall be included in the photometric
study as part of the final lighting plan submittal.
58. All water features shall be designed to minimize "splash", and use high
efficiency pumps and lighting to the satisfaction of the Design and
Development Director. They shall be included in the landscape plan water
efficiency calculations per Municipal Code Chapter 8.13.
Page 12 of 14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 13 of 14
59. All rooftop mechanical equipment shall be completely screened from view.
Utility transformers or other ground mounted mechanical equipment shall be
fully screened with a screening wall or landscaping and painted to match the
adjacent buildings.
60. The applicant shall submit the final landscape plans for review, processing and
approval to the Design and Development Department, in accordance with the
Final Landscape Plan application process. Design and Development Director
approval of the final landscape plans is required prior to issuance of the first
building permit unless the Design and Development Director determines
extenuating circumstances exist which justifies an alternative processing
schedule. The final landscape plans shall include a low wall/barrier and
planter -buffer between the parking lot and outdoor patio.
NOTE: Plans are not approved for construction until signed by the appropriate
City official, including the Design and Development Director and/or City
Engineer.
61. The applicant or his agent has the responsibility for proper sight distance
requirements per guidelines in the AASHTO "A Policy on Geometric Design of
Highways and Streets, 5th Edition" or latest, in the design and/or installation
of all landscaping and appurtenances abutting and within the private and
public street right-of-way.
62. The final design of the perimeter landscaping, particularly the perimeter wall,
shall be included with the Final Landscape Plan submittal.
PUBLIC SERVICES
63. The applicant shall provide public transit improvements if required by SunLine
Transit Agency and approved by the City Engineer.
64. Consistent with the letter provided by Sunline dated May 3, 2019, the existing
bus stop #869 located on the northwest corner of Calle Tampico and
Washington Street could be impacted by the improvement project. According
to the proposed plans, bus stop #869 may need to be temporarily closed while
work is being performed at that located. Contractor performing work shall
contact Sunline at least thirty (30) days in advance of work commencing so
arrangements can be made to have the existing amenities closed or removed.
MAINTENANCE
65. The applicant shall comply with the provisions of LQMC Section 13.24.160
(Maintenance).
Page 13 of 14
PLANNING COMMISSION RESOLUTION 2019-011
CONDITIONS OF APPROVAL - APPROVED
SITE DEVELOPMENT PERMIT 2019-0002
STARBUCKS
ADOPTED: NOVEMBER 12, 2019
Page 14 of 14
66. The applicant shall make provisions for the continuous and perpetual
maintenance of all private on -site improvements, perimeter landscaping up to
the curb, access drives, sidewalks, and stormwater BMPs.
FEES AND DEPOSITS
67. The applicant shall comply with the provisions of LQMC Section 13.24.180
(Fees and Deposits). These fees include all deposits and fees required by the
City for plan checking and construction inspection. Deposits and fee amounts
shall be those in effect when the applicant makes application for plan check
and permits.
68. Permits issued under this approval shall be subject to the provisions of the
Development Impact Fee and Transportation Uniform Mitigation Fee programs
in effect at the time of issuance of building permit(s).
69. The applicant shall return to the Planning Commission within six (6) months of
receiving a certificate of occupancy to review the implementation of the drive -
through stacking, circulation, and directional signage and the Planning
Commission or applicant may propose any additional condition necessary or
proper to improve such operation.
Page 14 of 14